You are on page 1of 88

Catatan Kuliah

ANALISA STRUKTUR STATIS TAK TENTU


METODE MOMENT DISTRIBUSI
(THE MOMENT DISTRIBUSI METHOD )
( CROSS)
Ref:
Chu Kia Wang , Ph.D
Statically Indeterminate Structures

Ir . H. Kartono Hd

The Moment Distrubution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

Dasar Teori Cross

Tinjau satu batang dengan


tumpuan sendi di A dan tumpuan jepit di B

M A

= 0

EI

Pada tumpuan A , diberi momen M


pada tumpuan B akan timbul moment induksi
sebesar M
B

M B

L
M A

EI

M
M
EI

(+)

, maka

Bidang Moment

Bidang Moment
EI
2/3 L

1/3 L
R' A

Q=

M A. L
2EI

R' B

R''

Q=

sebagai beban pada balok


Conjugate

= R'

= 2/3 . 1/2.

= R'

= 1/3 . 1/2.

M A .L
EI

(-)

M
R''

B
B

M
EI

Bidang Moment
EI

sebagai beban pada balok


Conjugate

= R"

= 1/3 . 1/2.

M B .L

= R"

= 2/3 . 1/2.

M B .L

= R'

= 1/3 . 1/2.

= R"

= 2/3 . 1/2.

M .L

3 EI

6 EI

.L

A B
Untuk

6 EI

Pada tumpuan B, diberi beban moment M

M B

M B. L
2EI

3 EI
M A .L

EI

M A .L
3 EI

A = 1 radian , maka besarnya

1/2.M
6 EI

.L

M A .L

.L

3 EI

EI
M

.L

3 EI
A

3 EI

EI

6 EI

M B .L

6 EI
M B .L

M A .L

EI

M B .L

EI

M A .L

M A .L

.L

M A .L

4 EI
M

6 EI

4 EI
L

4 EI
L

1
M
2

The Moment Distrubution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

4 EI

Pada tumpuan sendi, A , diberi moment


M A sebesar 4 EI/L , maka pada tumpuan A
akan timbul putaran sudut
sebesar
A = 1 Radian

= 0

EI

L

4 EI

M B = 1/2 M

Bila pada balok dengan perletakan sendi (di titik A) dan perletakan
jepit diujung balok ( dititik B) , diberi moment searah jarum pada
titik A sebesar M
A , maka pada perletakan yang berperletakan
jepit ( dititik B ) akan timbul moment induksi sebesar 1/2 M

Disebut sebagai Carry Ov er Factor ( Faktor induksi) , yakni


menyatakan ratio moment yang terjadi pada perletakkan
jepit B, sebagai akibat adanya moment yang diberikan pada titik A

angka 1/2

Disebut sebagai Stiffness Factor ( faktor kekakuan ) , yakni


menyatakan besar moment yang diperlukan untuk diberikan
pada titik A yang berupa sendi , agar terjadi putaran sudut

4 EI
L

A sebesar 1 Radian

Modified Stiffness Factor

M A
EI

M B =0

A = sendi ; B = sendi

L
Bidang Moment
(+)

Bidang Moment
EI

EI
2/3 L

1/3 L
R' A

Q = 1/2.
M A .L
3 EI

.L

R' B

EI

3 EI
L

Bila sistem perletakan diujung balok lainya berupa sendi , maka besarnya
faktor kekakuannya adalah 3/4 dari faktor kekakuan bila ujung lainya berupa jepit.
Hal ini disebut
Modified Stiffness Factor

A =

4 EI
4L

sebagai beban pada balok


Conjugate

= R' A = 2/3 . 1/2.

M A .L

= R' B = 1/3 . 1/2.

M A .L

M A .L

EI

6 EI

A =

3 4 EI
4
L

EI

M A .L
3 EI

The Moment Distrubution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

Kontrol pada Metode Moment Distribusi


Perhitungan Moment Distribusi dimulai dari penentuan faktor kekakuan, penentuan besar moment
primer dan terakhir adalah penentuan moment akhir.
Kontrol pertama atas ketepatan perhitungan moment akhir , didasarkan pada jumlah moment di
setiap titik perletakkan sama dengan nol, Kontrol ini adalah kontrol statika.
Selanjutnya kontrol juga dilakukan atas dasar geometri yakni hubungan antara putaran sudut, faktor
kekakuan dan moement akhir.
Hal ini dapat dilakukan dengan mencari rotasi relativ e ( relativ e v aloes of the rotation ) pada tiap
joint
P2

P1

Tinjau Balok AB sebagai elemen struktur dalam


portal , mengalami putaran sudut seperti gambar .
M AB adalah momen yang diperlukan untuk
meredam putaran sudut
A,
dan M
adalah momen yang diperlukan untuk
BA
meredam putaran sudut
B

M BA

B
A

M AB

(=)
P1

P2

A =-

M FBA

A1 +

M AB = M FAB

M FAB

(+)

A1

B1

M' A

M'

A1 =

M' B

A2

B2

B =+

B1 -

1x(2)

B =+

+ M'

= M FAB

M BA = M FBA + M'

= M

Atau

FBA

2 EI
L
2 EI
L

M'

=+

M'

=+

(-2 A - B )
(-2 B - A )

+ M'

= M FAB

K relative

(-2 A - B )

( 1)

M BA = M FBA + M'

= M

FBA

K relative

(-2 B - A )

(2)

M AB = M FAB

A2
B2

( 1)

M AB - M

FAB

2K

relative

A +K

relative

=0

( 2)

M BA - M

FBA

2K

relative

B +K

relative

=0

.L

= =+

6 EI
M' B .L

.L

6 EI
M'

.L

(+)

3 EI
=-

B2

3 EI
M' B .L
M' A .L
+
--> ( 1 )
6 EI
3 EI
M' A .L
M' .L
--> ( 2 ) B
6 EI
3 EI
B .L

2 M'

2 M' A .L
+
3 EI
M' A .L
6 EI
2 M'
+
3 EI
2 EI
L
2 EI
L

M'

B2 =

6 EI

2 A + B = -

M AB = M FAB

B1 =

A1 +

2 A = -

Analog :

.L

A =-

2x( 1)

B1 -

M BA = M FBA + M'

3 EI
M' A .L

A2 =

(+)

+ M'

B =+

A2

M'

=6 EI

.L

(-2 A - B )
(-2 B - A )

3 M'
6 EI

.L

M'
2 EI

.L

Ref:Chu Kia Wang, Statically Indeterminate Structures

2x ( 1 )

2M AB - 2M

1x( 2 )

M BA - M

FBA

2( M

AB

-3K

relative

- 3K
2

FAB

4K

2K

relative

- M FAB

relative

)-(M

A)

relative

) + 3K

- M FAB

)-(M

AB

- M FAB

) - ( M1
2

relative

relative

AB

A =(M

(M AB - M FAB

B +K
- M FBA

BA

A = 2( M

A + 2K

relative

(-)

A =0

BA

- M FBA

- M FBA

A dan

Dengan demikian, persamaannya menj adi sebagai berikut :

A)

relative

(M AB - M FAB
(-K

)-

( M1
2

relative

BA

- M FB A )

( - Perubahan
)1
2

Atau

ujung dekat

( Perubahan)
=

) - ( 1M
- M FB A )
BA
2
1
K relative
1
2

Selanj utnya, karena yang diperhitungkan hanyalah harga-harga relativ e saja dari
bilangan murni 1,50 dalam penyebut dapat dihilangkan

=0

=0

relative

BA

ujung dekat

(-K

relative

ujung jauh

B , maka

Ref: Chu Kia Wang, Statically Indeterminate Structures

5
P2

P1
A

B
A

Balok AB sebagai elemen struktur dalam portal ,


mengalami putaran sudut seperti gambar .
M AB adalah momen yang diperlukan untuk
meredam putaran sudut
A,
dan M
adalah
momen
yang
diperlukan
untuk
BA
meredam putaran sudut
B
Tumpuan B mengalami penurunan sebesar

AB

P1

B'

BA

P2

(=)

M FBA

M AB = M FAB
M FAB

P1

(+)
R=

P2

M'

B
B

FAB

M'

M' A

(-2 A - B )

M' B = +

2 EI
L

(-2 B - A )

R=

B2

P2

(+)

B
A

FAB

Besarnya M'
B'

FAB

M'

.L

M'

FAB

2
L
3

M AB = M FAB

FBA

+M'

FBA

.L

M'

1
L
6

M'

= M'

Jadi .

= M'

FBA

EI

4 EI

FBA

M'

M'

EI

M' B

P1

M'

+M'

(+)
A2

M'

2 EI
L

FBA

B1

FBA

+ M'

M' A =

B'

(+)
A1

FAB

M BA = M FBA + M'

+M'

FAB

= Besarnya M'

5 L - M' FBA .L
6
4 EI

.L

4 EI
B =

M'

FAB

M'

FBA

= M'

FAB

.L

2 L
3

4 EI

4 EI

FAB

6 EI.
L

1
6 L
=

M'

FAB

6 EI

6 EI.R
L

5
L
6

+ M'

6 EI.R

2 EI
L

= M FAB

+M'

FAB

+ M'

= M FAB

M BA = M FBA +M'

FBA

+ M'

= M FBA

FAB

M AB = M FAB

(-2 A - B )
2 EI
L
2 EI
L

( - 2 A - B + 3R)

( - 2 B - A + 3R)
Ir . H.Kartono Hd

.L

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

Selesaikan dengan metode Distribusi Moment ( Cross)


P = 4 ton
q = 2 t/m'
EI

2 EI

4m

4m

2m

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

BC

4 ( EI )
=
L
4 ( EI )

4 ( EI )
= EI
4

=
L

4 ( 2 EI )
EI

4
3

Kekakuan relatip ( Relativ e Stiffness ) =


K

:K

AB

BC

= EI : 4 EI: = 3 : 4
3

Menghitung Faktor Distribusi ( Distribution Factor) = DF

AB = 0
k= 3

0,00

0,429

0,571

k= 4

3
( 3+ 4)

BA =

0,00

4
( 3+ 4)

BC =

= 0,429
= 0,571

CB = 0
Menghitung Fixed End Moment (FEM)
q = 2 t/m'

FAB

M FAB
M

4m

FBC

4m

1
M FBA = - .q.L
12

FBA

P = 4 ton

= + .q.L1
12

2m

FCB

=+

=-

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

=+
=-

.2.41
12

.2.4 1
12

4.4.2
6

2
2

4.2.4
6

= + 2,67 tm
= - 2,67 tm

= + 1,78 tm
= - 3,56 tm

Ir . H.Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 3

K= 3

0,00
A

FEM
M.Distribusi
M.Induksi
M.Distribusi

+ 0,19

M.Akhir

+ 2,86

AB

BA

- 2,67
+ 0,38
-

Periksa ( Kontrol Geometri )


+ 0,19

1
(Perubahan)
2
Jumlah

re l =

0
Jumlah
( -K)

0,00

BC

CB

+ 0,26
-

+ 2,29

- 3,30

BA

BC

CB

+ 0,38

+ 0,51

+ 0,26

- 0,13

- 0,26

+ 0,28
- 0,09

- 3,56
-

+ 1,78
+ 0,51

- 0,10

- 0,19

K= 4

0,571

- 2,29

AB
Perubahan

K= 4

0,429

+ 2,67

+ 0,38

- 0,09

(Periksa )

Penjelasan perhitungan
( perubahan )
re l =

( perubahan )
+ 2,86 - 2,67 = + 0,19
- 2,29 + 2,67 = + 0,38
+ 2,29 - 1,78 = + 0,51
- 3,30 + 3,56 = - 0,26

+ 2,86 tm

ujung dekat

+ ( - ) 1( perubahan )
2

ujung dekat

(-K

relative

(1perubahan ) =
2

( - ) (1+ 0,19 ) = - 0,10


2
( - ) (1+ 0,38 ) = - 0,19
2
( - ) (1+ 0,51 ) = - 0,26
2
( - ) (1- 0,26 ) = + 0.13
2

- 2,29 tm

ujung jauh

+ 2,29 tm

re l =

jumlah
( -K)

+ 0,28
( -3 )

= - 0,09

+ 0,38
(- 4)

= - 0,09

- 3,30
tm

Ir . H.Kartono Hd

P = 4 ton

M A = - 2,86 tm
q = 2 t/m'

Menghitung besar reaksi perletakkan :

M B = - 2,29 tm

M C = - 3,30 tm
2 EI

EI

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distibution Method

M B =0

4m

4m

Tinjau batang AB

+ V A . 4 - 2,86 - .2.4

1
2

M A =0
- V B1 . 4 - 2,86 + .2.4

2m

1
2

+ 2,29 = 0
V A = + 4,14 ton
2

+ 2,29 = 0
V B1 = + 3,86 ton

+ 4,14 ton

V= 0

Kontrol :

V A + V B1 - q.4 = 4,14 + 3,86 - 2.4


= 8 - 8 = 0 ( ok)
+ 1,16 ton

( +)

(-)

- 2,84 ton

Tinjau batang BC

- 3,86 ton

M C =0

Bidang D

+ V B2 . 6 - 2,29 - 4 .2
M B =0

- 2,29 tm

- V C . 6 - 2,29 + 4.4

(+)

Kontrol :

(+)

+ 1,42 tm
+ 1,68 tm
Bidang M

+ 3,30 = 0
V C = + 2,84 ton

(-)

(-)

(-)

+ 3,30 = 0
V B2 = + 1,16 ton

- 3,30 tm
- 2,86 tm

= + 1,42 tm

(-)

2,11m

1
2

M Max = + 4,14.2,07 - 2,86 - .2. ( 2,07 )

( +)

V= 0

V B 2 +V C - P = + 1,16 + 2,84 - 4
= + 4 - 4 = 0 ( ok)
M'

= + 2,84 . 2 - 4

= + 1,68 tm

Resume :
V A = + 4,14 ton
V B = V B1 + V B2 = + 3,86 + 1,16
= + 5,02 ton
V C = + 2,84 ton
Kontrol :
V A + V B + V C - q.4 - P
= + 4,14 + 5,02 + 2,84 - 2.4 - 4
= 12 - 12 = 0 ( ok)

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chiu Kia Wang, Statically Indeterminate Structures

Selesaikan dengan metode Distribusi Moment


P = 4 ton
q = 2 t/m'
A

EI
4m

2 EI

4m

2m

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

4 ( EI )
=
L

= EI

4 ( EI )
4

BC

4 ( EI )
=
L

4 ( 2 EI )
EI
6

4
3

Kekakuan relatip ( Relativ e Stiffness ) =


K

:K

AB

= EI : EI = 43 : 4
3

BC

Menghitung Faktor Distribusi ( Distribution Factor) = DF

k= 3

0,00

0,429

0,571

AB = 0

k= 4

1,00

3
( 3+ 4)
4
BC = ( 3 + 4 )

BA =

= 0,429

= 0,571

CB = 1
Menghitung Fixed End Moment ( FEM )
q = 2 t/m'

= + q.L1

M FBA = - q.L1
12

M FAB
M

FAB

FBA

4m

P = 4 ton

FBC

4m

2m

FCB

12

= + .2.41

= + 2,67 tm

1
= - .2.4

= - 2,67 tm

12

12

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

=+
=-

4.4.2
6

4.2.4
62

= + 1,78 tm
= - 3,56 tm

Ir.H.Kartono Hd

Ref:Chiu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 3

AB
+ 2,67

FEM
M.Distribusi
M.Induksi
M.Distribusi

+ 0,19

M.Induksi
M.Distribusi

- 0,38

M.Induksi
M.Distribusi

+ 0,03

M.Induksi
M.Distribusi

- 0,06

M.Akhir

+ 2,45

0,571

BA

BC

+ 0,06

- 0,11

+ 0,22

jumlah
sum
( -K)

Penjelasan perhitungan

re l =
( Perubahan )

- 3,56
+ 3,56

+ 1,78
- 1,02

+ 0,26

- 0,13
+ 0,07

- 0,51
+ 0,51

+ 0,26

+ 0,04
- 0,04

- 0,26

- 0,15
-

- 0,08
+ 0,08

- 3,10

AB
- 0,22

CB

+ 0,51

Perubaha
n
1
- (Perubahan)
2

1,00

+ 1,78

- 0,76

Priksa / Kontrol Geometri

re l =

0,429
- 2,67
+ 0,38

K= 4

K= 4

K= 3

0,00

+ 3,10

BA

- 0,43

BC
+ 1,32

+ 3,56

+ 0,11

- 1,78

- 0,66

- 0,32

- 0,46

+ 2,90

+ 0,11

( Perubahan )

+ 0,11

+ ( - 1/2 ) ( Perubahan )

ujung dekat

- 0,73

( priksa )

(-K

ujung dekat

CB

relative

ujung jauh

re l =

( 1Perubahan )
2

+ 2,45 - 2,67 = - 0,22

( - 1/2 ) - ( 0,22 ) = + 0,11

- 3,10 + 2,67 = - 0,43

( - 1/2 ) . ( - 0,43 ) = + 0,22

+ 3,10 - 1,78 = + 1,32

( - 1/2 ) . ( + 1,32 ) = - 0,66

0 + 3,56 = + 3,56

( - 1/2 ) . ( + 3,56 ) = - 1,78

- 0,32
(-3)

sum
( -K)

= + 0,11

- 0,46
( -4 )

= + 0,11

+ 2,90
( -4 )

= - 0,73

P = 4 ton
q = 2 t/m'
A

+ 2,45 tm

- 3,10 tm

+ 3,10 tm
Ir.H.Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The M om ent Dis tib ution Method

Menghitung besar reaksi perletakkan :

P = 4 ton

Tinj au batang AB

q = 2 t/m'
2 EI

EI
A

M B = - 3,10 tm

M A = - 2,45 tm

4m

4m

M B =0
+ V A . 4 - 2,45 - .2.4

1
2

M A =0
- V B1 . 4 - 2,45 + .2.4
2m

+ 3,10 = 0
V A = + 3,84 ton

1
2

+ 3,10 = 0
V B1 = + 4,16 ton

V=0

Kontrol :

V A + V B1 - q.4 = 3,84 + 4,16 - 2.4


= 8 - 8 = 0 ( ok)
+ 3,84 ton

M
+ 1,85 ton

(+)

= + 1,24 tm

( +)
(-)

Tinj au batang BC

(-)

- 2,15 ton

M C =0
+ V B2 . 6 - 3,10 - 4 .2

- 4,16 ton

1,92m

1
2

= + 3,84.1,92 - 2,45 - .2. ( 1,92 )

Max

=0
V B2 = + 1,85 ton

Bidang D

M B =0
- V C . 6 - 3,10 + 4.4

- 3,10 tm

=0

- 2,45 tm

V C = + 2,15 ton
(-)

Kontrol :

(-)
(+)

V B 2 +V C - P = + 1,85 + 2,15 - 4
= + 4 - 4 = 0 ( ok)

(+)

+ 1,24 tm
Bidang M

V=0

M'
+ 4,30 tm

= + 2,15 . 2

= + 4,30 tm

Resume :
V A = + 3,84 ton
V B = V B1 + V B2 = + 4,16 + 1,85
= + 6,01 ton
V C = + 2,15 ton
Kontrol :
V A + V B + V C - q.4 - P
= + 3,84 + 6,01 + 2,15 - 2.4 - 4
= 12 - 12 = 0 ( ok)
Ir.H.Kartono Hd

Ref:Chiu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

Selesaikan dengan metode Distribusi Moment atas dasar modifikasi kekakuan relatip
P = 4 ton
q = 2 t/m'
A

EI
4m

2 EI

4m

2m

Menghitung faktor kekakuan batang ( Stiffness Factor ) dan


modifikasi kekakuan batang ( Modification Stiffness Factor)
K

4 ( EI )
=
L

AB

4 ( EI )
=
L

BC

= EI

4 ( EI )
4
4 ( 2 EI )
EI
6

4
3

AB,mod

4 ( EI )
=
L

= EI

4 ( EI )
4

BC,mod

3 ( EI )
=
L

3 ( 2 EI )
= EI

Kekakuan relatip ( Relativ e Stiffness ) =


K

AB

:K

BC

= EI : EI = 43 : 4
3

Modifikasi Kekakuan relatip (Modification Relativ e Stiffness ) =


K

: K

AB,mod

= EI : EI = 1 : 1

BC,mod

Menghitung Faktor Distribusi ( Distribution Factor) = DF


k AB modifikasi

=1

k AB = 4

k BC modifikasi
B

AB =

=1

k BC = 4

1
(1+ 1)
1
BC = ( 1 + 1 )

