STANDARD SPECIFICATIONS

STATE OF CALIFORNIA
BUSINESS, TRANSPORTATION AND HOUSING AGENCY
DEPARTMENT OF TRANSPORTATION

2010

PUBLISHED BY

DEPARTMENT OF TRANSPORTATION

Copies of this book may be obtained from:


STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
PUBLICATION DISTRIBUTION UNIT
1900 ROYAL OAKS DRIVE
SACRAMENTO, CALIFORNIA 95815-3800
Telephone (916) 263-0822
Fax (916) 263-0470
Publication Unit Web site: http://caltrans-opac.ca.gov/publicat.htm

TABLE OF CONTENTS

DIVISION I GENERAL PROVISIONS......................................................................................................... 1

1 GENERAL................................................................................................................................................. 1

2 BIDDING................................................................................................................................................. 17

3 CONTRACT AWARD AND EXECUTION .............................................................................................. 25

4 SCOPE OF WORK ................................................................................................................................. 29

5 CONTROL OF WORK............................................................................................................................ 33

6 CONTROL OF MATERIALS................................................................................................................... 57

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ........................................................... 63

8 PROSECUTION AND PROGRESS ....................................................................................................... 97

9 PAYMENT ............................................................................................................................................ 111

DIVISION II GENERAL CONSTRUCTION ............................................................................................. 131

10 GENERAL........................................................................................................................................... 131

11 QUALITY CONTROL AND ASSURANCE ......................................................................................... 133

12 TEMPORARY TRAFFIC CONTROL .................................................................................................. 141

13 WATER POLLUTION CONTROL....................................................................................................... 159

14 ENVIRONMENTAL STEWARDSHIP ................................................................................................. 203

15 EXISTING FACILITIES....................................................................................................................... 215

DIVISION III GRADING........................................................................................................................... 253

16 CLEARING AND GRUBBING ............................................................................................................ 253

17 WATERING ........................................................................................................................................ 255

18 DUST PALLIATIVE ............................................................................................................................. 257

19 EARTHWORK .................................................................................................................................... 259

20 LANDSCAPE ...................................................................................................................................... 283

21 EROSION CONTROL ........................................................................................................................ 341

22 FINISHING ROADWAY ...................................................................................................................... 353

23 RESERVED ........................................................................................................................................ 353

DIVISION IV SUBBASES AND BASES ................................................................................................. 355

24 STABILIZED SOILS ........................................................................................................................... 355

25 AGGREGATE SUBBASES ................................................................................................................ 361

26 AGGREGATE BASES........................................................................................................................ 363

27 CEMENT TREATED BASES.............................................................................................................. 367

28 CONCRETE BASES .......................................................................................................................... 375

29 TREATED PERMEABLE BASES....................................................................................................... 379

30-36 RESERVED ................................................................................................................................... 381

DIVISION V SURFACING AND PAVEMENTS....................................................................................... 383

TABLE OF CONTENTS

37 BITUMINOUS SEALS ........................................................................................................................ 383

38 RESERVED ........................................................................................................................................ 410

39 HOT MIX ASPHALT ........................................................................................................................... 411

40 CONCRETE PAVEMENT ................................................................................................................... 459

41 CONCRETE PAVEMENT REPAIR .................................................................................................... 489

42 GROOVE AND GRIND CONCRETE ................................................................................................. 509

4345 RESERVED .................................................................................................................................. 512

DIVISION VI STRUCTURES................................................................................................................... 513

46 GROUND ANCHORS AND SOIL NAILS ........................................................................................... 513

47 EARTH RETAINING SYSTEMS......................................................................................................... 527

48 TEMPORARY STRUCTURES ........................................................................................................... 537

49 PILING ................................................................................................................................................ 547

50 PRESTRESSING CONCRETE .......................................................................................................... 575

51 CONCRETE STRUCTURES .............................................................................................................. 583

52 REINFORCEMENT ............................................................................................................................ 627

53 SHOTCRETE...................................................................................................................................... 649

54 WATERPROOFING ........................................................................................................................... 655

55 STEEL STRUCTURES ....................................................................................................................... 663

56 SIGNS................................................................................................................................................. 681

57 WOOD AND PLASTIC LUMBER STRUCTURES.............................................................................. 699

58 SOUND WALLS.................................................................................................................................. 709

59 PAINTING ........................................................................................................................................... 715

60 RESERVED ........................................................................................................................................ 727

DIVISION VII DRAINAGE ....................................................................................................................... 729

61 CULVERT AND DRAINAGE PIPE JOINTS ....................................................................................... 729

62 ALTERNATIVE CULVERTS ............................................................................................................... 735

63 RESERVED ........................................................................................................................................ 737

64 PLASTIC PIPE.................................................................................................................................... 739

65 CONCRETE PIPE .............................................................................................................................. 745

66 CORRUGATED METAL PIPE............................................................................................................ 753

67 STRUCTURAL PLATE CULVERTS................................................................................................... 763

68 SUBSURFACE DRAINS .................................................................................................................... 769

69 OVERSIDE DRAINS .......................................................................................................................... 779

70 MISCELLANEOUS DRAINAGE FACILITIES..................................................................................... 781

71 RESERVED ........................................................................................................................................ 788

ii

TABLE OF CONTENTS

DIVISION VIII MISCELLANEOUS CONSTRUCTION ............................................................................ 789

72 SLOPE PROTECTION ....................................................................................................................... 789

73 CONCRETE CURBS AND SIDEWALKS ........................................................................................... 803

74 PUMPING EQUIPMENT AND CONTROLS....................................................................................... 809

75 MISCELLANEOUS METAL ................................................................................................................ 831

76 WELLS................................................................................................................................................ 845

77 LOCAL INFRASTRUCTURE .............................................................................................................. 847

7879 RESERVED .................................................................................................................................. 847

80 FENCES ............................................................................................................................................. 849

81 MONUMENTS .................................................................................................................................... 861

DIVISION IX TRAFFIC CONTROL FACILITIES .................................................................................... 863

82 MARKERS AND DELINEATORS ....................................................................................................... 863

83 RAILINGS AND BARRIERS ............................................................................................................... 867

84 TRAFFIC STRIPES AND PAVEMENT MARKINGS .......................................................................... 881

85 PAVEMENT MARKERS ..................................................................................................................... 887

86 ELECTRICAL SYSTEMS ................................................................................................................... 891

DIVISION X MATERIALS ....................................................................................................................... 957

87 MATERIALSGENERAL .................................................................................................................... 957

88 GEOSYNTHETICS ............................................................................................................................. 959

89 RESERVED ........................................................................................................................................ 965

90 CONCRETE........................................................................................................................................ 967

91 PAINT ............................................................................................................................................... 1003

92 ASPHALTS ....................................................................................................................................... 1005

93 LIQUID ASPHALTS .......................................................................................................................... 1009

94 ASPHALTIC EMULSIONS ............................................................................................................... 1019

95 EPOXY ............................................................................................................................................. 1025

9698 RESERVED ................................................................................................................................ 1028

DIVISION XI BUILDING CONSTRUCTION.......................................................................................... 1029

99 BUILDING CONSTRUCTION........................................................................................................... 1029

iii

DIVISION I GENERAL PROVISIONS

1 GENERAL

1-1.01 GENERAL
Section 1 includes general rules of interpretation.
The specifications are divided into 11 divisions.
Division I includes general specifications applicable to every contract unless specified as applicable under
certain conditions.
Division II includes specifications for general construction applicable to every contract unless specified as
applicable under certain conditions.
Divisions III through IX include construction specifications for specific bid items.
Division X includes specifications for common materials. For a material specified in this division, that
material specified in any section must comply with the specifications in division X.
Division XI includes construction specifications for buildings.
The bid items set forth the construction specifications that apply. The first 2 digits of a bid item code
correspond to the specification section number with the same 2 first digits except for bid item code
999990 that corresponds to section 9 and unless shown otherwise in the table titled "Bid Items and
Applicable Sections" in the special provisions.
The specifications are written to the Bidder before award and the Contractor after. Before award, interpret
sentences written in the imperative mood as starting with "The Bidder must" and interpret "you" as "the
Bidder" and "your" as "the Bidder's." After award, interpret sentences written in the imperative mood as
starting with "The Contractor must" and interpret "you" as "the Contractor" and "your" as "the
Contractor's."
After Contract approval, submit documents and direct questions to the Engineer. Orders, authorizations,
and requests to the Contractor are by the Engineer.
The following items from the Department are in writing:
1.
2.
3.
4.
5.
6.

Approvals
Authorizations
Decisions
Notifications
Orders
Responses

The following items from the Contractor must be in writing:


1.
2.
3.
4.
5.
6.
7.

Assignments
Notifications
Proposals
Reports
Requests, including RFIs, sequentially numbered
Subcontracts
Test results

Where a location is not specified with the words "shown," "specified," or "described," interpret:
1. "Shown" as "shown on the plans."
2. "Specified" as "specified in the specifications."
3. "Described" as "described in the Contract." "Described" means "shown, specified, or both."
Headings are included for the purposes of organization and referencing. Inclusion of a heading with no
related content, "Not Used," or "Reserved" does not indicate that no specification exists for that subject;
applicable specifications may be covered in a general or referenced specification.
1

SECTION 1

GENERAL

Sections are reserved in the Standard Specifications for correlation of special provisions and revised
standard specifications with the Standard Specifications and for future expansion of the Standard
Specifications.
The specifications are expressed in U.S. customary units except where a referenced document uses the
International System of Units as the standard.
Unless an object or activity is specified to be less than the total, the quantity or amount is all of the object
or activity.
All items in a list apply unless the items are specified as choices.
1-1.02 STYLE VARIATIONS
The Department is gradually standardizing the style of the specifications. The use of the new style does
not change the meaning of a Contract part not using this style. The new style includes:
1. Use of:
1.1. Imperative mood
1.2. Introductory modifiers
1.3. Conditional clauses
1.4. Industry-standard terms
2. Elimination of:
2.1. Language variations
2.2. Definitions for industry-standard terms
2.3. Redundant specifications
2.4. Needless cross-references
Because of the transition, some terms or clauses used in Division I are different from those used in other
divisions and in other Contract parts. Interpret the equivalent term or clause shown in the following table
as having the same meaning as the corresponding term or clause in Division I:
Term or clause in
Division I
Authorize
Authorized Material
List
Department

Department
furnished material
<work description>
is change order
work

Terms Equivalencies
Equivalent term or phrase that may
Conditions
be in other divisions and in other
Contract parts
Approve
Except in a Change Order
Pre-Qualified Products List
-Engineer

Where referring to anyone other than the


Resident Engineer or the Resident
Engineer's authorized representatives
--

State-furnished material
<work description> will be paid for
as extra work <with or without a
reference to a section>

1-1.031-1.04 RESERVED
1-1.05 REFERENCES
A reference within parentheses to a law or regulation is included in the Contract for convenience only and
is not a comprehensive listing of related laws and regulations. Lack of a reference does not indicate no
related laws or regulations exist.
Where the version of a referenced document is not specified, use the current version in effect on the date
of the Notice to Bidders.
A reference to a section includes the general specifications for the section.
Where a section number is referenced without a reference to a document, the reference is to a section of
the Standard Specifications as revised by any revised standard specification, special provision, or both.
2

SECTION 1

GENERAL

A code not specified as a federal code is a California code.

A department not specified as a federal or local department is a California department.

SECTION 1

GENERAL

1-1.06 ABBREVIATIONS
Interpret the meaning of an abbreviation used in the specifications and the Bid Item List as shown in the
following table:
Abbreviation
AASHTO
AB
ACI
AISC
AISI
AMA
ANSI
API
AREMA
AS
ASME
ASQ
ATPB
AWG
AWPA
AWS
AWWA
BBS
BNSF
Cal/OSHA
CBC
CDPH
CIDH
CIH
CIP
CJP
CMU
CPM
CPL
CRCP
CRM
CTB
CTPB
CVN
CWI
DBE
DRA
DRB
DTSC
DVBE
ECTC
EIA
ESA
ETL
fc
f'c
FHWA
GAAP
GGBFS
GSP
HMA

Abbreviations
Meaning
American Association of State Highway and Transportation Officials
aggregate base
American Concrete Institute
American Institute of Steel Construction
American Iron and Steel Institute
archaeological monitoring area
American National Standards Institute
American Petroleum Institute
American Railway Engineering and Maintenance-of-Way Association
aggregate subbase
American Society of Mechanical Engineers
American Society for Quality
asphalt treated permeable base
American Wire Gauge
American Wood Protection Association
a
American Welding Society
American Water Works Association
battery backup system
Burlington Northern Santa Fe
California Division of Occupational Safety and Health Administration
California Building Code
California Department of Public Health
cast-in-drilled-hole
Certified Industrial Hygienist
cast in place
complete joint penetration
concrete masonry unit
critical path method
composite plastic lumber
continuously reinforced concrete pavement
crumb rubber modifier
cement treated base
cement treated permeable base
Charpy V-notch
AWS Certified Welding Inspector
Disadvantaged Business Enterprise
Dispute Resolution Advisor
Dispute Resolution Board
Department of Toxic Substances Control
Disabled Veteran Business Enterprise
Erosion Control Technology Council
Electronic Industries Alliance
environmentally sensitive area
Electrical Testing Laboratories
extreme fiber compressive stress in concrete at service loads
compressive strength of concrete
Federal Highway Administration
Generally Accepted Accounting Principles
ground granulated blast furnace slag; slag cement
galvanized steel pipe
hot mix asphalt
4

SECTION 1
HMA-O
HS
ICC
ITE
IEEE
JMF
JPCP
ksf
ksi
LCB
LEED
LOTB
LTDS
MC
METS
MPI
MR
MSDS
MT
MUTCD
NDT
NETA
NEC
NEMA
NFPA
NPDES
NPT
NRTL
OBC
OGFC
OSD
PLAC
PC
PCC
pcf
PG
PI0
PJP
PQR
PS
PSF
PV
RAP
RCSC
RECP
RFI
RHMA
RHMA-G
RHMA-O
RHMA-O-HB
RPL
RSC
RSP
RSS
RT
RWQCB

GENERAL

hot mix asphalt (open graded)


high strength
International Code Council
Institute of Transportation Engineers
Institute of Electrical and Electronics Engineers
job mix formula
jointed plain concrete pavement
kips per square foot
kips per square inch
lean concrete base
Leadership in Energy and Environmental Design
log of test boring
long term design strength
medium curing
Department's Materials Engineering and Testing Services
Master Painters Institute
movement rating
material safety data sheet
magnetic particle testing
Manual on Uniform Traffic Control Devices
nondestructive testing
International Electrical Testing Association
National Electrical Code
National Electrical Manufacturers Association
National Fire Protection Association
National Pollutant Discharge Elimination System
National Pipe Thread Taper
Nationally Recognized Testing Laboratory
optimum binder content
open graded friction course
Offices of Structure Design
permit, license, agreement, certification, or any combination of these
precast
portland cement concrete
pounds per cubic foot
performance grade
zero blanking band profile index
partial joint penetration
procedure qualification record
prestressed
pedestrian signal face
programmed visibility
reclaimed asphalt pavement
Research Council on Structural Connections
rolled erosion control product
request for information
rubberized hot mix asphalt
rubberized hot mix asphalt (gap graded)
rubberized hot mix asphalt (open graded)
rubberized hot mix asphalt (open graded high binder)
recycled plastic lumber
rapid strength concrete
rock slope protection
revised standard specifications
radiographic testing
Regional Water Quality Control Board
5

SECTION 1

GENERAL

SMSA
Standard Metropolitan Statistical Area
SC
slow curing
SCC
self-consolidating concrete
SCM
supplementary cementitious material
SSPC
The Society for Protective Coatings
SWPPP
storm water pollution prevention plan
TEES
Transportation Electrical Equipment Specifications
TIA
time impact analysis
TV
target value
UDBE
Underutilized Disadvantaged Business Enterprise
UFFA
ultra fine fly ash
UL
Underwriters Laboratories, Inc
USC
United States Code
USM
unidentified stock material
UT
ultrasonic testing
VECP
value engineering change proposal
VFD
Variable-frequency drive
VPM
volts per mil
WPCP
water pollution control program
WPS
welding procedure specification
a
Interpret a reference to AWS as a reference to AWS, ANSI/AWS, or AASHTO/AWS
Bid Item List Abbreviations
Abbreviation
Meaning
ACRE
acre
CF
cubic foot
CY
cubic yard
EA
each
(F)
final pay item
GAL
gallon
H
hour
LB
pound
LF
linear foot
LS
lump sum
LNMI
lane mile
MFBM
thousand foot board measure
MI
mile
MSYD
thousand station yard
STA
station (100 feet)
SQFT
square foot
SQYD
square yard
TAB
tablet
TON
2,000 pounds
WDAY
working day
1-1.07 DEFINITIONS
1-1.07A General
Interpret terms as defined in the Contract documents.
1-1.07B Glossary
acts of God: "Acts of God" as defined in Pub Cont Code 7105
activity: Task, event, or other project element on a schedule that contributes to completing the project.
An activity has a description, start date, finish date, duration, and one or more logic ties.

SECTION 1

GENERAL

aerially deposited lead: Lead primarily from vehicle emissions deposited within unpaved areas or
formerly unpaved areas.
archaeological monitoring area: Area within or near construction limits where access is allowed, but
work is subject to archaeological monitoring.
archaeological resources: Remains of past human activity, including historic and prehistoric material
(e.g., tools and tool fragments, hearth and food remains, structural remains, and human remains).
authorized laboratory: Independent testing laboratory (1) not employed or compensated by any
subcontractor or subcontractor's affiliate providing other services for the Contract and (2) authorized
by the Department.
base: Layer of specified material of planned thickness placed immediately below the pavement or
surfacing.
basement material: Material in excavation or embankment under the lowest layer to be placed.
bid item: Specific work unit for which the Bidder provides a price.
Bid Item List: List of bid items and the associated quantities. The verified Bid Item List is the Bid Item List
with verified prices. The Contract Proposal of Low Bidder at the Department's Web site is the verified
Bid Item List. After Contract award, interpret a reference to the Bid Item List as a reference to the
verified Bid Item List.
bridge: Structure that:
1. Has a bridge number
2. Carries a utility or railroad or vehicle, pedestrian, or other traffic over, under, or around obstructions or
waterways
building-construction contract: Contract that has "Building Construction" on the cover of the Notice to
Bidders and Special Provisions.
California Test: Department-developed test for determining work quality. For California Tests, go to the
METS Web site.
certificate of compliance: Certificate stating the material complies with the Contract.
Certified Industrial Hygienist: Industrial hygienist certified in comprehensive practice by the American
Board of Industrial Hygiene.
change order work: Work described in a Change Order, including extra work and work described in the
Contract as change order work.
commercial quality: Quality meeting the best general practices.
commercial source: Established business operating as a material source to the general public.
Contract: Written and executed contract between the Department and the Contractor.
Contract acceptance: Director's written acceptance of a completed Contract.
Contract completion date: Current extended date for completion of the Contract shown on the Weekly
Statement of Working Days.
Contractor: Person or business or its legal representative entering into a Contract with the Department
for performance of the work.
controlling activity: Construction activity that will extend the scheduled completion date if delayed.
critical delay: Delay that extends the scheduled completion date.
critical path: Longest continuous chain of activities for the project that has the least amount of total float
of all chains. In general, a delay on the critical path extends the scheduled completion date.
7

SECTION 1

GENERAL

critical path method: Network based planning technique using activity durations and relationships
between activities to calculate a schedule for the entire project.
culvert: Structure other than a bridge that provides an opening under a roadway.
data date: Day after the date through which a schedule is current. Everything occurring earlier than the
data date is as-built and everything on or after the data date is planned.
day: 24 consecutive hours running from midnight to midnight; calendar day.
1. business day: Day on the calendar except Saturday or holiday.
2. working day: Time measure unit for work progress. A working day is any day except:
2.1. Saturday and holiday.
2.2. Day when you cannot perform work on the controlling activity for at least 50 percent of the day
with at least 50 percent of the normal labor and equipment due to any of the following:
2.2.1. Adverse weather-related conditions that cause the Contractor to dismiss the crew.
2.2.2. Maintaining traffic under the Contract.
2.2.3. Engineer's direction to suspend the controlling activities for reasons unrelated to the
Contractor's performance.
2.2.4. Unanticipated event not caused by either party such as:
2.2.4.1. Act of God
2.2.4.2. Act of a public enemy.
2.2.4.3. E
pidemic.
2.2.4.4. F
ire.
2.2.4.5. F
lood.
2.2.4.6. Governor-declared state of emergency.
2.2.4.7. L
andslide.
2.2.4.8. Quarantine restriction.
2.2.5. Issue involving a third party, including:
2.2.5.1. Industry or area-wide labor strike.
2.2.5.2. Material shortage.
2.2.5.3. Freight embargo.
2.2.5.4. Jurisdictional requirement of a law enforcement agency.
2.2.5.5. Workforce labor dispute of a utility or nonhighway facility owner resulting in
a nonhighway facility rearrangement not described and not solely for the
Contractor's convenience. Rearrangement of a nonhighway facility includes
installation, relocation, alteration, or removal of the facility.
deduction: Money permanently taken from progress payment and final payment. Deductions are
cumulative and are not retentions under Pub Cont Code 7107.
Department: Department of Transportation as defined in St & Hwy Code 20 and authorized in St &
Hwy Code 90; its authorized representatives.
detour: Temporary route for traffic around a closed road part. A passageway through a job site is not a
detour.
Director: Department's Director.
Disabled Veteran Business Enterprise: Business certified as a DVBE by the Department of General
Services, Office of Small Business and DVBE Services.
dispose of: Remove from the job site.
divided highway: Highway with separated traveled ways for traffic, generally in opposite directions.
Engineer: The Resident Engineer responsible for the Contract's administration; the Resident Engineer's
authorized representatives.
early completion time: Difference in time between an early scheduled completion date and the Contract
completion date.

SECTION 1

GENERAL

environmentally sensitive area: Area within or near construction limits where access is prohibited or
limited to protect environmental resources.
estimated cost: Estimated cost of the project as shown on the Notice to Bidders.
excusable delay: Delay to a controlling activity beyond the Contractor's control and not reasonably
foreseeable when the work began such as:
1. Change in the work
2. Department action that is not part of the Contract
3. Presence of an underground utility main not described in the Contract or in a location substantially
different from that specified
4. Described facility rearrangement not rearranged as described, by the utility owner by the date
specified, unless the rearrangement is solely for the Contractor's convenience
5. Department's failure to obtain timely access to the right-of-way
6. Department's failure to review a submittal or provide notification in the time specified
extra work: Any work, desired or performed, but not included in the original Contract.
federal-aid contract: Contract that has a federal-aid project number on the cover of the Notice to Bidders
and Special Provisions.
final pay item: Bid item whose quantity shown on the Bid Item List is the quantity paid.
fixed cost: Labor, material, or equipment cost directly incurred by the Contractor as a result of performing
or supplying a particular bid item that remains constant regardless of the item's quantity.
float: Difference between the earliest and latest allowable start or finish times for an activity.
force account work: Work ordered on a construction project without an existing agreement on its cost,
and performed with the understanding that the contractor will bill the owner according to the cost of
labor, materials, and equipment, plus a certain percentage for overhead and profit.
grading plane: Basement material surface on which the lowest layer of subbase, base, pavement,
surfacing, or other specified layer is placed.
highway: Whole right-of-way or area reserved for use in constructing the roadway and its appurtenances.
holiday: Holiday shown in the following table:
Holidays
Holiday
Date observed
Every Sunday
Every Sunday
New Year's Day
January 1st
Birthday of Martin Luther King, Jr. 3rd Monday in January
Lincoln's Birthday
February 12th
Washington's Birthday
3rd Monday in February
Cesar Chavez Day
March 31st
Memorial Day
Last Monday in May
Independence Day
July 4th
Labor Day
1st Monday in September
Columbus Day
2nd Monday in October
Veterans Day
November 11th
Thanksgiving Day
4th Thursday in November
Day after Thanksgiving Day
Day after Thanksgiving Day
Christmas Day
December 25th
If January 1st, February 12th, March 31st, July 4th, November 11th, or December 25th falls on a Sunday,
the Monday following is a holiday. If November 11th falls on a Saturday, the preceding Friday is a holiday.
idle equipment: Equipment:
9

SECTION 1

GENERAL

1. On the job site at the start of a delay


2. Idled because of the delay
3. Not operated during the delay
informal-bid contract: Contract that has "Informal Bid Authorized by Pub Cont Code 10122" on the
cover of the Notice to Bidders and Special Provisions.
job site: Area within the defined boundaries of a project.
Labor Surcharge and Equipment Rental Rates: Department publication that lists labor surcharge and
equipment rental rates.
landscaping: Practice of a landscaping contractor under 16 CA Code of Regs 832.27.
listed species: Any species listed as threatened or endangered under (1) federal Endangered Species
Act of 1973, 16 USC 1531 et seq., (2) California Endangered Species Act, Fish & Game Code
20502115.5, or (3) both.
material: Any product or substance specified for use in the construction of a project.
material shortage: Shortage of raw or produced material that is area-wide and caused by an unusual
market condition except if any of the following occurs:
1. Shortage relates to a produced, nonstandard material
2. Supplier's and the Contractor's priority for filling an order differs
3. Event outside the U.S. for a material produced outside the U.S.
material source facility audit: Self-audit and a Department audit evaluating a facility's capability to
consistently produce materials that comply with Department standards.
median: Portion of a divided highway separating the traveled ways including inside shoulders.
milestone: Event activity that has zero duration and is typically used to represent the start or end of a
certain stage of the project.
mobilization: Preparatory work that must be performed or costs incurred before starting work on the
various items on the job site (Pub Cont Code 10104).
narrative report: Document submitted with each schedule that discusses topics related to project
progress and scheduling.
near critical path: Chain of activities with total float exceeding that of the critical path but having no more
than 10 working days of total float.
paleontological resources: Fossils and the deposits they are found in. Fossils are evidence of ancient
life preserved in sediments and rock. Examples of paleontological resources are remains of (1)
animals, (2) animal tracks, (3) plants, and (4) other organisms. Archaeological resources are not
paleontological and fossils found within an archaeological resource are generally considered
archaeological resources, not paleontological resources.
pavement: Uppermost layer of material placed on the traveled way or shoulder.
permitted biological activities: Monitoring, surveying, or other practices that require a take permit and
project-specific permission from the U.S. Fish and Wildlife Service or NOAA Fisheries or a take
permit or memorandum of understanding with the Department of Fish and Game.
plans: Standard plans, revised standard plans, and project plans.
1. standard plans: Drawings standard to Department construction projects.
2. revised standard plans: New or revised standard plans.
3. project plans: Drawings specific to the project, including authorized shop drawings.
plant establishment period: Number of days shown on the Notice to Bidders for plant establishment.

10

SECTION 1

GENERAL

protective radius: Minimum distance between construction activities and a regulated species.
quality control plan: Contractor's plan to ensure QC.
regulated species: Any species protected by one or any combination of the following:
1.
2.
3.
4.
5.
6.

Federal Endangered Species Act of 1973, 16 USC 1531 et seq.


California Endangered Species Act, Fish & Game Code 20502115.5
Fish & Game Code 16001616
National Environmental Policy Act, 42 USC 4321 et seq.
California Environmental Quality Act, Pub Res Code 21000 et seq.
Other law or regulation that governs activities that affect species or their habitats

roadbed: Roadway portion extending from curb line to curb line or shoulder line to shoulder line. A
divided highway has 2 roadbeds.
roadside: Area between the outside shoulder edge and the right-of-way limits.
roadway: That portion of the highway within the outside lines of curbs, sidewalks, slopes, ditches,
channels, or waterways. Roadway includes structures and features necessary for safety, protection of
facilities, and drainage.
routine biological activities: Biological monitoring, surveying, or other activity that does not require a
take permit from the U.S. Fish and Wildlife Service or NOAA Fisheries or a take permit or memo of
understanding with the Department of Fish and Game.
schedule:
1. baseline schedule: Initial schedule showing the original work plan starting on the date of Contract
approval. This schedule shows no completed work to date and no negative float or negative lag to
any activity.
2. revised schedule: Schedule that incorporates a proposed or past change to logic or activity
durations.
3. updated schedule: Current schedule developed from the accepted baseline and any subsequent
accepted updated or revised schedules through regular monthly review to incorporate actual past
progress.
scheduled completion date: Planned project completion date shown on the current schedule.
service-approved biologist: Biologist whose activities must be approved by a state or federal agency as
provided in PLACs.
shoulder: Roadway portion contiguous with the traveled way for stopped vehicle accommodation,
emergency use, and lateral support of base and surface courses.
small tool: Tool or piece of equipment not listed in Labor Surcharge and Equipment Rental Rates that
has a replacement value of $500 or less.
specifications: Standard specifications, revised standard specifications, and special provisions.
1. standard specifications: Specifications standard to Department construction projects. These
specifications are in a book titled Standard Specifications.
2. revised standard specifications: New or revised standard specifications. These specifications are
in a section titled Revised Standard Specifications of a book titled Notice to Bidders and Special
Provisions.
3. special provisions: Specifications specific to the project. These specifications are in a section titled
Special Provisions of a book titled Notice to Bidders and Special Provisions.
State: The State of California, including its agencies, departments or divisions whose conduct or action is
related to the work.
Structure Design: Offices of Structure Design of the Department of Transportation.
subbase: Layer of material between a base and the basement material.
11

SECTION 1

GENERAL

subgrade: Roadbed portion on which pavement, surfacing, base, subbase, or a layer of any other
material is placed.
submittal:
1. action submittal: Written and graphic information and samples that require the Department's
response.
2. informational submittal: Written information that does not require the Department's response.
substantial defects: Defects plainly seen as damaged, displaced, or missing parts or improper
functioning of materials, parts, equipment, or systems.
substructure: Bridge parts below the bridge seats, pier tops, and haunches for rigid-framed bridges or
spring lines for arched bridges; includes abutment backwalls, abutment parapets, and wingwalls.
superstructure: Bridge parts except the substructure.
supplemental project information: Information relevant to the project, specified as supplemental project
information, and made available to bidders.
Department-owned float: Time saved on the critical path by actions of the Department. It is the last
activity shown on the schedule before the scheduled completion date.
surfacing: Uppermost layer of material placed on a traveled way or shoulders; pavement.
take: Legal definition regarding harm to listed species as defined in 16 USC 1532 and Fish & Game
Code 86.
take permit: Permit granted by the U.S. Fish and Wildlife Service or by the NOAA Fisheries that allows
take of federal-listed species under 16 USC 1539 or by the Department of Fish and Game that
allows take of state-listed species under Fish & Game Code 2081.
time impact analysis: Analysis using a CPM schedule developed specifically to demonstrate the effect a
proposed or past change or delay has on the current scheduled completion date.
time-scaled network diagram: Graphic depiction of a CPM schedule comprised of activity bars with
relationships for each activity represented by arrows. The tail of each arrow connects to the activity
bar for the predecessor and points to the successor.
total bid: Sum of the item totals as verified by the Department; original Contract price.
total float: Amount of time that an activity or chain of activities can be delayed before extending the
scheduled completion date.
traffic: Pedestrians, bicyclists, ridden or herded animals, vehicles, streetcars, and other conveyances
either singularly or together while using any highway for purposes of travel.
traffic lane: Portion of traveled way used for the movement of a single line of vehicles.
traveled way: Roadway portion for the movement of vehicles except shoulders.
tunnel: Tunnel as defined in 8 CA Code of Regs 8405 et seq.
unauthorized work: Work performed beyond the lines and grades described in the Contract or
established by the Engineer or extra work performed without authority.
withhold: Money temporarily or permanently taken from progress payment.
work: Resources and activities required for Contract acceptance, including labor, materials, equipment,
and the created product.
work plan: Detailed formulation of a program of action.
work zone: Area of a highway with construction, maintenance, or utility work activities.

12

SECTION 1

GENERAL

1-1.08 DISTRICTS
The Department's district composition and office addresses are as shown in the following table:
District
1

7
8

District Composition and Office Addresses


Counties
Street address
Del Norte (DN), Humboldt
1656 UNION ST
(Hum), Lake (Lak), Mendocino
EUREKA CA
(Men)
Lassen (Las), Modoc (Mod),
1657 RIVERSIDE DR
Plumas (Plu), Shasta (Sha),
REDDING CA
Siskiyou (Sis), Tehama (Teh),
Trinity (Tri)
Butte (But), Colusa (Col), El
703 B ST
Dorado (ED), Glenn (Gle),
MARYSVILLE CA
Nevada (Nev), Placer (Pla),
Sacramento (Sac), Sierra (Sie),
Sutter (Sut), Yolo (Yol), Yuba
(Yub)
Alameda (Ala), Contra Costa
111 GRAND AVE
(CC), Marin (Mrn), Napa (Nap),
OAKLAND CA
San Francisco (SF), San Mateo
(SM), Santa Clara (SCl), Solano
(Sol), Sonoma (Son)
Monterey (Mon) San Benito
50 HIGUERA ST
(SBt), San Luis Obispo (SLO),
SAN LUIS OBISPO CA
Santa Barbara (SB), Santa Cruz
(SCr)
Fresno (Fre), Kern (Ker), Kings
1352 W. OLIVE AVE
(Kin), Madera (Mad), Tulare
FRESNO CA
(Tul)
Los Angeles (LA), Ventura (Ven) 100 S. MAIN ST
LOS ANGELES CA
Riverside (Riv), San Bernardino
464 W 4TH St
(SBd)
SAN BERNARDINO CA

Inyo (Iny), Mono (Mno)

10

11

Alpine (Alp), Amador (Ama),


Calaveras (Cal), Mariposa
(Mpa), Merced (Mer), San
Joaquin (SJ), Stanislaus (Sta),
Tuolumne (Tuo)
Imperial (Imp), San Diego (SD)

12

Orange (Ora)

500 S MAIN ST
BISHOP CA
1976 E CHARTER WAY
STOCKTON CA

4050 TAYLOR ST
SAN DIEGO CA
3347 MICHELSON DR STE 100
IRVINE CA

Mailing address
PO BOX 3700
EUREKA CA 95502
PO BOX 496073
REDDING CA 96049
6073
PO BOX 911
MARYSVILLE CA 95901

PO BOX 23660
OAKLAND CA 94623
0660

50 HIGUERA ST
SAN LUIS OBISPO, CA
93401-5415
PO BOX 12616
FRESNO CA 93728-2616
100 S MAIN ST
LOS ANGELES CA 90012
464 W 4TH St
SAN BERNARDINO CA
92401-1400
500 S MAIN ST
BISHOP CA 93514-3423
PO BOX 2048
STOCKTON CA 95201

4050 TAYLOR ST
SAN DIEGO CA 92110
2737
3347 MICHELSON DR
STE 100
IRVINE CA 92612-0661

A project with work in District 1, 2, or 3 is a North Region project. For Districts 1, 2, and 3, interpret each
reference to the district office as the North Region office. The North Region office address is the District 3
address.

13

SECTION 1

GENERAL

1-1.09 FREEZE-THAW AREAS


Freeze-thaw areas are areas of the State where freeze-thaw cycles and heavy salting frequently occur. A
project is in a freeze-thaw area if the project is specified in the special provisions to be in a freeze-thaw
area.
1-1.10 RESERVED
1-1.11 WEB SITES, ADDRESSES, AND TELEPHONE NUMBERS

Reference or
agency or
department unit
Authorized
Laboratory Lists
Authorized Material
Lists
Authorized Material
Source Lists
Bidders' Exchange

CA Unified
Certification
Program's list of
certified DBEs
Department
Department of
Conservation,
Office of Mine
Reclamation
Department of
General Services,
Office of Small
Business and
DVBE Services
Department of
Industrial Relations
Division of
Accounting, Office
of External
Accounts Payable

Division of
Construction
Geotechnical
Services

Web Sites, Addresses, and Telephone Numbers


Web site
Address

http://www.dot.c
a.gov/hq/esc/ap
proved_products
_list

http://www.dot.c
a.gov/hq/esc/oe/
bidex

http://www.dot.c
a.gov/hq/bep/fin
d_certified.htm

MSC 26
BIDDERS' EXCHANGE
DEPARTMENT OF TRANSPORTATION
1727 30TH ST
SACRAMENTO CA 95816-7005
-

Telephone no.

--

(916) 227-6259

--

http://www.dot.c
a.gov
http://www.cons
ervation.ca.gov/
omr/

--

--

http://www.pd.dg
s.ca.gov/smbus/
default.htm

OFFICE OF SMALL BUSINESS AND DVBE


SERVICES
DEPARTMENT OF GENERAL SERVICES
707 3RD ST
WEST SACRAMENTO CA 95605-2811
455 GOLDEN GATE AVENUE
SAN FRANCISCO CA 94102
MAJOR CONSTRUCTION PAYMENT AND
INFORMATION UNIT
OFFICE OF EXTERNAL ACCOUNTS
PAYABLE
DIVISION OF ACCOUNTING
DEPARTMENT OF TRANSPORTATION
P.O. BOX 168043
SACRAMENTO CA 95816-8043
-

(800) 559-5529
(916) 375-4940

GEOTECHNICAL SERVICES
DEPARTMENT OF TRANSPORTATION
5900 FOLSOM BLVD
SACRAMENTO CA 95819-4612

(916) 227-7000

http://www.dir.ca
.gov
http://www.dot.c
a.gov/hq/asc/oa
p/payments/cont
act.htm#conpets
1

http://www.dot.c
a.gov/hq/constru
c/
http://www.dot.c
a.gov/hq/esc/ge
otech

14

-(916) 227-9013

--

SECTION 1
METS

GENERAL

http://www.dot.c
a.gov/hq/esc/Tra
nslab/

Office Engineer

--

Offices of Structure
Design, Documents
Unit

--

Publication
Distribution Unit

--

MATERIALS ENGINEERING AND


TESTING SERVICES
DEPARTMENT OF TRANSPORTATION
5900 FOLSOM BLVD
SACRAMENTO CA 95819-4612
MSC 43
OFFICE ENGINEER
DEPARTMENT OF TRANSPORTATION
1727 30TH ST
SACRAMENTO CA 95816-7005
MSC 9-4/4I
DOCUMENTS UNIT OFFICES OF
STRUCTURE DESIGN
DEPARTMENT OF TRANSPORTATION
1801 30TH ST
SACRAMENTO CA 95816-7006
PUBLICATION UNIT
DEPARTMENT OF TRANSPORTATION
1900 ROYAL OAKS DRIVE
SACRAMENTO CA 95815-3800

1-1.12 MISCELLANY
Make checks and bonds payable to the Department of Transportation.
1-1.131-1.15 RESERVED

15

(916) 227-7000

--

(916) 227-0716

2 BIDDING

2-1.01 GENERAL
Section 2 includes specifications related to bid eligibility and the bidding process.
2-1.02 BID INELIGIBILITY
A firm that has provided architectural or engineering services to the Department for this contract before
bid submittal for this contract is prohibited from any of the following:
1. Submitting a bid
2. Subcontracting for a part of the work
3. S
upplying materials
2-1.032-1.05 RESERVED
2-1.06 BID DOCUMENTS
2-1.06A General
Standard Specifications and Standard Plans may be viewed at the Bidders' Exchange Web site and may
be purchased at the Publication Distribution Unit.
The Notice to Bidders and Special Provisions and project plans may be viewed at the Bidders' Exchange
Web site and at the street address.
Bid books may be ordered at the Bidders' Exchange Web site.
For an informal-bid contract in addition to viewing and ordering them as specified above, the Notice to
Bidders and Special Provisions, project plans, and Bid book may be obtained at the Bidders' Exchange
street address.
The Notice to Bidders and Special Provisions includes the Notice to Bidders, revised standard
specifications, and special provisions.
2-1.06B Supplemental Project Information
The Department makes supplemental information available as specified in the special provisions.
Logs of test borings are supplemental project information.
If an Information Handout is available:
1. You may view it at the Bidders' Exchange Web site
2. For an informal-bid contract, you may obtain it at the Bidders' Exchange street address
If rock cores are available, you may view them by sending a request to Coreroom@dot.ca.gov.
If other supplemental project information is available for inspection, you may view it by phoning in a
request. Make your request at least 7 days before viewing. Include in your request:
1.
2.
3.
4.

District-County-Route
C
ontract number
V
iewing date
Contact information, including telephone number

For rock cores, also include the bridge number in your request.
If bridge as-built drawings are available:
1. For a project in District 1 through 6 or 10, you may request them from the Office of Structure
Maintenance and Investigations, fax (916) 227-8357
2. For a project in District 7, 8, 9, 11, or 12, you may request them from the Office of Structure
Maintenance and Investigations, fax (916) 227-8357, and are available at the Office of Structure
Maintenance and Investigations, Los Angeles, CA, telephone (213) 897-0877

17

SECTION 2

BIDDING

As-built drawings may not show existing dimensions and conditions. Where new construction dimensions
are dependent on existing bridge dimensions, verify the field dimensions and adjust dimensions of the
work to fit existing conditions.
2-1.06C2-1.06D Reserved
2-1.072-1.11 RESERVED
2-1.12 DISADVANTAGED BUSINESS ENTERPRISES
2-1.12A General
Section 2-1.12 applies to a federal-aid contract.
Under 49 CFR 26.13(b):
The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color,
national origin, or sex in the performance of this contract. The contractor shall carry out
applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted
contracts. Failure by the contractor to carry out these requirements is a material breach of this
contract, which may result in the termination of this contract or such other remedy as the
recipient deems appropriate.
Take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the Contract
(49 CFR 26).
2-1.12B Underutilized Disadvantaged Business Enterprises
2-1.12B(1) General
Section 2-1.12B applies if a UDBE goal is shown on the Notice to Bidders.
To ensure equal participation of DBE groups provided in 49 CFR 26.5, the Department shows a goal for
UDBEs. A UDBE is a firm that meets the definition of DBE and is a member of one of the following
groups:
1.
2.
3.
4.

B
lack Americans
N
ative Americans
A
sian-Pacific Americans
Women

References to DBEs include UDBEs, but references to UDBEs do not include all DBEs.
Make work available to UDBEs and select work parts consistent with available UDBE subcontractors and
suppliers.
Meet the UDBE goal shown on the Notice to Bidders or demonstrate that you made adequate good faith
efforts to meet this goal.
You are responsible to verify that the at the bid opening date the UDBE firm is certified as DBE by the CA
Unified Certification Program.
Only UDBE participation will count toward the UDBE goal. DBE participation will count toward the
Department's federally-mandated statewide overall DBE goal.
Credit for materials or supplies you purchase from UDBEs counts toward the goal in the following
manner:
1. 100 percent if the materials or supplies are obtained from a UDBE manufacturer.
2. 60 percent if the materials or supplies are obtained from a UDBE regular dealer.
3. Only fees, commissions, and charges for assistance in the procurement and delivery of materials or
supplies, if they are obtained from a UDBE that is neither a manufacturer nor regular dealer. 49 CFR
26.55 defines "manufacturer" and "regular dealer."
You receive credit toward the goal if you employ a UDBE trucking company that performs a commercially
useful function as defined in 49 CFR 26.55(d)(1)(4), (6).

18

SECTION 2

BIDDING

2-1.12B(2) UDBE Commitment Submittal


Submit UDBE information on the Caltrans Bidder - UDBE - Commitment form (UDBE commitment form)
included in the Bid book. If the form is not submitted with the bid, remove the form from the Bid book
before submitting your bid.
If the UDBE commitment form is not submitted with the bid, the apparent low bidder, the 2nd low bidder,
and the 3rd low bidder must complete and submit the form to the Office Engineer. The UDBE commitment
form must be received by the Office Engineer no later than 4:00 p.m. on the 4th business day after bid
opening.
Other bidders are not required to submit the UDBE commitment form unless the Department requests it. If
the Department requests a UDBE commitment form from you, submit the completed form within 4
business days of the request.
Submit written confirmation from each UDBE shown on the form stating that it will be participating in the
Contract. Include confirmation with the UDBE commitment form. A copy of a UDBE's quote will serve as
written confirmation that the UDBE will be participating in the Contract.
If you do not submit the UDBE commitment form by the specified time, your bid is nonresponsive.
2-1.12B(3) Good Faith Efforts Submittal
If you have not met the UDBE goal, complete and submit the Good Faith Efforts Documentation form with
the bid showing that you made adequate good faith efforts to meet the goal. Only good faith efforts
directed toward obtaining participation by UDBEs are considered. If good faith efforts documentation is
not submitted with the bid, it must be received by the Office Engineer no later than 4:00 p.m. on the 4th
business day after bid opening.
If your UDBE commitment form shows that you have met the UDBE goal or if you are required to submit
the UDBE commitment form, you must submit good faith efforts documentation within the specified time
to protect your eligibility for award of the contract in the event the Department finds that the UDBE goal
has not been met. Good faith efforts documentation must include the following information and supporting
documents, as necessary:
1. Items of work you have made available to UDBE firms. Identify those items of work you might
otherwise perform with your own forces and those items that have been broken down into
economically feasible units to facilitate UDBE participation. For each item listed, show the dollar value
and percentage of the total bid. You are responsible to demonstrate that sufficient work to meet the
goal was made available to UDBE firms.
2. Names of certified UDBEs and dates on which they were solicited to bid on the project. Include the
items of work offered. Describe the methods used for following up initial solicitations to determine with
certainty whether the UDBEs were interested and include the dates of the follow-up. Attach
supporting documents such as copies of letters, memos, facsimiles sent, telephone logs, telephone
billing statements, and other evidence of solicitation. You are reminded to solicit certified UDBEs
through all reasonable and available means and provide enough time to allow UDBEs to respond.
3. Name of selected firm and its status as a UDBE for each item of work made available. Include name,
address, and telephone number of each UDBE that provided a quote and its price quote. If the firm
selected for the item is not a UDBE, provide the reasons for the selection.
4. Name and date of each publication in which you requested UDBE participation for the project. Attach
copies of the published advertisements.
5. Names of agencies and dates on which they were contacted to provide assistance in contacting,
recruiting, and using UDBE firms. If the agencies were contacted in writing, provide copies of
supporting documents.
6. List of efforts made to provide interested UDBEs with adequate information about the plans,
specifications, and requirements of the contract to assist them in responding to a solicitation. If you
have provided information, identify the name of the UDBE assisted, the nature of the information
provided, and date of contact. Provide copies of supporting documents, as appropriate.
7. List of efforts made to assist interested UDBEs in obtaining bonding, lines of credit, insurance,
necessary equipment, supplies, and materials excluding supplies and equipment that the UDBE
subcontractor purchases or leases from the prime contractor or its affiliate. If such assistance is
provided by you, identify the name of the UDBE assisted, nature of the assistance offered, and date
assistance was offered. Provide copies of supporting documents, as appropriate.
19

SECTION 2

BIDDING

8. Any additional data to support demonstration of good faith efforts.


The Department may consider UDBE commitments of the 2nd and 3rd bidders in determining whether the
low bidder made good faith efforts to meet the UDBE goal.
2-1.132-1.14 RESERVED
2-1.15 DISABLED VETERAN BUSINESS ENTERPRISES
2-1.15A General
Section 2-1.15 applies to a non-federal-aid contract.
Take necessary and reasonable steps to ensure that DVBEs have opportunity to participate in the
Contract.
Comply with Mil & Vet Code 999 et seq.
2-1.15B Projects $5 Million or Less
Section 2-1.15B applies to a project with an estimated cost of $5 million or less.
Make work available to DVBEs and select work parts consistent with available DVBE subcontractors and
suppliers.
Meet the goal shown on the Notice to Bidders.
Complete and submit the Certified DVBE Summary form. List all DVBE participation on this form. For an
informal-bid contract, submit the form with your bid. For a non-informal-bid contract, you may submit the
form with your bid; if you do not, submit it such that it is received at the Office Engineer no later than 4:00
p.m. on the 4th business day after bid opening. If a DVBE joint venture is used, submit the joint venture
agreement with the Certified DVBE Summary form.
List each 1st-tier DVBE subcontractor in the Subcontractor List form regardless of percentage of the total
bid.
2-1.15C Projects More Than $5 Million
2-1.15C(1) General
Section 2-1.15C applies to a project with an estimated cost of more than $5 million
The Department encourages bidders to obtain DVBE participation to ensure the Department achieves its
State-mandated overall DVBE goal.
If you obtain DVBE participation:
1. Complete and submit the Certified DVBE Summary form. List all DVBE participation on this form.
2. List each 1st tier DVBE subcontractor in the Subcontractor List form regardless of percentage of the
total bid.
2-1.15C(2) DVBE Incentive
The Department grants a DVBE incentive to each bidder who achieves a DVBE participation of 1 percent
or greater (Mil & Vet Code 999.5 and Code of Regs 1896.98 et seq.).
To receive this incentive, submit the Certified DVBE Summary form. For an informal-bid contract, submit
the form with your bid. For a non-informal-bid-contract, you may submit the form with your bid; if you do
not and you are the low bidder or the 2nd or 3rd low bidder, submit it such that it is received at the Office
Engineer no later than 4:00 p.m. on the 4th business day after bid opening. If a DVBE joint venture is
used, submit the joint venture agreement with the Certified DVBE Summary form. Other bidders may be
required to submit this form if bid ranking changes.
2-1.15C(3) Incentive Evaluation
The Department applies the small business and nonsmall business preference during bid verification
and proceeds with the evaluation specified below for DVBE incentive.

20

SECTION 2

BIDDING

The DVBE incentive is a reduction, for bid comparison only, in the total bid submitted by the lesser of the
following amounts:
1. Percentage of DVBE achievement rounded to 2 decimal places of the verified total bid of the low
bidder
2. 5 percent of the verified total bid of the low bidder
3. $250,000
The Department applies DVBE incentive and determines whether bid ranking changes.
A nonsmall business bidder cannot displace a small business bidder. However, a small business bidder
with higher DVBE achievement can displace another small business bidder.
The Department proceeds with awarding the contract to the new low bidder and posts the new verified bid
results at the Department's Web site.
2-1.162-1.17 RESERVED
2-1.18 SMALL BUSINESS AND NONSMALL BUSINESS SUBCONTRACTOR PREFERENCES
2-1.18A General
Section 2-1.18 applies to a non-federal-aid contract.
The Department applies small business preferences and nonsmall business preferences under Govt
Code 14835 et seq. and 2 CA Code of Regs 1896 et seq.
Any contractor, subcontractors, supplier, or service provider who qualifies as a small business is
encouraged to apply for certification as a small business by submitting its application to the Department of
General Services, Office of Small Business and DVBE Services.
contract award is based on the total bid, not the reduced bid.
2-1.18B Small Business Preference
The Department allows a bidder certified as a small business by the Department of General Services,
Office of Small Business and DVBE Services, a preference if:
1. Bidder submitted a completed Request for Small Business Preference or NonSmall Business
Preference form with its bid
2. Low bidder did not request the preference or is not certified as a small business
The bidder's signature on the Request for Small Business Preference or NonSmall Business Preference
form certifies that the bidder is certified as a small business at the time and day of bid or has submitted a
complete application to the Department of General Services. The complete application and any required
substantiating documentation must be received by the Department of General Services by 5:00 p.m. on
the bid opening date.
The Department of General Services determines whether a bidder was certified on the bid opening date.
The Department of Transportation confirms the bidder's status as a small business before applying the
small business preference.
The small business preference is a reduction for bid comparison in the total bid submitted by the small
business contractor by the lesser of the following amounts:
1. 5 percent of the verified total bid of the low bidder
2. $50,000
If the Department determines that a certified small business bidder is the low bidder after the application
of the small business preference, the Department does not consider a request for nonsmall business
preference.
2-1.18C NonSmall Business Subcontractor Preference
The Department allows a bidder not certified as a small business by the Department of General Services,
Office of Small Business and DVBE Services, a preference if:
21

SECTION 2

BIDDING

1. Bidder submitted a completed Request for Small Business Preference or NonSmall Business
Preference form with its bid.
2. Certified Small Business Listing for the NonSmall Business Preference form shows that you are
subcontracting at least 25 percent to certified small businesses. You may submit this information with
your bid. If you do not, submit it such that it is received at the Office Engineer no later than 4:00 p.m.
on the 2nd business day after bid opening.
Each listed subcontractor and supplier must be certified as a small business at the time and day of bid or
must have submitted a complete application to the Department of General Services. The complete
application and any required substantiating documentation must be received by the Department of
General Services by 5:00 p.m. on the bid opening date.
The nonsmall business subcontractor preference is a reduction for bid comparison in the total bid
submitted by the nonsmall business contractor requesting the preference by the lesser of the following
amounts:
1. 5 percent of the verified total bid of the low bidder
2. $50,000
2-1.192-1.23 RESERVED
2-1.24 TIED BID RESOLUTION
If a small business bidder and a nonsmall business bidder request preferences and the reductions result
in a tied bid, the Department awards the contract to the small business bidder.
If a DVBE small business bidder and a non-DVBE small business bidder request preferences and the
reduction results in a tied bid, the Department awards the contract to the DVBE small business bidder.
After bid verification, the Department breaks a tie between 2 or more bidders with a coin toss.
2-1.252-1.26 RESERVED
2-1.27 CALIFORNIA COMPANIES
Section 2-1.27 applies to a non-federal-aid contract.
Under Pub Cont Code 6107, the Department gives preference to a "California company," as defined, for
bid comparison purposes over a nonresident contractor from any state that gives or requires a preference
to be given to contractors from that state on its public entity construction contracts.
Complete a California Company Preference form.
The California company reciprocal preference amount is equal to the preference amount applied by the
state of the nonresident contractor with the lowest responsive bid unless the California company is
eligible for a small business preference or a nonsmall business subcontractor preference, in which case
the preference amount is the greater of the two, but not both.
If the low bidder is not a California company and a California company's bid with reciprocal preference is
equal to or less than the lowest bid, the Department awards the contract to the California company on the
basis of its total bid.
2-1.282-1.29 RESERVED
2-1.30 JOB SITE AND DOCUMENT EXAMINATION
Examine the job site and bid documents.
Bid submission is your acknowledgment that you have examined the job site and bid documents and are
satisfied with:
1.
2.
3.
4.
5.

General and local conditions to be encountered


Character, quality, and scope of work to be performed
Quantities of materials to be furnished
Character, quality, and quantity of surface and subsurface materials or obstacles
Requirements of the contract

22

SECTION 2

BIDDING

2-1.312-1.32 RESERVED
2-1.33 BID DOCUMENT COMPLETION
2-1.33A General
Complete forms in the Bid book. Submit the forms with your bid.
On the Subcontractor List you may either submit the percentage of each bid item subcontracted with your
bid or fax the percentage to (916) 227-6282 within 24 hours after bid opening.
Except for the percentage of each bid item subcontracted, do not fax submittals.
2-1.33B Bid Item List and Bid Comparison
Submit a bid based on the bid item quantities the Department shows on the Bid Item List.
For a lump sum based bid, the Department compares bids based on the total price.
For a unit price based bid, the Department compares bids based on the sum of the item totals.
For a cost plus time based bid, the Department compares bids based on the sum of the item totals and
the total bid for time.
2-1.33C Subcontractor List
On the Subcontractor List, list each subcontractor to perform work in an amount in excess of 1/2 of 1
percent of the total bid or $10,000, whichever is greater (Pub Cont Code 4100 et seq.).
The Subcontractor List must show the name, address, and work portions to be performed by each
subcontractor listed. Show work portions by bid item number, description, and percentage of each bid
item subcontracted.
2-1.33D Opt Out of Payment Adjustments for Price Index Fluctuations
You may opt out of the payment adjustments for price index fluctuations specified in section 9-1.07. To
opt out, submit a completed Opt Out of Payment Adjustments for Price Index Fluctuations form with your
bid.
2-1.33E Reserved
2-1.34 BIDDER'S SECURITY
Submit your bid with one of the following forms of bidder's security equal to at least 10 percent of the bid:
1.
2.
3.
4.

Cash
Cashier's check
Certified check
Bidder's bond signed by a surety insurer who is licensed in California

If using a bidder's bond, you may use the form in the Bid book. If you do not use the form in the Bid book,
use a form containing the same information.
2-1.35 SSPC QP CERTIFICATION PREAWARD QUALIFICATION
Submit the SSPC QP certification required under section 59-2.01D(1) with your bid. Failure to submit the
certification results in a nonresponsive bid.
2-1.36 RESERVED
2-1.37 BID SUBMITTAL
Submit your bid:
1. Under sealed cover
2. Marked as a bid
3. Identifying the contract number and the bid opening date
If an agent other than the authorized corporation officer or a partnership member signs the bid, file a
Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may
be nonresponsive.
23

SECTION 2

BIDDING

2-1.382-1.39 RESERVED
2-1.40 BID WITHDRAWAL
An authorized agent may withdraw a bid before the bid opening date and time by submitting a written bid
withdrawal request at the location where the bid was submitted. Withdrawing a bid does not prevent you
from submitting a new bid.
After the bid opening time, you cannot withdraw a bid.
2-1.412-1.42 RESERVED
2-1.43 BID OPENING
The Department publicly opens and reads bids at the time and place shown on the Notice to Bidders.
2-1.442-1.45 RESERVED
2-1.46 BID REJECTION
The Department may reject:
1. All bids
2. A nonresponsive bid
2-1.47 BID RELIEF
The Department may grant bid relief under Pub Cont Code 5100 et seq. Submit any request for bid
relief to the Office Engineer. The Relief of Bid Request form is available at the Department's Web site.
2-1.48 RESERVED
2-1.49 SUBMITTAL FAILURE HISTORY
The Department considers a bidder's past failure to submit documents required after bid opening in
determining a bidder's responsibility.
2-1.50 BID RIGGING
Section 2-1.50 applies to a federal-aid contract.
The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities.
Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number
is (800) 424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous..
The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and
abuse and is operated under the direction of the DOT Inspector General.

24

3 CONTRACT AWARD AND EXECUTION


3-1.01 GENERAL
Section 3 includes specifications related to contract award and execution.
3-1.023-1.03 RESERVED
3-1.04 CONTRACT AWARD
Submit any bid protest to the Office Engineer.
If the Department awards the contract, the award is made to the lowest responsible bidder within the
number of days shown in the following table:
Days after bid opening
30
60

Contract Award Period


Project estimated cost shown on the Notice to Bidders
$200 million
$200 million

The Department may extend the specified award period if the bidder agrees.
3-1.05 CONTRACT BONDS (PUB CONT CODE 10221 AND 10222)
The successful bidder must furnish 2 bonds:
1. Payment bond to secure the claim payments of laborers, workers, mechanics, or materialmen
providing goods, labor, or services under the Contract. This bond must be equal to at least 100
percent of the total bid.
2. Performance bond to guarantee the faithful performance of the Contract. This bond must be equal to
at least 50 percent of the total bid.
The Department furnishes the successful bidder with bond forms.
3-1.06 CONTRACTOR LICENSE
For a federal-aid contract, the Contractor must be properly licensed as a contractor from contract award
through Contract acceptance (Pub Cont Code 10164).
For a non-federal-aid contract:
1. The Contractor must be properly licensed as a contractor from bid opening through Contract
acceptance (Bus & Prof Code 7028.15)
2. Joint venture bidders must obtain a joint venture license before contract award (Bus & Prof Code
7029.1)
3-1.07 INSURANCE POLICIES
The successful bidder must submit:
1. Copy of its commercial general liability policy and its excess policy or binder until such time as a
policy is available, including the declarations page, applicable endorsements, riders, and other
modifications in effect at the time of contract execution. Standard ISO form no. CG 0001 or similar
exclusions are allowed if not inconsistent with section 7-1.06. Allowance of additional exclusions is at
the discretion of the Department.
2. Certificate of insurance showing all other required coverages. Certificates of insurance, as evidence
of required insurance for the auto liability and any other required policy, shall set forth deductible
amounts applicable to each policy and all exclusions that are added by endorsement to each policy.
The evidence of insurance shall provide that no cancellation, lapse, or reduction of coverage will
occur without 10 days prior written notice to the Department.
3. A declaration under the penalty of perjury by a CPA certifying the accountant has applied GAAP
guidelines confirming the successful bidder has sufficient funds and resources to cover any self
insured retentions if the self-insured retention is over $50,000.
If the successful bidder uses any form of self-insurance for workers compensation in lieu of an insurance
policy, it shall submit a certificate of consent to self-insure under Labor Code 3700.
25

SECTION 3

CONTRACT AWARD AND EXECUTION

3-1.08 SMALL BUSINESS PARTICIPATION REPORT


The Department has established an overall 25 percent small business participation goal. The Department
is tracking small business participation on all contracts to determine whether the goal is achieved.
Complete and sign the Small Business (SB) Participation Report form included in the contract documents
whether or not no small business participation is reported.
3-1.093-1.10 RESERVED
3-1.11 PAYEE DATA RECORD
Complete and sign the Payee Data Record form included in the contract documents.
3-1.12 CALTRANS BIDDER - DBE INFORMATION FORM
Section 3-1.12 applies to a federal-aid contract.
Complete and sign the Caltrans Bidder - DBE Information form included in the contract documents
regardless of whether no DBE participation is reported.
Provide written confirmation from each DBE that the DBE is participating in the Contract. A copy of a
DBE's quote serves as written confirmation. If a DBE is participating as a joint venture partner, the
Department encourages you to submit a copy of the joint venture agreement.
3-1.133-1.17 RESERVED
3-1.18 CONTRACT EXECUTION
The successful bidder must sign the Contract form.
Deliver to the Office Engineer:
1.
2.
3.
4.
5.
6.

Signed Contract form


Contract bonds
Documents identified in section 3-1.07
Payee Data Record
Small Business (SB) Participation Report form
For a federal-aid contract, Caltrans Bidder - DBE Information form

For an informal-bid contract, the Office Engineer must receive these documents before the 5th business
day after the bidder receives the contract.
For all other contracts, the Office Engineer must receive these documents before the 10th business day
after the bidder receives the contract.
The bidder's security may be forfeited for failure to execute the contract within the time specified (Pub
Cont Code 10181, 10182, and 10183).
The following is a copy of the Contract form:

26

SECTION 3

CONTRACT AWARD AND EXECUTION

3-1.19 BIDDERS' SECURITIES


The Department keeps the securities of the 1st, 2nd, and 3rd low bidders until the contract has been
executed. The other bidders' securities, other than bidders' bonds, are returned upon determination of the
1st, 2nd, and 3rd low bidders, and their bidders' bonds are of no further effect (Pub Cont Code 10184).

27

4 SCOPE OF WORK

4-1.01 GENERAL
Section 4 includes specifications related to the scope of work.
4-1.02 INTENT
The Contract intent is to provide for work completion using the best general practices.
Nothing in the specifications voids the Contractor's public safety responsibilities.
4-1.03 WORK DESCRIPTION
Construct the work described on the Notice to Bidders and as described in the Contract.
4-1.04 USE OF MATERIALS FOUND ON THE JOB SITE
You may use aggregate or other materials found in excavation that comply with the specifications. The
Department pays for the material excavated at the excavation item Contract price. Replace the quantity of
material removed and used with an equal quantity of material. The material must have been designated
for use in the work. Except for material used as structure backfill, the Department does not pay for
replacing the material. The Department pays for excavated material replacement used for structure
backfill at the Contract price for structure backfill. Do not excavate material from outside the excavation's
slope and grade lines without authorization.
4-1.05 CHANGES AND EXTRA WORK
4-1.05A General
The Department may make changes within the scope of work and add extra work. The Engineer
describes the changes and extra work, the payment basis, and any time adjustment in a Change Order.
A Change Order is approved when the Department signs the Change Order.
Until the Department approves a Change Order, continue to perform the work under the Contract unless
the Engineer orders you to start the work described in the Change Order before its approval.
Submit detailed cost data for a unit price adjustment for a bid item if (1) the Engineer requests the data or
(2) you request a unit price adjustment resulting from a change of more than 25 percent in the bid item's
quantity.
4-1.05B Work-Character Changes
The Department adjusts the unit price for an item if:
1. An ordered plan or specification change materially changes the character of a work item from that on
which the bid price was based
2. The unit cost of the changed item differs when compared to the unit cost of that item under the
original plans and specifications
3. N
o approved Change Order addresses the payment
4-1.06 DIFFERING SITE CONDITIONS (23 CFR 635.109)
4-1.06A General
Reserved
4-1.06B Contractor's Notification
Promptly notify the Engineer if you find either of the following conditions:
1. Physical conditions differing materially from either of the following:
1.1. Contract documents
1.2. Job site examination
2. Physical conditions of an unusual nature, differing materially from those ordinarily encountered and
generally recognized as inherent in the work provided for in the Contract
Include details explaining the information you relied on and the material differences you discovered.

29

SECTION 4

SCOPE OF WORK

If you fail to promptly notify the Engineer, you waive the differing site condition claim for the period
between your discovery of the differing site condition and your notification to the Engineer.
If you disturb the site after discovery and before the Engineer's investigation, you waive the differing site
condition claim.
4-1.06C Engineer's Investigation and Decision
Upon your notification, the Engineer investigates job site conditions and:
1. Notifies you whether to resume affected work
2. Decides whether the condition differs materially and is cause for an adjustment of time, payment, or
both
4-1.07 VALUE ENGINEERING
4-1.07A General
Reserved
4-1.07B Value Engineering Change Proposal
You may submit a VECP to reduce any of the following:
1. Total cost of construction
2. Construction activity duration
3. Traffic congestion
Before preparing a VECP, meet with the Engineer to discuss:
1.
2.
3.
4.
5.
6.
7.

P
roposal concept
P
ermit issues
Impact on other projects
Project impacts, including traffic, schedule, and later stages
Peer reviews
Overall proposal merits
Review times required by the Department and other agencies

The VECP must not impair the project's essential functions or characteristics, including:
1.
2.
3.
4.
5.

S
ervice life
Operation economy
Maintenance ease
Desired appearance
Design and safety

The VECP must include:


1. Description of the Contract specifications and drawing details for performing the work and the
proposed changes.
2. Itemization of Contract specifications and plan details that would be changed.
3. Detailed cost estimate for performing the work under the existing Contract and under the proposed
change. Determine the estimates under section 9-1.04.
4. Deadline for the Engineer to decide on the changes.
5. Bid items affected and resulting quantity changes.
The Department is not required to consider a VECP. If a VECP is similar to a change in the plans or
specifications being considered by the Department at the time the proposal is submitted or if the proposal
is based on or similar to plans or specifications adopted by the Department before Contract award, the
Department does not accept the VECP and may make these changes without VECP payments.
If the Department does not approve a Change Order before the deadline stated in the VECP or other date
you subsequently stated in writing, the VECP is rejected. The Department does not adjust time or
payment for a rejected VECP.
30

SECTION 4

SCOPE OF WORK

The Department decides whether to accept a VECP and the estimated net construction-cost savings from
adopting the VECP or parts of it.
The Department may require you to accept a share of the investigation cost as a condition of reviewing a
VECP. After written acceptance, the Department considers the VECP and deducts the agreed cost.
If the Department accepts the VECP or parts of it, the Department issues a Change Order that:
1.
2.
3.
4.

Incorporates changes in the Contract necessary to implement the VECP or the parts adopted
Includes the Department's acceptance conditions
States the estimated net construction-cost savings resulting from the VECP
Obligates the Department to pay you 50 percent of the estimated net savings

In determining the estimated net construction-cost savings, the Department excludes your VECP
preparation cost and the Department's VECP investigation cost, including parts paid by you.
If a VECP providing for a reduction in working days is accepted by the Department, 50 percent of the
reduction is deducted from Contract time.
If a VECP providing for a reduction in traffic congestion or avoiding traffic congestion is accepted by the
Department, the Department pays 60 percent of the estimated net savings in construction costs
attributable to the VECP. Submit detailed traffic handling comparisons between the existing Contract and
the proposed change, including estimates of the traffic volumes and congestion.
The Department may apply an accepted VECP for general use on other contracts.
If an accepted VECP is adopted for general use, the Department pays only the contractor who first
submitted the VECP and only to the contracts awarded to that contractor before the submission of the
accepted VECP.
If the Department does not adopt a general-use VECP, an identical or similar submitted proposal is
eligible for acceptance.
4-1.07C Value Analysis Workshop
Section 4-1.07C applies to a non-building-construction contract with a total bid of over $5 million.
You may request a value analysis workshop by submitting a request after Contract approval.
The Department offers a value analysis workshop to:
1. Identify value enhancing opportunities
2. Consider changes to the Contract that will reduce the total cost of construction, construction activity
duration, or traffic congestion without impairing the essential functions specified for a VECP in section
4-1.07B
If the request is authorized, you and the Engineer:
1. Schedule a value analysis workshop
2. Select a facilitator and workshop site
3. Agree to other workshop administrative details
The workshop must be conducted under the methods described in the Department's Value Analysis
Team Guide. For the guide, go to the Department's Division of Design Web site.
The facilitator must be a certified value specialist as recognized by the Society of American Value
Engineers.
The Department reimburses you for 1/2 of the workshop cost. The workshop cost is the sum of the
workshop-facilitator cost and the workshop-site cost. The Engineer determines the workshop cost based
on the facilitator and workshop-site invoice prices minus any available or offered discounts. The
Department does not pay you for any other associated costs.

31

SECTION 4

SCOPE OF WORK

4-1.084-1.12 RESERVED
4-1.13 CLEANUP
Before final inspection, leave the job site neat and presentable and dispose of:
1.
2.
3.
4.
5.

Rubbish
Excess materials
Falsework
Temporary structures
Equipment

Do not remove warning, regulatory, or guide signs until Contract acceptance.

32

5 CONTROL OF WORK

5-1.01 GENERAL
Section 5 includes specifications regarding the Contract parties' relations and Contract acceptance.
Furnish the resources except Department-furnished materials required to complete the work as described
in the Contract.
Provide QC.
Work is subject to the Department's QA. The Department's QA does not relieve you of your responsibility
to provide QC.
Ensure the Department's safe and unrestricted access to the work. Furnish facilities necessary for the
Department's inspection.
Where the means and methods to complete the work are not described in the Contract, choose the
means and methods to complete the work.
Where the Contract describes more than 1 construction method or more than 1 type of material or
equipment, the Department does not assure that each construction method or type of material or
equipment can be used successfully throughout all or any part of the project. You are responsible to use
the alternative or alternatives that will accomplish the work under the conditions encountered.
Failure to comply with any Contract part is a waiver of your right to an adjustment of time and payment
related to that part.
Use contract administration forms at the Department's Web site.
5-1.02 CONTRACT COMPONENTS
A component in one Contract part applies as if appearing in each. The parts are complementary and
describe and provide for a complete work.
If a discrepancy exists:
1. The governing ranking of Contract parts in descending order is:
1.1. Special provisions
1.2. Project plans
1.3. Revised standard specifications
1.4. Standard specifications
1.5. Revised standard plans
1.6. Standard plans
1.7. Supplemental project information
2. Written numbers and notes on a drawing govern over graphics
3. A detail drawing governs over a general drawing
4. A detail specification governs over a general specification
5. A specification in a section governs over a specification referenced by that section
If a discrepancy is found or confusion arises, submit an RFI.
5-1.03 ENGINEER'S AUTHORITY
The Engineer makes the final decision on questions regarding the Contract, including:
1.
2.
3.
4.
5.
6.

Work quality and acceptability


Manner of performance of the work
Drawing and specification interpretation
Contract fulfillment
Time and progress rate
Measurement and payment

The Engineer has the authority to enforce or fulfill an order that you fail to fulfill promptly.
Failure to enforce a Contract part does not waive enforcement of any Contract provision.
33

SECTION 5

CONTROL OF WORK

The Engineer may reject work that does not comply with the Contract at any time, including after a
payment has been made.
5-1.045-1.05 RESERVED
5-1.06 PROTESTS
You may protest an Engineer's decision by submitting an RFI.
5-1.075-1.08 RESERVED
5-1.09 PARTNERING
5-1.09A General
The Department strives to work cooperatively with all contractors; partnering is our way of doing business.
The Department encourages project partnering among the project team made up of significant
contributors from the Department and the Contractor and their invited stakeholders.
For a contract with a total bid over $1 million, professionally facilitated project partnering is encouraged.
For a contract with a total bid over $10 million, professionally facilitated project partnering is required.
In implementing project partnering, you and the Engineer manage the Contract by:
1.
2.
3.
4.
5.
6.
7.

Using early and regular communication with involved parties


Establishing and maintaining a relationship of shared trust, equity, and commitment
Identifying, quantifying, and supporting attainment of mutual goals
Developing strategies for using risk management concepts
Implementing timely communication and decision making
Resolving potential problems at the lowest possible level to avoid negative impacts
Holding periodic partnering meetings and workshops as appropriate to maintain partnering
relationships and benefits throughout the life of the project
8. Establishing periodic joint evaluations of the partnering process and attainment of mutual goals
Partnering does not void any Contract part.
The Department's Field Guide to Partnering on Caltrans Construction Projects is available to the project
team as reference. This guide provides structure, context, and clarity to the partnering process
requirements. For the guide, go to the Department's Division of Construction Web site.
In implementing project partnering, the project team must:
1. Create a partnering charter that includes:
1.1. Mutual goals, including core project goals and may also include project-specific goals and
mutually supported individual goals
1.2. Partnering maintenance and close-out plan
1.3. Dispute resolution plan that includes a dispute resolution ladder and may also include use of
facilitated dispute resolution sessions
1.4. Team commitment statement and signatures
2. Participate in monthly partnering evaluation surveys to measure progress on mutual goals and may
also measure short-term key issues as they arise
3. Evaluate the partnering facilitator on the Partnering Facilitator Evaluation forms. The Engineer
provides the evaluation forms to the project team and collects the results. The Department makes
evaluation results available upon your request. Facilitator evaluations must be completed: at the end
of:
3.1. Initial partnering workshop
3.2. Project close-out partnering workshop
4. Conduct a project close-out partnering workshop
5. Document lessons learned before Contract acceptance
5-1.09B Partnering Facilitator, Workshops, and Monthly Evaluation Surveys
The Engineer sends you a written invitation to enter into a partnering relationship after Contract approval.
Respond within 15 days to accept the invitation and request the initial and additional partnering
workshops. After the Engineer receives the request, you and the Engineer cooperatively:
34

SECTION 5

CONTROL OF WORK

1. Select a partnering facilitator that offers the service of a monthly partnering evaluation survey with a
5-point rating and agrees to follow the Department's Partnering Facilitator Standards and
Expectations available at the Department's Division of Construction Web site
2. Schedule initial partnering workshop
3. Determine initial workshop site and duration
4. Agree to other workshop administrative details
Additional partnering workshops and sessions are encouraged throughout the life of the project as
determined necessary by you and the Engineer, recommended quarterly.
5-1.09C Training in Partnering Skills Development
For a contract with a total bid of $25 million or greater, training in partnering skills development is
required.
For a contract with a total bid between $10 million and $25 million, training in partnering skills is optional.
You and the Engineer cooperatively schedule the training session and select a professional trainer,
training site, and 1 to 4 topics from the following list to be covered in the training:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Active listening
Building teams

Change management

Communication
Conflict resolution
Cultural diversity
Dealing with difficult people
Decision making
Effective escalation ladders
Emotional intelligence
Empathy

12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Ethics
Facilitation skills
Leadership
Partnering process and concepts
Project management
Project organization
Problem solving
Running effective meetings
Time management
Win-win negotiation

Before the initial partnering workshop, the trainer conducts a 1-day training session in partnering skills
development for the Contractor's and the Engineer's representatives. This training session must be a
separate session from the initial partnering workshop and must be conducted locally. The training session
must be consistent with the partnering principles under the Department's Field Guide to Partnering on
Caltrans Construction Projects.
Send at least 2 representatives to the training session. One of these must be your assigned
representative specified in section 5-1.16.
5-1.09D Payment
The Department pays you for:
1. 1/2 of partnering workshops and sessions based on facilitator and workshop site cost
2. 1/2 of monthly partnering evaluation survey service cost
3. Partnering skills development trainer and training site cost
The Engineer determines the costs based on invoice prices minus any available or offered discounts. The
Department does not pay markups on these costs.
The Department does not pay for wages, travel expenses, or other costs associated with the partnering
workshops and sessions, monthly partnering evaluation surveys, and training in partnering skills
development.
5-1.105-1.11 RESERVED
5-1.12 ASSIGNMENT
No third-party agreement relieves you or your surety of the responsibility to complete the work. Do not
sell, transfer, or otherwise dispose of any Contract part without prior written consent from the Department.

35

SECTION 5

CONTROL OF WORK

If you assign the right to receive Contract payments, the Department accepts the assignment upon the
Engineer's receipt of a notice. Assigned payments remain subject to deductions and withholds described
in the Contract. The Department may use withheld payments for work completion whether payments are
assigned or not.
5-1.13 SUBCONTRACTING
5-1.13A General
No subcontract releases you from the Contract or relieves you of your responsibility for a subcontractor's
work.
Before subcontracted work starts, submit a Subcontracting Request form.
Do not use a debarred contractor. For a list of debarred contractors, go to the Department of Industrial
Relations' Web site.
If you violate Pub Cont Code 4100 et seq., the Department may exercise the remedies provided under
Pub Cont Code 4110. The Department may refer the violation to the Contractors State License Board
as provided under Pub Cont Code 4111.
Except for a building-construction non-federal-aid contract, perform work equaling at least 30 percent of
the value of the original total bid with your employees and with equipment you own or rent, with or without
operators.
Each subcontract must comply with the Contract.
The Department encourages you to include a dispute resolution process in each subcontract.
Each subcontractor must have an active and valid State contractor's license with a classification
appropriate for the work to be performed (Bus & Prof Code 7000 et seq.).
Submit copies of subcontracts upon request.
Upon request, immediately remove and do not again use a subcontractor who fails to prosecute the work
satisfactorily.
5-1.13B Disadvantaged Business Enterprises
5-1.13B(1) General
Section 5-1.13B applies to a federal-aid contract.
Use each DBE subcontractor as listed on the Subcontractor List form and the Caltrans Bidder - DBE
Information form unless you receive authorization for a substitution.
Notify the Engineer of any changes to your anticipated DBE participation. Submit this notification before
starting the affected work.
Maintain records including:
1. Name and business address of each 1st-tier subcontractor
2. Name and business address of each DBE subcontractor, DBE vendor, and DBE trucking company,
regardless of tier
3. Date of payment and total amount paid to each business
If you are a DBE contractor, include the date of work performed by your own forces and the
corresponding value of the work.
Before the 15th day of each month, submit a Monthly DBE Trucking Verification form.
If a DBE subcontractor is decertified before completing subcontracted work, the subcontractor must notify
you in writing of the decertification date. If a subcontractor becomes a certified DBE before completing
subcontracted work, the subcontractor must notify you in writing of the certification date. Submit the
notifications. On work completion, complete a Disadvantaged Business Enterprises (DBE) Certification
Status Change form. Submit the form within 90 days of Contract acceptance.

36

SECTION 5

CONTROL OF WORK

Upon work completion, complete a Final Report Utilization of Disadvantaged Business Enterprises
(DBE), First-Tier Subcontractors form. Submit it within 90 days of Contract acceptance. The Department
withholds $10,000 until the form is submitted. The Department releases the withhold upon submission of
the completed form.
5-1.13B(2) Underutilized Disadvantaged Business Enterprises
Section 5-1.13(B)(2) applies if a UDBE goal is shown on the Notice to Bidders.
UDBEs must perform work or supply materials as listed in the Caltrans Bidder - UDBE - Commitment
form.
Do not terminate a UDBE listed subcontractor for convenience and perform the work with your own forces
or obtain materials from other sources without written authorization from the Department.
The Department authorizes a request to use other forces or sources of materials if it shows any of the
following justifications:
1. Listed UDBE fails or refuses to execute a written contract based on the plans and specifications for
the project.
2. You stipulated that a bond is a condition of executing the subcontract and the listed UDBE fails to
meet your bond requirements.
3. Work requires a contractors license and the listed UDBE does not have a valid license under
Contractors License Law.
4. Listed UDBE fails or refuses to perform the work or furnish the listed materials.
5. Listed UDBE's work is unsatisfactory and not in compliance with the Contract.
6. Listed UDBE delays or disrupts the progress of the work.
7. Listed UDBE becomes bankrupt or insolvent.
If a listed UDBE is terminated, you must make good faith efforts to find another UDBE to substitute for the
original UDBE. The substitute UDBE must perform at least the same amount of work as the original
UDBE under the Contract to the extent needed to meet the UDBE goal.
The substitute UDBE must be certified as a DBE at the time of request for substitution.
Unless the Department authorizes (1) a request to use other forces or sources of materials or (2) a good
faith effort for a substitution of a terminated UDBE, the Department does not pay for work listed on the
Caltrans Bidder - UDBE - Commitment form unless it is performed or supplied by the listed UDBE or an
authorized substitute.
5-1.13C Disabled Veteran Business Enterprises
Section 5-1.13C applies to a non-federal-aid contract.
Use each DVBE as shown on the Certified DVBE Summary form unless you receive authorization for a
substitution.
The requirement that DVBEs be certified by the bid opening date does not apply to DVBE substitutions
after Contract award.
Maintain records of subcontracts made with DVBEs. Include in the records:
1. Name and business address of each business
2. Total amount paid to each business
For the purpose of determining compliance with Pub Cont Code 10115 et seq.:
1. Upon Contract completion, complete and submit Final Report - Utilization of Disabled Veteran
Business Enterprises (DVBE) State Funded Projects Only form.
2. Upon reasonable notice and during normal business hours, permit access to its premises for the
purposes of:
2.1. I nterviewing employees.
2.2. Inspecting and copying books, records, accounts and other material that may be relevant to a
matter under investigation.
37

SECTION 5

CONTROL OF WORK

5-1.13D NonSmall Businesses


Section 5-1.13D applies to a non-federal-aid contract.
Use each subcontractor as shown on the Certified Small Business Listing for the Non-Small Business
Preference form unless you receive authorization for a substitution.
The requirement that small businesses be certified by the bid opening date does not apply to small
business substitutions after contract award.
Maintain records of subcontracts made with small business subcontractors and records of materials
purchased from certified small business suppliers. Include in the records:
1. Name and business address of each business
2. Total amount paid to each business
For the purpose of determining compliance with 2 CA Code of Regs 1896 et seq.:
1. Provide the Department relevant information requested
2. Upon reasonable notice and during normal business hours, permit access to its premises for the
purposes of:
2.1. I nterviewing employees
2.2. Inspecting and copying books, records, accounts and other material that may be relevant to a
matter under investigation
5-1.13E5-1.13I Reserved
5-1.145-1.15 RESERVED
5-1.16 REPRESENTATIVE
Before starting work, assign a representative to:
1.
2.
3.
4.

