You are on page 1of 1
yeccan Mechanical and | ined Pipe Connection Procedure hemical ind. Pvt.Ltd WI/ PROD / 03(a) = 50 MALD.C, Title : Pipe with brach Fittings: jaramati - 413133 ‘Manufacturing process. JResponsibility : Production Engineer A)Issue the manufacturing drg. 2)As per drawing Marking for the hole of banch fittings on the ms pipe will be done. 8) Cut the hole by gas cutting and finish it by grinding 4)Close the hioe from ouside with dummy plate by tag welding, 5) Fit the fix & rotating flanges on both side of pipe with required id. 8)Lock the pipe & flanges by 20 mm tie rod with tightened the bolts from both side of tie rod, ‘)Lift the assembled pipe by beit & crane and fix the pipe on spinning machine. '8) Spinning machine speed adjusted as per requried by VFD. 9)Take the ready mix of Ceracoat material in a vam mixer 110)Mix the Ceracoat material properly upto 7min. ‘1D After this the mix is ready for spinning. 12)Take correct quantity of mixing material as per requirement of pipe ID ceracoat thickness. 13)Start the Spinning machine & insert the ceracoat mix material ball inside the pipe. 14) Whole process of spinning should be completed within 10 min. 18) After completion of spinning remove both sides fixed flange 16) Remove the dummy plate by grinder. 17) Make the hole in the ceracoat lining in the green stage itself 18) After 24 hrs air curing allow water curing for 72 hrs with wet guney bag. 19) Do the Fitup Branch fittings with pipe by tacking on layout 20)Fit up end connection like flange ,collor, Spool on layout 2:1) Release the pipe for welding. 22)Carry out Final Dimensional inspection as per approved drawing . 23) Release the job for painting , packing and despatch ry a somes 87. (G- pac eM Date

You might also like