DAFTAR HARGA SATUAN UPAH

No.

PEKERJA

(1)

(2)

Mandor

Kepala Tukang Kayu

Kepala Tukang Batu

Kepala Tukang Besi

Kepala Tukang Cat

Kepala Tukang Style Bali

Tukang Kayu

Tukang Batu

Tukang Besi

10

Tukang Kaca

11

Tukang Cat

12

Tukang Gali

13

Tukang Style Bali

14

Tukang Bongkar Begesting

15

Pekerja

DAFTAR SATUAN BAHAN BANGUNAN

No.

JENIS BAHAN BANGUNAN

(1)

(2)

Pasir Pasang

Pasir Biasa

Tanah Urug

Batu Kali

Batu Koral

Kerikil Beton

Batu Bata Standart

Batu Bata Mesin Press (amplas halus)

Semen Tiga Roda 50 kg

10

Semen Gresik 50 kg

11

Besi Beton 6 mm

12

Besi Beton 8 mm

13

Besi Beton 10 mm

14

Besi Beton 12 mm

15

Besi Beton 16 mm

16

Besi Beton semua ukuran per kg

16

Paku Kayu / Tripleks 1- 4 cm

17

Paku Kayu / Tripleks 5 - 12 cm

18

Paku Beton Baisa

19

Kawat Beton

20

Tripleks tebal 3 mm

21

Tripleks tebal 4 mm

22

Tripleks tebal 6 mm

23

Tripleks tebal 9 mm

24

Tripleks Tebal 12 mm

25

Tripleks tebal 15 mm

26

Tripleks tebal 18 mm

27

Kaca Bening Tebal 3 mm

28

Kaca Bening Tebal 5 mm

29

Kaca Bening Tebal 8 mm

30

Kaca Bening Tebal 10 mm

31

Kaca Ryben Tebal 3 mm

32

Kaca Ryben tebal 5 mm

33

Kaca Ryben tebal 8 mm

34

Kaca Ryben tebal 6 mm

35

Fiber Semen flat elephant 122 x 244 tebal 4 mm

36

Fiber Semen flat elephant 122 x 244 tebal 6 mm

37

Fiber Semen flat elephant 122 x 244 tebal 8 mm

38

Papan Gypsum Merk Elephant 120 x 240 tebal 9 mm

39

Papan Gypsum Merk Jayaboard 120 x 240 tebal 9 mm

40

List Gypsum

41

Reng 2 x 3 meranti

42

Reng 3 x 4 meranti

43

Reng 2 x 3 kamper

44

Reng 3 x 4 kamper

45

Kaso 4 x 6 meranti

46

Kaso 5 x 7 meranti

47

Kaso 4 x 6 kamper

48

Kaso 5 x 7 kamper

49

Galar 5 x 10 meranti

50

Galar 5 x 10 kamper

51

Kayu Sembarang

52

Kayu Bekisting per m3

53

Kayu meranti per m 3

54

Kayu Kamper per m3

55

Cat Tembok Interior Dulux 25 kg

56

Cat Tembok Interior Catylac 25 kg

57

Cat tembok Interior Metrolite 25 kg

58

Cat Tembok Eksterior Dulux 25 kg

59

Cat Kayu Dulux 1 kg

60

Cat kayu Catylac 1kg

61

Cat Kayu Glotex 1kg

62

Ultran Politur

63

Ultran Agua Politur

64

Plamur

65

Plamur Kayu

66

Amplas

67

Kuas

67

Water Proof Aqua Proof

68

Genteng Keramik Kanmuri Natural

69

Genteng Keramik Kanmuri Standart

70

Genteng Keramik Kanmuri Exclusive

71

Genteng Beton Morando berglazur

72

Genteng Beton Morando Natural

73

Genteng Ideal bergalzur

74

Genteng Ideal natural

75

Rabung Genteng Standart

76

Asbes Jabesmen 150 x105

77

Seng gelombang tebal 0.20

78

Seng gelombang tebal 0.30

79

Keramik Lantai 20 x 20 Roman

80

Keramik Lantai 30 x 30 Roman

81

Keramik Lantai 40 x 40 Roman

82

Keramik Dinding 20 x 20 Roman

83

Keramika Dinding 20 x 25 Roman

84

Batu Alam Artistik

85

Paving Block Kelas I Type 4 persegi uk.10x20x8 cm

86

Closet Duduk Sanremo Classic

87

Closet Duduk Lexington

88

Closet Duduk Projecta

89

Wastafel Studio 3000 Lava & Pedestal

90

Floor Drain (Stainless)

91

Kran air standart

92

Pipa PVC WAVIN 1/2 inch

93

Pipa PVC WAVIN 3/4 inch

94

Pipa PVC WAVIN 1 inch

95

Pipa PVC WAVIN 2 inch

96

Pipa PVC WAVIN 3 inch

97

Pipa PVC WAVIN 4 inch

98

Elbow PVC 1/2 inch

99

Elbow PVC 3/4 inch

100

Elbow PVC 1 inch

101

Elbow PVC 2 inch

102

Elbow PVC 3 inch

103

Elbow PVC 4 inch

104

Socket PVC 1/2 inch

105

SocketPVC 3/4 inch

106

Socket PVC 1 inch

107

Socket PVC 2 inch

108

Socket PVC 3 inch

109

Socket PVC 4 inch

110

Tee PVC 1/2 inch

111

Tee PVC 3/4 inch

112

Tee PVC 1 inch

113

Tee PVC 2 inch

114

Tee PVC 3 inch

115

Tee PVC 4 inch

116

Pipa GIV 1/2 inc

117

Pipa GIV 3/4 inch

118

Pipa GIV 1 inch

119

Socket GIV 1/2 inch

120

Socket GIV 3/4 inch

121

Socket GIV 1 inch

122

Elbow GIV 1/2 inch

123

Elbow GIV 3/4 inch

124

Elbow GIV 1 inch

125

Tee GIV 1/2 inch

126

Tee GIV 3/4 inch

127

Tee GIV 1 inch

128

Kunci Firo

129

Kunci Yale

130

Grendel Firo

131

Grendel Yale

132

Engsel Firo 4''