Receive the Engineer's orders


Prosecute the Engineer's orders
Supervise the workers
Coordinate the subcontractors' work

The representative must be present at the job site while work is in progress. The representative must
submit contact information (name, telephone number) so the representative can be easily contacted to
perform emergency work while work is not in progress.
5-1.17 CHARACTER OF WORKERS
If a worker appears to the Engineer to be incompetent or acts disorderly or improperly, discharge the
worker immediately upon request. Do not employ that worker again on the work.
5-1.185.19 RESERVED
5-1.20 COORDINATION WITH OTHER ENTITIES
5-1.20A General
Other entities may perform work at or near the job site and material sources at any time. Coordinate
activities to avoid delays.
Each contractor or other entity performing work at or near the job or material site is responsible to the
other for damage to work, persons, or property and for costs due to unnecessary delays.
5-1.20B Permits, Licenses, Agreements, and Certifications
5-1.20B(1) General
Comply with PLACs. The Department makes PLAC changes under section 4-1.05. Maintain a copy of
each PLAC at the job site.

38

SECTION 5

CONTROL OF WORK

5-1.20B(2) Before Award


To make a change to a PLAC made available to you before award, submit the proposed change. The
Department sends the proposed change to the appropriate authority for consideration.
5-1.20B(3) After Award
Confirm with the Engineer which after-award PLACs are obtained by the Department and which are
obtained by the Contractor.
To make a change to an after-award PLAC obtained by the Department, submit the proposed change.
The Department sends the proposed change to the appropriate authority for consideration.
Obtain those PLACs to be issued to you and pay fees and costs associated with obtaining them. Submit
copies of Contractor-obtained after-award PLACs for review.
5-1.20B(4) ContractorProperty Owner Agreement
Before procuring material from or disposing of material on nonhighway property:
1. Submit a written agreement from the property owner:
1.1. For property use
1.2. Absolving the Department from responsibility in connection with the property
2. Obtain authorization to start
Before Contract acceptance, submit a document signed by the owner of the material source or disposal
site stating that the Contractor has complied with the Contractor-owner agreement.
5-1.20C Railroad Relations
Reserved
5-1.20D5-1.20F Reserved
5-1.215-1.22 RESERVED
5-1.23 SUBMITTALS
5-1.23A General
Section 5-1.23 includes specifications for action and informational submittals.
Any submittal not specified as an informational submittal is an action submittal.
Each sheet of a submittal must include:
1. Contract number
2. DistrictCountyRoutePost Mile
3. Structure name and number, if any
The Department rejects a submittal if it has any error or any omission.
Convert foreign language documents to English and U.S. customary units.
5-1.23B Action Submittals
5-1.23B(1) General
Action submittals include:
1.
2.
3.
4.
5.
6.
7.
8.

Shop drawings
Product data
Samples
Test samples
Quality control plans
Work plans
Material sources
Test data, test results, and evaluation reports

39

SECTION 5

CONTROL OF WORK

Maintain a sequential list of submittals except for samples, test samples, and material sources. With each

individual submittal, submit a copy of the updated list.

Submit an action submittal before the start of the affected work to allow for review and corrections without

work delays.

Except for test samples, obtain the Department's authorization for action submittals before you perform

work based on them.

Except for shop drawings and test samples, allow 15 days for review.

The time allowed for the review of a submittal starts when the Department receives the submittal.

If the last day for submitting a document falls on a Saturday or holiday, it may be submitted on the next

business day with the same effect as if it had been submitted on the day specified.

Do not change the scope of work on revised submittals.

The Department's authorization of a submittal does not void any Contract part.

5-1.23B(2) Shop Drawings


Submit shop drawings as specified and as otherwise required to control the work.
Each drawing and calculation sheet must be in black ink and sequentially numbered.
Each drawing sheet must:
1. Be 11 by 17 inches
2. Be on minimum of 20 lb paper
3. Have text of minimum nominal height of 5/32 inch
Each calculation sheet must:
1. Be 8-1/2 by 11 inches
2. Have text of a minimum 12-point font
Text and graphics must be legible for photocopying and reduction.
Calculations must demonstrate the design adequacy. Calculations specified as independently checked
must be sealed and signed by an engineer who is registered as a civil engineer in the State and who did
not seal and sign the drawings.
Allow 20 days for the review.
If multiple sets are submitted simultaneously or an additional set is submitted before the review of a
previously submitted set is complete, designate the sequence that the sets are to be reviewed. Allow
review time specified plus 15 days for each additional set. A set consists of 40 or fewer sheets.
If drawings require corrections, the Department:
1. Describes deficiencies
2. Stamps the drawings with the date that the review stopped
3. Returns the drawings
For complete resubmitted drawings, allow 20 days for the review. Show set revision number. Uniquely
number each revised detail. Show the number in an inverted triangle near the revised portion of the detail.
In a legend, describe and date the revision.
Upon review completion, the Department returns 1 copy that shows the authorized date.
To make a change to an authorized drawing, submit it as specified for a new submittal. Note the changes.
After the work shown on the drawings is complete, submit electronic copies of as-built drawings. Include
an index of sheet numbers and titles on the 1st sheet for each structure. Arrange the drawings in the
drawing-number order shown in the index.
40

SECTION 5

CONTROL OF WORK

5-1.23B(3) Product Data


Reserved
5-1.23B(4) Samples
Reserved
5-1.23B(5) Test Samples
For test samples, comply with section 6-3.05G.
If requested, obtain the Department's authorization for the material before incorporating the material
represented by the test sample into the work.
5-1.23B(6) Quality Control Plans
Submit 7 copies of each authorized QC plan and make 1 copy available at each location where work is
performed.
5-1.23B(7) Work Plans
Reserved
5-1.23C Informational Submittals
Informational submittals include:
1.
2.
3.
4.
5.
6.

Assignments
Certificates of compliance
Manufacturer instructions not associated with drawing submittals
Notifications
PLACs
Subcontracts

5-1.245-1.25 RESERVED
5-1.26 CONSTRUCTION SURVEYS
The Department places stakes and marks under Chapter 12, "Construction Surveys," of the Department's
Surveys Manual.
Submit your request for Department-furnished stakes:
1. Once staking area is ready for stakes
2. On a Request for Construction Stakes form
After your submittal, the Department starts staking within 2 business days.
Preserve stakes and marks placed by the Department. If the stakes or marks are destroyed, the
Department replaces them at the Department's earliest convenience and deducts the cost.
5-1.27 RECORDS
5-1.27A General
Reserved
5-1.27B Record Retention
Retain project records from bid preparation through:
1. Final payment
2. Resolution of claims, if any
For at least 3 years after the later of these, retain cost records, including records of:
1.
2.
3.
4.

Bid preparation
Overhead
Payrolls
Payments to subcontractors and suppliers
41

SECTION 5

CONTROL OF WORK

5. C
ost accounting
Maintain the records in an organized way in the original format, electronic and hard copy, conducive to
professional review and audit.
5-1.27C Record Inspection, Copying, and Auditing
Make your records available for inspection, copying, and auditing by State representatives for the same
time frame specified under section 5-1.27B. The records of subcontractors and suppliers must be made
available for inspection, copying, and auditing by State representatives for the same period. Before
Contract acceptance, the State representative notifies the Contractor, subcontractor, or supplier 5
business days before inspection, copying, or auditing.
If an audit is to start more than 30 days after Contract acceptance, the State representative notifies the
Contractor, subcontractor, or supplier when the audit is to start.
5-1.27D Cost Accounting Records
Maintain cost accounting records for the project distinguishing between the following work cost
categories:
1. Work performed based on bid item prices
2. Change order work other than extra work. Distinguish this work by:
2.1. Bid item prices
2.2. Force account
2.3. Agreed price
3. Extra work. Distinguish extra work by:
3.1. Bid item prices
3.2. Force account
3.3. Agreed price
3.4. Specialist billing
4. Work performed under potential claim records
5. Overhead
6. Subcontractors, suppliers, owner-operators, and professional services
Cost accounting records must include:
1.
2.
3.
4.
5.
6.

Final cost code lists and definitions


Itemization of the materials used and corresponding vendor's invoice copies
Direct cost of labor
Equipment rental charges
Workers' certified payrolls
E
quipment:
6.1. Size
6.2. Type
6.3. Identification number
6.4. Hours operated

5-1.27E Change Order Bills


Maintain separate records for change order work costs.
Submit change order bills using the Department's Internet change order billing system.
The Contractor submitting and the Engineer authorizing a change order bill using the Internet change
order billing system is the same as each party signing the bill.
The Department provides billing system:
1. Training within 30 days of your request
2. Accounts and user identification to your assigned representatives after a representative has received
training
Each representative must maintain a unique password.
42

SECTION 5

CONTROL OF WORK

5-1.285-1.29 RESERVED
5-1.30 NONCOMPLIANT AND UNAUTHORIZED WORK
Correct or remove and replace work that does not comply with the Contract, is unauthorized, or both. The
Department does not pay for any of the following:
1. Corrective, removal, or replacement work
2. Unauthorized work
If ordered, submit a work plan for the corrective, removal, or replacement work.
The Department may reduce payment for noncompliant work left in place.
If you fail to comply promptly with an order under section 5-1.30, the Department may correct, remove, or
replace noncompliant or unauthorized work. The Department deducts the cost of this work.
5-1.31 JOB SITE APPEARANCE
Keep the job site neat. In areas visible to the public:
1. If practicable, dispose of debris removed during clearing and grubbing concurrently with its removal. If
stockpiling is necessary, dispose of weekly.
2. Furnish trash bins for debris from construction. Place debris in trash bins daily.
3. Stack forms for falsework to be reused neatly and concurrently with their removal.
5-1.32 AREAS FOR USE
Occupy the highway only for purposes necessary to perform the work.
If no State-owned area is designated for the Contractor's use, you may arrange for temporary storage
with the Department.
Defend, indemnify, and hold the State harmless to the same extent as under section 7-1.05.
The Department does not allow temporary residences within the highway.
5-1.33 EQUIPMENT
Clearly stencil or stamp at a clearly visible location on each piece of equipment except hand tools an
identifying number and:
1. On compacting equipment, its make, model number, and empty gross weight that is either the
manufacturer's rated weight or the scale weight
2. On meters and on the load-receiving element and indicators of each scale, the make, model, serial
number, and manufacturer's rated capacity
Submit a list describing each piece of equipment and its identifying number
Upon request, submit manufacturer's information that designates portable vehicle scale capacities.
For proportioning materials, use measuring devices, material plant controllers, and undersupports
complying with section 9-1.02B.
Measuring devices must be tested and approved under California Test 109 in the Department's presence
by any of the following:
1. County Sealer of Weights and Measures
2. Scale Service Agency
3. Division of Measurement Standards Official
The indicator over-travel must be at least 1/3 of the loading travel. The indicators must be enclosed
against moisture and dust.
Group measuring system dials such that the smallest increment for each indicator can be read from the
location at which proportioning is controlled.

43

SECTION 5

CONTROL OF WORK

5-1.345-1.35 RESERVED
5-1.36 PROPERTY AND FACILITY PRESERVATION
5-1.36A General
Preserve property and facilities, including:
1.
2.
3.
4.
5.
6.
7.
8.
9.

A
djacent property
Department's instrumentation
ESAs
Lands administered by other agencies
Railroads and railroad equipment
Roadside vegetation not to be removed
Temporary work
U
tilities
Waterways

Immediately report damage to the Engineer.


If you cause damage, you are responsible.
The Department may make a temporary repair to restore service to a damaged facility.
Install sheet piling, cribbing, bulkheads, shores, or other supports necessary to support existing facilities
or support material carrying the facilities.
Maintain temporary facilities until they are no longer needed.
Dispose of temporary facilities when they are no longer needed.
Excavate and backfill as necessary to remove temporary facilities. Backfill with materials of equal or
better quality and to a comparable density of surrounding materials and grade surface to match the
existing grade and cross slope.
5-1.36B Landscape
If you damage plants not to be removed:
1. Dispose of them unless the Engineer authorizes you to reduce them to chips and spread the chips
within the highway at locations designated by the Engineer
2. R
eplace them
Replace plants with plants of the same species.
Replace trees with 24-inch-box trees.
Replace shrubs with no. 15-container shrubs.
Replace ground cover plants with plants from flats. Replace Carpobrotus ground cover plants with plants
from cuttings. Plant ground cover plants 1 foot on center.
If a plant establishment period is specified, replace plants before the start of the plant establishment
period; otherwise, replace plants at least 30 days before Contract acceptance.
Water each plant immediately after planting and saturate the backfill soil around and below the roots or
ball of earth around the roots of each plant. Water as necessary to maintain plants in a healthy condition
until Contract acceptance.
5-1.36C Railroad Property
If working on or adjacent to railroad property, do not interfere with railroad operations.
For an excavation on or affecting railroad property, submit work plans showing the system to be used to
protect railroad facilities. Instead of the 15 days specified in section 5-1.23B, allow 65 days for the review
of the plans.

44

SECTION 5

CONTROL OF WORK

5-1.36D Nonhighway Facilities


The Department may rearrange a nonhighway facility during the Contract. Rearrangement of a
nonhighway facility includes installation, relocation, alteration, or removal of the facility.
The Department may authorize facility owners and their agents to enter the highway to perform
rearrangement work for their facilities or to make connections or repairs to their property. Coordinate
activities to avoid delays.
Notify the Engineer at least 3 business days before you contact the regional notification center under
Govt Code 4216 et seq. Failure to contact the notification center prohibits excavation.
Before starting work that could damage or interfere with underground infrastructure, locate the
infrastructure described in the Contract, including laterals and other appurtenances, and determine the
presence of other underground infrastructure inferred from visible facilities such as buildings, meters, and
junction boxes.
Notify the Engineer if the infrastructure described in the Contract cannot be found. If after giving the
notice, you find the infrastructure in a substantially different location from described, finding the
infrastructure is change order work.
Underground infrastructure described in the Contract may be in different locations from described, and
additional infrastructure may exist.
Upon discovering an underground main or trunk line not described in the Contract, immediately notify the
Engineer and the infrastructure owner. The Engineer orders the locating and protecting of the
infrastructure. The locating and protecting is change order work. If ordered, repair infrastructure damage.
If the damage is not due to your negligence, the repair is change order work.
If necessary underground infrastructure rearrangement is not described in the Contract, the Engineer may
order you to perform the work. The rearrangement is change order work.
If you want infrastructure rearrangement different from that described in the Contract:
1.
2.
3.
4.

Notify the Engineer


Make an arrangement with the infrastructure owner
Obtain authorization for the rearrangement
The Department does not adjust time or payment for rearrangement different from that described the
Contract
5. Pay the infrastructure owner any additional cost
Immediately notify the Engineer of a delay due to:
1. The presence of main line underground infrastructure not described in the Contract or in a
substantially different location
2. Rearrangement different from that described the Contract
5-1.37 MAINTENANCE AND PROTECTION
5-1.37A General
Maintain and protect work until the Department has granted relief from maintenance or accepted the
Contract.
Prevent construction equipment that exceeds the maximum weight limits in Veh Code Div 15 from
operating on completed or existing treated base, pavement, or structures.
5-1.37B Load Limits
5-1.37B(1) General
For areas within the project limits and subject to the Contractor providing protective measures and
repairing related damage, construction equipment exceeding the size or weight limits in Veh Code Div 15
may move over:
1. Public roads within the highway
2. Treated base or pavement under construction or completed
45

SECTION 5

CONTROL OF WORK

3. Culverts and pipes


4. Structures not open to traffic that are designed for AASHTO HS20-44 live loading, except culverts
and pipes. Before crossing one of these structures, submit the dimensions and maximum axle
loadings of the equipment; and unless a material hauling equipment lane on a bridge is shown on the
drawings, comply with the following specifications:
4.1. The maximum loading on a bridge due to pneumatic-tired truck and trailer combinations must
not exceed:
4.1.1. 28,000 lb for single axles
4.1.2. 48,000 lb for tandem axles
4.1.3. 60,000 lb total gross load for single vehicles
4.1.4. 110,000 lb total gross load for truck and trailer or semi-trailer combinations
4.2. The loading on a bridge due to 2- and 3-axle pneumatic tired earthmovers must not exceed
that shown in the following table:
Allowable Construction Loading on Bridges for 2- and 3-Axle Earthmovers
Bridge girder center-to-center spacing
Maximum axle loading
(feet)
(pounds)
4
28,000
5
29,000
6
30.000
7
32,000
8
34,000
9
37,000
10 and over
40,000
NOTE: Minimum axle spacing:
For 2-axle earthmovers:
For 3-axle earthmovers:
Axles 1 to 2 = 20 feet
Axles 1 to 2 = 8 feet
Axles 2 to 3 = 20 feet
5. Completed or existing base, pavement, and structures under the Department's Transportation
Permits Manual, whether open to the public or not
Loads imposed on existing, new, or partially completed structures must not exceed the load carrying
capacity of the structure or any portion of the structure as determined by AASHTO LRFD with interims
and California Amendments, Design Strength Limit State II. The f'c to be used in computing the load
carrying capacity must be the smaller of the following:
1. Actual compressive strength at the time of loading
2. Value of f'c shown on the plans for that portion of the structure or 2.5 times the value of fc shown on
the plans for portions of the structure where no f'c is shown
5-1.37B(2) Increased Load Carrying Capacity
You may submit a request to the Department to redesign a structure to increase its load carrying
capacity.
The Department does not authorize a redesign for any of the following:
1. Load increase more than 130,000 lb per single axle or pair of axles less than 8 feet apart
2. Total gross vehicle weight more than 330,000 lb
Your request to the Department must include:
1.
2.
3.
4.
5.

Description of the structure or structures


Detailed overload description
Date the revised plans are required
Signed statement agreeing to pay the costs, including the engineering costs
Signed statement agreeing to waive a time extension request for any delay

46

SECTION 5

CONTROL OF WORK

If the Department authorizes a redesign to strengthen the structure, the Engineer notifies you of the
change's estimated cost and availability date of the revised plans. If the cost and date are satisfactory to
you, the Engineer prepares a Change Order for the changes.
5-1.37B(3) Material Hauling Equipment Lane on Bridges
Section 5-1.37B(3) applies to a bridge constructed with a material hauling equipment lane.
You may cross the bridge with pneumatic-tired material hauling equipment that exceeds the size and
weight limits specified but that does not exceed the load limits shown on the material hauling equipment
loading diagram on the plans.
For each bridge with a material hauling equipment lane:
1. Construct a minimum 150-foot approach at each bridge end to a grade that provides a smooth
transition to the bridge roadway grade. Maintain these approaches in a smooth and uniform condition
during the operation of the equipment.
2. Operate equipment in a way that prevents jolting and bouncing of the equipment while crossing the
bridge.
3. Confine equipment to the material hauling lane using temporary barriers unless the plans show that
the entire bridge may be used for hauling equipment and the permanent barriers are completed.
4. At most 1 piece of equipment may be on the bridge at one time.
If ordered, verify the weight of loaded material hauling equipment by weighing. The Department furnishes
individual wheel or axle type scales. The Department weighs the equipment within the project limits and
within the highway at a location accessible to the equipment. You determine the exact weighing location.
Install and maintain the scales. Installing and maintaining scales is change order work.
5-1.38 MAINTENANCE AND PROTECTION RELIEF
You may request relief from maintenance and protection responsibilities on a completed work portion.
The work portion must have been completed under the Contract and to the Engineer's satisfaction. Work
parts eligible for relief include:
1. Completed 0.3 mi of roadway or 0.3 mi of one roadway of a divided highway or frontage road
including:
1.1. Planned roadway protection work
1.2. Lighting
1.3. Required traffic control
1.4. Access facilities
2. Bridge or other major structure
3. Complete unit of a traffic control signal system or a highway lighting system
4. Nonhighway facility constructed for another agency
If relieved by the Department, you are not required to perform further work on that portion of work. On a
relieved portion of work, you are not responsible for damage, including damage caused by traffic or the
elements, except for that caused by your own activities or negligence
5-1.39 DAMAGE REPAIR AND RESTORATION
5-1.39A General
Before Contract acceptance, restore damaged work to the same state of completion as before the
damage. Restoration of damaged work includes restoration of erected falsework and formwork.
The Department does not adjust payment for repair or restoration that the Engineer determines was
caused by your failure to construct the work under the Contract or protect the work.
5-1.39B Damage Caused by an Act of God
Under Pub Cont Code 7105, the Department pays for repair or restoration to damaged work in excess
of 5 percent of the total bid if the damage was caused by an act of God.
Submit a request for repair or restoration work payment before performing work other than emergency
work.
47

SECTION 5

CONTROL OF WORK

The Engineer determines the repair or restoration work cost under section 9-1.04 except markups are not
allowed.
The Department may change the Contract for the areas requiring repair or restoration. If the cost for the
changes exceeds the repair or restoration cost based on the Bid Item List, the Engineer determines the
payment adjustment under section 9-1.04.
5-1.39C Landscape Damage
5-1.39C(1) General
Repair slopes or other existing facilities that were damaged after starting job site activities and before
starting plant establishment.
As ordered, replace plants that have been damaged from either or both of the following conditions:
1. Ambient air temperature falling below 32 degrees F during the plant establishment period
2. Department or its supplier restricting or stopping water delivery during the plant establishment period
This plant replacement work is change order work.
5-1.39C(2) Plant Establishment Period of 3 Years or More
Section 5-1.39C(2) applies if a plant establishment period of 3 years or more is specified in the special
provisions. Perform work specified in section 5-1.39C(2) as ordered.
Repair slopes or other existing facilities that were damaged before starting job site activities. This work is
change order work.
Repair slopes or other existing facilities that were damaged by a change in the runoff pattern from that
which existed on the date of the Notice to Bidders and was the result of work by others within the
highway. This work is change order work.
Replace plants and repair slopes, irrigation systems, and other highway facilities damaged as a result of
rain during the plant establishment period. The Department pays 1/2 the accumulated costs in excess of
the greater of 5 percent of the plant establishment work or $2,000; the Contractor pays the other 1/2. The
Engineer determines the repair cost under section 9-1.04.
5-1.405-1.41 RESERVED
5-1.42 REQUESTS FOR INFORMATION
Submit an RFI upon recognition of any event or question of fact arising under the Contract.
The Engineer responds to the RFI within 5 days. Proceed with the work unless otherwise ordered. You
may protest the Engineer's response by:
1. S
ubmitting an Initial Potential Claim Record within 5 days after receiving the Engineer's response
2. Complying with section 5-1.43
5-1.43 POTENTIAL CLAIMS AND DISPUTE RESOLUTION
5-1.43A General
Minimize and mitigate impacts of potentially claimed work or event.
For each potential claim, assign an identification number determined by chronological sequencing and the
1st date of the potential claim.
Use the identification number for each potential claim on the:
1. Initial Potential Claim Record
2. Supplemental Potential Claim Record
3. Full and Final Potential Claim Record
Failure to comply with this procedure is:
1. Waiver of the potential claim and a waiver of the right to a corresponding claim for the disputed work
in the administrative claim procedure
48

SECTION 5

CONTROL OF WORK

2. Bar to arbitration (Pub Cont Code 10240.2)


5-1.43B Initial Potential Claim Record
Submit an Initial Potential Claim Record within 5 days of the Engineer's response to the RFI or within 5
days from the date when a dispute arises due to an act or failure to act by the Engineer. The Initial
Potential Claim Record establishes the claim nature and circumstances. The claim nature and
circumstances must remain consistent.
The Engineer responds within 5 days of receiving the Initial Potential Claim Record. Proceed with the
potentially claimed work unless otherwise ordered.
Within 20 days of a request, provide access to the project records determined necessary by the Engineer
to evaluate the potential claim.
5-1.43C Supplemental Potential Claim Record
Within 15 days of submitting the Initial Potential Claim Record, submit a Supplemental Potential Claim
Record including:
1. Complete nature and circumstances causing the potential claim or event
2. Contract specifications supporting the basis of a claim
3. Estimated claim cost and an itemized breakdown of individual costs stating how the estimate was
determined
4. T
IA
The Engineer evaluates the Supplemental Potential Claim Record and furnishes you a response within 20
days of receiving the submittal. To pursue a potential claim, comply with sections 5-1.43D and 5-1.43E.
If the estimated cost or effect on the scheduled completion date changes, update the Supplemental
Potential Claim Record information as soon as the change is recognized and submit this information.
5-1.43D Full and Final Potential Claim Record
Notify the Engineer within 10 days of the completion date of the potentially claimed work. The Engineer
authorizes this completion date or notifies you of a revised date.
Within 30 days of the completion of the potentially claimed work, submit a Full and Final Potential Claim
Record including:
1. A detailed factual account of the events causing the potential claim, including:
1.1. Pertinent dates
1.2. Locations
1.3. Work items affected by the potential claim
2. The Contract documents supporting the potential claim and a statement of the reasons these parts
support entitlement
3. If a payment adjustment is requested, an itemized cost breakdown. Segregate costs into the following
categories:
3.1. Labor, including:
3.1.1. Individuals
3.1.2. Classifications
3.1.3. Regular and overtime hours worked
3.1.4. D
ates worked
3.2. Materials, including:
3.2.1. Invoices
3.2.2. P
urchase orders
3.2.3. Location of materials either stored or incorporated into the work
3.2.4. Dates materials were transported to the job site or incorporated into the work
3.3. Equipment, including:
3.3.1. Detailed descriptions, including make, model, and serial number
3.3.2. Hours of use
3.3.3. Dates of use
3.3.4. Equipment rates at the rental rate listed in Labor Surcharge and Equipment Rental
Rates in effect when the affected work related to the claim was performed
49

SECTION 5

CONTROL OF WORK

4. If a time adjustment is requested:


4.1. Dates for the requested time.
4.2. Reasons for a time adjustment.
4.3. Contract documentation supporting the requested time adjustment.
4.4. TIA. The TIA must demonstrate entitlement to a time adjustment.
5. Identification and copies of your documents and copies of communications supporting the potential
claim, including certified payrolls, bills, cancelled checks, job cost reports, payment records, and
rental agreements
6. Relevant information, references, and arguments that support the potential claim
The Department does not consider a Full and Final Potential Claim Record that does not have the same
nature, circumstances, and basis of claim as those specified on the Initial Potential Claim Record and
Supplemental Potential Claim Record.
The Engineer evaluates the information presented in the Full and Final Potential Claim Record and
furnishes you a response within 30 days of its receipt unless the Full and Final Potential Claim Record is
submitted after Contract acceptance, in which case, a response may not be furnished. The Engineer's
receipt of the Full and Final Potential Claim Record must be evidenced by postal return receipt or the
Engineer's written receipt if delivered by hand.
5-1.43E Alternative Dispute Resolution
5-1.43E(1) General
5-1.43E(1)(a) General
Section 5-1.43E applies to a contract with 100 or more working days.
"The parties" in section 5-1.43E means you and the Department.
"Dispute meeting" in section 5-1.43E refers to both the traditional and informal dispute meeting
processes.
The alternative dispute resolution process must be used for the timely resolution of disputes that arise out
of the work.
You must comply with section 5-1.43E to pursue a claim, file for arbitration, or file for litigation. You must
comply with section 5-1.43E(2)(d). You may comply with section 5-1.43E(1)(d).
The alternative dispute resolution process is not a substitute for the submitting of an RFI or a potential
claim record.
Do not use the alternative dispute resolution process for disputes between you and subcontractors or
suppliers that have no grounds for a legal action against the Department. If you fail to comply with section
5-1.43 for a potential claim on behalf of a subcontractor or supplier, you release the Department of the
subcontractor's potential claim.
Do not use the alternative dispute resolution process for quantification of disputes for overhead type
expenses or costs. For disputes for overhead type expenses or costs, comply with section 9-1.17D.
You, the Department, and the DRA or DRB must complete and comply with the Dispute Resolution
Advisor Agreement or Dispute Resolution Board Agreement. For these agreement forms, go to the
Department's Division of Construction Web site.
No DRA- or DRB-related meetings are allowed until you, the Department, and the DRA or DRB, execute
the agreement. However, you, the Department, and the DRA or DRB, may agree to sign and execute the
agreement at the 1st meeting.
5-1.43E(1)(b) Establishment of Procedures
Upon selecting the DRA or DRB, the parties must meet with the DRA or DRB to establish and agree to
procedures for:
1. S
ubmitting documents
2. C
onducting hearings
3. P
roviding recommendations
50

SECTION 5

CONTROL OF WORK

4. Associated tasks
The established procedures must comply with the Contract and the Dispute Resolution Advisor
Agreement or Dispute Resolution Board Agreement. The procedures need not comply with laws of
evidence.
5-1.43E(1)(c) Dispute Meetings
You must follow the traditional dispute meeting process to pursue a potential claim.
Either you or the Department may refer a dispute to the DRA or DRB. To request a dispute meeting,
submit a copy of the referral and supporting documentation to the DRA or DRB. The documentation must
describe the dispute in individual discrete segments such that resolved and unresolved discrete segments
are differentiated. Include an estimate of the cost of the affected work and impacts to the work completion
date.
A copy of all documents submitted to the DRA or DRB must be simultaneously submitted to the other
party.
The Department provides the DRA or DRB with the Contract documents and provides conference
facilities for meetings at no cost to you.
Neither you nor the Department may meet with or discuss Contract issues with the DRA or DRB members
unless the other party is present.
Only the Engineer, the Department's area construction engineer, or the Department's structure
representative and your superintendent or project manager may present information at a dispute meeting.
If the dispute involves a subcontractor, the subcontractor's superintendent or project manager must be
present at the dispute meeting and may present information.
Only persons who are directly involved with the Contract and who have direct knowledge of the dispute
may participate in the dispute meeting. No participation of either party's attorney is allowed. However, you
and the Department may agree to a request from the DRA or DRB for participation of a person not
associated with the Contract to provide technical services if the services are necessary to help the DRA
or DRB make a recommendation.
If the DRA or DRB needs outside technical services, you and the Department must agree to the services
before they are acquired. If you, the Department, and the DRA or DRB agree, the technical services may
be provided by technical staff who works for you or the Department.
During a dispute meeting, each party presents its position, makes rebuttals, provides relevant documents,
and responds to DRA or DRB questions and requests. The following is not allowed:
1. Testimony under oath
2. Cross-examination
3. Reporting of the procedures by a shorthand reporter or by electronic means
If either party fails to attend a dispute meeting, all documents submitted by the nonattending party is
considered as the nonattending party's entire argument.
5-1.43E(1)(d) Informal Dispute Meetings
You and the Department may resolve small and uncomplicated disputes using an informal process. You
and the Department may use this process only if you, the Department, and the DRA or DRB agree its use
is appropriate for resolving the dispute.
The informal dispute meeting process is independent from the traditional process. The Department does
not grant time extensions for the traditional dispute process if the informal dispute process is used.
You and the Department must each furnish the DRA or DRB a 1-page brief description of the dispute with
supporting documentation and any additional information requested by the DRA or DRB.
In an informal dispute meeting, each party presents its position and receives the DRA's or DRB's
recommendation orally on the same day the dispute is heard.
51

SECTION 5

CONTROL OF WORK

You and the Department may ask for clarification of the DRA's or DRB's recommendation within 5 days of
the dispute meeting.
The DRA or DRB will not be bound by its informal recommendation if a dispute is later heard in a
traditional dispute meeting.
If the dispute is not settled using the informal dispute meeting process, continue to comply with section 5
1.43E(2)(d).
5-1.43E(1)(e) Recommendations
Recommendations resulting from the alternative dispute resolution process are nonbinding.
If you and the Department resolve the dispute with the aid of the DRA's or DRB's recommendation,
implement the resolution.
5-1.43E(1)(f) Completion of Alternative Dispute Resolution
All alternative dispute resolution activities must be completed before Contract acceptance. Accelerated
timeframes may be used if you, the Department, and the DRA or DRB agree.
If a dispute becomes an unresolved claim after Contract acceptance, comply with section 9-1.17D(2).
Neither you nor the Department may call the DRA or DRB members who served on the Contract as a
witness in arbitration or other proceedings that may arise from the Contract.
You and the Department must jointly indemnify and hold harmless the DRA or DRB members from and
against all claims, damages, losses, and expenses, including attorney's fees, arising out of and resulting
from the findings and recommendations of the DRA or DRB.
5-1.43E(1)(g) Payment
Pay the DRA or each DRB member $1,500 per day for the DRA's or DRB's participation at each on-site
meeting except if the DRA or a DRB member serves on more than one Department DRA or DRB, the
$1,500 must be divided evenly among the contracts:
On-site meetings include:
1. Meeting at the start of the project
2. Scheduled progress meetings for a project with a DRB
3. Dispute meetings
This payment includes full compensation for onsite time, travel expenses, transportation, lodging, travel
time, and incidentals for each day or portion thereof the DRA or DRB member is at a DRA or DRB
meeting.
Before a DRA or DRB member spends any time reviewing plans and specifications, evaluating positions,
preparing recommendations, or performs any other off-site DRA- or DRB-related tasks, you and the
Department must agree to pay for the tasks. Pay the DRA or DRB member $150 per hour for these tasks.
This payment includes full compensation for incidentals such as expenses for telephone, fax, and
computer services.
The Department reimburses you for 1/2 of the invoiced costs to the DRA or DRB and 1/2 of the costs of
any technical services agreed to. Submit a change order bill and associated invoices with original
supporting documents in the form of a cancelled check or bank statement to receive reimbursement. Do
not add mark-ups to the change order bill.
The Department does not pay for any DRA- or DRB-related work performed after Contract acceptance.
The Department does not pay your cost of preparing for and attending a dispute resolution meeting.
5-1.43E(2) Dispute Resolution Advisor
5-1.43E(2)(a) General
Section 5-1.43E(2) applies to a contract with a total bid from $3 million to $10 million.
The DRA is a single-member board you and the Department establish.
52

SECTION 5

CONTROL OF WORK

5-1.43E(2)(b) DRA Selection


Within 30 days of Contract approval, you and the Department must select the DRA using the following
procedure:
1. You and the Department each nominates 3 DRA member candidates. Each candidate must be (1) on
the Department's Dispute Resolution Advisor Candidates List at the Department's Division of
Construction Web site or (2) must:
1.1. Be knowledgeable in the type of construction and contract documents anticipated by the
Contract
1.2. Have completed training by the Dispute Resolution Board Foundation
1.3. Have served on at least 3 dispute resolution boards on a Department contract as a member or
at least 2 dispute resolution boards on a Department contract as the chairman
1.4. Have no prior direct involvement on this Contract
1.5. Have no financial interest in the Contract or with the parties, subcontractors, suppliers,
consultants, or associated legal or business services within 6 months before award and during
the Contract except for payments for Department DRA or DRB services or payments for
retirement or pensions from either party not tied to, dependent on, or affected by the net worth
of the party
2. You and the Department must request a disclosure statement from each nominated DRA candidate
and must furnish the 3 statements to the other party. Each statement must include:
2.1. Resume of the candidate's experience
2.2. Declaration statement that describes past, present, anticipated, and planned professional or
personal relationships with each of the following:
2.2.1. Parties involved in the Contract
2.2.2. Parties' principals
2.2.3. Parties' counsel
2.2.4. Associated subcontractors and suppliers
3. You and the Department must select 1 of the 6 candidates to be the DRA. If you and the Department
cannot agree on 1 candidate, you and the Department each must select 1 of the 3 nominated by the
other and the DRA is decided between the 2 candidates by a coin toss.
5-1.43E(2)(c) DRA Replacement
The services of the DRA may end at any time with notice of at least 15 days if:
1. The DRA resigns.
2. Either you or the Department replaces the DRA for failing to fully comply at all times with the required
employment or financial disclosure conditions of the DRA as described in the Contract and the
Dispute Resolution Advisor Agreement.
A DRA replacement is selected the same way as the original DRA. The selection of a replacement DRA
must start upon determination of the need for replacement and must be completed within 15 days. The
Dispute Resolution Advisor Agreement must be amended to reflect the change of the DRA.
5-1.43E(2)(d) DRA Traditional Dispute Meeting
If you choose to pursue a potential claim, refer the dispute to the DRA within 5 days after receiving the
Engineer's response to your Supplemental Potential Claim Record. The dispute meeting must be
scheduled no later than 25 days after of the DRA receives the referral unless you and the Department
otherwise agree.
At least 10 days before the scheduled dispute meeting, each party must furnish the DRA documentation
that supports its position and any additional information requested by the DRA.
If the DRA requests additional information within 5 days after the dispute meeting, the party receiving the
request must furnish this information within 5 days of receiving the request.
The DRA provides a written recommendation report within 10 days of the dispute meeting unless you and
the Department agree to allow more time.

53

SECTION 5

CONTROL OF WORK

Within 5 days of receiving the DRA's recommendation report, either you or the Department may request
clarification of any part of the report. Only one request for clarification from each party is allowed per
dispute.
Within 10 days after receiving the DRA's recommendation report, each party must furnish a written
response to the DRA indicating acceptance or rejection of the recommendation. If a party rejects the
recommendation and has new information that supports its position, the party may request
reconsideration. The reconsideration request must be made within 10 days after receiving the DRAs
recommendation report. Only one reconsideration request from each party is allowed per dispute.
If both you and the Department accept the DRA's recommendation but cannot agree on the time or
payment adjustment within 30 days of accepting the recommendation, either party may request that the
DRA recommend an adjustment.
5-1.43E(3) Dispute Resolution Board
5-1.43E(3)(a) General
Section 5-1.43E(3) applies to a contract with a total bid of over $10 million.
The DRB is a 3-member board that you and the Department establish.
5-1.43E(3)(b) DRB Member Selection
Within 45 days of Contract approval, you and the Department must select DRB members and establish
the DRB using the following procedure:
1. You and the Department each nominates a DRB member candidate who is on the Departments
approved list. For the list of approved member candidates, go to the Department's Division of
Construction Web site. If you or the Department nominates someone who is not on that list, the
candidate must:
1.1. Be knowledgeable in the type of construction and contract documents anticipated by the
Contract
1.2. Have completed training by the Dispute Resolution Board Foundation
1.3. Have no prior direct involvement on this Contract
1.4. Have no financial interest in the Contract or with the parties, subcontractors, suppliers,
consultants, or associated legal or business services within 6 months before award and during
the Contract, except for payments for Department DRA or DRB services, or payments for
retirement or pensions from either party not tied to, dependent on, or affected by the net worth
of the party
2. You and the Department must request a disclosure statement from each nominated DRB member
candidate and must each furnish it to the other party. The statement must include:
2.1. Resume of the candidate's experience
2.2. Declaration statement that describes past, present, anticipated, and planned professional or
personal relationships with each of the following:
2.2.1. Parties involved in the Contract
2.2.2. Parties principals
2.2.3. Parties counsel
2.2.4. Associated subcontractors and suppliers
3. You and the Department are allowed:
3.1. A one-time objection to the other's candidate
3.2. An objection to the other's candidate based on a specific breach of the candidate's

responsibilities or qualifications under items 1 and 2 above.

4. If you or the Department objects to the other's candidate, the party whos candidate was objected to
must nominate another DRB candidate within 15 days.
5. The 1st candidate from a party that receives no objection becomes that party's DRB member.
6. You and the Department each provide written notification to your selected DRB member.
7. Within 15 days of their notifications, the selected DRB members recommend to you and the
Department the 3rd DRB member candidate and provide that candidates disclosure statement.
8. Within 15 days of the recommendation, you and the Department must each notify the first 2 DRB
members whether you approve or disapprove of the recommended 3rd DRB member candidate.
9. If the 2 DRB members cannot agree on the 3rd DRB candidate, they will submit a list of candidates to
you and the Department for final selection and approval.
54

SECTION 5

CONTROL OF WORK

10. If the 2 DRB members do not recommend a 3rd DRB candidate within 15 days of notification of their
selections, or if you and the Department do not agree on the 3rd DRB member candidate within 15
days of the recommendation, or if you and the Department do not agree on any of the candidates on
the list provided by the first 2 selected DRB members, you and the Department each must select 3
candidates from the current list of arbitrators certified by the Public Works Contract Arbitration
Committee established by Pub Cont Code 10245 et seq. who will be willing to serve as a DRB
member. The first 2 selected DRB members must select the 3rd member in a blind draw of these 6
candidates.
11. The 3 DRB members then decide which of the 3 will act as the DRB chairman. If you and the
Department do not agree with the selected chairman, the 3rd member will act as the DRB chairman.
5-1.43E(3)(c) DRB Member Replacement
The service of a DRB member may end at any time with notice of at least 15 days if:
1.
2.
3.
4.
5.

member resigns
A
The Department replaces its selected member
You replace your selected member
The Department's and your selected members replace the 3rd member
You or the Department replace any member who fails to comply with specified employment or
financial disclosure conditions of DRB membership

Replacing any DRB member must be accomplished by written notification to the DRB and the other party
with substantiation for replacing the member.
A DRB member replacement is selected the same way as the original DRB member selection. Selecting a
replacement DRB member must start upon determination of the need for replacement and must be
completed within 15 days. The Dispute Resolution Board Agreement must be amended to reflect the
change to the DRB.
5-1.43E(3)(d) DRB Progress Meetings
You and the Department must periodically meet with the DRB and visit the job site so the DRB members
can keep abreast of construction activities and develop familiarity with the work in progress.
The progress meetings must occur at the start of the project and at least once every 4 months after that.
Both parties must attend each progress meeting.
You and the Department may agree to waive scheduled progress meetings when the only work remaining
is plant establishment.
5-1.43E(3)(e) DRB Traditional Dispute Meeting
If you choose to pursue a potential claim, refer the dispute to the DRB within 21 days after receiving the
Engineer's response to your Supplemental Potential Claim Record unless a facilitated dispute resolution
is included in the signed original partnering charter, in which case, make the referral within 41 days after
receiving the response. The dispute meeting must be held no later than 60 days after the DRB receives
the referral unless you and the Department otherwise agree.
At least 15 days before the scheduled dispute meeting, each party must furnish the DRB documentation
that supports its position and any additional information requested by the DRB.
If the DRB requests additional information within 10 days after the dispute meeting, the party receiving
the request must furnish this information within 10 days of receiving the request.
The DRB provides a written recommendation report within 30 days of the dispute meeting unless you and
the Department agree to allow more time.
Within 10 days of receiving the DRB's recommendation report, either you or the Department may request
clarification of any part of the report. Only one request for clarification from each party is allowed per
dispute.
Within 30 days after receiving the DRB's recommendation report, each party must furnish a written
response to the DRB indicating acceptance or rejection of the recommendation. If a party rejects the
55

SECTION 5

CONTROL OF WORK

recommendation and has new information that supports its position, the party may request
reconsideration. The reconsideration request must be made within 30 days after receiving the DRB's
recommendation report. Only one request for reconsideration from each party is allowed per dispute.
If both you and the Department accept the DRB's recommendation but cannot agree on the time or
payment adjustment within 60 days of accepting the recommendation, either party may request that the
DRB recommend an adjustment.
5-1.43F Reserved
5-1.445-1.45 RESERVED
5-1.46 FINAL INSPECTION AND CONTRACT ACCEPTANCE
When you complete the work, request the Engineer's final inspection.
If the Engineer determines that the work is complete, the Engineer recommends Contract acceptance.
Immediately after Contract acceptance, you are relieved from:
1. Maintenance and protection duties
2. Responsibility for injury to persons or property or damage to the work occurring after Contract
acceptance except as specified in section 6-3.06
5-1.475-1.50 RESERVED

56

6 CONTROL OF MATERIALS

6-1 GENERAL

6-1.01 GENERAL
Section 6 includes specifications related to control of materials.
6-2 MATERIAL SOURCE
6-2.01 GENERAL
Material incorporated into the work must be new.
6-2.02 MATERIAL SOURCE
Before the preconstruction conference, submit material source information on a Notice of Materials to Be
Used form.
6-2.03 DEPARTMENT-FURNISHED MATERIALS
Request Department-furnished material except sign panels at least 15 days before their scheduled
installation. Request sign panels at least 30 days before their scheduled installation.
If the Department furnishes the material:
1. At the job site, unload and store the material
2. At a location other than the job site, deliver the material to the job site and store it
The Engineer orders the return and disposal of surplus Department-furnished material. This returning and
disposing of material is change order work.
You are responsible for the cost of replacing Department-furnished material. The Department deducts
replacement costs. Department-furnished material not used in the work remains the property of the
Department.
6-2.04 LOCAL MATERIALS
Local material must be:
1. Mineral material, including rock, sand, or gravel, or earth
2. Selected material or material procured from an established commercial source and not local borrow
3. Procured or produced from a source in the work vicinity specifically for project use
Upon your request, the Department tests material from an untested local source. If satisfactory material
from that source is used in the work, the Department does not charge you for the tests; otherwise, the
Department deducts test costs.
6-2.05 BUY AMERICA
6-2.05A General
Reserved
6-2.05B Crumb Rubber (Pub Res Code 42703(D))
Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:
1. Produced in the U.S
2. Derived from waste tires taken from vehicles owned and operated in the U.S
6-2.05C Steel and Iron Materials (23 CFR 635.410)
Section 6-2.05C applies to a federal-aid contract.
Furnish steel and iron materials to be incorporated into the work with certificates of compliance. Steel and
iron materials must be produced in the U.S. except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic
production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)]
57

SECTION 6

CONTROL OF MATERIALS

2. If the total combined cost of the materials does not exceed the greater of 0.1 percent of the total bid
or $2,500, materials produced outside the U.S. may be used
Production includes:
1. Processing steel and iron materials, including smelting or other processes that alter the physical form
or shape (such as rolling, extruding, machining, bending, grinding, and drilling) or chemical
composition
2. Coating application, including epoxy coating, galvanizing, and painting, that protects or enhances the
value of steel and iron materials
6-3 QUALITY
6-3.01 GENERAL
Store materials and samples in a way that preserves the quality and facilitates prompt inspection.
6-3.02 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION
A reference to a specific brand or trade name establishes a quality standard and is not intended to limit
competition. You may use a product that is equal to or better than the specified brand or trade name if
authorized.
Submit a substitution request with a time period that:
1. Follows Contract award
2. Allows 30 days for review
3. Causes no delay
Include substantiating data with the substitution request that proves that substitution:
1. Causes no delay
2. Is of equal or better quality and suitability
6-3.03 AUTHORIZED LABORATORY LISTS
Section 6-3.03 applies where an authorized laboratory is specified to be on an Authorized Laboratory List.
For procedures to be included on an Authorized Laboratory List, go to the METS Web site.
6-3.04 QUALITY CONTROL
Material production and testing equipment must measure accurately and precisely.
Prepare and maintain QC records, including:
1.
2.
3.
4.
5.

Inspection types, results, and dates


Testing types, results, and dates
Inspector names and certificates
Acceptance criteria
Corrective actions

6-3.05 QUALITY ASSURANCE


6-3.05A General
The Department may use multiple QA methods for a material.
Allow the Department to record, including photograph and video record, to ensure a material is produced
to comply with the Contract.
You may examine the records and reports of tests the Department performs if they are available at the
job site.
Schedule work to allow time for QA.
The Department deducts testing costs for work that does not comply with the Contract.
58

SECTION 6

CONTROL OF MATERIALS

The Department may retest material previously tested and authorized for use. If the Department notifies
you of a retest, furnish resources for retesting.
For a material specified to comply with a State Specification number, the material may comply with a later
version of the specification. Obtain State Specifications from METS.
For a material specified to comply with a property shown in the following table, the Department tests
under the corresponding California Test shown:
California Tests
Property
California Test
Relative compaction
216 or 231
Sand equivalent
217
Resistance (R-value)
301
Grading (sieve analysis)
202
Durability index
229

59

SECTION 6

CONTROL OF MATERIALS

6-3.05B Source Inspection Expense Deductions


For each item shown in the following table, the Department deducts the corresponding amount shown:
Source Inspection Expense Deductions
Deduction
Distancea
Steel pipe piling
> 300
$5,000
Prestressing system
> 3,000
$8,000
Precast concrete members specified section
11-2
Epoxy-coated reinforcement
Structural steel for sign structures
Miscellaneous metal
Extinguishable message signs
> 300
$2,000
Variable message signs
Changeable message signs
Service equipment enclosures
Telephone demarcation cabinets
Closed circuit television cabinets
Weigh-in-motion cabinets
Highway advisory radio cabinets
Poles for electrical systems
> 300
$1,000 for 10 poles and
$1,000 for every multiple of 10 poles
thereafter
Structural steel
> 300
The greater of:
1. $5,000
2. $0.02/lb
> 3,000
The greater of:
1. $8,000
2. $0.036/lb
Structural steel paint
> 300
The greater of:
1. $2,000
2. $0.01/sq ft
> 3,000
The greater of:
1. $5,000
2. $0.015/sq ft
Check samples
> 300
$2,000
High mast poles
> 300
$2,500
> 3,000
$5,000
PTFE bearings, 2 lots
> 300
$5,000
> 3,000
$15,000
PTFE bearings, > 2 lots
> 300
$10,000
> 3,000
$20,000
a
Distance is air-line miles from both Sacramento and Los Angeles to the inspection source.
Item

6-3.05C Material Source Inspection and Testing


Section 6-3.05C applies if a material is to be inspected or tested at the source.
Submit an inspection request form:
1. At least 3 business days before the requested inspection date for a material source within California.
2. At least 5 business days before the requested inspection date for a material source outside California
but within the U.S.
3. 50 days before the planned production start for a material source outside the U.S. Notify the Engineer
at least 20 days before the actual start.
For the inspection request form and the procedure for its submittal, go to the METS Web site. Notify the
Engineer of each submittal.
60

SECTION 6

CONTROL OF MATERIALS

6-3.05D Job Site Inspection and Testing


Section 6-3.05D applies if a material is to be inspected or tested at the job site.
The material must be authorized for use before it is incorporated into the work.
6-3.05E Certificates of Compliance
Section 6-3.05E applies (1) where a certificate of compliance is specified and (2) if any material is
produced outside the U.S.
Submit a certificate:
1. Before the material is incorporated into the work.
2. For each lot of the material. Identify the lot on the certificate.
3. Signed by the producer of the material and stating that the material complies with the Contract.
6-3.05F Test Data, Test Reports, and Evaluation Reports
Reserved
6-3.05G Test Samples
Section 6-3.05G applies where a test sample is specified or if a test sample is requested.

Notify the Engineer 10 days before taking a sample.

Submit material to be tested with a Sample Identification Card. For the card, go to the METS Web site.

Restore work immediately after sampling.

6-3.05H Reserved
6-3.05I Authorized Facility Audit Lists
Section 6-3.05I applies where a facility is specified to be on an Authorized Facility Audit List.
An audit authorized by the Department not more than 3 years before completion of the fabrication
process is acceptable if the Department determines the audit was for the same type of work to be
performed. For procedures to be included on an Authorized Facility Audit List, go to the METS Web site.
6-3.05J Quality Control Plans
Reserved
6-3.05K Authorized Material Lists
Section 6-3.05K applies where a material is specified to be on an Authorized Material List.
The material must be on an Authorized Material List before it is incorporated into the work.
For procedures to be included on an Authorized Material List, go to the METS Web site.
6-3.05L Authorized Material Source Lists
Section 6-3.05L applies where a material is specified to be on an Authorized Material Source List.
The material source must be on an Authorized Material Source List before the item from the source is

incorporated into the work.

For procedures to be included on an Authorized Material Source List, go to the METS Web site.

6-3.06 GUARANTEE
Guarantee that work remains free from substantial defects for 1 year after Contract acceptance except for
work portions for which you were relieved of maintenance and protection. Guarantee each of these
relieved work portions for 1 year after the relief date.
The guarantee excludes damage or displacement caused by an event outside your control, including:
1. Normal wear and tear
2. Improper operation
61

SECTION 6
3.
4.
5.
6.

CONTROL OF MATERIALS

I nsufficient maintenance
A
buse
Unauthorized change
Act of God

During the guarantee period, repair or replace each work portion having a substantial defect.
The Department does not pay for corrective work.
During corrective work activities, provide the same insurance specified before Contract acceptance.
The Contract bonds must be in force until the later of:
1. Expiration of guarantee period
2. Completion of corrective work
If a warranty specification conflicts with section 6-3.06, comply with the warranty specification.
During the guarantee period, the Engineer monitors the completed work. If the Engineer finds work
having a substantial defect, the Engineer lists work parts and furnishes you the list.
Within 10 days of receipt of the list, submit for authorization a detailed plan for correcting the work.
Include a schedule that includes:
1. Start and completion dates
2. List of labor, equipment, materials, and any special services you plan to use
3. Work related to the corrective work, including traffic control and temporary and permanent pavement
markings
The Engineer notifies you when the plan is authorized. Start corrective work and related work within 15
days of notice.
If the Engineer determines corrective work is urgently required to prevent injury or property damage:
1. The Engineer furnishes you an order to start emergency repair work and a list of parts requiring
corrective work
2. Mobilize within 24 hours and start work
3. Submit a corrective work plan within 5 business days of starting emergency repair work
If you fail to perform work as specified, the Department may perform the work and bill you.

62

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.01 GENERAL
Section 7 includes specifications regarding your:
1. Compliance with laws
2. Responsibilities for public safety and convenience
3. Responsibilities for indemnification, insurance, and liability
7-1.02 LAWS
7-1.02A General
Comply with laws, regulations, orders, and decrees applicable to the project. Indemnify and defend the
State against any claim or liability arising from the violation of a law, regulation, order, or decree by you or
your employees. Immediately report to the Engineer a discrepancy or inconsistency between the Contract
and a law, regulation, order, or decree.
If the Department incurs any fines or penalties because of your failure to comply with a law, regulation,
order, or decree, the Department deducts the amount of the fine or penalty.
Immediately notify the Engineer if a regulatory agency requests access to the job site or to records.
Submit a list of documents provided to the agency and issued enforcement actions.
7-1.02B U.S. Fair Labor Standards Act
Comply with 29 USC 201 et seq.
7-1.02C Emissions Reduction
Submit to the Department the following certification before performing the work:
I am aware of the emissions reduction regulations being mandated by the California Air Resources
Board. I will comply with such regulations before commencing the performance of the work and
maintain compliance throughout the duration of this Contract.
Contract signing constitutes submittal of this certification.
7-1.02D7-1.02H Reserved
7-1.02I Government Code
7-1.02I(1) General
Reserved
7-1.02I(2) Nondiscrimination
Under 2 CA Code Regs 8107 and 8203:
1. During the performance of this contract, contractor and its subcontractors shall not unlawfully
discriminate against any employee or applicant for employment because of race, religion, color,
national origin, ancestry, physical handicap, medical condition, marital status, age (over 40) or sex.
Contractors and subcontractors shall insure that the evaluation and treatment of their employees and
applicants for employment are free of such discrimination. Contractors and subcontractors shall
comply with the provisions of the Fair Employment and Housing Act (Gov. Code, Section 12900 et
seq.) and the applicable regulations promulgated thereunder (Cal. Admin. Code, Tit. 2, Section
7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission
implementing Government Code, Section 12990, set forth in Chapter 5 of Division 4 of Title 2 of the
California Administrative Code are incorporated into this contract by reference and made a part
hereof as if set forth in full. Contractor and its subcontractors shall give written notice of their
obligations under this clause to labor organizations with which they have a collective bargaining or
other agreement.
2. This Contractor shall include the nondiscrimination and compliance provisions of this clause in all
subcontracts to perform work under the contract.
STANDARD CALIFORNIA NONDISCRIMINATION CONSTRUCTION CONTRACT SPECIFICATIONS
(GOV. CODE, SECTION 12990)
63

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

These specifications are applicable to all state contractors and subcontractors having a construction
contract or subcontract of $5,000, or more.
1. As used in the specifications:
a.
"Administrator" means Administrator, Office of Compliance Programs, California Department of
Fair Employment and Housing, or any person to whom the Administrator delegates authority;
b.
"Minority" includes:
(i)
Black (all persons having primary origins in any of the black racial groups of Africa, but
not of Hispanic origin);
(ii)
Hispanic (all persons of primary culture or origin in Mexico, Puerto Rico, Cuba, Central
or South America or other Spanish derived culture or origin regardless of race);
(iii)
Asian / Pacific Islander (all persons having primary origins in any of the original
peoples of the Far East, Southeast Asia, the Indian Subcontinent or the Pacific
Islands); and
(iv)
American Indian / Alaskan Native (all persons having primary origins in any of the
original peoples of North America and who maintain culture identification through tribal
affiliation or community recognition).
2. Whenever the contractor or any subcontractor subcontracts a portion of the work, it shall physically
include in each subcontract of $5,000 or more the nondiscrimination clause in this contract directly or
through incorporation by reference. Any subcontract for work involving a construction trade shall also
include the Standard California Construction Contract Specifications, either directly or through
incorporation by reference.
3. The contractor shall implement the specific nondiscrimination standards provided in paragraph 6(a)
through (e) of these specifications.
4. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom
the contractor has a collective bargaining agreement, to refer either minorities or women shall excuse
the contractor's obligations under these specifications, Government Code, Section 12990, or the
regulations promulgated pursuant thereto.
5. In order for the nonworking training hours of apprentices and trainees to be counted, such
apprentices and trainees must be employed by the contractor during the training period, and the
contractor must have made a commitment to employ the apprentices and trainees at the completion
of their training, subject to the availability of employment opportunities. Trainees must be trained
pursuant to training programs approved by the U.S. Department of Labor or the California
Department of Industrial Relations.
6. The contractor shall take specific actions to implement its nondiscrimination program. The evaluation
of the contractor's compliance with these specifications shall be based upon its effort to achieve
maximum results from its actions. The contractor must be able to demonstrate fully its efforts under
Steps a. through e. below:
a.
Ensure and maintain a working environment free of harassment, intimidation, and coercion at
all sites, and at all facilities at which the contractor's employees are assigned to work. The
contractor, where possible, will assign two or more women to each construction project. The
contractor shall specifically ensure that all foremen, superintendents, and other on-site
supervisory personnel are aware of and carry out the contractor's obligations to maintain such
a working environment, with specific attention to minority or female individuals working at such
sites or in such facilities.
b.
Provide written notification within seven days to the director of DFEH when the union or unions
with which the Contractor has a collective bargaining agreement has not referred to the
Contractor a minority person or woman sent by the Contractor, or when the Contractor has
other information that the union referral process has impeded the Contractor's efforts to meet
its obligations.
c.
Disseminate the Contractor's equal employment opportunity policy by providing notice of the
policy to unions and training, recruitment and outreach programs and requesting their
cooperation in assisting the Contractor to meet its obligations; and by posting the company
policy on bulletin boards accessible to all employees at each location where construction work
is performed.
d.
Ensure all personnel making management and employment decisions regarding hiring,
assignment, layoff, termination, conditions of work, training, rates of pay or other employment
decisions, including all supervisory personnel, superintendents, general foremen, on-site

64

SECTION 7

7.

8.

9.

10.

11.
12.

13.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

foremen, etc., are aware of the Contractor's equal employment opportunity policy and
obligations, and discharge their responsibilities accordingly.
e.
Ensure that seniority practices, job classifications, work assignments and other personnel
practices, do not have a discriminatory effect by continually monitoring all personnel and
employment related activities to ensure that the equal employment opportunity policy and the
Contractor's obligations under these specifications are being carried out.
Contractors are encouraged to participate in voluntary associations which assist in fulfilling their equal
employment opportunity obligations. The efforts of a contractor association, joint contractor-union,
contractor-community, or other similar group of which the contractor is a member and participant,
may be asserted as fulfilling any one or more of its obligations under these specifications provided
that the contractor actively participates in the group, makes every effort to assure that the group has a
positive impact on the employment of minorities and women in the industry, ensures that the concrete
benefits of the program are reflected in the Contractor's minority and female workforce participation,
and can provide access to documentation which demonstrates the effectiveness of actions taken on
behalf of the Contractor. The obligation to comply, however, is the Contractor's.
The Contractor is required to provide equal employment opportunity for all minority groups, both male
and female, and all women, both minority and non-minority. Consequently, the Contractor may be in
violation of the Fair Employment and Housing Act (Gov. Code, Section 12990 et seq.) if a particular
group is employed in a substantially disparate manner.
Establishment and implementation of a bona fide affirmative action plan pursuant to Section 8104 (b)
of this Chapter shall create a rebuttal presumption that a contractor is in compliance with the
requirements of Section 12990 of the Government Code and its implementing regulations.
The Contractor shall not use the nondiscrimination standards to discriminate against any person
because of race, color, religion, sex, national origin, ancestry, physical handicap, medical condition,
marital status or age over 40.
The Contractor shall not enter into any subcontract with any person or firm decertified from state
contracts pursuant to Government Code Section 12990.
The Contractor shall carry out such sanctions and penalties for violation of these specifications and
the nondiscrimination clause, including suspension, termination and cancellation of existing
subcontracts as may be imposed or ordered pursuant to Government Code Section 12990 and its
implementing regulations by the awarding agency. Any Contractor who fails to carry out such
sanctions and penalties shall be in violation of these specifications and Government Code Section
12990.
The Contractor shall designate a responsible official to monitor all employment related activity to
ensure that the company equal employment opportunity policy is being carried out, to submit reports
relating to the provisions hereof as may be required by OCP and to keep records. Records shall at
least include for each employee the name, address, telephone numbers, construction trade, union
affiliation if any, employee identification number when assigned, social security number, race, sex,
status, (e.g., mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours
worked per week in the indicated trade, rate of pay, and locations at which the work was performed.
Records shall be maintained in any easily understandable and retrievable form; however, to the
degree that existing records satisfy this requirement, contractors shall not be required to maintain
separate records.

7-1.02J Reserved
7-1.02K Labor Code
7-1.02K(1) General
Work on the job site must comply with Labor Code 1727 and 17701815 and 8 CA Code of Regs
16000 et seq. Work includes roadside production and processing of materials.
Payroll records include time cards, cancelled checks, cash receipts, trust fund forms, books, documents,
schedules, forms, reports, receipts or other information which reflect job assignments, work schedules by
days and hours, and the disbursement of payment to workers (8 CA Code of Regs 16000).
7-1.02K(2) Wages
The Department obtains the general prevailing rate of wages applicable to the work to be done. The rate
includes:
1. Basic hourly rate
65

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

2. Employer payments for health and welfare, pension, vacation, apprenticeship training fees, travel
time, and subsistence pay as provided for in Labor Code 1773.1
3. Similar purposes
The general prevailing wage rates and any applicable changes to these wage rates are available:
1. At the Department's Labor Compliance Office of the district in which the work is located
2. From the Department of Industrial Relations' Web site
Post the general prevailing wage rates at a prominent place at the job site (Labor Code 1773.2).
The wage determinations refer to expiration dates. The determinations with a single asterisk after the
expiration date, and in effect on the date of advertisement for bids, are good for the life of the Contract.
The determinations with double asterisks after the expiration date indicate the wage rate to be paid for
work performed after this date has been determined. If work is to extend past this date, pay the new rate
and incorporate it into the Contract. Changes in general prevailing wage determinations apply to the
Contract when the Director of Industrial Relations has issued them at least 10 days before advertisement.
(Labor Code 1773.6 and 8 CA Code of Regs 16204)
The Department does not recognize any claim for additional payment because of a payment by the
Contractor of any wage rate in excess of the prevailing wage rate specified in the Contract.
The Contractor and any subcontractor must forfeit to the Department not more than $50 per day or part of
a day for each worker paid less than the prevailing wage rate and pay the worker the difference between
the prevailing wage rate and the rate paid (Labor Code 1775). The Labor Commissioner determines the
amount of this penalty and bases the amount on:
1. Whether the failure to pay the correct prevailing wage rate was a good-faith mistake that the
Contractor or subcontractor promptly and voluntarily corrected upon notice
2. The prior record of the Contractor or subcontractor in meeting its prevailing wage obligations
3. The Contractor or subcontractor's willful failure to pay the correct rate of prevailing wages
If a worker employed by a subcontractor on a public works project is not paid the general prevailing per
diem wages by the subcontractor, the Contractor is not liable for the penalties described in section 7
1.02K(2) unless the Contractor had knowledge of the failure to pay the correct general prevailing per diem
wages or unless the Contractor fails to comply with the following requirements (Labor Code 1775):
1. The contract executed between the Contractor and the subcontractor for the performance of work on
the public works project must include a copy of the requirements in Labor Code 1771, 1775, 1776,
1777.5, 1813 and 1815.
2. The Contractor must monitor the payment of the specified general prevailing rate of per diem wages
by periodic review of the certified payroll records of the subcontractor.
3. Upon becoming aware of the subcontractor's failure to pay the specified prevailing rate of wages to
the subcontractor's workers, the Contractor must diligently take corrective action to stop or rectify the
failure, including withholding sufficient funds due the subcontractor for work performed on the public
works project.
4. Before making final payment to the subcontractor for work performed on the public works project, the
Contractor must obtain an affidavit signed under penalty of perjury from the subcontractor that the
subcontractor has paid the specified general prevailing rate of per diem wages to its employees on
the public works project and any amounts due under Labor Code 1813.
Under Labor Code 1775, the Department must notify the contractor on a public works project within 15
days of receipt by the Department of a complaint of the failure of a subcontractor on that public works
project to pay workers the general prevailing rate of per diem wages.
7-1.02K(3) Certified Payroll Records (Labor Code 1776)
Keep accurate payroll records.
Submit a copy of your certified payroll records, weekly, including those of subcontractors. Include:
1. E
ach employee's:
66

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

1.1.
1.2.
1.3.
1.4.
1.5.
1.6.

Full name
Address
Social security number
Work classification
Straight time and overtime hours worked each day and week
Actual wages paid for each day to each:
1.6.1. Journeyman
1.6.2. Apprentice
1.6.3. Worker
1.6.4. Other employee you employ for the work
1.7. Pay rate
1.8. Itemized deductions made
1.9. Check number issued
2. Apprentices and the apprentice-to-journeyman ratio
Each certified payroll record must include a Statement of Compliance signed under penalty of perjury that
declares:
1. The information contained in the payroll record is true, correct, and complete
2. The employer has complied with the requirements of sections 1771, 1811, and 1815 for any work
performed by his or her employees on the public works project
3. The wage rates paid are at least those required by the Contract
The Department allows the use of a form with identical wording as the Statement of Compliance form
provided by the Department.
You may submit certified payroll records electronically to the mailbox address that corresponds to the
district in which the work is located. The districts' electronic mailbox addresses are as shown in the
following table:
District
1
2
3
4
5
6
7
8
9
10
11
12

Electronic Mailboxes
Address
district1.payrolls@dot.ca.gov
district2.payrolls@dot.ca.gov
district3.payrolls@dot.ca.gov
district4.payrolls@dot.ca.gov
district5.payrolls@dot.ca.gov
district6.payrolls@dot.ca.gov
district7.payrolls@dot.ca.gov
district8.payrolls@dot.ca.gov
district9.payrolls@dot.ca.gov
district10.payrolls@dot.ca.gov
district11.payrolls@dot.ca.gov
district12.payrolls@dot.ca.gov

Before submitting the payroll records electronically, you must complete and sign the Contractor's
Acknowledgement and submit it to the district's electronic mailbox address.
The Department responds with an e-mail containing a Caltrans Internet Certificate to be used for the
electronic submission of payroll records. When you accept the certificate and reply to the e-mail, the
Department is ready to accept your electronic submissions.
Each electronic submission must:
1. Include certified payroll records in a nonmodifiable pdf format. No spreadsheets, Microsoft Word
documents, or password-protected documents are accepted.
2. Include a signed Statement of Compliance form with each weekly record.
3. Be received by the Department by close of business on the 15th day of the month for the prior
month's work.
67

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

4. Be encrypted before submission.


5. Contain the following information in the subject line:
5.1. Contract number.
5.2. Week ending date as W/E mm/dd/yy.
6. Contain 1 contract number and week ending date per submission.
For additional information on electronic submission of certified payroll records, go to the Department's
Labor Compliance Web site.
Make certified payroll records available for inspection at all reasonable hours at your main office on the
following basis:
1. Upon the employee's request or upon request of the employee's authorized representative, make
available for inspection a certified copy of the employee's payroll record.
2. Refer the public's requests for certified payroll records to the Department. Upon the public's request,
the Department makes available for inspection or furnishes copies of your certified payroll records.
Do not give the public access to the records at your main office.
Make all payroll records available for inspection and copying or furnish a copy upon request of a
representative of the:
1. Department
2. Division of Labor Standards Enforcement of the Department of Industrial Relations
3. Division of Apprenticeship Standards of the Department of Industrial Relations
Furnish the Department the location of the records. Include the street address, city, and county. Furnish
the Department a notification of a location and address change within 5 business days of the change.
Comply with a request for the records within 10 days after you receive a written request. If you do not
comply within this period, the Department withholds from progress payments a $25 penalty for each day
or part of a day for each worker until you comply. You are not assessed this penalty for a subcontractor's
failure to comply with Labor Code 1776.
The Department withholds from progress payments for delinquent or inadequate records (Labor Code
1771.5). If you have not submitted an adequate record by the month's 15th day for the period ending on
or before the 1st of that month, the Department withholds up to 10 percent of the monthly progress
estimate, exclusive of mobilization. The Department does not withhold more than $10,000 or less than
$1,000.
7-1.02K(4) Apprentices
Comply with the apprentice to journeyman ratio requirements (Labor Code 1777.5(g)).
Comply with the training contribution requirements (Labor Code 1777.5(m)(1)).
For answers to questions, contact the Division of Apprenticeship Standards before starting work.
The Department deducts from progress payments civil penalties assessed by the Chief of the Division of
Apprenticeship Standards for violating Labor Code 1777.5 (Labor Code 1777.7).
7-1.02K(5) Working Hours
Eight hours is a legal day's work (Labor Code 1810).
The time of service of any worker employed on public work is limited and restricted to 8 hours in 1 day
and 40 hours in 1 calendar week, except as provided by Labor Code 1815 (Labor Code 1811).
A Contractor's employee may work more than 8 hours per day and 40 hours per week if the Contractor
pays the employee 1-1/2 times the basic pay rate for the hours worked in excess of 8 hours per day and
40 hours per week (Labor Code 1815).
For each worker employed in the work for each day the worker works more than 8 hours in 1 day and 40
hours in 1 calendar week without overtime pay, the Department deducts $25 as a penalty for violating
Labor Code 1815 (Labor Code 1813).
68

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.02K(6) Occupational Safety and Health Standards


7-1.02K(6)(a) General
Comply with applicable occupational safety and health standards, rules, regulations, and orders. The
Occupational Safety and Health Standards Board is the only agency authorized in the State to adopt and
enforce occupational safety and health standards (Labor Code 142 et seq.).
You are the controlling employer and must ensure hazardous conditions are corrected (Labor Code
6400).
The Engineer may notify Cal/OSHA if you fail to establish or maintain a safe and healthful workplace.
Submit copies of your Injury and Illness Prevention Program and permits required by Cal/OSHA. The
program must address the use of personal and company-issued electronic devices during work. Do not
allow the use of entertainment and personal communication devices in the work zone. Workers may use
a communication device for business purposes in the work area, at a location where their safety and the
safety of other workers and the traveling public is not compromised.
7-1.02K(6)(b) Excavation Safety
Comply with Labor Code 6705 while excavating. For an excavation 5 feet or more in depth, submit shop
drawings for a protective system.
The drawings must show the design and details for providing worker protection from caving ground during
excavation. The submittal must allow review time and include the contents shown in the following table
except the review time is 65 days for an excavation on or affecting railroad property:

Review time
Contents

Drawing Review Time and Contents


Plan not requiring a signature
Plan requiring a signature
5 business days before excavating 20 days before excavating
Drawings
Drawings
Calculations
Calculations
Material information
Material information
Proprietary system information
Proprietary system information
Soil classification
Soil properties
Soil design calculations

7-1.02K(6)(c) Tunnel Safety


Cal/OSHA classifies tunnels into one of the following classifications:
1.
2.
3.
4.

Nongassy
Potentially gassy
Gassy
Extrahazardous

If a tunnel location is described in the Contract, the classification is included in the Information Handout
and you must:
1. Designate an on-site Safety Representative under 8 CA Code of Regs 8406
2. Submit the name of your on-site Safety Representative at least 7 days before starting work at each
tunnel
3. Prominently post a notice at the job site of:
3.1. Tunnel classifications
3.2. Any special orders, rules, special conditions, or regulations related to tunnel work
4. Ensure your workers are informed of these classifications
Notify the Engineer at least 20 days before a worker enters a tunnel not described in the Contract. The
Department obtains the classification of the tunnel. The Engineer may suspend the work because of a
change directly resulting from the Contractor's planned activities that causes activities to fall under the
Tunnel Safety Orders of 8 CA Code of Regs 8422.
69

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.02K(6)(d) Confined Space Safety


Comply with 8 CA Code of Regs 5158 while working in a confined space.
7-1.02K(6)(e)7-1.02K(6)(i) Reserved
7-1.02K(6)(j) Lead Safety
7-1.02K(6)(j)(i) General
Reserved
7-1.02K(6)(j)(ii) Lead Compliance Plan
Section 7-1.02K(6)(j)(ii) applies if the submittal of a lead compliance plan is specified in the special
provisions.
Regulations containing specific Cal/OSHA requirements when working with lead include 8 CA Code of
Regs 1532.1.
Submit a plan:
1. That documents your compliance program to prevent or minimize worker exposure to lead
2. Including the items listed in 8 CA Code of Regs 1532.1(e)(2)(B)
3. Signed and sealed by a CIH
Allow 7 days for the Engineer's review. Obtain authorization for the plan before starting any activity that
presents the potential for lead exposure.
Before starting any activity that presents the potential for lead exposure to employees who have no prior
training, including State employees, provide a safety training program to these employees that complies
with 8 CA Code of Regs 1532.1 and your lead compliance plan.
Submit copies of air monitoring or job site inspection reports made by or under the direction of the CIH
under 8 CA Code of Regs 1532.1 within 10 days after the date of monitoring or inspection.
Supply personal protective equipment, training, and washing facilities required by your lead compliance
plan for 5 State employees.
7-1.02K(6)(j)(iiiviii) Reserved
7-1.02K(6)(k)7-1.02K(6)(t) Reserved
7-1.02L Public Contract Code
7-1.02L(1) General
Reserved
7-1.02L(2) Antitrust Claims
In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant
to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding
body all rights, title, and interest in and to all causes of action it may have under section 4 of the Clayton
Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with 16700) of Part 2 of
Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials
pursuant to the public works contract or the subcontract. This assignment shall be made and become
effective at the time the awarding body tenders final payment to the contractor, without further
acknowledgment by the parties. [Pub Cont Code 7103.5 (b)]
7-1.02M Public Resources Code
7-1.02M(1) General
Reserved
7-1.02M(2) Reserved
7-1.02M(3) Surface Mining and Reclamation Act
Imported borrow or aggregate material must come from a surface mine permitted under the Surface
Mining and Reclamation Act of 1975, Pub Res Code 2710 et seq., or from a source not subject to this
act.
70

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

For the list of permitted sites, go to the Department of Conservation, Office of Mine Reclamation Web site.
If you import borrow or aggregate material from a surface mine not on this list, submit proof that the
source is not subject to this act.
7-1.02M(4)7-1.02M(7) Reserved
7-1.02N Reserved
7-1.02O Vehicle Code
Under Veh Code 591, the Department determines areas within the project limits are open to public
traffic. For those areas, comply with the requirements set forth in Divisions 11, 12, 13, 14 and 15 of the
Veh Code.
Veh Code 591 does not relieve you or any other person from the duty of exercising due care.
7-1.02P7-1.02Q Reserved
7-1.02R Environmental Stewardship
Comply with section 14.
7-1.02S7-1.02Z Reserved
7-1.03 PUBLIC CONVENIENCE
Compliance with section 7-1.03 does not relieve you of your responsibility for public safety.
Construction activities must not inconvenience the public or abutting property owners. Schedule and
conduct work to avoid unnecessary inconvenience to the public and abutting property owners. Avoid
undue delay in construction activities to reduce the public's exposure to construction.
Where possible, route traffic on new or existing paved surfaces.
Maintain convenient access to driveways, houses, and buildings. When an abutting property owner's
access across the right-of-way line is to be eliminated or replaced under the Contract, the existing access
must not be closed until the replacement access facility is usable. Construct temporary approaches to a
crossing and an intersecting highway.
Provide a reasonably smooth and even surface for use by traffic at all time during the excavation of a
roadway and construction of an embankment. Before other grading activities, place fill at culverts and
bridges to allow traffic to cross. If ordered, excavate a roadway cut in layers and construct an
embankment in partial widths at a time alternating construction from one side to the other and routing
traffic over the side opposite the one under construction. Install or construct culverts on only 1/2 the width
of the traveled way at a time; keep the traveled way portion being used by traffic open and unobstructed
until the opposite side of the traveled way is ready for use by traffic.
Upon completion of rough grading or placing any subsequent layer, bring the surface of the roadbed to a
smooth and even condition, free of humps and depressions, and satisfactory for the use of the public.
After subgrade preparation for a specified layer of material has been completed, repair any damage to the
roadbed or completed subgrade, including damage caused by public use.
While subgrade and paving activities are underway, allow the public to use the shoulders. If half-width
paving methods are used, allow the public to use the side of the roadbed opposite the one under
construction. If enough width is available, keep open a passageway wide enough to accommodate at
least 2 lanes of traffic at locations where subgrade and paving activities are underway. Shape shoulders
or reshape subgrade as necessary to accommodate traffic during subgrade preparation and paving
activities.
Apply water or dust palliative for the prevention or alleviation of dust nuisance.
Install signs, lights, flares, Type K temporary railing, barricades and other facilities to direct traffic. Provide
flaggers whenever necessary to direct the movement of the public through or around the work.
You are required to pay for the cost of replacing or repairing all facilities installed under change order
work for the convenience, direction, or warning of the public that are lost while in your custody or are
damaged by your operations to such an extent as to require replacement or repair.
71

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

The Engineer may order or consent to your request to open a completed section of surfacing, pavement,
or structure roadway surface for public use. You will not be compensated for any delay to your
construction activities caused by the public. This does not relieve you from any other contractual
responsibility.
7-1.04 PUBLIC SAFETY
You are responsible to provide for public safety.
Do not construct a temporary facility that interferes with the safe passage of traffic.
Control dust resulting from the work, inside and outside the right-of-way.
Move workers, equipment, and materials without endangering traffic.
Whenever your operations create a condition hazardous to the public, furnish, erect and maintain those
fences, temporary railing, barricades, lights, signs, and other devices and take any other necessary
protective measures to prevent damage or injury to the public.
Any fences, temporary railing, barricades, lights, signs, or other devices furnished, erected and
maintained by you are in addition to those for which payment is provided elsewhere in the specifications.
Provide flaggers whenever necessary to ensure that the public is given safe guidance through the work
zone. At locations where traffic is being routed through construction under one-way controls, move your
equipment in compliance with the one-way controls unless otherwise ordered.
Use of signs, lights, flags, or other protective devices must comply with the California MUTCD and any
directions of the Engineer. Signs, lights, flags or other protective devices must not obscure the visibility of,
nor conflict in intent, meaning, and function of either existing signs, lights and traffic control devices, or
any construction area signs.
Keep existing traffic signals and highway lighting in operation. Other forces within the Department will
perform routine maintenance of these facilities during the work.
Cover signs that direct traffic to a closed area. Except for work specified in section 12, maintaining, and
removing the covers on construction area signs is change order work.
Install temporary illumination in a manner which the illumination and the illumination equipment does not
interfere with public safety. The installation of general roadway illumination does not relieve you from
furnishing and maintaining any protective devices.
Equipment must enter and leave the highway via existing ramps and crossovers and must move in the
direction of traffic. All movements of workmen and construction equipment on or across lanes open to
traffic must be performed in a manner that do not endanger the public. Your vehicles or other mobile
equipment leaving an open traffic lane to enter the construction area must slow down gradually in
advance of the location of the turnoff to give the traffic following an opportunity to slow down. When
leaving a work area and entering a roadway carrying traffic, your vehicles and equipment must yield to
traffic.
Immediately remove hauling spillage from a roadway lane or shoulder open to traffic. When hauling on
roadways, trim loads and remove material from shelf areas to minimize spillage.
Notify the Engineer not less than 20 days and not more than 90 days before the anticipated start of an
activity that will change the vertical or horizontal clearance available to traffic, including shoulders.
If vertical clearance is temporarily reduced to 15.5 feet or less, place low clearance warning signs in
compliance with the California MUTCD and any directions of the Engineer. Signs must comply with the
dimensions, color, and legend requirements of the California MUTCD and section 12-3.06 except that the
signs must have black letters and numbers on an orange retroreflective background. W12-2P signs must
be illuminated so that the signs are clearly visible.
Pave or provide full width continuous and cleared wood walks for pedestrian openings through falsework.
Protect pedestrians from falling objects and concrete-curing water. Extend overhead protection for
pedestrians at least 4 feet beyond the edge of the bridge deck. Illuminate all pedestrian openings through
72

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

falsework. Temporary pedestrian facilities must comply with the California MUTCD, Part 6, Chapter 6D,
"Pedestrian and Worker Safety."
Do not store vehicles, material, or equipment in a way that:
1. Creates a hazard to the public
2. Obstructs traffic control devices
Do not install or place temporary facilities used to perform the work which interfere with the free and safe
passage of traffic.
If you appear to be neglectful or negligent in furnishing warning devices and taking protective measures,
the Engineer may direct your attention to the existence of a hazard. You must furnish and install the
necessary warning devices. If the Engineer points out the inadequacy of warning devices and protective
measures, that action on the part of the Engineer does not relieve you from your responsibility for public
safety or abrogate your obligation to furnish and pay for these devices and measures.
Install Type K temporary railing or other authorized protective systems under any of the following
conditions:
1. Excavations: Where the near edge of the excavation is within 15 feet from the edge of an open traffic
lane
2. Temporarily unprotected permanent obstacles: When the work includes the installation of a fixed
obstacle together with a protective system, such as a sign structure together with protective railing,
and you elect to install the obstacle before installing the protective system; or you, for your
convenience and as authorized, remove a portion of an existing protective railing at an obstacle and
do not replace such railing completely the same day
3. Storage areas: When material or equipment is stored within 15 feet of the edge of an open traffic lane
and the storage is not otherwise prohibited by the Contract
4. Height differentials: When construction operations create a height differential greater than 0.15 feet
within 15 feet of the edge of traffic lane
Installation of Type K temporary railing is not required if an excavation within 15 feet from the edge of an
open traffic lane is protected by any of the following:
1. Steel plate or concrete covers of adequate thickness to prevent accidental entry by traffic or the
public
2. Side slope where the downhill slope is 4:1 (horizontal:vertical) or less unless a naturally occurring
condition
3. Barrier or railing
Offset the approach end of Type K temporary railing a minimum of 15 feet from the edge of an open
traffic lane. Install the temporary railing on a skew toward the edge of the traffic lane of not more than 1
foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15-foot
minimum offset cannot be achieved, the temporary railing must be installed on the 10 to 1 skew to obtain
the maximum available offset between the approach end of the railing and the edge of the traffic lane,
and an array of temporary crash cushion modules must be installed at the approach end of the temporary
railing.
Secure Type K temporary railing in place before starting work for which the temporary railing is required.
Where 2 or more lanes in the same direction are adjacent to the area where the work is being performed,
including shoulders, the adjacent lane must be closed under any of the following conditions:
1. Work is off the traveled way but within 6 feet of the edge of the traveled way, and the approach speed
is greater than 45 miles per hour
2. Work is off the traveled way but within 3 feet of the edge of the traveled way, and the approach speed
is less than 45 miles per hour
Closure of the adjacent traffic lane is not required when performing any of the following:
1. Working behind a barrier
73

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

2. Paving, grinding, or grooving


3. Installing, maintaining, or removing traffic control devices except Type K temporary railing
Do not reduce an open traffic lane width to less than 10 feet. When traffic cones or delineators are used
for temporary edge delineation, the side of the base of the cones or delineators nearest to traffic is
considered the edge of the traveled way.
If a traffic lane is closed with channelizers for excavation work, move the devices to the adjacent edge of
the traveled way when not excavating. Space the devices as specified for the lane closure.
Do not move or temporarily suspend anything over a traffic lane open to the public unless the public is
protected.
7-1.05 INDEMNIFICATION
7-1.05A General
You must defend, indemnify, and save harmless the State, including its officers, employees, and agents
(excluding agents who are design professionals), from any and all claims, demands, causes of action,
damages, costs, expenses, actual attorneys' fees, losses or liabilities, in law or in equity (Section 7-1.05
Claims) arising out of or in connection with your performance of this Contract for:
1. Bodily injury including, but not limited to, bodily injury, sickness or disease, emotional injury or death
to persons, including, but not limited to, the public, any employees or agents of you, the State, or any
other contractor; and
2. Damage to property of anyone including loss of use thereof; caused or alleged to be caused in whole
or in part by any negligent or otherwise legally actionable act or omission of you or anyone directly or
indirectly employed by you or anyone for whose acts you may be liable.
Except as otherwise provided by law, these requirements apply regardless of the existence or degree of
fault of the State. You are not obligated to indemnify the State for Claims arising from conduct delineated
in Civ Code 2782 and for Claims arising from any defective or substandard condition of the highway
that existed at or before the start of work, unless this condition has been changed by the work or the
scope of the work requires you to maintain existing highway facilities and the Claim arises from your
failure to maintain. Your defense and indemnity obligation shall extend to Claims arising after the work is
completed and accepted if the Claims are directly related to alleged acts or omissions by you that
occurred during the course of the work. Any inspection of the work by the State is not a waiver of full
compliance with these requirements.
Your obligation to defend and indemnify is not excused because of your inability to evaluate liability or
because you evaluate liability and determine that you are not liable. You must respond within 30 days to
the tender of any Claim for defense and indemnity by the State, unless this time has been extended by
the State. If you fail to accept or reject a tender of defense and indemnity within 30 days, in addition to
any other remedy authorized by law, the Department may withhold such funds the State reasonably
considers necessary for its defense and indemnity until disposition has been made of the Claim or until
the Contractor accepts or rejects the tender of defense, whichever occurs first.
With respect to third-party claims against you, you waive all rights of any type to express or implied
indemnity against the State, its officers, employees, or agents (excluding agents who are design
professionals).
Nothing in the Contract is intended to establish a standard of care owed to any member of the public or to
extend to the public the status of a third-party beneficiary for any of these indemnification specifications.
7-1.05B Responsibility to Other Entities
You are responsible for any liability imposed by law and for injuries to or death of any person, including
workers and the public, or damage to property. Indemnify and save harmless any county, city or district
and its officers and employees connected with the work, within the limits of which county, city, or district
the work is being performed, all in the same manner and to the same extent specified for the protection of
the State.

