PRECIOS UNITARIOS
COSTO TOTAL
2,440,338.00
637,150.00
1,298.00
319,349.00
101,087.00
99,776.00
139,930.00
63,675.00
72,893.00
6,375,286.00
300,705.00
129,700.00
14,645.00
4,192.00
4,325.00
1,648.00
336,389.00
72,893.00
45,502.00
3,566.00
13,104.00
7,511.00
5,842.00
79,653.00
4,694.00
71,334.00
3,505.00
6,983.00
8,272.00
8,633.00
6,215.00
2,487.00
1,014.00
4,299.00
8,021.00
8,021.00
638.00
65,378.00
123,792.00
161,752.00
76,250.00
123,575.00
153,406.00
141,571.00
168,681.00
143,069.00
143,069.00
143,069.00
150,708.00
780.00
2,990.00
2,990.00
3,413.00
2,867.00
2,867.00
3,580.00
3,845.00
4,111.00
4,111.00
3,713.00
2,877.00
2,326.00
1,313.00
1,313.00
1,698.00
1,815.00
8,443.00
13,635.00
21,180.00
24,606.00
5,153.00
6,214.00
4,536.00
6,748.00
8,401.00
1 de 794
PRECIOS UNITARIOS
UNIDAD
M2
M2
M2
M2
M2
COSTO TOTAL
9,514.00
4,843.00
7,235.00
9,011.00
9,102.00
M3
M3
M3
M3
M3
M3
M3
M3
224,189.00
224,189.00
224,189.00
232,187.00
160,011.00
165,939.00
167,625.00
107,941.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
244,953.00
633,678.00
244,953.00
644,774.00
244,953.00
670,286.00
M2
M3
M3
M3
M3
M3
M2
KG
LT
LT
M3
M
M
5,276.00
49,839.00
70,651.00
109,937.00
110,591.00
M3
KG
798,345.00
780.00
M2
87,184.00
M3
M3
M3
M3
M3
M3
M3
15,712.00
18,985.00
117,288.00
171,377.00
12,758.00
16,035.00
35,531.00
M3
M3
M3
57,436.00
20,256.00
94,101.00
M
M
U
M
M3
M
M3
M
U
M2
M2
M2
M2
M
M
U
M3
M3
M3
M3
M3
M3
M3
M3
M3
M
M
M2
690,000.00
244,953.00
580,703.00
244,953.00
580,703.00
244,953.00
580,703.00
294,488.00
294,488.00
294,488.00
294,488.00
286,992.00
6,069.00
42,741.00
5,737.00
6,067.00
108,380.00
948,571.00
921,271.00
755,066.00
716,607.00
640,362.00
479,221.00
417,567.00
531,862.00
800,402.00
326,597.00
604,343.00
28,376.00
2 de 794
09/15/2015
PRECIOS UNITARIOS
UNIDAD
M2
M
M3
COSTO TOTAL
17,676.00
428,262.00
677,694.00
KG
KG
TON-M
KG
U (DM3)
M
4,226.00
1,693.00
527,788.00
49,140.00
KG
KG
KG
KG
M
M
M
M
M
M
415,173.00
511,565.00
M3
M3
M3
M
M
M3
M2
M3
M
M
LT
KG
243,064.00
541,456.00
555,925.00
M2
M
M3
M3
M3
178,606.00
46,996.00
120,369.00
7,194.00
136,474.00
184,377.00
221,912.00
5,260.00
4,518.00
153,180.00
133,656.00
M2
M
M
M
M2
M2
M2
U
1,591.00
1,233.00
404,239.00
10,574.00
U
U
U
U
M2
419,745.00
491,245.00
498,915.00
411,819.00
460,949.00
181,565.00
M
U
U
M
U
202,029.00
78,851.00
22,439.00
15,275.00
M
M
M
M
HA
M2
M
M
M
U
M
M2
M2
M2
M2
M2
U
M3-E
M3-KM
M3-KM
13,944.00
26,155.00
315,531.00
14,184.00
11,117.00
27,597.00
2,167.00
1,300.00
1,300.00
3 de 794
09/15/2015
TARIFAS DE EQUIPO
6,000.00
30,000.00
###
15,000.00
20,000.00
25,000.00
25,000.00
35,000.00
35,000.00
90,000.00
20,000.00
1,000.00
###
###
30,000.00
###
4 de 794
09/15/2015
TARIFAS DE EQUIPO
5 de 794
COSTOS MATERIALES
6 de 794
09/15/2015
COSTOS MATERIALES
7 de 794
09/15/2015
MANO DE OBRA
%
%
%
%
KM
KM
KM
KM
KM
KM
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
20%
5%
5%
185%
5.0
10.0
15.0
35.0
35.0
50.0
36,100.00
65,000.00
20,600.00
36,100.00
60,600.00
20,600.00
40,000.00
65,000.00
65,000.00
8 de 794
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
200.1
UNIDAD:
HA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
BULDOZER D6
110,000
0.18
611,111.11
120,000
0.18
666,666.67
10,000
0.07
153,846.15
MOTOSIERRA
HERRAMIENTA MENOR (10%MO)
13,232.64
Sub-Total
1,444,856.57
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DESMONTADO
60.0
Distancia
M3-Km
5.0
300.0
Tarifa
Valor-Unit.
1,000
300,000.00
Sub-Total
300,000.00
Jornal
(5)
$ 103,000
Prestaciones
185%
Jornal Total
Rendimiento
190,550
1.44
Valor-Unit.
132,326.39
Sub-Total
Total Costo Directo
132,326.39
1,877,182.96
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
375,436.59
IMPREVISTOS
5%
93,859.15
UTILIDAD
5%
93,859.15
Sub-Total
563,154.89
2,440,338.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
200.2
UNIDAD:
HA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
GUADAADORA
10,000
0.09
112,359.55
MOTOSIERRA
10,000
1.00
10,000.00
10,705.06
Sub-Total
133,064.61
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DESMONTADO
50.0
Distancia
M3-Km
5.0
250.0
Tarifa
Valor-Unit.
1,000
250,000.00
Sub-Total
250,000.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
0.71
Valor-Unit.
107,050.56
Sub-Total
Total Costo Directo
107,050.56
490,115.17
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
98,023.03
IMPREVISTOS
5%
24,505.76
UTILIDAD
5%
24,505.76
Sub-Total
147,034.55
637,150.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
200.4P
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
ESTACIN
Rendimiento
20,000
100.00
Valor-Unit.
200.00
Sub-Total
200.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
GLOBAL
350.00
Sub-Total
350.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
TOPOGRAFO
OFICIAL
(3)
OBREROS
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 65,000
185%
120,250
800.00
150.31
$ 108,300
185%
200,355
800.00
250.44
$ 20,600
185%
38,110
800.00
47.64
Sub-Total
Total Costo Directo
448.39
998.39
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
199.68
IMPREVISTOS
5%
49.92
UTILIDAD
5%
49.92
Sub-Total
299.52
1,298.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.1
UNIDAD:
GL
DEMOLICIN DE EDIFICACIONES
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.00
EQUIPO DE OXICORTE
30,000
1.00
30,000.00
120,000
1.00
120,000.00
70,000.00
2,263.94
Sub-Total
222,263.94
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
0.2
5.0
0.8
Tarifa
Valor-Unit.
1,000
750.00
Sub-Total
750.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
8.00
14,291.25
$ 36,100
185%
66,785
8.00
8,348.13
Sub-Total
Total Costo Directo
22,639.38
245,653.31
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
49,130.66
IMPREVISTOS
5%
12,282.67
UTILIDAD
5%
12,282.67
Sub-Total
73,695.99
319,349.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.2
UNIDAD:
GL
DEMOLICIN DE ESTRUCTURAS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.50
EQUIPO DE OXICORTE
30,000
15.00
2,000.00
120,000
10.00
12,000.00
46,666.67
1,008.40
Sub-Total
61,675.07
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
12.00
9,527.50
$ 36,100
185%
66,785
120.00
556.54
Sub-Total
Total Costo Directo
10,084.04
77,759.11
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
15,551.82
IMPREVISTOS
5%
3,887.96
UTILIDAD
5%
3,887.96
Sub-Total
23,327.73
101,087.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.1P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.50
EQUIPO DE OXICORTE
30,000
15.00
2,000.00
120,000
10.00
12,000.00
46,666.67
Sub-Total
60,666.67
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
12.00
9,527.50
$ 36,100
185%
66,785
120.00
556.54
Sub-Total
Total Costo Directo
10,084.04
76,750.71
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
15,350.14
IMPREVISTOS
5%
3,837.54
UTILIDAD
5%
3,837.54
Sub-Total
23,025.21
99,776.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.00
EQUIPO DE OXICORTE
30,000
10.00
3,000.00
120,000
10.00
12,000.00
70,000.00
1,512.61
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
Jornal
(3)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
8.00
14,291.25
$ 36,100
185%
66,785
80.00
834.81
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
21,527.73
IMPREVISTOS
5%
5,381.93
UTILIDAD
5%
5,381.93
Sub-Total
INDICE
201.2P
M3
86,512.61
0.00
6,000.00
15,126.06
107,638.67
32,291.60
139,930.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
DEMOLICION DE PAVIMENTOS RIGIDOS, PISOS, ANDENES Y BORDILLOS DE CO
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
5.00
14,000.00
120,000
5.00
24,000.00
452.79
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
40.00
2,858.25
$ 36,100
185%
66,785
40.00
1,669.63
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
Porcentaje
Valor Total
20%
9,796.13
5%
2,449.03
UTILIDAD
5%
2,449.03
Sub-Total
INDICE
201.3
GL
38,452.79
0.00
6,000.00
4,527.88
48,980.66
14,694.20
63,675.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.4
UNIDAD:
GL
DEMOLICION DE OBSTACULOS.
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
70,000
2.00
Valor-Unit.
35,000.00
1,370.16
Sub-Total
36,370.16
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
16.00
9,527.50
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
13,701.56
56,071.72
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
11,214.34
IMPREVISTOS
5%
2,803.59
UTILIDAD
5%
2,803.59
Sub-Total
16,821.52
72,893.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.5
UNIDAD:
DEMOLICIN DE EDIFICACIONES.
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
0.05
EQUIPO DE OXICORTE
30,000
0.05
600,000.00
120,000
0.05
2,400,000.00
1,400,000.00
45,278.75
Sub-Total
4,445,278.75
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
0.40
285,825.00
$ 36,100
185%
66,785
0.40
166,962.50
Sub-Total
Total Costo Directo
452,787.50
4,904,066.25
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
980,813.25
IMPREVISTOS
5%
245,203.31
UTILIDAD
5%
245,203.31
Sub-Total
1,471,219.88
6,375,286.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.6
UNIDAD:
DEMOLICION DE ESTRUCTURAS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.00
EQUIPO DE OXICORTE
30,000
2.00
15,000.00
120,000
1.00
120,000.00
70,000.00
1,846.53
Sub-Total
206,846.53
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
8.00
14,291.25
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
18,465.31
231,311.84
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
46,262.37
IMPREVISTOS
5%
11,565.59
UTILIDAD
5%
11,565.59
Sub-Total
69,393.55
300,705.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.7
UNIDAD:
M3
DEMOLICION DE ESTRUCTURAS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.50
46,666.67
EQUIPO DE OXICORTE
30,000
1.50
20,000.00
120,000
12.00
10,000.00
1,509.29
Sub-Total
78,175.96
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.3
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
12.00
9,527.50
$ 36,100
185%
66,785
12.00
5,565.42
Sub-Total
Total Costo Directo
15,092.92
99,768.88
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
19,953.78
IMPREVISTOS
5%
4,988.44
UTILIDAD
5%
4,988.44
Sub-Total
29,930.66
129,700.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
20.00
3,500.00
120,000
20.00
6,000.00
113.20
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
0.1
5.0
0.5
Tarifa
Valor-Unit.
1,000
520.00
Sub-Total
Jornal
(3)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 61,800
185%
114,330
160.00
714.56
$ 36,100
185%
66,785
160.00
417.41
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
Porcentaje
Valor Total
20%
2,253.03
5%
563.26
UTILIDAD
5%
563.26
Sub-Total
INDICE
201.8
M2
9,613.20
0.00
520.00
1,131.97
11,265.17
3,379.55
14,645.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
45.00
1,555.56
120,000
150.00
800.00
31.76
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
0.1
5.0
0.5
Tarifa
Valor-Unit.
1,000
520.00
Sub-Total
Jornal
(3)
$ 61,800
Prestaciones
185%
Jornal Total
Rendimiento
114,330
360.00
Valor-Unit.
317.58
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
Porcentaje
Valor Total
20%
644.98
5%
161.24
UTILIDAD
5%
161.24
Sub-Total
INDICE
201.9
M2
2,387.31
0.00
520.00
317.58
3,224.90
967.47
4,192.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
70,000
50.00
Valor-Unit.
1,400.00
152.44
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
0.1
5.0
0.3
Tarifa
Valor-Unit.
1,000
250.00
Sub-Total
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
50.00
Valor-Unit.
1,524.40
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
Porcentaje
Valor Total
20%
665.37
5%
166.34
UTILIDAD
5%
166.34
Sub-Total
INDICE
201.10
M
1,552.44
0.00
250.00
1,524.40
3,326.84
998.05
4,325.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.11
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
GRUA TELESCPICA
EQUIPO DE OXICORTE
Tarifa/Hora
Rendimiento
Valor-Unit.
185,000
1,000.00
185.00
30,000
1,000.00
30.00
4.76
Sub-Total
219.76
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE ESTRUCTURA
Vol-peso Cant.
Distancia
1.0
1.0
M3-Km
Tarifa
1.0
Valor-Unit.
1,000
1,000.00
Sub-Total
1,000.00
Jornal
(10)
$ 206,000
Prestaciones
185%
Jornal Total
Rendimiento
381,100
8,000.00
Valor-Unit.
47.64
Sub-Total
Total Costo Directo
47.64
1,267.40
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
253.48
IMPREVISTOS
5%
63.37
UTILIDAD
5%
63.37
Sub-Total
380.22
1,648.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.12
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
85,000
1.00
Valor-Unit.
85,000.00
1,905.50
Sub-Total
86,905.50
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
TIERRA ABONADA
M3
73,500
2.00
147,000.00
M2
950
4.00
3,800.00
2,000
1.00
2,000.00
SEAL TEMPORAL
Sub-Total
152,800.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(4)
$ 82,400
Prestaciones
185%
Jornal Total
Rendimiento
152,440
8.00
Valor-Unit.
19,055.00
Sub-Total
Total Costo Directo
19,055.00
258,760.50
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
51,752.10
IMPREVISTOS
5%
12,938.03
UTILIDAD
5%
12,938.03
Sub-Total
77,628.15
336,389.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.13
UNIDAD:
REMOCION DE OBSTACULOS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
70,000
2.00
Valor-Unit.
35,000.00
1,370.16
Sub-Total
36,370.16
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE DEMOLICION
Vol-peso Cant.
Distancia
M3-Km
1.2
5.0
6.0
Tarifa
Valor-Unit.
1,000
6,000.00
Sub-Total
6,000.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
16.00
9,527.50
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
13,701.56
56,071.72
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
11,214.34
IMPREVISTOS
5%
2,803.59
UTILIDAD
5%
2,803.59
Sub-Total
16,821.52
72,893.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.15
UNIDAD:
REMOCION DE ALCANTARILLAS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
85,000
4.00
Valor-Unit.
21,250.00
446.89
Sub-Total
21,696.89
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE REMOCION
Vol-peso Cant.
Distancia
1.8
5.0
M3-Km
Tarifa
8.8
Valor-Unit.
1,000
8,835.73
Sub-Total
8,835.73
Jornal
(2)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 41,200
185%
76,220
32.00
2,381.88
$ 36,100
185%
66,785
32.00
2,087.03
Sub-Total
Total Costo Directo
4,468.91
35,001.53
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
7,000.31
IMPREVISTOS
5%
1,750.08
UTILIDAD
5%
1,750.08
Sub-Total
10,500.46
45,502.00
INDICE
CORDOBA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.16
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
190.55
Sub-Total
190.55
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
GRAPAS
KG
4,400
0.03
146.67
ML
500
1.00
500.00
Sub-Total
646.67
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(4)
$ 82,400
Prestaciones
185%
Jornal Total
Rendimiento
152,440
80.00
Valor-Unit.
1,905.50
Sub-Total
Total Costo Directo
1,905.50
2,742.72
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
548.54
IMPREVISTOS
5%
137.14
UTILIDAD
5%
137.14
Sub-Total
822.82
3,566.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
201.21
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
158.79
VOLQUETA 7 M3
50,000
6.00
8,333.33
Sub-Total
8,492.13
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
48.00
Valor-Unit.
1,587.92
Sub-Total
Total Costo Directo
1,587.92
10,080.04
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,016.01
IMPREVISTOS
5%
504.00
UTILIDAD
5%
504.00
Sub-Total
3,024.01
13,104.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.1.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
130,000
25.00
Valor-Unit.
5,200.00
5.72
Sub-Total
5,205.72
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(1)
$ 20,600
185%
38,110
200.00
190.55
PALETEROS
(2)
$ 41,200
185%
76,220
200.00
381.10
Sub-Total
Total Costo Directo
571.65
5,777.37
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,155.47
IMPREVISTOS
5%
288.87
UTILIDAD
5%
288.87
Sub-Total
1,733.21
7,511.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.1.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
130,000
30.00
Valor-Unit.
4,333.33
1.59
Sub-Total
4,334.92
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(1)
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
240.00
Valor-Unit.
158.79
Sub-Total
Total Costo Directo
158.79
4,493.71
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
898.74
IMPREVISTOS
5%
224.69
UTILIDAD
5%
224.69
Sub-Total
1,348.11
5,842.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.2.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
130,000
15.00
8,666.67
70,000
15.00
4,666.67
120,000
15.00
8,000.00
45.45
Sub-Total
21,378.78
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CORDN DETONANTE
ML
5,000
2.00
10,000.00
LB
25,300
0.40
10,120.00
FULMINANTES
1,100
0.50
550.00
MECHA LENTA
ML
3,900
0.50
1,950.00
15,000.00
Sub-Total
37,620.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
120.00
PALETEROS
(2)
$ 41,200
185%
76,220
120.00
635.17
$ 65,000
185%
120,250
120.00
1,002.08
EXPERTO EN EXPLOSIVOS
635.17
Sub-Total
Total Costo Directo
61,271.20
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
2,272.42
Valor Total
20%
12,254.24
IMPREVISTOS
5%
3,063.56
UTILIDAD
5%
3,063.56
Sub-Total
Precio unitario total aproximado al peso
18,381.36
79,653.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.2.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
130,000
40.00
Valor-Unit.
3,250.00
3.57
Sub-Total
3,253.57
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(1)
$ 20,600
185%
38,110
320.00
119.09
PALETEROS
(2)
$ 41,200
185%
76,220
320.00
238.19
Sub-Total
Total Costo Directo
357.28
3,610.85
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
722.17
IMPREVISTOS
5%
180.54
UTILIDAD
5%
180.54
Sub-Total
1,083.26
4,694.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.2.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
130,000
20.00
6,500.00
70,000
20.00
3,500.00
120,000
20.00
6,000.00
24.56
Sub-Total
16,024.56
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CORDN DETONANTE
ML
5,000
2.00
10,000.00
LB
25,300
0.40
10,120.00
FULMINANTES
1,100
0.50
550.00
MECHA LENTA
ML
3,900
0.50
1,950.00
15,000.00
Sub-Total
37,620.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
EXPERTO EN EXPLOSIVOS
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 41,200
185%
76,220
160.00
476.38
$ 65,000
185%
120,250
160.00
751.56
Sub-Total
Total Costo Directo
54,872.50
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
1,227.94
Valor Total
20%
10,974.50
IMPREVISTOS
5%
2,743.62
UTILIDAD
5%
2,743.62
Sub-Total
Precio unitario total aproximado al peso
16,461.75
71,334.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
210.2.4
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
130,000
50.00
Valor-Unit.
2,600.00
0.95
Sub-Total
2,600.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(1)
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
400.00
Valor-Unit.
95.28
Sub-Total
Total Costo Directo
95.28
2,696.23
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
539.25
IMPREVISTOS
5%
134.81
UTILIDAD
5%
134.81
Sub-Total
808.87
3,505.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
211.1
UNIDAD:
M3
REMOCION DE DERRUMBES
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
35.00
3,142.86
50,000
35.00
1,428.57
5.44
Sub-Total
4,576.87
Unidad
GLB
SEAL PREVENTIVA
Precio-Unit.
