You are on page 1of 62

Proposed Two-Storey Residential Building with Roofdeck

II. Rebar Works

I. Concreting Works
PRICE LIST
MATERIAL
LAFARGE REPUBLIC PORTLAND PLUS 40KG

WASHED SAND
CRUSHED GRAVEL 1"

PRICE
203.00
600.00

MATERIAL
/bag
/m

10 mm
12 mm

850.00

/m

16 mm

Concreting of Column Footing

#16 G.I. WIRE


5.4

WIDTH

1.5

LENGTH
HEIGHT/THICKNESS

1.5
0.2

NUMBER OF CF

12
CEMENT

48.6

40 kg./bag Portland
Cement

MATERIAL COST

LABOR COST

9865.8

2959.74

TOTAL COST

12825.54
2375.1

REINFORCEMEN

Total Length for of RSB for Colu

DIMENSIONS

DIMENSIONS

CONCRETE MIXTURE
CLASS A

Total Volume of Column Footing (m)

16 mm x 6

/m
105.6

SAND
2.7
MATERIAL COST

TOTAL COST

m of Washed Sand

1620

LABOR COST

486

MATERIAL COS

LABOR COST

2106

390

COST
/m

NUMBER OF INTERSEC

GRAVEL

5.4

m of Crushed Gravel 1"

MATERIAL COST

LABOR COST

4590

1377

NUMBER OF FOOT

TOTAL COST

LENGTH OF TIE W

5967

1105

302.4

MATERIAL COS
LABOR COST

/m

Concreting of Column
11.56

DIMENSIONS

WIDTH

0.25

LENGTH

0.4

CONCRETE MIXTURE
CLASS A

Total Volume of Column (m)

TOTAL COST

REINFORCEMEN

Total Length for of RSB for Colu

6.8

NUMBER OF COLUMN

17

CONCRETE MIXTURE
CLASS A

DIMENSIONS

HEIGHT/THICKNESS

104.04

40 kg./bag Portland
Cement

MATERIAL COST

LABOR COST

21120.12

6336.036

DIMENSIONS

CEMENT
TOTAL COST

Total Length for of RSB for Colu

27456.156
2375.1

/m

16 mm x 6

SAND
5.78

m of Washed Sand

MATERIAL COST

LABOR COST

3468

1040.4

9.9

TOTAL COST

MATERIAL COS

4508.4

LABOR COST

390

COST

/m

GRAVEL
11.56

TOTAL COST

m of Crushed Gravel 1"

MATERIAL COST

NUMBER OF INTERSEC

LABOR COST

9826

2947.8

NUMBER OF FOOT

LENGTH OF TIE W

12773.8

24.3

1105

/m

MATERIAL COS

Concreting of Wall Footing

LABOR COST

DIMENSIONS

CONCRETE MIXTURE
CLASS A

Total Volume of Wall Footing (m)

4.4925

WIDTH

0.5

THICKNESS

0.15

LENGTH OF WF1

59.9

TOTAL COST

REINFORCE
Total Length for of RSB for

CEMENT
40 kg./bag Portland
Cement

MATERIAL COST

LABOR COST

8207.7975

2462.33925

TOTAL COST

10670.13675
2375.1

/m

SAND
2.24625

1347.75

LABOR COST

404.325

16 mm x 6
119.68

TOTAL COST

m of Washed Sand

MATERIAL COST

DIMENSIONS

40.4325

MATERIAL COS

1752.075
390

LABOR COST
/m

COST

NUMBER OF LATERA

GRAVEL
4.4925
MATERIAL COST

TOTAL COST

m of Crushed Gravel 1"

3818.625

LABOR COST

1145.5875

NUMBER OF RS

NUMBER OF COLU

4964.2125
1105

LENGTH OF TIE W

/m

1180.8

Concreting of Beam

MATERIAL COS
16.9425
0.5
0.15

WIDTH

DIMENSIONS

CONCRETE MIXTURE CLASS


A

Total Volume of Beam (m)

THICKNESS
LENGTH OF FTB-1

225.9
34.95

LENGTH OF RCB-1

190.95

LENGTH OF BEAMS

152.4825

40 kg./bag Portland
Cement

MATERIAL COST

LABOR COST

30953.9475

9286.18425

TOTAL COST

40240.13175
80480.2635

5082.75

LABOR COST

1524.825

14401.125

LABOR COST

4320.3375

MATERIAL COS

LABOR COST

6607.575
13215.15

COST
/m

TOTAL COST

LENGTH OF COLUMN LATE

NUMBER OF COLU

NUMBER OF LATERA

18721.4625
37442.925

NUMBER

/m

Concreting of Slab (GF)

SPACING
REMAINING LENGTH

SPACING

14.3445

DIMENSIONS

THICKNESS

0.15

TOTAL AREA

95.63

CONCRETE MIXTURE
CLASS A

Total Volume of Slab (m)

16 mm x 6

PERIMETER OF COL

m of Crushed Gravel 1"

MATERIAL COST

Total Length for of RSB for

TOTAL COST

GRAVEL
16.9425

REINFORCE

9.97

m of Washed Sand

MATERIAL COST

/m

SAND
8.47125

TOTAL COST

DIMENSIONS

CEMENT

LABOR COST

10 mm x 6
166.12

MATERIAL COS
LABOR COST

COST

CEMENT
40 kg./bag Portland
Cement

86.067
MATERIAL COST

LABOR COST

17471.601

5241.4803

TOTAL COST

NUMBER OF LATERA

22713.0813

NUMBER OF RS

1583.4

NUMBER OF COLU

/m

LENGTH OF TIE W

SAND
7.17225

m of Washed Sand

MATERIAL COST

LABOR COST

4303.35

1291.005

98.4

TOTAL COST

MATERIAL COS

5594.355

LABOR COST

390

/m

TOTAL COST

GRAVEL

14.3445

m of Crushed Gravel 1"

MATERIAL COST

LABOR COST

12192.825

3657.8475

REINFORCE

TOTAL COST

15850.6725

Total Length of RSB for Wal

1105

/m

35.23545

DIMENSIONS

THICKNESS

0.15

TOTAL AREA

234.903

CONCRETE
MIXTURE CLASS A

Total Volume of Slab (m)

CEMENT
317.11905

40 kg./bag Portland
Cement

MATERIAL COST

64375.16715

LABOR COST

19312.550145

10570.635

LABOR COST

3171.1905

MATERIAL COS

LABOR COST

83687.717295
2375.1

COST

m of Crushed Gravel 1"

10 mm x 6

/m

TOTAL COST

13741.8255

390

GRAVEL
35.23545

32.95

18.49

m of Washed Sand

MATERIAL COST

12 mm x 6

TOTAL COST

SAND
17.617725

DIMENSIONS

Concreting of Slab (2F and RD)

MATERIAL COS

LABOR COST
COST
/m

NUMBER OF HOOP B

NUMBER OF RS

TOTAL COST

LENGTH OF TIE W

35.23545

m of Crushed Gravel 1"

MATERIAL COST

LABOR COST

29950.1325

8985.03975

38935.17225

1105

180.6

MATERIAL COS

/m

LABOR COST

Concreting of Stairs

TOTAL COST
0.9

LENGTH
HEIGHT/THICKNESS
NUMBER OF STEPS

CEMENT
40 kg./bag Portland
Cement

8.1
MATERIAL COST

1644.3

LABOR COST

493.29

TOTAL COST

REINFORCEMENT

Total Length of RSB fo


DIMENSIONS

1.5
0.2
0.2
15

WIDTH

DIMENSIONS

CONCRETE MIXTURE
CLASS A

Total Volume of Column (m)

