Professional Documents
Culture Documents
DEPARTMENT OF EDUCATION
REGION V (BICOL)
DIVISION OF ALBAY
Attachment
1
POSITION
DEPED
SCHOOL HEAD
DEPED
SCHOOL
PHYSICAL
FACILITIES
COORDINATOR
LORENA B. CIAR
GPTA
GPTA
PRESIDENT
DEXTER V. RABO
YES-O
ADVISER
SPG
ADVISER
NAME
JOSELYN N. SAMPAL
DEXTER V. RABO
MARIA FE B.
BALMACEDA
ROLE
PREPARED BY:
JOSELYN N. SAMPAL
SCHOOL HEAD
Attachment
2
: JUNE
NAME OF
BUILDING
2014
ID or
BLDG
No. If
any
YEAR OF
COMPLET
ION
BUILDING SIZE
WIDT
H
LENG
TH
AREA (sq.
m)
NOTES
No. of
Storey
MAYON TYPE
1967
72
MARCOS TYPE
1949
48
PREPARED BY:
JOSELYN N. SAMPAL
SCHOOL HEAD
School
Name
Location
Attachment
2
: JUNE
2014
DESCRIPTION OF
ROOM
(WITHIN THE
BUILDING)
1.
2.
3.
4.
CLASSROOM
LABORATORY
TEACHERS OFFICE
TOILET
5. OTHERS (Specify)
NUMBER OF
THE ROOM
WITHIN THE
BUILDING
2
0
0
0
SIZE (sq. m)
NOTES
WIDTH X LENGTH
8X9
School
Name
Location
Attachment
:
: JUNE
2014
DESCRIPTION OF
ROOM
(WITHIN THE
BUILDING)
1.
2.
3.
4.
CLASSROOM
LABORATORY
TEACHERS OFFICE
TOILET
5. OTHERS (Specify)
NUMBER OF
THE ROOM
WITHIN THE
BUILDING
3
0
0
0
SIZE (sq. m)
NOTES
WIDTH X LENGTH
6X8
No. of WC
Male Female No. of Latrines
School
Name
Location
Attachment
2
: JUNE
2014
DESCRIPTION OF
ROOM
(MAKESHIFT)
1.
2.
3.
4.
CLASSROOM
LABORATORY
TEACHERS OFFICE
TOILET
NUMBER OF
THE ROOM
WITHIN THE
BUILDING
1
0
1
1
SIZE (sq. m)
NOTES
WIDTH X LENGTH
5X6
No. of WC
Male -
Attachment 3
Date of Assessment
NAME of
INSPECTOR(S)
: ASSESSMENT SHEET
: MARCH 2015
BLDG. NO.
ROOM
NO.
PARTS OF
THE
ROOM
1, 2
WINDOWS
CEILING
3,4,& 5
WINDOWS
ROOFING
WALL
CONDITION
PROBLEM
FOR
REPLACEMENT
FOR
REPLACEMENT &
REPAIR
COMMENTS/CONCERNS
(Work Recommended)
REPLACEMENT OF WINDOWS AND
CONSTRUCTION OF CEILING OF 1
ROOM
REPLACEMENT OF WINDOWS AND
REPAIR OF WALL AND ROOFINGS
ESTIMATED COST
UNIT
COST
QTY
UNIT
TOTAL COST
35
PCS
600.00
21,000.00
45
PCS
1000.00
45,000.00
Attachment 4
ACTIVITIES
RECONSTRUCTING
OF ROOFING,
AREA
LOCATION OF
ACTIVITIES
3 (6 X 8)
PERSON INCHARGE
TIME FRAME
DEPED
2015
IMPLEMENTO
R WORKER
CONTRUCTOR,
LABORER
MATERIALS
NOTES
CORR GI-SHEET,
WOODEN JALOUSIE,
PLYWOOD, GOOD
FOR MAJOR
REPAIR
CEILING,
WINDOWS
2
REPAINTING OF
CLASSROOMS
AND PERIMETER
FENCE
LUMBER
LORENA B. CIAR
DANILO BRECIA
CONSTRUCTION
OF CONCRETE
SCHOOL
SIGNAGE
DEPED
MAY 2015
MAY 2015
LABORER,
PARENTS
PAINT, BRUSH,
ROLLER
LABORER,
PARENT
CEMENT, HALLOW
BLOCKS, SAND,
GRAVEL, ROUND
BAR,STEEL
MATTING,PAINT,BR
USH, ROLLER,
PLYWOOD
Attachment 4
FOR
CONSTRUCTION
PRIORITY NO.
WORK TO BE
DONE
MATERIALS COST
(UNIT COST X QUANTITY)
LABOR COST
(DAILY WAGE
X NO.OF
DAYS)
TOTAL COST
RE-CONSTRUCTING
PHP 5, 400.00
REPAINTING
PHP 4, 800.00
REPAIRING
PHP 4,500.00
PHP 26,000.00
Attachment 5
LACKING
AMOUNT OF
MONEY
DATE
IMPLEMENTE
R
2007
DEPED
2011
GPTA
2014
PTA
GPTA
DEPED
PLACE/BUILDING
NO./ROOM NO.
ACTIVITY
(WORK COMPLETED)
LABOR
COST
MATERIAL
COST
TOTAL COST
PHP45,
000.00
STAGE
REPAIR OF STAGE
PHP 25,000.00
COMFORT ROOMS
CONSTRUCTION OF 3
SETS OF TOILET
PHP 15,000.00
PHP 10,000.00
REMARKS
TEMPORARY