133

Engsel Yale 4''

134

Engsel Firo 3''

135

Engsel Yale 3''

136

Saklar Tunggal Broco

137

Saklar Ganda Broco

138

Stop Kontak Broco

139

Fiting Lampu Bulat Broco

140

Cable Listrik NYA 3 x 2.5

141

Cable TIC 3 x 35 + 1 N

142

Breaker Panel Fujitsu + 4 MCB Merlyn Geryn

143

Buis Beton 50 x100

144

Buis Beton 30 x100

145

Buis Beton 15 x 75

146

Kansteen Standart lebar 50 cm

147

Rumput Halus

148

Pohon sejenis kembang kertas

149

Pohon sejensi cempaka

150

Pohon sejensi Cemara

151

Pohon sejenis pangkas kuning

152

Kusen Aluminium

153

Pipa Stainless Diameter 2 inch

154

Pekerjaan Railing Besi Stainless

SAT

HARGA UPAH
(Rp)

(3)

(4)

Hari

65,000.00

Hari

65,000.00

Hari

65,000.00

Hari

65,000.00

Hari

65,000.00

Hari

65,000.00

Hari

55,000.00

Hari

55,000.00

Hari

55,000.00

Hari

55,000.00

Hari

55,000.00

Hari

37,500.00

Hari

37,500.00

Hari

37,500.00

Hari

37,500.00

SAT

HARGA SATUAN
(Rp)

(3)

(4)

M3

74,750.00

M3

55,200.00

M3

55,000.00

M3

80,500.00

M3

74,750.00

m3

215,000.00

bh

300.00

bh

575.00

zak

52,325.00

zak

51,750.00

btg

24,000.00

btg

37,500.00

btg

64,600.00

btg

82,500.00

btg

147,900.00

kg

10,000.00

kg

14,375.00

kg

11,500.00

kg

10,350.00

kg

9,200.00

Lbr

36,800.00

Lbr

52,900.00

Lbr

62,100.00

Lbr

113,735.00

Lbr

128,800.00

Lbr

162,150.00

Lbr

184,000.00

m2

86,250.00

m2

97,750.00

m2

149,500.00

m2

212,750.00

m2

74,750.00

m2

94,875.00

m2

253,000.00

m2

143,750.00

Lbr

43,125.00

Lbr

77,625.00

Lbr

103,500.00

Lbr

40,825.00

Lbr

51,750.00

20,700.00

btg

10,350.00

btg

12,650.00

btg

5,175.00

btg

18,400.00

btg

23,000.00

btg

57,500.00

btg

37,375.00

btg

57,500.00

btg

46,000.00

btg

92,000.00

m3

2,300,000.00

m3

2,500,000.00

m3

4,025,000.00

m3

4,600,000.00

klg

670,000.00

klg

285,000.00

klg

241,500.00

klg

959,000.00

klg

54,625.00

klg

32,000.00

klg

27,950.00

klg

31,625.00

klg

25,875.00

kg

11,000.00

kg

12,500.00

lbr

1,500.00

bh

5,000.00

klg

38,000.00

bh

8,625.00

bh

28,750.00

bh

5,750.00

bh

11,500.00

bh

14,375.00

bh

34,500.00

bh

97,750.00

bh

15,000.00

lbr

28,750.00

m2

31,050.00

m2

40,250.00

m2

34,500.00

m2

35,650.00

m2

37,375.00

m2

44,275.00

m2

34,500.00

m2

32,000.00

m2

900.00

bj

1,367,723.75

bh

3,650,531.25

bh

1,086,750.00

bh

423,775.00

bh

25,000.00

bh

14,500.00

btg

15,525.00

btg

21,505.00

btg

29,434.25

btg

64,779.50

btg

130,122.50

btg

215,676.75

bh

1,725.00

bh

1,725.00

bh

1,725.00

bh

4,600.00

bh

5,750.00

bh

8,050.00

bh

1,725.00

bh

1,725.00

bh

1,725.00

bh

4,600.00

bh

5,750.00

bh

8,050.00

bh

1,725.00

bh

1,725.00

bh

1,725.00

bh

4,600.00

bh

5,750.00

bh

8,050.00

btg

73,600.00

btg

86,250.00

btg

126,500.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

3,450.00

bh

304,750.00

bh

126,500.00

bh

28,750.00

bh

17,250.00

bh

40,250.00

bh

23,000.00

bh

28,750.00

bh

17,250.00

bh

15,000.00

bh

17,500.00

bh

15,000.00

bh

20,000.00

2,875.00

56,500.00

set

201,250.00

bh

80,000.00

bh

45,000.00

bh

25,000.00

bh

18,000.00

m2

15,000.00

bh

17,250.00

bh

75,000.00

bh

125,000.00

bh

15,000.00

280,000.00

btg

759,000.00

m2

634,800.00

III. TABEL ANALISA HARGA SATUAN


HARGA
No.

