NOTES :

1. Cable sizes, route length and number of runs have been considered based on available detail provided in Technical Specification.
2. Make, type and specification of cables shall be as per TS ( Cl. No. 4.12.1)

1
Rev. No.

01.08.13

Revised for re-submission to MECON for Approval

Date

Description

Category of Drawing

Approval

Information

Reference

Record

SAIL - ROURKELA STEEL PLANT, ROURKELA


HT/ LT SUB STATION FOR LIME PLANT, CED, PROPANE PLANT WITH
INTERPLANT CABLING & MISC. ELECTRICAL WORKS
4.2 MTPA EXPANSION, PACKAGE No. - 73A
CONSULTANT:

MECON LIMITED
STERLING & WILSON LTD., KOLKATA

CONTRACTOR:

Designed

Name

Date

Name

Date

RNB

15.02.13

INTER PLANT HT ( 33 KV & 6.6 KV)


CABLE SCHEDULE
Scale :

Drawn
Checked

RNB

15.02.13

Project's Drg. No.

Approved

ABC

15.02.13

SAIL-RSP Drg. No.

NTS

RSP-ROURKELA/S&WL/20/29/DE/242

RNB

RNB

ABC

By

Chekd

Appvd

Construction

& 6.6 KV)

LE

Sheet

Rev.

1 of 4

STERLING & WILSON LTD., KOLKATA


ECC Division - EDRC

Sl. No.

PROJECT

HT/ LT SUB STATION FOR LIME PLANT, CED, PROPANE PLANT WITH INTERPLANT CABLING & MISC. ELECTRICAL WORKS, PA
No. - 073A

TITLE

HT (33kV & 6.6kV CABLE SCHEDULE

Cable No

From

Panel No.

To

A
1
2

33 KV
73A-00-02-H1-001
73A-02-01-H1-002

MSDS-3 (O/D)
CPP-1 (AIS - I/D)

CPP-3 (GIS)
CPP-3 (GIS)

B
1

LBDS-13
73A-06-03-H2-001A

LBSS-1

73A-06-03-H2-002A

LBSS-1

73A-06-03-H2-003/1
73A-06-03-H2-003

LBSS-1
HT Isolator-1

73A-06-03-H2-003

LBSS-1

73A-03-03-H2-004/1
73A-03-03-H2-004

LBSS-1
HT Isolator-2

73A-03-03-H2-004

LBDS-13 HT Sw. Board

5
6
7

73A-03-03-H2-005A
73A-03-03-H2-006A
73A-03-03-H2-007

LBDS-13 HT Sw. Board


LBDS-13 HT Sw. Board
LBDS-13 HT Sw. Board

73A-03-03-H2-008

LBDS-13 HT Sw. Board

73A-03-03-H2-009
73A-03-03-H2-010

LBDS-13 HT Sw. Board


LBDS-13 HT Sw. Board

LBDS-13 HT Sw. Board, Incoming


Feeder-1
LBDS-13 HT Sw. Board, Incoming
Feeder-2
HT Isolator-1
630 KVA Trafo-1 at
LBDS-13
630 KVA Trafo-1 at
LBDS-13
HT Isolator-2
630 KVA Trafo-2 at
LBDS-13
630 KVA Trafo-2 at
LBDS-13
Existing NCP, Fdr.-1
Existing NCP, Fdr.-2
Existing Marshalling
Yard S/S, Fdr.-1
Existing Marshalling
Yard S/S, Fdr.-2
1MVAr Capacitor bank-1
1MVAr Capacitor bank-2

LTSS- 01A

Panel
No

Connected Load

1
2
3
4

73A-07-04-H2-001
73A-07-04-H2-001/1
73A-07-04-H2-002
73A-07-04-H2-002/1

LBSS-2
HT Isolator-1
LBSS-2
HT Isolator-2

HT Isolator-1
LTSS-01A, 1600 KVA Trafo-1
HT Isolator-2
LTSS-01A, 1600 KVA Trafo-2

D
1

LBDS-15
73A-08-05-H2-001

Existing NSP - S/S

LBDS-15 HT Sw. Board, Incoming


Feeder-1

73A-08-05-H2-002

Existing BP- II, HT S/S

73A-08-05-H2-003

LBDS-15 HT Sw. Board

73A-08-05-H2-004

LBDS-15 HT Sw. Board

5
6

73A-08-05-H2-005
73A-08-05-H2-006

LBDS-15 HT Sw. Board


LBDS-15 HT Sw. Board

LBDS-15 HT Sw. Board, Incoming


Feeder-2
1600 KVA Trafo-1 at LBDS-15 ( Open
Bus- Bar)
1600 KVA Trafo-2 at LBDS-15 (Open
Bus- Bar)
HRLS
CPTI

Note: Buried 33 kV cable shall have water swellable tape.


