You are on page 1of 9
CPRI TEST REPORT Central Power Research Institute (A Govt. of India Society) P.B.No. 8066, Sadashivanagar Post Office, Sir C.V. Raman Road, Bangalore - 560 080 (INDIA) CENTRAL POWER RESEARCH INSTITUTE TEST REPORT Test Report Number: 292EATDIP1380149 Dated: 22.05.2013 Name & Address of the Customer Mis Bharat Heavy Electricals Ltd ELECTROPORCELAINS DIVISION Prof. C.NR, Rao Circle, Opp. lISC., Malleswaram, Bangalore ~ $60 012. INDIA. Name & Address of the Manufacturer M/s Bharat Heavy Electricals Ltd ELECTROPORCELAINS DIVISION Prof. C.N.R. Rao Circle, Opp. IISC., Malleswaram, Bangalore ~ 560 012. INDIA. Particulars of sample tested Condition of the sample on Receipt New Type Indoor ! Outdoor Designation Double Front MCC Serial Number TYLT/ 10 Number of samples tested One only Date (s) of Test (s) 21.08.2013 CPRI sample code nos) EATOIP1380149 Particulars of tests conducted Test in accordance with Standard / specification IP 42 Test as per IEC 60529 Edition 2.1, 2001-02 Standard Clause 13.2 Sampling Plan Not applicable Customer's requirement 1, IP 42 Tests per IEC 60529 Edition 2.1, 2001-02 Standard Clause 13.2 2. Insulation Resistance test at S00V DC and 3. Power frequency High Voltage withstand test at 2.5kV AC to be applied for one minute between all terminals of Busbars shorted together and the body of Double Front MCC Enclosure, to be conducted before and after IP 42 tests. Deviations itany Nit Name of the witnessing porsons Customer's representative Mr, Raj Kumar Pradhan, Other than customer's representatives None Test subcontracted with address of the laboratory None Documents constituting this report (In words) Number of sheets Three Only Number of oscillograms Nile Number of graphs Nik Number of photos “Nile Number of test circuit diagrams “Nit Number of drawings Five only. Org. No. EPD-1P42-001, Rev 00, Sheet 01/01 and Sheet 02/02. Drg. No. ND 52080, ND 52086, ND 50035, Rev 00, Sheet 0105 Sheet 0003 y Mu wee (M1 SIDDHARTHA BHATT) Additional Director Sher FoFS (GUJJALA a) Test Engineer CENTRAL POWER RESEARCH INSTITUTE Test Report Number: 292EATDIP13S0149 Dated: 22.05.2013 CPRI TEST RESULTS: PARTICULARS SL. OBSERVATIONSIVALUES OBTAINED No. | TESTS REFERENCE CLAUSE conbucteD [70 IP 4Xtest as per | Clause 13.2 Rigid steel rod of 1.0 °° mm, with IEC 60529 Protection against access | edges free from burrs applied with a force Edition 2.1, 2001- | to hazardous parts ~ of 1N#10% did not penetrate nor pass (02 standard Insertion of Test Probe of | through the openings provided on tne 1,0 mmdia, Double Front MCC Enclosure. Protection provided is satisfactory" 20 | iP X2test as per | Clauset42.2 Droplets of water is found observed on all IEC 60529 Protection against harmful_| compartments and feeder tray of the Edition 2.1, 2001. | ingrass of water ~ Dripping | Double Front MCC Enclosure. 02 standard rain 3-5 mm per min with sample inclined to vertical | axis by 15° in all four directions, Total duration | 10 minutes. 