SAT

1
A

3
PEKERJAAN PERSIAPAN AWAL

1M2

Pek. Pembersihan awal lokasi


Pekerja

M'

URAIAN

65,000.00

65.00

Pasangan Bouwplank
Kayu Sembarang

0.003

2,300,000.00

0.15
0.02

11,500.00
55,000.00

1,100.00

0.001
0.022

65,000.00
37,500.00

65.00
825.00

0.75

37,500.00

28,775.00
28,125.00

0.01

65,000.00

650.00

0.25

37,500.00

9,570.00
9,375.00

0.003

65,000.00

195.00

1.2
0.3
0.01

55,000.00
37,500.00
65,000.00

1.1

55,200.00

0.3
0.01

37,500.00
65,000.00

11,250.00
650.00

0.25

37,500.00

10,025.00
9,375.00

0.01

65,000.00

650.00

1M3

1.1

55,200.00

0.3
0.01

37,500.00
65,000.00

1.1
0.3

80,500.00
55,200.00

0.8
0.05

37,500.00
65,000.00

Pek. Galian tanah biasa


Tukang Gali

1M3

Pek. Urugan tanah kembali


Pekerja

1M3

Pek. Urugan tanah

1M3

1M3

Pek. Pemadatan dan perataan


Pekerja
Kepala Tukang Batu

1M3

Pekerja
Kepala Tukang Batu

11,250.00
650.00

11,900.00

Pek. Urugan pasir


Pasir Biasa

11,900.00

Pek. Pasir Urug bawah Lantai


Pekerja
Kepala Tukang Kayu

1,990.00

PEK. TANAH DAN PASIR

Pasir Biasa

0.001

Tanah Urug
Pekerja
Kepala Tukang Kayu

(Rp)

Kepala Tukang Kayu

Kepala Tukang Kayu

815.00
750.00

Kepala Tukang Kayu


3

HARGA UPAH

37,500.00

Kepala Tukang Kayu


Pekerja

SATUAN
(Rp)

0.02

Paku Kayu / Tripleks 5 - 12 cm


Tukang Kayu

KOEF

11,900.00
11,250.00
650.00

PEK. PASANGAN DAN PLESTERAN


1M3

Pek. Pasangan batu kosong


Batu Kali
Pasir Biasa

Pekerja
Kepala Tukang Batu

33,250.00

30,000.00
3,250.00

HARGA
No.

SAT

1M3

URAIAN

Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1M3

Pek. Pas Bata Artistik (1:2)


Batu Bata Mesin Press (amplas halus)
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1M3

Pek. Pas Bata merah (1:4)


Batu Bata Standart
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1M2

Pek. Plesteran (1:3)


Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

10

1M2

Pek. Plesteran Artistik


Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

12

1M2

Kepala Tukang Cat


Pekerja

HARGA UPAH
(Rp)
113,875.00

1.1
2.8

80,500.00
52,325.00

0.537
1.1

74,750.00
55,000.00

60,500.00

0.1
1.25

65,000.00
37,500.00

6,500.00
46,875.00

650

575.00

3.2936
0.333
1.5

52,325.00
74,750.00
55,000.00

82,500.00

0.15
4

65,000.00
37,500.00

9,750.00
150,000.00

500

300.00

1.6472
0.417

52,325.00
74,750.00

1.1
0.05

55,000.00
65,000.00

60,500.00
3,250.00

37,500.00

75,000.00

0.1304

52,325.00

0.0194
0.0666667

74,750.00
55,000.00

3,666.67

0.01
0.1

65,000.00
37,500.00

650.00
3,750.00

0.35

52,325.00

0.25
0.5

74,750.00
55,000.00

27,500.00

0.045
0.5

65,000.00
37,500.00

2,925.00
18,750.00

1.1
0.225

38,000.00
55,000.00

0.0225
0.15

65,000.00
37,500.00

3.632

52,325.00

0.54
0.91
4

74,750.00
215,000.00
37,500.00

242,250.00

138,750.00

8,066.67

49,175.00

Pek. Waterprofing
Water Proof Aqua Proof
Tukang Cat

SATUAN
(Rp)

Pek. Pasangan Batu kali (1:4)


Batu Kali
Semen Tiga Roda 50 kg

KOEF

7,087.50

1,462.50
5,625.00

PEK. BETON

1M3

Pek. Beton rabat (1:3:5)


Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja

175,250.00

150,000.00

HARGA
No.

SAT

URAIAN
Tukang Batu
Kepala Tukang Batu

1 M3

3,250.00

872,125.00
52,325.00

0.54
0.75

74,750.00
215,000.00

Pekerja
Tukang Batu

4
0.75

37,500.00
55,000.00

150,000.00
41,250.00

0.05
1.5
110

65,000.00

3,250.00

Kawat Beton
Tukang Besi

2
4.25

9,200.00
55,000.00

233,750.00

Kepala Tukang Besi


Pekerja

0.05
4

65,000.00
37,500.00

3,250.00
150,000.00

1
0.125

2,500,000.00

Paku Kayu / Tripleks 5 - 12 cm


Tukang Kayu

3.5
3.5

11,500.00
55,000.00

192,500.00

Kepala Tukang Kayu


Pekerja

0.5
1.5

65,000.00
37,500.00

32,500.00
56,250.00

0.25

37,500.00

9,375.00

Tukang Bongkar Begesting

10,000.00

Pek. Balok (Ukuran Standart 15/20 ; 15/25 ; 15/30 ; 20/25 ; 20/30)


M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
Pasir Pasang

890,875.00

6.512
0.54

52,325.00
74,750.00

Kerikil Beton
Pekerja

0.75
4.5

215,000.00
37,500.00

168,750.00

Tukang Batu
Kepala Tukang Batu

0.75
0.05

55,000.00
65,000.00

41,250.00
3,250.00

1.5
110

10,000.00

Kawat Beton
Tukang Besi

2
4.25

9,200.00
55,000.00

233,750.00

Kepala Tukang Besi


Pekerja

0.05
4

65,000.00
37,500.00

3,250.00
150,000.00

1
0.15
3.5

2,500,000.00
11,500.00

3.5
0.5

55,000.00
65,000.00

192,500.00
32,500.00

1.5
0.25

37,500.00
37,500.00

56,250.00
9,375.00

Kg Pekerjaan besi
Besi Beton semua ukuran per kg

Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Tukang Bongkar Begesting

1 M3

65,000.00

(Rp)
22,000.00

Pasir Pasang
Kerikil Beton

Pekerjaan Begisting
Kayu Bekisting per m3

13

0.05

HARGA UPAH

1
6.512

Kepala Tukang Batu


Kg Pekerjaan besi
Besi Beton semua ukuran per kg

1 M3

0.4

SATUAN
(Rp)
55,000.00

Pek. Sloof Beton (Ukuran Standart 15/20 ; 15/25 ; 15/30 dan 20/30)
M3 Pekerjaan Beton
Semen Tiga Roda 50 kg