74

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.06 INSURANCE
7-1.06A General
Nothing in the Contract is intended to establish a standard of care owed to any member of the public or to
extend to the public the status of a third-party beneficiary for any of these insurance specifications.
7-1.06B Casualty Insurance
Obtain and maintain insurance on all of your operations with companies acceptable to the State as
follows:
1. Keep all insurance in full force and effect from the start of the work through Contract acceptance.
2. All insurance must be with an insurance company with a rating from A.M. Best Financial Strength
Rating of A- or better and a Financial Size Category of VII or better.
3. Maintain completed operations coverage with a carrier acceptable to the State through the expiration
of the patent deficiency in construction statute of repose set forth in Civ Pro Code 337.15.
7-1.06C Workers' Compensation and Employer's Liability Insurance
Under Labor Code 1860, secure the payment of worker's compensation under Labor Code 3700.
Submit to the Department the following certification before performing the work (Labor Code 1861):
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be
insured against liability for workers' compensation or to undertake self-insurance in accordance with
the provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
Contract signing constitutes certification submittal.
Provide Employer's Liability Insurance in amounts not less than:
1. $1,000,000 for each accident for bodily injury by accident
2. $1,000,000 policy limit for bodily injury by disease
3. $1,000,000 for each employee for bodily injury by disease
If there is an exposure of injury to your employees under the U.S. Longshoremen's and Harbor Workers'
Compensation Act, the Jones Act, or under laws, regulations, or statutes applicable to maritime
employees, coverage must be included for such injuries or claims.
7-1.06D Liability Insurance
7-1.06D(1) General
Carry General Liability and Umbrella or Excess Liability Insurance covering all operations by or on behalf
of you providing insurance for bodily injury liability and property damage liability for the following limits
and including coverage for:
1.
2.
3.
4.
5.
6.

Premises, operations and mobile equipment


Products and completed operations
Broad form property damage (including completed operations)
Explosion, collapse, and underground hazards
Personal injury
Contractual liability

75

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.06D(2) Liability Limits/Additional Insureds


The limits of liability must be at least the values shown in the following table:
Total bid

For each
occurrencea

Liability Limits
Aggregate for
products/completed
operation
$2,000,000

General
aggregateb

Umbrella or
excess liabilityc

$1,000,000
$1,000,000
$2,000,000
$5,000,000
> $1,000,000
$10,000,000
$1,000,000
$2,000,000
$2,000,000
$10,000,000
> $10,000,000
$25,000,000
$2,000,000
$2,000,000
$4,000,000
$15,000,000
> $25,000,000
$2,000,000
$2,000,000
$4,000,000
$25,000,000
a
Combined single limit for bodily injury and property damage.

b
This limit must apply separately to your work under this Contract.

c
The umbrella or excess policy must contain a clause stating that it takes effect (drops down) in the event

the primary limits are impaired or exhausted.

Do not require a small business subcontractor to carry liability insurance that exceeds the limits shown in

the preceding table. For a small business subcontractor, interpret "Total Bid" in the table as the dollar

amount of subcontracted work.

As used in section 7-1.06D(2), a small business:

1. For a non-federal-aid contract is defined in 2 CA Code of Regs 1896 and is incorporated by this
reference
2. For a federal-aid contract is defined in 13 CFR 121.201 and is incorporated by this reference
The State, including its officers, directors, agents (excluding agents who are design professionals), and
employees, must be named as additional insureds under the General Liability and Umbrella Liability
Policies with respect to liability arising out of or connected with work or operations performed by or on
behalf of you under this Contract. Coverage for such additional insureds does not extend to liability:
1. Arising from any defective or substandard condition of the roadway which existed at or before the
time you started work, unless such condition has been changed by the work or the scope of the work
requires you to maintain existing roadway facilities and the claim arises from your failure to maintain;
2. For claims occurring after the work is completed and accepted unless these claims are directly
related to alleged acts or omissions of you that occurred during the course of the work; or
3. To the extent prohibited by Ins Code 11580.04.
Additional insured coverage must be provided by a policy provision or by an endorsement providing
coverage at least as broad as Additional Insured (Form B) endorsement form CG 2010, as published by
the Insurance Services Office (ISO), or other form designated by the Department.
7-1.06D(3) Contractor's Insurance Policy is Primary
The policy must stipulate that the insurance afforded the additional insureds applies as primary insurance.
Any other insurance or self-insurance maintained by the State is excess only and must not be called upon
to contribute with this insurance.
7-1.06E Automobile Liability Insurance
Carry automobile liability insurance, including coverage for all owned, hired, and nonowned automobiles.
The primary limits of liability must be not less than $1,000,000 combined single limit each accident for
bodily injury and property damage. The umbrella or excess liability coverage required under section 7
1.06D(2) also applies to automobile liability.
7-1.06F Policy Forms, Endorsements, and Certificates
Provide your General Liability Insurance under Commercial General Liability policy form no. CG0001 as
published by the Insurance Services Office (ISO) or under a policy form at least as broad as policy form
no. CG0001.
76

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

7-1.06G Deductibles
The State may expressly allow deductible clauses, which it does not consider excessive, overly broad, or
harmful to the interests of the State. Regardless of the allowance of exclusions or deductions by the
State, you are responsible for any deductible amount and must warrant that the coverage provided to the
State complies with section 7-1.06.
7-1.06H Enforcement
The Department may assure your compliance with your insurance obligations. Ten days before an
insurance policy lapses or is canceled during the Contract period you must submit to the Department
evidence of renewal or replacement of the policy.
If you fail to maintain any required insurance coverage, the Department may maintain this coverage and
withhold or charge the expense to you or terminate your control of the work.
You are not relieved of your duties and responsibilities to indemnify, defend, and hold harmless the State,
its officers, agents, and employees by the Department's acceptance of insurance policies and certificates.
Minimum insurance coverage amounts do not relieve you for liability in excess of such coverage, nor do
they preclude the State from taking other actions available to it, including the withholding of funds under
this Contract.
7-1.06I Self-Insurance
Self-insurance programs and self-insured retentions in insurance policies are subject to separate annual
review and approval by the State.
If you use a self-insurance program or self-insured retention, you must provide the State with the same
protection from liability and defense of suits as would be afforded by first-dollar insurance. Execution of
the Contract is your acknowledgment that you will be bound by all laws as if you were an insurer as
defined under Ins Code 23 and that the self-insurance program or self-insured retention shall operate
as insurance as defined under Ins Code 22.
7-1.07 LEGAL ACTIONS AGAINST THE DEPARTMENT
7-1.07A General
If legal action is brought against the Department over compliance with a State or federal law, rule, or
regulation applicable to highway work, then:
1. If the Department in complying with a court order prohibits you from performing work, the resulting
delay is a suspension related to your performance, unless the Department terminates the Contract.
2. If a court order other than an order to show cause or the final judgment in the action prohibits the
Department from requiring you to perform work, the Department may delete the prohibited work or
terminate the Contract.
7-1.07B Seal Coat Claims
Pay for claims for personal property damage caused by screening and bituminous binder. Seal coat
claims are limited to:
1. 10 percent of the total bid
2. Damage occurring between the 1st day of screening spreading and 4 days after the last day of
screening spreading for each seal coat location
Within 30 days of the last screening spreading, do the following:
1. Process and resolve all claims reported or submitted to you by the public as follows:
1.1. Within 3 business days of receipt of a claim, submit to the Department a copy of the claim, a
written analysis of the claim, and a statement indicating whether or not you will pay the claim. If
you reject a claim, provide the reasons for rejection in writing.
1.2. If the claimant becomes dissatisfied with your handling of the claim, immediately refer the
claimant to the local district claims office for assistance in resolving the claim.
2. Submit to the Department evidence of your paid claims.

77

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

All claims presented to the Department, any district claims office, or the State Board of Control (Govt
Code 900 et seq.) are processed and resolved by the Department as follows:
1. The claims are processed as formal government claims subject to all laws and policies and are
resolved as the Department determines including referring the claim to you for handling.
2. If the Department or the State Board of Control approves settlement of a claim or is ordered to pay
pursuant to a court order, the claim is paid from funds withheld from you.
3. Within 3 business days of the Departments determination that you are responsible for resolving the
claim, the Department sends a copy of the claim to you for resolution or notifies you of the
Departments decision to resolve the claim.
The Department withholds an amount not to exceed 5 percent of the total bid to resolve all claims. The
amount is held no longer than 60 days following the last spreading of screenings so that the Department
has ample time to resolve any pending claims. After 60 days, any remaining amount withheld is returned
to you.
If no withheld funds remain or have been returned, the Department may pay any claims and seek
reimbursement from you through an offset or any other legal means. Any reimbursement or offset to be
recovered from you, including all other paid claims, is limited to 10 percent of the total bid.
Section 7-1.07B does not limit your obligation to defend and indemnify the Department.
7-1.08 PERSONAL LIABILITY
Neither the Director, the Engineer nor any other officer or authorized employee of the State of California,
nor any officer or employee of any county, city or district shall be personally responsible for any liability
arising under or by virtue of the Contract.
7-1.097-1.10 RESERVED
7-1.11 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS
7-1.11A General
Section 7-1.11 includes specifications required in a federal-aid construction contract and applies to a
federal-aid contract.
Form FHWA-1273 is included in the Contract in section 7-1.11B. Some Contract terms on the form are
different from those used in other Contract parts as shown in the following table:

FHWA-1273 Terms and Department Equivalencies


FHWA-1273 term
Equivalent term used in other Contract parts
proposal
bid
SHA
Department
SHA contracting officer Engineer
SHA resident engineer Engineer
special provision
specification
7-1.11B FHWA-1273
FHWA-1273 Electronic version -- March 10, 1994
with revised Section VI

REQUIRED CONTRACT PROVISIONS

FEDERAL-AID CONSTRUCTION CONTRACTS

I.
II.
III.
IV.
V.
VI.

General
N
ondiscrimination
Nonsegregated Facilities
Payment of Predetermined Minimum Wage
Statements and Payrolls
Record of Materials, Supplies, and Labor
78

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

VII. Subletting or Assigning the Contract


VIII.Safety: Accident Prevention
IX. False Statements Concerning Highway Projects
X. Implementation of Clean Air Act and Federal Water Pollution Control Act
XI. Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion
XII. Certification Regarding Use of Contract Funds for Lobbying
ATTACHMENTS
A. Employment Preference for Appalachian Contracts (included in Appalachian contracts only)
I. GENERAL
1.
These contract provisions shall apply to all work performed on the contract by the contractors
own organization and with the assistance of workers under the contractors immediate
superintendence and to all work performed on the contract by piecework, station work, or by
subcontract.
2.
Except as otherwise provided for in each section, the contractor shall insert in each
subcontract all of the stipulations contained in these Required Contract Provisions, and further
require their inclusion in any lower tier subcontract or purchase order that may in turn be made.
The Required Contract Provisions shall not be incorporated by reference in any case. The
prime contractor shall be responsible for compliance by any subcontractor or lower tier
subcontractor with these Required Contract Provisions.
3.
A breach of any of the stipulations contained in these Required Contract Provisions shall be
sufficient grounds for termination of the contract.
4.
A breach of the following clauses of the Required Contract Provisions may also be grounds for
debarment as provided in 29 CFR 5.12:

Section I, paragraph 2;

Section IV, paragraphs 1, 2, 3, 4, and 7;

Section V, paragraphs 1 and 2a through 2g.

5.
Disputes arising out of the labor standards provisions of Section IV (except paragraph 5) and
Section V of these Required Contract Provisions shall not be subject to the general disputes
clause of this contract. Such disputes shall be resolved in accordance with the procedures of
the U.S. Department of Labor (DOL) as set forth in 29 CFR 5, 6, and 7. Disputes within the
meaning of this clause include disputes between the contractor (or any of its subcontractors)
and the contracting agency, the DOL, or the contractors employees or their representatives.
6.
Selection of Labor: During the performance of this contract, the contractor shall not:
a.
discriminate against labor from any other State, possession, or territory of the United
States (except for employment preference for Appalachian contracts, when applicable,
as specified in Attachment A), or
b.
employ convict labor for any purpose within the limits of the project unless it is labor
performed by convicts who are on parole, supervised release, or probation.
II. NONDISCRIMINATION
(Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or
more.)
1.
Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to
discriminate and to take affirmative action to assure equal opportunity as set forth under laws,
executive orders, rules, regulations (28 CFR 35, 29 CFR 1630 and 41 CFR 60) and orders of
the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant
to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the
contractors project activities under this contract. The Equal Opportunity Construction Contract
Specifications set forth under 41 CFR 60-4.3 and the provisions of the American Disabilities
Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are
incorporated by reference in this contract. In the execution of this contract, the contractor
agrees to comply with the following minimum specific requirement activities of EEO:
a.
The contractor will work with the State highway agency (SHA) and the Federal
Government in carrying out EEO obligations and in their review of his/her activities
under the contract.
b.
The contractor will accept as his operating policy the following statement:
79

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

"It is the policy of this Company to assure that applicants are employed,
and that employees are treated during employment, without regard to their
race, religion, sex, color, national origin, age or disability. Such action shall
include: employment, upgrading, demotion, or transfer; recruitment or
recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship,
preapprenticeship, and/or on-the-job training."

2.

3.

4.

5.

EEO Officer: The contractor will designate and make known to the SHA contracting officers an
EEO Officer who will have the responsibility for and must be capable of effectively
administering and promoting an active contractor program of EEO and who must be assigned
adequate authority and responsibility to do so.
Dissemination of Policy: All members of the contractors staff who are authorized to hire,
supervise, promote, and discharge employees, or who recommend such action, or who are
substantially involved in such action, will be made fully cognizant of, and will implement, the
contractors EEO policy and contractual responsibilities to provide EEO in each grade and
classification of employment. To ensure that the above agreement will be met, the following
actions will be taken as a minimum:
a.
Periodic meetings of supervisory and personnel office employees will be conducted
before the start of work and then not less often than once every six months, at which
time the contractors EEO policy and its implementation will be reviewed and
explained. The meetings will be conducted by the EEO Officer.
b.
All new supervisory or personnel office employees will be given a thorough
indoctrination by the EEO Officer, covering all major aspects of the contractors EEO
obligations within thirty days following their reporting for duty with the contractor.
c.
All personnel who are engaged in direct recruitment for the project will be instructed by
the EEO Officer in the contractors procedures for locating and hiring minority group
employees.
d.
Notices and posters setting forth the contractors EEO policy will be placed in areas
readily accessible to employees, applicants for employment and potential employees.
e.
The contractors EEO policy and the procedures to implement such policy will be
brought to the attention of employees by means of meetings, employee handbooks, or
other appropriate means.
Recruitment: When advertising for employees, the contractor will include in all advertisements
for employees the notation: "An Equal Opportunity Employer." All such advertisements will be
placed in publications having a large circulation among minority groups in the area from which
the project work force would normally be derived.
a.
The contractor will, unless precluded by a valid bargaining agreement, conduct
systematic and direct recruitment through public and private employee referral sources
likely to yield qualified minority group applicants. To meet this requirement, the
contractor will identify sources of potential minority group employees, and establish
with such identified sources procedures whereby minority group applicants may be
referred to the contractor for employment consideration.
b.
In the event the contractor has a valid bargaining agreement providing for exclusive
hiring hall referrals, he is expected to observe the provisions of that agreement to the
extent that the system permits the contractor's compliance with EEO contract
provisions. (The DOL has held that where implementation of such agreements have
the effect of discriminating against minorities or women, or obligates the contractor to
do the same, such implementation violates Executive Order 11246, as amended.)
c.
The contractor will encourage his present employees to refer minority group applicants
for employment. Information and procedures with regard to referring minority group
applicants will be discussed with employees.
Personnel Actions: Wages, working conditions, and employee benefits shall be established
and administered, and personnel actions of every type, including hiring, upgrading, promotion,
transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion,
sex, national origin, age or disability. The following procedures shall be followed:

80

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

a.

6.

7.

The contractor will conduct periodic inspections of project sites to insure that working
conditions and employee facilities do not indicate discriminatory treatment of project
site personnel.
b.
The contractor will periodically evaluate the spread of wages paid within each
classification to determine any evidence of discriminatory wage practices.
c.
The contractor will periodically review selected personnel actions in depth to
determine whether there is evidence of discrimination. Where evidence is found, the
contractor will promptly take corrective action. If the review indicates that the
discrimination may extend beyond the actions reviewed, such corrective action shall
include all affected persons.
d.
The contractor will promptly investigate all complaints of alleged discrimination made
to the contractor in connection with his obligations under this contract, will attempt to
resolve such complaints, and will take appropriate corrective action within a
reasonable time. If the investigation indicates that the discrimination may affect
persons other than the complainant, such corrective action shall include such other
persons. Upon completion of each investigation, the contractor will inform every
complainant of all of his avenues of appeal.
Training and Promotion:
a.
The contractor will assist in locating, qualifying, and increasing the skills of minority
group and women employees, and applicants for employment.
b.
Consistent with the contractors work force requirements and as permissible under
Federal and State regulations, the contractor shall make full use of training programs,
i.e., apprenticeship, and on-the-job training programs for the geographical area of
contract performance. Where feasible, 25 percent of apprentices or trainees in each
occupation shall be in their first year of apprenticeship or training. In the event a
special provision for training is provided under this contract, this subparagraph will be
superseded as indicated in the special provision.
c.
The contractor will advise employees and applicants for employment of available
training programs and entrance requirements for each.
d.
The contractor will periodically review the training and promotion potential of minority
group and women employees and will encourage eligible employees to apply for such
training and promotion.
Unions: If the contractor relies in whole or in part upon unions as a source of employees, the
contractor will use his/her best efforts to obtain the cooperation of such unions to increase
opportunities for minority groups and women within the unions, and to effect referrals by such
unions of minority and female employees. Actions by the contractor either directly or through a
contractors association acting as agent will include the procedures set forth below:
a.
The contractor will use best efforts to develop, in cooperation with the unions, joint
training programs aimed toward qualifying more minority group members and women
for membership in the unions and increasing the skills of minority group employees
and women so that they may qualify for higher paying employment.
b.
The contractor will use best efforts to incorporate an EEO clause into each union
agreement to the end that such union will be contractually bound to refer applicants
without regard to their race, color, religion, sex, national origin, age or disability.
c.
The contractor is to obtain information as to the referral practices and policies of the
labor union except that to the extent such information is within the exclusive
possession of the labor union and such labor union refuses to furnish such information
to the contractor, the contractor shall so certify to the SHA and shall set forth what
efforts have been made to obtain such information.
d.
In the event the union is unable to provide the contractor with a reasonable flow of
minority and women referrals within the time limit set forth in the collective bargaining
agreement, the contractor will, through independent recruitment efforts, fill the
employment vacancies without regard to race, color, religion, sex, national origin, age
or disability; making full efforts to obtain qualified and/or qualifiable minority group
persons and women. (The DOL has held that it shall be no excuse that the union with
which the contractor has a collective bargaining agreement providing for exclusive
referral failed to refer minority employees.) In the event the union referral practice
prevents the contractor from meeting the obligations pursuant to Executive Order

81

SECTION 7

8.

9.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

11246, as amended, and these specifications, such contractor shall immediately notify
the SHA.
Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The
contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age
or disability in the selection and retention of subcontractors, including procurement of materials
and leases of equipment.
a.
The contractor shall notify all potential subcontractors and suppliers of his/her EEO
obligations under this contract.
b.
Disadvantaged business enterprises (DBE), as defined in 49 CFR 23, shall have equal
opportunity to compete for and perform subcontracts which the contractor enters into
pursuant to this contract. The contractor will use his best efforts to solicit bids from and
to utilize DBE subcontractors or subcontractors with meaningful minority group and
female representation among their employees. Contractors shall obtain lists of DBE
construction firms from SHA personnel.
c.
The contractor will use his best efforts to ensure subcontractor compliance with their
EEO obligations.
Records and Reports: The contractor shall keep such records as necessary to document
compliance with the EEO requirements. Such records shall be retained for a period of three
years following completion of the contract work and shall be available at reasonable times and
places for inspection by authorized representatives of the SHA and the FHWA.
a.
The records kept by the contractor shall document the following:
1.
The number of minority and non-minority group members and women
employed in each work classification on the project;
2.
The progress and efforts being made in cooperation with unions, when
applicable, to increase employment opportunities for minorities and women;
3.
The progress and efforts being made in locating, hiring, training, qualifying,
and upgrading minority and female employees; and
4.
The progress and efforts being made in securing the services of DBE
subcontractors or subcontractors with meaningful minority and female
representation among their employees.
b.
The contractors will submit an annual report to the SHA each July for the duration of
the project, indicating the number of minority, women, and non-minority group
employees currently engaged in each work classification required by the contract
work. This information is to be reported on Form FHWA-1391. If on-the-job training is
being required by special provision, the contractor will be required to collect and report
training data.

III. NONSEGREGATED FACILITIES


(Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or
more.)
a.
By submission of this bid, the execution of this contract or subcontract, or the consummation of
this material supply agreement or purchase order, as appropriate, the bidder, Federal-aid
construction contractor, subcontractor, material supplier, or vendor, as appropriate, certifies
that the firm does not maintain or provide for its employees any segregated facilities at any of
its establishments, and that the firm does not permit its employees to perform their services at
any location, under its control, where segregated facilities are maintained. The firm agrees that
a breach of this certification is a violation of the EEO provisions of this contract. The firm further
certifies that no employee will be denied access to adequate facilities on the basis of sex or
disability.
b.
As used in this certification, the term "segregated facilities" means any waiting rooms, work
areas, restrooms and washrooms, restaurants and other eating areas, timeclocks, locker
rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or
entertainment areas, transportation, and housing facilities provided for employees which are
segregated by explicit directive, or are, in fact, segregated on the basis of race, color, religion,
national origin, age or disability, because of habit, local custom, or otherwise. The only
exception will be for the disabled when the demands for accessibility override (e.g. disabled
parking).
c.
The contractor agrees that it has obtained or will obtain identical certification from proposed
subcontractors or material suppliers prior to award of subcontracts or consummation of
82

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

material supply agreements of $10,000 or more and that it will retain such certifications in its
files.
IV. PAYMENT OF PREDETERMINED MINIMUM WAGE
(Applicable to all Federal-aid construction contracts exceeding $2,000 and to all related subcontracts,
except for projects located on roadways classified as local roads or rural minor collectors, which are
exempt.)
1.
General:
a.

2.

All mechanics and laborers employed or working upon the site of the work will be paid
unconditionally and not less often than once a week and without subsequent
deduction or rebate on any account [except such payroll deductions as are permitted
by regulations (29 CFR 3) issued by the Secretary of Labor under the Copeland Act
(40 U.S.C. 276c)] the full amounts of wages and bona fide fringe benefits (or cash
equivalents thereof) due at time of payment. The payment shall be computed at wage
rates not less than those contained in the wage determination of the Secretary of
Labor (hereinafter "the wage determination") which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist
between the contractor or its subcontractors and such laborers and mechanics. The
wage determination (including any additional classifications and wage rates conformed
under paragraph 2 of this Section IV and the DOL poster (WH-1321) or Form FHWA
1495) shall be posted at all times by the contractor and its subcontractors at the site of
the work in a prominent and accessible place where it can be easily seen by the
workers. For the purpose of this Section, contributions made or costs reasonably
anticipated for bona fide fringe benefits under Section 1(b) (2) of the Davis- Bacon Act
(40 U.S.C. 276a) on behalf of laborers or mechanics are considered wages paid to
such laborers or mechanics, subject to the provisions of Section IV, paragraph 3b,
hereof. Also, for the purpose of this Section, regular contributions made or costs
incurred for more than a weekly period (but not less often than quarterly) under plans,
funds, or programs, which cover the particular weekly period, are deemed to be
constructively made or incurred during such weekly period. Such laborers and
mechanics shall be paid the appropriate wage rate and fringe benefits on the wage
determination for the classification of work actually performed, without regard to skill,
except as provided in paragraphs 4 and 5 of this Section IV.
b.
Laborers or mechanics performing work in more than one classification may be
compensated at the rate specified for each classification for the time actually worked
therein, provided, that the employers payroll records accurately set forth the time
spent in each classification in which work is performed.
c.
All rulings and interpretations of the Davis-Bacon Act and related acts contained in 29
CFR 1, 3, and 5 are herein incorporated by reference in this contract.
Classification:
a.

b.

c.

The SHA contracting officer shall require that any class of laborers or mechanics
employed under the contract, which is not listed in the wage determination, shall be
classified in conformance with the wage determination.
The contracting officer shall approve an additional classification, wage rate and fringe
benefits only when the following criteria have been met:
1.
the work to be performed by the additional classification requested is not
performed by a classification in the wage determination;
2.
the additional classification is utilized in the area by the construction
industry;
3.
the proposed wage rate, including any bona fide fringe benefits, bears a
reasonable relationship to the wage rates contained in the wage
determination; and
4.
with respect to helpers, when such a classification prevails in the area in
which the work is performed.
If the contractor or subcontractors, as appropriate, the laborers and mechanics (if
known) to be employed in the additional classification or their representatives, and the
contracting officer agree on the classification and wage rate (including the amount
83

SECTION 7

d.

e.

3.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

designated for fringe benefits where appropriate), a report of the action taken shall be
sent by the contracting officer to the DOL, Administrator of the Wage and Hour
Division, Employment Standards Administration, Washington, D.C. 20210. The Wage
and Hour Administrator, or an authorized representative, will approve, modify, or
disapprove every additional classification action within 30 days of receipt and so
advise the contracting officer or will notify the contracting officer within the 30-day
period that additional time is necessary.
In the event the contractor or subcontractors, as appropriate, the laborers or
mechanics to be employed in the additional classification or their representatives, and
the contracting officer do not agree on the proposed classification and wage rate
(including the amount designated for fringe benefits, where appropriate), the
contracting officer shall refer the questions, including the views of all interested parties
and the recommendation of the contracting officer, to the Wage and Hour
Administrator for determination. Said Administrator, or an authorized representative,
will issue a determination within 30 days of receipt and so advise the contracting
officer or will notify the contracting officer within the 30-day period that additional time
is necessary.
The wage rate (including fringe benefits where appropriate) determined pursuant to
paragraph 2c or 2d of this Section IV shall be paid to all workers performing work in
the additional classification from the first day on which work is performed in the
classification.

Payment of Fringe Benefits:


a.

b.

4.

Whenever the minimum wage rate prescribed in the contract for a class of laborers or
mechanics includes a fringe benefit which is not expressed as an hourly rate, the
contractor or subcontractors, as appropriate, shall either pay the benefit as stated in
the wage determination or shall pay another bona fide fringe benefit or an hourly case
equivalent thereof.
If the contractor or subcontractor, as appropriate, does not make payments to a
trustee or other third person, he/she may consider as a part of the wages of any
laborer or mechanic the amount of any costs reasonably anticipated in providing bona
fide fringe benefits under a plan or program, provided, that the Secretary of Labor has
found, upon the written request of the contractor, that the applicable standards of the
Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to
set aside in a separate account assets for the meeting of obligations under the plan or
program.

Apprentices and Trainees (Programs of the U.S. DOL) and Helpers:


a.

Apprentices:
1.
Apprentices will be permitted to work at less than the predetermined rate for
the work they performed when they are employed pursuant to and
individually registered in a bona fide apprenticeship program registered with
the DOL, Employment and Training Administration, Bureau of
Apprenticeship and Training, or with a State apprenticeship agency
recognized by the Bureau, or if a person is employed in his/her first 90 days
of probationary employment as an apprentice in such an apprenticeship
program, who is not individually registered in the program, but who has
been certified by the Bureau of Apprenticeship and Training or a State
apprenticeship agency (where appropriate) to be eligible for probationary
employment as an apprentice.
2.
The allowable ratio of apprentices to journeyman-level employees on the
job site in any craft classification shall not be greater than the ratio
permitted to the contractor as to the entire work force under the registered
program. Any employee listed on a payroll at an apprentice wage rate, who
is not registered or otherwise employed as stated above, shall be paid not
less than the applicable wage rate listed in the wage determination for the
classification of work actually performed. In addition, any apprentice
84

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

3.

4.

b. Trainees:
1.

2.

3.

4.

performing work on the job site in excess of the ratio permitted under the
registered program shall be paid not less than the applicable wage rate on
the wage determination for the work actually performed. Where a contractor
or subcontractor is performing construction on a project in a locality other
than that in which its program is registered, the ratios and wage rates
(expressed in percentages of the journeyman-level hourly rate) specified in
the contractors or subcontractors registered program shall be observed.
Every apprentice must be paid at not less than the rate specified in the
registered program for the apprentices level of progress, expressed as a
percentage of the journeyman-level hourly rate specified in the applicable
wage determination. Apprentices shall be paid fringe benefits in accordance
with the provisions of the apprenticeship program. If the apprenticeship
program does not specify fringe benefits, apprentices must be paid the full
amount of fringe benefits listed on the wage determination for the
applicable classification. If the Administrator for the Wage and Hour
Division determines that a different practice prevails for the applicable
apprentice classification, fringes shall be paid in accordance with that
determination.
In the event the Bureau of Apprenticeship and Training, or a State
apprenticeship agency recognized by the Bureau, withdraws approval of an
apprenticeship program, the contractor or subcontractor will no longer be
permitted to utilize apprentices at less than the applicable predetermined
rate for the comparable work performed by regular employees until an
acceptable program is approved.
Except as provided in 29 CFR 5.16, trainees will not be permitted to work at
less than the predetermined rate for the work performed unless they are
employed pursuant to and individually registered in a program which has
received prior approval, evidenced by formal certification by the DOL,
Employment and Training Administration.
The ratio of trainees to journeyman-level employees on the job site shall not
be greater than permitted under the plan approved by the Employment and
Training Administration. Any employee listed on the payroll at a trainee rate
who is not registered and participating in a training plan approved by the
Employment and Training Administration shall be paid not less than the
applicable wage rate on the wage determination for the classification of
work actually performed. In addition, any trainee performing work on the job
site in excess of the ratio permitted under the registered program shall be
paid not less than the applicable wage rate on the wage determination for
the work actually performed.
Every trainee must be paid at not less than the rate specified in the
approved program for his/her level of progress, expressed as a percentage
of the journeyman-level hourly rate specified in the applicable wage
determination. Trainees shall be paid fringe benefits in accordance with the
provisions of the trainee program. If the trainee program does not mention
fringe benefits, trainees shall be paid the full amount of fringe benefits listed
on the wage determination unless the Administrator of the Wage and Hour
Division determines that there is an apprenticeship program associated with
the corresponding journeyman-level wage rate on the wage determination
which provides for less than full fringe benefits for apprentices, in which
case such trainees shall receive the same fringe benefits as apprentices.
In the event the Employment and Training Administration withdraws
approval of a training program, the contractor or subcontractor will no
longer be permitted to utilize trainees at less than the applicable
predetermined rate for the work performed until an acceptable program is
approved.

c. Helpers:
Helpers will be permitted to work on a project if the helper classification is
specified and defined on the applicable wage determination or is approved
85

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

pursuant to the conformance procedure set forth in Section IV.2. Any


worker listed on a payroll at a helper wage rate, who is not a helper under
an approved definition, shall be paid not less than the applicable wage rate
on the wage determination for the classification of work actually performed.

5.

Apprentices and Trainees (Programs of the U.S. DOT):


Apprentices and trainees working under apprenticeship and skill training programs which have
been certified by the Secretary of Transportation as promoting EEO in connection with Federal
aid highway construction programs are not subject to the requirements of paragraph 4 of this
Section IV. The straight time hourly wage rates for apprentices and trainees under such
programs will be established by the particular programs. The ratio of apprentices and trainees
to journeymen shall not be greater than permitted by the terms of the particular program.

6.

Withholding:
The SHA shall upon its own action or upon written request of an authorized representative of
the DOL withhold, or cause to be withheld, from the contractor or subcontractor under this
contract or any other Federal contract with the same prime contractor, or any other Federally
assisted contract subject to Davis-Bacon prevailing wage requirements which is held by the
same prime contractor, as much of the accrued payments or advances as may be considered
necessary to pay laborers and mechanics, including apprentices, trainees, and helpers,
employed by the contractor or any subcontractor the full amount of wages required by the
contract. In the event of failure to pay any laborer or mechanic, including any apprentice,
trainee, or helper, employed or working on the site of the work, all or part of the wages required
by the contract, the SHA contracting officer may, after written notice to the contractor, take
such action as may be necessary to cause the suspension of any further payment, advance, or
guarantee of funds until such violations have ceased.

7.

Overtime Requirements:
No contractor or subcontractor contracting for any part of the contract work which may require
or involve the employment of laborers, mechanics, watchmen, or guards (including
apprentices, trainees, and helpers described in paragraphs 4 and 5 above) shall require or
permit any laborer, mechanic, watchman, or guard in any workweek in which he/she is
employed on such work, to work in excess of 40 hours in such workweek unless such laborer,
mechanic, watchman, or guard receives compensation at a rate not less than one-and-one-half
times his/her basic rate of pay for all hours worked in excess of 40 hours in such workweek.

8.

Violation:
Liability for Unpaid Wages; Liquidated Damages: In the event of any violation of the clause set
forth in paragraph 7 above, the contractor and any subcontractor responsible thereof shall be
liable to the affected employee for his/her unpaid wages. In addition, such contractor and
subcontractor shall be liable to the United States (in the case of work done under contract for
the District of Columbia or a territory, to such District or to such territory) for liquidated
damages. Such liquidated damages shall be computed with respect to each individual laborer,
mechanic, watchman, or guard employed in violation of the clause set forth in paragraph 7, in
the sum of $10 for each calendar day on which such employee was required or permitted to
work in excess of the standard work week of 40 hours without payment of the overtime wages
required by the clause set forth in paragraph 7.

9.

Withholding for Unpaid Wages and Liquidated Damages:


The SHA shall upon its own action or upon written request of any authorized representative of
the DOL withhold, or cause to be withheld, from any monies payable on account of work
performed by the contractor or subcontractor under any such contract or any other Federal
contract with the same prime contractor, or any other Federally-assisted contract subject to the
contract Work Hours and Safety Standards Act, which is held by the same prime contractor,
86

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

such sums as may be determined to be necessary to satisfy any liabilities of such contractor or
subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in
paragraph 8 above.
V. STATEMENTS AND PAYROLLS
(Applicable to all Federal-aid construction contracts exceeding $2,000 and to all related subcontracts,
except for projects located on roadways classified as local roads or rural collectors, which are
exempt.)
1.
Compliance with Copeland Regulations (29 CFR 3):
The contractor shall comply with the Copeland Regulations of the Secretary of Labor which are
herein incorporated by reference.
2.

Payrolls and Payroll Records:


a.

b.

c.

d.

Payrolls and basic records relating thereto shall be maintained by the contractor and
each subcontractor during the course of the work and preserved for a period of 3
years from the date of completion of the contract for all laborers, mechanics,
apprentices, trainees, watchmen, helpers, and guards working at the site of the work.
The payroll records shall contain the name, social security number, and address of
each such employee; his or her correct classification; hourly rates of wages paid
(including rates of contributions or costs anticipated for bona fide fringe benefits or
cash equivalent thereof the types described in Section 1(b)(2)(B) of the Davis Bacon
Act); daily and weekly number of hours worked; deductions made; and actual wages
paid. In addition, for Appalachian contracts, the payroll records shall contain a notation
indicating whether the employee does, or does not, normally reside in the labor area
as defined in Attachment A, paragraph 1. Whenever the Secretary of Labor, pursuant
to Section IV, paragraph 3b, has found that the wages of any laborer or mechanic
include the amount of any costs reasonably anticipated in providing benefits under a
plan or program described in Section 1(b)(2)(B) of the Davis Bacon Act, the contractor
and each subcontractor shall maintain records which show that the commitment to
provide such benefits is enforceable, that the plan or program is financially
responsible, that the plan or program has been communicated in writing to the
laborers or mechanics affected, and show the cost anticipated or the actual cost
incurred in providing benefits. Contractors or subcontractors employing apprentices or
trainees under approved programs shall maintain written evidence of the registration
of apprentices and trainees, and ratios and wage rates prescribed in the applicable
programs.
Each contractor and subcontractor shall furnish, each week in which any contract work
is performed, to the SHA resident engineer a payroll of wages paid each of its
employees (including apprentices, trainees, and helpers, described in Section IV,
paragraphs 4 and 5, and watchmen and guards engaged on work during the
preceding weekly payroll period). The payroll submitted shall set out accurately and
completely all of the information required to be maintained under paragraph 2b of this
Section V. This information may be submitted in any form desired. Optional Form WH
347 is available for this purpose and may be purchased from the Superintendent of
Documents (Federal stock number 029- 005-0014-1), U.S. Government Printing
Office, Washington, D.C. 20402. The prime contractor is responsible for the
submission of copies of payrolls by all subcontractors.
Each payroll submitted shall be accompanied by a "Statement of Compliance," signed
by the contractor or subcontractor or his/her agent who pays or supervises the
payment of the persons employed under the contract and shall certify the following:
1.
that the payroll for the payroll period contains the information required to be
maintained under paragraph 2b of this Section V and that such information
is correct and complete;
2.
that such laborer or mechanic (including each helper, apprentice, and
trainee) employed on the contract during the payroll period has been paid
the full weekly wages earned, without rebate, either directly or indirectly,
and that no deductions have been made either directly or indirectly from the
87

SECTION 7

e.

f.
g.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

full wages earned, other than permissible deductions as set forth in the
Regulations, 29 CFR 3;
3.
that each laborer or mechanic has been paid not less that the applicable
wage rate and fringe benefits or cash equivalent for the classification of
worked performed, as specified in the applicable wage determination
incorporated into the contract.
The weekly submission of a properly executed certification set forth on the reverse
side of Optional Form WH-347 shall satisfy the requirement for submission of the
"Statement of Compliance" required by paragraph 2d of this Section V.
The falsification of any of the above certifications may subject the contractor to civil or
criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 231.
The contractor or subcontractor shall make the records required under paragraph 2b
of this Section V available for inspection, copying, or transcription by authorized
representatives of the SHA, the FHWA, or the DOL, and shall permit such
representatives to interview employees during working hours on the job. If the
contractor or subcontractor fails to submit the required records or to make them
available, the SHA, the FHWA, the DOL, or all may, after written notice to the
contractor, sponsor, applicant, or owner, take such actions as may be necessary to
cause the suspension of any further payment, advance, or guarantee of funds.
Furthermore, failure to submit the required records upon request or to make such
records available may be grounds for debarment action pursuant to 29 CFR 5.12.

VI. RECORD OF MATERIALS, SUPPLIES, AND LABOR


(As of May 22, 2007, Form FHWA-47 is no longer required.)
VII. SUBLETTING OR ASSIGNING THE CONTRACT
1.
The contractor shall perform with its own organization contract work amounting to not less than
30 percent (or a greater percentage if specified elsewhere in the contract) of the total original
contract price, excluding any specialty items designated by the State. Specialty items may be
performed by subcontract and the amount of any such specialty items performed may be
deducted from the total original contract price before computing the amount of work required to
be performed by the contractors own organization (23 CFR 635).
a.
"Its own organization" shall be construed to include only workers employed and paid
directly by the prime contractor and equipment owned or rented by the prime
contractor, with or without operators. Such term does not include employees or
equipment of a subcontractor, assignee, or agent of the prime contractor.
b.
"Specialty Items" shall be construed to be limited to work that requires highly
specialized knowledge, abilities, or equipment not ordinarily available in the type of
contracting organizations qualified and expected to bid on the contract as a whole and
in general are to be limited to minor components of the overall contract.
2.
The contract amount upon which the requirements set forth in paragraph 1 of Section VII is
computed includes the cost of material and manufactured products which are to be purchased
or produced by the contractor under the contract provisions.
3.
The contractor shall furnish (a) a competent superintendent or supervisor who is employed by
the firm, has full authority to direct performance of the work in accordance with the contract
requirements, and is in charge of all construction operations (regardless of who performs the
work) and (b) such other of its own organizational resources (supervision, management, and
engineering services) as the SHA contracting officer determines is necessary to assure the
performance of the contract.
4.
No portion of the contract shall be sublet, assigned or otherwise disposed of except with the
written consent of the SHA contracting officer, or authorized representative, and such consent
when given shall not be construed to relieve the contractor of any responsibility for the
fulfillment of the contract. Written consent will be given only after the SHA has assured that
each subcontract is evidenced in writing and that it contains all pertinent provisions and
requirements of the prime contract.
VIII.SAFETY: ACCIDENT PREVENTION
1.
In the performance of this contract the contractor shall comply with all applicable Federal,
State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor
88

SECTION 7

2.

3.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

shall provide all safeguards, safety devices and protective equipment and take any other
needed actions as it determines, or as the SHA contracting officer may determine, to be
reasonably necessary to protect the life and health of employees on the job and the safety of
the public and to protect property in connection with the performance of the work covered by
the contract.
It is a condition of this contract, and shall be made a condition of each subcontract, which the
contractor enters into pursuant to this contract, that the contractor and any subcontractor shall
not permit any employee, in performance of the contract, to work in surroundings or under
conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as
determined under construction safety and health standards (29 CFR 1926) promulgated by the
Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety
Standards Act (40 U.S.C. 333).
Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or
authorized representative thereof, shall have right of entry to any site of contract performance
to inspect or investigate the matter of compliance with the construction safety and health
standards and to carry out the duties of the Secretary under Section 107 of the Contract Work
Hours and Safety Standards Act (40 U.S.C. 333).

IX. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS


In order to assure high quality and durable construction in conformity with approved plans and
specifications and a high degree of reliability on statements and representations made by Engineers,
contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons
concerned with the project perform their functions as carefully, thoroughly, and honestly as possible.
Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a
violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and
similar acts, the following notice shall be posted on each Federal-aid highway project (23 CFR 635) in
one or more places where it is readily available to all persons concerned with the project:
NOTICE TO ALL PERSONNEL ENGAGED ON FEDERAL-AID

HIGHWAY PROJECTS

18 U.S.C. 1020 reads as follows:


"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or
whoever, whether a person, association, firm, or corporation, knowingly makes any false statement,
false representation, or false report as to the character, quality, quantity, or cost of the material used
or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof
in connection with the submission of plans, maps, specifications, contracts, or costs of construction
on any highway or related project submitted for approval to the Secretary of Transportation; or
Whoever knowingly makes any false statement, false representation, false report or false claim with
respect to the character, quality, quantity, or cost of any work performed or to be performed, or
materials furnished or to be furnished, in connection with the construction of any highway or related
project approved by the Secretary of Transportation; or
Whoever knowingly makes any false statement or false representation as to material fact in any
statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act
approved July 1, 1916, (39 Stat. 355), as amended and supplemented;
Shall be fined not more that $10,000 or imprisoned not more than 5 years or both."
X. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT
(Applicable to all Federal-aid construction contracts and to all related subcontracts of $100,000 or
more.)
By submission of this bid or the execution of this contract, or subcontract, as appropriate, the bidder,
Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have
stipulated as follows:
1.
That any facility that is or will be utilized in the performance of this contract, unless such
contract is exempt under the Clean Air Act, as amended (42 U.S.C. 1857 et seq., as amended
by Pub.L. 91-604), and under the Federal Water Pollution Control Act, as amended (33 U.S.C.
1251 et seq., as amended by Pub.L. 92-500), Executive Order 11738, and regulations in
implementation thereof (40 CFR 15) is not listed, on the date of contract award, on the U.S.
Environmental Protection Agency (EPA) List of Violating Facilities pursuant to 40 CFR 15.20.
89

SECTION 7
2.

3.

4.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

That the firm agrees to comply and remain in compliance with all the requirements of Section
114 of the Clean Air Act and Section 308 of the Federal Water Pollution Control Act and all
regulations and guidelines listed thereunder.
That the firm shall promptly notify the SHA of the receipt of any communication from the
Director, Office of Federal Activities, EPA, indicating that a facility that is or will be utilized for
the contract is under consideration to be listed on the EPA List of Violating Facilities.
That the firm agrees to include or cause to be included the requirements of paragraph 1
through 4 of this Section X in every nonexempt subcontract, and further agrees to take such
action as the government may direct as a means of enforcing such requirements.

XI. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY


EXCLUSION
1.
Instructions for Certification - Primary Covered Transactions:
(Applicable to all Federal-aid contracts - 49 CFR 29)
a.
b.

c.

d.

e.

f.

g.

h.

By signing and submitting this proposal, the prospective primary participant is


providing the certification set out below.
The inability of a person to provide the certification set out below will not necessarily
result in denial of participation in this covered transaction. The prospective participant
shall submit an explanation of why it cannot provide the certification set out below. The
certification or explanation will be considered in connection with the department or
agencys determination whether to enter into this transaction. However, failure of the
prospective primary participant to furnish a certification or an explanation shall
disqualify such a person from participation in this transaction.
The certification in this clause is a material representation of fact upon which reliance
was placed when the department or agency determined to enter into this transaction. If
it is later determined that the prospective primary participant knowingly rendered an
erroneous certification, in addition to other remedies available to the Federal
Government, the department or agency may terminate this transaction for cause of
default.
The prospective primary participant shall provide immediate written notice to the
department or agency to whom this proposal is submitted if any time the prospective
primary participant learns that its certification was erroneous when submitted or has
become erroneous by reason of changed circumstances.
The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier
covered transaction," "participant," "person," "primary covered transaction," "principal,"
"proposal," and "voluntarily excluded," as used in this clause, have the meanings set
out in the Definitions and Coverage sections of rules implementing Executive Order
12549. You may contact the department or agency to which this proposal is submitted
for assistance in obtaining a copy of those regulations.
The prospective primary participant agrees by submitting this proposal that, should the
proposed covered transaction be entered into, it shall not knowingly enter into any
lower tier covered transaction with a person who is debarred, suspended, declared
ineligible, or voluntarily excluded from participation in this covered transaction, unless
authorized by the department or agency entering into this transaction.
The prospective primary participant further agrees by submitting this proposal that it
will include the clause titled "Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," provided by the
department or agency entering into this covered transaction, without modification, in all
lower tier covered transactions and in all solicitations for lower tier covered
transactions.
A participant in a covered transaction may rely upon a certification of a prospective
participant in a lower tier covered transaction that is not debarred, suspended,
ineligible, or voluntarily excluded from the covered transaction, unless it knows that the
certification is erroneous. A participant may decide the method and frequency by
which it determines the eligibility of its principals. Each participant may, but is not
required to, check the nonprocurement portion of the "Lists of Parties Excluded From

90

SECTION 7

i.

j.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Federal Procurement or Nonprocurement Programs" (Nonprocurement List) which is


compiled by the General Services Administration.
Nothing contained in the foregoing shall be construed to require establishment of a
system of records in order to render in good faith the certification required by this
clause. The knowledge and information of participant is not required to exceed that
which is normally possessed by a prudent person in the ordinary course of business
dealings.
Except for transactions authorized under paragraph f of these instructions, if a
participant in a covered transaction knowingly enters into a lower tier covered
transaction with a person who is suspended, debarred, ineligible, or voluntarily
excluded from participation in this transaction, in addition to other remedies available
to the Federal Government, the department or agency may terminate this transaction
for cause or default.
*****
Certification Regarding Debarment, Suspension, Ineligibility
and Voluntary Exclusion--Primary Covered Transactions

1.

The prospective primary participant certifies to the best of its knowledge and belief, that it and
its principals:
a.
Are not presently debarred, suspended, proposed for debarment, declared ineligible,
or voluntarily excluded from covered transactions by any Federal department or
agency;
b.
Have not within a 3-year period preceding this proposal been convicted of or had a
civil judgement rendered against them for commission of fraud or a criminal offense in
connection with obtaining, attempting to obtain, or performing a public (Federal, State
or local) transaction or contract under a public transaction; violation of Federal or State
antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification
or destruction of records, making false statements, or receiving stolen property;
c.
Are not presently indicted for or otherwise criminally or civilly charged by a
governmental entity (Federal, State or local) with commission of any of the offenses
enumerated in paragraph 1b of this certification; and
d.
Have not within a 3-year period preceding this application/proposal had one or more
public transactions (Federal, State or local) terminated for cause or default.

2.

Where the prospective primary participant is unable to certify to any of the statements in this
certification, such prospective participant shall attach an explanation to this proposal.
*****

2.

Instructions for Certification - Lower Tier Covered Transactions:


(Applicable to all subcontracts, purchase orders and other lower tier transactions of $25,000 or
more - 49 CFR 29)
a.
b.

c.

By signing and submitting this proposal, the prospective lower tier is providing the
certification set out below.
The certification in this clause is a material representation of fact upon which reliance
was placed when this transaction was entered into. If it is later determined that the
prospective lower tier participant knowingly rendered an erroneous certification, in
addition to other remedies available to the Federal Government, the department, or
agency with which this transaction originated may pursue available remedies,
including suspension and/or debarment.
The prospective lower tier participant shall provide immediate written notice to the
person to which this proposal is submitted if at any time the prospective lower tier
91

SECTION 7

d.

e.

f.

g.

h.

i.

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

participant learns that its certification was erroneous by reason of changed


circumstances.
The terms "covered transaction," "debarred," "suspended," "ineligible," "primary
covered transaction," "participant," "person," "principal," "proposal," and "voluntarily
excluded," as used in this clause, have the meanings set out in the Definitions and
Coverage sections of rules implementing Executive Order 12549. You may contact the
person to which this proposal is submitted for assistance in obtaining a copy of those
regulations.
The prospective lower tier participant agrees by submitting this proposal that, should
the proposed covered transaction be entered into, it shall not knowingly enter into any
lower tier covered transaction with a person who is debarred, suspended, declared
ineligible, or voluntarily excluded from participation in this covered transaction, unless
authorized by the department or agency with which this transaction originated.
The prospective lower tier participant further agrees by submitting this proposal that it
will include this clause titled "Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without
modification, in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
A participant in a covered transaction may rely upon a certification of a prospective
participant in a lower tier covered transaction that is not debarred, suspended,
ineligible, or voluntarily excluded from the covered transaction, unless it knows that the
certification is erroneous. A participant may decide the method and frequency by
which it determines the eligibility of its principals. Each participant may, but is not
required to, check the Nonprocurement List.
Nothing contained in the foregoing shall be construed to require establishment of a
system of records in order to render in good faith the certification required by this
clause. The knowledge and information of participant is not required to exceed that
which is normally possessed by a prudent person in the ordinary course of business
dealings.
Except for transactions authorized under paragraph e of these instructions, if a
participant in a covered transaction knowingly enters into a lower tier covered
transaction with a person who is suspended, debarred, ineligible, or voluntarily
excluded from participation in this transaction, in addition to other remedies available
to the Federal Government, the department or agency with which this transaction
originated may pursue available remedies, including suspension and/or debarment.
*****

Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Lower Tier


Covered Transactions:
1.

2.

The prospective lower tier participant certifies, by submission of this proposal, that
neither it nor its principals is presently debarred, suspended, proposed for debarment,
declared ineligible, or voluntarily excluded from participation in this transaction by any
Federal department or agency.
Where the prospective lower tier participant is unable to certify to any of the
statements in this certification, such prospective participant shall attach an explanation
to this proposal.
*****

XII. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING


(Applicable to all Federal-aid construction contracts and to all related subcontracts which exceed
$100,000 - 49 CFR 20)
1.
The prospective participant certifies, by signing and submitting this bid or proposal, to the best
of his or her knowledge and belief, that:

92

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

a.

2.

3.

No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or
employee of any Federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with the awarding
of any Federal contract, the making of any Federal grant, the making of any Federal
loan, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any Federal contract, grant, loan, or
cooperative agreement.
b.
If any funds other than Federal appropriated funds have been paid or will be paid to
any person for influencing or attempting to influence an officer or employee of any
Federal agency, a Member of Congress, an officer or employee of Congress, or an
employee of a Member of Congress in connection with this Federal contract, grant,
loan, or cooperative agreement, the undersigned shall complete and submit Standard
Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for
making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to
file the required certification shall be subject to a civil penalty of not less than $10,000 and not
more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she
shall require that the language of this certification be included in all lower tier subcontracts,
which exceed $100,000 and that all such recipients shall certify and disclose accordingly.

7-1.11C Female and Minority Goals


To comply with section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction
Contracts," the Department is including in section 7-1.11C female and minority utilization goals for
federal-aid construction contracts and subcontracts that exceed $10,000.
The nationwide goal for female utilization is 6.9 percent.

93

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

The goals for minority utilization [45 Fed Reg 65984 (10/3/1980)] are as shown in the following table:
Minority Utilization Goals
Economic area
174

175

176

177

178

179

Redding CA:
Non-SMSA Counties:
CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama
Eureka, CA
Non-SMSA Counties:
CA Del Norte; CA Humboldt; CA Trinity
San Francisco-Oakland-San Jose, CA:
SMSA Counties:
7120 Salinas-Seaside-Monterey, CA
CA Monterey
7360 San Francisco-Oakland
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo
7400 San Jose, CA
CA Santa Clara, CA
7485 Santa Cruz, CA
CA Santa Cruz
7500 Santa Rosa
CA Sonoma
8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano
Non-SMSA Counties:
CA Lake; CA Mendocino; CA San Benito
Sacramento, CA:
SMSA Counties:
6920 Sacramento, CA
CA Placer; CA Sacramento; CA Yolo
Non-SMSA Counties
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA
Yuba
Stockton-Modesto, CA:
SMSA Counties:
5170 Modesto, CA
CA Stanislaus
8120 Stockton, CA
CA San Joaquin
Non-SMSA Counties
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne
Fresno-Bakersfield, CA
SMSA Counties:
0680 Bakersfield, CA
CA Kern
2840 Fresno, CA
CA Fresno
Non-SMSA Counties:
CA Kings; CA Madera; CA Tulare

94

Goal
(Percent)
6.8

6.6

28.9
25.6

19.6
14.9
9.1
17.1
23.2

16.1
14.3

12.3
24.3
19.8

19.1
26.1
23.6

SECTION 7
180

181

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Los Angeles, CA:


SMSA Counties:
0360 Anaheim-Santa Ana-Garden Grove, CA
CA Orange
4480 Los Angeles-Long Beach, CA
CA Los Angeles
6000 Oxnard-Simi Valley-Ventura, CA
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA
CA Santa Barbara
Non-SMSA Counties
CA Inyo; CA Mono; CA San Luis Obispo
San Diego, CA:
SMSA Counties
7320 San Diego, CA
CA San Diego
Non-SMSA Counties
CA Imperial

11.9
28.3
21.5
19.0
19.7
24.6

16.9
18.2

For each July during which work is performed under the Contract, you and each non-material-supplier
subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C
to 23 CFR 230). Submit the forms by August 15.
7-1.11D Training
Section 7-1.11D applies if a number of trainees or apprentices is shown on the Notice to Bidders.
As part of your equal opportunity affirmative action program, provide on-the-job training to develop full
journeymen in the types of trades or job classifications involved.
You have primary responsibility for meeting this training requirement.
If you subcontract a Contract part, determine how many trainees or apprentices are to be trained by the
subcontractor.
Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of
apprenticeship or training.
Distribute the number of apprentices or trainees among the work classifications on the basis of your
needs and the availability of journeymen in the various classifications within a reasonable recruitment
area.
Before starting work, submit:
1. Number of apprentices or trainees to be trained for each classification
2. Training program to be used
3. Training starting date for each classification
Obtain the Department's approval for this submitted information before you start work. The Department
credits you for each apprentice or trainee you employ on the work who is currently enrolled or becomes
enrolled in an approved program.
The primary objective of section 7-1.11D is to train and upgrade minorities and women toward
journeymen status. Make every effort to enroll minority and women apprentices or trainees, such as
conducting systematic and direct recruitment through public and private sources likely to yield minority
and women apprentices or trainees, to the extent they are available within a reasonable recruitment area.
Show that you have made the efforts. In making these efforts, do not discriminate against any applicant
for training.
Do not employ as an apprentice or trainee an employee:
95

SECTION 7

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

1. In any classification in which the employee has successfully completed a training course leading to
journeyman status or in which the employee has been employed as a journeyman
2. Who is not registered in a program approved by the U.S. Department of Labor, Bureau of
Apprenticeship and Training
Ask the employee if the employee has successfully completed a training course leading to journeyman
status or has been employed as a journeyman. Your records must show the employee's answers to the
questions.
In your training program, establish the minimum length and training type for each classification. The
Department and FHWA approves a program if one of the following is met:
1. It is calculated to:
1.1. Meet your equal employment opportunity responsibilities.
1.2. Qualify the average apprentice or trainee for journeyman status in the classification involved by
the end of the training period.
2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training and it is
administered in a way consistent with the equal employment responsibilities of federal-aid highway
construction contracts.
Obtain Department approval for your training program before you start work involving the classification
covered by the program.
Provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is
allowed in lower level management positions such as office engineers, estimators, and timekeepers if the
training is oriented toward construction applications. Training is allowed in the laborer classification if
significant and meaningful training is provided and approved by the FHWA division office. Off-site training
is allowed if the training is an integral part of an approved training program and does not make up a
significant part of the overall training.
The Department reimburses you 80 cents per hour of training given an employee on this Contract under
an approved training program:
1. For on-site training
2. For off-site training if the apprentice or trainee is currently employed under a federal-aid contract and
you do at least one of the following:
2.1. Contribute to the cost of the training
2.2. Provide the instruction to the apprentice or trainee
2.3. Pay the apprentice's or trainee's wages during the off-site training period
3. If you comply with section 7-1.11D
Each apprentice or trainee must:
1. Start training on the project as soon as feasible after the start of work involving the apprentice's or
trainee's craft
2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work
classification or until the apprentice or trainee has completed the training program
Furnish the apprentice or trainee:
1. Copy of the program you will comply with in providing the training
2. Certification showing the type and length of training satisfactorily completed
Maintain records and submit reports documenting your performance under section 7-1.11D.

96

8 PROSECUTION AND PROGRESS

8-1.01 GENERAL
Section 8 includes specifications related to prosecuting the Contract and work progress.
8-1.02 SCHEDULE
8-1.02A General
Upon completion of all work, the Department returns the withholds associated with section 8-1.02 and
makes a payment adjustment for work not performed in the same manner as work-character changes.
8-1.02B Level 1 Critical Path Method Schedule
8-1.02B(1) General
Section 8-1.02B applies to a contract with a total bid less than $1 million and less than 100 working days.
Before or at the preconstruction conference, submit a CPM baseline schedule.
For each schedule submittal:
1. Submit a plotted original, time-scaled network diagram on a sheet at least 8-1/2 by 11 inches with a
title block and timeline
2. If a computer program is used to make the schedule, submit a read-only compact disc or other
Engineer-authorized data-storage device containing the schedule data. Label the data storage device
with:
2.1. Contract number
2.2. CPM schedule number and date produced
2.3. File name
8-1.02B(2) Schedule Format
On each schedule, show:
1. Planned and actual start and completion date of each work activity, including applicable:
1.1. Submittal development
1.2. Submittal review and acceptance
1.3. Material procurement
1.4. Contract milestones and constraints
1.5. Equipment and plant setup
1.6. Interfaces with outside entities
1.7. Erection and removal of falsework and shoring
1.8. Test periods
1.9. Major traffic stage change
1.10. Final cleanup
2. Order that you propose to prosecute the work
3. Logical links between the time-scaled work activities
4. All controlling activities
5. Legible description of each activity
6. At least 1 predecessor and 1 successor to each activity except for project start and project end
milestones
7. Duration of at least 1 working day for each activity
8. Start milestone date as the Contract approval date
8-1.02B(3) Updated Schedule
Submit a monthly updated schedule that includes the status of work completed to date and the work yet
to be performed as planned.
You may include changes on updated schedules that do not alter a critical path or extend the scheduled
completion date compared to the current schedule. Changes may include:
1. Adding or deleting activities
97

SECTION 8

PROSECUTION AND PROGRESS

2. Changing activity constraints


3. Changing durations
4. Changing logic
If any proposed change in planned work results in altering the critical path or extending the scheduled
completion date, submit a revised schedule within 15 days of the proposed change.
8-1.02C Level 2 Critical Path Method Schedule
8-1.02C(1) General
Section 8-1.02C applies to a contract with (1) a total bid less than $1 million and 100 or more working
days, (2) a total bid from $1 to $5 million, or (3) a total bid over $5 million and less than 100 working days.
Submit baseline, monthly updated, and final updated schedules, each consistent in all respects with the
time and order of Contract work requirements. Perform work in the sequence indicated on the current
accepted schedule.
Use computer software to prepare each schedule.
Submit compatible software for the Engineer's exclusive possession and use.
You are responsible for assuring that all activity sequences are logical and that each schedule shows a
coordinated plan for complete performance of the work.
If the Contract includes construction staging and you propose changes to the described staging, do not
perform work affected by the proposed changes until the Engineer accepts your schedule. Changes to
the schedule that change described staging is change order work.
The Engineer's review and acceptance of schedules does not void any Contract part and does not void
your responsibility for submitting complete and accurate information.
Correct rejected schedules and resubmit them within 7 days of notification by the Engineer. Allow 7 days
for the Engineer's review of the resubmittal.
Errors or omissions on schedules do not void your responsibility for completing all work within the time
specified for completion of the Contract.
If either you or the Engineer discovers that any aspect of the schedule has an error or omission after a
schedule has been accepted, correct it on the next updated schedule.
8-1.02C(2) Schedule Format
For the schedule format, comply with the 1st paragraph of section 8-1.02B(2) and show:
1. Calculations using the CPM to determine controlling activities.
2. Duration activities less than 20 working days.
3. Each required constraint. Constraints other than those required by the specifications may be included
only if authorized.
8-1.02C(3) Computer Software
8-1.02C(3)(a) General
Submit a description of the proposed schedule software to be used. After authorization of the proposed
software, submit schedule software and original software instruction manuals.
Software must be compatible with the current version of the Microsoft Windows operating system in use
by the Engineer.
The schedule software must include the latest version of Primavera P6 for Windows or equal.
Any proposed schedule software equal to Primavera P6 must be capable of:
1. Generating files that can be imported into Primavera P6
2. Comparing 2 schedules and providing reports of changes in activity ID, activity description,
constraints, calendar assignments, durations, and logic ties
98

SECTION 8

PROSECUTION AND PROGRESS

The Engineer returns the schedule software to you before the final estimate. The Department pays you by
force account for replacement of software or manuals damaged, lost, or stolen after submittal.
8-1.02C(3)(b) Computer Software Training
Instruct the Engineer in the use of the software and provide software support until Contract acceptance.
Within 15 days of Contract approval, provide a commercial training session for 2 Department employees
in the use of the software at a location acceptable to the Engineer. For Primavera P6 software, the
training session must be 8 hours. For other software, the training session must be 16 hours.
The Department recommends that you send at least 2 employees to the same training session to
facilitate development of similar knowledge and skills in the use of the software.
8-1.02C(4) Data and Network Diagrams
For each schedule, submit:
1. 1 data-storage device containing the schedule data
2. 2 sets of originally plotted, time-scaled network diagrams
The data-storage device must comply with item 2 of the 3rd paragraph of section 8-1.02B(1).
The time-scaled network diagrams must:
1.
2.
3.
4.
5.

Show a continuous flow of information from left to right


Be based on early start and early finish dates of activities
Clearly show the primary critical path using graphical presentation
Be on 11 by 17 inches or larger sheets
Include a title block and a timeline on each page

8-1.02C(5) Baseline Schedule


Submit a baseline schedule and all support data within 20 days of Contract approval. Allow 20 days for
the Engineer's review after the submittal.
Starting the week the baseline schedule is first submitted, meet with the Engineer weekly to discuss and
resolve schedule issues until the baseline schedule is accepted.
The baseline schedule submittal is not complete until the computer software is installed for use.
The baseline schedule must include the entire scope of work and how you plan to complete all work
contemplated.
The baseline schedule must show the activities that define the critical path. Multiple critical paths and
near-critical paths must be kept to a minimum. A total of not more than 50 percent of the baseline
schedule activities must be critical or near critical unless otherwise authorized.
The baseline schedule must not extend beyond the number of Contract working days.
8-1.02C(6) Updated Schedule
Each updated schedule must comply with section 8-1.02B(3).
Meet with the Engineer to review work progress on or before the 1st day of each month, starting 1 month
after the baseline schedule is accepted.
Allow 15 days for review after the updated schedule and all support data are submitted. The review
period does not start until the previous month's required schedule is accepted.
Updated schedules not accepted or rejected within the review period are accepted.
The updated schedule must:
1. Have a data date of the 21st day of the month or other date established by the Engineer
2. Show changes from accepted revised schedules

99

SECTION 8

PROSECUTION AND PROGRESS

8-1.02C(7) Final Updated Schedule


Submit a final updated as-built schedule with actual start and finish dates for the activities within 30 days
after work completion.
Submit a written certificate with this submittal signed by your project manager or an officer of the
company stating:
"To my knowledge and belief, the enclosed final updated schedule reflects the actual start and finish
dates of the actual activities for the project contained herein."
An officer of the company may delegate in writing the authority to sign the certificate to a responsible
manager.
8-1.02D Level 3 Critical Path Method Schedule
8-1.02D(1) General
Section 8-1.02D applies to a contract with a total bid over $5 million and 100 or more working days.
Comply with section 8-1.02D(1).
8-1.02D(2) Schedule Format
For the schedule format, comply with section 8-1.02C(2) and show:
1. At least 50 but not more than 500 activities unless authorized. The number of activities must be
sufficient to assure adequate planning of the project, to permit monitoring and evaluation of progress,
and to do an analysis of time impacts.
2. Department-owned float as the predecessor activity to the scheduled completion date.
3. Activities with identification codes for responsibility, stage, work shifts, location, and bid items.
You may show early completion time on any schedule if you comply with the Contract. Early completion
time is a resource for your exclusive use. You may increase early completion time by improving
production, reallocating resources to be more efficient, performing sequential activities concurrently, or by
completing activities earlier than planned. You may also submit a VECP that will reduce construction
time.
You may show a scheduled completion date that is later than the Contract completion date on an updated
schedule after the baseline schedule is accepted. Provide an explanation for a late scheduled completion
date in the narrative report included with the schedule.
8-1.02D(3) Computer Software
Computer software must comply with section 8-1.02C(3).
8-1.02D(4) Data, Network Diagrams, and Reports
For each schedule submittal, submit:
1. 1 data-storage device containing the schedule data
2. 2 sets of originally plotted, time-scaled network diagrams
3. 2 copies of a narrative report
The data-storage device must comply with item 2 of the 3rd paragraph of section 8-1.02B(1).
The network diagrams must comply with section 8-1.02C(4) except the sheets must be 34 by 44 inches.
The narrative report must be organized in the following sequence with all applicable documents included:
1. Transmittal letter
2. Work completed during the period
3. Identification of unusual conditions or restrictions regarding labor, equipment, or material; including
multiple shifts, 6-day work weeks, specified overtime or work at times other than regular days or
hours
4. Description of the current critical path
5. Changes to the critical path and scheduled completion date since the last schedule submittal
100

SECTION 8

PROSECUTION AND PROGRESS

6. Description of problem areas


7. Current and anticipated delays, including:
7.1. Cause of delay
7.2. Impact of delay on other activities, milestones, and completion dates
7.3. Corrective action and schedule adjustments to correct the delay
8. Pending items and status of:
8.1. Permits
8.2. Change orders
8.3. Time adjustments
8.4. Noncompliance notices
9. Reasons for an early or late scheduled completion date in comparison to the Contract completion
date
A schedule submittal is complete only when all documents and data are submitted as specified in section
8-1.02D(4).
8-1.02D(5) Preconstruction Scheduling Conference
Hold a preconstruction scheduling conference with your project manager and the Engineer within 15 days
after Contract approval. The Engineer conducts the conference and reviews section 8-1.02D with you.
Within 10 days after Contract approval, submit a general time-scaled logic diagram showing the major
activities and sequence of planned operations. Be prepared to discuss the proposed work plan and
schedule methodology during the preconstruction scheduling conference.
If the Contract includes construction staging and you propose changes to the described staging, the
general time-scaled logic diagram must show the changes and resulting time impacts. Be prepared to
discuss the proposal.
At this conference, submit the alphanumeric coding structure and activity identification system for labeling
work activities.
To easily identify relationships, each activity description must indicate its associated scope or location of
work by including such terms as quantity of material, type of work, bridge number, station to station
location, side of highway (such as left, right, northbound, or southbound), lane number, shoulder, ramp
name, ramp line descriptor, or mainline.
The Engineer reviews the logic diagram, coding structure, and activity identification system and provides
any required baseline schedule changes to you for implementation.
8-1.02D(6) Baseline Schedule
The baseline schedule must comply with section 8-1.02C(5).
The baseline schedule must have a data date of Contract approval.
If you start work before Contract approval, the baseline schedule must have a data date of the 1st day
you performed work at the job site.
If you submit an early completion baseline schedule that shows Contract completion in less than 85
percent of the Contract working days, the baseline schedule must be supplemented with resource
allocations for every task activity and include time-scaled resource histograms. Resource allocations must
be shown to a level of detail that facilitates report generation based on labor crafts and equipment classes
for you and your subcontractors.
Use average composite crews to display the labor loading of job site construction activities. Optimize and
level labor to reflect a reasonable plan for accomplishing the work and to assure that resources are not
duplicated in concurrent activities.
The time-scaled resource histograms must show labor crafts and equipment classes to be used.
The Engineer may review the baseline schedule activity resource allocations using Means Productivity
Standards for Construction or equivalent to determine whether the schedule is practicable.

101

SECTION 8

PROSECUTION AND PROGRESS

8-1.02D(7) Updated Schedule


The updated schedule must comply with section 8-1.02C(6) except the 5th paragraph.
The updated schedule must:
1.
2.
3.
4.

Have a data date of the 21st day of the month or other date established by the Engineer
Show the status of work actually completed to date and the work yet to be performed as planned
Show actual activity start dates, percent complete, and finish dates
Show durations for work that has been completed as the work actually occurred, including the
Engineer's review and your resubmittal times

Justify in writing the reasons for any changes to planned work. If any proposed changes in planned work
results in altering a critical path or near critical path or extending the schedule completion date, submit a
revised schedule and a TIA within 15 days of the proposed change.
8-1.02D(8) Time Impact Analysis
8-1.02D(8)(a) General
Submit a TIA with each request for adjustment of Contract time or whenever you or the Engineer
considers that an authorized or anticipated change may impact the critical path or work progress.
The TIA must:
1. Illustrate the impacts of each change or delay on the current scheduled completion date or internal
milestone.
2. Use the accepted schedule that has a data date closest to and before the event. If the Engineer
determines that the accepted schedule used does not appropriately represent the conditions before
the event, the accepted schedule must be updated to the day before the event being analyzed.
3. Include an impact schedule developed from incorporating the event into the accepted schedule by
adding or deleting activities or by changing durations or logic of existing activities. If the impact
schedule shows that incorporating the event modifies the critical path and scheduled completion date
of the accepted schedule, the difference between scheduled completion dates of the 2 schedules
must be equal to the adjustment of Contract time.
The Engineer may construct and use an appropriate project schedule or other recognized method to
determine adjustments in Contract time until you submit the TIA.
Submit 2 copies of the TIA within 20 days of receiving a written request for a TIA. Allow the Engineer 15
days after receipt to review the submitted TIA. Authorized TIA schedule changes must be shown on the
next updated schedule.
If a TIA you submit is rejected, meet with the Engineer to discuss and resolve issues related to the TIA. If
clarification is needed after you meet, you are allowed 15 days to submit a protest. If agreement is not
reached, you are allowed 5 days from the date you receive the Engineer's response to your protest to
submit an Initial Potential Claim Record.
Show only actual as-built work, not unauthorized changes related to the TIA, in subsequent updated
schedules.
If agreement is reached at a later date, the authorized TIA schedule changes must be shown on the next
updated schedule.
The Department withholds remaining payment on the progress schedule (critical path method) bid item if
a TIA is requested and not submitted within 20 days.
The Department returns the withhold in the next progress payment after the submittal of the requested
TIA.
8-1.02D(8)(b) Department-Owned Float
Prepare a TIA whenever requested to determine the effect of Department-owned float. Department
owned float is a resource for the exclusive use of the Department.

102

SECTION 8

PROSECUTION AND PROGRESS

The Engineer may accrue Department-owned float by early review completion of any submittal if the early
review completion saves time on the critical path.
The Engineer documents Department-owned float by ordering you to update the Department-owned float
activity on the next updated schedule.
Include a log of the action on the Department-owned float activity and include a discussion of the action in
the narrative report.
The Engineer may use Department-owned float to mitigate past, present, or future Department delays by
offsetting a potential time extension for a Change Order.
8-1.02D(8)(c) Ordered Changes
For an ordered change that affects the scheduled completion date, prepare a TIA to determine the effect
of adjusting Contract working days.
Include the impacts of the ordered change in the next updated schedule.
An ordered change that affects the controlling activity on the critical path is a basis for a time adjustment.
The Department grants a time extension only if the total float is absorbed and the scheduled completion
date is delayed 1 or more working days due to the ordered change.
8-1.02D(9) Final Updated Schedule
The final updated schedule must comply with section 8-1.02C(7).
8-1.02D(10) Payment
The Department pays you for progress schedule (critical path method) as follows:
1. A total of 25 percent of the item total is paid upon:
1.1. Completion of 5 percent of all work
1.2. Acceptance of schedules and authorization of TIAs required when 5 percent of all work is
complete
1.3. Submittal of schedule software
1.4. Completion of required schedule-software training
2. A total of 50 percent of the item total is paid upon completion of 25 percent of all work and
acceptance of schedules and authorization of TIAs required when 25 percent of all work is complete
3. A total of 75 percent of the item total is paid upon completion of 50 percent of all work and
acceptance of schedules and authorization of TIAs required when 50 percent of all work is complete
4. A total of 100 percent of the item total is paid upon completion of all work, acceptance of schedules
and authorization of TIAs required when all work is complete, and submittal of the certified final
updated schedule
The Department does not adjust payment for any increased or decreased work ordered in submitting
schedules.
8-1.02E8-1.02F Reserved
8-1.03 PRECONSTRUCTION CONFERENCE
Attend a preconstruction conference with key personnel, including your assigned representative, at a time
and location determined by the Engineer. Submit documents as required before the preconstruction
conference. You may start work before the preconstruction conference.

