You are on page 1of 83

Line 1

ITEM No.:- M675

operations Neck attachment


Neck Finish
Date
11-Jun-11
29
13-Jun-11
22
14-Jun-11
26
15-Jun-11
16-Jun-11
17-Jun-11
18-Jun-11
20-Jun-11
21-Jun-11
22-Jun-11
23-Jun-11
TOTAL

22
13
7
4
5
10
7
5
150

SL.No.
1
2
3
4

Zipper attachment

Zipper finish

side o/l

sleeve fold

27
24
0

25
34
0

21
17
0

7
0
0

7
0
0

10
10
8
6
3
16
6
6
116

5
11
21
12
14
4
12
2
140

0
1
3
15
12
3
7
2
81

3
3
8
0
10
2
6
14
53

0
0
5
0
7
6
0
6
31

TOP 4 OPERATION HAVING DEFECTS


OPERATIONS
No. OF DEFECTS
Neck attachment
150
Zipper attachment
140
Neck Finish
116
Zipper finish
81
total
487

160
140
120
100
80
60
40
20
0

TOTAL

total defects= 740


out of 740, 487 are found in 4
operations only..
i.e. 65.8%

cost for these 4 alters


opereration

time(in min.)

overhead/time

Total/pc

no. of pcs

Neck attachment
Neck Finish
Zipper attachment
Zipper Finish

2.12
1.22
5.54
3.04

3.25
3.25
3.25
3.25

6.89
3.965
18.005
9.88

150
116
140
81
TOTAL

Bottom fold

TOTAL

sleeve tacking

dori

3
0
8

13
0
0

6
5
14
4
4
9
2
2
57

0
0
0
0
0
0
0
0
13

total(in Rs)

Label attach
0
3
0
0
0
5
5
5
TOTAL
5
4
10
37

TOTAL
0
0
12

132
100
46

18
6
0
12
0
0
9
5
62

64
49
71
58
60
55
53
52
740

1033.5
459.94
2520.7
800.28
4814.42

Line 1

Time taken for rework


SL. No.

Operations

rework time

1 Pleat
2 neck attach
3 neck finish
4 side o/l
5 sleeve fold
6 Bottom fold
7 Zipper Attach
8 Zipper Finish
9 sleeve tacking
10 Dori
11 label attach

0.88
1.4
0.5
1.16
0.98
0.96
4.82
2.32
0.4
0.5
0.8

after poka yoke


time taken by operators to check these operations and cost analysis
SL. No.

Operations

time(in min)

Overhead/time(in Rs)

1 Pleat
2 neck attach
3 neck finish
4 side o/l
5 sleeve fold
6 Bottom fold
7 Zipper Attach
8 Zipper Finish

0.4
0.5
0.4
0.45
0.32
0.45
0.6
0.52

3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25

9 sleeve tacking
10 Dori
11 label attach

0.36
0.4
0.3

3.25
3.25
3.25

ITEM No.:- M675

Time taken for rework


total
recheck time endline
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72

1.6
2.12
1.22
1.88
1.7
1.68
5.54
3.04
1.12
1.22
1.52

ations and cost analysis

cost for these 4 alters


total/pc(in Rs)
1.3
1.625
1.3
1.4625
1.04
1.4625
1.95
1.69
1.17
1.3
0.975

opereration
Neck attachment
Neck Finish
Zipper attachment
Zipper Finish

cost saved per alter pc of these


opereration
Neck attachment
Neck Finish
Zipper attachment
Zipper Finish

Savings per line

r these 4 alters
time(in min.) overhead/time
total/pc
2.12
3.25
1.22
3.25
5.54
3.25
3.04
3.25

no. of pcs total(in Rs)


6.89
150
1033.5
3.965
116
459.94
18.005
140
2520.7
9.88
81
800.28
TOTAL
4814.42

cost saved per alter pc of these 4 critical operations


cost before
cost after
reduction
cost/pc(in Rs) cost/pc(in Rs)
(in Rs)
6.89
1.625
5.265
3.965
1.3
2.665
18.005
1.95
16.055
9.88
1.69
8.19
TOTAL
4009.98

Final cost
(in Rs)
243.75
150.8
273
136.89
804.44

tal(in Rs)

inline checker 2

Puckering/Pleating/ Roping
Broken Stitch
Raw edge
Run Of
Uunbalanced/ Unmatched
Smocking Problem
Trim problem
Wavy Stitch
Specs
Cutting problem
Others

6/11/2011
27
20
0
19
0
0
0
0
0
0
0

6/13/2011
11
19
0
15
9
0
0
0
0
0
0

100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

Inline checker 2

Puckering/Pleating/ Roping
Broken Stitch
Raw edge

inline checker 1
6/11/2011
6/13/2011
13
8
9
13
0
3

Run Of
Uunbalanced/ Unmatched
Smocking Problem
Trim problem
Wavy Stitch
Specs
Cutting problem
Others

0
24
0
0
9
0
0
1

6
10
0
0
0
0
0
0

Puckeing/ Pleating/ Roping


11-Jun-11
13-Jun-11
14-Jun-11
15-Jun-11
16-Jun-11
17-Jun-11
18-Jun-11
20-Jun-11
21-Jun-11
22-Jun-11
23-Jun-11
Total

6/13/2011

6/11/2011

100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

Broken Stitch
10
0
0
8
4
14
0
14
7
5
6
68

6
6
12
0
9
5
0
12
11
0
0
61
100%
90%
80%
70%

100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
11-Jun-11

6/14/2011
13
15
0
21
8
0
0
0
0
0
0

6/15/2011
8
8
0
28
16
0
0
0
0
0
0

6/16/2011
14
18
0
14
16
0
0
0
0
0
0

6/17/2011
21
12
0
21
7
0
0
0
0
0
0

Others
Cutting problem
Specs
Wavy Stitch
Trim problem
Smocking Problem

Uunbalanced/ Unmatche
Run Of
Raw edge
Broken Stitch

Puckering/Pleating/ Ropin

Inline checker 2

6/14/2011
4
3
5

6/15/2011
8
17
0

6/16/2011
0
15
4

6/17/2011
12
5
8

10
2
0
0
11
0
0
0

7
18
0
0
0
0
0
0

32
7
0
0
4
0
0
0

0
22
0
0
8
0
0
2

00%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

Ot

Cu

Sp

Wa

Trim
6/23/2011

6/22/2011

6/21/2011

6/20/2011

6/18/2011

6/17/2011

6/16/2011

6/15/2011

6/14/2011

6/13/2011

6/11/2011

Sm

inline checker 1

Raw Edge

Run Of
0
22
3
5
11
24
5
4
12
0
4
90

100%
90%
80%
70%

Ru

Ra

Bro

Pu

Unbalanced/Unmatched
14
0
2
6
1
5
19
0
10
3
14
74

Uu

Smocking Problem
0
8
26
3
15
5
8
25
5
7
15
102

0
0
0
0
0
0
0
0
0
0
0
0

100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

11-Jun-11 13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11 18-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11

End line checker

defects
140
120
100
80
60
40
20
0

6/18/2011
17
15
0
12
17
0
0
0
0
0
0

6/20/2011
15
14
0
11
16
0
0
0
0
0
0

6/21/2011
17
11
0
13
14
0
0
0
0
0
0

6/22/2011
0
24
0
19
12
0
0
0
0
0
0

6/23/2011
9
21
0
16
15
0
0
0
0
0
0

6/20/2011
11
6
15

6/21/2011
8
16
8

6/22/2011
7
11
10

6/23/2011
14
8
13

Others
Cutting problem
Specs
Wavy Stitch
Trim problem
Smocking Problem
Uunbalanced/ Unmatched
Run Of
Raw edge
Broken Stitch
Puckering/Pleating/ Roping

6/18/2011
14
16
0

12
8
0
0
0
0
0
0

6
8
0
0
14
0
0
0

21
12
0
0
0
0
0
0

11
9
0
0
6
0
0
0

Others
Cutting problem
Specs
Wavy Stitch
Trim problem
6/23/2011

6/22/2011

Smocking Problem
Uunbalanced/ Unmatched
Run Of
Raw edge
Broken Stitch
Puckering/Pleating/ Roping

Trim Problem

Wavy Stitch
0
0
0
0
0
0
0
0
0
3
5
8

Specs
0
16
3
24
5
12
14
5
4
27
8
118

OT
CP
SP

Cutting Problem
0
0
0
0
0
0
4
0
3
0
0
0
2
0
0
0
0
0
0
0
0
0
9
0

4
17
0
0
9
0
0
0

OT
CP
SP
WS
TP
SM
UM
RO

20-Jun-11 21-Jun-11 22-Jun-11 23-Jun-11 RE


Broken S
Puckering
Problem

defects

Line 1
ITEM No.:- M675

inline checker 1
DATE
operations
11-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS

RE

5
4
8
5
13
9
23.214 16.071

defects
RO
UM
SM
0
0
10
0
0
14
0
0
24
0
0 42.857

TP

WS

0
0
0
0

SP

0
9
0
0
0
9
0 16.07

CP
0
0
0
0

OT

total

0
1
0
0
0
1
0 1.7857

29
27
56

50
40

11-Jun-11

30
Total

20

DHU

10
0
PP

DATE
operations
13-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS

RE

RO

UM

defects
BS
RE
RO
UM
3
5
0
4
5
8
3
2
8
13
3
6
20
32.5
7.5
15
35
30

SM

TP

SM
4
6
10
25

WS

SP

TP
0
0
0
0

CP

WS
0
0
0
0

OT

SP
0
0
0
0

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

13-Jun-11

25
20
15
10
5
0

Total
DHU

16
24
40

30
25
20
Total

15

DHU

10
5
0
PP

DATE
operations
14-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

BS

RE

RO

UM

SM

TP

defects
PP
BS
RE
RO
UM
SM
0
0
5
0
0
4
3
0
10
2
4
3
5
10
2
11.429 8.5714 14.29 28.571 5.7143

WS

SP

TP
0
0
0
0

CP

WS

OT

SP

0
11
0
0
0
11
0 31.43

35

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

16
19
35

14-Jun-11

30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
15-Jun-11 Neck attachmemt
Neck Finish
Total

PP

BS
2
6
8

BS

RE
10
7
17

RE

RO

UM

defects
RO
UM
0
0
0
7
0
7

SM

TP

WS

SM
10
8
18

SP

TP
0
0
0

CP

WS
0
0
0

OT

SP
0
0
0

CP
0
0
0

OT
0
0
0

total
0
0
0

22
28
50

DHU

16

34

14

36

40

15-Jun-11

35
30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
16-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS

RE

RO

UM

SM

defects
BS
RE
RO
UM
SM
0
5
0
0
4
0
10
4
32
3
0
15
4
32
7
0 24.194 6.452 51.613 11.29

TP

WS

SP

TP
0
0
0
0

CP

WS

SP

0
4
0
0
0
4
0 6.452

60

OT

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

16-Jun-11

50
40
30

Total

20

DHU

10
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

13
49
62

DATE
operations
17-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

defects
PP
BS
RE
RO
UM
SM
10
0
0
0
10
2
5
8
0
12
12
5
8
0
22
21.053 8.7719 14.04
0 38.596

TP

WS
SP
0
0
0
8
0
8
0 14.04

0
0
0
0

50

CP
0
0
0
0

OT
total
0
2
22
0
0
35
0
2
57
0 3.5088

17-Jun-11

40
30

Total

20

DHU

10
0
PP

DATE
operations
18-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS
4
10
14
28

RE
8
8
16
32

BS

RE

RO

defects
RO
UM
0
0
0
12
0
12
0
24

UM SM

TP

SM
6
2
8
16

WS

SP

TP
0
0
0
0

CP

OT

WS
0
0
0
0

SP

CP

0
0
0
0

0
0
0
0

OT
0
0
0
0

total
0
0
0
0

18-Jun-11

35
30
25
20

Total

15

DHU

10
5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

18
32
50

Total

15

DHU

10
5
0
PP

DATE
operations
20-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS

RE

RO

UM

SM

defects
RE
RO
UM
SM
6
0
0
1
0
15
6
7
6
15
6
8
10
25
10 13.333

BS

9
2
11
18.333

TP

WS

TP

SP

CP

WS

0
0
0
0

SP

0
0
0
14
0
14
0 23.33

30

OT

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

16
44
60

20-Jun-11

25
20
15

Total

10

DHU

5
0
PP

DATE
operations
21-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

BS

RE

RO

UM

SM

defects
PP
BS
RE
RO
UM
SM
8
11
0
0
0
0
5
8
21
12
8
16
8
21
12
12.308 24.615 12.31 32.308 18.462
35

TP

WS

SP

TP
0
0
0
0

CP

WS
0
0
0
0

OT

SP
0
0
0
0

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

21-Jun-11

30
25
20
15
10

Total
DHU

19
46
65

21-Jun-11

35
30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
22-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

BS

RE

RO

UM

SM

defects
PP
BS
RE
RO
UM
SM
7
5
0
0
0
0
6
10
11
9
7
11
10
11
9
12.963 20.37 18.52 20.37 16.667

TP

TP
0
0
0
0

WS

SP

CP

WS
SP
0
6
0
0
0
6
0 11.11

25

OT

CP
0
0
0
0

OT
0
0
0
0

total
0
0
0
0

18
36
54

22-Jun-11

20
15
Total

10

DHU

5
0
PP

DATE
operations
23-Jun-11 Neck attachmemt
Neck Finish

PP

BS
4
10

BS

RE

RO

defects
RE
RO
UM
8
0
0
0
13
4

UM

SM

TP

SM
0
17

WS

TP
0
0

SP

CP

WS
0
0

OT

SP
4
5

CP
0
0

OT
0
0

total
0
0

16
49

Total
DHU

14
8
21.538 12.308

13
4
17
20 6.1538 26.154

0
0

0
9
0 13.85

0
0

0
0

0
0

65

23-Jun-11

30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
24-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

DATE
operations
25-Jun-11 Neck attachmemt
Neck Finish
Total
DHU

PP

BS

12
6
0
6
12
12
18.462 18.462

BS

12
6
0
13
12
19
19.355 30.645

BS

RE

RO

UM

SM

defects
RO
UM
SM
0
0
0
9
21
11
9
21
11
13.85 32.308 16.923

TP

WS

RE

defects
RO
UM
SM
0
0
2
8
16
5
8
16
7
12.9 25.806 11.29

SP

TP
0
0
0
0

RE

WS
0
0
0
0

TP
0
0
0
0

CP

SP
0
0
0
0

WS
0
0
0
0

OT

CP
0
0
0
0

SP
0
0
0
0

OT
0
0
0
0

CP
0
0
0
0

total
0
0
0
0

OT
0
0
0
0

18
47
65

total
0
0
0
0

20
42
62

DEFECT LIST
PP
BS
RE
RO
UM
SM
TP
WS
SP
CP
OT

PUCKERING/PLEATING/ROPING
BROKEN/INSECURE/SKIP/UNTIDY JOINT
RAW EDGE
RUN OFF
UNBALANCED/UNMATCHED
SMOCKING PROBLEM
TRIM PROBLEM
WAVY STITCH
SPECS
CUTTING PROBLEM
OTHER

total checked pcs


132

total checked pcs


166

DHU
21.9697
20.45455
42.42424

DHU
9.638554
14.45783
24.09639

total checked pcs


120

total checked pcs


204

DHU
13.33333
15.83333
29.16667

DHU
10.78431
13.72549
24.5098

total checked pcs


240

DHU
5.416667
20.41667
25.83333

total checked pcs


585

total checked pcs


525

DHU
3.760684
5.982906
9.74359

DHU
3.428571
6.095238
9.52381

total checked pcs


480

total checked pcs


480

DHU
3.333333
9.166667
12.5

DHU
3.958333
9.583333
13.54167

total checked pcs


435

total checked pcs


465

DHU
4.137931
8.275862
12.41379

DHU
3.44086
10.53763

465
13.97849

total checked pcs


585

total checked pcs


585

DHU
3.076923
8.034188
11.11111

DHU
3.418803
7.179487
10.59829

Line 1

inline checker 2
DATE
operations
11-Jun-11 Zipper Attach
Zipper Finish
Side attach
Total
DHU

