Professional Documents
Culture Documents
ATMN procedures
Packet 3
17. 19. september 2002
Installation
Thomas Bareiss,
Sep. 2002 -- 1
General
About 50 people announced
Room 222
Room 337
(meeting point)
(next floor)
Installation
Thomas Bareiss,
Sep. 2002 -- 2
Day 2
Day 3
Upgrade 4 rack
Bearer Services
Hand Over
Power Control
Performance
Management
Diagnosis hints
NB 440 Database
Iur configuration
IMA function
ATM measuring
methods
Symptom saving
NB 440 diagnosis
practical demonstration
System Information
Installation
Thomas Bareiss,
If testbed available
Sep. 2002 -- 3
Power Control
Performance
Management
System Information
Bearer Services
Installation
Day 2
Day 3
Iur configuration
ATM measuring
methods
IMA function
Upgrade 4 rack
Diagnosis hints
NB 440 diagnosis
practical demonstration
Symptom saving
Interface TAC 2 - TAC 3
Data base handling
NB 440 Database
Hand Over
Thomas Bareiss,
If testbed available
Sep. 2002 -- 4