Professional Documents
Culture Documents
PROYEK
PEKERJAAN
LOKASI
: PEMBANGUNAN KAWASAN PUSAT GROSIR NIAGA BENUA DAN DERMAGA PETI KEMAS
: PENDAHULUAN
: DUSUN JONGKANG DESA REMPANGA KEC.LOA KULU KAB.KUKAR
NO.
URAIAN PEKERJAAN
JUMLAH HARGA
( Rp )
3
I.
PEKERJAAN PENDAHULUAN
2,000,000.00
II.
99,788,850.00
III.
21,500,000.00
C.
REAL COST
123,288,850.00
12,328,885.00
135,617,735.00
D.
DIBULATKAN
135,617,000.00
## Seratus Enam Juta Sembilan Ratus Tiga Puluh Sembilan Ribu Rupiah ##
Catatan :
Belum Termasuk Penambahan PPN 10%
: PEMBANGUNAN KAWASAN PUSAT GROSIR NIAGA BENUA DAN DERMAGA PETI KEMAS
: PAGAR PROYEK & POS JAGA
: DUSUN JONGKANG DESA REMPANGA KEC.LOA KULU KAB.KUKAR
NO.
URAIAN PEKERJAAN
I.
PEKERJAAN PENDAHULUAN
1 Bangsal Kerja
2 Papan Nama Proyek
Ls
Bh
1.00
1.00
1,500,000.00
500,000.00
1,500,000.00
500,000.00
2,000,000.00
1
2
3
4
Ttk
M3
Lbr
M2
180.00
3.00
585.00
630.00
79,950.00
6,030,000.00
77,009.00
35,329.50
14,391,000.00
18,090,000.00
45,050,265.00
22,257,585.00
99,788,850.00
Ls
Sub Total Pekerjaan
2.00
10,750,000.00
21,500,000.00
21,500,000.00
KOEF
SAT
URAIAN
HARGA
SATUAN
HARGA
BAHAN
UPAH
JUMLAH HARGA
A. PEKERJAAN KAYU
A.1
0.010
0.100
0.250
0.025
0.005
M
OH
OH
OH
OH
Ulin 5 X 10
Pekerja
Tukang
Kepala tukang
Mandor
###
80,000.00
95,000.00
105,000.00
115,000.00
Jumlah
A.2
45,000.00
8,000.00
23,750.00
76,750.00
2,625.00
575.00
45,000.00
8,000.00
23,750.00
2,625.00
575.00
3,200.00
79,950.00
400,000.00
570,000.00
63,000.00
23,000.00
4,950,000.00
24,000.00
400,000.00
570,000.00
63,000.00
23,000.00
1.100
0.800
5.000
6.000
0.600
0.200
M
KG
OH
OH
OH
OH
Ulin 5 X 5
Paku Ulin
Pekerja
Tukang
Kepala tukang
Mandor
###
30,000.00
80,000.00
95,000.00
105,000.00
115,000.00
Jumlah
###
24,000.00
###
###
6,030,000.00
1.000
0.100
0.094
0.098
0.010
0.010
Lbr
KG
OH
OH
OH
OH
Seng BJLS
Paku Seng
Pekerja
Tukang
Kepala tukang
Mandor
55,000.00
30,000.00
80,000.00
95,000.00
105,000.00
115,000.00
Jumlah
55,000.00
3,000.00
58,000.00
7,520.00
9,310.00
1,029.00
1,150.00
55,000.00
3,000.00
7,520.00
9,310.00
1,029.00
1,150.00
19,009.00
77,009.00
6,000.00
10,355.00
1,144.50
230.00
16,200.00
1,400.00
6,000.00
10,355.00
1,144.50
230.00
17,729.50
35,329.50
C. PEKERJAAN PENGECATAN
C.1 1 M2 PEKERJAAN PENGECATAN
0.360
0.200
0.075
0.109
0.011
0.002
KG
Set
OH
OH
OH
OH
45,000.00
7,000.00
80,000.00
95,000.00
105,000.00
115,000.00
16,200.00
1,400.00
17,600.00
PROYEK
PEKERJAAN
LOKASI
0
NO.
A
1
2
3
4
5
6
: PEMBANGUNAN KAWASAN PUSAT GROSIR NIAGA BENUA DAN DERMAGA PETI KEMAS
: PAGAR PROYEK & POS JAGA
: DUSUN JONGKANG DESA REMPANGA KEC.LOA KULU KAB.KUKAR
0
TENAGA KERJA
SATUAN
KOMPONENSATUAN
HARGA SAT.
KOMPONEN
( Rp. )
UPAH
Mandor
Kepala Tukang
Tukang Kayu
Tukang Batu
Tukang Cat
Pekerja
OH
OH
OH
OH
OH
OH
1.00
1.00
1.00
1.00
1.00
1.00
115,000.00
105,000.00
95,000.00
95,000.00
95,000.00
80,000.00
NO.