PP

BS

RE

7
8
0
12
20
0
27
20
40.9091 30.303

defects
RO
UM
0
10
0
9
0
0
0
19
0 28.788

ITEM No.:- M675

SM

TP

0
0
0
0
0

0
0
0
0
0

WS
0
0
0
0
0

50

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

25
21
20
66

11-Jun-11

40
30
Total

20

DHU

10
0
PP

DATE
operations
13-Jun-11 Zipper Attach
Zipper Finish
Side attach
Total
DHU

PP

BS

RE

0
11
11
0
0
8
11
19
20.3704 35.185
40
35
30
25
20
15
10

BS

RE

RO UM SM

defects
RO
UM
SM
0
9
5
0
6
0
0
0
4
0
15
9
0 27.778 16.667

TP

WS

SP

TP
0
0
0
0
0

CP

OT

WS
0
0
0
0
0

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

13-Jun-11

Total
DHU

total
0
0
0
0
0

25
17
12
54

40
35
30
25
20
15
10
5
0

13-Jun-11

Total
DHU

PP

DATE
operations
14-Jun-11 Zipper Attach
Zipper Finish
Side attach
Total
DHU

BS

RE

RO

UM

SM

defects
RO
UM
SM
0
13
0
0
8
8
0
0
0
0
21
8
0 36.842 14.035

PP

BS
RE
8
9
0
0
5
6
13
15
22.807 26.316

TP

WS

TP
0
0
0
0
0

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

30
16
11
57

Total
DHU

BS
0
8

OT

14-Jun-11

PP

PP

CP

WS
0
0
0
0
0

40
35
30
25
20
15
10
5
0

DATE
operations
15-Jun-11 box pleat attach
sleeve attach

SP

RE
0
8

BS

RE

RO

UM

defects
RO
UM
0
7
0
5

SM

TP

SM
8
0

WS

SP

TP
0
0

CP

WS
0
0

SP
0
0

CP
0
0

OT
0
0

total
0
0

15
21

center sleeve attach


Total
DHU

0
0
8
8
13.3333 13.333

0
16
8
0
28
16
0 46.667 26.667

0
0
0

0
0
0

0
0
0

0
0
0

50

0
0
0

0
0
0

24
60

15-Jun-11

40
30
Total

20

DHU

10
0
PP

DATE
operations
16-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS

BS

RE

4
11
0
7
10
0
14
18
22.5806 29.032

RE

RO

UM

SM

TP

defects
RO
UM
SM
0
0
0
0
9
16
0
5
0
0
14
16
0 22.581 25.806

WS

SP

TP
0
0
0
0
0

CP

OT

WS
0
0
0
0
0

35

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

16-Jun-11

30
25
20
Total

15

DHU

10
5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

total
0
0
0
0
0

15
32
15
62

25
20
Total

15

DHU

10
5
0
PP

DATE
operations
17-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS

BS

RE

4
0
5
12
12
0
21
12
34.4262 19.672

RE

RO

UM

SM

TP

defects
RO
UM
SM
0
0
7
0
5
0
0
16
0
0
21
7
0 34.426 11.475

WS

TP
0
0
0
0
0

6
0
11
17
27.8689

OT

WS

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

11
22
28
61

17-Jun-11

Total
DHU

PP

PP

CP

0
0
0
0
0

40
35
30
25
20
15
10
5
0

DATE
operations
18-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

SP

BS
0
15
0
15
24.59

BS

RE

RE

RO

UM

SM

defects
RO
UM
SM
0
6
0
0
6
7
0
0
10
0
12
17
0 19.672 27.869

TP

WS

SP

TP
0
0
0
0
0

CP

OT

WS
0
0
0
0
0

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

12
28
21
61

30

18-Jun-11

25
20
15

Total

10

DHU

5
0
PP

DATE
operations
20-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS

0
15
0
15
26.7857

RE
6
0
8
14
25

BS

RE

RO

UM

SM

TP

defects
RO
UM
SM
0
0
5
0
11
0
0
0
11
0
11
16
0 19.643 28.571

WS

SP

TP

CP

OT

WS

0
0
0
0
0

0
0
0
0
0

30

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

20-Jun-11

25
20
15

Total

10

DHU

5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

total
0
0
0
0
0

11
26
19
56

DATE
operations
21-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS

5
0
12
17
30.9091

RE
0
11
0
11
20

defects
RO
UM
SM
0
0
5
0
13
0
0
0
9
0
13
14
0 23.636 25.455

TP
0
0
0
0
0

WS
0
0
0
0
0

35

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

10
24
21
55

21-Jun-11

30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
22-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS

BS
RE
0
11
0
5
0
8
0
24
0 43.636
50
45
40
35
30
25
20
15
10

RE

RO

UM

SM

defects
RO
UM
SM
0
10
0
0
9
5
0
0
7
0
19
12
0 34.545 21.818

TP

WS

SP

TP
0
0
0
0
0

CP

OT

WS
0
0
0
0
0

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

22-Jun-11

Total
DHU

total
0
0
0
0
0

21
19
15
55

22-Jun-11

45
40
35
30
25
20
15
10
5
0

Total
DHU

PP

DATE
operations
23-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

BS

PP

BS
RE
0
7
9
5
0
9
9
21
14.7541 34.426

RE

RO

UM

SM

TP

defects
RO
UM
SM
0
0
15
0
9
0
0
7
0
0
16
15
0 26.23 24.59

WS

SP

TP
0
0
0
0
0

CP

WS
0
0
0
0
0

40

OT

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

total
0
0
0
0
0

22
23
16
61

23-Jun-11

35
30
25
20

Total

15

DHU

10
5
0
PP

DATE
operations
24-Jun-11 box pleat attach
sleeve attach

PP

BS

BS
0
8

RE
0
0

RE

RO

UM

defects
RO
UM
0
8
0
17

SM

TP

WS

SM
6
0

SP

TP
0
0

CP

OT

WS
0
0

SP
0
0

CP
0
0

OT
0
0

total
0
0

14
25

center sleeve attach


Total
DHU

0
10
8
10
12.6984 15.873

0
0
14
0
25
20
0 39.683 31.746

0
0
0

0
0
0

45

0
0
0

0
0
0

0
0
0

0
0
0

24
63

24-Jun-11

40
35
30
25

Total

20

DHU

15
10
5
0
PP

DATE
operations
25-Jun-11 box pleat attach
sleeve attach
center sleeve attach
Total
DHU

PP

BS
0
10
9
0
0
0
9
10
15 16.667
40
35

BS

RE

RE

RO

UM

SM

defects
RO
UM
SM
0
0
9
0
7
0
0
12
13
0
19
22
0 31.667 36.667

TP

WS

SP

TP
0
0
0
0
0

CP

OT

WS
0
0
0
0
0

SP
0
0
0
0
0

CP
0
0
0
0
0

OT
0
0
0
0
0

25-Jun-11

30
25
20

Total

15

DHU

10
5
0

total
0
0
0
0
0

19
16
25
60

25
20

Total

15

DHU

10
5
0
PP

PP
BS
RE
RO
UM
SM
TP
WS
SP
CP
OT

BS

RE

RO

UM

DEFECT LIST
PUCKERING/PLEATING/ROPING
BROKEN/INSECURE/SKIP/UNTIDY JOINT
RAW EDGE
RUN OFF
UNBALANCED/UNMATCHED
SMOCKING PROBLEM
TRIM PROBLEM
WAVY STITCH
SPECS
CUTTING PROBLEM
OTHER

SM

TP

WS

SP

CP

OT

total checked pcs


165

total checked pcs


245

DHU
15.15152
12.72727
12.12121
40

DHU
10.20408
6.938776
4.897959
22.04082

total checked pcs


255

total checked pcs


305

DHU
11.76471
6.27451
4.313725
22.35294

DHU
4.918033
6.885246

305

total checked pcs


395

7.868852
19.67213

DHU
3.797468
8.101266
3.797468
15.6962

total checked pcs


485

total checked pcs


510

DHU
2.268041
4.536082
5.773196
12.57732

DHU
2.352941
5.490196
4.117647
11.96078

total checked pcs


415

DHU
2.650602
6.26506
4.578313
13.49398

total checked pcs


460

total checked pcs


490

DHU
2.173913
5.217391
4.565217
11.95652

DHU
4.285714
3.877551
3.061224
11.22449

total checked pcs


475

total checked pcs


450

DHU
4.631579
4.842105
3.368421
12.84211

DHU
3.111111
5.555556

450

total checked pcs


510

5.333333
14

DHU
3.72549
3.137255
4.901961
11.76471

Line 1
ITEM No.:- M675

Endline checker
DATE
11-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP
0
0
0
7
0
3
0
0
0
0
0
10
33.3333

BS

RE
0
0
0
0
0
0
0
0
6
0
0
6
20

defects
RO
UM
0
0
0
0
0
0
0
0
0
7
0
0
0
0
0
0
0
7
0
0
0
0
0
14
0 46.667

SM
0
0
0
0
0
0
0
0
0
0
0
0
0

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS
0
0
0
0
0
0
0
0
0
0
0
0
0

SP

CP

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

50

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
7
7
3
0
0
13
0
0
30

11-Jun-11

45
40
35
30
25

Total

20

DHU

15
10
5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

endline checker
DATE
13-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS

defects
RO
UM
SM
0
0
0
5
0
3
0
0
0
0
0
2
0
0
0
16
0
0
1
0
0
0
0
0
0
0
0
0
0
3
0
0
0
22
0
8
42.308
0 15.385

RE

0
0
0
0
0
0
0
0
0
0
0
0
0
6
0
0
0
0
0
0
0
0
0
6
0 11.5385

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

SP

0
0
0
14
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
16
0 30.769

45

CP
0
0
0
0
0
0
0
0
0
0
0
0
0

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
0
0
0

13-Jun-11

40
35
30
25

Total

20

DHU

15
10
5
0
PP

BS

RE

RO

endline checker
defects

UM

SM

TP

WS

SP

CP

OT

0
22
0
2
0
16
9
0
0
3
0
52

DATE
14-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS

RE

RO

UM

SM

0
0
0
0
0
0
0
0
0
26
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
12
0
0
0
0
12
3
2
26
0 26.087 6.5217 4.3478 56.522