BA =

= 0,50

= 0,50

CB = 1
Menghitung Fixed End Moment ( FEM )
q = 2 t/m'

= + q.L1

M FBA = - q.L1
12

M FAB
M

FAB

FBA

4m

P = 4 ton

FBC

4m

2m

FCB

12

= + .2.41

= + 2,67 tm

= - .2.41

= - 2,67 tm

12

12

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

=+
=-

4.4.2
6

2
2

4.2.4
6

= + 1,78 tm
= - 3,56 tm

Ir.H.Kartono Hd

The Moment Distribution Method

Ref:Chiu Kia Wang, Statically Indeterminate Structures

K= 3
Modified K

K= 3
=1

mod

mod

AB
FEM
M.Distribusi

+ 2,67

M.Induksi
M.Distribusi

+ 0,222

BA

1,00
CB

+ 1,78

+ 0,222

- 0,89

- 0,222
-

- 3,115

=1

mod

- 3,56
+ 3,56

+ 2,442

+ 1,78
+ 0,445

- 0,45

=1

BC

- 0,89

mod

K= 4

0,50

- 2,67
+ 0,445

M.Akhir

=1

0,50

0,00

M.Induksi
M.Distribusi

K= 4

- 0,45
+ 0,45

+ 3,115

Priksa / Kontrol Geometri


AB
- 0,23

Perubahan
1
- (Perubahan)
2

+ 0,23

jumlah

re l =
Penjelasan perhitungan

CB
+ 3,56

- 1,78

- 0,67

- 0,44

- 0,33

+ 2,89

+ 0,11

+ 0,11

- 0,72

( priksa )

re l =
( Perubahan )

BC
+ 1,34

+ 0,12
0

sum
( -K)

BA
- 0,45

( Perubahan )

+ ( - 1/2 ) ( Perubahan )

ujung dekat

(-K
1( Perubahan )
2

ujung dekat

relative

ujung jauh

re l =

sum
( -K)

+ 2,44 - 2,67 = - 0,23

( - 1`/2 ) - ( 0,23 ) = + 0,12

- 3,12 + 2,67 = - 0,45

( - 1/2 ) . ( - 0,45 ) = + 0,23

+ 3,12 - 1,78 = + 1,34

( - 1/2 ) . ( + 1,34 ) = - 0,67

- 0,46
( -4 )

= + 0,11

0 + 3,56 = + 3,56

( - 1/2 ) . ( + 3,56 ) = - 1,78

+ 2,89
( -4 )

= - 0,72

- 0,32
( - 3)

= + 0,11

P = 4 ton
q = 2 t/m'
A

+ 2,44 tm

- 3,12 tm

+ 3,12 tm

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

Selesaikan dengan metode Distribusi Moment ( Cross)


P = 4 ton
q = 2 t/m'
EI

2 EI

4m

4m

2m

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

4 ( EI )
=
L

4 ( EI )
= EI

BC

4 ( EI =)

4 ( 2 EI )
EI
6

4
3

Kekakuan relatip ( Relativ e Stiffness ) =


K

:K

AB

BC

=3: 4

Menghitung Faktor Distribusi ( Distribution Factor) = DF


k= 3

1,00

0,571

0,429

k= 4

AB = 1

1,00

BA =

3
(3+ 4)
4

BC = ( 3 + 4 )

= 0,429
= 0,571

CB = 1
Menghitung Fixed End Moment (FEM)
q = 2 t/m'

M FAB
M

FAB

4m

FBC

4m

1
M FBA = - .q.L
12

FBA

P = 4 ton

= + .q.L1
12

2m

FCB

=+

=-

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

=+
=-

1
.2.4
12

.2.41
12

4.4.2
6

2
2

4.2.4
6

= + 2,67 tm
= - 2,67 tm

= + 1,78 tm
= - 3,56 tm

Ir . H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

K= 3

K=3

1,00

K= 4

0,429
BA

AB

10
K=4

0,571

1,00

BC

CB

FEM
M.Distribusi

+ 2,67
- 2,67

- 2,67
+ 0,38

+ 1,78
+ 0,51

- 3,56
+ 3,56

M.Induksi
M.Distribusi

+ 0,19
- 0,19

- 1,34
- 0,19

+ 1,78
- 0,25

+ 0,26
- 0,26

M.Induksi
M.Distribusi

- 0,10
+ 0,10

- 0,10
+ 0,10

- 0,13
+ 0,13

+ 0,13

M.Induksi
M.Distribusi

+ 0,05
- 0,05

+ 0,05
- 0,05

+ 0,07
- 0,07

+ 0,07
- 0,07

M.Induksi
M.Distribusi

- 0,025
+ 0,025

M.Akhir

- 0,13

- 0,035
+ 0,035

- 3,82

+ 3,82

Periksa ( Kontrol Geometri )


AB
Perubahan
-

1
(Perubahan)
2
Jumlah
re l =

Jumlah
( -K)

Penjelasan perhitungan

- 2,67

- 1,15

+ 0,58

+ 1,34

- 2,09

+ 0,19

0,70

BC

CB

+ 2,04

+ 3,56

- 1,78

- 1.02

+ 0,26

+ 2,54

- 0,06

- 0,64

- 0,06
(Periksa )

re l =
( Perubahan )

BA

( Perubahan )

+ ( - 1/2 ) ( Perubahan )

ujung dekat

(-K

(1Perubahan )
2

ujung dekat

relative

ujung jauh

re l =

sum
( -K)

0 - 2,67 = - 2,67

( - 1/2 ) - ( 2,67 ) = + 1,34

- 3,82 + 2,67 = - 1,15

( - 1/2 ) . ( - 1,15 ) = + 0,58

+ 3,82 - 1,78 = + 2.04

( - 1/2 ) . ( + 2,04 ) = - 1,02

+ 0,26
( -4 )

= + 0,06

0 + 3,56 = + 3,56

( - 1/2 ) . ( + 3,56 ) = - 1,78

+ 2,54
( -4 )

= - 0,64

+ 0,19
(-3)

= - 0,06

P = 4 ton
q = 2 t/m'

- 3,82 tm

+ 3,82 tm
Ir . H.Kartono Hd

The Mom ent Dis tibutio n Method

P = 4 ton

Menghit ung besar reaksi perletakkan :

M B = - 3,82 tm

q = 2 t/m'

T injau batang AB
2 EI

EI
A

11

Ref: Chu Kia Wang, Statically Indeterminate Structures

M B =0
+ V A . 4 - .2.4 1

+ 3,82 = 0

V A = + 3,05 ton

M A =0
- V B1 . 4 + .2.4 1

4m

4m

V B1 = + 4,95 ton

V=0

Kontrol :

2m

+ 3,82 = 0

V A + V B1 - q.4 = + 3,05 + 4,95 - 2.4


= 8 - 8 = 0 ( ok)
M

+ 3,05 ton

Max

= + 2,33 tm

+ 1,97 ton
(+)

1
2

= + 3,05.1,525 - .2. ( 1,525 )

(+)
(-)

T injau batang BC

(-)

- 2,03 ton

M C =0
+ V B2 . 6 - 3,82 - 4 .2

=0

- 4,95 ton

1,525 m

V B2 = + 1,97 ton
M B =0
- V C . 6 - 3,82 + 4.4

Bidang D

=0
V C = + 2,03 ton

- 3,82 tm
V=0

Kontrol :
(-)

V B 2 +V C - P = + 1,97 + 2,05 - 4
= + 4 - 4 = 0 ( ok)

(+)

(+)

+ 2,33 tm

Bidang M

M'
+ 4,06 tm

= + 2,03 . 2

= + 4,06 tm

Resume :
V A = + 3,05 ton
V B = V B1 + V B2 = + 4,95 + 1,97
= + 6,92 ton
V C = + 2,03 ton
Kontrol :
V A + V B + V C - q.4 - P
= + 3,05 + 6,92 + 2,03 - 2.4 - 4
= 12 - 12 = 0 ( ok)

Ir.H.Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

12

Selesaikan dengan metode Distribusi Moment ( Cross)


P = 2 ton

P = 4 ton
q = 2 t/m'
EI

2 EI

4m

4m

2m

2m

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

BC

4 ( EI )
=
L
4 ( EI )

4 ( EI )
= EI
4

=
L

4 ( 2 EI )
EI

4
3

Kekakuan relatip ( Relativ e Stiffness ) =


K

:K

AB

BC

= EI : 4 EI = 3 : 4
3

Menghitung Faktor Distribusi ( Distribution Factor) = DF

k= 3

0,00

0,429

0,571

k= 4

AB = 0

1,00

BA =

3
( 3+ 4)

= 0,429

BC =

4
( 3+ 4)

= 0,571

CB = 1
Menghitung Fixed End Moment (FEM)
q = 2 t/m'

FAB

M FAB
M

4m

FBC

4m

1
M FBA = - .q.L
12

FBA

P = 4 ton

= + .q.L1
12

2m

FCB

=+

=-

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

=+
=-

.2.41
12

.2.41
12

4.4.2
6

2
2

4.2.4
6

= + 2,67 tm
= - 2,67 tm

= + 1,78 tm
= - 3,56 tm

Ir . H.Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

K= 3

K= 3

0,00

K= 4

0,571

1,00

AB

BA

FEM
M.Distribusi

+ 2,67
-

- 2,67
+ 0,38

+ 1,78
+ 0,51

- 3,56
- 0,44

M.Induksi
M.Distribusi

+ 0,19

+ 0,09

- 0,22
+ 0,13

+ 0,26
- 0,26

M.Induksi
M.Distribusi

+ 0,04

- 0,13
+ 0,07

+ 0,07
- 0,07

M.Induksi
M.Distribusi

+ 0,03

- 0,04
+ 0,02

+ 0,04
- 0,04

M.Induksi
M.Distribusi

+ 0,01

BC

+ 0,01
- 0,01

M.Akhir

+ 2,94

+ 2,12

- 4,00

+ 0,06

+ 0,02
-

Periksa ( Kontrol Geometri )

1
(Perubahan)
2
Jumlah

CB

- 2,12

AB

Perubahan
-

0,429

K= 4

BA

BC

+ 4,00

- 4,00

CB

+ 0,27

+ 0,55

+ 0,34

- 0,44

- 0,27

- 0,13

+ 0,22

- 0,17

+ 0,42

+ 0,56

- 0,61

- 0,14

- 0,14

+ 0,15

re l = Jumlah
( -K)

13

(Periksa )

Penjelasan perhitungan
( perubahan )
re l =

( perubahan )
+ 2,94 - 2,67 = + 0,27
- 2,12 + 2,67 = + 0,55
+ 2,12 - 1,78 = + 0,34
- 4 + 3,56 = - 0,44

+ 2,94 tm

ujung dekat

+ ( - ) 1( perubahan )
2

ujung dekat

(-K
=

relative

(1perubahan ) =
2

( - ) (1+ 0,27 ) = - 0,13


2
( - ) (1+ 0,55 ) = - 0,27
2
( - ) (1+ 0,34 ) = - 0,17
2
( - ) (1- 0,44 ) = + 0.22
2

- 2,12 tm

ujung jauh

+ 2,12 tm

re l =

jumlah
( -K)

+ 0,42
( -3 )

= - 0,14

+ 0,56
(- 4)

= - 0,14

- 4 tm

+ 4 tm

Ir . H.Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Mom ent Dis tibutio n Method

14

Menghitung besar reaksi perletakkan :


P = 4 ton
M A = - 2,94 tm
q = 2 t/m'

M B = - 2,12 tm

M C = - 4 tm
2 EI

EI

M B =0
+ V A . 4 - 2,94 - .2.4
2 EI

D
C

4m

4m

Tinjau batang AB

P = 2 ton

M A =0
- V B1 . 4 - 2,94 + .2.4

+ 4,21 ton

( +)

(+)
(-)

- 3,79 ton
Bidang D
- 4 tm

(+)

(+)

+ 1,96 tm
Bidang M

1
2

+ 4= 0

+ 4= 0
V C = + 2,98 ton

V= 0

V B 2 +V C - P = + 1,02 + 2,98 - 4
= + 4 - 4 = 0 ( ok)
M'

+ 1,49 tm

V B1 = + 3,79 ton

V B2 = + 1,02 ton

- V C . 6 - 2,12 + 4.4

Kontrol :
(-)

(-)

(-)

+ 2,12 = 0

Tinjau batang BC

M B =0

- 2,12 tm

= + 1,49 tm

+ V B2 . 6 - 2,12 - 4 .2

- 2,98 ton

- 2,94 tm

1
2

M C =0

(-)

2,11m

V A = + 4,21 ton

= + 4,21.2,11 - 2,94 - .2. ( 2,11 )

Max

+ 2 ton

+ 1,49 ton

(+)

+ 2,12 = 0

Kontrol :
V= 0
V A + V B1 - q.4 = 4,21 + 3,79 - 2.4
= 8 - 8 = 0 ( ok)

2m

2m

1
2

= + 2,98 . 2 - 4

= + 1,96 tm

Resume :
V A = + 4,21 ton
V B = V B1 + V B2 = + 3,79 + 1,49
= + 4,81 ton
V C = + 2,98 + 2 = 4,98 ton
Kontrol :
V A + V B + V C - q.4 - P
= + 4,21 + 4,81 + 4,98 - 2.4 - 4 - 2
= 14 - 14 = 0 ( ok)

Ir.H.Kartono Hd

15

Ref:Chu Kia Wang,Statically Indeterminate Structures

The Moment Distribution Method

Selesaikan dengan metode Distribusi Moment ( Cross)


q = 2 T/m'

P = 4 ton
2EI

2EI

C
EI

8m

4m

4m

2m

Jawab : Struktur termasuk portal tak bergoyang


Menghitung faktor kekakuan batang ( Stiffness Factor )
K

AB

BC

BD

4 ( EI )
=
L
4 ( EI )
=
=
L
4 ( EI )
=
=
L

4 ( 2 EI )
= EI
8
4 ( 2 EI )
= EI

4
3

4 ( EI )
= EI
4

Kekakuan relatip ( Relativ e Stiffness ) =


K

:K

AB

BC

: K BD = EI : EI : EI4 = 3 : 4 : 3
3

Menghitung Faktor Distribusi ( Distribution Factor) = DF


k= 3

0,3

B 0,4

k= 4

0,3

AB = 0

1,0

k= 3
0

BD =

BA =

3
( 3+ 4 + 3 )

= 0,30

DB = 0

BC =

4
( 3+ 4 + 3 )

= 0,40

CB = 1

3
( 3+ 4 + 3 )

D
Menghitung besar Fixed End Moment ( FEM)
q = 2 t/m'

FAB

M FAB
M

8m

M FBA = - .q.L1
12

FBA

P = 4 ton

FBC

4m

FCB

1
= + .q.L
12

=+

P.a.b
L2

M FBC

=-

P.b.a
L2

M FCB

2m
M FBD = M

FDB

=+
=-

.2.81
12

=+

.2.81
12

=-

4.4.2
6

4.2.4
62

= + 10,67 tm
= - 10,67 tm

= + 1,78 tm
= - 3,56 tm

= 0
Ir.H.Kartono Hd

= 0,30

The Moment Distribution Method

Ref: Chu Kia Wang,Statically Indeterminate Structures

16

Distribusi moment
k= 3

k= 3
0

0,30

AB
FEM

+ 10,67
-

M.Distribusi
M.Induksi

- 10,67

+ 1,334
-

M.Distribusi

- 0,267
-

+ 0,267

M.Induksi
M.Distribusi

+ 0,133
-

M.Akhir

- 0,534

M.Induksi
M.Distribusi

+ 11,87

0,30

+ 2,667

+ 2,667

0,40

BD

BA

k= 4

k= 4

k= 3

- 0,534
+ 0,267

BC

CB

+ 1,78
+ 3,556

- 3,56

+ 1,78
- 0,712

+ 1,778
- 1,778

- 0,889
+ 0,355

- 0,356
+ 0,356

- 8,27

DB

+ 2,40

+ 3,56

+ 5,87

+ 1,334
- 0,267
+ 0,133
+ 1,20

Periksa ( Kontrol Geometri )


AB

BA

+ 1,20

+ 2,40

+ 2,40

+ 4,09

+ 3,56

+ 1,20

- 1,20

- 0,60

- 0,60

- 1,78

- 2,05

- 1,20

Jumlah

+ 1,80

+ 1,80

+ 2,31

+ 1,51

re l = Jumlah

- 0,60

- 0,60

Perubahan
- 1 (Perubahan)
2

( -K)

BD

BC

Priksa

- 0,60

CB

DB

- 0,40

B
A

+ 2,40 tm

+ 11,87tm

- 8,27 tm

+ 5,87 tm

+ 1,20 tm
D
Ir.H.Kartono Hd

H A = 0,39 ton

17

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

M BC = - 5,87

M BC = - 8,27

q = 2 t/m'

P = 4 ton
2EI

2EI

H C = 0,51 ton

M BD = - 2,40 tm

M AB = - 11,87tm
VA

Mencari besar reaksi perletakan


dan moment lapangan

tm

tm

Tinjau batang AB

EI
M DB = + 1,20 tm

+11,87 + .2.8
VA =

H D = 0,90 t

- 8,27
= 8,45 ton

8
- 11,87 + .2.8

VD

+ 8,45 ton

1
2

V B1 =

1
2

+ 8,27
= 7,55 ton

(+)

V = 16 ton

+ 2,31 ton

(+)

(+)
(-)

- 1,69 ton

(+)

= q.8 = 16 ton ( OK)

Tinjau batang BC

(-)

+ 5,87 + 4.2

V B2 =

- 7,55 ton
+ 0,90 ton

= + 2,31 ton

6
- 5,87 + 4.4

VC =

= + 1,69 ton

V = 4 ton = P = 4 ton ( OK)

Bidang D

V D = V B = V B1 + V B2 = 7,55 + 2,31 = 9,86 ton

- 11,87 tm
- 8,27 tm
(-)

(-)

- 5,87 tm

M Max pada batang AB terjadi pada titik D

(-)

(-)

( +)

(+)

- 2,40 tm

+ 3,38 tm

+ 5,98 tm

(+)

+ 1,20 tm

VA
q

x =
Max

= + 8,45 .4,225 - 11,87 -

HB =
(+)

+ 0,51 ton

- 9,86 ton

= 4,225 m dari titik A arah kekanan


. 2 . 4,225

1
2

= + 5,98 tm

M Max = + 1,69 . 2 = + 3,38 tm

- 0,39 ton

(-)

8,45
2

=0

M Max pada batang BC :

Bidang M

(-)

2,40 + 1,20
4

= 0,90 ton

H D = H B = 0,90 ton
HC =

8.0,90
14

= 0,51 ton

HA =

6.0,90
14

= 0,39 ton

Bidang N

Ir.H.Kartono Hd

The Moment Distribution Method

18

Ref:Chu Kia Wang, Statically Indeterminate Structures

Selesaikan dengan metode Distribusi Moment ( Cross)


q = 2 T/m'
B

C
3 EI
EI

EI

4M

8M

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

4 ( EI )
=

BC

4 ( EI )
=

CD

4 ( EI )
=

L
L

4 ( EI )
4
4 ( 3 EI )
= EI
8
4 ( EI )
= EI
4

= EI

3
2

Kekakuan relatip ( Relativ e Stiffness ) =


K

AB

:K

BC

: K CD =

EI

: 3 EI : EI
2

= 2: 3: 2

Menghitung Faktor Distribusi ( Distribution Factor) = DF


B

k= 3

0,60

0,60

0,40

AB = 0

0,40

k= 2

k= 2

0,00

0,00

DC = 0

BA =

2
(2 + 3 )

= 0,40

CB =

3
( 2+ 3)

= 0,60

BC =

3
( 2+ 3 )

= 0,60

CD =

2
( 2 + 3)

= 0,40

Menghitung Fixed End Moment ( FEM )


1
M FBC = + .q.L
12

q = 2 t/m'