KOEF

Pek. Kolom Beton (Ukuran Standart 15/25 ; 15 / 30 ; 20/20 ; 25/25)


M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu

875,250.00

6.512
0.54

52,325.00
74,750.00

0.75
4.5
0.75

215,000.00
37,500.00
55,000.00

168,750.00
41,250.00

HARGA
No.

SAT

URAIAN

0.05
1.5
110

10,000.00

2
4

9,200.00
55,000.00

220,000.00

0.05
4

65,000.00
37,500.00

3,250.00
150,000.00

1
0.15

2,500,000.00

Paku Kayu / Tripleks 5 - 12 cm


Tukang Kayu

3.5
3.5

11,500.00
55,000.00

192,500.00

Kepala Tukang Kayu


Pekerja
Tukang Bongkar Begesting

0.5
1.5
0.2

65,000.00
37,500.00
37,500.00

32,500.00
56,250.00
7,500.00

Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3

18

1 M3

Pek. Pelat Lantai


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang

921,500.00
1
52,325.00
74,750.00

Kerikil Beton
Pekerja

0.75
4.5

215,000.00
37,500.00

168,750.00

Tukang Batu
Kepala Tukang Batu

0.75
0.05

55,000.00
65,000.00

41,250.00
3,250.00

1.5
110

10,000.00

2
4.5
0.05

9,200.00
55,000.00
65,000.00

247,500.00
3,250.00

4
1

37,500.00

150,000.00

0.25
3.5

2,500,000.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu

3.5
0.5

55,000.00
65,000.00

192,500.00
32,500.00

Pekerja
Tukang Bongkar Begesting

2
0.2

37,500.00
37,500.00

75,000.00
7,500.00

Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm

1 M3

(Rp)
3,250.00

6.512
0.54

Kg Pekerjaan besi
Besi Beton semua ukuran per kg

20

HARGA UPAH

SATUAN
(Rp)
65,000.00

Kepala Tukang Batu

KOEF

Pek. Pelat Tangga


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu

837,750.00
1
6.512
0.54
0.75

52,325.00
74,750.00
215,000.00

4
0.75

37,500.00
55,000.00

150,000.00
41,250.00

0.05
1.5

65,000.00

3,250.00

110
2

10,000.00
9,200.00

4
0.05

55,000.00
65,000.00

220,000.00
3,250.00

3
1

37,500.00

112,500.00

0.2
3.5
3.5

2,500,000.00
11,500.00
55,000.00

192,500.00

HARGA
No.

21

SAT

1 M3

URAIAN
Kepala Tukang Kayu

0.5

SATUAN
(Rp)
65,000.00

Pekerja
Tukang Bongkar Begesting

2
0.2

37,500.00
37,500.00

Pek. Pelat Pondasi Telapak


M3 Pekerjaan Beton

Semen Tiga Roda 50 kg


Pasir Pasang

819,000.00

215,000.00
37,500.00

150,000.00

0.75
0.05
1.5

55,000.00
65,000.00

41,250.00
3,250.00

110
2

10,000.00
9,200.00

4
0.05

55,000.00
65,000.00

220,000.00
3,250.00

3
1

37,500.00

112,500.00

0.15
3.5

2,500,000.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu

3.5
0.5

55,000.00
65,000.00

192,500.00
32,500.00

Pekerja
Tukang Bongkar Begesting

1.5
0.2

37,500.00
37,500.00

56,250.00
7,500.00

Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm

Pek. Cor Beton Bertulang Menengah (Saluran dan Bak Kontrol)


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg

674,000.00

1
6

52,325.00

Pasir Pasang
Kerikil Beton

0.55
0.75

74,750.00
215,000.00

Pekerja
Tukang Batu

3.5
0.5

37,500.00
55,000.00

131,250.00
27,500.00

0.05
2.5

65,000.00

3,250.00

100
1.5

10,000.00
9,200.00

3.5
0.75

55,000.00
65,000.00

192,500.00
48,750.00

3
1
0.1

37,500.00

112,500.00

2,500,000.00

2
1.5

11,500.00
55,000.00

82,500.00

Kepala Tukang Kayu


Pekerja

0.25
0.75

65,000.00
37,500.00

16,250.00
28,125.00

Mandor
Tukang Bongkar Begesting

0.05
0.75

65,000.00
37,500.00

3,250.00
28,125.00

Kepala Tukang Batu


Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu

1 M3

75,000.00
7,500.00

0.75
4

Besi Beton semua ukuran per kg


Kawat Beton

24

(Rp)
32,500.00

52,325.00
74,750.00

Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi

1 M3

HARGA UPAH

6.512
0.54

Kerikil Beton
Pekerja

23

KOEF

Pek. Listplank Beton dan Kanopi


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja

863,250.00
1
6.512

52,325.00

0.54
0.75
4

74,750.00
215,000.00
37,500.00

150,000.00

HARGA
No.