103

SECTION 8

PROSECUTION AND PROGRESS

Be prepared to discuss the topics and documents shown in the following table:
Topics
Potential claim and dispute resolution
Contractor's representation
DBE and DVBE
Equipment
Labor compliance and equal employment
opportunity
Material inspection
Materials on hand
Measurements
Partnering
Quality control
Safety
Schedule
Subcontracting
Surveying
Traffic control
Utility work
Weight limitations
Water pollution control
Work restrictions
Action submittals

Document
Potential claim forms
Assignment of Contractor's representative
Final utilization reports
Equipment list
Job site posters and benefit and payroll reports
Notice of Materials to be Used
Request for Payment for Materials on Hand
--QC plans
Injury and Illness Prevention Program and job site
posters
Baseline schedule and Weekly Statement of Working
Days
Subcontracting Request
Survey Request
Traffic contingency plan and traffic control plans
--SWPPP or WPCP
PLACs
--

8-1.04 START OF JOB SITE ACTIVITIES


8-1.04A General
Reserved
8-1.04B Standard Start
Start job site activities within 15 days after receiving notice that the Contract has been approved by the
Attorney General or the attorney appointed and authorized to represent the Department.
Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work,
submit a separate notice for each location.
You may start job site activities before receiving notice of Contract approval if you:
1.
2.
3.
4.
5.
6.

Deliver the signed Contract, bonds, and evidence of insurance to the Department
Submit 72-hour notice
Obtain an encroachment permit from the Department
Are authorized by the Department to start
Perform work at your own risk
Perform work under the Contract

If the Contract is approved, work already performed that complies with the Contract is authorized.
If the Contract is not approved, leave the job site in a neat condition. If a facility has been changed,
restore it to its former condition or an equivalent condition. The Department does not pay for the
restoration.
The Department does not adjust time for starting before the 1st working day.
8-1.04C Delayed Start
Reserved

104

SECTION 8

PROSECUTION AND PROGRESS

8-1.04D Early Return-Early Start


Reserved
8-1.04E Next-Day Start
Reserved
8-1.04F8-1.04J Reserved
8-1.05 TIME
Contract time starts on the day specified in section 8-1.04 or on the day you start job site activities,
whichever occurs first.
Complete the work:
1. Within the number of working days shown on the Notice to Bidders for a noncost plus time based bid
2. Within the number of working days bid for a cost plus time based bid
Meet each specified interim work completion date.
The Engineer issues a Weekly Statement of Working Days by the end of the following week unless the
Contract is suspended for reasons unrelated to your performance.
The Weekly Statement of Working Days shows:
1.
2.
3.
4.

Working days and nonworking days during the reporting week


Time adjustments
Work completion date computations, including working days remaining
Controlling activities

8-1.06 SUSPENSIONS
8-1.06A General
The Engineer may suspend work wholly or in part due to any of the following:
1. Conditions are unsuitable for work progress.
2. You fail to do any of the following:
2.1. Fulfill the Engineer's orders.
2.2. Fulfill a Contract part.
2.3. Perform weather-dependent work when conditions are favorable so that weather-related
unsuitable conditions are avoided or do not occur.
Upon the Engineer's order of suspension, suspend work immediately. Provide for public safety and a
smooth and unobstructed passageway through the work zone during the suspension as under sections 7
1.03 and 7-1.04. Resume work when ordered.
8-1.06B Suspensions Unrelated to Contractor Performance
For a suspension unrelated to your performance, providing for a smooth and unobstructed passageway
through the work during the suspension is force account work.
The days during a suspension unrelated to your performance are nonworking days.
8-1.06C Suspensions Related to Contractor Performance
For a suspension related to your performance, the Department may provide for a smooth and
unobstructed passageway through the work during the suspension and deduct the cost from payments.
The days during a suspension related to your performance are working days.
8-1.07 DELAYS
8-1.07A General
To request a delay-related time or payment adjustment, submit an RFI.

105

SECTION 8

PROSECUTION AND PROGRESS

8-1.07B Time Adjustments


For an excusable critical delay, the Department may make a time adjustment. The Engineer uses
information from the schedule to evaluate requests for time adjustments.
If requesting an adjustment, submit a revised schedule showing the delay's effect on the controlling
activity. If the delay has:
1. Occurred, submit records of dates and what work was performed during the delayed activity
2. Not occurred, submit the expected dates or duration of the delayed activity
If the Engineer requests, update the schedule to the last working day before the start of the delay.
8-1.07C Payment Adjustments
The Department may make a payment adjustment for an excusable delay that affects your costs.
Only losses for idle equipment, idle workers, and equipment moving or transporting are eligible for delay
related payment adjustments.
The Engineer determines payment for idle time of equipment in the same manner as determinations are
made for equipment used in the performance of force account work under section 9-1.04 with the
following exceptions:
1. Delay factor in the Labor Surcharge and Equipment Rental Rates applies to each equipment rental
rate.
2. Daily number of payable hours equals the normal working hours during the delay, not to exceed 8
hours per day.
3. Delay days exclude nonworking days.
4. Markups are not added.
The Engineer determines payment adjustment for idle workers under section 9-1.04B, but does not add
markups.
The Engineer includes costs due to necessary extra equipment moving or transporting.
8-1.088-1.09 RESERVED
8-1.10 LIQUIDATED DAMAGES
8-1.10A General
The Department specifies liquidated damages (Pub Cont Code 10226). Liquidated damages, if any,
accrue starting on the 1st day after the expiration of the working days through the day of Contract
acceptance except as specified in sections 8-1.08B and 8-1.08C.
The Department withholds liquidated damages before the accrual date if the anticipated liquidated
damages may exceed the value of the remaining work.
Liquidated damages for all work except plant establishment are as shown in the following table:
Liquidated Damages
Total bid
Liquidated damages
From over
To
per day
$0
$50,000
$1,200
$50,000
$120,000
$1,500
$120,000
$1,000,000
$1,900
$1,000,000
$5,000,000
$3,000
$5,000,000
$10,000,000
$5,400
$10,000,000
$30,000,000
$8,300
$30,000,000 $100,000,000
$10,500
$100,000,000 $250,000,000
$28,500
If all work except plant establishment is complete and the total number of working days have expired,
liquidated damages are $950 per day.
106

SECTION 8

PROSECUTION AND PROGRESS

8-1.10B Failure to Complete Work Parts within Specified Times


The Department may deduct specified damages from payments for each day in completing a work part
beyond the time specified for completing the work part.
Damages for untimely completion of work parts may not be equal to the daily amount specified as
liquidated damages for the project as a whole, but the Department does not simultaneously assess
damages for untimely completion of work parts and for the whole work.
Damages accrue starting the 1st day after a work part exceeds the specified time through the day the
specified work part is complete.
8-1.10C Failure to Complete Work Parts by Specified Dates
The Department may deduct specified damages from payments for each day in completing a work part
beyond the specified completion date for the work part.
Damages for untimely work part completion may not be equal to the daily amount specified as liquidated
damages for the project as a whole, but the Department does not simultaneously assess damages for
untimely work part completion and the whole work.
Damages accrue starting the 1st day after an unmet completion date through the day the work part is
complete.
8-1.10D Director Days
If the work is not completed within the working days, the Director may grant director days if it serves the
State's best interest.
By granting director days, the Director adds working days to the Contract. The Director may either grant
enough days to eliminate the liquidated damages or fewer. In the latter case, the Department deducts
liquidated damages for the remaining overrun in Contract time. The Director may deduct the Department's
engineering, inspection, and overhead costs incurred during the period of extension granted as director
days.
8-1.118-1.12 RESERVED
8-1.13 CONTRACTOR'S CONTROL TERMINATION
The Department may terminate your control of the work for failure to do any of the following (Pub Cont
Code 10253):
1.
2.
3.
4.

Supply an adequate workforce


Supply material as described
Pay subcontractors (Pub Cont Code 10262)
Prosecute the work as described in the Contract

The Department may also terminate your control for failure to maintain insurance coverage.
For a federal-aid project, the Department may terminate your control of the work for failure to include
"Required Contract Provisions, Federal-Aid Construction Contracts" in subcontracts.
The Department gives you and your surety notice at least 5 business days before terminating control. The
notice describes the failures and the time allowed to remedy the failures. If failures are not remedied
within the time provided, the Department takes control of the work.
The Department may complete the work if the Department terminates the Contractor's control or you
abandon the project (Pub Cont Code 10255). The Department determines the unpaid balance under
Pub Cont Code 10258 and the Contract.
At any time before final payment of all claims, the Department may convert a Contractor's control
termination to a Contract termination.

107

SECTION 8

PROSECUTION AND PROGRESS

8-1.14 CONTRACT TERMINATION


8-1.14A General
The Director may terminate the Contract if it serves the State's best interest. The Department issues you
a written notice, implements the termination, and pays you.
8-1.14B Relief from Responsibility for Work
Upon receiving a termination notice:
1.
2.
3.
4.
5.

Stop work
Notify subcontractors and suppliers of the Contract termination and stop Contract-related work
Perform the Engineer-ordered work to secure the job site for termination
R
emove equipment
Subject to the Engineer's authorization, settle termination-related claims and liabilities involving
subcontractors and suppliers; assign to the Department the rights, titles, or interests held by you with
respect to these parties

8-1.14C Responsibility for Materials


Upon receiving a termination notice, protect unused material until:
1. You submit an inventory of materials already produced, purchased, or ordered but not yet used;
include the location of the material.
2. The Engineer identifies materials that will be retained by the Department. Submit bills of sales or
other records of material title.
3. The Engineer confirms that unused materials paid by progress payment and materials furnished by
the State have been delivered and stored as ordered.
4. The titles are transferred for materials purchased by the Department.
Dispose of materials that will not be retained by the Department.
8-1.14D Contract Acceptance after Termination
The Engineer recommends Contract acceptance after determining completion of:
1. Work ordered to be completed before termination
2. Other work ordered to secure the project before termination
3. Material delivery and title transfer
The Department pays you under section 9-1.17.
8-1.14E Payment Adjustment for Termination
If the Department issues a termination notice, the Engineer determines payment for termination based on
the following:
1. Direct cost for the work:
1.1. Including:
1.1.1. Mobilization.
1.1.2. Demobilization.
1.1.3. Securing the job site for termination.
1.1.4. Losses from the sale of materials.
1.2. Not including:
1.2.1. Cost of materials you keep.
1.2.2. Profit realized from the sale of materials.
1.2.3. Cost of material damaged by:
1.2.3.1. Act of God.
1.2.3.2. Act of a public enemy.
1.2.3.3. Fire.
1.2.3.4. Flood.
1.2.3.5. Governor-declared state of emergency.
1.2.3.6. Landslide.
1.2.3.7. Tsunami.
1.2.4. Other credits.
108

SECTION 8

PROSECUTION AND PROGRESS

2. Cost of remedial work, as estimated by the Engineer, is not reimbursed.


3. Allowance for profit not to exceed 4 percent of the cost of the work. Prove a likelihood of having made
a profit had the Contract not been terminated.
4. Material handling costs for material returned to the vendor or disposed of as ordered.
5. Costs in determining the payment adjustment due to the termination, excluding attorney fees and
litigation costs.
Termination of the Contract does not relieve the surety of its obligation for any just claims arising out of
the work performed.
8-1.158-1.16 RESERVED

109

9 PAYMENT

9-1.01 GENERAL
Section 9 includes specifications related to work payment.
9-1.02 MEASUREMENT
9-1.02A General
The Department determines bid item quantities under U.S. customary units.
Except for final pay item quantities, the Engineer measures quantities for payment.
9-1.02B Weighing Equipment and Procedures
9-1.02B(1) General
Measure material quantities for payment with devices that comply with:
1. 4 CA Code of Regs 4000 et seq.
2. Bus & Prof Code 12001 et seq.
To determine the material payment quantities, use measuring devices that have been sealed by the
Department of Food and Agriculture's Division of Measurement Standards or its designated
representative.
If a device is not type approved by the Division of Measurement Standards, type approve it under
California Test 109.
Notify the Engineer at least 1 business day in advance of equipment testing.
Use material plant controllers having elements affecting the data accuracy and delivery that have been
sealed by the Engineer. Make these elements available to the Engineer for inspection. If the elements are
adequate for use, the Engineer seals them. If security seal manipulation occurs, stop material production.
Do not resume production until the Engineer reinspects and reseals the device.
Measure material paid for by weight onsealed scales regularly inspected by the Department of Food and
Agriculture's Division of Measurement Standards or its designated representative.
Obtain authorization of portable vehicle scale installations before sealing.
9-1.02B(2) Equipment
Each scale must be long enough to fit an entire vehicle or a combination vehicle on the scale deck. The
Department allows you to weigh a combination vehicle separately if you disconnect the vehicles.
Construct scale undersupports:
1. Using portland cement concrete containing at least 470 pounds of cement per cubic yard produced
from commercial quality materials
2. Such that footing heights are at least 20 inches thick
3. With a bearing surface at least 30 inches wide and bearing pressure on the footing not over 4000
lb/sq ft
In constructing a scale:
1. Furnish drainage to prevent water from saturating the ground under the scale
2. Use bulkheads that prevent displacement
3. If shimming is necessary:
3.1. Use securely attached metal shims or grout
3.2. Do not use wedges to shim the supports
3.3. Do not use shim material in excess of 3 inches
4. Install mechanical indicating elements level, plumb, and rigidly mounted on the concrete
undersupports
5. For a hopper scale, rigidly attach hopper scale lever systems and mechanical indicating elements so
no weight is lost from bending or support distortion
111

SECTION 9

PAYMENT

Each scale used to determine material payment quantities must be operated by a licensed weighmaster
(Bus & Prof Code 12700 et seq.).
Submit a public weighmaster's certificate or certified daily summary weigh sheets for each weighed
material quantity. The Department may witness material weighing and check and compile the daily scale
weight record.
Each vehicle operator must obtain weight or load slips from the weighmaster. Submit these records at the
delivery point.
9-1.02B(3) Procedures
Weigh empty vehicles used to haul material paid for by weight daily. Each vehicle must have a legible
identification mark. The Department may verify material weight by having an empty and loaded vehicle
weighed on any scale the Engineer designates.
If imported topsoil, soil amendment, or mulch is measured by volume:
1. Each vehicle must allow for an accurate contents determination
2. Unless vehicles are of uniform capacity, each vehicle must have a legible identification mark showing
its volume capacity
3. Load vehicles to at least the volume capacity
4. Level vehicle loads on arrival at the delivery point
If determining a quantity paid on a volume basis is impractical or if you request and the request is
authorized, weigh the material and the Engineer converts the result to a volume measurement. The
Engineer determines the conversion factors and, if you agree, adopts this method of measurement.
9-1.02C Final Pay Item Quantities
The Department shows a bid item quantity as a final pay item for payment purposes only. For a final pay
item, accept payment based on the Bid Item List quantity, regardless of actual quantity used unless
dimensions are changed by the Engineer.
9-1.02D Quantities of Aggregate and Other Roadway Materials
The Engineer determines the weight of aggregate and other roadway material that are being paid for by
weight as shown in the following table and does not include the deducted weight of water in their payment
quantities:
Determination of Quantities of Aggregate and Other Roadway Materials
Material
Quantity determination
Aggregate or other roadway material
By deducting the weight of water in the materiala in excess of 3
except as otherwise shown in this
percent of the dry weight of the material from the weight of the
table
material
Imported borrow, imported topsoil,
By deducting the weight of water in the materiala in excess of 6
aggregate subbase
percent of the dry weight of the material from the weight of the
material
Straw
By deducting the weight of water in the materiala in excess of 15
percent of the dry weight of the material from the weight of the
material
Fiberb
Engineer does not deduct the weight of water
Aggregate base and aggregate for
As specified in section 26 and section 27
cement treated bases
NOTE: Percentage of water is determined by California Test 226.

a
At the time of weighing

b
Weight of water in the fibera must not exceed 15 percent of the dry weight of the fiber.

9-1.03 PAYMENT SCOPE


The Department pays you for furnishing the resources and activities required to complete the work. The
Department's payment is full compensation for furnishing the resources and activities, including:

112

SECTION 9

PAYMENT

1. Risk, loss, damage repair, or cost of whatever character arising from or relating to the work and
performance of the work
2. PLACs and taxes
The Department does not pay for your loss, damage, repair, or extra costs of whatever character arising
from or relating to the work that is a direct or indirect result of your choice of construction methods,
materials, equipment, or manpower, unless specifically mandated by the Contract.
Payment is:
1. Full compensation for all work involved in each bid item specified by the description and
measurement unit shown on the Bid Item List
2. For the price bid for each bid item shown on the Bid Item List or as changed by change order with a
specified price adjustment
Full compensation for work specified in divisions I, II, and X is included in the payment for the bid items
unless:
1. Bid item for the work is shown on the Bid Item List
2. Work is specified as change order work
Work paid for under one bid item is not paid for under any other bid item.
Payment for a bid item includes payment for work in sections referenced by the section set forth by that
bid item.
If an alternative is described in the Contract, the Department pays based on the bid items for the details
and specifications not described as an alternative unless the bid item is described as an alternative, in
which case, the Department pays based on the details and specifications for that alternative.
The Department pays for change order work based on one or a combination of the following:
1.
2.
3.
4.

Bid item prices


F
orce account
A
greed price
S
pecialist billing

If the Engineer chooses to pay for change order work based on an agreed price, but you and the
Engineer cannot agree on the price, the Department pays by force account.
If a portion of extra work is covered by bid items, the Department pays for this work as changed quantities
in those items. The Department pays for the remaining portion of the extra work by force account or
agreed price.
The Department pays 10 percent annual interest for unpaid and undisputed:
1. Progress payments
2. After-acceptance payment except for claims
For these payments, interest starts to accrue 30 days after the 1st working day following the 20th day of
the month payment is due. For a change order bill not submitted within 7 days after performing the work,
interest starts to accrue 60 days after the 1st working day following the 20th day of the month payment is
due.
The Department pays 6 percent annual interest for unpaid and undisputed claims. Interest starts to
accrue 61 days after the Department accepts a claim statement.
The Department pays 6 percent annual interest for awards in arbitration (Civ Code 3289).
If the amount of a deduction or withhold exceeds final payment, the Department invoices you for the
difference, to be paid upon receipt.

113

SECTION 9

PAYMENT

Pay your subcontractors within 10 days of receipt of each progress payment under Pub Cont Code
10262 and 10262.5.
9-1.04 FORCE ACCOUNT
9-1.04A General
For work paid by force account, the Engineer compares the Department's records to your daily force
account work report. When you and the Engineer agree on the contents of the daily force account work
reports, the Engineer accepts the report and the Department pays for the work. If the records differ, the
Department pays for the work based only on the information shown on the Department's records.
If a subcontractor performs work at force account, accept an additional 10 percent markup to the total
cost of that work paid at force account, including markups specified in section 9-1.04, as reimbursement
for additional administrative costs.
The markups specified in labor, materials, and equipment include compensation for all delay costs,
overhead costs, and profit.
If an item's unit price is adjusted for work-character changes, the Department excludes your cost of
determining the adjustment.
Payment for owner-operated labor and equipment is made at the market-priced invoice submitted.
9-1.04B Labor
Labor payment is full compensation for the cost of labor used in the direct performance of the work plus a
35 percent markup. Force account labor payment consists of:
1. Employer payment to the worker for:
1.1. Basic hourly wage
1.2. Health and welfare
1.3. Pension
1.4. Vacation
1.5. Training
1.6. Other State and federal recognized fringe benefit payments
2. Labor surcharge percentage in Labor Surcharge and Equipment Rental Rates current during the work
paid at force account for:
2.1. Workers' compensation insurance
2.2. Social security
2.3. Medicare
2.4. Federal unemployment insurance
2.5. State unemployment insurance
2.6. State training taxes
3. Subsistence and travel allowances paid to the workers
4. Employer payment to supervisors, if authorized
The 35 percent markup consists of payment for all overhead costs related to labor but not designated as
costs of labor used in the direct performance of the work including:
1.
2.
3.
4.
5.
6.

Home office overhead


Field office overhead
B
ond costs
Profit
Labor liability insurance
Other fixed or administrative costs that are not costs of labor used in the direct performance of the
work

9-1.04C Materials
Material payment is full compensation for materials you furnish and use in the work. The Engineer
determines the cost based on the material purchase price, including delivery charges, except:
1. A 15 percent markup is added
2. Supplier discounts are subtracted whether you took them or not
114

SECTION 9

PAYMENT

3. If the Engineer believes the material purchase prices are excessive, the Department pays the lowest
current wholesale price for a similar material quantity
4. If you procured the materials from a source you wholly or partially own, the determined cost is based
on the lower of the:
4.1. Price paid by the purchaser for similar materials from that source on Contract items
4.2. Current wholesale price for those materials
5. If you do not submit a material cost record within 30 days of billing, the determined cost is based on
the lowest wholesale price:
5.1. During that period
5.2. In the quantities used
9-1.04D Equipment Rental
9-1.04D(1) General
Equipment rental payment is full compensation for:
1. Rental equipment costs, including moving rental equipment to and from the change order work site
using its own power.
2. Transport equipment costs for rental equipment that cannot be transported economically using its
own power. No payment is made during transport for the transported equipment.
3. 15 percent markup.
If you want to return the equipment to a location other than its original location, the payment to move the
equipment must not exceed the cost of returning the equipment to its original location. If you use the
equipment for work other than work paid by force account, the transportation cost is included in the other
work.
Before moving or loading the equipment, obtain authorization for the equipment rental's original location.
The Engineer determines rental costs:
1. Using rates in Labor Surcharge and Equipment Rental Rates:
1.1. By classifying equipment using manufacturer's ratings and manufacturer-approved changes.
1.2. Current during the work paid by force account.
1.3. Regardless of equipment ownership; but the Department uses the rental document rates or
minimum rental cost terms if:
1.3.1. Rented from equipment business you do not own.
1.3.2. The Labor Surcharge and Equipment Rental Rates hourly rate is $10.00 per hour or
less.
2. Using rates established by the Engineer for equipment not listed in Labor Surcharge and Equipment
Rental Rates. You may submit cost information that helps the Engineer establish the rental rate; but
the Department uses the rental document rates or minimum rental cost terms if:
2.1. Rented from equipment business you do not own.
2.2. The Engineer establishes a rate of $10.00 per hour or less.
3. Using rates for transport equipment not exceeding the hourly rates charged by established haulers.
Equipment rental rates include the cost of:
1.
2.
3.
4.
5.
6.

Fuel
O
il
L
ubrication
S
upplies
Small tools that are not consumed by use
Necessary attachments

7.
8.
9.
10.
11.

Repairs and maintenance


Depreciation
Storage
Insurance
Incidentals

The Department pays for small tools consumed by use. The Engineer determines payment for small tools
consumed by use based on Contractor-submitted invoices.
The Engineer may authorize rates in excess of those in the Labor Surcharge and Equipment Rental
Rates if:
1. You submit a request to use rented equipment
115

SECTION 9
2.
3.
4.
5.

PAYMENT

Equipment is not available from your normal sources or from one of your subcontractors
Rented equipment is from an independent rental company
Proposed equipment rental rate is reasonable
The Engineer authorizes the equipment source and the rental rate before you use the equipment

The Department pays for fuel consumed during the operation of rented equipment not included in the
invoiced rental rates.
9-1.04D(2) Equipment On the Job Site
For equipment on the job site at the time required to perform work paid by force account, the time paid is
the time:
1. To move the equipment to the location of work paid by force account plus an equal amount of time to
move the equipment to another location on the job site when the work paid by force account is
completed
2. To load and unload equipment
3. Equipment is operated to perform work paid by force account and:
3.1. Hourly rates are paid in 1/2-hour increments
3.2. Daily rates are paid in 1/2-day increments
9-1.04D(3) Equipment Not On the Job Site Required for Original-Contract Work
For equipment not on the job site at the time required to perform work paid by force account and required
for original-Contract work, the time paid is the time the equipment is operated to perform work paid by
force account and the time to move the equipment to a location on the job site when the work paid by
force account is completed.
The minimum total time paid is:
1. 1 day if daily rates are paid
2. 8 hours if hourly rates are paid
If daily rates are recorded, equipment:
1. Idled is paid as 1/2 day
2. Operated 4 hours or less is paid as 1/2 day
3. Operated 4 hours or more is paid as 1 day
If the minimum total time exceeds 8 hours and if hourly rates are listed, the Department rounds up hours
operated to the nearest 1/2-hour increment and pays based on the hours shown the following table. The
table does not apply when equipment is not operated due to breakdowns, in which case rental hours are
the hours the equipment was operated.
Equipment Rental Hours
Hours operated
Hours paid
0.0
4.00
0.5
4.25
1.0
4.50
1.5
4.75
2.0
5.00
2.5
5.25
3.0
5.50
3.5
5.75
4.0
6.00
4.5
6.25
5.0
6.50
5.5
6.75
6.0
7.00
6.5
7.25
7.0
7.5
116

SECTION 9

PAYMENT

7.5
8.0

7.75
hours used

9-1.04D(4) Equipment Not On the Job Site Not Required for Original-Contract Work
For equipment not on the job site at the time required to perform work paid by force account and not
required for original-Contract work, the time paid is the time:
1. To move the equipment to the location of work paid by force account plus an equal amount of time to
return the equipment to its source when the work paid by force account is completed
2. To load and unload equipment
3. Equipment is operated to perform work paid by force account
9-1.04D(5) Non-Owner-Operated Dump Truck Rental
Submit the rental rate for non-owner-operated dump truck rental. The Engineer determines the payment
rate. Payment for non-owner-operated dump truck rental is for the cost of renting a dump truck, including
its driver. For the purpose of markup payment only, the non-owner-operated dump truck is rental
equipment and the owner is a subcontractor.
9-1.05 EXTRA WORK PERFORMED BY SPECIALISTS
If the Engineer determines that you or your subcontractors are not capable of performing specialty extra
work, a specialist may be used. Itemize the labor, material, and equipment rental costs unless it is not the
special service industry's established practice to provide itemization, in which case, the Engineer accepts
current market-priced invoices for the work.
The Engineer may accept an invoice as a specialist billing for work performed at an offjob site
manufacturing plant or machine shop.
The Engineer determines the cost based on the specialist invoice price minus any available or offered
discounts plus a 10 percent markup.
9-1.06 CHANGED QUANTITY PAYMENT ADJUSTMENTS
9-1.06A General
The unit prices specified in section 9-1.06 are adjusted under section 9-1.04.
9-1.06B Increases of More Than 25 Percent
If the total bid item quantity exceeds 125 percent of the quantity shown on the Bid Item List and if no
approved Change Order addresses payment for the quantity exceeding 125 percent, the Engineer may
adjust the unit price for the excess quantity under section 9-1.04 or the following:
1. The adjustment is the difference between the unit price and the unit cost of the total item pay quantity.
2. In determining the unit cost, the Engineer excludes the item's fixed costs. You have recovered the
fixed costs in the payment for 125 percent shown on the Bid Item List.
3. After excluding fixed costs, the Engineer determines the item unit cost under section 9-1.04.
If the payment for the number of units of a bid item in excess of 125 percent of the Bid Item List is less
than $5,000 at the unit price, the Engineer may not adjust the unit price unless you request it.
9-1.06C Decreases of More Than 25 Percent
If the total item pay quantity is less than 75 percent of the quantity shown on the Bid Item List and if no
approved Change Order addresses payment for the quantity less than 75 percent, you may request a unit
price adjustment. The Engineer may adjust the unit price for the decreased quantity under section 9-1.04
or the following:
1. The adjustment is the difference between the unit price and the unit cost of the total pay quantity.
2. In determining the unit cost, the Engineer includes the item's fixed costs.
3. After including fixed costs, the Engineer determines the item unit cost under section 9-1.04.
The Department does not pay more than 75 percent of the item total in the Bid Item List.

117

SECTION 9

PAYMENT

9-1.06D Eliminated Items


If the Engineer eliminates an item, the Department pays your costs incurred before the Engineer's
elimination notification date.
If you order authorized material for an eliminated item before the notification date and the order cannot be
canceled, either of the following occurs:
1. If the material is returnable to the vendor, the Engineer orders you to return the material and the
Department pays your handling costs and vendor charges.
2. The Department pays your cost for the material and its handling and becomes the material owner.
The Engineer determines the payment for the eliminated bid item under section 9-1.04.
9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS
9-1.07A General
Section 9-1.07 applies to asphalt contained in materials for pavement structure and pavement surface
treatments such as HMA, tack coat, asphaltic emulsions, bituminous seals, asphalt binders, and modified
asphalt binders placed in the work. Section 9-1.07 does not apply if you opted out of payment
adjustments for price index fluctuations at the time of bid.
The Engineer adjusts payment whenever the California statewide crude oil price index for the month the
material is placed is more than 5 percent higher or lower than the price index at the time of bid.
The Department determines the California statewide crude oil price index each month on or about the 1st
business day of the month using the average of the posted prices in effect for the previous month as
posted by Chevron, ExxonMobil, and ConocoPhillips for the Buena Vista, Huntington Beach, and Midway
Sunset fields.
If a company discontinues posting its prices for a field, the Department determines the index from the
remaining posted prices. The Department may include additional fields to determine the index.
For the California statewide crude oil price index, go to the Department's Division of Construction Web
site.
If the adjustment is a decrease in payment, the Department deducts the amount from the monthly
progress payment.
The Department includes payment adjustments due to price index fluctuations for changed quantities
under section 9-1.06.
If you do not complete the work within the Contract time, payment adjustments during the overrun period
are determined using the California statewide crude oil price index in effect for the month in which the
overrun period began.
If the price index at the time of placement increases:
1. 50 percent or more over the price index at bid opening, notify the Engineer.
2. 100 percent or more over the price index at bid opening, do not furnish material containing asphalt
until the Engineer authorizes you to proceed with that work. The Department may decrease bid item
quantities, eliminate bid items, or terminate the Contract.
Before placing material containing asphalt, submit the current sales and use tax rate in effect in the tax
jurisdiction where the material is to be placed.
Submit a public weighmaster's certificate for HMA, tack coat, asphaltic emulsions, and modified asphalt
binders, including those materials not paid for by weight. For slurry seals, submit a public weighmaster's
certificate separately for the asphaltic emulsion.
9-1.07B Asphalt Quantities
9-1.07B(1) General
Reserved

118

SECTION 9

PAYMENT

9-1.07B(2) Hot Mix Asphalt


The Engineer calculates the quantity of asphalt in HMA using the following formula:
Qh = HMATT x [Xa / (100 + Xa)]
where:
Qh = quantity in tons of asphalt used in HMA
HMATT = HMA, total tons placed
Xa = theoretical asphalt content from the job mix formula expressed as a percentage of the weight of
dry aggregate
9-1.07B(3) Rubberized Hot Mix Asphalt
The Engineer calculates the quantity of asphalt in RHMA using the following formula:
Qrh = RHMATT x 0.80 x [Xarb / (100 + Xarb)]
where:
Qrh = quantity in tons of asphalt in asphalt rubber binder used in RHMA
RHMATT = RHMA, total tons placed
Xarb = theoretical asphalt rubber binder content from the job mix formula expressed as a percentage
of the weight of dry aggregate
9-1.07B(4) Modified Asphalt Binder in Hot Mix Asphalt
The Engineer calculates the quantity of asphalt in modified asphalt binder using the following formula:
Qmh = MHMATT x [(100 - Xam) / 100] x [Xmab / (100 + Xmab)]
where:

Qmh = quantity in tons of asphalt in modified asphalt binder used in HMA

MHMATT = modified asphalt binder HMA, total tons placed

Xam = specified percentage of asphalt modifier

Xmab = theoretical modified asphalt binder content from the job mix formula expressed as a

percentage of the weight of dry aggregate


9-1.07B(5) Hot Mix Asphalt Containing Reclaimed Asphalt Pavement
The Engineer calculates the quantity of asphalt in HMA containing RAP using the following formula:
Qrap = HMATT x [Xaa / (100 + Xaa)]
where:

Xaa = Xta - [(100 - Xnew) x (Xra / 100)]

and:
Qrap = quantity in tons of asphalt used in HMA containing RAP
HMATT = HMA, total tons placed
Xaa = asphalt content of HMA adjusted to account for the asphalt content in RAP expressed as a
percentage of the weight of dry aggregate
Xta = total asphalt content of HMA expressed as a percentage of the weight of dry aggregate
Xnew = theoretical percentage of new aggregate in the HMA containing RAP determined from the
RAP percentage in the job mix formula

Xra = asphalt content of RAP expressed as percentage

9-1.07B(6) Tack Coat


The Engineer calculates the quantity of asphalt in tack coat (Qtc) as either of the following:
1. Asphalt binder using the asphalt binder total tons placed as tack coat
2. Asphaltic emulsion by applying the formula in section 9-1.07B(7) to the asphaltic emulsion total tons
placed as tack coat

119

SECTION 9

PAYMENT

9-1.07B(7) Asphaltic Emulsion


The Engineer calculates the quantity of asphalt in asphaltic emulsions, including fog seals and tack coat,
using the following formula:
Qe = AETT x (Xe / 100)
where:

Qe = quantity in tons of asphalt used in asphaltic emulsions

AETT = undiluted asphaltic emulsions, total tons placed

Xe = minimum percent residue specified in section 94 based on the type of emulsion used

You may determine Xe by submitting daily test results for asphalt residue for the asphaltic emulsion used.
If you choose this option, you must:
1. Take 1 sample for every 200 tons but not less than 1 sample per day in the presence of the Engineer
from the delivery truck, at midload from a sampling tap or thief, and as follows:
1.1. Draw and discard the 1st gallon
1.2. Take 2 separate 1/2 gal samples
2. Submit the 1st sample at the time of sampling
3. Furnish the 2nd sample within 3 business days of sampling to an authorized laboratory that
participates in the AASHTO Proficiency Sample Program
4. Submit test results from the laboratory within 10 business days of sample date
9-1.07B(8) Slurry Seal
The Engineer calculates the quantity of asphalt in slurry seals (Qss) by applying the formula in section 9
1.07B(7) to the quantity of asphaltic emulsion used in producing the slurry seal mix.
9-1.07B(9) Modified Asphalt Binder
The Engineer calculates the quantity of asphalt in modified asphalt binder using the following formula:
Qmab = MABTT x [(100 - Xam) / 100]
where:

Qmab = quantity in tons of asphalt used in modified asphalt binder

MABTT = modified asphalt binder, total tons placed

Xam = specified percentage of asphalt modifier

9-1.07B(10) Other Materials


For materials containing asphalt not covered in sections 9-1.07B(1) through 9-1.07B(9), the Engineer
determines the method for calculating the quantity of asphalt (Qo).
9-1.07C Payment Adjustments
The Engineer includes payment adjustments for price index fluctuations in progress estimates. If material
containing asphalt is placed within 2 months during 1 estimate period, the Engineer calculates 2 separate
adjustments. Each adjustment is calculated using the price index for the month in which the quantity of
material containing asphalt subject to adjustment is placed in the work. The sum of the 2 adjustments is
used for increasing or decreasing payment in the progress estimate.
The Engineer calculates each payment adjustment using the following formula:
PA = Qt x A

where:

PA = Payment adjustment in dollars for asphalt contained in materials placed in the work for a given

month
Qt = Sum of all quantities of asphalt (Qh + Qrh + Qmh + Qrap + Qtc + Qe + Qss + Qmab + Qo)
A = Adjustment in dollars per ton of asphalt used to produce materials placed in the work rounded to
the nearest $0.01
where:
120

SECTION 9

PAYMENT

A = [(Iu / Ib) - 1.05] x Ib x [1 + (T / 100)] for an increase in the crude oil price index exceeding 5
percent
A = [(Iu / Ib) - 0.95] x Ib x [1 + (T / 100)] for a decrease in the crude oil price index exceeding 5
percent
and:
Iu = California statewide crude oil price index for the month in which the quantity of asphalt subject to
adjustment was placed in the work
Ib = California statewide crude oil price index for the month in which the bid opening for the project
occurred
T = Sales and use tax rate expressed as a percent currently in effect in the tax jurisdiction where the
material is placed. If the tax rate information is not submitted timely, the statewide sales and
use tax rate is used in the payment adjustment calculations until the tax rate information is
submitted.
9-1.089-1.10 RESERVED
9-1.11 TIME-RELATED OVERHEAD
9-1.11A General
Section 9-1.11 applies to a project with (1) an estimated cost over $5 million and (2) 100 or more working
days not including any plant establishment period working days.
The 1st sentence of section 8-1.07C and "excusable delay" and its definition in section 1-1.07B do not
apply.
Time-related overhead includes costs for field- and home-office overhead for the time required to
complete the work. It does not include non-time-related costs such as mobilization, licenses, permits, and
other charges incurred once during the Contract.
Time-related overhead does not apply to subcontractors of any tier, suppliers, fabricators, manufacturers,
or other parties associated with you.
Costs for field office overhead are time-related costs associated with the normal and recurring
construction activities not directly attributed to the Contract work such as:
1. Salaries, benefits, and equipment costs of:
1.1. Project managers
1.2. General superintendents
1.3. Field office managers
1.4. Field office staff assigned to the project
2. Rent
3. Utilities
4. Maintenance
5. Security
6. Supplies
7. Office equipment costs for the project's field office
Costs for home-office overhead are fixed general and administrative costs for operating your business
such as:
1.
2.
3.
4.
5.
6.

General administration
Insurance
Personnel and subcontract administration
Purchasing
Accounting
Project engineering and estimating

Home-office overhead costs exclude expenses specifically related to:


1. Your other contracts or other businesses
121

SECTION 9

PAYMENT

2. E
quipment coordination
3. Material deliveries
4. Consultant and legal fees
Each bid item price except time-related overhead must exclude time-related overhead costs.
The Department does not make the unit price adjustment resulting from a change of more than 25
percent in the bid item's quantity specified in section 4-1.05A for the time-related overhead bid item.
Section 9-1.17D(2)(b) does not apply.
9-1.11B Audit Examinations and Reports
If the total time-related overhead bid item exceeds 149 percent of the quantity at the time of bid and if
ordered, submit an audit examination and report prepared by an independent CPA within 60 days of the
order. The audit examination and report must show your actual overhead costs, including:
1. Project and company-wide financial records
2. Overall average daily rates for both field and home office overhead for the entire duration of the
project and whether the costs have been properly allocated. The field and home office overhead rates
must be:
2.1. Allowable under 48 CFR 31
2.2. Supported by reliable records
2.3. Related solely to the project
The CPAs audit must be performed under the Attestation Standards published by the American Institute
of Certified Public Accountants.
Within 20 days of receipt of the Engineer's order, make your financial records available for an audit by the
State for the purpose of verifying the actual rate of time-related overhead described in your submitted
audit. The Engineer may or may not accept the rate of time-related overhead submitted.
The Department pays the accepted actual rate for time-related overhead in excess of 149 percent of the
quantity shown on the Bid Item List.
The Department pays 1/2 the cost of performing the examination and preparing the report; the Contractor
pays the other 1/2. The cost is determined under section 9-1.05.
The Department does not pay for an audit performed for the purpose of verifying actual rates for:
1. Overhead costs incurred before the 1st working day
2. Overhead claims
9-1.11C Payment
Time for plant establishment is not included in the quantity for time-related overhead.
The Engineer increases the quantity of time-related overhead if:
1. A suspension is ordered not related to:
1.1. Weather conditions unfavorable for the suitable prosecution of the controlling activity.
1.2. Your failure to carry out orders given or perform the work under the Contract.
1.3. Factors beyond your control not caused by either the Department or you.
1.4. Conditions that mutually benefit the State and you.
2. An increase of Contract time for a compensable delay is granted. A compensable delay is caused
solely by the fault, deficiency, error, omission, or change made by the Department. A time adjustment
and payment adjustment for the actual cost without markup or profit are allowed. A TIA is used to
determine the duration of the compensable delay.
The Engineer decreases the quantity of time-related overhead if a decrease in Contract time due to an
approved Change Order is granted.
The Department does not adjust the quantity of time-related overhead for:

122

SECTION 9
1.
2.
3.
4.
5.

6.
7.
8.

9.

PAYMENT

Early completion of the project.


Performing change order work that does not affect a controlling activity.
Nonworking days.
Delays to the controlling activities that occur before the 1st working day.
Nonexcusable delay. A nonexcusable delay is caused by you or your subcontractors of any tier or
suppliers for either nonperformance or deficiency of the work. Days during a nonexcusable delay are
working days. No time or payment adjustment for a nonexcusable delay is allowed.
Excusable delay. An excusable delay is caused by factors beyond your or the Department's control.
Days during an excusable delay are nonworking days.
2 or more concurrent delays that occur when a nonexcusable or excusable delay overlaps partially or
entirely with an excusable or compensable delay.
Suspensions ordered due to:
8.1. Weather conditions unfavorable for the suitable prosecution of the controlling activity.
8.2. Failure to carry out orders given or perform the work under the Contract.
8.3. Factors beyond your control not caused by either the Department or you.
Suspensions that mutually benefit you and the Department.

For a cost-plus-time contract, if the quantity of time-related overhead is adjusted, the lump sum price for
time-related overhead is adjusted for each day by an amount equal to the lump sum price bid divided by
the number of working days bid to complete the Contract.
The Department makes progress payments for time-related overhead based on the number of working
days used during that estimate period, including compensable suspensions and delays. The amount paid
per working day is the lesser of the following amounts:
1. Bid item price for a non-cost-plus-time contract
2. Bid item lump sum price divided by the number of working days bid for a cost-plus-time contract
3. 20 percent of the total bid divided by the Contract number of working days
Working days granted by an approved Change Order due to changes and extra work is paid for upon
Contract completion.
Payment for time-related overhead includes full compensation for additional overhead costs incurred
during days of inclement weather when the Contract is extended into any additional construction seasons
due to delays caused by the Department.
Payment for time-related overhead does not include payment for additional overhead cost involved in:
1. Satisfying an internal milestone or multiple calendar requirements
2. Performing additional work not considered a controlling activity
3. Overhead costs incurred by your subcontractors of any tier, suppliers, fabricators, manufacturers, and
other associates
4. Other non-time-related-overhead costs
For a project without plant establishment work, the Department pays you the remaining balance of time
related overhead as specified in section 9-1.17B.
For a project with plant establishment work, the Department pays you the remaining balance of time
related overhead in the 1st progress payment after the work except plant establishment work is
completed.
For work you perform that is paid by force account, the Department pays you based on the markups
shown in the following table instead of the markups specified in section 9-1.04:
Cost
Percent markup
Labor
30
Materials
10
Equipment rental
10
Note: The markups apply to work paid by force account, regardless of whether the work revises the
current Contract completion date.

123

SECTION 9

PAYMENT

For subcontracted work paid by force account, the markups in section 9-1.04 apply.
9-1.129-1.14 RESERVED
9-1.15 WORK-CHARACTER CHANGES
The Department adjusts a bid item unit price based on the difference between the cost to perform the
work as planned and the cost to perform the work as changed. The Engineer determines the payment
adjustment under section 9-1.04. The Department adjusts payment for only the work portion that changed
in character.
9-1.16 PROGRESS PAYMENTS
9-1.16A General
The Department pays you based on Engineer-prepared monthly progress estimates. Each estimate
reflects:
1. Total work completed during the pay period
2. Change order bills if:
2.1. Submitted by the 15th day of a month
2.2. Approved by the 20th day of a month
3. Amount for materials on hand
4. Amount earned for mobilization
5. Deductions
6. Withholds
7. Resolved potential claims
8. Payment adjustments
Submit certification stating the work complies with the QC procedures. The Engineer does not process a
progress estimate without a signed certification.
9-1.16B Schedule of Values
Section 9-1.16B applies to a lump sum bid item for which a schedule of values is specified to be
submitted.
The sum of the amounts for the work units listed in the schedule of values must equal the lump sum price
bid for the bid item.
Obtain authorization of a schedule of values before you perform work shown on the schedule. The
Department does not process a progress payment for the bid item without an authorized schedule of
values.
Accept progress payments for overhead, profit, bond costs, and other fixed or administrative costs as
distributed proportionally among the items listed except that for a contract with a bid item for mobilization,
accept progress payments for bond costs as included in the mobilization bid item.
For changed quantities of the work units listed, the Department adjusts payments in the same manner as
specified for changed quantities of bid items under section 9-1.06.
9-1.16C Materials On Hand
A material on hand but not incorporated into the work is eligible for progress payment if:
1.
2.
3.
4.

Listed in a special provision as eligible and is in compliance with other Contract parts
P
urchased
An invoice is submitted
Stored within the State and you submit evidence that the stored material is subject to the
Department's control
5. Requested on the Department-furnished form
9-1.16D Mobilization
Mobilization is eligible for partial payments if the Contract includes a bid item for mobilization. The
Department makes the partial payments under Pub Cont Code 10264. If the Contract does not include
a mobilization bid item, mobilization is included in the payment for the various bid items.
124

SECTION 9

PAYMENT

The Department pays the item total for mobilization in excess of 10 percent of the total bid in the 1st
payment after Contract acceptance.
9-1.16E Withholds
9-1.16E(1) General
The Department may withhold payment for noncompliance.
The Department returns the noncompliance withhold in the progress payment following correction of
noncompliance.
Withholds are not retentions under Pub Cont Code 7107 and do not accrue interest under Pub Cont
Code 10261.5.
Withholds are cumulative and independent of deductions.
Section 9-1.16E does not include all withholds that may be taken; the Department may withhold other
payments as specified.
9-1.16E(2) Progress Withholds
The Department withholds 10 percent of a progress payment for noncompliant progress. Noncompliant
progress occurs when:
1. Total days to date exceed 75 percent of the revised Contract working days
2. Percent of working days elapsed exceeds the percent of value of work completed by more than 15
percent
The Engineer determines the percent of working days elapsed by dividing the total days to date by the
revised Contract working days and converting the quotient to a percentage.
The Engineer determines the percent of value of work completed by summing payments made to date
and the amount due on the current progress estimate, dividing this sum by the current total estimated
value of the work, and converting the quotient to a percentage. These amounts are shown on the
Progress Payment Voucher.
When the percent of working days elapsed minus the percent of value of work completed is less than or
equal to 15 percent, the Department returns the withhold in the next progress payment.
9-1.16E(3) Performance Failure Withholds
During each estimate period you fail to comply with a Contract part, including submittal of a document as
specified, the Department withholds a part of the progress payment. The documents include QC plans,
schedules, traffic control plans, and water pollution control submittals.
For 1 performance failure, the Department withholds 25 percent of the progress payment but does not
withhold more than 10 percent of the total bid.
For multiple performance failures, the Department withholds 100 percent of the progress payment but
does not withhold more than 10 percent of the total bid.
9-1.16E(4) Stop Notice Withholds
The Department may withhold payments to cover claims filed under Civ Code 3179 et seq.
Stop notice information may be obtained from the Division of Accounting, Office of External Accounts
Payable.
9-1.16E(5) Penalty Withholds
Penalties include fines and damages that are proposed, assessed, or levied against you or the
Department by a governmental agency or private lawsuit. Penalties are also payments made or costs
incurred in settling alleged violations of federal, state, or local laws, regulations, requirements, or PLACs.
The cost incurred may include the amount spent for mitigation or correcting a violation.

125

SECTION 9

PAYMENT

If the Department is assessed a penalty, the Department may withhold the penalty amount until the
penalty disposition has been resolved. The Department may withhold penalty amounts without notifying
you.
Instead of the withhold, you may provide a bond equal to the highest estimated liability for any disputed
penalties proposed except you may not provide a bond for withholds related to labor compliance
violations.
9-1.16E(6)9-1.16E(10) Reserved
9-1.16F Retentions
Section 9-1.16F applies before January 1, 2014.
The Department does not retain moneys from progress payments due to the Contractor for work
performed (Pub Cont Code 7202).
9-1.16G9-1.16M Reserved
9-1.17 PAYMENT AFTER CONTRACT ACCEPTANCE
9-1.17A General
Reserved
9-1.17B Payment Before Final Estimate
After Contract acceptance, the Department pays you based on the Engineer-prepared estimate that
includes withholds and the balance due after deduction of previous payments.
9-1.17C Proposed Final Estimate
The Engineer estimates the amount of work completed and shows the amount payable in a proposed
final estimate based on:
1.
2.
3.
4.
5.

Contract items
Payment adjustments
Work paid by force account or agreed price
Extra work
Deductions

Submit either a written final estimate acceptance or a claim statement no later than the 30th day after
receiving the proposed final estimate. Evidence of the Contractor's receipt of the final estimate and the
Engineer's receipt of the Contractor's written acceptance or claim statement is a delivery service's proof
of delivery or Engineer's written receipt if hand delivered.
If you claim that the final estimate is less than 90 percent of your total bid, the Department adjusts the
final payment to cover your overhead. The adjustment is 10 percent of the difference between the total
bid and the final estimate. The Department does not make this adjustment on a terminated contract.
9-1.17D Final Payment and Claims
9-1.17D(1) General
If you accept the proposed final estimate or do not submit a claim statement within 30 days of receiving
the estimate, the Engineer furnishes the final estimate to you and the Department pays the amount due
within 30 days. This final estimate and payment is conclusive except as specified in sections 5-1.27, 6
3.06, and 9-1.21.
If you submit a claim statement within 30 days of receiving the Engineer's proposed final estimate, the
Engineer furnishes a semifinal estimate to the Contractor and the Department pays the amount due within
30 days. The semifinal estimate is conclusive as to the amount of work completed and the amount
payable except as affected by the claims or as specified in sections 5-1.27, 6-3.06, and 9-1.21.
9-1.17D(2) Claim Statement
9-1.17D(2)(a) General
For each claim, submit a claim statement showing only the identification number that corresponds to the
Full and Final Potential Claim Record and the final amount of additional payment requested except:
126

SECTION 9

PAYMENT

1. If the final amount of requested payment differs from the amount requested in the Full and Final
Potential Claim Record
2. For a claim for quantities, withholds, deductions, liquidated damages, or change order bills
3. For an overhead claim
If the final amount of requested payment differs from the amount requested in the Full and Final Potential
Claim Record, submit:
1.
2.
3.
4.
5.

I dentification number that corresponds to the Full and Final Potential Claim Record
Final amount of additional payment requested
Basis for the changed amount
Contract documentation that supports the changed amount
Statement of the reasons the Contract documentation supports the claim

The Engineer notifies you of an omission of or a disparity in the exclusive identification number. Within 15
days of the notification, correct the omission or disparity. If the omission or disparity is not resolved after
the 15 days, the Engineer assigns a new number.
For a claim for quantities, withholds, deductions, or change order bills submit:
1. Final amount of additional payment requested
2. Enough detail to enable the Engineer to determine the basis and amounts of the additional payment
requested
9-1.17D(2)(b) Overhead Claims
Include with an overhead claim:
1. Final amount of additional payment requested
2. Independent CPA audit report
Failure to submit the audit report with an overhead claim with the claim statement is a waiver of the
overhead claim and operates as a bar to arbitration on the claim (Pub Cont Code 10240.2).
The Department deducts an amount for field and home office overhead paid on added work from any
claim for overhead. The value of the added work equals the value of the work completed minus the total
bid. The home office overhead deduction equals 5 percent of the added work. The field office overhead
deduction equals 5-1/2 percent of the added work.
If you intend to pursue a claim for reimbursement for field or home office overhead beyond that provided
expressly by the Contract:
1. Notify the Engineer within 30 days of receipt of the proposed final estimate of your intent to seek
reimbursement for specific overhead costs beyond that provided by the Contract
2. Specifically identify each claim and each date associated with each claim from which you seek
reimbursement for specific overhead costs beyond that provided by the Contract
3. Timely submit all other claims
4. Within 30 days of receipt of the proposed final estimate, submit an audit report prepared by an
independent CPA
4.1. The audit report must show calculations with supporting documentation of actual home office
and project field overhead costs
4.2. The calculations must specify the actual daily rates for both field and home office overhead for
the entire duration of the project expressed as a rate per working day
4.3. The start and end dates of the actual project performance period, number of working days,
overhead cost pools, and all allocation bases must be disclosed in the calculations of your
actual field and home office overhead daily rates
4.4. Neither daily rate may include a markup for profit
5. Field overhead costs from which the daily rate is calculated must be:
5.1. Allowable under 48 CFR 31
5.2. Supported by reliable records
5.3. Related solely to the project
5.4. Incurred during the actual project performance period
127

SECTION 9

PAYMENT

5.5. Comprised of only time-related field overhead costs


5.6. Not a direct cost
6. Home office overhead costs from which the daily rate is calculated must be:
6.1. Allowable under 48 CFR 31
6.2. Supported by reliable records
6.3. Incurred during the actual project performance period
6.4. Comprised of only fixed home office overhead costs
6.5. Not a direct cost
The actual rate of time-related overhead is subject to authorization by the Engineer.
The CPAs audit must be performed under the Attestation Standards published by the American Institute
of Certified Public Accountants. The CPAs audit report must express an opinion whether or not your
calculations of your actual field and home office overhead daily rates comply with section 9-1.17D(2)(b).
The attest documentation prepared by the CPA in connection with the audit must be reproduced and
submitted for review with the audit report.
The Department provides markups for all work paid by force account. Overhead for field and home office
costs are included in the markups. Overhead claims in excess of Contract markups are not allowed under
the Contract. If you seek reimbursement for costs not allowed under the Contract, the Department does
not pay your cost of performing the independent CPA examination specified in section 9-1.17D(2)(b),
including preparation of the audit report.
9-1.17D(2)(c) Declaration
Submit a declaration that includes the following language with the claim statement:
I declare under penalty of perjury, according to the laws of the State of California, that the foregoing
claims, with specific reference to the California False Claims Act (Govt Code 12650 et seq.) and to
the extent the project contains federal funding, the U.S. False Claims Act (31 USC 3729 et seq.),
are true and correct, and that this declaration was signed on ______(date)_______, 20__ at
_________________, California.
9-1.17D(2)(d) Waiver
A claim is waived if:
1. Claim does not have a corresponding Full and Final Potential Claim Record identification number
2. Claim does not have the same nature, circumstances, and basis of claim as the corresponding Full
and Final Potential Claim Record
3. Claim is not included in the claim statement
4. You do not comply with the claim procedures
5. You do not submit the declaration specified in section 9-1.17D(2)(c)
9-1.17D(3) Final Determination of Claims
Failure to allow timely access to claim supporting data when requested waives the claim.
The Department's costs in reviewing or auditing a claim not supported by the Contractor's accounting or
other records are damages incurred by the State within the meaning of the California False Claims Act.
If the Engineer determines that a claim requires additional analysis, the Engineer schedules a board of
review meeting. Meet with the board of review and make a presentation supporting the claim.
After claim review completion by the Engineer or board of review, the Department makes the final
determination of claims and furnishes it to the Contractor.
After the determination, the Engineer furnishes a final estimate to the Contractor and the Department
pays the amount due within 30 days. The final estimate is conclusive as to the amount of work completed
and the amount payable except as specified in sections 5-1.27, 6-3.06, and 9-1.21.
The Contractor's failure to comply with the claim procedures is a bar to arbitration under Pub Cont Code
10240.2.

128

SECTION 9

PAYMENT

9-1.189-1.20 RESERVED
9-1.21 CLERICAL ERRORS
For 3 years after Contract acceptance, estimates and payments are open to correction and adjustment for
clerical errors. Either the Department or the Contractor pays to the other the amount due except for
clerical errors resulting in an adjustment less than $200, in which case, no payment is made.
9-1.22 ARBITRATION
Pub Cont Code 10240 through 10240.13 provides for the resolution of contract claims by arbitration.
Start arbitration by filing a complaint with the Office of Administrative Hearings in Sacramento (1 CA Code
Regs 1350). File the arbitration complaint no later than 90 days after receiving the Department's final
written decision on a claim (Pub Cont Code 10240.1).

129

DIVISION II GENERAL CONSTRUCTION


10 GENERAL
10-1 GENERAL
Reserved
10-2 SUSTAINABLE DESIGN REQUIREMENTS
10-2.01 GENERAL
Reserved
10-2.02 LEED
10-2.02A10-2.02H Reserved
10-2.0310-2.10 RESERVED
10-310-10 RESERVED

131

11 QUALITY CONTROL AND ASSURANCE

11-1 GENERAL

11-1.01 GENERAL
Section 11 includes specifications relating to quality control and assurance.
11-1.02 QUALITY CONTROL MANAGER
Where a QC manager is specified, assign a QC manager before starting construction activities. The QC
manager must be the sole individual responsible for:
1. Receiving, reviewing, and approving all correspondence, submittals, and reports before they are
submitted to the Department
2. Signing QC plans
3. Implementing QC plans
4. Maintaining QC records
The QC manager must be responsible directly to you for the quality of the work, including materials and
workmanship performed by you and your subcontractors.
The QC manager must be your employee or must be hired by a subcontractor providing only QC
services. The QC manager must not be employed or compensated by a subcontractor or by other
persons or entities hired by subcontractors who will provide other services or materials for the project.
Notify the Engineer of the name and contact information of the QC manager.
11-2 PRECAST CONCRETE MEMBERS
11-2.01 GENERAL
Section 11-2 applies to PC concrete members fabricated under sections 49 or 51 excluding PC concrete
members fabricated with minor concrete.
Fabricate PC concrete members at a plant on the Authorized Facility Audit List.
11-2.02 PRECAST CONCRETE QUALITY CONTROL MANAGER
Assign a PC concrete QC manager for each precasting plant.
11-2.03 QUALITY CONTROL INSPECTOR
The QC inspector must witness all PC concrete activities.
The QC inspector must either (1) be registered as a civil engineer in the State or (2) have a current Plant
Quality Personnel Certification, Level II from the Precast/Prestressed Concrete Institute.
The QC inspector must perform inspection and testing before precasting, during precasting, and after
precasting, as specified and as necessary to ensure that materials and workmanship comply with the
Contract.
Regardless of your acceptance of a PC concrete member, the Engineer inspects PC concrete members
and rejects any members that do not comply with the Contract.
11-2.04 SUBMITTALS
11-2.04A General
Before submitting the PC concrete QC plan, hold a meeting to discuss the requirements for PC concrete
QC. The meeting attendees must include the Engineer, the PC concrete QC manager, and a
representative from each plant performing PC concrete activities for the Contract.
11-2.04B Precast Concrete Quality Control Plan
Before performing any precasting activities, submit 3 copies of a PC concrete QC plan for each member
to be precast. Submit a separate QC plan for each plant. Allow 25 days for the Engineer's review.
Each QC plan must include:

133

SECTION 11

QUALITY CONTROL AND ASSURANCE

1. Name of the precasting plant, concrete plant to be used, and any concrete testing laboratory to be
used.
2. Manual prepared by the precasting plant that includes equipment, testing procedures, safety plan,
and the names, qualifications, and documentation of certifications for all personnel to be used.
3. Name of the QC manager and the names, qualifications, and documentation of certifications for all
QC inspectors.
4. Organizational chart showing all QC personnel and their assigned QC responsibilities.
5. Methods and frequencies for performing all required QC procedures, including all inspections,
material testing, and any required survey procedures for all components of the PC concrete members
including prestressing systems, concrete, grout, reinforcement, steel components embedded or
attached to the PC concrete member, miscellaneous metal, and formwork.
6. System for reporting noncompliant PC concrete members to the Engineer.
7. System for identification and tracking of any required repairs, how they were repaired, and a
procedure for the reinspection of any repaired PC concrete members.
8. Forms to be used for certificates of compliance, daily production logs, and daily reports.
A QC plan that was previously authorized no more than 1 year before the start of job site activities on the
Contract is acceptable for the entire period of the Contract, if the Engineer determines the QC plan is for
the same type of work that is to be performed on the Contract.
Submit an amended QC plan or an addendum to the QC plan for any changes to:
1.
2.
3.
4.
5.

oncrete plants or source materials


C
Material testing procedures and testing labs
Procedures and equipment
Updated systems for tracking and identifying PC concrete members
Q
C personnel

Submit 7 copies of each authorized QC plan and make 1 copy available at each location where work is
performed.
11-2.04C Daily Production Log
The QC inspector must provide reports to the QC manager on a daily basis for each day that precasting
activities are performed.
The QC manager must maintain a daily production log for precasting for each day that precasting
activities are performed, including setting forms, placing reinforcement, setting prestressing steel, casting,
curing, post tensioning, and form release. This daily log must be available for viewing by the Engineer at
the precasting plant. The daily log must include:
1.
2.
3.
4.
5.
6.

P
lant location
Specific description of casting or related activities
Any problems or deficiencies discovered
Any testing or repair work performed
Names of all QC inspectors and the specific QC inspections they performed that day
Reports for that day's precasting activities from each QC inspector

Notify the Engineer immediately when any precasting problems or deficiencies are discovered and submit
the proposed repair or process changes required to correct them. Allow 25 days for the Engineer 's
review.
11-2.04D Precast Concrete Report
Submit a PC concrete report within 15 days following the completion of any PC concrete member. The
report must include:
1. Reports of all material tests and any required survey checks.
2. Documentation that you have evaluated all tests and corrected all rejected deficiencies, and all
repairs have been re-examined with the required tests and found acceptable.
3. Daily production logs.

134

SECTION 11

QUALITY CONTROL AND ASSURANCE

4. Certificate of compliance signed by the QC manager. The certificate must state that all of the
materials and workmanship incorporated in the work and all required tests and inspections of this
work, have been performed as described in the Contract.
The person who performed the material tests and required survey checks must sign all reports regarding
these tests and survey checks and furnish these reports directly to the QC manager for review and
signature before submittal to the Engineer. Corresponding names must be clearly printed or typed next to
all signatures.
11-3 WELDING
11-3.01 GENERAL
11-3.01A General
Section 11-3.01 includes general specifications for welding where welding is specified to comply with an
AWS welding code.
Do not perform welding using flux-cored welding electrodes that comply with AWS A5.20, E6XT-4 or
E7XT-4.
Wherever reference is made to the following AWS welding codes in the Contract, the year of adoption for
these codes is shown in the following table:
AWS code
D1.1
D1.3
D1.4
D1.5
D1.6
D1.8

Year of adoption
2008
2008
2005
2008
2007
2009

11-3.01B Definitions
continuous inspection: QC Inspector must be within close proximity of all welders or welding operators
so that inspections by the QC Inspector of each welding activity at each welding location does not
lapse for a period exceeding 30 minutes.
gross nonconformance: Sum of planar type rejectable indications in more than 20 percent of the tested
length.
11-3.01C Quality Control Inspector
Replace clause 6.1.3 of AWS D1.1, the 1st paragraph of section 7.1.2 of AWS D1.4, and clause 6.1.1.2 of
AWS D1.5 with:
The QC Inspector must be the duly assigned person who acts for and on your behalf for inspection,

testing, and quality related matters for all welding.

Quality assurance is the prerogative of the Engineer. The QA Inspector is the duly designated person

who acts for and on behalf of the Engineer.

The QC Inspector must be responsible for QC acceptance or rejection of materials and workmanship.

Where the term "Inspector" is used without further qualification, it refers to the QC Inspector.

The QC Inspector must document inspection and approval of:


1. All joint preparations, assembly practices, joint fit-ups, welding techniques
2. Performance of each welder, welding operator, and tack welder on a daily basis for each day welding
is performed
For each inspection, including fit-up, WPS verification, and final weld inspection, the QC Inspector must
confirm and document compliance with AWS welding codes and the specifications on all welded joints
before welding, during welding, and after the completion of each weld.

135

SECTION 11

QUALITY CONTROL AND ASSURANCE

11-3.01D Personnel Qualifications and Certifications


The Engineer has the authority to verify the qualifications or certifications of any welder, QC Inspector, or
NDT personnel to specified levels by retests or other means determined by the Engineer. The period of
effectiveness for a welder's or welding operator's qualification must be a maximum of 3 years for the
same weld process, welding position, and weld type. If welding will be performed without gas shielding,
then qualification must also include welding without gas shielding. Excluding welding of fracture critical
members, a valid qualification at the start of job site activities on a contract is acceptable for the entire
period of the Contract, as long as the welder's or welding operator's work remains satisfactory.
Replace clause 6.14.6 of AWS D1.1, section 7.8 of AWS D1.4, and clause 6.1.3.4 of AWS D1.5 with:
Personnel performing NDT must be qualified and certified under American Society for Nondestructive
Testing (ASNT) Recommended Practice No. SNT-TC-1A and the written practice of the NDT firm.
The written practice of the NDT firm must comply with or exceed the guidelines of the ASNT
Recommended Practice No. SNT-TC-1A. Individuals who perform NDT, review the results, and
prepare the written reports must be one of the following:
1.
2.

Certified NDT Level II technicians


Level III technicians who hold a current ASNT Level III certificate in that discipline and are
certified to perform the work of Level II technicians

11-3.01E Joint Weld Details


If joint weld details proposed for use in the work are not prequalified under clause 3 of AWS D1.1 or figure
2.4 or 2.5 of AWS D1.5, submit the joint weld details, including their intended locations, welding
parameters, and essential variables.
Upon authorization of the proposed joint detail locations and qualification of the proposed joint details,
welders and welding operators using these details must weld a qualification test plate using the WPS
variables and the joint weld detail to be used in production. The test plate must:
1. Have the maximum thickness to be used in production and a minimum length of 18 inches.
2. Be mechanically and radiographically tested. Mechanical and radiographic testing and acceptance
criteria must comply with the applicable AWS codes.
If a nonstandard weld joint is to be made using a combination of WPSs for work welded under AWS D1.1,
you may conduct a single test combining the WPSs to be used in production, if the essential variables,
including weld bead placement, of each process are limited to those established in table 4.5 of AWS
D1.1.
The Engineer will witness all procedure qualification tests for WPSs that were not previously authorized
by the Department.
Submit an inspection request form to METS at least 7 days before performing any procedure qualification
tests. Notify the Engineer of your submittal. Witnessing of qualification tests by the Engineer does not
constitute authorization of the intended joint locations, welding parameters, or essential variables.
11-3.01F Nondestructive Testing
Replace paragraph 3 of clause 6.26.3.2 of AWS D1.5 with:
3.

If indications that exhibit these planar characteristics are present at scanning sensitivity, or
other evidence exists to suggest the presence of transverse cracks, a more detailed evaluation
of the discontinuity by other means must be performed (e.g., alternate UT techniques, RT,
grinding, or gouging for visual inspection or MT of the excavated areas.). For welds that have
transverse cracks, remove the metal for the full length of the crack plus 2 inches on each side
of the crack and reweld.

Clause 6.6.5 of AWS D1.1, section 7.6.5 of AWS D1.4, and clause 6.6.5 of AWS D1.5 do not apply.
The Engineer may order you to perform NDT that is in addition to the visual inspection or NDT specified in
the specifications or AWS welding code. The additional NDT and associated repair work is change order
work. If the NDT discloses an attempt to defraud or reveals a gross nonconformance, the Department
136

SECTION 11

QUALITY CONTROL AND ASSURANCE

does not pay for the costs associated with the repair of the deficient area, the NDT of the weld and of the
repair, or any delays caused by the repair.
If less than 100 percent of NDT is specified for any weld, the entire length of weld must comply with the
specified acceptance criteria. If any welding deficiencies are discovered by additional NDT ordered or
performed by the Engineer that uses the same NDT method as that originally specified, the Department
does not pay for the costs associated with the repair of the deficient area, including NDT of the weld and
of the weld repair, or any delays caused by the repair.
If any welding deficiencies are discovered by visual inspection ordered or performed by the Engineer, the
Department does not pay for the costs associated with the repair of a deficient area or any delays caused
by the repair.
11-3.02 WELDING QUALITY CONTROL
11-3.02A General
Section 11-3.02 applies to work welded under sections 49, 52, 55, 75-1.03E, and 99-05120.
All welding requires inspection by the Engineer.
You must provide continuous inspection when any welding is being performed.
11-3.02B Welding Quality Control Manager
Assign a welding QC manager. The welding QC manager must be registered as a civil engineer in the
State or currently certified as a CWI.
11-3.02C Submittals
11-3.02C(1) General
If welding is performed at the job site, submit an inspection request form at least 3 business days before
performing welding at the job site. Notify the Engineer of your submittal.
11-3.02C(2) Welding Quality Control Plan
Before submitting a welding QC plan, hold a prewelding meeting to discuss the requirements for the
welding QC plan. The meeting attendees must include the Engineer, your welding QC manager, and a
representative from each entity performing welding or inspection for the Contract.
For the contents, format, and organization required for a welding QC plan, go to the METS Web site.
Submit 2 copies of a welding QC plan for each subcontractor or supplier for each item of work for which
welding is performed.
Submit an amended welding QC plan or an addendum to the welding QC plan for any changes to:
1.
2.
3.
4.
5.
6.

PS
W
NDT firms
QC and QC personnel
NDT personnel or procedures
Systems for tracking and identifying welds
Welding personnel

Allow 7 days for the Engineer's review of an amended welding QC plan or an addendum to the welding
QC plan.
Submit 7 copies of each authorized QC plan and make 1 copy available at each location where work is
performed.
11-3.02C(3) Welding Report
Submit a welding report within 15 days following the performance of any welding. The welding report
must include:
1. Daily production log for welding for each day that welding is performed
2. Reports of all visual weld inspections and NDT performed, whether specified, additional, or
informational
137

SECTION 11

QUALITY CONTROL AND ASSURANCE

3.
4.
5.
6.

Radiographs and radiographic reports, and other required NDT reports


Summary of welding and NDT activities that occurred during the reporting period
Reports of each application of heat straightening
Summarized log listing the rejected lengths of weld by welder, position, process, joint configuration,
and piece number
7. Documentation that you have
7.1. Evaluated all radiographs and radiograph reports and NDT and NDT reports
7.2. Corrected all rejectable deficiencies and that all repaired welds have been reexamined using
the required NDT and found acceptable

The daily production log must include:


1. Locations of all welding
2. For each location, the welders' names, quantity of welding performed, any problems or deficiencies
discovered, and any testing or repair work performed
3. Daily report from each QC Inspector
Clearly write the following information on the outside of radiographic envelopes:
1.
2.
3.
4.
5.
6.
7.

Name of the QC manager


Name of the NDT firm
Name of the radiographer
Date
C
ontract number
Complete part description
All included weld numbers, report numbers, and station markers or views as detailed in the welding
QC plan

Clearly write on all interleaves the part description and all included weld numbers and station markers or
views as detailed in the welding QC plan. Use a maximum of 2 pieces of film for each interleave.
The QC Inspector or certified technician must sign all visual inspection and NDT reports and submit them
daily to the welding QC manager for review and signature before submittal to the Engineer.
Corresponding names must be clearly printed or typewritten next to all signatures. Submit reports of all
NDT performed, whether specified, additional, or informational.
The Engineer reviews the welding report to determine whether you are complying with the welding QC
plan and the Contract. Except for field welded steel pipe piling and field welded bar reinforcement in CIP
concrete piling:
1. Allow the Engineer 15 days to review the report.
2. You may encase in concrete or cover welds for which the welding report has been submitted before
receiving authorization of the welding report. If you choose this option, you will not be relieved of the
responsibility for incorporating material in the work that complies with the Contract. Material not
complying with the Contract is subject to rejection.
For field welded steel pipe piling and field welded bar reinforcement in CIP concrete piling:
1. Allow the Engineer 2 business days to review the welding report
2. Do not install the steel pipe piling or encase the reinforcement in concrete until the Engineer has
authorized the welding report
11-3.02C(4) Certificates of Compliance
Submit a certificate of compliance for each item of work for which welding is performed. The certificate
must be signed by the welding QC manager. The certificate must state that all of the materials and
workmanship incorporated in the work, and all required tests and inspections of this work, have been
performed in compliance with the Contract.
11-3.02D Personnel Qualifications and Certifications
Clauses 6.1.4.1 and 6.1.4.3 of AWS D1.1, the 2nd paragraph of section 7.1.2 of AWS D1.4, and clauses
6.1.3.2 through 6.1.3.3 of AWS D1.5 are replaced with:
138

SECTION 11

QUALITY CONTROL AND ASSURANCE

The QC Inspector must be currently certified as an AWS Certified Welding Inspector under AWS
QC1.
The QC Inspector may be assisted by an Assistant QC Inspector provided that this individual is
currently certified as an AWS Certified Associate Welding Inspector under AWS QC1. The Assistant
QC Inspector may perform inspection under the direct supervision of the QC Inspector provided the
assistant is always within visible and audible range of the QC Inspector. The QC Inspector must be
responsible for signing all reports and for determining if welded materials comply with the
workmanship and acceptance criteria. The ratio of QC Assistants to QC Inspectors must not exceed 5
to 1.
Welding inspection personnel or NDT firms to be used in the work must not be employed or compensated
by any subcontractor or by other persons or entities hired by subcontractors who will provide other
services or materials for the Contract, unless one of the following conditions is met:
1. Work is welded under AWS D1.5 and is performed at a permanent fabrication or manufacturing plant
that is certified under the AISC Quality Certification Program, Category CBR, Major Steel Bridges,
and Fracture Critical Endorsement F, if required
2. Structural steel for building work is welded under AWS D1.1 and is performed at a permanent
fabrication or manufacturing plant that is certified under the AISC Quality Certification Program,
Category STD, Standard for Steel Building Structures
For welding performed at these facilities, the inspection personnel or NDT firms may be employed or
compensated by the plant performing the welding if the plant maintains a QC program independent from
production.
An authorized independent 3rd party must witness the qualification tests for welders or welding operators.
The independent 3rd party must be currently certified as a CWI and must not be an employee of the
Contractor performing the welding. Allow 15 days for the Engineer to review the qualifications and copy of
the current certification of the independent 3rd party.
11-3.02E Welding Inspection
Replace clause 6.5.4 of AWS D1.5 with:
The QC Inspector must inspect and approve each joint preparation, assembly practice, welding
technique, joint fit-up, and the performance of each welder, welding operator, and tack welder to
make certain that the applicable requirements of this code and the qualified WPS are met. The QC
Inspector must examine the work to make certain that it complies with clauses 3 and 6.26. The size
and contour of all welds must be measured using suitable gages. Visual inspection for cracks in
welds and base metal, and for other discontinuities must be aided by strong light, magnifiers, or other
devices as necessary. You may use acceptance criteria different from those specified in this code if
authorized.
11-3.02F Welding Procedures Qualification
Welding procedures qualification for work welded under AWS D1.5 must comply with clause 5.12 or 5.13
of AWS D1.5, and the following:
1. Unless considered prequalified, qualify fillet welds in each position. Conduct the fillet weld soundness
test using the essential variables of the WPS as established by the PQR.
2. For qualifying joints that do not comply with figures 2.4 and 2.5 of AWS D1.5, conduct at least 2 WPS
qualification tests. Conduct the tests using both figure 5.1 and figure 5.3. Conduct the test complying
with figure 5.1 under clause 5.12 or 5.13 of AWS D1.5. Conduct the test complying with figure 5.3
using the welding electrical parameters that were established for the test conducted complying with
figure 5.1. The ranges of welding electrical parameters established during welding under figure 5.1 in
compliance with clause 5.12 of AWS D1.5 must be further restricted in compliance with the limits in
table 5.3 during welding under figure 5.3.
3. You may qualify multiple zones within a weld joint. The travel speed, amperage, and voltage values
that are used for tests conducted under clause 5.13 of AWS D1.5 must be consistent for each pass in
a weld joint and must not vary by more than 10 percent for travel speed, 10 percent for amperage,
and 7 percent for voltage as measured from a predetermined target value or average within each

139

SECTION 11

4.

5.
6.

7.

QUALITY CONTROL AND ASSURANCE

weld pass or zone. The travel speed must not vary by more than 15 percent when using submerged
arc welding.
For a WPS qualified under clause 5.13 of AWS D1.5, base the values to be used for calculating
ranges for current and voltage on the average of all weld passes made in the test. Calculate heat
input using the average of current and voltage of all weld passes made in the test for a WPS qualified
under clause 5.12 or 5.13 of AWS D1.5.
Macroetch tests are required for WPS qualification tests, and acceptance must comply with clause
5.19.3 of AWS D1.5.
If a nonstandard weld joint is to be made using a combination of WPSs, you may conduct a test under
figure 5.3, combining the WPSs to be used in production, if the essential variables, including weld
bead placement, of each process are limited to those established in table 5.3 of AWS D1.5.
Before preparing mechanical test specimens, inspect the PQR welds by visual and radiographic tests.
The backing bar must be 3 inches in width and must remain in place during NDT. Results of the
visual and radiographic tests must comply with clause 6.26.2 of AWS D1.5 excluding clause 6.26.2.2.
Do not use test plates that do not comply with both tests.

11-3.02G Repair Work


Notify the Engineer immediately when you discover welding problems, deficiencies, base metal repairs, or
any other type of repairs not included in the welding QC plan. Submit the proposed repair procedures to
correct them.
Allow the Engineer 7 days to review the repair procedures.
You must receive authorization before performing:
1. 3rd-time excavations of welds or base metal to repair unacceptable discontinuities, regardless of NDT
method
2. Repairs of cracks
For requests to perform 3rd-time excavations or repairs of cracks, include an engineering evaluation of
the proposed repair. At a minimum, the engineering evaluation must address:
1. Cause of each defect
2. Why the repair will not degrade the material properties
3. What steps are being taken to prevent similar defects from happening again
11-3.03 WELDING FOR OVERHEAD SIGN AND POLE STRUCTURES
11-3.03A General
Section 11-3.03 applies to work welded under sections 56-3 and 86-2.04.
Fabricate overhead sign and pole structures at a plant on the Authorized Facility Audit List.
11-3.03B Welding Inspection
Welding inspection personnel or NDT firms to be used in the work must not be employed or compensated
by any subcontractor or by other persons or entities hired by subcontractors who provide other services
or materials for the Contract except for welding performed at a permanent fabrication or manufacturing
plant that is certified under the AISC Quality Certification Program.
The AISC Certification category for overhead sign structures is the Simple Steel Bridge Structures (SBR).
The AISC Certification category for pole structures is the Simple Steel Bridge Structures (SBR) or
Standard for Steel Building Structures (STD).
11-3.03C Submittals
Submit a welding report under section 11-3.02C(3) except submit the welding report 2 business days
before submitting the certificate of compliance.
11-411-9 RESERVED

140

12 TEMPORARY TRAFFIC CONTROL

12-1 GENERAL

12-1.01 GENERAL

Section 12-1 includes general specifications for flagging, placing and installing temporary traffic-handling
equipment and devices, maintaining traffic, placing and installing temporary traffic control systems, and
placing temporary pavement delineation.
Temporary traffic control must comply with part 6, "Temporary Traffic Control," of the California MUTCD.
For the California MUTCD, go to the Department's Web site.
12-1.02 FLAGGERS
Flagging apparel, traffic control devices, and equipment for flaggers must comply with part 6, "Temporary
Traffic Control," of the California MUTCD. Assign flaggers to control traffic and to warn the public of any
dangerous conditions resulting from work activities. Maintain flagging apparel, traffic control devices, and
equipment for flaggers in good repair at all times.
12-1.03 FLAGGING COSTS
You and the State share the cost of furnishing all flaggers, including transporting flaggers and furnishing
stands and towers for flaggers to provide for the passage of traffic through the work as specified in
sections 7-1.03 and 7-1.04. The Department determines the cost under section 9-1.04 and pays you 1/2
of the cost. Furnishing and operating pilot cars if ordered is change order work.
12-2 CONSTRUCTION PROJECT FUNDING SIGNS
Reserved
12-3 TRAFFIC-HANDLING EQUIPMENT AND DEVICES
12-3.01 GENERAL
12-3.01A General
12-3.01A(1) Summary
Section 12-3 includes general specifications for placing, installing, maintaining, repairing, replacing, and
removing traffic-handling equipment and devices.
Perform all layout work necessary to place channelizing devices:
1.
2.
3.
4.

On the proper alignment


Uniformly at the location and spacing shown
Straight on a tangent alignment
On a true arc in a curved alignment

Do not intermix different types of temporary traffic control devices on the same alignment. Types include
plastic drums, portable delineators, channelizers, tubular markers, traffic cones, and Type I and Type II
barricades.
Immediately replace or restore traffic-handling equipment and devices at their original location in an
upright position whenever they are displaced or not in an upright position from any cause.
At your expense, repair or replace traffic-handling equipment and devices damaged from any cause
during the Contract, including repainting if necessary.
Remove traffic-handling equipment and devices from the job site when they are no longer needed for
controlling traffic.
12-3.01A(2) Definitions
Category 1 temporary traffic control devices: Small, lightweight devices weighing less than 100
pounds certified as crashworthy by crash testing or crash testing of similar devices. Category 1
temporary traffic control devices include traffic cones, plastic traffic drums, portable delineators, and
channelizers.
Category 2 temporary traffic control devices: Small, lightweight devices weighing less than 100
pounds that are not expected to produce significant changes in vehicular velocity, but could cause
141

SECTION 12

TEMPORARY TRAFFIC CONTROL

harm to impacting vehicles. Category 2 temporary traffic control devices include barricades and
portable sign supports.
Category 3 temporary traffic control devices: Temporary traffic-handling equipment and devices
weighing 100 pounds or more that are expected to produce significant changes in the vehicular
velocity of impacting vehicles. Category 3 temporary traffic-handling equipment and devices include
crash cushions, impact attenuator vehicles, temporary railing, temporary barrier, and end treatments
for temporary railings and barriers.
hours of darkness: As defined under Veh Code 280.
useable shoulder area: Any longitudinal paved or unpaved contiguous surface adjacent to the traveled
way with:
1. Enough weight-bearing capacity to support traffic control vehicles and equipment, such as flashing
arrow signs, portable changeable message signs, and impact attenuator vehicles
2. Slope not greater than 6:1 (horizontal:vertical)
12-3.01A(3) Submittals
Upon notification submit the following informational submittals:
1. Self-certification for crashworthiness of Category 1 temporary traffic control devices at least 5
business days before starting any work using the devices or within 2 business days after the
notification if the devices are already in use. Either you or the manufacturer must perform the self
certification. Include the following information:
1.1. Date
1.2. Federal Aid number if applicable
1.3. Contract number, district, county, route and post mile of project limits
1.4. Company name of certifying vendor, street address, city, state and zip code
1.5. Printed name, signature and title of certifying person
1.6. Types of Category 1 temporary traffic control devices
2. List of proposed Category 2 temporary traffic control devices at least 5 business days before starting
any work using the devices or within 2 business days after the notification if the devices are already in
use.
Obtain a standard form for self-certification from the Engineer.
Submit a sample of the type of portable delineator that you will be using on the project before placing
portable delineators on the job site.
12-3.01A(4) Quality Control and Assurance
Category 2 temporary traffic control devices must be on the Authorized Material List for acceptable,
crashworthy Category 2 hardware for work zones.
Category 2 temporary traffic control devices must be labeled with the FHWA acceptance letter number
and the name of the manufacturer. The label must be legible and permanently affixed to the traffic control
device by the manufacturer.
Category 3 temporary traffic control devices must be the type shown and on the Authorized Material List
for highway safety features.
Retroreflectivity for the following materials must comply with Table 2A-3, "Minimum Retroreflectivity
Requirements," of the California MUTCD and be on the Authorized Material List for signing and
delineation materials:
1.
2.
3.
4.
5.
6.
7.

