Professional Documents
Culture Documents
COSTO MATERIAL
CLAVE
CONCEPTO
UNIDAD
CANTIDAD
P.U
IMPORTE
P.U
IMPORTE
RESUMEN
P.U
IMPORTE
PRELIMINARES
PRE-01
LOTE
1.00
$0.00
$0.00
$0.00
$0.00
PRE-02
M2
456.00
$0.00
$0.00
$0.00
$0.00
M2
316.00
$0.00
$0.00
$0.00
$0.00
ML
223.00
$0.00
$0.00
$0.00
$0.00
M2
206.54
$0.00
$0.00
$0.00
$0.00
ML
28.00
$0.00
$0.00
$0.00
$0.00
ML
24.00
$0.00
$0.00
$0.00
$0.00
M3
1.30
$0.00
$0.00
$0.00
$0.00
M3
31.00
$0.00
$0.00
$0.00
$0.00
M3
102.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PRE-03
PRE-04
PRE-05
PRE-06
PRE-07
PRE-08
PRE-09
PRE-10
SUMA DE PRELIMINARES:
$0.00
DES-01
DES-02
DES-03
LOTE
1.00
$0.00
$0.00
$0.00
$0.00
M2
50.00
$0.00
$0.00
$0.00
$0.00
M2
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ALBAILERIA
ALB-01
M3
55.00
$0.00
$0.00
COSTO MATERIAL
CLAVE
ALB-02
ALB-03
CONCEPTO
FORJADO DE PASOS PARA INSTALACIONES EN FIRME DE CONCRETO A BASE DE TUBO DE P.V.C.
SANITARIO DE HASTA 6" DE DIAMETRO, INCLUYE: MATERIALES CON ACARREO, MANO DE OBRA,
HERRAMIENTA, CALAFATEO, ALAMBRE RECOCIDO CAL. 18, DESPERDICIOS, EQUIPO DE
PROTECCIN Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.
SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN MURETES DE CONCRETO PARA CANALES DE
HASTA 60CMS. DE ALTURA, INCLUYE: MATERIAL, CIMBRADO, DESCIMBRADO, MANO DE OBRA,
HERRAMIENTA, ACARREOS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
P.U
IMPORTE
P.U
IMPORTE
RESUMEN
UNIDAD
CANTIDAD
P.U
IMPORTE
PZA
20.00
$0.00
$0.00
$0.00
$0.00
M2
132.86
$0.00
$0.00
$0.00
$0.00
ALB-04
M2
62.54
$0.00
$0.00
$0.00
$0.00
ALB-06
M2
497.00
$0.00
$0.00
$0.00
$0.00
ALB-07
M3
46.00
$0.00
$0.00
$0.00
$0.00
ALB-08
ML
203.00
$0.00
$0.00
$0.00
$0.00
ALB-09
M2
142.00
$0.00
$0.00
$0.00
$0.00
ALB-09
ML
3.00
$0.00
$0.00
$0.00
$0.00
M2
70.00
$0.00
$0.00
$0.00
$0.00
PZA
3.00
$0.00
$0.00
$0.00
$0.00
PZA
3.00
$0.00
$0.00
$0.00
$0.00
PZA
1.00
$0.00
$0.00
$0.00
$0.00
ML
18.00
$0.00
$0.00
$0.00
$0.00
ML
18.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ALB-10
ALB-11
ALB-12
ALB-13
ALB-14
ALB-15
SUMA DE ALBAILERIA:
$0.00
IMPERMEABILIZACIN
IMP-01
M2
439.00
$0.00
$0.00
COSTO MATERIAL
CLAVE
IMP-02
IMP-03
IMP-04
IMP-05
IMP-06
IMP-07
CONCEPTO
APLICACION DE SISTEMA DE IMPERMEABILIZACION DE CHAROLA SOBRE LECHO SUPERIOR DE
LOSA DE ESTACIONAMIENTOE1, A BASE DE MEMBRANA PREFABRICADA DE ASFALTO MODIFICADO
DE LA MARCA AL-KOAT, DENOMINADA PP40 TSBS, DE4MM. DE ESPESOR CON REFUERZO CENTRAL Y
ACABADO SUPERIOR EN POLIESTER, SIGUIENDO LOS CRITERIOS DE APLICACIN PUBLICADOS POR