FBC

8m

FCB

M FBA = - .q.L1
12

=+

=-

1
.2.812

.2. 81
12

= + 10,67 tm

= - 10,67 tm

Ir . H. Kartono Hd

The Moment Distribution Method

Ref: Chiu Kia Wang, Statically Indeterminate Structures

K= 3

AB
FEM
M.Distribusi
M.Induksi

- 4,27

- 1,28

- 2,14

M.Distribusi
M.Induksi
M.Distribusi

- 0,64 -

M.Induksi

- 0,19

M.Distribusi

- 0,12
-

- 0,02

M.Distribusi

BC
+ 10,67
- 6,40

CB
- 10,67
+ 6,40

+ 3,20
- 1,92

- 3,20
+ 1,92

+ 0,96
- 0,58

- 0,96
+ 0,58

+ 0,29
- 0,17

- 0,29
+ 0,17

- 3,05

M.Akhir

0,60

+ 0,09
- 0,05

- 0,04

M.Induksi

A
-

- 0,06

M.Distribusi

0,00

- 0,38

M.Induksi

0,60

0,40

BA

K= 3
K= 2

K= 2

19

0,40

CD
+ 4,27
-

+ 2,14
-

+ 0,64
-

+ 0,38
-

+ 0,19
-

+ 0,12
-

+ 0,06
-

+ 0,04

+ 0,05

+ 6,09

DC
-

+ 1,28

0,00

- 0,09
-

- 6,09

- 6,09

+ 6,09

+ 0,02
+ 3,05

Periksa ( Kontrol Geometri )


AB
Perubahan
- 1 (Perubahan)
2

BC

CB

CD

DC

- 3,05

- 6,09

- 4,58

+ 4,58

+ 6,09

+ 3,05

+ 3,05

+ 1,53

- 2,29

+ 2,29

- 1,53

- 3,05

- 4,56

- 6,87

+ 6,87

+ 4,56

+ 2,30

+ 2,30

- 2,30

Jumlah
re l =

BA

Jumlah
( -K)

Priksa

- 2,30

Priksa

Penjelasan perhitungan
( perubahan )
re l =

( perubahan )
- 3,05 - 0 = - 3,05
- 6,09 - 0 = - 6.09
+ 6,09 - 10,67 = - 4,58

ujung dekat

+ ( - ) 1( perubahan )
2

uj ung dekat

(-K
=

relative

(1perubahan ) =
2

( - )1( - 3,05 ) = + 1,53


2
1
( - ) ( - 6,09 ) = + 3,05
2
1
( - ) ( - 4,58 ) = + 2,29
2

ujung jauh

)
re l =

jumlah
( -K)

- 4,56
( -2 )

= + 2,30

- 6,87
( - 3)

= + 2,30

Ir . H. Kartono Hd

The Moment Distribution Method

Ref: Chiu Kia Wang, Statically Indeterminate Structures

20

q = 2 T/m'
B

C
- 6,09 tm

3 EI
- 6,09 tm
EI

EI

+ 3,05 tm

+ 3,05 tm

V A = 8t

D
V D = 8t

8M

6,09 + 3,05
4

= 2,285 Ton

HD =

6,09 + 3,05
4

= 2,285 Ton

4M

H A = 2,285 Ton

HA =

H D = 2,285 Ton

+ 8 Ton
(+)
(-)
- 8 Ton

( +)

( +)

+ 2,285 Ton

+ 2,285 Ton

Bidang D
- 6,09 tm

- 6,09 tm
- 6,09 tm

(-)

- 6,09 tm

(-)
(-)

(+)

(-)

+ 9,91 Tm
(+)

+ 3,05 tm

(+)

Bidang M

+ 3,05 tm
M Maks

- 4,57 Ton

= + 8 . 4 - 6,09 - .2.4

1
2

= + 9,91 Tm

- 4,57 Ton
(-)

(-)

(-)

- 8 Ton

Bidang N

- 8 Ton

Ir . H. Kartono Hd

The Moment Distribution Method

P = 4 Ton
D

21

Ref: Chiu Kia Wang, Statically Indeterminate Structures

q = 2 T/m'
B

3 EI

3 EI

EI

Selesaikan dengan metode


Distribusi Moment ( Cross)

4M

A
2M

8M

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

4 ( EI )
=
L

= EI

BC

4 ( EI )
=
L

4 ( EI )
4

4 ( 3 EI )
EI

3
2

Kekakuan relatip ( Relativ e Stiffness ) =


EI : 3 EI = 2 : 3
2
Menghitung Faktor Distribusi ( Distribution Factor) = DF
K

AB

:K

BC

AB = 0

k= 3
D

k= 2
A

BA =

2
(2+ 3)

= 0,40

BC =

3
( 2+ 3)

= 0,60

CB = 0
Menghitung Fixed End Moment ( FEM )
q = 2 t/m'

FBC

P = 4 Ton

1
M FBC = + .q.L
12
M

8m

FBD

=+

1
.2.812

= + 10,67 tm

FCB

M FCB

q = 2 t/m'

FBD

= - .q.L1
12

=- 1 .q.L

-P. L= -

=-

.2. 81
12

1 . 2. 2
2

= - 10,67 tm

- 4 . 2 = - 12 Tm

2m
M FAB

= M FBA = 0

Ir . H. Kartono Hd

The Moment Distribution Method

22

Ref: Chu Kia Wang,Statically Indeterminate Structures

Distribusi moment

k= 3
0,60
BD

FEM
M.Distribusi
M.Induksi
M.Distribusi
M.Akhir

k= 2
0,40

BA

- 12

+ 0,53

BC

CB

+ 10,67

- 10,67
-

+ 0,80
-

- 12

+ 0,40

+ 0,53

+ 11,47

- 10,27

AB
+ 0,27
+ 0,27

Periksa ( Kontrol Geometri )


AB

BA

BC

CB

+ 0,27

+ 0,53

+ 0,80

+ 0,40

- 0,27

- 0,14

- 0,20

- 0,40

Jumlah

+ 0,39

+ 0,60

re l = Jumlah
( -K)

- 0,20

- 0,20

Perubahan
- 1 (Perubahan)
2

Priksa

B
C

+ 0,53 Tm

- 12 Tm

+ 11,47 Tm

- 10,27 Tm

+ 0,27 Tm
A
Ir .H.Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

23

Mencari besar reaksi perletakan dan moment lapangan

8 ton

M BD = - 12 tm

M BC = - 11,47tm

8,15 ton

7,85 ton

q = 2 T/m'

H C =0,20 ton
M CB = - 10,27 tm
8,15 ton

8 ton
M BA = + 0,53 tm

H A =H

0,53 + 0,27
4

7,85 ton

V C = + 7,85 ton

M C =0

= 0,20 ton

1
2

+ V B2 .8 - 11,47 - .2.8

+ 10,27 = 0

V B2 = + 8,15 ton

M BA = - 0,27 tm

M B =0

FREE BODY

- V C .8 - 11,47 + .2.8

H A = 0,20 ton

1
2

+ 10,27 = 0

V C = + 7,85 ton

V A = 16,15ton

Kontrol :

V = 0 ---> + 8,15 + 7,85 - 2.8 = 16 - 16 = 0 ( OK)

M Max = + 8,15 . ( 4,075 ) - 11,47 - .2.4,075

1
2

= + 5,14 tm

V A = 8 + 8,15 = + 16,15 ton

+ 8,15 ton
(+)
(-)

(-)

- 8 ton

- 7,85 ton

(+)

4,075 m

+ 0,20 ton

Bidang D
- 12 tm
- 11,47 tm
(-)

- 10,27 tm

(-)

+ 0,53 tm

(-)
(+)

+ 5,14 tm

(-)

Bidang M

- 0,27 tm

+ 0,20 ton

(+)

(-)

Bidang N
- 16,15 ton
Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

24

Selesaikan dengan metode Distribusi Moment ( Cross)


2T/m

A
B

3EI

EI

3 EI

EI

EI

4M

E
8M

8M

Jawab :
Menghitung faktor kekakuan batang ( Stiffness Factor )
4 ( EI )
4 ( 3EI )
=
= EI
L
8
4 ( EI )
4
(
EI
)
K AD = K BE = K CF =
=
= EI
4
L
Kekakuan relatip ( Relativ e Stiffness ) =
K

AB

= K

AB

:K

AD

BC

3
2

= 3
2

: 1 =

3: 2

Menghitung Faktor Distribusi ( Distribution Factor) = DF


A

k= 3

0,60

0,375

0,40

k= 3

0,375

0,25

0,40

k= 2

k= 2

0,60

CB

AD =

CF

BA =

k= 2

0,25

AB =

0,00

0,00

BE

0,00

2= 0,40
( 2+ 3 )
3
BC = ( 3 + 3 + 2 )= 0,375
=

2 = 0,25
( 3 + 3 +2 )

DA =

3
= 0,60
( 2+ 3)

EB

= FC = 0

=+

1
.2.812

=-

.2. 81
12

Menghitung Fixed End Moment = ( FEM )


q = 2 t/m'

FAB

M FAB
M

8m

FBA

q = 2 t/m'

FBC

8m

M FBA = - .q.L1
12

M FBC
M

FCB

1
= + .q.L
12

M FCB

M FAD

1
= + .q.L
12
= - .q.L1
12

=+

=-

1
.2.8
12
.2. 18
12

= M FDA = M FBE = M FEB

= + 10,67 tm
2

= - 10,67 tm

= + 10,67 tm
= - 10,67 tm

= M FCF = M FFC = 0
Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

K= 3

K= 3

K= 3

0,375

0,60

DA

AD

AB

-------

---- 4,27

+ 10,67
- 6,40

- 10,67
----

- 2,14
----

-------

-------

- 3,20
----

- 2,14

- 4,27

+ 4,27

- 13,87

FEM

K= 2

Periksa/ kontrol geometri

Perubahan
- 1/2

(Perubahan)

+ 3,20
----

-------

+ 13,87

- 4,27

- 4,27

+ 2,14
0

2,4 7 tm

6,80 ton
6,80 ton

FC

EB

- 6,40

- 3,20

+ 3,20

+ 6,40

+ 4,27

+ 2,14

+ 1,07

+ 1,60

+ 3,20

- 3,20

- 1,60

- 1,07

- 2,14

- 3,20

- 4,80

+ 4,80

+ 3,20

+ 1,60

+ 1,60

- 1,60

- 1,60

13,87 tm

(Periksa )

( Periksa )
q = 2 T/m

D
D

x
x

1,60 ton

= 6,80 ton

1 . 2.8
2

4,27 tm

C
1,60 ton

6,80 ton

- 4,27 + 13,87
8

18,40
ton

= 1,60 ton

13,87 tm

9,20 ton

18,40
ton

+ 4,27 - 13,87

Max terj adi pada titik dimana D

6,80 ton

9,20 ton
1,60 ton

9,20 ton

8m

8
4,27 tm

+ 2,14

CF

(Periksa )

+ 4,27 + 2,14
4

1,60 ton

+ 4,27

CB

4,27 tm

+ 2,14
----

BC

9,20 ton

1 . 2.8
2

-------

BE

1,60 ton

6,80 ton

-------

BA

AB

FC

---+ 4,27
K= 2

q = 2 T/m

2,4 7 tm

maks

- 10,67
+ 6,40

1,60 ton

+ 10,67
----

CF

6,80 ton

1,6 0 to n

K= 2

CB

Free Body

BC

-2,14

( -K)

C
0,40

AD

re l = Jumlah

0,60

0,375

BA

DA

Jumlah

K= 3

0,25

0,40

25

6,80 ton
6,80 ton

= 9,20 ton
1,60 ton

+ 4,27 + 2,14
4

=0

= 1,60 ton

4,27 tm

= 0 ; V A - qx = 0
= 6,80 - 2x = 0

x = 3,40 m ( dari titik A )


= + 6,80 . 3,40 - 1/2.2.3,40

= + 11,56 tm

2,14 tm

2,14 tm

1,60 ton

1,60 ton

18,40
ton
18,40
ton

6,80 ton
6,80 ton

6,80 ton
6,80 ton

2,14 tm

2,14 tm

1,60 ton

= 6,80 ton

= 18,40 ton

= 6,80 ton

Ir . H. Kartono Hd

1,60 ton

The Moment Dis tribution Method

26

Ref:Chu Kia Wang, Statically Indeterminate Structures

4,27 tm

q = 2 t/m

13,87 tm

q = 2 t/m

4,27 tm

4EI

13,87 tm

4,27 tm
EI

4EI

4,27 tm

EI

EI

4m

8m

8m
2,14 tm

2,14 tm
1,60 ton

6,80 ton

1,60 ton

18,40 ton

6,80 ton

+ 9,20 ton
+ 6,80 ton
(+)

(+)

A
B

(-)

+ 1,60 ton

(-)

- 6,80 ton
(-)

(+)

- 9,20 ton

- 1,60 ton

Bidang D

- 13,87 tm

3,40m

3,40 m

- 4,27 tm

- 4,27 tm

- 4,27 tm

(-)

(-)

(+)

(+)

+ 11,56 tm

+ 2,14 tm

+ 2,14 tm

(+)

Bidang M
- 1,60 ton

- 4,27 tm

(-)

+ 11,56 tm

(-)

(+)

(-)

- 1,60 ton
(-)

(-)

(-)

- 6,80 ton

(-)

(-)

- 9,20 ton

- 6,80 ton

Bidang N
Ir . H. Kartono Hd

The Moment Distribution Method

27

Ref: Chu Kia Wang, Statically Indeterminate Structures

4,27 tm

13,87 tm

q = 2 t/m

q = 2 t/m

4,27 tm

4EI

4EI

13,87 tm

4,27 tm
EI

4,27 tm

EI

EI

4m

8m

8m
2,14 tm

2,14 tm
1,60 ton

6,80 ton
- 13,87 tm

3,40m

1,60 ton

18,40 ton

6,80 ton

3,40 m

- 4,27 tm

- 4,27 tm

- 4,27 tm

(-)

(-)

(+)

(+)

H'
5,70 ton - m
EI

+ 2,14 tm

+ 2,14 tm

a : b = 4,27 : 2,14--->a =

b = 2b

1,42 ton - m
EI

2,14
EI

(+)

Bidang M
4,27
EI

a + b = 4 ---> 2 b + b = 4 ---> b = 1,33 m


a = 2,67 m
Q 1=

1
.2,67.
2

4,27
= 5,70
EI

ton- m
EI

Q 2=

1
.1,33.
2

= 1,422,14
EI

ton- m
EI

A = H'
0,00445

ton - m
EI

4,27
2,14

-Q

2 .3,56 +

Q =

1 .0,89

- 1,42 . 3,56 + 5,70.0,89


4

ton-m
EI

= + 0,00445

C
B

- 4,27 tm

(-)

+ 11,56 tm

+ 11,56 tm

(-)

(+)

(-)

E
kurv a elastis

0,00445

ton - m
EI

Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

Diketahui :

Ref : Soal No 73

Balok menerus, seperti gambar


Perletakan B, mengalami penurunan sebesar 1/2 "
3 EI

10 E I

0,5 "

12 '

2 EI

B'
24 '
6

E = 200.10
I = 400.10

-6

12 '

Ditanyakan :
Bidang M dan N dengan
metode distribusi moment
atas dasar modifikasi
kekakuan relatip

3'

kN/m
m 4

28

1 kip = 4,4482 kN
1 foot- kip = 1,3558 kNm
1 foot (ft) = 0,3048 m
1 pound ( lb) = 4,4462 N

Menghitung faktor kekakuan batang ( Stiffness Factor ) dan


modifikasi kekakuan batang ( Modification Stiffness Factor)
K

AB

4 ( EI )
=
L

= EI

4 ( 3 EI )
12

BC

4 ( EI =)

4 ( 10 EI )
EI
24

5
3

CD

4 ( EI=)

4 ( 2 EI )
EI
12

2
3

=
L
Kekakuan relatip ( Relativ e Stiffness ) =

AB,mod

3 ( EI )
=
L

BC,mod

4 ( EI )
=
L

CD,mod

3 ( 3 EI )
EI
12
4 ( 10 EI )
= EI
24

5
3

3 ( 2 EI )
EI
12

2
4

3
4

3 ( EI )
=L

2
5
: K CD = 1 : : = 3 : 5 : 2
3
3
Modifikasi Kekakuan relatip (Modification Relativ e Stiffness ) =
K

:K

AB

BC

3
5
2
: = 2,25 : 5 : 1,50
4
3
3
Menghitung Faktor Distribusi ( Distribution Factor) = DF
AB

: K

k mod

: K CD

BC

= :

= 2,25

k mod

k mod

=5

= 1,50

BA =

2,25
( 2,25+5 )

= 0,310

BC =

5
( 2,25+5 )

= 0,690

CB =

5
( 5 + 1,50 )

= 0,769

CD =

1,5
( 5 + 1,50 )

= 0,231

Menghitung Moment Primer ( Fixed End Moment ) = FEM


M

FAB

12 '
M

FBC

FBA

FCB

M FBC = +
24'
M

FCD

FCB

FDC

M FCD
12 '

=M

FDC

= +

(6).(30000)(300)
= + 1.085,072 kip-ft
( 12 ) (12
)

= +
2

(6).(30000)(300)= + 1.085,07 kip-ft


2 )
( 12 ) (12

6.E.I. = +
L 2

(6).(30000).(10000)= - 904,22 kip-ft


2 )
( 12 ) (12

= + 6.E.I.
L
6.E.I.
= +
L

M FAB

FBA

= - 6.E.I. = -
L 2

(6).(30000).(10000) = - 904,22 kip-ft


2 )
( 12 ) (12

0,50
12 2
0,50
12 2
- 0,50
12 2
- 0,50
12 2

=0
Note : 1 feet = 12 inchi
Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 3
Modified K

K= 3
= 2,25

mod

K= 5
= 2,25

mod

0,310
+ 1.085,10
- 1.085,10

FEM
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi

mod

K= 5
=5

0,690

mod

29

K= 2
=5

K= 2

mod

= 1,50

0,769

0,231

+ 1.085,10
- 56,10

- 904.20
- 124,80

- 904,20
+ 695,30

---+ 208,90

- 542,60
- 60,50

+ 347,60
+ 134,50

- 62,40
+ 48,00

---+ 14,40

----

= 1,50

mod

-------

----

7,40

+ 24.00
- 16,60

+ 67,20
- 51,70

- 15,50

---8,00

- 25,80
+ 17,80

- 8,30
+ 6,40

---+ 1,90

---1,00

+ 3,20
- 2,20

+ 8,90
- 6,80

---- 2,10

---+ 1,10

- 3,40
+ 2,30

- 1,10
+ 0,80

---+ 0,30

---0,10

+ 0,40
- 0,30

+ 1,20
- 0,90

---- 0,30

---0,10

- 0,40
+ 0,30

- 0,20
+ 0,20

-------

-------

+ 0,10
- 0,10

+ 0,20
- 0,20

-------

+ 547,60

- 547,60

- 207,60

+ 207,60

M.Akhir

Periksa
Perubahan
- 1/2

- 537,50

- 1.085,10

+ 356,60

+ 696,60

+ 207,60

(Perubahan)

+ 268,80

+ 542,60

- 348,30

- 178,30

- 103,80

Jumlah

- 816,30

+ 5,10

+ 8,30

+ 518,30

+ 207,60

- 103,80

+ 272,10

- 103,70

- 103,80

+ 51,90

re l = Jumlah

1,70

1,70

(Periksa )

( -K)

re l =
( perubahan )
0 - 1.085,10 = - 1.085,10
+ 547,60 - 1.085,10 = - 537,50
- 547,60 - ( - 904,20) = +356,60
- 207,60 - ( - 904,20) = +696,60
+ 207,60 - 0 = + 207,60
0 -0 =0

( perubahan )

ujung dekat

+ ( - 1/2 ) ( perubahan )

ujung dekat

(-K
=

( Periksa )

relative

ujung jauh

- 1/2 ( perubahan ) =
( - 1/2 ) - (- 1.085,10 ) = + 542,60
( - 1/2 ) . ( - 537,50 ) = + 268,80
( - 1/2 ) . ( +356,60 ) = - 178,30
( - 1/2 ) . ( + 696,60) = - 348,30
( - 1/2 ) . ( + 207,60) = - 103,80
( - 1/2 ) . ( 0 ) = 0

re l =

jumlah
( -K)

- 816,3
( -3)
+ 5,10
( -3 )
+ 8,30
( -5 )
+ 518,30
( -5 )
+ 207,60
(- 2)
- 103,80
(- 2)

Ir . H. Kartono Hd

= + 272,10
= - 1,70
= - 1,70
= - 103,70
= - 103,80
= + 51,90

The Moment Distribution Method

30

Ref:Chu Kia Wang, Statically Indeterminate Structures

Menghitung reaksi perletakan


+547,60 kip-ft

- 207,60 kip-ft
10 E I

3 EI
12'

2 EI

24'

