You are on page 1of 70

ZTE GPON RFP Template

For International Market

ZTE GPON RFP Template

ZTE GPON RFP Template


Version

Date

V1.0

2009/5/23

V2.00

2009/11/23

V3.00

2010/517

V3.10

Author

Reviewer

Wang

Not open to the Third Party

Xinsheng
Wang

Not open to the Third Party

Xinsheng
Yuan Ning,

Wang Xinsheng,

Zhang Hui

Dai Chi

Yuan Ning,

Wang Xinsheng,

Zhang Hui

Dai Chi

2011/2/23

Notes

Not open to the Third Party

Not open to the Third Party

V3.20

2012/8/22

Qin Yewen

Wang Xinsheng

Not open to the Third Party

V3.30

2012/12/3

Qin Yewen

Wang Xinsheng

Not open to the Third Party

V4.0

2013/4/27

Qin Yewen

Wang Xinsheng

Not open to the Third Party

V4.1

2014/6/23

Qin Yewen

Wang Xinsheng

Not open to the Third Party

V4.2

2014/10/21

Wang Xinsheng

Not open to the Third Party

Wang Xinsheng

Not open to the Third Party

Wang Xinsheng

Not open to the Third Party

Qin Yewen
Shi Ying
V4.3

2014/12/02

Qin Yewen
Qin Yewen

V5.0

2014/12/17

Meng Qing
Zhu Zhenghua
Bao Yintao

2015 ZTE Corporation. All rights reserved.


ZTE CONFIDENTIAL: This document contains proprietary information of ZTE and is not to be disclosed or used
without the prior written permission of ZTE.
Due to update and improvement of ZTE products and technologies, information in this document is subjected to
change without notice.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

TABLE OF CONTENTS

1
1.1
1.2
1.3

General Introduction ............................................................................................ 5


Introduction ............................................................................................................. 5
Scope of the specification....................................................................................... 5
Referred Standards ................................................................................................ 7

2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5

General Technical Requirements ....................................................................... 9


OLT System Specification ...................................................................................... 9
Transmission Requirements ................................................................................... 9
Physical layer ....................................................................................................... 11
Uplink interface ..................................................................................................... 13
Optical Fiber Protection Switchover Requirements .............................................. 14
GTC layer ............................................................................................................. 16
OLT - ONT/ONU interoperability .......................................................................... 16
Ethernet OAM ....................................................................................................... 17
ONT/ONU Specific Requirements ........................................................................ 18
Basic requirement for GPON ONT/ONU .............................................................. 18
GPON Interface Function ..................................................................................... 18
GPON Transmission Convergence ...................................................................... 19
Upstream .............................................................................................................. 20
Downstream ......................................................................................................... 21

3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.2
3.2.1
3.2.2

Service Functionality Requirements ................................................................ 21


OLT Service Specific Requirements ..................................................................... 21
User Side Requirements of OLT .......................................................................... 21
Network side requirements of OLT ....................................................................... 22
IPv6 ...................................................................................................................... 27
TDM Service ......................................................................................................... 27
Complete Time and Clock Synchronization .......................................................... 28
Security................................................................................................................. 28
OLT Management Requirements ......................................................................... 30
ONT/ONU Service Specific Requirements ........................................................... 35
Requirements of GPON ONT (FTTH) .................................................................. 35
Requirements of GPON ONU............................................................................... 40

4
4.1
4.2
4.3
4.4

EMS Requirements ............................................................................................ 53


Management System Architecture ....................................................................... 53
EMS Platform Requirements ................................................................................ 53
EMS Fault and Alarm Management ..................................................................... 55
EMS Configuration Management ......................................................................... 56

ZTE Confidential & Proprietary

ZTE GPON RFP Template

4.4.1
4.4.2
4.4.3
4.5
4.6
4.7

Presentation of Equipment Configuration ............................................................. 56


Configuration and Release Changes.................................................................... 56
Software Download EMS...................................................................................... 57
EMS Performance Management .......................................................................... 57
EMS Testing ......................................................................................................... 58
PON Detecting System......................................................................................... 58

5
5.1
5.1.1
5.2
5.2.1
5.2.2
5.3
5.4
5.4.1
5.4.2
5.4.3
5.5
5.5.1
5.5.2
5.5.3
5.6
5.6.1
5.6.2

Environment and Working Requirements ....................................................... 59


Environmental Requirements ............................................................................... 59
Environmental Conditions Specification ............................................................... 59
Power Supply ....................................................................................................... 61
OLT Devices ......................................................................................................... 61
ONT / ONU / Servers............................................................................................ 62
EMC Requirements .............................................................................................. 62
Safety Requirements ............................................................................................ 63
General safety requirements ................................................................................ 63
Electrical Safety Requirements ............................................................................ 64
Laser Safety Requirements .................................................................................. 64
Reliability and Availability Requirements .............................................................. 65
Maintainability ....................................................................................................... 65
Availability............................................................................................................. 65
Reliability .............................................................................................................. 65
Installation Conditions .......................................................................................... 65
General requirement............................................................................................. 65
Cables .................................................................................................................. 67

Acronyms ........................................................................................................... 67

ZTE Confidential & Proprietary

ZTE GPON RFP Template

FIGURES
Figure 1-1 GPON Network Topology ..................................................................................... 6
Figure 2-1

GPON Backbone Optical Fiber Protection Switchover Mode ............................. 14

Figure 2-2

GPON Full Optical Fiber Protection Switchover Mode ....................................... 15

TABLES
Table 3-1 FTTx MDU service cards requirement ................................................................. 45
Table 6-1

Acronyms ............................................................................................................. 67

ZTE Confidential & Proprietary

ZTE GPON RFP Template

General Introduction

1.1

Introduction
XXX have a key objective to enhance the level of telecommunications services and
solutions. The integrated triple-play solutions already in operation offer multimedia
services as well, although the significant growth of bandwidth demands is forecasted.
Optical systems among the new possibilities and the passive solutions, the PON networks,
in optical infrastructure will play an increasing role.
The main target of this technical specification is to functionally define the requirements of
the services for GPON network as FTTx configuration. The basic scenarios are taken into
consideration:
FTTP --- FTTH, FTTO, Fiber to subscribers premise
FTTN --- FTTB, FTTC, Fiber to about 1K-5K feet of subscribers premise; last mile is
copper-based (VDSL2)

1.2

Scope of the specification


The specification covers the requirement of the following equipment and elements:

GPON OLT

GPON ONT/ONU

Connectorized optical splitters for indoor and outdoor environment with the following
splitting ratio: 1:2; 1:4; 1:8; 1:16; 1:32; 1:64 and 1:128

Management system and principles for GPON system

Figure 1-1 shows a schematic representation of the system reference configuration.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

Figure 1-1 GPON Network Topology

Legend:
ONT: Optical Network Termination
ODN: Optical Distribution Network
OLT: Optical Line Termination
WDM: Wavelength Division Multiplexing (Optional)
NE: Network Element using different Wavelengths for OLT and ONU/ONT
AF: Adaptation Function
SNI : Service Node Interface
UNI : User Interface Network
Optical Line Termination (OLT): OLT provides an interface to PDN network side
(Optical Access Network) and sends the signal through one or more ODNs, which is
distributed to a certain number of ONUs
Optical Distribution Network (ODN): An Optical Distribution Network provides a
transmission mean between OLT and users in both transmission directions. It uses
passive optical components (optical fibers, cables, optical connectors, filters, splitters,
attenuators and splices).

ZTE Confidential & Proprietary

ZTE GPON RFP Template

Optical Network Unite (ONU): Optical Network Unit provides the user side interface of
the Optical Access Network and it is connected to ODN. All systems ONU receives the
same signal and each one of them extracts the corresponding information according to
an access protocol. In the reverse sense (downstream), data are transmitted according
to an OLT control mechanism using TDMA (Time Division Multiple Access) protocol that
allocates a transmission time to each ONU.
Optical Network Termination (ONT): Optical Network Terminal is an UN used for the
FTTH (Fiber To The Home) architecture and includes user's port functions

1.3

Referred Standards
1.

The GPON solutions offered must comply, but not limited to the following
International Standards

ITU-T G.984.1: GPON General characteristics

ITU-T G.984.2: GPON Physical Media Dependent (PMD) layer specification

ITU-T G.984.3: GPON Transmission convergence layer specification

ITU-T G.984.4: GPON ONT management and control interface specification

ITU-T G.987.1 XG-PON General requirements

ITU-T G.987.2 XG-PON Physical media dependent (PMD) layer specification

ITU-T G.987.3 XG-PON Transmission convergence (TC) specification

ITU-T G.988 ONU management and control interface (OMCI) specification

2.

The proposed equipments should support IEEE 802.1ad Provider Bridges

3.

The proposed equipments should support IEEE 802.1D Spanning Tree Protocol

4.

The proposed equipments should support IEEE 802.1p VLAN prioritization

5.

The proposed equipments should support IEEE 802.1Q VLAN tagging

ZTE Confidential & Proprietary

ZTE GPON RFP Template

6.

The proposed equipments should support IEEE 802.1w Rapid Spanning Tree
Protocol of at least 8 ports, based on port-based, address-based, and round robin

7.

The proposed equipments should support IEEE 802.3u 100 Mbps Fast Ethernet

8.

The proposed equipments should support IEEE 802.3ad Ethernet Link Aggregation

9.

The proposed equipments should support IEEE 802.3ae 10 Gigabit Ethernet

10. The proposed equipments should support IEEE 802.3z Gigabit Ethernet
11. The proposed equipments should support IEEE 802.3x Flow Control
12. The proposed equipments should support IETF RFC 2131: DHCP
13. The proposed equipments should support IETF RFC 2236: Internet Group
Management Protocol, Version 2
14. The proposed equipments should support IETF RFC 3376: Internet Group
Management Protocol, Version 3
15. The proposed equipments should support IETF RFC 3046: DHCP Relay Agent Info
Option (Option 82)
16. The proposed small-capacity OLT must have possessed of a MEF CE2.0
authentication
17. The proposed system should support SIP and H.248 for Voice providing
18. The Bidder must ensure that the compliance to any standards specified above is
kept up-to-date with the latest version available.
19. The version of hardware and software of the equipment should be provided
20. The proposed equipment must use a highly flexible, modular, scalable, and
non-blocking platform at all level/part of the design without any restriction.
21. The Bidder shall submit the detail chipset type, manufacturer, and version of the
proposed Equipment including the ONT.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

22. The version of hardware and software of the equipment should be provided.

General Technical Requirements

2.1

OLT System Specification

2.1.1

Transmission Requirements
1.

