You are on page 1of 4

Listado Total de Insumos

Obra
Cliente
Ubicacion

IU Cdigo

MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE 4 EN EL PUEBLO JOVEN CALIFORNIA,


DISTRITO DE PAUCARPATA - AREQUIPA - AREQUIPA
MUNICIPALIDAD DISTRITAL DE PAUCARPATA
PAUCARPATA - AREQUIPA - AREQUIPA
Costo a : Septiembre - 2013

Descripcin

Unidad

Cantidad

Precio

Parcial

HH
HH
HH
HH
HH

1,690.85
139.68
14,748.13
9,436.11
20,635.43

17.69
14.37
16.08
13.79
12.43

29,911.14
2,007.20
237,149.93
130,123.96
256,498.39

MANO DE OBRA
47 00003
47 00008
47 00006
47 00012
47 00004

CAPATAZ
TOPOGRAFO
OPERARIO
OFICIAL
PEON

655,690.62
MATERIALES
02 00140
02 00044
02 00041
02 00189
02 00161
02 00159
02 00040
02 00191
03 00045
03 00088
04 00028
04 00005
04 00080
05 00032
05 00201
05 00021
05 00046
05 00024
05 00042
06 00081
07 00058
07 00086
07 00083
08 00059
08 00060
10 00119
10 00137
10 00139
10 00183
10 00138
10 00143
11 00048
11 00055
11 00050
11 00051
12 00053
12 00090
12 00094
12 00093
12 00062
12 00065
12 00061
12 00063
12 00064
12 00054
12 00099
12 00100
12 00103
17 00029
P.1/4

ACEITE PARA MOTOR SAE


ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA CALAMINA
CLAVOS PARA MADERA C/C 2 1/2"
CLAVOS PARA MADERA C/C 2"
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 4"
ACERO CORRUGADO fy=4200kg/cm2 GRADO 60
TAPA DE CONCRETO DE 40X60 cm
ARENA FINA
TIERRA DE CHACRA
TIERRA VEGETAL
ARENA GRUESA
MATERIAL MEJORADO PARA RELLENO
MATERIAL PARA BASE GRANULAR
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA DE 4"
CONECTOR DE COBRE TIPO AB
CABLE THW 2.5 MM2
CONDUCTOR DE COBRE DESNUDO DE 10 mm2
CONDUCTOR DE COBRE DESNUDO DE 35 mm2
CABLES DE CONEXIONADO
TABLERO METALICO DE 16 POLOS
INODORO TQUE. BAJO NORMAL BLANCO C/A
LAVATORIO BLANCO 23X17 C/ACCES
LLAVE PARA LAVATORIO TIPO FLUSH
REGISTRO DE BRONCE DE 4"
TRAMPA P C/DESAGUE PVC. CROMADO
URINARIO BLANCO CON ACCESORIOS Y VALVULA FLUSH
CORTACIRCUITO P/POSTE DE CONCRETO
LAMPARA VAPOR DE SODIO 70 SIM.JOFEL, LAMP.VAPOR DE SODIO
70W
PASTORAL DE FIERRO INC. ACCESORIOS
REFLECTOR DE 400W, INC. ACCESORIOS
ARTEF. FLUORESC. 2x36 W AF (REACTOR ALPHA)
CAJA OCTOGONAL GALV. 100x100x40mm
CAJA RECTANGULAR GALV. 100x55x50 MM.
INTERRUPTOR BAKELITA X 1 SWITCH
INTERRUPTOR DIFERENCIAL 2 X 25 A - 30mA
INTERRUPTOR HORARIO 0-24HRS,220V, 60HZ
INTERRUPTOR TERMOMAGNETICO 2x16 A
INTERRUPTOR TERMOMAGNETICO 2x30 A
INTERRUPTOR TERMOMAGNETICO 3x60 A
SOPORTE S-2 SUSP. C/2 VARILLAS 1m
TUBERIA CLASE 10 DE 1"
TUBERIA DE PVC CLASE 10 DE 3/4" P/AGUA
TUBERIA PVC 1/2"
ADOQUIN DE 10X20X6