Cantidad
250,000
Valor-Unit.
0.001
250.00
Sub-Total
250.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
280.00
272.21
PALETEROS
(2)
$ 41,200
185%
76,220
280.00
272.21
Sub-Total
Total Costo Directo
544.43
5,371.30
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,074.26
IMPREVISTOS
5%
268.57
UTILIDAD
5%
268.57
Sub-Total
1,611.39
6,983.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
220.1
UNIDAD:
M3
TERRAPLEN
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
40.00
1,125.00
110,000
40.00
2,750.00
90,000
40.00
2,250.00
Sub-Total
6,125.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
320.00
Valor-Unit.
238.19
Sub-Total
Total Costo Directo
238.19
6,363.19
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,272.64
IMPREVISTOS
5%
318.16
UTILIDAD
5%
318.16
Sub-Total
1,908.96
8,272.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
221.1
UNIDAD:
M3
PEDRAPLEN COMPACTO
I. EQUIPO
Descripcin
Tipo
BULDOZER D6
Tarifa/Hora
Rendimiento
110,000
18.00
Valor-Unit.
6,111.11
Sub-Total
6,111.11
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
144.00
Valor-Unit.
529.31
Sub-Total
Total Costo Directo
529.31
6,640.42
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,328.08
IMPREVISTOS
5%
332.02
UTILIDAD
5%
332.02
Sub-Total
1,992.13
8,633.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
221.2
UNIDAD:
M3
PEDRAPLEN SUELTO
I. EQUIPO
Descripcin
Tipo
BULDOZER D6
Tarifa/Hora
Rendimiento
110,000
25.00
Valor-Unit.
4,400.00
Sub-Total
4,400.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
200.00
Valor-Unit.
381.10
Sub-Total
Total Costo Directo
381.10
4,781.10
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
956.22
IMPREVISTOS
5%
239.06
UTILIDAD
5%
239.06
Sub-Total
1,434.33
6,215.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
225P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
BULDOZER D6
Tarifa/Hora
Rendimiento
110,000
60.00
Valor-Unit.
1,833.33
Sub-Total
1,833.33
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
480.00
Valor-Unit.
79.40
Sub-Total
Total Costo Directo
79.40
1,912.73
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
382.55
IMPREVISTOS
5%
95.64
UTILIDAD
5%
95.64
Sub-Total
573.82
2,487.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
230.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
456.00
263.16
VIBROCOMPACTADOR 10 TON
90,000
456.00
197.37
45,000
456.00
98.68
Sub-Total
559.21
Unidad
Precio-Unit.
LT
AGUA
Cantidad
25
Valor-Unit.
8.00
200.00
SEAL TEMPORAL
Sub-Total
200.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
3,648.00
Valor-Unit.
20.89
Sub-Total
Total Costo Directo
20.89
780.10
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
156.02
IMPREVISTOS
5%
39.01
UTILIDAD
5%
39.01
Sub-Total
234.03
1,014.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
230.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
80.00
1,500.00
VIBROCOMPACTADOR 10 TON
90,000
80.00
1,125.00
45,000
80.00
562.50
Sub-Total
3,187.50
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
640.00
Valor-Unit.
119.09
Sub-Total
Total Costo Directo
119.09
3,306.59
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
661.32
IMPREVISTOS
5%
165.33
UTILIDAD
5%
165.33
Sub-Total
991.98
4,299.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
231.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
5.72
Sub-Total
5.72
Unidad
M2
Precio-Unit.
Cantidad
5,500
Valor-Unit.
1.10
6,050.00
SEAL PREVENTIVA
Sub-Total
6,050.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 41,200
185%
76,220
1,000.00
76.22
$ 20,600
185%
38,110
1,000.00
38.11
Sub-Total
Total Costo Directo
114.33
6,170.05
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,234.01
IMPREVISTOS
5%
308.50
UTILIDAD
5%
308.50
Sub-Total
1,851.01
8,021.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
232.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
5.72
Sub-Total
5.72
Unidad
M2
Precio-Unit.
Cantidad
5,500
Valor-Unit.
1.10
6,050.00
SEAL PREVENTIVA
Sub-Total
6,050.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 41,200
185%
76,220
1,000.00
76.22
$ 20,600
185%
38,110
1,000.00
38.11
Sub-Total
Total Costo Directo
114.33
6,170.05
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,234.01
IMPREVISTOS
5%
308.50
UTILIDAD
5%
308.50
Sub-Total
1,851.01
8,021.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
310.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
600.00
200.00
VIBROCOMPACTADOR 10 TON
90,000
600.00
150.00
45,000
600.00
75.00
Sub-Total
425.00
Unidad
AGUA
Precio-Unit.
LT
Cantidad
25
Valor-Unit.
2.00
50.00
Sub-Total
50.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
4,800.00
Valor-Unit.
15.88
Sub-Total
Total Costo Directo
15.88
490.88
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
98.18
IMPREVISTOS
5%
24.54
UTILIDAD
5%
24.54
Sub-Total
147.26
638.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
311.1
UNIDAD:
M3
AFIRMADO
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
50.00
900.00
VIBROCOMPACTADOR 10 TON
90,000
50.00
1,800.00
120,000
50.00
2,400.00
MOTONIVELADORA
Sub-Total
5,100.00
Unidad
MATERIAL DE AFIRMADO
Precio-Unit.
M3
Cantidad
21,000
Valor-Unit.
1.25
26,250.00
SEAL PREVENTIVA
Sub-Total
26,250.00
III. TRANSPORTES
Material
MATERIAL DE AFIRMADO
1.3
Distancia
M3-Km
15.0
18.8
Tarifa
Valor-Unit.
1,000
18,750.00
Sub-Total
18,750.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
400.00
Valor-Unit.
190.55
Sub-Total
Total Costo Directo
190.55
50,290.55
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
10,058.11
IMPREVISTOS
5%
2,514.53
UTILIDAD
5%
2,514.53
Sub-Total
15,087.17
65,378.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
25.00
1,800.00
VIBROCOMPACTADOR 10 TON
90,000
25.00
3,600.00
120,000
25.00
4,800.00
MOTONIVELADORA
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
MATERIAL DE AFIRMADO
M3
21,000
1.30
27,300.00
CEMENTO GRIS
KG
600
72.00
43,200.00
SEAL PREVENTIVA
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE AFIRMADO
1.3
Distancia
M3-Km
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
Jornal
(8)
$ 164,800
Prestaciones
185%
Jornal Total
Rendimiento
304,880
200.00
Valor-Unit.
1,524.40
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
19,044.88
IMPREVISTOS
5%
4,761.22
UTILIDAD
5%
4,761.22
Sub-Total
INDICE
311.1P
M3
10,200
70,500.00
13,000.00
1,524.40
95,224.40
28,567.32
123,792.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
25.00
1,800.00
VIBROCOMPACTADOR 10 TON
280,000
25.00
11,200.00
MOTONIVELADORA
120,000
25.00
4,800.00
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
MATERIAL DE AFIRMADO
M3
21,000
1.30
27,300.00
CAL
KG
600
108.00
64,800.00
SEAL PREVENTIVA
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE AFIRMADO DE LA
1.3
Distancia
M3-Km
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
Jornal
(8)
$ 164,800
Prestaciones
185%
Jornal Total
Rendimiento
304,880
200.00
Valor-Unit.
1,524.40
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
24,884.88
IMPREVISTOS
5%
6,221.22
UTILIDAD
5%
6,221.22
Sub-Total
INDICE
311.2P
M3
17,800
92,100.00
13,000.00
1,524.40
124,424.40
37,327.32
161,752.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
10,000
1.50
Valor-Unit.
6,666.67
635.17
Sub-Total
Unidad
MATERIAL DE AFIRMADO
Precio-Unit.
M3
Cantidad
21,000
1.25
Valor-Unit.
26,250.00
SEAL PREVENTIVA
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE AFIRMADO
1.3
Distancia
M3-Km
15.0
18.8
Tarifa
Valor-Unit.
1,000
18,750.00
Sub-Total
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
12.00
Valor-Unit.
6,351.67
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
11,730.70
IMPREVISTOS
5%
2,932.68
UTILIDAD
5%
2,932.68
Sub-Total
INDICE
311.3P
M3
7,301.83
26,250.00
18,750.00
6,351.67
58,653.50
17,596.05
76,250.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
320.1
UNIDAD:
M3
SUBBASE GRANULAR
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
35.00
1,285.71
VIBROCOMPACTADOR 10 TON
90,000
35.00
2,571.43
120,000
35.00
3,428.57
MOTONIVELADORA
Sub-Total
7,285.71
Unidad
Precio-Unit.
M3
Cantidad
35,000
Valor-Unit.
1.25
43,750.00
SEAL TEMPORAL
Sub-Total
43,750.00
III. TRANSPORTES
Material
MATERIAL DE SUBBASE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
280.00
Valor-Unit.
272.21
Sub-Total
Total Costo Directo
272.21
95,057.93
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
19,011.59
IMPREVISTOS
5%
4,752.90
UTILIDAD
5%
4,752.90
Sub-Total
28,517.38
123,575.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
320.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR 1 - 3 TONELADAS
Rendimiento
60,000
2.50
Valor-Unit.
24,000.00
571.65
Sub-Total
24,571.65
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
30,000
1.25
37,500.00
AGUA
LT
25
30.00
750.00
SEAL TEMPORAL
Sub-Total
38,250.00
III. TRANSPORTES
Material
MATERIAL DE SUBBASE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
20.00
7,622.00
PALETEROS
(2)
$ 41,200
185%
76,220
20.00
3,811.00
Sub-Total
Total Costo Directo
11,433.00
118,004.65
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
23,600.93
IMPREVISTOS
5%
5,900.23
UTILIDAD
5%
5,900.23
Sub-Total
35,401.40
153,406.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
330.1
UNIDAD:
M3
BASE GRANULAR
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
30.00
1,500.00
VIBROCOMPACTADOR 10 TON
280,000
30.00
9,333.33
MOTONIVELADORA
120,000
30.00
4,000.00
Sub-Total
14,833.33
Unidad
MATERIAL DE BASE
Precio-Unit.
M3
Cantidad
40,000
Valor-Unit.
1.25
50,000.00
SEAL TEMPORAL
Sub-Total
50,000.00
III. TRANSPORTES
Material
MATERIAL DE BASE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
240.00
Valor-Unit.
317.58
Sub-Total
Total Costo Directo
317.58
108,900.92
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
21,780.18
IMPREVISTOS
5%
5,445.05
UTILIDAD
5%
5,445.05
Sub-Total
32,670.28
141,571.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
330.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR 1 - 3 TONELADAS
Rendimiento
60,000
2.50
Valor-Unit.
24,000.00
571.65
Sub-Total
24,571.65
Unidad
MATERIAL DE BASE
Precio-Unit.
M3
Cantidad
40,000
Valor-Unit.
1.25
50,000.00
SEAL TEMPORAL
Sub-Total
50,000.00
III. TRANSPORTES
Material
MATERIAL DE BASE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
20.00
7,622.00
PALETEROS
(2)
$ 41,200
185%
76,220
20.00
3,811.00
Sub-Total
Total Costo Directo
11,433.00
129,754.65
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
25,950.93
IMPREVISTOS
5%
6,487.73
UTILIDAD
5%
6,487.73
Sub-Total
38,926.40
168,681.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
340.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
25.00
4,800.00
VIBROCOMPACTADOR 10 TON
90,000
25.00
3,600.00
80,000
25.00
3,200.00
Sub-Total
11,600.00
Unidad
M3
Precio-Unit.
Cantidad
40,000
Valor-Unit.
1.30
52,000.00
SEAL PREVENTIVA
Sub-Total
52,000.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.3
Distancia
35.0
M3-Km
Tarifa
45.5
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
OFICIAL
OBREROS
(4)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 20,600
185%
38,110
200.00
190.55
$ 82,400
185%
152,440
200.00
762.20
Sub-Total
Total Costo Directo
952.75
110,052.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
22,010.55
IMPREVISTOS
5%
5,502.64
UTILIDAD
5%
5,502.64
Sub-Total
33,015.83
143,069.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
340.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
25.00
4,800.00
VIBROCOMPACTADOR 10 TON
90,000
25.00
3,600.00
80,000
25.00
3,200.00
Sub-Total
11,600.00
Unidad
M3
Precio-Unit.
Cantidad
40,000
Valor-Unit.
1.30
52,000.00
SEAL PREVENTIVA
Sub-Total
52,000.00
III. TRANSPORTES
Material
MATERIAL GRANULAR DE BASE
Vol-peso Cant.
Distancia
1.3
35.0
M3-Km
Tarifa
45.5
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
OFICIAL
OBREROS
(4)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 20,600
185%
38,110
200.00
190.55
$ 82,400
185%
152,440
200.00
762.20
Sub-Total
Total Costo Directo
952.75
110,052.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
22,010.55
IMPREVISTOS
5%
5,502.64
UTILIDAD
5%
5,502.64
Sub-Total
33,015.83
143,069.00
24,974.18
168,043.18
GALON/M3
54.89
Lt/m3
19,210.91
350.00
$/LT
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
340.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
MOTONIVELADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
25.00
4,800.00
VIBROCOMPACTADOR 10 TON
90,000
25.00
3,600.00
80,000
25.00
3,200.00
Sub-Total
11,600.00
Unidad
M3
Precio-Unit.
Cantidad
40,000
Valor-Unit.
1.30
52,000.00
SEAL PREVENTIVA
Sub-Total
52,000.00
III. TRANSPORTES
Material
MATERIAL GRANULAR DE BASE
Vol-peso Cant.
Distancia
1.3
35.0
M3-Km
Tarifa
45.5
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
OFICIAL
OBREROS
(4)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 20,600
185%
38,110
200.00
190.55
$ 82,400
185%
152,440
200.00
762.20
Sub-Total
Total Costo Directo
952.75
110,052.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
22,010.55
IMPREVISTOS
5%
5,502.64
UTILIDAD
5%
5,502.64
Sub-Total
33,015.83
143,069.00
24,113.00
167,182.00
GALON/M3
53.00
Lt/m3
18,548.46
350.00
$/LT
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
341.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
VIBROCOMPACTADOR 10 TON
MOTONIVELADORA
CARROTANQUE DE AGUA 10000 LITROS
RECICLADORA
Tarifa/Hora
Rendimiento
Valor-Unit.
90,000
35.00
2,571.43
120,000
35.00
3,428.57
45,000
35.00
1,285.71
365,000
35.00
10,428.57
34.03
Sub-Total
17,748.31
Unidad
M3
Precio-Unit.
Cantidad
40,000
Valor-Unit.
1.30
52,000.00
Sub-Total
52,000.00
III. TRANSPORTES
Material
MATERIAL DE BASE (GRADACIN
Vol-peso Cant.
Distancia
1.3
35.0
M3-Km
Tarifa
45.5
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
OFICIAL
OBREROS
(4)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 20,600
185%
38,110
280.00
136.11
$ 82,400
185%
152,440
280.00
544.43
Sub-Total
Total Costo Directo
680.54
115,928.85
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
23,185.77
IMPREVISTOS
5%
5,796.44
UTILIDAD
5%
5,796.44
Sub-Total
34,778.65
150,708.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
341.2
UNIDAD:
KG
CEMENTO PORTLAND
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
CEMENTO GRIS
Precio-Unit.
KG
Cantidad
600
Valor-Unit.
1.00
600.00
Sub-Total
600.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
600.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
120.00
IMPREVISTOS
5%
30.00
UTILIDAD
5%
30.00
Sub-Total
180.00
780.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
410.1
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
2,300
Valor-Unit.
1.00
2,300.00
Sub-Total
2,300.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
2,300.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
460.00
IMPREVISTOS
5%
115.00
UTILIDAD
5%
115.00
Sub-Total
690.00
2,990.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
410.2
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
2,300
Valor-Unit.
1.00
2,300.00
Sub-Total
2,300.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
2,300.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
460.00
IMPREVISTOS
5%
115.00
UTILIDAD
5%
115.00
Sub-Total
690.00
2,990.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
411.1
UNIDAD:
LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
EMULSIN CRM-m
LT
Precio-Unit.
Cantidad
2,500
Valor-Unit.
1.05
2,625.00
Sub-Total
2,625.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
2,625.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
525.00
IMPREVISTOS
5%
131.25
UTILIDAD
5%
131.25
Sub-Total
787.50
3,413.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
411.2
UNIDAD:
LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
EMULSIN CRL-1
LT
Precio-Unit.
Cantidad
2,100
Valor-Unit.
1.05
2,205.00
Sub-Total
2,205.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
2,205.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
441.00
IMPREVISTOS
5%
110.25
UTILIDAD
5%
110.25
Sub-Total
661.50
2,867.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
411.3
UNIDAD:
LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
EMULSIN CRL-1h
LT
Precio-Unit.
Cantidad
2,100
Valor-Unit.
1.05
2,205.00
Sub-Total
2,205.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
2,205.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
441.00
IMPREVISTOS
5%
110.25
UTILIDAD
5%
110.25
Sub-Total
661.50
2,867.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
414.1
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
2,700
Valor-Unit.
1.02
2,754.00
Sub-Total
2,754.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
2,754.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
0.00
Valor Total
20%
550.80
IMPREVISTOS
5%
137.70
UTILIDAD
5%
137.70
Sub-Total
Precio unitario total aproximado al peso
826.20
3,580.00
INDICE
ANTIOQUIA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
414.2
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
2,900
Valor-Unit.
1.02
2,958.00
Sub-Total
2,958.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
2,958.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
0.00
Valor Total
20%
591.60
IMPREVISTOS
5%
147.90
UTILIDAD
5%
147.90
Sub-Total
Precio unitario total aproximado al peso
887.40
3,845.00
INDICE
ANTIOQUIA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
414.3
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
3,100
Valor-Unit.
1.02
3,162.00
Sub-Total
3,162.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
3,162.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
0.00
Valor Total
20%
632.40
IMPREVISTOS
5%
158.10
UTILIDAD
5%
158.10
Sub-Total
Precio unitario total aproximado al peso
948.60
4,111.00
INDICE
ANTIOQUIA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
414.4
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
KG
Precio-Unit.
Cantidad
3,100
Valor-Unit.
1.02
3,162.00
Sub-Total
3,162.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
3,162.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
0.00
Valor Total
20%
632.40
IMPREVISTOS
5%
158.10
UTILIDAD
5%
158.10
Sub-Total
Precio unitario total aproximado al peso
948.60
4,111.00
INDICE
ANTIOQUIA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
415.1
UNIDAD:
LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Kg
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
LT
Precio-Unit.
Cantidad
2,800
Valor-Unit.
1.02
2,856.00
Sub-Total
2,856.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
2,856.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
0.00
Valor Total
20%
571.20
IMPREVISTOS
5%
142.80
UTILIDAD
5%
142.80
Sub-Total
Precio unitario total aproximado al peso
856.80
3,713.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
420.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
500.00
160.00
70,000
500.00
140.00
0.76
Sub-Total
300.76
Unidad
EMULSIN CRL-0
LT
Precio-Unit.
Cantidad
2,205
Valor-Unit.
0.85
1,874.25
Sub-Total
1,874.25
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
4,000.00
19.06
PALETEROS
(2)
$ 41,200
185%
76,220
4,000.00
19.06
Sub-Total
Total Costo Directo
38.11
2,213.12
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
442.62
IMPREVISTOS
5%
110.66
UTILIDAD
5%
110.66
Sub-Total
663.94
2,877.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
420.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
500.00
160.00
70,000
500.00
140.00
0.38
Sub-Total
300.38
Unidad
GAL
Precio-Unit.
Cantidad
2,100
Valor-Unit.
0.70
1,470.00
Sub-Total
1,470.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
4,000.00
Valor-Unit.
19.06
Sub-Total
Total Costo Directo
19.06
1,789.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
357.89
IMPREVISTOS
5%
89.47
UTILIDAD
5%
89.47
Sub-Total
536.83
2,326.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
421.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
530.00
150.94
70,000
530.00
132.08
0.72
Sub-Total
283.74
Unidad
EMULSIN CRR-1
LT
Precio-Unit.
Cantidad
2,300
Valor-Unit.
0.30
690.00
SEAL PREVENTIVA
Sub-Total
690.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
4,240.00
17.98
PALETEROS
(2)
$ 41,200
185%
76,220
4,240.00
17.98
Sub-Total
Total Costo Directo
35.95
1,009.69
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
201.94
IMPREVISTOS
5%
50.48
UTILIDAD
5%
50.48
Sub-Total
302.91
1,313.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
421.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
530.00
150.94
70,000
530.00
132.08
0.72
Sub-Total
283.74
Unidad
EMULSIN CRR-2
LT
Precio-Unit.