B
1
2
3
4
5
C
1
2
3
4
5
6
7
8
D
1
2
3
4
5
6
7
E
1
2
BAHAN/MATERIAL
SATUAN
KOMPONENSATUAN
HARGA SAT.
KOMPONEN
( Rp. )
M3
M3
M3
M3
Kg
1.00
1.00
1.00
1.00
1.00
130,000.00
170,000.00
350,000.00
300,000.00
1,600.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
20,000.00
45,000.00
40,000.00
25,000.00
3,500.00
20,000.00
17,500.00
4,500,000.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
55,000.00
50,000.00
17,500.00
25,000.00
25,000.00
30,000.00
30,000.00
1.00
1.00
750,000.00
7,000.00
Kg
Kg
Kg
Ltr
Lbr
Bh
Bh
M3
Lbr
Lbr
Kg
Kg
Kg
Kg
Kg
PERALATAN
Water Tank Truck 68 HP
Alat Bantu @ Set
Ls
Ls
NO BAB
I.
URAIAN PEKERJAAN
HARGA PEKERJAAN
BOBOT
PEKERJAAN PENDAHULUAN
1 Bangsal Kerja
2 Papan Nama Proyek
1,500,000.00
500,000.00
1.217
0.406
1.217
0.406
14,391,000.00
18,090,000.00
45,050,265.00
22,257,585.00
11.673
14.673
36.540
18.053
3.891
21,500,000.00
17.439
123,288,850.00
12,328,885.00
135,617,735.00
135,610,000.00
Mingguan
komulatif
Mingguan
komulatif
Mingguan
komulatif
100.00
II.
1
2
3
4
III.
: PEMBANGUNAN KAWASAN PUSAT GROSIR NIAGA BENUA DAN DERMAGA PETI KEMAS
: PAGAR PROYEK & POS JAGA
: DUSUN JONGKANG DESA REMPANGA KEC.LOA KULU KAB.KUKAR
0
0
0
5.513
5.513
100%
3.891
4.891
9.135
17.917
23.430
3.891
4.891
9.135
17.917
41.347
4.891
9.135
6.018
9.135
6.018
6.018
5.813
5.813
5.813
25.857
67.204
20.966
88.169
50%
11.831
100.000
0%
NO.
A
: PEMBANGUNAN KAWASAN PUSAT GROSIR NIAGA BENUA DAN DERMAGA PETI KEMAS
#REF!
: DUSUN JONGKANG DESA REMPANGA KEC.LOA KULU KAB.KUKAR
0
TENAGA KERJA
SATUAN
KOMPONEN SATUAN
HARGA SAT.
KOMPONEN
( Rp. )
UPAH
1
2
3
4
5
6
7
8
9
10
11
12
Mandor
Kepala Tukang Kayu
Tukang Kayu
Kepala Tukang Batu
Tukang Batu
Kepala Tukang Cat
Tukang Cat
Kepala Tukang Pipa
Tukang Pipa
Tukang Gali
Pekerja
Penjaga Malam
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
Bln
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
90,000.00
110,000.00
100,000.00
110,000.00
100,000.00
110,000.00
100,000.00
110,000.00
100,000.00
85,000.00
85,000.00
1,500,000.00
BAHAN/MATERIAL
SATUAN
KOMPONEN SATUAN
HARGA SAT.
KOMPONEN
( Rp. )
M'
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
135,000.00
175,000.00
35,000.00
45,000.00
800.00
265,000.00
295,000.00
275,000.00
320,000.00
1,300.00
3,000.00
2,750.00
42,000.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
69,000.00
70,000.00
68,000.00
115,000.00
19,000.00
65,000.00
12,500.00
26,000.00
17,000.00
M3
M3
M3
M3
Bh
M3
M3
M3
M3
Kg
Kg
Kg
BAHAN FINISHING
Cat Mowilex Interior
Cat Mowilex Exterior
Cat Tembok Merk "Dulux" Warna
Cat Tembok Merk "Dulux" Warna ( Weathershi
Cat Catylac
Cat Tembok Danabrite
Cat Tembok Putih Ex. Paragon
Undercoat Mowilex
Cat Dasar
NO.
11
12
13
14
15
16
17
18
19
20
21
D
1
2
3
4
5
6
7
8
9
10
13
14
15
16
17
18
20
22
23
25
27
28
29
30
31
32
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
BAHAN/MATERIAL
SATUAN
KOMPONEN SATUAN
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Lbr
Bh
Bh
Bh
HARGA SAT.
