ANALISA HARGA SATUAN

NO

URAIAN

II
1

1.000 M' Pengukuran & pemasangan bouwplank


0.012 M3 Kayu usuk 5/7 ( kruwing )
0.020 Kg Paku reng
0.007 M3 Kayu papan 3/20 ( meranti )
0.100 Oh Tukang kayu
0.100 Oh Pekerja
0.010 Oh Kepala tukang kayu
0.005 Oh Mandor
0.005 Oh Mandor
PEKERJAAN TANAH

3,500,000.00
16,000.00
3,000,000.00
85,000.00
65,000.00
90,000.00
95,000.00
Total :

HARGA UPAH
(Rp.)

JUMLAH HARGA
(Rp.)

42,000.00
320
21,000.00

63,320.00

8,500.00
6,500.00
900
475
16,375.00

42,000.00
320
21,000.00
8,500.00
6,500.00
900
475
79,695.00

1.000
0.400
0.040
0.040

M3 Galian tanah biasa sedalam 1 meter


Oh Pekerja
Oh Mandor
Oh Mandor

65,000.00
95,000.00
Total :

26,000.00
3,800.00
29,800.00

26,000.00
3,800.00
29,800.00

1.000
0.192
0.019
0.019

M3 Urugan kembali
Oh Pekerja
Oh Mandor
Oh Mandor

65,000.00
95,000.00
Total :

12,480.00
1,805.00
14,285.00

12,480.00
1,805.00
14,285.00

32,500.00
4,750.00
37,250.00

32,500.00
4,750.00
37,250.00

1.000 M3

Pemadatan tanah

0.500
0.050
0.050
1.000
1.200

Oh Pekerja
Oh Mandor
Oh Mandor
M3 Urugan pasir
M3 Pasir urug

65,000.00
95,000.00
Total :

0.300
0.010
0.010
1.000

Oh Pekerja
Oh Mandor
Oh Mandor
M3 Urugan sirtu

65,000.00
95,000.00
Total :

60,000.00

70,728.00

84,873.60

1.200 M3

HARGA SATUAN ( HARGA BAHAN


Rp.)
(Rp.)

0.250
0.025
0.025
1.000
1.200

Sirtu di bawah lantai

Oh Pekerja
Oh Mandor
Oh Mandor
M3 Urugan tanah
M3 Tanah urug

50,000.00

60,000.00

65,000.00
95,000.00
Total :

84,873.60

40,000.00

48,000.00

0.300 Oh
0.010 Oh

Pekerja
Mandor

65,000.00
95,000.00

0.010 Oh

Mandor

Total :

48,000.00

60,000.00
19,500.00
950
20,450.00

19,500.00
950
80,450.00
84,873.60

16,250.00
2,375.00
18,625.00

16,250.00
2,375.00
103,498.60
48,000.00

19,500.00
950

19,500.00
950

20,450.00

68,450.00

NO
1
III
1

URAIAN
3

1.000 M3

Pasang pondasi batu kali 1 Pc : 5 Ps

1.100 M3

Batu kali

0.544 M3

HARGA BAHAN
(Rp.)
5

HARGA UPAH
6

JUMLAH
HARGA
7 (Rp.)

PEKERJAAN PONDASI

136.000 Kg

HARGA SATUAN
( Rp.)
4

Semen portland
Pasir pasangan

110,000.00

121,000.00

121,000.00

1,020.00

138,720.00

138,720.00

135,000.00

73,440.00

73,440.00

1.500 Oh

Pekerja

65,000.00

97,500.00

97,500.00

0.600 Oh

Tukang batu

85,000.00

51,000.00

51,000.00

0.060 Oh

Kepala Tukang

90,000.00

5,400.00

5,400.00

0.075 Oh

Mandor

95,000.00

0.075 Oh

Mandor

Total :

333,160.00

1.000 M3

Pasangan pondasi batu kosong

1.200 M3

Batu kali

110,000.00

132,000.00

132,000.00

0.300 M3

Pasir urug

50,000.00

15,000.00

15,000.00

7,125.00

7,125.00

161,025.00

494,185.00

0.780 Oh

Pekerja

65,000.00

50,700.00

50,700.00

0.390 Oh

Tukang batu

85,000.00

33,150.00

33,150.00

0.039 Oh

Kepala Tukang

90,000.00

3,510.00

3,510.00

0.039 Oh

Mandor

95,000.00

0.039 Oh

Mandor

Total :

147,000.00

1.000 M2

Pasang bekisting untuk pondasi

0.040 M3

Kayu terentang (Albesia)

3,705.00

3,705.00

91,065.00

238,065.00

1,112,500.00

44,500.00

44,500.00

0.300 Kg

Paku usuk

16,000.00

4,800.00

4,800.00

0.100 Ltr

Minyak bekisting

23,287.50

2,328.75

2,328.75

0.300 Oh

Pekerja

65,000.00

19,500.00

19,500.00

0.260 Oh

Tukang kayu

85,000.00

22,100.00

22,100.00

0.026 Oh

Kepala Tukang

90,000.00

2,340.00

2,340.00

0.005 Oh

Mandor

95,000.00

475

475

44,415.00

96,043.75

Total :

51,628.75