GLN
KG
KG
KG
KG
KG
KG
KG
KG
PZA
M3
M3
M3
M3
M3
M3
M3
M3
M3
UND
m
M
M
EST
UND
UND
UND
UND
UND
UND
UND
UND
UND

3.81
4,467.64
1,046.47
5.59
0.03
0.84
1,034.47
0.17
88,324.40
6.00
125.63
408.50
4.00
832.10
2,406.93
590.39
1,069.15
74.31
328.09
2.00
174.35
6.00
10.50
1.00
1.00
2.00
2.00
2.00
2.00
2.00
1.00
11.00
14.00

30.00
3.22
3.22
6.86
3.22
3.22
3.22
3.22
2.34
35.60
53.39
21.20
35.30
38.14
27.45
32.97
68.81
38.14
38.40
7.70
0.79
3.22
11.19
50.00
289.60
178.32
143.64
102.29
14.41
16.02
130.70
22.03
210.00

114.30
14,385.80
3,369.63
38.35
0.10
2.70
3,330.99
0.55
206,679.10
213.60
6,707.36
8,660.20
141.20
31,732.63
66,070.23
19,462.86
73,568.21
2,834.18
12,598.66
15.40
137.74
19.32
117.50
50.00
289.60
356.64
287.28
204.58
28.82
32.04
130.70
242.33
2,940.00

UND
UND
UND
UND
UND
UND
UND
UND
und
UND
UND
UND
UND
M
M
und

14.00
4.00
5.00
3.00
3.00
3.00
2.00
1.00
2.00
2.00
1.00
5.00
106.12
139.68
108.05
107,936.34

96.36
297.80
95.84
4.30
3.30
7.54
122.03
239.83
52.36
82.63
192.00
51.51
12.33
11.27
1.31
0.77

1,349.04
1,191.20
479.20
12.90
9.90
22.62
244.07
239.83
104.72
165.26
192.00
257.55
1,308.46
1,574.36
141.55
83,110.98

Listado Total de Insumos


Obra
Cliente
Ubicacion

IU Cdigo
17 00082
17 00147
17 00154
19 00057
19 00056
21 00022
24 00153
24 00152
26 00163
26 00190
26 00164
30 00145
30 00144
30 00126
30 00052
30 00102
30 00043
30 00067
30 00150
30 00125
30 00167
30 00035
30 00070
30 00186
30 00096
30 00010
30 00151
30 00079
30 00132
30 00110
30 00169
30 00075
30 00165
30 00130
30 00073
30 00001
30 00039
30 00027
30 00038
30 00078
30 00087
30 00166
31 00185
31 00118
34 00026
38 00023
39 00030
39 00108
39 00037
39 00109
39 00097
39 00127
39 00077
39 00194
39 00196
39 00197
39 00128
39 00124
39 00068
P.2/4

MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE 4 EN EL PUEBLO JOVEN CALIFORNIA,


DISTRITO DE PAUCARPATA - AREQUIPA - AREQUIPA
MUNICIPALIDAD DISTRITAL DE PAUCARPATA
PAUCARPATA - AREQUIPA - AREQUIPA
Costo a : Septiembre - 2013