EL FABRICANTE DEL PRODUCTO. APLICADO POR MEDIO DE TERMOFUSION CON SOPLETE A GAS
BUTANO CONSIDERANDO TRASLAPES LONGITUDINALES DE 10CM. Y TRANSVERSALES DE 15CM.,
DEJANDO EL AREA LISTA PARA RECIBIR RELLENO. INCLUYE: SUMINISTR DE TODOS LOS
MATERIALES, MANO DE OBRA, CONFINAMIENTO DEL AREA DE TRABAJO, EQUIPO DE SEGURIDAD,
HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
IMPORTE
M2
439.00
$0.00
$0.00
$0.00
$0.00
M2
122.00
$0.00
$0.00
$0.00
$0.00
M2
122.00
$0.00
$0.00
$0.00
$0.00
M2
262.00
$0.00
$0.00
$0.00
$0.00
M2
262.00
$0.00
$0.00
$0.00
$0.00
ML
1,568.00
$0.00
$0.00
$0.00
$0.00
P.U
RESUMEN
CANTIDAD
SUMA DE IMPERMEABILIZACIN:
P.U
UNIDAD
IMPORTE
P.U
IMPORTE
ACABADOS
ACA-01
ACA-02
ACA-03
ACA-04
ACA-05
SUMA DE ACABADOS:
M2
320.00
$0.00
$0.00
$0.00
$0.00
M2
320.00
$0.00
$0.00
$0.00
$0.00
M2
4.84
$0.00
$0.00
$0.00
$0.00
M2
59.00
$0.00
$0.00
$0.00
$0.00
M2
20.00
$0.00
$0.00
$0.00
$0.00
$
INSTALACIN HIDRULICA
COSTO MATERIAL
CLAVE
IHS-01
CONCEPTO
SUMINISTRO E INSTALACIN DE TUBERIA DE PVC HIDRULICO CEMENTADO CDULA 40 EN
DAMETROS DE 2" Y 4" DE DIMETRO, INCLUYE: CODOS, CONEXIONES, VLVULAS, ACCESORIOS
PARA SU CORRECTO FUNCIONAMIENTO, LOS SOPORTES NECESARIOS PARA FIJARLOS EN LOS
LUGARES DESIGNADOS, SUMINISTRO DEL MATERAL, FLETES, ACARREOS, HERRAMIENTA, EQUIPO
MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA INSTALACIN.
UNIDAD
CANTIDAD
ML
121.00
P.U
IMPORTE
P.U
$0.00
RESUMEN
IMPORTE
P.U
$0.00
IMPORTE
$0.00
$0.00
INSTALACIN ELCTRICA
IE-01
ML
66.00
$0.00
$0.00
$0.00
$0.00
IE-02
PZA
2.00
$0.00
$0.00
$0.00
$0.00
IE-03
PZA
2.00
$0.00
$0.00
$0.00
$0.00
LIMPIEZA
LIMP-01
LIMPIEZA DURANTE LA EJECUCION DE LOS TRABAJOS Y RETIRO DEL MATERIAL SOBRANTE FUERA
DEL AREA DE TRABAJO, INCLUYE: MATERIALES, HERRAMIENTA, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.
JOR
30.00
$0.00
$0.00
$0.00
$0.00
LIMP-02
LIMPIEZA FINAL PARA ENTREGA DE OBRA Y RETIRO DEL MATERIAL SOBRANTE FUERA DEL AREA DE
TRABAJO, INCLUYE: MATERIALES, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
JOR
4.00
$0.00
$0.00
$0.00
$0.00
SUMA DE LIMPIEZA:
$
RESUMEN POR PARTIDAS
PREELIMINARES:
MATERIAL
MANO DE OBRA
TOTAL
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ALBAILERIA:
$0.00
$0.00
$0.00
IMPERMEABILIZACIN:
$0.00
$0.00
$0.00
ACABADOS:
$0.00
$0.00
$0.00
INSTALACIN HIDRULICA:
$0.00
$0.00
$0.00
INSTALACIN ELCTRICA:
$0.00
$0.00
$0.00
LIMPIEZA:
$0.00
$0.00
$0.00
SUBTOTAL
$0.00
$0.00
$0.00
I.V.A.
$0.00
$0.00
$0.00
IMPORTE FINAL
$0.00
$0.00
$0.00
DESMONTAJE DE INSTALACIONES
Y CUARTO DE MQUINAS DE
FUENTE ACTUAL: