ISSN 1985-739X

SIARAN KHAS
Special Release

MALAYSIA

(UNTUK KERJA-KERJA MEKANIKAL DAN ELEKTRIKAL)

(For Mechanical and Electrical Works)

DISEMBER 2011
DECEMBER 2011

JABATAN PERANGKAAN MALAYSIA


DEPARTMENT OF STATISTICS, MALAYSIA

Tarikh :
Date:

16 Januari 2012
16th January 2012

Kandungan
Contents

Muka Surat
Page

Jadual 1
Table 1

: Indeks harga seunit bagi Copper Cables


: Unit price index for Copper Cables

Jadual 2
Table 2

: Indeks harga seunit bagi Switchgears


: Unit price index for Switchgears

Jadual 3
Table 3

: Indeks harga seunit bagi Transformers


: Unit price index for Transformers

Jadual 4
Table 4

: Indeks harga seunit bagi Generators


: Unit price index for Generators

Jadual 5

: Indeks harga seunit bagi Lightning Protection System and


Earthing System
: Unit price index for Lightning Protection System & Earthing
System

Jadual 6
Table 6

: Indeks harga seunit bagi Air Conditioning System


: Unit price index for Air Conditioning System

Jadual 7
Table 7

: Indeks harga seunit bagi Motor (Pumpset)


: Unit price index for Motor (Pumpset)

12

Table 5

13

Nota teknikal
Technical notes

-i-

JADUAL
TABLE

Jadual 1: Indeks harga seunit bagi copper cables


Table 1: Unit price index for copper cables
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(1) Copper Cables

1.1) Concealed/Surface wiring using


G.I conduit (per unit point)

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

134.9
139.4
140.1
144.7
143.9
143.9
143.8
143.5
144.7
146.1
145.7
146.2
144.2

154.8
155.2
164.3
164.3
164.3
164.3
164.3
171.7
172.3
172.3
172.3
172.3
172.3

152.4
161.3
165.4
165.4
161.4
161.4
160.1
160.1
161.7
159.2
153.6
156.9
156.9

1.2) Cables in galvanized trunking


(per meter run)

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

134.9
139.4
140.1
144.7
143.9
143.9
143.8
143.5
144.7
146.1
145.7
146.2
144.2

154.8
155.2
164.3
164.3
164.3
164.3
164.3
171.7
172.3
172.3
172.3
172.3
172.3

152.4
161.3
165.4
165.4
161.4
161.4
160.1
160.1
161.7
159.2
153.6
156.9
156.9

1.3) Cables laid underground (per meter run)


(i) 120 sq. mm and above

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

147.3
153.0
154.7
154.7
154.3
154.3
155.1
156.2
156.4
155.0
153.9
154.1
153.2

165.2
169.6
173.4
175.4
175.4
175.4
175.4
179.5
180.2
180.2
180.2
180.2
180.2

162.6
166.4
174.1
174.1
171.5
171.5
169.7
170.2
169.4
168.1
165.0
167.1
167.1

-1 -

Jadual 1: Indeks harga seunit bagi copper cables (samb.)


Table 1: Unit price index for copper cables (cont'd)
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(1) Copper Cables

1.3) Cables laid underground (per meter run)


ii) Below 120 sq. mm

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

156.8
162.9
164.3
168.6
168.2
168.1
168.2
168.0
168.8
169.4
169.0
169.4
167.3

171.9
177.0
185.6
186.4
186.4
186.4
186.4
194.1
197.0
197.0
197.0
197.0
197.0

169.2
176.9
182.8
183.1
180.3
180.3
174.0
180.2
182.1
179.6
171.8
178.5
178.5

1.4) Cables on tray/ladder (per meter run)


i) 120 sq. mm and above

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

147.3
153.0
154.7
154.7
154.3
154.3
155.1
156.2
156.4
155.0
153.9
154.1
153.2

165.2
169.6
173.4
175.4
175.4
175.4
175.4
179.5
180.2
180.2
180.2
180.2
180.2

162.6
166.4
174.1
174.1
171.5
171.5
169.7
170.2
169.4
168.1
165.0
167.1
167.1

1.4) Cables on tray/ladder (per meter run)