12 mm x 6

2137.59
41.94

2375.1

/m

MATERIAL COS

SAND
0.45

m of Washed Sand

MATERIAL COST

LABOR COST

270

81

LABOR COST
TOTAL COST

COST

351
390

Total Length of Stirrups

PERIMETER OF FT
10 mm x 6

/m

GRAVEL
0.9

m of Crushed Gravel 1"

MATERIAL COST

765

LABOR COST

229.5

61.16

TOTAL COST

MATERIAL COS

994.5
1105

LABOR COST
COST

/m

NUMBER OF STIRR
NUMBER OF RS

LENGTH OF TIE W
550.4625

MATERIAL COS

LABOR COST
TOTAL COST

REINFORCEMENT

REINFORCEMENT

Total Length of RSB fo


DIMENSIONS

16 mm x 6
305.52

MATERIAL COS

LABOR COST
COST

Total Length of Stirrups f

PERIMETER OF RC
10 mm x 6
334.16

MATERIAL COS

LABOR COST
COST

NUMBER OF STIRR
NUMBER OF RS

LENGTH OF TIE W
4009.95

MATERIAL COS

LABOR COST
TOTAL COST

REINFORCEM

Total Length of RSB for


A
B

LENGTH OF RS
ALONG A
ALONG B

12 mm x 6
257.91

MATERIAL COS

LABOR COST
COST

NUMBER OR INTERSE

LENGTH OF TIE W

1310.4

MATERIAL COS

LABOR COST
TOTAL COST

REINFORC

Total Length of 12mm

NUMBER OF STEEL

AREA
12 mm x 6
144.74

MATERIAL COS

LABOR COST
COST

Total Length of 10mm

NUMBER OF STEEL

AREA
10 mm x 6
144.74

MATERIAL COS

LABOR COST
COST

NUMBER OR INTERSE

LENGTH OF TIE W

80.886

MATERIAL COS

LABOR COST
TOTAL COST

II. Rebar Works

III. Masonry Works


PRICE LIST

PR

MATERIAL

REINFORCEM
ENT BARS

10 mm
12 mm
16 mm

#16 G.I. WIRE

PRICE
125.00
192.00

MATERIAL
/pc
/pc

CONCRETE HOLLOW BLOCK 5" T

315.00

/pc

LAFARGE REPUBLIC PORTLAND PLUS 40

180.00

/kg

CONCRETE HOLLOW BLOCK 4" T

WASHED SAND
CRUSHED GRAVEL 1"

REINFORCEMENT BARS FOR COLUMN FOOTING (F1)

CONCRETE HOLLOW B
633.6

LENGTH

3.3

NUMBER OF RSB

ALONG (B)

1.5

ALONG (L)

1.5

12

NUMBER OF FOOTING (F1)

16 mm x 6m
REINFORCEMENT STEEL
BAR

Total Length for of RSB for Column Footing (m)

Total Area of Exterior Walls (m


GROUND FLOOR
SECOND FLOOR

CONCRETE HOLLOW BLOCK 5" T

CEMENT M

16 mm x 6m REINFORCEMENT STEEL BAR


105.6

pcs

MATERIAL COST
LABOR COST
COST

CEMENT

TOTAL COST

SAND

43243.2
33264
9979.2

19219.2

PLASTERING @

AREA OF WALLS (TWO SIDES


CEMENT
/m

SAND
TOTAL COST
MATERIAL COST

#16 G.I. WIRE


NUMBER OF INTERSECTIONS

63

NUMBER OF FOOTING

16

LENGTH OF TIE WIRE

302.4

meters

CHB 5" THK

0.3

5.71

kg.

MATERIAL COST
LABOR COST

1027.0188679245
308.1056603774

TOTAL COST

1335.1245283019

SAND

CHB 5" THK


CEMENT
SAND

CONCRETE HOLLOW B

/m

593.3886792453

Total Area of Interior Walls (m

REINFORCEMENT BARS FOR COLUMN FOOTING (F2)


59.4

16 mm x
REINFORCEME
BAR

Total Length for of RSB for Column Footing (m)

CEMENT

GROUND FLOOR

59.4

LENGTH

3.3

NUMBER OF RSB

ALONG (B)

1.5

ALONG (L)

1.5

NUMBER OF FOOTING (F1)

16 mm x 6m
REINFORCEMENT STEEL
BAR

Total Length for of RSB for Column Footing (m)

SECOND FLOOR

CONCRETE HOLLOW BLOCK 4" T

CEMENT M
CEMENT
SAND

PLASTERING @

16 mm x 6m REINFORCEMENT STEEL BAR


9.9

pcs

MATERIAL COST
LABOR COST
COST

AREA OF WALLS (TWO SIDES

TOTAL COST

CEMENT

4054.05
3118.5
935.55

SAND
TOTAL COST
MATERIAL COST

68.25

/m

CHB 5" THK

#16 G.I. WIRE

CEMENT

NUMBER OF INTERSECTIONS

81

NUMBER OF FOOTING

LENGTH OF TIE WIRE

24.3

meters

SAND

CHB 5" THK

0.3

0.46

kg.

CEMENT
SAND

Total Length of RSB for Vertical B

MATERIAL COST

82.5283018868

LABOR COST

24.758490566

TOTAL WIDTH OF WALLS

TOTAL COST

107.2867924528

SPACING

/m

47.6830188679

LENGTH
12 mm x 6m REIN

REINFORCEMENT BARS FOR COLUMN (C1)

67.5229166667
16 mm x 6m
REINFORCEMENT STEEL
BAR

Total Length for of RSB for Column (m)

718.08

LENGTH OF COLUMN

6.8

NUMBER OF RSB/COLUMN

NUMBER OF COLUMN
16
16 mm x 6m REINFORCEMENT STEEL BAR
119.68

LABOR COST
COST

12964.4
COST

Total Length of RSB for Horizontal


HEIGHT OF WALL

WIDTH
10 mm x 6m REIN

49008.96
37699.2
11309.76
68.25

#16 G.I. WIRE

TOTAL COST

pcs

MATERIAL COST

MATERIAL COST

8.98
/m

MATERIAL COST
LABOR COST

NUMBER OF LATERAL TIES

41

NUMBER OF RSB

NUMBER OF COLUMN

16

LENGTH OF TIE WIRE

1180.8

meters

COST

0.3

/m

22.28

kg.

