You are on page 1of 36

HOJA DE METRADOS PARA MOVIMIENTO DE TIERRAS

PROYECTO
PROPIET.
DISTRITO
03.00.00

KM.
ANTECANAL
0+00 - 0+025
0+025 - 0+045
0+045 - 0+090
0+090 - 0+093

03.00.00

KM.
ANTECANAL
0+00 - 0+025
0+025 - 0+055

04.04.00

N de Cajas
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

04.04.00

N de Cajas
1.0
2.0
1.0
2.0
1.0
4.0

05.01.00

N
1.0

05.02.00

N
1.0

: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"


: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
: COLCA

PROV.
DPTO.

: FAJARDO
: AYACUCHO

=== ANTECANAL=====

Volumen
Unitario
(M3)
2.5
2.5
2.5
2.5

Volumen
Total (M3)
62.50
50.00
112.50
7.50

Roca Fija
(%)
10
30
20
10

Roca suelta
Material
(%)
Comun (%)
20
70
30
40
20
60
15
75
TOTAL

Roca Fija

Roca suelta

6.25
15
22.5
0.75
44.50

12.5
15
22.5
1.13
51.13

Roca Fija

Roca suelta

2.425
8.73
11.16

4.85
8.73
13.58

Roca Fija

Roca suelta

0.3456
2.7648
3.1104
1.728
2.7648
2.7648
2.0736
2.7648
2.0736
2.4192
0.3456
23.1552

0.5184
0.6912
0.3456
1.3824
0.3456
0.3456
0.6912
0.3456
0.6912
0.6912
0.5184
6.5664

Roca Fija

Roca suelta

0.6912
0.6912
0.3456
0.3456
0.3456
0.3456
2.7648

0.6912
0.6912
0.6912
0.3456
0.5184
0.864
3.8016

Roca Fija

Roca suelta

7.50
7.50

11.25
11.25

Roca Fija

Roca suelta

0.32
0.32

0.48
0.48

Material
Suelto
43.75
20
67.5
5.63
136.88

===CANAL DESRIPEADOR=====

Volumen
Unitario
(M3)
0.97
0.97

Volumen
Total (M3)
24.25
29.10

Roca Fija
(%)
10
30

Roca suelta
Material
(%)
Comun (%)
20
70
30
40
TOTAL

Material
Suelto
16.975
11.64
28.62

=== CAJAS DE INSPECCION (11 UNID.)=====

Volumen
Unitario
(M3)
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46

Volumen
Total (M3)
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46
3.46

Roca Fija
(%)
10
80
90
50
80
80
60
80
60
70
10

Roca suelta
Material
(%)
Comun (%)
15
75
20
0
10
0
40
10
10
10
10
10
20
20
10
10
20
20
20
10
15
75
TOTAL

Material
Suelto
2.592
0
0
0.3456
0.3456
0.3456
0.6912
0.3456
0.6912
0.3456
2.592
8.2944

=== TOMAS LATERALES (11 UNID.)=====

Volumen
Unitario
(M3)
3.46
3.46
3.46
3.46
3.46
3.46

Volumen
Total (M3)
3.46
6.91
3.46
6.91
3.46
13.82

Roca Fija
(%)
20
20
10
10
10
10

Roca suelta
Material
(%)
Comun (%)
20
60
20
60
20
70
10
80
15
75
25
65
TOTAL

Roca Fija
(%)
10

Roca suelta
Material
(%)
Comun (%)
15
75
TOTAL

Material
Suelto
2.0736
4.1472
2.4192
5.5296
2.592
8.9856
25.7472

=== DESARENADOR=====

Volumen
Unitario
(M3)
75.03

Volumen
Total (M3)
75.03

Material
Suelto
56.27
56.27

=== POZA DE CAPTACION=====

Volumen
Unitario
(M3)
3.21

Volumen
Total (M3)
3.21

Roca Fija
(%)
10

Roca suelta
Material
(%)
Comun (%)
15
75
TOTAL

Material
Suelto
2.41
2.41

HOJA DE METRADOS PARA MOVIMIENTO DE TIERRAS


PROYECTO
PROPIET.
DISTRITO
05.03.00

N de Canoas
4.0
1.0
1.0
2.0
1.0
1.0
1.0
3.0
1.0
1.0
1.0
6.0
1.0

05.04.00

N de Rapidas
1.0
05.05.00

N de Tomas
2.0

05.05.00

N de
Vertedero
1.0

05.09.00

N de
Alcantarillas
1.0
1.0
2.0
3.0
1.0

05.10.00

N
1.0

: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"


: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
: COLCA

PROV.
DPTO.

: FAJARDO
: AYACUCHO

=== CANOAS (24 UNID.)=====

Volumen
Unitario
(M3)
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70

Volumen
Total (M3)
10.80
2.70
2.70
5.40
2.70
2.70
2.70
8.10
2.70
2.70
2.70
16.19
2.70

Roca Fija
(%)
90
60
80
60
65
70
20
20
10
10
10
10
10

Roca suelta
Material
(%)
Comun (%)
10
0
20
20
10
10
20
20
20
15
20
10
20
60
20
60
20
70
10
80
15
75
25
65
10
80
TOTAL

Roca Fija

Roca suelta

9.71568
1.61928
2.15904
1.61928
1.75422
1.88916
0.53976
0.53976
0.26988
0.26988
0.26988
0.26988
0.26988
21.18558

1.07952
0.53976
0.26988
0.53976
0.53976
0.53976
0.53976
0.53976
0.53976
0.26988
0.40482
0.6747
0.26988
6.747

Roca Fija

Roca suelta

7.84
7.84

7.84
7.84

Roca Fija

Roca suelta

1.16
1.16

1.16
1.16

Roca Fija

Roca suelta

0.00
0.00

16.32
16.32

Roca Fija

Roca suelta

2.0616
12.3696
2.0616
2.0616
2.0616
20.616

4.1232
4.1232
3.0924
5.154
2.0616
18.5544

Roca Fija

Roca suelta

0.16
0.16

0.24
0.24

Material
Suelto
0
0.53976
0.26988
1.07952
0.40482
0.26988
1.61928
4.85784
1.88916
2.15904
2.0241
10.52532
2.15904
27.79764

=== RAPIDAS KM 2+740 - 2+760 ====

Volumen
Unitario
(M3)
39.19

Volumen
Total (M3)
39.19

Roca Fija
(%)
20

Roca suelta
Material
(%)
Comun (%)
20
60
TOTAL

Material
Suelto
23.51
23.51

===TOMA TIPICA DE INGRESO Y SALIDA (02 UNIDAD)====

Volumen
Unitario
(M3)
2.90

Volumen
Total (M3)
5.8

Roca Fija
(%)
20

Roca suelta
Material
(%)
Comun (%)
20
60
TOTAL

Roca Fija
(%)
0

Roca suelta
Material
(%)
Comun (%)
80
20
TOTAL

Roca Fija
(%)
10
60
10
10
10

Roca suelta
Material
(%)
Comun (%)
20
70
20
20
15
75
25
65
10
80
TOTAL

Roca Fija
(%)
10

Roca suelta
Material
(%)
Comun (%)
15
75
TOTAL

Material
Suelto
3.48
3.48

===VERTEDERO====

Volumen
Unitario
(M3)
20.40

Volumen
Total (M3)
20.398

Material
Suelto
4.08
4.08

=== ALCANTARILLAS ====

Volumen
Unitario
(M3)
20.62
20.62
20.62
20.62
20.62

Volumen
Total (M3)
20.616
20.616
41.232
61.848
20.616

Material
Suelto
14.4312
4.1232
30.924
40.2012
16.4928
106.1724

=== CANAL DE PURGA=====

Volumen
Unitario
(M3)
1.62

Volumen
Total (M3)
1.62

Material
Suelto
1.22
1.22

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.
05.05.05

DESCRIPCIN

Und.

PROV. : FAJARDO
DPTO. : AYACUCHO

N de
DIMENSIONES (m)
Veces Largo
Ancho Alto

PARCIAL TOTAL

===VERTEDERO ===

01.00.00
01.01.00
01.01.01
01.01.02

TRAZO Y REPLANTEO PRELIMINAR


Trazo y replanteo
vertedero
canal de evacuacion

M2
M2

1.00
1.00

0.80
5.20

5.00
5.00

02.00.00
02.01.00
02.01.00

MOVIMIENTO DE TIERRAS
Excavacion
vertedero + canal de evacuacion

M3

1.00

area ->

3.29

03.00.00
03.01.00

ENCOFRADO Y DESENCOFRADO
vertedero + canal de evacuacion (lateral)

M2

4.00

area ->

12.60

04.00.00
04.01.00
04.02.00
04.03.00

CONC. SIMPLE fc=175 Kg/cm2


fc=140 Kg/cm2+ 40% P.G.
Vertedero
Muros laterales
Canal de Evacuacion

05.00.00
05.01.00
06.00.00
06.01.00

30.00
-

4.00
26.00

20.40
6.20

20.40
50.40

50.40

M3

7.42

M3
M3
M3

1.00
2.00
1.00

area ->
area ->
area ->

0.56
0.57
1.01

TARRAJEO DE IMPERMEABILIZACION
vertedero + canal de evacuacion (lateral)

M2

2.00

area ->

12.60

ENROCADO DE PROTECCION
Enrocado a pie de canal

M3

1.00

area ->

0.37

4.00
1.00
4.00

2.24
1.14
4.04
25.20

25.20
1.48

4.00

1.48

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

Und.

05.05.05
01.00.00
01.01.00

===TOMAS LATERALES===
TRAZO Y REPLANTEO PRELIMINAR
Trazo y replanteo

02.00.00
02.01.00

MOVIMIENTO DE TIERRAS
Excavacion de caja de inspeccion

M3

03.00.00
03.01.00
03.02.00
03.03.00
03.04.00

ENCOFRADO Y DESENCOFRADO
Base
Muros
Tapa lados
Tapa base

M2

04.00.00
04.01.00
04.02.00
04.03.00

CONCRETO ARMADO fc=175 Kg/cm2


Base
Muros
Tapa

M3

06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02
06.03.03

ACEROS DE REFUERZO fy=4200 kg/cm2


Base
Acero Longitudinal
Acero Transversal
Muros de la toma
Acero Longitudinal
Acero Transversal
Tapa de la toma
Acero Longitudinal
Acero Transversal
Ganchos para asas

KG

07.00.00
07.01.00
07.02.00

TARRAJEO DE IMPERMEABILIZACION
Base
Muros

M2

N de
Veces

PROV. : FAJARDO
DPTO. : AYACUCHO

DIMENSIONES (m)
Largo Ancho Alto

PARCIAL TOTAL

M2
1

1.60

1.60

1.00

1.60

1.60

1.35

3.46

4.00
8.00
4.00
1.00

1.60
1.30
1.18
1.18

1.80

0.15
1.20
0.10
-

0.96
12.48
0.47
2.12

1.00
4.00
1.00

1.60
1.30
1.18

1.60
1.10
1.18

2.56

2.56
3.46

16.04

1.38
0.15
0.15
0.10

0.38
0.86
0.14

N veces

fierro Kg/ml. Peso(kg)

8.00
8.00

1.55
1.55

1/2"
1/2"

1.02
1.02

12.65
12.65

24.00
24.00

1.25
1.25

1/2"
1/2"

1.02
1.02

30.60
30.60

9.00
9.00
2.00

1.14
1.14
0.80

1/2"
1/2"
3/8"

1.02
1.02
0.58

10.47
10.47
0.93

4.00
4.00

1.60
1.30

0.15
1.20

108.35

7.20
0.96
6.24

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA

PART.

DESCRIPCIN

Und.