Retroreflective sheeting for barricades


Retroreflective bands for portable delineators
Retroreflective sheeting for construction area signs
Retroreflective sheeting for channelizers
Reflectors for Type K temporary railing
Retroreflective cone sleeves
White and orange-colored retroreflective stripes for plastic traffic drums.
142

SECTION 12

TEMPORARY TRAFFIC CONTROL

The following traffic-handling devices must be visible from 1,000 feet during the hours of darkness under
illumination of legal high-beam headlights by persons with 20/20 vision or vision corrected to 20/20:
1. Retroreflective bands on portable delineators
2. Retroreflective sheeting on channelizers
3. Retroreflective cone sleeves on traffic cones
12-3.01B Materials
Not Used
12-3.01C Construction
Furnishing, installing, maintaining, moving, removing traffic control equipment and devices, and
performing lane closures ordered by the Engineer except for providing for public safety and convenience
under section 7 is change order work.
12-3.01D Payment
Not Used
12-3.02 BARRICADES
12-3.02A General
Section 12-3.02 includes specifications for placing barricades.

Do not imprint owner identification on the retroreflective face of any rail.

12-3.02B Materials
Markings for barricade rails must be alternating orange and white retroreflective stripes.
Orange retroreflective sheeting must match color PR no. 6, Highway Orange, of the Federal Highway
Administration's Color Tolerance Chart.
The interface between the rail surface and the retroreflective sheeting must be free of air bubbles or
voids.
The predominant color of barricade components other than the rails must be white or unpainted
galvanized metal or aluminum.
If a Type III barricade is used for a sign support, it must be successfully crash tested under NCHRP
Report 350 criteria as a single unit with an attached sign panel of the size and type used.
Sign panels for construction area signs and marker panels to be mounted on barricades must comply with
section 12-3.06B(2).
12-3.02C Construction
Place barricades so that the stripes slope downward in the direction road users are to pass.

Place sand-filled bags near ground level on the lower parts of the frame or stays to serve as ballast for

the barricades. Do not place ballast on top of barricades or over any retroreflective barricade rail face that

is facing traffic.

Install construction area signs and marker panels on barricades at the locations shown.

Do not remove barricades that are shown to be left in place at the time of project completion.

Moving the barricades from location to location is change order work if ordered after initial placement of

the barricades.

12-3.02D Payment
Payment for barricades described for a traffic control system is not included in the payment for
barricades.

143

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-3.03 FLASHING ARROW SIGNS


12-3.03A General
Section 12-3.03 includes specifications for placing and operating flashing arrow signs.
Flashing arrow signs must comply with the minimum legibility distance shown in the following table:
Legibility Requirements
Min number of
Min legibility
Type
Min size
panel lights
distancea
I
48" x 96"
15
1 mile
II
36" x 72"
13
3/4 mile
a
The minimum legibility distance is the distance that a flashing arrow
sign must be legible at noon on a cloudless day and during the hours
of darkness by persons with 20/20 vision or vision corrected to
20/20.
12-3.03B Materials
Flashing arrow signs must be finished with commercial-quality, flat-black enamel and must be equipped
with yellow or amber lamps that form arrows or arrowheads as required. Each lamp must be provided with
a visor and the lamps must be controlled by an electronic circuit that provides between 30 and 45
complete operating cycles per minute in each of the displays and modes specified. The control must
include provisions for dimming the lamps by reducing the voltage to 50 5 percent for nighttime use.
Type I signs must have both manual and automatic photoelectric-dimming controls. Dimming in both
modes must be continuously variable over the entire dimming range.
Flashing arrow signs must be capable of being operated in the following display modes:
1.
2.
3.
4.

Pass Left Display


Pass Right Display
Simultaneous Display
Caution Display

Flashing arrow signs must be capable of operating in the flashing arrow mode or the sequential mode.
In the flashing arrow mode, all lamps forming the arrowhead and shaft must flash on and off
simultaneously.
In the sequential mode, either arrowheads or arrows must flash sequentially in the direction indicated.
In the simultaneous display mode, the lamps forming both the right and left arrowheads and the lamps
forming the arrow shaft or center 3 lamps for Type I signs must flash simultaneously. For Type II signs,
the lamps forming the right and left arrowhead, but not the center lamp, may be illuminated continuously;
the lamps forming the shaft and the center lamp of the arrowheads must flash on and off simultaneously.
In the caution display mode, a combination of lamps not resembling any other display or mode must flash.
Each flashing arrow sign must be:
1. Mounted on a truck or trailer
2. Capable of operating when the vehicle is moving
3. Capable of being placed and maintained in operation at locations described
The bottom of the flashing arrow sign must be a minimum of 7 feet above the roadway when mounted.
Flashing arrow sign trailers must be equipped with devices so that they can be leveled and plumbed.
Sign trailers must be equipped with a supply of electrical energy capable of operating the sign as
specified in section 12-3.03.

144

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-3.03C Construction
Not Used
12-3.03D Payment
Not Used
12-3.04 PORTABLE DELINEATORS
12-3.04A General
Section 12-3.04 includes specifications for placing portable delineators.
Use only one type of portable delineator on the project.
12-3.04B Materials
Portable delineators, including the base, must be composed of a material that has enough rigidity to
remain upright when unattended and must be flexible or collapsible upon impact by a vehicle. The base
must be shaped to prevent rolling after impact. The base must be anchored or weigh enough to keep the
delineator in an upright position. Comply with the manufacturer's instructions for ballast for portable
delineators.
The vertical portion of portable delineators must be fluorescent orange or predominantly orange. The
posts must be not less than 3 inches in width or diameter. The minimum height must be 36 inches above
the traveled way.
A minimum of 2 white retroreflective bands, each not less than 3 inches wide, must be mounted a
minimum of 1-1/2 inches apart. The lower retroreflective band must be from 2.5 to 3 feet above the
roadway surface.
12-3.04C Construction
Not Used
12-3.04D Payment
Not Used
12-3.05 PORTABLE FLASHING BEACONS
Reserved
12-3.06 CONSTRUCTION AREA SIGNS
12-3.06A General
12-3.06A(1) Summary
Section 12-3.06 includes specifications for placing, installing, maintaining, and removing construction
area signs.
Construction area signs include all temporary signs and object markers required for the direction of traffic
through or within the project limits.
If construction area signs are not shown as stationary-mounted signs or portable signs, you may use
either type.
12-3.06A(2) Definitions
background: Dominant sign color.
legend: All letters, numerals, tildes, bars, arrows, route shields, symbols, logos, borders, artwork, and
miscellaneous characters that are intended to convey specific meanings on traffic signs. The style,
font, size, and spacing of the legend must comply with the Standard Alphabets published in the
FHWA's Standard Highway Signs Book.
12-3.06A(3) Quality Control and Assurance
Construction area signs must be the product of a commercial sign manufacturer.

145

SECTION 12

TEMPORARY TRAFFIC CONTROL

Construction area signs must be visible from 500 feet and legible from 300 feet at noon on a cloudless
day and during the hours of darkness under illumination of legal low-beam headlights by persons with
20/20 vision or vision corrected to 20/20. Fabric sign panels on portable signs are not subject to the
visibility and legibility requirements for headlight illumination during the hours of darkness.
Construction area signs may be new or used. Used signs must have the specified sheeting material and
must comply with section 12-3.01A(4). A significant difference between day and nighttime retroreflective
color is cause for rejecting signs.
12-3.06B Materials
12-3.06B(1) General
Unless the background and legend are shown differently, construction area warning and guide signs must
have a black legend on a retroreflective, fluorescent orange background. W10-1 and W47(CA) advance
warning signs for highway-rail grade crossings must have a black legend on a retroreflective yellow
background.
Construction area signs must have Type III or higher grade retroreflective sheeting.
12-3.06B(2) Stationary-Mounted Signs
Materials for stationary-mounted signs must comply with section 56-2 for the type of panel involved.
Temporary sign supports of any type placed within 15 feet from the edge of the traveled way must comply
with section 12-3.01 for Category 2 temporary traffic control devices.
Post size and number of posts must be as shown. The Engineer determines the post size and number of
posts if the type of sign installation is not shown.
Sign posts must be good, sound wood posts. Wood posts must have the breakaway feature shown.
Fastening hardware and back braces must be commercial-quality materials.
12-3.06B(3) Portable Signs
Each portable sign must consist of a base, standard or framework, and a sign panel. Units delivered to
the job site must be capable of being placed into immediate operation.
Sign panels for portable signs must be one of the following:
1. Sign panels specified for stationary signs
2. Type VI, retroreflective, elastomeric roll-up fabric on the Authorized Material List for signing and
delineation materials
3. Nonretroreflective cotton drill fabric
4. Nonretroreflective flexible industrial nylon fabric
5. Another type of fabric, if authorized
Do not use nonretroreflective portable signs during the hours of darkness. The size, color, and legend for
portable signs must comply with section 12-3.06B(2).
The height above the edge of traveled way to the bottom of the portable sign panel must be at least 1
foot.
12-3.06B(4) Temporary Object Markers
Temporary object markers must be mounted on stationary wood or metal posts as shown and must
comply with section 82.
Marker panels for Type N (CA), Type P (CA), and Type R (CA) object markers must comply with section
12-3.06B(2) for stationary sign panels.
Target plates, posts, and hardware for Type K (CA) and Type L (CA) temporary object markers must
comply with section 82.

146

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-3.06C Construction
12-3.06C(1) General
Place all construction area signs outside of the traveled way. Do not block bicycle and pedestrian
pathways with construction area signs.
Place, install, maintain, and remove temporary object markers shown as construction area signs in the
same way specified for construction area signs.
Maintain accurate information on construction area signs. Immediately replace or correct signs that
convey inaccurate information.
During the progress of work, immediately cover or remove unneeded signs. Check covered signs daily for
damage and immediately replace covers if needed.
Covers for construction area signs must be of sufficient size and density to completely block out the
message so that it is not visible. Securely fasten covers to prevent movement from wind.
Clean all construction area sign panels at the time of installation and at least once every 4 months
thereafter.
Be prepared to furnish additional construction area sign panels, posts and mounting hardware, or
portable sign mounts on short notice due to changing traffic conditions or damage caused by traffic or
other conditions. Maintain an inventory of commonly required items at the job site or make arrangements
with a supplier who is able, on a daily basis, to furnish the items on short notice.
Replace any damaged construction area sign or repair the sign if authorized.
Remove sign panels that exhibit irregular luminance, shadowing, or dark blotches at nighttime under
vehicular headlight illumination at your expense.
12-3.06C(2) Stationary-Mounted Signs
Install stationary-mounted signs as shown for the installation of roadside signs except as follows:
1. Back braces and blocks for sign panels are not required for signs that do not exceed 48 inches in
width or diamond-shaped signs that are not larger than 48 by 48 inches.
2. The height above the edge of traveled way to the bottom of the sign panel must be at least 7 feet.
3. You may install construction area signs on above-ground, temporary platform sign supports or on
existing lighting standards or other supports if authorized. Do not make holes in the standards to
support the sign if installed on existing lighting standards.
4. Post embedment must be 2.5 feet if post holes are backfilled around the posts with PCC produced
from commercial-quality aggregates. The concrete must contain at least 295 pounds of cementitious
material per cubic yard.
Excavate post holes by hand methods without the use of power equipment. You may use power
equipment at locations where you determine that subsurface utilities are not present in the area of the
proposed post holes if authorized. The post hole diameter must be at least 4 inches greater than the
longest cross-sectional dimension of the post if backfilled with PCC.
Furnishing, installing, maintaining, moving, and removing any additional construction area signs if ordered
is change order work.
12-3.06D Payment
Payment for construction area signs described for a traffic control system is not included in the payment
for construction area signs.
12-3.07 CHANNELIZERS
12-3.07A General
Section 12-3.07 includes specifications for placing channelizers.
12-3.07B Materials
Channelizers must be on the Authorized Material List for signing and delineation materials.
147

SECTION 12

TEMPORARY TRAFFIC CONTROL

Channelizer posts must be orange.

Channelizers must be affixed with retroreflective white sheeting, 3 by 12 inches in size.

Channelizer bases must be cemented to the pavement under section 85-1.03 for cementing pavement

markers to the pavement.

12-3.07C Construction
Install channelizers to clean, dry surfaces.
When no longer required for the work, remove the channelizers except those to be left in place and the
underlying adhesive used to cement the channelizer bases to the pavement. Channelizers and adhesive
that you remove become your property.
Do not remove channelizers that are shown to be left in place at the time of project completion.
12-3.07D Payment
Not Used
12-3.08 TYPE K TEMPORARY RAILING
12-3.08A General
12-3.08A(1) Summary
Section 12-3.08 includes specifications for placing, maintaining, repairing, replacing, and removing Type
K temporary railing, including reinforcement, Type P marker panels, reflectors, excavation and backfill,
drilling holes and bonding threaded rods or dowels if required, removing threaded rods or dowels and
filling the drilled holes with mortar, and moving and replacing removable panels as required.
Type K temporary railing must consist of interconnected new or undamaged, used precast concrete
barrier units as shown.
You may have your name or logo on each panel of Type K temporary railing. The name or logo must not
be more than 4 inches in height and must be located not more than 12 inches above the bottom of the rail
panel.
12-3.08A(2) Submittals
Submit a certificate of compliance for new and used Type K temporary railing not cast at the job site.
12-3.08B Materials
12-3.08B(1) General
Paint exposed surfaces of new and used Type K temporary railing with white paint under section 91-4
before placing them on the job site. Repainting of units is change order work if ordered after the units are
in place.
Concrete must comply with the specifications for minor concrete. Load tickets and a certificate of
compliance are not required.
Reinforcing steel must comply with section 52.
Steel bars to receive bolts at ends of concrete panels must comply with ASTM A 36/A 36M. Bolts must
comply with ASTM A 307.
You may substitute a round bar of the same diameter for the end-connecting bolt shown. If a round bar is
used, the round bar must:
1. Comply with ASTM A 36/A 36M
2. Have a minimum length of 26 inches
3. Have a 3-inch diameter by 3/8-inch thick plate welded on the upper end with a 3/16-inch fillet weld
The final surface finish of Type K temporary railing must comply with section 51-1.03F(2).

148

SECTION 12

TEMPORARY TRAFFIC CONTROL

Cure the exposed surfaces of concrete elements by the water method, the forms-in-place method, or the
curing compound method. Comply with section 90-1.03B(3) for curing compound no. 1 if the curing
compound method is used.
12-3.08B(2) Type K Temporary Terminal Section
Reserved
12-3.08C Construction
Place Type K temporary railing on a firm, stable foundation. Grade the foundation to provide a uniform
bearing surface throughout the entire length of the railing.
Structure excavation and structure backfill must comply with section 19-3 except compaction of earth fill
placed behind Type K temporary railing in a curved layout is not required.
Place and maintain abutting ends of precast concrete units in alignment without substantial offset to each
other.
Bond threaded rods or dowels in holes drilled in the existing concrete at the locations shown. Drilling of
holes and bonding of threaded rods or dowels must comply with section 51-1 for bonding dowels. After
you remove Type K temporary railing, remove all threaded rods or dowels to a depth of at least 1 inch
below the surface of the concrete. Fill the resulting holes with mortar under section 51-1, except the
mortar must be cured by the water method or by the curing compound method. Comply with section 83
2.02D(5) for curing concrete barrier if the curing compound method is used.
Install a reflector on top of the rail of each rail unit placed within 10 feet of a traffic lane. Reflectors must
be on the Authorized Material List for signing and delineation materials. The adhesive for mounting the
reflector must comply with the reflector manufacturer's instructions.
Install a Type P marker panel at each end of railing installed adjacent to a 2-lane, 2-way highway and at
the end facing traffic for railing installed adjacent to a 1-way roadbed. If the railing is placed on a skew,
install the marker at the end of the skew nearest the traveled way. Type P marker panels must comply
with section 82, except you must furnish the marker panels.
After you remove Type K temporary railing, restore any area to its previous condition or construct it to its
planned condition where temporary excavation or embankment was used to accommodate the railing.
Whenever the Engineer orders a lateral move of Type K temporary railing and the repositioning is not
shown, the lateral move is change order work and the railing is not measured in the new position.
12-3.08D Payment
Temporary railing (Type K) is measured along the top of the railing.
12-3.09 TELESCOPING FLAG TREES
Telescoping flag trees must be manufactured from commercial-quality material designed for the intended
purpose and capable of maintaining an upright position at all times while in use.
12-3.10 TRAFFIC CONES
Traffic cones must be flexible, fluorescent orange, and be manufactured from commercial-quality material
designed for the intended purpose.
The outer section of the portion above the base of the traffic cone must be translucent and be of a highly
pigmented, fluorescent orange, polyvinyl compound. The overall height of a traffic cone must be at least
28 inches and the bottom inside diameter must be at least 10.5 inches. The base must be anchored or
have enough size and mass to keep the traffic cone in an upright position.
During the hours of darkness, traffic cones must have retroreflective cone sleeves.
Retroreflective cone sleeves must be one of the following types:
1. Removable flexible retroreflective cone sleeves fabricated from retroreflective sheeting at least 13
inches in height, placed a maximum of 3 inches from the top of the cone. Do not use the sleeves
during daylight hours.
149

SECTION 12

TEMPORARY TRAFFIC CONTROL

2. Permanently affixed, semitransparent, retroreflective cone sleeves fabricated from semitransparent,


retroreflective sheeting at least 13 inches in height, placed a maximum of 3 inches from the top of the
cone. You may use traffic cones with semitransparent retroreflective cone sleeves during daylight
hours.
3. Permanently affixed double-band retroreflective cone sleeves consisting of 2 white retroreflective
bands. The top band must be 6 inches in height, placed a maximum of 4 inches from the top of the
cone. The lower band must be 4 inches in height, placed 2 inches below the bottom of the top band.
You may use traffic cones with double-band retroreflective cone sleeves during daylight hours.
Use the same type of retroreflective cone sleeve for all cones used on the project.
12-3.11 PLASTIC TRAFFIC DRUMS
12-3.11A General
12-3.11A(1) Summary
Section 12-3.11 includes specifications for placing and removing plastic traffic drums.
Plastic traffic drums must comply with the manufacturers instructions for weight and ballast.
12-3.11A(2) Definitions
orange-colored: The colors of orange, red-orange, fluorescent orange, or fluorescent red-orange.
12-3.11A(3) Submittals
Submit a certificate of compliance for plastic traffic drums.
12-3.11B Materials
Plastic traffic drums must:
1. Be orange-colored, low-density polyethylene
2. Be flexible and collapsible upon vehicle impact
3. Have a weighted base to maintain an upright position and prevent displacement by passing traffic
The weighted base must:
1.
2.
3.
4.

B
e detachable
Be shaped to prevent rolling upon impact
Have a maximum outside diameter of 38 inches
Have a maximum height above the ground surface of 4 inches

Use the same type and brand of retroreflective sheeting for all plastic traffic drums used on the project.
12-3.11C Construction
Use one type of plastic traffic drum on the project.
Do not use sandbags or comparable ballast.
Plastic traffic drums must be a minimum of 36 inches in height above the traveled way.
Moving plastic traffic drums from location to location if ordered after initial placement is change order
work.
Upon completion of work, plastic traffic drums become your property and must be removed from the job
site.
12-3.11D Payment
Not Used

150

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-3.12 PORTABLE CHANGEABLE MESSAGE SIGNS


12-3.12A General
12-3.12A(1) Summary
Section 12-3.12 includes specifications for placing, operating, maintaining, repairing, replacing,
transporting from location to location, and removing portable changeable message signs.
Each trailer-mounted portable changeable message sign must consist of a controller unit, a power supply,
and a structural support system. The unit must be assembled to form a complete self-contained portable
changeable message sign that can be delivered to the job site and placed into immediate operation. The
sign unit must be capable of operating in an ambient air temperature from -4 to 158 degrees F and must
be unaffected by unauthorized mobile-radio transmissions. The trailer must be equipped so that it can be
leveled and plumbed.
12-3.12A(2) Submittals
Upon notification, submit a certificate of compliance for each portable changeable message sign.
12-3.12A(3) Quality Control and Assurance
Comply with the manufacturer's operating instructions for the portable changeable message sign.
Approaching drivers must be able to read the entire message at least 2 times before passing the portable
changeable message sign at the posted speed limit. Use more than 1 portable changeable message sign
to comply with this requirement if necessary.
12-3.12B Materials
The text displayed on a portable changeable message sign must not scroll or travel horizontally or
vertically across the face of the message panel.
The sign face must be flat black. The sign face must be protected from the glare of the sun by a method
that does not interfere with the clarity of the sign message. The sign must be raised and lowered by
means of a power-driven lifting mechanism.
Matrix signs must provide complete alphanumeric selection.
Matrix-type signs utilizing lamps must be equipped with an automatic-dimming mode that automatically
compensates for the influence of temporary light sources or other abnormal lighting conditions. The sign
must have 3 or more manual dimming modes of different lamp intensities.
During the hours of darkness, matrix signs not utilizing lamps must be either internally or externally
illuminated.
The controller must be an all solid-state unit containing all the necessary circuitry for the storage of at
least 5 preprogrammed messages. The controller must be installed at a location that allows the operator
to perform all functions from a single position. The controller must have a keyboard entry system that
allows the operator to generate an infinite number of additional messages in addition to the
preprogrammed stored messages. The keyboard must be equipped with a security lockout feature to
prevent unauthorized use of the controller.
The controller must contain nonvolatile memory that holds keyboard-created messages in memory during
periods when the power is not activated. The controller must provide for a variable display rate that allows
the operator to match the information display to the speed of approaching traffic. The operator must be
able to adjust the flashing-off time from within the control cabinet.
12-3.12C Construction
Place a portable changeable message sign as far from the traveled way as practicable where it is legible
to approaching traffic without encroaching on the traveled way. At locations where vertical roadway
curvature restricts the sight distance of approaching traffic, place the portable changeable sign on or
before the crest of the curvature where it is most visible to the approaching traffic. At locations where
horizontal roadway curvature restricts the sight distance of approaching traffic, place the portable
changeable message sign at or before the curve where it is most visible to approaching traffic. Where
practicable, place a portable changeable message sign behind guardrail or Type K temporary railing.
151

SECTION 12

TEMPORARY TRAFFIC CONTROL

Except where placed behind guardrail or Type K temporary railing, make a taper consisting of 9 traffic
cones placed 25 feet apart to delineate the location of a portable changeable message sign.
When in full operation, the bottom of a portable changeable message sign must be at least 7 feet above
the ground and the top must be no more than 14.5 feet above the ground.
The sign panel must be capable of displaying a 3-line message with at least 7 characters per line. The
characters must be at least 18 inches in height where the useable shoulder area is at least 15 feet wide.
To prevent encroachment onto the traveled way where the useable shoulder area is less than 15 feet
wide, you may use a smaller message panel with at least 12-inch high characters.
The message displayed on the sign must be visible from a distance of 1,500 feet and must be legible
from a distance of 750 feet at noon on a cloudless day by persons with 20/20 vision or vision corrected to
20/20.
Display only messages shown or ordered.
Repeat the entire message continuously in not more than 2 phases of at least 3 seconds per phase.
You must be available by cell phone during activities that require a portable changeable message sign.
Before starting the activity, submit your cell phone number. Be prepared to change the displayed
message immediately upon notification. You may operate the portable changeable message sign with a
24-hour timer control or remote control if authorized.
After initial placement, move portable changeable message signs from location to location as ordered.
Move unprotected portable changeable message signs to an area at least 15 feet from the edge of the
traveled way or remove them from the job site away from traffic when not in use.
12-3.12D Payment
Not Used
12-3.13 IMPACT ATTENUATOR VEHICLE
Reserved
12-3.14 TEMPORARY TRAFFIC SCREEN
Reserved
12-3.15 TEMPORARY CRASH CUSHION MODULE
12-3.15A General
Section 12-3.15 includes specifications for installing and maintaining sand-filled temporary crash cushion
modules in groupings or arrays. The grouping or array of sand-filled modules must form a complete sand
filled temporary crash cushion as described.
Whenever work activity exposes traffic to a fixed obstacle, protect the traffic from the obstacle with a
sand-filled temporary crash cushion. The crash cushion must be in place before opening traffic lanes
adjacent to the obstacle.
12-3.15B Materials
A sand-filled temporary crash cushion module must be manufactured after March 31, 1997 and be on the
Authorized Material List for highway safety features.
Modules contained in the same grouping or array must be of the same type. The color of the modules
must be standard yellow with black lids as furnished by the manufacturer. The modules must exhibit good
workmanship, free from structural flaws and objectionable surface defects. The modules need not be
new. You may use good, used, undamaged modules. For Fitch modules requiring a seal, the top edge of
the seal must be securely fastened to the wall of the module by a continuous strip of heavy-duty tape.
Fill the modules with sand under the manufacturer's instructions and to the sand capacity in pounds for
each module shown. Sand for filling the modules must be clean, commercial-quality, washed concrete
sand. At the time the sand is placed in the modules, the sand must contain not more than 7 percent water
when tested under California Test 226.
152

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-3.15C Construction
Secure the sand-filled modules in place before commencing a work activity requiring a temporary crash
cushion.
Maintain sand-filled temporary crash cushions in place at each location, including times when work is not
actively in progress. You may remove sand-filled temporary crash cushions during the work period for
access to the work if the exposed fixed obstacle is 15 feet or more from the nearest lane carrying traffic.
Reset the crash cushion before the end of the work period. Remove sand-filled temporary crash cushions
when no longer required.
Immediately repair sand-filled temporary crash cushion modules damaged due to your activities. Remove
and replace any module damaged beyond repair. Repair of temporary crash cushion modules damaged
by traffic is change order work.
You may place sand-filled temporary crash cushion modules on movable pallets or frames complying with
the dimensions shown. The pallets or frames must provide a fullbearing base beneath the modules. Do
not move the modules and supporting pallets or frames by sliding or skidding along the pavement or
bridge deck.
Attach a Type R or Type P marker panel to the front of the temporary crash cushion if the closest point of
the crash cushion array is within 12 feet of the traveled way. Firmly fasten the marker panel to the crash
cushion with commercial quality hardware or by other authorized methods.
Remove sand-filled temporary crash cushion modules, including sand, pallets or frames, and marker
panels, at the time of Contract acceptance. Do not install sand-filled temporary crash cushion modules in
the permanent work.
12-3.15D Payment
The Department does not pay for temporary crash cushion modules placed under section 7-1.04 or
placed in excess of the number described.
A lateral move of temporary crash cushion module is change order work if ordered and the repositioning
is not shown. The Department does not count repositioned modules in the count of temporary crash
cushion modules.
12-3.16 TEMPORARY SIGNAL SYSTEM
Reserved
12-3.17 TEMPORARY FLASHING BEACON SYSTEM
Reserved
12-4 MAINTAINING TRAFFIC
12-4.01 GENERAL
Section 12-4 includes specifications for maintaining traffic through construction workzones.
Closures must comply with section 12-5.
A closure is defined as the closure of a traffic lane or lanes, including shoulder, ramp, or connector lanes,
within a single traffic control system.
Wherever local authorities regulate traffic, notify the local authorities at least 5 business days before the
start of work. Cooperate with the local authorities to handle traffic through the work area and to make
arrangements to keep the work area clear of parked vehicles.
12-4.02 CLOSURE REQUIREMENTS
12-4.02A General
Limit work that interferes with traffic to the hours closures are allowed.
If complete ramp closure hours and ramp lane requirements are not included, you may close the ramp
adjacent to the closed freeway lane.

153

SECTION 12

TEMPORARY TRAFFIC CONTROL

Adjacent ramps in the same direction of travel servicing 2 consecutive local streets must not be closed
simultaneously, unless directed by the Engineer.
Use the signs as shown in the following table:
Sign no.
C43(CA)

Sign description
Fresh Concrete

SC6-3(CA)
SC6-4(CA)

Ramp Closed

Condition
Use at the beginning of a pavement slab replacement work area and
keep the sign in place throughout the curing period.
Use to inform motorists that a connector, entrance ramp, or exit
ramp will be closed for (1) 1 business day and use sign SC6-3(CA)
or (2) more than 1 business day and use sign SC6-4(CA). Notify the
Engineer at least 2 business days before installing the sign and
install the sign 7 to 15 days before the closure.

Freeways may be closed only if signed for closing 7 days in advance. Notify the Engineer at least 5
business days before signing the freeway. If the freeway is not closed on the posted day, change the
closure to allow a 3-business-day advance notice before closure.
If a minor deviation from the lane requirement charts is required, submit a request. If no significant
increase in cost is accrued to the Department and the work can be expedited and better serve the traffic,
the deviation may be authorized.
If pedestrian traffic is allowed to pass through construction areas, provide a pedestrian access facility
through the construction areas within the highway. The walkway must:
1. Be surfaced with HMA, PCC, or timber.
2. Be skid resistant and free of irregularities.
3. Include hand railings on each side of the walkway as necessary to protect pedestrian traffic from
hazards caused by construction activities or adjacent vehicular traffic. Railing must be made of wood,
S4S, and painted white.
4. Include protective overhead covering as necessary to insure protection from falling objects and drips
from overhead structures.
At locations where pedestrian openings through falsework are required, provide pedestrian access
facilities during all bridge construction activities. If an activity requires a closure of a walkway, another
walkway must be made available nearby off of the traveled way.
Maintain railings and walkways in good condition and keep walkways clear of obstructions.
Erect and remove falsework 1 location at a time. During falsework erection and removal, detour or stop
traffic in the lanes over which falsework is erected or removed as specified. Falsework erection includes
adjustments or removal of components that contribute to the horizontal stability of the falsework system.
Falsework removal includes lowering the falsework, blowing sand from sand jacks, turning screws on
screw jacks, and removing wedges.
If falsework pavement lighting or pedestrian openings through the falsework are required, falsework
lighting must be installed under section 86-6.13.
Payment for providing pedestrian facilities is included in the payment for the bid items involved.
12-4.02B Seal Coats
On the days that lane closures are not allowed, moving lane closures are allowed to maintain the seal
coat surface as specified in section 37-2.03I. Lane closures to maintain the seal coat surface must be
restricted to daylight hours when traffic will be least inconvenienced and delayed as determined by the
Engineer.
If traffic is routed over a surface where a seal coat application is intended, the seal coat must not be
applied to more than half the width of the traveled way at a time and the remaining width must be kept
free of obstructions and open to traffic until the previously applied width is ready for traffic use.

154

SECTION 12

TEMPORARY TRAFFIC CONTROL

Pilot cars used to convoy or control traffic must have radio contact with other pilot cars and personnel in
the work area. The maximum speed of the pilot cars convoying or controlling traffic through the traffic
control zone must be 15 mph on 2-lane, 2-way roadways and 25 mph on multilane divided and undivided
roadways. Pilot cars must only use traffic lanes open to traffic.
On 2-lane, 2-way roadways, place W8-7, "Loose Gravel," and W13-1 (35) speed advisory signs at
maximum 2,000-foot intervals along each side of the traveled way where screenings are spread on a
traffic lane and at public roads or streets entering the seal coat area. Place the 1st W8-7 sign in each
direction where traffic first encounters loose screenings, regardless of which lane the screenings are
spread. A W13-1 (35) sign is not required where the posted speed limit is less than 40 mph.
On freeways, expressways, and multilane conventional highways, place W8-7, "Loose Gravel," and W13
1 (35) speed advisory signs at maximum 2,000-foot intervals along the outside edge of the traveled way
nearest to the lane worked on, at on ramps, and at public roads or streets entering the seal coat area.
Place the 1st W8-7 sign where the screenings start with respect to the direction of travel on that lane. A
W13-1 (35) sign is not required where the posted speed limit is less than 40 mph.
Maintain signs in place at each location until the final brooming of the seal coat surface for that location is
complete. Signs may be set on temporary portable supports with the W13-1 sign below the W8-7 sign or
on barricades with the W13-1 sign alternating with the W8-7 sign.
Payment for furnishing and using pilot cars to reduce the speed of traffic and convoy or control traffic, as
specified, is included in the payment for the bid items involved unless a bid item for traffic control system
is included in the Bid Item List.
12-4.02C Bridge Painting and Cleaning
In addition to the signs shown, furnish and place the signs shown in the following table:
Sign
no.
W20-1

Sign description
Road Work Ahead

Cleaning and
Painting Operations

Requirements
Place a portable 30 by 30 inch sign at locations where traffic
approaches a bridge with work underway. If the approach speed is
greater than 50 mph, the size of the sign must be 48 by 48 inches. The
sign panel base material must not be plywood. Attach an orange or
fluorescent red-orange flag not less than a 16-inch square to each
sign. The exact location of the signs will be determined by the
Engineer. Signs must not be used until needed. Maintain signs in
place while cleaning and painting operations are performed and
remove at the end of each day's work.
Place a 48 by 48 inch square sign near each W20-1 sign. Use 4-inch
high black lettering and include your name, address, and telephone
number on an orange background. Maintain the sign in place while
cleaning and painting operations are performed and remove at the end
of each day's work.

At the end of each day's work, when activities are not in progress, remove obstructions and leave the
roadway clear and unobstructed to allow free passage for traffic. Remove blast cleaning residue from the
traveled way before opening the area to traffic.
You may lay supply lines along the top of curbs adjacent to railing posts if the lines do not interfere with
traffic. Remove the lines when work is not in progress.
12-4.02D Toll Bridges
Reserved
12-4.03 CLOSURE SCHEDULE AND CONDITIONS
Every Monday by noon, submit a schedule of planned closures for the next week period. The next week
period is defined as Sunday noon through the following Sunday noon.

155

SECTION 12

TEMPORARY TRAFFIC CONTROL

Submit a schedule not less than 25 days and not more than 125 days before the anticipated start of any
activity that will:
1. Reduce the horizontal clearances of traveled ways, including shoulders, to 2 lanes or less due to
operations such as temporary barrier placement and paving
2. Reduce the vertical clearances available to the public due to operations such as pavement overlay,
overhead sign installation, or falsework or girder erection
Use the closure schedule request form from the Engineer and show the locations and times of the
proposed closures. Closure schedules submitted with incomplete or inaccurate information will be
rejected and returned for correction and resubmittal. You will be notified of unauthorized closures or
closures that require coordination with other parties as a condition of approval.
Submit closure schedule amendments, including adding additional closures, by noon at least 3 business
days before a planned closure. Approval of amendments will be at the discretion of the Engineer.
The Engineer must be notified of a cancelled closure 2 business days before the date of the closure.
The Engineer may reschedule a closure cancelled due to unsuitable weather.
A detailed contingency plan must be prepared for reopening closures to traffic. The contingency plan
must be submitted within 1 business day of the Engineer's request.
If a closure is not reopened to traffic by the specified time, work must be suspended. No further closures
are allowed until the Engineer has reviewed and accepted a work plan submitted by you that insures that
future closures will be reopened to traffic at the specified time. Allow the Department 2 business days to
review your proposed work plan. You are not entitled to compensation for the suspension of work
resulting from the late reopening of closures.
Notify the Engineer of delays in your activities caused by:
1. Your proposed closure schedule being denied although your planned closures are within the time
frame allowed for closures as specified in the special provisions. You will not be entitled to
compensation for amendments to the closure schedule that are not authorized.
2. Your confirmed closure being denied.
If in the opinion of the Engineer your controlling activities are delayed or interfered with by reason of the
conditions listed above and your loss due to that delay could not have been avoided by rescheduling the
affected closure or by judicious handling of forces, equipment and plant, you will be compensated for the
delay.
If you are directed to remove a closure before the time designated in the authorized closure schedule,
you will be compensated for the delay.
12-4.04 LANE CLOSURE RESTRICTIONS FOR DESIGNATED HOLIDAYS AND SPECIAL DAYS
Reserved
12-4.05 LANE REQUIREMENT CHARTS
12-4.05A General
Reserved
12-4.05B Freeway and Expressway Lane Requirements
Reserved
12-4.05C Complete Freeway and Expressway Closure Hours
Reserved
12-4.05D Complete Connector Closure Hours and Connector Lane Requirements
Reserved
12-4.05E Complete Ramp Closure Hours and Ramp Lane Requirements
Reserved
156

SECTION 12

TEMPORARY TRAFFIC CONTROL

12-4.05F Conventional Highway Lane Requirements


Reserved
12-4.05G Complete Conventional Highway Closure Hours
Reserved
12-4.05H Reserved
12-4.05I Reserved
12-5 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE
Reserved
12-6 TRAFFIC CONTROL SYSTEM FOR RAMP CLOSURE
12-6.01 GENERAL
Section 12-6 includes specifications for closing ramps. A traffic control system for a ramp closure must
comply with the details shown.
12-6.02 MATERIALS
Use a SC6-3(CA) "Ramp Closed" sign to inform motorists of a temporary closing of a freeway or an
expressway entrance or an exit ramp for 1 day or less.
Use a SC6-4(CA) "Ramp Closed" sign to inform motorists of a temporary closing of a freeway or an
expressway entrance or an exit ramp for more than 1 day.
12-6.03 CONSTRUCTION
Close ramps at the times and locations specified in section 12-4.
Install a SC6-3(CA) or a SC6-4(CA) sign, whichever is applicable, at least 7 days before closing a ramp
but not more than 14 days in advance of the ramp closure. Notify the Engineer at least 2 business days
before installing a SC6-3(CA) or SC6-4(CA) sign. The SC6-3(CA) or SC6-4(CA) sign must be stationary
mounted at the locations shown and must remain in place and visible to motorists during the ramp
closure.
Whenever components of the traffic control system are displaced or cease to operate or function as
specified from any cause, immediately repair the components to the original condition or replace the
components and restore the components to the original location.
For a ramp closure made only for the work period, remove the components of the traffic control system
from the traveled way and shoulder, except for portable delineators placed along open trenches or
excavation adjacent to the traveled way at the end of each work period. You may store the components at
selected central locations designated by the Engineer within the limits of the highway.
Maintain accurate and timely information on the SC6-3(CA) or SC6-4(CA) sign. Immediately update the
sign message when the information becomes outdated. Cover or remove a SC6-3(CA) or SC6-4(CA) sign
when it is no longer required.
12-6.04 PAYMENT
Traffic control system for ramp closure is paid for as traffic control system.
12-7 TEMPORARY PEDESTRIAN WALKWAYS
12-7.01 GENERAL
Section 12-7 includes specifications for constructing temporary pedestrian walkways.
Provide temporary pedestrian access through work areas within the highway.
In addition to the required openings through falsework, provide temporary pedestrian access during pile
driving, footing, wall, and other bridge work activities. At least 1 walkway must be available at all times. If
work activities require the closure of the walkway, provide another walkway nearby, off the traveled way.
12-7.02 MATERIALS
Railings for a temporary pedestrian walkway must be S4S lumber and painted white.
157

SECTION 12

TEMPORARY TRAFFIC CONTROL

The walkway must be surfaced with HMA, portland cement concrete, or wood. The surface must be skid
resistant and free of irregularities.
Maintain railings and walkways in good condition. Keep walkways clear of obstructions.
12-7.03 CONSTRUCTION
Construct a hand railing on each side of a temporary pedestrian walkway as necessary to protect
pedestrian traffic from hazards due to work activities or adjacent vehicular traffic.
Construct a protective overhead covering as necessary to protect pedestrians from falling objects and
drippings from overhead structures.
12-7.04 PAYMENT
Not Used
12-8 TEMPORARY PAVEMENT DELINEATION
Reserved

158

13 WATER POLLUTION CONTROL

13-1 GENERAL

13-1.01 GENERAL
13-1.01A Summary
Section 13-1 includes general specifications for preventing, controlling, and abating water pollution in
streams, waterways, and other bodies of water.
Information on forms, reports, and other documents can be found in the following Department manuals:
1. Field Guide for Construction Site Dewatering
2. Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP)
Preparation Manual
3. Construction Site Best Management Practices (BMP) Manual
4. Construction Site Monitoring Program (CSMP) Guidance Manual
For the above-referenced manuals, go to the Department's Web site for the Division of Construction,
Storm Water and Water Pollution Control Information or the Department's publication distribution unit.
Do not start job site activities until:
1. The WPCP or SWPPP is authorized.
2. The waste discharge identification number is issued if the project requires a SWPPP.
3. WPCP or SWPPP review requirements have been fulfilled. If the RWQCB requires time for review,
allow 30 days for the review. For projects in the Lake Tahoe Hydrologic Unit and the Mammoth Lakes
Hydrologic Unit, the Lahontan RWQCB will review the WPCP or SWPPP.
If you operate a Contractor-support facility, protect stormwater systems or receiving waters from the
discharge of potential pollutants by using water pollution control practices.
Contractor-support facilities include:
1.
2.
3.
4.
5.
6.

Staging areas
Storage yards for equipment and materials
M
obile operations
Batch plants for PCC and HMA
Crushing plants for rock and aggregate
Other facilities installed for your convenience, such as haul roads

Discharges from manufacturing facilities, such as batch plants and crushing plants, must comply with the
general waste discharge requirements for Order No. 97-03-DWQ, NPDES General Permit No.
CAS000001, issued by the State Water Resources Control Board for "Discharge of Storm Water
Associated with Industrial Activities Excluding Construction Activities" and referred to herein as "General
Industrial Permit." For the General Industrial Permit, go to the Web site for the State Water Resources
Control Board.
If you operate a batch plant to manufacture PCC, HMA, or other material or a crushing plant to produce
rock or aggregate, obtain coverage under the General Industrial Permit. You must be covered under the
General Industrial Permit for batch plants and crushing plants located:
1. Outside of the job site
2. Within the job site that serve 1 or more contracts
If you obtain or dispose of material at a noncommercially operated borrow or disposal site, prevent water
pollution due to erosion at the site during and after completion of your activities. Upon completion of your
work, leave the site in a condition such that water will not collect or stand therein.
The Department does not pay for water pollution control practices at Contractor-support facilities and
noncommercially operated borrow or disposal sites.
13-1.01B Definitions
active area: Area where soil-disturbing work activities have occurred at least once within 15 days.
159

SECTION 13

WATER POLLUTION CONTROL

construction phase: Includes (1) highway construction phase for building roads and structures, (2) plant
establishment and maintenance phase for placing vegetation for final stabilization, and (3)
suspension phase for suspension of work activities or winter shutdown. The construction phase
continues from the start of work activities to Contract acceptance.
inactive area: Area where soil-disturbing work activities have not occurred within 15 days.
normal working hours: Hours you normally work on the project.
qualifying rain event: Storm that produces at least 0.5 inch of precipitation with a 48-hour or greater
period between rain events.
storm event: Storm that produces or is forecasted to produce at least 0.10 inch of precipitation within a
24-hour period.
13-1.01C Submittals
Within 48 hours after the conclusion of a storm event resulting in a discharge, after a nonstormwater
discharge, or after receiving a written notice or an order from the RWQCB or another regulatory agency,
the WPC manager must submit the following information:
1.
2.
3.
4.

Date, time, location, and nature of the activity and the cause of the notice or order
Type and quantity of discharge
Water pollution control practices in use before the discharge or before receiving the notice or order
Description of water pollution control practices and corrective actions taken to manage the discharge
or cause of the notice

Submit water pollution control training records for all employees and subcontractors who will be working
at the job site as an informational submittal. Include the training subjects, training dates, ongoing training,
and tailgate meetings with your submittal. Submit records for:
1. Existing employees within 5 business days of obtaining SWPPP or WPCP authorization
2. New employees within 5 business days of receiving the training
3. Subcontractor's employees at least 5 business days before a subcontractor starts work
At least 5 business days before operating any Contractor-support facility, submit:
1. A plan showing the location and quantity of water pollution control practices associated with the
Contractor-support facility
2. A copy of the notice of intent approved by the RWQCB and the WPCP or SWPPP approved by the
RWQCB if you will be operating a batch plant or a crushing plant under the General Industrial Permit
13-1.01D Quality Control and Assurance
13-1.01D(1) General
Reserved
13-1.01D(2) Training
Employees must receive initial water pollution control training before starting work at the job site.
For your project managers, supervisory personnel, subcontractors, and employees involved in water
pollution control work:
1. Provide stormwater training in the following subjects:
1.1. Water pollution control rules and regulations
1.2. Implementation and maintenance for:
1.2.1. Temporary soil stabilization
1.2.2. Temporary sediment control
1.2.3. Tracking control
1.2.4. Wind erosion control
1.2.5. Material pollution prevention and control
1.2.6. Waste management
1.2.7. Nonstormwater management
160

SECTION 13

WATER POLLUTION CONTROL

2. Conduct weekly training meetings covering:


2.1. Deficiencies and corrective actions for water pollution control practices
2.2. Water pollution control practices required for work activities during the week
2.3. Spill prevention and control
2.4. Material delivery, storage, usage, and disposal
2.5. W
aste management
2.6. Nonstormwater management procedures
Training for personnel who collect water quality samples must include:
1. CSMP review
2. Health and safety review
3. S
ampling simulations
13-1.01D(3) Water Pollution Control Manager
13-1.01D(3)(a) General
The WPC manager must be a QSP if the project requires a WPCP. The WPC manager must be a QSD if
the project requires a SWPPP.
Assign 1 WPC manager to implement the WPCP or SWPPP, whichever is applicable for the project.
13-1.01D(3)(b) Qualifications
The QSD must:
1. Have completed the stormwater management training described in the Department's Web site for the
Division of Construction, Storm Water and Water Pollution Control Information
2. Be registered or certified for at least one of the following:
2.1. California registered civil engineer
2.2. C
alifornia registered professional geologist or engineering geologist
2.3. California licensed landscape architect
2.4. Professional hydrologist registered through the American Institute of Hydrology
2.5. Certified Professional in Erosion and Sediment Control (CPESC) registered through Enviro
Cert International, Inc.
2.6. Certified Professional in Storm Water Quality (CPSWQ) registered through Enviro Cert
International, Inc.
2.7. Professional in erosion and sediment control registered through the National Institute for
Certification in Engineering Technologies (NICET)
The QSP must comply with the qualifications for a QSD or must:
1. Have completed the storm water management training described in the Department's Web site for the
Division of Construction, Storm Water and Water Pollution Control Information
2. Be certified for at least one of the following:
2.1. Certified Erosion, Sediment and Storm Water Inspector (CESSWI) registered through Enviro
Cert International, Inc.
2.2. Certified Inspector of Sediment and Erosion Control (CISEC) registered through CISEC, Inc.
13-1.01D(3)(c) Responsibilities
The WPC manager must:
1. Be responsible for water pollution control work
2. Be the primary contact for water pollution control work
3. Oversee:
3.1. Maintenance of water pollution control practices
3.2. Inspections of water pollution control practices identified in the SWPPP or WPCP
3.3. Inspections and reports for visual monitoring
3.4. Preparation and implementation of REAPs
3.5. Sampling and analysis
3.6. Preparation and submittal of:
3.6.1. NAL exceedance reports
161

SECTION 13

4.
5.
6.
7.
8.
9.
10.

WATER POLLUTION CONTROL

3.6.2. NEL violation reports


3.6.3. SWPPP annual certification
3.6.4. Annual reports
3.6.5. BMP status reports
Oversee and enforce hazardous waste management practices under section 14-11, including spill
prevention and control measures
Have authority to mobilize crews to make immediate repairs to water pollution control practices
Ensure that all employees have current water pollution control training
Implement the authorized SWPPP or WPCP
Amend the SWPPP or WPCP if required
Be at the job site within 2 hours of being contacted
Have the authority to stop construction activities damaging water pollution control practices or
causing water pollution

13-1.01D(4)13-1.01D(6) Reserved
13-1.02 MATERIALS
Not Used
13-1.03 CONSTRUCTION
13-1.03A General
Install facilities and devices used for water pollution control practices before performing work activities.
Install soil stabilization materials for water pollution control practices in all work areas that are inactive or
before storm events.
Repair or replace water pollution control practices within 24 hours of discovering any damage, unless a
longer period is authorized.
The Department does not pay for the cleanup, repair, removal, disposal, or replacement of water pollution
control practices due to improper installation or your negligence.
You may request changes to the water pollution control work or the Engineer may order changes to water
pollution control work. Changes may include additional or new water pollution control practices. Additional
water pollution control work is change order work.
Retain a printed copy of the authorized WPCP or SWPPP at the job site.
13-1.03B Monitoring
Monitor the National Weather Service's forecast on a daily basis. For the National Weather Service's
forecast, go to the Web site for the National Weather Service.
13-1.03C Inspections
Use the Stormwater Site Inspection Report form for documenting site inspections.
The WPC manager must oversee:
1. Inspections of water pollution control practices identified in SWPPP or WPCP:
1.1. Before a forecasted storm event
1.2. After a qualifying rain event that produces site runoff
1.3. At 24-hour intervals during extended storm events
1.4. On a predetermined schedule of at least once a week
2. Daily inspections of:
2.1. Storage areas for hazardous materials and waste under section 14-11
2.2. Hazardous waste disposal and transporting activities under section 14-11
2.3. Hazardous material delivery and storage activities
3. I nspections of:
3.1. Vehicle and equipment cleaning facilities:
3.1.1. Daily if vehicle and equipment cleaning occurs daily
3.1.2. Weekly if vehicle and equipment cleaning does not occur daily
3.2. Vehicle and equipment maintenance and fueling areas:
3.2.1. Daily if vehicle and equipment maintenance and fueling occurs daily
162

SECTION 13

WATER POLLUTION CONTROL

3.2.2. Weekly if vehicle and equipment maintenance and fueling does not occur daily
3.3. Vehicles and equipment at the job site for leaks and spills on a daily schedule. Verify that
operators are inspecting vehicles and equipment each day of use.
3.4. Demolition sites within 50 feet of storm drain systems and receiving waters daily.
3.5. Pile driving areas for leaks and spills:
3.5.1. Daily if pile driving occurs daily
3.5.2. Weekly if pile driving does not occur daily
3.6. Temporary concrete washouts:
3.6.1. Daily if concrete work occurs daily
3.6.2. Weekly if concrete work does not occur daily
3.7. Paved roads at job site access points for street sweeping:
3.7.1. Daily if earthwork and other sediment or debris-generating activities occur daily
3.7.2. Weekly if earthwork and other sediment or debris-generating activities do not occur
daily
3.7.3. Within 24 hours of precipitation forecasted by the National Weather Service
3.8. D
ewatering work:
3.8.1. Daily if dewatering work occurs daily
3.8.2. Weekly if dewatering work does not occur daily
3.9. Temporary active treatment system:
3.9.1. Daily if temporary active treatment system activities occur daily
3.9.2. Weekly if temporary active treatment system activities do not occur daily
3.10. Work over water:
3.10.1. Daily if work over water occurs daily
3.10.2. Weekly if work over water does not occur daily
13-1.03D Deficiencies
Whenever you or the Engineer identify a deficiency in the implementation of the authorized WPCP or
SWPPP, correct the deficiency:
1. Immediately, unless a later date is authorized
2. Before precipitation occurs
The Department may correct the deficiency and deduct the cost of correcting the deficiency from payment
if you fail to correct the deficiency by the agreed date or before the onset of precipitation.
13-1.03E13-1.03G Reserved
13-1.04 PAYMENT
Not Used
13-2 WATER POLLUTION CONTROL PROGRAM
13-2.01 GENERAL
13-2.01A Summary
Section 13-2 includes specifications for developing and implementing a WPCP for projects where soil
disturbance from work activities will be one of the following:
1. Less than 1 acre
2. Less than 5 acres if the project has an Environmental Protection Agency Small Construction Project
Erosivity Waiver referred to herein as "Erosivity Waiver"
Prepare water pollution control program includes developing and implementing the WPCP, providing a
WPC manager, conducting water pollution control training, and monitoring, inspecting and correcting
water pollution control practices.
You may assign a QSP other than the WPC manager to develop the WPCP.
13-2.01B Submittals
Within 7 days after Contract approval:

163

SECTION 13

WATER POLLUTION CONTROL

1. Submit 2 copies of your WPCP for review. The Engineer provides comments and specifies the date
when the review stopped if revisions are required.
2. Resubmit a revised WPCP within 7 days of receiving the Engineer's comments. The Department's
review resumes when the complete WPCP has been resubmitted.
3. When the Engineer authorizes the WPCP, submit an electronic copy and 3 printed copies of the
authorized WPCP.
4. If the RWQCB requires review of the authorized WPCP, the Engineer submits the authorized WPCP
to the RWQCB for its review and comment.
5. If the Engineer orders changes to the WPCP based on the RWQCB's comments, amend the WPCP
within 3 business days.
The WPCP must comply with the Department's Storm Water Pollution Prevention Plan (SWPPP) and
Water Pollution Control Plan (WPCP) Preparation Manual and must:
1. Show the location of disturbed soil areas, water bodies, and water conveyances
2. Describe the work involved in the installation, maintenance, repair, and removal of temporary water
pollution control practices
3. Show the locations and types of water pollution control practices that will be used for:
3.1. Stormwater and nonstormwater in areas outside the job site but related to work activities,
including:
3.1.1. Staging areas
3.1.2. Storage yards
3.1.3. Access roads
3.2. Activities or mobile activities related to all NPDES permits
3.3. C
ontractor-support facilities
4. Show the locations and types of temporary water pollution control practices that will be used in the
work for each construction phase
5. Show the locations and types of water pollution control practices that will be installed permanently
under the Contract
6. Include a schedule showing when:
6.1. Work activities will be performed that could cause the discharge of pollutants into stormwater
6.2. Water pollution control practices associated with each construction phase will be implemented
6.3. Soil stabilization and sediment control practices for disturbed soil areas will be implemented
7. Include a copy of permits obtained by the Department, including Fish & Game permits, US Army
Corps of Engineers permits, RWQCB 401 certifications, aerially deposited lead variance from the
Department of Toxic Substance Control, aerially deposited lead variance notification, and RWQCB
waste discharge requirements for aerially deposited lead reuse
Amend the WPCP whenever:
1.
2.
3.
4.
5.
6.

Changes in work activities could affect the discharge of pollutants


Water pollution control practices are added by change order work
Water pollution control practices are added at your discretion
Changes in the quantity of disturbed soil are substantial
Objectives for reducing or eliminating pollutants in stormwater discharges have not been achieved
Project receives a written notice or order from the RWQCB or any other regulatory agency

Allow the same review time for amendments to the WPCP as for the original WPCP.
13-2.02 MATERIALS
Not Used
13-2.03 CONSTRUCTION
Manage work activities in a way that reduces the discharge of pollutants to surface waters, groundwater,
and separate municipal storm sewer systems.
Monitor and inspect water pollution control practices at the job site.
Notify the Engineer within 6 hours whenever any of the following occurs:

164

SECTION 13

WATER POLLUTION CONTROL

1. You identify discharges into receiving waters or drainage systems that are causing or could cause
water pollution
2. You receive a written notice or order for the project from the RWQCB or any other regulatory agency
Continue WPCP implementation during any suspension of work activities.
You are responsible for delays and you must pay all costs associated with submitting a SWPPP due to
your actions that result in one of the following:
1. 1 or more acres of soil disturbance on projects without an Erosivity Waiver
2. More than 5 acres of soil disturbance on projects with an Erosivity Waiver
3. Failure to comply with the schedule for soil disturbing activities for projects with an Erosivity Waiver if
the delays void the Erosivity Waiver
13-2.04 PAYMENT
The Department pays you for prepare water pollution control program as follows:
1. A total of 75 percent of the item total upon authorization of the WPCP
2. A total of 100 percent of the item total upon Contract acceptance
13-3 STORM WATER POLLUTION PREVENTION PLAN
13-3.01 GENERAL
13-3.01A Summary
Section 13-3 includes specifications for developing and implementing a SWPPP for projects where soil
disturbance from work activities will be 1 or more acres.
Prepare storm water pollution prevention plan includes developing and implementing the SWPPP,
providing a WPC manager, conducting water pollution control training, and monitoring, inspecting, and
correcting water pollution control practices.
You may assign a QSD other than the WPC manager to develop the SWPPP.
Discharges of stormwater from the project must comply with NPDES General Permit for Storm Water
Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ,
NPDES No. CAS000002) referred to herein as "Permit."
Whenever a qualifying rain event produces runoff for a risk level 2 or risk level 3 project, sampling and
analysis work must comply with the project's CSMP.
A storm water annual report must cover the preceding period from July 1st to June 30th.
13-3.01B Submittals
13-3.01B(1) General
Reserved
13-3.01B(2) Storm Water Pollution Prevention Plan
13-3.01B(2)(a) General
Within 20 days of Contract approval:
1. Submit 3 copies of your SWPPP for review. Allow 20 days for the Department's review. The Engineer
provides comments and specifies the date when the review stopped if revisions are required.
2. Change and resubmit a revised SWPPP within 15 days of receiving the Engineer's comments. The
Department's review resumes when a complete SWPPP has been resubmitted.
3. When the Engineer authorizes the SWPPP, submit an electronic copy and 4 printed copies of the
authorized SWPPP.
4. If the RWQCB requires review of the authorized SWPPP, the Engineer submits the authorized
SWPPP to the RWQCB for its review and comment.
5. If the Engineer requests changes to the SWPPP based on the RWQCB's comments, amend the
SWPPP within 10 days.

165

SECTION 13

WATER POLLUTION CONTROL

The SWPPP must comply with the Department's Storm Water Pollution Prevention Plan (SWPPP) and
Water Pollution Control Plan (WPCP) Preparation Manual. Include the following in the SWPPP:
1. Description of the work involved in the installation, maintenance, repair, and removal of temporary
and permanent water pollution control practices.
2. Maps showing:
2.1. Locations of disturbed soil areas
2.2. Water bodies and conveyances
2.3. Locations and types of water pollution control practices that will be used for each Contractor
support facility:
2.4. Locations and types of temporary water pollution control practices that will be used in the work
for each construction phase
2.5. Locations and types of water pollution control practices that will be installed permanently under
the Contract
2.6. Pollutant sampling locations
2.7. Locations planned for storage and use of potential nonvisible pollutants
2.8. Receiving water sampling locations
3. CSMP
4. Copy of permits obtained by the Department, including Fish & Game permits, US Army Corps of
Engineers permits, RWQCB 401 certifications, aerially deposited lead variance from the Department
of Toxic Substance Control, aerially deposited lead variance notification, and RWQCB waste
discharge requirements for aerially deposited lead reuse.
Include the following items in the SWPPP:
1. For all projects:
1.1. Schedule
1.2. CSMP
2. For risk level 2 projects add:
2.1. Adherence to effluent standards for NALs
2.2. R
EAP
3. For risk level 3 projects add:
3.1. Adherence to effluent standards for NALs and NELs
3.2. R
EAP
The SWPPP schedule must show when:
1. Work activities will be performed that could cause the discharge of pollutants into stormwater
2. Water pollution control practices associated with each construction phase will be implemented
3. Soil stabilization and sediment control practices for disturbed soil areas will be implemented
Amend and resubmit the SWPPP:
1. Annually before July 15th
2. Whenever:
2.1. Changes in work activities could affect the discharge of pollutants
2.2. Water pollution control practices are added by change order work
2.3. Water pollution control practices are added at your discretion
2.4. Changes in the quantity of disturbed soil are substantial
2.5. Objectives for reducing or eliminating pollutants in stormwater discharges have not been
achieved
2.6. You receive a written notice of a permit violation for the project from the RWQCB or any other
regulatory agency
Allow the same review time for amendments to the SWPPP as for the original SWPPP.
13-3.01B(2)(b) Construction Site Monitoring Program
A QSD must prepare the CSMP. Change the program to reflect current job site activities as needed. The
CSMP must include the following:
1. For all projects:
166

SECTION 13

WATER POLLUTION CONTROL

1.1. Visual monitoring procedures


1.2. SAP for nonvisible pollutants
1.3. SAP for nonstormwater discharges
1.4. SAP for monitoring required by RWQCB
2. For risk level 2 projects add:
2.1. SAP for pH and turbidity
3. For risk level 3 projects add:
3.1. SAP for pH and turbidity
3.2. SAP for temporary active treatment systems
13-3.01B(2)(c) Sampling and Analysis Plan
The SAP must comply with the Department's Construction Site Monitoring Program (CSMP) Guidance
Manual.
Describe the following water quality sampling procedures in the SAP:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

S
ampling equipment
Sample preparation
Collection
Field measurement methods
Analytical methods
Quality assurance and quality control
Sample preservation and labeling
C
ollection documentation
S
ample shipping
Chain of custody
Data management and reporting
Precautions from the construction site health and safety plan
Laboratory selection and certifications

The SAP must identify the State-certified laboratory, sample containers, preservation requirements,
holding times, and analytical method. For a list of State-certified laboratories go to the CDPH Web site.
Include procedures for sample collection during precipitation.
List conditions when you will not be required to physically collect samples such as:
1. D
angerous weather
2. Flooding or electrical storms
3. Times outside of normal working hours
Amend the SAP whenever discharges or sampling locations change because of changed work activities
or knowledge of site conditions.
Include procedures for collecting and analyzing at least 3 samples for each day of each qualifying rain
event for a risk level 2 or risk level 3 project. Describe the collection of effluent samples at all locations
where the stormwater is discharged off-site.
13-3.01B(2)(d) Sampling and Analysis Plan for Nonvisible Pollutants
The SAP for nonvisible pollutants must describe the sampling and analysis strategy for monitoring
nonvisible pollutants.
The SAP for nonvisible pollutants must identify potential nonvisible pollutants present at the job site
associated with any of the following:
1. Construction materials and wastes
2. Existing contamination due to historical site usage
3. Application of soil amendments, including soil stabilization materials, with the potential to change pH
or contribute toxic pollutants to stormwater

167

SECTION 13

WATER POLLUTION CONTROL

The SAP for nonvisible pollutants must include sampling procedures for the following conditions when
observed during a stormwater visual inspection. Include a procedure for collecting at least 1 sample for
each storm event for:
1. Materials or wastes containing potential nonvisible pollutants not stored under watertight conditions
2. Materials or wastes containing potential nonvisible pollutants stored under watertight conditions at
locations where a breach, leak, malfunction, or spill occurred and was not cleaned up before the
precipitation
3. Chemical applications occurring within 24 hours before precipitation or during precipitation that could
discharge pollutants to surface waters or drainage systems, including fertilizer, pesticide, herbicide,
methyl methacrylate concrete sealant, or nonpigmented curing compound
4. Applied soil amendments, including soil stabilization materials that could change pH levels or
contribute toxic pollutants to stormwater runoff and discharge pollutants to surface waters or drainage
systems, unless independent test data is available to indicate acceptable concentrations of nonvisible
pollutants in the material
5. Stormwater runoff from an area contaminated by historical usage of the site that could discharge
pollutants to surface waters or drainage systems
The SAP for nonvisible pollutants must provide sampling procedures and a schedule for:
1.
2.
3.
4.

Sample collection during the first 2 hours of rain events that generate runoff
Sample collection during normal working hours
Each nonvisible pollutant source
Uncontaminated control sample

The SAP for nonvisible pollutants must identify locations for sampling downstream and control samples
and the reasons for selecting those locations. Select locations for control samples where the sample does
not come in contact with materials, wastes, or areas associated with potential nonvisible pollutants or
disturbed soil areas.
13-3.01B(2)(e)13-3.01B(2)(g) Reserved
13-3.01B(3) Annual Certification
Submit an annual certification of compliance as described in the Department's Storm Water Pollution
Prevention Plan (SWPPP) and Water Pollution Control Plan (WPCP) Preparation Manual before July 15th
of each year.
13-3.01B(4) Site Inspection Reports
The WPC manager must submit the following informational submittals within 24 hours of completing a
weekly inspection:
1. C
ompleted Stormwater Site Inspection Report form.
2. BMP status report. The WPC manager must oversee the preparation of the report. The report must
include:
2.1. Location and quantity of installed water pollution control practices
2.2. Location and quantity of disturbed soil for active and inactive areas
13-3.01B(5) Visual Monitoring Reports
Submit visual monitoring reports for:
1. Each storm event. Include:
1.1. Date, time, and rain gauge reading
1.2. Visual observations:
1.2.1. Within 2 business days before the storm for:
1.2.1.1. Spills, leaks, or uncontrolled pollutants in drainage areas
1.2.1.2. Proper implementation of water pollution control practices
1.2.1.3. Leaks and adequate freeboard in storage areas
1.2.2. Every 24 hours during the storm event for:
1.2.2.1. Effective operation of water pollution control practices
1.2.2.2. Water pollution control practices needing maintenance and repair
1.2.3. Within 2 business days after the qualifying rain event for:
168

SECTION 13

WATER POLLUTION CONTROL

1.2.3.1. S
tormwater discharge locations
1.2.3.2. Evaluation of design, implementation, effectiveness, and locations of water
pollution control practices including locations where additional water
pollution control practices may be needed
2. Nonstormwater discharges during each of the following periods:
2.1. January through March
2.2. A
pril through June
2.3. J uly through September
2.4. October through December
Use the Stormwater Site Inspection Report form to document visual monitoring. A visual monitoring report
must include:
1. Name of personnel performing the inspection, inspection date, and date the inspection report is
completed
2. Storm and weather conditions
3. Location of any:
3.1. Floating and suspended material, sheen on the surface, discoloration, turbidity, odor, and
source of observed pollutants for flowing and contained stormwater systems
3.2. Nonstormwater discharges and their sources
4. Corrective action taken
Retain visual monitoring reports at the job site as part of the SWPPP.
13-3.01B(6) Sampling and Analysis Day
13-3.01B(6)(a) General
Submit a printed copy and electronic copy of water quality analysis results, and quality assurance and
quality control reports within 48 hours of field sampling, and within 30 days of laboratory analysis.
Electronic copies must be in one of the following formats: (1) xls, (2) .txt, (3) .cvs, (4) .dbs, or (5) .mdb.
Include an evaluation of whether the downstream samples show levels of the tested parameter that are
higher than the control sample. The evaluation must include:
1.
2.
3.
4.
5.
6.
7.

Sample identification number


C
ontract number
C
onstituent
R
eported value
A
nalytical method
Method detection limit
R
eported limit

13-3.01B(6)(b) Numeric Action Level Exceedance Reports


Whenever a NAL is exceeded, notify the Engineer and submit a NAL exceedance report within 48 hours
after conclusion of a storm event. The report must include:
1. Field sampling results and inspections, including:
1.1. Analytical methods, reporting units, and detection limits
1.2. Date, location, time of sampling, visual observations, and measurements
1.3. Quantity of precipitation from the storm event
2. Description of BMPs and corrective actions taken to manage NAL exceedance
13-3.01B(6)(c) Numeric Effluent Limit Violation Reports
Whenever a NEL is exceeded, notify the Engineer and submit a NEL violation report within 6 hours. The
report must include:
1. Field sampling results and inspections, including:
1.1. Analytical methods, reporting units, and detection limits
1.2. Date, location, time of sampling, visual observation and measurements
1.3. Quantity of precipitation from the storm event
2. Description of BMPs and corrective actions taken to manage NEL exceedance
169

SECTION 13

WATER POLLUTION CONTROL

13-3.01B(6)(d)13-3.01B(6)(f) Reserved

13-3.01B(7) Rain Event Action Plan

For a risk level 2 or risk level 3 project, submit a REAP whenever the National Weather Service is
predicting a storm event with at least 50 percent probability of precipitation within 72 hours.
The WPC manager must submit the REAP at least 48 hours before a forecasted storm event.
The REAP must include:
1. Site location
2. Project risk level
3. Contact information including 24-hour emergency phone numbers for:
3.1. W
PC manager

3.2. Erosion and sediment control providers or subcontractors

3.3. Stormwater sampling providers or subcontractors

4. Storm information
5. Description of:
5.1. Construction phase, including active and inactive areas

5.2. Active work areas and activities

5.3. Subcontractors and trades on the job site

5.4. Prestorm activities including:

5.4.1. Responsibilities of the WPC manager

5.4.2. Responsibilities of the crew and crew size

5.4.3. Stabilization for active and inactive disturbed soil areas

5.4.4. Stockpile management

5.4.5. Corrective actions taken for deficiencies identified during prestorm visual inspections

5.5. Activities to be performed during storm events, including:

5.5.1. Responsibilities of the WPC manager

5.5.2. Responsibilities of the crew and crew size

5.5.3. BMPs for maintenance and repair

6. Flood contingency measures


13-3.01B(8) Storm Water Annual Report

Submit the storm water annual report before July 15th if construction occurs from July 1st through June
30th or within 15 days after Contract acceptance if construction ends before June 30th. Submit 2 copies
of the report. Allow 10 days for the Engineer's review. The Engineer provides comments and specifies the
date when the review stopped if revisions are required.
Obtain authorization for the format of the storm water annual report. The report must include:
1. Project information such as description and work locations
2. Stormwater monitoring information, including:
2.1. Summary and evaluation of sampling and analysis results and laboratory reports

2.2. Analytical methods, reporting units, and detections limits for analytical parameters

2.3. Summary of corrective actions taken

2.4. Identification of corrective actions taken and compliance activities not implemented

2.5. Summary of violations

2.6. Names of individuals performing stormwater inspections and sampling

2.7. Logistical information for inspections and sampling, including location, date, time, and

precipitation

2.8. Visual observations and sample collection records

3. Documentation of training for individuals responsible for:


3.1. P
ermit compliance

3.2. BMP installation, inspection, maintenance, and repair

3.3. Preparing, revising, and amending the SWPPP

Submit a revised report within 5 business days of receiving the Engineer's comments. The Engineer's
review resumes when a complete report has been resubmitted.
170

SECTION 13

WATER POLLUTION CONTROL

When the storm water annual report is authorized, submit 1 electronic copy and 2 printed copies of the
report signed by the WPC manager.
13-3.01B(9)13-3.01B(11) Reserved
13-3.01C Quality Control and Assurance
13-3.01C(1) General
Assign trained personnel to collect water quality samples. Document the personnel and training in the
SAP.
Samples taken by assigned field personnel must comply with the equipment manufacturer's instructions
for collection, analytical methods, and equipment calibration.
Samples taken for laboratory analysis must comply with water quality sampling procedures and be
analyzed by a State-certified laboratory under 40 CFR part 136, Guidelines Establishing Test Procedures
for the Analysis of Pollutants.
Whenever downstream samples show increased levels of pollutants, assess water pollution control
practices, site conditions, and surrounding influences to determine the probable cause for the increase.
For a risk level 2 or risk level 3 project, obtain samples of pH and turbidity as shown in the following table:
Parameter

Test method

Turbidity

Field test with


calibrated portable
instrument
Field test with
calibrated portable
instrument

pH

Detection
limit (min)
1

Unit
NTU

0.2

pH units

For a risk level 3 project, obtain samples and analyze the suspended sediment concentration whenever
the turbidity NEL is exceeded as shown in the following table:
Parameter

Test method

Suspended sediment concentration

ASTM D 3977

Detection
limit (min)
5

Unit
Mg/L

For a risk level 3 project, obtain samples of pH and turbidity from representative and accessible locations
upstream of the discharge point and downstream of the discharge point.
For multiple discharge points, obtain samples from a single upstream and a single downstream location.
13-3.01C(2) Numeric Action Levels
For a risk level 2 or risk level 3 project, NALs must comply with the values shown in the following table:

171

SECTION 13

WATER POLLUTION CONTROL

Parameter
pH

Turbidity

Numeric Action Levels


Test method
Detection
Unit
limit (min)
Field test
0.2
pH
with
calibrated
portable
instrument
Field test
1
NTU
with
calibrated
portable
instrument

Value
Lower NAL = 6.5
Upper NAL = 8.5

250 NTU max

13-3.01C(3) Numeric Effluent Limits


For a risk level 3 project, NELs must comply with the values shown in the following table:

Parameter
pH

Turbidity

Numeric Effluent Limits


Test method
Detection
Unit
limit (min)
Field test with
0.2
pH
calibrated
portable
instrument
Field test with
1
NTU
calibrated
portable
instrument

Value
Lower NEL = 6.0
Upper NEL = 9.0

500 NTU max

The storm event daily average for storms up to the 5-year, 24-hour storm must not exceed the NEL for
turbidity.
The daily average sampling results must not exceed the NEL for pH.
13-3.01C(4)13-3.01C(6) Reserved
13-3.02 MATERIALS
Not Used
13-3.03 CONSTRUCTION
13-3.03A General
Obtain, install, and maintain a rain gauge at the job site. Observe and record daily precipitation.

Complete REAP activities, including crew mobilization, within 24 hours before precipitation occurs.

Continue SWPPP implementation during any suspension of work activities.

You may request or the Engineer may order laboratory analysis of stormwater samples. If ordered,

laboratory analysis of stormwater samples is change order work.

The Department does not pay for the preparation, collection, laboratory analysis, and reporting of

stormwater samples for nonvisible pollutants if water pollution control practices are not implemented

before precipitation or if you fail to correct a water pollution control practice before precipitation.

13-3.03B Rain Event Action Plan


Have the REAP at the job site at least 24 hours before a forecasted storm event. The WPC manager
must submit the REAP on the following forms:
1. Rain Event Action Plan Highway Construction Phase
172

SECTION 13

WATER POLLUTION CONTROL

2. Rain Event Action Plan Plant Establishment Phase


3. Rain Event Action Plan For Inactive Project
Retain a printed copy of each REAP at the job site as part of the SWPPP.
Implement the REAP, including mobilizing crews to complete activities, within 24 hours before
precipitation occurs.
13-3.03C Sampling and Analysis Day
For a risk level 2 or risk level 3 project, collect samples:
1. During a storm event for:
1.1. Each nonvisible pollutant source and a corresponding uncontaminated control sample
1.2. All locations identified on the Storm Event Sampling and Analyses Plan form
2. During a qualifying rain event for:
2.1. Each nonvisible pollutant source and a corresponding uncontaminated control sample
2.2. Turbidity, pH, and other constituents as required
2.3. At least 3 samples for each day of a qualifying rain event
2.4. All locations identified on the Qualifying Rain Event Sampling and Analyses Plan form
Perform sample collection during:
1. Normal working hours
2. Each qualifying rain event
3. First 2 hours of each storm event
Collect receiving-water samples for a risk level 3 project and whenever a direct discharge to receiving
waters occurs and NELs are violated.
Do not physically collect samples during dangerous weather conditions, such as flooding or electrical
storms.
Whenever downstream samples show increased levels of turbidity, pH, and other constituents, assess
water pollution control practices, site conditions, and surrounding influences to determine the probable
cause for the increase.
Document sample collection during precipitation.
Retain documentation of water quality sampling and analysis results with the SWPPP at the job site.
13-3.03D Storm Water Annual Report
Document and summarize monitoring, sampling and analysis results, laboratory reports, and training.
13-3.03E13-3.03G Reserved
13-3.04 PAYMENT
For projects with 60 working days or less, the Department pays you for prepare stormwater pollution
prevention plan as follows:
1. A total of 75 percent of the item total upon authorization of the SWPPP
2. A total of 100 percent of the item total upon Contract acceptance
For projects with more than 60 working days, the Department pays you for prepare stormwater pollution
prevention plan as follows:
1. A total of 50 percent of the item total upon authorization of the SWPPP
2. A total of 90 percent of the item total over the life of the Contract
3. A total of 100 percent of the item total upon Contract acceptance
The Department pays $500 for each rain event action plan submitted.
The Department does not adjust the unit price for an increase or decrease in the rain event action plan
quantity.
173

SECTION 13

WATER POLLUTION CONTROL

The Department does not adjust the unit price for an increase or decrease in the storm water sampling
and analysis day quantity.
The Department pays $2,000 for each storm water annual report submitted.
The Department does not adjust the unit price for an increase or decrease in the storm water annual
report quantity.
For each failure to submit a completed storm water annual report, the Department withholds $10,000.
This withhold is in addition to other performance failure withholds.
13-4 JOB SITE MANAGEMENT
13-4.01 GENERAL
13-4.01A Summary
Section 13-4 includes specifications for performing job site management, including spill prevention and
control, material management, waste management, nonstormwater management, and dewatering
activities.
Implement effective handling, storage, usage, and disposal practices to control material pollution and
manage waste and nonstormwater at the job site before they come in contact with storm drain systems
and receiving waters.
Linear sediment barriers must comply with section 13-10.
13-4.01B Submittals
Before you start dewatering, submit a dewatering and discharge work plan. The dewatering and
discharge work plan must include:
1. Title sheet and table of contents
2. Description of dewatering and discharge activities detailing locations, quantity of water, equipment,
and discharge point
3. Estimated schedule for dewatering and discharge start and end dates of intermittent and continuous
activities
4. Discharge alternatives, such as dust control or percolation
5. Visual monitoring procedures with inspection log
6. Copy of written approval to discharge into a sanitary sewer system at least 5 business days before
starting discharge activities
Submit the following informational submittals:
1. MSDS at least 5 business days before material is used or stored
2. Monthly inventory records for material used or stored
Submit written approval from the local health agency, city, county, and sewer district before discharging
from a sanitary or septic system directly into a sanitary sewer system.
13-4.02 MATERIALS
Not Used
13-4.03 CONSTRUCTION
13-4.03A General
Reserved
13-4.03B Spill Prevention and Control
Keep material or waste storage areas clean, well organized, and equipped with enough cleanup supplies
for the material being stored.
Implement spill and leak prevention procedures for chemicals and hazardous substances stored on the
job site. Whenever you spill or leak chemicals or hazardous substances at the job site, you are
responsible for all associated cleanup costs and related liability.
174

SECTION 13

WATER POLLUTION CONTROL

Report minor, semisignificant, and significant or hazardous spills to the WPC manager. The WPC
manager must notify the Engineer immediately.
As soon as it is safe, contain and clean up spills of petroleum materials and sanitary and septic waste
substances listed under 40 CFR, parts 110, 117, and 302. Comply with section 14-11 whenever spills or
leaks produce hazardous waste.
13-4.03B(1) Minor Spills
Minor spills consist of quantities of oil, gasoline, paint, or other materials that are small enough to be
controlled by a first responder upon discovery of the spill.
Clean up a minor spill using the following procedures:
1.
2.
3.
4.

Contain the spread of the spill


Recover the spilled material using absorption
Clean the contaminated area
Dispose of the contaminated material and absorbents promptly and properly

13-4.03B(2) Semisignificant Spills


Semisignificant spills consist of spills that can be controlled by a first responder with help from other
personnel.
Clean up a semisignificant spill immediately using the following procedures:
1. Contain the spread of the spill.
2. On paved or impervious surfaces, encircle and recover the spilled material with absorbent materials.
Do not allow the spill to spread widely.
3. If the spill occurs on soil, contain the spill by constructing an earthen dike and dig up the
contaminated soil for disposal.
4. If the spill occurs during precipitation, cover the spill with 10-mil plastic sheeting or other material to
prevent contamination of runoff.
5. Dispose of the contaminated material promptly and properly.
13-4.03B(3) Significant or Hazardous Spills
Significant or hazardous spills consist of spills that cannot be controlled by job site personnel.
Immediately notify qualified personnel of a significant or hazardous spill. Take the following steps:
1.
2.
3.
4.

Do not attempt to clean up the spill until qualified personnel have arrived
Notify the Engineer and follow up with a report
Obtain the immediate services of a spill contractor or hazardous material team
Notify local emergency response teams by dialing 911 and county officials by using the emergency
phone numbers retained at the job site
5. Notify the California Emergency Management Agency State Warning Center at (916) 845-8911
6. Notify the National Response Center at (800) 424-8802 regarding spills of Federal reportable
quantities under 40 CFR 110, 119, and 302
7. Notify other agencies as appropriate, including:
7.1. Fire Department
7.2. Public Works Department
7.3. Coast Guard
7.4. Highway Patrol
7.5. City Police or County Sheriff's Department
7.6. Department of Toxic Substances
7.7. California Division of Oil and Gas
7.8. Cal/OSHA
7.9. Regional Water Resources Control Board
Prevent a spill from entering stormwater runoff before and during cleanup activities. Do not bury or wash
the spill with water.