MATERIAL COST

4010.2641509434

LABOR COST

1203.079245283

TOTAL COST

5213.3433962264

766.6681465039

/m

REINFORCEMENT BARS FOR COLUMN (C2)


16 mm x 6m
REINFORCEMENT STEEL
BAR

Total Length for of RSB for Column (m)

59.84

LENGTH OF COLUMN

6.8

NUMBER OF RSB/COLUMN

1
NUMBER OF COLUMN
16 mm x 6m REINFORCEMENT STEEL BAR
9.97

pcs

MATERIAL COST
LABOR COST
COST

TOTAL COST

4084.08
3141.6
942.48
68.25

/m
996.71

LENGTH OF COLUMN LATERAL TIES (m)

1.3

PERIMETER OF COLUMN
NUMBER OF COLUMN

17

NUMBER OF LATERAL TIES

40.5

NUMBER

11

SPACING

0.1

REMAINING LENGTH

5.7

SPACING

TOTAL NUMBER OF LATERAL TIES

41

0.2
10 mm x 6m REINFORCEMENT STEEL BAR

166.12
MATERIAL COST
LABOR COST

pcs

TOTAL COST

26994.2291666667
20764.7916666667
6229.4375

COST

27.0833333333

/m

#16 G.I. WIRE


NUMBER OF LATERAL TIES

41

NUMBER OF RSB

8
1

NUMBER OF COLUMN
LENGTH OF TIE WIRE

98.4

meters

0.3

/m

1.86

kg.

MATERIAL COST
LABOR COST
TOTAL COST

334.1886792453
100.2566037736
434.4452830189

63.8890122087

/m

REINFORCEMENT BARS FOR WALL FOOTING


197.67

NUMBER OF RSB

LENGTH OF WALL FOOTING

59.9

Total Length of Hoop Bars (m)

110.92

SPACING OF HOOP BARS

0.3

12 mm and 10 mm
REINFORCEMENT STEEL BARS

Total Length of RSB for Wall Footing (m)

0.5
12 mm x 6m REINFORCEMENT STEEL BAR

WIDTH OF HOOP BARS

32.95

TOTAL COST

pcs

MATERIAL COST
LABOR COST
COST

8223.072
6325.44
1897.632
41.6

/m

10 mm x 6m REINFORCEMENT STEEL BAR


18.49

TOTAL COST

pcs

MATERIAL COST
LABOR COST
COST

3003.9930555556
2310.7638888889
693.2291666667

27.0833333333

/m

#16 G.I. WIRE


NUMBER OF HOOP BARS

200.67

NUMBER OF RSB

LENGTH OF TIE WIRE

0.3

180.6

meters

3.41

kg.

LABOR COST

184.0075471698

TOTAL COST

797.3660377358

MATERIAL COST

613.358490566

13.3116199956

/m

REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)


Total Length of RSB for FTB-1

251.64

NUMBER OF RSB

TOP BARS

6
3

BOTTOM BARS

3
m

TOTAL LENGTH OF FTB-1


34.95
12 mm x 6m REINFORCEMENT STEEL BAR
41.94

pcs

MATERIAL COST
LABOR COST
COST

TOTAL COST

10468.224
8052.48
2415.744
41.6

Total Length of Stirrups for FTB-1

/m
366.975

1.2
PERIMETER OF FTB-1
10 mm x 6m REINFORCEMENT STEEL BAR
61.16

pcs

MATERIAL COST
LABOR COST
COST

TOTAL COST

9938.90625
7645.3125
2293.59375

284.375

/m

#16 G.I. WIRE


NUMBER OF STIRRUPS
NUMBER OF RSB

305.8125
6

LENGTH OF TIE WIRE

0.3

550.4625

meters

MATERIAL COST
LABOR COST
TOTAL COST
810.1146226415

10.39

kg.

1869.4952830189
560.8485849057
2430.3438679245
/m

REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)


Total Length of RSB for RCB-1

1833.12

2
3
3

WEB BARS
TOP BARS
BOTTOM BARS

TOTAL LENGTH OF RCB-1


190.95
16 mm x 6m REINFORCEMENT STEEL BAR
305.52

pcs

MATERIAL COST
LABOR COST
COST

TOTAL COST

125110.44
96238.8
28871.64
68.25

Total Length of Stirrups for RCB-1

/m
2005.0

1.2
PERIMETER OF RCB-1
10 mm x 6m REINFORCEMENT STEEL BAR
334.16

pcs

MATERIAL COST
LABOR COST
COST

TOTAL COST

54301.40625
41770.3125
12531.09375

284.375

/m

#16 G.I. WIRE


NUMBER OF STIRRUPS
NUMBER OF RSB

1670.8125
8

LENGTH OF TIE WIRE

0.3

4009.95

meters

75.66

MATERIAL COST
LABOR COST
TOTAL COST

kg.

13618.6981132075
4085.6094339623
17704.3075471698

92.7169811321

/m

REINFORCEMENT FOR GROUND FLOOR SLAB


Total Length of RSB for GF Slab
7.05

13.5

SPACING
0.15

1547.46

ALONG A

48

ALONG B

91
m

LENGTH OF RSB
ALONG A

1289.55
648

ALONG B

641.55

m
m

12 mm x 6m REINFORCEMENT STEEL BAR


257.91

TOTAL COST

pcs

MATERIAL COST
LABOR COST
COST

64374.336
49518.72
14855.616

14.7377142857

/m

#16 G.I. WIRE


4368

NUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE

1310.4

meters

0.3

24.72

kg.

MATERIAL COST
LABOR COST
TOTAL COST

4450.4150943396
1335.1245283019
5785.5396226415

1.3245283019

/m

REINFORCEMENT FOR 2F AND RD SLAB


Total Length of 12mm RSB

868.45
3.221

AREA
269.62
12 mm x 6m REINFORCEMENT STEEL BAR

NUMBER OF STEEL BARS

144.74

TOTAL COST

pcs

MATERIAL COST
LABOR COST
COST

36127.354432
27790.27264
8337.081792

133.9936

/m

Total Length of 10mm RSB

868.45
3.221

AREA
269.62
10 mm x 6m REINFORCEMENT STEEL BAR

NUMBER OF STEEL BARS

144.74

TOTAL COST

pcs

MATERIAL COST
COST

LABOR COST

23520.4130416667
18092.6254166667
5427.787625

87.2354166667

/m

#16 G.I. WIRE


NUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE

269.62
0.3

80.886

meters

MATERIAL COST
LABOR COST
TOTAL COST
1.3245283019

1.53

kg.

274.7071698113
82.4121509434
357.1193207547
/m

orks

III. Formworks
PRICE LIST

PRICE LIST

MATERIAL

RETE HOLLOW BLOCK 5" THK

RETE HOLLOW BLOCK 4" THK

GE REPUBLIC PORTLAND PLUS 40KG

WASHED SAND

CRUSHED GRAVEL 1"

PRICE
9.00
8.00

MATERIAL
/pc
/pc

Form Lumber 2" x 3" x 12' Coco Lumber

203.00

/bag

1/2"x4'x8' Ordinary Plywood

600.00

/m

850.00

/m

Form Lumber 2" x 2" x 12' Coco Lumber

FORMS FOR COLUMN


SIDES OF THE COLUMN
SHORTER SIDE

CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)

l Area of Exterior Walls (m)

LONGER SIDE

167.929

LATERAL PERIMETER OF THE COLUMN

GROUND FLOOR

85.3155

COLUMN HEIGHT

SECOND FLOOR

82.6135

NUMBER OF COLUMNS

2099.1125

RETE HOLLOW BLOCK 5" THK

TOTAL AREA

pcs.