Voltage & No of Core

Size

6.6 kV , 3 Core,AL
33 kV , 3 Core,CU

240
400

Length
(Km)

31.098
5.1

Term
(Nos)

66
6

RICAL WORKS, PACKAGE

DOCUMENT NO
RSP-ROURKELA/S&WL/20/29/DE/242
PREPARED

RNB

Voltage
(kV)

CABLE DETAILS
Material
Runs
Core

Area
Sq.mm

Insul.

DATE
9/23/2015

CHECKED

SHEET

RNB

1 of 1

Route
Length
(km)

Total Length(km)

Termn

Joints

Drum length
(m)

33
33

CU
CU

1
2

3
3

400
400

XLPE
XLPE

0.9
2.1

0.9
4.2

2
4

1
8

500
500

6.6

AL

240

XLPE

2.1

8.4

16

1000

6.6

AL

240

XLPE

2.1

8.4

16

1000

6.6
6.6

AL
AL

1
1

3
3

240
240

XLPE
XLPE

0.04
0.004

0.04
0.004

2
2

0
0

1000
1000

6.6

AL

240

XLPE

2.1

2.1

1000

6.6
6.6

AL
AL

1
1

3
3

240
240

XLPE
XLPE

2.1
0.004

2.1
0.004

2
2

4
0

1000
1000

6.6

AL

240

XLPE

0.04

0.04

1000

6.6
6.6
6.6

AL
AL
AL

2
2
1

3
3
3

250
250
600

XLPE
XLPE
XLPE

0.6
0.6
0.25

1.2
1.2
0.25

4
4
2

2
2
0

1000
1000
1000

6.6

AL

600

XLPE

0.25

0.25

1000

6.6
6.6

AL
AL

1
1

3
3

240
240

XLPE
XLPE

0.04
0.04

0.04
0.04

2
2

0
0

1000
1000

6.6
6.6
6.6
6.6

AL
AL
AL
AL

1
1
1
1

3
3
3
3

240
240
240
240

XLPE
XLPE
XLPE
XLPE

0.1
0.08
0.1
0.1

0.1
0.08
0.1
0.1

2
2
2
2

0
0
0
0

1000
1000
1000
1000

6.6

AL

240

XLPE

1.25

2.5

1000

6.6

AL

240

XLPE

1.4

1.4

1000

6.6

AL

240

XLPE

0.05

0.05

1000

6.6

AL

240

XLPE

1.4

1.4

1000

6.6
6.6

AL
AL

1
1

3
3

240
240

XLPE
XLPE

0.2
1.1

0.2
1.1

2
2

0
2

1000
1000

Joints
(Nos)

54
9

REMARKS

Along Trays in Existing Cable Tunne


/Along
CableTrays
Bridge.
in Existing Cable Tunne
/ Cable Bridge, Buried U/G.

Existing Cable Tunne / Cable Bridge, Buried U/G, On


trays within SS (S2, A4)
Existing Cable Tunne / Cable Bridge, Buried U/G, On
trays within SS (Y1, A4)

Y2, A7, D3, F3

A7, D3
A4 / A5, K2 /K3, Buried U/G
A4 / A5, K2 /K3, Buried U/G
A4 / A5, K2 /K3, Buried U/G
A4 / A5, K2 /K3, Buried U/G

Buried U/G, Pipes


On trays
Buried U/G, Pipes
On trays

Buried U/G, Existing Cable Tunne, Buried U/G, On trays


within SS (S3,
A4)
Existing Cable Tunne, Buried U/G, On trays within SS
( S3, A4)
A6, D3
A6, D3, F3
A3, S2, Buried U/G
A6, D3, F3, Pipes, Buried U/G

You might also like