The bit rates downstream (2488, 32Mbit/s), upstream (1244,16Mbit/s) of optical


interfaces of the offered GPON system must comply with the requirements of clause
8.2.3.1 8.2.3.2 of ITU-T G.984.2 (03/2003) Recommendations.

2.

The architecture of the offered GPON system must be single fiber.

3.

The logical reach of the offered GPON system shall be minimum 60km.

4.

The offered GPON system must support minimum 1:64 split ratio.

5.

The physical reach of the offered GPON system must be minimum 20km.

6.

The differential fiber distance of the offered GPON system must be minimum 20km.

7.

The offered GPON system must support downstream security: AES conformity to
clause 12.2 of ITU-T Rec. G.984.3 (02/2004). GPON system should be able to
switch the encryption on/off

8.

GPON system must be able to establish AES encryption per ONT/ONU basis

9.

The size of the OLT shelf should fit in a standard 19 inch or ETSI 21 rack

10. The shelf should not be more than 10U high


11. The rack should be 300mm deep rack
12. The shelf should meet 300mm deep rack
13. The rack should not be higher than 2200mm

ZTE Confidential & Proprietary

ZTE GPON RFP Template

14. GPON system should be at least 8 ports per GPON board


15. GPON system should provides 16 ports per GPON board
16. GPON system should provides low power consumption 8/16 ports GPON board
17. GPON system should provides 8 ports per XG-PON1 board
18. GPON system should provides not less than 128/256 PON ports per shelf in ETSI
21 rack
19. GPON system should support smoothing migration to XG-PON1
20. GPON system should support smoothing migration to NG-PON2
21. GPON system should support 160G slot bandwidth for XG-PON1
22. GPON system should support 6.4T Backplane data bus capacity
23. GPON system should support optical link and breakpoint diagnosing function.
24. GPON system should support separate control bus.
25. Switching capacity of the GPON and XG-PON1 system should be at least
2.56Tbps.
26. Main control board should support 1+1 or 1:1 protection mode
27. The GPON OLT should provide 1+1 redundancy protection with different power
supply cards.
28. OLT should provide clock (1PPS+TOD), BITS/HZ, and environment interfaces in
the same board
29. The GPON OLT should have the option to provide the P2P GE/FE interface board.
30. GPON system should provides 24/48 GE/FE ports per P2P board
31. GPON system should provides not less than 768 PON ports per shelf in ETSI 21
rack

10

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.1.2

Physical layer
1.

The type of the offered GPON system must support 28dB and 32 dB link budgets
according to ITU-T Rec. G.984.2 Amendment 1. (02/2006).

2.

2.1.2.1

2.1.2.2

2.1.2.3

System must support GPON Class B+ and Class C+ optical budget

Downstream direction: OLT transmitter


1.

Operating wavelength range: 1480 to 1500nm

2.

Line code: Scrambled NRZ

3.

Mask of the transmitter eye diagram: Figure 2/G.984.2

4.

Minimum ORL of ODN at Olu and Old: 32dB

5.

Main launched power: min. +1,5dBm

6.

Main launched power: max. +5dBm

7.

Extinction ratio: min. 10dB

Downstream direction: ONT/ONU Receiver


1.

Maximum reflectance of equipment, measured at receiver wavelength: -20dB

2.

Minimum sensitivity: -27dBm (Bit error ratio <1x10-10)

3.

Minimum overload: -8dBm (Bit error ratio <1x10-10)

4.

Consecutive identical digit immunity: > 72bit

5.

Jitter tolerance: Figure 5/G.984.2

6.

Tolerance to the reflected optical power: Less than min. receiver sensitivity -10dB

Upstream direction: ONT/ONU Transmitter


1.

Operating wavelength: 1260nm to 1360nm

ZTE Confidential & Proprietary

11

ZTE GPON RFP Template

2.

Line code: Scrambled NRZ

3.

Mask of the transmitter eye diagram: Figure 3/ITU-T Rec.G.984.2 (03/2003)

4.

Maximum reflectance of equipment, measured at transmitter wavelength: Less than


min. launched power - 6dB

5.

Minimum ORL of ODN at Oru and Ord: 32dB

6.

Main launched power: min.+0,5dBm

7.

Main launched power: max. +5dBm

8.

Launched optical power in case of without optical input signal: Less than min.
receiver sensitivity -10dB.

9.

Extinction ratio: min. 10dB

10. Jitter transfer: Figure 4/G.984.2 see clause 8.2.8.9.1 of ITU-T Rec.G.984.2
(03/2003).
11. Jitter generation from 4.0 kHz to 10.0 kHz: 0.33UIpp.

2.1.2.4

12

Upstream direction: OLT Receiver


1.

Equipment, measured at receiver wavelength: - 26dB

2.

Minimum sensitivity: -28dBm (Bit error ratio <1x10-10)

3.

Minimum overload: -8dBm (Bit error ratio <1x10-10)

4.

Consecutive identical digit immunity: > 72bit

5.

Tolerance to the reflected optical power: Less than min. receiver sensitivity -10dB

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.1.3

Uplink interface

2.1.3.1

Optical Gigabit Ethernet


1.

The offered GPON system must support 1000Base-LX (Long Wavelength Laser)
and 1000Base-SX (Short Wavelength Laser) optical uplink interfaces corresponding
to the provisions of Chapter 38 of the Standards IEEE 802.3 2005.

2.

The GE interface must be interchangeable SFP module.

3.

The uplink card support mixed plug, uplink card shall separate with control switch
card.

4.

The bidder shall give the number of pieces of interfaces implemented on one unit
(card).

5.

2.1.3.2

The optical modules insert on the uplink port should be an oblique type.

10 GbE
1.

The offered GPON system must support 10GBase-LR (1310nm, LAN PHY) optical
uplink interface. The parameters of the 10 GbE interfaces of the offered equipment
shall comply with the parameters corresponding to the provisions of Chapter 52 of
the Standards IEEE 802.3 2005.

2.

The 10 GbE optical interface must be SFP+ module.

3.

The offered GPON system must have 10GBase-LR optical uplink interface.

4.

The offered GPON system must have 10GBase-ER optical uplink interface.

5.

GPON system uplink cards should support at least 8*10GE uplink interfaces in the
case of full user slots were configured.

2.1.3.3

E1
1.

The offered GPON system must support E1 Standards ITU-T G.703

ZTE Confidential & Proprietary

13

ZTE GPON RFP Template

2.

2.1.3.4

2.1.4

16/32 E1 ports per board are needed.

STM-1/STM/4
1.

The offered GPON system must support STM-1/STM-4 Standards ITU-T G.707

2.

STM-N card should support mixed plug in.

Optical Fiber Protection Switchover Requirements


The GPON system can adopt the optical fiber protection switchover mechanism to
improve the network reliability and viability. The optical fiber protection switchover can be
implemented in the following two modes:
1.

Automatic switchover: It is triggered by faults, including signal loss or signal


deterioration.

2.

2.1.4.1

Forced switchover: It is triggered by management events.

Types
There are mainly two types of optical fiber protection switchover: backbone optical fiber
protection switchover (TYPE B) and full optical fiber protection switchover (TYPE C), as
shown in Figure 2-1 and Figure 2-2 respectively:

Figure 2-1 GPON Backbone Optical Fiber Protection Switchover Mode

14

ZTE Confidential & Proprietary

ZTE GPON RFP Template

Figure 2-2 GPON Full Optical Fiber Protection Switchover Mode

2.1.4.2

1.

The offered GPON system must support LACP for uplink protection.

2.

The offered GPON system must support MSTP for uplink protection.

3.

The offered GPON system must support G.8032 for ring protection.

Criteria
In the GPON system, the optical fiber protection switchover must be implemented in one
of the following condition:

2.1.4.3

1.

Input optical signal loss (LOS)

2.

Input channel deterioration

Too high or too low input optical signal power

BER exceeding the threshold

Other conditions to be specified

Protection Time
When the GPON system implements optical fiber protection switch over, the optical
channel protection time is recommended to be as follows:
1.

The TYPE B fiber protection: The service interruption is no longer than 100ms.

ZTE Confidential & Proprietary

15

ZTE GPON RFP Template

2.

The TYPE C Full fiber protection: The service interruption period is no longer than
50ms.

3.

The Uplink card protection: switchover time of 1+1 mode must no longer than
200ms.

2.1.5

GTC layer
1.

The offered GPON system must support GPON Encapsulation Method (GEM)
mapping conformity to clauses 8.1 8.3 of ITU-T Rec.G.984.3 (02/2004).

2.

The offered GPON system shall support optical leveling conformity clause 8.3.2. of
ITU-T Rec. G.984.2 (03/2003).

3.

The offered GPON system must support Dynamic Bandwidth Assignment (DBA)
payload processing conformity to clauses 7.7, 8.4 of ITU-T Rec.G.984.3 (02/2004).

4.

The offered GPON system shall support DBA Type: SR-DBA and NSR-DBA. The
minimum bandwidth allocation granularity shall be no more than 64kbit/s.

5.

The offered GPON system shall support FEC functionalities conformity to clause 13
of ITU-T Rec.G.984.3 (02/2004).

6.

The activation procedure in the ONT/ONU must comply with clause 10.2 of ITU-T
Rec.G.984.3 (02/2004).

2.1.6

OLT - ONT/ONU interoperability


Use for the scenario that requires the IOT, if has no requirement, delete this
chapter
1.

The inviter of this RFQ intends to open the optical interface in order to achieve
interoperability between OLT and ONT of different vendors. To ensure the required
interoperability between multiple OLT and/or ONT the bidder must commit to open
the GPON interface (incl. OMCI) and to share this information with other selected
vendors.

16

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.

The bidder shall provide information of already tested interoperability between


GPON systems of the vendors invited to this RFQ.

2.1.7

Ethernet OAM
1.

GPON system should support Ethernet OAM functionalities conform to IEEE


802.1ag, ITU-T Y.1731 and IEEE 802.3 Section 57.

2.

GPON system should support creation of Maintenance Assosiations (MA) and


Maintenance Domains (MD).

3.

GPON system should support configuration of the OAM level of MDs.

4.

GPON system should support creation of MEP and MIP.

5.

GPON system should support Continuity check (CCM) and Frame Delay
Measurement (DM) functions.

6.

GPON system should support Loopback (LB) and Link trace (LT) functions.

7.

GPON system should support configuration of Multicast MAC address.

8.