Cantidad
2,300
Valor-Unit.
0.30
690.00
SEAL PREVENTIVA
Sub-Total
690.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
4,240.00
17.98
PALETEROS
(2)
$ 41,200
185%
76,220
4,240.00
17.98
Sub-Total
Total Costo Directo
35.95
1,009.69
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
201.94
IMPREVISTOS
5%
50.48
UTILIDAD
5%
50.48
Sub-Total
302.91
1,313.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
421.3
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
275.00
290.91
70,000
275.00
254.55
1.39
Sub-Total
546.84
Unidad
EMULSIN CRR-1m
LT
Precio-Unit.
Cantidad
2,300
Valor-Unit.
0.30
690.00
SEAL PREVENTIVA
Sub-Total
690.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
2,200.00
34.65
PALETEROS
(2)
$ 41,200
185%
76,220
2,200.00
34.65
Sub-Total
Total Costo Directo
69.29
1,306.13
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
261.23
IMPREVISTOS
5%
65.31
UTILIDAD
5%
65.31
Sub-Total
391.84
1,698.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
421.4
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
275.00
290.91
70,000
275.00
254.55
1.39
Sub-Total
546.84
Unidad
EMULSIN CRR-2m
LT
Precio-Unit.
Cantidad
2,600
Valor-Unit.
0.30
780.00
SEAL PREVENTIVA
Sub-Total
780.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
2,200.00
34.65
PALETEROS
(2)
$ 41,200
185%
76,220
2,200.00
34.65
Sub-Total
Total Costo Directo
69.29
1,396.13
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
279.23
IMPREVISTOS
5%
69.81
UTILIDAD
5%
69.81
Sub-Total
418.84
1,815.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
430.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
400.00
200.00
90,000
400.00
225.00
COMPACTADOR NEUMATICO
90,000
400.00
225.00
70,000
400.00
175.00
Sub-Total
825.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.02
1,000.00
EMULSIN CRR-2
LT
2,300
1.70
3,910.00
SEAL PREVENTIVA
Sub-Total
4,910.00
III. TRANSPORTES
Material
AGREGADO PETREO
Vol-peso Cant.
Distancia
M3-Km
0.0
35.0
0.7
Tarifa
Valor-Unit.
1,000
700.00
Sub-Total
700.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
3,200.00
47.64
$ 20,600
185%
38,110
3,200.00
11.91
Sub-Total
Total Costo Directo
59.55
6,494.55
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,298.91
IMPREVISTOS
5%
324.73
UTILIDAD
5%
324.73
Sub-Total
1,948.36
8,443.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
430.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
400.00
200.00
90,000
400.00
225.00
COMPACTADOR NEUMATICO
90,000
400.00
225.00
70,000
400.00
175.00
Sub-Total
825.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.02
1,000.00
EMULSIN CRR-2m
LT
2,600
3.04
7,904.00
SEAL PREVENTIVA
Sub-Total
8,904.00
III. TRANSPORTES
Material
AGREGADO PETREO
Vol-peso Cant.
Distancia
M3-Km
0.0
35.0
0.7
Tarifa
Valor-Unit.
1,000
700.00
Sub-Total
700.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
3,200.00
47.64
$ 20,600
185%
38,110
3,200.00
11.91
Sub-Total
Total Costo Directo
59.55
10,488.55
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,097.71
IMPREVISTOS
5%
524.43
UTILIDAD
5%
524.43
Sub-Total
3,146.56
13,635.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
431.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
200.00
400.00
90,000
200.00
450.00
COMPACTADOR NEUMATICO
90,000
200.00
450.00
70,000
800.00
87.50
Sub-Total
1,387.50
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.02
M3
50,000
0.01
1,000.00
500.00
EMULSIN CRR-2
LT
2,300
5.32
12,236.00
SEAL PREVENTIVA
Sub-Total
13,736.00
III. TRANSPORTES
Material
AGREGADO PETREO
Vol-peso Cant.
Distancia
M3-Km
0.0
35.0
1.1
Tarifa
Valor-Unit.
1,000
1,050.00
Sub-Total
1,050.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
1,600.00
95.28
$ 20,600
185%
38,110
1,600.00
23.82
Sub-Total
Total Costo Directo
119.09
16,292.59
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
3,258.52
IMPREVISTOS
5%
814.63
UTILIDAD
5%
814.63
Sub-Total
4,887.78
21,180.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
431.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
139.00
575.54
90,000
139.00
647.48
COMPACTADOR NEUMATICO
90,000
139.00
647.48
70,000
139.00
503.60
Sub-Total
2,374.10
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.02
M3
50,000
0.01
1,000.00
500.00
EMULSIN CRR-2m
LT
2,600
5.32
13,832.00
SEAL PREVENTIVA
Sub-Total
15,332.00
III. TRANSPORTES
Material
AGREGADO PETREO
Vol-peso Cant.
Distancia
M3-Km
0.0
35.0
1.1
Tarifa
Valor-Unit.
1,000
1,050.00
Sub-Total
1,050.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
1,112.00
137.09
$ 20,600
185%
38,110
1,112.00
34.27
Sub-Total
Total Costo Directo
171.36
18,927.46
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
3,785.49
IMPREVISTOS
5%
946.37
UTILIDAD
5%
946.37
Sub-Total
5,678.24
24,606.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
432.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
COMPACTADOR NEUMATICO
90,000
418.00
215.31
80,000
418.00
191.39
90,000
418.00
215.31
Sub-Total
622.01
Unidad
ARENA LAVADA
M3
Precio-Unit.
40,000
Cantidad
0.01
Valor-Unit.
280.00
EMULSIN CRR-2
LT
2,300
1.20
2,760.00
SEAL PREVENTIVA
Sub-Total
3,040.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
ARENA LAVADA
0.0
35.0
0.2
Tarifa
Valor-Unit.
1,000
245.00
Sub-Total
245.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
3,344.00
45.59
$ 20,600
185%
38,110
3,344.00
11.40
Sub-Total
Total Costo Directo
56.98
3,963.99
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
792.80
IMPREVISTOS
5%
198.20
UTILIDAD
5%
198.20
Sub-Total
1,189.20
5,153.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
432.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
COMPACTADOR NEUMATICO
90,000
250.00
360.00
80,000
250.00
320.00
90,000
250.00
360.00
Sub-Total
1,040.00
Unidad
ARENA LAVADA
M3
Precio-Unit.
40,000
Cantidad
0.01
Valor-Unit.
280.00
EMULSIN CRR-2m
LT
2,600
1.20
3,120.00
SEAL PREVENTIVA
Sub-Total
3,400.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
ARENA LAVADA
0.0
35.0
0.2
Tarifa
Valor-Unit.
1,000
245.00
Sub-Total
245.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
2,000.00
76.22
$ 20,600
185%
38,110
2,000.00
19.06
Sub-Total
Total Costo Directo
95.28
4,780.28
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
956.06
IMPREVISTOS
5%
239.01
UTILIDAD
5%
239.01
Sub-Total
1,434.08
6,214.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
42,000
0.01
462.00
EMULSIN CRL-1h
LT
2,100
1.18
2,478.00
SEAL PREVENTIVA
Sub-Total
2,940.00
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
3,489.01
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
697.80
IMPREVISTOS
5%
174.45
UTILIDAD
5%
174.45
Sub-Total
1,046.70
4,536.00
INDICE
411.3
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
44,000
0.01
484.00
EMULSIN CRL-1h
LT
2,100
1.98
4,158.00
SEAL PREVENTIVA
Sub-Total
4,642.00
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
5,191.01
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,038.20
IMPREVISTOS
5%
259.55
UTILIDAD
5%
259.55
Sub-Total
1,557.30
6,748.00
INDICE
411.3
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.3
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
46,200
0.01
508.20
EMULSIN CRL-1h
LT
2,100
2.57
5,405.40
SEAL PREVENTIVA
Sub-Total
5,913.60
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
6,462.61
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,292.52
IMPREVISTOS
5%
323.13
UTILIDAD
5%
323.13
Sub-Total
1,938.78
8,401.00
INDICE
411.3
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.4
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
48,400
0.01
532.40
EMULSIN CRL-1h
LT
2,100
2.97
6,237.00
SEAL PREVENTIVA
Sub-Total
6,769.40
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
7,318.41
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,463.68
IMPREVISTOS
5%
365.92
UTILIDAD
5%
365.92
Sub-Total
2,195.52
9,514.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.8
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
42,000
0.01
462.00
EMULSIN CRL-1hm
LT
2,300
1.18
2,714.00
SEAL PREVENTIVA
Sub-Total
3,176.00
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
3,725.01
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
745.00
IMPREVISTOS
5%
186.25
UTILIDAD
5%
186.25
Sub-Total
1,117.50
4,843.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.6
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
42,000
0.01
462.00
EMULSIN CRL-1hm
LT
2,300
1.98
4,554.00
SEAL PREVENTIVA
Sub-Total
5,016.00
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
5,565.01
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,113.00
IMPREVISTOS
5%
278.25
UTILIDAD
5%
278.25
Sub-Total
1,669.50
7,235.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.8
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
42,000
0.01
462.00
EMULSIN CRL-1hm
LT
2,300
2.57
5,920.20
SEAL PREVENTIVA
Sub-Total
6,382.20
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
6,931.21
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,386.24
IMPREVISTOS
5%
346.56
UTILIDAD
5%
346.56
Sub-Total
2,079.36
9,011.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
433.8
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIN DE SLURRY
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
1,250.00
88.00
70,000
1,250.00
56.00
0.95
Sub-Total
144.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
48,400
0.01
532.40
EMULSIN CRL-1hm
LT
2,300
2.57
5,920.20
SEAL PREVENTIVA
Sub-Total
6,452.60
III. TRANSPORTES
Material
Vol-peso Cant.
0.0
Distancia
M3-Km
35.0
0.4
Tarifa
Valor-Unit.
1,000
385.00
Sub-Total
385.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
10,000.00
15.24
$ 20,600
185%
38,110
10,000.00
3.81
Sub-Total
Total Costo Directo
19.06
7,001.61
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,400.32
IMPREVISTOS
5%
350.08
UTILIDAD
5%
350.08
Sub-Total
2,100.48
9,102.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
440.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
80,000
35.00
2,285.71
120,000
5.00
24,000.00
VOLQUETA 7 M3
50,000
10.00
5,000.00
VIBROCOMPACTADOR 10 TON
90,000
10.00
9,000.00
COMPACTADOR NEUMATICO
90,000
10.00
9,000.00
11,000.00
52.40
Sub-Total
60,338.12
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
1.25
62,500.00
AGUA
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
63,125.00
III. TRANSPORTES
Material
AGREGADO PETREO PARA MEZCLA
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(3)
$ 61,800
185%
114,330
80.00
1,429.13
OBREROS
(8)
$ 164,800
185%
304,880
80.00
3,811.00
Sub-Total
Total Costo Directo
5,240.13
172,453.24
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
34,490.65
IMPREVISTOS
5%
8,622.66
UTILIDAD
5%
8,622.66
Sub-Total
51,735.97
224,189.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
440.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
80,000
35.00
2,285.71
120,000
5.00
24,000.00
VOLQUETA 7 M3
50,000
10.00
5,000.00
VIBROCOMPACTADOR 10 TON
90,000
10.00
9,000.00
COMPACTADOR NEUMATICO
90,000
10.00
9,000.00
11,000.00
52.40
Sub-Total
60,338.12
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
1.25
62,500.00
AGUA
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
63,125.00
III. TRANSPORTES
Material
AGREGADO PETREO PARA MEZCLA
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(3)
$ 61,800
185%
114,330
80.00
1,429.13
OBREROS
(8)
$ 164,800
185%
304,880
80.00
3,811.00
Sub-Total
Total Costo Directo
5,240.13
172,453.24
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
34,490.65
IMPREVISTOS
5%
8,622.66
UTILIDAD
5%
8,622.66
Sub-Total
51,735.97
224,189.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
440.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
80,000
35.00
2,285.71
120,000
5.00
24,000.00
VOLQUETA 7 M3
50,000
10.00
5,000.00
VIBROCOMPACTADOR 10 TON
90,000
10.00
9,000.00
COMPACTADOR NEUMATICO
90,000
10.00
9,000.00
11,000.00
52.40
Sub-Total
60,338.12
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
1.25
62,500.00
AGUA
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
63,125.00
III. TRANSPORTES
Material
AGREGADO PETREO PARA MEZCLA
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(3)
$ 61,800
185%
114,330
80.00
1,429.13
OBREROS
(8)
$ 164,800
185%
304,880
80.00
3,811.00
Sub-Total
Total Costo Directo
5,240.13
172,453.24
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
34,490.65
IMPREVISTOS
5%
8,622.66
UTILIDAD
5%
8,622.66
Sub-Total
51,735.97
224,189.00
936,000.00
1,160,189.00
INDICE
180
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
440.4
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
80,000
10.00
8,000.00
120,000
10.00
12,000.00
VOLQUETA 7 M3
50,000
10.00
5,000.00
COMPACTADOR 1 - 3 TONELADAS
60,000
10.00
6,000.00
11,000.00
164.40
Sub-Total
42,164.40
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
1.25
62,500.00
M2
1,010
13.00
13,125.98
AGUA
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
76,250.98
III. TRANSPORTES
Material
AGREGADO PETREO PARA MEZCLA
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,000
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
30.00
1,270.33
OBREROS
(8)
$ 164,800
185%
304,880
30.00
10,162.67
PALETEROS
(2)
$ 41,200
185%
76,220
30.00
2,540.67
RASTRILLEROS (1)
$ 40,000
185%
74,000
30.00
2,466.67
Sub-Total
Total Costo Directo
16,440.33
178,605.72
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
35,721.14
IMPREVISTOS
5%
8,930.29
UTILIDAD
5%
8,930.29
Sub-Total
53,581.71
232,187.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
RETROEXCAVADORA A25C
160,000
35.00
4,571.43
280,000
10.00
28,000.00
VOLQUETA 7 M3
11,000.00
50,000
10.00
5,000.00
PLANTA TRITURADORA
350,000
35.00
10,000.00
190,000
10.00
19,000.00
VIBROCOMPACTADOR 10 TON
90,000
10.00
63.15
COMPACTADOR NEUMATICO
90,000
10.00
9,000.00
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
GLB
500
1.30
650.00
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
24,617.00
IMPREVISTOS
5%
6,154.25
UTILIDAD
5%
6,154.25
Sub-Total
INDICE
no se usa
441.1
M3
86,634.58
EMULSION CRM
LT
180
23,635.00
6,500.00
6,315.44
123,085.02
36,925.51
160,011.00
160,011.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
441.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
35.00
3,428.57
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
30.00
11,666.67
190,000
10.00
19,000.00
280,000
10.00
28,000.00
90,000
10.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
91,195.24
Unidad
M3
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
GLB
500
1.30
650.00
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
23,635.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
127,645.68
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
25,529.14
IMPREVISTOS
5%
6,382.28
UTILIDAD
5%
6,382.28
Sub-Total
38,293.70
COSTO EMULSION
165,939.00
0
165939
INDICE
no se usa
EMULSION CRM
LT
180
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
441.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
35.00
3,428.57
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
27.00
12,962.96
190,000
10.00
19,000.00
280,000
10.00
28,000.00
90,000
10.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
92,491.53
Unidad
M3
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
GLB
500
1.30
650.00
LT
25
25.00
625.00
SEAL TEMPORAL
Sub-Total
23,635.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
128,941.97
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
25,788.39
IMPREVISTOS
5%
6,447.10
UTILIDAD
5%
6,447.10
Sub-Total
38,682.59
COSTO EMULSION
167,625.00
0
167625
I. EQUIPO
INDICE
no se usa
EMULSION CRM
LT
180
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
441.4
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
20,000
4.00
Valor-Unit.
5,000.00
23.82
Sub-Total
5,023.82
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
1.25
62,500.00
RIEGO DE LIGA
LT
1,010
13.00
13,125.98
SEAL TEMPORAL
Sub-Total
75,625.98
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
32.00
Valor-Unit.
2,381.88
Sub-Total
Total Costo Directo
2,381.88
83,031.67
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
16,606.33
IMPREVISTOS
5%
4,151.58
UTILIDAD
5%
4,151.58
Sub-Total
24,909.50
107,941.00
0.00
107,941.00
EMULSION CRM LT
180
NOTA:
EL COSTO DE LOS AGRAGADOS PETREOS PARA MEZCLAS ASFALTICAS, CORRESPONDE AL COSTO DE MEZCLA
ABIERTA EN FRIO TIPO MAF-1
INDICE
no se usa
421.1
OJO
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
450.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
403,000.00
647,953.00
INDICE
310000
403000
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
30.00
9,333.33
VIBROCOMPACTADOR 10 TON
90,000
30.00
3,000.00
COMPACTADOR NEUMATICO
90,000
30.00
3,000.00
157.87
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
330,800
1.25
Valor-Unit.
413,500.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA DENSA EN CALIENTE MD
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
240.00
158.79
OBREROS
(5)
$ 103,000
185%
190,550
240.00
793.96
PALETEROS
(2)
$ 41,200
185%
76,220
240.00
317.58
RASTRILLEROS (1)
$ 40,000
185%
74,000
240.00
308.33
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
97,488.97
IMPREVISTOS
5%
24,372.24
UTILIDAD
5%
24,372.24
Sub-Total
INDICE
450.1P
M3
15,491.20
413,500.00
56,875.00
1,578.67
487,444.87
146,233.46
633,678.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
450.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
403,000.00
647,953.00
INDICE
310000
403000
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
20.00
14,000.00
VIBROCOMPACTADOR 10 TON
90,000
20.00
4,500.00
COMPACTADOR NEUMATICO
90,000
20.00
4,500.00
236.80
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
330,800
1.25
Valor-Unit.
413,500.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA DENSA EN CALIENTE MD
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
160.00
238.19
OBREROS
(5)
$ 103,000
185%
190,550
160.00
1,190.94
PALETEROS
(2)
$ 41,200
185%
76,220
160.00
476.38
RASTRILLEROS (1)
$ 40,000
185%
74,000
160.00
462.50
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
99,195.96
IMPREVISTOS
5%
24,798.99
UTILIDAD
5%
24,798.99
Sub-Total
INDICE
450.2P
M3
23,236.80
413,500.00
56,875.00
2,368.00
495,979.80
148,793.94
644,774.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
450.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
451,360.00
696,313.00
INDICE
347200
451360
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
20.00
14,000.00
VIBROCOMPACTADOR 10 TON
90,000
20.00
4,500.00
COMPACTADOR NEUMATICO
90,000
20.00
4,500.00
236.80
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
346,500
1.25
Valor-Unit.
433,125.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA DENSA EN CALIENTE MD
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
160.00
238.19
OBREROS
(5)
$ 103,000
185%
190,550
160.00
1,190.94
PALETEROS
(2)
$ 41,200
185%
76,220
160.00
476.38
RASTRILLEROS (1)
$ 40,000
185%
74,000
160.00
462.50
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
103,120.96
IMPREVISTOS
5%
25,780.24
UTILIDAD
5%
25,780.24
Sub-Total
INDICE
450.3P
M3
23,236.80
0
433,125.00
17400
56,875.00
2,368.00
515,604.80
154,681.44
670,286.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR 1 - 3 TONELADAS
Rendimiento
60,000
2.50
Valor-Unit.
24,000.00
207.39
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
330,800
1.25
413,500.00
RIEGO DE LIGA
LT
1,010
15.30
15,448.27
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA DENSA EN CALIENTE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
(5)
$ 103,000
185%
190,550
20.00
9,527.50
RASTRILLEROS (2)
$ 80,000
185%
148,000
20.00
7,400.00
PALETEROS
$ 41,200
185%
76,220
20.00
3,811.00
(2)
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
106,153.83
IMPREVISTOS
5%
26,538.46
UTILIDAD
5%
26,538.46
Sub-Total
INDICE
450.9P
M3
24,207.39
450.1
421.1
OJO
0
428,948.27
56,875.00
20,738.50
530,769.15
159,230.75
690,000.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
451.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
282,100.00
527,053.00
INDICE
217000
282100
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
30.00
9,333.33
VIBROCOMPACTADOR 10 TON
90,000
30.00
3,000.00
COMPACTADOR NEUMATICO
90,000
30.00
3,000.00
157.87
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
298,200
1.25
Valor-Unit.