8'

T injau Batang AB :

M
M

BA

3'

= + 547,60 kip-ft

BA

M B =+R

.12 - 547,60

=0

B1

M A =- R

.12 - 547,60

B1

V = 0

T injau Batang BC :

M
B2

BC

24 '

CB

C1

BC

= + 547,60 kip-ft

CB

= - 207,60 kip-ft

M C =+R
R

B2

B1

= - 547,60 = - 45,63 kip


12

=0

- 547,60 - 207,60
= - 31,47 kip
24

M B =-R

V = 0

Kontol :

( )

.24 + 547,60 + 207,60

C1

( )

: R A + R B1 = + 45,63 - 45,63 = 0 ( ok )

.24 + 547,60 + 207,60

B2

( )

=0
R

Kontol :

+ 547,60= + 45,63 kip


12

=0

: R B2 + R C1 = - 31,47 + 31,47 = 0 ( ok )
C1

( )

547,60 + 207,60 = + 31,47 kip


24

T injau Batang CDE :


M
M
R

C2

= - 207,70kip-ft

CD

M D = +R

CD

12'

M C = -R
R

Kontol :
R
R
R
R

.12 - 207,70

=0

+ 207,60= + 17,30 kip


12

C2

C2

D1

.12 - 207,70

( )
=0

- 207,60
= - 17,30 kip
12
V = 0

( )

: R C2 + R D = + 17,30 - 17,30 = 0 ( ok )

= + 45,63 kip
= R B1 + R B2 = - 45,63 - 31,47 = - 77,10 kip
C = R C1 + R C2 = + 31,47 + 17,30 = + 48,77 kip
D = - 17,30 kip
A
B

Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

C
A

3 EI

0,5 "

10 E I

2 EI

24 '

12 '

B'
12 '

D
3'

R
R
R
R

31

= + 45,63 kip
B = R B1 + R B2 = - 45,63 - 31,47 = - 77,10 kip
C = R C1 + R C2 = + 31,47 + 17,30 = + 48,77 kip
D = R D = - 17,30 kip
A

+ 45,63 kip

Bidang D

(+)
+ 17,30 kip
(+)
(-)
- 31,47 kip

= - 207,60 kip-ft
(-)

Bidang M
(+ )

= + 547,60 kip-ft
D

B
A

0,5 "

B'

D
E

Kurv a elastis

Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

32

H = 20 ton
B

3 EI

C
EI

EI

Selesaikan dengan metode


Distribusi Moment ( Cross)

4M

8M

Menghitung faktor kekakuan batang ( Stiffness Factor )


K

AB

BC

CD

4 ( EI )
=
L
4 ( EI )
=
=
L
4 ( EI )
=
=
L

4 ( EI )
= EI
4
4 ( 3 EI )
= EI

= EI

3
2

4 ( EI )
4

Kekakuan relatip ( Relativ e Stiffness ) =


K

AB

:K

BC

: K CD = EI : 3 EI : EI
2

Menghitung Faktor Distribusi ( Distribution Factor) = DF


k= 3

0,60

= 2: 3: 2

0,60

0,40

AB = 0

0,40

k= 2

k= 2
0,00

0,00

DC = 0

BA =

1
( 1+ 1)

= 0,50

CB =

1
( 1+ 1)

= 0,50

BC =

1
( 1+ 1)

= 0,50

CD =

1
( 1+ 1)

= 0,50

D
Menentukan besar Relativ e Magnitudes akibat pergoyangan

M
M
M
M
M

H = 20 ton
M' FCD

M' FBA

4M

M
M' FDC

M' FAB

M' FAB

= M'

M' FDC = M'

FBA

FCD

=+
=+

Relativ e Magnitudes :
( Besaran relatip )

=+

6 EI

=+
2

6 EI

6 EI
L2
6 EI
L

=+

6 EI
16

= + 3 EI

=+
2

6 EI
16

= + 3 EI

42
4

FDC

=0

FBA
FBC
FCB

= Moment jepit diujung


batang akibat
pergoyangan ( defleksi)

8
8

= M'

FBA

=+

3 . 800. k = + 300.k
8

M' FDC = M'

FCB

=+

3
. 800. k = + 300.k
8

M' FAB

M' FAB

FCD

=0
=0
=0
=0
=0

FAB

( k = ratio determination )

Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

Pendistribusian moment
dalam harga k

K= 3

M.Distribusi

AB
+ 300
-

M.Induksi

- 60

FEM

+ 18

+ 36

M.Induksi

-5

- 180

- 90
+ 54

- 90
+ 54

A
-

+3

+ 27
- 16

+ 27
- 16

-8
+5

-8
+5

+1
-

M.Distribusi

+ 256

+ 208

CD
+ 300
- 120

DC
+ 300
-

- 60

+ 36

0,00

+ 18
-

- 11
-

- 208

C
0,40

CB
-

- 180

M.Akhir

BC
-

0,00

- 11

M.Induksi

0,60

M.Induksi
M.Distribusi
M.Distribusi

0,60

0,40

BA
+ 300
- 120

M.Distribusi

K= 3
K= 2

K= 2

33

-6
-

+3
-

+1
-

- 208

+ 208

+ 256

Periksa ( Kontrol Geometri )


AB

CB

CD

DC

- 92

- 208

- 208

- 92

- 46

+ 46

+ 23

+ 104

+ 104

+ 23

+ 46

- 104

- 104

- 69

+ 35

+ 35

+ 35

Jumlah

re l =

BC

- 46

Perubahan
- 1 (Perubahan)
2

BA

Jumlah
( -K)

- 69

+ 35

Priksa

Priksa

Penjelasan perhitungan
( perubahan )

re l =
( perubahan )
+ 256 - 300 = - 46
+ 208 - 300 = - 92
- 208 - 0 = - 208

ujung dekat

+ ( - ) 1( perubahan )
2

uj ung dekat

(-K
=

relative

(1perubahan ) =
2

( - ) (1- 46 ) = + 23
2
( - ) (1- 92 ) = + 46
2
( - ) (1- 208 ) = + 104
2

ujung jauh

re l =

jumlah
( -K)

- 69
( -2 )

= + 35

- 104
(- 3)

= + 35

Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

34

Mencari besar harga k ( Ratio determination )


H = 20 ton
208 tm

208 tm
256 tm

256 tm
HD

HA
Besar Moment Akhir akibat gaya horizontal :

H A + H D = H = 20 ton
H A = 208 k+ 256k
4
208 k+ 256k
HD =
4

= 116 k ton
= 116 k ton

116 k + 116 K = 20
k = 0,0862

M AB = 0,0862 x ( + 256 ) = + 22,07 tm


M BA = 0,0862 x ( + 208 ) = + 17,93 tm
M CB = 0,0862 x ( - 208 ) = - 17,93 tm
M CB = 0,0862 x ( - 208 ) = - 17,93 tm
M CD = 0,0862 x ( + 208 ) = + 17,93 tm
M DC = 0,0862 x ( + 256 ) = + 22,07 tm

- 17,93 tm
H = 20 ton
+ 17,93 tm

- 17,93 tm

+ 17,93 tm

- 22.07 tm

+ 22.07 tm
H D = 10 ton

H A = 10 ton

V D = 11,04 ton

V A = 11,04 ton

HA =

22,07 + 17,93

VA =

22,07 + 22,07

4
4

= 10 ton

HD =

22,07 + 17,93

= 11,04 ton

VD =

22,07 + 22,07

4
4

= 10 ton
= 11,04 ton

Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

35

H = 20 ton
B

3 EI

C
EI

EI

4M

8M

(-)

- 11,04 ton

(+)

(+)

+10 ton

+10 ton

Bidang D

- 17,93 tm
+ 17,93 tm

(-)

(+)

+ 17,93 tm

- 17,93 tm

(-)

(-)

(+)

+ 22,07 tm

- 22,07 tm

Bidang M

- 20 ton
-10 ton

-10 ton
(-)

(+)

+ 11,04 ton

(-)

Bidang N

- 11,04 ton

Ir . H. Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

36

Diketahui : Portal kaku (rigid frame ) dengan perletakan jepit seperti gambar (Ref. Soal No 78)
24 kip
6'

6'

B
2EI

6'
12 kip

EI

Ditanyakan :
Bidang M,N dan D dengan
cara moment distribusi

10 '

EI

9'

D
A
Jawab :
Menghitung faktor kekakuan batang ( Stiffness Factor )
K

AB

4 ( EI )
=
L

BC

4 ( EI )
=
L

CD

4 ( EI=)

AB

: K

=
=

=
L
Kekakuan relatip ( Relativ e Stiffness ) =
BC

: K CD =

4
15

4 ( EI )
EI
15

4
15

4 ( 2 EI )
EI
12

2
3

4 ( EI )
EI
10

2
5

: 2
3

2
5

= 2: 5: 3

Menghitung Faktor Distribusi ( Distribution Factor) = DF


C

k= 5

k= 3
k= 2
D

2
( 2+ 5)
5
BC =
( 2+5 )

BA =

5
(5+ 3)
3
CD = ( 5 + 3 )

CB =

= 0,625

= 0, 286

= 0,375

= 0,714

DC = 0

AB = 0

A
Menghitung Fixed End Moment ( FEM )
M FAB

=+

M FBA = M FBC

=+

M FCB

=-

P.b.a
=+ 2
L
P.a.b
=L2
P.L
=+
8
P.L
=8

2
12.9.6
= + 17,28 kip-ft 2
15
2
12.6.9
= - 25,92 kip-ft 2
15
24.12
= + 36,00 kip-ft
8
24.12
= - 36,00 kip-ft
8

Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 5
K= 2
AB

K= 5
0,625

0,714

K= 3

C
0,375

0,286

+ 17,28
---- 1,44
----- 1,61
------ 0,16
- --- 0,18
---- 0,02
--- 0,02
----------+ 13,85

FEM

37

BA

BC

CB

CD

DC

- 25,92
- 2,88
---- 3,22
----- 0,32
----- 0,36
----- 0,03
----- 0,04
---- 0,01
---0,01

+ 36,00
- 7,20

- 36,00
+ 22,50
- 3,60
+ 2,25
- 4,02
+ 2,51
- 0,40
+ 0,25
- 0,44
+ 0,28
- 0,04
+ 0,02
- 0,05
+ 0,03
--------

------+ 13,50
----+ 1,35
----+ 1,51
----+ 0,15
----+ 0,16
----+ 0,02
----+ 0,01
--------

- 16,71

+ 16,71

----------+ 6,75
---+ 0,68
---+ 0,75
--+ 0,08
----+ 0,08
---+ 0,01
-+ 0,01
---+ 8,36

+ 11,25
- 8,03
+ 1,12
- 0,80
+ 1,25
- 0,89
+ 0,12
- 0,09
+ 0,14
- 0,10
+ 0,02
- 0,01
+ 0,02
- 0,01
+ 32,79

- 32,79

0,00

0,00

AB

BA

BC

CB

CD

DC

- 3,43

- 6,87

- 3,21

+ 19,29

+ 16,71

+ 8,36

+ 3,43

+ 1,72

- 9,64

+ 1,60

- 4,18

- 8,36

- 5,15

- 12,85

+ 20,89

+ 12,53

+ 2,58

+ 2,57

- 4,18

- 4,18

Periksa
Perubahan
- 1/2

(Perubahan)

Fase 0
( Distribusi FEM akibat gaya luar )

Jumlah

re l = Jumlah

( -K)

re l =
( change) ) near end =
( perubahan
13,85 - 17,25
- 32,79 - (- 25,92)
+32,79 - 36,00
- 16,71 - (- 36,00)
+ 16,71 - 0
+ 8,36 - 0

= - 3,43
= - 6,87
= - 3,21
= + 19,29
= + 16,71
= + 8,36

(Periksa )
( perubahan )

(-K

uj ung dekat

+ ( - 1/2 ) ( perubahan )

ujung dekat

relative

( Periksa )

ujung jauh

re l =

- 1/2 ( perubahan ) =
( - 1`/2 ) . (- 3,43 ) =
( - 1/2 ) . ( - 6,87 ) =
( - 1/2 ) . ( - 3,21 ) =
( - 1/2 ) . ( + 19,29 ) =
( - 1/2 ) . ( + 16,71 ) =
( - 1/2 ) . ( + 8,36 ) =

+ 1,72
+ 3,43
+ 1,60
- 9,64
- 8,36
- 4,18

jumlah
( -K)

0
( - 2)

=0

+ 20,89
( -5 )

= - 4,18

- 5,15
( - 2)

= + 2,58

+ 12,53
( -3)

= - 4,18

- 12,85
( - 5)

= + 2,57

0
( -3)

=0

Ir . H. Kartono Hd

The Moment Distribution Method

38

Ref:Chu Kia Wang, Statically Indeterminate Structures

Menentukan besarnya Relativ e Magnitudes akibat pergoyangan


Besar pembanding , untuk penyederhanaan , diambil kelipatan 100,
Dengan cara coba-coba , didapatkan faktor pengali sebesar 90000.
M FAB

= M FBA

M FCD

= M FDC

K= 2

6.EI.

Relativ e Magnitudes
=
L2

6.EI.

=
L2

6.EI.
15 2

6.EI.
225

6.EI.
10 2

6.EI.
100

K= 5
0,714

0,625

0,286

FEM

K= 3

0,375

CB

CD

DC

+ 400,0
---- 57,2
---+ 40,2
---- 6,4
---+ 4,5
--- 0,7
---

+ 400,0
- 114,4
---+ 80,4
----- 12,8
----+ 9,0
----- 1,4
----+ 1,0

---- 285,6
- 281,2
+ 200,8
+ 44,6
- 31,4
- 31,8
+ 22,4
+ 5,0
- 3,6
- 3,5
+ 2,5

---- 562,5
- 142,8
+ 89,2
+ 100,4
- 62,8
- 15,9
+ 9,9
+ 11,2
- 7,0
- 1,8
+ 1,1

+ 900,0
- 337,5
---+ 53,6
----- 37,6
----+ 6,0
----- 4,2
----+ 0,7

+ 900,0
---- 168,8
---+ 26,8
---- 18,8
---+ 3,0
--- 2,1
---

0,5
--- 0,1
--------

---- 0,2
---+ 0,1
-------

+
+

+
+
+
-

1,2
0,8
0,2
0,1
0,2
0,1

---- 0,4
---+ 0,1
---- 0,1

+ 0,4
--- 0,2
--------

+ 361,7

- 361,7

- 580,6

+ 580,6

+ 740,3

(Perubahan)

0,00

0,6
0,4
0,4
0,3
-----

Fase 1
( Distribusi FEM akibat pergoyangan ( side way)
BA

BC

CB

CD

- 19,2

- 38,3

- 361,7

- 580,6

- 319,4

- 159,7

+ 19,2

+ 9,6

+ 290,3

+ 180,8

+ 79,8

+ 159,7

- 28,7

- 71,4

- 399,8

- 239,6

+ 14,4

+ 14,3

-+ 80,0

+ 79,9

re l = Jumlah

( -K)

re l =

- 1/2 ( perubahan ) =
( - 1`/2 ) . (- 19,2 ) = + 9,6
( - 1/2 ) . ( - 38,3 ) = + 19,2
( - 1/2 ) . ( - 361,7 ) = + 180,8
( - 1/2 ) . ( - 580,6 ) = + 290,3
( - 1/2 ) . ( - 319,4 ) = + 159,7
( - 1/2 ) . ( - 159,7 ) = + 79,8

DC

( Periksa )

(Periksa )

ujung dekat

0,00

AB

Jumlah

= - 19,2
= - 38,3
= - 361,7
= - 580.6
= - 319,4
= - 159,7

1
x 90000 = + 900
100

BC

Perubahan

+ 380,8 - 400,0
+ 361,7 - 400,0
- 361,7 - 0
- 580,6 - 0
+ 580,6 - 900,0
+ 740,3 - 900,0

BA

Periksa

( change
( perubahan
) ) near end =

1
x 90000 = + 400
225

AB

+ 380,8

- 1/2

K= 5
C

jumlah
( -K)

0
(-2)

=0

- 399,8
(-5)

= + 80,0

- 28,7
(-2)

= + 14,4

- 239,6
(-3)

= + 79,9

- 71,4
(-5)

= + 14,3

0
(-3)

=0

Ir . H. Kartono Hd

The Moment Dis tribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

39

Mencari besarnya harga , k ( Determination of Ratio )


24
M

CB

BC

BA

CD

12
h

DC

H
M

AB

H A +H

H = 0 ;

= P.a+
h

H
H A +H

= 12

=AB

= 4,80 +

+M
=
h2

CD

+M
h

2(M

+M
15

AB

AB

15

DC

AB

=12.64,80 +

BA

BA

+M

CD

BA

DC

= 12

BA

+M
10

+M
15

) + 3( M

CD

+M
10

CD

DC

+M

DC

) = 216

Subtitusi :

2( M

AB

+M

AB

= + 13,85 + k ( + 380,8 )

BA

= - 32,79 + k ( + 361,7 )

CD

= + 16,71 + k ( + 580,6 )

DC

= + 8,36 + k ( + 740,3 )

BA

) + 3( M

CD

+M

DC

) = 216

2 {( + 13,85 + k ( + 380,8 ) - 32,79 + k ( + 361,7 ) } + 3 {+ 16,71 + k ( + 580,6 ) + 8,36 + k ( + 740,3 )} = 216


2 ( - 18,94

+ 742,5 k

) + 3 ( 25,07

+ 1320,9 k

) = 216

- 37,88 + 1485.k + 75,21 + 3962,7.k = 216


+ 5447,7.k + 37,41 = 216
+ 5447,7.k = 178,59
k = + 0,0328
Ir . H. Kartono Hd

AB

+M
15

BA

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

40

k = 0,0328
k x Moment Akhir fase 1 , batang AB

Perhitungan Moment Akhir


(Total Balance Moment )

= 0,0328 x ( + 380,8 ) = + 12,49

k x Moment Akhir fase 1 , batang BA = 0,0328 x ( + 361,7 ) = + 11,89


k x Moment Akhir

fase 1 , batang BC = 0,0328 x ( - 361,7 ) = - 11,86

k x Moment Akhir

fase 1 , batang CB = 0,0328 x ( - 580,6 ) = - 19,04

k x Moment Akhir

fase 1 , batang CD = 0,0328 x ( + 580,6 ) = + 19,04

k x Moment Akhir

fase 1 , batang DC = 0,0328 x ( + 740,3 ) = + 24,28

AB

BA

BC

CB

CD

DC

Moment Akhir dari Fase 0

+ 13,85

- 32,79

+ 32,79

- 16,71

+ 16,71

+ 8,36

0,0328 x Moment Akhir Fase 1

+ 12,49

+ 11,86

- 11,86

- 19,04

+ 19,04

+ 24,28

Jumlah Moment Akhir


(Total Balance Moment )

+ 26,34

- 20,93

+20,93

- 35,74

+ 35,74

+ 32,64

Periksa
Perubahan
- 1/2

(Perubahan)

Jumlah

re l = Jumlah

AB

BA

- 4,06

- 8,13

+ 4,06

+ 2,03

- 6,10

+ 3,05
(Periksa )

( -K)

re l =
( change )) near end =
( perubahan
+ 26,34 - 30,4
- 20,93 - (- 12,8)
+ 20,93 - 36,0
- 35,74 - (- 36,0)
+ 35,74 - 29,52
+ 32,64 - 29,52

= - 4,06
= - 8,13
= - 15,07
= + 0,25
= + 6,23
= + 3,12

uj ung dekat

( perubahan )

CB

- 15,07

+ 0,25

+ 6,23

+ 3,12

+ 0,12

+ 7,54

- 1,56

- 3,12

- 15,19

+ 7,79

+ 4,67

+ 3,04

- 1,54

relative

+ 1,56

ujung jauh

re l =

- 1/2 ( perubahan ) =
( - 1`/2 ) . (- 4,06 )
( - 1/2 ) . ( - 8,13 )
( - 1/2 ) . ( - 15,07 )
( - 1/2 ) . ( + 0,25 )
( - 1/2 ) . ( + 6,23 )
( - 1/2 ) . ( + 3,12 )

= + 2,03
= + 4,06
= + 7,54
= + 0,12
= - 3,12
= - 1,56

DC

CD

( Periksa )

+ ( - 1/2 ) ( perubahan )

uj ung dekat

(-K

BC

jumlah
( -K)

0
(-2)

=0

+ 7,79
( -5 )