05.02.00
01.00.00
01.01.00

==CANAL DE PURGA==
TRAZO Y REPLANTEO PRELIMINAR
Trazo y replanteo

02.00.00
02.01.00

MOVIMIENTO DE TIERRAS
Excavacion

M3

03.00.00
03.01.00

ENCOFRADO Y DESENCOFRADO
Paredes

M2

04.00.00
04.01.00
04.02.00

CONCRETO SIMPLE fc=175 Kg/cm2


Base
Muros

M3

05.00.00
05.01.00
05.02.00

TARRAJEO DE IMPERMEABILIZACION
Base
Muros

M2

06.00.00

ENROCADO A PIE DEL CANAL e =0.25

M3

PROV. : FAJARDO
DPTO. : AYACUCHO

N de
DIMENSIONES (m)
PARCIAL TOTAL
Veces Largo Ancho Alto

M2
1

6.00

0.40

1.00

6.00

Area=>

0.27

1.62

4.00

5.00

0.40

8.00

1.00
2.00

5.00
5.00

0.50
0.10

0.10
0.40

0.25
0.40

2.4

2.40
1.62

8.00

0.65

5.50
1.00
2.00

5.00
5.00

0.30
0.40

1.50
4.00

1.00

1.00

0.50

0.50

0.25

0.25

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA

PART.

DESCRIPCIN

Und.

05.02.00
01.00.00
01.01.00

==POZA DE CAPTACION==
TRAZO Y REPLANTEO PRELIMINAR
Trazo y replanteo

02.00.00
02.01.00

MOVIMIENTO DE TIERRAS
Excavacion de caja de inspeccion

M3

03.00.00
03.01.00

ENCOFRADO Y DESENCOFRADO
Paredes

M2

04.00.00
04.01.00
04.02.00

CONCRETO ARMADO fc=175 Kg/cm2


Base
Muros

M3

06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02

ACEROS DE REFUERZO fy=4200 kg/cm2


Base
Acero Longitudinal
Acero Transversal
Muros
Acero Longitudinal
Acero Transversal

KG

07.00.00
07.01.00
07.02.00

TARRAJEO DE IMPERMEABILIZACION
Base
Muros

M2

08.00.00

JUNTAS ELASTOMERICAS

ML

N de
Veces

PROV.
DPTO.

DIMENSIONES (m)
Largo Ancho
Alto

: FAJARDO
: AYACUCHO

PARCIAL TOTAL

M2
1

1.40

1.70

2.38

1.00

1.40

1.70

1.35

3.21

3.00

1.00

1.70

5.10

2.38
3.21

5.10

1.36
1.00
2.00
1.00
N veces

0.48
1.40
1.70
0.20
0.68
1.70
0.20
1.00
0.20
###
0.20
1.00
L
fierro Kg/ml. Peso(kg)

9.00
9.00

1.20
1.60

3/8"
3/8"

0.58
0.58

6.26
8.35

14.00
9.00

1.06
1.60

3/8"
3/8"

0.58
0.58

8.61
8.35

1.00
2.00
1.00
1.00

1.00
1.00
1.00
1.40

1.70
1.70
1.00
-

31.58

6.10
1.70
3.40
1.00
1.40

1.40

HOJA DE METRADOS EN OBRAS DE ARTE


PROYEC : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA

PART.

DESCRIPCIN

Und.

N de
Veces

05.05.05
01.00.00
01.01.00

==CAJAS DE INSPECCION ==
TRAZO Y REPLANTEO PRELIMINAR
Trazo y replanteo

02.00.00
02.01.00

MOVIMIENTO DE TIERRAS
Excavacion de caja de inspeccion

M3

03.00.00
03.01.00
03.02.00
03.03.00
03.04.00

ENCOFRADO Y DESENCOFRADO
Base
Muros
Tapa lados
Tapa base

M2

04.00.00
04.01.00
04.02.00
04.03.00

CONCRETO ARMADO fc=175 Kg/cm2


Base
Muros
Tapa

M3

06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02
06.03.03

ACEROS DE REFUERZO fy=4200 kg/cm2


Base
Acero Longitudinal
Acero Transversal
Muros de la toma
Acero Longitudinal
Acero Transversal
Tapa de la toma
Acero Longitudinal
Acero Transversal
Ganchos para asas

KG N veces

07.00.00
07.01.00
07.02.00

TARRAJEO DE IMPERMEABILIZACION
Base
Muros

M2

08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00

INSTALACION DE ACCESORIOS
TUBERIA PVC SAP 4" SAL
ADAPTADOR PVC 4" SAL
CODO 4" X 90 F G
NIPLE 4" FG
MALLA SOLDADA

PROV.
DPTO.

DIMENSIONES (m)
Largo
Ancho
Alto

: FAJARDO
: AYACUCHO

PARCIAL TOTAL

M2

ML
UND
UND
UND
UND

1.60

1.60

1.00

1.60

1.60

1.35

3.46

4.00
8.00
4.00
1.00

1.60
1.30
1.18
1.18

1.80

0.15
1.20
0.10
-

0.96
12.48
0.47
2.12

1.00
4.00
1.00

1.60
1.30
1.18

1.60
1.30
1.18

2.56

2.56
3.46

16.04

1.54
0.15
0.15
0.10

0.38
1.01
0.14

fierro

Kg/ml. Peso(kg)

8.00
8.00

1.55
1.55

1/2"
1/2"

1.02
1.02

12.65
12.65

24.00
24.00

1.25
1.25

1/2"
1/2"

1.02
1.02

30.60
30.60

9.00
9.00
2.00

1.14
1.14
0.80

1/2"
1/2"
3/8"

1.02
1.02
0.58

10.47
10.47
0.93

4.00
4.00

1.60
1.30

0.15
1.20

0.96
6.24

0.20
1.00
1.00
1.00
1.00

0.20
1.00
1.00
1.00
1.00

108.35

7.20

0.20
1.00
1.00
1.00
1.00

HOJA DE METRADOS ( UNITARIO)


HOJA DE METRADOS EN OBRAS DE ARTE
PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DPTO.
DISTRITO : COLCA

PART.
05.03.00
05.03.01

05.03.02

DESCRIPCIN

UNID.

MOVIMIENTO DE TIERRAS
Excavacion

ENCOFRADO Y DESENCOFRADO
sardinel
aleros
aleros
losa canoa

m2

CONCRETO f'c=140 Kg/cm2 + 40% PG


losa canoa
uas
sardinel
aleros

m3

uas alero

05.03.08

5.00

3.30

16.50

2
4
1

1.40
1.41
3.00

0.20
0.45
1.40

0.60
0.60
0.20

0.34
1.52
0.84

4.00
8.00
4.00
2.00
2.00

3.00
1.41
0.20
3.00
1.40

0.75
0.63
0.50
0.20
0.20

9.00
7.05
0.40
1.20
0.56

2.70

m3
Aleros

05.03.07

16.50

m2

losa canoa

05.03.06

PARCIAL TOTAL

==== CANOAS (01 UNIDAD)====


TRABAJOS PRELIMINARES
Trazo y replanteo

Uas

05.03.05

N de
DIMENSIONES (m)
Veces Largo Ancho
Alto

: FAJARDO
: AYACUCHO

EMBOQUILLADO DE PIEDRA
e=0.25 m.

m2

TARRAJEO DE MUROS

m2
aleros
aleros
sardinel

18.21

4.03
1.00
2.00
2.00
4.00
4.00

3.00
1.40
3.00
1.41
1.41

2.40
0.20
0.20
0.20
0.45

2.00

1.00

2.15

8.00
4.00
4.00

1.41
0.20
3.00

0.20
0.40
0.75
0.63
0.30

1.44
0.22
0.90
0.71
0.76

4.30
4.30

15.04
0.50
0.50
0.75

5.64
0.40
9.00

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA

PART.
05.01.00
01.00.00
01.01.00

DESCRIPCIN
==DESARENADOR===
LIMPIEZA DE TERRENO
Limpieza

Und.

N de
Veces

17.08
1.4

12.2

1.4

12.2

Area =>

6.15

75.03

12.2

Area =>

0.15

1.83

1
2
1
2
1

Area =>
2
10.2
10.2
1.4

2.2
0.2
1.4
0.2
0.2

0.2
1.44
0.3
1.44
1.55

0.44
1.152
4.284
5.8752
0.434

4
2
2

2
10.2
1.25

1.44
1.44
1.4

11.52
29.376
3.5

fierro

Kg/ml.

Peso(kg)

12.00
14.00

2.00
2.10

3/8"
3/8"

0.58
0.58

13.92
17.05

12.00
23.00

4.50
2.00

3/8"
3/8"

0.58
0.58

31.32
26.68

8.00
68.00

10.45
1.35

3/8"
3/8"

0.58
0.58

48.49
53.24

8.00
9.00

1.75
1.35

3/8"
3/8"

0.58
0.58

8.12
7.05

1.4

2.8

03.00.00
03.01.00

MOVIMIENTO DE TIERRAS
Transicion y Poza desarenadora

M3

04.00.00
04.01.00

RELLENO Y COMPACTADO
Transicion y Poza desarenadora

M3

05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00

CONCRETO f'c = 210KG/CM2


Base de Transicion de Entrada
Paredes de la Transicion
Base Poza desarenadora
Paredes de Poza desarenadora
Vertedero

M3

06.00.00
06.01.00
06.02.00
06.03.00

ENCOFRADO Y DESENCOFRADO
Paredes de la Transicion
Paredes de Poza desarenadora
Vertedero

M2

07.00.00
07.01.00

ACERO DE REFUERZO FY= 4200KG/CM2


Base de Transicion de Entrada
Acero Longitudinal
Acero Transversal
Paredes de la Transicion
Acero Longitudinal
Acero Transversal
Base Poza desarenadora
Acero Longitudinal
Acero Transversal
Paredes de Poza desarenadora
Acero Longitudinal
Acero Transversal

KG N veces

JUNTA ELASTOMERICAS

ML

08.00.00

PARCIAL TOTAL

12.2

M2

07.04.00

DIMENSIONES (m)
Largo
Ancho
Alto

TRAZO Y REPLANTEO PRELIMINAR


Trazo y Replanteo

07.03.00

: FAJARDO
: : AYACUCHO

M2

02.00.00
02.01.00

07.02.00

PROV.
DPTO.

17.08
17.08
17.08
75.03

1.83

12.1852

44.396

205.87

2.8

HOJA DE METRADOS EN OBRAS DE ARTE


PROYEC : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

Und.

N de
Veces

PROV. : FAJARDO
DPTO. : AYACUCHO

DIMENSIONES (m)
Largo Ancho
Alto

PARCIAL

01.00.00
01.01.00

=== ALCANTARILLLA===
LIMPIEZA DE TERRENO
Limpieza

M2

1.00

5.00

3.30

16.5

02.00.00
02.01.00

TRABAJOS PRELIMINARES
Trazo y replanteo

M2

1.00

5.00

3.30

16.50

03.00.00
03.01.00

MOVIMIENTO DE TIERRAS
Excavaciones
caja de aleros
Aleros
caja de canoa
uas

2.00
4.00
1.00
2.00

1.00
1.40
3.00
3.00

2.35
0.45
1.40
0.20

1.80
0.30
2.60
0.40

8.46
0.76
10.92
0.48

2.00
1.00
8.00

3.00
3.00
1.41

1.00
1.00
1.50

6.00
3.00
16.92

1.00
2.00
2.00
4.00
4.00

3.00
3.00
0.20
1.41
1.41

1.40
0.20
3.00
0.45
0.20

0.20
0.40
1.00
0.30
1.80

0.84
0.48
1.20
0.76
2.03

1.00
2.00

1.40
1.40

3.00
0.20

0.20
0.80

0.84
0.45

04.00.00

05.00.00

ENCOFRADO Y DESENCOFRADO

M3

M2

CONC. CICLOPEO fc=140 Kg/cm2 + 30 % P.G.


fondo
uas alcantarilla
muros
aleros -uas
cuerpo alero

M3

CONCRETO ARMADO fc=210 Kg/cm2


losa superior de alcantarilla
sardineles

M3

07.00.00

ACERO DE REFUERZO fy = 4200 Kg/cm2

KG

N veces
8.00
8.00
32.00
12.00

L
4.90
4.30
1.50
1.50

fierro
1/2"
1/2"
1/2"
1/2"

Kg/ml.
1.02
1.02
1.02
1.02

Peso(kg)
39.98
35.09
48.96
18.36

08.00.00

RELLENO CON MATERIAL PROPIO

M3

1.00

2.60

0.8

3.00

6.24

09.00.00

ENROCADO DE e= 0.25 ENTRADA Y SALIDA

M2

2.00

2.00

1.00

4.00

10.00.00

TARRAJEO CON MORTERO PROP. 1:2

M2
8.00
4.00

1.41
0.20

0.50
0.50

4.00
2.00

06.00.00

TOTAL

16.5

16.50
20.62

25.92

5.31

1.29

142.39

6.24

4.00

6.00

HOJA DE METRADOS EN OBRAS DE ARTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.
05.05.05
01.00.00
01.01.00
01.01.01
01.01.02

DESCRIPCIN
===TOMA TIPICA ==
TRAZO Y REPLANTEO PRELIMINAR
Trazo y replanteo
Toma
Estructura de limpia

02.00.00
02.01.00
02.01.00
02.02.00

MOVIMIENTO DE TIERRAS
Excavacion
Cajuela
Estructura de limpia

03.00.00
03.01.00

ENCOFRADO Y DESENCOFRADO
Volado de Compuerta

03.02.00
03.03.00
03.04.00
03.05.00
03.06.00

Colchon de salida
Aletas
Base de la toma
Tapa de la toma
Muros de la Toma

04.00.00

CONCRETO CICLOPEO
fc=140 Kg/cm2+ 40% P.G.
Volado de Compuerta

04.01.00
04.02.00
04.03.00

Colchon de salida
Aletas

05.00.00
05.01.00
05.02.00
05.03.00

CONCRETO ARMADO fc=210 Kg/cm2


Base de la toma
Tapa de la toma
Muros de la Toma

06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02

ACEROS DE REFUERZO fy=4200 kg/cm2


Base de la toma
Acero Longitudinal
Acero Transversal
Muros de la toma
Acero Longitudinal
Acero Transversal
Tapa de la toma
Acero Longitudinal
Acero Transversal

07.00.00
07.01.00

TARRAJEO DE IMPERMEABILIZACION
Volado de Compuerta

07.02.00
07.03.00
07.04.00
07.05.00
07.06.00

Colchon de salida
Aletas
Base de la toma
Tapa de la toma
Muros de la Toma

Und.