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

SP

0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
3
0 6.5217

60

CP
0
0
0
0
0
0
0
0
0
0
0
0
0

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
0
0
0

0
26
0
0
0
8
0
0
0
0
12
46

14-Jun-11

50
40
30

Total
DHU

20
10
0
PP

DATE
inline operations
15-Jun-11 checker Pleat
neck attach
neck finish

PP

BS
0
8
0

RE
0
0
0

BS

RE

RO

defects
RO
UM
0
0
0
0
0
6

UM

SM

SM
0
0
0

TP

TP
0
0
0

WS

SP

WS
0
0
0

CP

SP
0
0
0

OT

CP
0
0
4

OT
0
0
0

total
0
0
0

0
8
10

side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

0
0
0
0
0
0
0
0
8
16

0
0
0
0
0
0
0
0
0
0

0
0
0
5
0
0
0
0
5
10

0
0
0
0
0
0
0
0
6
12

3
0
0
0
0
0
0
0
3
6

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
6
0
0
0
0
18
24
48

0
0
0
0
0
0
0
0
4
8

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

3
0
6
5
0
0
0
18
50

60

15-Jun-11
50
40
30

Total
DHU

20
10
0
PP

DATE
16-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach

PP

BS
0
0
4
0
0
0
0

RE
0
0
0
3
0
0
0

BS

RE

RO

UM

defects
RO
UM
SM
0
0
0
0
0
12
0
0
0
0
0
0
0
0
0
5
0
0
6
0
3

SM

TP

TP
0
0
0
0
0
0
0

WS

WS
0
0
0
0
0
0
0

SP

CP

SP
0
0
3
0
0
0
2

OT

CP
0
0
3
0
0
0
0

OT
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0

0
12
10
3
0
5
11

Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

0
0
0
0
4
8.33333

0
0
1
0
0
0
0
0
0
6
0
0
9
11
1
18.75 22.917 2.0833

0
0
0
0
15
31.25

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
5
0 10.417

35

0
0
0
0
3
6.25

0
0
0
0
0
0

0
0
0
0
0
0

1
0
0
6
48

16-Jun-11

30
25
20
Total

15

DHU

10
5
0
PP

DATE
17-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori

PP

BS
0
6
0
8
0
0
0
0
0
0

RE
0
0
0
0
0
2
0
0
0
3

BS

RE

RO

defects
RO
UM
0
0
0
0
0
0
0
0
0
0
12
0
12
2
0
3
0
0
0
0

UM

SM

SM
0
0
5
0
0
0
0
0
0
0

TP

WS

TP
0
0
0
0
0
0
0
0
0
0

SP

WS
0
0
0
0
0
0
0
0
0
0

CP

OT

SP
0
0
3
0
0
0
7
0
0
2

CP
0
0
0
0
0
0
0
0
0
0

OT
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
5
0
0
0
0
0

0
6
8
8
5
14
21
3
0
5

label attach
Total
DHU

0
0
0
0
0
14
5
24
5
5
20 7.14286 34.286 7.1429 7.1429

0
0
0

0
0
0
12
0 17.143

0
0
0

40

0
0
0
5
0 7.14286

0
70

17-Jun-11

35
30
25
20

Total
DHU

15
10
5
0
PP

DATE
18-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS
0
0
0
0
0
0
0
0
0
0
0
0
0

BS

RE

RO

UM

SM

defects
RE
RO
UM
SM
0
0
0
0
0
0
0
4
0
0
0
4
0
0
0
0
0
0
0
0
0
0
6
0
0
0
2
0
0
0
11
0
0
0
0
0
0
5
0
0
0
0
0
0
0
5
19
8
0 8.3333 31.667 13.333

TP

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

SP

CP

OT

WS
SP
CP
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
10
0
0
4
0
0
0
0
0
0
0
0
0
0
0
14
2
0 23.333 3.33333

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
12
12
20

0
4
6
0
0
6
12
15
0
5
12
60

35

18-Jun-11

30
25
20
Total
15

DHU

10
5
0
PP

DATE
20-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP
0
0
3
0
7
0
0
4
0
0
0
14
23.3333

BS

BS

RE

RO

UM

SM

defects
RE
RO
UM
SM
0
0
0
0
0
0
0
5
0
0
0
0
0
0
0
10
0
0
0
0
0
4
0
0
4
0
0
10
5
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
12
4
0
25
20 6.6667
0 41.667

TP

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

SP

WS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
2
0
0
0
5
0 8.3333

CP

OT

SP

CP
0
0
0
0
0
0
0
0
0
0
0
0
0

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
0
0
0

0
5
3
10
7
4
14
12
0
5
0
60

45

20-Jun-11

40
35
30
25

Total

20

DHU

15
10
5
0
PP

DATE
21-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS

0
5
0
2
0
0
0
0
0
0
0
7
12.7273
25
20
15

BS

RE

RO

UM

SM

defects
RE
RO
UM
SM
0
0
0
0
0
0
0
5
11
0
5
0
0
0
0
0
0
0
0
0
0
9
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
5
0
0
0
0
0
11
12
10
5
20 21.818 18.182 9.0909