= - 1,54

- 6,10
(-2)

= + 3,05

+ 4,67
( -3)

= + 1,56

- 15,19
(-5)

= + 3,04

0
( -3)

=0

Ir . H. Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

41

Mencari raksi perletakan dan menghitung besar moment tengah balok


24 kip

10,766 kip

13,234 kip

M CB = - 35,74 kip-ft

M BC = - 20,93 kip-ft

C
H

V B = 10,766 kip

10,766 kip
H

V C = 13,234 kip

= 6,84 kip
H

= 6,84 kip

= 6.84 kip

13,234 kip
C

= 6.84 kip

M CD = - 35,74 kip-ft

M BA = - 20,93 kip-ft
M' = + 13,234 x 8 - 35,74 = + 43,66 kip-ft ,atau
M' = + 10,766x6 - 20,93 = + 43,66 kip-ft
12 kip
M' = - 20,93 + 6,84x6 = + 20,10 kip-ft ,atau
M' = + 5,16 x 9 - 26,34 = + 20,10 kip-ft

M DC = + 32.64 kip-ft
H

M C = 0;
VB =

M B = 0;

H A = 5,16 kip

Kontrol :

V A = 10,766 kip

= 6,84 kip

V D = 13,234 kip

Tinjau batang BC

M BA = - 26,34 kip-ft

+ V B .12 - 20,93 - 24x6 + 35,74 = 0


+ 20,93 + 24x6 - 35,74=
= 10,766 kip
12
12

129,19

( )

158,81

( )

- V C .12 - 20,93 + 24x6 + 35,74 = 0

- 20,93 + 24x6 + 35,74=


VC =
12
V = 0;

= 13,234 kip
12

V B + V C - 24 = 10,766+ 13,234 - 24 = 24 - 24 = 0 (OK)

M A = 0;

Tinjau batang AB

- H B .15 + 20,93 + 12x9 - 26,34 = 0


+ 20,93 + 12x9 - 26,34=
HB =
15
+ H A .15 + 20,93 - 12x6 - 26,34 = 0

M B = 0;

= 6,84 kip
15

102,59

- 20,93 + 12x6 + 26,34=


= 5,16 kip
15
15
+ H C - 12 = 6,84 + 5,16 -12 = 12-12 = 0 (OK)

77,41

HA =

Kontrol :

H =0

Tinjau batang DC

M D = 0;
M C = 0;

+ H C .10 - 35,74 - 32,64 = 0


H C = + 35,74 + 32,64
=
10
+ H D .10 - 35,74 - 32,64 = 0
HC =

Kontrol :

H = 0;

= 6,84 kip
10

68,38

+ 35,74 + 32,64
=
= 6,84 kip 68,38
10
10
H C + H D = 6,84 - 6,84 = 0 (OK)

Ir . H. Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution


Method

42

24 kip
M BC = - 20,93 kip-ft

M CB = - 35,74 kip-ft
M CD = - 35,74 kip-ft

M BA = - 20,93 kip-ft

12 kip

M DC = + 32,64 kip-ft
H D = 6,84 kip
M BA = - 26,34 kip-ft
H A = 5,16 kip

V D = 13,234 kip

V A = 10,766 kip
+ 10,766 kip
(+)
(-)

(-)
(+)

- 13,234 kip
(+)

H D = 6,84 kip
Bidang D

H A = 5,16 kip

M CB = - 35,74 kip-ft

M BC = - 20,93 kip-ft
(-)

M BA = - 20,93 kip-ft

M' = + 43,66 kip-ft

(-)

(-)
(-)

(+)

M CD = - 35,74 kip-ft

(+)

M' = + 20,10 kip-ft

(+)

M DC = + 32,64 kip-ft
M BA = - 26,34 kip-ft

(-)

Bidang M

(-)

- 6,84 kip

(-)
(-)

- 13,234 kip

- 10,766 kip

Bidang N

Ir . H. Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

43

Diketahui : Portal kaku (rigid frame ) dengan perletakan sendi seperti gambar ( Ref : Soal No 77 )
24 kip

6'

6'

C
2EI

6'

Ditanyakan :
Bidang M,N dan D dengan
cara moment distribusi

12 kip
10 '

EI
EI

9'

D
A
Jawab :

Menghitung faktor kekakuan batang ( Stiffness Factor ) dan


modifikasi kekakuan batang ( Modification Stiffness Factor)
K

AB

4 ( EI )
=

4 ( EI )
EI
15

BC

4 ( EI )
=
L

CD

4 ( EI =)

4
15

4 ( EI )
EI
15
4 ( EI )
EI
10

AB,mod

3 ( EI= )
L

EI3 ( EI )
15

2
3

BC,mod

4 ( EI )
=
L

4 ( 2 EI )
EI

2
5

CD,mod

3 ( EI )
=
L

3 ( EI )
EI
10

3
15
L

2
3
3
10

Kekakuan relatip ( Relativ e Stiffness ) =


4 : 2 : 2 = 2: 5: 3
5
3
15
Modifikasi Kekakuan relatip (Modification Relativ e Stiffness ) =
3
3 : 2
K mod AB
: K modBC
: K modCD
=
:
3
10
15
Menghitung Faktor Distribusi ( Distribution Factor) = DF
K

AB

: K

BC

: K CD =

K mod

K mod

=5

= 1,50

AB = 1

K mod

= 1,50 : 5 : 2,25

= 2,25

2,25
( 5 + 2,25 )
5
CB =
( 5 + 1,50 )

CD =

1,5
BA = ( 1,5 + 5 )

= 0, 231

5
BC = ( 1,5+5 )

= 0,769

DC = 1

D
A
Menghitung Fixed End Moment ( FEM )
M FAB

=+

M FBA = M FBC = +
M FCB = -

P.b.a
=+ 2
L

P.a.b
=L2
P.L
=+
8
P.L
=8

2
12.9.6
= + 17,28 kip-ft 2
15
2
12.6.9
= - 25,92 kip-ft 2
15
24.12
= + 36,00 kip-ft
8
24.12
= - 36,00 kip-ft
8

Ir . H. Kartono Hd

= 0,310
= 0,769

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K =5

K =5

24 kip
K Mod = 5

K Mod = 1,50
K= 2
FEM

K Mod = 5
0,690

0,769

0,231

AB
+ 17,28
- 17,28

44

12 kip

CB

BA
- 25,92
- 2,33
- 8,64
- 0,87
----- 0,31
----- 0,12
----- 0,04
----- 0,01
-------------

BC
+ 36,00
- 7,75
+ 12,42
- 2,91
+ 1,34
- 1,03
+ 0,50
- 0,38
+ 0,18
- 0,14
+ 0,06
- 0,05
+ 0,02
- 0,02
-------

- 36,00
+ 24,84
- 3,88
+ 2,68
- 1,46
+ 1,01
- 0,52
+ 0,36
- 0,19
+ 0,13
- 0,07
+ 0,05
- 0,02
+ 0,01
- 0,01
+ 0,01

------+ 11,16

- 38,24

+ 38,24

- 13,06

+ 13,06

0,310

CD

----+ 1,20
----+ 0,45
----+ 0,16
----+ 0,06
----+ 0,02
----+ 0,01
--------

DC
-------------

1,00

1,00

K Mod = 2,25
Fase 0
( Distribusi FEM akibat gaya luar )

A
K Mod

K= 3
K Mod = 2,25

= 1,50

Periksa

AB

BA

BC

CB

CD

DC

Perubahan

- 17,28

- 12,32

+ 2,24

+ 22,94

+ 13,06

+ 6,16

+ 8,64

- 11,47

- 1,12

- 6,53

- 11,22

- 3,68

- 9,23

+ 21,82

+ 13,06

- 6,53

+ 5,56

+ 1,84

+ 1,85

- 4,36

- 4,35

+ 2,18

- 1/2

(Perubahan)

Jumlah

re l = Jumlah

( -K)

( Periksa )
( perubahan )

re l =
( change
( perubahan
) ) near end = ujungdekat
0 - 17,28 = - 17,28
- 38,24 - (- 25,92) = - 12,32
+ 38,24 - 36,00 = + 2,24
- 13,06 - ( - 36,00 ) = + 22,94
+ 13,06 - 0 = + 13,06
0 - 0 = 0

+ ( - 1/2 ) ( perubahan )

ujung dekat

(-K

(Periksa )

relative

ujung jauh

re l =

- 1/2 ( perubahan ) =
( - 1/2 ) . (- 17,28 ) = + 8,64
( - 1/2 ) . ( - 12,32 ) = + 6,16
( - 1/2 ) . ( + 2,24 ) = - 1,12
( - 1/2 ) . ( + 22,94 ) = - 11,47
( - 1/2 ) . ( + 13,06 ) = - 6,53
( - 1/2 ) . ( 0 ) = 0

11,22
(- 2)
- 3,69
(- 2)
- 9,23
(- 5)

= + 5,56
= + 1,84
= + 1,85

j umlah
( -K)
+ 21,82
( -5 )

= - 4,36

+ 13,06
( - 3)
- 6,53
( - 3)

= - 4,35

Ir . H. Kartono Hd

= + 21,8

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

45

Menentukan besarnya Relativ e Magnitudes akibat pergoyangan


Besar pembanding , untuk penyederhanaan FEM, diambil kelipatan 100,
Dengan cara coba-coba , didapatkan faktor pengali sebesar 90000.
M FAB

= M FBA

M FCD

= M FDC

K =5

K= 2

=2
L

6.EI. =
L2

6.EI.
15 2

6.EI.
225

6.EI.
10 2

6.EI.
100

1
x 90000 = + 400
225

+
+

1
x 90000 = + 900
100

K Mod = 5

K =5

0,690

0,769
0,231

CB
----- 621,0
- 153,8
+ 416,6
+ 196,3
- 135,4
- 80,1
+ 55,3
+ 26,0
- 17,9
- 10,6
+ 7,3
+ 3,4
- 2,3
- 1,4
+ 1,0
+ 0,4
- 0,3
- 0,2
+ 0,1

CD
+ 900,0
- 279,0
- 450,0
+ 187,2
----- 60,9
----+ 24,8
----- 8,1
----+ 3,3
----- 1,1

----

BC
---- 307,6
- 310,5
+ 392,6
+ 208,3
- 160,2
- 67,7
+ 52,1
+ 27,6
- 21,2
- 9,0
+ 6,9
+ 3,6
- 2,8
- 1,2
+ 0,9
+ 0,5
- 0,4
- 0,2
+ 0,2

+ 188,1

- 188,1

- 316,6

+ 316,6

BA
+ 400,0
- 92,4
- 200,0
+ 117,9
----- 48,1
----+ 15,6
----- 6,4
----+ 2,1
---- 0,8

0
K= 2
K Mod = 1,50

---- 0,3
---- 0,1
1,00

Periksa
Perubahan
(Perubahan)

Jumlah

re l = Jumlah

= - 400,0
= - 211,9
= - 188,1
= - 316,6
= - 583,4
= - 900,0

DC
+ 900,0
- 900,0

K Mod = 2,25

K= 3
K Mod = 2,25

----+ 0,4
---- 0,1
--+ 0,1

1,00

CD

DC

- 188,1

- 316,6

- 583,4

- 900,0

+ 200,0

+ 158,3

+ 94,0

+ 450,0

+ 291,7

- 11,9

- 29,8

- 222,6

- 133,4

- 618,3

+ 6,0

+ 6,0

+ 44,5

+ 44,5

+ 206,1

BA

BC

- 400,0

- 211,9

+ 106,0
- 294,0
+ 147,0

( Periksa )

(Periksa )

ujung dekat

0,310

CB

AB

( -K)

( change
( perubahan
) ) near end =

K= 3

Fase 1
( Distribusi FEM akibat pergoyangan ( side way)

0 - 400,0
+ 188,1 - 400,0
- 188,1 - 0
- 316,6 - 0
+ 316,6 - 900,0
0 - 900,0

AB
+ 400,0
- 400,0

- 1/2

6.EI.

K Mod = 5

K Mod = 1,50
FEM

Relativ e Magnitudes FEM

- 1/2 ( perubahan ) =
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .

( - 400,0 )
( - 211,9 )
( - 188,1 )
( - 316,6 )
( - 583,4 )
( - 900,0 )

re l =
=
=
=
=
=
=

+ 200,0
+ 106,0
+ 94,0
+ 158,3
+ 291,7
+ 450,0

- 294
( - 2)
- 11,9
( - 2)
- 29,8
( - 5)

= + 147
= + 6,0
= + 6,0

jumlah
( -K)

- 222,6
(-5)

= + 44,5

- 133,4
(-3)
- 618,3
(-3)

= + 44,5

Ir . H. Kartono Hd

= + 206,1

46

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

Mencari besarnya harga , k ( Determination of Ratio)


24

h
1

+H

= P.a+

CD

12
h

CD

+M

+H

AB

= 12

AB

AB

15

DC

+M

CD

+M
15

BA

DC

10

= 4,80 +

AB

+ M BA
15 = 12

CD

+M
10

DC

DC

H
H

= 12.6
4,80 +

BA

2(M
M

+M
h

AB

+M

BA

) + 3( M

CD

+M

DC

) = 216

Subtitusi :

2(M

AB

+M

AB

= 0+ k(0 )= 0

BA

= - 38,24 + k ( + 188,1 ) = - 38,24 + 188,1. k

CD

= + 13,06 + k ( + 316,6 ) = + 13,06 + 316,6 .k

DC

= 0+ k(0)= 0

BA

) + 3(M

CD

+M

DC

) = 216

2.( - 38,24 + 188,1.k ) + 3.( + 13,06 + 316,6.k ) = 216


- 76,48 + 376,2.k + 39,18 + 949,8.k = 216
+ 1326.k - 37,3 = 216
+ 1326.k = 253,3
k = + 0,1910

Ir . H. Kartono Hd

AB

+M
15

BA

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

48

Mencari raksi perletakan dan menghitung besar moment tengah balok


24 kip

6,065 kip
7,353 kip

17,935 kip

M CB = - 73,53 kip-ft

M BC = - 2,31 kip-ft

C
6'

7,353 kip

6'

V B = 6,065 kip

V C = 17,935 kip

= 7,353 kip

= 7,353 kip

= 7,353 kip

17,935 kip

6,065 kip
H

= 7,353 kip

M CD = - 73,53 kip-ft

M BA = - 2,31 kip-ft
M' = + 17,935x6 - 73,53 = + 34,10 kip-ft ,atau
M' = + 6,065x6 - 2,31 = + 34,10 kip-ft

6'
12 kip

M' = - 2,31 + 7,353x6 = + 41,80 kip-ft ,atau


M' = + 4,647 x 9 = + 41,80 kip-ft

D
9'

V D = 17,935 kip

Tinjau batang BC

M C = 0;

+ V B .12 - 2,31 - 24x6 + 73,53 = 0


+ 2,31 + 24x6 - 73,53=
12
- V C .12 - 2,31 + 24x6 + 73,53 = 0
V C = - 2,31 + 24x6 + 73,53=
12
VB =

M B = 0;
A

H A = 4,647 kip
V A = 6,065 kip

Tinj au batang AB

M A = 0;
M B = 0;

- H B .15 + 2,31 + 12x9 = 0


H B = + 2,31 + 12x9=
15
+ H A .15 - 12x6 + 2,31 = 0
HA =

Kontrol :
Tinj au batang DC

V =0

Kontrol :

M D =0
M C =0

H =0

+ 12x6 - 2,31=
15
H

15

+ H C .10 - 73,53 = 0
H C = + 73,53
= 7,35 kip
10

= 6,065 kip

72,78

= 17,935 kip
12

215,22

12

( )

( )

V B + V C - 24 = 6,065+ 17,935 - 24 = 24 - 24 = 0 (OK)

= 7,353 kip 110,31

= 4,647 kip 69,69


15
+ H C - 12 = 7,353 + 4,647 -12 = 12-12 = 0 (OK)

+ H D .10 - 73,53 = 0
+ 73,53
= 7,35 kip
( )
10
H =0
H C + H D = 7,53 - 7,53 = 0 (OK)

HD =
Kontrol :

Ir . H. Kartono Hd

The Moment Distribution Method

47

Ref:Chu Kia Wang, Statically Indeterminate Structures

k = 0,191
Perhitungan Moment Akhir
(Total Balance Moment )

k x Moment Akhir fase 1 , batang AB

= 0,191 x ( 0 ) = 0

k x Moment Akhir fase 1 , batang BA = 0,191 x ( + 188,1 ) = + 35,93


k x Moment Akhir

fase 1 , batang BC = 0,191 x ( - 188,1 ) = - 35,93

k x Moment Akhir

fase 1 , batang CB = 0,191 x ( - 316,6 ) = - 60,47

k x Moment Akhir

fase 1 , batang CD = 0,191 x ( + 316,6 ) = + 60,47

k x Moment Akhir

fase 1 , batang DC = 0,191 x ( 0 ) = 0

0,690

0,769

0,310

0,231

AB

BA

BC

CB

CD

DC

Momen Akhir dari Fase 0

----

- 38,24

+ 38,24

- 13,06

+ 13,06

----

0,191 x Moment Akhir Fase 1

----

+ 35,93

- 35,93

- 60,47

+ 60,47

----

Jumlah Moment Akhir


(Total Balance Moment )

-----

- 2,31

+ 2,31

- 73,53

+ 73,53

----

1,00

1,00

A
Periksa

AB

BA

BC

CB

CD

DC

Perubahan

- 93,68

- 52,79

- 33,69

- 37,53

- 98,37

- 171,90

+ 26,40

+ 46,84

+ 18,76

+ 16,84

+ 85,95

+ 49,18

- 67,28

- 5,95

- 14,93

- 20,69

- 12,42

- 122,72

+ 33,64

+ 2,98

+ 2,99

+ 4,14

+ 4,14

+ 40,91

- 1/2

(Perubahan)

Jumlah

re l = Jumlah

( -K)

( change )) near end =


( perubahan
+
+

93,68 - 0 = - 93,68
2,31 - 50,48 = - 52,79
2,31 - 36,0 = - 33,69
73,53 - ( - 36 ) = - 37,53
73,53 - 171,90 = - 98,37
0 - 171,90 = - 171,90

( Periksa )

(Periksa )

ujung dekat

re l =

- 1/2 ( perubahan ) =
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .
( - 1/2 ) .