372,750.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA ABIERTA EN CALIENTE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
240.00
158.79
OBREROS
(5)
$ 103,000
185%
190,550
240.00
793.96
PALETEROS
(2)
$ 41,200
185%
76,220
240.00
317.58
RASTRILLEROS (1)
$ 40,000
185%
74,000
240.00
308.33
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
89,338.97
IMPREVISTOS
5%
22,334.74
UTILIDAD
5%
22,334.74
Sub-Total
INDICE
451.1P
M3
15,491.20
372,750.00
56,875.00
1,578.67
446,694.87
134,008.46
580,703.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
451.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
322,400.00
567,353.00
INDICE
248000
322400
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
30.00
9,333.33
VIBROCOMPACTADOR 10 TON
90,000
30.00
3,000.00
COMPACTADOR NEUMATICO
90,000
30.00
3,000.00
157.87
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
298,200
1.25
Valor-Unit.
372,750.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA ABIERTA EN CALIENTE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
240.00
158.79
OBREROS
(5)
$ 103,000
185%
190,550
240.00
793.96
PALETEROS
(2)
$ 41,200
185%
76,220
240.00
317.58
RASTRILLEROS (1)
$ 40,000
185%
74,000
240.00
308.33
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
89,338.97
IMPREVISTOS
5%
22,334.74
UTILIDAD
5%
22,334.74
Sub-Total
INDICE
451.2P
M3
15,491.20
0
372,750.00
17400
56,875.00
1,578.67
446,694.87
134,008.46
580,703.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
451.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000
10.00
11,000.00
120,000
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
M3
GLB
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.30
22,360.00
500
1.30
650.00
SEAL TEMPORAL
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
188,425.44
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,685.09
IMPREVISTOS
5%
9,421.27
UTILIDAD
5%
9,421.27
Sub-Total
56,527.63
244,953.00
403000
647953
INDICE
310000
403000
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
30.00
9,333.33
VIBROCOMPACTADOR 10 TON
90,000
30.00
3,000.00
COMPACTADOR NEUMATICO
90,000
30.00
3,000.00
157.87
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
298,200
1.25
Valor-Unit.
372,750.00
SEAL TEMPORAL
Sub-Total
III. TRANSPORTES
Material
MEZCLA ABIERTA EN CALIENTE
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
43.8
Tarifa
Valor-Unit.
1,300
56,875.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 20,600
185%
38,110
240.00
158.79
OBREROS
(5)
$ 103,000
185%
190,550
240.00
793.96
PALETEROS
(2)
$ 41,200
185%
76,220
240.00
317.58
RASTRILLEROS (1)
$ 40,000
185%
74,000
240.00
308.33
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
89,338.97
IMPREVISTOS
5%
22,334.74
UTILIDAD
5%
22,334.74
Sub-Total
INDICE
451.3P
M3
15,491.20
0
372,750.00
17400
56,875.00
1,578.67
446,694.87
134,008.46
580,703.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
452.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000.00
8.00
13,750.00
120,000.00
8.00
15,000.00
1,000
8.00
125.00
90,000
8.00
11,250.00
PLANTA TRITURADORA
350,000
8.00
43,750.00
420,000
8.00
52,500.00
280,000
8.00
35,000.00
90,000
8.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
11,250.00
Sub-Total
182,625.00
Unidad
Precio-Unit.
M3
Cantidad
Valor-Unit.
17,200
1.300
22,360.00
500
1.300
650.00
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
64.00
4,763.75
OFICIALES (3)
$ 108,300
185%
200,355
64.00
3,130.55
Sub-Total
Total Costo Directo
7,894.30
226,529.30
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
45,305.86
IMPREVISTOS
5%
11,326.46
UTILIDAD
5%
11,326.46
Sub-Total
67,958.79
294,488.00
1170000
###
INDICE
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
452.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000.00
8.00
13,750.00
120,000.00
8.00
15,000.00
1,000
8.00
125.00
90,000
8.00
11,250.00
PLANTA TRITURADORA
350,000
8.00
43,750.00
420,000
8.00
52,500.00
280,000
8.00
35,000.00
90,000
8.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
11,250.00
Sub-Total
182,625.00
Unidad
M3
Precio-Unit.
Cantidad
Valor-Unit.
17,200
1.300
22,360.00
500
1.300
650.00
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
64.00
4,763.75
OFICIALES (3)
$ 108,300
185%
200,355
64.00
3,130.55
Sub-Total
Total Costo Directo
7,894.30
226,529.30
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
45,305.86
IMPREVISTOS
5%
11,326.46
UTILIDAD
5%
11,326.46
Sub-Total
67,958.79
294,488.00
1170000
1464488
INDICE
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
452.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000.00
8.00
13,750.00
120,000.00
8.00
15,000.00
1,000
8.00
125.00
90,000
8.00
11,250.00
PLANTA TRITURADORA
350,000
8.00
43,750.00
420,000
8.00
52,500.00
280,000
8.00
35,000.00
90,000
8.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
11,250.00
Sub-Total
182,625.00
Unidad
Precio-Unit.
M3
Cantidad
Valor-Unit.
17,200
1.300
22,360.00
500
1.300
650.00
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
64.00
4,763.75
OFICIALES (3)
$ 108,300
185%
200,355
64.00
3,130.55
Sub-Total
Total Costo Directo
7,894.30
226,529.30
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
45,305.86
IMPREVISTOS
5%
11,326.46
UTILIDAD
5%
11,326.46
Sub-Total
67,958.79
294,488.00
1170000
1,464,488.00
INDICE
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
452.4
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000.00
8.00
13,750.00
120,000.00
8.00
15,000.00
1,000
8.00
125.00
90,000
8.00
11,250.00
PLANTA TRITURADORA
350,000
8.00
43,750.00
420,000
8.00
52,500.00
280,000
8.00
35,000.00
90,000
8.00
TERMINADORA DE ASFALTO
VOLQUETA
COMPACTADOR NEUMATICO
11,250.00
Sub-Total
182,625.00
Unidad
Precio-Unit.
M3
Cantidad
Valor-Unit.
17,200
1.300
22,360.00
500
1.300
650.00
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
64.00
4,763.75
OFICIALES (3)
$ 108,300
185%
200,355
64.00
3,130.55
Sub-Total
Total Costo Directo
7,894.30
226,529.30
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
45,305.86
IMPREVISTOS
5%
11,326.46
UTILIDAD
5%
11,326.46
Sub-Total
67,958.79
294,488.00
1170000
1464488
INDICE
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
453.1
UNIDAD:
M3
MEZCLA DRENANTE
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110,000.00
10.00
11,000.00
120,000.00
10.00
12,000.00
TERMINADORA DE ASFALTO
1,000
10.00
100.00
90,000
10.00
9,000.00
PLANTA TRITURADORA
350,000
10.00
35,000.00
420,000
10.00
42,000.00
280,000
10.00
28,000.00
90,000
10.00
VOLQUETA
COMPACTADOR NEUMATICO
9,000.00
Sub-Total
146,100.00
Unidad
Precio-Unit.
M3
Cantidad
Valor-Unit.
17,200
1.300
22,360.00
500
1.300
650.00
Sub-Total
23,010.00
III. TRANSPORTES
Material
MATERIAL CRUDO
Vol-peso Cant.
Distancia
M3-Km
1.3
10.0
13.0
35.0
43.8
1.25
Tarifa
Valor-Unit.
1,300
650.00
16,900.00
28,437.50
Sub-Total
45,337.50
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (8)
$ 164,800
185%
304,880
80.00
3,811.00
OFICIALES (3)
$ 108,300
185%
200,355
80.00
2,504.44
Sub-Total
Total Costo Directo
6,315.44
220,762.94
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
44,152.59
IMPREVISTOS
5%
11,038.15
UTILIDAD
5%
11,038.15
Sub-Total
66,228.88
286,992.00
1170000
1456992
INDICE
SIN REFERENTE
17400
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
460.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
FRESADORA DE PAVIMENTO
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
120.00
2,333.33
80,000
120.00
666.67
Sub-Total
3,000.00
Unidad
SEAL PREVENTIVA
GLB
Precio-Unit.
Cantidad
250,000
Valor-Unit.
0.001
250.00
Sub-Total
250.00
III. TRANSPORTES
Material
MATERIAL FRESADO
0.1
Distancia
M3-Km
5.0
0.7
Tarifa
Valor-Unit.
1,000
650.00
Sub-Total
650.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
960.00
79.40
PALETEROS
(2)
$ 41,200
185%
76,220
960.00
79.40
Sub-Total
Total Costo Directo
158.79
4,058.79
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
811.76
IMPREVISTOS
5%
202.94
UTILIDAD
5%
202.94
Sub-Total
1,217.64
5,276.00
INDICE
0.62
3.1
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
FRESADORA DE PAVIMENTO
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
12.00
23,333.33
80,000
12.00
6,666.67
Sub-Total
Unidad
SEAL PREVENTIVA
GLB
Precio-Unit.
Cantidad
250,000
0.002
Valor-Unit.
500.00
Sub-Total
III. TRANSPORTES
Material
MATERIAL FRESADO
1.3
Distancia
M3-Km
5.0
6.3
Tarifa
Valor-Unit.
1,000
6,250.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
96.00
793.96
PALETEROS
(2)
$ 41,200
185%
76,220
96.00
793.96
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
7,667.58
IMPREVISTOS
5%
1,916.90
UTILIDAD
5%
1,916.90
Sub-Total
INDICE
460.1P
M3
30,000.00
500.00
6,250.00
1,587.92
38,337.92
11,501.38
49,839.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
461.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
18.00
4,444.44
VIBROCOMPACTADOR 10 TON
90,000
18.00
5,000.00
MOTONIVELADORA
120,000
18.00
6,666.67
RECICLADORA
365,000
36.00
10,138.89
45,000
18.00
2,500.00
20.52
Sub-Total
28,770.52
Unidad
M3
Precio-Unit.
50,000
Cantidad
0.25
Valor-Unit.
AGUA
M3
25
35.00
875.00
ARENA LAVADA
M3
40,000
0.04
1,400.00
12,500.00
SEAL PREVENTIVA
Sub-Total
14,775.00
III. TRANSPORTES
Material
ARENA LAVADA
0.3
Distancia
M3-Km
35.0
8.8
Tarifa
Valor-Unit.
1,000
8,750.00
Sub-Total
8,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
144.00
463.78
OBREROS
(4)
$ 82,400
185%
152,440
144.00
1,058.61
PALETEROS
(2)
$ 41,200
185%
76,220
144.00
529.31
Sub-Total
Total Costo Directo
2,051.70
54,347.22
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
10,869.44
IMPREVISTOS
5%
2,717.36
UTILIDAD
5%
2,717.36
Sub-Total
16,304.17
70,651.00
234000
304,651.00
INDICE
EMULSION ASFALTICA LT
45
4000
180000
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
461.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000
12.00
6,666.67
VIBROCOMPACTADOR 10 TON
280,000
12.00
23,333.33
MOTONIVELADORA
120,000
12.00
10,000.00
370,000
12.00
30,833.33
45,000
12.00
3,750.00
30.78
Sub-Total
74,614.11
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.10
5,000.00
AGUA
LT
25
75.00
1,875.00
SEAL PREVENTIVA
Sub-Total
6,875.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
96.00
695.68
OBREROS
(4)
$ 82,400
185%
152,440
96.00
1,587.92
PALETEROS
(2)
$ 41,200
185%
76,220
96.00
793.96
Sub-Total
Total Costo Directo
3,077.55
84,566.66
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
16,913.33
IMPREVISTOS
5%
4,228.33
UTILIDAD
5%
4,228.33
Sub-Total
25,370.00
109,937.00
78,000.00
187,937.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
462.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
280,000
36.00
7,777.78
VIBROCOMPACTADOR 10 TON
90,000
36.00
2,500.00
COMPACTADOR NEUMATICO
90,000
36.00
2,500.00
420,000
70.00
6,000.00
FRESADORA DE PAVIMENTO
280,000
36.00
7,777.78
51.29
Sub-Total
26,606.85
Unidad
M3
Precio-Unit.
Cantidad
330,800
Valor-Unit.
0.15
DESPERDICIOS (2%)
49,620.00
992.40
SEAL PREVENTIVA
Sub-Total
50,612.40
III. TRANSPORTES
Material
MEZCLA DENSA EN CALIENTE MD
Vol-peso Cant.
Distancia
M3-Km
0.2
35.0
5.3
Tarifa
Valor-Unit.
1,300
6,825.00
Sub-Total
6,825.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
288.00
231.89
OBREROS
(4)
$ 82,400
185%
152,440
288.00
529.31
PALETEROS
(2)
$ 41,200
185%
76,220
288.00
264.65
Sub-Total
Total Costo Directo
1,025.85
85,070.10
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
17,014.02
IMPREVISTOS
5%
4,253.50
UTILIDAD
5%
4,253.50
Sub-Total
25,521.03
110,591.00
INDICE
CORDOBA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
464.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
COMPACTADOR NEUMATICO
90,000
500.00
180.00
70,000
500.00
140.00
2.62
Sub-Total
322.62
Unidad
M2
Precio-Unit.
Cantidad
3,600
Valor-Unit.
1.20
4,320.00
SEAL PREVENTIVA
Sub-Total
4,320.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
4,000.00
16.70
OBREROS
(1)
$ 20,600
185%
38,110
4,000.00
9.53
Sub-Total
Total Costo Directo
26.22
4,668.85
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
933.77
IMPREVISTOS
5%
233.44
UTILIDAD
5%
233.44
Sub-Total
1,400.65
6,069.00
INDICE
JULIO (ok)
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
465.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
10.00
7,000.00
CORTADORA DE PAVIMENTO
18,000
4.00
4,500.00
85,000
10.00
8,500.00
10,000
4.00
2,500.00
184.65
Sub-Total
22,684.65
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DE EXCAVACION
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
80.00
834.81
OBREROS
(4)
$ 82,400
185%
152,440
80.00
1,905.50
PALETEROS
(2)
$ 41,200
185%
76,220
80.00
952.75
Sub-Total
Total Costo Directo
3,693.06
32,877.72
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
6,575.54
IMPREVISTOS
5%
1,643.89
UTILIDAD
5%
1,643.89
Sub-Total
9,863.31
42,741.00
INDICE
$/ML
RENDIMIENTO ML/M3
2500 0.0714285714
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
466.1
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
70,000
63.00
Valor-Unit.
1,111.11
28.37
Sub-Total
1,139.49
Unidad
KG
Precio-Unit.
Cantidad
2,300
Valor-Unit.
1.30
2,990.00
Sub-Total
2,990.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
504.00
132.51
OBREROS
(2)
$ 41,200
185%
76,220
504.00
151.23
Sub-Total
Total Costo Directo
283.74
4,413.23
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
882.65
IMPREVISTOS
5%
220.66
UTILIDAD
5%
220.66
Sub-Total
1,323.97
5,737.00
INDICE
MIRALDIS
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
466.2
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
40.00
1,750.00
5,000
40.00
125.00
44.69
Sub-Total
1,919.69
Unidad
KG
Precio-Unit.
Cantidad
2,300
Valor-Unit.
1.00
2,300.00
Sub-Total
2,300.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OFICIAL
(1)
$ 36,100
185%
66,785
320.00
208.70
OBREROS
(2)
$ 41,200
185%
76,220
320.00
238.19
Sub-Total
Total Costo Directo
446.89
4,666.58
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
933.32
IMPREVISTOS
5%
233.33
UTILIDAD
5%
233.33
Sub-Total
1,399.97
6,067.00
INDICE
MIRALDIS
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
CORTADORA DE PAVIMENTO
18,000
2.00
9,000.00
15,000
2.00
7,500.00
1,000
1.00
1,000.00
VIBRADOR DE CONCRETO
15,000
2.00
7,500.00
70,000
65.00
1,076.92
2,000
30.00
ASPERSOR MANUAL
HERRAMIENTA MENOR (10%MO)
66.67
2,084.72
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
380,000
1.00
380,000.00
ML
13,100
8.00
104,800.00
ML
600
8.00
4,800.00
KG
4,000
4.00
16,000.00
KG
4,000
1.30
5,200.00
ANTISOL
KG
7,800
1.12
8,736.00
Sub-Total
III. TRANSPORTES
Material
CONCRETO HIDRAULICO PARA PA
Distancia
M3-Km
Tarifa
1.0
35.0
35.0
1,300
Valor-Unit.
45,500.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(7)
$ 144,200
185%
266,770
16.00
16,673.13
OFICIAL
(1)
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
122,822.30
IMPREVISTOS
5%
30,705.57
UTILIDAD
5%
30,705.57
Sub-Total
INDICE
500.1
M3
28,228.31
640.3
M3
ML
LT
M2
50000 GALON
519,536.00
45,500.00
0
20,847.19
614,111.50
184,233.45
KG
25
798,345.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
501.1
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
CEMENTO GRIS
Precio-Unit.
KG
Cantidad
600
Valor-Unit.
1.00
600.00
Sub-Total
600.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
600.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
120.00
IMPREVISTOS
5%
30.00
UTILIDAD
5%
30.00
Sub-Total
180.00
780.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
510.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
10,000
40.00
Valor-Unit.
250.00
743.33
Sub-Total
993.33
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ADOQUIN E= 10 cm
M2
54,600
1.03
56,238.00
M3
40,000
0.05
2,000.00
M3
40,000
0.01
400.00
SEAL TEMPORAL
Sub-Total
58,638.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(8)
$ 164,800
185%
304,880
50.00
6,097.60
OFICIAL
(1)
$ 36,100
185%
66,785
50.00
1,335.70
Sub-Total
Total Costo Directo
7,433.30
67,064.63
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
13,412.93
IMPREVISTOS
5%
3,353.23
UTILIDAD
5%
3,353.23
Sub-Total
20,119.39
87,184.00
INDICE
0.005
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
85,000
25.00
3,400.00
70,000
50.00
1,400.00
71.50
Sub-Total
4,871.50
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
200.00
381.10
OFICIAL
(1)
$ 36,100
185%
66,785
200.00
333.93
Sub-Total
Total Costo Directo
715.03
12,086.53
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,417.31
IMPREVISTOS
5%
604.33
UTILIDAD
5%
604.33
Sub-Total
3,625.96
15,712.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.1P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
158.89
Sub-Total
158.89
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
18.00
4,234.44
OFICIAL
(1)
$ 36,100
185%
66,785
18.00
3,710.28
Sub-Total
Total Costo Directo
7,944.72
14,603.62
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,920.72
IMPREVISTOS
5%
730.18
UTILIDAD
5%
730.18
Sub-Total
4,381.09
18,985.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
3.00
23,333.33
130,000
18.00
7,222.22
690.28
Sub-Total
31,245.84
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
LB
25,300
0.40
10,120.00
FULMINANTES
KG
1,100
1.00
1,100.00
MECHA LENTA
3,900
0.50
1,950.00
ML
5,000
2.00
10,000.00
CORDN DETONANTE
15,000.00
Sub-Total
38,170.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.4
Distancia
M3-Km
5.0
7.0
Tarifa
Valor-Unit.
1,000
7,000.00
Sub-Total
7,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
24.00
6,351.67
OFICIAL
(1)
$ 36,100
185%
66,785
24.00
2,782.71
$ 60,600
185%
112,110
24.00
4,671.25
EXPERTO EN EXPLOSIVOS
Sub-Total
Total Costo Directo
13,805.63
90,221.46
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
18,044.29
IMPREVISTOS
5%
4,511.07
UTILIDAD
5%
4,511.07
Sub-Total
27,066.44
117,288.00
INDICE
70.00
70.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
70,000
1.50
46,666.67
130,000
30.00
4,333.33
10,000
1.50
6,666.67
MOTOBOMBA 3 PULGADAS
HERRAMIENTA MENOR (5%MO)
1,380.56
Sub-Total
59,047.23
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
LB
25,300
0.40
10,120.00
FULMINANTES
KG
1,100
1.00
1,100.00
MECHA LENTA
3,900
0.50
1,950.00
ML
5,000
2.00
10,000.00
CORDN DETONANTE
15,000.00
Sub-Total
38,170.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.4
Distancia
M3-Km
5.0
7.0
Tarifa
Valor-Unit.
1,000
7,000.00
Sub-Total
7,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
12.00
12,703.33
OFICIAL
(1)
$ 36,100
185%
66,785
12.00
5,565.42
$ 60,600
185%
112,110
12.00
9,342.50
EXPERTO EN EXPLOSIVOS
Sub-Total
Total Costo Directo
27,611.25
131,828.48
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
26,365.70
IMPREVISTOS
5%
6,591.42
UTILIDAD
5%
6,591.42
Sub-Total
39,548.54
171,377.00
INDICE
70.00
70.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.4
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
85,000
30.00
Valor-Unit.