TP

TP
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

SP

CP

OT

WS
SP
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
4
0 7.2727

0
0
0
0
0
0
0
0
0
0
0
0
0

CP

21-Jun-11

OT
total
0
0
0
0
0
10
0
0
16
0
0
2
0
6
6
0
0
9
0
0
4
0
0
3
0
0
0
0
0
5
0
0
0
0
6
55
0 10.9091

20
15
Total
10

DHU

5
0
PP

DATE
22-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS

BS

0
2
0
3
0
0
0
0
0
0
0
5
9.43396
60

RE
0
0
0
0
0
0
0
0
0
0
0
0
0

RE

RO

UM

SM

defects
RO
UM
SM
0
0
0
0
0
0
0
3
0
0
0
3
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
0
3
7
0 5.6604 13.208

TP

WS

SP

TP
WS
SP
0
0
0
0
0
5
0
0
3
0
0
0
0
0
0
0
0
0
0
0
8
0
0
7
0
0
0
0
0
4
0
3
0
0
3
27
0 5.6604 50.943

CP

OT

CP
0
0
0
0
0
0
0
0
0
0
0
0
0

OT
total
0
0
0
0
0
7
0
0
6
0
0
6
0
0
0
0
2
2
0
0
12
0
0
7
0
0
0
0
0
4
0
6
9
0
8
53
0 15.0943

22-Jun-11

50
40
30
20

Total
DHU

30

Total
DHU

20
10
0
PP

DATE
23-Jun-11

operations
inline Pleat
checker neck attach
neck finish
side o/l
sleeve fold
Bottom fold
Zipper Attach
Zipper Finish
sleeve tacking
Dori
label attach
Total
DHU

PP

BS

BS

0
0
2
4
0
0
0
0
0
0
0
6
11.5385

RE

RO

UM

SM

TP

defects
RO
UM
SM
0
0
0
0
0
5
0
4
0
0
0
10
0
0
0
2
0
0
0
0
0
2
0
0
0
0
0
0
10
0
0
0
0
4
14
15
7.6923 26.923 28.846

RE
0
0
0
0
0
0
0
0
0
0
0
0
0

WS

TP

SP

CP

WS

OT

SP

CP

0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
5
0
0
5
8
0 9.6154 15.385

35

0
0
0
0
0
0
0
0
0
0
0
0
0

OT
0
0
0
0
0
0
0
0
0
0
0
0
0

total
0
0
0
0
0
0
0
0
0
0
0
0
0

23-Jun-11

30
25
20
Total

15

DHU

10
5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

0
5
6
14
6
2
2
2
0
10
5
52

5
0
PP

BS

RE

RO

UM

SM

TP

WS

SP

CP

OT

DEFECT LIST
PP
BS
RE
RO
UM
SM
TP
WS
SP
CP
OT

Total

PUCKERING/PLEATING/ROPING
BROKEN/INSECURE/SKIP/UNTIDY JOINT
RAW EDGE
RUN OFF
UNBALANCED/UNMATCHED
SMOCKING PROBLEM
TRIM PROBLEM
WAVY STITCH
SPECS
CUTTING PROBLEM
OTHER

Puckerin Broken StRaw


11-Jun-11
10
6
13-Jun-11
0
6
14-Jun-11
0
12
15-Jun-11
8
0
16-Jun-11
4
9
17-Jun-11
14
5
18-Jun-11
0
0
20-Jun-11
14
12
21-Jun-11
7
11
22-Jun-11
5
0
23-Jun-11
6
0
68
61
100%
90%
80%
70%

EdgRun
0
22
3
5
11
24
5
4
12
0
4
90

Of UnbalanSmockinTrim ProWavy StiSpecs


14
0
0
0
0
0
8
0
0
16
2
26
0
0
3
6
3
0
0
24
1
15
0
0
5
5
5
0
0
12
19
8
0
0
14
0
25
0
0
5
10
5
0
0
4
3
7
0
3
27
14
15
0
5
8
74
102
0
8
118

Cutting Others
0
0
0
0
0
0
0
0
0
4
0
0
3
0
0
0
0
5
2
0
0
0
0
0
0
0
6
0
0
8
0
0
0
9
0
19

Others
Cutting Problem
Specs

Others

90%

Cutting Problem

80%

Specs

70%

Wavy Stitch

60%

Trim Problem

50%

Smocking Problem

40%

Unbalanced/Unmatched

30%

Run Of

20%

Raw Edge

10%

Broken Stitch

0%
Puckering Problem
11-Jun-11
13-Jun-11
14-Jun-11
15-Jun-11
16-Jun-11
17-Jun-11
18-Jun-11
20-Jun-11
21-Jun-11
22-Jun-11
23-Jun-11