SAT

URAIAN
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi

10,000.00
9,200.00

3.5
0.05

55,000.00
65,000.00

192,500.00
3,250.00

3
1

37,500.00

112,500.00

Kayu Bekisting per m3


Paku Kayu / Tripleks 5 - 12 cm

0.2
3

2,500,000.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu
Pekerja

3
0.5
2

55,000.00
65,000.00
37,500.00

165,000.00
32,500.00
75,000.00

Mandor
Tukang Bongkar Begesting

0.2
2

65,000.00
37,500.00

13,000.00
75,000.00

1 M2

23
0.15

8,625.00
55,000.00

8,250.00

0.015
0.15

65,000.00
37,500.00

975.00
5,625.00

4
0.338

15,000.00
52,325.00

0.032
0.2

74,750.00
55,000.00

11,000.00

0.02
0.4

65,000.00
37,500.00

1,300.00
15,000.00

Kayu meranti per m 3


Paku Kayu / Tripleks 5 - 12 cm

0.0105
0.1

4,025,000.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu

0.0571
0.0057

55,000.00
65,000.00

3,140.50
370.50

Pekerja

0.0571

37,500.00

2,141.25

0.006
0.15

4,025,000.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu

0.0428
0.0042

55,000.00
65,000.00

2,354.00
273.00

Pekerja

0.0428

37,500.00

1,605.00

Pek. Kuda-Kuda
Kayu meranti per m 3

1.1

4,025,000.00

Tukang Kayu
Kepala Tukang Kayu

24
2.4

55,000.00
65,000.00

1,320,000.00
156,000.00

37,500.00

300,000.00

0.025

4,025,000.00

Pek. Pas. Atap Genteng Pres

Kepala Tukang Batu


Pekerja

1 M'

Pek. Pas. Bubungan Genteng


Rabung Genteng Standart
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1 M2

1 M2

1 M3

1 M2

14,850.00

27,300.00

Pek. Pas. Usuk

Pek. Pas. Reng


Kayu meranti per m 3
Paku Kayu / Tripleks 5 - 12 cm

Pekerja

3,250.00

PEK. ATAP / KAP

Genteng Keramik Kanmuri Natural


Tukang Batu

(Rp)
41,250.00

110
2

Pekerja
Pekerjaan Begisting

HARGA UPAH

65,000.00

Tukang Besi
Kepala Tukang Besi

0.75

SATUAN
(Rp)
55,000.00

0.05
1.5

Besi Beton semua ukuran per kg


Kawat Beton

KOEF

Pek. Papan Ram (ListPlank)


Kayu meranti per m 3

5,652.25

4,232.00

1,776,000.00

40,200.00

HARGA
No.

SAT

URAIAN

F
1

Paku Kayu / Tripleks 5 - 12 cm

0.07

Tukang Kayu
Kepala Tukang Kayu

0.5
0.08

55,000.00
65,000.00

27,500.00
5,200.00

0.2

37,500.00

7,500.00

Pek. Kusen Biasa


Kayu Kamper per m3

1.1

4,600,000.00

Tukang Kayu
Kepala Tukang Kayu

20
2.5

55,000.00
65,000.00

1,100,000.00
162,500.00

10

37,500.00

375,000.00

0.04

4,600,000.00

0.9
0.1

97,750.00
14,375.00

2
0.35

55,000.00
65,000.00

110,000.00
22,750.00

1.1

37,500.00

41,250.00

1 M3

1 M2

1.1
0.1

97,750.00
14,375.00

0.75
0.1
0.45

55,000.00
65,000.00
37,500.00

Fisher
Tukang Besi

2
0.1

3,000.00
55,000.00

Pekerja
Kusen Aluminium 50 x 100 mm

0.3
1.1

37,500.00
46,666.67

Paku Rivet
Kaso 4 x 6 kamper

3
0.3

1,500.00
37,375.00

1.1

97,750.00

0.5
1.1
0.5

55,000.00
140,000.00
55,000.00

27,500.00

0.25

37,500.00

9,375.00

0.06

4,025,000.00

2.5
0.36

55,000.00
65,000.00

137,500.00
23,400.00

37,500.00

37,500.00

51,750.00

Pek. Daun Pintu/Jendela Kaca


Kayu Kamper per m3
Kaca Bening Tebal 5 mm
Paku Kayu / Tripleks 1- 4 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

1 M2

Tukang Kayu
Kepala Tukang Kayu
Pekerja

1 M1

1 M2

Pek. Pasang Kaca tebal 5mm Kusen Aluminium


Kaca Bening Tebal 5 mm

Pekerja
1 M2

Pek. Daun Pintu/Jendela Panel


Kayu meranti per m 3
Tukang Kayu
Kepala Tukang Kayu
Pekerja

G
1

174,000.00

64,625.00

Pek. Pasang Kusen Aluminium

Tukang Kaca
Kusen Aluminium 50 x 100 mm
Tukang Besi

1,637,500.00

Pek. Jendela Kaca Mati


Kaca Bening Tebal 5 mm
Paku Kayu / Tripleks 1- 4 cm

(Rp)

PEK. KUSEN , DAUN PINTU DAN JENDELA

Pekerja

HARGA UPAH

SATUAN
(Rp)
11,500.00

Pekerja

KOEF

41,250.00
6,500.00
16,875.00
27,962.50
5,500.00
11,250.00

11,212.50

64,375.00

27,500.00

198,400.00

PEK. PLAFOND DAN LANTAI


1 M2

Pek. Pas. Plafond Gypsum


Papan Gypsum Merk Jayaboard 120 x 240 tebal 9

31,050.00

HARGA
No.

