You are on page 1of 2

Consorcio: Ing YURI WILBER RUELAS CASTILLO & Arq.

ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
Obra

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA INSTITUCIN EDUCATIVA ANDRES AVELINO


CACERES - ISPACAS - YANAQUIHUA - CONDESUYOS - AREQUIPA

Sub Presupuesto

01 - CERCO PERIMETRICO INCLUIDO MUROS DE CONTENCION

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


YANAQUIHUA - CONDESUYOS - AREQUIPA

IU Cdigo

Descripcin

Costo a :

Junio - 2013

Unidad

Cantidad

Precio

Parcial

HH
HH
HH
HH
HH

1,197.07
17.91
9,954.01
5,062.44
11,035.17

18.35
15.22
16.68
14.65
13.25

21,966.23
272.59
166,032.89
74,164.75
146,216.00

MANO DE OBRA
47 00007
47 00032
47 00008
47 00009
47 00010

CAPATAZ
TOPOGRAFO
OPERARIO
OFICIAL
PEON

408,652.46
MATERIALES
00 02603
01 03432
02 00714
02 00708
02 00381
02 00384
02 01349
02 00703
02 00709
03 02371
04 00055
04 00044
05 00003
05 01013
05 01356
05 00725
05 00710
17 00749
21 00004
26 03449
30 00830
30 01358
30 03437
30 00718
34 01511
38 00006
39 03726
39 03722
39 03489
39 03889
39 03845
39 03891
39 03890
39 03887
39 03888
39 03488
39 01390
39 01543
39 03892
39 03844
39 03721
39 03723
43 03843
43 00711
44 00719
44 00713
44 00705
45 00706
53 01353
54 03648
54 00125
54 03433
60 01481

P.1/2

SERVICIO CAMA BAJA (AREQUIPA - ISPACAS)


ACEITE PARA MOTOR SAE
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
CALAMINA 0.18 MM X 1.80 X 0.81 M
CLAVOS PARA CALAMINA
CLAVOS PARA MADERA C/C 2"
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 4"
ACERO CORRUGADO FY=4200 KG/CM2 (GRADO 60)
ARENA FINA
ARENA GRUESA
AGUA
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA (MX 3")
PIEDRA MEDIANA DE 4"
LADRILLO K.K. DE ARCILLA 9X14X24 CM
CEMENTO PORTLAND TIPO IP (42.5KG)
BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"
ADITIVO CURADOR DE CONCRETO
ADITIVO DESMOLDANTE DE MADERA
SIKAFLEX 11 FC PLUS O SIMILAR
YESO DE 28 Kg
GASOLINA
HORMIGON
CAPACITACIN EN SEGURIDAD Y SALUD
COMEDOR PROVISIONAL P/PERSONAL
CORTAVIENTOS P/CASCO
DISEO DE MEZCLA DE CONCRETO
ELABORACIN, IMPLEMENTACIN Y ADM. DEL
PLAN DE SEG.
ENSAYO DE DENSIDAD DE CAMPO
ENSAYO DE ROTURA DE BRIQUETAS DE CONCRETO
ESTUDIO DE IMPACTO AMBIENTAL
ESTUDIO DE SUELOS
FRANELA
LIJA PARA MADERA
PAGO DE SERVICIO DE AGUA
PRUEBA HIDRAULICA
SERVICIO ENERGIA ELECTRICA
SERVICIOS HIGIENICOS PROVISIONALES
P/PERSONAL
VESTUARIOS PROVISIONALES P/PERSONAL
BANNER DE 3.60x2.40 m
PALO DE EUCALIPTO DE 5" x 4 m
ESTACA DE MADERA
MADERA TORNILLO CEPILLADA
TRIPLAY DE 4'x8'x 6 mm
MADERA TORNILLO INC.CORTE P/ENCOFRADO
PETROLEO
PINTURA LATEX
PINTURA LATEX SAT 1GL
SELLADOR DE PARED
TEKNOPOR DE 1" x 4' x 8'

est
GLN
KG
KG
PLN
KG
KG
KG
KG
KG
M3
M3
M3
M3
M3
M3
M3
UND
BOL
PAR
GLN
GLN
UND
BOL
GLN
M3
GLB
M2
UND
UND
GLB

1.00
1.99
3,466.30
520.92
33.91
30.00
0.30
710.88
0.18
60,321.42
49.37
235.83
230.63
339.76
67.03
9.67
0.08
34,858.16
4,858.62
7.50
110.87
110.87
3.52
8.98
227.17
148.88
1.00
24.00
100.00
1.00
1.00

8,650.00
30.00
4.10
4.10
16.90
7.55
4.10
4.10
4.10
2.95
83.00
65.00
4.20
106.00
82.00
82.00
82.00
0.98
20.30
22.60
45.00
45.00
62.35
14.17
13.55
45.00
980.00
950.00
9.50
450.00
985.00