KOMPONEN
( Rp. )
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
46,000.00
10,700.00
17,500.00
26,500.00
10,200.00
17,500.00
8,000.00
2,700.00
20,000.00
15,000.00
25,000.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3,400,000.00
3,600,000.00
3,600,000.00
3,400,000.00
2,350,000.00
2,250,000.00
4,200,000.00
4,300,000.00
2,200,000.00
8,500.00
4,500.00
350,000.00
275,000.00
99,000.00
150,000.00
55,000.00
105,000.00
75,000.00
50,000.00
58,000.00
99,000.00
47,500.00
61,000.00
83,000.00
130,000.00
170,000.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
48,000.00
47,500.00
53,000.00
44,000.00
93,500.00
46,000.00
70,000.00
11,666.67
50,000.00
5,000.00
70,000.00
3,500.00
60,000.00
2,400.00
4,500.00
5,000.00
BAHAN KAYU
Kayu Bengkirai
Kayu Bengkirai Papan 3/20 x 400 cm
Kayu Kapur Papan
Kayu Kapur Balok
Kayu Meranti Papan 3/20 x 400 cm ( Klas III )
Kayu Meranti balok Klas III
Kayu Ulin Balok
Kayu Ulin Papan
Kayu Bekisting
Kayu Dolken Galam dia 8-10 / 400 Cm
List Profil Kayu
Daun Pintu Panel Bengkirai
Daun Jendela Kayu Bengkirai + Kaca Bening
Multiplek 9 mm
Multiplek 12 mm
Calciboard 3,5 mm
Calciboard 6 mm
Teakwood 6 mm
Plywood 4 mm
Plywood 5 mm
Plywood 9 mm
Nusaboard 3.5 mm
Nusaboard 4.5 mm
Nusaboard 6 mm
Nusaboard 9 mm
Nusaboard 12 mm
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
M1
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Doz
Bh
Doz
Bh
Doz
Bh
Doz
Bh
Bh
Bh
NO.
17
18
19
F
1
2
3
4
5
6
7
8
9
10
11
12
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
H
1
2
3
4
5
6
7
8
9
10
11
12
13
BAHAN/MATERIAL
SATUAN
KOMPONEN SATUAN
HARGA SAT.
KOMPONEN
( Rp. )
Bh
Bh
Bh
1.00
1.00
1.00
10,000.00
12,000.00
6,500.00
Kg
Kg
Kg
Kg
Kg
Ktk
Kg
Kg
Kg
Kg
Bh
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12,500.00
15,400.00
18,500.00
18,500.00
24,000.00
27,500.00
27,500.00
27,000.00
30,000.00
17,500.00
7,500.00
200,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
M
M
M
M
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13,500.00
10,000.00
17,000.00
15,000.00
15,000.00
76,000.00
110,000.00
30,000.00
12,000.00
220,000.00
375,000.00
38,000.00
85,000.00
88,000.00
115,500.00
126,500.00
275,000.00
Bh
Bh
Bh
Bh
M1
Bh
Bh
Bh
Btg
Bh
Bh
Bh
Bh
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
40,000.00
40,000.00
55,000.00
250,000.00
12,500.00
33,000.00
235,000.00
265,000.00
9,000.00
46,000.00
55,000.00
45,000.00
35,000.00
M2
Bh
Bh
Bh
Bh
Bh
BAHAN LISTRIK
Stop kontak
Sakelar tunggal
Sakelar ganda
Box sekering / MCB 3 Phase
Kabel instalasi
Bola Lampu Baret 23 Watt
Lampu Box TL 2X18 RMA
Lampu Box TL 2X36 RMA
Pipa Listrik Plastik 5/8
Lampu ESL 13 watt
Lampu ESL 20 watt
Lampu Down Light 13 Watt
Lampu Down Light 7 Watt
NO.
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
J
1
2
BAHAN/MATERIAL
SATUAN
KOMPONEN SATUAN
HARGA SAT.
KOMPONEN
( Rp. )
BAHAN SANITAIR
Kloset Jongkok American Standard
Kloset Jongkok Putih
Kloset Duduk Keramik (TOTO)
Kloset Duduk Lokal Putih
Kloset Duduk Mono Blok Lokal
Bak Mandi Fibre (Kecil)
Bak Mandi Plastik (Besar)
Urinoir
Floor Drain
Kran Air 1/5"
Kran Tembok
Tandon Air 2000 L Fibre glass
Tandon Air 1100 L Stanlees
Tandon Air 1500 L Stanlees
Water Drain + Aksesoris
Seal Tape
Pipa Paralon " - 4 m AW
Pipa Paralon 1" - 4 m AW
Pipa Paralon 2" - 4 m AW
Pipa Paralon 3" - 4 m AW
Pipa Paralon 4" - 4 m AW
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m'
m'
m'
m'
m'
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2,500.00
8,125.00
13,125.00
18,750.00
43,750.00
50,000.00
Ls
Ls
1.00
1.00
15,000.00
20,000.00
155,000.00
159,500.00
1,760,000.00
1,485,000.00
1,210,000.00
210,000.00
235,000.00
1,700,000.00
50,000.00
20,000.00
75,000.00
2,500,000.00
2,750,000.00
3,000,000.00
500,000.00
PERALATAN
Water Tank Truck 68 HP
Alat Bantu @ Set
NO JENIS BARANG
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
MERK / TYPE
BAHAN AGGREGAT
Pasir Lokal
Pasir Bontang
Pasir Beton (Palu)
Tanah Timbunan Pilihan
Tanah Timbnunan Biasa
Agregat Halus/pasir bersih/pasir bersih (kelas A)
Agregat Halus/pasir bersih/pasir bersih (kelas B)
Debu Batu
Batu Asalan / Batu besar - Batu padas
Batu Gunung
Batu Bata
Batako
Kerikil Sirtu
Krekil berpasiran alami / sirtu tak diayak
Batu Split
Batu Split
Batu Split
Batu Split
Batu Split
Kayu Bakar
Filler Abu Batu untuk Hotmix
Beton Ready Mix
Beton Ready Mix
Beton Ready Mix
Beton Ready Mix
Beton Ready Mix
Beton Ready Mix
Beton Ready Mix
NO JENIS BARANG
29
30
31
32
33
34
35
Aspal Emulasi
Semen Tonasa
Semen Putih
Geotextile
Tiang Pancang / Mini Pile
Tiang Pancang / Mini Pile
Tiang Pancang / Mini Pile
II.