2,833.33
43.71
Sub-Total
2,877.04
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(1)
$ 20,600
185%
38,110
240.00
158.79
OFICIAL
(1)
$ 36,100
185%
66,785
240.00
278.27
Sub-Total
Total Costo Directo
437.06
9,814.10
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,962.82
IMPREVISTOS
5%
490.71
UTILIDAD
5%
490.71
Sub-Total
2,944.23
12,758.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.4P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
114.40
Sub-Total
114.40
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
25.00
3,048.80
OFICIAL
(1)
$ 36,100
185%
66,785
25.00
2,671.40
Sub-Total
Total Costo Directo
5,720.20
12,334.60
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,466.92
IMPREVISTOS
5%
616.73
UTILIDAD
5%
616.73
Sub-Total
3,700.38
16,035.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
600.5
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
20.00
6,000.00
10,000
2.00
5,000.00
MOTOBOMBA 3 PULGADAS
HERRAMIENTA MENOR (2%)
893.78
Sub-Total
11,893.78
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
TRANSPORTE INCLUYENDO EL
1.3
Distancia
M3-Km
5.0
6.5
Tarifa
Valor-Unit.
1,000
6,500.00
Sub-Total
6,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
16.00
4,763.75
OFICIAL
(1)
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
8,937.81
27,331.59
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
5,466.32
IMPREVISTOS
5%
1,366.58
UTILIDAD
5%
1,366.58
Sub-Total
8,199.48
35,531.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
610.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
10,000
2.00
Valor-Unit.
5,000.00
893.78
Sub-Total
5,893.78
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
12,000
1.30
15,600.00
AGUA
LT
25
30.00
750.00
SEAL PREVENTIVA
Sub-Total
16,350.00
III. TRANSPORTES
Material
1.3
Distancia
M3-Km
10.0
13.0
Tarifa
Valor-Unit.
1,000
13,000.00
Sub-Total
13,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
16.00
4,763.75
OFICIAL
(1)
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
8,937.81
44,181.59
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
8,836.32
IMPREVISTOS
5%
2,209.08
UTILIDAD
5%
2,209.08
Sub-Total
13,254.48
57,436.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
610.1P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
10,000
2.00
Valor-Unit.
5,000.00
893.78
Sub-Total
5,893.78
Unidad
AGUA
Precio-Unit.
LT
Cantidad
25
Valor-Unit.
30.00
750.00
SEAL PREVENTIVA
Sub-Total
750.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
16.00
4,763.75
OFICIAL
(1)
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
8,937.81
15,581.59
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
3,116.32
IMPREVISTOS
5%
779.08
UTILIDAD
5%
779.08
Sub-Total
4,674.48
20,256.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
565.98
Sub-Total
Unidad
M3
Precio-Unit.
Cantidad
40,000
Valor-Unit.
1.10
44,000.00
SEAL PREVENTIVA
Sub-Total
III. TRANSPORTES
Material
1.1
Distancia
M3-Km
15.0
16.5
Tarifa
Valor-Unit.
1,000
16,500.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
16.00
7,145.63
OFICIAL
(1)
$ 36,100
185%
66,785
16.00
4,174.06
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
14,477.13
IMPREVISTOS
5%
3,619.28
UTILIDAD
5%
3,619.28
Sub-Total
INDICE
610.2
M3
565.98
44,000.00
16,500.00
11,319.69
72,385.67
21,715.70
94,101.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
622.1
UNIDAD:
M2
TABLESTACADO DE MADERA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
1,006.19
Sub-Total
1,006.19
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
16,400
1.10
KG
3,100
1.50
18,040.00
4,650.00
ML
19,844
2.50
49,611.11
SEAL PREVENTIVA
Sub-Total
72,301.11
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
18.00
6,351.67
OFICIAL
(1)
$ 36,100
185%
66,785
18.00
3,710.28
Sub-Total
Total Costo Directo
10,061.94
83,369.25
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
16,673.85
IMPREVISTOS
5%
4,168.46
UTILIDAD
5%
4,168.46
Sub-Total
25,010.78
108,380.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.1
UNIDAD:
M3
CONCRETO CLASE A
(VIGAS DE PUENTES)
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
VIBRADOR DE CONCRETO
Rendimiento
15,000
2.00
Valor-Unit.
7,500.00
6,565.44
Sub-Total
14,065.44
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE A
M3
400,000
1.05
M2
17,500
4.60
420,000.00
80,500.00
M2
24,500
4.60
112,700.00
Sub-Total
613,200.00
III. TRANSPORTES
Material
CONCRETO
Vol-peso Cant.
Distancia
M3-Km
1.1
35.0
36.8
Tarifa
Valor-Unit.
1,000
36,750.00
Sub-Total
36,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(6)
$ 123,600
185%
228,660
4.50
50,813.33
OFICIAL
(1)
$ 36,100
185%
66,785
4.50
14,841.11
Sub-Total
Total Costo Directo
65,654.44
729,669.89
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
145,933.98
IMPREVISTOS
5%
36,483.49
UTILIDAD
5%
36,483.49
Sub-Total
218,900.97
948,571.00
INDICE
138000
24778
162778
162778
50000
3854999
100000
4167777
5418110.1
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.2
UNIDAD:
M3
CONCRETO CLASE B
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
VIBRADOR DE CONCRETO
Rendimiento
15,000
2.00
Valor-Unit.
7,500.00
6,565.44
Sub-Total
14,065.44
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE B
M3
380,000
1.05
M2
17,500
4.60
399,000.00
80,500.00
M2
24,500
4.60
112,700.00
Sub-Total
592,200.00
III. TRANSPORTES
Material
CONCRETO
Vol-peso Cant.
Distancia
M3-Km
1.1
35.0
36.8
Tarifa
Valor-Unit.
1,000
36,750.00
Sub-Total
36,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(6)
$ 123,600
185%
228,660
4.50
50,813.33
OFICIAL
(1)
$ 36,100
185%
66,785
4.50
14,841.11
Sub-Total
Total Costo Directo
65,654.44
708,669.89
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
141,733.98
IMPREVISTOS
5%
35,433.49
UTILIDAD
5%
35,433.49
Sub-Total
212,600.97
921,271.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.3
UNIDAD:
M3
CONCRETO CLASE C
(PLACAS DE PUENTES, RIOSTRAS)
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
VIBRADOR DE CONCRETO
Rendimiento
15,000
2.50
Valor-Unit.
6,000.00
6,565.44
Sub-Total
12,565.44
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE C
M3
367,000
1.05
385,350.00
M2
17,500
4.60
80,500.00
Sub-Total
465,850.00
III. TRANSPORTES
Material
CONCRETO
Vol-peso Cant.
Distancia
M3-Km
1.1
35.0
36.8
Tarifa
Valor-Unit.
1,000
36,750.00
Sub-Total
36,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(6)
$ 123,600
185%
228,660
4.50
50,813.33
OFICIAL
(1)
$ 36,100
185%
66,785
4.50
14,841.11
Sub-Total
Total Costo Directo
65,654.44
580,819.89
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
116,163.98
IMPREVISTOS
5%
29,040.99
UTILIDAD
5%
29,040.99
Sub-Total
174,245.97
755,066.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.4
UNIDAD:
M3
CONCRETO CLASE D
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
15,000
0.80
18,750.00
VIBRADOR DE CONCRETO
15,000
0.80
18,750.00
9,357.64
Sub-Total
46,857.64
Unidad
M3
Precio-Unit.
45,000
Cantidad
0.86
Valor-Unit.
AGUA
LT
25
160.00
4,000.00
ARENA LAVADA
M3
40,000
0.56
22,400.00
CEMENTO GRIS
KG
600
350.00
210,000.00
M2
17,500
4.60
80,500.00
DESPERDICIO (2%)
38,700.00
5,502.00
Sub-Total
361,102.00
III. TRANSPORTES
Material
Distancia
M3-Km
ARENA LAVADA
35.0
19.6
Tarifa
1,000
Valor-Unit.
19,600.00
0.9
35.0
30.1
1,000
30,100.00
Sub-Total
49,700.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(10)
$ 206,000
185%
381,100
5.50
69,290.91
OFICIAL
(2)
$ 72,200
185%
133,570
5.50
24,285.45
Sub-Total
Total Costo Directo
93,576.36
551,236.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
110,247.20
IMPREVISTOS
5%
27,561.80
UTILIDAD
5%
27,561.80
Sub-Total
165,370.80
716,607.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.5
UNIDAD:
M3
CONCRETO CLASE E
(MUROS)
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
15,000
0.80
18,750.00
VIBRADOR DE CONCRETO
15,000
0.80
18,750.00
8,577.83
Sub-Total
46,077.83
Unidad
M3
Precio-Unit.
45,000
Cantidad
0.95
Valor-Unit.
AGUA
LT
25
170.00
4,250.00
ARENA LAVADA
M3
40,000
0.55
22,000.00
CEMENTO GRIS
KG
600
300.00
180,000.00
M2
17,500
3.10
54,250.00
DESPERDICIO (2%)
42,750.00
4,980.00
Sub-Total
308,230.00
III. TRANSPORTES
Material
ARENA LAVADA
0.6
1.0
Distancia
M3-Km
35.0
19.3
Tarifa
1,000
Valor-Unit.
19,250.00
35.0
33.3
1,000
33,250.00
Sub-Total
52,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(10)
$ 206,000
185%
381,100
6.00
63,516.67
OFICIAL
(2)
$ 72,200
185%
133,570
6.00
22,261.67
Sub-Total
Total Costo Directo
85,778.33
492,586.17
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
98,517.23
IMPREVISTOS
5%
24,629.31
UTILIDAD
5%
24,629.31
Sub-Total
147,775.85
640,362.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.6
UNIDAD:
M3
CONCRETO CLASE F
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
15,000
0.80
Valor-Unit.
18,750.00
5,598.56
Sub-Total
24,348.56
Unidad
M3
Precio-Unit.
45,000
Cantidad
0.84
Valor-Unit.
AGUA
LT
25
185.00
4,625.00
ARENA LAVADA
M3
40,000
0.63
25,200.00
CEMENTO GRIS
KG
600
260.00
156,000.00
M2
17,500
0.50
8,750.00
DESPERDICIO (2%)
37,800.00
4,472.50
Sub-Total
236,847.50
III. TRANSPORTES
Material
Distancia
M3-Km
ARENA LAVADA
35.0
22.1
Tarifa
1,000
Valor-Unit.
22,050.00
0.8
35.0
29.4
1,000
29,400.00
Sub-Total
51,450.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(10)
$ 206,000
185%
381,100
8.00
47,637.50
OFICIAL
(1)
$ 36,100
185%
66,785
8.00
8,348.13
Sub-Total
Total Costo Directo
55,985.63
368,631.69
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
73,726.34
IMPREVISTOS
5%
18,431.58
UTILIDAD
5%
18,431.58
Sub-Total
110,589.51
479,221.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.7
UNIDAD:
M3
CONCRETO CLASE G
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
4,288.92
Sub-Total
4,288.92
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE F
M3
312,646
0.60
187,587.64
M3
32,600
0.40
13,040.00
M2
17,500
1.50
26,250.00
DESPERDICIO
260.80
Sub-Total
227,138.44
III. TRANSPORTES
Material
PIEDRA PARA CONCRETO CICLP
Vol-peso Cant.
Distancia
M3-Km
0.4
10.0
4.0
Tarifa
Valor-Unit.
1,000
4,000.00
Sub-Total
4,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(10)
$ 206,000
185%
381,100
6.00
63,516.67
OFICIAL
(2)
$ 72,200
185%
133,570
6.00
22,261.67
Sub-Total
Total Costo Directo
85,778.33
321,205.69
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
64,241.14
IMPREVISTOS
5%
16,060.28
UTILIDAD
5%
16,060.28
Sub-Total
96,361.71
417,567.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630P
UNIDAD:
M3
MORTERO 1.3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
3,131.79
Sub-Total
3,131.79
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
AGUA
LT
25
180.00
4,500.00
ARENA LAVADA
M3
40,000
1.09
43,600.00
CEMENTO GRIS
KG
600
454.00
272,400.00
DESPERDICIO (5%)
16,025.00
Sub-Total
336,525.00
III. TRANSPORTES
Material
ARENA
1.1
Distancia
M3-Km
35.0
38.2
Tarifa
Valor-Unit.
1,000
38,150.00
Sub-Total
38,150.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
7.00
21,777.14
OFICIAL
(1)
$ 36,100
185%
66,785
7.00
9,540.71
Sub-Total
Total Costo Directo
31,317.86
409,124.64
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
81,824.93
IMPREVISTOS
5%
20,456.23
UTILIDAD
5%
20,456.23
Sub-Total
122,737.39
531,862.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
631P
UNIDAD:
M3
BOLSACRETOS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
BOMBA DE CONCRETO
55,000
1.00
55,000.00
85,000
15.00
5,666.67
Sub-Total
60,666.67
Unidad
BOLSACRETO DE 1 m3
CONCRETO CLASE E (2500 PSI)
Precio-Unit.
Cantidad
Valor-Unit.
19,700
1.00
19,700.00
M3
492,586
1.05
517,215.48
Sub-Total
536,915.48
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
10.00
11,433.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
615,693.64
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
Porcentaje
18,111.50
Valor Total
20%
123,138.73
5%
30,784.68
UTILIDAD
5%
30,784.68
Sub-Total
184,708.09
800,402.00
INDICE
630.5
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
632.1
UNIDAD:
BARANDA DE CONCRETO
I. EQUIPO
Descripcin
Tipo
VIBRADOR DE CONCRETO
Tarifa/Hora
Rendimiento
15,000
0.25
Valor-Unit.
60,000.00
2,192.25
Sub-Total
62,192.25
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE D
M3
551,236
0.10
55,123.60
ML
24,300
1.00
24,300.00
SEAL PREVENTIVA
Sub-Total
79,423.60
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
2.00
76,220.00
OFICIAL
(1)
$ 36,100
185%
66,785
2.00
33,392.50
Sub-Total
Total Costo Directo
109,612.50
251,228.35
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
50,245.67
IMPREVISTOS
5%
12,561.42
UTILIDAD
5%
12,561.42
Sub-Total
75,368.51
326,597.00
INDICE
0.03
630.4
INDICE
REPUBLICA DE COLOMBIA
NORTE SANTANDER
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
632.1P
UNIDAD:
BARANDA METALICA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
11,296.80
20,000
1.00
20,000.00
EQUIPO DE OXICORTE
30,000
1.00
30,000.00
2,000
3.00
666.67
15,000
3.00
5,000.00
Sub-Total
66,963.47
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ML
63,000
1.45
91,350.00
ML
49,700
3.00
149,100.00
KG
8,800
0.60
5,280.00
GAL
60,900
0.30
18,270.00
GAL
14,600
0.10
1,460.00
PINTURA ANTICORROSIVA
GAL
60,900
0.32
19,488.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
284,948.00
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
2.00
38,110.00
OFICIAL
(1)
$ 36,100
185%
66,785
2.00
33,392.50
$ 65,000
185%
120,250
2.90
41,465.52
SOLDADOR
Sub-Total
Total Costo Directo
112,968.02
464,879.49
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
92,975.90
IMPREVISTOS
5%
23,243.97
UTILIDAD
5%
23,243.97
Sub-Total
139,463.85
604,343.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
632.3P
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
15,000
10.00
1,500.00
CAMIONETA D-300
30,000
10.00
3,000.00
95.28
Sub-Total
4,595.28
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
GAL
66,800
0.20
13,360.00
GAL
14,600
0.20
2,920.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
16,280.00
Sub-Total
0.00
Jornal
(2)
Prestaciones
$ 41,200
185%
Jornal Total
Rendimiento
76,220
80.00
Valor-Unit.
952.75
Sub-Total
Total Costo Directo
952.75
21,828.03
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
4,365.61
IMPREVISTOS
5%
1,091.40
UTILIDAD
5%
1,091.40
Sub-Total
6,548.41
28,376.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
632.4P
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
15,000
40.00
375.00
CAMIONETA D-300
30,000
40.00
750.00
23.82
Sub-Total
1,148.82
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
GAL
66,800
0.15
10,020.00
GAL
14,600
0.15
2,190.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
12,210.00
Sub-Total
0.00
Jornal
(2)
Prestaciones
$ 41,200
185%
Jornal Total
Rendimiento
76,220
320.00
Valor-Unit.
238.19
Sub-Total
Total Costo Directo
238.19
13,597.01
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,719.40
IMPREVISTOS
5%
679.85
UTILIDAD
5%
679.85
Sub-Total
4,079.10
17,676.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
632.5P
UNIDAD:
I. EQUIPO
Descripcin
Tipo
VIBRADOR DE CONCRETO
Tarifa/Hora
Rendimiento
15,000
0.50
Valor-Unit.
30,000.00
3,622.30
Sub-Total
33,622.30
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE D
M3
551,236
0.26
142,274.01
ACERO PDR-60
KG
2,600
18.15
47,190.00
ML
24,300
1.00
24,300.00
GAL
66,800
0.10
6,680.00
GAL
14,600
0.20
2,920.00
Sub-Total
223,364.01
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
2.50
45,732.00
OFICIAL
(1)
$ 36,100
185%
66,785
2.50
26,714.00
Sub-Total
Total Costo Directo
72,446.00
329,432.31
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
65,886.46
IMPREVISTOS
5%
16,471.62
UTILIDAD
5%
16,471.62
Sub-Total
98,829.69
428,262.00
INDICE
0.03
630.4
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
630.4P
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
15,000
0.50
30,000.00
VIBRADOR DE CONCRETO
15,000
0.50
30,000.00
9,291.63
Sub-Total
69,291.63
Unidad
M3
Precio-Unit.
45,000
Cantidad
0.85
Valor-Unit.
AGUA
LT
25
160.00
4,000.00
ARENA LAVADA
M3
40,000
0.55
22,000.00
CEMENTO GRIS
KG
600
350.00
210,000.00
M2
6,600
4.60
30,360.00
DESPERDICIO (2%)
38,250.00
5,485.00
Sub-Total
310,095.00
III. TRANSPORTES
Material
Distancia
M3-Km
ARENA LAVADA
35.0
19.3
Tarifa
1,000
Valor-Unit.
19,250.00
0.9
35.0
29.8
1,000
29,750.00
Sub-Total
49,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(8)
$ 164,800
185%
304,880
4.00
76,220.00
OFICIAL
(1)
$ 36,100
185%
66,785
4.00
16,696.25
Sub-Total
Total Costo Directo
92,916.25
521,302.88
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
104,260.58
IMPREVISTOS
5%
26,065.14
UTILIDAD
5%
26,065.14
Sub-Total
156,390.86
677,694.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
640.1
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
CIZALLA MANUAL
Tarifa/Hora
Rendimiento
3,000
38.00
Valor-Unit.
78.95
8.39
Sub-Total
8.39
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ACERO PDR-60
KG
2,600
1.05
2,730.00
KG
3,100
0.03
93.00
Sub-Total
2,823.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(1)
$ 20,600
185%
38,110
250.00
152.44
OFICIAL
(1)
$ 36,100
185%
66,785
250.00
267.14
Sub-Total
Total Costo Directo
419.58
3,250.97
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
650.19
IMPREVISTOS
5%
162.55
UTILIDAD
5%
162.55
Sub-Total
975.29
4,226.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
641.1
UNIDAD:
TON-M
ACERO DE PREESFUERZO
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
30,000
670.00
44.78
35,000
670.00
52.24
20,000
670.00
29.85
4.27
Sub-Total
131.13
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
8,000
0.09
680.00
KG
15,500
0.00
62.00
ML
15,500
0.00
62.00
KG
57,800
0.00
57.80
KG
3,100
0.02
62.00
LT
1,700
0.02
34.00
Sub-Total
957.80
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
670.00
113.76
OFICIAL
(1)
$ 36,100
185%
66,785
670.00
99.68
Sub-Total
Total Costo Directo
213.44
1,302.37
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
260.47
IMPREVISTOS
5%
65.12
UTILIDAD
5%
65.12
Sub-Total
390.71
1,693.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
642.1
UNIDAD:
U (DM3)
APOYO ELASTOMERICO
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
Precio-Unit.
Cantidad
404,800
Valor-Unit.
1.00
404,800.00
Sub-Total
404,800.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
32.00
Valor-Unit.