1/2"x4'x8' Ordinary Plywood

CEMENT MORTAR (CLASS C)


CEMENT

1601.62

bag

TOTAL COST

SAND

177.17

MATERIAL COST

PLASTERING @ 12mm THK (CLASS B)

A OF WALLS (TWO SIDES)


CEMENT
SAND
TOTAL COST
MATERIAL COST

18892.0125
334947.2370685
108717.23

CHB 5" THK


CEMENT
SAND

LABOR COST

335.86

48.36

bag

4.03

42.651
WOOD FRAME OF COLUMNS

601323.43
LABOR COST

5667.60375

MATERIAL COST

100484.17112055

LABOR COST

Form Lumber 2" x 2" x 12' Coco Lumber


TOTAL COST

32615.17038
146.25
2592.94945
841.62

CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)

/m
/m
/m

29.000

SCAFFOLDING FOR COLUMNS


HORIZONTAL BRACES
VERTICAL BRACES
DIAGONAL BRACES

al Area of Interior Walls (m)


GROUND FLOOR

150.005
65.2

Form Lumber 2" x 2" x 12' Coco Lumber

SECOND FLOOR

84.805
1875.0625

RETE HOLLOW BLOCK 4" THK

TOTAL COST
MATERIAL COST

pcs.

LABOR COST

CEMENT MORTAR (CLASS C)


CEMENT

1430.67

bag

SAND

158.26

Form Lumber 2" x 3" x 12' Coco Lumber

PLASTERING @ 8mm THK (CLASS B)

A OF WALLS (TWO SIDES)

1675.960

TOTAL COST

300.01

MATERIAL COST

CEMENT

28.80

bag

LABOR COST

SAND
TOTAL COST

2.40

MATERIAL COST

529966.92
LABOR COST

15000.5
296273.1504425
96393.21

CHB 5" THK


CEMENT
SAND

ength of RSB for Vertical Bars

4500.15

TWO SIDE FORMS

88881.94513275

BOTTOM FORM

28917.9639

LENGTH OF BEAM

130

/m

2567.61505

/m

835.38

/m
m

OTAL WIDTH OF WALLS

107.77

SPACING

0.8

LENGTH
3.00
12 mm x 6m REINFORCEMENT STEEL BAR

229166667

MATERIAL COST

1/2"x4'x8' Ordinary Plywood


TOTAL COST
MATERIAL COST
LABOR COST

Form Lumber 2" x 3" x 12' Coco Lumber

16853.72

TOTAL COST

ngth of RSB for Horizontal Bars

LABOR COST
/m

53.885

HEIGHT OF WALL

MATERIAL COST

3889.32

156.3860072376

m
3

WIDTH
107.77
10 mm x 6m REINFORCEMENT STEEL BAR
pcs

TOTAL COST

42.651
WOOD FRAME OF COLUMNS

LABOR COST

12964.4

MATERIAL COST
LABOR COST

TOTAL AREA

TOTAL COST

pcs.

66.733
FORMS FOR BEAM
PERIMETER OF TWO SIDES FORM

405.1375

8.98

1459.3854166667
1122.6041666667
336.78125

55.126

SCAFFOLDING FOR COLUMNS


HORIZONTAL BRACES
VERTICAL BRACES

Form Lumber 2" x 2" x 12' Coco Lumber


TOTAL COST
MATERIAL COST
LABOR COST

27.0833333333

/m

47.165
Form Lumber 2" x 3" x 12' Coco Lumber
TOTAL COST
MATERIAL COST
LABOR COST

90.316

PRICE LIST

MATERIAL

" x 3" x 12' Coco Lumber

" x 2" x 12' Coco Lumber

Ordinary Plywood

PRICE
132.00
88.00

/pc
/pc

320.00

/pc

FORMS FOR COLUMN

OF THE COLUMN

0.65

ORTER SIDE

0.25
0.4

m
m

1.5

NGER SIDE

METER OF THE COLUMN

UMN HEIGHT

6.8

R OF COLUMNS

17

OTAL AREA

Ordinary Plywood

OTAL COST

ERIAL COST

BOR COST

173.4

17.7780511811

pcs

7395.67
5688.98
1706.69

42.651

/m

WOOD FRAME OF COLUMNS

ERIAL COST

BOR COST

pcs

x 2" x 12' Coco Lumber


OTAL COST

43.956

5028.59
3868.15
1160.44

29.000

/m

SCAFFOLDING FOR COLUMNS

ICAL BRACES

809.2

ONAL BRACES

1352.52

x 2" x 12' Coco Lumber

2540.310

bd. Ft. bd. Ft.

2427.6

bd. Ft. bd. Ft.

ONTAL BRACES

OTAL COST

ERIAL COST

BOR COST

290611.46
223547.28
67064.18

1675.960

/m

OTAL COST

ERIAL COST

BOR COST

bd. Ft.

67.433

x 3" x 12' Coco Lumber

11571.56
8901.20
2670.36

66.733
FORMS FOR BEAM

/m
0.95

0.25

TTOM FORM

0.35

GTH OF BEAM

225.9

214.605

22.003

pcs

OF TWO SIDES FORM


SIDE FORMS

OTAL AREA

Ordinary Plywood

OTAL COST

ERIAL COST

BOR COST

9153.10
7040.85
2112.25

42.651

/m

WOOD FRAME OF COLUMNS

OTAL COST

ERIAL COST

BOR COST

bd. Ft.

68.942

x 3" x 12' Coco Lumber

11830.38
9100.29
2730.09

55.126

/m

SCAFFOLDING FOR COLUMNS


88.4775

ICAL BRACES

112.95

BOR COST

pcs

88.478

x 2" x 12' Coco Lumber

OTAL COST
ERIAL COST

bd. Ft. bd. Ft.

ONTAL BRACES

10121.83
7786.02
2335.81

47.165

/m

OTAL COST
ERIAL COST

BOR COST
90.316

bd. Ft.

112.950

x 3" x 12' Coco Lumber

19382.22
14909.40
4472.82
/m

TWO STOREY RESIDENTIAL BUILDIN

BILL OF MATERIAL
I.D. NO

DESCRIPTION
GENERAL REQUIREMENTS
Mobilization/Temporary Structures, Utilities
and Services/Demobilization/Permits

UNIT

lot

Sub-total
1.00
1.01
1.02
1.03
1.04
1.05
1.06

Earthworks
Clearing and Grubbing
Structural Excavation
Backfilling and Compaction
Gravel Bedding G-1
Select Fill
Soil Poisoning
Sub-Total

2.00

Concreting Works
Column Footing
Portland Cement
Crushed Gravel 1"
Washed Sand
Wall Footing
Portland Cement
Crushed Gravel 1"
Washed Sand
Column
Portland Cement
Crushed Gravel 3/4""
Washed Sand
Beams
Portland Cement

2.01
2.02
2.03
2.01
2.02
2.03
2.01
2.02
2.03
2.01
2.02
2.03
2.01
2.02
2.03

Crushed Gravel 3/4""


Washed Sand
Slab on Grade
Portland Cement
Crushed Gravel 1"
Washed Sand
Stairs

sq.m
cu.m
cu.m
cu.m
cu.m
sq.m

bag
cu.m
cu.m
bag
cu.m
cu.m
bag
cu.m
cu.m
bag
cu.m
cu.m
bag
cu.m
cu.m

2.01
2.02
2.03

Portland Cement
Crushed Gravel 1"
Washed Sand
Sub-total

3.00

Rebar Works
Footings

3.01
3.02
3.01
3.02
3.03
3.01
3.02
3.03
3.01
3.02
3.03
3.04
3.01
3.02
3.03
4.00
4.01
4.02
4.03
4.01