ii) Below 120 sq. mm

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

156.8
162.9
164.3
168.6
168.2
168.1
168.2
168.0
168.8
169.4
169.0
169.4
167.3

171.9
177.0
185.6
186.4
186.4
186.4
175.4
194.1
197.0
197.0
197.0
197.0
197.0

169.2
176.9
182.8
183.1
180.3
180.3
174.0
180.2
182.1
179.6
171.8
178.5
178.5

-2 -

Jadual 1: Indeks harga seunit bagi copper cables (samb.)


Table 1: Unit price index for copper cables (cont'd)
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

158.0
158.0
158.0
158.0
158.0
158.0
158.0
158.0
158.0
154.0
154.0
154.0
154.0

154.1
154.2
154.2
154.2
154.2
154.2
154.2
154.2
154.2
154.2
154.2
154.2
154.2

(1) Copper Cables

1.5) Busduct

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

-3 -

161.8
161.9
161.9
161.9
162.0
162.0
162.0
163.0
163.0
163.0
165.9
165.9
165.9

Jadual 2: Indeks harga seunit bagi switchgears


Table 2: Unit price index for switchgears
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(2) Switchgears

2.1) HT Switchgears

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

112.5
112.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5

118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
115.3
115.3
115.3
115.3

118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0
118.0

2.2) LV Switchboards
(Incomer breaker 600A
and above)

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

101.6
101.6
101.6
101.6
101.7
101.7
101.8
101.5
101.1
100.9
100.1
100.1
100.0

101.6
102.1
102.1
102.1
102.1
102.1
108.4
108.4
112.9
112.9
112.9
112.9
113.5

101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6

2.3) LV Switchboards and Sub


Switchboards (Incomer breaker
below 600A)

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

101.6
101.6
101.6
101.6
101.7
101.7
101.8
101.5
101.1
100.9
100.1
100.1
100.0

101.6
102.1
102.1
102.1
102.1
102.1
108.4
108.4
112.9
112.9
112.9
112.9
113.5

101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6
101.6

-4-

Jadual 2: Indeks harga seunit bagi switchgears (samb.)


Table 2: Unit price index for switchgears (cont'd)
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

100.0
100.0
100.0
100.0
100.0
100.0
100.6
100.4
100.5
100.5
100.5
100.5
100.5

100.0
100.5
100.5
100.5
100.5
100.5
100.5
101.3
102.7
102.7
102.7
102.7
102.7

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
101.2
102.2
102.3
102.5

(2) Switchgears

2.4) TPN & SPN Distribution Boards


(Incomer breaker 100A
and below)

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

-5-

Jadual 3: Indeks harga seunit bagi transformers


Table 3: Unit price index for transfomers
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(3) Transformers

3.1) Low loss cast resin transfomer

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

142.6
142.6
142.6
142.6
142.6
144.6
144.9
144.9
144.9
144.9
144.9
144.9
144.9

142.6
143.1
143.1
143.1
143.1
143.1
143.1
143.1
143.1
137.3
137.3
137.3
137.3

142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6
142.6

3.2) Low loss hermetically sealed


(oil filled) transfomer

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

135.5
135.5
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8

133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
130.9
130.9
130.9
130.9

133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9
133.9

-6-

Jadual 4: Indeks harga seunit bagi generators


Table 4: Unit price index for generators
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(4) Generators

4.1) Generator Ratings


Above 500kVA

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3
129.3

131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6
131.6

131.6
131.6
131.6
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8
135.8

4.2) Generator Ratings


500kVA and below

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2
128.2

126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8
126.8

126.8
126.8
126.8
130.7
130.7
130.7
130.7
130.7
130.7
130.7
130.7
130.7
130.7

-7 -

Jadual 5: Indeks harga seunit bagi lightning protection system and earthing system
Table 5: Unit price index for lightning protection system and earthing system
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah

Sarawak

(5) Lightning Protection System &


Earthing System
5.1) Lightning Protection System

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

131.4
147.4
147.4
176.1
176.1
176.1
177.3
177.3
177.3
177.3
177.3
177.3
177.3

144.5
148.6
156.8
156.8
156.8
156.8
156.8
175.3
180.2
206.9
206.9
206.9
206.9

142.3
157.0
158.5
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7

5.2) Earthing System


i) Earthing System for
Main Switchboards and
Sub Switchboards

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

131.4
147.4
147.4
176.1
176.1
176.1
177.3
177.3
177.3
177.3
177.3
177.3
177.3

144.5
148.6
156.8
156.8
156.8
156.8
156.8
175.3
180.2
206.9
206.9
206.9
206.9
.

142.3
157.0
158.5
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7

5.2) Earthing System


ii) Earthing System for
Distribution Boards

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

131.4
147.4
147.4
176.1
176.1
176.1
177.3
177.3
177.3
177.3
177.3
177.3
177.3

144.5
148.6
156.8
156.8
156.8
156.8
156.8
175.3
180.2
206.9
206.9
206.9
206.9

142.3
157.0
158.5
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7
163.7

-8-

Jadual 6: Indeks harga seunit bagi air conditioning system


Table 6: Unit price index for air conditioning system
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah
&
Sarawak

6. Air Conditioning System

6.1) Water Cooled Chiller

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

103.7
103.7
112.2
112.2
112.2
112.2
112.2
112.2
112.2
112.2
112.2
112.2
112.2

102.3
102.3
122.3
122.3
122.3
122.3
122.3
122.3
122.3
122.3
122.3
122.3
122.3

6.2) Air Cooled Chiller

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

102.0
102.0
129.0
129.0
129.0
129.0
129.0
129.0
129.0
129.0
129.0
129.0
129.0

102.0
102.0
135.6
135.6
135.6
135.6
135.6
135.6
135.6
135.6
135.6
135.6
135.6

6.3) Water Cooled Package

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

103.2
103.2
108.5
108.5
108.5
108.5
108.5
108.5
108.5
108.5
108.5
108.5
108.5

107.4
107.4
116.3
116.3
116.3
116.3
116.3
116.3
116.3
116.3
116.3
116.3
116.3

-9-

Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)


Table 6: Unit price index for air conditioning system (cont'd)
(Disember 2007=100)
(December 2007=100)
Kawasan
Region
Item

Tempoh
Period

Semenanjung
Malaysia
Peninsular
Malaysia

Sabah
&
Sarawak

6. Air Conditioning System

6.4) Air Cooled Package

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

104.3
104.3
107.6
107.6
107.6
107.6
107.6
107.6
107.6
107.6
107.6
107.6
107.6

106.8
106.8
115.5
115.5
115.5
115.5
115.5
115.5
115.5
115.5
115.5
115.5
115.5

6.5) Split Unit System


i) Wall Mounted

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

104.9
104.9
106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2
106.2

105.4
105.4
115.8
115.8
115.8
115.8
115.8
115.8
115.8
115.8
115.8
115.8
115.8

6.5) Split Unit System


ii) Ceiling Cassette / Mounted

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

98.6
98.6
101.1
101.1
101.1
101.1
101.1
101.1
101.1
101.1
101.1
101.1
101.1

98.8
98.8
101.9
107.4
107.4
107.4
107.4
107.4
107.4
107.4
107.4
107.4
107.4

- 10 -

Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)


Table 6: Unit price index for air conditioning system (cont'd)
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah
&
Sarawak

