You are on page 1of 4

Workshop CW 38

ATMN procedures
Packet 3
17. 19. september 2002

Installation

Thomas Bareiss,

Sep. 2002 -- 1

General
About 50 people announced

Split into 2 groups

Room 222

Room 337

(meeting point)

(next floor)

Installation

Thomas Bareiss,

Sep. 2002 -- 2

Agenda room 222


Day 1
09:00
09:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30

Day 2

Day 3

Upgrade 4 rack
Bearer Services
Hand Over

Power Control
Performance
Management

Diagnosis hints

NB 440 Database

Iur configuration
IMA function

Interface TAC 2 - TAC 3


Data base handling

ATM measuring
methods

Symptom saving

NB 440 diagnosis
practical demonstration

System Information

Installation

Thomas Bareiss,

If testbed available

Sep. 2002 -- 3

Agenda room 337


Day 1
09:00
09:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30

Power Control
Performance
Management

System Information
Bearer Services

Installation

Day 2

Day 3

Iur configuration

ATM measuring
methods

IMA function
Upgrade 4 rack
Diagnosis hints

NB 440 diagnosis
practical demonstration

Symptom saving
Interface TAC 2 - TAC 3
Data base handling

NB 440 Database

Hand Over

Thomas Bareiss,

If testbed available

Sep. 2002 -- 4

You might also like