4.02
4.01
4.02

Column Footings
16 mm
#16 G.I. Wire
Wall Footings
12 mm
10 mm
#16 G.I. Wire
Column
16 mm
10 mm
#16 G.I. Wire
Roof beams & Tie beams
16 mm
12 mm
10 mm
#16 G.I. Wire
Slabs
12 mm
10 mm
#16 G.I. Wire
Sub-total
Forms and Scaffoldings
Column form
Good lumber ( 2" x 2" x 12')
Plywood Ordinary, 1/4" x 4" x 8'
CWN, Assorted
Column & Roof beam Scaffolding
Vertical Support ( 2" x 3" x 12' Good lumber)
Horizontal Support (2" x 2" x 12' Good lumber)
Diagonal braces (2" x 2" x 12' Good lumber)
CWN, Assorted
Beam form
Good lumber ( 2" x 2" x 12')
Plywood Ordinary, 1/4" x 4" x 8'

bag
cu.m
cu.m

pc
kg
pc
pc
kg
pc
pc
kg
pc
pc
pc
kg
pc
pc
kg

pc
pc
kg
pc
pc
pc
kg
pc
pc

4.03

CWN, Assorted
Sub-total

5.00

Masonry Works

5.01
5.02
5.03
5.04
5.05
5.06
5.01
5.02

Masonry wall
CHB 5" THK
CHB 4" THK
Portland Cement
Washed Sand
12mm x 6m RSB
#61 G.I. Tie wire
Plastering
Portland Cement
Washed Sand
Sub-total

kg

pcs.
pcs.
bag
cu.m
pc
kg
bag
cu.m

6.00

Doors And Windows

6.01

D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden
door jamb

set

6.02

D-2, Panel door with 2" x 6" wooden frame


& 2" x 6" wooden door jamb

set

6.03

D-3, Panel door with 2" x 6" wooden frame


& 2" x 6" wooden door jamb

set

6.04

W-1, 12mm thk. bronze glass on powder coated


aluminum frame

set

6.05

W-2, 6mm thk. bronze glass on powder


coated aluminum frame

set

6.07

W-3, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

set

6.08

W-4, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

set

6.09

W-5, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

set

6.1

W-6, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

set

6.12

W-7, 12mm thk. bronze glass on powder coated


aluminum frame

set

6.13

W-8, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.
Sub-total
Electrical Works
Roughing-ins
Electrical Conduit uPVC, 15mm

set

7.00
7.01

pc

7.02

RSC 60mm

pc

Entrance Cap 60mm dia.


7.03

pc
Junction Box , 4" x 4" G.I

7.04

pc
Utility Box, 2" x 4" x G.I

7.05

pc
Grounding Rod, 2.4m x 16mm dia.

7.06

pc
Wires and Fixtures
3.5 mm2 THW wire , Stranded

7.01

box
Duplex C.O. with Plate

7.02

pc
3 Way Switch With Plate

7.03

pc
40 watts Flourescent Lamp

7.04

pc
Single Switch with Plate

7.05

pc
2-Gang Switch with Plate

7.06

pc

7.07

Incandescent Bulb 50W

set

7.08
7.09
7.10
7.11

Panel Box, Flush Type, 4 Branches

set
set
set
pc

8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10

Circuit Breaker, 20A 2P


Main Circuit Breaker, 175A 2P
Electrical Tape
Sub-total
Plumbing Works
Water Closet 1.6gpf with Accessories
Kitchen Sink
Faucet , Hose Bibb , Brass 3/4"
G.I Coupling, 3/4"
G.I Tee, 3/4"
G.I. Pipe 3/4" Sch.40
G.I. Elbow 90 x 3/4"
Gate Valve , 3/4"dia.
Check Valve , 3/4"dia.
S.S. Floor Drain 4' x 4"
Sub-total

set
set
pc
pc
pc
pc
pc
pc
pc
pc

9.00
9.01
9.02
9.03
9.04
9.05
9.06
9.07
9.08
9.09

Sanitary works
uPVC Sanitary Pipe 4" x 10'
uPVC Wye 4" x 4"
uPVC Wye 4" x 2"

10.03
10.04

Acri Color

10.01
10.02

11.00
11.01
11.02
11.03
11.04
11.05
11.06

11.01
11.02
11.03

pc

uPVC Sanitary Pipe 2"


uPVC P-TRAP 2"
uPVC P-TRAP 4"
uPVC Elbow 45 x 4 "
uPVC Cleanout 4" diameter
PVC Cement
Sub-total
Painting Works
Concrete surfaces
Neutralizer
Latex, Flat
Latex, Semi Gloss

10.00

pc
pc
pc
pc
pc
pc
pc
can

sq.m
qrt
gal
gal
qrt

Sub-total
TileWorks
Wall
Unglazed Wall Tiles 20cm x 30cm T&B
Unglazed Wall Tiles 20cm x 20cm KITCHEN
Tile Trim 6mm.
Lining 2" X 20cm (T&B and KITCHEN)
Tile Adhesive 25kg/bag
Tile Grout 5 kg/bag
Flooring

pc
pc
pc
pc
bag
bag
sq.m

Glazed Floor Tiles 20cmx 20cm


(INTERIOR )

pc

Tile Adhesive 25kg/bag


Tile Grout 5 kg/bag
Sub-total

bag
bag

TOTAL BUILDING COST (LABOR AND MATERIAL)