GPON system should provide tc configuration of the following variables for


Continuity Check (CC):

9.

The Continuity Check (CC) frequency

GPON system should provide tc configuration of the following variables for Frame
Delay Measurement (DM):

The frequency of sending DM frames (time between DM frames)

P bits in VLAN tag for frames carry DM messages

ZTE Confidential & Proprietary

17

ZTE GPON RFP Template

2.2

ONT/ONU Specific Requirements

2.2.1

Basic requirement for GPON ONT/ONU


1.

The ONT/ONU is fully comply with ITU-T G.984.1~G.984.4.

2.

The chipset for ONT/ONU must be SoC(System-on-a-Chip) designed and


manufactured by main stream broadband chipset Tenderer (like Broadcom, Marvell
and Lantiq, etc.)

3.

Specify if the ONU support line card Flexible plug in and pull out, and specify the
number of slots that ONU have.

2.2.2

4.

Specify if the ONT have the design of fiber coil.

5.

Specify if the ONT have the design of fiber hiding.

GPON Interface Function


Describe the following characteristics.
1.

The number of GPON interface

2.

The number of T-CONT

3.

The number of GEM Port

4.

FEC decoding

5.

DBA reporting in status indications in the PLOu, and by piggyback reports in the
DBRu

18

6.

The maximum transmit distance

7.

Transmission Wavelength

8.

Support dying gasp function

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.2.3

GPON Transmission Convergence


1.

The ONT/ONU supports a GTC that is composed by a "Framing Sublayer" and an


"Adaptation Sublayer" in conformance with ITU-T G.984.3.

2.

The ONT/ONU realizes the mapping of GEM frames into GTC payload (and
inversely extracts GEM frames from GTC payload) in conformance with ITU-T
G.984.3.

3.

The ONT/ONU realizes the mapping of Ethernet frames into GEM frames (and
inversely extracts Ethernet frames from GEM frames) in conformance with ITU-T
G.984.3.

4.

The ONT/ONU is able to send frames according to a static allocation provisioned at


the OLT.

5.

The ONT/ONU supports the Non Status Reporting mode in conformance with ITU-T
G.984.3.

6.

The ONT/ONU is able to provide the information to the DBA function at the OLT in
order to optimize bandwidth allocation between ONUs when needed.

7.

The ONT/ONU supports the Status Reporting mode in conformance with ITU-T
G.984.3.

8.

The ONT/ONU supports DBRu mode 0 in conformance with ITU-T G.984.3.

9.

The ONT/ONU implements the principle of T-CONT (identified by "Alloc-ID") as the


basic control unit for upstream direction in conformance with ITU-T G.984.3.

10. Option 1: Single T-CONT per ONU


The ONT/ONU is able to support a single T-CONT.
11. Option 2: Multiple T-CONTs per ONU
The ONT/ONU is able to support up to 4 T-CONTs i.e. 1 T-CONT per CoS.
12. The ONT/ONU can support 8 T-CONTs (Alloc-IDs).

ZTE Confidential & Proprietary

19

ZTE GPON RFP Template

13. The ONT/ONU can support 32 GEM-Ports (Port-IDs).


14. The ONT/ONU supports several ways for GEM-Ports mapping into T-CONTs as
following.
15. All GEM ports are mapped into the same T-CONT.
16. Each GEM port is mapped into a single T-CONT.
17. It can be supported that all GEM ports corresponding to CoS1, CoS2 or CoS3 are
mapped into the same T-CONT, but each GEM port corresponding to CoS4 is
mapped into a single T-CONT.
18. The ONT/ONU is able to use the activation Discovered SN method in conformance
with ITU-T G.984.3.
19. The ONT/ONU is able to use the activation Configured SN method in conformance
with ITU-T G.984.3.
20. The ONT/ONU uses the encryption system (128 bits AES) and the Key Exchange
mechanism in conformance with ITU-T G.984.3.
21. The ONT/ONU implements an "embedded OAM channel", a "PLOAM channel" and
an "OMCI channel" in conformance with ITU-T G.984.4.

2.2.4

Upstream
1.

Nominal line rate:


The ONT/ONU supports a 1.244 Gbps line rate

2.

Optical performances
The ONT/ONU supports Class B+ (Optical budget, source type, transmitter range,
mean launched power min, mean launched power max, extinction ratio) as
defined in ITU-T G.984.2 Amd1

20

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.2.5

Downstream
1.

Nominal line rate:


The ONT/ONU supports a 2.488 Gbps line rate

2.

Optical performances:
The ONT/ONU supports Class B+ (Optical budget, receiver type, maximum
reflectance, BER, minimum sensitivity) as defined in ITU-T G.984.2 Amd1

Service Functionality Requirements

3.1

OLT Service Specific Requirements

3.1.1

User Side Requirements of OLT

3.1.1.1

GPON Layer
1.

GEM Port IDs must be assigned automatically (default) and manually by the OLT.

2.

A GEM Port must identify one or more traffic flows of a specific class of service
going to a specific U interface on a specific ONT/ONU.

3.

3.1.1.2

Support service flow and GEM PORT mapping

Traffic management and QoS


1.

The GPON OLT must be able to prioritize traffic based on service VLAN in the
downstream direction.

2.

The GPON OLT must provide traffic shaping on per service basis in downstream
direction.

3.

The GPON OLT must be able to prioritize traffic based on service VLAN forwarding
to the uplink interface.

ZTE Confidential & Proprietary

21

ZTE GPON RFP Template

4.

The GPON OLT must support at least 4 queues per interface (including GPON
ports and Ethernet uplink interfaces), one per traffic class.

5.

The GPON OLT must support at least 4 traffic classes for Ethernet frames, and
shall support configurable mapping to these classes from the 8 possible values of
the Ethernet priority field.

6.

The GPON OLT must support strict priority queuing (SP).

7.

The GPON OLT should support Weighted Round Robin (WRR).

8.

The GPON OLT should support combined queuing (strict for the highest queue and
weighted to the other queues).

9.

The GPON system must support traffic shaping in both directions

10. The bidder should provide information about traffic limit; minimum rate limit step,
available rate limit values, is limitation on L2 or L3 packets
11. The GPON OLT must support Hierarchical QoS.
12. The GPON OLT should support the controllable bandwidth accuracy not more
than1%.

3.1.2

Network side requirements of OLT

3.1.2.1

Functionality
1.

The Ethernet interfaces must conform to IEEE 802.1q VLAN trunking standard.

2.

The Ethernet interfaces should provide double-tagged VLAN capabilities conform to


IEEE 802.1ad standard.

3.

GPON OLT must support defining of 802.1p priority at VLAN level.

4.

If the equipment has more than one Ethernet uplink interface, the interfaces must
support link aggregation according to IEEE 802.3ad standard.

5.

22

The Ethernet interface should support Ethernet frame MTU at least 9000 Bytes.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

3.1.2.2

VLAN Considerations
1.

GPON OLT must support mapping of user VLANs of a given GPON port to different
service VLANs.

2.

Corresponding to the guidelines of DSL Forum TR-101, GPON OLT must support
simultaneously the following mappings of User VLANs and Service VLANs:

Mapping multiple User VLANs (of same or different GPON ports) to a single
Service VLAN,

Mapping multiple (m) User VLANs (of same or different GPON ports) to
multiple (n) Service VLANs, where m=n and n1.

(Remark: A given User VLAN shall not be bound to more than one Service VLAN.)
3.

The GPON OLT must be able to translate the VLAN tag received from customer to
the Service VLAN tag in the upstream direction.

4.

The GPON OLT must be able to translate the Service VLAN tag to User VLAN tag
in the downstream direction.

5.

The GPON OLT must support untagged frames received from the customer and
must be able to add the Service VLAN tag in the upstream direction.

6.

The GPON OLT must be able to detach the Service VLAN tag and forward
untagged frames in downstream direction in case of single tagged frame.

7.

The GPON OLT must be able to accept both tagged and untagged frames from the
customer and must attach the service VLAN tag to the frames.

8.

The GPON OLT should support selective QinQ (double stacking) encapsulation
Ethernet frames received from the customer should be dropped, forwarded without
change of the VLAN field, forwarded with QinQ encapsulation or forwarded with
translated VLAN field based on configuration.

9.

The GPON OLT must conform to N:1 VLAN forwarding defined in TR-101 of DSL
Forum.

ZTE Confidential & Proprietary

23

ZTE GPON RFP Template

3.1.2.3

Multicast Considerations
1.

IGMPv2 operation must be in conformance to RFC2236.

2.

IGMPv3 operation should be in conformance to RFC3376.

3.

GPON OLT must support IGMP snooping function.

4.

GPON OLT must support IGMP proxy function.

5.

GPON OLT should support configurable filtering of IGMP Membership Report


messages.

6.

The GPON OLT must support dropping of all IGMP messages received on a
subscriber port.

7.

The GPON OLT must support an IGMP v2 (IGMP v3) transparent snooping function.
This feature shall be configurable on a per VLAN basis.

8.

The GPON OLT must support IGMP immediate leave (Fast Leave) as part of the
IGMP function.

9.

The GPON OLT must support IGMP join delay below 50ms.

10. The GPON OLT should be able to configure per GPON port the maximum number
of simultaneous multicast channels allowed.
11. GPON OLT must support the Globally Scoped Multicast Addresses (224.0.1.0
238.255.255.255).
12. GPON OLT must support the Limited Scoped Multicast Addresses (239.0.0.0/8).
13. The GPON OLT must support a mechanism to prevent a user port from becoming a
multicast router port by blocking IGMP query messages.
14. The GPON OLT must support mechanisms to stop user ports injecting unauthorized
multicast traffic into the aggregation network.
15. The GPON OLT must be able to rate limit the number of IGMP messages per user
port.

24

ZTE Confidential & Proprietary

ZTE GPON RFP Template

16. Multicast packets transported between RG (Routing Gateway) and GPON OLT is
using IPoE encapsulation.
17. The desired goal is to support multicast optimization by controlling the flooding of
Ethernet multicast frames making use of IGMP agents in intermediate (L2) devices
(e.g. GPON OLT, Ethernet aggregation).
18. N:1 VLANs forwarding mode should be used in order allow efficient forwarding of
multicast traffic. (It is to be noted that other types of traffic (data, voice, unicast video)
could be delivered via N:1 VLANs as well.)
19. Dedicated Multicast VLAN model should be supported. (This is a model where a
dedicated N:1 VLAN is used to send some multicast groups from a multicast router /
BNG to one or several access nodes (GPON OLT), over an aggregation network.
Other traffic is sent across different VLANs, where these VLANs could be 1:1 or
N:1.)
20. Integrated Multicast VLAN model should be supported. (This is a model where
multicast traffic is inserted into one of the N:1 VLANs that are terminated at a
subscriber GPON port, or alternatively dot1q trunked to the RG. This effectively
means multicast and unicast share a VLAN.)
21. GPON OLT should support 8K multicast groups, and support 1K multicast groups
per PON port.