1
2
3
4
5
6
7
8
9
BAHAN PERKAYUAN
Acuan dari kayu
Balok bengkirai
Papan bengkirai
Balok kapur
Papan kapur
Balok ulin
Papan ulin
Balok meranti
Papan meranti
MERK / TYPE
10
11
12
13
14
15
16
17
18
19
20
21
Multiplek
Multiplek
Multiplek
Plywood
Plywood
Plywood
Plywood
Papan siring
Papan siring
Teakwood
Kusen pintu
NO JENIS BARANG
MERK / TYPE
21 Kusen pintu
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BAHAN PERPIAAN
Pipa porous
Pipa untuk piling D200 mm w > 8mm - 10mm
Pipa untuk piling D300 mm w > 8mm - 10mm
Pipa untuk piling D400 mm w > 8mm - 10mm
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa galvanis (Galvanized Steel Pipe - GSP)
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
NO JENIS BARANG
27 Sok PVC
28 Sok PVC
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
MERK / TYPE
Rucika
Rucika
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
NO JENIS BARANG
56
57
58
59
60
61
Foot Valve
Flexible Joint
Check valve
Rubbering Packing
Water meter All Flange
Reserpipe Steel
IV
1
2
3
4
5
6
7
8
9
10
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
Rucika
San Ei
Onda
Onda
San Ei
San Ei
San Ei
San Ei
Onda
Onda
San Ei
MERK / TYPE
11 Valve socket
12 Valve socket
13 Water meter
V
1
2
3
4
5
6
NO JENIS BARANG
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
VI
1
2
3
4
5
6
7
8
9
10
11
NO JENIS BARANG
12
13
14
15
Atap Sirap
Atap Tilux
Atap Genteng Keramik
Atap Genteng Beton
MERK / TYPE
MERK / TYPE
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
NO JENIS BARANG
41
42
43
44
45
46
47
48
49
Bubungan
Bubungan
Bubungan
Bubungan
Gipsum board
Gipsum board
Kalsiboard
Kalsiboard
Kalsiboard
VII
1
2
3
4
5
6
7
8
9
10
Standart 0,35
Standart 0,35
Standart 0,35
Standart 0,35
Standart 0,35
Standart 0,35
MERK / TYPE
Elephant
Elephant
2
3
4
5
6
Kaca Bening
Kaca Ryben
Kaca nako
Pintu panel
Pintu panel
NO JENIS BARANG
7
8
9
10
11
12
13
Engsel
Engsel
Engsel
Grendel
Handle
Hak Angin
Kunci tanam 2 slag
IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
NO JENIS BARANG
21
22
23
24
25
26
27
28
29
MERK / TYPE
Al-tex
Dulux
Dulux
Propan
Propan
Mowilex
Mowilex
Paragon
Aftelax
Aica Aibon
Fox
MERK / TYPE
Pinotex
30
31
32
33
34
35
36
37
38
39
Saklar
Saklar
Saklar
Lampu pijar
Lampu pijar
Lampu pijar
Lampu SL / Lilin
Lampu SL / Lilin
Lampu SL / Lilin
Isolasi
X
1
2
3
4
5
6
7
8
NO JENIS BARANG
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Porselin
Tegel abu - abu
Plint keramik
Plint keramik
Bolven list
Roster
Grass block
Tandon Air
Tandon Air
Tandon Air
Buis Beton
Buis Beton
Buis Beton
Buis Beton
Buis Beton
NO JENIS PEKERJA
1
2
3
4
5
6
7
8
9
MERK / TYPE
Pekerja Kasar
Pekerja Semi Terampil
Pekerja Terampil
Mandor
Pembantu Mekanik
Mekanik Terampil
Kepala Tukang
Tukang
Pembantu Operator
10
11
12
13
NO
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
II.