PRICE FOR BIDDING


LABOR AND MATERIALS

Y RESIDENTIAL BUILDING WITH ROOFDECK


BILL OF MATERIALS
QTY

UNIT COST
MATERIAL

TOTAL COST
LABOR

MATERIAL

LABOR

1.00

30,000.00

9,000.00

30,000.00

9,000.00

140.00
75.80
50.00
5.00
13.00
140.00

0.00
0.00
150.00
850.00
150.00
50.00

50.00
250.00
50.00
255.00
45.00
15.00

0.00
0.00
7,500.00
4,250.00
1,950.00
7,000.00

7,000.00
18,950.00
2,500.00
1,275.00
585.00
2,100.00

48.60
5.40
2.70

203.00
850.00
600.00

66.00
255.00
180.00

9,865.80
4,590.00
1,620.00

3,207.60
1,377.00
486.00

40
2.25
4.5

203.00
850.00
600.00

66.00
255.00
180.00

8,120.00
1,912.50
2,700.00

2,640.00
573.75
810.00

105.00
11.56
5.78

203.00
850.00
600.00

66.00
255.00
180.00

21,315.00
9,826.00
3,468.00

6,930.00
2,947.80
1,040.40

153.00
16.94
8.47

203.00
850.00
600.00

66.00
255.00
180.00

31,059.00
14,399.00
5,082.00

10,098.00
4,319.70
1,524.60

417.00
50.85
25.40

203.00
850.00
600.00

66.00
255.00
180.00

84,651.00
43,225.90
15,240.60

27,522.00
12,967.77
4,572.18

8.00
0.90
0.45

203.00
850.00
600.00

66.00
255.00
180.00

1,624.00
765.00
270.00

528.00
229.50
81.00

164.00
4.28

315.00
180.00

10.00
10.00

51,660.00
770.40

1,640.00
42.80

33.00
18.50
3.41

192.00
125.00
180.00

10.00
10.00
10.00

6,336.00
2,312.50
613.80

330.00
185.00
34.10

130.00
167.00
24.14

315.00
125.00
180.00

10.50
10.00
10.00

40,950.00
20,875.00
4,345.20

1,365.00
1,670.00
241.40

306.00
41.94
395.00
86

315.00
192.00
125.00
180.00

10.50
10.00
10.00
10.00

96,390.00
8,052.48
49,375.00
15,480.00

3,213.00
419.40
3,950.00
860.00

403.00
144.74
26.25

192.00
125.00
180.00

10.00
10.00
10.00

77,376.00
18,092.50
4,725.00

4,030.00
1,447.40
262.50

44.00
18.00
30.00

88.00
320.00
80.00

26.40
96.00
24.00

3,872.00
5,760.00
2,400.00

1,161.60
1,728.00
720.00

180.38
209.67
112.71
35.00

132.00
88.00
88.00
80.00

39.60
26.40
26.40
24.00

23,810.16
18,450.96
9,918.48
2,800.00

7,143.05
5,535.29
2,975.54
840.00

69.00
22.00

88.00
320.00

26.40
96.00

6,072.00
7,040.00

1,821.60
2,112.00

30.00

80.00

24.00

2,400.00

720.00

2,100.00
1,875.00
3,032.00
275.43
76.50
20.00

9.00
8.00
203.00
600.00
192.00
180.00

2.55
2.55
57.00
168.00
9.60
19.50

18,900.00
15,000.00
615,496.00
165,258.00
14,688.00
3,600.00

5,355.00
4,781.25
172,824.00
46,272.24
734.40
390.00

77.16
56.32

203.00
600.00

54.00
168.00

15,663.48
33,792.00

4,166.64
9,461.76

10,800.00

3,240.00

10,800.00

3,240.00

4,500.00

1,350.00

22,500.00

6,750.00

2,495.00

748.50

7,485.00

2,245.50

8,700.00

2,610.00

8,700.00

2,610.00

7,500.00

2,250.00

67,500.00

20,250.00

7,000.00

2,100.00

42,000.00

12,600.00

5,625.00

1,687.50

39,375.00

11,812.50

5,500.00

1,650.00

11,000.00

3,300.00

4,200.00

1,260.00

21,000.00

6,300.00

3,145.00

943.50

3,145.00

943.50

3,000.00

900.00

3,000.00

900.00

50.00

58.00

14.50

2,900.00

725.00

11.00

1,000.00

250.00

11,000.00

2,750.00

11.00

80.00

20.00

880.00

220.00

34.00

20.00

5.00

680.00

170.00

12.00

20.00

5.00

240.00

60.00

14.00

200.00

50.00

2,800.00

700.00

12.00

3,750.00

937.50

45,000.00

11,250.00

14.00

108.00

27.00

1,512.00

378.00

4.00

250.00

62.50

1,000.00

250.00

10.00

150.00

37.50

1,500.00

375.00

10.00

68.00

17.00

680.00

170.00

13.00

108.00

27.00

1,404.00

351.00

14.00

40.00

10.00

560.00

140.00

3.00
4.00
1.00
35.00

320.00
350.00
3,000.00
25.00

80.00
87.50
750.00
6.25

960.00
1,400.00
3,000.00
875.00

240.00
350.00
750.00
218.75

4.00
2.00
7.00
11.00
11.00
13.00
8.00
5.00
12.00
4.00

4,500.00
600.00
250.00
17.00
17.00
370.00
17.00
360.00
300.00
200.00

1,125.00
150.00
62.50
4.25
4.25
92.50
4.25
90.00
75.00
50.00

18,000.00
1,200.00
1,750.00
187.00
187.00
4,810.00
136.00
1,800.00
3,600.00
800.00

4,500.00
300.00
437.50
46.75
46.75
1,202.50
34.00
450.00
900.00
200.00

11.00
11.00

525.00
160.00

131.25
40.00

5,775.00
1,760.00

1,443.75
440.00

14.00

97.00

24.25

1,358.00

339.50

14.00
11.00
17.00
8.00
5.00
6.00

205.00
50.00
110.00
97.00
110.00
120.00

51.25
12.50
27.50
24.25
27.50
30.00

2,870.00
550.00
1,870.00
776.00
550.00
720.00

717.50
137.50
467.50
194.00
137.50
180.00

646.52
8.62
21.55

130.00
450.00

32.50
112.50

1,120.60
9,697.50

280.15
2,424.38

22.00

440.00

110.00

9,680.00

2,420.00

4.20

123.00

30.75

516.60

129.15

168.00
45.00
21.00
54.00
8.00
8.00

40.00
32.00
50.00
25.00
270.00
165.00

10.00
8.00
12.50
6.25
67.50
41.25

6,720.00
1,440.00
1,050.00
1,350.00
2,160.00
1,320.00

1,680.00
360.00
262.50
337.50
540.00
330.00

15,530.00

13.00

3.25

201,890.00

50,472.50

134.00

270.00

67.50

36,180.00

9,045.00

134.00

185.00

46.25

24,790.00

6,197.50

431.39

T (LABOR AND MATERIAL)

2,993,117.44

PRICE FOR BIDDING


31506.50

GRAND TOTAL

I.D. NO

39,000.00
39,000.00
1.00
7,000.00
18,950.00
10,000.00
5,525.00
2,535.00
9,100.00
53,110.00

1.01
1.02
1.03
1.04
1.05
1.06

2.00
13,073.40
5,967.00
2,106.00

2.01
2.02
2.03

10,760.00
2,486.25
3,510.00

2.01
2.02
2.03

28,245.00
12,773.80
4,508.40

2.01
2.02
2.03

41,157.00
18,718.70
6,606.60

2.01
2.02
2.03

112,173.00
56,193.67
19,812.78

2.01
2.02
2.03

2,152.00
994.50
351.00
303,686.45

2.01
2.02
2.03

3.00

53,300.00
813.20

3.01
3.02

6,666.00
2,497.50
647.90

3.01
3.02

42,315.00
22,545.00
4,586.60
99,603.00
8,471.88
53,325.00
16,340.00
81,406.00
19,539.90
4,987.50
417,044.48

5,033.60
7,488.00
3,120.00
30,953.21
23,986.25
12,894.02
3,640.00
7,893.60
9,152.00

3.01
3.02
3.03

3.01
3.02
3.03
3.01
3.02
3.03

3.01
3.02
3.03
3.01
3.02
3.03

3.01
3.02
3.01

3,120.00
107,280.68

3.02
3.03
4.00

24,255.00
19,781.25
788,320.00
211,530.24
15,422.40
3,990.00
19,830.12
43,253.76
1,236,783.45

4.01
4.02
4.03
4.01

4.02
4.01

14,040.00

4.02

29,250.00

4.03

9,730.50
11,310.00

5.00

87,750.00
54,600.00

5.01

51,187.50

5.02

14,300.00

5.03

27,300.00

5.04

4,088.50

5.05

3,900.00

5.06

307,456.50
5.01
5.02
3,625.00

13,750.00

6.00

1,100.00

6.01

850.00

6.02

300.00

6.03

3,500.00

6.04
6.05

56,250.00

6.07

1,890.00

6.08

1,250.00

6.09

1,875.00

6.1

850.00

6.12

1,755.00

6.13

700.00
1,200.00
1,750.00
3,750.00
1,093.75
95,488.75
22,500.00
1,500.00
2,187.50
233.75
233.75
6,012.50
170.00
2,250.00
4,500.00
1,000.00
40,587.50