3.1.2.4

Access Methods
1.

GPON OLT must support PPPoE connection methods.

2.

GPON OLT must support DHCP connection methods.

3.

GPON OLT must support filtering options in order to prevent L2 traffic between
customers connected to the same GPON OLT considering PPPoE and DHCP
environment (Intra-GPON filtering).

4.

GPON OLT should support filtering options in order to prevent L2 traffic between
customers connected to different GPON OLTs considering PPPoE and DHCP
environment (Inter-GPON filtering) considering N:1 VLAN forwarding.

ZTE Confidential & Proprietary

25

ZTE GPON RFP Template

5.

Intra-GPON and Inter-GPON filters of the GPON OLT must be capable to be


disabled partly or entirely on VLAN basis.

6.

The OLT shall support ONU MAC address authentication based on PON port and
ONU logic identification authentication and their hybrid mode. The ONU logic
identification mode is the best choice. To authenticate the ONU legality, the OLT
shall refuse the illegal ONU access. It shall support to enable and disable the
function, and reduce the bad effect caused by ONUs continual authentication trial.
In consideration of construction convenience, the ONU should have a certain
chances of authentication trial.

3.1.2.5

Additional Functional Requirements


1.

GPON OLT must support configurable Ethertype filter for upstream direction.

2.

The bidder should provide the MAC address capacity in their documents.

3.

GPON OLT should support configurable Destination MAC (single address or a


range) filter in upstream direction.

4.

GPON OLT should support configurable Source MAC (single address or a range)
filter in upstream direction.

5.

GPON OLT must support configurable Broadcast (blocking/enabling) filter for


downstream direction.

6.

GPON OLT must support configurable Multicast (enabling, disabling, and prefix
specific enabling) filter for upstream direction.

7.

GPON OLT must be able to store at least K*8 MAC addresses, where "K=Maximum
number of GPON-ports multiplied by the maximum splitting ration supported by
GPON ports".

8.

In order to prevent source MAC flooding attacks the GPON OLT must be able to
limit the number of source MAC addresses learned from a user VLAN

9.

MAC addresses learning on the Network Side Ethernet interface should be


configurable per Service VLAN (enable/disable) if implemented

26

ZTE Confidential & Proprietary

ZTE GPON RFP Template

10. GPON OLT must support Virtual MAC address and MAT (MAC Address
Translation).
11. Virtual MAC address and MAT must be configurable (enable/disable).
12. GPON OLT must support L2 marking (802.1p) of the traffic coming from the User
VLANs.
13. Binding management traffic to a dedicated VLAN must be provided.

3.1.3

IPv6
1.

The OLT shall support an option to migrate to IPv6 without any hardware upgrade

2.

OLT should support IPv6 SW upgrade, although IPv4 will be used in the initial
phase of the implementation

3.

3.1.4

The GPON OLT MUST support IPv6 and IPv4 dual stack function.

TDM Service
1.

When the GPON system bears E1 dedicated line service, it shall adopt MEF TDM
over Ethernet or IETF PWE3 mode in compliant with MEFs MEF8 or IETF
RFC3985 (2005), RFC4197 (2005) specifications. It configures its encapsulation
mode by the OLT local NM to be MEF8, RFC4553 (SATOP mode) or
Draft-left-pwe3-cesopn-02.txt (CESOPSN) mode).

2.

The GPON system born TDM service shall adopt self-adaptive clock recovery mode.
Thats to recover the clock through the clock stamp in the packet.

3.

To ensure the interoperability requirements based on TDM service, the OLT


equipment shall respectively set the adopted standard, the encapsulated E1
numbers, the corresponding CESOP IP address, MAC address, VLAN, etc.

4.

The OLT equipment to bear the TDM service shall support TDM (E1) service
transparent transmission, STM-1/STM-4 protection. The bidder shall elaborate the
STM-1/STM-4 protection mechanism and performance, and provide the application
instances in the existing network.

ZTE Confidential & Proprietary

27

ZTE GPON RFP Template

5.

3.1.5

TDM service process in OLT system only in less 3 boards

Complete Time and Clock Synchronization


The system shall support the following functions to implement time and clock
synchronization to provide flexible and various time synchronization modes for the
operators and to meet the networking and service requirements for movable backhaul,
etc:

3.1.6

1.

BITS input and output

2.

1PPS + TOD

3.

IEEE 1588 V2

4.

Synchronization Ethernet

Security
1.

Please describe PON security features. Both logical and physical security should be
addressed.

2.

The proposed Equipment must be equipped with the security features to prevent
malicious DOS attack to the network and to other users.

3.

The proposed Equipment must support broadcast suppression per VLAN.

4.

L2 and L3 ACL should be supported on your OLT

5.

Support MAC and IP Address Anti Spoofing

6.

Support MAC and IP Address binding

7.

Support Anti ICMP/IP Attacking

8.

The proposed Equipment should support the IP address filtering function. Details
explanation shall be given on how the user traffic is permitted and denied based on
source and/or destination IP addresses.

28

ZTE Confidential & Proprietary

ZTE GPON RFP Template

9.

The proposed Equipment must support the Ethernet MAC address filtering function.

10. The proposed Equipment must support the following, but not limited to:

IP anti-spoofing

DHCP snooping

11. Support MAC address registration capability to limit the number of MAC address per
port that can access that port
12. Prevention of IP/MAC Spoofing for DHCP user s Prevention of MAC spoofing for
PPPOE users
13. Limited MAC address based on the traffic stream
14. Static MAC address configuration based on the traffic stream
15. IP address binding based on the traffic stream\
16. MAC address filtering on the user side
17. Support unknown unicast packet suppression
18. Support broadcast packet suppression
19. DHCP Source Guard based on MAC and IP
20. Support downstream 128-bit advantage encryption standard (AEC) encryption
21. Support remote device management through Telnet
22. Support remote service configuration and device management through OMCI
23. Black List and White List for IP Address Segment is configurable
24. Ethernet uplink protection, Support LACP, MSTP and G.8032 for protection
25. Support STM-1, STM-4 uplink interface protection

ZTE Confidential & Proprietary

29

ZTE GPON RFP Template

3.1.6.1

3.1.6.2

IP Address
1.

Support user ports source IP binding

2.

Support DHCP Snooping

3.

Support IP source guard

4.

Support anti DHCP spoofing

Anti DOS-Attacking
1.

Support anti ARP attacking

2.

Support ARP Relay Agent

3.

Support ARP Proxy

4.

Support anti ICMP/IP attacking

3.1.7

OLT Management Requirements

3.1.7.1

General Requirements
1.

30

Please describe the NE level :

Alarm management

Provisioning

Performance detecting

Troubleshooting

Inventory

Backup & restore

Software upgrade

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.

Security (access right)

The interface description of the equipment and the SNMP MIBs, NBI (TL1, XML),
API description of NB interface and other types of interfaces must be submitted.

3.

The NEs must have inband management interface

4.

The NEs shall have out of band management interface.

5.

The NEs must have command line terminal access capability for initial
configurations and debug purposes.

6.

The NEs must have different user levels like read only, operator, system
administrator

7.

The NEs command line capability must cover the complete range of management
features and functions.

8.

The NEs must store all configuration parameters non-volatile, and must run in
service without any management system connection.

3.1.7.2

NE Interfaces
1.

The NE shall have a SNMPv3 for management.

2.

The proposed equipment shall have a command line IF via remote SSH access for
NE management.

3.

Please describe the management interfaces of the proposed equipment.

4.

The NE shall provide north-bound interface. Its protocol is in TL1, XML, FTP modes,
preferably TL1 mode.

5.

For all the offered NE an alarm, fault and performance interface must be proposed.

6.

For all the offered NE an inventory interface must be proposed.

7.

For all the offered NE provisioning interface must be proposed.

8.

For all the offered NE testing interface shall be proposed.

ZTE Confidential & Proprietary

31

ZTE GPON RFP Template

3.1.7.3

NE Fault and Alarm Management (FM)


1.

The NEs of the offered system must be able to send alarm information to an existing
consolidated event management system via SNMP (GET-Request and Trap)

2.

The NEs of the offered system shall be able to send alarm information to an existing
consolidated event management system via syslog interface for real-time alarm
management.

3.

Supplier must hand over the list of the equipment events and alarms and their
severity.

4.

Please describe the FM (event and alarm management) features, functions and
operation of the proposed equipments.

5.

The NE must support ability of sending messages in form of SNMP Traps to at least
two specified destination. It's necessary to list all supported messages and MIBs.

3.1.7.4

NE Configuration Management (CM)


1.

The NEs of the offered system shall be able to be configured or managed via
SNMPv3 for any wanted changes eg. Configuration for operation of the network
elements, adaptation to planned operational modifications or user requirements.

2.

All the parameters and settings of the proposed NEs must be configurable remotely
(without any local assistance).

3.

It shall be possible to query the position of cards and interfaces via SNMP
(Entity-MIB, RFC4133).

4.

It shall be possible to query the type, own serial number and state of equipment
interfaces via SNMP (Entity-MIB, RFC4133).

5.

It shall be possible to query free resources (ports, cards, interfaces, positions) via
SNMP (Entity-MIB, RFC4133).

32

ZTE Confidential & Proprietary

ZTE GPON RFP Template

6.

It shall be possible to query all the equipment status parameters (e.g.


node/card/port/interface; subscriber service parameters; connections; ) via SNMP
(IF-MIB, RFC2863; Entity-MIB, RFC4133).

7.

It must be possible to query all the equipment status parameters (e.g.


node/card/port/interface; subscriber service parameters; connections ;) via SSH.

8.

The NE id (serial number) reported by the NE and printed on the surface of the NE
must be identical (both in semantics and syntactic).

9.

It shall be possible to change the configuration in the equipment with remote


process via SNMP.