1,190.94
Sub-Total
Total Costo Directo
1,190.94
405,990.94
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
81,198.19
IMPREVISTOS
5%
20,299.55
UTILIDAD
5%
20,299.55
Sub-Total
121,797.28
527,788.00
INDICE
45*35*5 DUREZA 60
70*50*5 DUREZA 60
25*25*1,5
$ 241,280 MGDALENA
523218
$ 40,507
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
642.2
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
38.11
Sub-Total
38.11
Unidad
ML
Precio-Unit.
Cantidad
37,000
Valor-Unit.
1.00
37,000.00
Sub-Total
37,000.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
100.00
Valor-Unit.
762.20
Sub-Total
Total Costo Directo
762.20
37,800.31
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
7,560.06
IMPREVISTOS
5%
1,890.02
UTILIDAD
5%
1,890.02
Sub-Total
11,340.09
49,140.00
INDICE
MIRALDIS
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
660.3
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
DIFERENCIAL DE 2 TON.
Rendimiento
5,000
3.00
Valor-Unit.
1,666.67
913.44
Sub-Total
2,580.10
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
409,125
0.02
8,182.49
CONCRETO CLASE F
M3
368,632
0.46
169,570.58
ML
120,000
1.00
120,000.00
SEAL PREVENTIVA
Sub-Total
297,753.07
III. TRANSPORTES
Material
TUBERIA
0.3
Distancia
Ml o m3-Km
35.0
9.9
Tarifa
Valor-Unit.
1,000
9,896.02
Sub-Total
9,896.02
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
24.00
6,351.67
OFICIAL
(1)
$ 36,100
185%
66,785
24.00
2,782.71
Sub-Total
Total Costo Directo
9,134.38
319,363.57
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
63,872.71
IMPREVISTOS
5%
15,968.18
UTILIDAD
5%
15,968.18
Sub-Total
95,809.07
415,173.00
INDICE
CORDOBA
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
661.1
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
DIFERENCIAL DE 2 TON.
Rendimiento
5,000
1.50
Valor-Unit.
3,333.33
1,826.88
Sub-Total
5,160.21
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
409,125
0.02
8,182.49
M3
30,000
0.46
13,800.00
ML
290,000
1.00
290,000.00
SEAL PREVENTIVA
Sub-Total
311,982.49
III. TRANSPORTES
Material
Distancia
Ml o m3-Km
35.0
42.0
Tarifa
1,000
Valor-Unit.
42,000.00
0.5
35.0
16.1
1,000
16,100.00
Sub-Total
58,100.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
12.00
12,703.33
OFICIAL
(1)
$ 36,100
185%
66,785
12.00
5,565.42
Sub-Total
Total Costo Directo
18,268.75
393,511.45
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
78,702.29
IMPREVISTOS
5%
19,675.57
UTILIDAD
5%
19,675.57
Sub-Total
118,053.44
511,565.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
670.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
274.03
Sub-Total
274.03
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
4,200
1.00
4,200.00
50,400
0.50
25,200.00
M3
32,600
1.00
32,600.00
M2
6,600
2.00
13,200.00
M3
409,125
0.12
49,094.96
Sub-Total
124,294.96
III. TRANSPORTES
Material
PIEDRA PARA GAVIN
Vol-peso Cant.
Distancia
M3-Km
1.0
35.0
35.0
Tarifa
Valor-Unit.
1,000
35,000.00
Sub-Total
35,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
8.00
19,055.00
OFICIAL
(1)
$ 36,100
185%
66,785
8.00
8,348.13
Sub-Total
Total Costo Directo
27,403.13
186,972.11
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
37,394.42
IMPREVISTOS
5%
9,348.61
UTILIDAD
5%
9,348.61
Sub-Total
56,091.63
243,064.00
INDICE
SANTANDER
SEGUN DISENO
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
670.2
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
6,263.57
Sub-Total
6,263.57
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE G
M3
321,206
1.00
321,205.69
M2
6,600
4.00
26,400.00
Sub-Total
347,605.69
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
3.50
43,554.29
OFICIAL
(1)
$ 36,100
185%
66,785
3.50
19,081.43
Sub-Total
Total Costo Directo
62,635.71
416,504.97
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
83,300.99
IMPREVISTOS
5%
20,825.25
UTILIDAD
5%
20,825.25
Sub-Total
124,951.49
541,456.00
INDICE
SANTANDER
630.7
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
671.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
1,370.16
Sub-Total
1,370.16
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE F
M3
368,632
1.00
M2
6,600
0.30
368,631.69
1,980.00
M3
12,000
1.00
12,000.00
SELLO DE JUNTAS
KG
2,500
0.50
1,250.00
SEAL PREVENTIVA
Sub-Total
383,861.69
III. TRANSPORTES
Material
MATERIAL SELECCIONADO PARA
Vol-peso Cant.
Distancia
1.0
15.0
M3-Km
Tarifa
15.0
Valor-Unit.
1,000
15,000.00
Sub-Total
15,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
8.00
19,055.00
OFICIAL
(1)
$ 36,100
185%
66,785
8.00
8,348.13
Sub-Total
Total Costo Directo
27,403.13
427,634.97
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
85,526.99
IMPREVISTOS
5%
21,381.75
UTILIDAD
5%
21,381.75
Sub-Total
128,290.49
555,925.00
INDICE
630.6
410.1
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
672.1
UNIDAD:
BORDILLOS DE CONCRETO
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
362.23
Sub-Total
362.23
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CONCRETO CLASE F
M3
368,632
0.06
22,117.90
M2
6,600
0.86
5,676.00
SELLO DE JUNTAS
KG
2,500
0.30
750.00
SEAL PREVENTIVA
Sub-Total
28,543.90
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
25.00
4,573.20
OFICIAL
(1)
$ 36,100
185%
66,785
25.00
2,671.40
Sub-Total
Total Costo Directo
7,244.60
36,150.73
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
7,230.15
IMPREVISTOS
5%
1,807.54
UTILIDAD
5%
1,807.54
Sub-Total
10,845.22
46,996.00
391,633.33
INDICE
SANTANDER
630.6
410.1
0.1
$/M3
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
673.1
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
323.42
Sub-Total
323.42
Unidad
Precio-Unit.
M3
Cantidad
43,000
Valor-Unit.
1.10
47,300.00
Sub-Total
47,300.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.1
Distancia
M3-Km
35.0
38.5
Tarifa
Valor-Unit.
1,000
38,500.00
Sub-Total
38,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
28.00
4,083.21
OFICIAL
(1)
$ 36,100
185%
66,785
28.00
2,385.18
Sub-Total
Total Costo Directo
6,468.39
92,591.81
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
18,518.36
IMPREVISTOS
5%
4,629.59
UTILIDAD
5%
4,629.59
Sub-Total
27,777.54
120,369.00
INDICE
630.6
410.1
0.1
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
673.2
UNIDAD:
M2
GEOTEXTIL
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
M2
Precio-Unit.
Cantidad
4,800
Valor-Unit.
1.10
5,280.00
Sub-Total
5,280.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
300.00
Valor-Unit.
254.07
Sub-Total
Total Costo Directo
254.07
5,534.07
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,106.81
IMPREVISTOS
5%
276.70
UTILIDAD
5%
276.70
Sub-Total
1,660.22
7,194.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
673.3
UNIDAD:
M3
MATERIAL DE COBERTURA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
10,000
1.00
Valor-Unit.
10,000.00
952.75
Sub-Total
10,952.75
Unidad
M3
Precio-Unit.
Cantidad
30,000
Valor-Unit.
1.30
39,000.00
Sub-Total
39,000.00
III. TRANSPORTES
Material
MATERIAL DE SUB- BASE CBR=2
Vol-peso Cant.
Distancia
1.3
35.0
M3-Km
Tarifa
45.5
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
76,220
Rendimiento
8.00
Valor-Unit.
9,527.50
Sub-Total
Total Costo Directo
9,527.50
104,980.25
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
20,996.05
IMPREVISTOS
5%
5,249.01
UTILIDAD
5%
5,249.01
Sub-Total
31,494.08
136,474.00
INDICE
JULIO (OK)
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
120,000
1.10
Valor-Unit.
109,090.91
317.79
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ML
13,900
1.00
13,900.00
2,600
0.20
520.00
1,500
0.50
750.00
M2
3,400
0.40
1,360.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
9.00
8,468.89
OFICIAL
(1)
$ 36,100
185%
66,785
9.00
7,420.56
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
28,365.63
IMPREVISTOS
5%
7,091.41
UTILIDAD
5%
7,091.41
Sub-Total
INDICE
674.1
M
109,408.70
16,530.00
0.00
15,889.44
141,828.14
42,548.44
184,377.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
120,000
0.90
Valor-Unit.
133,333.33
408.59
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ML
13,900
1.00
13,900.00
2,600
0.20
520.00
1,500
0.50
750.00
M2
3,400
0.40
1,360.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
7.00
10,888.57
OFICIAL
(1)
$ 36,100
185%
66,785
7.00
9,540.71
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
34,140.24
IMPREVISTOS
5%
8,535.06
UTILIDAD
5%
8,535.06
Sub-Total
INDICE
674.2
M
133,741.92
16,530.00
0.00
20,429.29
170,701.20
51,210.36
221,912.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
675.2
UNIDAD:
LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
80,000
1,000.00
Valor-Unit.
80.00
Sub-Total
80.00
Unidad
EMULSIN CRR-1
LT
Precio-Unit.
Cantidad
2,300
Valor-Unit.
1.05
2,415.00
Sub-Total
2,415.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
8,000.00
Valor-Unit.
9.53
Sub-Total
Total Costo Directo
9.53
2,504.53
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,504.53
IMPREVISTOS
5%
125.23
UTILIDAD
5%
125.23
Sub-Total
2,754.98
5,260.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
675.3
UNIDAD:
KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
0.00
Unidad
LT
Precio-Unit.
Cantidad
2,100
Valor-Unit.
1.05
2,205.00
Sub-Total
2,205.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(5)
$ 103,000
Prestaciones
185%
Jornal Total
Rendimiento
190,550
150.00
Valor-Unit.
1,270.33
Sub-Total
Total Costo Directo
1,270.33
3,475.33
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
695.07
IMPREVISTOS
5%
173.77
UTILIDAD
5%
173.77
Sub-Total
1,042.60
4,518.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
ESCAMAS EN CONCRETO
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
120,000
23.00
5,217.39
100
1.00
100.00
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
551,236
0.18
99,222.48
KG
3,251
3.80
12,353.69
ML
17,700
0.35
6,195.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(2)
$ 41,200
185%
76,220
10.00
7,622.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
27,477.81
IMPREVISTOS
5%
6,869.45
UTILIDAD
5%
6,869.45
Sub-Total
ESPESOR
ACERO
diametro mt
0.009
0.006
0.019
0.009
0.006
0.009
0.006
0.019
0.009
0.006
0.019
0.009
0.006
0.009
0.006
FLEJES*ES
A
AI
D
CI
DI
3.00
3.00
2.00
3.00
3.00
2.00
3.00
1.00
2.00
3.00
1.00
2.00
3.00
2.00
3.00
0.75
0.75
0.38
0.38
0.38
0.38
7,820.00
7.00
3.00
1.00
1.00
1.00
1.00
14.00
0.39
5.25
2.25
0.38
0.38
0.38
0.38
9.02
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
###
###
0.00000
INDICE
680.1
M2
5,317.39
630.4
640.3
117,771.17
0.00
14,300.50
137,389.06
41,216.72
178,606.00
M3
KG
0.00766
0.00173
0.00156
0.00186
0.00047
0.00046
0.00009
0.00007
0.00046
0.00009
0.00007
0.00041
0.00009
0.00041
0.00009
3.00000
3,350.08000
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
680.3
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
45,000
5.00
9,000.00
VIBROCOMPACTADOR 10 TON
90,000
5.00
18,000.00
120,000
5.00
24,000.00
MOTONIVELADORA
HERRAMIENTA MENOR (10%MO)
452.79
Sub-Total
51,452.79
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
12,000
1.30
15,600.00
AGUA
LT
25
30.00
750.00
Sub-Total
16,350.00
III. TRANSPORTES
Material
MATERIAL SELECCIONADO PARA
Vol-peso Cant.
Distancia
M3-Km
1.3
35.0
45.5
Tarifa
Valor-Unit.
1,000
45,500.00
Sub-Total
45,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
40.00
2,858.25
OFICIAL
(1)
$ 36,100
185%
66,785
40.00
1,669.63
Sub-Total
Total Costo Directo
4,527.88
117,830.66
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
23,566.13
IMPREVISTOS
5%
5,891.53
UTILIDAD
5%
5,891.53
Sub-Total
35,349.20
153,180.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
681.1
UNIDAD:
M3
GAVION
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
452.79
Sub-Total
1,214.06
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
4,200
1.50
6,300.00
50,400
0.50
25,200.00
M3
32,600
1.05
34,230.00
M2
3,300
2.00
6,600.00
Sub-Total
72,330.00
III. TRANSPORTES
Material
PIEDRA PARA GAVIN
Vol-peso Cant.
Distancia
M3-Km
1.1
10.0
10.5
Tarifa
Valor-Unit.
1,000
10,500.00
Sub-Total
10,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
20.00
5,716.50
OFICIAL
(1)
$ 36,100
185%
66,785
20.00
3,339.25
Sub-Total
Total Costo Directo
9,055.75
93,099.81
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
18,619.96
IMPREVISTOS
5%
4,654.99
UTILIDAD
5%
4,654.99
Sub-Total
40,555.89
133,656.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
700.1
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
VEHICULO DELINEADOR
90,000
3,000.00
30.00
CAMIONETA D-300
30,000
3,000.00
10.00
0.08
Sub-Total
40.08
Unidad
ESFERAS REFLECTIVAS
Precio-Unit.
Cantidad
Valor-Unit.
KG
4,000
0.05
188.00
GALON
66,800
0.01
981.96
GALON
14,600
0.00
6.44
SEAL PREVENTIVA
Sub-Total
1,176.40
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
24,000.00
4.76
OFICIAL
(1)
$ 36,100
185%
66,785
24,000.00
2.78
Sub-Total
Total Costo Directo
7.55
1,224.02
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
244.80
IMPREVISTOS
5%
61.20
UTILIDAD
5%
61.20
Sub-Total
367.21
1,591.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
700.1P
UNIDAD:
LINEA DE IMPRIMACIN
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
VEHICULO DELINEADOR
90,000
3,000.00
30.00
CAMIONETA D-300
30,000
3,000.00
10.00
0.08
Sub-Total
40.08
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
PINTURA IMPRIMANTE
GALON
60,900
0.01
895.23
GALON
14,600
0.00
5.84
SEAL PREVENTIVA
Sub-Total
901.07
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
24,000.00
4.76
OFICIAL
(1)
$ 36,100
185%
66,785
24,000.00
2.78
Sub-Total
Total Costo Directo
7.55
948.69
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
189.74
IMPREVISTOS
5%
47.43
UTILIDAD
5%
47.43
Sub-Total
284.61
1,233.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
700.3
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
6.00
Valor-Unit.
5,000.00
69.49
Sub-Total
5,069.49
Unidad
ESFERAS REFLECTIVAS
Precio-Unit.
Cantidad
Valor-Unit.
KG
4,000
0.47
1,880.00
GALON
66,800
0.05
3,340.00
GALON
14,600
0.00
21.90
Sub-Total
5,241.90
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(7)
$ 144,200
185%
266,770
48.00
5,557.71
OFICIAL
(1)
$ 36,100
185%
66,785
48.00
1,391.35
Sub-Total
Total Costo Directo
6,949.06
17,260.45
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
3,452.09
IMPREVISTOS
5%
863.02
UTILIDAD
5%
863.02
Sub-Total
5,178.14
22,439.00
INDICE
6.25
0.112
0.741
$ 55,000.00
$ 2,600.00
$ 6,160.00
$ 1,926.60
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
35,000
1.00
35,000.00
CAMIONETA D-300
30,000
1.00
30,000.00
6,000
1.00
6,000.00
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
50,000
0.03
1,500.00
RESINA TERMOPLASTICA
KG
10,500
20.00
210,000.00
Sub-Total
III. TRANSPORTES
Material
AGREGADOS SELECCIONADOS (T
Vol-peso Cant.
Distancia
M3-Km
0.0
35.0
1.1
Tarifa
Valor-Unit.
1,000
1,050.00
Sub-Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
8.00
19,055.00
OFICIAL
(1)
$ 36,100
185%
66,785
8.00
8,348.13
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
62,190.63
IMPREVISTOS
5%
15,547.66
UTILIDAD
5%
15,547.66
Sub-Total
INDICE
700P
M2
71,000.00
211,500.00
1,050.00
27,403.13
310,953.13
93,285.94
404,239.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
701.1
UNIDAD:
TACHAS REFLECTIVAS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
CAMIONETA D-300
30,000
250.00
120.00
15,000
250.00
60.00
1.48
Sub-Total
181.48
Unidad
TACHA REFLECTIVA
RESINA TERMOPLASTICA
Precio-Unit.
Cantidad
Valor-Unit.
7,700
1.00
7,700.00
KG
10,500
0.01
105.00
Sub-Total
7,805.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(6)
$ 123,600
185%
228,660
2,000.00
114.33
OFICIAL
(1)
$ 36,100
185%
66,785
2,000.00
33.39
Sub-Total
Total Costo Directo
147.72
8,134.20
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,626.84
IMPREVISTOS
5%
406.71
UTILIDAD
5%
406.71
Sub-Total
2,440.26
10,574.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
710.1.1
UNIDAD:
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
10.00
Valor-Unit.
3,000.00
181.12
Sub-Total
3,181.12
Unidad
CONCRETO CLASE F
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.05
16,588.43
185,000
1.00
185,000.00
100,000
1.00
100,000.00
Sub-Total
301,588.43
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
10.00
11,433.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
18,111.50
322,881.04
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
64,576.21
IMPREVISTOS
5%
16,144.05
UTILIDAD
5%
16,144.05
Sub-Total
96,864.31
419,745.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
710.1.2
UNIDAD:
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
10.00
Valor-Unit.
3,000.00
181.12
Sub-Total
3,181.12
Unidad
CONCRETO CLASE F
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.05
16,588.43
240,000
1.00
240,000.00
100,000
1.00
100,000.00
Sub-Total
356,588.43
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
10.00
11,433.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
18,111.50
377,881.04
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
75,576.21
IMPREVISTOS
5%
18,894.05
UTILIDAD
5%
18,894.05
Sub-Total
113,364.31
491,245.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
710.1.3
UNIDAD:
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
1.50
Valor-Unit.
20,000.00
181.12
Sub-Total
20,181.12
Unidad
CONCRETO CLASE F
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.05
16,588.43
228,900
1.00
228,900.00
100,000
1.00
100,000.00
Sub-Total
345,488.43
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
10.00
11,433.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
18,111.50
383,781.04
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
76,756.21
IMPREVISTOS
5%
19,189.05
UTILIDAD
5%
19,189.05
Sub-Total
115,134.31
498,915.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
710.1.4
UNIDAD:
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
10.00
Valor-Unit.
3,000.00
120.74
Sub-Total
3,120.74
Unidad
CONCRETO CLASE F
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.05
16,588.43
185,000
1.00
185,000.00
100,000
1.00
100,000.00
Sub-Total
301,588.43
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
15.00
7,622.00
OFICIAL
(1)
$ 36,100
185%
66,785
15.00
4,452.33
Sub-Total
Total Costo Directo
12,074.33
316,783.50
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
63,356.70
IMPREVISTOS
5%
15,839.18
UTILIDAD
5%
15,839.18
Sub-Total
95,035.05
411,819.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
710.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
10.00
Valor-Unit.
3,000.00
301.86
Sub-Total
3,301.86
Unidad
CONCRETO CLASE F
SEAL GRUPO V (0,9*1,13m)
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.05
16,588.43
304,500
1.00
304,500.00
Sub-Total
321,088.43
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(3)
$ 61,800
185%
114,330
6.00
19,055.00
OFICIAL
(1)
$ 36,100
185%
66,785
6.00
11,130.83
Sub-Total
Total Costo Directo
30,185.83
354,576.12
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
70,915.22
IMPREVISTOS
5%
17,728.81
UTILIDAD
5%
17,728.81
Sub-Total
106,372.84
460,949.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
720.1
UNIDAD:
POSTE DE REFERENCIA
I. EQUIPO
Descripcin
Tipo
CAMIONETA D-300
Tarifa/Hora
Rendimiento
30,000
5.00
Valor-Unit.
6,000.00
114.33
Sub-Total
6,114.33
Unidad
CONCRETO CLASE F
POSTE KILOMETRAJE
Precio-Unit.
Cantidad
Valor-Unit.