SAT

URAIAN

0.015

Paku Kayu / Tripleks 1- 4 cm


Paku Kayu / Tripleks 5 - 12 cm

0.02
0.2

14,375.00
11,500.00

Tukang Kayu
Kepala Tukang Kayu

0.2
0.02

55,000.00
65,000.00

11,000.00
1,300.00

0.5

37,500.00

18,750.00

1.0000

20,700.00

0.0400
0.1

14,375.00
37,500.00

3,750.00

0.02
0.002

55,000.00
65,000.00

1,100.00
130.00

37,375.00

Semen Tiga Roda 50 kg


Pasir Pasang

0.25
0.02

52,325.00
74,750.00

Tukang Batu
Kepala Tukang Batu

0.2
0.01

55,000.00
65,000.00

11,000.00
650.00

0.3

37,500.00

11,250.00

35,650.00

Semen Tiga Roda 50 kg


Pasir Pasang

0.25
0.02

52,325.00
74,750.00

Tukang Batu
Kepala Tukang Batu
Pekerja

0.2
0.01
0.3

55,000.00
65,000.00
37,500.00

34,500.00

Semen Tiga Roda 50 kg


Pasir Pasang

0.25
0.02

52,325.00
74,750.00

Tukang Batu
Kepala Tukang Batu

0.2
0.01

55,000.00
65,000.00

11,000.00
650.00

0.3

37,500.00

11,250.00

Keramika Dinding 20 x 25 Roman


Semen Tiga Roda 50 kg
Pasir Pasang

1
0.25
0.02

34,500.00
52,325.00
74,750.00

Tukang Batu
Kepala Tukang Batu

0.25
0.01

55,000.00
65,000.00

13,750.00
650.00

0.2

37,500.00

7,500.00

Batu Alam Dinding Artistik


Semen Tiga Roda 50 kg

1
0.25

32,000.00
52,325.00

Pasir Pasang
Tukang Batu

0.02
0.2

74,750.00
55,000.00

11,000.00

Kepala Tukang Batu


Pekerja

0.01
0.25

65,000.00
37,500.00

650.00
9,375.00

Pekerja
2

1 M'

Pek. List Plafoon Gypsum


List Gypsum
Paku Kayu / Tripleks 1- 4 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu

1 M2

Pek. Pas. Kramik 40/40


Keramik Lantai 40 x 40 Roman

Pekerja
3

1 M2

1 M2

Pek. Pas. Kramik 30/30


Keramik Lantai 30 x 30 Roman

Pek. Pas. Kramik 20/20


Keramik Dinding 20 x 20 Roman

Pekerja

1 M2

1 M2

(Rp)

4,980.00

22,900.00

22,900.00

11,000.00
650.00
11,250.00

22,900.00

Pek. Pas. Kramik dinding 20/25

Pekerja

HARGA UPAH

SATUAN
(Rp)
4,025,000.00

Kayu meranti per m 3

KOEF

21,900.00

Pek. Pas. Batu Alam Penutup Dinding Artistik

21,025.00

HARGA
No.

SAT

1 M2

URAIAN

Pek. Pas. Paving Block


Paving Block Kelas I Type 4 persegi uk.10x20x8 cm
Tukang Batu
Kepala Tukang Batu
Pekerja

H
1

1 M2

Pek. Mengecat Tembok (interior) , 1x Plamir2x Mengecat


Cat Tembok Interior Dulux 25 kg
Plamur

Tukang Cat
Kepala Tukang Cat
Pekerja
1 M2

Pek. Mengecat Tembok (exterior) , 1x Plamir2x Mengecat


Cat Tembok Eksterior Dulux 25 kg
Amplas
Kuas
Tukang Cat
Kepala Tukang Cat
Pekerja

SATUAN
(Rp)

HARGA UPAH
(Rp)
14,850.00

50

900.00

0.15
0.015

55,000.00
65,000.00

8,250.00
975.00

0.15

37,500.00

5,625.00

PEK. PENGECATAN DAN POLITURAN

Amplas
Kuas

KOEF

1 M2

Pek. Mengecat Kayu, 1x Cat Dasar,1x Plamur,


2x Cat Halus
Cat Kayu Dulux 1 kg

0.37
0.25

670,000.00
11,000.00

0.50
0.05

1,500.00
5,000.00

0.05
0.01

55,000.00
65,000.00

2,750.00
650.00

0.075

37,500.00

2,812.50
2%
6,212.50

0.37
0.50

670,000.00
1,500.00

0.05
0.05
0.01

5,000.00
55,000.00
65,000.00

2,750.00
650.00

0.075

37,500.00

2,812.50

9,900.00
0.284

54,625.00

Plamur Kayu
Amplas

0.25
0.5

12,500.00
1,500.00

Ultran Politur
Kuas

0.142
0.01

31,625.00
5,000.00

0.1
0.01

55,000.00
65,000.00

5,500.00
650.00

0.1

37,500.00

3,750.00

Tukang Cat
Kepala Tukang Cat
Pekerja

6,212.50

PEK. BORONGAN

1
2

ls
m

Pemasangan Rambu Pengaman


Pas. Buis Beton 50 x 100

1
1

22,000.00
15,000.00

3
4

m
m

Pas. Buis Beton 30 x 100


Pas. Buis Beton 10 x 75 cm

1
1

12,000.00
10,000.00

5
6

m
titik

Pas. Kansteen Jalan


Pas. Instalasi Titik Lampu

1
1

7,500.00
20,000.00

7
8

titik
titik

Pas. Instalasi Stop Kontak


Pas. Saklar Ganda

1
1

20,000.00
20,000.00

9
10

titik
titik

Pas. Saklar Tunggal


Pas. MCB Box Breaker

1
1

20,000.00
75,000.00

11
12

m
m

Pas. Jaringan Kabel


Pas, Jaringan Kabel Tegangan Rendah

1
1

1,500.00
15,000.00

13
14

m
bh

Pas. Pipa PVC 2"


Pas. Tee Pipa PVC 2"

1
1

3,000.00
2,000.00

15

bh

Pas. Elbow Pipa PVC 2"

2,000.00

HARGA
URAIAN

KOEF

SATUAN
(Rp)

HARGA UPAH

No.

