You are on page 1of 4
Combined Group Company for Trading & Contracting W.L.L, ec sacyr Construccion S.A. For the period from April 2014 — Dec 2014 SL# TRAINING SUBJECT PARTICIPANTS a MANDATORY OPTIONAL 1. | HSE POLICY, Construction OVERVIEW OF PROJECT HSS PLAN, CLIENT'S WORK SITE SAFETY REGULATIONS, Managers, Engineers ‘DATE SCHEDULE 15 April -30 April 2014 HEAT STRESS & SUMMAR SAFETY. Workers 4 2 | GUIDELINES FOR HEAVY Equipment 20 May -30 May EQUIPMENTS OPERATIONS operators, 2014 = RISK ASSESSMENT AND Signalmen CONTROL MEASURES. Excavation = SIGNAL COMMUNICATIONS. Supervisors — HEAT STRESS&SUMMER SAFETY 3. | HSE POLICY, RESPONSIBILITY & General Foremen, ‘Lune ~ 15 June ACCOUNTABILITY FOR HEALTH Foremen, 2014 AND SAFETY OF EMPLOYEES AT _| Subcontractor’s Staff WORK. HEAT STRESS & SUMMER SAFETY CONFINED SPACE WORK PROCEDURE TRAINING. 4 | CLIENT'S WORK SITE SAFETY Construction ‘July —15 July REGULATIONS Managers, Engineers 2014 HEAT STRESS &SUMMER SAFETY |” General Foremen , Equipment 1 August ~ 20 CONFINED SPACE WORK Foremen, Operators ‘August 2013 PROCEDURE Subcontractor’s Staff 5 | BASIC CONCEPTS & THEORIES OF | Engineers, General 15 SEPT - 15 OCT ACCIDENT PREVENTION. Foremen, Foremen, 2014 GENERAL HAZARDS ON WORK SITE | Subcontractor’s staff AND PRECAUTIONS TO BE TAKEN ‘All workers. 5 | WORK PERMIT SYSTEM, Engineers, General 15 AUG ~ 30 AUG Purpose and Procedure Foremen, Foremen, Sub contractors’ 2014 Combined Group Company for Trading & Contracting JV Sacyr Construccion S.A. W.LL. Pree eee eeeere eee staff 6 | HOT WORK SAFETY PROCEDURES Fabrication / Subcontractors 1 SEPT 15 SEPT mechanical foremen. 2014 Welders and Fabricators 7 | WORKINSIDE CONFINED SPACES | GeneralForemen, | Skilled pipe fitters / | 1 SEPT-25 OCT - Deep Excavations Foremen. Labours 2014 - Manholes® Skilled pipe fitters / 1SEPT=25 OCT ~_ Tunnels. Labours 2014 8 | HEAVY EQUIPMENTS EXCAVATION Equipment 25 SEPT - 30 OCT | OPERATIONS - RISK ASSESSMENT FOREMEN , operators, 2014 i AND CONTROL MEASURES Subcontractors Banksmen ‘9 | MICROTUNNELING ~ RISK Microtunneling | 4 SEPT—15 SEPT ASSESSMENT subcontractor 2014 personnel 10 | SLURRY GROUT AND ANNULAR Microtunneling | 1SEPT—15 SEPT SPACE FILLING subcontractor 2014 personnel ae 12. | PRECAST YARD OPERATIONS — Precast Engineer, Steel fixers, 1 NOV-30 NOV RISK ASSESSMENT AND CONTROL | Foremen and Precast Carpenters 2014 MEASURES. workers 13 | CAUSES OF FIRE AND Engineers, Foremen, 1 DEC = 10 DEC PRECAUTIONS Subcontractor's staff 2014 All workers 11 DEC— 30 DEC 2014 Note: 1. Concerned Group leaders / Engineers / Manager shall give names of participants to conduct training on a convenient day within the date schedule given for each training. 2. Mandatory trainings should be attended by the category of participants as shown above. 3. Time of trainings shall vary from 45 minutes to 1 hr as per the subject. Prepared by: HSEManager | Approved by : Project Manage: Sign: Sign : 1qlo6leet qi Date Date Roads and Infrastructure Project in Al Kheesa North and East ET Tad Cole te) Project: [Roads & Infrastructure in Al Kheesa North&East. Phase 1 82. [Date Of Mock Drill: 17-06-2014 Scenario of Drill | Fire caught on a waste bin Kept outside Hyder Site Office near to Mosque . On suspecting that the fire will catch on the site office, Emergency siren was raised at site offices. All employees in site office proceed to Assembly