M3
368,632
0.06
22,117.90
100,000
1.00
100,000.00
Sub-Total
122,117.90
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(3)
$ 61,800
Prestaciones
185%
Jornal Total
Rendimiento
114,330
10.00
Valor-Unit.
11,433.00
Sub-Total
Total Costo Directo
11,433.00
139,665.23
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
27,933.05
IMPREVISTOS
5%
6,983.26
UTILIDAD
5%
6,983.26
Sub-Total
41,899.57
181,565.00
INDICE
630.6
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
730.1
UNIDAD:
DEFENSAS METALICAS
I. EQUIPO
Descripcin
Tipo
CAMION 350
Tarifa/Hora
Rendimiento
40,000
7.62
Valor-Unit.
5,249.34
219.23
Sub-Total
5,468.57
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
73,500
1.00
73,500.00
135,000
0.33
44,550.00
30,200
0.33
9,966.00
Sub-Total
128,016.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS
(4)
$ 82,400
185%
152,440
10.00
15,244.00
OFICIAL
(1)
$ 36,100
185%
66,785
10.00
6,678.50
Sub-Total
Total Costo Directo
21,922.50
155,407.07
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
31,081.41
IMPREVISTOS
5%
7,770.35
UTILIDAD
5%
7,770.35
Sub-Total
46,622.12
202,029.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
730.2
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
26.28
Sub-Total
26.28
Unidad
Precio-Unit.
Cantidad
58,000
Valor-Unit.
1.00
58,000.00
Sub-Total
58,000.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
29.00
Valor-Unit.
2,628.28
Sub-Total
Total Costo Directo
2,628.28
60,654.56
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
12,130.91
IMPREVISTOS
5%
3,032.73
UTILIDAD
5%
3,032.73
Sub-Total
18,196.37
78,851.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
740.1
UNIDAD:
CAPTAFAROS
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
5.44
Sub-Total
5.44
Unidad
CAPTAFARO METALICO
Precio-Unit.
Cantidad
11,200
Valor-Unit.
1.00
11,200.00
Sub-Total
11,200.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(1)
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
70.00
Valor-Unit.
544.43
Sub-Total
Total Costo Directo
544.43
11,749.87
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,349.97
IMPREVISTOS
5%
587.49
UTILIDAD
5%
587.49
Sub-Total
3,524.96
15,275.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
800.1
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
457.32
Sub-Total
457.32
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
ML
500
4.00
GRAPAS
KG
4,400
0.04
176.00
8,800
0.40
3,520.00
2,000.00
SEAL TEMPORAL
Sub-Total
5,696.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(3)
$ 61,800
Prestaciones
185%
Jornal Total
Rendimiento
114,330
25.00
Valor-Unit.
4,573.20
Sub-Total
Total Costo Directo
4,573.20
10,726.52
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,145.30
IMPREVISTOS
5%
536.33
UTILIDAD
5%
536.33
Sub-Total
3,217.96
13,944.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
800.2
UNIDAD:
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
601.74
Sub-Total
601.74
Unidad
ML
Precio-Unit.
Cantidad
Valor-Unit.
500
3.00
1,500.00
30,000
0.40
12,000.00
SEAL TEMPORAL
Sub-Total
13,500.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(3)
$ 61,800
Prestaciones
185%
Jornal Total
Rendimiento
114,330
19.00
Valor-Unit.
6,017.37
Sub-Total
Total Costo Directo
6,017.37
20,119.11
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
4,023.82
IMPREVISTOS
5%
1,005.96
UTILIDAD
5%
1,005.96
Sub-Total
6,035.73
26,155.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
ROCERIA
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
GUADAADORA
Rendimiento
10,000
0.07
Valor-Unit.
142,857.14
6,805.36
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
III. TRANSPORTES
Material
MATERIAL DESMONTADO
Distancia
M3-Km
5.0
25.0
Tarifa
Valor-Unit.
1,000
25,000.00
Sub-Total
Jornal
$ 20,600
Prestaciones
185%
Jornal Total
Rendimiento
38,110
0.56
Valor-Unit.
68,053.57
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
48,543.21
IMPREVISTOS
5%
12,135.80
UTILIDAD
5%
12,135.80
Sub-Total
INDICE
801.1
HA
149,662.50
0.00
25,000.00
68,053.57
242,716.07
72,814.82
315,531.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
810.1
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
54.81
Sub-Total
54.81
Unidad
CESPEDONES
M2
GLB
TIERRA ABONADA
M3
Precio-Unit.
Cantidad
Valor-Unit.
3,000
1.00
350
2.50
3,000.00
875.00
40,000
0.03
1,200.00
Sub-Total
5,075.00
III. TRANSPORTES
Material
TIERRA ABONADA
0.03
Distancia
M3-Km
10.0
0.3
Tarifa
Valor-Unit.
1,000
300.00
Sub-Total
300.00
Jornal
(4)
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
40.00
3,811.00
$ 36,100
185%
66,785
40.00
1,669.63
Sub-Total
Total Costo Directo
5,480.63
10,910.43
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,182.09
IMPREVISTOS
5%
545.52
UTILIDAD
5%
545.52
Sub-Total
3,273.13
14,184.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
810.2
UNIDAD:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
152.44
Sub-Total
152.44
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
50,000
0.05
2,500.00
TIERRA ABONADA
M2
40,000
0.10
4,000.00
AGUA
LT
25
15.00
375.00
Sub-Total
6,875.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
(2)
$ 41,200
Prestaciones
185%
Jornal Total
Rendimiento
76,220
50.00
Valor-Unit.
1,524.40
Sub-Total
Total Costo Directo
1,524.40
8,551.84
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,710.37
IMPREVISTOS
5%
427.59
UTILIDAD
5%
427.59
Sub-Total
2,565.55
11,117.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
UNIDAD:
ARBORIZACION
ARBOL 1.2 M
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
CAMIONETA D-300
Rendimiento
30,000
50.00
Valor-Unit.
600.00
548.06
Sub-Total
Unidad
ARBOL DE 0,6 m
TIERRA ABONADA
Precio-Unit.
Cantidad
Valor-Unit.
11,600
1.00
11,600.00
M3
40,000
0.04
1,600.00
Sub-Total
III. TRANSPORTES
Material
ARBOL DE 0,6 m
0.04
Distancia
M3-Km
35.0
1.4
Tarifa
Valor-Unit.
1,000
1,400.00
Sub-Total
Jornal
(4)
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 82,400
185%
152,440
40.00
3,811.00
$ 36,100
185%
66,785
40.00
1,669.63
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
4,245.74
IMPREVISTOS
5%
1,061.43
UTILIDAD
5%
1,061.43
Sub-Total
INDICE
815P
U
1,148.06
13,200.00
1,400.00
5,480.63
21,228.69
6,368.61
27,597.00
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
900.1
UNIDAD:
M3-E
I. EQUIPO
Descripcin
Tipo
VOLQUETA 7 M3
Tarifa/Hora
Rendimiento
50,000
30.00
Valor-Unit.
1,666.67
Sub-Total
1,666.67
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
1,666.67
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
333.33
IMPREVISTOS
5%
83.33
UTILIDAD
5%
83.33
Sub-Total
500.00
2,167.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
900.2
UNIDAD:
M3-KM
I. EQUIPO
Descripcin
Tipo
VOLQUETA 7 M3
Tarifa/Hora
Rendimiento
50,000
50.00
Valor-Unit.
1,000.00
Sub-Total
1,000.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
1,000.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
200.00
IMPREVISTOS
5%
50.00
UTILIDAD
5%
50.00
Sub-Total
300.00
1,300.00
INDICE
REPUBLICA DE COLOMBIA
TERRITORIAL NARIO
CARRETERA :
ITEM:
ESPECIFICACIN:
900.3
UNIDAD:
M3-KM
I. EQUIPO
Descripcin
Tipo
VOLQUETA 7 M3
Tarifa/Hora
Rendimiento
50,000
50.00
Valor-Unit.
1,000.00
Sub-Total
1,000.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
1,000.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
200.00
IMPREVISTOS
5%
50.00
UTILIDAD
5%
50.00
Sub-Total
300.00
1,300.00
INDICE
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VIAS
ITEM:
ESPECIFICACIO
P1
UNIDAD:
M2
I. EQUIPO
Descripcin
25000
Rendimiento
Valor Unitario
257.00
Sub - Total
II. MATERIALES EN OBRA
Descripcin
Unidad
Precio Unit.
Cantidad
Valor Unitario
Cemento
kg
520.00
5.6000
Arena
M3
33,300.00
0.0189
628.70
Celulosa
kg
800.00
4.4800
3,584.00
Quimico
GBL
3,000.00
0.0160
48.00
20.00
2.9600
59.20
Agua
LT
2,912.00
Sub - Total
III. TRANSPORTES
Material
Vol-peso cant.
Arena
Celulosa
M3-Km
Tarifa
Valor Unitario
0.019
50,000.00
944.00
0.00448
50,000.00
224.00
Sub - Total
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor Unitario
107,124.00
185%
198,179.40
50.00
3,964.00
31,500.00
185%
58,275.00
50.00
1,166.00
Sub - Total
Porcentaje
Valor total
20%
2,757.40
Utilidad
5%
689.35
Imprevistos
5%
689.35
Sub - Total
CIOS UNITARIOS
257.00
7,231.90
1,168.00
5,130.00
13,787.00
4,136.10
17,923.00
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VIAS
ITEM:
ESPECIFICACIO
P-2
UNIDAD:
ML
I. EQUIPO
Descripcin
25000
Rendimiento
Valor Unitario
124.00
Sub - Total
124.00
Unidad
Vetiver
Abono organico
Precio Unit.
Cantidad
Valor Unitario
ML
4,200.00
1.00
4,200.00
BULTO
12,000.00
0.05
600.00
Sub - Total
4,800.00
III. TRANSPORTES
Material
Vol-peso cant.
M3-Km
Tarifa
Valor Unitario
Sub - Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor Unitario
2 Obreros
35,708.00
185%
66,059.80
50.00
1,321.00
1 Oficial
31,500.00
185%
58,275.00
50.00
1,166.00
Sub - Total
TOTAL COSTO DIRECTO
2,487.00
7,411.00
V. COSTOS INDIRECTOS
Descripcin
Administracin
Porcentaje
Valor total
20%
1,482.00
Utilidad
5%
371.00
Imprevistos
5%
371.00
Sub - Total
2,224.00
9,635.00
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VIAS
ITEM:
ESPECIFICACIO
P3
UNIDAD:
ML
I. EQUIPO
Descripcin
25000
Rendimiento
Valor Unitario
165.00
Sub - Total
II. MATERIALES EN OBRA
Descripcin
Unidad
ML
Precio Unit.
Cantidad
35,900.00
Valor Unitario
1.00
35,900.00
Sub - Total
III. TRANSPORTES
Material
Vol-peso cant.
M3-Km
Tarifa
Valor Unitario
Sub - Total
IV. MANO DE OBRA
Trabajador
2 Ayudantes
Jornal
Prestaciones
35,708.00
185%
Jornal Total
Rendimiento
66,059.80
20.00
Valor Unitario
3,303.00
Sub - Total
TOTAL COSTO DIRECTO
V. COSTOS INDIRECTOS
Descripcin
Administracin
Porcentaje
Valor total
20%
7,874.00
Utilidad
5%
1,968.00
Imprevistos
5%
1,968.00
Sub - Total
CIOS UNITARIOS
165.00
35,900.00
0.00
3,303.00
39,368.00
11,810.00
51,178.00
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN:
UNIDAD :M 2
I. EQUIPO
Descripcin
Tipo
CAMIONETA D 300
Tarifa/Hora
Rendimiento
27,000.00
100.00
Valor-Unit.
270.00
19.67
Sub-Total
Unidad
FRIJOL FORRAJERO
Precio-Unit.
Cantidad
Valor-Unit.
3,000
1.000
3,000.00
TIERRA ABONADA
M3
20,200
0.040
808.00
CAL DOLOMITA
KG
0.010
0.00
Sub-Total
III. TRANSPORTES
Material
TIERRA ABONADA
0.04
Distancia
M3-Km
Tarifa
10.0
0.4
1,000.00
Valor-Unit.
400.00
Sub-Total
Jornal
OBREROS (3)
$ 53,562.00
Prestaciones
185%
Jornal Total
99,089.70
Rendimiento
800.00
Valor-Unit.
123.86
OFICIAL
$ 31,500.00
185%
58,275.00
800.00
72.84
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
938.88
IMPREVISTOS
5%
234.72
UTILIDAD
5%
234.72
Sub-Total
Precio unitario total aproximado al peso
SPECIFICACIN: P 5
289.67
3,808.00
400.00
196.71
4,694.38
1,408.31
6,103.00
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 604-P
MORTERO EPOXICO
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
2,072.25
Sub-Total
2,072.25
Unidad
Kg
Kg
Kg
M2
Precio-Unit.
Cantidad
8400
3600
10000
5200
Valor-Unit.
2
25
1.25
0.5
$ 16,800.00
$ 90,000.00
$ 12,500.00
$ 2,386.00
Sub-Total
121,686.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (2)
$ 35,708.00
185%
66,059.8
3.00
22,019.93
OFICIAL
$ 31,500.00
185%
58,275.0
3.00
19,425.00
Sub-Total
Total Costo Directo
41,444.93
165,203.18
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
33,040.64
IMPREVISTOS
5%
8,260.16
UTILIDAD
5%
8,260.16
Sub-Total
49,560.95
214,764.13
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 600-P
Mortero para sello de grietas en obras de drenaje (Mortero 1:3)
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
2,072.25
Sub-Total
2,072.25
Unidad
Precio-Unit.
Kg
M3
Lt
CEMENTO
ARENA
AGUA
Cantidad
$ 520.00
$ 33,300.00
$ 20.00
Valor-Unit.
310
0.55
180
DESPERDICIO 5%
$ 161,200.00
$ 18,315.00
$ 3,600.00
$ 9,155.75
Sub-Total
192,270.75
III. TRANSPORTES
Material
ARENA
Vol-peso Cant.
Distancia
0.5775
M3-Km
35
Tarifa
20.2125
Valor-Unit.
$ 900.00
$ 18,191.25
Sub-Total
18,191.25
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (2)
$ 35,708.00
185%
66,059.8
3.00
22,019.93
OFICIAL
$ 31,500.00
185%
58,275.0
3.00
19,425.00
Sub-Total
Total Costo Directo
41,444.93
253,979.18
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
50,795.84
IMPREVISTOS
5%
12,698.96
UTILIDAD
5%
12,698.96
Sub-Total
76,193.75
330,172.93
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 601-P
Mortero para anillar tubera de concreto (Mortero 1:3)
UNIDAD : ML
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
414.45
Sub-Total
414.45
Unidad
Precio-Unit.
Kg
M3
Lt
CEMENTO
ARENA
AGUA
Cantidad
$ 520.00
$ 33,300.00
$ 20.00
Valor-Unit.
6.75
0.015
5
DESPERDICIO 5%
$ 3,510.00
$ 499.50
$ 100.00
$ 205.48
Sub-Total
4,314.98
III. TRANSPORTES
Material
Vol-peso Cant.
ARENA
0.01575
Distancia
M3-Km
35
Tarifa
0.55125
Valor-Unit.
$ 900.00
$ 496.13
Sub-Total
496.13
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
66,059.8
Rendimiento
15.00
Valor-Unit.
4,403.99
OFICIAL
$ 31,500.00
185%
58,275.0
15.00
3,885.00
Sub-Total
Total Costo Directo
8,288.99
13,514.54
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
2,702.91
IMPREVISTOS
5%
675.73
UTILIDAD
5%
675.73
Sub-Total
4,054.36
17,568.90
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 602-P
Mortero para revestimiento de alcantarilla (Mortero 1:4)
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
414.45
Sub-Total
414.45
Unidad
Precio-Unit.
Kg
M3
Lt
Kg
CEMENTO
ARENA
AGUA
Sikadur 32 primer
Cantidad
$ 520.00
$ 33,300.00
$ 20.00
$ 62,400.00
Valor-Unit.
18.2
0.058
5
0.4
DESPERDICIO 5%
$ 9,464.00
$ 1,931.40
$ 100.00
$ 24,960.00
$ 1,822.77
Sub-Total
38,278.17
III. TRANSPORTES
Material
Vol-peso Cant.
ARENA
0.0609
Distancia
M3-Km
35
Tarifa
2.1315
Valor-Unit.
$ 900.00
$ 1,918.35
Sub-Total
1,918.35
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
66,059.8
Rendimiento
15.00
Valor-Unit.
4,403.99
OFICIAL
$ 31,500.00
185%
58,275.0
15.00
3,885.00
Sub-Total
Total Costo Directo
8,288.99
48,899.96
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
9,779.99
IMPREVISTOS
5%
2,445.00
UTILIDAD
5%
2,445.00
Sub-Total
14,669.99
63,569.94
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 820,1
Geotextil para gaviones
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
8.26
CAMIONETA
D-300
27,000.00
80.00
337.50
Sub-Total
345.76
Unidad
Precio-Unit.
M2
Geotextil NT 1800
Cantidad
$ 4,000.00
Valor-Unit.
1.1
$ 4,400.00
$ 0.00
$ 0.00
$ 0.00
$ 220.00
Sub-Total
4,620.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
Rendimiento
66,059.8
160.00
Valor-Unit.
412.87
Sub-Total
Total Costo Directo
412.87
5,378.63
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,075.73
IMPREVISTOS
5%
268.93
UTILIDAD
5%
268.93
Sub-Total
1,613.59
6,992.22
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 690
Pedraplenes en concreto (Mortero 1:8)
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
1,243.35
MEZCLADORA
1 bulto
10,000.00
5.00
2,000.00
Sub-Total
3,243.35
Unidad
CEMENTO
Kg
ARENA
M3
AGUA
Lt
PIEDRA FRACTURADA
M3
Precio-Unit.
Cantidad
$ 520.00
$ 33,300.00
$ 20.00
$ 31,000.00
Valor-Unit.
16
0.097
10
0.15
DESPERDICIO 3%
$ 8,320.00
$ 3,230.10
$ 200.00
$ 4,650.00
$ 492.00
Sub-Total
16,892.10
III. TRANSPORTES
Material
Vol-peso Cant.
ARENA
0.09991
PIEDRA
0.1545
Distancia
M3-Km
35
35
Tarifa
3.49685
5.4075
Valor-Unit.
$ 900.00
$ 900.00
$ 3,147.17
4,866.75
Sub-Total
8,013.92
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
66,059.8
Rendimiento
10.00
Valor-Unit.
6,605.98
OFICIAL
$ 31,500.00
185%
58,275.0
10.00
5,827.50
Sub-Total
Total Costo Directo
12,433.48
40,582.85
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
8,116.57
IMPREVISTOS
5%
2,029.14
UTILIDAD
5%
2,029.14
Sub-Total
12,174.85
52,757.70
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 629-P
Mortero para tratamiento superficial
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
414.45
Sub-Total
414.45
Unidad
Precio-Unit.
Kg
M3
Lt
Kg
CEMENTO
ARENA
AGUA
Sikadur 32 primer
Cantidad
$ 520.00
$ 33,300.00
$ 20.00
$ 62,400.00
Valor-Unit.
11.25
0.025
10
1
DESPERDICIO 5%
$ 5,850.00
$ 832.50
$ 200.00
$ 62,400.00
$ 3,464.13
Sub-Total
72,746.63
III. TRANSPORTES
Material
Vol-peso Cant.
ARENA
0.02625
Distancia
M3-Km
35
Tarifa
0.91875
Valor-Unit.
$ 900.00
$ 826.88
Sub-Total
826.88
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
66,059.8
Rendimiento
15.00
Valor-Unit.
4,403.99
OFICIAL
$ 31,500.00
185%
58,275.0
15.00
3,885.00
Sub-Total
Total Costo Directo
8,288.99
82,276.94
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
16,455.39
IMPREVISTOS
5%
4,113.85
UTILIDAD
5%
4,113.85
Sub-Total
24,683.08
106,960.02
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 450.3
MEZCLA DENSA EN CALIENTE TIPO MDC - 2
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
TERMINADORA DE ASFALTO
Rendimiento
Valor-Unit.
280,000
20.00
14,000.00
90,000
20.00
4,500.00
COMPACTADOR NEUMATICO
90,000
20.00
4,500.00
207.08
Sub-Total
23,207.08
Unidad
Precio-Unit.
M3
Cantidad
330,800
Valor-Unit.
1.250
413,500.00
SEAL TEMPORAL
Sub-Total
413,500.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.25
Distancia
M3-Km
Tarifa
20.0
25.0
1,000.00
Valor-Unit.