(- 93,68 ) = + 46,84
( - 52,79 ) = + 26,40
( - 33,69 ) = + 16,84
( - 37,53 ) = + 18,76
( - 98,37 ) = + 49,18
( - 171,90 ) = + 85,95

jumlah
( -K)

- 67,28
( - 2)

= + 33,64

- 20,69
( -5 )

= + 4,14

- 5,95
( - 2)

= + 2,98

- 12,42
( - 3)

= + 4,14

- 14,93
(-5)

= + 2,99

122,72
( - 3)

= + 40,91

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

48

Mencari raksi perletakan dan menghitung besar moment tengah balok


24 kip

6,065 kip
7,353 kip

17,935 kip

M CB = - 73,53 kip-ft

M BC = - 2,31 kip-ft

C
6'

7,353 kip

6'

V B = 6,065 kip

V C = 17,935 kip

= 7,353 kip

= 7,353 kip

= 7,353 kip

17,935 kip

6,065 kip
H

= 7,353 kip

M CD = - 73,53 kip-ft

M BA = - 2,31 kip-ft
M' = + 17,935x6 - 73,53 = + 34,10 kip-ft ,atau
M' = + 6,065x6 - 2,31 = + 34,10 kip-ft

6'
12 kip

M' = - 2,31 + 7,353x6 = + 41,80 kip-ft ,atau


M' = + 4,647 x 9 = + 41,80 kip-ft

D
9'

V D = 17,935 kip

Tinjau batang BC

M C = 0;

+ V B .12 - 2,31 - 24x6 + 73,53 = 0


+ 2,31 + 24x6 - 73,53=
12
- V C .12 - 2,31 + 24x6 + 73,53 = 0
V C = - 2,31 + 24x6 + 73,53=
12
VB =

M B = 0;
A

H A = 4,647 kip
V A = 6,065 kip

Tinj au batang AB

M A = 0;
M B = 0;

- H B .15 + 2,31 + 12x9 = 0


H B = + 2,31 + 12x9=
15
+ H A .15 - 12x6 + 2,31 = 0
HA =

Kontrol :
Tinj au batang DC

V =0

Kontrol :

M D =0
M C =0

H =0

+ 12x6 - 2,31=
15
H

15

+ H C .10 - 73,53 = 0
H C = + 73,53
= 7,35 kip
10

= 6,065 kip

72,78

= 17,935 kip
12

215,22

12

( )

( )

V B + V C - 24 = 6,065+ 17,935 - 24 = 24 - 24 = 0 (OK)

= 7,353 kip 110,31

= 4,647 kip 69,69


15
+ H C - 12 = 7,353 + 4,647 -12 = 12-12 = 0 (OK)

+ H D .10 - 73,53 = 0
+ 73,53
= 7,35 kip
( )
10
H =0
H C + H D = 7,53 - 7,53 = 0 (OK)

HD =
Kontrol :

Ir . H. Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

49

24 kip
M BC = - 2,31 kip-ft

M CB = - 73,53 kip-ft
M CD = - 73,53 kip-ft

M BA = - 2,31 kip-ft

12 kip

H D = 7,353 kip
V D = 17,935 kip
H A = 4,647 kip
V A = 6,065 kip
+ 6,065 kip
(+)
(-)

(-)
(+)

- 17,935 kip
(+)

7,353 kip
Bidang D

M CB = - 73,53 kip-ft

4,647 kip
M BC = - 2,31 kip-ft

(-)

M BA = - 2,31 kip-ft

(+)

M CD = - 73,53 kip-ft
(-)

(+)

M' = + 17,935.6 - 73,53 = + 34,10 kip-ft


M' = + 4,647x9 = + 41,81 kip-ft
Bidang M
- 7,353 kip
(-)

(-)
(-)

- 17,935 kip
Bidang N
- 6,065 kip

Ir . H. Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

50

Kurva Elastis
M

1. Tinjau batang BC
M

= - 2,31 kip-ft

BC

Bidang M

2EI

= - 73,53 kip-ft

CB

(+)
M' = + 34,10 kip-ft
6'

1+

6
17,05
1,155

= 0,38'

6'

5,62'

Q
1,155
EI

36,765
EI

10,633
'
6,63'

C = V'

B = V'

B = V'

1
EI

(Q

5,37'

.4,13) - ( Q

3 .6,63) +

12
0,127 ) - ( 47,9105 x

1 ( 0,2195 x
EI

1 ( Q 1 .11,873 ) - ( Q
EI
1 - ( 0,2195 x 11,873
=
EI

12

(Q

.5,37) + ( Q

) + ( 47,9105 x

Q 3 = 11,90
2
1
Q 4 = 4,1
2

= 17,05
EI
36,765
=
EI

16,1975
EI
75,3683
EI

6,63) + ( 75,3683 x

6
41,81
2,31

1+

6'

5,686'

kip-ft

kip-ft

kip-ft

10,633)

) - ( 75,3683 x

kip-ft

1,367)

29,87
EI

kip-ft

0,105'
5

9'

41,35
EI

= 0,314'

M BA = - 2,31 kip-ft

kip-ft

.1,367 )

7,87) + ( 16,1975 x 5,37

4,105'

(+)

M' = + 41,81 kip-ft

15'

10,895'

9'

Bidang Moment

Q 7 = 1. 9 .
2

0,2195
EI
47,9105
EI

12

2. Tinjau batang AB

Q 5 = 10,314.
2
1
Q 6 = 5,686.
2

= 1,155
EI
= 17,05
EI

4 .10,633 )

4,13) - ( 16,1975 x
12

.7,87) - ( Q

1
0,38
2
1
Q 2 = 5,62
2
Q 1=

7,87'

1 . 0,127 ) - ( Q

sebagai beban pada balok


conj ugated

Bidang M
EI

11,873
'

0,127'

= 1,90'

1,367'

4,13'

C = V'

17,05
EI

12'

6
36,765
17,05

1+

4,1'

2,31
EI
41,81
EI
41,81
EI

0,363
=
EI
118,866
= EI
= 188,145
EI

kip-ft

kip-ft

kip-ft

6'

Bidang Moment
EI

14,895'

sebagai beban pada balok conjugated

A = B + Q 6 + Q 7 - Q 5 = 29,87
EI

+ 188,145
EI

118,866
EI

0,363
EI

336,518
EI

Ir . H. Kartono Hd

kip-ft

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

51

3. Tinjau batang CD
M

CD

= - 73,53 kip-ft
73,53
EI

C
(-)

1
.10.
2

Q 8=

73,53
=
EI

D= C+ Q
D

Bidang Moment
EI

Bidang Moment

5047,77
- 2181
EI EI
EI

15. A = 15.

336,518
EI EI

= 2866,77

kip-ft

= 5047,77

kip-ft

367,65
EI
8

kip-ft
41,35
=
EI

367,65
EI

409
EI

kip-ft

sebagai beban pada balok conjugated

188,145
EI

.9 +

118,866
EI

. 4,105 -

0,363
EI

10. D = 10.
4090 - 1225,5
EI EI EI

= 2864,5

kip-ft

409 =
EI EI
367,65
EI 3

2181
EI

. 0,105 =

4090
. 10=

Kurv a Elastis

Ir . H. Kartono Hd

kip-ft
1225,5
EI

kip-ft

kip-ft

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

52

Diketahui : Portal kaku (rigid frame ) dengan perletakan jepit seperti gambar ( Ref: soal no. 80)
A

3 kip

B
3EI

Ditanyakan :
Bidang M,N dan D dengan cara moment distribusi

2EI

6 kip

2EI

16'

3EI
2EI

8'

4EI

16'

E
12'

Jawab :
Menghitung faktor kekakuan batang ( Stiffness Factor )
4 ( EI )
L
4 ( EI )
L

4 ( 3 EI )
12
4 ( 2 EI )

AB

CD

AC

BD

CE

4 ( EI )
L

4 ( 4 EI )
16

DF

4 ( EI )
L

4 ( 2 EI )
8

1
1
2

16
1

EI
EI

EI
1

EI

Kekakuan relatip ( Relativ e Stiffness ) =


K

AB

:K

CD

:K

AC

:K

BD

: K CE : K DF =

1 : 1 :

1
2

1
2

: 1

: 2

: 1

: 1

Menghitung Faktor Distribusi ( Distribution Factor) = DF

k =2

AB

AC =
k=1

k=1

BA =
BD =

k =2

CA =

k=2

CD =

CE =

k=2

DB =
DC =
DE =

2
( 2+ 1)
1
( 2+1 )
2
( 2+ 1)
1
( 2+ 1)
1
( 2+1 + 2 )
2
( 2+1 + 2 )
2
( 2+1 + 2 )
1
( 2+1 + 2 )
2
( 2+1 + 2 )
2
( 2+1 + 2 )

= 0,667
= 0,333
= 0, 667

EC = 0
FD = 0

= 0,333
= 0,20
= 0,40
= 0,40
= 0,20
= 0,40
= 0,40

Ir . H. Kartono Hd

: 2

: 2

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

53

Langkah penyelesaian selanjutnya adalah sebagai berikut :


1. Fase 1
Pada arah lurus batang CD , diberi
pergoyangan , sedangkan pada arah lurus batang AB tidak beri pendel
sehingga dapat bergoyang.

3 kip

2EI

16'
Pendel

3EI
2EI

8'

4EI

16'

agar tidak terjadi

3EI
2EI

6 kip

pendel pada dititik D

F
E
12'

Menentukan besarnya Relativ e Magnitudes akibat pergoyangan, dengan


pemberian pendel di titik D

Besar pembanding , untuk penyederhanaan , FEM diambil kelipatan 100.


Dengan cara coba-coba , didapatkan faktor pengali sebesar

6400
3
Relativ e Magnitudes FEM

= M FCA

6.EI. =
L2

M FBD = M FDB

6.2EI. =
L2

M FAC

6.2EI.

=
16 2
=

6.2EI.

16 2

12EI.
256
12.EI.
256

12
+ 256x

12
+ 256x

6400
= + 100
3
6400
= + 100
3

Ir . H. Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 2
A

K= 1

K= 2
0,667

0,667

CA
+ 100,0
- 20.0
- 16,6
+ 7,3
+ 7,2
- 2,9
- 3,0
+ 1,2
+ 1,2
- 0,5
- 0,5
+ 0,2
+ 0,2
- 0,1
- 0,1
---+ 73,6

0,333

AB

AC
+ 100,0
- 33,3
- 10,0
+ 14,4
+ 3,6
- 6,0
- 1,4
+ 2,5
+ 0,6
- 1,0
- 0,2
+ 0,4
+ 0,1
- 0,2
----+ 0,1
+ 69,6

---- 66.7
- 33,3
+ 28,9
+ 14,4
- 12,0
- 6,0
+ 4,9
+ 2,4
- 2,0
- 1,0
+ 0,8
+ 0,4
- 0,3
- 0,2
+ 0,1
- 69,6

K= 1

BA

BD

---- 66.7
- 33,3
+ 28,9
+ 14,4
- 12,0
- 6,0
+ 4,9
+ 2,4
- 2,0
- 1,0
+ 0,8
+ 0,4
- 0,3
- 0,2
+ 0,1
+ 69,6

+ 100,0
- 33,3
- 10,0
+ 14,4
+ 3,6
- 6,0
- 1,4
+ 2,5
+ 0,6
- 1,0
- 0,2
+ 0,4
+ 0,1
- 0,2
----+ 0,1
+ 69,6

K= 1

0,20

CE

EC
------ 20,0
--+ 7,3
--- 2,9
--+ 1,2
--- 0,5
---+ 0,2
------- 14,7

0,40

CA
+ 100,0
- 20.0
- 16,6
+ 7,3
+ 7,2
- 2,9
- 3,0
+ 1,2
+ 1,2
- 0,5
- 0,5
+ 0,2
+ 0,2
- 0,1
- 0,1
---+ 73,6

DB
+ 100,0
- 20,0
- 16,6
+ 7,3
+ 7,2
- 2,9
- 3,0
+ 1,2
+ 1,2
- 0,5
- 0,5
+ 0,2
+ 0,2
- 0,1
- 0,1
--+ 73,6

0,20
0,40

---- 40,0
--+ 14,7
--- 5,8
--+ 2,3
---- 0,1
---+ 0,4
---- 0,1
---+ 0,1
- 29,4

K= 1

0,333

FEM

54

K= 2

0,40

CE

CD

DC

---- 40,0
--+ 14,7
--- 5,8
--+ 2,3
---- 0,1
---+ 0,4
---- 0,1
---+ 0,1
- 29,4

---- 40,0
- 20,0
+ 14,6
+ 7,3
- 5,8
- 2,9
+ 2,4
+ 1,2
- 0,9
- 0,5
+ 0,4
+ 0,2
- 0,2
- 0,1
+ 0,1
- 44,2

---- 40,0
- 20,0
+ 14,6
+ 7,3
- 5,8
- 2,9
+ 2,4
+ 1,2
- 0,9
- 0,5
+ 0,4
+ 0,2
- 0,2
- 0,1
+ 0,1
- 44,2

D
0,40

DB
+ 100,0
- 20,0
- 16,6
+ 7,3
+ 7,2
- 2,9
- 3,0
+ 1,2
+ 1,2
- 0,5
- 0,5
+ 0,2
+ 0,2
- 0,1
- 0,1
--+ 73,6

K= 2

DF

FD

---- 40,0
--+ 14,7
---- 5,8
---+ 2,3
--- 1,0
--+ 0,4
--- 0,1
--+ 0,1
- 29,4

------ 20,0
--+ 7,3
--- 2,9
--+ 1,2
--- 0,5
---+ 0,2
------- 14,7

E
Periksa

AB

Perubahan
- 1/2

(Perubahan)

Jumlah

re l = Jumlah

( -K)

AC

BA

BD

CA

- 69,6

- 30,4

- 69,6

- 30,4

- 26,4

- 44,2

- 29,4

+ 34,8

+ 13,2

+ 34,8

+ 13,2

+ 15,2

+ 22,1

+ 7,4

- 34,8

- 17,2

- 34,8

- 17,2

- 11,2

- 22,1

- 22,0

- 11,2

+ 17,4

+ 17,2

+ 17,4

+ 17,2

+ 11,2

+ 11,0

+ 11,2

+ 11,2

(Periksa )

( Periksa )

CD

( Periksa )

CE

DB

EC

DC

DF

- 26,4

- 44,2

- 29,4

- 14,7

- 14,7

+ 15,2

+ 22,1

+ 7,4

+ 14,7

+ 14,7

- 22,1

- 22,0

+ 11,0

+ 11,0

( Periksa )

Ir . H. Kartono Hd

FD

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

2. Fase 2
Pada arah lurus batang AB , diberi
pergoyangan sedangkan pada arah lurus batang CD tidak beri pendel
sehingga dapat bergoyang.

pendel pada dtitik B

55

agar tidak terjadi

Pendel
A

3 kip

B
3EI

2EI

6 kip

2EI

16'

3EI
2EI

8'

4EI

16'

E
12'

Besar pembanding , untuk penyederhanaan , FEM diambil kelipatan 100,


Dengan cara coba-coba , didapatkan faktor pengali sebesar

6400
3

Relativ e Magnitudes FEM


M FAC

= M FCA

M FBD

= M FDB

M FCE = M FEC

M FDF = M FFD

6.EI.

=
L2

6.2EI.
6.EI.

=
L2

=
L2

6.2EI.

= 2
L

= 6.2EI.

16 2

16 2

6.2EI.
8

12EI.
256

6.2EI.
16 2

= 6.4EI.
=

12.EI.
256
24EI.
256

12.EI.
64

12
x
256

= + 6400
100
3

12
x
256

= + 6400
100
3

24
x
256

6400
= + 200
3

12
x
64

6400
= + 400
3

Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

56

K= 2
A

K= 1

K= 2

AC

CA
- 100,0
- 20.0
+ 16,6
+ 8,7
- 3,9
+ 0,7
- 0,6
+ 0,4
- 0,4
+ 0,2
- 0,2
+ 0,1
- 0,1
---- 98,5

B
0,333

0,333

FEM

- 100,0
+ 33,3
- 10,0
- 7,8
+ 4,4
- 1,1
+ 0,4
- 0,9
+ 0,2
- 0,3
+ 0,1
- 0,2
------- 81,9

AB

BA

BD

---+ 66.7
+ 33,3
- 15,5
- 1,1
- 2,2
+ 2,4
- 1,9
+ 0,6
- 0,5
+ 0,4
- 0,3
----+ 81,9

---+ 66.7
+ 33,3
- 2,2
- 7,8
+ 4,9
- 1,1
+ 1,3
- 1,0
+ 0,8
- 0,2
+ 0,1
- 0,2
+ 0,1
+ 94,7

- 100,0
+ 33,3
- 30,0
- 1,1
+ 0,4
+ 2,5
- 0,8
+ 0,6
- 0,2
+ 0,4
---+ 0,1
--+ 0,1

K= 1

K= 1
0,20
0,40

0,40

0,40

CE

EC
+ 200,0
--- 20,0
--+ 8,7
--+ 0,6
--+ 0,4
--+ 0,2
--------+ 189,9

CA
- 100,0
- 20.0
+ 16,6
+ 8,7
- 3,9
+ 0,7
- 0,6
+ 0,4
- 0,4
+ 0,2
- 0,2
+ 0,1
- 0,1
---- 98,5

DB
- 100,0
- 60,0
+ 16,6
+ 0,7
- 0,6
- 1,6
+ 1,2
- 0,4
+ 0,3
- 0,1
+ 0,2
- 0,1
------ 143,8

- 94,7

0,20

+200,0
- 40,0
--+ 17,4
--+ 1,3
--+ 0,9
---+ 0,3
---+ 0,1
---+ 0,1
- 180,1

K= 1

0,667

0,667

0,40

K= 2

CE

CD

DC

+200,0
- 40,0
--+ 17,4
--+ 1,3
--+ 0,9
---+ 0,3
---+ 0,1
---+ 0,1
+ 180,1

---- 40,0
- 60,0
+ 17,3
+ 0,6
+ 1,3
- 1,6
+ 0,9
- 0,4
+ 0,3
- 0,2
+ 0,2
- 0,1
+ 0,1
- 81,6

---- 120,0
- 20,0
+ 1,3
+ 8,6
- 3.2
+ 0,6
- 0,7
+ 0,4
- 0,3
+ 0,2
- 0,2
+ 0,1
- 0,1
- 133,3

DB
- 100,0
- 60,0
+ 16,6
+ 0,7
- 0,6
- 1,6
+ 1,2
- 0,4
+ 0,3
- 0,1
+ 0,2
- 0,1
------ 143,8

K= 2

DF

FD

+ 400,0
- 120,0
--+ 1,4
---- 3,2
---- 0,7
--- 0,3
--- 0,1
----+ 277,1

+ 400,0
--- 60,0
--+ 0,7
--- 1,6
--- 0,4
--- 0,2
--------+ 338,5

E
( check)

AC

BA

BD

CA

CD

CE

DB

DC

DF

EC

FD

change

+ 81,9

+ 18,1

+ 94,7

+ 5,3

+ 1,5

- 81,6

- 19,9

- 43,8

- 133,3

- 122,9

- 10,1

- 61,5

- 1/2 (change)

- 47,4

- 0,8

- 41,0

- 21,9

- 9,0

+ 66,6

+ 5,0

- 2,6

+ 40,8

+ 30,8

+ 10,0

+ 61,5

+ 34,5

+ 17,3

+ 53,7

+ 27,2

- 7,5

- 15,0

- 14.9

- 46,4

- 92,5

- 92,1

- 17,2

- 17,3

- 26,8

- 27,2

+ 7,5

+ 7,5

+ 7,5

+ 46,4

+ 46,2

+ 46,0

( check )

( check )

AB

sum

re l =

sum
( -K)

( check )

( check )

( check )

( check )

Ir . H. Kartono Hd

Ref:Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution


Method

57

Mencari besarnya harga , k ( Determination of Ratio)

3 kip

AB

M
M

M
6 kip

BD

CA

C
M

BA

AC

CD

M
CE

DC
DF

M
EC

FD

F
H

Pendel

DB

D
M

Pendel

AC

+H

= 3 kip

+M

CA

AC

CE

+M
+H

CE

16

=3

BD

+M

DF

+M

DB

DB

= 48

= 9 kip
EC

+M

16

+M

BD

+ M

CA
D

+M

16

+ 2( M

EC

=9
DF

FD

+M

DF

) = 144

Subtitusi :
M

AC

+ 69,6 k

AC

= + 69,6 k

CA

= + 73,6 k

BD

= + 69,6 k

1 - 98,5 k
1 - 94,7 k

DB

= + 73,6 k

+M

CA

+ M

- 81,9 k

BD

- 81,9 k

- 143,8 k
+M

+ 73,6 k

DB

CE

= - 29,4 k

+ 180,1 k

EC

= - 14.7 k

+ 189,9 k

DF

= - 29,4 k

+ 277,1 k

FD

= - 14.7 k

+ 388,5 k

= 48
1

- 98,5 k

+ 69,6 k

+ 286,4 k
- 132,3 k

1
1

- 94,7 k

- 418,9 k

+ 1601,2 k

+ 73,6 k

- 143 k

= 48

= 48
2

= 144

k 1 = + 0, 3403
k 2 = + 0, 1181

Ir . H. Kartono Hd

58

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

K= 2
A

K= 1

K= 2
0,667

0,667

0,333

0,3403 Moment Akhir


dari Fase 1
0,1181 x Moment Akhir
dari Fase 2
Jumlah Moment Akhir
(Total Balance Moment )

0,333

AC

AB

BA

BD

+ 23,7

- 23,7

- 23,7

+ 23,7

- 9,7

+ 9,7

+ 11.2

- 11,2

+ 14,0

- 14,0

- 12,5

+ 12,5

K= 1

K= 1
0,20

0,20
0,40

0,40

0,40

EC

0,1181 x Moment
Akhir dari Fase 2
Jumlah Moment Akhir
(Total Balance Moment )

D
0,40

CA

CE

CD

DC

DB

K= 2

0,3403 Moment Akhir


dari Fase 1

K= 1

DF

FD

K= 2

- 5,0

+ 25,0

- 10,0

- 15,0

- 15,0

+ 25,0

- 10,0

- 5,0

+ 22,4

- 11,6

+ 21,2

- 9,6

- 15,7

- 17,0

+ 32,7

+ 40,0

+ 17,4

+ 13,4

+ 11,2

- 24,6

- 30,7

+ 8,0

+ 22,7

+ 35,0

0,00

0,00

E
( check)