N de
Veces

PROV.
DPTO.

DIMENSIONES (m)
Largo
Ancho
Alto

: FAJARDO
: AYACUCHO

PARCIAL TOTAL

2.90
M2
M2

1.00
1.00

1.60
area ->

1.20
0.98

M3
M3

1.00
1.00

1.60
area ->

1.20
0.98

M2
M2
M2
M2
M2
M2
M2

2.00
2.00
2.00
2.00
1.00
2.00
2.00

0.50
0.60
2.10
2.12
5.60
1.10
4.40

0.60
1.00
0.60
0.40
0.20
1.20
1.40

1.92
0.98

4.21
1.40
1.55

2.69
1.52
22.10
0.60
1.20
2.52
1.70
1.12
2.64
12.32

M3

0.41

M3
M3
M3
M3

1.00
1.00
1.00
1.00

0.50
0.60
2.10
2.12

0.60
0.15
0.60
0.10

0.15
1.00
0.15
0.40

0.05
0.09
0.19
0.08

M3
M3
M3

1.00
1.00
1.00

1.60
1.10
2.00

1.20
1.20
2.40

0.20
0.20
1.40

0.38
0.26
6.72

7.37

KG N veces

fierro

Kg/ml. Peso(kg)

KG
KG

7.00
8.00

1.40
1.10

1/2"
1/2"

1.02
1.02

10.00
8.98

KG
KG

14.00
16.00

1.20
1.10

1/2"
1/2"

1.02
1.02

17.14
17.95

KG
KG

7.00
9.00

1.28
1.10

1/2"
1/2"

1.02
1.02

9.14
10.10

73.30

11.61
M2
M2
M2
M2
M2
M2
M2

1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.50
0.60
2.10
2.12
5.60
1.10
4.40

0.60
1.00
0.60
0.40
0.20
1.20
1.40

0.30
0.60
1.26
0.85
1.12
1.32
6.16

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
0+00
0+02
0+030
0+040
0+060
0+070
0+080
0+090
0+100
0+120
0+130
0+140
0+150
0+160
0+170
0+180
0+190
0+200
0+220
0+240
0+260
0+280
0+290
0+300
0+320
0+330
0+340
0+350
0+360
0+380
0+400
0+420
0+440
0+460
0+470
0+480
0+500
0+520
0+530
0+540
0+560
0+580
0+590
0+600
0+610
0+620
0+630
0+640

M2

Longitud
M

Volumen
total

0.57
0.77
0.31
0.36
0.43
0.25
0.17
0.3
0.2
0.31
0.36
0.42
0.54
0.46
0.44
0.47
0.35
0.35
0.33
0.25
0.38
0.41
0.45
0.58
0.72
0.72
0.82
0.87
0.83
0.65
0.58
2.13
0.71
0.72
2.28
1.86
1.34
0.91
0.36
1
1.38
1.07
0.98
1.17
0.79
1.3
2.73
2.76

20
10
10
20
10
10
10
10
20
10
10
10
10
10
10
10
10
20
20
20
20
10
10
20
10
10
10
10
20
20
20
20
20
10
10
20
20
10
10
20
20
10
10
10
10
10
10

13.4
5.4
3.35
7.9
3.4
2.1
2.35
2.5
5.1
3.35
3.9
4.8
5
4.5
4.55
4.1
3.5
6.8
5.8
6.3
7.9
4.3
5.15
13
7.2
7.7
8.45
8.5
14.8
12.3
27.1
28.4
14.3
15
20.7
32
22.5
6.35
6.8
23.8
24.5
10.25
10.75
9.8
10.45
20.15
27.45

MS
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
0%
0
20%
20%
20%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Tipo de suelo
RS
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
10%
10%
60%
60%
60%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

RF
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
90%
90%
20%
20%
20%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
90%
90%
90%
90%
90%
90%

MS

RS

RF

10.05
4.05
2.51
5.93
2.55
1.58
1.76
1.88
3.83
2.51
2.93
3.60
3.75
3.38
3.41
3.08
2.63
5.10
4.35
4.73
5.93
3.23
3.86
0.00
0.00
1.54
1.69
1.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.01
0.81
0.50
1.19
0.51
0.32
0.35
0.38
0.77
0.50
0.59
0.72
0.75
0.68
0.68
0.62
0.53
1.02
0.87
0.95
1.19
0.65
0.77
1.30
0.72
4.62
5.07
5.10
2.96
2.46
5.42
5.68
2.86
3.00
4.14
6.40
4.50
1.27
1.36
4.76
4.90
1.03
1.08
0.98
1.05
2.02
2.75

1.34
0.54
0.34
0.79
0.34
0.21
0.24
0.25
0.51
0.34
0.39
0.48
0.50
0.45
0.46
0.41
0.35
0.68
0.58
0.63
0.79
0.43
0.52
11.70
6.48
1.54
1.69
1.70
11.84
9.84
21.68
22.72
11.44
12.00
16.56
25.60
18.00
5.08
5.44
19.04
19.60
9.23
9.68
8.82
9.41
18.14
24.71

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
0+660
0+670
TOTALES
0+680
0+700
0+710
0+720
0+740
0+760
0+770
0+780
0+790
0+800
0+820
0+840
0+860
0+880
0+890
0+900
0+910
0+920
0+940
0+960
0+980
1+000
1+020
1+040
1+060
1+080
1+090
1+100
1+120
1+130
1+140
1+160
1+170
1+180
1+190
1+200
1+220
1+240
1+260
1+280
1+290
1+300
1+320
1+340
1+350

M2

2.43
4.29
3.77
2.67
2.06
2
1.95
1.3
1.13
0.9
0.93
0.81
0.56
0.4
0.33
0.51
0.39
0.47
0.31
0.31
0.4
0.44
0.49
0.98
0.64
0.66
0.55
0.42
0.4
0.48
0.44
0.5
0.56
0.49
0.45
0.41
0.38
1.73
5.21
0.56
0.68
0.63
0.57
0.5
0.45
0.51
0.5

Longitud
M
20
10
670
10
20
10
10
20
20
10
10
10
10
20
20
20
20
10
10
10
10
20
20
20
20
20
20
20
20
10
10
20
10
10
20
10
10
10
10
20
20
20
20
10
10
20
20
10

Volumen
total
51.9
33.6
583.2
40.3
64.4
23.65
20.3
39.5
32.5
12.15
10.15
9.15
8.7
13.7
9.6
7.3
8.4
4.5
4.3
3.9
3.1
7.1
8.4
9.3
14.7
16.2
13
12.1
9.7
4.1
4.4
9.2
4.7
5.3
10.5
4.7
4.3
3.95
10.55
69.4
57.7
12.4
13.1
6
5.35
9.5
9.6
5.05

MS
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
70%
70%
70%
70%
70%
70%
30%
30%
30%
30%
30%
30%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%

Tipo de suelo
RS
RF
10%
90%
10%
90%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
30%
30%
30%
30%
30%
30%
40%
40%
40%
30%
30%
30%
30%
30%
30%
30%
30%
30%
10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%

90%
90%
90%
90%
90%
90%
90%
90%
90%
90%
10%
10%
10%
10%
10%
10%
40%
40%
40%
40%
40%
40%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
80%
80%
80%
80%
80%
80%
80%
80%
80%
60%
60%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
0.00
0.00
91.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.59
6.72
5.11
5.88
3.15
3.01
1.17
0.93
2.13
2.52
2.79
4.41
1.62
1.30
1.21
1.94
0.82
0.88
1.84
0.94
1.06
2.10
0.94
0.86
0.40
1.06
6.94
5.77
1.24
1.31
0.60
0.54
0.95
1.92
1.01

RS
5.19
3.36
101.27
4.03
6.44
2.37
2.03
3.95
3.25
1.22
1.02
0.92
0.87
2.74
1.92
1.46
1.68
0.90
0.86
1.17
0.93
2.13
2.52
2.79
4.41
6.48
5.20
4.84
2.91
1.23
1.32
2.76
1.41
1.59
3.15
1.41
1.29
0.40
1.06
6.94
5.77
1.24
1.31
0.60
0.54
0.95
1.92
1.01

RF
46.71
30.24
390.41
36.27
57.96
21.29
18.27
35.55
29.25
10.94
9.14
8.24
7.83
1.37
0.96
0.73
0.84
0.45
0.43
1.56
1.24
2.84
3.36
3.72
5.88
8.10
6.50
6.05
4.85
2.05
2.20
4.60
2.35
2.65
5.25
2.35
2.15
3.16
8.44
55.52
46.16
9.92
10.48
4.80
4.28
7.60
5.76
3.03

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
1+360
1+380
1+390
1+400
1+420
TOTALES
1+440
1+460
1+480
1+500
1+520
1+540
1+550
1+560
1+580
1+590
1+600
1+620
1+640
1+660
1+680
1+700
1+720
1+740
1+760
1+780
1+800
1+820
1+840
1+860
1+870
1+880
1+900
1+920
1+940
1+960
1+980
2+000
2+020
2+040
2+060
2+080
2+100
2+120
2+130
2+140
2+160
2+180

M2

0.44
0.41
0.46
0.58
0.18
0.16
0.45
0.52
0.58
0.65
2.69
2.53
2.9
2.96
2.66
1.01
0.93
0.68
0.51
0.56
1.22
0.92
0.76
0.62
0.49
1.93
0.79
0.82
0.86
1.89
2.1
2.23
0.96
1.44
1.29
1.1
0.8
0.65
0.69
0.73
0.65
1.31
1.02
0.78
0.63
0.61
0.61

Longitud
M
10
20
10
10
20
750
20
20
20
20
20
20
10
10
20
10
10
20
20
20
20
20
20
20
20
20
20
20
20
20
10
10
20
20
20
20
20
20
20
20
20
20
20
20
10
10
20
20

Volumen
total
4.7
8.5
4.35
5.2
7.6
686.25
3.4
6.1
9.7
11
12.3
33.4
26.1
27.15
58.6
28.1
18.35
19.4
16.1
11.9
10.7
17.8
21.4
16.8
13.8
11.1
24.2
27.2
16.1
16.8
13.75
19.95
43.3
31.9
24
27.3
23.9
19
14.5
13.4
14.2
13.8
19.6
23.3
9
7.05
12.4
12.2

