RUNNING ACCOUNT BILL NO:13th

STRUCTURE:
Item No.24.00 Earth work
Chainage
S.No
Side
Length
From
To
1 19+100 19+165 R/S 65
2 22+920 22+940 L/S 20
3 22+180 22+240 R/S 60
4 22+850 22+920 L/S
70
5 23+100(A1+A2)
R/S 2*5.8

Breadth
1.9
1.9
1.9
1.4
3.1

Depth

1.45
1.45
0.95
0.9
(5.3+1.8)/2
TOTAL

Item No.25.00 SAND FILLIN


S.No

Chainage
Side
Length
From
To
1 19+100 19+165 R/S 65
22+920 22+940 L/S 20
2
22+180 22+240 R/S 60
3 22+850 22+920 L/S
70
4 23+100(A1+A2)
R/S 2*5.8

Item No. 26.00 P.C.C(1:3:6)


Chainage
S.No
Side
From
To
1 19+100 19+165 R/S
2 22+920 22+940 L/S
3 22+180 22+240 R/S
4 22+850 22+920 L/S
5 23+100(A1+A2)
R/S

19+165
22+940

1.9
1.9
1.9
1.4
3.1

Length
65
20
60
70
2*5.8

Item No.28.1 BELOW GROUND


LEVEL(M-15)
Chainage
S.No
Side
Length
From
To
1 19+100 19+165 R/S 65
2 22+920 22+940 L/S 20
3 22+180 22+240 R/S 60
4 19+100
5 22+920

Breadth

R/S 65
L/S 20

0.15
0.15
0.15
0.15
0.15
TOTAL

Breadth
1.9
1.9
1.9
1.4
3.1

Depth

0.15
0.15
0.15
0.15
0.15
TOTAL

Breadth
1.7
1.7
1.7

Depth

Depth
0.25
0.25
0.25

(1.5+1.233)/2 0.8
(1.5+1.233)/2 0.8

6 22+180
7 22+850
8
9
10
11

22+240 R/S
22+920 L/S

23+100(A1+A2)
23+100(A1+A2)
23+100(A1+A2)
23+100(A1+A2)

R/S
R/S
R/S
R/S

60
70

(1.5+1.233)/2 0.8
(1.2+.92)/2
0.8

2*5.8
2*5.8
2*5.8
2*6.0

2.90
0.4
2.50
0.4
(2.5+2.1/)2
0.4
(2.1+1.77)/2
0.8
TOTAL

Item No.28.2 ABOVE GROUND LEVEL(M-15)


S.No

Chainage
Side
Length
From
To
1 19+100 19+165 R/S 65
2 22+920 22+940 L/S 20
3 22+180 22+240 R/S 60
4 22+850 22+920 L/S
70
R/S 2*6.0
5 23+100(A1+A2)

Breadth

Depth

(1.233+.5)/2
2.2
(1.233+.5)/2
2.2
(1.3+.5)/2
1.7
(0.92+.5)2
1.2
(1.77+.5)/2
3.065
TOTAL

Item No.37.00 Retaining wall& wing WALL STEEL(HYSD BARS):


Chainage
S.No
Length
Breadth
Depth
From
To
1 19+100

19+165
2 22+920 22+940
3 22+180 22+240
4 22+850 22+920
5 23+100(A1+A2)
TOTAL
Item No.36.00 Retaining wall WEEP HOLES:
Chainage
S.No
Side
NO'S
From
To
1 19+100 19+165 R/S
1
19+100 19+165 R/S
1
19+100 19+165 R/S
1
22+920 22+940 L/S
1
22+920 22+940 L/S
1
22+920 22+940 L/S
1
22+180 22+240 R/S
1
22+180 22+240 R/S
1
22+850 22+920 L/S
1

Length
65.00
65.00
65.00
20.00
20.00
20.00
60.00
60.00
70.00

Breadth
1.23
0.8
0.5
1.23
0.8
0.5
1.3
0.7
0.92

22+850 22+920 L/S


23+100(A1+A2)
R/S
23+100(A1+A2)
R/S
23+100(A1+A2)
R/S
23+100(A1+A2)
R/S

1
2
2
2
2

70.00
0.5
5.00
1.77
5.00
1.2
5.00
0.8
5.00
0.5
TOTAL

Qty

Remarks

179.08 Retaining wall


55.10 Retaining wall
108.30 Retaining wall
88.20 Retaining wall
127.66 WING WALL
558.33

Qty
18.53
5.70
17.10
14.70
5.39
61.42

Qty
18.53
5.70
17.10
14.70
5.39
61.42

Qty

Remarks
Retaining wall
Retaining wall
Retaining wall
Retaining wall
WING WALL

Remarks
Retaining wall
Retaining wall
Retaining wall
Retaining wall
WING WALL

Remarks

27.63
8.50
25.50

Retaining wall
Retaining wall
Retaining wall

70.72
21.76

Retaining wall
Retaining wall

67.20
59.36

Retaining wall
Retaining wall

13.45
11.60
10.67
18.58
334.96

WING
WING
WING
WING

WALL
WALL
WALL
WALL

Qty
123.84
38.10
91.80
59.64
41.74
355.12

Remarks
Retaining wall
Retaining wall
Retaining wall
Retaining wall
WING WALL Aubtment

Qty
2941.47
1661.67
1444.45
1406.59
7454.18

Remarks
Retaining wall
Retaining wall
Retaining wall
Retaining wall
WING WALL Aubtment

Qty
79.95
52.00
32.50
24.60
16.00
10.00
78.00
42.00
64.40

1ST FOOTING
2ND FOOTING
3RD FOOTING
Aubtment

Remarks
Retaining
Retaining
Retaining
Retaining
Retaining
Retaining
Retaining
Retaining
Retaining

wall
wall
wall
wall
wall
wall
wall
wall
wall

35.00
17.70
12.00
8.00
5.00
477.15

Retaining wall
WING WALL
WING WALL
WING WALL
WING WALL

Abstract
s.no

tipe of work
1 Earth work
2 sand
3 p.c.c (1:3:6)
4 Below g.l
5 Above g.l
6 weephole
7 steel

unit
cum
cum
cum
cum
cum
RMT
M.T

rate
89.9
252.26
4101
4609.2
4287.2
100.47
65408.35
Total

Excess

4.71%

qty
558.33
61.42
61.42
334.96
355.12
477.15
7.454

amount
50193.87
15493.81
251883.4
1543898
1522470
47939.26
487553.8
3919432
4104038

remarks

Name of the work: Widening & strengthening to Dharamgada-GolamundaSinapali road (MDR-111) from km 0/000 to 2/000 and16/000 24/000 under
CRF Scheme for 2013-14.

Physical status
S.No
1
2
3
4
5
6
7
8
9
10
11

Item
Earth work
Gsb coarse grade
Gsb close
Wmm
BM
SDBC
H.P. Culverts
Widening culverts
Re construction culverts
toe wall
Retaining eall

Status up to 31st july 2015


Complete up to 23+000 KM
Complete up to21+000 KM
Complete up to 21+000 KM
Complete up to 21+000 KM (1st layer only)
Complete up to 19+000 KM
Complete up to 19+000 KM
5 Nos Complete
13 Nos complete
1 Nos Complete
850 mts Complete
550 mts Complete

Assistant Engineer
Dharamagade (R&B) Sec-I

Dy. Executivet Engineer


Dharamagade (R&B)Sub Dv
Dharamagade

ecutivet Engineer
agade (R&B)Sub Dv
haramagade