175

SECTION 13

WATER POLLUTION CONTROL

13-4.03B(4)13-4.03B(6) Reserved
13-4.03C Material Management
13-4.03C(1) General
Minimize or eliminate discharge of material into the air, storm drain systems, and receiving waters while
taking delivery of, using, or storing the following materials:
1. Hazardous chemicals, including acids, lime, glues, adhesives, paints, solvents, and curing
compounds
2. Soil stabilizers and binders
3. Fertilizers
4. Detergents
5. P
laster
6. Petroleum materials, including fuel, oil, and grease
7. Asphalt and concrete components
8. Pesticides and herbicides
Employees trained in emergency spill cleanup procedures must be present during the unloading of
hazardous materials or chemicals.
Use less hazardous materials if practicable.
The following activities must be performed at least 100 feet from concentrated flows of stormwater,
drainage courses, and inlets if within the floodplain and at least 50 feet if outside the floodplain, unless
otherwise authorized:
1.
2.
3.
4.

Stockpiling materials
Storing pile-driving equipment and liquid waste containers
Washing vehicles and equipment in outside areas
Fueling and maintaining vehicles and equipment

13-4.03C(2) Material Storage


If materials are stored:
1. Store liquids, petroleum materials, and substances listed in 40 CFR 110, 117, and 302 and place
them in secondary containment facilities as specified by USDOT for storage of hazardous materials.
2. Secondary containment facilities must be impervious to the materials stored there for a minimum
contact time of 72 hours.
3. Cover secondary containment facilities during nonworking days and whenever precipitation is
forecasted. Secondary containment facilities must be adequately ventilated.
4. Keep secondary containment facilities free of accumulated rainwater or spills. After precipitation, or in
the event of spills or leaks, collect accumulated liquid and place it into drums within 24 hours. Handle
the liquid as hazardous waste under section 14-11 unless testing confirms that the liquid is
nonhazardous.
5. Do not store incompatible materials, such as chlorine and ammonia, in the same secondary
containment facility.
6. Store materials in their original containers with the original material labels maintained in legible
condition. Immediately replace damaged or illegible labels.
7. Secondary containment facilities must have the capacity to contain precipitation from a 24-hour-long,
25-year storm, plus 10 percent of the aggregate volume of all containers or the entire volume of the
largest container within the facility, whichever is greater.
8. Store bagged or boxed material on pallets. Protect bagged or boxed material from wind and rain
during nonworking days and whenever precipitation is forecasted.
9. Provide sufficient separation between stored containers to allow for spill cleanup or emergency
response access. Storage areas must be kept clean, well organized, and equipped with cleanup
supplies appropriate for the materials being stored.
10. Repair or replace perimeter controls, containment structures, covers, and liners as necessary. Inspect
storage areas before and after precipitation and at least weekly during other times.

176

SECTION 13

WATER POLLUTION CONTROL

13-4.03C(3) Stockpile Management


Minimize stockpiling of materials at the job site.
Implement water pollution control practices within 72 hours of stockpiling material or before a forecasted
storm event, whichever occurs first. If stockpiles are being used, do not allow soil, sediment, or other
debris to enter storm drains, open drainages, and watercourses.
Active and inactive soil stockpiles must be:
1. Covered with soil stabilization material or a temporary cover
2. Surrounded with a linear sediment barrier
Stockpiles of asphalt concrete and PCC rubble, HMA, aggregate base, or aggregate subbase must be:
1. Covered with a temporary cover
2. Surrounded with a linear sediment barrier
Stockpiles of pressure-treated wood must be:
1. Placed on pallets
2. Covered with impermeable material
Stockpiles of cold mix asphalt concrete must be:
1. Placed on an impervious surface
2. Covered with an impermeable material
3. Protected from stormwater run-on and runoff
Control wind erosion year round under section 14-9.03.
Repair or replace linear sediment barriers and covers as needed to keep them functioning properly.
Whenever sediment accumulates to 1/3 of the linear sediment barrier height, remove the accumulated
sediment.
13-4.03C(4)13-4.03C(6) Reserved
13-4.03D Waste Management
13-4.03D(1) General
Manage solid waste under section 14-10.
Manage hazardous waste under section 14-11.
13-4.03D(2) Paint Waste
Clean water-based and oil-based paint from brushes or equipment within a contained area in a way that
does not contaminate soil, receiving waters, or storm drain systems. Handle and dispose of the following
as hazardous waste under section 14-11: paints, thinners, solvents, residues, and sludges that cannot be
recycled or reused. When thoroughly dry, dispose of the following as solid waste under section 14-10: dry
latex paint, paint cans, used brushes, rags, absorbent materials, and drop cloths.
13-4.03D(3) Concrete Waste
Use practices to prevent the discharge of asphalt concrete, PCC, and HMA waste into storm drain
systems and receiving waters.
Collect and dispose of asphalt concrete, PCC, and HMA waste at locations where:
1.
2.
3.
4.

Concrete material, including grout, is used


Concrete dust and debris result from demolition
Sawcutting, coring, grinding, grooving, or hydro-concrete demolition creates a residue or slurry
Concrete trucks or other concrete-coated equipment is cleaned at the job site

177

SECTION 13

WATER POLLUTION CONTROL

13-4.03D(4) Sanitary and Septic Waste


Do not bury or discharge wastewater from a sanitary or septic system within the highway. A sanitary
facility discharging into a sanitary sewer system must be properly connected and free from leaks. Place a
portable sanitary facility at least 50 feet away from storm drains, receiving waters, and flow lines.
Comply with local health agency provisions if using an on-site disposal system.
13-4.03D(5) Liquid Waste
Use practices that will prevent job-site liquid waste from entering storm drain systems and receiving
waters. Liquid wastes include the following:
1.
2.
3.
4.
5.

Drilling slurries or fluids


Grease-free and oil-free wastewater and rinse water
Dredgings, including liquid waste from cleaning drainage systems
Liquid waste running off a surface, including wash or rinse water
Other nonstormwater liquids not covered by separate permits

Hold liquid waste in structurally sound, leak-proof containers, such as roll-off bins or portable tanks.
Liquid waste containers must be of sufficient quantity and volume to prevent overflow, spills, and leaks.
Store containers at least 50 feet from moving vehicles and equipment.
Remove and dispose of deposited solids from sediment traps under section 14-10 unless the Engineer
authorizes another method.
Liquid waste may require testing to determine hazardous material content before disposal.
Dispose of drilling fluids and residue.
If an authorized location is available within the job site, fluids and residue exempt under 23 CA Code of
Regs 2511(g) may be dried by evaporation in a leak-proof container. Dispose of the remaining solid
waste under section 14-10.
13-4.03D(6)13-4.03D(8) Reserved
13-4.03E Nonstormwater Management
13-4.03E(1) Water Control and Conservation
Manage water used for work activities in a way that will prevent erosion and the discharge of pollutants
into storm drain systems and receiving waters. Obtain authorization before washing anything at the job
site with water that could discharge into a storm drain system or receiving waters. Report discharges
immediately.
Implement water conservation practices if water is used at the job site. Inspect irrigation areas. Adjust
watering schedules to prevent erosion, excess watering, or runoff. Shut off the water source to broken
lines, sprinklers, or valves and repair breaks within 24 hours. Reuse water from waterline flushing for
landscape irrigation if practicable. Sweep and vacuum paved areas. Do not wash paved areas with water.
Direct runoff water, including water from water line repair, from the job site to areas where it can infiltrate
into the ground. Do not allow runoff water to enter storm drain systems and receiving waters. Do not allow
spilled water to escape filling areas for water trucks. Direct water from off-site sources around the job site
if practicable. Minimize the contact of off-site water with job site water.
13-4.03E(2) Illicit Connection and Illegal Discharge Detection and Reporting
Before starting work, inspect the job site and the job site's perimeter for evidence of illicit connections,
illegal discharges, and dumping. After starting work, inspect the job site and perimeter on a daily schedule
for illicit connections and illegal dumping and discharges.
Whenever illegal connections, discharges, or dumping are discovered, notify the Engineer immediately.
Do not take further action unless ordered. Assume that unlabeled or unidentifiable material is hazardous.
Look for the following evidence of illicit connections, illegal discharges, and dumping:

178

SECTION 13
1.
2.
3.
4.
5.
6.
7.
8.
9.

WATER POLLUTION CONTROL

Debris or trash piles


Staining or discoloration on pavement or soils
Pungent odors coming from drainage systems
Discoloration or oily sheen on water
Stains and residue in ditches, channels, or drain boxes
Abnormal water flow during dry weather
Excessive sediment deposits
Nonstandard drainage junction structures
Broken concrete or other disturbances at or near junction structures

13-4.03E(3) Vehicle and Equipment Cleaning


Limit vehicle and equipment cleaning or washing at the job site except what is necessary to control
vehicle tracking or hazardous waste. Notify the Engineer before cleaning vehicles and equipment at the
job site with soap, solvents, or steam. Contain and recycle or dispose of resulting waste under section 14
11 or section 13-4.03D(5), whichever is applicable. Do not use diesel to clean vehicles or equipment.
Minimize the use of solvents.
Clean or wash vehicles and equipment in a structure equipped with disposal facilities. You may wash
vehicles in an outside area if the area is:
1. Paved with asphalt concrete, HMA, or PCC
2. Surrounded by a containment berm
3. Equipped with a sump to collect and dispose of wash water
Use as little water as practicable whenever washing vehicles and equipment with water. Hoses must be
equipped with a positive shutoff valve.
Discharge liquid from wash racks to a recycling system or to another authorized system. Remove liquids
and sediment as necessary.
13-4.03E(4) Vehicle and Equipment Fueling and Maintenance
If practicable, perform maintenance on vehicles and equipment off-site.
If fueling or maintenance must be done at the job site, assign a site or sites, and obtain authorization
before using them. Minimize mobile fueling and maintenance activities. Fueling and maintenance
activities must be performed on level ground in areas protected from stormwater run-on and runoff.
Use containment berms or dikes around fueling and maintenance areas. Keep adequate quantities of
absorbent spill-cleanup material and spill kits in the fueling or maintenance area and on fueling trucks.
Dispose of spill-cleanup material and kits immediately after use. Use drip pans or absorbent pads during
fueling or maintenance.
Do not leave fueling or maintenance areas unattended during fueling and maintenance activities. Fueling
nozzles must be equipped with an automatic shutoff control. Nozzles must be equipped with vapor
recovery fueling nozzles where required by the Air Quality Management District. Secure nozzles in an
upright position when not in use. Do not top off fuel tanks.
Recycle or properly dispose of used batteries and tires.
If leaks cannot be repaired immediately, remove the vehicle or equipment from the job site.
13-4.03E(5) Material and Equipment Used Over Water
Place drip pans and absorbent pads under vehicles and equipment used over water. Keep an adequate
supply of spill-cleanup material with vehicles and equipment. Place drip pans or plastic sheeting under
vehicles and equipment on docks, barges, or other surfaces over water whenever vehicles or equipment
will be idle for more than 1 hour.
Furnish watertight curbs or toe boards on barges, platforms, docks, or other surfaces over water to
contain material, debris, and tools. Secure material to prevent spills or discharge into the water due to
wind.
Report discharges to receiving waters immediately upon discovery. Submit a discharge notification.
179

SECTION 13

WATER POLLUTION CONTROL

13-4.03E(6) Structure Removal Over or Adjacent to Water


Do not allow demolished material to enter storm drain systems and receiving waters. Use authorized
covers and platforms to collect debris. Use attachments on equipment to catch debris during small
demolition activities. Empty debris-catching devices daily and handle debris under section 13-4.03D.
13-4.03E(7) Paving, Sealing, Sawcutting, Grooving, and Grinding Activities
Prevent material from entering storm drain systems and receiving waters including:
1.
2.
3.
4.
5.
6.
7.
8.

Cementitious material
Asphaltic material
Aggregate or screenings
Sawcutting, grooving, and grinding residue
Pavement chunks
Shoulder backing
Methacrylate
Sandblasting residue

Cover drainage inlets and use linear sediment barriers to protect downhill receiving waters until paving,
sealing, sawcutting, grooving, and grinding activities are completed and excess material has been
removed. Cover drainage inlets and manholes during the application of seal coat, tack coat, slurry seal, or
fog seal.
Whenever precipitation is forecasted, limit paving, sawcutting, and grinding to places where runoff can be
captured.
Do not start seal coat, tack coat, slurry seal, or fog seal activities whenever precipitation is forecasted
during the application and curing period. Do not excavate material from existing roadways during
precipitation.
Use a vacuum to remove slurry immediately after slurry is produced. Do not allow the slurry to run onto
lanes open to traffic or off the pavement.
Collect the residue from PCC grooving and grinding activities with a vacuum attachment on the grinding
machine. Do not leave the residue on the pavement or allow the residue to flow across pavement.
You may stockpile material excavated from existing roadways under section 13-4.03C(3) if authorized.
Do not coat asphalt trucks and equipment with substances that contain soap, foaming agents, or toxic
chemicals.
Park paving equipment over drip pans or plastic sheeting with absorbent material to catch drips if the
paving equipment is not in use.
13-4.03E(8) Thermoplastic Striping and Pavement Markers
Do not preheat, transfer, or load thermoplastic within 50 feet of drainage inlets and receiving waters.
Do not unload, transfer, or load bituminous material for pavement markers within 50 feet of drainage
inlets and receiving waters.
Collect and dispose of bituminous material from the roadway after removing markers.
13-4.03E(9) Pile Driving
Keep spill kits and cleanup materials at pile driving locations. Park pile driving equipment over drip pans,
absorbent pads, or plastic sheeting with absorbent material. Protect pile driving equipment by parking on
plywood and covering with plastic whenever precipitation is forecasted.
Store pile driving equipment on level ground and protect it from stormwater run-on when not in use. Use
vegetable oil instead of hydraulic fluid if practicable.

180

SECTION 13

WATER POLLUTION CONTROL

13-4.03E(10) Concrete Curing


Do not overspray chemical curing compounds. Minimize the drift by spraying as close to the concrete as
practicable. Do not allow runoff of curing compounds. Cover drainage inlets before applying the curing
compound.
Minimize the use and discharge of water by using wet blankets or similar methods to maintain moisture
when concrete is curing.
13-4.03E(11) Concrete Finishing
Collect and dispose of water and solid waste from high-pressure water blasting. Collect and dispose of
sand and solid waste from sandblasting. Before sandblasting, cover drainage inlets within 50 feet of
sandblasting. Minimize the drift of dust and blast material by keeping the nozzle close to the surface of
the concrete. If the character of the blast residue is unknown, test it for hazardous materials and dispose
of it properly.
Inspect containment structures for concrete finishing for damage before each day of use and before
forecasted precipitation. Remove liquid and solid waste from containment structures after each work shift.
13-4.03E(12)13-4.03E(15) Reserved
13-4.03F Sweeping
Sweep by hand or mechanical methods, such as vacuuming. Do not use methods that use only
mechanical kick brooms.
Sweep paved roads at construction entrance and exit locations and paved areas within the job site:
1.
2.
3.
4.
5.
6.
7.

During clearing and grubbing activities


During earthwork activities
During trenching activities
During pavement structure activities
When vehicles are entering and leaving the job site
After soil-disturbing activities
After observing off-site tracking of material

Monitor paved areas and roadways within the project. Sweep within:
1. 1 hour whenever sediment or debris is observed during activities that require sweeping
2. 24 hours whenever sediment or debris is observed during activities that do not require sweeping
Remove collected material, including sediment, from paved shoulders, drain inlets, curbs and dikes, and
other drainage areas. You may stockpile collected material at the job site. Dispose of collected material at
least once per week if stockpiled.
You may dispose of sediment within the job site collected during sweeping activities. Protect the disposal
areas against erosion.
Keep dust to a minimum during street sweeping activities. Use water or a vacuum whenever dust
generation is excessive or sediment pickup is ineffective.
Remove and dispose of trash collected during sweeping.
13-4.03G Dewatering
Dewatering consists of discharging accumulated stormwater, groundwater, or surface water from
excavations or temporary containment facilities.
Perform dewatering work as specified for the work items involved, such as temporary active treatment
system or dewatering and discharge.
If dewatering and discharging activities are not specified under a work item and you perform dewatering
activities:
1. Conduct dewatering activities under the Department's Field Guide for Construction Site Dewatering.

181

SECTION 13

WATER POLLUTION CONTROL

2. Ensure that any dewatering discharge does not cause erosion, scour, or sedimentary deposits that
could impact natural bedding materials.
3. Discharge the water within the project limits. Dispose of the water if it cannot be discharged within
project limits due to site constraints or contamination.
4. Do not discharge stormwater or nonstormwater that has an odor, discoloration other than sediment,
an oily sheen, or foam on the surface. Notify the Engineer immediately upon discovering any such
condition.
13-4.03H13-4.03J Reserved
13-4.04 PAYMENT
Job site management is paid for as construction site management.
13-5 TEMPORARY SOIL STABILIZATION
13-5.01 GENERAL
Section 13-5 includes general specifications for applying temporary soil stabilization.
The Engineer designates the areas to receive soil stabilization materials by directing the placement of
stakes or other suitable markers in increments of 1 acre or less. Furnish tools, labor, materials, and
transportation for marking areas that will receive temporary soil stabilization.
Move-in/move-out temporary erosion control includes: (1) moving onto the project when the Engineer
determines an area is ready to receive temporary soil stabilization materials, (2) setting up all required
personnel and equipment, and (3) moving out all personnel and equipment when work in that area is
complete.
13-5.02 MATERIALS
13-5.02A General
The following materials must comply with section 21-1.02:
1.
2.
3.
4.

T
ackifier
Fiber
Seed
Straw

13-5.02B Erosion Control Blankets


Erosion control blankets must comply with section 21-1.02O for jute mesh, netting, and erosion control
blanket.
An erosion control blanket classified as long-term and nondegradable must be rock slope protection
fabric, Class 8.
13-5.02C Mulch
Temporary mulch must comply with section 20-7.02D(6).
13-5.02D Cementitious Binder
Cementitious binder must be:
1.
2.
3.
4.
5.
6.
7.

Calcium sulfate hemihydrate


At least 85 percent pure
Functional for at least 365 days
Able to easily mix with water and fiber
Nontoxic to aquatic organisms
Free from growth or germination-inhibiting factors
Nonflammable

13-5.02E Soil Binder


Soil binder must comply with the material specifications for tackifier.

182

SECTION 13

WATER POLLUTION CONTROL

13-5.02F Temporary Covers


Temporary cover must be geosynthetic fabric, plastic sheeting, or a combination.
Plastic sheeting must be single-ply geomembrane material, 10 mils thick, complying with ASTM D2103.
Use restrainers to secure the cover fabric or plastic sheeting to the surface of the slope or stockpile.
Restrainers must be one of the following:
1. Gravel-filled bags roped together and spaced not more than 6 feet apart.
2. Wooden lath and anchor restrainers as shown. Wooden lath must be 2 by 4 inches by 8 feet made
from fir or pine. Anchor restrainers must be made from steel reinforcing bars and spaced not more
than 4 feet apart along the wooden lath.
3. Another authorized method.
Rope must be at least 3/8 inch in diameter and be biodegradable or nondegradable. Biodegradable rope
must be made from sisal, manila, or other natural fiber. Nondegradable rope must be made from nylon,
polypropylene, or other geosynthetic fiber.
Use a linear sediment barrier under section 13-10.
13-5.02G Gravel-Filled Bags
Gravel-filled bags must:
1. Be made of geosynthetic gravel-filled bag.
2. Have inside dimensions from 24 to 32 inches long and from 16 to 20 inches wide.
3. Have a bound opening to keep gravel. The opening must be sewn with yarn, bound with wire, or
secured with a closure device.
4. Weigh from 30 to 50 pounds when filled with gravel.
Gravel for gravel-filled bags must be from 3/8 to 3/4 inch in diameter and must be clean and free of clay
balls, organic matter, and other deleterious materials.
13-5.02H13-5.02J Reserved
13-5.03 CONSTRUCTION
13-5.03A General
Apply temporary soil stabilization materials within 24 hours after an area is ready to receive temporary soil
stabilization or before a forecasted storm event. Do not use hydraulically-applied materials under the
following conditions:
1.
2.
3.
4.

During precipitation
Whenever water is standing on or moving across the soil surface
Soil is frozen
Air temperature is below 40 degrees F during the tackifier's curing period unless allowed by the
tackifier manufacturer and authorized

13-5.03B Temporary Erosion Control Blankets


Apply temporary erosion control blanket under section 21-1.03O.
13-5.03C Temporary Mulch
Apply temporary mulch under section 20-7.03I(10).
If rates are not shown, spread mulch to a uniform thickness to form a 2-inch thick blanket.
13-5.03D Temporary Hydraulic Mulch
Apply temporary hydraulic mulch under section 21-1.03E.
If rates are not shown, apply temporary hydraulic mulch at the following rate:
1. Fiber at 2,000 lb/acre
2. Tackifier under the manufacturer's instructions for the slope, soil, and wind conditions
183

SECTION 13

WATER POLLUTION CONTROL

13-5.03E Temporary Hydraulic Mulch (Bonded Fiber Matrix)


Apply temporary hydraulic mulch (bonded fiber matrix) under section 21-1.03J.

If rates are not shown, apply temporary hydraulic mulch (bonded fiber matrix) at the rate of 3,500 lb/acre.

13-5.03F Temporary Hydraulic Mulch (Polymer-Stabilized Fiber Matrix)


Apply temporary hydraulic mulch (polymer-stabilized fiber matrix) under section 21-1.03I.
If rates are not shown, apply temporary hydraulic mulch (polymer-stabilized fiber matrix) at the following
rate:
1. Fiber at 2,000 lb/acre
2. Tackifier at 8 gallons/acre
13-5.03G Temporary Hydraulic Mulch (Cementitious Binder)
Apply temporary hydraulic mulch (cementitious binder) under section 21-1.03E.

If rates are not shown, apply temporary hydraulic mulch (cementitious binder) at the following rate:

1. Fiber at 2,000 lb/acre


2. Cementitious binder at 4,000 lb/acre
Fiber for temporary hydraulic mulch (cementitious binder) must be at least 50 percent wood fiber. The
remaining percentage must be cellulose fiber, alternate fiber, or a combination.
13-5.03H Temporary Tacked Straw
Apply temporary tacked straw under section 21-1.03H.

If rates are not shown, apply temporary tacked straw at the following rate:

1. Straw at 2.0 tons/acre


2. Fiber at 2,000 lb/acre
3. Tackifier under the manufacturer's instructions for the slope, soil, and wind conditions
Fiber for temporary tacked straw must be at least 50 percent wood fiber. The remaining percentage must
be cellulose fiber, alternate fiber, or a combination.
13-5.03I Temporary Hydroseed
Apply temporary hydroseed under section 21-1.03E.

If rates are not shown for fiber and tackifier, apply temporary hydroseed at the following rate:

1. S
eed as shown
2. Fiber at 2,000 lb/acre
3. Tackifier under the manufacturer's instructions for the slope, soil, and wind conditions
Fiber for temporary hydroseed must be at least 50 percent wood fiber. The remaining percentage must be
cellulose fiber, alternate fiber, or a combination.
13-5.03J Temporary Soil Binder
Apply temporary soil binder under section 21-1.03E.
If rates are not shown, apply temporary soil binder under the manufacturer's instructions for the slope,
soil, and wind conditions.
13-5.03K Temporary Covers
Install temporary cover fabric as follows:
1. Place fabric loosely on the slope or stockpile with the longitudinal edges perpendicular to the slope
contours.
2. Place fabric on the upper portion of the slope to overlap the fabric on the lower portion of the slope.
184

SECTION 13

WATER POLLUTION CONTROL

3. Place fabric on the side facing the prevailing wind to overlap the fabric on the downwind side of the
slope.
4. Anchor the perimeter edge of the fabric in key trenches.
5. Overlap edges of the fabric by at least 2 feet.
6. Place restrainers at the overlap area and along the toe of the slope. Space the restrainers a
maximum of 8 feet on center between the overlaps.
7. If anchor restraints are used, ensure that the leg of the steel reinforcing bar pierces the fabric and
holds the wooden lath firmly against the surface of the slope or stockpile.
Install a temporary linear sediment barrier to protect excavation and embankment slopes from run-on and
concentrated flows of stormwater. Place the barrier parallel with the slope contour at the toe of the slope.
Angle the last 6 feet of the barrier upslope at the downhill end of the run.
Install a temporary linear sediment barrier to prevent run-on and concentrated flows of stormwater from
touching stockpiled material. Surround the stockpile with the barrier. Add additional barrier within 24
hours of adding more material to the stockpile.
Whenever you remove a temporary cover to perform other work, replace and resecure it within 1 hour of
stopping work.
Maintain a temporary cover to minimize exposure of slopes and stockpiles and prevent material
movement beyond the linear sediment barrier.
Relocate and secure restrainers to keep erosion control blankets in place. Whenever a temporary cover
breaks free, resecure it immediately.
Repair or replace a temporary cover whenever any of the following occur:
1. Covered area becomes exposed or exhibits visible erosion
2. Washouts occur between the joints or beneath the linear sediment barrier
3. Temporary cover becomes detached, torn, or unraveled
13-5.03L13-5.03N Reserved
13-5.04 PAYMENT
Bid items paid for by the area are measured parallel with the ground surface except overlaps.
Except for maintaining a temporary cover, you and the Department share the cost of maintaining soil
stabilization measures. The Department determines the maintenance cost under section 9-1.04 and pays
you 1/2 of that cost.
13-6 TEMPORARY SEDIMENT CONTROL
13-6.01 GENERAL
Section 13-6 includes specifications for constructing measures for temporary sediment control.
Temporary linear sediment barriers must comply with section 13-10.
13-6.02 MATERIALS
13-6.02A General
Erosion control blanket must comply with section 21-1.02O(4).
Fiber rolls, rope, stakes, gravel-filled bags, and foam barriers must comply with section 13-10.02.
13-6.02B Rigid Plastic Barriers
A rigid plastic barrier must:
1.
2.
3.
4.
5.

Have an integrated filter


Have a formed outer jacket of perforated HDPE or polyethylene terephthalate
Have a flattened tubular-shaped cross section
Be made from virgin or recycled materials
Be free from biodegradable filler materials that degrade the physical or chemical characteristics of the
completed filter core or outer jacket
185

SECTION 13

WATER POLLUTION CONTROL

6. Have a length of at least 4 feet per unit


7. Have the ability to interlock separate units into a long barrier so that water does not flow between the
units
8. Be secured to:
8.1. Pavement with 1-inch concrete nails with 1-inch washers and solvent-free adhesive, gravel
filled bags, or a combination
8.2. Soil with 6-inch nails with 1-inch washers and wood stakes
9. Comply with the values of the properties shown in the following table:
Property
Grab tensile strength of outer jacket material, lb/sq in, min in each
direction
Break strength of outer jacket, lb/sq in
Permittivity of filter core, 1/sec., min
Flow rate of filter core, gpm per sq ft
Filter core aperture size, max AOS, microns
UV stability (outer jacket & filter core), % tensile strength retained
after 500 hours, min, xenon-arc lamp and water spray weathering
method
a
or appropriate test method for specific polymer

Test
method
ASTM
D4632a
ASTM
D4632a
ASTM
D4491
ASTM
D4491
-ASTM
D4355

Value
4,000
1,300
0.38
100 min
200 max
425
90

For a curb inlet without a grate, rigid plastic barriers must be sized to fit the catch basin or drainage inlet
and have:
1. Horizontal flap of at least 6 inches with an under-seal gasket to prevent underflows
2. High-flow bypass
3. Vertical height of at least 7 inches after installation
For a grated catch basin without a curb inlet, rigid plastic barriers must be sized to fit the catch basin or
drainage inlet and:
1. Cover the grate by at least 2 inches on each side and have an under-seal gasket to prevent
underflows
2. Have a high-flow bypass
3. Have a vertical height of at least 1.5 inches after installation
For a curb inlet with a grate, rigid plastic barriers must be sized to fit the catch basin or drainage inlet and
have:
1. Horizontal flap that covers the grate by at least 2 inches on the 3 sides that are away from the curb
opening and must have an under-seal gasket to prevent underflows
2. High-flow bypass
3. Vertical section that covers the curb opening by at least 5 inches after installation
13-6.02C Sediment Filter Bags
Each sediment filter bag must be sized to fit the catch basin or drainage inlet and have a high-flow
bypass.
Sediment filter bags may include a metal frame. If the sediment filter bag does not have a metal frame
and is deeper than 18 inches, it must include lifting loops, dump straps, and a restraint cord to keep the
sides of the bag away from the walls of the catch basin.

186

SECTION 13

WATER POLLUTION CONTROL

13-6.02D13-6.02F Reserved
13-6.03 CONSTRUCTION
13-6.03A General
Remove sediment deposits whenever the sediment exceeds 1 inch in depth from the surface of an
erosion control blanket.
Remove sediment from a Type 2 sediment trap of a temporary inlet whenever the volume has been
reduced by approximately 1/2.
Remove sediment from a sediment filter bag whenever it becomes full or whenever the restraint cords are
no longer visible. Empty a sediment filter bag without a metal frame by placing 1-inch steel reinforcing
bars through the lifting loops and lifting the filled bag from the drainage inlet. Empty a sediment filter bag
with a metal frame by lifting the metal frame from the drainage inlet. Rinse the sediment filter bag before
replacing it at the drainage inlet. Whenever rinsing a sediment filter bag, do not allow the rinse water to
enter a drainage inlet or waterway.
Whenever you place the removed sediment within the job site, stabilize the sediment deposits to prevent
erosion.
13-6.03B Temporary Check Dams
Before placing a temporary check dam, remove obstructions, including rocks, clods, and debris greater
than 1 inch in diameter from the ground.
If a temporary check dam is to be placed in the same area as an erosion control blanket, install the
blanket before placing the dam.
A temporary check dam must be:
1. Placed approximately perpendicular to the centerline of the ditch or drainage line
2. Installed with sufficient spillway depth to prevent flanking of concentrated flow around the ends of the
check dam
3. Type 2 if the ditch is lined with concrete or HMA
4. Type 1 or Type 2 if the ditch is unlined
For a Type 1 temporary check dam:
1.
2.
3.
4.

Secure the fiber rolls with rope and notched wood stakes as shown.
Drive the stakes into the soil until the notch is even with the top of the fiber roll.
Lace rope between the stakes and over the fiber roll. Knot the rope at each stake.
Tighten by driving the stakes further into the soil and forcing the fiber roll against the surface of the
ditch or drainage line.

Place a Type 2 temporary check dam as a single layer of gravel-filled bags, placed end-to-end to
eliminate gaps. If you need to increase the height of the dam, add more layers of gravel-filled bags. Stack
the bags in the upper row to overlap the joints in the lower row. Stabilize the rows by adding more rows of
bags in the lower layers.
13-6.03C Temporary Drainage Inlet Protection
Provide temporary drainage inlet protection around drainage inlets as changing conditions require.
Drainage inlet protection must be Type 1, Type 2, Type 3A. Type 3B, Type 4A, Type 4B, Type 5, Type
6A, Type 6B, or a combination, as appropriate for conditions around the drainage inlet.
For drainage inlet protection at drainage inlets in paved and unpaved areas:
1. Prevent runoff ponds from encroaching onto the traveled way or overtopping the curb or dike. Use a
linear sediment barrier to redirect runoff and control ponding.
2. Clear the area around each drainage inlet of obstructions, including rocks, clods, and debris greater
than 1 inch in diameter, before installing the drainage inlet protection.
3. Install the linear sediment barrier upslope of the existing drainage inlet and parallel with the curb,
dike, or flow line to prevent sediment from entering the drainage inlet.

187

SECTION 13

WATER POLLUTION CONTROL

If gravel-filled bags are used for Type 3A and Type 3B temporary drainage inlet protection, place the
gravel-filled bags end-to-end to eliminate gaps. Stack the bags so that the upper row overlaps joints in the
lower row. Arrange the bags to create a spillway by removing 1 or more gravel-filled bags from the upper
layer.
Place fiber rolls over the erosion control blanket for Type 4A temporary drainage inlet protection.
If a foam barrier is used for Type 4B temporary drainage inlet protection, secure the barrier to the
pavement at the angle and spacing shown. Place the barrier to provide a tight joint with the curb or dike.
Cut the cover fabric or jacket to ensure a tight fit.
If a rigid sediment barrier is used for Type 6A or Type 6B temporary drainage inlet protection at a grated
catch basin without a curb inlet, place the barrier using a gasket to prevent runoff from flowing under the
barrier. Secure the barrier to the pavement with nails and adhesive, gravel-filled bags, or a combination.
Install a sediment filter bag for Type 5 temporary drainage inlet protection as follows:
1. Remove the drainage inlet grate
2. Place the sediment filter bag in the opening
3. Replace the grate to secure the sediment filter bag in place
The Department does not pay for relocation of temporary drainage inlet protection during the course of
work.
13-6.03D Temporary Sediment Basin
Reserved
13-6.03E Temporary Fiber Rolls
Install a temporary fiber roll under section 21-1.03P.
13-6.03F Temporary Gravel Bag Berms
Install a temporary gravel bag berm under section 13-10.03C.
13-6.03G Temporary Large Sediment Barriers
Install a temporary large sediment barrier under section 13-10.03D.
13-6.03H Temporary Reinforced Silt Fence
Install a temporary reinforced silt fence under section 13-10.03E.
13-6.03I Temporary Silt Fence
Install a temporary silt fence under section 13-10.03F.
13-6.03J Temporary Straw Bale Barrier
Install a temporary straw bale barrier under section 13-10.03D.
13-6.03K13-6.03M Reserved
13-6.04 PAYMENT
Items paid for by length are measured along the centerline of the installed material.
Where temporary fiber rolls are joined and overlapped, the overlap is measured as a single installed
check dam.
You and the Department share the maintenance cost of sediment control measures. The Department
determines the maintenance cost under section 9-1.04 and pays you 1/2 of that cost.
13-7 TEMPORARY TRACKING CONTROL
13-7.01 GENERAL
13-7.01A Summary
Section 13-7 includes specifications for limiting and removing sediment and debris tracked onto
roadways.
188

SECTION 13

WATER POLLUTION CONTROL

13-7.01B Submittals
For a construction entrance, submit details for alternatives at least 5 business days before installation.
You may propose alternatives for sump and corrugated steel panels. You may eliminate the sump if
authorized.
At least 5 business days before starting clearing and grubbing, earthwork, or other activities with the
potential for tracking sediment or debris, submit the number and type of street sweeper that will be used
on the project.
13-7.01C Quality Control and Assurance
Retain and submit records of street sweeping activities, including sweeping times, sweeping locations,
and the quantity of disposed sweeping waste.
13-7.02 MATERIALS
13-7.02A General
The street sweeper must be one of the following:
1. Mechanical sweeper followed by a vacuum-assisted sweeper
2. Vacuum-assisted dry, waterless, sweeper
3. Regenerative-air sweeper
Fabric for a temporary construction entrance must be rock slope protection fabric, Class 8.
Fabric for temporary construction roadway must be rock slope protection fabric, Class 10.
13-7.02B Rock
Type A rock must comply with:
1. Section 72-2.02
2. Sizes shown in the following table:
Square screen size
(inch)
6
3

Percentage passing

Percentage retained

100
0

0
100

Type B rock must be railway ballast number 25. Do not use blast furnace slag. Railway ballast number 25
must comply with:
1. Description in AREMA Manual for Railway Engineering
2. Sizes shown in the following table:
Nominal
size
square
opening
2-1/2"3/8"

3"

100

2-1/2"

2"

80100 6085

Percentage passing
1-1/2"
1"
3/4"

1/2"

3/8"

No. 4

5070

520

010

03

2550

3. Values of the properties shown in the following table:

189

--

SECTION 13

WATER POLLUTION CONTROL

Property
Percent material passing no. 200 sieve, max
Bulk specific gravity, min
Absorption, % min
Clay lumps and friable particles, % max
Degradation, % max
Soundness (sodium sulfate), % max
Flat, elongated particles, or both, % max

Test method
ASTM C117
ASTM C127
ASTM C127
ASTM C142
ASTM C535
ASTM C88
ASTM D4791

Value
1.0
2.60
1.0
0.5
30
5.0
5.0

13-7.02C Corrugated Steel Panels


Corrugated steel panels must:
1. Be made of steel
2. Be pressed or shop welded
3. Have a slot or hook for connecting the panels together
13-7.02D13-7.02F Reserved
13-7.03 CONSTRUCTION
13-7.03A General
Prepare the location for a temporary construction entrance or roadway as follows:
1.
2.
3.
4.
5.

Remove vegetation to ground level and clear away debris


Grade the ground to a uniform plane
Grade the ground surface to drain
Remove sharp objects that could damage the fabric
Compact the top 1.5 feet of the soil to at least 90 percent relative compaction

Construct a temporary construction entrance or roadway as follows:


1.
2.
3.
4.
5.

Position the fabric along the length of the entrance or roadway


Overlap the sides and ends of the fabric by at least 12 inches
Spread rock over the fabric in the direction of traffic
Cover the fabric with rock within 24 hours
Keep a 6-inch layer of rock over the fabric to prevent damage from spreading equipment

Do not drive on the fabric until the rock is spread.


Repair fabric damaged during rock spreading by placing new fabric over the damaged area. The new
fabric must be large enough to cover the damaged area and provide at least an 18-inch overlap on all
edges.
Maintain a temporary construction entrance or roadway to minimize the generation of dust and tracking of
soil and sediment onto public roads. Whenever dust or sediment tracking increases, place additional rock
unless the Engineer authorizes another method.
Repair a temporary construction entrance or roadway if:
1. Fabric is exposed
2. Depressions in the surface develop
3. Rock is displaced
When the temporary construction entrance or roadway is being used, do not allow soil, sediment, and
other debris that is tracked onto the pavement to enter storm drains, open drainage facilities, and
watercourses. When material is tracked onto the pavement, remove it within 6 hours, unless the Engineer
authorizes a longer period.
The Department does not pay the additional cost of relocating temporary construction entrances or
roadways during the course of work.

190

SECTION 13

WATER POLLUTION CONTROL

13-7.03B Temporary Construction Entrance


If a Type 1 temporary construction entrance is shown, use Type A rock.
If a Type 2 temporary construction entrance is shown, use Type B rock under the corrugated steel panels.
Use at least 6 corrugated steel panels for each entrance. Couple the panels together to prevent
movement.
If using a sump, install the sump within 20 feet of each temporary construction entrance.
13-7.03C Temporary Construction Roadway
Reserved
13-7.03D Street Sweeping
Street sweeping does not void specifications for main residue collection included in other work activities,
such as grooving, grinding, or asphalt concrete planing.
Street sweeping must comply with section 13-4.03F except use a street sweeper.
At least 1 street sweeper must be kept at the job site at all times when street sweeping work is required.
The street sweeper must be in good working order.
13-7.03E13-7.03G Reserved
13-7.04 PAYMENT
You and the Department share the cost of maintaining a temporary construction entrance or roadway.
The Department determines the maintenance cost under section 9-1.04 and pays you 1/2 of that cost.
13-8 TEMPORARY ACTIVE TREATMENT SYSTEM
13-8.01 GENERAL
13-8.01A Summary
Section 13-8 includes specifications for designing, installing, operating, monitoring, maintaining, and
removing a temporary active treatment system for the treatment and discharge of uncontaminated
groundwater and accumulated stormwater from excavations or other areas requiring dewatering.
Design, installation, operation, and monitoring of an ATS and monitoring of the treated effluent must
comply with Attachment F of NPDES General Permit for Stormwater Discharges Associated with
Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No. CAS000002).
You may discharge into a publicly owned treatment works system instead of using an ATS. If
uncontaminated groundwater, stormwater, or both are discharged to a publicly owned treatment works,
obtain a municipal batch discharge permit. You are responsible for all costs and requirements related to
obtaining the municipal batch discharge permit and discharging the water.
13-8.01B Submittals
13-8.01B(1) General
Reserved
13-8.01B(2) Active Treatment System Plan
Start the following process for the ATS plan within 20 days of Contract approval:
1. Submit 3 copies of the ATS plan. Allow 20 days for the Department's review. The Engineer provides
comments and specify the date when the review stopped if revisions are required.
2. Change and resubmit a revised ATS plan within 15 days of receiving the Engineer's comments. The
Engineer's review resumes when a complete ATS plan has been resubmitted.
3. When the Engineer authorizes the ATS plan, submit an electronic copy and 4 printed copies of the
authorized ATS plan.
4. Allow 15 days for the Engineer to submit the authorized ATS plan to the State Water Resources
Control Board and RWQCB.
5. If the Engineer requests changes to the ATS plan based on the State Water Resources Control
Board's or RWQCB's comments, amend the ATS plan within 5 business days.

191

SECTION 13

WATER POLLUTION CONTROL

The ATS plan must include:


1. T
itle sheet.
2. Table of contents.
3. Certification and approval sheet described in the Department's Storm Water Prevention Plan
(SWPPP) and Water Pollution Control Plan (WPCP) Preparation Manual.
4. Amendment log and format described in the Department's Storm Water Prevention Plan (SWPPP)
and Water Pollution Control Plan (WPCP) Preparation Manual.
5. Description and schedule of the discharge activities.
6. Discharge alternatives, including:
6.1. Reuse of treated water for job site activities, such as dust control, irrigation, fill compaction, or
concrete batch plant
6.2. Percolation
6.3. S
torm sewers
6.4. Surface waters
7. Treatment system description and components.
8. Anticipated flow rates.
9. Operation and maintenance manual for equipment.
10. Monitoring, sampling, and reporting plan, including quality assurance and quality control.
11. Health and safety plan.
12. Spill prevention plan.
13. Field-recorded data, visual inspection, calibration procedures, and examples of logs.
14. Measuring equipment descriptions.
15. Shop drawings showing:
15.1. Section and plan views of stormwater effluent treatment systems
15.2. Location of sampling points for water quality measurements
15.3. Flow path and placement of pipes, hoses, pumps, holding tanks, and other equipment used to
convey water
15.4. General position of treatment components relative to excavations or other areas requiring
dewatering
15.5. Point of stormwater discharge
16. Daily inspection report form. The daily inspection report must include:
16.1. Discharge volumes
16.2. Water quality monitoring records
16.3. Discharge point information that includes:
16.3.1. Date and time
16.3.2. Weather conditions, including wind direction and velocity
16.3.3. Presence or absence of water fowl or aquatic wildlife
16.3.4. Color and clarity of the effluent discharge
16.3.5. Erosion or ponding downstream of the discharge site
16.3.6. Photographs labeled with the time, date, and location
17. Municipal batch discharge permit from a publicly owned treatment works if required.
18. Coagulant prevention work plan if you use chemical coagulants, in-line flocculants, or both, in the
treatment system. The coagulant prevention work plan must include:
18.1. Description of BMPs to prevent accidental spillage, overfeeding into the treatment system, or
other mishandling of coagulant agents
18.2. Monitoring plan for all coagulants, flocculants, or both
18.3. Description of the agents, including chemical and trade names
18.4. Determination of acute and chronic toxicity for aquatic organisms conforming to EPA methods
for the agents
18.5. Monitoring plan to detect a residual agent at concentrations at or below established acute
toxicity levels for freshwater and marine conditions for that agent
13-8.01B(3) Notice of Discharge Report
Whenever observations and measurements confirm that a residual chemical or water quality standard is
exceeded:
1. Submit the notice of discharge within 48 hours after exceeding the limits

192

SECTION 13

WATER POLLUTION CONTROL

2. Document the reasons for exceeding the water quality standard and any corrective work performed to
prevent a recurrence in the notice of discharge
13-8.01B(4) Numeric Effluent Limit Violation Report
Whenever the NEL is exceeded for a risk level 3 project, notify the Engineer and submit a NEL violation
report within 6 hours. The report must include:
1. Field sampling results and inspections, including:
1.1. Parameters, analytical methods, reporting units, and detection limits
1.2. Date, location, time of sampling, visual observations, and measurements
1.3. Quantity of precipitation of the storm event
2. Description of BMPs and corrective actions taken to manage NEL exceedance
13-8.01B(5) Other Active Treatment System Submittals
If the ATS is discharging treated effluent, submit a daily inspection report within 24 hours.
Submit records of delivery and removal of ATS components.
13-8.01B(6)13-8.01B(8) Reserved
13-8.01C Quality Control and Assurance
A residual chemical for the coagulant must be at less than 10 percent of the maximum allowable
threshold concentration for the most sensitive species.
Discharges from an ATS must comply with the NEL values shown in the following table:

Parameter
Turbidity

pH

Test method
EPA 0180.1 or
field test with
calibrated
portable
instrument
Field test with
calibrated
portable
instrument

Numeric Effluent Limits


Detection limit
Unit
(min)
1
NTU

0.2

pH

Values
10 NTU for daily flow
weighted average and 20
NTU for any single sample

Lower NEL = 6.0


Upper NEL = 9.0

13-8.02 MATERIALS
13-8.02A General
Design and implement an appropriate active water treatment system for the site conditions and
anticipated flow rate that includes (1) a treatment system, (2) a collection and conveyance system, and
(3) a discharge method.
Design and implement an ATS to capture and treat, within a 72-hour period, a volume equal to the runoff
from a 10-year, 24-hour storm event using a watershed coefficient of 1.0.
13-8.02B Treatment System
The treatment system must be capable of removing sediment and turbidity-producing suspended solids.
Primary and secondary treatment may be required, or the design of the treatment system may require
combined use of the various treatment components in series to achieve effective treatment. The
treatment system must have components to:
1. Remove sediment and turbidity-producing suspended solids. Components may include desilting
basins, settling tanks, sediment traps, gravity bag filters, sand media filters, pressurized bag filters,
cartridge filters, chemical coagulants and in-line flocculants, temporary holding tanks, or any
combination necessary to provide primary and secondary treatment.
2. Adjust pH or dissolved oxygen by:
193

SECTION 13

WATER POLLUTION CONTROL

2.1. Addition of sulfuric, phosphoric, citric, or nitric acid under the supplier's specifications for
treatment of water with high pH. You may use hydrochloric acid if the water is dechlorinated
before discharge.
2.2. Filtration through a limestone bed or addition of sodium hydroxide for treatment of water with a
low pH. You may use carbon dioxide diffusion that produces carbonic acid for pH adjustment.
2.3. Aeration for treatment of water with low dissolved oxygen.
13-8.02C Collection and Conveyance System
Provide pumps and piping to convey the water from the point of dewatering or stormwater capture to the
treatment system and to the point of discharge. Pumps and piping must comply with section 74-2.
Use a flow meter to measure all discharges from treatment activities.
13-8.02D Discharge Method
Provide a method for discharging treated water and include a discharge location. Do not discharge
treated water in a way that impacts the natural bedding and aquatic life.
Discharge treated water:
1. To control dust in active work areas.
2. To land where the grade allows sheet flow and the soil allows infiltration.
3. In a way that does not cause erosion and scour. Whenever scour occurs, repair the damage and
install a velocity dissipater.
13-8.02E13-8.02G Reserved
13-8.03 CONSTRUCTION
13-8.03A General
Water quality must comply with limits for discharge effluents and the receiving waters. Whenever
observations and measurements under section 13-8.03B determine the water quality limits are exceeded:
1. Stop the discharge immediately
2. Notify the Engineer
3. Start corrective measures to change, repair, or replace the equipment and procedures used to treat
the water
After the Engineer inspects and authorizes your corrective measures, resume treatment and discharge
activities under the startup-phase sampling requirements before resuming regular-phase sampling.
Maintain the ATS to provide proper function and prevent leaks. Whenever a component of the dewatering
equipment is not functioning properly, discontinue the treatment activities and repair or replace the
component.
Sediments removed from uncontaminated areas during maintenance of the treatment system must be
dried, distributed uniformly, and stabilized at a location within the project limits where authorized.
Relocate the ATS as needed.
13-8.03B Monitoring
Comply with the manufacturer's instructions for all calibrations of the flow meter. Perform calibrations in
the presence of the Engineer.
While the ATS is being operated, monitor:
1.
2.
3.
4.
5.
6.
7.

Influent turbidity
E
ffluent turbidity
I nfluent pH
Effluent pH
Residual chemical
Effluent flow rate
Effluent flow volume
194

SECTION 13

WATER POLLUTION CONTROL

Monitoring equipment for the ATS must record data at least once every 15 minutes. Cumulative flow data
must be recorded daily. The recording system must have the capacity to record a minimum of 7 days of
continuous data.
Monitoring equipment must be interfaced with the control system of the ATS to provide shutoff or
recirculation whenever effluent readings exceed limits for turbidity and pH. The control system must
default to recirculation or shutoff during a power failure or other catastrophic event.
The control system must control the dose of the coagulant, flocculant, or both to prevent overdosing.
Take water quality measurements to verify limit requirements for receiving waters and discharge effluent
for:
1. Discharges of water that exceed 4 hours in duration occurring within a 24-hour period as follows:
1.1. If the discharge could affect the receiving body of water in a stormwater drainage system, take
measurements at the background and receiving water-sampling locations not more than 1 hour
before discharging the treated water.
1.2. Perform start-up phase sampling 10 to 30 minutes after measurable runoff occurs during a
storm. Startup-phase sampling includes stormwater runoff, background, and receiving water
measurements taken during the first 3 days of discharge. Take samples at regular intervals
during the storm. Take at least 4 samples for each discharge lasting 4 hours or more. The time
between sampling must not exceed 4 hours.
1.3. Perform regular-phase sampling at least twice daily. Regular-phase sampling includes effluent,
background, and receiving water measurements that occur after the 3rd day of activities. Take
samples at regular intervals.
1.4. Whenever the receiving body of water noticeably changes in color or clarity, take additional
effluent, background, and downstream measurements.
1.5. Whenever an initial measurement shows that the water quality limits are exceeded, take an
additional measurement not less than 15 minutes and not more than 1 hour after the initial
measurement.
1.6. Whenever the 2nd test confirms the limits were exceeded, revert to the startup-phase sampling
requirements before resuming regular-phase sampling.
1.7. For cofferdam maintenance dewatering, you may discontinue regular-phase monitoring after
10 days if the effluent and receiving water measurements are consistently below the water
quality limits.
2. Discharges of water for 4 hours or less in duration occurring within a 24-hour period as follows:
2.1. If the discharge could affect the receiving body of water in a stormwater drainage system, take
measurements at the background and receiving water-sampling locations no more than 1 hour
before discharging the treated water.
2.2. Take effluent, background, and receiving water measurements from 10 to 30 minutes after
initiating the discharge. Continue to take measurements every hour.
2.3. Whenever an initial measurement shows that the water quality limits are exceeded, take an
additional measurement not more than 15 minutes after the initial measurement.
2.4. Whenever the receiving body of water noticeably changes in color or clarity, take additional
effluent, background, and downstream measurements.
3. All other discharges of water as follows:
3.1. Measure stormwater effluent turbidity and pH at the end of the outfall or in-line sampling port.
3.2. Measure receiving water turbidity, pH, and dissolved oxygen at a point within the mixing zone.
3.3. Measure receiving water turbidity, pH, and dissolved oxygen at a point within 15 feet

downstream of the discharge point.

3.4. Measure natural background turbidity, dissolved oxygen, and pH at a location that is from 9 to
15 feet upstream of the discharge point. If another job site activity is being performed, measure
at least 150 feet upstream of the discharge point.
3.5. If the discharge is made into a surface body of water or into a stormwater drainage system that
produces an observable effect on a surface body of water, monitor the receiving water.
4. Receiving water and natural background measurements as follows:
4.1. If the receiving water is deeper than 3 feet, take depth-averaged measurements by taking
samples from 3 points within the water column and averaging the following 3 measurements:
4.1.1. 12 inches below the surface.
4.1.2. Mid-depth.
195

SECTION 13

WATER POLLUTION CONTROL

4.1.3. 12 inches above the bottom.


4.2. If the receiving water is less than 3 feet in depth, take the measurement 12 inches below the
surface.
Comply with the manufacturer's instructions for the use and calibration of meters and devices for taking
water quality measurements. Perform calibrations in the presence of the Engineer.
13-8.03C13-8.03E Reserved
13-8.04 PAYMENT
Not Used
13-9 TEMPORARY CONCRETE WASHOUTS
13-9.01 GENERAL
13-9.01A Summary
Section 13-9 includes specifications for installing temporary concrete washouts. Temporary concrete
washouts include:
1. T
emporary concrete washout facilities
2. Portable temporary concrete washouts
3. Temporary concrete washout bins
13-9.01B Submittals
At least 5 business days before concrete activities start, submit an informational submittal that includes:
1.
2.
3.
4.

Location of each concrete washout


Name and location of the off-site concrete waste disposal plant to receive the concrete waste
Copy of the permit issued by the RWQCB for the off-site commercial disposal plant
Copy of the permit issued by the state or local agency having jurisdiction over the disposal plant if the
disposal site is located outside of the State

Retain and submit an informational submittal for records of disposed concrete waste, including weight
tickets and receipts for delivery and removal of temporary concrete washouts.
Submit a certificate of compliance for:
1. G
ravel-filled bag
2. P
lastic liner
Submit a sample of your alternate attachment device for temporary sediment barriers if you propose not
to use staples.
13-9.02 MATERIALS
13-9.02A General
The sign for a concrete washout must comply with section 12-3.06B(3), except the sign panel may be
plywood if authorized. The sign panel must be at least 2 by 4 feet in size. The sign legend must read
"Concrete Washout" in at least 3-inch high black letters on a white background.
13-9.02B Temporary Concrete Washout Facility
Stakes for a temporary concrete washout facility must comply with section 13-10.02C.
Straw bales for a temporary concrete washout facility must comply with section 13-10.02H.
Gravel-filled bags for a temporary concrete washout facility must comply with section 13-5.02G.
The plastic liner for a temporary concrete washout facility must be:
1. Single ply, new polyethylene sheeting, without seams or overlapping joints
2. At least 10 mils thick
3. Free of holes, punctures, tears or other defects

196

SECTION 13

WATER POLLUTION CONTROL

13-9.02C Portable Temporary Concrete Washout


A portable temporary concrete washout must be a commercially available, watertight container with
enough capacity to contain all liquid and concrete waste generated by washout activities without seepage
or spills and be:
1. At least 55 gallons in capacity.
2. Labeled for exclusive use as a concrete waste and washout facility. Stencil "Concrete Waste
Material" in 3-inch high black letters on white background where the top of stenciling is 12 inches from
the top of the container.
13-9.02D Temporary Concrete Washout Bin
A temporary concrete washout bin must be a commercially available, watertight container with enough
capacity to contain all liquid and concrete waste generated by washout activities without seepage or spills
and be:
1. At least 5 cubic yards in capacity
2. Roll-off type with or without folding steel ramps
3. Labeled for exclusive use as a concrete waste and washout facility
13-9.02E13-9.02G Reserved
13-9.03 CONSTRUCTION
Place a concrete washout at the job site:
1.
2.
3.
4.

Before concrete placement activities start


In the immediate area of concrete work where authorized
No closer than 50 feet from storm drain inlets, open drainage facilities, ESAs, and watercourses
Away from traffic or public access areas

Install a concrete washout sign adjacent to each concrete washout location.


Use a concrete washout to collect:
1. Washout from concrete delivery trucks
2. Slurries containing PCC or HMA from sawcutting, coring, grinding, grooving, and hydro-concrete
demolition
3. Concrete waste from mortar mixing stations
Do not fill a concrete washout higher than 6 inches below the upper rim.
Remove and dispose of concrete waste within 2 business days after a concrete washout becomes filled.
Dispose of concrete waste material from a concrete washout at a plant licensed to receive solid concrete
waste, liquid concrete waste, or both.
Relocate a portable temporary concrete washout or bin as needed for concrete work.
The Department does not pay for relocating a portable temporary concrete washout or bin.
Secure a portable temporary concrete washout or bin to prevent spilling of concrete waste material
whenever it is being relocated or transported within the job site. Whenever any spilled material is
observed, clean up the spilled material and place it back into the concrete washout unit.
13-9.04 PAYMENT
Not Used
13-10 TEMPORARY LINEAR SEDIMENT BARRIERS
13-10.01 GENERAL
13-10.01A Summary
Section 13-10 includes specifications for installing temporary linear sediment barriers.

197

SECTION 13

WATER POLLUTION CONTROL

13-10.01B Submittals
Submit a certificate of compliance for:
1.
2.
3.
4.
5.
6.

F
iber roll
Safety cap for metal posts
Silt fence fabric
Sediment filter bag
F
oam barrier
Gravel-filled bag fabric

If you substitute steel wire staples with an alternative attachment device, submit a sample of the device
for approval at least 5 business days before installation.
13-10.02 MATERIALS
13-10.02A General
Fasteners and stakes must comply with section 21-1.02R.
13-10.02B Fiber Roll
Fiber rolls must comply with section 21-1.02P.
Fiber rolls for a large sediment barrier must be Type B, except the dimensions must be from 18 to 22
inches in diameter, at least 8 feet long, and weigh at least 6.5 pounds per linear foot.
13-10.02C Posts
Posts must be wood or metal.
Wood posts must be:
1.
2.
3.
4.

At least 2 by 2 inches in size and 4 feet long


Untreated fir, redwood, cedar, or pine, cut from sound timber
Straight and free of loose or unsound knots and other defects that could render the posts unfit for use
Pointed on the end to be driven into the ground

Metal posts must:


1. Be at least 4 feet long.
2. Be made of steel.
3. Have a U-shaped, T-shaped, L-shaped, or other cross-sectional shape that can resist failure from
lateral loads.
4. Be pointed on the end to be driven into the ground.
5. Weigh at least 0.75 pound per foot.
6. Have a safety cap attached to the exposed end. The safety cap must be orange or red plastic and
must fit snugly onto the metal post.
Do not use metal posts for a temporary large sediment barrier.
Posts for a temporary reinforced silt fence must be at least 6 feet in length for a Type 1 installation and 5
feet in length for a Type 2 installation.
Posts used as stakes for a temporary straw-bale barrier must be wood or metal.
13-10.02D High Visibility Fence
High visibility fabric must contain UV inhibitors and comply with the requirements in the following table:
Property
Width, inches, min
Opening size inches
Color
Roll weight, lb, min for 4 x 100 roll

Specifications
Measured
Measured
Observed
Measured
198

Requirements
48
1" x 1" (min)
2" x 4" (max)
Orange
12

SECTION 13
Tensile strength, lb, min

WATER POLLUTION CONTROL

ASTM D4595

320

13-10.02E Wire Mesh


Wire mesh for a temporary reinforced silt fence must comply with section 80-2.02E, be fabricated from at
least 14-gage horizontal and vertical wires welded at each intersection, and have a maximum opening 2
inches wide by 4 inches high. The fence must be supplied in 50-foot rolls.
13-10.02F Wire
Wire for guy wires and tie wires for a temporary reinforced silt fence must be 16-gage iron or steel.
13-10.02G Anchors
Anchors for a temporary reinforced silt fence must be fabricated from no. 4 steel reinforcing bar.
13-10.02H Straw Bales
Straw for straw bales must comply with section 21-1.02I.
Straw bales must be:
1. At least 14 inches wide, 18 inches high, 36 inches long, and weigh at least 50 pounds.
2. Composed entirely of vegetative matter except for the binding material.
3. Bound by wire, nylon, or polypropylene string. Do not use jute or cotton binding. Baling wire must be
at least 16 gauge. Nylon or polypropylene string must be approximately 0.08 inch in diameter with 80
pounds of breaking strength.
13-10.02I Foam Barriers
Foam barriers must have:
1.
2.
3.
4.
5.
6.
7.

Urethane foam-filled core


Geosynthetic fabric cover and flap
Triangular, circular, or square cross section
Vertical height of at least 5 inches after installation
Horizontal flap at least 8 inches in width
A length of at least 4 feet per unit
Ability to interlock separate units into a long barrier so that water will not flow between units

The geosynthetic fabric cover and flap for foam barriers must have the values of the properties shown in
the following table:
Property
Grab breaking load
1-inch grip, lb, min in each direction
Apparent elongation
%, min in each direction
Water flow rate
max average roll value, gpm/sq ft
Permittivity
1/sec, min
Apparent opening size
max average roll value, U.S. standard sieve size
UV resistance, %
min retained grab breaking load, 500 hr

Test method
ASTM D4632

Value
200

ASTM D4632

15

ASTM D4491

100150

ASTM D4491

0.05

ASTM D4751

40

ASTM D4355

70

Secure foam barriers to:


1. Pavement with 1-inch concrete nails, 1-inch washers, and solvent-free adhesive
2. Soil with 6-inch nails and 1-inch washers

199

SECTION 13

WATER POLLUTION CONTROL

13-10.02J Gravel-filled Bag Berms


Gravel-filled bags for the temporary gravel bag berm must comply with section 13-5.02G.
13-10.02K13-10.02M Reserved
13-10.03 CONSTRUCTION
13-10.03A General
Before installing a temporary linear sediment barrier, remove obstructions, including rocks, clods, and
debris greater than 1 inch in diameter from the ground.
Maintain a temporary linear sediment barrier to provide sediment-holding capacity and to reduce
concentrated flow velocities.
Repair or adjust the barrier whenever rills and other evidence of concentrated runoff are occurring
beneath the barrier.
Repair or replace split, torn, or unraveled material. Add or replace posts, stakes, or fasteners as needed
to prevent sagging or slumping.
Whenever a barrier becomes detached or dislodged from the pavement, reattach it.
Repair a split or torn rigid plastic barrier with 16-gauge galvanized steel wire or UV-stabilized cable ties
from 5 to 7 inches in length.
Remove sediment deposits, trash, and other debris as needed or ordered.
Remove sediment deposits whenever the sediment exceeds:
1. 1/3 of the height above ground behind a fence
2. 1 inch in depth behind a flexible sediment barrier
Whenever you place the removed sediment deposits within the job site, stabilize the sediment deposits to
prevent erosion.
Place gravel-filled bags behind Type K temporary railing if used within a shoulder area.
13-10.03B Temporary Fiber Rolls
Install temporary fiber rolls under section 21-1.03P.
13-10.03C Temporary Gravel Bag Berms
Place the bags end-to-end to eliminate gaps. Place bags approximately parallel with the slope contour.
Angle the last 6 feet upslope at the downhill end of the run. Stack the bags so that the upper row overlaps
joints in the lower row.
If you need to increase the height of a temporary gravel bag berm, add more layers of gravel-filled bags.
Stack the bags in the upper row to overlap the joints in the lower row. Stabilize the rows by adding more
rows of bags in the lower layers.
13-10.03D Temporary Large Sediment Barriers
Install a temporary large sediment barrier as follows:
1. Place a single row of fiber rolls end-to-end approximately parallel with the slope contour. For any 20
foot section of fiber roll, do not allow the fiber roll to vary by more than 5 percent from level.
2. Place the fiber rolls in a furrow that is from 6 to 8 inches deep.
3. Secure the fiber rolls with wood stakes 4 feet apart.
4. Place a stake 18 inches from each end of each fiber roll.
5. Drive the stakes into the soil so that the top of the stakes are less than 2 inches above the top of the
fiber rolls.
6. Angle the last 6 feet upslope at the downhill end of the run.

200

SECTION 13

WATER POLLUTION CONTROL

13-10.03E Temporary Reinforced Silt Fences


Place a temporary reinforced silt fence parallel with the slope contour. For any 50-foot section of
reinforced silt fence, do not allow the elevation at the base of the fence to vary by more than 1/3 of the
fence height.
Install a temporary reinforced silt fence as follows:
1.
2.
3.
4.

Dig a 6-inch deep trench.


Place the wire mesh and the bottom of the silt fence fabric in the trench.
Place posts on the downhill side of the fabric and wire mesh.
Attach the silt fence fabric to the wire mesh with tie wires or locking plastic fasteners along the length
of the fence at not more than 3-foot horizontal spacing and from top to bottom at not more than 8-inch
vertical spacing.
5. Backfill the trench with soil by hand or mechanical tamping to secure the silt fence fabric and the wire
mesh in the trench.
6. Attach guy wires and anchors at each post. Install at least 2 anchors and guy wires at angle points
and end posts.
Connect sections of temporary reinforced silt fence as follows:

1. Join separate sections of the silt fence to form reaches not more than 500 feet long. Each section
must be a continuous run of silt fence from end-to-end or from an end to an opening, including joined
panels.
2. Secure the end posts of each section by wrapping the tops of the posts with at least 2 wraps of 16
gauge tie wire.
If temporary reinforced silt fence Type 1 is shown, attach high-visibility fabric to the steel posts by using
tie wires or locking plastic fasteners.
13-10.03F Temporary Silt Fences
Construct a temporary silt fence with silt fence fabric, posts, and fasteners assembled at the job site or
with prefabricated silt fence.
If prefabricated silt fence is used, attach the fabric to the posts by inserting the posts into the sewn
pockets. If assembled at the job site:
1. Fasten the fabric to the posts with staples or nails if wood posts are used
2. Fasten the fabric to the posts with tie wires or locking plastic fasteners if steel posts are used
3. Space the fasteners not more than 8 inches apart
Place temporary silt fence parallel with the slope contour. For any 50-foot section of temporary silt fence,
do not allow the base elevation of the fence to vary by more than 1/3 of the height of the fence above the
ground.
Install a temporary silt fence as follows:
1. Place the bottom of the fabric in a 6-inch deep trench
2. Secure it with the posts placed on the downhill side of the fabric
3. Backfill the trench with soil and compact by hand or mechanical methods to secure the fabric in the
trench
Connect sections of a temporary silt fence as follows:
1. Join separate sections of the silt fence to form reaches not more than 500 feet long. Each section
must be a continuous run from end-to-end or from an end to an opening, including joined panels.
2. Secure the end posts of each section by wrapping the tops of the posts with at least 2 wraps of 16
gauge tie wire.
You may install the silt fence by mechanically pushing the silt fence fabric vertically into the soil.
Mechanically installed fabric must not slip out of the soil or allow sediment to pass under the fabric.

201

SECTION 13

WATER POLLUTION CONTROL

13-10.03G Temporary Straw Bale Barriers


Install a temporary straw bale barrier as follows:
1. Place a single row of straw bales end-to-end parallel with the slope contour. For any 20-foot section
of straw bale barrier, do not allow it to vary by more than 5 percent from level.
2. Place straw bales in a trench or keyed into the slope. Place the bales so that the binding wire or string
does not come in contact with the soil.
3. Secure each straw bale with 2 stakes. The first stake in each bale must be driven toward the
previously laid bale to force the bales together.
4. Drive the stakes into the soil so that the top of the stake is less than 2 inches above the top of the
straw bale.
5. Angle the last 6 feet upslope at the downhill end of the run.
13-10.03H Temporary Foam Barriers
Secure temporary foam barriers to the pavement with nails and adhesive, gravel-filled bags, or a
combination.
Install the foam barrier with the horizontal flap in a 3-inch deep trench and secure with nails and washers
placed not more than 4 feet apart. Secure the barrier with 2 nails at the connection points where barriers
overlap. Do not pierce the barrier's core with nails or stakes.
13-10.03I Temporary Earthen Berms
Construct a temporary earthen berm with native soil or selected material at least 8 inches high by 36
inches wide. Compact by hand or mechanical methods.
13-10.03J13-10.03L Reserved
13-10.04 PAYMENT
Not Used
13-1113-14 RESERVED

202

14 ENVIRONMENTAL STEWARDSHIP

14-1 GENERAL

14-1.01 GENERAL

Section 14-1 includes general specifications for environmental compliance and environmental resource
management.
14-1.02 ENVIRONMENTALLY SENSITIVE AREA
14-1.02A General
Section 14-1.02 includes specifications for environmentally sensitive area requirements.
If an ESA is shown:
1. The boundaries shown are approximate; the Department marks the exact boundaries on the ground
2. Do not enter the ESA unless authorized
3. If the ESA is breached, immediately:
3.1. Secure the area and stop all operations within 60 feet of the ESA boundary
3.2. Notify the Engineer
4. If the ESA is damaged, the Department determines what efforts are necessary to remedy the damage
and who performs the remedy; you are responsible for remedies and charges
14-1.02B Materials
Not Used
14-1.02C Construction
Not used
14-1.02D Payment
Not used
14-1.03 TYPE ESA TEMPORARY FENCE
14-1.03A General
14-1.03A(1) Summary
Section 14-1.03 includes specifications for installing, maintaining, and removing Type ESA temporary

fence.

Type ESA temporary fence provides a visible boundary adjacent to protected areas such as an ESA.

Signs are required for Type ESA temporary fence.

14-1.03A(2) Submittals
Submit a certificate of compliance for high visibility fabric and safety caps for metal posts.
14-1.03B Materials
14-1.03B(1) High Visibility Fabric
High visibility fabric for Type ESA temporary fence must comply with section 13-10.02D and must:
1. Contain ultraviolet inhibitors
2. Comply with the ESA properties in the following table:

203

SECTION 14

ENVIRONMENTAL STEWARDSHIP

Property
Width, inches, min
Opening size,
inches
Color
Roll weight, lb, min
for 4 by 100 foot
roll
Tensile strength, lb,
min

Specifications
Measured
Measured
Observed
Measured

Requirements
48
1 by 1 inch (min)
2 by 4 inches (max)
Orange
12

ASTM D4595

320

14-1.03B(2) Posts
Posts for Type ESA temporary fence must be wood or steel.
Wood and metal posts for Type ESA temporary fence must comply with section 13-10.02.
Wood posts must be at least 2 by 2 inches in size and 6 feet long.
Metal posts must be at least 6 feet long.
14-1.03B(3) Signs
Signs for Type ESA temporary fence must be:
1. Weatherproof and fade-proof and may include plastic laminated printed paper affixed to an inflexible
weatherproof backer board
2. Attached to the high visibility fabric with tie wire or locking plastic fasteners
14-1.03C Construction
14-1.03C(1) General
Install Type ESA temporary fence:
1. With high visibility fabric, posts, and fasteners as follows:
1.1. If wood posts are used, fasteners must be staples or nails
1.2. If steel posts are used, fasteners must be tie wires or locking plastic fasteners
1.3. Spacing of the fasteners must be no more than 8 inches apart
2. Before clearing and grubbing activities
3. From outside of the protected area
4. With posts spaced 8 feet apart and embedded at least 16 inches in the soil
Signs must be attached with the top of the sign panel flush with the top of the high visibility fabric and
placed 100 feet apart along the length and at each end of the fence.
If trees and other plants need protection, install the fence to enclose the drip line of the foliage canopy of
protected plants and protect visible roots from encroachment.
14-1.03C(2) Maintenance
Maintain Type ESA temporary fence by:
1.
2.
3.
4.

Keeping posts in a vertical position


Reattaching fabric to posts
Replacing damaged sections of fabric
Replacing and securing signs

14-1.03D Payment
The fence payment quantity does not include the width of openings.
The fence is measured:
1. Parallel to the ground slope
204

SECTION 14

ENVIRONMENTAL STEWARDSHIP

2. Along the fence


14-1.0414-1.10 RESERVED
14-2 CULTURAL RESOURCES
14-2.01 GENERAL
Section 14-2 includes specifications relating to cultural resources.
14-2.02 ARCHAEOLOGICAL RESOURCES
14-2.02A General
Section 14-2.02 applies if archaeological resources are discovered at the job site. Do not disturb the
resources and immediately:
1. Stop all work within a 60-foot radius of the discovery
2. Protect the discovery area
3. Notify the Engineer
The Department investigates. Do not move archaeological resources or take them from the job site. Do
not resume work within the discovery area until authorized.
If ordered, furnish resources to assist in the investigation or recovery of archaeological resources. This
work is change order work.
14-2.02B Materials
Not Used
14-2.02C Construction
Not used
14-2.02D Payment
Not used
14-2.03 ARCHAEOLOGICAL MONITORING AREA
14-2.03A General
Section 14-2.03 applies if an AMA is described in the Contract.
The Department assigns an archaeological monitor to monitor job site activities within the AMA. Do not
work within the AMA unless the archeological monitor is present.
The Engineer and the Department's archaeological monitor conduct an AMA location field review with you
at least 5 business days before start of work. The Department marks the exact boundaries of the AMA on
the ground.
If Type ESA temporary fence or other enclosure for an AMA is described in the Contract, install Type ESA
temporary fence or other enclosure to define the boundaries of the AMA during the AMA location field
review.
At least 5 business days before starting work within an AMA, submit a schedule of days and hours to be
worked for the Engineer's authorization. If you require changes in the schedule, submit an update for the
Engineer's authorization at least 5 business days before any changed work day.
If archaeological resources are discovered within an AMA, comply with section 14-2.02.
14-2.03B Materials
Not Used
14-2.03C Construction
Not used
14-2.03D Payment
Not used
205

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-2.0414-2.09 RESERVED
14-2.10 HISTORIC STRUCTURES
Reserved
14-2.1114-2.16 RESERVED
14-3 COMMUNITY IMPACTS AND ENVIRONMENTAL JUSTICE
14-3.0114-3.10 RESERVED
14-4 NATIVE AMERICAN CONCERNS
14-4.0114-4.10 RESERVED
14-5 AESTHETICS
14-5.0114-5.10 RESERVED
14-6 BIOLOGICAL RESOURCES
14-6.01 GENERAL
14-6.01A General
14-6.01A(1) Summary
Section 14-6 includes specifications relating to biological resources.

14-6.01A(2) Definitions

Nongame birds: Birds identified in the Fish and Game Code as nongame birds.

14-6.01B Materials
Not Used
14-6.01C Construction
Not Used
14-6.01D Payment
Not Used
14-6.02 SPECIES PROTECTION
Reserved
14-6.03 BIRD PROTECTION
14-6.03A General
Section 14-6.03 includes specifications relating to bird protection.

Protect migratory and nongame birds, their occupied nests, and their eggs.

The Department anticipates nesting or attempted nesting from February 15 to September 1.

The federal Migratory Bird Treaty Act, 16 USC 703711, and 50 CFR Pt 10 and Fish & Game Code

3503, 3513, and 3800 protect migratory and nongame birds, their occupied nests, and their eggs.

The federal Endangered Species Act of 1973, 16 USC 1531 and 1543, and the California Endangered

Species Act, Fish & Game Code 20502115.5, prohibit the take of listed species and protect occupied

and unoccupied nests of threatened and endangered bird species.

The Bald and Golden Eagle Protection Act, 16 USC 668, prohibits the destruction of bald and golden

eagles and their occupied and unoccupied nests.

If migratory or nongame bird nests are discovered that may be adversely affected by construction

activities or an injured or killed bird is found, immediately:

1. Stop all work within a 100-foot radius of the discovery


2. Notify the Engineer
The Department investigates. Do not resume work within the specified radius of the discovery until
authorized.
206

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-6.03B Materials
Not Used
14-6.03C Construction
If ordered, use exclusion devices, take nesting prevention measures, remove and dispose of partially
constructed and unoccupied nests of migratory or nongame birds on a regular basis to prevent their
occupation, or perform any combination of these. This work is change order work.
Prevent nest materials from falling into waterways.
14-6.03D Payment
Not used
14-6.04 FISH PROTECTION
Section 14-6.04 includes specifications relating to fish protection.
Protect all life stages of anadromous fish in streams and conduct work activities to allow free passage of
anadromous migratory fish. Assure that construction work does not produce sound in water that results in
unauthorized take of listed species.
14-6.05 CONTRACTOR-SUPPLIED BIOLOGIST
Reserved
14-6.06 SPECIES PROTECTION AREA
Reserved
14-6.07 NATURAL RESOURCES PROTECTION PLAN
Reserved
14-6.08 BIOLOGICAL RESOURCE INFORMATION PROGRAM
Reserved
14-6.09 TEMPORARY WETLAND PROTECTION MAT
Reserved
14-6.1014-6.20 RESERVED
14-7 PALEONTOLOGICAL RESOURCES
14-7.01 GENERAL
Section 14-7 includes specifications relating to paleontological resources.
14-7.02 PALEONTOLOGICAL RESOURCE DISCOVERY
14-7.02A General
Section 14-7.02 includes specifications relating to paleontological resource discovery.

If paleontological resources are discovered at the job site, do not disturb the material and immediately:

1. Stop all work within a 60-foot radius of the discovery


2. Protect the area
3. Notify the Engineer
The Department investigates and modifies the dimensions of the protected area if necessary. Do not
move paleontological resources or take them from the job site. Do not resume work within the specified
radius of the discovery until authorized.
14-7.02B Materials
Not Used
14-7.02C Construction
Not Used
207

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-7.02D Payment
Not Used
14-7.0314-7.10 RESERVED
14-8 NOISE AND VIBRATION
14-8.01 GENERAL
Section 14-8 includes specifications relating to controlling noise and vibration.
14-8.02 NOISE CONTROL
14-8.02A General
Section 14-8.02 includes specifications relating to noise control.

Do not exceed 86 dBA LMax at 50 feet from the job site activities from 9 p.m. to 6 a.m.

Equip an internal combustion engine with the manufacturer-recommended muffler. Do not operate an

internal combustion engine on the job site without the appropriate muffler.

14-8.02B Materials
Not Used
14-8.02C Construction
Not Used
14-8.02D Payment
Not Used
14-8.0314-8.10 RESERVED
14-9 AIR QUALITY
14-9.01 GENERAL
Section 14-9 includes specifications relating to air quality.
14-9.02 AIR POLLUTION CONTROL
14-9.02A General
Section 14-9.02 includes specifications relating to air pollution control.
Comply with air pollution control rules, regulations, ordinances, and statutes that apply to work performed
under the Contract, including air pollution control rules, regulations, ordinances, and statutes provided in
Govt Code 11017 (Pub Cont Code 10231).
Do not burn material to be disposed of.
14-9.02B Materials
Not Used
14-9.02C Construction
Not Used
14-9.02D Payment
Not Used
14-9.03 DUST CONTROL
14-9.03A General
Section 14-9.03 includes specifications relating to dust control.

Prevent and alleviate dust by applying water, dust palliative, or both under section 14-9.02 and by

covering active and inactive stockpiles under sections 13-4.03C(3) and 14-9.02.

Apply water under section 17.

Apply dust palliative under section 18.

208

SECTION 14

ENVIRONMENTAL STEWARDSHIP

If ordered, apply water, dust palliative, or both to control dust caused by public traffic. This work is change
order work.
14-9.03B Materials
Not Used
14-9.03C Construction
Not Used
14-9.03D Payment
Not Used
14-9.04 AIR MONITORING
Reserved
14-9.0514-9.10 RESERVED
14-10 SOLID WASTE DISPOSAL AND RECYCLING
14-10.01 GENERAL
Section 14-10 includes general specifications relating to solid waste disposal and recycling.
Do not allow litter, trash, or debris to accumulate anywhere on the job site, including storm drain grates,
trash racks, and ditch lines. Pick up and remove litter, trash, and debris from the job site at least once a
week. WPC manager must monitor solid waste storage and disposal procedures on the job site.
If practicable, recycle nonhazardous job site waste and excess material. If recycling is not practicable,
dispose of it.
Furnish enough closed-lid dumpsters of sufficient size to contain the solid waste generated by work
activities. When refuse reaches the fill line, empty the dumpsters. Dumpsters must be watertight. Do not
wash out dumpsters at the job site. Furnish additional containers and more frequent pickup during the
demolition phase of construction.
Solid waste includes:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Brick
Mortar
Timber
Metal scraps
Sawdust
Pipe
Electrical cuttings
Nonhazardous equipment parts
Styrofoam and other packaging materials
Vegetative material and plant containers from highway planting
Litter and smoking material, including litter generated randomly by the public
Other trash and debris

Furnish and use trash receptacles in the job site yard, field trailers, and locations where workers gather
for lunch and breaks.
14-10.02 SOLID WASTE DISPOSAL AND RECYCLING REPORT
14-10.02A General
Section 14-10.02 includes specifications relating to the solid waste disposal and recycling report.
14-10.02A(1) Submittals
Submit an annual Solid Waste Disposal and Recycling Report between January 1 and 15 for each year
work is performed under the Contract at any time during the previous calendar year. Show the types and
amounts of project-generated solid waste taken to or diverted from landfills or reused on the project from
January 1 through December 31 of the previous calendar year.