1
2
3
4
5
JENIS KENDARAAN
ALAT BERAT
Excavator
Excavator
Excavator
Excavator
Excavator
Buldozer
Buldozer
Buldozer
Buldozer
Compactor
Compactor
Wheel Loader
Wheel Loader
Wheel Loader
Wheel Loader
Wheel Loader
Wheel Loader
Side Boom
Crane
Crane
Crane
Crane
6
7
8
9
10
11
12
III.
Changlin
Liu Gong
Komatsu
Changlin
caterpillar
Tadano
American
Sumitomo
Kato
Nissan
Volvo
Nissan
Nissan
Hino
JENIS KENDARAAN
Dump Truck
Dump Truck
Dump Truck
Water / Fuel Tank
Water / Fuel Tank
Bus
Speed Boat
UTILITY
1 Welding Machine
2 Air Compressor
3 Injection Pump
MERK
Komatsu
Komatsu
Komatsu
Hitachi
Komatsu
Komatsu
Komatsu
Komatsu
Komatsu
Bomag
Changlin
SUPPORT
Prime Over
Prime Over
Boom Truck
Boom Truck
Dump Truck
NO
66,000
80,000
58,000
66,000
MERK
Scania
Komatsu
Mitsubishi
Mitsubishi
Mitsubishi
4
5
6
7
8
SPESIFIKASI / UKURAN
SATUAN
ZONE I
Ukuran 5 - 7cm
Ukuran 3 - 5 cm
Ukuran 2 - 3 cm
Ukuran 1 - 2 cm
Ukuran 0.5 - 1 cm
Beton K - 175
Beton K - 225
Beton K - 250
Beton K - 275
Beton K - 300
Beton K - 350
Beton K - 400
SPESIFIKASI / UKURAN
50 kg/Zak
10 x 10 x 400 cm
2x 20 x 400 cm
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
buah
buah
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
HARGA SATUAN
ZONE II
ZONE III
198,000
254,000
509,000
95,000
62,000
367,000
353,000
215,000
233,000
369,000
600
4,300
192,000
170,000
372,000
405,000
324,000
343,000
344,000
57,000
237,000
1,559,000
1,627,000
1,684,000
1,718,000
1,785,000
1,853,000
1,921,000
230,000
295,000
592,000
110,000
72,000
426,000
410,000
250,000
271,000
429,000
700
5,000
223,000
197,000
432,000
471,000
376,000
398,000
400,100
66,300
275,600
1,813,000
1,892,200
1,985,500
1,998,000
2,076,000
2,155,000
2,234,100
264,000
339,000
678,000
126,000
82,600
489,200
470,500
286,600
311,000
492,000
800
5,700
255,900
226,600
495,900
539,900
431,900
457,200
458,600
76,000
315,900
2,078,100
2,168,800
2,244,800
2,290,100
2,379,400
2,470,000
2,560,700
kg
Zak
kg
M2
M
M
M
ZONE I
30,000
62,000
6,200
85,000
226,000
396,000
791,000
HARGA SATUAN
ZONE II
34,900
72,300
7,200
98,900
262,800
460,500
919,900
ZONE III
40,000
82,900
8,300
113,300
301,300
572,900
1,054,400
M3
M3
M3
M3
M3
M3
M3
M3
M3
1,278,000
1,917,000
1,970,300
1,810,500
1,917,000
2,396,300
2,662,500
1,917,000
2,023,500
1,486,300
2,229,500
2,291,500
2,105,600
2,229,500
2,768,900
3,096,500
2,229,500
2,353,300
1,703,600
2,076,100
2,133,800
1,960,800
2,076,100
2,595,200
2,883,500
2,076,100
2,191,500
SATUAN
ketebalan 9 mm
ketebalan 12 mm
ketebalan 18 mm
ketebalan 3 mm
ketebalan 4 mm
ketebalan 6 mm
ketebalan 9 mm
1/15 panjang 2 m
1/10 panjang 2 m
lembar
lembar
lembar
lembar
lembar
lembar
lembar
lembar
M3
M4
SPESIFIKASI / UKURAN
113,000
133,100
169,500
50,900
62,200
79,100
101,700
24,400
22,600
57,600
39,600
1,921,000
131,400
154,800
197,100
59,200
72,300
92,000
118,300
29,000
26,300
67,000
46,100
2,234,100
150,600
177,400
225,900
67,800
82,900
105,400
135,600
27,000
24,500
76,800
52,800
2,560,700
ZONE I
39,600
HARGA SATUAN
ZONE II
46,100
ZONE III
52,800
SATUAN
M3
Ukuran : 1/2" (6 m)
Ukuran : 3/4" (6 m)
Ukuran : 1" (6 m)
Ukuran : 1 1/4" (6 m)
Ukuran : 1 1/2" (6 m)
Ukuran : 2" (6 m)
AW C ukuran : 1/2" (4 m)
AW C ukuran : 3/4" (4 m)
AW C ukuran : 1" (4 m)
AW C ukuran : 1 1/4" (4 m)
