A maintenance facility of a large manufacturer performs two operations. These operations


must be performed in series; operation 2 always follows operation 1. The units that are
maintained are bulky, and space is available for only eight units including the units being
worked on. A proposed design leaves space for two units between the works stations, and
space for four units before work station 1. Currently company policy is to subcontract the
maintenance of a unit if it can not gain access to the in-house facility.
Historical data indicates that the time interval between requests for maintenance is
exponentially distributed with a mean of 0.4 time units. Service times are also exponentially
distributed with the first station requiring on the average 0.25 time units, and the second
station 0.5 time units. Units are transported automatically from work station 1 to work
station 2 in a negligible amount of time.
If the queue of work station 2 is full, that is, if there are two units waiting for work station 2,
the first station is blocked and a unit can not leave the station. A blocked work station can not
serve other unit.
To evaluate the proposed design, statistics on the following variables are to be obtained over
a period of 300 time units: i) work station utilization, ii) time to process a unit through the
two work stations, iii) time between the subcontracting unit, iv) number of units waiting for
each work station, v) fraction of time that work station 1 is blocked.