defects
140
120
100
80
60
40
20
0

defects

total checked pcs

180

DHU
0
0
0
3.888889
3.888889
1.666667
0
0
7.222222
0
0
16.66667

total checked pcs

302

DHU
0
7.284768
0
0.662252
0
5.298013
2.980132
0
0
0.993377
0
17.21854

total checked pcs

286

DHU
0
9.090909
0
0
0
2.797203
0
0
0
0
4.195804
16.08392

Total

DHU

total checked pcs

DHU
0
2.285714
2.857143

350

350

0.857143
0
1.714286
1.428571
0
0
0
5.142857
14.28571

Total
DHU

total checked pcs

448

DHU
0
2.678571
2.232143
0.669643
0
1.116071
2.455357

448
0.223214
0
0
1.339286
10.71429

total checked pcs

570

DHU
0
1.052632
1.403509
1.403509
0.877193
2.45614
3.684211
0.526316
0
0.877193

0
12.2807

total checked pcs

560

DHU
0
0.714286
1.071429
0
0
1.071429
2.142857
2.678571
0
0.892857
2.142857
10.71429

total checked pcs

560

DHU
0
0.892857
0.535714
1.785714
1.25
0.714286
2.5
2.142857
0
0.892857
0
10.71429

total checked pcs

555

DHU
0
1.801802
2.882883
0.36036
1.081081
1.621622
0.720721
0.540541
0
0.900901
0
9.90991

total checked pcs

553

DHU
0
1.265823
1.084991
1.084991
0
0.361664
2.169982
1.265823
0
0.723327
1.627486
9.584087

total checked pcs

552

DHU
0
0.905797
1.086957
2.536232
1.086957
0.362319
0.362319
0.362319
0
1.811594
0.905797
9.42029

Line 1
Sl. No.

ITEM No.:- M675


CRITICAL OPERATIONS

front pintuk making

Collar finish

Zipper attachment

Zipper finish

Hemming

DEFECTS
Pinch
Unstitched
Insecure stitch
Inside ply visible
uneven curve
Misstitch
Uneven width
Pinch
Improper allignment
Loose stitch
Loose stitch
Raw edge
Unfinished
Wavy hem
Raw edge

MAN
Y
Y
Y
y
y
y
y
y
y
y
y
y
y
y

CAUSES
MACHINE

MATERIAL
Y

METHOD

Y
Y
y
y
Y
y
y
Y
y
y

Line 1
Alter checked Pcs
Date
Sl No.

Operation

11-Jun-11 Type

1 In line checker 1 (pleat,


neck attach)
2 In line checker 2 (neck
finish)
3 Side o/l
4 Sleeve Hem
5 Bottom Hem
6 Sleeve fold taki
7 Dori

13-Jun-11
22

7
7
3
13

PP
RO
PP
6BS+7RO

2
16
3

8 Zipper attach

Zipper finish
10 Label attach
TOTAL ALTER
TOTAL CHECHED
DHU %

30
180
16.6666666667

52
302
17.218543

Total extra time

Total extra time for the style


Extra cost incurred

ITEM No.:- M675


Alter checked Pcs
Type

14-Jun-11 Type

5RO+14WS+
3UM

26 UM

15-Jun-11 Type
8 PP
10 4SP+6RO
3 UM

UM
RE

8 3RE+2RO+3WS

6 WS

16-Jun-11
12
10
3
5

UM
6BS+1RE+2
WS

5 RE

12 BS
46
286
16.08391608

al extra time for the style


Extra cost incurred

18 WS
50
350
14.285714

11
1
6
48
448
10.714286

Type
UM
3WS+4PP
+3SP
BS
RE

17-Jun-11 Type
6 PP
8 3WS+5UM
8 PP
5 OT
14 12RE+2BS
5 2WS+3BS

3UM+2W
S+6RE
RO
BS

12RE+7WS
21 +2RO
3 RO
70
570
12.280702

18-Jun-11 Type
4 UM
6 4UM+2SP

20-Jun-11 Type
5 UM

6 RO

3 PP
10 UM
7 PP
4 RE

5 RE

5 BS

12 10WS+2RO
15 11RO+4WS
12 OT
60
560
10.714286

14 10UM+4BS
3WS+4PP+
12 5BS
60
560
10.714286

21-Jun-11 Type

22-Jun-11 Type

10 5UM+5PP

7 2PP+5WS

16 5RO+11BS
2 PP
6 OT
9 RE

6 3RO+3WS
6 3UM+3PP

5 RO
4 WS
3 RO
55
555
9.9099099

23-Jun-11 Type
5 UM

2 OT

6 4RO+2PP
14 10UM+4PP
6 WS
2 RE

4 WS

10 RO

12 8WS+2UM
7 WS
9 TP
53
553
9.584087

2 WS
2 RE
5 TP
52
552
9.4202899

Line 1

actual SAM
(in min.)
SL. No.

operations
1 pintuck making
2 neck attach
3 neck finish
4 side o/l
5 sleeve Hem
6 Bottom Hem
7 Zipper Attach
8 Zipper Finish
9 sleeve tacking
10 loop
11 label attach

1.28
1.35
0.4
0.8
1.2
0.8
1.36
1.2
0.4
0.65
0.52

observed SAM
(in min.)
1.14
2.2
0.45
1.16
1.77
1.1
2.6
1.19
0.84
0.5
0.34

ITEM No.:- M675

time for rework


(in min.)
0.8
1.4
0.5
0.4
0.98
0.96
4.82
2.54
0.78
0.5
0.6

Checking time
(per gmt in min.)
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95

Total
(in min.)
2.89
4.55
1.9
2.51
3.7
3.01
8.37
4.68
2.57
1.95
1.89

Checking after rework


(in min.)
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72

Total
(in min.)
3.61
5.27
2.62
3.23
4.42
3.73
9.09
5.4
3.29
2.67
2.61

You might also like