You are on page 1of 4
wT StNo OF De oer MAY ter larsre feprar feifee=Se le = my "i ae DGM Gai it Nig Lite hn Government of india Enterprise} Emile Emeaae August Kranti Bhawan. Bhikaji Cama Place, R. K. Puram, New Delhi Tel Nu. 011-26738195/295/395/495 Fax, 011-26182957, 011-26738196 No:2010/Elect/Ploicy/39_ Pt-IV Dt: 23.4.2012 as CearePand =i Wy GM/Elect/DLI, BBS, SC, MAS, BPL, Kolkata, Kolkata Metro, Pune, BSP # GM (Elect) /PINDLS \& DGM /Elect/Raipur, Mumbai, Jaipur Sub: OHE Foundation Drawings for increased implantation from 2800 mm. to 2900 mm from center line or nearest track Ref: Director General (TI)/RDSO letter No. TVCIVILFND/12 dated: 11" April, 2012 A copy of the above referred letter of RDSO on the subject of OHE Foundation Drawings for increased implantation from 2800 mm to 2900 mm from center line or nearest track to be used wherever formation width permits along with copies of following drawings is enclosed for record and future referance 1 RDSO Drawing No. TVDRG/CIV/FND/RDSO/00001/04/0 (Sheet 1 to 5) 2 RDSO Drawing No. THCIV/ RDSO/00001/12/0 (Sheet 1 to 5). 3 RDSO Drawing No. ETVOHE/G/01403 (Sheet 1 to 3) DA: As above Agee (Kamta Prasad) Manager (Elect) For Executive Director (Elect) Correspondance docx ee 6 99- tacnan wpue-2a60 /62 as it Sa Si te ‘Telephone : 2465765. 42€05(0/¢) Bie sera meets - 226 O11 No. To, Fax : 01-089.2485763 ao ooverhnient Of Initia, san E-rsail: dti5@gmail.com Research Designs « Standards Organisation Manak Nagar, Lucknow - 226 O11 TI/CIVILYFND/12 Dated, the 26" March, 2012 ypeq 1 Tre Chief Electrical Engineer, oe ee og! Mans calals (5) rdie> Railways, ailing List Enclosed) m_to 2590 mm from center jing of nearesi trai r No.ELCORE/T/ORE/ALE/FIT/41 date 14.92 & 06.02 (i). This office letucr Mo. T/CIVIL/HND/04/0 dated U5.07.2004 (ili) RDSC's Drawing No. 11/DRG/CIV/FND/ROSO/GN001/64/0 \Sheet 1 ta 5) (iv) RBSU's Drawing No EN/OHE/G/01403 (Si 1.io3 RDSO Erawing No. T1/DRG/CIV/FNG/RDSO/06I01/04/0 (Sheet 1 to 5} is fer casting foundation for OHE Structure. Foundation Drawing have been prepared considering Schedule of Dimensions -2004. The snain features of the Drawings are:- Width of the Foundation top across the track is 600 mm i.e. ‘C’ dimension has been reduced from 800 mm to 600 mm for ‘Side Gravity’ and from 700 mm & 800 mm to 600 mm for ‘Side bearing’ type of foundatiun. For other type of Foundations viz. New Gravity type, Dry Ble=k Cotton Soil type, & Wet Black Cotton Soil type, the top widt!, of foundations has also been reduced to 692 mm. Minimum implantesion of O¥4E Structure ie. Setth ‘entre, is 2800 mni. foundation above Form: Top portion of Foundation below the Formation level is 50 mm (a) (b) There have been references from the various [.zilways as weil as Railway Electrification Project about the difficuitias faced at site for shuttering & casting the tep portion of the Foundation. The thickness he concret2 at the top portion of founciation is 40 mm and delow. Considering the wor'cability at field level all Foundation Drawings have usen reviewed. Based on tho conditions, fellowing may be adoptad at field level: In case sufficient Setting Distance is available at site . comply with the requirement of Schedule of Dimensions-2004, the Setting Distance of OHE Structure, wherever the formation width permits, may be adopted as 200 mm irom the center line of nearest track (instead of 2800 mm as advised earlier). While casting the “Side Bearing type” of Foundation, it shall be ensured that the distance between farther end of the face of foundation to the end cf embankment should not be less than 300 mm. If this dimension is less than 3C0 mm then other type of foundation, 25 per site condition, shail be cast with the epproval of Competent Puthority of Raikvay Electrification Project/

You might also like