7.00
7.01
7.02
7.03
7.04
7.05
7.06
7.01
7.02
7.03
7.04
7.05
7.06
7.07
7.08

7,218.75
2,200.00

7.09
7.10
7.11

1,697.50
3,587.50

8.00

687.50
2,337.50
970.00
687.50
900.00
20,286.25

8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10

1,400.75
12,121.88
12,100.00
645.75

9.00

26,268.38

9.01
9.02
9.03
9.04
9.05
9.06
9.07
9.08
9.09

8,400.00
1,800.00
1,312.50
1,687.50
2,700.00
1,650.00

252,362.50

10.00

45,225.00
30,987.50

10.01
10.02

346,125.00

10.03
10.04

2,993,117.44

11.00

/m

11.01
11.02
11.03
11.04
11.05

11.06
11.01
11.02
11.03

TWO STOREY RESIDENTIAL BUILDING WITH ROOFD

DETAILED ESTIMATES
COST (MATERIALS AND LABOR AND LABOR ONL
DESCRIPTION

MATERIALS AND LA

GENERAL REQUIREMENTS
Mobilization/Temporary Structures, Utilities
and Services/Demobilization/Permits
Earthworks
Clearing and Grubbing
Structural Excavation
Backfilling and Compaction
Gravel Bedding G-1
Select Fill
Soil Poisoning

Concreting Works
Concreting of Column Footing (F1)
Portland Cement
Crushed Gravel 1"
Washed Sand
Concreting of Wall Footing (WF1)
Portland Cement
Crushed Gravel 1"
Washed Sand
Column (C1 & C2)
Portland Cement
Crushed Gravel 3/4""
Washed Sand
Beams (FTB-1, RCB-1 & RFB-1)
Portland Cement
Crushed Gravel 3/4""
Washed Sand
Slab on Grade (S-1)
Portland Cement
Crushed Gravel 1"
Washed Sand
Stairs

Php

278.

Php
Php
Php
Php
Php
Php
Php

379
50
135
71
39
18
65

Php
Php
Php
Php
Php

63,257
3,916
2,421
1,105
390

Php

3,103

Php
Php
Php

1,992
460
650

Php

8,430

Php
Php
Php

5,230
2,365
834

Php

12,311

Php
Php
Php

7,621
3,466
1,223

Php

34,848

Php
Php
Php

20,772
10,406
3,669

Php

647

Portland Cement
Crushed Gravel 1"
Washed Sand

Php
Php
Php

398
184
65

Rebar Works

Php

8,162

Reinforcing Steel Bars in Footings


Column Footing (C1F1)
16 mm
#16 G.I. Wire
Column Footing (C2F1)
16 mm
#16 G.I. Wire
Wall Footings
12 mm
10 mm
#16 G.I. Wire

Php
Php

3,582
1,651

Php
Php

1,601
49

Php

1,849

Php
Php
Php
Php
Php
Php

1,801
47
81
41
27
13

Php
Php

1,629
731

Php
Php
Php

450
233
47

Php

898

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

600
233
63
1,686
653
300
284
69
1,032
655
284
93
1,263
738
677
60
525
275

Reinforcing Steel Bars in Column


Column (C1F1)
16 mm
10 mm
#16 G.I. Wire
Column (C2F1)
16 mm
10 mm
#16 G.I. Wire
Reinforcing Steel Bars in Roof Beams
FTB-1
12 mm
10 mm
#16 G.I. Wire
RCB-1 and RFB-2
16 mm
10 mm
#16 G.I. Wire
Reinforcing Steel Bars in Slabs
Ground Floor Slab
12 mm
#16 G.I. Wire
S-1
12 mm

10 mm
#16 G.I. Wire

Php
Php

174
75

Installation of Forms and Scaffoldings

Php

15,776

Column form
Good lumber ( 2" x 2" x 12')
Plywood Ordinary, 1/4" x 4" x 8'
CWN, Assorted
Column & Roof beam Scaffolding
Vertical Support ( 2" x 3" x 12' Good lumber)
Horizontal Support (2" x 2" x 12' Good lumber)
Diagonal braces (2" x 2" x 12' Good lumber)
CWN, Assorted
Beam form
Good lumber ( 2" x 2" x 12')

Php

2,300

Php
Php
Php

740
1,101
458

Php

10,510

Php
Php
Php
Php
Php
Php

4,551
3,527
1,896
535
2,965
1,160

Plywood Ordinary, 1/4" x 4" x 8'

Php

1,345

CWN, Assorted

Php

458

Masonry Works

Php

3,690

Masonry wall

Php

3,491

CHB 5" THK

Php

144

CHB 4" THK

Php

131

Portland Cement

Php

2,486

Washed Sand

Php

667

12mm x 6m RSB

Php

48

#61 G.I. Tie wire

Php

12

Plastering
Portland Cement
Washed Sand

Php
Php
Php

199
62
136

Installation of Doors And Windows

Php

3,236

D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb

Php

147

D-2, Panel door with 2" x 6" wooden frame


& 2" x 6" wooden door jamb

Php

307

D-3, Panel door with 2" x 6" wooden frame


& 2" x 6" wooden door jamb

Php

102

W-1, 12mm thk. bronze glass on powder coated


aluminum frame

Php

119

W-2, 6mm thk. bronze glass on powder


coated aluminum frame

Php

923

W-3, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

Php

574

W-4, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

Php

538

W-5, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

Php

150

W-6, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

Php

287

W-7, 12mm thk. bronze glass on powder coated


aluminum frame

Php

43

W-8, 6mm thk. bronze glass on powder coated


aluminum frame with open back, screen & lock accs.

Php

41

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

1,005
243
38
144
11
8
3
36
761
592
19
13
19
8
18
7
12

Electrical Works
Installation of Roughing-ins
Electrical Conduit uPVC, 15mm
RSC 60mm
Entrance Cap 60mm dia.
Junction Box , 4" x 4" G.I
Utility Box, 2" x 4" x G.I
Grounding Rod, 2.4m x 16mm dia.
Wires and Fixtures
3.5 mm2 THW wire , Stranded
Duplex C.O. with Plate
3 Way Switch With Plate
40 watts Flourescent Lamp
Single Switch with Plate
2-Gang Switch with Plate
Incandescent Bulb 50W
Panel Box, Flush Type, 4 Branches

Circuit Breaker, 20A 2P


Main Circuit Breaker, 175A 2P
Electrical Tape

Php
Php
Php

18
39
11

Plumbing Works

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

427
236
15
23
2
2
63
1
23
47
10

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

213
75
23
17
37
7
24
10
7
9

Php

87

Php
Php
Php
Php

4
40
40
2

Php
Php
Php
Php
Php
Php
Php

3,643
184
88
18
13
17
28

Water Closet 1.6gpf with Accessories


Kitchen Sink
Faucet , Hose Bibb , Brass 3/4"
G.I Coupling, 3/4"
G.I Tee, 3/4"
G.I. Pipe 3/4" Sch.40
G.I. Elbow 90 x 3/4"
Gate Valve , 3/4"dia.
Check Valve , 3/4"dia.
S.S. Floor Drain 4' x 4"
Sanitary works
uPVC Sanitary Pipe 4" x 10'
uPVC Wye 4" x 4"
uPVC Wye 4" x 2"
uPVC Sanitary Pipe 2"
uPVC P-TRAP 2"
uPVC P-TRAP 4"
uPVC Elbow 45 x 4 "
uPVC Cleanout 4" diameter
PVC Cement
Painting Works
Concrete surfaces
Neutralizer
Latex, Flat
Latex, Semi Gloss
Acri Color
TileWorks
Wall
Unglazed Wall Tiles 20cm x 30cm T&B
Unglazed Wall Tiles 20cm x 20cm KITCHEN
Tile Trim 6mm.
Lining 2" X 20cm (T&B and KITCHEN)
Tile Adhesive 25kg/bag