AW C ukuran : 1 1/2" (4 m)
AW C ukuran : 2" (4 m)
AW C ukuran : 2 1/2" (4 m)
AW C ukuran : 3" (4 m)
AW C ukuran : 4" (4 m)
AW C ukuran : 6" (4 m)
AW C ukuran : 8" (4 m)
AW C ukuran : 10" (4 m)
AW C ukuran : 12" (4 m)
AW, Ukuran : 1/2"
AW, Ukuran : 1"
AW, Ukuran : 1 1/4"
M1
M1
M1
M1
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
buah
buah
buah
SPESIFIKASI / UKURAN
SATUAN
45,000
890,000
1,070,000
1,045,000
96,000
124,000
192,000
249,000
288,000
396,000
30,500
36,200
53,100
68,900
91,500
128,800
167,200
255,400
394,400
776,300
1,174,100
1,789,900
2,538,000
1,100
3,400
4,500
HARGA SATUAN
ZONE II
7,900
9,200
124,000
14,400
ZONE I
D, Ukuran :
D, Ukuran :
buah
buah
52,300
60,000
1,035,100 1,86,400
1,244,400
1,426,300
1,215,300
1,393,000
111,600
128,000
144,200
165,300
223,300
255,900
289,600
331,900
334,900
383,900
460,500
527,900
35,500
40,700
42,100
48,300
61,800
70,800
80,100
91,800
106,400
122,000
149,800
171,700
194,500
222,900
297,000
340,400
458,700
525,700
902,800
1,034,800
13,655,800
1,565,100
2,081,700
2,385,900
2,951,700
3,383,200
1,300
1,500
4,000
4,500
5,200
6,000
ZONE III
10,500
16,500
1,100
2,300
3,400
5,700
1,100
1,100
2,300
4,500
3,400
5,700
6,800
15,800
27,100
4,500
4,500
6,800
4,500
38,400
55,400
73,500
66,700
79,100
108,500
50,900
53,100
79,100
76,800
1,300
2,700
4,000
6,600
1,300
1,300
2,700
5,200
4,000
6,600
7,900
18,400
31,500
5,200
5,200
7,900
5,200
44,700
64,400
85,500
77,600
92,000
126,200
59,200
61,800
92,000
89,300
1,500
3,100
4,500
7,600
1,500
1,500
3,100
6,000
4,500
7,600
9,100
21,100
36,100
6,000
6,000
9,100
6,000
51,200
73,800
98,000
88,900
105,400
144,600
67,800
70,800
105,400
102,400
Unit
Unit
Unit
kg
buah
buah
ZONE I
446,000
2,593,000
2,766,000
131,000
6,017,300
531,100
HARGA SATUAN
ZONE II
518,700
3,015,700
3,216,900
152,400
6,998,100
617,700
ZONE III
594,500
3,456,500
3,678,100
174,600
8,021,100
708,000
buah
2" x 1/2"
buah
3" x 1/2"
buah
Drat PVC 2" X 1/2"
buah
(mekanikal Joint - mate treat 1/2")buah
1/2" - PVC SII
buah
1/2"
buah
1/2"
buah
1/2"
buah
1/2"
buah
158,000
82,000
94,000
21,000
51,000
11,000
37,000
6,000
21,000
51,000
183,800
95,400
109,300
24,400
59,300
12,800
43,000
7,000
24,400
59,300
210,600
109,300
125,000
28,000
68,000
14,700
49,300
8,000
28,000
68,000
SPESIFIKASI / UKURAN
tebal 5 mm
75 mm
75 mm - 60 mm
SATUAN
kg
kg
kg
kg
kg
kg
SPESIFIKASI / UKURAN
Ukuran : 8"
Ukuran : 6"
Tinggi : 90 cm
Tinggi : 120 cm
6 ft K20
6 ft K25
Kelas I
Kelas II
Kelas III
lebar 45 cm
lebar 90 cm
Ukuran 9 bh/m2
Ukuran 11 bh/m2
lebar 55 cm
lebar 110 cm
SPESIFIKASI / UKURAN
51,000
46,000
406,000
59,300
53,500
472,200
68,000
61,300
541,200
14,000
27,100
64,000
36,000
31,000
21,000
16,300
31,500
74,400
41,900
36,100
24,400
18,700
36,100
85,300
48,000
41,300
28,000
ZONE I
13,000
16,000
19,000
89,700
74,000
1,245,800
541,000
657,000
64,000
62,000
73,000
28,300
17,000
34,200
734,500
56,500
HARGA SATUAN
ZONE II
15,100
18,600
22,100
104,300
86,100
1,448,900
629,200
764,700
74,400
72,100
84,900
32,900
19,800
39,800
854,200
65,700
ZONE III
17,300
21,300
25,300
119,600
98,600
1,660,700
721,200
876,400
85,300
82,600
97,300
37,700
22,700
45,600
979,100
75.3
51,000
57,000
254,000
181,000
136,000
51,000
73,000
50,000
62,000
17,000
23,000
59,300
66,300
295,400