MS
20%
20%
20%
20%
20%

Tipo de suelo
RS
20%
20%
20%
20%
20%

RF
60%
60%
60%
60%
60%

20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%

20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%

60%
60%
60%
60%
60%
60%
60%
60%
60%
80%
80%
80%
80%
80%
80%
80%
80%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
80%
80%
80%
80%
80%
80%
80%
60%
60%
60%
60%
60%
60%
60%
60%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
0.94
1.70
0.87
1.04
1.52
90.72
0.68
1.22
1.94
2.20
2.46
6.68
5.22
5.43
11.72
2.81
1.84
1.94
1.61
1.19
1.07
1.78
2.14
3.36
2.76
2.22
4.84
5.44
3.22
3.36
2.75
3.99
8.66
3.19
2.40
2.73
2.39
1.90
1.45
1.34
2.84
2.76
3.92
4.66
1.80
1.41
2.48
2.44

RS
0.94
1.70
0.87
1.04
1.52
110.98
0.68
1.22
1.94
2.20
2.46
6.68
5.22
5.43
11.72
2.81
1.84
1.94
1.61
1.19
1.07
1.78
2.14
3.36
2.76
2.22
4.84
5.44
3.22
3.36
2.75
3.99
8.66
3.19
2.40
2.73
2.39
1.90
1.45
1.34
2.84
2.76
3.92
4.66
1.80
1.41
2.48
2.44

RF
2.82
5.10
2.61
3.12
4.56
484.56
2.04
3.66
5.82
6.60
7.38
20.04
15.66
16.29
35.16
22.48
14.68
15.52
12.88
9.52
8.56
14.24
17.12
10.08
8.28
6.66
14.52
16.32
9.66
10.08
8.25
11.97
25.98
25.52
19.20
21.84
19.12
15.20
11.60
10.72
8.52
8.28
11.76
13.98
5.40
4.23
7.44
7.32

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
2+200
2+220
2+240
2+260
2+280
2+300
2+320
2+340
TOTALES
2+360
2+380
2+400
2+420
2+440
2+450
2+460
2+480
2+500
2+510
2+520
2+540
2+560
2+580
2+590
2+600
2+620
2+640
2+650
2+660
2+680
2+700
2+720
2+740
2+750
2+760
2+780
2+800
2+810
2+820
2+840
2+860
2+880
2+900
2+910
2+920
2+930
2+940
2+960

M2

0.69
0.53
0.29
0.59
0.67
1.16
1.27
1.11
1.28
1.54
2.1
2.57
2.75
2.75
1.41
1.72
0.98
0.69
0.61
0.54
1.03
2.65
2.73
4.02
2.68
2.8
2.8
2.97
3.53
2.89
2.44
2.69
1.92
1.32
0.92
0.51
0.47
0.51
0.61
0.65
0.51
0.52
0.57
0.84
0.59
0.35
0.57

Longitud
M
20
20
20
20
20
20
20
20
920
20
20
20
20
20
10
10
20
20
10
10
20
20
20
10
10
20
20
10
10
20
20
20
20
10
10
20
20
10
10
20
20
20
20
10
10
10
10
20

Volumen
total
13
12.2
8.2
8.8
12.6
18.3
24.3
23.8
921.25
25.5
28.2
36.4
46.7
53.2
27.5
20.8
31.3
27
8.35
6.5
11.5
15.7
36.8
26.9
33.75
67
54.8
28
28.85
65
64.2
53.3
51.3
23.05
16.2
22.4
14.3
4.9
4.9
11.2
12.6
11.6
10.3
5.45
7.05
7.15
4.7
9.2

MS
20%
20%
20%
20%
20%
20%
20%
10%

Tipo de suelo
RS
20%
20%
20%
20%
20%
20%
20%
20%

RF
60%
60%
60%
60%
60%
60%
60%
65%

10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

65%
65%
65%
65%
65%
65%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
2.60
2.44
1.64
1.76
2.52
3.66
4.86
2.38
152.10
2.55
2.82
3.64
4.67
5.32
2.75
2.08
3.13
2.70
0.84
0.65
1.15
1.57
3.68
2.69
3.38
6.70
5.48
2.80
17.31
39.00
38.52
31.98
30.78
13.83
9.72
13.44
8.58
2.94
2.94
6.72
7.56
6.96
6.18
3.27
4.23
4.29
2.82
5.52

RS
2.60
2.44
1.64
1.76
2.52
3.66
4.86
4.76
154.48
5.10
5.64
7.28
9.34
10.64
5.50
4.16
6.26
5.40
1.67
1.30
2.30
3.14
7.36
5.38
6.75
13.40
10.96
5.60
5.77
13.00
12.84
10.66
10.26
4.61
3.24
4.48
2.86
0.98
0.98
2.24
2.52
2.32
2.06
1.09
1.41
1.43
0.94
1.84

RF
7.80
7.32
4.92
5.28
7.56
10.98
14.58
15.47
613.49
16.58
18.33
23.66
30.36
34.58
17.88
14.56
21.91
18.90
5.85
4.55
8.05
10.99
25.76
18.83
23.63
46.90
38.36
19.60
5.77
13.00
12.84
10.66
10.26
4.61
3.24
4.48
2.86
0.98
0.98
2.24
2.52
2.32
2.06
1.09
1.41
1.43
0.94
1.84

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
2+980
2+990
3+000
3+020
3+040
3+060
3+080
3+100
3+110
3+120
3+130
TOTALES
3+140
3+160
3+180
3+200
3+220
3+240
3+260
3+280
3+290
3+300
3+320
3+340
3+360
3+370
3+380
3+400
3+420
3+440
3+460
3+470
3+480
3+490
3+500
3+520
3+540
3+560
3+580
3+600
3+620
3+640
3+660
3+680
3+690
3+700
3+710
3+720

M2

0.64
0.68
0.69
0.72
0.63
0.55
0.72
0.74
0.74
0.69
0.65
0.65
0.65
0.66
0.58
1.28
1.05
0.65
0.48
0.35
0.36
0.39
0.53
0.58
0.55
0.79
0.48
0.68
0.89
1.25
1.25
1.46
1.5
1.36
1.21
1.18
1.22
2.71
2.69
2.76
2.19
1.14
0.92
0.88
1.18
1.35
0.57

Longitud
M
20
10
10
20
20
20
20
20
10
10
10
790
10
20
20
20
20
20
20
20
10
10
20
20
20
10
10
20
20
20
20
10
10
10
10
20
20
20
20
20
20
20
20
20
10
10
10
10

Volumen
total
12.1
6.6
6.85
14.1
13.5
11.8
12.7
14.6
7.4
7.15
6.7
1127.05
6.5
13
13.1
12.4
18.6
23.3
17
11.3
4.15
3.55
7.5
9.2
11.1
5.65
6.7
12.7
11.6
15.7
21.4
12.5
13.55
14.8
14.3
25.7
23.9
24
39.3
54
54.5
49.5
33.3
20.6
9
10.3
12.65
9.6

MS
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%

Tipo de suelo
RS
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

RF
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%
70%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
7.26
3.96
4.11
8.46
8.10
7.08
7.62
8.76
4.44
4.29
4.02
383.28
3.90
7.80
7.86
7.44
11.16
13.98
10.20
6.78
2.49
2.13
4.50
5.52
6.66
3.39
4.02
7.62
6.96
9.42
12.84
7.50
9.49
10.36
10.01
17.99
16.73
16.80
27.51
37.80
38.15
34.65
23.31
14.42
6.30
7.21
8.86
6.72

RS
2.42
1.32
1.37
2.82
2.70
2.36
2.54
2.92
1.48
1.43
1.34
225.41
1.30
2.60
2.62
2.48
3.72
4.66
3.40
2.26
0.83
0.71
1.50
1.84
2.22
1.13
1.34
2.54
2.32
3.14
4.28
2.50
2.71
2.96
2.86
5.14
4.78
4.80
7.86
10.80
10.90
9.90
6.66
4.12
1.80
2.06
2.53
1.92

RF
2.42
1.32
1.37
2.82
2.70
2.36
2.54
2.92
1.48
1.43
1.34
507.49
1.30
2.60
2.62
2.48
3.72
4.66
3.40
2.26
0.83
0.71
1.50
1.84
2.22
1.13
1.34
2.54
2.32
3.14
4.28
2.50
1.36
1.48
1.43
2.57
2.39
2.40
3.93
5.40
5.45
4.95
3.33
2.06
0.90
1.03
1.27
0.96

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
3+740
3+760
3+780
3+800
3+810
3+820
3+840
3+850
3+860
3+870
3+880
3+900
3+920
3+930
TOTALES
3+940
3+960
3+980
4+000
4+020
4+030
4+040
4+060
4+080
4+100
4+110
4+120
4+140
4+160
4+180
4+190
4+200
4+220
4+230
4+240
4+260
4+280
4+300
4+310
4+320
4+330
4+340
4+350
4+360
4+380
4+400
4+420
4+440

M2

0.19
0.66
0.97
0.52
0.66
1.1
0.62
0.46
0.47
0.1
0.96
1
0.98
0.96
0.9
0.9
0.94
0.91
0.99
1.04
1.17
1.12
1.16
0.98
0.91
0.9
0.89
0.99
1.07
1.04
1.01
1.05
1.08
1.04
1.03
1.28
1.22
1.18
1.08
0.98
1.42
1.43
1.42
0.93
0.79
0.94
0.94

Longitud
M
20
20
20
20
10
10
20
10
10
10
10
20
20
10
800
10
20
20
20
20
10
10
20
20
20
10
10
20
20
20
10
10
20
10
10
20
20
20
10
10
10
10
10
10
20
20
20
20

Volumen
total
7.6
8.5
16.3
14.9
5.9
8.8
17.2
5.4
4.65
2.85
5.3
19.6
19.8
9.7
792.45
9.3
18
18.4
18.5
19
10.15
11.05
22.9
22.8
21.4
9.45
9.05
17.9
18.8
20.6
10.55
10.25
20.6
10.65
10.6
20.7
23.1
25
12
11.3
10.3
12
14.25
14.25
23.5
17.2
17.3
18.8

MS
70%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

Tipo de suelo
RS
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

RF
10%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%

10%
10%
10%
10%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%

10%
10%
10%
10%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%

80%
80%
80%
80%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
5.32
0.85
1.63
1.49
0.59
0.88
1.72
0.54
0.47
0.29
0.53
1.96
1.98
0.97
447.68
0.93
1.80
1.84
1.85
14.25
7.61
8.29
17.18
17.10
16.05
7.09
6.79
13.43
14.10
15.45
7.91
7.69
15.45
7.99
7.95
15.53
17.33
18.75
9.00
8.48
7.73
9.00
10.69
10.69
17.63
12.90
12.98
14.10

RS
1.52
0.85
1.63
1.49
0.59
0.88
1.72
0.54
0.47
0.29
0.53
1.96
1.98
0.97
144.60
0.93
1.80
1.84
1.85
2.85
1.52
1.66
3.44
3.42
3.21
1.42
1.36
2.69
2.82
3.09
1.58
1.54
3.09
1.60
1.59
3.11
3.47
3.75
1.80
1.70
1.55
1.80
2.14
2.14
3.53
2.58
2.60
2.82

RF
0.76
6.80
13.04
11.92
4.72
7.04
13.76
4.32
3.72
2.28
4.24
15.68
15.84
7.76
200.17
7.44
14.40
14.72
14.80
1.90
1.02
1.11
2.29
2.28
2.14
0.95
0.91
1.79
1.88
2.06
1.06
1.03
2.06
1.07
1.06
2.07
2.31
2.50
1.20
1.13
1.03
1.20
1.43
1.43
2.35
1.72
1.73
1.88

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
4+460
4+480
4+500
4+510
4+520
4+540
4+560
4+570
4+580
4+590
4+600
4+620
4+630
4+640
4+660
4+680
4+700
TOTALES
4+720
4+730
4+740
4+750
4+760
4+780
4+800
4+810
4+820
4+840
4+860
4+880
4+900
4+920
4+930
4+940
4+960
4+970
4+980
5+000
5+010
5+020
5+040
5+060
5+080
5+100
5+120
5+140
5+160
5+170

M2

0.58
1.46
2.54
1.83
1.68
1.91
1.28
0.74
1.26
1.11
1.09
0.81
0.91
1.04
1.88
2.53
3.2
2.37
2.02
1.91
1.64
1.13
2.33
2.35
2.45
1.89
1.47
1.3
2.88
1.56
1.7
1.08
1.8
0.45
1.5
1.91
2.24
1.98
2.03
1.36
1.41
1.39
1.4
1.58
1.22
2.32
2.23