10. Supplier must hand over the list of the possible equipment configuration
parameters.
11. It must be possible to upload the configuration parameters from equipment.
12. It must be possible to download the configuration parameters to the equipment.
13. The configuration fails shall be detected and the changes shall be refused.
14. It shall be possible to restore the previous good configuration in all NE.
15. It shall be possible to reset the previous good configuration in all NE.
16. It must be possible to change the software releases in the equipment with remote
processes via SNMP or CLI.
17. The date of change shall be stored in the equipment.
18. It must be possible to read the software version(s) from equipment via SNMP or
CLI.
19. It must be possible to download the appropriate software/firmware to equipment.
20. The download fails shall be detected and the changes shall be refused. The NE
shall continue to work with the old software. The fail cause shall be reported to the
Management system.

ZTE Confidential & Proprietary

33

ZTE GPON RFP Template

21. It shall be possible to restore the previous good software release in all managed
equipment.
22. It shall be possible to reset the previous good software release in all managed
equipment.

3.1.7.5

NE Performance Management (PM)


1.

The NEs must provide performance data via SNMP, Telnet.

2.

The NEs shall provide performance data via TL1 interface

3.

The NE must provide traffic counter for both the incoming and outgoing traffic on all
the possible interfaces (on the OLT as well as on the ONT).

4.

Supplier must hand over the list of the retrievable performance data of the proposed
equipment.

3.1.7.6

Local Craft Terminal/LCT


1.

Local Terminal (LCT) must be supplied for NE management.

2.

LCT must be able to manage each type of the offered equipment.

3.

The same LCT and unified interface shall be provided to connect to the different
type of equipment. Comment: 10/100BaseT Ethernet with R-J45 plug as unified
interface is proposed.

4.

The access priority to the equipment from the LCT shall be higher than from the
EMS.

5.

The LCT access shall operate independent from the EMS access.

6.

Each configuration change carried out through the LCT must automatically be
synchronized with the EMS.

7.

34

The LCT access to the equipment shall be reported to the EMS.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

8.

The LCT must provide for configuring the default settings (default VLAN, IP address,
etc.).

3.2

ONT/ONU Service Specific Requirements

3.2.1

Requirements of GPON ONT (FTTH)

3.2.1.1

Requirement of GPON ONT type


GPON ONT should support user interfaces as following:

3.2.1.2

3.2.1.3

10/100/1000Base-T Ethernet interfaces with RJ-45 connector

POTS interfaces with RJ-11 connector

USB host interface, 2.0 standard

Wi-Fi

RF overlay

Uplink interface
1.

GPON uplink: SC/APC interface for fiber connection.

2.

Fully compliant to ITU-T G.984.x GPON standards

Access protocols
1.

GPON ONT must support bridging of 802.1q tagged Ethernet frames between its
LAN and WAN interfaces.

2.

GPON ONT must support bridging PPPoE over the encapsulated Ethernet as
defined in IETF RFC 2516 and support up 4 PPPoE sessions.

3.

GPON ONT must be able to bridge IP over Ethernet.

ZTE Confidential & Proprietary

35

ZTE GPON RFP Template

3.2.1.4

4.

GPON ONT must support oversized Ethernet frames at least 1934 bytes.

5.

The ONT must support bridged Ethernet and routed Ethernet

6.

The ONT must support DHCP client

7.

The ONT must support NAT/NATP

8.

The ONT must support DNS

Traffic management and QoS


1.

The ONT must support mapping traffic into individual GEM Ports based on user port
/ VLAN priority bits / VLAN ID in the upstream direction.

2.

In the downstream direction, the ONT must support at least 4 queues per user
facing port, one per traffic class.

3.

In the upstream direction, the ONT must support at least 4 user queues, one per
traffic class

4.

The ONT must support scheduling of user queues according to strict priority among
at least 4 queues.

3.2.1.5

5.

The ONT must support at least 4 network facing T-CONTs, one per traffic class.

6.

The ONT should support all 5 defined T-Cont types.

Multicast support
1.

The ONT should support dropping of all IGMP messages received on a user port
and/or VLAN.

2.

The ONT must support IGMPv2 snooping or proxy function.

3.

The ONT must support IGMP immediate leave as part of the IGMP transparent
snooping function.

4.

36

The ONT must support IGMP join delay below 20ms.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

5.

The ONT MUST support IGMP explicit host tracking as part of the IGMP
transparent snooping function

3.2.1.6

LAN (UNI) Interface


1.

The ONT supports at least one, to four 10/100/1000M interfaces in conformance


with IEEE 802.3z, with RJ45 connectors.

2.

The Ethernet UNI(s) support(s) by default auto-negotiation of speed and duplex


mode.

3.

For each Ethernet UNI, it is possible to configure manually duplex mode as half or
full.

4.

The ONT supports Auto MDI / MDI-X feature.

5.

For each Ethernet UNI, the ONT supports "Flow Control" (in conformance with IEEE
802.3 Annex 31B) with PAUSE functionality1

3.2.1.7

3.2.1.8

Voice (UNI) Interface


1.

The ONT supports at least one, to two POTS interfaces with RJ11 connectors.

2.

Protocol: SIP/H.248

3.

The following codecs should be supported: G.711 A-law, -law, G.723, G.722.

4.

Shall offer fax operation according to ITU-T recommendation T.38.

USB(UNI) Interface
1.

The ONT supports at least one USB host interface in conformance with USB2.0
standard.

2.

Support 3G dongle

3.

Support file sharing and print server

ZTE Confidential & Proprietary

37

ZTE GPON RFP Template

4.

3.2.1.9

Support USB fast recovery and profile quick backup

Wi-Fi (UNI) Interface


1.

Support 802.11a, 802.11b, 802.11g and 802.11n.

2.

Support 2*2 MIMO

3.

Support 4 SSIDs

4.

Each SSID can be allocated for home network connection, WEB portal for public
hot-spot access exclusively, each scenario can bundle with one WAN.

5.

3.2.1.10

The ONT should support Wireless security features:


i.

WEP encryption (64bit/128bit)

ii.

MAC based access control list

Wireless Access Control (SSID)

Option for closed (hidden) SSID must be available

Wi-Fi Protected access (WPA2) compatible

Pre-shared Key

Remote management

RF Overlay
(Depends on the ONU type features)
1.

The ONT shall comply with ITU-T Recommendation G.984.5

2.

The enhancement band used for video shall be according with option 3 of G.984.5
Recommendation, from 1550nm to 1560nm

3.

38

The ONT shall comply with ITU-T Recommendation J.186

ZTE Confidential & Proprietary

ZTE GPON RFP Template

4.

The ONT shall be able to convert optical signals with modulation format is Intensity
Modulation (IM) in FDM analogue AM-VSB and/or digital video signals.

3.2.1.11

3.2.1.12

3.2.1.13

5.

The RF connector shall be 75ohms F connector

6.

RF level at the F connector: maximum 17 dBmV/ch

7.

RF Passband: 47 MHz~870 MHz

8.

Flatness : -1~1dB

Management requirements
1.

ONT must be manageable through Network Element manager of OLT

2.

The possibility for Local management for ONT (PON part), it must be disabled.

3.

Management of GPON ONU should based on OMCI or OMCI+TR-069

4.

The equipment must have dying gasp functionality.

IPV6
1.

The ONT shall support an option to migrate to IPv6 without any hardware upgrade

2.

Support IPv4/v6 Dual Stack

3.

Support DS-Lite

Security
1.

Support AES security mechanism defined in G.984.3.

2.

The ONT should support verification by SN password SN+password

3.

ONT should has built-in capability for management, including management,


detecting, and maintenance.

ZTE Confidential & Proprietary

39

ZTE GPON RFP Template

4.

Standard compliant OMCI (the embedded operations channel) interface as defined


by ITU-T G.984.4 and G.983.2

3.2.1.14

5.

Alarming and AVC report, performance detecting

6.

Remotely software image download over OMCI, as well as activation and rebooting

Power supply
1.

3.2.1.15

Rated 12V DC (through the external AC/DC adapter)

Other requirements
1.

All physical ports (POTS and GE) shall have a link integrity indicator LED (one for
each port).

2.

The equipment shall have a reset button, in order to reset the equipment
configuration to the default factory settings. The reset button may be labeled as
"reset" so a help desk can more easily identify it to a user.

3.2.2

Requirements of GPON ONU

3.2.2.1

General Service requirement

3.2.2.1.1

Traffic management and QoS


1.

GPON ONU should support service traffic classification:

Classifies the upstream service traffic based on physical ports, source MAC
address, destination MAC address, VLAN ID, VLAN priority (IEEE 802.1p),
Ethernet type (such as IP, PPPoE, ARP/RARP), destination IP address,
source IP address, IP protocol type (TCP, UDP, ICMP, IGMP), IP DSCP,
TCP/UDP protocol port, and implements in-depth packets detection (the first
128 bytes).

40

It should support the mapping relations between 802.1p priority and services.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.

3.

GPON ONU should support service traffic Marking:

Priority marking of the upstream services based on the traffic classification

Reusing, adding, modification of 802.1p user priority marking

Modification of ToS/DSCP priority marking

Configuring the service priority marking of each user port

GPON ONU should support queue scheduling:

Mapping upstream/downstream services to queues with different priority


based on 802.1Q user priority marking, and scheduling the queues

Scheduling the upstream services locally according to the OLT bandwidth


authorization, PON port supporting 8 queues

SP/WRR/SP+WRR scheduling algorithm.

Supporting network side/user side queues 8/8

4.

GPON ONU should support Tail-Drop and WRED algorithm.

5.

GPON ONU should support status reporting DBA, schedules the upstream service
traffic according to the DBA authority of the OLT to limit the upstream service traffic
rate.

6.

The Ethernet interface at the user side supports rate limit of the upstream and
downstream service port.

3.2.2.1.2

VLAN considerations
1.

GPON ONU must support VLAN protocols:

IEEE 802.1q VLAN with the Q-VLAN ranging from 1 to 4094

IEEE 802.1ad VLAN Stacking, with the C-VLAN ID and S-VLAN ID ranging
from 1 to 4094

ZTE Confidential & Proprietary

41

ZTE GPON RFP Template

2.

VLAN definition and application in TR-101 of Broadband Forum

GPON ONU must support VLAN translation list:


The system configures a VLAN translation list for the specific VLAN membership list.
The VLAN translation list configures possible translation for each VID in the VLAN
membership list as follows:

3.

Translation and counter-translation between Q-VID and S-VID

Translation and counter-translation between Q-VID and C-VID

Translation and counter-translation between Q-VID and C-VID/S-VID pair

GPON ONU must be able to translate the VLAN tag received from customer to the
Service VLAN tag in the upstream direction.

4.

