You are on page 1of 1

CONCRETE CRUSHING CHECK

Project :- PIPELINE REPALCEMENT PROJECT-3


20" OD x 20.6 mm WT x 50mm CWC pipe @ 86.9m WD ( HAT)
1.0 Scope
This worksheet assesses the adequacy of the pipe concrete coating crush check in
accordance with DNV 2000, Offshore Standard OS-F101, Submarine Pipeline Systems,
Section 12, K 200, p 108.
2.0 Inputs
_Pipe OD

D := 508 mm

_Modulus of Elasticity

E := 196500MPa
Ieff := 102000cm

_Maximum Bending Moment (Extracted from offpipe output)

M := 1166kN m
R := E

_Effective Moment of Inertia

Ieff
M

R = 171.895 m

_Minimum Overbend Radius

eaxial := 0.00%

_Minimum Axial (tensile) Strain at Overbend Area (conservatively set at zero)

ecc := 0.2%

_0.2% if no other information is available.


For concrete coating of
40mm - 0.22% for
42" P/L and 0.24% for 16" P/L, w/linear interpolation
(negative value denotes compressive strain)

cc := 1.05

_Safety Factor for Concrete Crushing

3.0 Calculation
Calculated Mean Overbend Starin
emean :=

D
2 R

+ eaxial

emean = 0.1478 %
Note: Limit mean strain giving crushing of the concrete. Positive strain denotes tensile strain.
This Should Satisfy

cc emean ecc

cc emean = 0.1552 %

Result := if cc emean ecc , "OK" , "FAILED"

Result = "OK"

Page 1 of 1
Date: 19/12/2013

You might also like