Longitud
M
20
20
20
10
10
20
20
10
10
10
10
20
10
10
20
20
20
770
20
10
10
10
10
20
20
10
10
20
20
20
20
20
10
10
20
10
10
20
10
10
20
20
20
20
20
20
20
10

Volumen
total
15.2
20.4
40
21.85
17.55
35.9
31.9
10.1
10
11.85
11
19
8.6
9.75
29.2
44.1
57.3
923.35
55.7
21.95
19.65
17.75
13.85
34.6
46.8
24
21.7
33.6
27.7
41.8
44.4
32.6
13.9
14.4
22.5
9.75
17.05
41.5
21.1
20.05
33.9
27.7
28
27.9
29.8
28
35.4
22.75

MS
75%
75%
75%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%

Tipo de suelo
RS
15%
15%
15%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%

RF
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%

25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

MS
11.40
15.30
30.00
14.20
11.41
23.34
20.74
6.57
6.50
7.70
7.15
12.35
5.59
6.34
18.98
28.67
37.25
618.97
36.21
14.27
12.77
11.54
9.00
22.49
30.42
15.60
14.11
21.84
18.01
27.17
28.86
21.19
9.04
9.36
14.63
6.34
11.08
26.98
16.88
16.04
27.12
22.16
22.40
22.32
23.84
22.40
28.32
18.20

RS
2.28
3.06
6.00
5.46
4.39
8.98
7.98
2.53
2.50
2.96
2.75
4.75
2.15
2.44
7.30
11.03
14.33
167.10
13.93
5.49
4.91
4.44
3.46
8.65
11.70
6.00
5.43
8.40
6.93
10.45
11.10
8.15
3.48
3.60
5.63
2.44
4.26
10.38
2.11
2.01
3.39
2.77
2.80
2.79
2.98
2.80
3.54
2.28

RF
1.52
2.04
4.00
2.19
1.76
3.59
3.19
1.01
1.00
1.19
1.10
1.90
0.86
0.98
2.92
4.41
5.73
137.28
5.57
2.20
1.97
1.78
1.39
3.46
4.68
2.40
2.17
3.36
2.77
4.18
4.44
3.26
1.39
1.44
2.25
0.98
1.71
4.15
2.11
2.01
3.39
2.77
2.80
2.79
2.98
2.80
3.54
2.28

HOJA DE EXPLANACIONES PARA VOLUMENES DE CORTE


PROYECTO : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE" PROV.
PROPIET.
: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO DPTO.
DISTRITO : COLCA
PROG.

A. CORTE

KM
5+180
5+200
5+220
5+240
5+260
5+277.5
TOTALES

M2

2.46
1.73
0.85
1.1
0.98
1.58

Longitud
M
10
20
20
20
20
17.5
577.5

Volumen
total
23.45
41.9
25.8
19.5
20.8
22.4
983.65

MS
80%
80%
80%
80%
80%
80%

Tipo de suelo
RS
10%
10%
10%
10%
10%
10%

: HUAMANGA
: : AYACUCHO

VOLUMENES PARCIALES

RF
10%
10%
10%
10%
10%
10%

MS
18.76
33.52
20.64
15.60
16.64
17.92
703.64

RS
2.35
4.19
2.58
1.95
2.08
2.24
181.65

RF
2.35
4.19
2.58
1.95
2.08
2.24
98.37

HOJA DE EXPLANACIONES PARA VOLUMENES DE RELLENO


PROYECT : "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PROG.

A. RELLENO longitud
m^2

0+00
0+02
0+030
0+040
0+060
0+070
0+080
0+090
0+100
0+120
0+130
0+140
0+150
0+160
0+170
0+180
0+190
0+200
0+220
0+240
0+260
0+280
0+290
0+300
0+320
0+330
0+340
0+350
0+360
0+380
0+400
0+420
0+440
0+460
0+470
0+480
0+500
0+520
0+530
0+540
0+560
0+580
0+590
0+600
0+610
0+620
0+630
0+640
0+660
0+670
TOTALES
0+680

0.15
0
0.84
0.87
0.57
1.41
1.8
0.99
1.33
0.95
0.77
0.52
0.19
0.44
0.96
0.4
0.92
0.78
0.75
1.32
0.83
0.55
0.42
0.11
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

m
20
10
10
20
10
10
10
10
20
10
10
10
10
10
10
10
10
20
20
20
20
10
10
20
10
10
10
10
20
20
20
20
20
10
10
20
20
10
10
20
20
10
10
10
10
10
10
20
10
670
10

Volumen
total
1.5
4.2
8.55
14.4
9.9
16.05
13.95
11.6
22.8
8.6
6.45
3.55
3.15
7
6.8
6.6
8.5
15.3
20.7
21.5
13.8
4.85
2.65
1.1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
233.5
0

Tipo de suelo
MS
RS
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
75%
15%
10%
10%
20%
60%
20%
60%
20%
60%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%

PROV.
DPTO.

: HUAMANGA
: AYACUCHO

VOLUMENES PARCIALES

M. PROPIO
1.13
0.00
6.41
10.80
7.43
12.04
10.46
8.70
17.10
6.45
4.84
2.66
2.36
5.25
5.10
4.95
6.38
11.48
15.53
16.13
10.35
3.64
1.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
171.15
0.00

ENROCADO
0.23
0.63
1.28
2.16
1.49
2.41
2.09
1.74
3.42
1.29
0.97
0.53
0.47
1.05
1.02
0.99
1.28
2.30
3.11
3.23
2.07
0.73
0.40
0.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.97
0.00

0+700
0+710
0+720
0+740
0+760
0+770
0+780
0+790
0+800
0+820
0+840
0+860
0+880
0+890
0+900
0+910
0+920
0+940
0+960
0+980
1+000
1+020
1+040
1+060
1+080
1+090
1+100
1+120
1+130
1+140
1+160
1+170
1+180
1+190
1+200
1+220
1+240
1+260
1+280
1+290
1+300
1+320
1+340
1+350
1+360
1+380
1+390
1+400
1+420
TOTALES
1+440
1+460
1+480
1+500
1+520
1+540
1+550
1+560
1+580
1+590

0
0
0
0
0
0
0
0
0
0.18
0.54
0.92
0.62
0.83
0.37
0
0.91
0.6
0.57
0.51
0.17
0
0
0.21
0.84
0.78
0.36
0.62
0.33
0.18
0.38
0.47
0.6
0.69
0
0
0.16
0
0
0.12
0.32
0.51
0.3
0.29
0.47
0.64
0.43
0.16
1.47
1.57
0.54
0.21
0.12
0
0
0
0
0
0

20
10
10
20
20
10
10
10
10
20
20
20
20
10
10
10
10
20
20
20
20
20
20
20
20
10
10
20
10
10
20
10
10
10
10
20
20
20
20
10
10
20
20
10
10
20
10
10
20
750
20
20
20
20
20
20
10
10
20
10

0
0
0
0
0
0
0
0
0
1.8
7.2
14.6
15.4
7.25
6
1.85
4.55
15.1
11.7
10.8
6.8
1.7
0
2.1
10.5
8.1
5.7
9.8
4.75
2.55
5.6
4.25
5.35
6.45
3.45
0
1.6
1.6
0
0.6
2.2
8.3
8.1
2.95
3.8
11.1
5.35
2.95
16.3
238.2
30.4
21.1
7.5
3.3
1.2
0
0
0
0
0

70%
70%
70%
70%
70%
70%
30%
30%
30%
30%
30%
30%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%

10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
30%
30%
30%
30%
30%
30%
40%
40%
40%
30%
30%
30%
30%
30%
30%
30%
30%
30%
10%
10%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%

20%
20%
20%
20%
20%
20%
20%
20%
20%
10%

20%
20%
20%
20%
20%
20%
20%
20%
20%
10%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.26
5.04
10.22
10.78
5.08
4.20
0.56
1.37
4.53
3.51
3.24
2.04
0.17
0.00
0.21
2.10
1.62
1.14
1.96
0.95
0.51
1.12
0.85
1.07
0.65
0.35
0.00
0.16
0.16
0.00
0.06
0.22
0.83
1.62
0.59
0.76
2.22
1.07
0.59
3.26
76.05
6.08
4.22
1.50
0.66
0.24
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.36
1.44
2.92
3.08
1.45
1.20
0.56
1.37
4.53
3.51
3.24
2.04
0.68
0.00
0.84
3.15
2.43
1.71
2.94
1.43
0.77
1.68
1.28
1.61
0.65
0.35
0.00
0.16
0.16
0.00
0.06
0.22
0.83
1.62
0.59
0.76
2.22
1.07
0.59
3.26
56.72
6.08
4.22
1.50
0.66
0.24
0.00
0.00
0.00
0.00
0.00

1+600
1+620
1+640
1+660
1+680
1+700
1+720
1+740
1+760
1+780
1+800
1+820
1+840
1+860
1+870
1+880
1+900
1+920
1+940
1+960
1+980
2+000
2+020
2+040
2+060
2+080
2+100
2+120
2+130
2+140
2+160
2+180
2+200
2+220
2+240
2+260
2+280
2+300
2+320
2+340
TOTALES
2+360
2+380
2+400
2+420
2+440
2+450
2+460
2+480
2+500
2+510
2+520
2+540
2+560
2+580
2+590
2+600
2+620
2+640
2+650

0
0
0
0.33
0.16
0
0
0
0
0.35
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.27
1.05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.24
2.82
0
0
0
0
0
0

10
20
20
20
20
20
20
20
20
20
20
20
20
20
10
10
20
20
20
20
20
20
20
20
20
20
20
20
10
10
20
20
20
20
20
20
20
20
20
20
920
20
20
20
20
20
10
10
20
20
10
10
20
20
20
10
10
20
20
10

0
0
0
3.3
4.9
1.6
0
0
0
3.5
3.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.7
13.2
10.5
0
0
0
0
106.7
0
0
0
0
0
0
0
0
0
0
0
2.4
30.6
28.2
0
0
0
0
0

10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%

10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

0.00
0.00
0.00
0.33
0.49
0.16
0.00
0.00
0.00
0.70
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
2.64
2.10
0.00
0.00
0.00
0.00
20.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.24
3.06
2.82
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.33
0.49
0.16
0.00
0.00
0.00
0.70
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
2.64
2.10
0.00
0.00
0.00
0.00
20.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.48
6.12
5.64
0.00
0.00
0.00
0.00
0.00

2+660
2+680
2+700
2+720
2+740
2+750
2+760
2+780
2+800
2+810
2+820
2+840
2+860
2+880
2+900
2+910
2+920
2+930
2+940
2+960
2+980
2+990
3+000
3+020
3+040
3+060
3+080
3+100
3+110
3+120
3+130
TOTALES
3+140
3+160
3+180
3+200
3+220
3+240
3+260
3+280
3+290
3+300
3+320
3+340
3+360
3+370
3+380
3+400
3+420
3+440
3+460
3+470
3+480
3+490
3+500
3+520
3+540
3+560
3+580
3+600

0
0
0
0
0
0
0
0
0.36
0.47
0.31
0
0
0.3
0.32
0.19
0
0
1.06
0.17
0
0
0
0
0
0.24
0
0
0
0
0
0
0
0
0.15
0
0
0
0.36
0.77
0.74
0.64
0.34
0
0
0
0.51
0
0
0
0
0
0
0
0
0
0
0
0

10
20
20
20
20
10
10
20
20
10
10
20
20
20
20
10
10
10
10
20
20
10
10
20
20
20
20
20
10
10
10
790
10
20
20
20
20
20
20
20
10
10
20
20
20
10
10
20
20
20
20
10
10
10
10
20
20
20
20
20

0
0
0
0
0
0
0
0
3.6
4.15
3.9
3.1
0
3
6.2
2.55
0.95
0
5.3
12.3
1.7
0
0
0
0
2.4
2.4
0
0
0
0
112.75
0
0
0
1.5
1.5
0
0
3.6
5.65
7.55
13.8
9.8
3.4
0
0
5.1
5.1
0
0
0
0
0
0
0
0
0
0
0

60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
70%
70%
70%
70%
70%
70%
70%
70%