GPON ONU must be able to translate the Service VLAN tag to User VLAN tag in the
downstream direction.

5.

GPON ONU must support untagged frames received from the customer and must
be able to add the Service VLAN tag in the upstream direction.

6.

The GPON ONU must be able to detach the Service VLAN tag and forward
untagged frames in downstream direction in case of single tagged frame.

7.

The GPON ONU must be able to accept both tagged and untagged frames from the
customer and must attach the service VLAN tag to the frames.

3.2.2.1.3

42

Multicast support
1.

IGMPv2 operation must be in conformance to RFC2236

2.

GPON ONU must support IGMP immediate or fast leave (<10ms).

3.

Detection of IGMP messages on Layer 2 or Layer 3 at the ONU.

4.

GPON ONU should support configurable filtering of IGMP membership reports

ZTE Confidential & Proprietary

ZTE GPON RFP Template

5.

GPON ONU should be able to configure per user port the maximum number of
simultaneous multicast channels allowed.

6.

GPON ONU must be able to rate limit the number of group records per second per
user port.

7.

3.2.2.1.4

The "rate limit" function should be configurable.

Security
1.

Specify if the ONU supports the AES security mechanism defined in G.984.3.

2.

The ONU should support verification by SN password SN+password

3.

ONU should has built-in capability for management, including management,


detecting, and maintenance.

4.

Standard compliant OMCI (the embedded operations channel) interface as defined


by ITU-T G.984.4 and G.983.2

5.

Alarming and AVC report, performance detecting

6.

Remotely software image download over OMCI, as well as activation and rebooting

3.2.2.2

Requirements of GPON ONU in FTTB/C

3.2.2.2.1

System Architecture requirement


1.

The Tender must describe the general architecture and functional block diagram of
the proposed GPON ONU, which used as MDU (Multi-Dwelling Unit) equipment in
FTTB/C scenario.

2.

The Tender must indicate which buses are dedicated and which are shared by
different parts of the MDU as well as the bandwidth.

3.

Software roll-back to the old version shall be supported in case of update failure.

ZTE Confidential & Proprietary

43

ZTE GPON RFP Template

4.

Please indicate the number of MDU slots. Please breakdown into slots for
subscriber's cards, network cards, etc.

3.2.2.2.2

Module and capacity


1.

The proposed system should be 5U or less height and can be plug into 19 inch
standard rack.

2.

The proposed system should be in general consist of the following service interface
and all service line card can be mixed plugged in the same shelf:

3.

ADSL2+ interface

VDSL2 interface

SHDSL interface

SHDSL.bis interface

VoIP interface

ISDN PRI and BRI interface

FE and GE interface

The proposed system should be in general consist of the following network


interface:

4.

FE electric and optical

GE electric and optical

GPON uplink

ADSL2+ line card recommended to be per-card 32 port and splitter-embedded line


card is preferred

5.

VDSL2+ line card recommended to be per-card 32 and above port and


splitter-embedded line card is preferred

44

ZTE Confidential & Proprietary

ZTE GPON RFP Template

6.

SHDSL line card recommended to be per-card 24 port

7.

ISDN PRI line card recommended to be 4 port

8.

ISDN BRI line card recommended to be 8 port

9.

VoIP line card recommended to be 64 port

10. The Tender should state the capacity figures of the system, if the proposed
equipment include several types, For each type, please fill the table respectively :

Table 3-1 FTTx MDU service cards requirement


Max Quantity of
Description

cards Per
System

Quantity of ports
Per card

ADSL2+
VDSL2
POTS
FE
SHDSL
ISDN(BRI)
ISDN(PRI)
GE uplink
FE uplink
GPON uplink
11. The backplane capacity of MDU should be more than 20G
12. The switching capacity of MDU should be more than 10G

3.2.2.2.3

VoIP service
1.

MDU should support built-in VoIP management module.

2.

MDU should support single IP and dual IP mechanism for VOIP

3.

MDU should support H.248 protocol: Version1 / Version2 / Version3.

ZTE Confidential & Proprietary

45

ZTE GPON RFP Template

3.2.2.2.4

4.

MDU should support SIP; it is in compliance with IETF RFC 3435.

5.

MDU should support Voice signal coding and encoding:

MDU supports G.711 (A/U).

MDU supports G.729A/B.

MDU supports G.723.1.

Ethernet (UNI) interface


1.

The ONU Ethernet interfaces must support Auto-MDI(X) functionality.

2.

The connector must be RJ45 female and shall conform to IEC 60603-7 standard.

3.

The Ethernet interfaces must conform to IEEE 802.1q VLAN trunking standard.

4.

The Ethernet interfaces should provide double-tagged VLAN capabilities conform to


IEEE 802.1ad standard.

3.2.2.2.5

5.

The Ethernet interfaces must conform to IEEE 802.1p standard.

6.

GPON ONU must support defining of 802.1p priority at VLAN level.

7.

The Ethernet interface must support oversized Ethernet frames at least 1526 byte.

Power supply
1

MDU should support power supply mode: AC (220V), DC (-48V), AC (220V) +DC
(-48V).

46

DC rated voltage -48 V with the range of -40 VDC to -57 VDC

AC rated voltage 110 VAC/220 VAC with the range of 88 VAC to 290 VAC

ZTE Confidential & Proprietary

ZTE GPON RFP Template

3.2.2.3

Requirements of GPON ONU in FTTM

3.2.2.3.1

System Architecture requirement


1.

The Tender must describe the general architecture and functional block diagram of
the proposed GPON ONU, which used as CBU (Cellular Basic Unit) equipment in
FTTM scenario.

3.2.2.3.2

2.

Software roll-back to the old version shall be supported in case of update failure.

3.

CBU should support Type C protection.

Module and capacity


1.

The proposed system should be 2U height and can be plug into 19 inch standard
rack.

2.

The proposed system should be in general consist of the following UNI: FE


interface/E1 interface

3.2.2.3.3

SyncE Service
1.

SyncE specifications and requirements are bounded by four primary standards:

ITU-T G.8261: Timing and synchronization aspects in packet network

ITU-T G.8262: Timing characteristics of Synchronous Ethernet equipment


slave clock

2.

ITU-T G.8264: Distribution of timing through packet networks

ITU-T G.781: Synchronization layer functions

Synchronous clocking support should be provided when the device is operating in


the following modes: 1000BASE-T, 1000BASE-X, 100BASE-TX, or 100BASE-FX
on the line interface.

ZTE Confidential & Proprietary

47

ZTE GPON RFP Template

3.

There should be two components to synchronous clocking support. The first is to


output a recovered clock. The second is to select between the local reference clock
and a cleaned up recovered clock.

3.2.2.3.4

3.2.2.3.5

Time & Clock synchronization


1.

GPON ONU should support two 1PPS+TOD ports and two 1PPS ports.

2.

GPON ONU should support 1588V2.

3.

GPON ONU should fulfill the requirements of all kinds of mobile base stations.

E1 emulation service and E1 (UNI) Interface


1.

GPON ONU should support the built-in E1 emulation processing module to


implement E1 emulation on the L2 Ethernet/IP/MPLS network.

2.

3.

GPON ONU should support the E1/T1 emulation service protocols as follows:

MEF 8.0 protocol: TDMoIP over MPLS.

IETF RFC4553 protocol: SAToP over IP or MPLS.

IETF RFC5086 protocol: CESoPSN over IP or MPLS

Specify the kind of connector and the impedance (75 Ohm or 120 Ohm) used for the
E1s

4.

Specify if the interface its configurable as unframed (G.703) or framed (G.704)

5.

Support no less than 8* E1 ports.

6.

Specify if the E1 has transparent clock (adaptive mode) or if it works as


Master/Slave.

7.

Specify the different types of loop back supported for maintenance and
troubleshooting

48

ZTE Confidential & Proprietary

ZTE GPON RFP Template

3.2.2.3.6

Power supply
1.

2.

CBU should support power supply as:

DC rated voltage -48 V with the range of -40 VDC to -57 VDC

AC rated voltage 110 VAC/220 VAC with the range of 85 VAC to 286 VAC

CBU should support LiFePO4 battery for power backup when AC fails.

Support AC power supply and -48V DC power backup

Support -48V DC power supply and -48V DC power backup.

3.2.2.4

Requirements of GPON ONU in FTTW

3.2.2.4.1

System Architecture requirement


1.

The Tender must describe the general architecture and functional block diagram of
the proposed GPON ONU, which used as MDU (Multi-Dwelling Unit) equipment in
FTTW scenario.

2.

3.2.2.4.2

Software roll-back to the old version shall be supported in case of update failure.

Module and capacity


1.

The proposed system should be 1U height and can be plug into 19 inch standard
rack.

2.

The proposed system should be in general consisting of UNI interface: 8/16


10/100/1000Base-T with RJ45 interface.

3.2.2.4.3

Ethernet Power Supply


1.

GPON ONU in FTTW scenario should support built-in PoE/PoE+ processing


module and complies with standard PSE specified in PoE/PoE+ protocol.

ZTE Confidential & Proprietary

49

ZTE GPON RFP Template

2.

GPON ONU in FTTW should support PoE management function, all the functions
listed below can be queried through CLI/TELNET/SNMP. POE management
function includes the following

Port control management function

PoE/PoE+ working mode setting

Standard and non-standard PD detection

Interconnection with Cisco special PD devices

Enabling and disabling of port power output

Power management mode (dynamic) setting

Whether to disconnect power supply of the port on controlling the soft resetting
of the device

Remote PD resetting

Port protection and alarm function

Over-current protection for the ports and generating alarms in case of


over-current

Over-voltage protection for the

ports and generating alarms in case of

over-voltage

Over-temperature protection for the whole device and generating alarms in


case of over-temperature with configurable threshold value

Under-voltage protection of the ports and generating alarms in case of


under-voltage

50

Abnormal logs of each port

Abnormal power down notification of the port

Port status querying

ZTE Confidential & Proprietary

ZTE GPON RFP Template

Querying the power, voltage, current of each PoE/PoE+ port

Querying the working status of each PoE/PoE+ port

Collecting the total current, voltage and power of the all PoE/PoE+ ports of the
overall device

3.

3.2.2.4.4

Querying the working temperature of the PoE/PoE+ module

Ethernet interfaces with POE/POE+ function should be Gigabit Ethernet interface.

Ethernet (UNI) interface


1.

The ONU Ethernet interfaces must support Auto-MDI(X) functionality.

2.

The connector must be RJ45 female and shall conform to IEC 60603-7 standard.

3.