SAT

16

Pas. Pipa PVC 3"

(Rp)
3,500.00

17
18

bh
bh

Pas. Tee Pipa PVC 3"


Pas. Elbow Pipa PVC 3"

1
1

2,000.00
2,000.00

19
20

bh
bh

Pas. Reducer Pipa PVC 2 - 3"


Pas. Kloset Warna Duduk KIA

1
1

2,000.00
80,000.00

21
22

bh
bh

Pas. Shower Standart KIA


Pas. Floor Drain

1
1

50,000.00
12,000.00

23
24

bh
m

Pas. Keran Air


Pas. Pipa Air Bersih 3/4"

1
1

5,000.00
3,000.00

25
26

bh
bh

Pas. Elbow Pipa Air Bersih 3/4"


Pas. Sokcket Pipa Air Bersih 3/4"

1
1

2,000.00
2,000.00

27
28
29

bh
set
bh

Pas. Tee Y Pipa Air Bersih 3/4"


Pas. Wastafel Cuci Stainless
Pas Wastafel Putih KIA ukuran 50 x 35 cm

1
1
1

2,000.00
45,000.00
80,000.00

30
31

m3
ls

Pembentuhan lahan landscaping


Pemangkasan dan perapihan pohon

1
1

7,500.00
50,000.00

32
33

m2
m2

Penanaman Rumput
Penanaman Kembang Kertas

1
1

4,000.00
3,000.00

34
35

m2
m

Penanaman Pohon type Palem


Penanaman Cemara

1
1

20,000.00
20,000.00

36
37

m
titik

Penanaman Pangkas Kuning


Pek. Penyambungan Listrik

1
1

1,500.00
250,000.00

38
39

m
m2

Pek. Penyambungan Air


Pekerjaan pemasangan railing besi

1
1

150,000.00
42,500.00

40

Pekerjaan Pipa stainless

12,000.00

HARGA BAHAN

JUM HARGA

(Rp)

(Rp)

815.00
750.00
65.00

8,625.00
6,900.00

10,615.00
6,900.00

1,725.00

1,725.00
1,100.00
65.00
825.00

28,775.00
28,125.00
650.00
9,570.00
9,375.00
195.00

66,000.00

77,900.00

66,000.00

66,000.00
11,250.00
650.00

60,720.00
60,720.00

72,620.00
60,720.00
11,250.00
650.00

10,025.00
9,375.00
650.00

60,720.00
60,720.00

72,620.00
60,720.00
11,250.00
650.00

105,110.00

138,360.00

88,550.00
16,560.00

88,550.00
16,560.00
30,000.00
3,250.00

HARGA BAHAN

JUM HARGA

(Rp)
275,200.75

(Rp)
389,075.75

88,550.00
146,510.00

88,550.00
146,510.00

40,140.75

40,140.75
60,500.00
6,500.00
46,875.00

570,979.37
373,750.00

813,229.37
373,750.00

172,337.62
24,891.75

172,337.62
24,891.75
82,500.00
9,750.00
150,000.00

267,360.49
150,000.00

406,110.49
150,000.00

86,189.74
31,170.75

86,189.74
31,170.75
60,500.00
3,250.00
75,000.00

8,273.33
6,823.18

16,340.00
6,823.18

1,450.15

1,450.15
3,666.67
650.00
3,750.00

37,001.25
18,313.75

86,176.25
18,313.75

18,687.50

18,687.50
27,500.00
2,925.00
18,750.00

54,175.00

61,262.50

41,800.00
12,375.00

41,800.00
12,375.00
1,462.50
5,625.00

426,059.40
190,044.40

601,309.40
190,044.40

40,365.00
195,650.00

40,365.00
195,650.00
150,000.00

HARGA BAHAN
(Rp)

JUM HARGA
(Rp)
22,000.00
3,250.00

2,013,505.40

2,885,630.40

340,740.40

794,540.00
340,740.40

40,365.00
161,250.00

40,365.00
161,250.00
150,000.00
41,250.00

1,100,000.00
18,400.00

3,250.00
1,226,500.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00

312,500.00
40,250.00

2,141,500.00
312,500.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

2,076,005.40

2,966,880.40
794,540.00

340,740.40
40,365.00

340,740.40
40,365.00

161,250.00

161,250.00
168,750.00
41,250.00
3,250.00

1,100,000.00
18,400.00

1,226,500.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00

375,000.00
40,250.00

2,141,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

2,076,005.40

2,951,255.40
794,540.00

340,740.40
40,365.00

340,740.40
40,365.00

161,250.00

161,250.00
168,750.00
41,250.00

HARGA BAHAN
(Rp)

1,100,000.00
18,400.00

JUM HARGA
(Rp)
3,250.00
1,226,500.00
1,100,000.00
18,400.00
220,000.00
3,250.00
150,000.00

375,000.00
40,250.00

2,141,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
7,500.00

2,326,005.40

3,247,505.40
794,540.00

340,740.40
40,365.00

340,740.40
40,365.00

161,250.00

161,250.00
168,750.00
41,250.00
3,250.00

1,100,000.00
18,400.00

1,226,500.00
1,100,000.00
18,400.00
247,500.00
3,250.00
150,000.00
2,141,500.00

625,000.00
40,250.00

625,000.00
40,250.00
192,500.00
32,500.00
75,000.00
7,500.00

2,201,005.40

3,038,755.40
794,540.00

340,740.40
40,365.00
161,250.00

340,740.40
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00

1,100,000.00
18,400.00

1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
2,141,500.00

500,000.00
40,250.00

500,000.00
40,250.00
192,500.00

HARGA BAHAN
(Rp)