25,000.00
Sub-Total
25,000.00
Jornal
OBREROS (5)
$ 103,000.00
Prestaciones
185%
Jornal Total
190,550.00
Rendimiento
160.00
Valor-Unit.
1,190.94
RASTRILLEROS (1)
$ 40,000.00
185%
74,000.00
160.00
462.50
OFICIAL
$ 36,100.00
185%
66,785.00
160.00
417.41
Sub-Total
Total Costo Directo
2,070.84
463,777.93
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
92,755.59
IMPREVISTOS
5%
23,188.90
UTILIDAD
5%
23,188.90
Sub-Total
139,133.38
602,911.00
282678
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 450.3
MEZCLA DENSA EN CALIENTE TIPO MDC - 2
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
TERMINADORA DE ASFALTO
Rendimiento
Valor-Unit.
105,000
20.00
5,250.00
75,000
20.00
3,750.00
COMPACTADOR NEUMATICO
70,000
20.00
3,500.00
180.11
Sub-Total
12,680.11
Unidad
Precio-Unit.
M3
Cantidad
300,000
Valor-Unit.
1.250
375,000.00
SEAL TEMPORAL
Sub-Total
375,000.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.25
Distancia
M3-Km
Tarifa
55.0
68.8
900.00
Valor-Unit.
61,875.00
Sub-Total
61,875.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (5)
$ 89,270.00
185%
165,149.50
160.00
1,032.18
RASTRILLEROS (1)
$ 35,000.00
185%
64,750.00
160.00
404.69
OFICIAL
$ 31,500.00
185%
58,275.00
160.00
364.22
Sub-Total
Total Costo Directo
1,801.09
451,356.20
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
90,271.24
IMPREVISTOS
5%
22,567.81
UTILIDAD
5%
22,567.81
Sub-Total
135,406.86
586,763.00
282678
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 210.1
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
RETROEXCAVADORA 320
BULDOZER D6
Rendimiento
Valor-Unit.
125,000
25.00
5,000.00
95,000
50.00
1,900.00
4.95
Sub-Total
6,904.95
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBRERO (1)
$ 17,854.00
185%
33,029.90
200.00
165.15
PALETEROS
$ 35,708.00
185%
66,059.80
200.00
330.30
Sub-Total
Total Costo Directo
495.45
7,400.40
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,480.08
IMPREVISTOS
5%
370.02
UTILIDAD
5%
370.02
Sub-Total
2,220.12
9,621.00
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 210.3
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
RETROEXCAVADORA 320
BULDOZER D6
Rendimiento
Valor-Unit.
125,000
40.00
3,125.00
95,000
80.00
1,187.50
1.03
Sub-Total
4,313.53
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL PREVENTIVA
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 17,854.00
Prestaciones
185%
Jornal Total
Rendimiento
33,029.90
320.00
Valor-Unit.
103.22
Sub-Total
Total Costo Directo
103.22
4,416.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
883.35
IMPREVISTOS
5%
220.84
UTILIDAD
5%
220.84
Sub-Total
1,325.03
5,742.00
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 320.1
SUBBASE GRANULAR DE CBR>=20%
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
42,000
35.00
1,200.00
75,000
35.00
2,142.86
100,000
35.00
2,857.14
Sub-Total
6,200.00
Unidad
MATERIAL DE SUBBASE
Precio-Unit.
M3
Cantidad
20,000
Valor-Unit.
1.250
25,000.00
SEAL TEMPORAL
Sub-Total
25,000.00
III. TRANSPORTES
Material
MATERIAL DE SUBBASE
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.25
35.0
43.8
900.00
Valor-Unit.
39,375.00
Sub-Total
39,375.00
Jornal
$ 35,708.00
Prestaciones
185%
Jornal Total
Rendimiento
66,059.80
280.00
Valor-Unit.
235.93
Sub-Total
Total Costo Directo
235.93
70,810.93
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
14,162.19
IMPREVISTOS
5%
3,540.55
UTILIDAD
5%
3,540.55
Sub-Total
21,243.28
92,054.00
45941
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 320.2
SUBBASE GRANULAR DE CBR>=30%
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
42,000.0
35.00
1,200.00
75,000.0
35.00
2,142.86
100,000.0
35.00
2,857.14
Sub-Total
6,200.00
Unidad
MATERIAL DE SUBBASE
Precio-Unit.
M3
Cantidad
22,000
Valor-Unit.
1.250
27,500.00
SEAL TEMPORAL
Sub-Total
27,500.00
III. TRANSPORTES
Material
MATERIAL DE SUBBASE
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.3
35.0
43.8
900.00
Valor-Unit.
39,375.00
Sub-Total
39,375.00
Jornal
$ 35,708.00
Prestaciones
185%
Jornal Total
Rendimiento
66,059.80
280.00
Valor-Unit.
235.93
Sub-Total
Total Costo Directo
235.93
73,310.93
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
14,662.19
IMPREVISTOS
5%
3,665.55
UTILIDAD
5%
3,665.55
Sub-Total
21,993.28
95,304.00
45941
REPUBLICA DE COLOMBIA
CARRETERA :
ITEM:
ESPECIFICACIN: 450.1
COSTO MEZCLA (MEZCLA DENSA EN CALIENTE TIPO MDC - 3)
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
80,000.00
10.00
8,000.00
105,000.00
30.00
3,500.00
47,000
10.00
4,700.00
PLANTA TRITURADORA
280,000
30.00
9,333.33
400,000
10.00
40,000.00
19.67
Sub-Total
65,553.00
Unidad
Precio-Unit.
M3
Valor-Unit.
1.300
500
1.300
650.00
2,000
120
240,000.00
Cantidad
15,600
KG
20,280.00
SEAL TEMPORAL
Sub-Total
260,930.00
III. TRANSPORTES
Material
Vol-peso Cant.
MATERIAL CRUDO
1.3
Distancia
M3-Km
Tarifa
25
32.5
1,000.00
Valor-Unit.
32,500.00
Sub-Total
32,500.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (3)
$ 53,562.00
185%
99,089.70
80.00
1,238.62
OFICIALES (1)
$ 31,500.00
185%
58,275.00
80.00
728.44
Sub-Total
Total Costo Directo
1,967.06
360,950.06
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
72,190.01
IMPREVISTOS
5%
18,047.50
UTILIDAD
5%
18,047.50
Sub-Total
108,285.02
469,235.00
544312.6945
PARA PLANTA
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 450.5
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR BENITIN
Rendimiento
45,000
2.50
Valor-Unit.
18,000.00
1,710.00
Sub-Total
19,710.00
Unidad
MEZCLA MDC-2
M3
Precio-Unit.
300,000
Cantidad
1.250
Valor-Unit.
375,000.00
M2
896
15.3
234.09
SEAL TEMPORAL
Sub-Total
375,234.09
III. TRANSPORTES
Material
MEZCLA MDC-2
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.250
20.0
25.0
1,200.00
Valor-Unit.
30,000.00
Sub-Total
30,000.00
Jornal
PALETEROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
57,000.00
Rendimiento
20.00
Valor-Unit.
2,850.00
OBREROS (5)
89,270
185%
142,500.00
20.00
7,125.00
RASTRILLEROS
70,000
500%
142,500.00
20.00
7,125.00
Sub-Total
17,100.00
442,044.09
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
88,408.82
IMPREVISTOS
5%
22,102.20
UTILIDAD
5%
22,102.20
Sub-Total
132,613.23
574,657.32
421.2
0
1.5
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 450.5
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR BENITIN
Rendimiento
45,000
2.50
Valor-Unit.
18,000.00
0.00
Sub-Total
18,000.00
Unidad
MEZCLA MDC-2
M3
Precio-Unit.
220,000
Cantidad
1.250
Valor-Unit.
275,000.00
EMULSION ASFALTICA
KG
896
8.0
7,167.48
SEAL TEMPORAL
Sub-Total
282,167.48
III. TRANSPORTES
Material
MEZCLA MDC-2
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.250
50.0
62.5
700.00
Valor-Unit.
43,750.00
Sub-Total
43,750.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
PALETEROS (2)
185%
20.00
0.00
OBREROS (5)
185%
20.00
0.00
RASTRILLEROS
500%
20.00
0.00
Sub-Total
0.00
343,917
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
IMPREVISTOS
5%
UTILIDAD
5%
Sub-Total
Precio unitario total aproximado al peso
0.00
343,917
1.5
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 450.5
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR BENITIN
Rendimiento
45,000
2.50
Valor-Unit.
18,000.00
1,710.00
Sub-Total
19,710.00
Unidad
MEZCLA MDC-2
M3
Precio-Unit.
300,000
Cantidad
1.250
Valor-Unit.
375,000.00
M2
896
15.3
234.09
SEAL TEMPORAL
Sub-Total
375,234.09
III. TRANSPORTES
Material
MEZCLA MDC-2
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.250
20.0
25.0
1,200.00
Valor-Unit.
30,000.00
Sub-Total
30,000.00
Jornal
PALETEROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
57,000.00
Rendimiento
20.00
Valor-Unit.
2,850.00
OBREROS (5)
89,270
185%
142,500.00
20.00
7,125.00
RASTRILLEROS
70,000
500%
142,500.00
20.00
7,125.00
Sub-Total
17,100.00
442,044.09
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
88,408.82
IMPREVISTOS
5%
22,102.20
UTILIDAD
5%
22,102.20
Sub-Total
132,613.23
574,657.32
421.2
0
1.5
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 450.5
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR BENITIN
Rendimiento
45,000
2.50
Valor-Unit.
18,000.00
0.00
Sub-Total
18,000.00
Unidad
MEZCLA MDC-2
M3
Precio-Unit.
220,000
Cantidad
1.250
Valor-Unit.
275,000.00
EMULSION ASFALTICA
KG
896
8.0
7,167.48
SEAL TEMPORAL
Sub-Total
282,167.48
III. TRANSPORTES
Material
MEZCLA MDC-2
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.250
30.0
37.5
1,200.00
Valor-Unit.
45,000.00
Sub-Total
45,000.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
PALETEROS (2)
OBREROS (5)
RASTRILLEROS
Sub-Total
Total Costo Directo
0.00
345,167.48
V. COSTOS INDIRECTOS
Descripcin
Porcentaje
Valor Total
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Sub-Total
Precio unitario total aproximado al peso
0.00
345,167.48
44
69
1.5
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 450.5
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
COMPACTADOR BENITIN
Rendimiento
45,000
2.50
Valor-Unit.
18,000.00
1,710.00
Sub-Total
19,710.00
Unidad
MEZCLA MDC-2
M3
Precio-Unit.
300,000
Cantidad
1.250
Valor-Unit.
375,000.00
M2
896
15.3
234.09
SEAL TEMPORAL
Sub-Total
375,234.09
III. TRANSPORTES
Material
MEZCLA MDC-2
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.250
55.0
68.8
1,200.00
Valor-Unit.
82,500.00
Sub-Total
82,500.00
Jornal
PALETEROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
57,000.00
Rendimiento
20.00
Valor-Unit.
2,850.00
OBREROS (5)
89,270
185%
142,500.00
20.00
7,125.00
RASTRILLEROS
70,000
500%
142,500.00
20.00
7,125.00
Sub-Total
17,100.00
494,544.09
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
98,908.82
IMPREVISTOS
5%
24,727.20
UTILIDAD
5%
24,727.20
Sub-Total
148,363.23
642,907.32
421.2
0
1.5
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 621.7P
UNIDAD : ML
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
85000
0.125
680000
25000
0.125
200000
12000
0.125
96000
MEZCLADORA
10000
0.125
80000
8500.00
0.125
68000
25000.00
0.125
200000
Pluma
PLANTA ELECTRICA
HERRAMIENTA MENOR
4,484.47
Sub-Total
1,328,484.47
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
CEMENTO
KG
520
616
320,320.00
AGREGADO GRUESO
48,000
1.500
72,000.00
AGREGADO FINO
33,300
1.000
33,300.00
AGUA
LT
20
246.000
4,920.00
40,000.00
SUPERPLASTIFICANTE SIKAMENT
GALON
50,000
0.80
UNIDAD
63,500
0.140
8,890.00
ML
33,300
33,300.00
Sub-Total
512,730.00
III. TRANSPORTES
Material
COMPRESOR
Vol-peso Cant.
Distancia
M3-Km
Tarifa
GLOBAL
Valor-Unit.
32.00
0.00
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 71,416.00
185%
135,690.40
1.00
135,690.40
OFICIAL
$ 31,500.00
185%
59,850.00
1.00
59,850.00
$ 89,270.00
185%
169,613.00
8.00
21,201.63
OFICIAL
$ 31,500.00
185%
59,850.00
8.00
7,481.25
Sub-Total
Total Costo Directo
224,223.28
2,065,437.74
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
413,087.55
IMPREVISTOS
5%
103,271.89
UTILIDAD
5%
103,271.89
Sub-Total
619,631.32
2,685,069.00
3.141592654
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 661.1
UNIDAD : ML
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
DIFERENCIAL
Rendimiento
4,500.00
1.00
Valor-Unit.
4,500.00
2,379.93
Sub-Total
6,879.93
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
M3
#REF!
20,000
0.030
0.460
#REF!
9,200.00
ML
240,000
1.000
240,000.00
Sub-Total
#REF!
III. TRANSPORTES
Material
Distancia
Ml o m3-Km
Tarifa
TUBERIA
60
69.0
600.00
Valor-Unit.
41,400.00
SUB BASE
0.5
60
27.6
900.00
24,840.00
Sub-Total
66,240.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (4)
$ 71,416.00
185%
132,119.60
8.00
16,514.95
OFICIAL
$ 31,500.00
185%
58,275.00
8.00
7,284.38
Sub-Total
Total Costo Directo
23,799.33
#REF!
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
#REF!
IMPREVISTOS
5%
#REF!
UTILIDAD
5%
#REF!
Sub-Total
#REF!
#REF!
238906
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 674
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
2.20
Sub-Total
2.20
Unidad
Precio-Unit.
M2
Cantidad
5,000
Valor-Unit.
1.100
5,500.00
SEAL PREVENTIVA
Sub-Total
5,500.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
OBREROS (2)
$ 35,708.00
185%
66,059.80
1,500.00
44.04
$ 0.00
185%
0.00
1,500.00
0.00
OFICIAL
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
44.04
5,546.24
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
1,109.25
IMPREVISTOS
5%
277.31
UTILIDAD
5%
277.31
Sub-Total
1,663.87
7,210.00
3718
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 675.3
UNIDAD : KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
110.10
Sub-Total
110.10
Unidad
Precio-Unit.
KG
Cantidad
2,000
Valor-Unit.
1.050
2,100.00
Sub-Total
2,100.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
OBREROS (5)
$ 89,270.00
Prestaciones
185%
Jornal Total
Rendimiento
165,150
150.00
Valor-Unit.
1,101.00
Sub-Total
Total Costo Directo
1,101.00
3,311.10
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
662.22
IMPREVISTOS
5%
165.55
UTILIDAD
5%
165.55
Sub-Total
993.33
4,304.00
410.1
2524
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 675.2
UNIDAD : LT
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
CARROTANQUE IRRIGADOR
Rendimiento
75,000.00
700
Valor-Unit.
107.14
Sub-Total
107.14
Unidad
Precio-Unit.
LT
Cantidad
2,000
Valor-Unit.
1.05
2,100.00
Sub-Total
2,100.00
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
Rendimiento
66,060
5,600.00
Valor-Unit.
11.80
Sub-Total
Total Costo Directo
11.80
2,218.94
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
443.79
IMPREVISTOS
5%
110.95
UTILIDAD
5%
110.95
Sub-Total
665.68
2,885.00
421.1
1609
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 682
UNIDAD : M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
75,000.00
20.00
3,750.00
42,000.00
20.00
2,100.00
100,000.00
20.00
5,000.00
8,000.00
10.00
800.00
64.11
Sub-Total
11,714.11
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
FORMALETA
M2
10,400
2.500
26,000.00
MATERIAL DE RELLENO
M3
9,500
1.300
12,350.00
Sub-Total
38,350.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.3
Distancia
M3-Km
Tarifa
35.0
45.5
900.00
Valor-Unit.
40,950.00
Sub-Total
40,950.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
$ 107,124.00
185%
198,179.40
80.00
2,477.24
$ 31,500.00
185%
58,275.00
80.00
728.44
Sub-Total
Total Costo Directo
3,205.68
94,219.79
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
18,843.96
IMPREVISTOS
5%
4,710.99
UTILIDAD
5%
4,710.99
Sub-Total
28,265.94
122,486.00
JULIO (OK)
43508
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 621.1
UNIDAD : ML
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
MAQUINA PILOTEADORA
R15
180000.0
180,000.00
PALA AUXILIAR
535
260000.0
130,000.00
77,500.00
75,000.00
A25C
155,000.00
CAMISA
150,000.00
37,657.07
2,379.93
MOTOBOMBA DE CONCRETO
50,000
19,607.84
25,340
1.00
25,339.89
Sub-Total
502,537.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
312,000
0.785
244,920.00
BENTONITA
KG
5,000
2.355
11,775.000
KG
875
127.000
111,125.00
Sub-Total
367,820.00
III. TRANSPORTES
Material
TRANSPORTE MATERIALES DE
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.2
10.0
12.0
900.00
Valor-Unit.
10,800.00
EQUIPOS
40,000.00
Sub-Total
50,800.00
Jornal
OBREROS (4)
$ 71,416.00
Prestaciones
185%
Jornal Total
132,120
Rendimiento
8.00
Valor-Unit.
16,514.95
OFICIALES (1)
$ 31,500.00
185%
58,275
8.00
7,284.38
Sub-Total
Total Costo Directo
23,799.33
944,956.33
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
188,991.27
IMPREVISTOS
5%
47,247.82
UTILIDAD
5%
47,247.82
Sub-Total
283,486.90
1,228,443.00
no se
no se
no se
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 201.9
UNIDAD : (M3)
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
65,000
5.00
13,000.00
105,000
12.00
8,750.00
165.15
Sub-Total
21,915.15
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
SEAL TEMPORAL
Sub-Total
0.00
III. TRANSPORTES
Material
Vol-peso Cant.
1.3
MATERIAL DE DEMOLICION
Distancia
M3-Km
Tarifa
5.0
6.5
900.00
Valor-Unit.
5,850.00
Sub-Total
5,850.00
Jornal
OBREROS (2)
$ 35,708.00
Prestaciones
185%
Jornal Total
Rendimiento
66,059.8
40.00
Valor-Unit.
1,651.50
Sub-Total
Total Costo Directo
1,651.50
29,416.64
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
5,883.33
IMPREVISTOS
5%
1,470.83
UTILIDAD
5%
1,470.83
Sub-Total
8,824.99
38,242.00
43367
38036
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 640.1.1
UNIDAD : KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
7.30
CIZALLA
3,000.00
37.50
80.00
Sub-Total
87.30
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
2,300
1.050
2,415.00
KG
2,600
0.030
78.00
Sub-Total
2,493.00
III. TRANSPORTES
Material
TRANSPORTE
1.050
Distancia
M3-Km
Tarifa
35.0
36.8
0.36
Valor-Unit.
13.23
Sub-Total
13.23
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
OBREROS (1)
$ 17,854.00
185%
33,029.90
250.00
132.12
OFICIAL
$ 31,500.00
185%
58,275.00
250.00
233.10
Sub-Total
Total Costo Directo
365.22
2,958.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
591.75
IMPREVISTOS
5%
147.94
UTILIDAD
5%
147.94
Sub-Total
887.63
3,846.00
REPUBLICA DE COLOMBIA
CARRETERA :
ESPECIFICACIN: 640.1.2
UNIDAD : KG
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
7.30
CIZALLA
3,000.00
37.50
80.00
Sub-Total
87.30
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
KG
2,300
1.050
2,415.00
KG
2,600
0.030
78.00
Sub-Total
2,493.00
III. TRANSPORTES
Material
TRANSPORTE
Distancia
M3-Km
Tarifa
35.0
36.8
0.36
Valor-Unit.
13.23
Sub-Total
13.23
Jornal
OBREROS (1)
$ 17,854.00
Prestaciones
185%
Jornal Total
33,029.90
Rendimiento
250.00
Valor-Unit.
132.12
OFICIAL
$ 31,500.00
185%
58,275.00
250.00
233.10
Sub-Total
Total Costo Directo
365.22
2,958.75
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
Valor Total
20%
591.75
IMPREVISTOS
5%
147.94
UTILIDAD
5%
147.94
Sub-Total
887.63
3,846.00
NO SE