The Ethernet interfaces must conform to IEEE 802.1q VLAN trunking standard.

4.

The Ethernet interfaces should provide double-tagged VLAN capabilities conform to


IEEE 802.1ad standard.

3.2.2.4.5

5.

The Ethernet interfaces must conform to IEEE 802.1p standard.

6.

GPON ONU must support defining of 802.1p priority at VLAN level.

7.

The Ethernet interface must support oversized Ethernet frames at least 1526 byte.

Power supply
1.

2.

MDU should support power supply as:

DC rated voltage -48 V with the range of -40 VDC to -57 VDC

AC rated voltage 110 VAC/220 VAC with the range of 85 VAC to 286 VAC

MDU should support LiFePO4 battery for power backup when AC fails.

Support AC power supply and 48V DC power backup

ZTE Confidential & Proprietary

51

ZTE GPON RFP Template

3.2.2.5

Requirements of GPON ONU in FTTO

3.2.2.5.1

System Architecture requirement


1.

The Tenderer must describe the general architecture and functional block diagram
of the proposed GPON ONU, which used as MDU (Multi-Dwelling Unit) equipment
in FTTO scenario.

2.

Software roll-back to the old version shall be supported in case of update failure.

3.

Please indicate the number of MDU slots. Please breakdown into slots for
subscriber's cards, network cards, etc.

3.2.2.5.2

Module and capacity


1.

The proposed system should be 1U height and can be plug into 19 inch standard
rack.

2.

3.2.2.5.3

The proposed system should be in general consist of following UNI interface:

E1 interfaces

10/100Base-T interfaces.

E1 emulation service and E1 (UNI) Interface


1.

GPON ONU should support the built-in E1 emulation processing module to


implement E1 emulation on the L2 Ethernet/IP/MPLS network.

2.

52

GPON ONU should support the E1/T1 emulation service protocols as follows:

MEF 8.0 protocol: TDMoIP over MPLS.

IETF RFC4553 protocol: SAToP over IP or MPLS.

IETF RFC5086 protocol: CESoPSN over IP or MPLS

ZTE Confidential & Proprietary

ZTE GPON RFP Template

3.

Specify the kind of connector and the impedance (75 Ohm or 120 Ohm) used for the
E1s

3.2.2.5.4

4.

Specify if the interface its configurable as unframed (G.703) or framed (G.704)

5.

Support minimum 8* E1 ports per board.

Power supply
1.

2.

MDU should support power supply as:

DC rated voltage -48 V with the range of -40 VDC to -57 VDC

AC rated voltage 110 VAC/220 VAC with the range of 85 VAC to 286 VAC

MDU should support LiFePO4 battery for power backup when AC fails.

Support AC power supply and 48V DC power backup

EMS Requirements

4.1

Management System Architecture


Pleased describe the quoted EMS and all the technical limitations related to the
proposed hardware and software configuration

4.2

EMS Platform Requirements


1.

High reliability and platform redundancy solution shall be offered.

2.

The Supplier must support a 1:1 EMS redundancy architecture in which the Primary
(Active) and Secondary (Standby) EMS are geographically distributed.

3.

With 1:1 EMS redundancy architecture, please explain the method through which
the EMS Primary and EMS Secondary database synchronization will be maintained.

ZTE Confidential & Proprietary

53

ZTE GPON RFP Template

4.

With 1:1 EMS redundancy architecture, please explain the method by which the
switchover occurs from the EMS Primary to the EMS Secondary.

5.

The proposed EMS must provide multi-user access.

6.

The proposed EMS must have different user levels like read only, operator, and
system administrator - with different access rights.

7.

The proposed EMS must provide concurrent EMS access.

8.

The proposed EMS shall support concurrent NE access.

9.

The proposed EMS shall have a client server architecture.

10. A single instance of the EMS must support at least 50 users/ session
simultaneously.
11. The data communication solution between the EMS and the NE must be IP.
12. Management System shall have open API(s) that supports:

Fault Management,

Performance Management,

Configuration Management,

Inventory Management,

Security Management

13. Management System servers must be 19" rack mountable. It is necessary to


provide standard racks and rack mount kits for servers.
14. The interface modules towards higher order management and support systems
shall be installed on Management System. API interfaces shall be implemented
using standard protocols, e.g. TL1 or SNMP.
15. Provide change request mechanism and procedures
16. The EMS shall support an option to migrate to IPv6 without any hardware upgrade

54

ZTE Confidential & Proprietary

ZTE GPON RFP Template

17. EMS should support IPv6 SW upgrade, although IPv4 will be used in the initial
phase of the implementation

4.3

EMS Fault and Alarm Management


1.

The proposed EMS must provide for fault and alarm management.

2.

Please describe the FM (event and alarm management) features, functions and
operation of the proposed equipments.

3.

Each alarm with its accompanied attributes, forming an alarm record, shall be
logged automatically. Alarm records shall be kept in the log for some time (e.g. 30
days) and alarm retrieval shall be supported. The same presentation, filter and
sorting functions shall be available for retrieved alarm records as they are for actual
alarms.

4.

All other events such as Alarm Acknowledgement, Alarm Severity setting, and
Alarm Collection allow/inhibit or Threshold settings shall be also logged.

5.

The report generation tool shall be available for Event Log records using filter
capabilities. Event Logging presentation shall allow the user to manage and analyze
the Event Log records.

6.

The event collection processes shall run continuously according to user defined
characteristic, even if all users are logged out.

7.

It shall be possible to archive any log file both manually and automatically.

8.

It shall be possible to retrieve any log file manually.

9.

It shall be possible to set archiving parameters including delete criteria by the


administrator.

ZTE Confidential & Proprietary

55

ZTE GPON RFP Template

4.4

EMS Configuration Management

4.4.1

Presentation of Equipment Configuration


1.

It must be possible to query the position of cards and interfaces via the SNMP
Interface.

2.

It must be possible to query the type, own serial number and state of equipment and
the type and state of the interfaces.

3.

It shall be possible to query free resources (ports, cards, interfaces, positions).

4.

It must be possible to query all the equipment status parameters (e.g.


node/card/port/interface; subscriber service parameters; connections).

5.

The NE id (serial number) reported by the NE and printed on the surface of the NE
must be identical (both in semantics and syntactic).

4.4.2

Configuration and Release Changes


1.

It must be possible to change the configuration in the equipment.

2.

It must be possible to upload the configuration parameters of the equipment.


(backup function)

3.

It must be possible to download the configuration parameters to the equipment.


(restore function)

4.

The download fails shall be detected and the changes shall be refused. The NE
shall continue to work with the old software. The fail cause shall be reported to the
Management system.

56

5.

It must be possible to restore the previous good configuration in all NE.

6.

It must be possible to reset the previous good configuration in all NE.

ZTE Confidential & Proprietary

ZTE GPON RFP Template

4.4.3

Software Download EMS


1.

It must be possible to change the software releases in the equipment.

2.

The date of change shall be stored and sent as a trap to the Management system.

3.

It must be possible to read the software version(s) from equipment via SNMP.

4.

It must be possible to download the appropriate software/firmware to equipment.

5.

The download fails shall be detected and the changes shall be refused. The NE
shall continue to work with the old software. The fail cause shall be reported to the
Management system.

6.

It must be possible to restore the previous good software release in all managed
equipment.

7.

It must be possible to reset and the previous good software release in all managed
equipment.

4.5

EMS Performance Management


1.

The EMS must provide equipment level performance information.

2.

The EMS must provide traffic counter for both the incoming and outgoing traffic on
all possible interfaces (on the OLT as well as on the ONT). These counters must be
available in the NE.

3.

The Management System shall provide data collection, processing and


presentation capabilities required to perform performance management (PM) on
various NEs and services.

4.

Supplier must hand over the list of the supported performance information,
parameters of the proposed EMS and NE. Information shall be easy readable,
printable and exportable to other systems.

ZTE Confidential & Proprietary

57

ZTE GPON RFP Template

4.6

EMS Testing
1.

The EMS shall provide functions for performing equipment level testing.

2.

The EMS shall perform test functions for the optical and DSL performance of the
GPON network.

3.

The EMS shall provide functions for activating and deactivating temporary
loop-back connections.

4.7

PON Detecting System


1.

PON detecting System is collection of software and hardware equipments capable


to detect and provide statistics and alarms for the PON.

2.

The system must provide the following functionalities:

3.

Detect and locate any fault along the fiber optic cable (fault management)

4.

Detect FO deterioration (pro-active maintenance)

5.

Continuous detecting of FO network (real-time detecting)

6.

Precise notification of any network problem automatically, without user intervention

7.

System interoperability:

Capability of sending alarms over a standard interface (SNMP) to another


management system

58

8.

Alarm management

9.

Multi-user capability

ZTE Confidential & Proprietary

ZTE GPON RFP Template

Environment and Working Requirements

5.1

Environmental Requirements

5.1.1

Environmental Conditions Specification

5.1.1.1

Operating
1.

OLT:
The equipment are supposed to be placed at normal living or working areas shall
comply with the Standard ETSI EN 300 019-1-3 Class 3.1. (Temperature-controlled
locations) which is a combination of classes 3K3/3Z2/3Z4/3B1/3C2(3C1)/3S2/3M1
of the Standard EN 60721-3-3.
Specified temperature limits: +5....+40 C
Relative humidity:

2.

5....85 %

The proposed connectorized optical splitters (splitting ratio: 1:2; 1:4; 1:8; 1:16; 1:32
and 1:64) must have the environment conditions:
Operating Temperature (C) = -40 to +85 C
Operating humidity 95% and frozen-free
Air pressure = 70 KPa to 106 KPa

3.

We kindly ask you to specify for each proposed connectorized optical splitters the
following data:
Operating Temperature C"
Stationary operating temperature limits

4.

For outdoor ONUs:

ZTE Confidential & Proprietary

59

ZTE GPON RFP Template

The equipment is supposed to be placed at garages, cellars, entrances and


staircases of buildings.
Temperature limits: -40 C....+65 C
Relative humidity: 10 %....95 %
5.

For indoor ONUs:


Temperature limits: 0 C....+40 C
Acoustic noise emission limits: Daytime 50dBA, Night-Time 35dBA"

6.

LED status indication is supported for power, PON link status and UNI status.

7.

The indoor ONU is mounted either inside building or placed (stand alone) on a desk.

8.

The ONU can be equipped with maintenance-free backup battery that will operate
the system in case of AC failure as an option.

5.1.1.2

Environmental Protection Requirements


1.

The bidder must make a declaration that the offered equipments not contain
components, materials and fittings that cause negative environmental impact during
transportation, storage installation or operation.

2.

The equipment must be provided in accordance with the Directive 2002/95/EC of


the European Parliament and of the Council on the restriction of the use of certain
hazardous substances in electrical and electronic equipment (RoHS).

3.

The bidder shall give a list for wrapping materials. Only recycling materials shall be
used for wrapping.

4.

In case if the bidder (manufacturer) of the equipment has a certificate of EN ISO


14001 or other environmental management system, a copy of the certificate shall be
attached to the Bid.

60

ZTE Confidential & Proprietary

ZTE GPON RFP Template

5.2

Power Supply

5.2.1

OLT Devices
1.

The power supply interface of the equipment supplied with 48 V nominal DC must
satisfy the requirements stipulated in the Standard ETSI EN 300 132-2. (The
positive side should be grounded.)

2.

The bidder shall attach the test report of the power supply interface according to the
ETSI EN 300-132-2 to prove that all the equipment meet the above requirements.

3.

After returning to normal supply voltage, the telecommunication equipment must


continue normal operation, WITHOUT any external intervention (e.g. reset,
administrator command).

4.

The bidder should declare whether the equipment complies the European Code of
Conduct on Energy Consumption of Broadband Equipment. The energy
consumption is measured and compared according to ETSI TS 102 533 (2008-05).

5.

Supplier must give the power consumption of the equipment relevant to all modes of
operation.

6.

All powering components of the equipment should be redundant. The switch


between the redundant powering components SHALL be automatic and cause no
disruption of service.

7.

The equipment should be protected against inversion of the polarity of the power
supply. Similarly, the power connector of the equipment shall be construed in a way
that it is provided against inversion of the polarity.

8.

The equipment must have remote management (remote checking feature) which
will inform the operator about discrepancies at the internal power supply.

9.

The power supply unit of the equipment (including the remote feeding circuits) shall
have a protection against overload and thermal runaway of the lead acid battery.

ZTE Confidential & Proprietary

61

ZTE GPON RFP Template

10. The normal service voltage must be within the range: -48 V 20%. The equipment
must operate at a voltage within this range.
11. The bidder shall specify the maximum power consumption for the OLT
12. The bidder shall describe the maximum overall power consumption of the OLT
equipment in full configuration with dual main control cards + dual power supply +
fan + dual 4GE uplink + GPON card.
13. GPON OLT should support 1+1 power supply redundancy protection.

5.2.2

ONT / ONU / Servers


1.

Provide details of heat dissipation information for the ONT/ONU/Servers

2.

Vendors should also provide LiFePO4 battery for power backup.

3.

Specify if the ONT/ONU Support POE (Power over Ethernet) and what is the
capability?

4.

The power supply interface of the equipment supplied with 230 V nominal AC must
satisfy the requirements stipulated in the Standard ETSI ETS 300 132-1 or ETSI
EN 300 132-3.

5.

Power supply: nominal voltage 90~230 V AC, 50Hz and Continental European plug.

6.

The equipments shall be tolerant of power fluctuations 230 VAC +15%, -25% @ 50
Hz 0.1%, continuing to operate normally and maintaining its configuration after
these events.

5.3

7.

Specify if the ONU support power saving mode for idle interface, and how?

8.

Does the version or model support 120VAC powering?

EMC Requirements
1.

In case of the RF emission the equipment must satisfy the class "B" limit of the EN
55022.

62

ZTE Confidential & Proprietary

ZTE GPON RFP Template

2.

The bidder must attach the Statement of Compliance (according to the Directive
2004/108/EC) to the Bid.

3.

The equipment must comply with the ITU-T recommendations K.20/K.21.

4.

The bidder must attach the EMC Test Report to prove that all the equipment meet
the above requirements, or shall hand the EMC Test Report over to the Technical
Conformance Tests.

5.4

Safety Requirements

5.4.1

General safety requirements


1.

The equipments, its sub-systems and accessories must comply with the general
life- and material safety requirements.

2.

The bidder must guarantee that precautions must be taken in order to prevent any
injuries or damages due to the following hazards according to standard EN 60950-1,
2.0 Ed.:

3.

Electric shock,

Energy hazards,

Fire,

Mechanical or heat hazards,

Radiation hazards,

Chemical hazards.

Only equipment must be allowed for installation that comply with the relevant
requirements in safety Standards (compliance evaluation procedure: according to
Directive 2006/95/EC and Directive 1999/5/EC of the European Parliament and of
the Council of 9 March 1999 on radio equipment and telecommunications terminal
equipment and the mutual recognition of their conformity ). The safety test reports of

ZTE Confidential & Proprietary

63

ZTE GPON RFP Template

the exchange and subscriber side units (the power supply of the subscribers unit if
exits too) according to EN 60950 must be attached to the bid.
4.

Markings and/or identity labels shall be placed on the equipments and on their
subsystems. The labels have to be placed on a visible place and should contain
durably the following information:

Type and manufacturers name, equipments release,

Power supply data,

Classes of equipment - protection against electric shock (at class II. equipment
the symbol, too),

5.

CE marking.

All the delivered materials and equipments shall be free of defects (such as sharp
edges, burrs etc) that could represent a safety hazard to personnel involved in its
assembly, installation, use or maintenance.

5.4.2

Electrical Safety Requirements


1.

With respect to electrical safety, the equipments and its power supply (if exists)
must comply with specifications in Standard EN 60950-1.

2.

The system of protection against electric shock, requirements for earthing and
equipotential bonding shall be established according to EN 60950-1, 2.0 Ed., and
ETSI EN 300 253 series of standards.

3.

The degree of protection of the equipment, depending on their placing shall be


established according to specifications described in standard EN 60529.

5.4.3

Laser Safety Requirements


1.

Product must be in line with EN60825-1 standard; Safety of Laser products

2.

According to Standards ISO 3864-1 and ISO 3864-2 should be used on equipment
parts and housings where laser beam exist.

64

ZTE Confidential & Proprietary

ZTE GPON RFP Template

5.5

Reliability and Availability Requirements

5.5.1

Maintainability
1.

GPON OLT and ONT equipment shall operate 24 hours a day, and every day of the
year. GPON OLT equipment shall be designed to meet an operational lifetime over
10 years with normal parts replacement.

2.

The bidder is obliged to ensure spare parts for offered platform for at least 10 year
period

5.5.2

Availability
Availability of the GPON OLT and ONU equipment shall be annually 99.99% for all nodes

5.5.3

Reliability
1.

MTBF of the GPON equipment used in the system should be more than 28 years.

2.

GPON PON cards MTBF min. = 30 years,

3.

The MTTR of OLT should not be more than 30 minutes

4.

The

bidder

must

show

evidence

to

demonstrate

that

the

predicted

availability/reliability of the proposed equipment is better than 99.999%.


5.

The bidder must state the maximum environmental operating temperature of the
fully equipped OLT in order to provide an availability/reliability of better than
99.999%.

5.6

Installation Conditions

5.6.1

General requirement
1.

Installation, operation and maintenance shall not require the use of special,
non-standard tools.

ZTE Confidential & Proprietary

65

ZTE GPON RFP Template

2.

All necessary materials for the installation shall be provided within the ONT, ONU,
OLT Kits

3.

4.

The Bid shall be made for:

19" with ETSI adapters rack-mountable OLT

19" with ETSI adapters rack-mountable ONU

Desktop and wall-mountable ONT.

Installation materials shall be quoted for each OLT based on the following
assumptions
All patch-cord lengths for OLT shall be of 20m;

5.

The ODF is assumed as SC/PC type for quotation purpose


Power and grounding cables for OLT shall be of 30m for quotation purpose
The actual values of installation materials will be determine on site-survey for each
OLT site; the site-survey data will be provided

6.

The proposed connectorized optical splitters (splitting ratio: 1:2; 1:4; 1:8; 1:16; 1:32
and 1:64) for indoor locations shall be 19" rack-able.

7.

The connectorized optical splitters installation must assure the eyes protection and
easy cabling.

8.

Each connectorized optical splitters shall have clear identification marks

9.

The outer cover of the offered unit(s) shall be resisting to mechanical damaging
impacts that may occur during implementation/installation and operation.

10. The outer cover of the offered units should meet the requirements of Flammability
Class V-1 according to Standard EN 60950-1, 2.0 Ed..
11. The structural design (construction) of the offered equipment and the materials
chosen shall not cause injury to persons, or damage, or deterioration to objects, if
properly used. The technical characteristics of the basic components used shall

66

ZTE Confidential & Proprietary

ZTE GPON RFP Template

comply with the requirements undertaken in or deriving from the technical


specifications of the product.

5.6.2

Cables
1.

The proposal shall include all the required tie cables from VDSL2 interfaces to the
MDF.

2.

The bidder shall offer quotation for the following tie cables lengths:

5m

10m

20m

Acronyms
Table 6-1 Acronyms
Acronym

Expansions

CP

Communications Provider

DoS

Denial of Service (hacker attack)

EMS

Element Management System

FSAN

Full Service Access Network

FTTB

FTTC

Fiber To The Building typically basement or communications


room.
Fiber to the Cabinet , also known as Fiber to the Curb, Fiber to
the Node.

FTTH

Fiber To The Home

GA

General Availability

GEA

Generic Ethernet Access

GEPON

Gigabit Ethernet Passive Optical Network [IEEE/ITU-T]

GPON

Gigabit Passive Optical Network [FSAN/ITU-T]

IEEE

Institute of Electronic and Electrical Engineers [USA]

ZTE Confidential & Proprietary

67

ZTE GPON RFP Template

Acronym
ISP
ITU-T

68

Expansions
Internet Service Provider
International Telecommunication Union - Telecommunications
Standardization Sector

MDU

Multiple Dwelling Unit

MSAN

Multi-Service Access Node

OF

Optical Fiber

OFCOM

OFfice of COMmunications [UK regulator]

OLT

Optical Line Termination

ONT

Optical Network Termination

OOB

Out of Band

OSS

Operational Support System

PON

Passive Optical Network

POTS

Plain Old Telephony Service (Analogue Telephony)

SIP

Session Initiation Protocol

SME

Small Medium Enterprise

SoR

Statement Of Requirements

T&D

Test and Diagnostics

TDM

Time Division Multiplexing

TSR

Telecommunications Strategic Review

USO

Universal Service Obligation

VLAN

Virtual Local Area Network

WDM

Wavelength Division Multiplexing

ZTE Confidential & Proprietary

You might also like