210,500
158,200
59,300
84,900
58,200
72,100
19,800
26,700
68,000
76,000
338,600
241,300
181,300
68,000
97,300
66,700
82,600
22,700
30,700
ZONE I
62,000
28,300
5,100
3,400
HARGA SATUAN
ZONE II
72,100
32,900
5,900
4,000
ZONE III
82,600
37,700
6,800
4,500
SATUAN
kg
kg
kg
M1
M2
M3
M4
M5
M6
kg
kg
liter
liter
kg
buah
kg
lembar
lembar
lembar
lembar
lembar
M1
M1
M2
M2
M
M
SATUAN
ikat
lembar
buah
buah
buah
M2
M2
M2
M2
M2
M2
M2
M2
M2
batang
batang
lembar
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
SPESIFIKASI / UKURAN
SATUAN
Type Pelana
Type Limas
Ceiling Flat Gypsum 9 mm 20 x
Ceiling Flat Gypsum 9 mm 20 x
Ceiling Flat Gypsum 9 mm 40 x
Kaisi 9 mm 20 x 40
Kaisi 9 mm 20 x 40 x 40 x 40
Kaisi 9 mm 40 x 40
9 bh/m2
asbes gelombang
tilux
karang pilang 4 bh / m'
biasa 3,5 bh / m'
120 x 240 cm, t = 9 mm
121 x 240 cm, t = 12 mm
3 mm
6 mm
10 mm
dia. 5/8 - 8 cm
tebal 3 cm
2,000
214,400
240,400
126,100
126,100
130,200
120,700
122,000
126,100
31,100
27,100
44,100
33,900
45,000
34,000
51,000
45,000
43,000
28,000
34,000
43,000
34,000
28,000
40,000
40,000
2,300
249,300
279,600
146,700
146,700
151,400
140,400
141,900
146,700
36,200
31,500
51,300
39,400
52,300
39,500
59,300
52,300
50,000
32,600
39,500
50,000
39,500
32,600
46,500
46,500
2,700
285,800
320,500
168,100
168,100
173,600
160,900
162,600
168,100
41,500
36,100
58,800
45,200
60,000
45,300
68,000
60,000
57,300
37,300
45,300
57,300
45,300
37,300
53,300
53,300
ZONE I
28,000
28,000
28,000
25,000
62,200
73,500
50,900
56,500
62,200
HARGA SATUAN
ZONE II
32,600
32,600
32,600
29,100
72,300
85,500
59,200
65,700
72,300
ZONE III
37,300
37,300
37,300
33,300
82,900
98,000
67,800
75,300
82,900
buah
kg
kg
kg
kg
kg
kg
buah
kg
buah
300
50,900
34,000
17,000
17,000
15,000
14,700
800
23,000
9,000
350
59,200
39,500
19,800
19,800
17,400
17,100
900
26,700
10,500
400
67,800
45,300
22,700
22,700
20,000
19,600
1,100
30,700
12,000
M2
113,000
131,400
150,600
buah
buah
M1
M1
lembar
lembar
lembar
lembar
lembar
tebal 5 cm
tebel 5 cm
Material : Bangkiray
Material : Plywood
SPESIFIKASI / UKURAN
Ukuran : 3"
Ukuran : 4"
Ukuran : 5"
Standar
Paragon
Kuning
Untuk Kayu ( Plamur )
SPESIFIKASI / UKURAN
M2
M2
set
M2
M2
130,000
141,000
170,000
396,000
237,000
151,200
164,000
197,700
460,500
275,600
173,300
188,000
226,600
527,900
315,900
pasang
pasang
pasang
buah
buah
pasang
buah
ZONE I
28,000
34,000
36,000
23,000
34,000
17,000
141,000
HARGA SATUAN
ZONE II
32,600
39,500
41,900
26,700
39,500
19,800
164,000
ZONE III
37,300
45,300
48,000
30,700
45,300
22,700
188,000
kg
liter
liter
liter
liter
liter
liter
liter
liter
liter
kaleng
kg
lembar
kg
kg
buah
kg
kg
liter
liter
20,300
22,600
39,600
33,900
77,400
103,400
50,900
56,500
61,000
85,900
73,500
30,500
153,000
39,600
24,900
10,200
32,800
28,300
20,300
17,000
23,600
26,300
46,100
39,400
90,000
120,300
59,200
65,700
70,900
99,900
85,500
35,500
177,900
46,100
29,000
11,900
38,100
32,900
23,600
19,800
27,100
30,100
52,800
45,200
103,200
137,800
67,800
75,300
81,300
114,500
98,000
40,700
203,900
52,800
33,200
13,600
43,700
37,700
27,100
22,700
ZONE I
28,300
39,600
33,900
37,300
35,100
9,100
4,300
28,800
85,200
HARGA SATUAN
ZONE II
32,900
46,100
39,400
43,400
40,800
10,600
5,000
33,500
99,100
ZONE III
37,700
52,800
45,200
49,700