30 ELECTRICAL TESTS Before IP ax ‘After IP X2 fest Test 31 [insulation Resistance Measurement at S00V DC } applied for one minute between all terminals of Busbars shorted together and the body of 21060 3720 Double Front MCC Encsure, 32 _| Power frequency high Voltage withstand test at 2.5kV AC applied for one minute between all terminals of Busbars shorted together and the Withstood withstood body of Double Front MCC Enclosure. ‘Shee Dor Test Report Number: 292EATDIP13S0149 a) » o e) CENTRAL POWER RESEARCH INSTITUTE |: 22.08.2013 NOTE The test results relate only to the item(s) (ested. Publication or reproduction ofthis report in any form other than by complete set of the whole report and in the language written is not permitted without the written consent of CPRI. ‘Any correction / erasure invalidate this test report / certificate NNABL has accredited this laboratory as per ISOMIEC 17025:2005 standard vide certificate no. T ~ 0010 for the tests carried out, Any anomaly / discrepancy in the test report / certificate should be brought to our notice within 45 days from the date of issue. The verification of the sample drawings by CPRI is limited to dimensional checks only wherever possible. Test'Engin Shee Fors = —=s cs ISL ey oh Bos 39M INCA Sep aor an Papa GUAN ST Tle SOE Sa owdgd FYWOA CY we ww NI -34V SNOISNSWIG TW = : =aI0N 2 RERINOD saDae T saw aswawe Woe aS woe and OER / MO woisuouic Tee ey & 4 sara ood Auer ‘aunnon aev seme 'sAounE 3809 sau scm tS [eh = = a —s = cs co 2 GEST scar ve ai wos Jon inoys Svenoo 30 NaMaONvaRNY = a Se aap] oe ae bahay jx] FO0-PSar-aat sw| 59m eaneeee| | l’ nes (GUNN STVOLITB AAVIH LVEVES ead Nave 4 eVsewe =a-" Rencuay yw £Yy — lr} | €/0G- GO-BE 080 o9s - Ninjesuag ivacbe eel bhioseid ze r ISaL oad INDSS TaNVd SO NV 1d NOIIIIS = H ae 062 oS 4 F oN 19 ins St ce22s ow , t - iy bere] yoo i] 33A09 GNF ae se 108 sx09007 vn ae seein 830334 ° -—™ t a = =o m3 = chs = = = 58 8S] \GSvo a3BEnw JON uD on a0r] Sw30 ae Save foro|na [ras] Swb0 y sue Pupachaal ‘08075 GN pana 40 NOUDIS SSOKD | | Saya aaa ame | She (GWT SMI AAV VV aa ang EV Seye Sa OU KCUAE YUMOA PH ZO¥ “OLNIO ‘93802 NI HLIM HSINDNUX3 OL 3AW14 ‘SOULSYSLOVYVHO ONINENE O€-SL :SS3NO4VH 3YOHS yowie '4n0709 AN3YdO3N 3ONOdS ‘LYN (080 09¢ = nanqesuog, Elot-40-%6 ae phroseigzalVicoe aa Isa a 0€ a = = = = e x Ea = 7 7 ‘ Le Le — o LY. i Lede © Ww} 1 fo 2 MAT: NEOPRENE RUBBER ee ee oe COLOUR: LIGHT GREY imensions only checking of 7 we asad SHORE HARDNESS: 35~45 pissolyt ees ii BURNING CHARACTERSTIC: FLAME TO EXTINGUISH WITH IN 20 SEC Cygh GEN. TOL: + 0.2 TEST El ER EATD, CPRI Pengalura = $90 080 Ras Kuni PRAD AIG Rape 24052, Deane i iar =a cons oe | Il) ATEN RES new [ws heenove>_ ev usm _|TTUE CROSS SECTION OF RUBBER GASKET ND sane aaa reom|enl “ox ee eS Le FOR PANEL 000R/COVERS cc = I = I Es I z I = Ls Te = I w = 5 — fal 35005 GN 13%5¥9 Nor ann ws pee a ch seat — Sark [ hoxcuyd ‘yw CW 2OF aL “Nz9 SLIM =3NOT09 NOTAN “LWA PI 080 09¢ - nanesuag pido ‘CLV ONITINOW YaLV 30VN 38 OL SIOH ‘ALON ‘LSHL T oO B0t-Go-zs 4 Mlosciarei Vater ww a auc ad Bu IS Of J 70H Or ST

You might also like