AB

AC

BA

BD

CA

CD

CE

DB

DC

DF

EC

FD

change

- 14,0

- 8,2

- 12,5

- 9,7

- 8,8

- 24,6

- 12,4

- 14,2

- 30,7

- 24,5

- 6,2

- 12,2

- 1/2 (change)

+ 6,2

+ 4,4

+ 7,0

+ 7,1

+ 4,1

+ 15,4

+ 3,1

+ 4,8

+ 12,3

+ 6,1

+ 6,2

+ 12,2

- 7,8

- 3,8

- 5,5

- 2,6

- 4,7

- 9,2

- 9,3

- 9,4

- 18,4

- 18,4

+ 3,9

+ 3,8

+ 2,7

+ 2,6

+ 4,7

+ 4,6

+ 4,6

+ 9,4

+ 9,2

+ 9,2

( check )

( check )

sum

re l =

sum
( -K)

( check )

( check )

( check )

( check )

Ir . H. Kartono Hd

The Moment Distribution Method

Ref:Chu Kia Wang, Statically Indeterminate Structures

59

Mencari reaksi perletakan


3 - 1,7125 = 1,2875 kip
2,2083 kip

3 kip

1,2875 kip

= + 14 kip-ft

AB

BA

2,2083 kip

= - 12,5 kip-ft

1,2875 kip
V

V A = 2,2083 kip
2,2083 kip
H

1,2875 kip

= 1,7125 kip

=V

= + 14 + 12,5 = 2,2083 kip


12

AC

=H

= + 14,0 kip-ft

C2

BD

2,2083 kip

= 1,2875 kip
= - 12,5 kip-ft

+ 14 + 13,4 = 1,7125 kip


16

M
M
H

= 1,7125 kip

C2

6 kip

= 2,2083 kip

C2

1,7875 kip

5,925 kip

= + 24,6 kip-ft

CD

=V

C1

+V

C2

= 6,8166 kip

C1

= 4,6083 kip
C1

=V

DC

= - 30,7 kip-ft

D1

= 1,2875 kip

D2

= 2,2083 kip

2,2083
4,6083 ( + )
6,8166 kip

= 4,6083 kip
V

+ 24,6 + 30,7 = 4,6083 kip


12

D1

6,8166 kip
c1

= + 8 kip-ft

5,925 kip

C
V

DB

D
1,7125 + 6 - 1,7875 = 5,925 kip

1,7125 kip

= - 13,40 kip-ft

CA

= 1,7875 kip
= + 11,2 kip-ft

CE

=H

C1

=V

D1

+V

D2

= 6,8166 kip

6,8166 kip
1,2875 kip

= 1,2875 kip

= 2,2083 kip

3 kip
M

= + 11,2 + 17,4 = 1,7875 kip


16

DF

1,2875
5,925 ( + )
7,2125 kiip

5,925 kip
= - 22,7 kip-ft

FD

= + 35 kip-ft

H F = 7,2125 kip

V F = 6,8166 kip

Kontrol :
M

EC

= - 17,4 kip-ft

H E = 1,7875 kip

V E = 6,8166 kip

V=0
V

+V

= - 6,8166 + 6,8166 = 0 ( OK )

H= 0
H

+H

- P = 1,7875 + 7,2125 - 6 - 3 = 0 ( OK )

Ir . H. Kartono Hd

The Moment Distribution Method

60

Ref:Chu Kia Wang, Statically Indeterminate Structures


A

3 kip

B
3EI

2EI

6 kip

2EI

16'

3EI
2EI

8'

4EI

16'

E
12'

- 1,2875 kip
A

1,7125 kip

1,2875 kip

+ 2,2083 kip

(- )

(-)

- 2,2083 kip

2,2083 kip
(+)

(+)

(+)

(- )

+ 5,925 kip
(- )

7,2125 kip
C

(-)

4,6083kip

D
(- )

(+)

(+)

(+)

- 6,8166 kip

7,2125 kip
Bidang N
Bidang D

E
1,7875 kip
M
A
M

AC

= + 14 kip-ft

= + 14 kip-ft

AB

BA

= - 12,5 kip-ft

(-)

(-)

(+)

M
M

= - 13,4 kip-ft

CA

CE

(-)

= + 11,2 kip-ft

CD

= + 24,6 kip-ft

(+
)

(-)

(+)

CB

(+)

(-)
EC

= - 17,4 kip-ft

D
(-)

BD

DC
DF

= - 12,5 kip-ft

= - 30,7 kip-ft
= -22,7 kip-ft

= + 8 kip-ft

+ 6,8166 kip
M

FD

F
= + 35 kip-ft
E

Rubahan bangun

E
Bidang M

Ir . H. Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures


q = 1,2 k/ft

Ref: Soal 82

C
2 EI

61

10 '

2 EI

Selesaikan dengan metode


Distribusi Moment ( Cross )

D
5
20 '

EI

EI

Cos

2
2

BC =

Menghitung faktor kekakuan batang ( Stiffness Factor )


K AB = K

ED

4 ( EI )
=

K BC = K

CD

4 ( 2 EI )
=
L BC

Sin =

40 '

4 ( EI )
20

5
20
2

= 10

EI
5
4 ( 2 EI )

4 ( 2 EI )
20
cos

4 EI

20
2

5
Kekakuan relatip ( Relativ e Stiffness ) =
K AB : K BC

EI
5

4 EI

:
5

EI
5

4 EI
5

: 4

Menghitung Faktor Distribusi ( Distribution Factor) = DF

BA =
BC =

5
4+
4
4+

CB =

= 0,3585

CD =

= 0,6415

Menghitung Fixed End Moment ( FEM )


= M FCD = +

.1,21.20
12

M FCB = M FDC = -

1
.1,2.20
12

M FBC

M FAB = M

FED

= 0

k= 4

4
4+ 4
4
4+ 4

0,50

0,6415

= 0,50

0,50

k= 4
0,6415

0,3585

0,3585

= 0,50
5

k=
0

= + 40 kip-ft

= - 40 kip-ft

k=

Note : 1 kip = 4,4482 kN


1 ft = 0,3048 M
1 kip - ft = 1,3558 kNm
1,2 k/ft = ( 1,2.4,4482 ) / 0,3048 = 17,5 kN/m = 1,75 T/m
Ir.H.Kartono Hd

Distribusi moment
The Moment Distribution Method

62

Ref: Chu Kia Wang,Statically Indeterminate Structures

C
0,50

0,50

k= 4

k= 4
0,6415

0,6415

0,3585

0,3585

AB

BA

FEM
M.Distribusi
M.Induksi

- 7,17

M.Distribusi
M.Akhir

k=

- 7,17

CB

BC

+ 40

- 40

+ 40

- 14,34

- 14,34

- 14,34

DC

DE

ED

+ 14,54

- 40

- 25,66

CD

- 12,83

+ 12,83
+ 52,83

- 52,83

k=
-

+ 25,66

- 14,34

- 7,17

- 7,17

+ 14,34

Periksa ( Kontrol Geometri )


AB

BC

BA

CB

CD

DC

ED

DE

Perubahan

- 7,17

- 14,34

- 25,66

- 12,83

+ 12,83

+ 25,66

+ 14,34

+ 7,17

- 1 (Perubahan)
2

+ 7,17

+ 3,58

+ 6,42

+ 12,83

- 12,83

- 6,42

- 3,58

- 7,17

- 19,24

+ 19,24

+ 10,76

+ 4,81

- 4,81

Jumlah

- 10,76

re l = Jumlah

+ 4,81

( -K)

Priksa

- 4,81

Priksa

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

63

q = 1,2 k/ft

10 '

20 '

A
40 '
Robahan Bangun ( Lendutan )
Menentukan besarnya Relativ e Magnitudes akibat pergoyangan
Besar pembanding , untuk penyederhanaan , diambil kelipatan dengan faktor
2000
6

pengali sebesar

Relativ e Magnitudes
M FAB

M FBC

M FCD

= M FCB

=M

FDC

= M FBA

=+

6.EI.= -
L AB 2

=-

6.( 2EI ).

=+
LBC

=-

6.( 2EI ).

M FDE = M FED

=LBC2

=+

=-

6.EI.
20 2

10

6.( 2EI ).

=-

10
6.EI.= +
L AB 2

6.( 2EI ).

=+

=+

6.EI.
400

6.EI.
20 2

12.EI.

5
5

500

12.EI.

500

6.EI.
400

x6
400
12.EI.

12.EI.

x6
400

= 2000
- 500
6
x
500

x
500

=5 + 1789 2000
6

=5 - 1789 2000

= +2000500
6

64

Ref: Chu Kia Wang,Statically Indeterminate Structures

The Moment Distribution Method

Distribusi moment

C
0,50

0,50

k= 4

k= 4
0,6415

0,6415

0,3585

0,3585

AB
FEM

- 500
-

M.Distribusi
M.Induksi

BA

BC

CB

- 500

+ 1789

+ 1789

- 462

- 827

- 231

M.Distribusi
M.Akhir

k=

- 731

- 962

+ 962

CD

DC

- 1789

- 414

DE

ED

- 1789

+ 500

+ 500

+ 827

+ 462

+ 414

+ 1375

k=
-

- 1375

- 962

+ 231

+ 962

+ 731

Periksa ( Kontrol Geometri )


AB

BC

BA

CB

CD

DC

Perubahan

- 231

- 462

- 827

- 414

+ 414

+ 827

- 1 (Perubahan)
2

+ 7,17

+ 116

+207

+414

- 414

- 207

- 620

+ 155

Jumlah

- 346

re l = Jumlah

+155

( -K)

Priksa

+462
- 116

+620
- 155

ED

DE

Priksa

+231
-231

+346

- 155

Ir.H.Kartono Hd

Ref:Chiu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

65

Mencari besarnya harga , k ( Determination of Ratio )


q = 1,2 k/ft

H
M

BC

BC

BC

BA

AB

+M

=+
h

BA

=+

20 '
ED

BA

+H

BC

40 '

BA

ED

VE

=0
AB

+M

BA

20

=+

DE

BC

+M

CB

h2

BC

DE

AB

+ 24.10 - ( M

+H

DC

AB

=+

BA

10 '

BA

VA

H = 0 ;

CD

DC

CD

M
M

CB

CB

AB

+M

BA

20

+ 240 - ( M

+ 240 - ( M

BC

+M

CB

10

BC

+M

10

( - 7,17 - 731 k - 14,34 - 962 k )


20

Subtitusi :

CB

AB

= - 7,17 - 731 k

BA

= - 14,34 - 962 k

BC

= + 14,34 + 962 k

CB

= - 52,83 + 1375 k

)
=0

+ 240 - ( + 14,34 + 962 k - 52,83 + 1375 k )

=0

10

- 7,17 - 731 k - 14,34 - 962 k + 480 - 28,68 - 1924 k + 105,66 - 2750 k = 0


- 6367 k + 535,47 = 0
k = 0,0841

Moment Akhir :
M
M
M
M

= - 7,17 - 731 ( 0,0841 ) = - 68,65 kft


= - 14,34 - 962 ( 0,0841 ) = - 95,24 kft
BC = + 14,34 + 962 ( 0,0841 ) = + 95,24 kft
CB = - 52,83 + 1375 ( 0,0841 ) = + 62,81 kft
AB

BA

Ir . H. Kartono Hd

66

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method


q = 1,2 k/ft

Ref: Soal 82

q = 1,2 k/ft

Tinjau batang AB :

C
62,81 k-ft

= 0,8944

Cos

62,81 k-ft

Sin = 0,4472
8,20 k

95,24 k-ft
8,20 k

95,24 k-ft

H A = 8,20 k

8,20 k
95,24 k-ft

V D = 24 k

V B = 24 k
8,20 k

8,20 k
95,24 k-ft

95,24 k-ft

68,65 k-ft

68,65 k-ft
8,20 k

8,20 k

68,65 k-ft

68,65 k-ft

H
H

=0

- H A .20 + 68,65 + 95,24 = 0

95,24 k-ft

8,20 k

62,81 k-ft

= 8,20 k

= 8,20 k

V E = 24 k

V A = 24 k
Tinjau batang BC
8,20 sin
8,20 k
8,20 cos
24 sin

8,20 cos

24 cos

8,20 sin

= 8,20 k

24 k

D B = + 24 cos

+ 8,20 sin

= +21,47 + 3,67 = + 25,14 k

D C = - 8,20 sin

N B = - 24 sin

+ 8,20 cos

= -10,73 + 7,33 = - 3,40 k

N C = + 8,20 cos

Kontrol :

D B - Q cos

D C = - 8,20 sin
N C = + 8,20 cos

-D

= + 25,14 - 1,2.20.cos

= + 7,33 k

- 3,67 = + 25,14 - 21,47 - 3,67 = 0 ( OK)


8,20 cos

= - 3,67 k
= + 7,33 k

= - 3,67 k

= 8,20 k

8,20 sin

Ir.H.Kartono Hd

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

62,81 k-ft

Ref;Soal 82

62,81 k-ft

Cos

95,24 k-ft

95,24 k-ft

= 0,8944

Sin = 0,4472

68,65 k-ft
H

67

68,65 k-ft

= 8,20 k

A
V

= 8,20 k

= 24 k

= 24 k

+ 3,67 k

(+)
(-)

+ 25,14k

- 25,14k

D C = - 8,20 sin

(-)

(+)

8,20k

(-)

(+ )

(+)

(-)

(+)

+68,65 k-ft

(+)

Bidang M

(+)

+ 7,33k

+68,65 k-ft

N C = + 8,20 cos

(+)

= + 7,33 k

- 3,40 k

(-)

(-)

N B = - 24 sin

+ 8,20 cos

= -10,73 + 7,33 = - 3,40 k

(-)

(-)

24 k

= +21,47 + 3,67 = + 25,14 k

-95,24 k-ft

(-)

+ 62,81 k-ft

(-)

- 3,40 k

+ 8,20 sin

8,20k

Bidang D

-95,24 k-ft

D B = + 24 cos

= - 3,67 k

Bidang N

24 k

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

68

Ref: Soal 83
q = 0,60 k/ft

C
2 EI

10 '

2 EI

Selesaikan dengan metode


Distribusi Moment ( Cross )

5
20 '

EI

EI

Cos

40 '

ED

4 ( EI )
=

BC =

K BC = K

CD

4 ( 2 EI )
=
L BC

4 ( EI )
20

2
2

5
1

Sin =

Menghitung faktor kekakuan batang ( Stiffness Factor )


K AB = K

5
20
2

= 10

EI
5
4 ( 2 EI )

4 ( 2 EI )
20
cos

20
2

4 EI
5

10

5
Kekakuan relatip ( Relativ e Stiffness ) =
K AB : K BC

EI
5

4 EI

:
5

EI
5

4 EI
5

: 4

Menghitung Faktor Distribusi ( Distribution Factor) = DF

BA =
BC =

5
4+

5
4

4+

CB =

= 0,3585

CD =

= 0,6415

0,50

k= 4
4
4+ 4
4
4+ 4

0,50

k= 4

0,6415

= 0,50

0,6415

0,3585

0,3585

= 0,50
k=

k=

Menghitung Fixed End Moment ( FEM )


1 .20
.0,60
12
1 .20
M FBA = - .0,60
12
1 .10
M FBC = + .0,60
12
M FAB

M FCB

= +

= -

1 .10
.0,60
12

= + 20 kip-ft

= - 20 kip-ft

= + 5 kip-ft

= - 5 kip-ft

Ir.H.Kartono Hd

The Moment Distribution Method

69

Ref: Chu Kia Wang,Statically Indeterminate Structures

Distribusi moment

0,50

0,50

k= 4

k= 4

0,6415

0,6415
0,3585

AB
FEM

BA
- 20

+ 20

M.Distribusi
M.Induksi

k=

M.Induksi

- 0,45
-

- 0,22

M.Distribusi
M.Induksi

+ 0,43

- 0,22

M.Distribusi
M.Induksi
M.Distribusi

- 0,04

M.Induksi

- 0,04

- 0,07

+ 0,07

M.Akhir

DC

-5

+ 9,62

+ 2,50

+ 1,25

+ 4,81

- 0,80

- 2,41

0,3585

DE

ED

k=

+ 2,50
+ 1,25

- 2,40

- 0,80

+ 1,20

- 0,40

- 0,40

- 1,20

+ 0,77

+ 0,40

+ 0,40

+ 0,77

- 0,45

+ 0,20

- 0,13

- 0,38

- 0,38

- 0,13

- 0,19

- 0,06

- 0,06

- 0,19

+ 0,12

+ 0,06

+ 0,06

+ 0,12

+ 0,07

+ 0,03

+ 0,06

+ 0,06

+ 0,03

- 0,06
- 0,01
+ 0,01
+ 0,01
- 0,01

- 0,06
- 0,01
+ 0,01
+ 0,01
- 0,01

- 0,02
- 0,03
+0,02

- 0,01

- 0,02
- 0,03
+ 0,02

- 0,10

+ 0,10

+ 0,02

CB

CD
+ 0,10

- 14,64

+ 12,64

- 0,22

+ 0,43

+ 0,38

+ 22,69

CD

+ 0,38

- 0,01
+ 0,01

CB

+ 0,20

M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi

+5

+ 5,38

+ 2,69

M.Distribusi

BC

+ 0,22

- 0,07
- 0,04

+ 0,04

+ 0,01

- 0,02

Periksa ( Kontrol Geometri )


AB

BC

BA

Perubahan

+ 2,69

+ 5,36

+ 9,64

+ 4,90

- 1 (Perubahan)
2

- 2,69

- 1,34

- 2,45

- 4,82

+ 7,19

+ 0,08

- 1,80

- 0,02

Jumlah

+ 4,02

re l = Jumlah

- 1,80

( -K)

Priksa

- 0,01
+ 0,09
- 0,02
Priksa

DC

ED

DE
- 0,02

+ 0,02
- 0,05

0
0

- 0,03
+ 0,01

+ 0,01

- 0,02

+ 0,01

Priksa

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

70

Pendel

10 '

20 '

40 '
Robahan Bangun ( Lendutan )
Menentukan besarnya Relativ e Magnitudes akibat pergoyangan

Besar pembanding , untuk penyederhanaan , diambil kelipatan dengan faktor


2000
6

pengali sebesar

Relativ e Magnitudes
M FAB

= M FBA

=-

6.EI. 1
=L AB 2
6.( 2EI ).

M FBC = M FCB

=-

M FCD = M FDC

=+

M FDE = M FED

=0

20

2
=LBC2
1

6.( 2EI ).
=+

LBC

2
2

6.EI.

=-

=-

5
=+

6.EI.

400
6.EI.

1 5

10

6.EI.

1 5

10

6.EI.

6.EI.
2

1 5

500

1 5

500

x6
400

6.

6.

= 2000
- 500
6

x
500

x
500

2000
= - 894,4
6

= + 894,42000
6

The Moment Distribution Method

71

Ref: Chu Kia Wang,Statically Indeterminate Structures

Distribusi moment

0,50

0,50

k= 4

k= 4

0,6415

0,6415
0,3585

AB
FEM

BA

+ 500

+ 500

M.Distribusi
M.Induksi
M.Distribusi

M.Distribusi

k=

M.Induksi

M.Induksi

M.Distribusi

M.Induksi
M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi

- 0,2

M.Induksi
M.Distribusi
M.Akhir

- 0,4

+ 562,1

DE

ED

- 329,6

+ 894,4
-

- 573,8

k=

+ 126,5

- 286,9

- 160,3

+ 80,2

+ 80,2

+ 40,1

+ 40,1

- 25,7

- 25,7

- 12,8

- 12,8

+ 12,8

+ 12,8

+ 6,4
- 4,1

- 2,-

- 2,-

+ 2,-

+ 2,-

- 0,1
+ 624,2

- 624,2

- 0,3
+ 0,3

- 687,7

+ 687,7

- 1,2

- 0,2
-

- 0,4

+ 1,- 0,6

- 0,3
+ 0,3

- 7,2

- 2,3

+ 6,4
- 4,1

+ 1,- 0,6

+ 0,2
- 0,1

- 14,4

+ 894,4

0,3585

- 894,4

DC

- 2,3

- 1,2

CD

CB

+ 253

- 14,4

- 7,2

M.Distribusi

- 894,4

+ 141,4

+ 70,7

M.Induksi

BC

+ 0,2
- 0,1

- 0,1

+ 337,8

- 337,8

- 168,9

Periksa ( Kontrol Geometri )


AB
Perubahan

+ 62,1

- 1 (Perubahan)
2

- 62,1

BA

BC

+ 124,2

+ 270,2

+ 206,7

- 31,-

- 103,4

- 135,1

+ 278,3

+ 166,8

+ 71,6

+ 71,6

- 41,7

- 17,9

Jumlah

+ 93,2

re l = Jumlah

- 41,7

( -K)

Priksa

CD

CB

- 206,7

- 17,9
Priksa

DC
- 337,8

- 556,6
+103,4
- 453,2
+ 113,3

ED

DE
- 168,9

+ 84,4

+ 168,9

- 253,4

+ 113,3

Priksa

Ir.H.Kartono Hd

72

Ref:Chu Kia Wang,Statically Indeterminate Structures

The Moment Distribution Method

Pendel

40 '

Robahan Bangun ( Lendutan )

Menentukan besarnya Relativ e Magnitudes akibat pergoyangan

Besar pembanding , untuk penyederhanaan , diambil kelipatan dengan faktor


2000
6

pengali sebesar

Relativ e Magnitudes
M FAB

= M FBA

=0

0
2

6.( 2EI ).
M FBC = M FCB

=+

M FCD = M FDC

=- 2

=-

LBC

=+

AB

2 5
5

10

=+ 2
L 2

6.EI.