Descripcin
CAJA DE REGISTRO CAV DE 25X25X40 CM.
LADRILLO K.K. DE ARCILLA 9X14X24 CM
LADRILLO PASTELERO 24X 24X3 CM
CABLE DE ENERGIA NYY 2-1X6mm2
EMPALME NYY
CEMENTO PORTLAND TIPO IP (42.5KG)
CERAMICA ANTIDESLIZANTE 30x30 CM.
CERAMICA ANTIDESLIZANTE 40x40 CM.
BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"
BISAGRAS DE FIERRO DE 3"
CERRADURA TIPO PARCHE DE TRES GOLPES
ADITIVO CURADOR DE CONCRETO
ADITIVO DESMOLDANTE DE MADERA
ARBOLES ORNAMENTALES
CINTA AISLANTE
CINTA TEFLON
ESTRUCTURA METALICA COLUMNAS P/MALLA RACHELL S/DISEO
ESTRUCTURA METALICA VIGAS P/MALLA RACHELL S/DISEO
FRAGUA
GRASS
LAMINA DE SEGURIDAD P/VIDRIO
LIJA
MALLA RACHELL
MEDIDOR DE AGUA Y ACCESORIOS
MEDIDOR DE ENERGIA ELECTRICA Y ACCESORIOS
OCRE
PEGAMENTO P/CERAMICO
PEGAMENTO PARA PVC
PUERTA METALICA DE TUBOS FN SEGUN DISEO
REGADERA
SELLADOR DE PARED
SELLADOR DE PARED TIPO CPP
SILICONA x 300gr
SOLDADURA CELLOCORD
SUMINISTRO E INST. DE COBERTURA EN PUENTE PEATONAL
SUMINISTRO E INST. DE JUEGO CAMA ELASTICA
SUMINISTRO E INST. DE JUEGO CARRUSEL
SUMINISTRO E INST. DE JUEGO INTEGRADO TIPO 1
TACHONES REFLECTIVOS, SEALIZACION PAVIMENTO INC.
PEGAMENTO
THOR GEL (CAJA DE 5 KG)
VARILLA DE COBRE DE 3/4" X 2.40 m C/PUNTA
VIDRIO IMPORTADO INCOLORO 3mm
CAJA DE CONCRETO PARA REGISTRO 0.60x0.30 M. H=0.60 M.
CAJA PREFABRICADA DE CONCRETO C/TAPA
GASOLINA 94 OCTANOS
HORMIGON
AGUA
ASPERSOR DE TURBINA WEATHERMATIC
BROCHA
CAJUELA DE CONCRETO
FORMADOR DE EMPAQUES ADEX DE 1/8 GLN
GRASS SINTETICO
LIJA PARA MADERA
MALLA ARPILLERA
PAGO DE SERVICIO DE AGUA
SERVICIO ENERGIA ELECTRICA
SUMINISTRO E INSTAL. ARCOS DE FUTBOLL
SUMINISTRO E INSTAL. PARADEROS
SUMINISTRO E INSTAL. PERGOLAS P/BANCAS SEGUN DISEO

Unidad

Cantidad

Precio

Parcial

UND
UND
UND
M
UND
BOL
M2
M2
PAR
UND
UND
GLN
GLN
und
M
M
UND
M
KG
M2
M2
UND
M2
UND
UND
KG
BOL
GLN
M2
UND
GLN
GLN
UND
KG
UND
UND
UND
UND
UND

1.00
1,367.89
503.36
478.10
68.28
15,169.75
20.81
12.14
8.00
2.80
2.00
0.81
0.81
88.99
10.39
41.96
10.00
94.00
14.14
2,447.92
1.50
156.10
426.71
1.00
1.00
90.52
5.23
1.16
52.50
3.00
9.02
3.54
0.50
183.96
2.00
1.00
2.00
1.00
696.00

50.00
0.85
2.18
16.50
25.00
16.95
21.95
21.95
5.40
5.81
83.47
38.14
38.14
27.54
0.41
1.12
1,452.00
276.98
5.88
7.02
32.65
1.86
2.99
168.00
285.30
16.95
12.31
45.00
103.65
50.85
11.02
25.00
12.71
10.17
1,520.00
3,256.00
3,985.00
4,582.00
37.95

50.00
1,162.71
1,097.32
7,888.65
1,707.00
257,114.41
456.78
266.47
43.20
16.25
166.94
30.89
30.89
2,451.00
4.26
47.00
14,520.00
26,036.12
83.14
17,184.40
48.98
291.03
1,276.51
168.00
285.30
1,534.24
64.38
52.20
5,441.63
152.55
99.40
88.50
6.36
1,870.78
3,040.00
3,256.00
7,970.00
4,582.00
26,413.20