46,800
12,100
5,700
38,400
113,600
SATUAN
SATUAN
kg
kg
kg
kg
kg
buah
lembar
buah
titik
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
26,600
29,300
34,100
5,900
5,900
5,900
5,300
6,400
7,500
9,600
30,900
34,100
39,700
6,900
6,900
6,900
6,200
7,400
8,700
11,200
35,500
39,100
45,500
7,900
7,900
7,900
7,100
8,500
10,000
12,800
Tulung Agung 40 x 40
Ujung Pandang 40 x 40
Ujung Pandang 60 x 60
Tulung Agung 60 x 60
Standar, Ukuran 20 cm x 20 cm
Standar, ukuran 25 cm x 20 cm
Standar, ukuran 30 cm x 30 cm
Standar, ukuran 40 cm x 40 cm
M2
M2
M2
M2
M2
M2
M2
M2
239,600
281,400
294,900
317,500
40,000
42,000
51,000
57,000
278,700
327,300
343,000
369,300
46,500
48,800
59,300
66,300
319,400
375,100
393,100
423,200
53,300
56,000
68,000
76,000
SPESIFIKASI / UKURAN
SATUAN
ZONE I
57,000
35,000
14,100
14,100
7,900
10,200
21,500
1,864,500
1,469,000
1,017,000
36,700
50,900
96,100
118,700
180,800
HARGA SATUAN
ZONE II
66,300
40,700
16,400
16,400
9,200
11,900
25,000
2,168,400
1,708,400
1,182,800
42,700
59,200
111,800
138,000
210,300
ZONE III
76,000
46,700
18,800
18,800
10,500
13,600
28,700
2,485,400
1,958,200
1,355,700
48,900
67,800
128,100
158,200
241,000
Standar 11cm x 11 cm
Standar, ukuran 10 cm x 30 cm
Standar, ukuran 10 cm x 40 cm
1400 Ltr
1200 Ltr
700 Ltr
15 x 100
20 x 100
30 x 100
40 x 100
50 x 100
M2
M3
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Hari
Hari
Hari
Hari
TYPE / SPESIFIKASI
9,429
11,429
8,286
9,429
Jam
Jam
Jam
Jam
SATUAN
ZONA I
HARGA SATUAN
ZONA II
ZONA III
PC 200-6
PC 200-7
PC 400 LC-7
ZX 450 LCH
PC 1250
D 68 ESS
D 85 ESS-2
D 275 A
D 375 A
BW 212-2
PY 220 H
WA 180-1
WA 350-3
PY 220 H
CLG 856
GD 621
PY 220 H
561 D
KR 45 HV
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
330,000
370,000
600,000
630,000
1,340,000
370,000
430,000
1,070,000
1,470,000
270,000
270,000
270,000
400,000
400,000
400,000
330,000
300,000
400,000
400,000
400,000
400,000
400,000
357,000
401,000
650,000
682,000
1,451,000
401,000
466,000
1,159,000
1,592,000
292,000
292,000
292,000
433,000
433,000
433,000
357,000
325,000
433,000
433,000
433,000
433,000
433,000
374,000
419,000
680,000
714,000
1,518,000
419,000
487,000
1,212,000
1,666,000
306,000
306,000
306,000
453,000
453,000
453,000
374,000
340,000
453,000
453,000
453,000
453,000
453,000
CW 620 GNT
Jam
Jam
Jam
Jam
Bulan
330,000
330,000
330,000
230,000
53,460,000
360,000
360,000
360,000
250,000
57,900,000
370,000
370,000
370,000
2,600,000
60,570,000
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
ZONA I
53,460,000
53,460,000
20,000
26,730,000
26,730,000
16,040,000
13,370,000
HARGA SATUAN
ZONA II
57,900,000
57,900,000
20,000
28,950,000
28,950,000
17,370,000
14,480,000
ZONA III
60,570,000
60,570,000
20,000
30,290,000
30,290,000
18,170,000
15,150,000
Bulan
Bulan
Bulan
6,680,000
13,370,000
20,050,000
7,230,000
14,480,000
21,710,000
7,570,000
15,150,000
22,720,000
TZA 520
PKD 211
FM 260 PS : Roda 10
TYPE / SPESIFIKASI
360 : Roda 10 HD
HD 465 - 5 : Roda 10
PS 120 : Roda 6
PS 135 : Roda 6
PS 220 Euro : Roda 6
25 Seat
SATUAN
50 KVA
Bulan
Bulan
Bulan
Bulan
Bulan
40,100,000
6,680,000
24,060,000
80,190,000
10,020,000
43,430,000
7,230,000
26,060,000
86,850,000
10,850,000
45,430,000
7,570,000
27,260,000
90,860,000
11,350,000
1240
8850