Professional Documents
Culture Documents
SEE SCHED.
T.O.P
MID
DL E
PO
HIG
HE
ST
PO
INT
INT
SEE SCHED.
T.O.R.S
SEE SCHED.
T.O.R.S
TOP OF TANK
GENERAL NOTES:
TOP OF TANK
750
SEE SCHED.
T.O.F.S (4rth)
BOTTOM OF TANK
ST
PO
IN
SEE SCHED.
T.O.F.S (4rth)
LO
WE
SCAFFOLDING LEGEND:
SEE SCHED.
T.O.T.S(3rd)
DLE
MID
HE
HIG
SEE SCHED.
T.O.T.S(3rd)
PO
ST
PO
IN
INT
SB(350x800)
OPEN
50
x8
0
0)
OPEN
OPEN
SB(350x800)
SB
(3
SEE SCHED.
T.O.S.S(2nd)
SEE SCHED.
T.O.S.S(2nd)
LO
WE
ST
PO
INT
FORMWORK-SCAFFOLDING-PROPS
CONSULTANT:
L
VA ON
O
R
PP UCTI
A
OR NSTR
F
O
UED OR C
S
IS T F
NO
CLIENT:
SEE SCHED.
T.O.F.S (1st)
SEE SCHED.
T.O.F.S (1st)
AL OFOQ CO.
HIG
HE
MID
ST
DLE
PO
PO
INT
INT
PROJECT:
ELEVATED TANK
OPEN
OPEN
DRAWING TITLE:
200
SEE SCHED.
F.G.L
SEE SCHED.
F.F.L
TP
OIN
DRAWN BY :
LO
W
ES
SCALE :
COMPACTED
SOIL
COMPACTED
SOIL
RRL
SECTION B
DESIGNED BY :
SCAFFOLDING PLAN
SEE SCHED
B.O.R
EX.L
SEE SCHED
TECHNICAL DEPT.
RAFT FOOTING
AS SHOWN
DATE :
28 FEBRUARY 2015
RAFT FOOTING
CHECKED BY :
SECTION A
DWG.NO:
ENGR. AA SAIF
TECHNICAL MANAGER :
ENGR. AA SAIF
SCR-0215-17
SHEET NO :
1 OF 1