6.EI.

=+

LBC2

6.( 2EI ).
M FCD = M FDC

=+

6.EI.

=-

10

=+

6.EI.
20

2 5
5

6.EI.

2 5

500

6.EI.
2

2 5

500

6.EI.
400

6.

6.

x
500

x6
400

x
500

2000
= + 894,4
6

2000
= - 894,4
6

= + 2000
500
6

The Moment Distribution Method

73

Ref: Chu Kia Wang,Statically Indeterminate Structures

Distribusi moment

0,50

0,50

k= 4

k= 4

0,6415

AB

BA

FEM

M.Distribusi

- 329,6

M.Induksi
M.Distribusi

- 160,3

M.Induksi

M.Distribusi

M.Induksi

BC
+ 894,4

k=

- 286,9
+ 80,2

+ 40,1

- 25,7

+ 6,4
- 4,1

- 1,2

M.Induksi

M.Distribusi

M.Akhir

- 168,9

- 12,8

- 12,8

+ 12,8

+ 12,8
-

- 2,-

- 0,1

- 0,1

- 337,8

+ 337,8

- 4,1

+ 687,7

- 687,7

- 7,2

- 2,3

- 0,4

+ 0,2
- 0,1

- 0,1

- 624,2

+ 624,2

- 1,2

- 0,2

Perubahan

- 168,9

- 1 (Perubahan)
2

+
168,9

BC

BA
- 337,8

- 556,6
+103,4

+ 84,4

CB

CD
+ 206,7

- 206,7
+ 278,3

DC

+ 562,1

ED

DE

+ 270,2

+ 124,2

+ 62,1
- 62,1

- 135,1

- 103,4

- 31,-

Jumlah

- 253,4

- 453,2

+ 71,6

+ 71,6

+ 166,8

+ 93,2

re l = Jumlah

+ 113,3

+ 113,3

- 17,9

- 17,9

- 41,7

- 41,7

( -K)

Priksa

Priksa

Periksa ( Kontrol Geometri )


AB

+ 70,7
5

k=

+ 1,- 0,6

- 0,3
+ 0,3

- 14,4

- 0,3
+ 0,3

+ 0,2

+ 6,4

+ 2,-

ED
+ 500

- 2,-

+ 2,-

+ 1,- 0,6

- 2,3

- 0,4

+ 141,4

- 0,2

+ 253

+ 500

+ 126,5
+ 80,2

0,3585

DE

- 894,4

- 25,7

M.Distribusi
M.Induksi

DC

+ 40,1

- 894,4

M.Induksi

M.Distribusi
M.Induksi
M.Distribusi
M.Induksi
M.Distribusi

CD

+ 894,4
-

CB

- 573,8
5

- 14,4

- 7,2

M.Distribusi

0,3585

0,6415

Priksa

Ir.H.Kartono Hd

Ref: Chiu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

74

Mencari besarnya harga , k ( Determination of Ratio )


M

CB

H
H

M
V

BA

q = 0,6 k/ft

M
M

BC

CB

CD

CB

CD

BC

BC

H
AB

AB

CB

AB

+ M BA )

20
( 0,6.30 ) - H

Tinjau Batang DE:

Tinjau Batang CDE :


H CD = H E D = +
.30 - ( M

AB

+ M CB )

( 270 ) - 30 H

6+

( M AB + M BA )
20
=

( M AB + M B A )
20

12 -

-( M

CB

+ M CB )

AB

20
AB

+ M CB )

- 180 + 30 M

AB

20
-2M

20

-( M

20

BA

ED

20

( M AB + M BA )

ED

( M DE + M ED )

20

+ M AB + 3 M

20 '

( M AB + M BA )

= 18 - 6 -

AB

DE

( M DE + M ED )
20

H E D =+

DE

Tinjau Batang ABC:

+ 270 - 30.12 + 30.

40 '
( 0,6.20.10 ) + ( M

CB

DC

DC

Tinjau Batang AB :

( 0,6.30.15 ) - H

AB

10 '
H

DC

BA

V CB

CD

+ 30 M

BA

- 20 M

400
- 180

CB

40
Tinjau Batang CDE :

CD

+ H CD .30 - ( M
20
+ 30 M

+ M ED )

CD

DE

+ 30 M

ED

- 20 M

+ 30
=

CD

- 20 M

( M DE + M ED )
-( M
20
20
ED

+ M ED + 3 M

400

Persamaan keseimbangan :

1. H
2. V

CB
CB

CD

DE

+M

-2M

ED

CD

40

= H CD
= V CD

Ir . H. Kartono Hd

AB

- 20 M

CB

Ref: Chiu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

Persamaan keseimbangan :

1. H

CB

= H CD

1. H

CB

= H CD

2. V

CB

= V CD

(M

+ 12 -

+M

AB

BA

(M

=+

20

+M

DE

ED

ED

+ 3M

75

20

M AB + M BA + M DE + M ED = + 240
2. V

= V CD

CB

+M

+ 3M

AB

- 2M

BA

- 180

CB

40

+M

+ 3M

AB

+( M

-M

AB

- 2M

BA

ED

- 180

CB

) + 3( M

+M

CD

40

+M

+ 3M

ED

- M DE ) - 2 ( M

BA

- 2M

DE

DE

- 2M

CD

- M CD ) = + 180 -

CB

Subtitusi :
M AB = + 22,69 + 562,1.k

- 168,9.k

M BA = - 14,64 + 624,2.k

- 337,8.k

M CB = - 0,10 - 687,7.k

M CD = + 0,10 + 687,7.k

AB

+ M BA + M

DE

1 - 168,9 k
+
1 624,2 k

2 - 14,64 + 624,2 k
+
2 0 - 168,9 k

-M

ED

1 + 562,1 k

+ 679,6 k
AB

1 + 624,2.k
1 + 562,1.k
2

+ M ED = + 240

+ 22,69 + 562,1 k
- 0,02 - 337,8 k

2. + ( M
-

- 687,7.k
1

M DE = - 0,02 - 337,8.k
M ED = 0 - 168,9.k
1. M

+ 687,7.k

) + 3( M

BA

+ ( 22,69 + 562,1 k
+ 3 ( - 14,64 + 624,2.k
- 2 ( - 0,10 - 687,7.k

- M DE ) - 2 ( M
- 168,9 k
- 337,8.k
1
+
687,7.k
1

CB

- 337,8 k

+ 679,6 k

+ 6367,8 k
6367,8 x ( 1 ) = + 4327556,88 k

679,6 x ( 2 ) = + 4327556,88 k

= + 231,97 ------------> Persamaan ( 1 )

- M CD ) = + 180

- 0 + 168,9 k
- 562,1 k
1
+
0,02
+
337,8
k
2
- 0,10 - 687,7.k
2

= + 240

)
2
624,2
k
1
+
687,7.k
1

- 6367,8 k

)
)
= + 180
2
2

= + 200,77 ------------> Persamaan ( 2 )

+ 4327556,88 k

= + 1477138,566

- 4327556,88 k

= + 136443,292

+ 8655113,76 k

= + 1613581,858

(+)

k 1 = + 0,18643
Dari persamaan ( 1 ) = + 679,6 ( 0,18643)

+ 679,6 k

= + 231,97

k 2 = + 0,15490
M AB = + 22,69 + 562,1.k
M BA = - 14,64 + 624,2.k

- 168,9.k

- 337,8.k
1
1 +337,8.k

M BC = + 14,64 - 624,2.k
M CB = - 0,10 - 687,7.k

+ 687,7.k

M CD = + 0,10 + 687,7.k

= + 22,69 + 562,1.( 0,18643) - 168,9.( 0,15490) = + 101,32

= - 14,64 + 624,2.(0,18643 ) - 337,8.(0,15490 ) = + 49,41

= + 14,64 - 624,2.(0,18643 ) + 337,8.(0,15490 ) = - 49,41

2=

- 0,10 - 687,7.(0,18643) - 687,7.(0,15490) = - 21,79

- 687,7.k

2 = + 0,10 + 687,7.(0,18643)

M DC = - 0,02 + 337,8.k

- 624,2.k

2 = - 0,02 +

M DE = - 0,02 - 337,8.k

+ 624,2.k

M ED = 0 - 168,9.k

+ 562,1.k

- 687,7.( 0,15490) = + 21,79

337,8.(0,18643) - 624,2.(0,15490 ) = - 33,69

= - 0,02 - 337,8.(0,18643) + 624,2.(0,15490 ) = + 33,69

2 = 0 - 168,9.(0,18643) + 562,1.(0,15490 ) = + 55,58

Ir . H. Kartono Hd

The Moment Distribution Method

Ref : Soal 83

q = 0,6 k/ft

21,79 k-ft

21,79 k-ft

21,79 k-ft
4,46 k

49,41 k-ft
1,54 k

2,83 k

33,69 k-ft

Cos

4,46 k

2,83 k

= 2,83 k

= 2,83 k

33,69 k-ft
4,46 k

1,54 k

33,69 k-ft

49,41 k-ft

101,32 k-ft

55,58 k-ft

13,54 k
55,58 k-ft

101,32 k-ft
H

= 13,54 k

=0

+ H A .20 - 1/2.0,6.20

M
+H

D
E

Tinjau batang ABC :

H= 0

H B =+1

,54 k

=0

H E = + 4,46 k

=0

H D = + 4,46 k

; 13,54 + 4,46 - 0,6 . 30 = 18 - 18 = 0 ( OK)

=0

+ V A .20 - 1/2.0,6.30
Tinjau batang CDE :

-101,32 - 49,41 = 0

=0

+ H D .20 - 55,58 - 33,69


Kontrol :

H A = + 13,54 k

=0

.20 - 55,58 - 33,69


E

-101,32 - 49,41 = 0

=0

+ H B .20 + 1/2.0,6.20
Tinjau batang DE :

V E = 2,83 k

= 2,83 k

Tinjau batang AB :

-101,32 - 49,41 + 49,41 + 13,54.30 = 0

V A = - 2,83 k

=0

- V B .20 + 4,46.30

- 55,58 - 33,69 + 33,69 - 21,79 = 0

V B = + 2,83 k
Ir.H.Kartono Hd

= 0,8944

Sin = 0,4472

49,41 k-ft
q = 0,6 k/f t

76

Ref: Chu Kia Wang, Statically Indeterminate Structures

= 4,46 k

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate Structures

Ref: Soal 83

Cos
21,79 k-ft

= 0,8944

Sin = 0,4472

21,79 k-ft

77

q = 0,60 k/ft

33,69 k-ft

49,41 k-ft

101,32 k-ft

55,58 k-ft

= 13,54 k

(+)

(-)

+ 4,52 k

- 4,52 k

2,83 cos

= 2,83 k

D B = - 2,83 cos

+ 1,54 sin

= - 1,84 k

D C = + 2,83 cos

+ 4,46 sin

= + 4,52 k

+ 4,46 k

-1,84 k
(+)

Kontrol : D

(+)

Bidang D

+D C =0

- Q sin

+ 4,52 = - 1,84 - 2,68 + 4,52= 0 ( ok)

- 1,84 - 0,6.10.sin
+ 13,54 k

4,46 sin

= 4,46 k

E
+ 4,52 k

4,46 k

2,83 k
H

= 2,83 k

+ 1,54 k

2,83 sin

4,46 cos

+ 4,46 k

- 21,79 k-ft
(- )

1,54 cos
- 33,69 k-ft

(+)

(+)

+ 49,41 k-ft

2,83 sin

1,54 k
1,54 sin

2,83 cos

(+)

(+ )

- 101,32 k-ft

2,83 k

+ 55,58 k-ft

Bidang M
- 2,73k
(-)
(+)

+ 2,64 k

(-)

- 2,73k
- 2,83 k

(+)

(+)

+ 2,83 k

N C = + 2,83 sin

- 4,46 cos

N B = + 2,83 sin

+ 1,54 cos

= - 2,73 k

(-)

Bidang N

= + 2,64 k

- 2,83 k

Ir.H.Kartono Hd

The Moment Distribution Method

Ref: Chu Kia Wang, Statically Indeterminate structures

Ref: Soal 82 + 83

q = 1,2 k/ft

78

q = 1,2 k/ft

Sin = 0,4472

41,02 k-ft
q = 0,6 k/ft

41,02 k-ft

41,02 k-ft
12,66 k

45,83 k-ft
2,83 k

6,66 k

45,83 k-ft

= 0,8944

Cos

128,93 k-ft
12,66 k

2,83 k

21,17 k

128,93 k-ft

26,83 k

q = 0,6 k/ft

12,66 k

6,66 k

128,93 k-ft

45,83 k-ft

32,67 k-ft

124,23 k-ft
5,34 k
32,67 k-ft

124,23 k-ft
H

Tinjau batang AB :

H A = + 5,34 k

-32,67 + 45,83 = 0

H B = + 6,66 k

+ H B .20 + 1/2.0,6.20

+H

- 32,67 + 45,83 = 0

=0

=0

.20 - 124,23 - 128,93

=0

H= 0

- 32,67 - 1/2.1,2.20

V=0

- 41,0

2 + 5,34 .30 = 0

V A = + 21,17 k

=0

- V B .20 - 124,23 + 12,66.30


Kontrol :

H D = + 12,66 k

=0

+ V A .20 - 1/2.0,6.30
Tinjau batang CDE :

=0

; 5,34 + 12,66 - 0,6 . 30 = 18 - 18 = 0 ( OK)

Tinj au batang ABC :

H E = - 12,66 k

=0

+ H D .20 - 124,33 - 128,93


Kontrol :

= 12,66 k

=0

+ H A .20 - 1/2.0,6.20

Tinjau batang DE :

V E = 26,83 k

= 21,17 k

= 5,34 k

+ 1/2.1,2.20

+ 41,02 = 0

V B = + 26,83 k

; 21,17 + 26,83 - 1,2 . 40 = 48 - 48 = 0 ( OK)


Ir.H.Kartono Hd

Cos

Ref: Soal 82 + 83

= 0,8944

Sin = 0,4472

6,66 cos

21,17 sin

79

Ref: Chu Kia Wang, Statically Indeterminate Structures

The Moment Distribution Method

6,66 k

6,66 sin

21,17 cos

D B = + 21,17 cos

- 6,66 sin

= + 15,96 k

N B = - 21,17 sin

- 6,66 cos

D C = + 2,83 cos

+ 12,66 sin

N C = + 2,83 sin

- 12,66 cos

= - 10,06 k

D C = - 2,83 cos

+ 12,66 sin

= + 3,13 k

N C = - 2,83 sin

- 12,66 cos

= - 12,60 k

= - 15,42 k

21,17 k

12,66 cos

C
2,83 sin

12,66 k

2,83 k

12,66 sin

2,83 cos

12,66 k

2,83 sin

2,83 k

2,83 cos

12,66 cos

12,66 k
12,66 sin
26,83 cos

12,66 cos

12,66 sin

= + 8,19 k

D
26,83 sin

D D = + 26,83 cos

- 12,66 sin

= + 18,33 k

N D = - 26,83 sin

- 12,66 cos

= - 23,32 k

26,83 k

Ir.H.Kartono Hd

The Moment Distribution Method

80

Ref: Chu Kia Wang, Statically Indeterminate Structures

Ref: Soal 82 + 83
Kontrol Gaya Lintang :
Kontrol :

q = 1,2 k/ft

Batang BC :
q = 0,6 k/ft

Q 2 sin

Q 1 cos

Q 1 sin

+ Q 2 cos

-D B -D C

= 6 sin

+ 24

- 15,96 - 8,19

cos

= 24,15 - 24,15 = 0 ( OK)


Q 1 = 0,6.10 = 6 k

Q 1 sin
Q 2 cos
Q 2 = 1,2.20 = 24 k
q = 1,2 k/ft

Batang CD :

Kontrol :
Q 3 sin
Q 3 cos

+ Q 3 cos

= + 24

cos

-D C -D D
- 3,13 - 18,33

= 21,46 - 21,46 = 0 ( OK)


Q 3 = 1,2.20 = 24 k

Menghitung moment lapangan maksimum


Tinj au batang AB

M Maksimum

terjadi pada titik dimana D

=0

D X = + 5,34 - 0,60 X = 0 -----------> X = 8,90 ' dari titik A


M Maksimum

= + 5,34.8,90 - 32,67 - 1/2 . 0,6.8,90

- 8,91 k-ft

Tinj au batang BC

M Maksimum
D

terjadi pada titik dimana D

= + 15,96 - 0,60 sin

M Maksimum

X - 1,20 . cos

=0
.X = 0 -----------> X = 11,90 ' dari titik B
2

.11,90

= + 15,96.11,90 - 45,83 - 1/2.0,6.sin

- 1/2.1,2.cos

. 11,90

= + 49,10 k-ft

Tinj au batang CD

M Maksimum

terjadi pada titik dimana D

D X = + 3,13 - 1,20 . cos


M Maksimum

= + 3,13.. 2,92 + 41,02

=0

.X = 0 -----------> X = 2,92 ' dari titik C


- 1/2.1,2.cos

. 2,92

= + 45,58 -ft
Ir.H.Kartono Hd

The Moment Distribution Method

81

Ref: Chu Kia Wang, Statically Indeterminate Structures


q = 1,2 k/f t

Ref: Soal 82 + 83
C

41,02 k-ft

41,02 k-ft

Sin = 0,4472

q = 0,60 k/ft

128,93 k-ft

45,83 k-ft

32,67 k-ft
H

= 0,8944

Cos

124,23 k-ft

= 5,34 k

= 21,17
k

+3,13 k

= 12,66k

= 26,83
k

(+)

(-)

+ 15,96k

- 8,19 k

(+)

(-)

+ 12,66k

(-)

- 6,66 k

- 18,33k

D B = + 21,17 cos

- 6,66 sin

= + 15,96 k

D C = + 2,83 cos

+ 12,66 sin

= + 8,19 k

D C = - 2,83 cos

+ 12,66 sin

= + 3,13 k

(+)
(+)

+ 5,34 k

D D = + 26,83 cos

+ 12,66 k

- 12,66 sin

= + 18,63 k

Bidang D
+ 41,02 k-ft
(+)

- 45,83 k-ft

(+)

- 128,93 k-ft

(-)

(-)

+ 49,10 k-ft

(-)

+ 45,58 k-ft

(-)

M A = + 68,65 - 101,32 = - 32,67 k-ft


M B = - 95,24 + 49,41 = - 45,83 k - ft

- 8,91 k-ft

M C = + 62,81 - 21,79 = + 41,02 k-ft

(+)

- 32,67 k-ft

M E = + 68,75 + 55,58 = + 124,23 k-ft

- 12,60k

- 10,06k
-15,42 k

M D = - 95,24 - 33,69 = - 128,93 k-ft

+ 124,23 k-ft

Bidang M

(-)

(-)

- 23,32k

N B = - 21,17 sin

- 6,66 cos

= - 15,42 k

N C = + 2,83 sin

- 12,66 cos

= - 10,06 k

N C = - 2,83 sin

- 12,66 cos

= - 12,60 k

- 26,83 k

(-)

(-)

Bidang N
- 21,17 k

N D = - 26,83 sin

- 12,66 cos

- 26,83 k

Ir.H.Kartono Hd

= - 23,32 k