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.16
2.49
2.34
1.86
0.00
1.80
3.72
1.53
0.57
0.00
3.18
7.38
1.02
0.00
0.00
0.00
0.00
1.44
1.44
0.00
0.00
0.00
0.00
37.05
0.00
0.00
0.00
0.90
0.90
0.00
0.00
2.16
3.39
4.53
8.28
5.88
2.04
0.00
0.00
3.06
3.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.72
0.83
0.78
0.62
0.00
0.60
1.24
0.51
0.19
0.00
1.06
2.46
0.34
0.00
0.00
0.00
0.00
0.48
0.48
0.00
0.00
0.00
0.00
22.55
0.00
0.00
0.00
0.30
0.30
0.00
0.00
0.72
1.13
1.51
2.76
1.96
0.68
0.00
0.00
1.02
1.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3+620
3+640
3+660
3+680
3+690
3+700
3+710
3+720
3+740
3+760
3+780
3+800
3+810
3+820
3+840
3+850
3+860
3+870
3+880
3+900
3+920
3+930
TOTALES
3+940
3+960
3+980
4+000
4+020
4+030
4+040
4+060
4+080
4+100
4+110
4+120
4+140
4+160
4+180
4+190
4+200
4+220
4+230
4+240
4+260
4+280
4+300
4+310
4+320
4+330
4+340
4+350
4+360
4+380
4+400
4+420
4+440
4+460
4+480
4+500
4+510

0
0
0.02
0.01
0.04
0
0
0.53
1.69
0.12
0
0.35
0.31
0
0.39
0.75
0.65
1.27
0
0
0
0
0
0
0
0
0
0
0
0
0.13
0.29
0.12
0.49
0.79
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

20
20
20
20
10
10
10
10
20
20
20
20
10
10
20
10
10
10
10
20
20
10
800
10
20
20
20
20
10
10
20
20
20
10
10
20
20
20
10
10
20
10
10
20
20
20
10
10
10
10
10
10
20
20
20
20
20
20
20
10

0
0
0.2
0.3
0.25
0.2
0
2.65
22.2
18.1
1.2
3.5
3.3
1.55
3.9
5.7
7
9.6
6.35
0
0
0
143
0
0
0
0
0
0
0
0
1.3
4.2
2.05
3.05
12.8
7.9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

70%
70%
70%
70%
70%
70%
70%
70%
70%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

20%
20%
20%
20%
20%
20%
20%
20%
20%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

10%
10%
10%
10%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
65%

10%
10%
10%
10%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
15%
25%

0.00
0.00
0.14
0.21
0.18
0.14
0.00
1.86
15.54
1.81
0.12
0.35
0.33
0.16
0.39
0.57
0.70
0.96
0.64
0.00
0.00
0.00
58.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.98
3.15
1.54
2.29
9.60
5.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.04
0.06
0.05
0.04
0.00
0.53
4.44
1.81
0.12
0.35
0.33
0.16
0.39
0.57
0.70
0.96
0.64
0.00
0.00
0.00
22.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.20
0.63
0.31
0.46
1.92
1.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4+520
4+540
4+560
4+570
4+580
4+590
4+600
4+620
4+630
4+640
4+660
4+680
4+700
TOTALES
4+720
4+730
4+740
4+750
4+760
4+780
4+800
4+810
4+820
4+840
4+860
4+880
4+900
4+920
4+930
4+940
4+960
4+970
4+980
5+000
5+010
5+020
5+040
5+060
5+080
5+100
5+120
5+140
5+160
5+170
5+180
5+200
5+220
5+240
5+260
5+277.5
TOTALES

0
0
0
0.27
0
0
0.02
0.2
0.1
0
0
0
0
0
0
0
0
0.14
0
0
0
0
0
0
0
0
0
0.03
0
0.85
0
0
0
0
0
0
0
0.16
0
0
0
0
0
0
0
0.3
0.06
0.08
0

10
20
20
10
10
10
10
20
10
10
20
20
20
770
20
10
10
10
10
20
20
10
10
20
20
20
20
20
10
10
20
10
10
20
10
10
20
20
20
20
20
20
20
10
10
20
20
20
20
17.5
577.5

0
0
0
1.35
1.35
0
0.1
2.2
1.5
0.5
0
0
0
38.3
0
0
0
0
0.7
1.4
0
0
0
0
0
0
0
0
0.15
0.15
8.5
4.25
0
0
0
0
0
0
1.6
1.6
0
0
0
0
0
0
3
3.6
1.4
0.7
27.05

65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%

25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%

65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
65%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%

25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%

0.00
0.00
0.00
0.88
0.88
0.00
0.07
1.43
0.98
0.33
0.00
0.00
0.00
28.03
0.00
0.00
0.00
0.00
0.46
0.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
5.53
2.76
0.00
0.00
0.00
0.00
0.00
0.00
1.28
1.28
0.00
0.00
0.00
0.00
0.00
0.00
2.40
2.88
1.12
0.56
19.37

0.00
0.00
0.00
0.34
0.34
0.00
0.03
0.55
0.38
0.13
0.00
0.00
0.00
6.45
0.00
0.00
0.00
0.00
0.18
0.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.04
2.13
1.06
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.16
0.00
0.00
0.00
0.00
0.00
0.00
0.30
0.36
0.14
0.07
4.98

RESUMEN DE EXPLANACIONES
PROYECTO
PROPIET.
DISTRITO

PROGRESIVA

: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"


: PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
: COLCA

DISTANCIAS
m^3
0+000-0+670
670
0+670-1+420
750
1+420-2+340
920
2+340-3+130
790
3+130-3+930
800
3+930-4+700
770
4+700-5+277.5
577.5
TOTALES
5277.5

VOLUMENES(M^3)
RELLENO
CORTE
233.5
583.2
238.2
686.25
106.7
921.25
112.75
1127.05
143
792.45
38.3
923.35
27.05
983.65
899.5
6017.2

RELLENO m^3
M. PROPIO
ENROCADO
171.15
34.97
76.05
56.72
20.36
20.36
37.05
22.55
58.28
22.58
28.03
6.45
19.37
4.98
410.29
168.61

PROV.
DPTO.

CORTE(M^3)
MAT. SUELTO R. SUELTA
91.52
101.27
90.72
110.98
152.10
154.48
383.28
225.41
447.68
144.60
618.97
167.10
703.64
181.65
2487.91
1085.49

: HUAMANGA
: AYACUCHO

R. FIJA
390.41
484.56
613.49
507.49
200.17
137.28
98.37
2431.76

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.
01.00.00

DESCRIPCIN

Und.

N de
Veces

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

DIMENSIONES (m)
Largo
Ancho
Alto

PARCIAL

TOTAL

== OBRAS PROVISIONALES ==
M2

CARTEL DE IDENTIFICACIN DE LA OBRA 3.60 * 4.80 M

UND

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO

EST

01.01.00

CAMPAMENTO PROVISIONAL DE OBRA

01.02.00
01.03.00

02.00.00

PROV.
DPTO.
FECHA

10.00

6.00

VER ANALISIS EN CALCULO DE FLETES

60.00

60.00

1.00

1.00

1.00

1.00

== BOCATOMA ==

02.01.00

Trabajos Preliminares

02.01.01

LIMPIEZA DE TERRENO - BOCATOMA

M2

1.00

30.38

25.00

759.50

759.50

25.00

759.50

759.50

30.38

30.38

PLAN TA GE N ER AL
ES C AL A : 1/200

3 .55

1.00

3.00

5 .00

2.9 3

12 .07

RIO HUILL C AM A YO

2 839.30

2.82

MUROS DE
ENCAUZAMIENTO

30.3 8

S o ro = 4. 5%

RE JIL LA DE CAPTACION
COMPU ERTA D ESRIPIADORA
TIPO ARMCO
MODELO 10-00
0 .3 0x0.3 0

1
2.38

5.00

COMPUERTA D E AD MISION
TIPO ARMCO
MODELO 10-00
20 .00
0 .4 0x0.4 0

3.00

CANAL DESRIPIADOR
So = 2%

1.50

.20

.2 1. 0.2

02.01.02

TRAZO Y REPLANTEO - BOCATOMA

M2

1.00

30.38

02.01.03

DESVIO DE CAUCE

ML

1.00

30.38

02.02.00

Movimiento de tierras

02.02.01

EXCAVACIN DE MATERIAL SUELTO (SOBRE AGUA)

M3

Margen Izquierda
Muro Tipo I
Muro Tipo II

M3
M3

1.00
1.00

area ->
area ->

6.24
6.24

7.38
7.97

46.05
49.73

46.05
49.73

Muro Tipo I
Muro Tipo II

M3
M3

1.00
1.00

area ->
area ->

6.24
6.24

7.38
7.97

46.05
49.73

46.05
49.73

Margen Derecha

02.02.02

EXCAVACIN DE MATERIAL COMUN BAJO AGUA

M3

area ->

34.23

30.38

0.50

519.95

519.95

02.02.03

EXCAVACIN DE ROCA SUELTA BAJO AGUA

M3

area ->

34.23

30.38

0.30

311.97

311.97

02.02.04

EXCAVACIN DE ROCA FIJA BAJO AGUA

M3

area ->

34.23

30.38

0.20

207.98

207.98

02.02.05

RELLENO Y COMPACTADO EN ESPALDONES MATERIAL PROPIO

M3

373.16

Estribo izquierdo

1.00

area ->

8.82

38.00

335.16

Estribo derecho

1.00

area ->

38.00

38.00

S EC C IO N 2-2
E SC ALA: 1/125

CONCRETO ARMADO
f'c = 210 kg/cm2

.39

15.00

5.00

.39

4.01
Eje de Antecanal

.25

4.00

2843.70

LOSA DE OPERACION
DE COMPUERTAS

.70

N.A. mxima avenida

1
3.90
5.90

REJILLA DE CAPTACION

COMPUERTA
DE ADMISION

5.40
2839.80
2839.30

.50

2837.80

.50

.15
.29
.06

2838.86

1.00
.50

.15
.35

2.00

2839.65
.50

2839.36
.50

2839.56
.75 2838.61

2838.61

.50
.30

2838.11
.1 .3 .1

3.35

02.03.00

Obras de Concreto Simple

3.71

.30
.20
.35
.40

COMPUERTA
DESRIPIADORA

.7 .1.4 .2
CONCRETO ARMADO
f'c = 210 Kg/cm2

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA

PROV.
DPTO.
FECHA

02.03.01

CONCRETO SIMPLE f'c=175 KG/CM2 BARRAJE

M3

N de
Veces
1.00

02.03.02

CONCRETO EN TOMA TIPO ALPINA (f'c=140 kg/cm2 + 30% PM)

M3

1.00

5.00

area ->

02.03.03

ENROCADO DE PROTEC. (CONCRETO CICLOPEO f'c=140 kg/cm2 +30% PG) M3

1.00

area ->

607.40

02.04.00

Obras de Concreto Armado

02.04.01

CONCRETO ARMADO EN MUROS DE ENCAUZAMIENTO f'c=210 Kg/cm2


Estribo derecho
TIPO I
TIPO II
Estribo izquierdo
TIPO I
TIPO II

M3

CONCRETO f'c=175 KG/CM2 EN LOSAS Y PANTALLAS

M3

PART.

02.04.01

DESCRIPCIN

Und.

losa
losa de operacin de compuerta
02.05.00

ENCOFRADO Y DESENCOFRADO

02.05.01

ENCOFRADO Y DESENCOFRADO EN MUROS


TIPO I

02.05.03

02.05.04

ENCOFRADO Y DESENCOFRADO EN TOMA TIPO ALPINA

ENCOFRADO Y DESENCOFRADO DE BARRAJE

ENCOFRADO Y DESENCOFRADO DE LOSAS

PARCIAL

84.60

5.38

26.90

26.90

1.00

607.40

607.40

140.24
1.00
1.00

area ->
area ->

3.57
2.34

11.35
20.00

40.46
46.80

1.00
1.00

area ->
area ->

3.57
2.34

8.92
9.05

31.80
21.18

1.00
1.00

3.90
2.00

area ->
area ->

1.02
1.20

3.98
2.40

1.00
1.00
1.00
1.00

20.27
20.27
29.05
29.05

5.40
5.40
4.05
4.05

109.46
109.46
117.65
117.65

1.00
1.00
1.00
1.00

5.00
5.00
5.00
5.00

2.35
1.85
1.04
0.75

11.75
9.25
5.20
3.75

1.00
1.00

15.00
15.00

2.50
2.92

37.50
43.80

2.00
2.00

1.80
1.42

1.75
1.75

6.30
4.97

6.38

454.22

29.95

M2

81.30

M2

ACERO DE REFUERZO

02.06.01

ACERO DE REFUERZO para Losas fy=4200 Kg/cm2


Acero Longitudinal
Acero Transversal

KG

ACERO DE REFUERZO EN MUROS DE ENCAUZAMIENTO fy=4200 Kg/cm2


TIPO I
Acero Longitudinal en la base
Acero Transversal en la base
Acero Longitudinal en Pantalla

KG

11.27

N veces

11.00
26.00

Acero Transversal en Pantalla


TIPO II
Acero Longitudinal en la base
Acero Transversal en la base
Acero Longitudinal en Pantalla

Acero Transversal en Pantalla

TOTAL

84.60

M2

02.06.00

02.06.02

DIMENSIONES (m)
Largo
Ancho
Alto
15.00
area ->
5.64

M2

TIPO II

02.05.02

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

N veces

fierro

5.35
2.00
L

Kg/ml.

3/8"
3/8"
fierro

0.56
0.56
Kg/ml.

Peso(kg)

62.08

32.96
29.12
Peso(kg)

164
21.00
102
102
102
102
102
102
102
44.00

3.40
20.20
5.75
0.15
0.35
5.7
0.12
0.28
2.1
20.20

1/2"
1/2"
3/8"
3/8"
3/8"
5/8"
5/8"
5/8"
5/8"
3/8"

1.02
1.02
0.58
0.58
0.58
1.60
1.60
1.60
1.60
0.58

568.75
432.68
340.17
8.87
20.71
930.24
19.58
45.70
342.72
515.50

195
195
15.00
195
195
195
38.00

2.25
1.20
29.05
4.25
4.87
1.50
29.05

1/2"
1/2"
1/2"
1/2"
3/8"
3/8"
3/8"

1.02
1.02
1.02
1.02
0.58
0.58
0.58

447.53
238.68
444.47
845.33
550.80
169.65
640.26

6,561.63

02.07.00

ESTRUCTURA METALICA

02.07.01

COMPUERTA PLANCHA DE ACERO DE 0.40 X0.40 (ADMISIN)

UND

1.00

1.00

1.00

02.07.02

COMPUERTA PLANCHA DE FIERRO DE 0.30 X 0.30 (PURGA)

UND

1.00

1.00

1.00

02.07.03

COMPUERTA PLANCHA DE FIERRO 0.30 X 0.30 (DESRIPEADORA)

UND

1.00

1.00

1.00

02.07.04

REJILLA METALICA DE BARRAS DE 5/8"

ML

33.00

19.80

19.80

0.60

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.
02.07.05

DESCRIPCIN
COMPUERTA METALICA TIPO TARJETERA PARA TOMAS LATERALES

PROV.
DPTO.
FECHA
Und.
UND

N de
Veces
11.00

DIMENSIONES (m)
Largo
Ancho
Alto
-

: HUAMANGA
: : AYACUCHO
:: MAYO 2005
PARCIAL
11.00

TOTAL
11.00

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

03.00.00

== ANTECANAL==

03.01.00

TRABAJOS PRELIMINARES

PROV.
DPTO.
FECHA
Und.

N de
Veces

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

DIMENSIONES (m)
Largo
Ancho
Alto

PARCIAL

TOTAL

03.01.01

ROCE Y LIMPIEZA DE TERRENO - CANAL

M2

1.00

93.00

1.00

93.00

93.00

03.01.02

TRAZO Y REPLANTEO PRELIMINAR - CANAL

ML

1.00

93.00

0.80

74.40

74.40

03.02.00

MOVIMIENTO DE TIERRAS

03.02.01

EXC. EN MATERIAL SUELTO - PLATAFORMA Y CAJA

M3

1.00

==== VOLUMEN ====>

136.88

136.88

03.02.02

EXC. EN MATERIAL ROCA SUELTAN - PLATAFORMA Y CAJA

M3

1.00

==== VOLUMEN ====>

51.13

51.13

03.02.03

EXC. EN ROCA FIJA - PLATAFORMA Y CAJA

M3

1.00

==== VOLUMEN ====>

44.50

44.50

03.02.04

PERFILADO DE TALUD DE CORTE

ML

1.00

93.00

93.00

93.00

03.02.05

REFINE DE ZANJA Y NIVELACIN DE FONDO

ML

1.00

93.00

93.00

93.00

03.02.06

RELLENO Y COMPACTACION EN BASE DE CANAL

M3

1.00

93.00

0.80

0.60

44.64

44.64

4.00
4.00

68.80
20.20

1.25
0.60

344.00
48.48

2.00
2.00
1.00

68.80
20.2
93.00

0.20
0.20
0.80

1.25
0.6
0.20

34.40
4.85
14.88

03.03.00
03.03.01

03.03.02

03.03.03

03.04.00
03.04.01
03.04.02

03.05.00

REVESTIMIENTOS DE ANTECANAL
ENCOFRADO Y DESENCOFRADO DE CANALES
KM 0+00 AL KM 0+068.8
KM 0+072.80 AL KM 0+093

M2

CONCRETO f'c= 175 KG/CM2


muros (KM 0+00 AL KM 0+068.8)
muros (KM 0+072.8 AL KM 0+093)
base

M3

ACERO DE REFUERZO fy=4200 Kg/cm2


Acero Longitudinal
Acero Transversal

KG

392.48

54.13

N veces

fierro

Kg/ml.

Peso(kg)

1,504.38

23.00
345.00

68.80
3.20

ML
ML

21.00
7.00

0.80
0.80

16.80
5.60

16.80
5.60

55.00

55.00

55.00

3/8"
3/8"

0.56
0.56

886.14
618.24

JUNTA Y OTROS
JUNTA ASFALTICA 1"
JUNTAS CON WATER STOP

CANAL DESRIPEADOR

03.05.01

TRAZO Y REPLANTEO PRELIMINAR - CANAL

ML

1.00

03.05.02

EXC. EN MATERIAL SUELTO - PLATAFORMA Y CAJA

M3

1.00 ==== VOLUMEN ===

28.62

28.62

28.62

03.05.03

EXC. EN MATERIAL ROCA SUELTAN - PLATAFORMA Y CAJA

M3

1.00 ==== VOLUMEN ===

13.58

13.58

13.58

03.05.04

EXC. EN ROCA FIJA - PLATAFORMA Y CAJA

M3

1.00 ==== VOLUMEN ===

11.16

11.16

11.16

03.05.05

PERFILADO DE TALUD DE CORTE

ML

1.00

55.00

55.00

55.00

03.05.06

REFINE DE ZANJA Y NIVELACIN DE FONDO

ML

1.00

55.00

55.00

55.00

03.05.07

RELLENO Y COMPACTACION EN BASE DE CANAL

M3

1.00

55.00

0.50

4.13

4.13

03.05.08

ENCOFRADO Y DESENCOFRADO DE CANALES

M2

4.00

55.00

0.70

220.00

220.00

03.05.09

CONCRETO f'c= 175 KG/CM2


Paredes
Base

M3
2.00
1.00

55.00
55.00

0.10
0.10

ACERO DE REFUERZO FY=4200 KG/CM2


Acero Principal
Acero Transversal

KG

JUNTA ASFALTICA 1"

03.05.10

03.05.11
04.00.00

== TUBERIA DE CONDUCCION ==

04.01.00

OBRAS PRELIMINARES

0.15
-

10.45

N veces

fierro

275.00
12.00

1.80
55.00

ML

28.00

0.50

0.70
0.50
Kg/ml.

3/8"
3/8"

0.56
0.56

7.70
2.75
Peso(kg)

646.80

277.20
369.60

14.00

14.00

04.01.01

ROCE Y LIMPIEZA DE TERRENO - CANAL

M2

1.00

5,277.50

1.50

7,916.25

7,916.25

04.01.02

TRAZO Y REPLANTEO PRELIMINAR - CANAL

ML

1.00

5,277.50

5,277.50

5,277.50

04.02.00

MOVIMIENTO DE TIERRAS

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

PROV.
DPTO.
FECHA
Und.

N de
Veces

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

DIMENSIONES (m)
Largo
Ancho
Alto

PARCIAL

TOTAL

04.02.01

EXC. EN MATERIAL SUELTO - PLATAFORMA Y ZANJA

M3

1.00 ==== VOLUMEN ===

2,487.91

2,487.91

2,487.91

04.02.02

EXC. EN MATERIAL ROCA SUELTA - PLATAFORMA Y ZANJA

M3

1.00 ==== VOLUMEN ===

1,085.49

1,085.49

1,085.49

04.02.03

EXC. EN ROCA FIJA - PLATAFORMA Y ZANJA

M3

1.00 ==== VOLUMEN ===

2,431.76

2,431.76

2,431.76

04.02.04

REFINE DE ZANJA Y NIVELACIN DE FONDO

ML

1.00

5,277.50

5,277.50

04.02.05

RELLENO Y COMPACTACION DE CANAL

M3

1.00 ==== VOLUMEN ===

578.90

578.90

04.02.06

PREPARACION Y EXTENDIDO DE CAMA DE APOYO

ML

1.00

5,277.50

5,277.50

5,277.50

04.02.07

PRUEBA HIDRAULICA

ML

1.00

5,277.50

5,277.50

5,277.50

04.03.00

5,277.50

578.90

INSTALACION Y EXTENDIDO DE TUBERIAS

04.03.01

TUBERIA PERFILADA PVC D=450 mm NTP 399.162

ML

1.00

2,940.00

2,940.00

2,940.00

04.03.02

TUBERIA PERFILADA PVC D=400 mm NTP 399.162

ML

1.00

1,977.50

1,977.50

1,977.50

04.03.03

TUBERIA PERFILADA PVC D=355 mm NTP 399.162

ML

1.00

360.00

360.00

360.00

04.03.04

SUMINISTRO E INSTALACION DE ACCESORIOS

UND

74.00

74.00

74.00

11.00

1.60

###

28.16

28.16

04.04.00

CAJAS DE INSPECCIN Y VOLTEO

04.04.01

TRAZO Y REPLANTEO

M2

04.04.02

EXC. PARA CIMENTACIN EN MATERIAL SUELTO

M3

1.00 ==== VOLUMEN ===

8.29

8.29

8.29

04.04.03

EXC. PARA CIMENTACIN EN ROCA SUELTA

M3

1.00 ==== VOLUMEN ===

6.57

6.57

6.57

04.04.04

EXC. PARA CIMENTACIN EN ROCA FIJA

M3

1.00 ==== VOLUMEN ===

23.16

23.16

23.16

04.04.05

ENCOFRADO Y DESENCOFRADO DE MUROS

M2

11.00 ====

===

16.04

176.40

176.40

04.04.06

CONCRETO f'c= 175 KG/CM2

M3

11.00 ==== VOLUMEN ===

1.54

16.91

16.91

04.04.07

ACERO DE REFUERZO FY=4200 KG/CM2 EN TAPAS

KG

11.00 ====

108.35

1,191.90

1,191.90

04.04.08

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

M2

11.00 ====

7.20

79.20

79.20

04.04.09

SUM. Y INST. DE ACCESORIOS

1.00

1.00

2.56

2.56

04.05.00

GLB

1.00

AREA

KILOS ===
AREA

===
-

TOMA LATERAL

04.05.01

TRAZO Y REPLANTEO

M2

1.00

04.05.02

EXC. PARA CIMENTACIN EN MATERIAL SUELTO

M3

1.00 ==== VOLUMEN ====>

25.75

25.75

04.05.03

EXC. PARA CIMENTACIN EN ROCA SUELTA

M3

1.00 ==== VOLUMEN ====>

3.80

3.80

04.05.04

EXC. PARA CIMENTACIN EN ROCA FIJA

M3

1.00 ==== VOLUMEN ====>

2.76

2.76

04.05.05

ENCOFRADO Y DESENCOFRADO DE MUROS

M2

11.00 ====

====>

16.04

16.04

04.05.06

CONCRETO f'c= 175 KG/CM2

M3

11.00 ==== VOLUMEN ====>

1.38

1.38

04.05.07

ACERO DE REFUERZO FY=4200 KG/CM2

KG

11.00 ====

108.35

108.35

04.05.08

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

M2

11.00 ====

AREA

====>

7.20

7.20

05.00.00

== OBRAS DE ARTE ==

05.01.00

DESARENADOR

1.60

###

AREA

KILOS ====>

05.01.01

LIMPIEZA DE TERRENO

M2

1.00 ====

AREA

===

17.08

17.08

17.08

05.01.02

TRAZO Y REPLANTEO PRELIMINAR

M2

1.00 ====

AREA

===

17.08

17.08

17.08

05.01.03

EXCAVACIN EN MATERIAL SUELTO

M3

1.00 ==== VOLUMEN ===

56.27

56.27

56.27

05.01.04

EXCAVACIN EN ROCA SUELTA

M3

1.00 ==== VOLUMEN ===

11.25

11.25

11.25

05.01.05

EXCAVACIN EN ROCA FIJA

M3

1.00 ==== VOLUMEN ===

7.50

7.50

7.50

05.01.06

RELLENO Y COMPACTADO

M3

1.00 ==== VOLUMEN ===

1.83

1.83

1.83

05.01.07

CONCRETO f'c = 210KG/CM2

M3

1.00 ==== VOLUMEN ===

12.19

12.19

12.19

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

PROV.
DPTO.
FECHA
Und.

N de
Veces

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

DIMENSIONES (m)
Largo
Ancho
Alto

PARCIAL

TOTAL

05.01.08

ENCOFRADO Y DESENCOFRADO

M2

1.00 ====

AREA

===

44.40

44.40

44.40

05.01.09

ACERO DE REFUERZO fy =4200 Kg/cm2

KG

1.00 ====

KILOS

==

205.87

205.87

205.87

05.01.10

JUNTA ELASTOMETRICAS

ML

2.00

1.40

2.80

2.80

1.40

1.70

2.38

2.38

05.02.00

POZA DE CAPTACIN

05.02.01

TRAZO Y REPLANTEO PRELIMINAR

M2

1.00

05.02.02

EXCAVACIN EN MATERIAL SUELTO

M3

1.00 ==== VOLUMEN ===

2.41

2.41

2.41

05.02.03

EXCAVACIN EN ROCA SUELTA

M3

1.00 ==== VOLUMEN ===

0.48

0.48

0.48

05.02.04

EXCAVACIN EN ROCA FIJA

M3

1.00 ==== VOLUMEN ===

0.32

0.32

0.32

05.02.05

CONCRETO f'c = 210KG/CM2

M3

1.00 ==== VOLUMEN ===

1.36

1.36

1.36

05.02.06

ENCOFRADO Y DESENCOFRADO

M2

1.00 ====

AREA

===

5.10

5.10

5.10

05.02.07

ACERO DE REFUERZO fy =4200 Kg/cm2

KG

1.00 ====

KILOS

==

31.58

31.58

31.58

05.02.08

TARRAJEO DE IMPERMEABILIZACION

M2

1.00 ====

AREA

===

6.10

6.10

6.10

05.02.09

JUNTAS ELASTOMERICAS

ML

1.00

1.40

1.40

1.40

24.00

5.00

3.30

396.00

396.00

05.03.00

CANOAS

05.03.01

TRAZO Y REPLANTEO PRELIMINAR

M2

05.03.02

EXCAVACIN EN MATERIAL SUELTO

M3

1.00 ==== VOLUMEN ====>

27.80

27.80

05.03.03

EXCAVACIN EN ROCA SUELTA

M3

1.00 ==== VOLUMEN ====>

6.75

6.75

05.03.04

EXCAVACIN EN ROCA FIJA

M3

1.00 ==== VOLUMEN ====>

21.19

21.19

05.03.05

ENCOFRADO Y DESENCOFRADO DE MUROS

M2

24.00 ====

====>

18.21

18.21

05.03.06

CONCRETO f'c= 140 KG/CM2 + 40% PG

M3

24.00 ==== VOLUMEN ====>

4.03

4.03

05.03.07

EMBOQUILLADO DE PIEDRA e = 0.25

M2

24.00 ==== VOLUMEN ====>

4.30

4.30

05.03.08

TARRAJEO DE MUROS

M2

24.00 ====

15.04

15.04

1.00

20.00

20.00

05.04.00

AREA

AREA

====>

RAPIDA

05.04.01

TRAZO Y REPLANTEO PRELIMINAR

ML

05.04.02

EXCAVACIN EN MATERIAL SUELTO

M3

==== VOLUMEN ====>

23.51

23.51

23.51

05.04.03

EXCAVACIN EN ROCA SUELTA

M3

==== VOLUMEN ====>

7.84

7.84

7.84

05.04.04

EXCAVACION EN ROCA FIJA

M3

==== VOLUMEN ====>

7.84

7.84

7.84

05.04.05

REFINE DE ZANJA Y NIVELACIN FONDO

ML

1.00

20.00

20.00

20.00

05.04.06

PREPARACIN DE CAMA DE APOYO

ML

1.00

20.00

20.00

20.00

05.04.07

RELLENO CON MATERIAL SELECCIONADO

M3

1.00

20.00

0.70

11.20

11.20

05.04.08

TUBERIA PERFILADA PVC D=400 mm NTP 399.162

ML

1.00

20.00

20.00

20.00

05.05.00

20.00

0.80
-

TOMAS TIPICA DE INGRESO Y SALIDA

05.05.01

TRAZO Y REPLANTEO PRELIMINAR

M2

2.00 ====

===

2.90

2.9

5.80

05.05.02

EXCAVACION EN MATERIAL SUELTO

M3

2.00 ==== VOLUMEN ===

3.48

3.48

6.96

05.05.03

EXCAVACION EN ROCA SUELTA

M3

2.00 ==== VOLUMEN ===

1.16

1.16

2.32

05.05.04

EXCAVACION EN ROCA FIJA

M3

2.00 ==== VOLUMEN ===

1.16

1.16

2.32

05.05.05

ENCOFRADO Y DESENCOFRADO

M2

2.00 ====

===

22.10

22.10

44.19

05.05.06

CONCRETO CICLOPEO
f'c= 140 Kg/cm2 + 40% P.G.

2.00 ==== VOLUMEN ===

0.41

0.41

0.82

M3

CONCRETO ARMADO f'c=210 Kg/cm2

M3

2.00 ==== VOLUMEN ===

7.37

7.37

14.74

05.05.07

AREA

AREA

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

PROV.
DPTO.
FECHA
Und.

: HUAMANGA
: : AYACUCHO
:: MAYO 2005

N de
DIMENSIONES (m)
PARCIAL
Veces
Largo
Ancho
Alto
2.00 ====
KILOS ==
73.30
73.30

TOTAL

05.05.08

ACERO DE REFUERZO fy =4200 Kg/cm2

KG

05.05.09

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

M2

2.00 ====

AREA

===

11.61

11.61

23.22

AREA

05.06.00

146.59

VERTEDERO DE DEMASIAS

05.06.01

TRAZO Y REPLANTEO PRELIMINAR

M2

1 ====

===

30.00

30.00

30.00

05.06.02

EXCAVACIN EN MATERIAL SUELTO

M3

1 ==== VOLUMEN ===

4.08

4.08

4.08

05.06.03

EXCAVACION EN ROCA SUELTA

M3

1 ==== VOLUMEN ===

16.32

16.32

16.32

05.06.04

ENCOFRADO Y DESENCOFRADO

M2

1 ====

===

50.40

50.40

50.40

05.06.05

CONCRETO SIMPLE f'c=175 KG/CM2

M3

1 ==== VOLUMEN ===

7.42

7.42

7.42

05.06.06

TARRAJEO DE IMPERMEABILIZACION

M2

1 ====

===

25.2

25.20

25.20

05.06.07

ENROCADO DE PROTECCION

M3

1 ==== VOLUMEN ===

1.48

1.48

1.48

05.07.00

DADO DE CONCRETO

AREA

AREA

05.07.01

LIMPIEZA DE TERRENO

M2

32 ====

AREA

===

0.83

26.56

26.56

05.07.02

TRAZO Y REPLANTEO PRELIMINAR

M2

32 ====

AREA

===

0.83

26.56

26.56

05.07.03

CONCRETO f'c = 175KG/CM2

M3

32

Area==>

0.65

1.05

21.84

21.84

05.07.04

ENCOFRADO Y DESENCOFRADO
interior
exterior

M2
32
32

0.6
1.5

0.5
1.03

05.08.00

59.04
-

9.6
49.44

ALCANTARILLAS

05.08.01

LIMPIEZA DE TERRENO

M2

8 ====

AREA

===

16.5

16.5

132.00

05.08.02

TRAZO Y REPLANTEO PRELIMINAR

M2

8 ====

AREA

===

16.50

16.50

132.00

05.08.03

EXCAVACIN EN MATERIAL SUELTO

M3

8 ==== VOLUMEN ===

106.1724

106.17

849.38

05.08.04

EXCAVACIN EN ROCA SUELTA

M3

8 ==== VOLUMEN ===

18.5544

18.55

148.44

05.08.05

EXCAVACIN EN ROCA FIJA

M3

8 ==== VOLUMEN ===

20.616

20.62

164.93

05.08.06

ENCOFRADO Y DESENCOFRADO

M2

8 ====

===

25.92

25.92

207.36

05.08.07

CONCRETO CICLOPEO f'c= 140KG/CM2 + 40% PM

M3

8 ==== VOLUMEN ===

5.31

5.31

42.49

05.08.08

CONCRETO f'c = 210 KG/CM2

M3

8 ==== VOLUMEN ===

1.29

1.29

10.30

05.08.09

ACERO DE REFUERZO fy= 4200KG/CM2

KG

8 ====

142.39

142.39

1139.14

05.08.10

RELLENO CON MATERIAL PROPIO

M3

8 ==== VOLUMEN ===

6.24

6.24

49.92

05.08.11

ENROCADO DE E=0.25M ENTRADA Y SALIDA

M3

8 ==== VOLUMEN ===

4.00

4.00

32.00

05.08.12

TARRAJEO CON MORTERO PROP. 1:2

M2

8 ====

AREA

===

6.00

6.00

48.00

05.09.00

AREA

KILOS

==

CANAL DE PURGA

05.09.01

LIMPIEZA DE TERRENO

M2

1 ====

AREA

===

2.40

2.4

2.40

05.09.02

TRAZO Y REPLANTEO PRELIMINAR

M2

1 ====

AREA

===

2.40

2.40

2.40

05.09.03

EXCAVACIN EN MATERIAL SUELTO

M3

1 ==== VOLUMEN ===

1.22

1.22

1.22

05.09.04

EXCAVACIN EN ROCA SUELTA

M3

1 ==== VOLUMEN ===

0.24

0.24

0.24

05.09.05

EXCAVACIN EN ROCA FIJA

M3

1 ==== VOLUMEN ===

0.16

0.16

0.16

05.09.06

ENCOFRADO Y DESENCOFRADO

M2

1 ====

===

5.50

5.50

5.50

05.09.07

CONCRETO CICLOPEO f'c= 140KG/CM2

M3

1 ==== VOLUMEN ===

0.65

0.65

0.65

M2

5.50

5.50

M3

1 ==== VOLUMEN ===

0.25

0.25

05.09.08
05.09.09
06.00.00

TARRAJEO DE IMPERMEABILIZACION
ENROCADO DE E=0.25M ENTRADA Y SALIDA
FLETE

AREA

0.25

HOJA RESUMEN GENERAL DE METRADOS


PROYECTO: "CONSTRUCCION CANAL DE RIEGO SAN JOS DE SUCRE"
PROPIET. : PROYECTO ESPECIAL SIERRA CENTRO SUR - AYACUCHO
DISTRITO : COLCA
PART.

DESCRIPCIN

PROV.
DPTO.
FECHA
Und.

N de
Veces

DIMENSIONES (m)
Largo
Ancho
Alto
-

06.01.01

FLETE TERRESTRE

GLB

06.01.02

FLETE RURAL

GLB

GLB

07.00.00
07.01.01

: HUAMANGA
: : AYACUCHO
:: MAYO 2005
PARCIAL

TOTAL

1.00

1.00

1.00

1.00

1.00

1.00

== IMPACTO AMBIENTAL ==
PLAN DE MANEJO DE IMPACTO AMBIENTAL