Tile Grout 5 kg/bag


Flooring
Glazed Floor Tiles 20cmx 20cm
(INTERIOR )
Tile Adhesive 25kg/bag
Tile Grout 5 kg/bag

Php
Php

17
3,458

Php

2,656

Php
Php

476
326

ESIDENTIAL BUILDING WITH ROOFDECK

DETAILED ESTIMATES
IALS AND LABOR AND LABOR ONLY)
COST

MATERIALS AND LABOR

LABOR

Php

278.57

per m

Php

64.29

per m

Php
Php
Php
Php
Php
Php
Php

379.36
50.00
135.36
71.43
39.46
18.11
65.00

per m
per m
per m
per m
per m
per m
per m

Php
Php
Php
Php
Php
Php
Php

231.50
50.00
135.36
17.86
9.11
4.18
15.00

per m
per m
per m
per m
per m
per m
per m

Php
Php
Php
Php
Php

63,257.24
3,916.00
2,421.00
1,105.00
390.00

per m

3,103.01

Php
Php
Php

1,992.59
460.42
650.00

Php

8,430.96

Php
Php
Php

5,230.56
2,365.52
834.89

Php

12,311.54

Php
Php
Php

7,621.67
3,466.43
1,223.44

Php

34,848.05

Php
Php
Php

20,772.78
10,406.24
3,669.03

Php

647.69

15,393.39
1,174.00
594.00
255.00
90.00
745.14
488.89
106.25
150.00
2,021.89
1,283.33
545.89
192.67
2,952.28
1,870.00
799.94
282.33
8,344.81
5,096.67
2,401.44
846.70
155.28

per m

Php

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php
Php

398.52
184.17
65.00

per m
per m
per m

Php
Php
Php

97.78
42.50
15.00

per m
per m
per m

Php

8,162.37

Php

2,448.71

Php
Php

3,582.52
1,651.05

Php
Php

1,601.60
49.45

Php

1,849.48

Php
Php
Php
Php
Php
Php

1,801.80
47.68
81.99
41.60
27.08
13.31

Php
Php
Php
Php
Php
Php
Php

1,074.76
495.32
480.48
14.84
554.84
540.54
14.30

Php

24.60

Php
Php

1,629.87
731.87

Php
Php
Php

450.45
233.51
47.91

Php

898.00

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

600.60
233.51
63.89
1,686.46
653.88
300.00
284.35
69.53
1,032.58
655.20
284.38
93.00
1,263.52
738.52
677.62
60.90
525.00
275.13

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

12.48
8.12
3.99
488.96
219.56
135.14
70.05
14.37
269.40
180.18
70.05
19.17

Php

505.94

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

196.16
90.00
85.31
20.86
309.77
196.56
85.31
27.90
379.06
221.56
203.29
18.27
157.50
82.54

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php

174.87
75.00

per m
per m

Php
Php

52.46
22.50

per m
per m

Php

15,776.57

Php

4,732.97

Php

2,300.24

Php
Php
Php

740.24
1,101.18
458.82

Php

10,510.81

Php
Php
Php
Php
Php
Php

4,551.94
3,527.39
1,896.18
535.29
2,965.53
1,160.82

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

690.07
222.07
330.35
137.65
3,153.24
1,365.58
1,058.22
568.85
160.59
889.66
348.25

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php

1,345.88

per m

Php

403.76

per m

Php

458.82

per m

Php

137.65

per m

Php

3,690.59

per m

Php

1,107.18

per m

Php

3,491.59

per m

Php

1,047.48

per m

Php

144.38

per m

Php

43.31

per m

Php

131.88

per m

Php

39.56

per m

Php

2,486.81

per m

Php

746.04

per m

Php

667.29

per m

Php

200.19

per m

Php

48.65

per m

Php

14.60

per m

Php

12.59

per m

Php

3.78

per m

Php
Php
Php

199.00
62.56
136.45

per m
per m
per m

Php
Php
Php

59.70
18.77
40.93

per m
per m
per m

Php

3,236.38

per m

Php

970.92

per m

Php

147.79

per m

Php

44.34

per m

Php

307.89

per m

Php

92.37

per m

Php

102.43

per m

Php

30.73

per m

Php

119.05

per m

Php

35.72

per m

Php

923.68

per m

Php

277.11

per m

Php

574.74

per m

Php

172.42

per m

Php

538.82

per m

Php

161.64

per m

Php

150.53

per m

Php

45.16

per m

Php

287.37

per m

Php

86.21

per m

Php

43.04

per m

Php

12.91

per m

Php

41.05

per m

Php

12.32

per m

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

1,005.14
243.42
38.16
144.74
11.58
8.95
3.16
36.84
761.72
592.11
19.89
13.16
19.74
8.95
18.47
7.37
12.63

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php

301.54

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

73.03
11.45
43.42
3.47
2.68
0.95
11.05
228.52
177.63
5.97
3.95
5.92
2.68
5.54
2.21
3.79

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php
Php

18.42
39.47
11.51

per m
per m
per m

Php
Php
Php

5.53
11.84
3.45

per m
per m
per m

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

427.24
236.84
15.79
23.03
2.46
2.46
63.29
1.79
23.68
47.37
10.53

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php

128.17

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

71.05
4.74
6.91
0.74
0.74
18.99
0.54
7.11
14.21
3.16

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php
Php
Php
Php
Php
Php
Php
Php
Php
Php

213.54
75.99
23.16
17.87
37.76
7.24
24.61
10.21
7.24
9.47

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php

64.06

Php
Php
Php
Php
Php
Php
Php
Php
Php

22.80
6.95
5.36
11.33
2.17
7.38
3.06
2.17
2.84

per m
per m
per m
per m
per m
per m
per m
per m
per m
per m

Php

87.56

per m

Php

26.27

per m

Php
Php
Php
Php

4.67
40.41
40.33
2.15

per m
per m
per m
per m

Php
Php

1.40
12.12

Php

12.10

Php

0.65

per m
per m
per m
per m

Php
Php
Php
Php
Php
Php
Php

3,643.42
184.74
88.42
18.95
13.82
17.76
28.42

per m
per m
per m
per m
per m
per m
per m

Php
Php
Php

1,093.03
55.42
26.53

Php

5.68

Php
Php
Php

4.14
5.33
8.53

per m
per m
per m
per m
per m
per m
per m

Php
Php

17.37
3,458.68

per m
per m

Php
Php

5.21
1,037.61

per m
per m

Php

2,656.45

per m

Php

796.93

per m

Php
Php

476.05
326.18

per m
per m

Php
Php

142.82
97.86

per m
per m