point and Fire wardens extinguished the fire. Total time taken for the drill Total 15 minutes from start to end Stert time 08.00 AM End timo 08:15 AM No: of person evacuated 17 employees of M/s Parson and Mis hyder 42 employees of CGC-SACYR JV _(Total ~ 59 employees) Total persons worked in the Office area on the day 59 persons Members involved Observer of Mock-drill (Chief Coordinator ) Eng.Rizq Al Zoubi. (Project Manager ~ CGC-SACYR JV) Emergency actions coordinator Eng.Enrique Fajardo (HSE Manager) (Evacuation, Fire & Safety coordinators) Mr.Muhammd Iqubal&Mr.Loveson (Sr. HSE Officer) Fire controllers. Mr.Fernando, Mr.Ashok (HSE Officers) ~ Mr-Michael- CGC-SACYR JV Office Erpeuenon coarse MrJerin, ,Mr.Sreekumar - Hyder Office First aider Mr.Jibin (Site Nurse) Mock Drill Scenario Massive chemical spillage O | Fire Othere Electric shock | Medical Emergency | Fait from height o Time Line Time Event / Activity 0600 AM Emergency siren raised at Site offices of Hyder and CGC-SACYR JV. Informed Fire wardens and Site Nurse. Tania Employees stopped working. Switched off computers, AIC, lights , closed doors of their office rooms and began to proceed to Emergency Assembly Point. 08:03 AM Fire wardens proceeded to Fire incident site with Fire Extinguishers. 08.04 AM Fire wardens began to extinguish fire. 08:05 AM Site Nurse reached incident site 08.06 AM Evacuation completed. Allemployees including Top Management at Site offices reached Assembly Point Head counting of assembled employees started Roads and Infrastructure Project in Al Kheesa North and East €& MOCK DRILL REPORT ty Head counting of assembled employees completed. Conformed all employees reached Assembly point 08:08 AM Fire wardens completed extinguishing of fire 08.09 AM Site nurse conformed nobody is injured in the incident. ‘08.10 AM-08.12 AM | Fire wardens and Site Nurse reached Assembly point. They informed the fire has been extinguished and Nobody is injured. Project Manager Eng.Rizq Al Zoubi declared thal the emergency is over and that Bee ‘everybody can resume their offices.. 08.15 AM All employees resumed their offices /jobs. Observations : The scenario was planned and discussed among the involved emergency coordinators. Alll the participants played their role well. All employees of Hyder Parson and CGC -SACYR JV participated the emergency drill. The fire incident site was attended immediately by fire wardens and the fire was extinguished using the right type of fire extinguisher in a professional way. The response time taken by Site nurse to reach the incident site was also appreciable. Project Director observed and assessed the emergency procedures from time to time and declared the completion of the emergency after ensuring safe conditions are restored. He advised everybody to resume their offices. The drill was good and effective as per the program. However, following lapse was noticed which need to be improved in the event of emergencies. As follows: - Response time taken by some employees to reach the Assembly point was more than enough, CORRECTIVE ACTION TO BE TAKEN 1. Awareness will be created among all employees to proceed to Assembly point immediately on hearing Emergency siren. Drill controlled by Drill Monitored By Noted By Position Sr. HSE Officer HSE Manager Project Manager Name Mr.Muhammed Iqubal Eng.Enrique Fajardo Signature

You might also like