UND
UND
P2
UND
UND
GLN
M3
M3
UND.
UND
UND
UND
M2
HJA
M
MES
EST
UND
UND
UND

2.50
1.00
20.62
3.00
5.00
811.43
474.65
1,045.00
12.00
16.38
3.00
114.08
398.40
40.80
280.00
5.00
5.00
2.00
2.00
7.00

58.00
155.30
3.65
50.42
41.29
12.88
38.14
6.01
168.27
5.76
67.80
5.93
88.30
1.69
2.28
230.00
425.00
639.83
2,152.30
1,062.00

145.00
155.30
75.26
151.26
206.45
10,452.32
18,101.06
6,280.45
2,019.24
94.39
203.40
676.49
35,178.72
69.15
638.40
1,150.00
2,125.00
1,279.66
4,304.60
7,434.00

Listado Total de Insumos


Obra
Cliente
Ubicacion

IU Cdigo
39 00069
39 00123
39 00066
43 00148
43 00193
43 00155
43 00157
43 00031
43 00149
43 00195
43 00192
43 00187
43 00136
44 00074
44 00033
52 00162
53 00202
54 00158
54 00036
54 00133
54 00007
54 00168
54 00076
54 00122
56 00071
56 00188
56 00072
65 00105
65 00114
65 00113
65 00116
70 00049
71 00131
72 00104
72 00175
72 00182
72 00178
72 00170
72 00171
72 00084
72 00176
72 00179
72 00107
72 00181
72 00172
72 00173
72 00174
72 00089
72 00085
72 00098
73 00106
73 00177
73 00180
73 00095
73 00101
74 00091
74 00092
77 00184
77 00112
78 00115
P.3/4

MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE 4 EN EL PUEBLO JOVEN CALIFORNIA,


DISTRITO DE PAUCARPATA - AREQUIPA - AREQUIPA
MUNICIPALIDAD DISTRITAL DE PAUCARPATA
PAUCARPATA - AREQUIPA - AREQUIPA
Costo a : Septiembre - 2013

Descripcin
SUMINISTRO E INSTAL.BANCAS SEGUN DISEO
SUMINISTRO E INSTALACION TACHOS PARA BASURA
TRANSPORTE DE HERRAMIENTAS Y MATERIALES A OBRA
ANDAMIO DE MADERA
BANNER DE 3.60x2.40 m
COLA SINTETICA
MADERA DE CEDRO CEPILLADO
MADERA TORNILLO
MADERA TORNILLO CEPILLADA
PALO DE EUCALIPTO DE 2" x 3.0m
PALO DE EUCALIPTO DE 5" x 4 m
PUNTAL DE EUCALIPTO 3"X13'
REGLA DE MADERA
TRIPLAY DE 4'x8'x 15 mm
TRIPLAY DE 4'x8'x 6 mm
DIVISION DE BAOS (INCL, ACCESORIOS)
PETROLEO
BARNIZ
DISOLVENTE - THINER
PINTURA ANTICORROSIVA
PINTURA ESMALTE
PINTURA LATEX
PINTURA LATEX TIPO CPP ORIGINAL
PINTURA PARA TRAFICO
CABLE GALVANIZADO 1/4"
CALAMINA 0.80x1.80x0.17mm
GRAPAS GALVANIZADAS # 10
NIPLE FG 1/2" x 1 1/4"
NIPLE FG 1" x 1 1/2"
UNION UNIVERSAL FG 1"
UNION UNIVERSAL FG 1/2"
POSTE DE CONCRETO CENTRIF. 8/100/120/240
TUBO F.N. D=2", 2mm, LONG. 6m
CODO DE PVC 1/2"
CODO PVC SAL 2"
CODO PVC SAL 4 X 2"
CODO PVC SAL 4"
CODO PVC SAP 1/2"
CODO PVC SAP 3/4"
CURVA DE PVC-SAP ELECTRICO DE 25MM
RAMAL YEE SIMPLE PVC SAL DE 2"
RAMAL YEE SIMPLE PVC SAL DE 4"
REDUCCION PVC SAP DE 1" A 3/4"
SOMBRERO DE VENTILACION PVC SAL DE 2"
TEE PVC SAP 1/2"
TUBERIA PVC SAP PRESION C-10 R. 1/2"
TUBERIA PVC SAP PRESION C-10 R. 3/4"
TUBO DE PVC-P ELECTRICO DE 20mm
TUBO DE PVC-SAP ELECTRICO DE 25MM
UNION SIMPLE DE HIDRO-3 DE 1"
REDUCCION PVC SAP 3/4" X 1/2"
TUBERIA PVC SAL PARA DESAGUE DE 2"
TUBERIA PVC SAL PARA DESAGUE DE 4"
UNION PVC SEL 20mm
UNION SIMPLE HIDRO 3 - 3/4 "
CONEXION A CAJA PVC SAP 20mm
CURVA PVC SAP INST. ELECTRICAS 20mm
SUMIDERO DE BRONCE DE 2"
VALVULA CHECK DE BRONCE 1"
VALVULA DE COMPUERTA 1"