209

SECTION 14

ENVIRONMENTAL STEWARDSHIP

Submit a final annual Solid Waste Disposal and Recycling Report within 5 business days after Contract
acceptance. Show the types and amounts of project-generated solid waste taken to or diverted from
landfills or reused on the project from January 1 to Contract acceptance.
For each failure to submit a completed report, the Department withholds $10,000.
14-10.02B Materials
Not Used
14-10.02C Construction
Not Used
14-10.02D Payment
Not Used
14-10.0314-10.10 RESERVED
14-11 HAZARDOUS WASTE AND CONTAMINATION
14-11.01 GENERAL
14-11.01A Summary
Section 14-11 includes general specifications relating to hazardous waste and contamination
If hazardous waste is, or will be, generated on the job site, the WPC manager must be thoroughly familiar
with proper hazardous waste handling and emergency procedures under 40 CFR 262.34(d)(5)(iii) and
must have successfully completed training under 22 CA Code of Regs 66265.16.
The WPC manager must:
1. Oversee and enforce hazardous waste management practices
2. Inspect all hazardous waste storage areas daily, including all temporary containment facilities and
satellite collection locations
3. Oversee all hazardous waste transportation activities on the job site
14-11.01B Submittals
14-11.01B(1) Disposal Documentation of Contractor-Generated Hazardous Waste
Submit a copy of uniform hazardous waste manifest forms within 24 hours of transporting hazardous
waste.
14-11.01B(2) Disposal Documentation of Department Generated Hazardous Waste
Submit receiving landfill documentation of proper disposal within 5 business days of hazardous waste
transport from the project.
14-11.02 CONSTRUCTION
14-11.02A Unanticipated Discovery of Asbestos and Hazardous Substances
Upon discovery, immediately stop working in and notify the Engineer of areas where asbestos or a
hazardous substance is present if the:
1. Contractor reasonably believes the substance is asbestos as defined in Labor Code 6501.7 or a
hazardous substance as defined in Health & Safety Code 25316 and 25317
2. Presence is not described in the Contract
3. Substance has not been made harmless
14-11.02B Hazardous Waste Management Practices
Handle, store, and dispose of hazardous waste under 22 CA Code of Regs Div 4.5.
Use the following storage procedures:
1. Store hazardous waste and potentially hazardous waste separately from nonhazardous waste at the
job site.
2. For hazardous waste storage, use metal containers approved by the United States Department of
Transportation (US DOT) for the transportation and temporary storage of hazardous waste.
210

SECTION 14

ENVIRONMENTAL STEWARDSHIP

3. Store hazardous waste in sealed, covered containers labeled with the contents and accumulation
start date under 22 CA Code of Regs, Div 4.5. Labels must comply with the provisions of 22 CA Code
of Regs, Div 4.5. 66262.31 and 66262.32. Immediately replace damaged or illegible labels.
4. Handle hazardous waste containers such that no spillage occurs.
5. Store hazardous waste away from storm drains, watercourses, moving vehicles, and equipment.
6. Furnish containers with adequate storage volume at convenient satellite locations for hazardous
waste collection. Immediately move these containers to secure temporary containment facilities when
no longer needed at the collection location or when full.
7. Store hazardous waste and potentially hazardous waste in secure temporary containment enclosures
having secondary containment facilities impervious to the materials stored there for a minimum
contact time of 72 hours. Temporary containment enclosures must be located away from public
access. Acceptable secure enclosures include a locked chain link fenced area or a lockable shipping
container located within the project limits until disposal as authorized.
8. Design and construct secondary containment facilities with the capacity to contain precipitation from a
24-hour-long, 25-year storm; and 10 percent of the aggregate volume of all containers, or the entire
volume of the largest container within the facility, whichever is greater.
9. Cover secondary containment facilities during non-working days and if a storm event is predicted.
Secondary containment facilities must be adequately ventilated.
10. Keep secondary containment facility free of accumulated rainwater or spills. After a storm event, or in
the event of spills or leaks, collect accumulated liquid and place into drums within 24 hours. Handle
these liquids as hazardous waste unless testing determines them to be nonhazardous.
11. Do not store incompatible wastes, such as chlorine and ammonia, in the same secondary
containment facility.
12. Provide sufficient separation between stored containers to allow for spill cleanup or emergency
response access. Storage areas must be kept clean, well organized, and equipped with cleanup
supplies appropriate for the wastes being stored.
13. Repair or replace perimeter controls, containment structures, covers, and liners as necessary. Inspect
storage areas before and after a storm event, and at least weekly during other times.
Do not:
1.
2.
3.
4.

O
verfill hazardous waste containers
Spill hazardous waste or potentially hazardous waste
Mix hazardous wastes
Allow hazardous waste or potentially hazardous waste to accumulate on the ground

Dispose of hazardous waste within 90 days of the start of generation. Use a hazardous waste manifest
and a transporter registered with the DTSC and in compliance with the CA Highway Patrol Biennial
Inspection of Terminals Program to transport hazardous waste to an appropriately permitted hazardous
waste management facility.
14-11.02C Dust Control
Excavation, transportation, and handling of material containing hazardous waste or contamination must
result in no visible dust migration. Have a water truck or tank on the job site at all times while clearing and
grubbing and performing earthwork operations in work areas containing hazardous waste or
contamination.
14-11.02D Stockpiling
Do not stockpile material containing hazardous waste or contamination unless ordered by the Engineer.
Stockpiles of material containing hazardous waste or contamination must not be placed where affected by
surface run-on or run-off. Cover stockpiles with 13 mils minimum thickness of plastic sheeting or 1 foot of
nonhazardous material. Do not place stockpiles in environmentally sensitive areas. Stockpiled material
must not enter storm drains, inlets, or waters of the State.
14-11.02D(1) Liner
Reserved

211

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-11.02E Contractor-Generated Hazardous Waste


14-11.02E(1) General
You are the generator of hazardous waste generated as a result of materials you bring to the job site. Use
hazardous waste management practices under section 14-11.02B if you generate waste on the job site
from the following substances:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Petroleum materials
Asphalt materials
Concrete curing compound
Pesticides
Acids
Paints
Stains
Solvents
Wood preservatives
Roofing tar
Road flares
Lime
Glues and adhesives
Materials classified as hazardous waste under 22 CA Code of Regs, Div 4.5

If hazardous waste constituent concentrations are unknown, use a laboratory certified by the
Environmental Laboratory Accreditation Program under the California Department of Public Health
(CDPH) to analyze a minimum of 4 discrete representative samples of the waste to determine whether it
is a hazardous waste and to determine safe and lawful methods for storage and disposal. Perform
sampling and analysis in compliance with US EPA Test Methods for Evaluating Solid Waste,
Physical/Chemical Methods (SW-846) and under 22 CA Code of Regs, Div 4.5.
Use your own US EPA Generator Identification Number and sign hazardous waste manifests for the
hazardous waste you generate.
14-11.02E(2) Contaminated Soil
Identify contaminated soil resulting from spills or leaks by noticing discoloration, or differences in soil
properties. Immediately notify the Engineer of spills or leaks. Clean up spills and leaks under the
Engineer's direction and to the satisfaction of the Engineer. Soil with evidence of contamination must be
sampled and analysis performed by a laboratory certified by the ELAP.
If sampling and analysis of contaminated soil demonstrates that it is a hazardous waste, handle and
dispose of the soil as hazardous waste. You are the generator of hazardous waste created as the result
of spills or leaks for which you are responsible.
Prevent the flow of water, including ground water, from mixing with contaminated soil by using one or a
combination of the following measures:
1.
2.
3.
4.
5.

Berms
Cofferdams
Grout curtains
Freeze walls
Concrete seal course

If water mixes with contaminated soil and becomes contaminated, sample and analyze the water using a
laboratory certified by the ELAP. If analysis results demonstrate that the water is a hazardous waste,
manage and dispose of the water as hazardous waste.
14-11.02F Department-Generated Hazardous Waste
14-11.02F(1) General
If the Department is the generator of hazardous waste during the work performed on this project use
hazardous waste management practices under section 14-11.02B.

212

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-11.02F(2) Hazardous Waste Storage


Labels must comply with the provisions of 22 CA Code of Regs 66262.31 and 66262.32. Mark labels
with:
1. Date the hazardous waste is generated
2. The words "Hazardous Waste"
3. Composition and physical state of the hazardous waste (for example, asphalt grindings with
thermoplastic or paint)
4. The word "Toxic"
5. Name, address, and telephone number of the Engineer
6. C
ontract number
7. Contractor or subcontractor name
Handle the containers such that no spillage occurs. You are the generator of any hazardous waste
generated as the result of cleanup of spillage.
14-11.02F(3) Hazardous Waste Transport and Disposal
Dispose of hazardous waste within California at a disposal site operating under a permit issued by DTSC.
The Engineer will obtain the US EPA Generator Identification Number for hazardous waste disposal.
The Engineer will sign all hazardous waste manifests. Notify the Engineer 5 business days before the
manifests are to be signed.
The Department will not consider you a generator of the hazardous waste and you will not be obligated
for further cleanup, removal, or remedial action for such material handled or disposed of under these
specifications and the appropriate State and federal laws and regulations and county and municipal
ordinances and regulations regarding hazardous waste.
14-11.03 MATERIAL CONTAINING HAZARDOUS WASTE CONCENTRATIONS OF AERIALLY
DEPOSITED LEAD
Reserved
14-11.04 MINIMAL DISTURBANCE OF MATERIAL CONTAINING HAZARDOUS WASTE
CONCENTRATIONS OF AERIALLY DEPOSITED LEAD
Reserved
14-11.05 NATURALLY OCCURRING ASBESTOS
Reserved
14-11.06 DEPARTMENT GENERATED CONTAMINATED SOIL
Reserved
14-11.07 REMOVE YELLOW TRAFFIC STRIPE AND PAVEMENT MARKING WITH HAZARDOUS
WASTE RESIDUE
Reserved
14-11.08 DISTURBANCE OF EXISTING PAINT SYSTEMS ON BRIDGES
Reserved
14-11.09 TREATED WOOD WASTE
Reserved
14-11.10 DISPOSAL OF ELECTRICAL EQUIPMENT REQUIRING SPECIAL HANDLING
Reserved
14-11.1114-11.20 RESERVED
14-12 OTHER INTERAGENCY RELATIONS
14-12.01 GENERAL
Section 14-12 includes specifications relating to other interagency relations.
213

SECTION 14

ENVIRONMENTAL STEWARDSHIP

14-12.02 RESERVED
14-12.03 STATE PARKS
Reserved
14-12.04 STATE RECLAMATION BOARD
Reserved
14-12.0514-12.15 RESERVED

214

15 EXISTING FACILITIES

15-1 GENERAL

15-1.01 GENERAL
Section 15-1 includes general specifications for performing work on existing facilities.
Wherever work requires removing materials, the work includes disposing of the materials unless
salvaging or incorporating the materials into the final work is described.
Wherever work includes removing, salvaging, reconstructing, abandoning, destroying, modifying,
resetting, relocating, or relaying, do not start such activities until the facility is no longer needed or not
being used.
Portions of the existing facilities that are to remain in place must be protected, preserved, and maintained.
If you damage a portion of the facility that is to remain in place, you must repair or replace the damaged
facility. After the repair or replacement, the condition of the facility must be equal or better in quality than it
was before beginning the work. Remove materials that are not repaired.
Drainage facilities include culverts, inlets, headwalls, endwalls, aprons, drains, pipes, catch basins,
gutters, gutter depressions, junction structures, spillways, and check dams.
15-1.02 MATERIALS
Not Used
15-1.03 CONSTRUCTION
15-1.03A General
Trenches, holes, depressions, and pits caused by removing, salvaging, reconstructing, abandoning,
destroying, modifying, resetting, relocating, adjusting, relaying, remodeling, and rehabilitating highway
facilities must be backfilled with embankment material under section 19. If the trenches, holes,
depressions, and pits are in surfaced areas that otherwise remain undisturbed, backfill with material that
is equal or better in quality and to the thickness of the surrounding materials.
Where partial removal of reinforced concrete is required, remove a sufficient volume of concrete to
expose the reinforcement for splicing. Splicing must comply with section 52. Clean off material adhering
to the reinforcement before placing new concrete.
15-1.03B Residue Containing Lead from Paint and Thermoplastic
Reserved
15-1.03C Loop Detectors
Reserved
15-1.03D Highway Irrigation Facilities
Underground irrigation facilities are either shown or marked by the Engineer. If underground irrigation
facilities are not shown or marked by the Engineer and you damage them, the repair or replacement is
change order work.
Maintain the existing water supply under section 20-3.03B(3).
15-1.03E15-1.03J Reserved
15-1.04 PAYMENT
Not Used
15-2 MISCELLANEOUS FACILITIES
15-2.01 GENERAL
15-2.01A General
Section 15-2 includes specifications for removing, salvaging, reconstructing, abandoning, destroying,
modifying, resetting, relocating, relaying, remodeling, and adjusting miscellaneous highway facilities.

215

SECTION 15

EXISTING FACILITIES

15-2.01B Materials
Unless described otherwise, use minor concrete.
Reinforcement must comply with section 52.
15-2.01C Construction
If a portion of the metal beam guard railing or thrie beam barrier is to remain in place, removing,
salvaging, reconstructing, relocating, or resetting work includes:
1. Resetting end caps, return caps, terminal sections, and buried post anchors
2. Providing connections to existing and new facilities, including connections to concrete
15-2.01D Payment
Except for concrete barrier, remove, salvage, reconstruct, relocate, or reset railing or barrier is measured
as specified for measuring new railing or barrier.
Remove, salvage, reconstruct, relocate, or reset fencing is measured parallel to the top of the fence.
Gates are units. The fence payment quantity does not include the width of the gate.
Remove, salvage, reconstruct, relocate, or reset roadside signs are measured as a unit. Each individual
sign installation is a unit regardless of the number of posts or sign panels involved.
15-2.02 REMOVE
15-2.02A General
Section 15-2.02 includes specifications for removing facilities or portions of facilities as described.
Remove bridges or portions of bridges under section 15-4 except removing surfacing on concrete bridges
and approaches must comply with section 15-5.
15-2.02B Remove Pavement
15-2.02B(1) General
Removing pavement includes cold planing AC pavement and obliterating roads, detours, and surfacing.
Removing PCC pavement must comply with section 15-3.
15-2.02B(2) Obliterate Roads, Detours, and Surfacing
Where a portion of the surface is to remain in place, saw a neat line along the edge of the portion to
remain in place before starting the obliteration operation.
Do not obliterate roads, detours, or surfacing until after they are no longer required for the passage of
public traffic.
Obliterate by rooting, plowing, pulverizing, or scarifying to the greater depth of 6 inches or the bottom of
the impermeable underlying base. Obliterate so that the material lumps are no larger than 4 inches in
greatest dimension. Mix bituminous material with equal amounts of underlying permeable material. Grade
the area so that it blends with the surrounding terrain and drains well.
You may obliterate by scarifying the existing base and surfacing for their full depth so that the material
lumps are no larger than 12 inches in greatest dimension. Cover the area with at least 6 inches of earth
cover. Grade the area so that it blends with the surrounding terrain and drains well.
15-2.02B(3) Cold Planing Asphalt Concrete Pavement
Reserved
15-2.02B(4) Remove Subbase, Base, and Bituminous Surfacing
15-2.02B(4)(a) General
Remove the subbase, base, and bituminous surfacing to a depth of at least 6 inches below the grade of
the existing surfacing. Subbases and bases include the various types shown. Backfill the resulting holes
and depressions with earth material from the excavation and to the lines and grades established by the
Engineer.
216

SECTION 15

EXISTING FACILITIES

15-2.02B(4)(b) Payment
For a given location if there is no bid item for cold plane or remove (1) various types of pavement, (2)
various types of surfacing, (3) subbase, (4) base, or (5) bituminous surfacing, payment for remove is
included in the payment for the type of excavation shown in the Bid Item List that corresponds to that
given location.
15-2.02C Remove Traffic Stripes and Pavement Markings
15-2.02C(1) General
Remove traffic stripes before making any change to the traffic pattern.
Remove traffic stripes and pavement markings by methods that do not materially damage the pavement.
Remove pavement marking images so that the old message cannot be identified. Wherever removing by
grinding, make the grinding area rectangular. The minimum dimensions of the rectangle is the height and
width of the pavement marking.
Sweep up or vacuum any residue before it can (1) be blown by traffic or wind, (2) migrate across lanes or
shoulders, or (3) enter a drainage facility.
If blast cleaning is used for removal and the work is performed within 10 feet of a traffic lane that is open
to the public, remove the residue with a vacuum attachment that operates concurrently with the blast
cleaning. The residue and dust must be removed immediately after contact between the sand and the
surface.
15-2.02C(2) Remove Traffic Stripes and Pavement Markings Containing Lead
Reserved
15-2.02C(3) Payment
The payment quantities for traffic stripes are determined as follows:
1.
2.
3.
4.

For single traffic stripes that are 6-inches wide, the length is multiplied by 1.5
For single traffic stripes that are 8-inches wide, the length is multiplied by 2
For double traffic stripes, the length is multiplied by 2
For triple traffic stripes, the length is multiplied by 3

The payment quantity for remove traffic stripe does not include the gaps in broken traffic stripes. Payment
for removal of paint evident in a gap is included in the payment for remove traffic stripe of the type
involved.
If no bid item is shown for remove pavement marking, remove pavement marking is paid for as remove
traffic stripe of the types shown in the Bid Item List, and the payment quantity for 1 square foot of
pavement marking is 3 linear feet.
15-2.02D Remove Pavement Markers
Remove pavement markers and the underlying adhesive by methods that cause the least possible
damage to the pavement or surfacing.
During removal of ceramic-type pavement markers, use screens or other protective devices to contain
fragments.
Fragments from the removal work must be removed before opening the lanes to public traffic.
15-2.02E Remove Contrast Treatment
Remove contrast treatment by methods that do not materially damage the pavement.
Sweep up or vacuum the removal residue before it can (1) be blown by traffic or wind, (2) migrate across
lanes or shoulders, or (3) enter the drainage facility.
If blast cleaning is used for removal and the work is performed within 10 feet of a traffic lane that is open
to the public, remove the residue with a vacuum attachment that operates concurrently with the blast
cleaning. Residue and dust must be removed immediately after contact between the sand and the
surface.
217

SECTION 15

EXISTING FACILITIES

15-2.02F Remove Asphalt Concrete Dikes


Reserved
15-2.02G Remove Metal Beam Guard Railing
Where removing metal beam guard railing, remove any concrete anchors and steel foundation tubes.
15-2.02H Remove Cable Chain Link Barriers
Where removing cable-chain link barrier, remove any anchor blocks and post footings.
Where post footings do not conflict with the installation of the new barrier, the post footings may remain in
place.
Where posts are in a bridge, remove the posts. Pipe post sleeves or other type of post anchorages must
be cut off flush with the bridge deck. Clean the sleeve and fill with grout. Grout must consist of 1 part
portland cement to 6 parts sand.
15-2.02I Remove Sign Structures
Reserved
15-2.02J Remove Roadside Signs
Do not remove roadside signs until the replacement signs are installed or until the existing signs are no
longer required for public traffic.
15-2.02K Remove Drainage Facilities
Box culverts, inlets, headwalls, and endwalls must be completely removed if any portion of these
structures is (1) within 3 feet of the grading plane in excavation areas, (2) within one foot of original
ground in embankment areas, or (3) shown to be removed.
Except for concrete pipe, removing PCC components of drainage facilities must comply with section 15-3.
Reuse frames, grates, and covers at the locations shown. Payment for removing and reusing frames,
grates, and covers is included in the payment for the various items of work that include the reused
frames, grates, and covers.
15-2.02L Remove Irrigation Facilities
Remove irrigation facilities as shown. Facilities that are more than 6 inches below the finished grade may
be abandoned in place unless salvaging is specified or shown.
Immediately after disconnecting an existing irrigation facility to be removed or abandoned from an existing
facility to remain, the remaining facility must be capped or plugged or connected to a new or existing
irrigation facility.
15-2.02M15-2.02R Reserved
15-2.03 SALVAGE
15-2.03A General
15-2.03A(1) General
Section 15-2.03 includes specifications removing, disassembling, cleaning, preparing, marking, bundling,

packaging, tagging, hauling, and stockpiling facilities or portions of facilities as described.

Salvaged material and items remain the property of the Department.

Salvaging does not include preparation of existing material that is reused.

15-2.03A(2) Materials
15-2.03A(2)(a) General
Cleaning includes removing earth, foreign materials, and concrete.

Comply with the requirements for bundles and packages shown in the following table:

218

SECTION 15

EXISTING FACILITIES

Material or item

Metal beam guard


railing

Fences

Manholes or inlets
or other facilities

Component
Rail
Wood posts, 6 by 8
inches
Wood posts, 10 by
10 inches
Steel posts
Blocks
Chain link fabric
Corner posts and
end posts
Frames and covers
Frames and grates

Single sheet
aluminum signs

--

Bundle or package
25/bundle
30/bundle
20/bundle
10/bundle
50/bundle
50 ft/pallet
One
assembly/bundle
Match marked
pairs
Match marked
pairs
Banded on a pallet
with a total weight
of not more than
500 lb/pallet

Tag incomplete bundles or pallets and show the quantity contained.


Tag all material and items using Department-furnished tags, and show the following information as
applicable:
1.
2.
3.
4.

Name or description of material or item


Type or model number
Dimensions
Quantity if more than one

Salvaged material and items must be hauled directly to the specified salvage storage location and
stockpiled. If authorized, you may temporarily store salvaged materials at your location and later haul to
and stockpile at the specified location. You must replace any material or items that are lost before they
are stockpiled at the specified location. The Department does not pay for replacement of lost material or
items.
15-2.03A(2)(b) Department Salvage Location
Reserved
15-2.03A(3) Construction
Segregate damaged from undamaged materials, and remove the damaged material or items.
If you damage material or items to be salvaged, repair, or replace them at your expense. Replacements
for lost or damaged materials must be of the same kind and of the same or better quality and condition as
the lost or damaged materials prior to removal. If authorized, the cost of replacement will be deducted in
lieu of you providing a replacement.
15-2.03A(4) Payment
Reserved
15-2.03B Salvage Metal Beam Guard Railing
Reserved
15-2.03C Salvage Irrigation Facilities
Reserved

219

SECTION 15

EXISTING FACILITIES

15-2.03D15-2.03H Reserved
15-2.04 RECONSTRUCT
15-2.04A General
Section 15-2.04 includes specifications for removing, disassembling, and constructing facilities again at
the original or new locations.
Furnish and install new parts and construct alterations as described.
Reconstructed facilities must conform to the design of the existing facility and be equal to the best
portions of the existing facility.
Reconstruction work must comply with the applicable specifications for new work of similar character.
Clean the material to be reconstructed. Remove earth, foreign materials, and concrete.
Segregate damaged from undamaged material or items, and remove the damaged material or items.
If you damage material or items to be reconstructed, repair, or replace them at your expense. The
replacement for the damaged material or item must be of the same kind and of the same or better quality
and condition as the material or item before removal. If authorized, the cost of replacement will be
deducted in lieu of you providing a replacement.
Before removal, if the Engineer determines that a portion of the existing facility cannot be reused in the
reconstruction, remove that portion. Furnishing the replacement material or item for that portion of the
existing facility is change order work.
15-2.04B Reconstruct Fences
Prevent livestock from escaping during fence reconstruction.
At the junction of the reconstructed fence and cross fence, place corner posts with braces and join the

fences.

Gates to be reused must be installed in reconstructed fences at the locations designated by the Engineer.

Fence reconstruction includes necessary clearing. Clearing must comply with section 80-1.02.

If the amount of fence to be disassembled exceeds the amount needed for reconstruction, dispose of the

excess fencing.

15-2.04C Reconstruct Sign Structures


Reserved
15-2.04D Reconstruct Metal Beam Guard Railing
Reserved
15-2.04E Reconstruct Metal Bridge Railing
Reserved
15-2.04F15-2.04J Reserved
15-2.05 ABANDON
15-2.05A General
Section 15-2.05 includes specifications for partially removing and rendering facilities unserviceable in
place.
Wherever manholes or drainage facilities are abandoned, pipes entering the manhole or drainage facility
must be securely closed by a tight-fitting plug that is either of the following:
1. Wall of minor concrete not less than 6 inches thick
2. Tight brick wall not less than 8 inches thick with cement mortar joints

220

SECTION 15

EXISTING FACILITIES

The bases of manholes or drainage facilities must be broken so that water is prevented from being
entrapped. Demolish the manhole or drainage facility to an elevation that is 3.5 feet below finished grade.
Backfill must comply with section 19-3.03E.
15-2.05B Abandon Manholes
Reserved
15-2.05C Abandon Culverts and Pipelines
Reserved
15-2.05D Abandon Inlets
Reserved
15-2.05E Abandon Pedestrian Undercrossings
Reserved
15-2.05F15-2.05J Reserved
15-2.06 DESTROY
15-2.06A General
Section 15-2.06 includes specifications for rendering facilities unserviceable in place.
15-2.06B Destroy Wells
Reserved
15-2.06C15-2.05F Reserved
15-2.07 MODIFY
15-2.07A General
Section 15-2.07 includes specifications for partially removing, adjusting, and adding to facilities.
15-2.07B Modify Sign Structures
Reserved
15-2.07C Modify Pipes
Modifying pipes includes extending pipes. Extending pipes must comply with the specifications for new
pipe installation.
Existing headwalls or end walls must be removed or moved to a new location.
If headwalls or end walls are to be moved, cut the pipe so that it has smooth edges at a point
approximately 1 foot behind the headwall or end walls and perpendicular to the centerline of the pipe.
Move the headwall or end wall to the reconstructed location and connect the pipes.
15-2.07D Modify Inlets, Manholes, and Risers
Modify inlet, manhole, and riser structures by capping.
Excavate and remove structures to a depth of at least 1 foot below the grading plane.
Cap inlet structures with minor concrete. Where shown, round the bottom of structures with minor
concrete. Minor concrete must contain at least 590 lb/cu yd of cementitious material.
Backfill to match the grading plane.
15-2.07E15-2.07J Reserved
15-2.08 RESET
15-2.08A General
Section 15-2.08 includes specifications for removing and reinstalling facilities at or near the original
locations. The exact locations are as shown or as authorized.

221

SECTION 15

EXISTING FACILITIES

15-2.08B Reset Mailboxes


15-2.08B(1) General
Mailboxes include newspaper boxes. Provide access for the mail and newspaper delivery at all times.
Reset the mail box location as necessary during your work. Mount mailboxes on posts that are set in the
ground. If authorized, temporary supports may be used. Do not use posts concreted in buckets for
temporary supports.
Reset a newspaper box wherever the newspaper box is attached to the existing facility.
For the final location, install mailboxes on new redwood posts that comply with the specifications for sign
posts under section 56.
Backfill the space around posts with earth material. Place the backfill in 4-inch thick layers. Moisten and
thoroughly compact each layer.
Dispose of posts, mounts, and hardware that are no longer used.
15-2.08B(2) Payment
A mail box is one unit. A newspaper box is one unit.

Multiple boxes on a single post are counted as multiple units.

Payment for a unit includes resetting as many times as necessary during your work.

15-2.08C Reset Roadside Signs


Each roadside sign must be reset on the same day that the sign is removed.
Where shown, drill 2 holes in each post to provide the breakaway feature.
15-2.08D15-2.08H Reserved
15-2.09 RELOCATE
15-2.09A General
Section 15-2.09 includes specifications for removing and installing facilities at new locations.
15-2.09B Relocate Sign Structures
Reserved
15-2.09C Relocate Roadside Signs
Each roadside sign must be relocated on the same day that the sign is removed.
Relocate using existing posts. If an existing post is deteriorated or broken, notify the Engineer. If ordered,
use a new post and provide the breakaway feature shown.
If a new post is ordered for reasons other than damage caused by you, the post and installation is change
order work.
15-2.09D Relocate Irrigation Facilities
Relocating irrigation facilities includes relocating valves, wye strainers, sprinklers, pull boxes, backflow
preventer assemblies, irrigation controllers, and other facilities shown.
Valves and wye strainers include valve boxes and valve box covers. Install relocated valve boxes with
new woven-wire cloth and gravel or crushed rock bedding as shown.
Sprinklers include risers, riser supports, check valves, and concrete protectors as shown.
Pull boxes include pull box covers. Install relocated pull boxes with new woven cloth and crushed rock
bedding as shown for valve box installations.
Backflow preventer assemblies include backflow preventers, wye strainers, gate valves, unions, fittings,
concrete pads, thrust blocks, pipe supports, backflow preventer assembly enclosures, and backflow
preventer assembly blankets.

222

SECTION 15

EXISTING FACILITIES

Install galvanized steel or copper pipe supply lines and fittings to the water meters or points of
connections as shown.
Irrigation controllers include, controller enclosures, controller enclosure cabinets, concrete pads, anchor
bolts, and electrical conduits. Electrical conduits include control conductors, neutral conductors, and
electrical power conductors. Conduits for control and neutral conductors and electrical power conductors
must terminate in separate new or relocated pull boxes located within 5 feet of the new concrete pads.
Where relocating 120-volt electrical power for irrigation facilities, comply with section 86-2.11B.
Irrigation facilities to be relocated and that are determined unsuitable by the Engineer must be replaced
under section 15-2.04A.
After irrigation facilities have been relocated, demonstrate in the presence of the Engineer that the
relocated facilities function properly.
15-2.09E15-2.09H Reserved
15-2.10 ADJUST
15-2.10A General
Section 15-2.10 includes specifications for partially removing and either lowering or raising facilities.
Adjust to grade with new materials that are similar in character to the existing materials.
15-2.10B Adjust Frames, Covers, Grates, and Manholes
Adjust frames, covers, grates and manholes by lowering before cold planing and raising after paving or
surfacing. Before opening the lane to traffic, either (1) complete permanent paving or surfacing or (2)
temporarily fill any depressions with HMA.
Where paving or surfacing work is shown, do not adjust to final grade until the adjacent pavement or
surfacing is complete.
For a structure that is to be raised, remove the cover or frame and trim the top of the structure to provide
a suitable foundation for the new material.
Instead of using new materials similar in character to those in the existing structure, you may use raising
devices to adjust a manhole to grade. Before starting paving work, measure, fabricate, and install raising
devices. Raising devises must:
1.
2
3.
4.

Comply with the specifications for section 75 except that galvanizing is not required
Have a shape and size that matches the existing frame
Be match marked by painting identification numbers on the device and corresponding structure
Result in an installation that is equal to or better than the existing one in stability, support, and
nonrocking characteristics
5. Be fastened securely to the existing frame without projections above the surface of the road or into
the clear opening
Where manholes are to be lowered, remove the facility to 3.5 feet below finished grade or to an
authorized depth. Adjust the manhole using the taper needed to match the finished grade.
If a manhole cover is unstable or noisy under traffic, place a coil of asphalt-saturated rope, a plastic
washer, or asphaltic compound on the cover seat. Before placement, obtain authorization for use of the
material.
If no item is described for adjust (1) frames, (2) covers, (3) grates, or (4) manholes, payment for adjusting
these materials is included in the payment for the type of pavement or type of surfacing involved.
If no item is shown for adjust (1) frames, (2) covers, (3) grates, or (4) manholes, and if pavement or
surfacing is not involved, payment for adjusting these materials is included in the payment for the type of
excavation shown in the Bid Item List.
15-2.10C Adjust Inlet
Adjust inlets as shown.
223

SECTION 15

EXISTING FACILITIES

Use minor concrete with at least 590 lb/cu yd of cementitious material.


Where inlets are adjusted before placing the uppermost layer of pavement or surfacing, limit the work
area so that adjusting the inlet and final paving or surfacing is completed within the same work day. The
top of the inlet grate or cover must be protected during paving operations by heavy plywood covers, steel
plate covers, or other authorized methods. Excess paving material must be removed before rolling.
Where inlets are adjusted after placing the uppermost layer of pavement or surfacing, do not adjust the
inlet to final grade until the paving or surfacing has been completed immediately adjacent to the inlet.
If adjust inlet is paid by the linear foot, adjusting the inlet is measured as the difference in the length
between the top of the existing inlet and the top of the adjusted inlet.
If no item is shown for adjust inlet, payment for adjusting the inlet is included in the payment for the type
of pavement or surfacing shown in the Bid Item List.
If (1) no item is shown for adjust inlet and (2) pavement or surfacing is not involved, payment for adjusting
the inlet is included in the payment for the type of excavation shown in the Bid Item List.
15-2.10D Adjust Metal Beam Guard Railing
Reserved
15-2.10E15-2.10H Reserved
15-2.11 RELAY
15-2.11A General
Section 15-2.11 includes specifications for removing and relaying facilities at the original or new locations.
15-2.11B15-2.11F Reserved
15-2.12 REMODEL
15-2.12A General
Section 15-2.12 includes specifications for rebuilding facilities at the original location. Remodeling may
require some removal.
15-2.12B15-2.12F Reserved
15-2.1315-2.15 RESERVED
15-3 CONCRETE REMOVAL
15-3.01 GENERAL
Section 15-3 includes specifications for removing all or a portion of a concrete facility.
Remove bridges or portions of bridges under section 15-4.
Remove concrete pipe under section 15-2.02K.
Types of concrete facilities to be removed may include curbs, gutters, gutter depressions, sidewalks,
driveways, slope paving, island paving, barriers, retaining walls, minor structures, aprons, spillways,
dams, and PCC pavement.
Where broken-concrete slope protection is shown, use broken PCC for the construction of the broken
concrete slope protection.
As an alternative to removing broken concrete from the job site, you may place broken concrete on the
job site by:
1. Burial in embankments. Concrete must be broken into pieces that can be readily handled and
incorporated into embankments and placed at a depth of at least 3 feet below the finished grade and
slope lines. Concrete must not be buried in areas where piling is to be placed or within 10 feet of
trees, pipelines, poles, buildings or other permanent objects or structures.
2. Placement at authorized locations. The broken concrete must not present an unsightly appearance
from the highway.

224

SECTION 15

EXISTING FACILITIES

15-3.02 MATERIALS
Concrete materials include PCC, masonry, and mortared rubble masonry.
15-3.03 CONSTRUCTION
Remove concrete to a depth of at least 3 feet below finished grade unless described otherwise.
Bar reinforcement or other steel may be encountered in portions of concrete to be removed.
Existing concrete must be cut to a true line where new concrete is joined to existing concrete.
Where no joint exists between the concrete facility to be removed and concrete to remain in place, use a
power-driven saw to cut the concrete on a neat line to a minimum depth of 2 inches before removing the
concrete.
Where no joint exists between PCC pavement to be removed and concrete pavement to remain in place,
use a power-driven saw to cut the pavement on a neat line to a minimum depth of 2 inches before
removing the pavement. If there is overlying material on the pavement, remove it with the pavement.
Where concrete has been removed outside the roadway prism, the backfilled areas must be graded to
drain and blend in with the surrounding terrain.
The floors of concrete basements, pits, and structures that are not required to be removed and that are
located within the roadway must be broken so that water will not be trapped.
Where shattering concrete is described, shatter the concrete into pieces that are equal to or less than 2
feet in greatest dimension.
15-3.04 PAYMENT
Concrete is measured before starting removal.
If there is an item for the removal of a concrete facility that has portions below ground, the payment
quantity includes the below-ground portion.
Payment for removing reinforcement and removing steel is included in the payment for the remove
concrete involved. If there is no item for remove concrete, removing reinforcement and removing steel is
included in the type of removal work involved.
15-4 BRIDGE REMOVAL
15-4.01 GENERAL
15-4.01A General
15-4.01A(1) Summary
Section 15-4 includes specifications for removing and disposing of bridges or portions of bridges.
Design and construct temporary support shoring, temporary bracing, and protective covers under section
48.
15-4.01A(2) Submittals
If required, submit a daily inspection report.
Submit a bridge removal work plan for each structure. Include details for the following:
1.
2.
3.
4.
5.
6.

Removal sequence, including staging of removal operations and equipment locations


Temporary support shoring or bracing
Locations where work is performed over traffic, utilities, or railroad property
Locations and types of protective covers
Protection of people, property, utilities, and improvements
Methods for preventing material, equipment, and debris from falling onto public traffic or railroad
property

If protective covers are required or superstructure removal work is performed, bridge removal work plans
must be (1) accompanied by substantiating calculations and (2) signed by an engineer who is registered
as a civil engineer in the State.
225

SECTION 15

EXISTING FACILITIES

Calculations for bridge removal work plans must demonstrate the stability of the structure during each
stage of removal. A stage is removal of (1) the deck, soffit, or girders in any span; or (2) walls, bent caps,
or columns at support locations. Include dead and live loads used in the design of protective covers.
15-4.01A(3) Quality Control and Assurance
15-4.01A(3)(a) General
For bridge removal work plans signed by a registered engineer, the engineer signing the work plan must:
1. Be present at all times during bridge removal activities.
2. Prepare a daily inspection report for removal activities. The daily inspection report must describe work
activities for each day and the condition of the remaining structure. A copy of the report must be
available at the job site at all times.
3. Immediately submit a work plan for deviations from the authorized plan or unplanned events.
15-4.01A(3)(b) Design Criteria
For removal activities, the horizontal load to be resisted in any direction for temporary support shoring
and temporary bracing must be (1) the sum of actual horizontal loads due to equipment, construction
sequence, or other causes plus an allowance for wind and (2) not less than 5 percent of the total dead
load of the structure being removed.
Temporary support shoring, temporary bracing, and protective covers over railroad property must (1)
conform to guidelines of the railroad company involved and (2) provide the minimum clearances specified
for railroad traffic.
15-4.01B Materials
Not Used
15-4.01C Construction
15-4.01C(1) General
Type and limits of removal are described.
15-4.01C(2) Preparation
15-4.01C(2)(a) General
The Engineer may require you to perform additional exploratory work of bridge members for unforeseen
damage. This is change order work.
Temporary support shoring, temporary bracing, and protective covers must not encroach within 8 feet
horizontally or 15 feet vertically of traffic lanes or shoulders open to public traffic.
15-4.01C(2)(b) Protective Covers
Provide protective covers for removal work over traffic or railroad property. Protective covers must:
1.
2.
3.
4.

Be constructed before starting removal activities.


Prevent any materials, equipment, or debris from falling onto traffic or railroad property.
Be supported using shoring, falsework, or the existing structure.
Provide the openings specified in section 12-4. If no openings are specified for bridge removal,
provide a vertical opening of 15 feet and a horizontal opening of 32 feet for public traffic.
5. Be cleaned of debris and fines before being removed.
Design and construct protective covers, shoring, and falsework with sufficient strength and rigidity to
support all imposed loads. Covers must be at least equal to 2-inch Douglas fir planking on posts at 5-foot
centers.
At locations where only bridge railing is removed, protective covers must extend from the face of the
exterior girder or at least 2 feet inside of the railing to be removed to at least 4 feet beyond the outside
face of the railing.
At locations where entire girders are removed, protective covers must extend at least 10 feet beyond the
outside face of the bridge railing.

226

SECTION 15

EXISTING FACILITIES

A separate protective cover is not required during removal of bridge segments if portions of the bridge
satisfy the requirements for protective covers.
15-4.01C(3) Construction
15-4.01C(3)(a) General
Wherever complete bridges are removed, do not start removal activities until traffic is no longer carried on
the bridge.
Before removing portions of monolithic concrete elements visible in the completed work, make a 1-inch
deep saw cut along neat lines around the perimeter of the concrete to be removed.
Repair or replace materials to be used in the reconstructed work that are damaged during work activities.
Remove piling, piers, abutments, and pedestals to 1 foot below the ground line or 3 feet below finished
grade, whichever is lower.
Protect existing reinforcement to be incorporated into the new work from damage. Thoroughly remove all
material adhering to the existing reinforcement before embedding it in new concrete.
You may use flame and saw cutting for removing, widening, or modifying bridges.
Do not use explosives.
Do not use the following for breaking or removing concrete attached to or supported by bridges:
1. Tools with a manufacturer's-rated striking energy of more than 1,200 ft-lb per blow
2. Freely falling mass
3. Falling mass attached to a cable, rope, or chain
Do not use a freely falling mass or a falling mass attached to a cable, rope, or chain above any public
space. Do not use falling masses within 30 feet horizontally of any public space without protective shields.
Design protective shields as required by the equipment and activities being performed. Protective shields
must be at least equal to 2-inch Douglas fir planking on posts at 5-foot centers.
Remove and stockpile salvaged materials under section 15-2.03.
You may dispose of broken concrete in embankments under section 15-3.
The Engineer may require you to remove existing footing concrete that is below ground and outside of the
footing limits. This is change order work.
For bridge removal activities over or adjacent to roadways that are only closed to traffic when removal
work is being performed, the following requirements apply:
1. Have all necessary personnel, materials, and equipment to complete the work onsite before closing
the roadway. Perform activities without interruption until the roadway is reopened.
2. Perform bridge removal activities only when the roadway is closed to traffic except as specified for
preliminary work.
3. During roadway closures, debris from bridge removal operations may fall directly onto the roadway if
protection is furnished for highway facilities. Minimum protection for paved areas is a 2-foot thick
earthen pad or a 1-inch thick steel plate placed over the impact area. Before reopening the roadway,
all debris, protective pads, and devices must be removed and the roadway swept clean with wet
power sweepers or equivalent methods.
4. For girder bridges, completely remove each girder within a span before starting removal of the
adjacent girder.
5. For slab bridges, perform removal activities within a span along a front parallel with the primary
reinforcing steel.
6. Protective covers are not required.

227

SECTION 15

EXISTING FACILITIES

15-4.01C(3)(b) Preliminary Work


Preliminary work is limited to activities that (1) will not reduce the structural strength or stability of the
bridge or bridge elements to a hazardous level as determined by the Engineer or (2) do not cause debris
or any other material to fall onto the roadway.
You may use protective covers to perform preliminary work if covers support all loads and prevent dust
and fine material from falling onto the traveled way.
Protective covers must extend 4 feet beyond the limit of the work being performed. Bottom slabs of box
girders may be considered as protective covers for preliminary work performed on top slabs inside the
limits of the exterior girders.
Use temporary support shoring and bracing during preliminary work if needed to ensure the stability of the
bridge.
15-4.01D Payment
Not Used
15-4.02 ACCESS OPENINGS
15-4.02A General
Section 15-4.02 includes specifications for (1) removing portions of bridges to provide cell access and (2)
closing access openings.
15-4.02B Materials
Concrete must be rapid-setting concrete complying with section 15-5.02.

Reinforcement must comply with section 52.

Steel plates, hardware, and thread locking compound must comply with section 75-1.03.

15-4.02C Construction
15-4.02C(1) General
Limits of removal shown are approximate. The Engineer authorizes removal limits before you start
removal activities.
Saw cut concrete to a depth of 1 inch around removal limits before removing concrete.
Remove concrete and reinforcement to the limits shown. Paint exposed ends of the remaining
reinforcement with 2 coats of organic zinc-rich coating under section 59-2.03C(2)(a).
Within cells where work activities are performed, remove existing formwork and concrete that interfere
with the work. In cells that adjoin hinges, bent caps, or abutments, remove existing forms and sharp
projections in the cell between the adjoined element and 5 feet past the access opening.
15-4.02C(2) Deck Access Opening
Reserved
15-4.02C(3) Soffit Access Opening
Seal access openings with access doors when cell access is no longer required.
15-4.02C(4) Soffit Access Extension
For bridge soffit access extensions, remove and replace concrete within the limits shown. You may
reduce removal limits if authorized.
Reconstruct soffit concrete to the original dimensions when cell access is no longer required.
15-4.02C(5) Close Deck Access Opening
Temporarily close deck access openings that are not completed before the traffic lane is opened.
Temporary deck cover plates must (1) be in place over access openings when lanes are not closed to
traffic and (2) remain in place until the concrete overlay closing the opening is placed.
228

SECTION 15

EXISTING FACILITIES

Use water to flush dust from areas to be filled with concrete. Remove all water by air blasting before
placing concrete.
Do not allow public traffic on the new concrete until 1 hour after final set unless authorized.
15-4.02D Payment
Not Used
15-4.0315-4.10 RESERVED
15-5 BRIDGE REHABILITATION
15-5.01 GENERAL
15-5.01A General
Section 15-5 includes specifications for rehabilitating concrete bridges.
15-5.01B Materials
Steel shot must comply with SSPC-AB 3. Recycled steel shot must comply with SSPC-AB 2.
15-5.01C Construction
15-5.01C(1) General
Before starting work, remove traffic stripes, pavement markings, and pavement markers under section 15
2.02.
Coarse aggregate remaining above the removal depth must be firmly embedded.
High-pressure water jet equipment must:
1. Have rotating or oscillating jets
2. Be rated at 30,000 psi minimum
Cold milling equipment must:
1. Have a minimum concrete removal depth of 1/4 inch
2. Provide a surface relief of at most 1/4 inch
3. Provide a 5/32-inch grade tolerance
Cold milling equipment must have the following features:
1.
2.
3.
4.
5.
6.
7.
8.
9.

3 or 4 riding tracks
Automatic grade control system with electronic averaging having 3 sensors on each side
Conveyer system that leaves no debris on the bridge
Drum that operates in an up-milling direction
Bullet tooth tools with tungsten carbide steel cutting tips
Maximum tool spacing of 1/4 inch
Maximum operating weight of 66,000 lb
Maximum track unit weight of 6,000 lb/ft
New tooth tools at the start of the work

Provide personnel on each side of the milling drum to monitor milling activities. Maintain constant radio
communication with the operator during milling activities.
15-5.01C(2) Prepare Concrete Deck Surface
Prepare concrete bridge decks before applying deck treatments or placing deck overlays.
Perform the following activities in the order listed:
1. Abrasive blast the deck surface with steel shot
2. Sweep the deck surface
3. Blow the deck surface clean using high-pressure air
Remove unsound concrete under section 15-5.01C(5) before abrasive blasting.
229

SECTION 15

EXISTING FACILITIES

The deck surface must be dry when abrasive blasting is performed. Remove all laitance, surface
contaminants, and foreign material from the deck surface.
If the deck surface becomes contaminated before placing the deck treatment or overlays, abrasive blast
clean the contaminated area and sweep the deck clean.
15-5.01C(3) Remove Concrete Deck Surface
Remove concrete deck surface to the specified depth.

Before removing concrete (1) sweep the deck surface and (2) blow the deck clean with high-pressure air.

Remove deck surface by cold milling or high-pressure water jetting.

15-5.01C(4) Remove Asphalt Concrete Surfacing


Where shown, remove asphalt concrete surfacing and reinforced concrete expansion dams from concrete
bridges and approaches.
Before removing asphalt concrete surfacing, verify the depth of asphalt concrete every 50 feet (1) on
each shoulder, (2) in the traveled way, and (3) at the roadway crown if a crown is shown.
Remove asphalt concrete surfacing and concrete expansion dams by cold milling. At least 1/2 inch of
asphalt concrete surfacing must remain after milling activities.
Remove remaining asphalt surfacing using other authorized means. Do not damage the concrete slab.
15-5.01C(5) Remove Unsound Concrete
Where shown, remove unsound portions of bridge decks, curbs, and railings.
Unsound concrete is concrete that emits a dead or hollow sound when chained or tapped with a metal
tool. The Engineer determines the soundness of concrete.
Equipment and tools that in the Engineer's opinion remove excess quantities of sound concrete are not
allowed.

For bridges over railroads, stop removal activities when trains pass under the bridge.

Reinforcing steel exposed after removing unsound concrete must be restored to position and blocked and

tied in conformance with section 52.

Replace or repair reinforcing steel damaged and rendered useless during removal.

15-5.01C(6) Remove Chip Seal


Where shown, remove bituminous chip seals, bituminous slurry seals, and polymer chip seals from bridge
decks by grinding.
Remove the seal from the deck under section 42-3. Remove no more than 1/4 inch of concrete deck
surface.
15-5.01D Payment
Wherever rapid setting concrete is used to fill voids from unsound concrete, the pay quantity for remove
unsound concrete is the same as the pay quantity for rapid setting concrete (patch). No deduction is
made for concrete used to fill spalls that existed before work began.
15-5.02 RAPID SETTING CONCRETE PATCH
15-5.02A General
Section 15-5.02 includes specifications for cleaning deck surfaces and placing rapid setting concrete
patches up to 4 inches in depth.
15-5.02B Materials
Rapid setting concrete must comply with the specifications for bonding materials in section 51-1.02C.

230

SECTION 15

EXISTING FACILITIES

You may extend concrete using a clean, uniform, rounded aggregate filler with a moisture content of no
more than 0.5 percent. Aggregate grading must comply with the requirements shown in the following
table:
Sieve size
1/2"
No. 16

Percentage passing
100
05

The amount of aggregate filler must comply with the manufacturer's instructions. Concrete strengths for
extended concrete must be at least as specified for magnesium phosphate concrete.
Combine components of dual-component magnesium phosphate by mixing only complete units supplied
by the manufacturer. Do not add water to dual-component magnesium phosphate.
15-5.02C Construction
Abrasive blast clean the contact surfaces of existing concrete and reinforcing steel. Remove at least 1/8
inch of concrete and all foreign material. Immediately before placing new concrete, reclean surfaces by
sweeping and pressure jetting or other authorized means to remove debris.
The surface temperature of the existing concrete must be at least 40 degrees F during placement.
Contact surfaces to receive magnesium phosphate concrete must be dry. Contact surfaces to receive
modified high-alumina concrete or portland cement concrete may be damp but not saturated.
Magnesium phosphate concrete must not be mixed in containers or worked with tools containing zinc,
cadmium, aluminum, or copper. Modified high-alumina based concrete must not be mixed in containers or
worked with tools containing aluminum.
Do not retemper concrete. Finishing tools cleaned with water must be thoroughly dried before working
concrete.
The Engineer may require that you use a flow-controlled modified concrete on slopes over 5 percent.
Cure modified high-alumina based concrete and portland cement based concrete using the curing
compound method. Do not cure magnesium phosphate concrete.
15-5.02D Payment
Pay quantities of rapid setting concrete (patch) are determined from the pounds of concrete used as
measured by scale weights divided by a plastic density of 135 lb/cu ft.
15-5.03 REPAIR SPALLED SURFACE AREA
15-5.03A General
15-5.03A(1) Summary
Section 15-5.03 includes specifications for removing and patching spalled concrete surfaces other than
bridge decks.
15-5.03A(2) Submittals
Submit a test sample of at least 1 complete unit of filler material. Allow 45 days for testing.
For contracts of less than 60 working days, submit certificates of compliance for the filler material and
bonding agents.
15-5.03B Materials
Mortar must comply with section 51-1.02C.

Shotcrete must comply with section 53.

Alternative filler materials and bonding agents must have the values for the material properties shown in

the following table:

231

SECTION 15
Property
Abrasion resistance, 28 days
Modulus of elasticity, 28 days
Water soluble chlorides
Water soluble sulfates

EXISTING FACILITIES

Test method
California Test 550
California Test 551
California Test 422
California Test 417

Value
25 grams, maximum
10.3 to 24.1 GPa
500 mg/kg, maximum
2,500 mg/kg, maximum

For projects of less than 60 days, alternative materials must be authorized before use.
15-5.03C Construction
Remove unsound concrete under section 15-5.01C(5).
Clean concrete surfaces and existing reinforcing steel by abrasive blasting before placing filler material.

Place reinforcing steel where shown.

Fill spalled surface areas under section 51-1.03F(2) or you may use an alternative filler material and

bonding agent.

If using an alternative filler material, apply bonding epoxy before placing the filler material. Place the filler

material under the manufacturer's instructions.

If using shotcrete, you may apply the shotcrete using a dry mix process with a hydration liquid applied

immediately after placing the shotcrete.

Patched concrete must emit a ringing sound similar to adjacent sound concrete when struck with a metal

tool 14 days after placement.

Removing and patching spalled concrete more than 4 inches deep is change order work.

15-5.03D Payment
Repair spalled surface area is measured by the square foot of completed, repaired surface. Measured
areas are recorded daily by the Engineer and agreed upon by you.
15-5.04 REFINISH BRIDGE DECK
15-5.04A General
Section 15-5.04 includes specifications for refinishing surfaces of bridge decks exposed when railings,
curbs, or sidewalks are removed.
The Engineer determines the exact area to be refinished.
15-5.04B Materials
Use either portland cement concrete or rapid setting concrete.

Portland cement concrete must comply with section 90-1 and the following:

1. Concrete must contain at least 675 pounds of cementitious material per cubic yard.
2. Free water must not exceed 280 lb/cu yd.
3. Aggregate must contain between 50 and 55 percent fine aggregate. The remaining portion must be
pea gravel. Grade pea gravel so that 100 percent passes the 1/2-inch sieve and at most 5 percent
passes the no. 16 sieve.
4. The Engineer may request admixtures be used.
Rapid setting concrete must comply with section 15-5.02.
15-5.04C Construction
15-5.04C(1) General
For removal work performed within 10 feet of a traffic lane or over traffic, remove dust and residue using
an authorized vacuum, water spray, or shield method.
Make a 3/4-inch deep saw cut around the perimeter of the deck to be refinished. Remove concrete in
areas to be refinished to a depth of approximately 3/4 inch. Do not damage concrete to remain in place.
232

SECTION 15

EXISTING FACILITIES

Prepare existing deck areas more than 3/4 inch below adjoining deck surfaces by removing at least 1/4

inch of surface material to expose sound aggregate. Remove concrete by abrasive blast cutting, abrasive

sawing, impact tool cutting, machine rotary abrading, or other methods. Removal methods must be

authorized.

Clean prepared areas of dust and loose and deleterious materials by brooming, abrasive blast cleaning,

and using high-pressure air. Reblast contaminated areas before starting concrete placement activities.

Protect existing reinforcement exposed during concrete removal.

Cut off dowels 1 inch below the existing deck surface or at the bottom of concrete removal, whichever is

lower.

Where refinishing is not required, cut dowels off 1 inch below the finished surface. Patch holes with rapid

setting concrete complying with section 15-5.02.

You may refinish isolated high areas by cutting the concrete down flush with adjoining deck surfaces. Use

abrasive sawing, grinding, impact tool cutting, or other authorized methods.

Fill prepared areas flush with the plane of the adjoining deck using concrete.

Transversely score fresh concrete surfaces. Use a stiff-bristled broom or suitable device.

Completed surfaces must have a uniform texture with a coefficient of friction of at least 0.35 when tested

under California Test 342.

Grind or groove surfaces having a coefficient of friction less than 0.35 under section 42.

Refinished surfaces must (1) be flush with the adjoining surface and (2) not vary more than 0.02 foot from

the lower edge of a 12-foot straightedge in the longitudinal direction.

15-5.04C(2) Placing Portland Cement Concrete


Abrasive blast clean surfaces to be refinished. Sweep blast-cleaned surfaces and blow them clean using
high-pressure air.
Apply an epoxy adhesive to cleaned surfaces immediately after cleaning. Surfaces must be dry and have
a temperature of at least 40 degrees F when applying the adhesive. Furnish and apply epoxy under
section 95-2.03. The Engineer determines the application rate.
Place concrete on fresh epoxy adhesive. Consolidate concrete immediately after placement until voids
are filled and free mortar appears on the surface. Strike off concrete to the required grade.
Cure concrete under section 51-1.03H.
Do not load concrete for 7 days after placement.
15-5.04C(3) Placing Rapid Setting Concrete
Blow surfaces to be refinished with high-pressure air immediately before placing concrete. Abrasive blast
clean surfaces that are contaminated before the concrete is placed.
Do not allow public traffic on concrete until 24 hours after final set unless authorized.
15-5.04D Payment
Refinish bridge deck is measured from refinished areas measured horizontally, plus 0.2 square foot for
patching around each dowel.
The Department does not adjust the unit price for an increase or decrease in the refinish bridge deck
quantity.
15-5.05 BRIDGE DECK METHACRYLATE RESIN TREATMENT
15-5.05A General
15-5.05A(1) Summary
Section 15-5.05 includes specifications for applying a high molecular weight methacrylate resin system
with sand and absorbent material to bridge decks.
233

SECTION 15

EXISTING FACILITIES

15-5.05A(2) Submittals
Submit a work plan for placement of the resin system. Include the following:
1.
2.
3.
4.
5.
6.
7.
8.

Schedule of work and testing for each bridge


Description of equipment for applying resin
Range of gel time and final cure time for resin
Description of absorbent material to be used
Description of equipment for applying and removing excess sand and absorbent material
Procedure for removing resin from the deck and equipment to be used
Procedure for storing and handling resin components and absorbent material
Procedure for disposing of excess resin and containers

Submit a material safety data sheet for each resin system component and diatomaceous earth shipment
before use.
Submit test samples of methacrylate resin components 15 days before use.
15-5.05A(3) Quality Control and Assurance
The Engineer performs California Test 342 on treated deck surfaces. The coefficient of friction must be at
least 0.35. The Engineer provides a 15-day notice for you to provide traffic control for testing at each
bridge location.
Complete a test area before starting production treatment activities.
The test area must:
1.
2.
3.
4.
5.
6.

Be approximately 500 sq ft
Be placed within the project limits outside the traveled way at an authorized location
Be constructed using the same equipment as the production work
Replicate field conditions for the production work
Demonstrate that the proposed means and methods comply with the acceptance criteria
Demonstrate that the production work will be completed within the time allowed

The Engineer determines acceptability of the test area. The test area is acceptable if:
1.
2.
3.
4.

The treated deck surface is tack free and not oily


The sand cover adheres and resists brushing by hand
Excess sand and absorbent material has been removed
The coefficient of friction is at least 0.35

15-5.05B Materials
Notify the Engineer 15 days before delivery of methacrylate resin components in containers over 55
gallons to the job site.
A high-molecular-weight methacrylate resin system consists of resin, promoter, and initiator.
High-molecular-weight methacrylate resin must be low odor and have the values for the material
properties shown in the following table:

234

SECTION 15

EXISTING FACILITIES

Property
Volatile contenta
Viscositya

Test method
ASTM D 2369
ASTM D 2196

Value
30 percent maximum
25 cP maximum
Brookfield RVT with UL adaptor, 50 RPM at 77 F
0.90 minimum at 77 F
180 F, minimum
1.0 mm Hg maximum at 77 F
400 minutes maximum at 25 C

Specific gravitya
Flash pointa
Vapor pressurea
Tack-free time

ASTM D 1475
ASTM D 3278
ASTM D 323
Prepare
specimens per
California Test 551
California Test 551 3.5 MPa minimum at 24 hours and 21 1 C

PCC-saturated
surface-dry bond
strength
a
Test must be performed before adding initiator.
Sand for abrasive sand finish must be:

1. Commercial-quality, dry-blast sand


2. A grading having not less than 95 percent pass the no. 8 sieve and not less than 95 percent retained
on the no. 20 sieve when tested under California Test 205
Absorbent material must be diatomaceous earth, abrasive blast dust, or an authorized substitute
recommended by the resin supplier.
15-5.05C Construction
The Engineer determines the exact methacrylate resin application rate at time of placement.
High-molecular-weight methacrylate resin applied by machine must be (1) combined in volumetric
streams of promoted resin to initiated resin by static in-line mixers and (2) applied without atomization.
You may apply resin manually. Mix at most 5 gallons of resin at a time.
Prepare the deck under sections 15-5.01C(2), 15-5.01C(5), and 15-5.02.
The deck must be dry before applying resin. The concrete surface must be from 50 to 100 degrees F.
Relative humidity must be not more than 85 percent during the work shift.
Thoroughly mix all resin components. Apply resin to the deck within 5 minutes of mixing at an
approximate application rate of 90 sq ft/gal. Resin that thickens during application is rejected.
Spread resin uniformly. Completely cover surfaces to be treated and fill all cracks. Redistribute excess
resin using squeegees or brooms within 10 minutes of application. For textured or grooved deck surfaces,
excess resin must be removed from the texture indentations.
Apply the abrasive sand finish no sooner than 20 minutes after applying resin. The sand application rate
must at least 2 lb/sq yd or until saturation as determined by the Engineer. Apply absorbent material
before opening lane to traffic. Remove excess sand and absorbent material by vacuuming or power
sweeping.
Traffic or equipment is allowed on the overlay after the Engineer has determined:
1.
2.
3.
4.

The treated deck surface is tack free and not oily


The sand cover adheres and resists brushing by hand
Excess sand and absorbent material has been removed
No material will be tracked beyond the limits of treatment by traffic

Remove resin from the deck surface if the Engineer determines (1) the conditions listed above have not
been met and (2) the allowable lane closure time will be exceeded.

235

SECTION 15

EXISTING FACILITIES

15-5.05D Payment
Furnish bridge deck treatment material is measured by the gallon of mixed high-molecular-weight
methacrylate resin placed.
Place bridge deck methacrylate resin treatment is paid as treat bridge deck.
15-5.06 POLYESTER CONCRETE OVERLAY
15-5.06A General
15-5.06A(1) Summary
Section 15-5.06 includes specifications for placing a polyester concrete overlay with a prime coat of high
molecular-weight methacrylate resin to bridge decks.
15-5.06A(2) Submittals
Submit a work plan for overlay placement. Include the following:
1.
2.
3.
4.
5.
6.
7.
8.

Schedule of overlay work and testing for each bridge


Description of equipment for applying methacrylate resin
Description of equipment for measuring, mixing, placing, and finishing the polyester concrete overlay
Method for isolating expansion joints
Cure time for polyester concrete
Description of equipment for applying sand
Method for storage and handling of methacrylate resin and polyester concrete components
Method for disposal of excess methacrylate resin, polyester concrete, and containers

For each shipment of methacrylate and polyester concrete, submit a material safety data sheet for each
component.
Submit test samples of methacrylate and polyester resins 15 days before use.
Submit aggregate and resin volumes recorded from the volumetric mixer at the end of each work shift.
15-5.06A(3) Quality Control and Assurance
Complete a trial overlay before starting production overlay activities.
The trial overlay must:
1.
2.
3.
4.
5.
6.
7.

Be at least 12 feet wide by 6 feet long and the same thickness as the project overlay
Be constructed on a prepared concrete base
Be placed within the project limits at an authorized location
Be constructed using the same equipment as the production work
Replicate field conditions for the production work
Be used to determine the initial polyester-concrete set time
Demonstrate suitability of the proposed means and methods

The Engineer determines acceptability of the trial overlay.


Dispose of the trial overlay and concrete base after acceptance.
15-5.06B Materials
Notify the Engineer 15 days before delivery of resin in containers over 55 gallons to the job site.
Polyester concrete consists of polyester resin binder and aggregate.
Polyester resin binder must:
1. Be an unsaturated isophthalic polyester-styrene co-polymer
2. Contain not less than 1 percent by weight gamma-methacryloxypropyltrimethoxysilane, an
organosilane ester silane coupler
3. Be used with a promoter compatible with suitable methyl ethyl ketone peroxide and cumene
hydroperoxide initiators
4. Have the values for the material properties shown in the following table:

236

SECTION 15

EXISTING FACILITIES

Property

Viscosity

Test method
ASTM D 2196

Specific gravitya
Elongation

ASTM D 1475
ASTM D 638

Tensile strength

ASTM D 618
ASTM D 638

Styrene contenta
PCC saturated surface-dry
bond strength
Static volatile emissiona

ASTM D 618
ASTM D 2369
California Test 551

SCAQMD Method
309-91
a
Test must be performed before adding initiator.

Value
75 to 200 cP
RVT, no. 1 spindle, 20 RPM at 77 F
1.05 to 1.10 at 77 F
35 percent, minimum
Type I specimen, 0.25 0.03 inch thick
Rate = 0.45 inch/minute
Sample Conditioning: 18/25/50+5/70
2,500 psi, minimum
Type I specimen, 0.25 0.03 inch thick
Rate = 0.45 inch/minute
Sample conditioning: 18/25/50+5/70
40 percent to 50 percent by weight
3.5 MPa minimum at 24 hours and 21 1 C
60 gram/sq m loss, maximum

Aggregate for polyester concrete must:


1. Comply with sections 90-1.02C(1), 90-1.02C(2), and 90-1.02C(3)
2. Have not more than 45 percent crushed particles retained on the no. 8 sieve when tested under
California Test 205
3. Have fine aggregate consisting of natural sand
4. Have a weighted-average aggregate absorption of no more than 1 percent when tested under
California Tests 206 and 207
5. At the time of mixing with resin, have a moisture content of not more than one half of the weighted
average aggregate absorption when tested under California Test 226
6. Comply with the requirements for one of the aggregate gradings shown in the following table:

Sieve size
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200

Percentage passing
3/8 inch maximum
No. 4 maximum
100
100
83100
100
6582
6285
4564
4567
2748
2950
1230
1636
617
520
07
07
03
03

High-molecular-weight methacrylate for the resin prime coat must comply with section 15-5.05B except
the methacrylate resin must be free of wax and tack-free time requirements do not apply.
Sand for abrasive sand finish must:
1. Be commercial-quality blast sand
2. Have not less than 95 percent pass the no. 8 sieve and not less than 95 percent retained on the no.
20 sieve when tested under California Test 205
3. Have an average absorption of not more than 1 percent when tested under California Test 207
15-5.06C Construction
15-5.06C(1) General
The Engineer determines the exact percentage of polyester resin binder at the time of placing.
237

SECTION 15

EXISTING FACILITIES

The Engineer provides final grade and cross slope before the start of overlay work.
The Engineer tests existing deck surface smoothness under section 51-1.03F(5) and may require you to
modify the existing deck smoothness under section 42-3. Modifying the existing deck smoothness is
change order work.
Construction of approach slabs must be complete before placing polyester overlay.
New concrete deck surfaces must comply with section 51-1.03E(5) before starting overlay work.
Use a continuous mixer to mix polyester concrete. The continuous mixer must:
1. Employ an auger screw device with a discharge chute
2. Be equipped with an automatic metering device that measures and records aggregate and resin
volumes
3. Have a visible readout gage that displays volumes of aggregate and resin being recorded
4. Be certified under California Test 109 before use
5. Produce a satisfactory mix consistently during a demonstration
Record polyester concrete volumes at least every 5 minutes, including time and date.
Finishing equipment for polyester concrete must:
1. Have grade control capabilities
2. Be used to consolidate the polyester concrete
Prepare the deck under sections 15-5.01C(2), 15-5.01C(5), and 15-5.02.
The deck must be dry before placing the methacrylate prime coat. The concrete surface must be from 50
to 100 degrees F. Relative humidity must be not more than 85 percent.
Sweep the deck. Blow the deck clean with compressed air.
Thoroughly mix all components of methacrylate resin. Apply methacrylate resin to the deck surface within
5 minutes of mixing. Apply methacrylate resin uniformly and spread to completely cover surfaces to be
overlaid.
The rate of application for methacrylate resin must be approximately 55 sq ft/gal.
Place methacrylate prime coat on magnesium phosphate concrete no sooner than 72 hours after final set
or on modified high-alumina based concrete no sooner than 30 minutes after final set.
For manual mixers, initiate the polyester resin binder and blend completely. Add aggregate and mix for
not less than 2 minutes.
Place polyester concrete:
1. Immediately after applying the methacrylate prime coat
2. Before gelling
3. Within 15 minutes of adding initiator
The weight of resin binder must be approximately 12 percent of the weight of the aggregate. Polyester
concrete must have an initial set time of from 30 to 120 minutes when tested using an initial-setting-time
Gillmore needle under ASTM C 266.
Consolidate and finish the overlay to the required grade and cross section using finishing equipment.
Polyester concrete must be consolidated to a relative compaction of not less than 97 percent when tested
under California Test 552.
Apply a sand finish of not less than 0.8 lb/sq yd before gelling occurs.
Protect the overlay from moisture for not less than 4 hours after finishing. Do not allow traffic or
equipment on the overlay for not less than 4 hours after final finishing.
Completed polyester-concrete deck surfaces must comply with section 51-1.03F(5).
238

SECTION 15

EXISTING FACILITIES

Taper polyester concrete overlay edges if the overlay (1) is not completed within the allowable lane
closure time and (2) is more than 1/2 inch higher in elevation than the adjacent pavement. Taper edges
that are transverse to the direction of traffic at a 20:1 (horizontal:vertical) slope. Taper edges that are
longitudinal to the direction of traffic at a 4:1 (horizontal:vertical) slope.
Tapers may remain and be overlaid with polyester concrete overlay.
15-5.06C(2) Expansion Dams
You may mix polyester concrete for expansion dams using mechanical mixers of not more than 9-yards

capacity.

For new asphalt concrete overlays, place the asphalt concrete overlay before starting polyester concrete

activities. Saw cut and remove asphalt concrete at expansion dam locations.

Remove asphalt concrete and expansion dams. Do not damage the deck or asphalt concrete to remain in

place.

The application rate of methacrylate resin must be approximately 100 sq ft/gal.

You may place and finish expansion dams using hand methods.

Protect expansion dams from moisture, traffic, and equipment for not less than 4 hours after finishing.

For expansion dams over 6 feet long, install 1/4-inch wide joint material at 6-foot intervals across the

width of the expansion dam. Joint material must be either expanded polyurethane or expanded

polyethylene.

15-5.06D Payment
The Engineer determines the payment quantity of furnishing polyester concrete using the following:
1. Quantity of resin binder used
2. Percent by weight of resin binder in the polyester concrete
3. Unit weight of 135 lb/cu ft
Place polyester concrete overlay is measured by the square foot based on the dimensions shown.

Expansion dam is measured by the cubic foot based on the dimensions shown.

Payment for trial overlay and concrete base for the trial overlay is included in the payment for furnish

polyester concrete.

15-5.07 CORE CONCRETE


15-5.07A General
15-5.07A(1) General
Section 15-5.07 includes specifications for coring holes through concrete bridge members.
15-5.07A(2) Materials
Water for coring activities must be from the local water supply or comply with the following:
1. Contain not more than 1,000 ppm chlorides as Cl
2. Contain not more than 1,300 ppm of sulfates as SO4
3. Contain no impurities that discolor the concrete or etch the surface
15-5.07A(3) Construction
Use coring methods that do not shatter or damage the concrete adjacent to the holes.
Do not allow water from coring activities to fall on public traffic, flow across shoulders or lanes occupied
by public traffic, or flow into gutters or other drainage facilities.
15-5.07A(4) Payment
Coring concrete is measured by the linear foot measured along the centerline of the hole. No deduction is
made for expansion joints.
239

SECTION 15

EXISTING FACILITIES

15-5.07B Core and Pressure Grout Dowels


15-5.07B(1) General
Section 15-5.07B includes specifications for coring holes through reinforced concrete, placing dowels,
and filling holes with pressurized grout.
15-5.07B(2) Materials
Grout must comply with ASTM C 1107 or ASTM C 845, Type K, with a compressive strength of 5,000 psi
at 28 days when tested under California Test 551.
Dowels must comply with the specifications for bar reinforcing steel in section 52.
Water for grout must comply with the specifications for water in section 90-1.02D.
Admixtures must contain not more than 500 ppm of chlorides as Cl when tested under California Test 422
and not more than 2,500 ppm of sulfates as SO4 when tested under California Test 417.
15-5.07B(3) Construction
Clean loose and foreign material from concrete and steel surfaces that will contact grout. Flush holes with
water and let dry to a surface-dry condition immediately before grouting.
Mix grout in conformance with the manufacturer's instructions. Fill cored holes with grout. Place dowels
into grouted holes. Seal the ends of holes after placing dowels.
Place a vent tube at 1 end of the hole and an injection feed tube at the other end. For holes with only a
single end, place vent and injection feed tubes in the same hole. Tubes must (1) vent air from holes and
(2) completely fill holes with grout.
Pump grout into holes. Use sufficient pressure to eliminate voids. Continually waste grout until air and
water eject from the vent tubes and there are no visible slugs.
15-5.07B(4) Payment
Dowels for pressure grouting are paid for as bar reinforcing steel (bridge).
15-5.08 EPOXY CRACK INJECTION
15-5.08A General
15-5.08A(1) Summary
Section 15-5.08 includes specifications for filling cracks in concrete structures with pressure-injected
epoxy.
15-5.08A(2) Quality Control and Assurance
Take a 3-ounce sample of mixed epoxy from the injection gun (1) before starting injection activities and
(2) at hourly intervals when requested by the Engineer. If samples show improper proportioning or mixing,
stop injection activities and correct deficiencies.
15-5.08B Materials
Epoxy must comply with section 95-2.11. Multiple formulations may be required for cracks of varying
widths.
15-5.08C Construction
The Engineer selects cracks having widths from 8 to 250 mils for filling.
Clean cracks of material that would impair bonding of epoxy using oil-free compressed air. Remove any
remaining material by flushing with water under pressure. After flushing, blow cracks clean with oil-free
compressed air.
Insert injection ports into cracks. Space ports not more than a distance equal to the thickness of the
concrete being injected. Spacing at ends of cracks must be equal to half the concrete thickness. Adjust
port spacing to ensure epoxy substantially fills the cracks.
Seal crack surfaces between ports with tape or other temporary sealant capable of retaining epoxy in
cracks during pressure injection and until epoxy has hardened.
240

SECTION 15

EXISTING FACILITIES

Concrete temperature must be from 50 to 90 degrees F during injection activities.


Pressure inject epoxy adhesive into cracks through injection ports. Use the lowest practical pumping
pressure. Injection equipment must maintain epoxy proportion and mix consistency. Fill cracks
completely. Do not allow epoxy to run down the face of the concrete from the head of the injection gun.
Start injection at the first port at the end of a crack. Pump epoxy into the port until epoxy runs
substantially from the next adjacent port. Seal the first port and start injection from the next port. Continue
in this manner until the crack is filled. For slanting or vertical cracks, start injecting at the lower end of the
crack. Where vertical and horizontal cracks intersect, inject the vertical crack below the intersection first.
Seal ports by removing the fitting, filling the void with epoxy, and covering the void with tape or surface
sealant. Leave the sealing tape and temporary surface sealant in place until the epoxy has hardened.
Clean excess epoxy from concrete surfaces exposed to public view after removing sealant.
15-5.08D Payment
Inject crack (epoxy) is paid for as the total length of cracks designated by the Engineer to be injected and
that are filled with epoxy.
For cracks extending around corners of members, the crack length is measured on both faces.
You are paid for cracks designated to be filled on opposite sides of a member if the cracks on both sides
are completely filled after injection from only one side.
15-5.0915-5.20 RESERVED
15-6 CULVERT REHABILITATION
15-6.01 GENERAL
15-6.01A General
15-6.01A(1) Summary
Section 15-6 includes specifications for cleaning and preparing, inspecting and evaluating, repairing,
rehabilitating, and reinspecting culverts.
Wherever storm drains, pipes, conduit, risers, downdrains, median drainage inlets, and underdrains are
attached to the culvert, they are included in the work under section 15-6.
Repair as described, and repairing may include:
1. Filling voids below and around the exterior of the culverts
2. Restoring culvert openings
3. Smoothing protrusions inside culverts
Rehabilitate as described, and rehabilitating may include:
1. Filling voids below and around culverts
2. Paving culvert inverts
3. Installing pipeliners inside culverts
For a given culvert, if only 1 type of pipeliner is shown, install that type of pipeliner. For a given culvert, if
more than 1 type of pipeliner is shown, choose one of the types shown.
15-6.01A(2) Definitions

alternative pipeliner: Bid items used where more than 1 type of pipeliner is shown for a given culvert.

annular space: Space or void between the outside wall of the pipeliner and the inside wall of a culvert.

lateral pipe opening: Opening in a culvert for a connecting pipe or drain of any kind.

service opening: Opening in a culvert for maintenance, repair, inspection, or cleaning.

wastewater: Water and contaminants generated by culvert rehabilitation.

waterway: Existing drainage system, including surface water, tributaries, and groundwater.

241

SECTION 15

EXISTING FACILITIES

15-6.01A(3) Submittals
15-6.01A(3)(a) General
For each culvert, submit a work plan in a 3-ring binder that has labeled dividers for each type of plan. The
work plan must include:
1.
2.
3.
4.
5.
6.

Cleaning plan
I nspection plan
Contact grouting plan when this work is described
Annular-space grouting plan when this work is described
Inspection and evaluation report
Postrehabilitation inspection report

For each portion of the work plan, obtain the Department's authorization before you perform work based
on that portion.
At the prerehabilitation meeting, submit the work plan. Include work plans for contact grouting and
annular grouting when this work is described. Allow 7 days for the Department's review. If multiple binders
are submitted simultaneously or a binder is submitted before the review of a previously submitted binder
is complete, designate the sequence that the binders are to be reviewed. Allow review time specified plus
3 days for each additional binder.
Within 7 days of the inspection of a culvert, submit an inspection and evaluation report. Allow 7 days for
the Department's review. If multiple reports are submitted simultaneously or a report is submitted before
the review of a previously submitted report is complete, designate the sequence that the reports are to be
reviewed. Allow the review time specified plus 3 days for each additional report.
Within 7 days of the completion of all culvert work, submit a postrehabilitation inspection report as an
action submittal. Allow 5 days for the Department's review. If multiple reports are submitted
simultaneously or an additional report is submitted before the review of a previously submitted report is
complete, designate the sequence that the reports are to be reviewed. Allow the specified review time
plus 3 days for each additional reinspection report. Obtain written approval of the reinspection report.
To make a change to an authorized plan or report, submit it as specified for a new submittal. Note the
changes.
Retain a copy of the culvert inspection videos and records until the postrehabilitation inspection report is
authorized.
15-6.01A(3)(b) Cleaning Plan
The cleaning plan must include methods for:
1. Cleaning
2. Controlling sediments dislodged during the cleaning
3. Controlling and diverting the existing stream or groundwater flow. The bypass system must have
adequate capacity and size. Include:
3.1. Your calculations for the existing flows and the capacity of the bypass system
3.2. Your schedule for the required use of the bypass system
15-6.01A(3)(c) Inspection Plan
The inspection plan must include:
1. Sample of the printed CCTV video log. The printed log must include digital photographs of material
not dislodged during cleaning operations, locations where invert repairs were necessary, culvert
joints, lateral connection joints, protrusions, and other portions of the culvert.
2. Sample CCTV video recording from previous culvert inspection work. The video must have audio
commentary stating operational and structural defects in pipes that are the same size as those for this
Contract. Sample video recording must be taken with the same camera and lighting equipment
proposed for this work. Describe the camera type, model. and transporter.
If human entry is possible, the plan must also include samples obtained from handheld video and still
photographs. Include the following:
242

SECTION 15

EXISTING FACILITIES

1. Sample of the printed video log. The printed log must include digital photographs of material not
dislodged during cleaning operations, locations where invert repairs were necessary, culvert joints,
lateral connection joints, protrusions, etc.
2. Sample video recording from previous culvert inspection work. The video must have audio
commentary showing operational and structural defects in pipes that are the same size as those for
this Contract. Sample video recording must be taken with the same camera and lighting equipment
proposed for this work. Describe the camera type, model, and transporter.
15-6.01A(3)(d) Contact Grouting Plan
If contact grouting is described, ordered, or proposed as a repair method, submit a contact grouting plan.
The grouting plan must include:
1.
2.
3.
4.
5.
6.

7.
8.
9.
10.

Order of work
Maximum injection pressures
Details and data for drilling and grouting equipment
Plans for controlling groundwater and existing culvert stream flows
Pressure gage, recorder, and field equipment certifications, including calibrations by an independent
testing agency
Sample printout of the form for recording grouting operations. Form must show the following tabulated
information for each grout port:
6.1. port location
6.2. pressure
6.3. volume
6.4. start and end time
Schedule of grout port installations and method for obtaining probe depth dimensions at grout ports;
tabulation of locations and dimensions
Culvert strut details as necessary
Method for monitoring deformation of culvert or concrete lining
Grout mix design, including:
10.1. Densities and viscosity
10.2. Initial set time
10.3. Materials and the independent testing agency's test data as specified in section 41-1.01
10.4. Grout working time before 15 percent change in density or viscosity occurs

15-6.01A(3)(e) Annular Space Grouting Plan


If a pipeliner with annular space grouting is described, submit an annular space grouting plan. Submit a
separate plan for each kind of grout or variation in grouting procedure or pipeliner installation. For each
plan, state the corresponding culvert location and applicable installation conditions. With authorization,
you may change the grout mix or grouting procedure before starting grouting at the given culvert location.
The grout plan must show grouting methods and procedures and include:
1. Grout mix design. Include details of and test results from an independent testing agency for the
following:
1.1. Components and proportions
1.2. Densities and viscosity
1.3. Initial set time of the grout
1.4. 28-day minimum grout compressive strength
1.5. Grout working time before a 15 percent change in density or viscosity occurs
2. Maximum injection pressures, including those for the stage at the crown of the culvert
3. Proposed grout lift heights and volumes (e.g., stage 1 to spring line; stage 2 is fully grouted)
4. Bulkhead designs and locations
5. Calculations of the buoyant forces during grouting and details for holding the pipeliner on the invert of
the culvert for a period of time long enough to allow the first lift of grout to set before proceeding to
the second lift
6. Details for re-establishing lateral connections and openings
7. Pressure gage, recorder, and field equipment calibration records from an independent testing agency
8. Proposed number and location of vents relative to pipeliner diameter, pipeliner stiffness, and depth of
flow of grout in the pipe
243

SECTION 15

EXISTING FACILITIES

9. Culvert strut details as necessary


10. Written confirmation that you have coordinated grouting procedures with the grout installer and
pipeliner manufacturer
11. Calculations or other documentation verifying that pipeliner joints will not leak, separate, or deform
under the proposed grouting pressure
15-6.01A(3)(f) Inspection and Evaluation Report
Report inspection findings and recommended repairs. CCTV or video recording and photography must
comply with section 15-6.01(A)(4).
The inspection and evaluation report must include:
1. 2 copies of the CCTV or video recording and on the outside of each copy include:
1.1. Recording number.
1.2. Inspection date.
1.3. Current distance along the culvert measured by a count meter.
1.4. Encoded text description of location, culvert size, type and length.
1.5. Printed labels with location and date on a hard copy of the video recording.
1.6. Audio portion stating:
1.6.1. Inspection date.
1.6.2. Confirmation of the orientation and origin of the tape counter meter.
1.6.3. Description of culvert size, type and length.
1.6.4. Description and location of each defect.
1.6.5. Description and location of each lateral pipe opening.
1.6.6. Description of flow direction.
2. 1 set of the digital photographs.
3. Documentation of the condition of the culvert, including:
3.1. Any condition that might prevent proper installation of pipeliner or invert paving.
3.2. Protrusions.
3.3. Collapsed or crushed areas.
3.4. Reduced cross-sectional areas.
3.5. Each lateral pipe opening, including:
3.5.1. Drainage system identification.
3.5.2. Distance into culvert.
3.5.3. Exact position and orientation within culvert wall.
3.5.4. Size or dimensions of opening.
3.5.5. Connecting joint.
3.5.6. Flow direction.
3.6. Each culvert joint.
4. Either a recommendation for repairs or statement that no repairs are needed.
5. If repairs are recommended, describe the location and conditions, including any sharp or protruding
appurtenances that might snag or tear the pipeliner. If possible, include a detailed evaluation by
human entry of the areas where repairs are needed. Describe any corrective action proposed to re
establish lateral pipe and service openings.
If the Engineer determines that the inspection documentation is not adequate, your inspection and
evaluation report will be rejected and you must reinspect and resubmit your report. Inadequate
documentation may include poor camera head position, poor camera focus, poor illumination, rapid rate
of progression, and incomplete records and logs. No payment is made for recleaning and reinspecting.
15-6.01A(3)(g) Postrehabilitation Inspection Report
After the completion of the postrehabilitation inspection, submit a postrehabilitation inspection report. The
written logs, videos, and photographs must comply with section 15-6.01A(3)(f).
The report must document the repairs, rehabilitation, and any subsequent deficiencies, including:
1.
2.
3.
4.

