1-TR-al-Ncrw< (GOVERNMENT OF INDIA )

-1-.410 ,4 (MINISTRY OF RAILWAYS)



.n (RAILWAY BOARD)
,

N . 2000/RE/161/1 Pt. Ill

New Delhi, Dt. 03.11.10

Executive Director/Electrical
RVNL, August Kranti Bhavan
Bhikaji Cama Place
R K Puram, New Delhi
Sub: Standard implantation for new electrification works.
Ref: (i) Your office letter no. RVNUBPUElect/BYT-URK/21 dated 22.09.10.
(ii) This office letter no. 2006/RE138/4 dated 26.02.10.
(iii) ACTM Advance correction slip no. 20 dated 3.11.10:
In continuation to ACTM correction slip no 20, following tabular guidelines regarding
setting distance is given with the approval of. Board (ML):

(a)
Mast
single OHE.

having

(b) Portal upright,


masts carrying more
than one OHE &
head span masts.

Implantation on Main line


Implantation in Yards
(a) 2.8 m - if minimum (a) If 2.8 m is not available,
formation
width
in implantation can go down
embankment available is as minimum upto 2.36 m which
per SOD Para 16, 17 schedule shall not require any specific
I, chapter 1. If this formation approval from CEE (open line).
width is not available,
implantation may be permitted
upto 2.5 m without approval of
CEE & upto 2.36 m with
approval of CEE. (ref:- Para

20.1, page 29 of ACTM 1994).


(b) Should not normally be less than 3.0 m which may be
relaxed to 2.8 m, with the personal approval of CEE (open line)
who may prescribe any special precaution as may be
considered necessary.

(Mrs. Manju Gupta)


Executive Director/Railway Electrification
Railway Board.
....
Copy to:
Chief Electrical Engineer (All Zonal Railways)
2 Director/IRIEEN, Nasik Road
l Sr. Prof./ElectriCal Railway Staff Qollege;Vadodara
4 EIJI/Co-ordination, RDSO
5 LE.E./ cote (a.1- 1)
D:\My

of CailwaYs

ard

:.;
Documents.1\sgoentrd issues\Standard implantatioagg.doetIV't:_