Unidad

Cantidad

Precio

Parcial

UND
UND
VJE
P2
UND
GLN
P2
P2
P2
UND
UND
PZA
P2
PLN
PLN
UND
GLN
GLN
GLN
GLN
GLN
GLN
GLN
GLN
M
PLN
UND
UND
UND
UND
UND
UND
UND
PZA
und
UND
UND
UND
UND
UND
UND
UND
UND
UND
PZA
UND
UND
M
M
UND
PZA
und
UND
PZA
PZA
PZA
UND
PZA
UND
UND

7.00
10.00
73.00
44.20
1.00
1.08
125.44
17,538.24
36.24
126.05
2.00
1.98
3.77
100.71
134.04
2.00
50.00
2.24
170.58
62.52
543.79
6.98
7.67
62.44
309.92
19.61
194.12
19.00
10.00
10.00
4.00
11.00
1,730.83
54.00
6.00
1.00
2.00
5.00
5.00
2.00
5.00
2.00
15.00
1.00
5.00
1.05
1.05
45.00
10.00
64.48
15.00
3.05
8.34
3.00
135.74
12.00
6.00
2.00
1.00
5.00

812.35
189.60
85.00
4.32
159.00
30.25
8.60
4.24
4.49
12.37
26.44
12.80
4.92
98.00
32.20
411.02
11.74
36.20
21.92
35.85
38.39
29.23
49.15
59.49
1.65
16.95
2.12
1.68
1.33
7.60
1.68
689.63
62.29
1.20
1.53
3.64
4.07
0.83
1.07
1.20
3.97
6.68
1.86
6.50
1.56
8.47
11.02
1.07
3.00
3.59
1.86
11.54
18.52
0.64
3.02
2.14
0.85
5.30
55.60
39.85

5,686.45
1,896.00
6,205.00
191.03
159.00
32.67
1,078.78
74,314.58
162.77
1,559.60
52.88
25.34
18.53
9,869.58
4,316.54
822.04
587.00
81.09
3,738.30
2,241.18
20,876.01
204.02
377.00
3,714.65
512.16
332.37
411.27
31.92
13.30
76.00
6.72
7,585.93
107,810.17
64.80
9.18
3.64
8.14
4.15
5.35
2.40
19.85
13.36
27.90
6.50
7.80
8.89
11.57
48.15
30.00
231.48
27.90
35.20
154.46
1.92
409.52
25.68
5.10
10.60
55.60
199.25

Listado Total de Insumos


Obra
Cliente
Ubicacion

IU Cdigo
78 00117
78 00111

MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE 4 EN EL PUEBLO JOVEN CALIFORNIA,