JUM HARGA
(Rp)
32,500.00
75,000.00
7,500.00

2,076,005.40

2,895,005.40
794,540.00

340,740.40
40,365.00

340,740.40
40,365.00

161,250.00

161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00

1,100,000.00
18,400.00

1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
2,141,500.00

375,000.00
40,250.00

375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
7,500.00

1,803,112.50

2,477,112.50

313,950.00

794,540.00
313,950.00

41,112.50
161,250.00

41,112.50
161,250.00
131,250.00
27,500.00
3,250.00
1,226,500.00

1,000,000.00
13,800.00

1,000,000.00
13,800.00
192,500.00
48,750.00

250,000.00
23,000.00

112,500.00
2,141,500.00
250,000.00
23,000.00
82,500.00
16,250.00
28,125.00
3,250.00
28,125.00

2,195,255.40

3,058,505.40

340,740.40

794,540.00
340,740.40

40,365.00
161,250.00

40,365.00
161,250.00
150,000.00

HARGA BAHAN
(Rp)

JUM HARGA
(Rp)
41,250.00
3,250.00
1,226,500.00

1,100,000.00
18,400.00

1,100,000.00
18,400.00
192,500.00
3,250.00
112,500.00
2,141,500.00

500,000.00
34,500.00

500,000.00
34,500.00
165,000.00
32,500.00
75,000.00
13,000.00
75,000.00

198,375.00

213,225.00

198,375.00

198,375.00
8,250.00
975.00
5,625.00

80,077.85
60,000.00
17,685.85

107,377.85
60,000.00
17,685.85

2,392.00

2,392.00
11,000.00
1,300.00
15,000.00

43,412.50

49,064.75

42,262.50
1,150.00

42,262.50
1,150.00
3,140.50
370.50
2,141.25

25,875.00
24,150.00
1,725.00

30,107.00
24,150.00
1,725.00
2,354.00
273.00
1,605.00

4,427,500.00
4,427,500.00

6,203,500.00
4,427,500.00
1,320,000.00
156,000.00
300,000.00

101,430.00
100,625.00

141,630.00
100,625.00

HARGA BAHAN

JUM HARGA

(Rp)

(Rp)
805.00

805.00
27,500.00
5,200.00
7,500.00

5,060,000.00
5,060,000.00

6,077,500.00
5,060,000.00
1,100,000.00
162,500.00
375,000.00

273,412.50
184,000.00

447,412.50
184,000.00

87,975.00
1,437.50

87,975.00
1,437.50
110,000.00
22,750.00
41,250.00

108,962.50

173,587.50

107,525.00
1,437.50

107,525.00
1,437.50
41,250.00
6,500.00
16,875.00

61,833.33

89,795.83

6,000.00

6,000.00
5,500.00

51,333.33

11,250.00
51,333.33

4,500.00

4,500.00
11,212.50

261,525.00
107,525.00

325,900.00
107,525.00

154,000.00

27,500.00
154,000.00
27,500.00
9,375.00

241,500.00
241,500.00

439,900.00
241,500.00
137,500.00
23,400.00
37,500.00

114,712.50
51,750.00

145,762.50
51,750.00

HARGA BAHAN

JUM HARGA

(Rp)
60,375.00

(Rp)
60,375.00

287.50
2,300.00

287.50
2,300.00
11,000.00
1,300.00
18,750.00

21,275.00
20,700.00

26,255.00
20,700.00

575.00

575.00
3,750.00
1,100.00
130.00

51,951.25
37,375.00

74,851.25
37,375.00

13,081.25
1,495.00

13,081.25
1,495.00
11,000.00
650.00
11,250.00

50,226.25
35,650.00

73,126.25
35,650.00

13,081.25
1,495.00

13,081.25
1,495.00
11,000.00
650.00
11,250.00

49,076.25
34,500.00

71,976.25
34,500.00

13,081.25
1,495.00

13,081.25
1,495.00
11,000.00
650.00
11,250.00

49,076.25

70,976.25

34,500.00
13,081.25
1,495.00

34,500.00
13,081.25
1,495.00
13,750.00
650.00
7,500.00

46,576.25

67,601.25

32,000.00
13,081.25

32,000.00
13,081.25

1,495.00

1,495.00
11,000.00
650.00
9,375.00

HARGA BAHAN

JUM HARGA

(Rp)

(Rp)

45,000.00
45,000.00

59,850.00
45,000.00
8,250.00
975.00
5,625.00

251,650.00

257,862.50

247,900.00
2,750.00

247,900.00
2,750.00

750.00
250.00

750.00
250.00
2,750.00
650.00
2,812.50

98%
248,900.00

255,112.50

247,900.00
750.00

247,900.00
750.00

250.00

250.00
2,750.00
650.00
2,812.50

23,929.25

33,829.25

15,513.50

15,513.50

3,125.00
750.00

3,125.00
750.00

4,490.75
50.00

4,490.75
50.00
5,500.00
650.00
3,750.00

75,000.00
80,000.00

97,000.00
95,000.00

45,000.00
25,000.00

57,000.00
35,000.00

18,000.00
20,000.00

25,500.00
40,000.00

15,000.00
17,500.00

35,000.00
37,500.00

15,000.00
250,000.00

35,000.00
325,000.00

4,000.00
56,500.00

5,500.00
71,500.00

10,796.58
4,600.00

13,796.58
6,600.00

4,600.00

6,600.00

HARGA BAHAN

JUM HARGA

(Rp)
21,687.08

(Rp)
25,187.08

5,750.00
5,750.00

7,750.00
7,750.00

10,000.00
1,086,750.00

12,000.00
1,166,750.00

423,775.00
25,000.00

473,775.00
37,000.00

14,500.00
14,375.00

19,500.00
17,375.00

5,000.00
5,000.00

7,000.00
7,000.00

7,000.00
225,000.00
450,000.00

9,000.00
270,000.00
530,000.00

7,500.00
50,000.00

11,500.00
17,250.00

15,500.00
20,250.00

75,000.00
100,000.00

95,000.00
120,000.00

8,000.00

9,500.00
250,000.00

634,800.00

150,000.00
677,300.00

86,250.00

98,250.00