10.0 OVERVIEW:
This chapter summing up all the work done of the two circuits designed; poles sensors
circuit interface to the PLC system and Ethernet control system. Both the circuits depend
on each other in such manner that one circuit is the poles sensing section and load control
system stands for PLC and second is Ethernet control system. Hence practically it is now
going to be implemented together.
10.1
PROJECT CYCLE:
GRI
D
ST A
TI O
N
CO N
TRO
L
SYS
TEM
P O L E S SENSOR SY S TEM
CO NDI T I O N CHECKR
SYSTEM COALESCE
97
CHAPTER: 10:
Description
0001
0010
0011
0100
0101
0110
TEMPERATURE 1 INCREASED
TEMPERATURE 2 INCREASED
TEMPERATURE 3 INCREASED
HUMIDITY 1 INCREASED
HUMIDITY 2 INCREASED
HUMIDITY 3 INCREASED
TABLE: 18: STATUS SIGNAL DESCRIPTION
SYSTEM COALESCE
98
10.3.1
CHAPTER: 10:
Explain:
For this interface the routine is as like having 6 different inputs from the
temperature and humidity control system. Hence those control signals simply
appears over the interface input and generates the signals.
10.3.2
Software Routine:
ALGORITHM
10.3.3
SYSTEM COALESCE
Circuit Diagram:
99
CHAPTER: 10:
100
CHAPTER: 10:
10.6 LAYOUT:
10.7 OBSERVATION:
SYSTEM COALESCE
101
CHAPTER: 10:
SYSTEM COALESCE