8,650.00
59.70
14,211.83
2,135.77
573.08
226.50
1.23
2,914.61
0.74
177,948.19
4,097.71
15,328.95
968.65
36,014.56
5,496.46
792.94
6.56
34,161.00
98,629.99
169.50
4,989.15
4,989.15
219.47
127.25
3,078.15
6,699.60
980.00
22,800.00
950.00
450.00
985.00

UND
UND
GLB
UND
M2
HJA
mes
UND
EST
UND

20.00
20.00
1.00
1.00
100.00
549.07
5.00
1.00
5.00
4.00

55.00
12.00
2,300.00
1,850.00
5.80
1.90
280.00
500.00
450.00
1,080.00

1,100.00
240.00
2,300.00
1,850.00
580.00
1,043.23
1,400.00
500.00
2,250.00
4,320.00

M2
UND
UND
P2
P2
PLN
P2
GLN
GLN
GLN
GLN
PLN

16.00
1.00
2.00
18.93
11.00
24.00
13,618.48
600.00
4.50
109.81
356.90
1.25

1,050.00
350.00
23.00
3.36
4.86
42.00
4.35
15.00
29.23
54.00
13.00
16.50

16,800.00
350.00
46.00
63.60
53.46
1,008.00
59,240.39
9,000.00
131.54
5,929.74
4,639.70
20.63

Consorcio: Ing YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Listado de Insumos
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA INSTITUCIN EDUCATIVA ANDRES AVELINO
CACERES - ISPACAS - YANAQUIHUA - CONDESUYOS - AREQUIPA

Obra
Sub Presupuesto

01 - CERCO PERIMETRICO INCLUIDO MUROS DE CONTENCION

Cliente
Ubicacion

GOBIERNO REGIONAL DE AREQUIPA


YANAQUIHUA - CONDESUYOS - AREQUIPA

IU Cdigo

Descripcin

Unidad

Cantidad

Costo a :

Junio - 2013

Precio

Parcial
561,522.03

EQUIPO
37 03483
37 03478
37 03490
37 03476
37 03485
37 03493
37 03481
37 03482
37 00005
37 03479
37 03494
37 03487
37 03484
37 03480
37 03477
37 03486
37 03492
37 03491
48 01482
48 03893
48 00828
49 00039
49 01512
49 00036
49 02923
49 00383
49 01357

CAMISA MANGA LARGA DENIM


CARETA TRANSPARENTE PARA ESMERILAR
CASCOS BLANCO (P.TECNICO)
CASCOS TIPO JOCKEY DE PLASTICO
CHALECO REFLECTIVO
CHALECO REFLECTIVO (P.TECNICO)
GUANTES DE CUERO REFORZADO
GUANTES DE JEBE
HERRAMIENTAS MANUALES
LENTES DE SEGURIDAD
LENTES DE SEGURIDAD (P.TECNICO)
MALLA DE SEGURIDAD X 1.00 MTS
PANTALON DENIM
PROTECCION DE OIDOS TIPO TAPON
RESPIRADOR CONTRA POLVO
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO
(P.TECNICO)
ZAPATOS DE SEGURIDAD P/ELECTRICISTA
ANDAMIO METAL TABLAS-ALQUILER
CAMION VOLQUETE 15 ton.
CIZALLA P/CORTE DE FIERRO
CAMION VOLQUETE 4x2 140-210 HP 6 M3.
MEZCLADORA CONCRETO TROMPO 8 HP 9 P3
PLANCHA COMPACTADORA VIBRAT. 4.0 HP
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.
TEODOLITO
VIBRADOR DE CONCRETO 4 HP 2.40"

UND
UND
PZA
PZA
UND
UND
UND
UND
%MO
UND
UND
RLL
UND
UND
UND
PAR
PAR

100.00
100.00
8.00
100.00
100.00
8.00
100.00
100.00

26.00
18.00
16.00
12.00
47.00
65.00
9.90
10.50

100.00
8.00
4.00
100.00
100.00
100.00
100.00
8.00

7.50
45.60
85.00
38.00
2.50
3.00
50.00
350.00

2,600.00
1,800.00
128.00
1,200.00
4,700.00
520.00
990.00
1,050.00
11,991.74
750.00
364.80
340.00
3,800.00
250.00
300.00
5,000.00
2,800.00

PAR
EST
HM
HM
HM
HM
HM
HM
HM
HM

2.00
558.37
48.00
1,903.98
381.28
366.93
995.16
99.46
18.17
308.69

130.00
0.46
165.00
2.69
100.84
10.00
11.80
142.50
10.00
7.00

260.00
256.85
7,920.00
5,121.71
38,448.28
3,669.30
11,742.89
14,173.05
181.70
2,160.83
122,519.15

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION

7.20 %
2.30 %
1.10 %

COSTO TOTAL PRESUPUESTAL


Son : UN MILLON DOSCIENTOS OCHO MIL QUINIENTOS DIECINUEVE CON 16/100 NUEVOS SOLES

P.2/2

1,092,693.64
78,673.94
25,131.95
12,019.63
1,208,519.16