ANALISA HARGA SATUAN

NO

URAIAN

1.000 M'
3

0.012 M
0.020 Kg
0.007
0.100
0.100
0.010
0.005
II
1

M
Oh
Oh
Oh
Oh

Kayu usuk 5/7 ( kruwing )


Paku reng

3,500,000.00
16,000.00

42,000.00
320.00

Kayu papan 3/20 ( meranti )


Tukang kayu
Pekerja
Kepala tukang kayu
Mandor

3,000,000.00
85,000.00
65,000.00
90,000.00
95,000.00
Total :

21,000.00

3
1.000 M
0.192 Oh
0.019 Oh

Urugan kembali
Pekerja
Mandor

3
1.000 M
0.500 Oh
0.050 Oh

Pemadatan tanah
Pekerja
Mandor

3
1.000 M

Urugan pasir

1.200 M
0.300 Oh
0.010 Oh

Pasir urug
Pekerja
Mandor

3
1.000 M

Urugan sirtu

1.200 M
0.250 Oh
0.025 Oh

Sirtu di bawah lantai


Pekerja
Mandor

3
1.000 M

Urugan tanah

1.200 M
0.300 Oh
0.010 Oh

HARGA UPAH
(Rp.)
6

JUMLAH
HARGA (Rp.)
7

Pengukuran & pemasangan bouwplank

PEKERJAAN TANAH
3
1.000 M Galian tanah biasa sedalam 1 meter
0.400 Oh Pekerja
0.040 Oh Mandor

HARGA SATUAN HARGA BAHAN


( Rp.)
(Rp.)
4
5

Tanah urug
Pekerja
Mandor

42,000.00
320.00
8,500.00
6,500.00
900.00
475.00
16,375.00

21,000.00
8,500.00
6,500.00
900.00
475.00
79,695.00

65,000.00
95,000.00
Total :

26,000.00
3,800.00
29,800.00

26,000.00
3,800.00
29,800.00

65,000.00
95,000.00
Total :

12,480.00
1,805.00
14,285.00

12,480.00
1,805.00
14,285.00

65,000.00
95,000.00
Total :

32,500.00
4,750.00
37,250.00

32,500.00
4,750.00
37,250.00

19,500.00
950.00
20,450.00

60,000.00
19,500.00
950.00
80,450.00

16,250.00
2,375.00
18,625.00

84,873.60
16,250.00
2,375.00
103,498.60

19,500.00
950.00
20,450.00

48,000.00
19,500.00
950.00
68,450.00

63,320.00

50,000.00
65,000.00
95,000.00
Total :

60,000.00

70,728.00
65,000.00
95,000.00
Total :

84,873.60

40,000.00
65,000.00
95,000.00
Total :

48,000.00

60,000.00

84,873.60

48,000.00

NO

URAIAN

1
III
1

0.544
1.500
0.600
0.060
0.075

M
Oh
Oh
Oh
Oh

3
1.000 M
3

1.200 M
0.300
0.780
0.390
0.039
0.039
3

HARGA UPAH
(Rp.)
6

JUMLAH
HARGA (Rp.)
7

PEKERJAAN PONDASI
3
1.000 M Pasang pondasi batu kali 1 Pc : 5 Ps
1.100 M
136.000 Kg

HARGA SATUAN HARGA BAHAN


( Rp.)
(Rp.)
4
5

M
Oh
Oh
Oh
Oh

2
1.000 M

0.040
0.300
0.100
0.300
0.260
0.026
0.005

M
Kg
Ltr
Oh
Oh
Oh
Oh

Batu kali
Semen portland

110,000.00
1,020.00

121,000.00
138,720.00

Pasir pasangan
Pekerja
Tukang batu
Kepala Tukang
Mandor

135,000.00
65,000.00
85,000.00
90,000.00
95,000.00
Total :

73,440.00

333,160.00

110,000.00

132,000.00

50,000.00
65,000.00
85,000.00
90,000.00
95,000.00
Total :

15,000.00

121,000.00
138,720.00
97,500.00
51,000.00
5,400.00
7,125.00
161,025.00

73,440.00
97,500.00
51,000.00
5,400.00
7,125.00
494,185.00

Pasangan pondasi batu kosong


Batu kali
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor

147,000.00

132,000.00
50,700.00
33,150.00
3,510.00
3,705.00
91,065.00

15,000.00
50,700.00
33,150.00
3,510.00
3,705.00
238,065.00

19,500.00
22,100.00
2,340.00
475.00
44,415.00

44,500.00
4,800.00
2,328.75
19,500.00
22,100.00
2,340.00
475.00
96,043.75

Pasang bekisting untuk pondasi


Kayu terentang (Albesia)
Paku usuk
Minyak bekisting
Pekerja
Tukang kayu
Kepala Tukang
Mandor

1,112,500.00
16,000.00
23,287.50
65,000.00
85,000.00
90,000.00
95,000.00
Total :

44,500.00
4,800.00
2,328.75

51,628.75

Denpasar, 9 Maret 2015


Dibuat oleh,

DONI SETIAWAN ZEBUA

NO

URAIAN

HARGA SATUAN HARGA BAHAN


( Rp.)
(Rp.)
4
5

HARGA UPAH
(Rp.)
6

JUMLAH