DISTRITO DE PAUCARPATA - AREQUIPA - AREQUIPA
MUNICIPALIDAD DISTRITAL DE PAUCARPATA
PAUCARPATA - AREQUIPA - AREQUIPA
Costo a : Septiembre - 2013

Descripcin
VALVULA DE COMPUERTA 1/2"
VALVULA ESFERICA DE 1/2"

Unidad
UND
UND

Cantidad

Precio

Parcial

2.00
3.00

19.71
17.96

39.42
53.88
1,279,416.45

EQUIPO
37 00160
37 00002
48 00146
48 00203
48 00017
48 00047
48 00141
48 00121
48 00025
48 00019
48 00015
48 00156
48 00129
48 00034
49 00020
49 00016
49 00200
49 00018
49 00120
49 00134
49 00199
49 00014
49 00011
49 00135
49 00009
49 00198
49 00013
49 00142

CEPILLADORA
HERRAMIENTAS MANUALES
ANDAMIO METAL TABLAS-ALQUILER
CAMION PLATAFORMA 4x2 210 HP 12 TON.
CAMION VOLQUETE 15 M3.
CIZALLA
CIZALLA P/CORTE DE FIERRO
MAQUINARIA PARA PINTAR PAVIMENTO
MEZCLADORA DE CONCRETO TAMBOR 18HP 11P3
MOTOBOMBA 10 HP 4"
RODILLO LISO VIBR. AUTOP 70-100 HP 7-9 T
SIERRA CIRCULAR
SOLDADORA ELECT. MONOF. ALTERNA 295 AMP.
VIBRADOR DE CONCRETO 4HP 2.40"
CAMION CISTERNA 4X2(AGUA) 122 HP 2000 GAL
CARGADOR FRONTAL 150-180HP
CARGADOR RETROEXCAVADOR
COMPACTADOR VIBR. TIPO PLANCHA 4 HP
COMPRESORA INCL. MARTILLOS DE 60 LBS.
COMPRESORA PARA PINTAR
EXCAVADORA S/ORUGA 170-250HP, 1.1-2.75YD3
MOTONIVELADORA DE 125 HP
NIVEL TOPOGRAFICO CON TRIPODE
PLANCHA COMPACTADORA VIBRAT. 4.0 HP
TEODOLITO
TRACTOR D7
TRACTOR DE ORUGAS DE 190-240 HP
WINCHE DE DOS BALDES (350KG)M.E. 3.6HP

HM
%MO
EST
HM
HM
HM
HM
HM
hm
HM
HM
HM
HM
hm
HM
HM
HM
HM
HM
HM
HM
HM
hm
HM
HM
HM
hm
HM

3.59

5.46

22.50
4.00
149.22
306.74
911.55
3.92
841.33
1.90
22.23
3.59
1,178.48
628.26
9.48
100.32
170.78
1,946.51
87.02
667.81
14.32
22.20
151.12
0.74
144.74
14.31
12.67
0.63

0.46
180.00
128.65
2.43
2.43
13.73
6.25
25.42
129.54
4.62
12.71
3.55
110.17
146.30
101.69
6.99
101.69
4.24
385.00
185.34
5.53
11.80
12.71
324.50
276.10
5.22

19.60
18,328.83
10.35
720.00
19,197.15
745.38
2,215.07
53.82
5,258.31
48.31
2,879.67
16.59
14,980.68
2,230.32
1,044.41
14,676.82
17,367.46
13,606.10
8,849.49
2,829.70
5,513.20
4,114.55
836.28
8.73
1,839.92
4,643.60
3,498.21
3.29
145,535.84

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
IGV.

9%
8%

2,080,642.91
187,257.86
166,451.43

18 %

2,434,352.20
438,183.40

PRESUPUESTO TOTAL
Son : DOS MILLONES OCHOCIENTOS SETENTA Y DOS MIL QUINIENTOS TREINTA Y CINCO CON 60/100 NUEVOS SOLES

P.4/4

2,872,535.60