No:2010/Elect/Ploicy/39_ Pt-IV Dt: 23.4.2012 as
CearePand =i Wy
GM/Elect/DLI, BBS, SC, MAS, BPL, Kolkata, Kolkata Metro, Pune, BSP #
GM (Elect) /PINDLS \&
DGM /Elect/Raipur, Mumbai, Jaipur
Sub: OHE Foundation Drawings for increased implantation from 2800 mm.
to 2900 mm from center line or nearest track
Ref: Director General (TI)/RDSO letter No. TVCIVILFND/12 dated:
11" April, 2012
A copy of the above referred letter of RDSO on the subject of OHE Foundation Drawings
for increased implantation from 2800 mm to 2900 mm from center line or nearest track to be
used wherever formation width permits along with copies of following drawings is enclosed
for record and future referance
1 RDSO Drawing No. TVDRG/CIV/FND/RDSO/00001/04/0 (Sheet 1 to 5)
2 RDSO Drawing No. THCIV/ RDSO/00001/12/0 (Sheet 1 to 5).
3 RDSO Drawing No. ETVOHE/G/01403 (Sheet 1 to 3)
DA: As above
Agee
(Kamta Prasad)
Manager (Elect)
For Executive Director (Elect)
Correspondance docxee 6 99- tacnan
wpue-2a60 /62 as it Sa Si te
‘Telephone : 2465765. 42€05(0/¢) Bie sera meets - 226 O11
No.
To,
Fax : 01-089.2485763 ao ooverhnient Of Initia, san
E-rsail: dti5@gmail.com Research Designs « Standards Organisation
Manak Nagar, Lucknow - 226 O11
TI/CIVILYFND/12 Dated, the 26" March, 2012
ypeq 1
Tre Chief Electrical Engineer,
oe ee
og! Mans
calals (5)
rdie> Railways,
ailing List Enclosed)
m_to 2590 mm from center jing of nearesi trai
r No.ELCORE/T/ORE/ALE/FIT/41
date 14.92 & 06.02
(i). This office letucr Mo. T/CIVIL/HND/04/0 dated U5.07.2004
(ili) RDSC's Drawing No. 11/DRG/CIV/FND/ROSO/GN001/64/0
\Sheet 1 ta 5)
(iv) RBSU's Drawing No EN/OHE/G/01403 (Si
1.io3
RDSO Erawing No. T1/DRG/CIV/FNG/RDSO/06I01/04/0
(Sheet 1 to 5} is fer casting foundation for OHE Structure.
Foundation Drawing have been prepared considering Schedule
of Dimensions -2004. The snain features of the Drawings are:-
Width of the Foundation top across the track is 600 mm i.e. ‘C’
dimension has been reduced from 800 mm to 600 mm for
‘Side Gravity’ and from 700 mm & 800 mm to 600 mm for
‘Side bearing’ type of foundatiun. For other type of Foundations viz.
New Gravity type, Dry Ble=k Cotton Soil type, & Wet Black Cotton Soil
type, the top widt!, of foundations has also been reduced to 692 mm.
Minimum implantesion of O¥4E Structure ie. Setth
‘entre, is 2800 mni.
foundation above Form:
Top portion of Foundation below the Formation level is 50 mm(a)
(b)
There have been references from the various [.zilways as weil
as Railway Electrification Project about the difficuitias faced at site for
shuttering & casting the tep portion of the Foundation. The thickness
he concret2 at the top portion of founciation is 40 mm and delow.
Considering the wor'cability at field level all
Foundation Drawings have usen reviewed. Based on tho
conditions, fellowing may be adoptad at field level:
In case sufficient Setting Distance is available at site . comply
with the requirement of Schedule of Dimensions-2004, the Setting
Distance of OHE Structure, wherever the formation width permits, may
be adopted as 200 mm irom the center line of nearest track (instead
of 2800 mm as advised earlier).
While casting the “Side Bearing type” of Foundation, it
shall be ensured that the distance between farther end of the
face of foundation to the end cf embankment should not be less
than 300 mm.
If this dimension is less than 3C0 mm then other type of
foundation, 25 per site condition, shail be cast with the epproval of
Competent Puthority of Raikvay Electrification Project/