Professional Documents
Culture Documents
OBRA
UBICACIN
FECHA
COSTO DIRECTO
VALOR REFERENCIAL
: S/. 850,859.06
: S/. 1,154,615.75
9.4034%
MES
UNIT.
PARCIAL
INCID.
SUB-TOTAL
TOTAL
3.00
3,000.00
9,000.00
0.25
2,250.00
SECRETARIA
3.00
1,200.00
3,600.00
0.25
900.00
3.00
3.00
5,000.00
4,000.00
15,000.00
12,000.00
1.00
1.00
15,000.00
12,000.00
ASISTENTE 2: ARQUITECTO
MAESTRO DE OBRA
3.00
3.00
4,000.00
3,700.00
12,000.00
11,100.00
1.00
1.00
12,000.00
11,100.00
ADMINISTRADOR DE OBRA
ALMACENERO
3.00
3.00
2,100.00
1,300.00
6,300.00
3,900.00
1.00
1.00
6,300.00
3,900.00
GUARDIANES
ENERGIA ELECTRICA PARA LA OBRA
OTROS
3.00
3.00
1,200.00
220.00
3,600.00
660.00
1.00
1.00
3,600.00
660.00
ALQUILER OFICINA
3.00
1,100.00
3,300.00
1.00
3,300.00
UTILES DE ESCRITORIO
MOVILIDAD PERMANENTE
3.00
3.00
1,000.00
2,000.00
3,000.00
6,000.00
1.00
1.00
3,000.00
6,000.00
OBRA
80,010.00
0.5966%
CANTIDAD
UNIT.
PARCIAL
GASTOS DE ADJUDICACION
FIANZAS DE FIEL CUMPLIMIENTO
1.00
1.00
1,075.91
2,000.00
1,075.91
2,000.00
IMPLEMENTOS DE SEGURIDAD
1.00
2,000.00
2,000.00
INCID.
PARCIAL
1.00
1.00
TOTAL
1,075.91
2,000.00
2,000.00
5,075.91
S/. 85,085.91
RESUMEN
Gastos Generales relacionados con el tiempo de ejecucin de la Obra
Gastos Generales no relacionados con el tiempo de ejecucin de la obra
9.4034%
0.5966%
10.000%
5.0000%