6. Air Conditioning System

6.6) VRV System


i) Indoor

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

104.5
104.5
107.5
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0

102.6
102.6
109.1
103.1
103.1
103.1
103.1
103.1
103.1
103.1
103.1
103.1
103.1

6.6) VRV System


ii) Outdoor

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

104.6
104.6
107.1
114.3
114.3
114.3
114.3
114.3
114.3
114.3
114.3
114.3
114.3

102.7
102.7
110.2
116.8
116.8
116.8
116.8
116.8
116.8
116.8
116.8
116.8
116.8

- 11 -

Jadual 7: Indeks harga seunit bagi motor (pumpset)


Table 7: Unit price index for motor (pumpset)
(Disember 2007=100)
(December 2007=100)

Item

Tempoh
Period

Kawasan
Region
Semenanjung
Malaysia
Peninsular
Malaysia

Sabah
&
Sarawak

7. Motor (Pumpset)

7.1) Condenser Water Pump

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

119.9
119.9
128.4
127.8
127.8
127.8
127.8
127.8
127.8
127.8
127.8
127.8
127.8

119.9
119.9
134.7
135.0
135.0
135.0
135.0
136.5
136.5
136.5
136.5
136.5
136.5

7.2) Chilled Water Pump

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

121.0
121.0
158.6
161.2
161.2
161.2
161.2
161.2
161.2
161.2
161.2
161.2
161.2

121.0
121.0
141.4
147.1
147.1
147.1
147.1
148.9
148.9
148.9
148.9
148.9
148.9

7.3) Hose Reel Pump

2010 Dis.
2011 Jan.
Feb.
Mac
Apr.
Mei
Jun
Jul.
Ogos
Sept.
Okt.
Nov.
Dis.

116.0
116.0
117.3
116.4
116.4
116.4
116.6
117.7
117.7
117.7
117.7
117.7
117.7

116.0
116.0
117.3
118.2
118.2
118.2
118.2
119.4
119.4
119.4
119.4
119.4
119.4

- 12 -

NOTA TEKNIKAL
TECHNICAL NOTES

TECHNICAL NOTES

NOTA TEKNIKAL

Indeks Kos Komponen Kerja-kerja Mekanikal

The

dan Elektrikal adalah berasaskan kepada

Mechanical and Electrical Works is based

tahun asas (Disember 2007=100). Indeks

on the base year (December 2007=100).

harga seunit diterbitkan mengikut tiga (3)

The

kawasan

according to

iaitu

Semenanjung

Malaysia,

Component

unit

price

Cost

indices

Index

are

of

the

reported

three (3) regions, that is

Sabah dan Sarawak.

Peninsular Malaysia, Sabah and Sarawak.

Spesifikasi untuk komponen mekanikal dan

The

elektrikal terpilih disediakan oleh Jabatan

mechanical and electrical components are

Kerja

determined by Public Works Department

Raya

(JKR)

dan

Lembaga

specifications

and

of

the

Pembangunan Industri Pembinaan Malaysia

(JKR)

(CIDB). Mulai Januari 2011, harga bagi

Development

komponen elektrikal diperoleh dari pungutan

Starting from January 2011, the prices for

harga yang dibuat oleh Jabatan Perangkaan

electrical components are obtained

Malaysia. Bagi komponen mekanikal, harga

the

diperoleh dari pembekal.

Department of Statistics, Malaysia.

price

Construction

selected

Board

Malaysia

collection

Industry
(CIDB).

conducted

from
by
For

mechanical components, the prices are


obtained from the suppliers.

- 13 -

HARGA :
PRICE

RM 2.00

BOLEH DIPEROLEH DARI:


OBTAINABLE FROM:
JABATAN PERANGKAAN MALAYSIA,
(DEPARTMENT OF STATISTICS, MALAYSIA)
PARCEL C, BLOK C6,
PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN,
62514 PUTRAJAYA,
MALAYSIA
Tel

: 03 - 8885 7000

Faks/Fax

: 03 - 8888 9248

E-mel/E-mail

: jpbkkp@stats.gov.my

Laman web/Homepage

: http://www.statistics.gov.my

Diterbitkan dan dicetak oleh Jabatan Perangkaan Malaysia