(INVESTIGATION REPORT)
Report No.: DGM (TPI-E)/A./2010/
Dt. 28-09-2010
Date
: 28-09-2010
Shift
: A
Time
: 01:30 PM
Department: MRD
Location : Slag Processing Shop
DSO
: Shri B.S. Vashistha
Recommendations:
1. Supply is never taken from incoming of the CB.
2. Awareness should be there for voltage level and their system before
connecting the leads.
3. Single phase to be taken from CB at outgoing side on OFF condition.
4. Proper supervision to be done.
5. Safety training should be given to individual.
(H.C. Chandniha)
Dy. Mgr.(TPI-E)
DGM(TPI-E)
AGM -Elect. (MRD)
CC:
1. DGM-I/C (EHT)
2. GM (E)