D
efects
Discoloration
I rregularities
S
urface discontinuities
244

SECTION 15

EXISTING FACILITIES

5. A
nomalies
6. Constrictions
7. D
eformities
If there are deficiencies and human entry is possible, the report must include more detailed
documentation of human-entry inspection, concentrating on the areas with deficiencies.
If there are deficiencies, the inspection report must include recommendations to correct the deficiencies.
If the Engineer determines that the inspection report is not adequate, your report will be rejected and you
must reinspect and resubmit your report. Inadequate documentation may include poor camera head
position, lack of focus, poor illumination, rapid rate of progression, and incomplete records and logs. No
payment is made for recleaning and reinspecting.
If there are deficiencies, do not start corrections until you have obtained authorization of the report.
15-6.01A(4) Quality Control and Assurance
15-6.01A(4)(a) General
Use an authorized laboratory with staff experienced and capable of conducting the specified testing.
Your staff that performs inspections must be trained and experienced in locating defects, breaks, and
obstacles.
15-6.01A(4)(b) Prerehabilitation Meeting
Before starting cleaning and preparation work, you must schedule and attend a prerehabilitation meeting
with the Engineer. Include any subcontractors, manufacturers and other parties involved in the culvert
work. Provide a meeting facility that is within 5 miles of the job site or at another location accepted by the
Engineer. Select a date and time that is acceptable to the Engineer and so that all participants will attend.
15-6.01A(4)(c) Pregrouting Meeting
Before starting grouting work, you must schedule and conduct a grouting meeting with the Engineer and
your personnel involved in the grouting work, including your:
1.
2.
3.
4.

P
roject superintendent
Supervisory personnel
Grouting foreman
Grouting subcontractors

Provide a meeting facility that is within 5 miles of the job site or at another location accepted by the
Engineer. Select a date and time that is acceptable to the Engineer and so that all participants will attend.
15-6.01A(4)(d) CCTV
CCTV recordings must be made and submitted in high quality electronic media such as VHS, CD, or
DVD.
The CCTV equipment must include:
1.
2.
3.
4.
5.

CCTV camera with articulating head


Transporter adapted for conditions of the culvert
Television monitor
Lighting
Cables and power sources

CCTV equipment must:


1.
2.
3.
4.
5.

Be specifically designed and constructed for pipe inspection


Have camera lighting for minimizing reflective glare
Have an adjustable focal-distance range from 6 inches to infinity
Produce a minimum resolution of 356 lines per inch for both the camera and monitor
Have a remote-reading meter counter accurate to 1 percent over the length of the particular section
being inspected
245

SECTION 15

EXISTING FACILITIES

Verify accuracy of the distance meter in the CCTV with a walking meter, roll-a-tape, or other authorized
device.
Where human entry is possible for the entire length of the culvert, you may use a handheld video camera
with lighting as an alternative to CCTV. Video and audio content must comply with the requirements for
CCTV. Inspect at a rate that is not more than 30 feet per minute.
15-6.01A(4)(e) Photographs
Use a digital camera and lighting. Lighting and photo quality must be suitable to provide clear and
focused photographs of the entire culvert surface under all conditions.
15-6.01A(4)(f) Monitoring of Annular Space Grouting
Wherever a pipeliner with annular space grouting is described, monitor the grouting and record pressures
throughout the grouting process. Verify compliance with the manufacturer's instructions for each phase of
the grouting process. Gages must comply with ANSI B40, Grade 2A. The pressure gages, recorder, and
field equipment must be calibrated by an independent testing agency.
15-6.01A(4)(g) Pipeliners
Pipeliners must be continuous over the entire length of the culvert and must have no visual defect such
as foreign inclusions, concentrated ridges, discoloration, pitting, pin holes, cracking or other deformities.
The pipeliner must not be over-deflected. There must not be segregation or voids in the grout.
15-6.01A(4)(h) Deflection Testing of Pipeliners
If a pipeliner with annular space grouting is described, test the pipeliner for deflection. Test after grouting
and in the presence of the Engineer.
For pipeliners with a nominal inside diameter of 36 inches and less, either pull a mandrel through the
pipeliner by hand or use another authorized method. The mandrel must be:
1.
2.
3.
4.
5.
6.

Rigid and nonadjustable


Comprised of at least 9 legs and have an odd number of total legs
Longer than it is wide
Made of steel
Fitted with pulling rings at each end
Stamped or engraved on some segment other than a runner indicating pipeliner material
specification, nominal size, and mandrel outside diameter (e.g., HDPE F 714-SDR 26- 36" 31.569")
7. Furnished in a suitable carrying case labeled with the same data as stamped on the mandrel
8. Authorized before use
For pipeliners with a nominal inside diameter greater than 36 inches, determine the deflection using a 1
inch diameter, rigid, nonadjustable metal bar; a minimum-radius rigid template; or other authorized
method.
The pipeliner must not be over-deflected. For pipeliners 36 inches or less in nominal diameter, the
mandrel must pass through the entire pipeliner. For pipeliners greater than 36 inches in nominal diameter,
the deflection must be the lesser of either of the following:
1. 5 percent greater than the actual dimension of the pipeliner in place. This actual dimension includes
the pipe joint system.
2. 6-1/2 percent of the nominal pipeliner dimension
If more than 8 percent of the nominal pipeliner dimension is over-deflected, the pipeliner is rejected. If 8
percent or less of the nominal pipeliner dimension is over-deflected, the pipeliner may remain in place
and the Department deducts 20 percent of the bid amount for that pipeliner.
15-6.01B Materials
15-6.01B(1) General
Slurry cement backfill for culverts must comply with section 19-3.02D.

246

SECTION 15

EXISTING FACILITIES

15-6.01B(2) Contact Grout


Grout for contact grouting must comply with section 41-1.02 and contain:
1. Not more than 2 percent bentonite by weight of cement and water
2. Not less than 590 lb of cement per cubic yard
If sand is used in the grout mix, sand must comply with section 90-1.02C(3) and the grading requirements
in the following table:
Sieve size
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200

Percent passing
100
95100
6085
2050
1030
020

15-6.01B(3) Annular Space Grout


Grout for annular space grouting must be low-density foam concrete that consists of water, cementitious
materials, foaming agent, and optional chemical admixtures.
Cementitious materials must comply with section 90-1 except:
1. Use of SCM is not mandatory
2. You may only use SCM if you submit a statement from the foaming agent's manufacturer verifying
that the foaming agent is compatible with the SCM
Foaming agent must comply with ASTM C 869.
The grout cast density at the point of placement must be from 53 to 68 lb/cu ft and the minimum
compressive strength must be 300 psi at 28 days.
Test the grout compressive strength under ASTM C 495 except that specimens must be moist cured
before the 28-day compressive strength test and not be oven dried. If the grouting plan shows multiple
stages, the grouting plan must include test results that verify that the grout stiffness is adequate for
placement of multiple lifts.
15-6.01C Construction
15-6.01C(1) General
Comply with the following work sequence and notify the Engineer before you start each of the following
steps:
1.
2.
3.
4.
5.
6.

Clean and prepare


Inspect and evaluate
R
epair culvert
Rehabilitate culvert
R
estore openings
Perform postrehabilitation inspection

Before starting the inspection, the culvert must be clean and free of water and debris. During all culvert
work, keep the culvert clean and free of water and debris.
Wherever culvert struts are described in the grouting plan, install struts before starting any grouting.
Wherever structural concrete repairs to the culvert are shown or ordered, the structural concrete repair
must be complete and the concrete must have a compressive strength of at least 2,500 psi before starting
any grouting.
Wherever concrete invert paving is shown or ordered, the invert paving must be complete and the
concrete paving must have a compressive strength of at least 2,500 psi before starting any grouting.
247

SECTION 15

EXISTING FACILITIES

15-6.01C(2) Cleaning and Preparation


Remove all debris, sediment, and other accumulated material from the culvert invert and restore the flow
area to the original flow area or to the diameter shown.
Where shown, disconnect down drains towards the downstream end of the culvert.
Clean the culvert with high-velocity cleaning equipment and air mover or mechanically powered
equipment. If human entry is possible, you may use nonmechanically powered cleaning equipment.
15-6.01C(3) Inspection and Evaluation
After cleaning and preparation is complete, inspect the entire length of the culvert, and submit the
inspection and evaluation report. Inspect by either CCTV or human entry.
If sediment, debris, or other accumulated material is found during inspection, stop the inspection and
reclean the culvert. Cleaning must comply with the manufacturer's instructions for the type of pipeliners
shown. Cleaning must be complete to allow accurate CCTV and photography of the entire culvert. No
payment is made for recleaning.
Make a 360-degree inspection, video, and photographic record of each joint and lateral joint.
If the CCTV camera does not pass from one end of the culvert through the entire length of the culvert,
reset the equipment and inspect from both ends until the entire length is documented.
If the inspection video is low quality and does not adequately depict the condition of the culvert, correct
the deficiencies and reinspect the culvert. Low quality may result from:
1.
2.
3.
4.
5.
6.

Poor camera head position


Poor focus
Low lighting
Rapid rate of progression
Missing documentation of time and location
Inadequate cleaning of the culvert

No payment is made for reinspection due to low quality and recleaning.


15-6.01C(4) Repairing
After obtaining authorization of the inspection and evaluation report, repair the existing culvert as
described or ordered.
Complete repairs before starting rehabilitation work.
15-6.01C(5) Rehabilitation
15-6.01C(5)(a) General
Place slurry cement backfill around the culvert and below the culvert invert as shown.
15-6.01C(5)(b) Annular Space Grouting
Before starting grouting activities, install the bulkheads and place grout injection tubes and breather tubes
with removable plugs around the pipeliner and through bulkheads as shown in the authorized grouting
plan.
Grout the entire annular space between the pipeliner and culvert without voids or grout segregation. If
before starting grouting you determine that the entire annular space is not accessible for grouting, submit
a work plan for correcting the annular space to allow for grouting. No payment is made for correction of
the annular space to allow for grouting.
Mix the water, cementitious materials, and chemical admixtures before adding the foaming agent to the
grout. Add the foaming agent at the job site.
For each batch of grout, perform density and viscosity tests under ASTM C138 and ASTM C 939 in the
presence of the Engineer. Grout density must be within 3 lb/cu ft of the density in the authorized grout
plan with mix design. The time of efflux (outflow) must not exceed 20 seconds as specified in ASTM C
939 unless otherwise authorized.
248

SECTION 15

EXISTING FACILITIES

For pipeliners with a stiffness less than 29 psi, the grout pump's pressure measured at the point of
injection must not exceed either of the following:
1. 5 psi
2. Manufacturer's instruction
For pipeliners with a stiffness at least 29 psi, the grout pump's pressure measured at the point of injection
must not exceed 7.25 psi.
The pipeliner must be able to withstand a static head of grout that is 6 inches above the highest crown
elevation. The maximum grout pressure for a static grout head must not exceed the grout pumps's
maximum allowable pressure.
Install a grout pressure gage and recorder immediately adjacent to each injection port. Continuously
record on paper with ink the actual grouting pressure versus time. Record grout pressure to an accuracy
of 0.5 psi. Attach a gage to a saddle-type diaphragm seal to prevent clogging with grout.
Grout must be placed in a continuous manner and injected in lifts. The height of the lifts must (1) not
exceed the height in the authorized grout plan or (2) be less if needed to avoid floating, shifting, or
deforming the pipeliner. Monitor the injection pressure, including the pressure for the last lift at the crown.
If the pipeliner cannot withstand grouting pressures or static head, either the maximum pressure at the
point of grout injection must be reduced, or staged grouting must be employed.
15-6.01C(6) Restoring Openings
Within 72 hours of installing a pipeliner, restore the lateral pipe and service openings, risers, downdrains,
median drainage inlets, and underdrains. Restore these openings before starting pipeliner installation at
another culvert location. The openings must conform and match the invert of connecting pipes.
Do not excavate unless authorized.
Restore openings from the interior of the pipe. Use either a CCTV and remote-control cutting device or
human entry.
The area of the restored opening must be at least 95 percent of the original area. Openings must have an
edge that is crack-free, smooth, and free of burrs and projections.
Where human entry is possible, grout the restored opening so that the seal is watertight. Grout must be
either of the following:
1.
2.
3.
4.

Quick-set epoxy mortar


High viscosity epoxy
Hydrophilic vulcanized expansive rubber strip
Manufacturer's recommended mix

15-6.01C(7) Postrehabilitation Inspection


Postrehabilitation inspection must comply with section 15-6.01C(3).
15-6.01D Payment
Payment for the following work is included in the payment for cleaning, inspecting, and preparing the
culvert:
1.
2.
3.
4.
5.
6.

Cleaning and preparation


Quality control and assurance
Keeping the culvert free of water and debris
Inspection and evaluation
Repairing
Performing postrehabilitation inspection

Unless a separate pay item is described for diverting the culvert flow, payment for diverting the flow of
water away from the culvert is included in the payment for cleaning, inspecting, and preparing the culvert.

249

SECTION 15

EXISTING FACILITIES

Repairs, additional cleaning, disconnecting downdrains, and reconnecting down drains are paid as
change order work unless such work is:
1. Due to your negligence. If you cause damage, you are responsible.
2. Described in the Contract
Record the quantity of slurry cement backfill that is installed in the culvert and submit this quantity. The
Department does not pay for slurry cement backfill material that is wasted, disposed of, or remaining on
hand after completion of the work.
Pipeliners are measured along the flow line of the existing culvert. No payment is made for pipeliner
length in excess of the measured length.
15-6.02 FILL CULVERT VOIDS
Reserved
15-6.03 CONTACT GROUTING
Reserved
15-6.04 CONCRETE INVERT PAVING
Reserved
15-6.0515-6.09 RESERVED
15-6.10 PLASTIC PIPELINERS
Reserved
15-6.11 CURED-IN-PLACE PIPELINERS
Reserved
15-6.12 DEFORMED AND REFORMED PIPELINERS
Reserved
15-6.13 MACHINE SPIRAL WOUND PVC PIPELINERS
15-6.13A General
15-6.13A(1) Summary
Section 15-6.13 includes specifications for fixed diameter and expandable diameter PVC pipeliner that is
machine spiral wound and installed directly into the culvert.
Restore openings.
15-6.13A(2) Submittals
Submit a certificate of compliance for each reel of PVC strip and include:
1.
2.
3.
4.
5.
6.

Name of manufacturer
Plant location
Date of manufacture and shift
Cell classification
Unit mass
Average pipeliner stiffness and profile type

15-6.13A(3) Quality Control and Assurance


Each reel and continuous PVC strip must be distinctively marked on the inside surface, at intervals not
exceeding 5 feet, and with a coded number. The coded number must include:
1.
2.
3.
4.
5.
6.

Name of manufacturer
Plant location
Date of manufacture and shift
Minimum strip thickness
Cell classification and profile type
Size
250

SECTION 15

EXISTING FACILITIES

The marking must be visible from inside the completed pipeliner.


15-6.13B Machine Spiral Wound PVC Pipeliners, Fixed Diameter
Reserved
15-6.13C Machine Spiral Wound PVC Pipeliners, Expandable Diameter
Reserved
15-6.14 CEMENTITIOUS PIPELINERS
Reserved
15-6.1515-6.20 RESERVED

251

DIVISION III GRADING

16 CLEARING AND GRUBBING

16-1.01 GENERAL
Section 16 includes specifications for clearing and grubbing.
Clearing and grubbing consists of removing objectionable material from within the highway, bridge
construction areas, road approaches, material sites within the right-of-way, areas through which ditches
and channels are to be excavated, and other specified areas.
Work specified in section 20-3.03B(4) must be completed before clearing and grubbing.
16-1.02 MATERIALS
Not Used
16-1.03 CONSTRUCTION
16-1.03A General
Clear and grub before performing earthwork in an area.
Do not injure standing trees, plants, and improvements shown to be protected.
Clear and grub construction areas on the job site where facilities are shown to be constructed, including
highways, structures, road approaches, frontage roads, accessory roads and connections, streets, ramps,
ditches, and channels.
Clear and grub to:
1.
2.
3.
4.
5.

5 feet outside of excavation and embankment slope lines where slopes are not rounded
Outside limits of slopes where slopes are rounded
5 feet outside of structures
5 feet outside of slope lines for ditches and channels with a bottom width of 12 feet or more
2 feet outside of slope lines for ditches and channels with a bottom width of less than 12 feet

Clear and grub material sites and construction areas enclosed by interchange loops and ramps.
If the construction area includes an orchard, vineyard, or other cultivated area, clear and grub the entire
right-of-way.
16-1.03B Clearing
Clear the area above original ground of all objectionable material including trees, vines, logs, upturned
stumps, downed trees, plants, brush, grass, weeds, concrete, and masonry.
Cut tree branches that extend over the roadway and hang within 20 feet of finished grade. Cut off
branches close to the trunk under section 20-1.03D. Cut other branches to give each tree a balanced
appearance.
16-1.03C Grubbing
In embankment areas where the grading plane is less than 2 feet above original ground, grub to a depth
necessary to remove all stumps, roots, buried logs, and other objectionable material.
In embankment areas where the grading plane is 2 feet or more above original ground, cut off trees,
stumps, and roots not more than 1 foot above original ground.
Remove trees, stumps, and roots completely where work includes:
1.
2.
3.
4.
5.
6.

Roadway excavation
Earthwork slope construction
Structure construction
Pile construction
Trench, ditch, or channel excavation
Removal of unsuitable material
253

SECTION 16

CLEARING AND GRUBBING

16-1.03D Disposal of Materials


Unless the Contract includes a bid item for duff as specified in section 21-1.02C, dispose of objectionable
materials resulting from clearing and grubbing activities. Do not leave objectionable material in or under
embankments, including dikes.
You may reduce combustible material to chips with a maximum thickness of 1/2 inch. Spread chips in
areas enclosed by interchange loops and ramps or between slope lines and right-of-way lines. Either bury
or distribute uniformly by mixing with underlying soil to prevent combustion.
Accumulation of flammable material is not allowed.
16-1.04 PAYMENT
Not Used

254

17 WATERING

17-1 GENERAL

17-1.01 GENERAL
17-1.01A General
Section 17-1 includes general specifications for watering.
If an available source of water is described in the Information Handout, verify the quality and quantity of
water.
If water becomes unavailable in the quantities needed for the work, the unavailability of water is a
material shortage.
17-1.01B Submittals
For recycled water, submit a copy of the waste water discharge permit or waiver from the appropriate
RWQCB for each water source before using the water in the work.
17-1.01C Quality Control and Assurance
For recycled water, meet the CDPH and the appropriate RWQCB requirements. File a report with the
appropriate RWQCB.
17-1.02 MATERIALS
Water may be potable or nonpotable. Nonpotable water must be either recycled water or nonpotable
water developed from other sources.
17-1.03 CONSTRUCTION
Not Used
17-1.04 PAYMENT
Not Used
17-2 DEVELOP WATER SUPPLY
17-2.01 GENERAL
17-2.01A Summary
Section 17-2 includes specifications for developing a water supply.
17-2.01B Submittals
Submit PLACs for developing a water supply system.
17-2.01C Quality Control and Assurance
Do not convey nonpotable water in tanks or drain pipes that will be used to convey potable water.
Label nonpotable water supply, tanks, pipes, and any other conveyances of nonpotable water as follows:
NONPOTABLE WATER
DO NOT DRINK
17-2.02 MATERIALS
Furnish pipelines or other necessary equipment to supply water for the work, including change order
work.
Each water storage tank and distribution system must be equipped with positive shut-off valves.
17-2.03 CONSTRUCTION
Not Used
17-2.04 PAYMENT
Not Used

255

SECTION 17

WATERING

17-3 APPLY WATER

17-3.01 GENERAL
Section 17-3 includes specifications for applying water.
17-3.02 MATERIALS
Not Used
17-3.03 CONSTRUCTION
Apply water in the quantity, at the location, and for the purpose described or ordered.
For compacting embankment material, subbase, base, and surfacing material and for dust control, apply

water with the appropriate equipment to ensure the uniform application of water.

You may use a chemical additive in water for compaction if authorized.

Unless all water is applied by means of pipelines or unless otherwise authorized, you must have at least 1

mobile unit available at all times. The unit must have a capacity of at least 1,000 gal.

17-3.04 PAYMENT
Not Used

256

18 DUST PALLIATIVE

18-1.01 GENERAL
Section 18 includes general specifications for controlling dust using binder or dust palliative.
Monitor air quality and provide dust control measures to limit dust below nuisance levels under section
14-9.
18-1.02 MATERIALS
Dust control binders or dust palliative must be either miscible in water or a material that is directly applied
to the surface without mixing with water.
Binders that are miscible in water must be one of the following types:
1. Resin emulsion composed from 57 to 63 percent of semiliquid petroleum resin and the remainder
composed of water to which a suitable emulsifying agent has been added. Resin emulsion must
comply with the following:
1.1. Resin emulsion must be readily miscible with water and when diluted with any hard water in the
proportions of 1 part emulsion to 10 parts water must show no signs of breakdown or
separation of the petroleum resin base.
1.2. Resin emulsion that has been stored in closed containers at temperatures above freezing for a
period up to 3 months must show no signs of separation.
1.3. Resin emulsion that has been stored for more than 3 months must not be used until tested and
authorized.
2. Asphaltic emulsion complying with the material specifications for asphaltic emulsions, Grade SS1.
3. Binder materials composed of lignin sulfonate.
4. Binder material that is noncorrosive, effective as a dust palliative, and miscible in water in the
proportions specified in section 18-1.03C.
Binders that are directly applied to the surface without mixing with water must be a product prepared from
crude petroleum that is effective as a dust palliative.
18-1.03 CONSTRUCTION
18-1.03A General
Monitor conditions and apply dust palliative for dust control as described and as ordered. Dust control
may be required at any time.
18-1.03B Mixing
Mix binders that are miscible in water with additional water at a rate of 4 to 19 parts water to 1 part binder.
The exact rate must be authorized. Accomplish mixing by placing the binder and water in the spreading
equipment simultaneously or by another mixing method that produces equivalent results.
18-1.03C Application
Apply binders that are miscible in water with pressure type water distributor trucks equipped with a spray
system or pressure type asphalt distributors that comply with mixing and application specifications in
section 93. Apply material at an approximate rate of 0.2 to 0.8 gal/sq yd.
Apply binders that are directly applied to the surface without mixing with water using authorized
equipment. Apply binder at a rate of 0.10 to 0.25 gal/sq yd.
18-1.04 PAYMENT
Dust palliative weight is measured before adding water.
The Department does not adjust the unit price for an increase or decrease in the binder (dust palliative) or
dust palliative (stabilizing emulsion).

257

19 EARTHWORK

19-1 GENERAL

19-1.01 GENERAL
19-1.01A Summary
Section 19-1 includes general specifications for performing earthwork activities including:
1.
2.
3.
4.
5.
6.
7.

xcavating
E
Excavating and replacing unsuitable material
Removing slides and slipouts
Preparing basement material
Constructing embankments and shoulder backing
Backfilling
G
rading

Work specified in section 20-3.03B(4) must be completed before starting earthwork activities.
19-1.01B Definitions
finished grade: Final surface of the completed facility. If the Contract includes stage construction, the
relation between finished grade and the work under this Contract is shown.
unsuitable material: Material encountered below the natural ground surface in embankment areas or
below the grading plane in excavation areas determined to be any of the following:
1. Of such unstable nature that it cannot be compacted to the specified density using ordinary methods
at optimum moisture content.
2. Too wet to be properly compacted and cannot be dried before incorporating into the work. Excessive
moisture alone is not sufficient cause for determining that the material is unsuitable.
3. Inappropriate for planned use.
19-1.02 MATERIALS
Not Used
19-1.03 CONSTRUCTION
19-1.03A General
Unless otherwise specified in section 14-11, use material resulting from any excavation to construct
embankments and dikes or you may use it to backfill structures. If the quantity of excavated material is
not sufficient to construct embankments, obtain material under section 19-7.
Apply water under section 17-3.
19-1.03B Unsuitable Material
Excavate unsuitable material.
Notify the Engineer before removing the unsuitable material if:
1. Removal is not otherwise described
2. You request payment for removal as change order work
Backfill the space resulting from excavating unsuitable material with material suitable for the planned use.
Place and compact suitable material under section 19-6.
19-1.03C Grade Tolerance
Immediately before placing subsequent layers of material, prepare the grading plane to comply with the
following:
1. Where HMA is to be placed, the grading plane must not vary more than 0.05 foot above or below the
grade established by the Engineer.
2. Where PCC base or pavement is to be placed, the grading plane must not extend above the grade
established by the Engineer.
259

SECTION 19

EARTHWORK

3. Where structure approach slabs or the thickened portion of sleeper slabs are to be placed, the
grading plane for the embankments beneath must not extend above the grade established by the
Engineer.
4. If material to be placed on the grading plane is paid by the cubic yard, the grading plane at any point
must be within 0.05 foot above the grade established by the Engineer.
5. If subbase or base material to be placed on the grading plane is paid by the ton, the grading plane at
any point must be within 0.10 foot above the grade established by the Engineer.
19-1.03D Buried Man-Made Objects
Remove and dispose of a buried man-made object encountered in an excavation as part of the
excavation work.
Notify the Engineer before removing the buried man-made object if:
1. Removal of the object is not otherwise described
2. Object could not have been determined by visual inspection
3. You request payment for removal and disposal as change order work
19-1.03E Ditch Excavation
Excavate ditches including channels for changing the course of streams.
The excavation required to construct a ditch or channel with a bottom width less than 12 feet is classified
as ditch excavation.
The excavation required to construct a ditch or channel with a bottom width 12 feet or more is classified
as roadway excavation.
Avoid excavating below the grade for the bottom of the ditch or water channel. If you excavate below
grade, backfill with suitable material and compact.
19-1.04 PAYMENT
If removal of unsuitable material is described, removing unsuitable material is paid for as the type of
excavation involved.
If removal of unsuitable material is not described, removing unsuitable material is paid for as the type of
excavation involved, unless before removal activities, (1) removing the material is ordered as change
order work or (2) you request the removal to be change order work.
If removal of a buried man-made object is described, payment for removing the object encountered in an
excavation is included in the type of excavation involved.
If removal of a buried man-made object is not described, payment for removing a buried man-made
object is included in the type of excavation involved, unless before removal activities, (1) removing the
object is ordered as change order work or (2) you request the removal to be change order work.
The payment quantity for ditch excavation is determined based on average areas and the distances
between them.
19-2 ROADWAY EXCAVATION
19-2.01 GENERAL
19-2.01A Summary
Section 19-2 includes specifications for excavating and grading to construct the roadway.
Comply with section 19-5.
Roadway excavation does not include structure excavation, ditch excavation, or other excavation work
paid for as a separate item.
19-2.01B Definitions
selected material: Specific material excavated from a described location on the job site. Selected
material includes top soil.
260

SECTION 19

EARTHWORK

19-2.02 MATERIALS
Not Used
19-2.03 CONSTRUCTION
19-2.03A General
Excavate to the described or authorized grade. If you overexcavate, backfill with authorized material and
compact.
Where a portion of the existing pavement is to be removed, cut the outline of the area to be removed on a
neat line with a power-driven saw to a depth of at least 0.17 foot before removing surfacing.
Construct embankments under section 19-6.
19-2.03B Surplus Material
If a quantity of surplus material is described, the quantity is approximate.

Ensure enough material is available to complete the embankments before placing the material at other

locations on the job site or disposing of it.

Obtain authorization before disposing of surplus material or using it for any of the following:

1. Widening embankments uniformly


2. Flattening slopes
3. Placing along the roadway or at other locations
If you cannot use surplus material within the highway, dispose of it.
If you dispose of any surplus material prematurely and later find a material shortage, you must replace it
with authorized material. The Department does not pay for replacing the material.
If an ordered change increases the quantity of excavation or decreases the quantity of embankment so
that surplus material must be disposed of, disposing of this material is change order work.
19-2.03C Deficiency Material
If the quantity of acceptable material from excavation is not enough to construct the embankments, the
quantity of material needed to complete the embankments must consist of local or imported borrow.
Obtain local or imported borrow under section 19-7.
If the Contract does not include a bid item for imported borrow, obtaining imported borrow is change order
work.
19-2.03D Selected Material
Use selected material as described.
If not used for topsoil or any other specified layer, place selected material in the roadway prism as
embankment or structure backfill.
If selected material is used as a specified layer, spread and compact it under section 25.
If practicable and unless processing of material is required, haul selected material directly from the
excavation to its final position in the roadway prism and compact it in place. This work is paid for as the
type of roadway excavation involved.
Selected material must remain in place until it can be placed in its final position as provided above. The
Department does not pay for any delay or inconvenience in excavation operations.
If stockpiling of selected material is ordered, payment for excavating and stockpiling the material is
included in the payment for the type of roadway excavation involved.
If stockpiling of selected material is ordered, removing selected material from stockpiles and placing it in
its final position in the roadway prism is again paid for as roadway excavation of the type involved, except
quantities are determined from measurements of the stockpile before removal.
261

SECTION 19

EARTHWORK

The Department does not pay for stockpiling selected material unless stockpiling is ordered.
Topsoil placed along the tops of slopes as erosion control is not considered stockpiled material.
19-2.03E Blasting
The Department does not allow excessive blasting.

Remove material outside the planned cross section that is shattered or loosened due to blasting.

Suspend blasting activities if any of the following conditions occurs:

1. O
vershooting
2. Endangerment to the public
3. Destruction of property or natural features
19-2.03F Slides and Slipouts
Excavate and remove material:
1. Outside the planned roadway or ditch slope that is unstable and constitutes a potential slide
2. From a slide that has come into the roadway or ditch
3. Slipped out of new or existing embankments
Excavate to the designated lines or slopes either by benching or as ordered.

Use removed material to construct embankments unless otherwise ordered.

If you complete a slope and are ordered to remove unstable or stable material and reslope the area, the

removal and resloping is change order work.

Repair any damage to finished work resulting from a slide or slipout as ordered. Repair work is paid for at

the bid price for the item of work involved unless authorized as change order work.

If a slide or slipout is caused by your activities or negligence, the Department does not pay for removing

slide or slipout material and restoring the slope.

19-2.03G Slopes
Construct slopes to the lines and grades established by the Engineer. Slope tolerances are measured

perpendicular to the planned slope.

Any point on the completed excavation slope must be within 0.5 foot of the planned slope, except if the

excavation is in rock, any point on the completed slope must be within 2 feet of the planned slope.

No portion of the slope may encroach on the roadbed.

Round the tops of excavation slopes and ends of excavations.

Any point on the completed embankment slope must be within 0.5 foot of the planned slope for slopes

within 4 feet of the shoulder grade. Slopes below 4 feet must be within 1 foot of the planned slope.

If an embankment is constructed of large rock and the size of rocks make it impracticable to construct

slopes within 1 foot, the Engineer may authorize you to construct slopes more than 4 feet below shoulder

grade to within 2 feet of the planned slope.

For median and side slopes with a 6:1 (horizontal:vertical) or flatter slope:

1. Completed slopes must be within 0.2 foot from the grade established by the Engineer
2. Flowlines must be graded to drain and must be within 0.1 foot from the grade established by the
Engineer
If the slope is to be cultivated or straw is to be incorporated into the surface, remove loose rocks larger
than 2-1/2 inches in maximum dimension, roots, and other debris on the surface of the slope before
cultivation or incorporation of straw.

262

SECTION 19

EARTHWORK

Maintain completed slopes true and smooth. The Department does not pay for repairing slope damage
caused by erosion regardless of amount or extent.
19-2.04 PAYMENT
The payment quantity for roadway excavation is determined based on average end areas and the
distances between them.
Whenever changed conditions or nature of a particular operation make it impractical to determine
quantities of roadway excavation based on average end areas, the Engineer computes the quantities of
material excavated by a method best suited to obtain an accurate determination.
When quantities of roadway excavation are determined based on average end areas and center line
distances, a correction for curvature is not applied to quantities within the roadway prism. In determining
the quantity of material outside the original roadway prism, where the roadway centerline is used as a
base, correction is made for curvature if the centerline radius is 1,000 feet or less.
The Department does not pay for an excavation in excess of the limits shown or authorized. If removal of
a slide or a slipout is described, removing the failed material is paid for as the type of roadway excavation
involved.
If removal of a slide or a slipout is not described, removing the failed material is paid for as the type of
roadway excavation involved, unless before removal activities, (1) removing the material is ordered as
change order work or (2) you request the removal to be change order work.
19-3 STRUCTURE EXCAVATION AND BACKFILL
19-3.01 GENERAL
19-3.01A General
19-3.01A(1) Summary
Section 19-3 includes specifications for performing structure excavation and backfill.
19-3.01A(2) Submittals
19-3.01A(2)(a) General
Reserved
19-3.01A(2)(b) Cofferdams
Submit shop drawings for cofferdam construction. Include construction methods and calculations in the
shop drawings. Shop drawings and calculations must be sealed and signed by an engineer who is
registered as a civil engineer in the State.
For cofferdams on or affecting railroad property, allow 60 days for review.
19-3.01A(2)(c) Soldier Pile Walls
Submit shop drawings for soldier pile wall construction. Shop drawings must include:
1.
2.
3.
4.
5.
6.
7.

Construction sequence
Traffic control
Method of soldier pile installation
Method of placing lagging
Excavation lift limits
Drilling and excavation equipment
Calculations showing soil stability at all stages of construction

Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil
engineer in the State.
Allow 10 days for review.

263

SECTION 19

EARTHWORK

19-3.01A(2)(d) Ground Anchor and Soil Nail Walls


Submit shop drawings for earthwork for each ground anchor wall and soil nail wall to OSD, Documents
Unit. Notify the Engineer of the submittal. Include in the notification the date and contents of the submittal.
The shop drawings must include:
1.
2.
3.
4.
5.

Wall construction schedule with construction sequence


Measures to ensure wall and slope stability during construction
Provisions for installing verification and proof test nails
Methods of excavation for the staged lifts and types of excavation equipment
Excavation lift height and maximum duration of exposure for each wall zone, including supporting
calculations and provisions to stabilize the exposed excavated face
6. Details for measuring the movement of the excavated face and the wall during stability testing and
construction
7. Space requirements for installation equipment
8. Dewatering plan to divert, control, and dispose of surface and ground water during construction
Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil
engineer in the State.
Submit 5 sets of shop drawings for initial review. Allow 30 days for review.
Submit from 6 to 12 sets of final shop drawings as requested by the Engineer for final authorization.
19-3.01A(2)(e) Test Results
Submit test results of any stability testing performed for ground anchor walls and soil nail walls.
19-3.01A(3) Quality Control and Assurance
19-3.01A(3)(a) General
Reserved
19-3.01A(3)(b) Stability Test for Ground Anchor and Soil Nail Walls
If you use an excavation lift height greater than 5 feet or an exposure duration longer than 1 work shift,
perform stability testing. Stability testing must be performed before roadway excavation.
Perform at least 1 stability test within the limits of each wall zone.
Excavate a neat face at most 3 feet in front of the final wall face alignment. The excavated face must:
1. Have a height as shown in the authorized shop drawings.
2. Be 20 feet long and parallel to the wall alignment with a constant height. You may excavate ramps
outside the 20-foot section for construction access.
3. Be left open for the proposed exposure time specified in the authorized shop drawings.
4. Maintain its integrity without raveling, sloughing, or measurable displacement throughout the
proposed exposure time.
After authorization of the test results, you may use the proposed excavation height within the tested wall
zone for the observed exposure time. For ground anchor walls, a wall zone is the entire wall.
If the Engineer determines the exposed excavated face is not maintaining its integrity, you must stabilize
the excavated face immediately and perform additional stability testing.
Stability testing does not apply to ground anchored soldier pile walls.
19-3.02 MATERIALS
19-3.02A General
Reserved
19-3.02B Structure Backfill
Structure backfill must be free of organic or other unsatisfactory material.

264

SECTION 19

EARTHWORK

Structure backfill compacted to a relative compaction of at least 95 percent and material placed behind
retaining walls must have a sand equivalent value of at least 20 and comply with the grading
requirements shown in the following table:
Sieve size
3"
No. 4
No. 30

Percentage passing
100
35100
20100

Except for material placed behind retaining walls, structure backfill compacted to a relative compaction of
at least 90 percent must comply with the grading requirements shown in the following table:
Sieve size
3"

Percentage passing
100

Structure backfill for crib walls must comply with the requirements shown in the following tables:
Wall height
(feet)
Under 10
1025
Over 25
Backfill
material
type
C
D
E

Type of backfill
material
C, D, or E
D or E
E

Sieve
size
3"
3"
No. 4
3"
No. 4
No. 50
No. 200

Thickness of each layer of


material before compaction (feet)
1
2
4

Grading
Percentage
passing
100
100
35100
100
2570
520
05

Sand
equivalent
None
30 min

Relative
compaction
90% min
90% min

None

90% min

19-3.02C Pervious Backfill Material


Pervious backfill material must consist of one or any combination of the following materials:
1.
2.
3.
4.
5.

Gravel
Crushed gravel
Crushed rock
Natural sand
Manufactured sand

Pervious backfill material must comply with the grading requirements shown in the following table:
Sieve sizes
2"
No. 50
No. 100
No. 200

Percentage passing
100
0100
08
04

Grading for sacked pervious backfill material behind wall drain outlets must comply with the grading
specified for 1-1/2 x 3/4 inch primary aggregate in section 90-1.02C(4)(b).

265

SECTION 19

EARTHWORK

19-3.02D Slurry Cement Backfill


Slurry cement backfill must be a fluid workable mixture of aggregate, cement, and water.

Cement must comply with section 90-1.02B(2) except testing is not required.

Water must be free from oil, salts, and other impurities that adversely affect the backfill.

Aggregate must be one of the following:

1. Commercial-quality concrete sand


2. Excavated or imported material in any combination, free of organic material and other deleterious
substances and complying with the grading requirements shown in the following table:
Sieve size
1-1/2"
1"
3/4"
3/8"
No. 4
No. 100

Percentage passing
100
80100
60100
50100
4080
1040

Proportion slurry cement backfill by weight or volume. Use at least 188 pounds of cement per cubic yard.
Use sufficient water to produce a fluid workable mix that flows and can be pumped without segregation
during placement.
Mix materials thoroughly by machine. Use a pugmill, rotary drum, or other authorized mixer. Mix until
cement and water are thoroughly dispersed.
You may use slurry cement backfill as structure backfill for pipe culverts.
19-3.02E Culvert Beddings
19-3.02E(1) General
Culvert beddings consist of shaped bedding, sand bedding, or soil cement bedding.

If more than one type of bedding is allowed, use the same bedding for the entire length of the culvert.

19-3.02E(2) Sand Beddings


Sand bedding must consist of sand:
1. Free from clay or organic material
2. Suitable for the purpose intended
3. Complying with the grading requirements shown in the following table:
Sieve sizes
No. 4
No. 200

Percentage passing
90100
05

19-3.02E(3) Soil Cement Beddings


Material and mixing requirements for soil cement bedding must comply with the specifications for slurry
cement backfill in section 19-3.02D except:
1. Use at least 282 pounds of cement per cubic yard
2. Do not use commercial-quality concrete sand as aggregate
19-3.02F Controlled Low-Strength Material
You may request to use controlled low-strength material as structure backfill for pipe culverts except when
pipe culverts have a diameter or span more than 20 feet.
Controlled low-strength material must be a fluid workable mixture of aggregate, cement, and water.
266

SECTION 19

EARTHWORK

Cement must comply with one of the following:


1. ASTM C 150
2. Blended hydraulic cement complying with either of the following:
2.1. ASTM C 595
2.2. Physical requirements in ASTM C 1157
If you propose using controlled low-strength material, submit a mix design including test data before
excavating the trench where controlled low-strength material is to be used. When tested under ASTM D
4832, the material must have a 28-day compressive strength:
1. From 50 to 100 psi for pipe culverts with 20 feet or less in height of cover
2. At least 100 psi for pipe culverts with over 20 feet in height of cover
Water must be free from oil, salts, and other impurities that adversely affect the backfill.
Aggregate must be one of the following:
1. Commercial-quality concrete sand
2. Excavated or imported material in any combination, free of organic material and other deleterious
substances and complying with the grading requirements shown in the following table:
Sieve size
1-1/2"
1"
3/4"
3/8"
No. 4
No. 100

Percentage passing
100
80100
60100
50100
4080
1040

19-3.02G Concrete Backfill


Concrete backfill encasing steel soldier piles below the lagging must comply with section 90 and contain
at least 505 pounds of cementitious material per cubic yard.
19-3.02H Lean Concrete Backfill
Lean concrete backfill must comply with the specifications for slurry cement backfill in section 19-3.02D
except aggregate must be commercial-quality concrete sand.
19-3.03 CONSTRUCTION
19-3.03A General
Reserved
19-3.03B Structure Excavation
19-3.03B(1) General
Structure excavation includes:
1. Excavating foundations for structures, including trenches for culverts, pipes, rods, deadmen, cutoff
walls, and other facilities
2. Control and removal of water
3. Installation and removal of facilities required to complete the work unless specified or allowed to
remain in place
Structure excavation (Type A) includes excavation for footings where seal courses are shown.
Obtain the Engineer's acceptance of the completed structure excavation before placing any concrete or
masonry.
When embankments must be constructed before culverts are placed, construct embankments to the
specified height and for a distance on each side of the culvert location 5 times the culvert diameter or
267

SECTION 19

EARTHWORK

height before excavating for and installing culverts. Where embankments are constructed on a steep
slope or at a difficult location, the Engineer may modify embankment heights before culverts are installed.
19-3.03B(2) Soldier Pile Walls
Excavate for and construct soldier pile walls in lifts from the top down.
Excavate in a way that minimizes voids requiring backfill behind the lagging.
Do not excavate more than 3 feet below any level of ground anchors that have not been stressed and
grouted.
The Engineer determines whether boulders or portions of boulders that interfere with lagging must be
removed. Perform any additional earthwork ordered. The additional earthwork is change order work.
Complete placing lagging to the full height of the exposed excavation face by the end of the work shift.
19-3.03B(3) Pier Column Excavation
Reserved
19-3.03C Cofferdams
Cofferdams for foundation construction must be (1) carried below the bottom of footings and (2) braced
and as watertight as practicable. Interior dimensions of cofferdams must provide sufficient space inside
wales for form construction and pile driving and allow pumping of water from outside foundation forms.
You may construct the cofferdam large enough to provide clearance to perform the work. The Department
does not pay for the increase in quantities greater than 1 foot outside the footing dimensions.
Cofferdams tilted or moved out of position during sinking must be righted or enlarged to provide the
required clearance and proper pier location.
In tidal waters or in streams that may flood, vent cofferdam walls at low water elevation to ensure equal
hydrostatic head inside and outside the cofferdam when placing and setting seals.
No shoring is allowed in cofferdams that would induce stress, shock, or vibration in the permanent
structure.
Cross struts or bracing may extend through foundation concrete if authorized. Struts or bracing below low
water may remain in place except in navigable streams or when specified to be removed. Remove struts
or bracing above low water. Fill resulting spaces with concrete of the type specified for the surrounding
concrete.
Remove cofferdams with all sheeting and bracing to at least 2 feet below the streambed after completing
substructure construction. Do not disturb or mar the finished concrete or masonry.
19-3.03D Water Control and Foundation Treatment
Select the method to remove and control water at excavations where seal courses are not shown.
Methods may include well point systems, pumping sumps, cofferdams, or concrete seal courses. If you
choose a seal course, (1) the 3rd paragraph of section 51-1.03D(3), does not apply for spread footings
and (2) section 51-1.03D(3) does not apply for pile footings.
Where concrete seal courses are shown, use a cofferdam, concrete seal course, and dewatering pumps.
Place seal course concrete under section 51-1.03D(3).
If no piles are used and footing concrete, culverts, or other structures are placed on an excavated surface
other than rock, comply with the following:
1. Perform excavation without disturbing foundation material. Dewater the excavation if ground water is
encountered and no seal course is used. Continue dewatering activities before or during subsequent
excavation. Foundations must be free of water when footing concrete or pipes are placed. Continue
dewatering activities as required to prevent damage to the work.
2. If foundation material is disturbed by excavation activities, damaged by water, or removed for your
convenience in dewatering, restore the foundation to a condition at least equal to the undisturbed
foundation. For culverts, use Class 2 aggregate base that complies with section 26 to replace
268

SECTION 19

EARTHWORK

damaged or removed foundation material. Compact Class 2 aggregate base as specified for structure
backfill in section 19-3.03E.
If the Engineer determines the undisturbed original material of the excavation is unsuitable, correct as
ordered. Corrective work is change order work.
When footing concrete or masonry is placed on rock, the rock must be fully uncovered and the surface
removed to sound rock. Rock must be leveled or cut to steps and then roughened.
Pressure grout or treat seams in rock as ordered. This work is change order work.
Except for arch culverts, if you encounter solid rock or other unyielding material when excavating for a
culvert at the elevation of the culvert bottom, remove the material below the bottom of the culvert to a
depth of 1/24 the height of embankment above the top of culvert. This removal must be a minimum of 1
foot to a maximum of 5 feet. Backfill the resulting space below the culvert using structure backfill under
section 19-3.03E. Excavating and backfilling below the planned elevation of the bottom of the culvert is
change order work.
For footings on piles, complete excavation to the bottom of footings before driving or drilling piling. If swell
or subsidence results from pile driving, excavate or backfill the footing area to the grade of the bottom of
the footing. If the material under footings would mix with footing concrete or would not support the weight
of wet concrete, replace the material with suitable material, install soffit forms, or provide a platform using
authorized means on which to cast the footing.
19-3.03E Structure Backfill
19-3.03E(1) General
Place structure backfill in uniform layers. Bring backfill up uniformly on all sides of structures. Backfill
layers must be at most 0.67 foot thick before compacting except when compaction is done by ponding
and jetting, the thickness must be at most 4 feet.
Do not use compaction equipment or methods that may cause excessive displacement or damage
structures.
Do not place structure backfill until footings or other portions of the structure or facility are inspected by
the Engineer and authorized for backfilling. Do not place backfill against the back of abutments, retaining
walls, or outside walls of CIP concrete structures until concrete has attained a compressive strength of at
least 2,500 psi or the concrete has been in place for 28 days.
Place backfill inside bridge wingwalls and abutments before railings on wingwalls are constructed.
Compaction by ponding and jetting may be authorized under the following conditions:
1. Backfill material is self-draining when compacted
2. Foundation materials will not soften or be damaged by water
3. Structures will not be damaged by hydrostatic pressure
Ponding and jetting of the upper 4 feet below finished grade is not allowed. Perform work without
damaging the structure or embankment and such that water is not impounded. Supplement ponding and
jetting with vibratory or other compaction equipment.
Compact structure backfill to a relative compaction of at least 95 percent except you may compact
structure backfill to a relative compaction of at least 90 percent at the following locations:
1.
2.
3.
4.
5.
6.

Overside drains
Footings for slope protection, slope paving, and aprons
Headwalls, endwalls, and culvert wingwalls
Retaining walls, except for portions under any surfacing
Inlets in median areas or in traffic interchange loops
Footings and pumping plants not beneath surfacing

Where ordered, place a compacted impervious backfill material instead of structure backfill at the
following locations:
269

SECTION 19

EARTHWORK

1. Outer 2-foot portion of structure backfill adjacent to inlets and outlets for pipes and culverts
2. Structure backfill placed within 2 feet of finished grade at abutments, abutment wingwalls, retaining
walls, and other portions of structures
For the impervious backfill material, use an authorized earthy material. The sand equivalent requirement
does not apply.
Structure backfill placed at bridge supports in waterways and water channels not beneath any
embankment, pavement, or slope protection:
1. Does not need to be compacted
2. Must be soil free of organic matter, trash, or other unsatisfactory material
3. Must be placed to the level of original ground or finished grade shown
If you excavate outside the designated pay limits, material placed in those excavation areas must comply
with the material and compaction requirements of the adjacent structure backfill.
If the Contract includes an item for imported borrow, you may use imported borrow as structure backfill if
it complies with the specifications for structure backfill. No deduction is made in the quantity of imported
borrow paid if you provide replacement material for imported borrow placed as structure backfill.
Material from structure excavation not suitable for use as structure backfill may be used to replace
imported borrow or other excavated material.
Material from structure excavation not used as structure backfill must be placed in roadway embankments
under section 19-6 or disposed of under section 19-2.03B.
19-3.03E(2) Crib Walls
Backfill cells formed by crib members and the space between crib walls and limits for structure
excavation. Include space from material removed outside excavation limits.
Structure backfill for crib walls must not sift or flow through the openings in the walls.
Backfill crib walls simultaneously during wall erection. Place material in uniform layers before compacting.
Compact material by hand tamping, mechanical compaction, or other authorized compaction means.
19-3.03E(3) Soldier Pile Walls
Compact structure backfill behind lagging of soldier pile walls by hand tamping or mechanical
compaction.
In fill areas behind the lagging, key structure backfill into the existing or excavated back slope.
Place and compact backfill behind the lagging at least 5 feet above the level of ground anchors before
drilling for the anchors. Place and compact the remaining backfill behind the lagging after the anchors are
drilled, stressed, and grouted.
19-3.03F Slurry Cement Backfill
Place slurry cement backfill within 1 hour of mixing. Place in a uniform manner without voids or
segregation. Place in a manner that does not float or shift culverts. Remove foreign material that falls into
trenches.
Do not backfill over or place material over slurry cement backfill until 4 hours after placement. Unless
concrete sand is used as aggregate and the in-place material is free draining, you may start backfilling as
soon as the surface water is gone.
If slurry cement backfill is used for structure backfill, you may reduce the excavation width so that the
clear distance between the outside of the pipe and the side of the excavation on each side of the pipe is
at least (1) 6 inches for pipes 42 inches or less in diameter or span or (2) 1 foot for pipes over 42 inches
in diameter or span.
Place slurry cement backfill only for that portion of structure backfill (1) below the original ground or
grading plane or (2) below the top of embankment placed before excavating for culvert pipe. Where
270

SECTION 19

EARTHWORK

necessary, compact earth plugs at each end of the pipe before placing backfill to completely contain
slurry in the pipe trench.
19-3.03G Pervious Backfill Material
Place pervious backfill material in layers along with and by the same methods specified for structure
backfill. Pervious backfill material at any one location must have approximately the same grading. Cover
pervious backfill material at locations exposed to erosion with a 1-foot layer of authorized earthen
material.
Where shown, you may use the Weep Hole and Geocomposite Drain alternative instead of pervious
backfill material. The alternative must comply with section 68-7.
19-3.03H Culvert Bedding
Shape trench beds to fit the bottom of the culvert and to provide uniform support along the entire culvert
length. You may excavate the trench below the bottom of the culvert and construct shaped bedding by
backfilling and compacting culvert backfill material. Shape beds using a template conforming to the
outside shape of the culvert that is guided by headers set parallel to the culvert grade. Headers may be
left in place.
Place soil cement bedding as specified in section 19-3.03F, except do not backfill over soil cement
bedding until 8 hours after placing bedding.
19-3.03I Controlled Low-Strength Material
If a controlled low-strength material l is used as structure backfill, the excavation width may be reduced so
that the clear distance between the outside of the pipe culvert and the side of the excavation on each side
of the pipe culvert is at least (1) 6 inches for pipe culverts with 20 feet or less in height of cover or with 42
inches or less of diameter or span or (2) 1 foot for pipe culverts with over 20 feet in height of cover or over
42 inches in diameter or span.
Mix materials thoroughly by machine. Use a pugmill, rotary drum, or other authorized mixer. Mix until
cement and water are thoroughly dispersed.
Place controlled low-strength material for that portion of structure backfill (1) below the original ground or
grading plane or (2) below the top of embankment that is placed before excavating for the pipe. Compact
earth plugs at each end of the pipe culvert before placing backfill to completely contain slurry in the pipe
culvert trench.
For trenches in existing pavement, place controlled low-strength material no higher than the bottom of the
existing pavement permeable drainage layer. Where a drainage layer does not exist, place the material
no higher than 1 inch below the bottom of the existing AC surfacing or no higher than the top of the base
below existing PCC pavement.
For rigid pipe culverts, the minimum height of controlled low-strength material relative to the pipe culvert
invert must be 0.5 times the pipe culvert diameter or 0.5 times the pipe culvert height.
For flexible pipe culverts, the minimum height of controlled low-strength material must be 0.7 times the
pipe culvert diameter or 0.7 times the pipe culvert height.
Whenever controlled low-strength material is placed within the travelled way or covered by paving or
embankment materials, the controlled low-strength material must achieve a maximum indentation
diameter of 3 inches as determined under ASTM D 6024 before covering and opening to traffic.
19-3.03J Soldier Pile Walls
Where necessary, remove lean concrete backfill from drilled holes and in front of pile flanges to install
lagging.
19-3.03K Ground Anchor and Soil Nail Walls
Excavate in lifts from the top down.
Before you excavate for the installation of production or proof test soil nails in a wall zone:
1. Complete stability testing
271

SECTION 19

EARTHWORK

2. Complete verification testing


3. Obtain authorization of test data
Clean the excavated face of loose materials, mud, rebound, and other materials that prevent or reduce
shotcrete bond to the excavated face and soil nails.
Remove cobbles, boulders, portions of boulders, or debris at the final wall alignment that protrude more
than 2 inches from the excavated face. Backfill the over excavation with shotcrete.
If stability testing is not performed, apply the shotcrete facing during the same work shift that the
excavation is performed. You may delay placing the shotcrete facing up to 24 hours if you demonstrate
the integrity of the excavated face is maintained.
Notify the Engineer immediately if raveling or instability of the excavated face occurs or the wall face
moves horizontally more than 0.4 percent of the excavated wall height.
Stabilize unstable areas immediately by buttressing the excavated face with an earth berm or other
authorized methods. Stop construction in unstable areas until remedial measures are authorized.
Protect installed soil nails and ground anchors during construction. Replace damaged soil nails and
ground anchors.
Do not excavate to the next underlying excavation lift until the following conditions have been attained for
the portion of the wall in the current excavation lift:
1.
2.
3.
4.
5.

Soil nails or ground anchors are installed and grouted


Reinforced shotcrete facing is constructed
Soil nail grout and shotcrete facing have cured for 72 hours
The soil nail facing anchorages are attached
Representative soil nail tests are complete for that portion of wall and the results are authorized

Do not excavate beyond the horizontal limits of the overlying completed wall section. At the end of each
excavation lift, maintain temporary slopes flatter than 2:1 (horizontal:vertical) to ensure slope stability.
19-3.04 PAYMENT
The Department does not pay for:
1.
2.
3.
4.

Removal of material coming into an excavation from outside the described limits
Removal of material resulting from heave caused by the driving of piles in an excavation
Volume of backfill occupied by the new structure
Furnishing and placing backfill material in an excavation that is below or outside the described limits

Unless otherwise shown, quantities for structure excavation and backfill for structures other than culverts
are computed as follows:
1. Horizontal limits are vertical planes 1 foot outside neat lines of footings or structures without footings.
2. Upper limit for structure excavation is the ground surface before starting construction activities.
Where structure excavation is performed within roadway excavation or ditch excavation area, the
upper limit is the plane of the bottom and side slopes of the excavated area. In new embankments,
the upper limit is the plane of the new embankment at the specified elevation. In no case is the upper
limit above the plane of the new embankment.
3. The upper limit for structure backfill is the finished grading plane or the finished slope lines. If the
Engineer authorizes a higher limit, the limit for payment is the authorized higher limit.
4. The lower limit is a plane at the bottom of the completed footings or structures or the lower outside
surface of rods or deadmen.
If the Engineer authorizes an increase in depth or width of structure excavation for structures except
culverts, excavation to a depth of 2 feet below and for a width up to 3 times the outside width of the
footing is paid for at the bid price for structure excavation. Excavation to greater depths or widths is paid
for at the contract price for structure excavation unless before removal activities, (1) the Engineer
authorizes this excavation to be paid for as change order work or (2) you request this excavation be paid
272

SECTION 19

EARTHWORK

as change order work. Payment for structure backfill is similarly increased and paid for at the bid price for
structure backfill.
Where a seal course is shown, structure excavation for footings is measured as structure excavation
(Type A). If the depth of the structure excavation is reduced due to a reduction or elimination of the seal
course, no decrease in the quantity of structure excavation (Type A) is made.
The volume of pervious backfill material within the limits of structure backfill is deducted from the
quantities of structure backfill.
Structure excavation or structure backfill for bridges not designated by type is paid as structure
excavation (bridge) and structure backfill (bridge).
The actual depth of structure excavation for culverts is the vertical distance between the ground line
before excavating and the bottom of the culvert trench. If the structure excavation depth is more than 0.5
foot from the depth shown and an adjustment is requested or ordered, the Department makes a payment
adjustment under section 4-1.05B. Increased depth due to unsuitable material, rock, other unyielding
material below the planned grade is not considered in determining the depth of structure excavation for
culverts.
Where compaction is not required, payment for structure backfill is included in payment for the type of
structure excavation involved.
Payment for shotcrete used on ground anchor and soil nail walls to fill voids created by the removal of
cobbles and boulders or other obstructions is included in the payment for shotcrete.
19-4 RESERVED
19-5 COMPACTION
19-5.01 GENERAL
19-5.01A Summary
Section 19-5 includes specifications for obtaining required compaction for all earthwork except structure
backfill.
19-5.02 MATERIALS
Not Used
19-5.03 CONSTRUCTION
19-5.03A General
Relative compaction specifications apply to material whether in excavation or embankment.
The moisture content of material to be compacted to at least 95 percent must be such that the specified
relative compaction is obtained and the embankment is in a firm and stable condition.
Do not compact material that contains excessive moisture until the material is dry enough.
19-5.03B Relative Compaction (95 Percent)
Obtain a relative compaction of at least 95 percent for at least a depth of:
1. 0.5 foot below the grading plane for the width between the outer edges of shoulders
2. 2.5 feet below the finished grade for the width of the traveled way plus 3 feet on each side
Except for the outer 5 feet measured horizontally from the embankment side slope, compact the full width
and depth of the embankment within 150 feet of each bridge abutment to at least 95 percent relative
compaction. The 150-foot limit is measured horizontally from the bridge abutment and either parallel or
concentric with the roadway centerline.
Obtain a relative compaction of at least 95 percent for embankments under retaining wall footings without
pile foundations:
1. For the full depth

273

SECTION 19

EARTHWORK

2. Within the limits established by inclined planes sloping 1.5:1 (horizontal:vertical) out and down from
lines 1 foot outside the bottom edges of the footing.
19-5.03C Relative Compaction (90 Percent)
Obtain a relative compaction of at least 90 percent in embankment areas not required to be compacted to
95 percent.
19-5.03D Foundation Preparation
You are responsible for preparing the foundation to receive material.
If you elect to excavate and replace basement material to facilitate compaction, before replacement
begins and if ordered, compact a layer below the excavated material to the depth, width, and degree of
compaction ordered. The ordered work is change order work.
19-5.04 PAYMENT
If basement material is (1) placed in the embankment or used in other planned or authorized work and (2)
replaced with planned excavated material or imported borrow, then the replaced material is paid for at the
bid price for the type of excavation or imported borrow involved.
19-6 EMBANKMENT CONSTRUCTION
19-6.01 GENERAL
Section 19-6 includes specifications for constructing embankments.
Embankment construction includes:
1. Preparing areas to receive embankment material
2. Placing and compacting embankment material including:
2.1. Suitable material within roadway areas where unsuitable material has been removed
2.2. Material in holes, pits, and other depressions within the roadway area
3. Constructing a temporary surcharge embankment above the grading plane
4. Constructing dikes on or off the job site
19-6.02 MATERIALS
19-6.02A General
Use material from excavations or from local or imported borrow.
In embankment areas where piles are to be placed or driven, do not use material containing rocks,
broken concrete, or other solid materials larger than 4 inches in greatest dimension.
Whenever selection of material is possible, do not place borrow or excavation material having a sand
equivalent value less than 10 within 2.5 feet of finished grade. Use this material to construct the lower
portions of embankments.
19-6.02B Geosynthetic Reinforced Embankment
Each geosynthetic reinforcement roll must be labeled with:
1.
2.
3.
4.
5.

Manufacturer's name
Production identification
R
oll dimensions
Lot number
Date of manufacture

Backfill for geosynthetic reinforced embankment must be free from:


1.
2.
3.
4.

Organic material
Shale, soft, or poor durability particles
Recycled materials such as glass, shredded tires, concrete rubble, or other unsuitable materials
Loose or extraneous material and sharp objects that may come in contact with the geosynthetic
reinforcement

274

SECTION 19

EARTHWORK

Backfill must comply with the requirements in the following 2 tables:


Sieve size
1-1/2"
3/4"
No. 4
No. 40
No. 200
Property
Plasticity index
pH

Percent passing
100
75100
20100
060
050
Requirement
20 max
59

California Test
204
643

The Engineer may authorize the use of backfill with grading larger than the specified size up to a 4 inches
maximum if you submit, with your LTDS calculations, test results for installation damage reduction factors
for each type of geosynthetic reinforcement under FHWA-NHI-00-044, section 5.1.
19-6.03 CONSTRUCTION
19-6.03A General
Compact embankment under section 19-5.
Construct embankment slopes under section 19-2.03G.
When constructing an embankment on an existing roadway, scarify, water, grade, and roll the existing
roadbed before placing new material.
When constructing an embankment against an existing slope or when constructing 1/2 the embankment
width at a time, prepare the slope by cutting into it at least 6 feet horizontally as you place the new
embankment in layers. Compact the cut material along with the new embankment material. If ordered to
cut more than 6 feet, the excavated material in excess of 6 feet is paid for as roadway excavation.
For bridge footings to be constructed in embankment, construct the embankment to the grading plane
elevation and extend the finished slope to the grading plane before:
1. Excavating for footings
2. Driving piles or drilling holes for CIP piles
The grading plane of embankments beneath structure approach slabs and beneath the thickened portion
of sleeper slabs must not project above the grade established by the Engineer.
Grade trenches, holes, depressions, and pits outside of areas where embankments are to be constructed
to provide a presentable and well-drained area.
19-6.03B Subsidence
Reserved
19-6.03C Placing and Compacting
Do not construct embankments when material is frozen or a blanket of snow prevents proper compaction.
Construct embankment in layers. The loose thickness of each layer must not exceed 8 inches.
Break up clods or hard lumps of earth that are over 8 inches in greatest dimension before compacting
material in the embankment, except if material, such as hardpan or cemented gravel, cannot be broken
readily:
1. Distribute material throughout the embankment.
2. Place enough earth or other fine material around the larger material as you deposit it to fill the
interstices and produce a dense, compact embankment.

275

SECTION 19

EARTHWORK

If embankment material contains the following percentages by volume of rock larger than 8 inches in
greatest dimension, before compaction, the loose thickness of each layer of embankment material below
a plane 3 feet below finished grade must comply with the following table:
Percent by volume
Over 50
From 25 to 50
Less than 25

Loose layer thickness


Max. rock size
Max. rock size up to 3 feet
8 inches in areas between rocks
larger than 8 inches

Reinforcement or metal attached to reinforced concrete rubble placed in embankments must not protrude
above the grading plane. Trim reinforcement or metal to less than 3/4 inch from the face of the reinforced
concrete rubble material before placing the material within 2 feet below the grading plane.
In a sidehill embankment where the width, including bench cuts for bonding existing and new
embankments, is too narrow to accommodate mobile power compacting equipment, you may place the
material by end dumping, if authorized.
If end dumping is allowed for constructing embankment against existing slopes or 1/2 the embankment
width at a time, then plow or cut the slopes of the original ground or embankment before end dumping
starts.
Where embankments are constructed across low, swampy ground that cannot support the weight of
hauling equipment, you may construct the lower part of the embankment by dumping successive loads in
a uniformly distributed layer that can support equipment for placing subsequent layers.
Construct embankments such that each layer has a cross fall less than 5 percent.
At locations where it is impractical to use mobile power compacting equipment, compact embankment
layers by any method that obtains the specified compaction.
19-6.03D Settlement Periods and Surcharges
Where an embankment settlement period is specified, construct the embankment to at least the grading
plane and to the limits described for:
1. Distance of at least 150 feet measured parallel to the centerline of the roadway from each bridge
abutment
2. Entire length of a retaining wall and a width of at least 30 feet from the face of the wall
If a surcharge is specified, place surcharge in uniform layers to the described height and limits. Compact
the full width of the surcharge by routing the grading equipment.
Retain embankment and any specified surcharge from encroaching upon the traveled way or existing
improvements.
The settlement period starts after the embankment and any specified surcharge is complete.
If ordered, install settlement platforms. The installation is change order work.
The surcharge must remain in place until the end of the specified settlement period or as ordered.
Before the end of the settlement period, do not:
1. Excavate for abutments, bent footings, wingwalls, or retaining wall footings
2. Drive foundation piles or drill holes for CIP piles
If an ordered settlement period increases or decreases the Contract completion time, the Department
makes a time adjustment.
Following removal of surcharge material above the grading plane and before placing subsequent layers of
subbase or base, the embankment below the grading plane must comply with section 19-5.

276

SECTION 19

EARTHWORK

19-6.03E Geosynthetic Reinforced Embankment


Place geosynthetic reinforcement within 3 inches of the design elevations.
Place at least 3 inches of compacted backfill between layers of geosynthetic reinforcement, unless
otherwise shown.
Geosynthetic reinforcement must be:
1.
2.
3.
4.
5.
6.

Secured with staples, pins, or small piles of backfill


P
laced without wrinkles
Aligned with the primary strength direction perpendicular to slope contours
Spliced under manufacturer's instructions
Butted edge-to-edge for straight slope contours
Butted edge-to-edge at the slope face and fanned out or overlapped into the backfill for curved slope
contours

Cover geosynthetic reinforcement with backfill within the same work shift.
Place at least 6 inches of backfill on the geosynthetic reinforcement before operating or driving equipment
or vehicles over it, except those used under the conditions specified below for spreading backfill.
You may drive equipment or vehicles for spreading backfill directly on the geosynthetic reinforcement if
you:
1.
2.
3.
4.
5.

Comply with manufacturer's instructions


Use rubber-tire vehicles
Minimize traffic repetitions
Maintain speed less than 5 mph
Avoid sudden braking and sharp turning

Where guard railing posts will be placed at the top crest of the geosynthetic reinforced embankment and
the geosynthetic reinforcement interferes with placement of posts, you may precut affected layers of
reinforcement into cross-shaped patterns. The precutting dimensions must not exceed post dimensions
by more than 12 inches.
Do not extend geosynthetic reinforcement into the pavement structure.
Replace or repair any geogrid reinforcement damaged during construction. Repair by placing additional
reinforcement to cover the damaged area and:
1. For reinforcement placed parallel to slope contours, overlapping 5 aperture openings or 8 inches
whichever is greater
2. For reinforcement placed perpendicular to slope contours, splicing the edges as instructed by the
manufacturer
Replace any geotextile reinforcement damaged during construction.
Grade and compact backfill to ensure the reinforcement remains taut.
Compact backfill under section 19-5.03C. If hand-operated equipment is used, do not place more than 6
inches of backfill before compaction.
Use hand-operated equipment to compact areas within 3 feet of:
1. Slope contours
2. U
nderground structures
Do not disk or plow in the reinforced area.
19-6.04 PAYMENT
Removing surcharge material is paid for as roadway excavation.

277

SECTION 19

EARTHWORK

19-7 BORROW MATERIAL

19-7.01 GENERAL
19-7.01A Summary
Section 19-7 includes specifications for obtaining local and imported borrow material for embankment
construction.
19-7.01B Definitions
local borrow: Material obtained by widening cuts or excavating from sources outside the planned or
authorized cross section on the job site. The location of the local borrow is described or designated
by the Engineer.
imported borrow: Material obtained from sources that comply with section 6-2.04 or from any other
source you choose.
19-7.01C Submittals
Submit PLACs for each imported borrow site.
19-7.01D Quality Control and Assurance
Notify the Engineer sufficiently in advance of opening any imported borrow material site so that cross
section elevations and measurements of the ground surface after stripping may be taken and the material
may be tested.
19-7.02 MATERIALS
19-7.02A General
Borrow material must be:
1. Suitable for the purpose intended
2. Free of unsuitable material including organic matter
19-7.02B Local Borrow
Reserved
19-7.02C Imported Borrow
Imported borrow must be free of man-made refuse such as:
1.
2.
3.
4.
5.
6.
7.

Portland cement concrete


Asphalt concrete
Residue from grooving and grinding operations
Metal
Rubber
Mixed debris
Rubble

19-7.03 CONSTRUCTION
19-7.03A General
Clear, grub, and strip borrow sites if necessary.
Excavate, load, and if necessary haul borrow material.
Construct embankments under section 19-6.
19-7.03B Local Borrow
Obtain local borrow such that no scar or unsightly appearance is generated.
19-7.03C Imported Borrow
Before placing imported borrow in embankments, ensure enough space is available in embankment
locations for placing planned or designated excavated material from the job site. You are responsible for
disposing of surplus material.

278

SECTION 19

EARTHWORK

19-7.04 PAYMENT
Local borrow is paid for as roadway excavation.
The payment quantity of imported borrow is determined based on average areas and the distances
between them.
Areas and distances are based on those from the material site before and after the imported borrow is
excavated.

The Department does not pay for imported borrow that is not used in the work.

The Department does not pay for disposal of surplus imported borrow.

19-8 SUBGRADE ENHANCEMENT GEOTEXTILE


19-8.01 GENERAL
Section 19-8 includes specifications for placing subgrade enhancement geotextile between the subgrade
and pavement structure.
19-8.02 MATERIALS
Subgrade enhancement geotextile must comply with section 88-1.02O.
19-8.03 CONSTRUCTION
Before placing subgrade enhancement geotextile, remove loose or extraneous material and sharp objects
that may come in contact with the geotextile material.
Place subgrade enhancement geotextile:
1. Under manufacturer's instructions
2. Longitudinally along the roadway alignment
3. Without wrinkles
Do not use a polyester-type geotextile within 4 inches of recycled concrete.
Overlap adjacent edges of rolls at least 2 feet. Overlap the ends of rolls at least 2 feet in the direction you
spread the material covering the geotextile.
You may fold or cut subgrade enhancement geotextile to conform to curves. If cut, overlap at least 1-1/2
feet. Hold the overlap in place with staples, pins, or small piles of material placed on the geotextile.
Do not:
1.
2.
3.
4.
5.

Stockpile material on the geotextile


Operate equipment or vehicles directly on the geotextile
Place more geotextile than can be covered in 72 hours
Compact with a sheepsfoot or other nonsmooth roller
Turn vehicles on material placed directly over geotextile

Before operating equipment on areas where geotextile has been placed, spread and compact 6 inches of
material on the geotextile. Compact it with either (1) a smooth-wheeled roller with no vibrations or (2) a
rubber-tired roller.
Repair or replace damaged subgrade enhancement geotextile. Make repairs by placing a new piece of
geotextile with at least 3 feet of overlap from the edges of the damaged area.
19-8.04 PAYMENT
The Department does not pay for additional geotextile used for overlaps.
19-9 SHOULDER BACKING
19-9.01 GENERAL
Section 19-9 includes specifications for constructing shoulder backing adjacent to the edge of new
pavement surfacing.
279

SECTION 19

EARTHWORK

19-9.02 MATERIALS
Shoulder backing must be clean and consist of one or any combination of the following materials:
1.
2.
3.
4.
5.

Broken stone
Crushed gravel
Natural rough surfaced gravel
Sand
Reclaimed processed asphalt concrete, PCC, LCB, or CTB

Shoulder backing may be 100 percent reclaimed asphalt concrete.


Shoulder backing must comply with the grading requirements for the sieve sizes shown in the following
table:
Sieve sizes
2"
1"
3/4"
No. 4
No. 30
No. 200

Percentage passing
100
75100
65100
3560
1035
515

Whenever 100 percent reclaimed asphalt concrete is used, shoulder backing must comply with the
grading requirements for the sieve sizes shown in the following table:
Sieve sizes
1-1/2"
3/4"
No. 4

Percentage passing
100
70100
3080

Sand equivalent for shoulder backing must be from 10 to 35 except whenever 100 percent reclaimed
asphalt concrete is used, the sand equivalent must be 10 minimum.
If a combination of broken stone, crushed gravel, natural rough surfaced gravel, and sand is used,
shoulder backing must comply with the quality requirements shown in the following table:
Property

California
Test
217
205

Sand equivalent
Percentage crushed particles (%,
a
min)
One fractured face
Two fractured faces
Durability index
229
a
Applies to material retained on no. 4 sieve only

Requirements
1030

75
50
25

When tested under California Test 212 using the rodding method, the minimum unit weight of shoulder
backing must be 105 lb/cu ft.
19-9.03 CONSTRUCTION
Shoulder backing placed within 100 feet measured horizontally from a culvert, watercourse, or bridge
must not contain reclaimed asphalt concrete.
Remove weeds, grass, and debris from the area to receive shoulder backing.
Scarify basement material to receive shoulder backing at least 0.25 foot deep and water immediately
before placing shoulder backing.

280

SECTION 19

EARTHWORK

Place and spread shoulder backing directly on the basement material. After placement, water shoulder
backing and compact with a minimum of 2 passes with a steel tired roller weighing not less than 8 tons.
Wherever the total thickness of shoulder backing is more than 6 inches, place shoulder backing under
section 19-5 and section 19-6. Form smooth and uniform cross sections and slopes.
Do not deposit shoulder backing on new pavement.
Complete shoulder backing within 5 days after placement of adjacent new surfacing.
Before opening a lane adjacent to uncompleted shoulder backing, place portable delineators and W8-9
(LOW SHOULDER) signs off of and adjacent to the new pavement surfacing.
Portable delineators and signs must comply with section 12 except the signs may be set on temporary
portable supports or on barricades.
Place portable delineators at the beginning and along the drop-off of the edge of pavement in the
direction of travel, at maximum intervals of 500 feet on tangents and 200 feet on curves.
Place the W8-9 signs at the beginning and along the drop-off of the edge of pavement in the direction of
travel, at maximum intervals of 2,000 feet.
Remove portable delineators and W8-9 signs when the shoulder backing is complete in that area.
19-9.04 PAYMENT
Not Used

281

20 LANDSCAPE

20-1 GENERAL

20-1.01 GENERAL
20-1.01A Summary
Section 20-1 includes general specifications for performing landscaping.
Wherever work requires removing materials, the work includes disposing of the materials unless
incorporating the materials into the final work is described.
Immediately before performing any construction activity, remove weeds, trash and debris within the
construction area.
20-1.01B Definitions
killing weeds: Killing weeds by hand, by the use of pesticides, or by other authorized methods.
mowing weeds: Mowing weeds by mower, string trimmer, sickle, or other authorized methods.
pesticides: Any substance or mixture of substances intended for preventing, repelling, mitigating or
destroying weeds, insects, diseases, rodents, or nematodes and any substance or mixture of
substances intended for use as a plant regulator, defoliant or desiccant. This includes herbicides,
insecticides, fungicides, rodenticides, germicides, nematocides, bactericides, inhibitors, fumigants,
defoliants, desiccants, soil sterilants, surfactants, and repellents.
20-1.01C Submittals
20-1.01C(1) General
At least 15 days before using any pesticide, submit a copy of the licensed pest control adviser's
recommendation. The recommendation must be authorized before using any pesticides.
At the end of each week, submit a report documenting the application of all pesticides as an informational
submittal. Use forms furnished by the Department.
20-1.01C(2) Notification
Notify the Engineer:
1. At least 72 hours before requiring initial access to the existing irrigation controllers.
2. At least 10 days before the shipment date when plants are to be shipped to the job site.
3. Of the location where cuttings are to be taken at least 10 days before taking Carpobrotus and
Delosperma cuttings. If cuttings are taken from the highway no notification is required.
4. At least 15 days before gathering willow cuttings.
5. At least 24 hours before each application of pesticide and indicate the hours of application.
6. At least 4 business days before the completion of work for each stage of an area as part of the
progress inspections.
20-1.01C(3) Quality Control and Assurance
20-1.01C(3)(a) General
Obtain permits and pay the inspection fees involved in obtaining willow cuttings.
20-1.01C(3)(b) Pesticides
Comply with all rules and regulations of the Department of Food and Agriculture, Department of Public
Health, Department of Industrial Relations, and all other agencies that govern the use of pesticides.
Unless prohibited by the County Agricultural Commissioner, pesticides may be used for highway planting
work. Obtain a licensed pest control adviser's recommendations for the use of all pesticides under Food &
Agri Code. The recommendation must include the pesticides to be used, rates of application, methods of
application and application areas.
20-1.02 MATERIALS
20-1.02A Water
Water must be of a quality that will promote germination of seeds and growth of plants.
283

SECTION 20

LANDSCAPE

20-1.02B Pesticides
If requested, other pesticides may be submitted for use.
Do not use oil or pelleted forms of pesticides for weed control.
20-1.03 CONSTRUCTION
20-1.03A Progress Inspections
Progress inspections are performed by the Engineer for completed highway planting and irrigation system
work at designated stages during the Contract.
Inspections are performed at the following stages of work:
1.
2.
3.
4.
5.

During pressure testing of pipelines on the supply side of control valves


During testing of low voltage conductors
Before planting begins and after completion of work specified in section 20-7.03C
Before plant establishment work begins and after work specified in section 20-7.03I
Once a month during the plant establishment period

Do not progress beyond each stage of work until the inspection has been completed, corrective work has
been performed and the work is accepted, unless otherwise authorized.
Allow at least 3 working days for the inspection.
20-1.03B Pesticides
Do not apply pesticides:
1.
2.
3.
4.

On Saturdays or holidays unless authorized


Whenever weather and wind conditions are unsuitable for application
Within the limits of the plant basins, except for transplant tree and transplant palm tree plant basins
So that the pesticides come in contact with the foliage and woody parts of the plant

Before mixing a pesticide, submit a copy of the registered label for the pesticide as an informational
submittal. If unavailable to copy, allow the Engineer to read the label on the container.
Mix pesticides according to the instructions on the registered label.
Apply pesticides according to the instructions on the registered label.
Apply pesticides for weed control with a photosensitive dye that produces a contrasting color when
sprayed on the ground. The color must disappear between 2 to 3 days after being applied. The dye must
not stain surfaces or injure plants or wildlife when applied at the manufacturer's recommended application
rate.
Kill stolon-type weeds with glyphosate.
20-1.03C Watering
Water available from an existing Department-owned facility within the project limits or an irrigation system
to be installed under the Contract is furnished at no charge. If water is not available, make arrangements
for furnishing and applying water.
If fluctuations of water pressure, water supply or both are encountered during normal working hours,
plants must be watered at other times, as often, and in sufficient amounts as conditions may require.
Water new plants and existing plants to be maintained as needed to keep the plants in a healthy growing
condition until Contract acceptance.
The remote control valve master, ball valve, or gate valve on the discharge side of backflow preventers
must be closed when the irrigation system is not in use.
Take precautions to prevent water from wetting vehicles, pedestrians, and pavement. Do not cause
erosion of the soil.

284

SECTION 20

LANDSCAPE

20-1.03D Pruning
Pruning includes removing deadwood, suckers, and broken or bruised branches 1 inch or larger in
diameter.

Prune plants under the latest edition of ANSI A300 part 1, Pruning, published by the Tree Care Industry

Association.

Do not use tree seal compounds to cover pruning cuts.


Dispose of pruned materials.
20-1.04 PAYMENT
Not Used
20-2 EXISTING HIGHWAY PLANTING
20-2.01 GENERAL
20-2.01A Summary
Section 20-2 includes specifications for performing existing highway planting, including transplant tree,
transplant palm tree and maintain existing planted areas.
20-2.01B Submittals
Submit the following:
1. A work plan that describes removing, transporting, storing, planting, guying, and maintaining the
transplanted trees. Include root ball size, method of root ball containment, and a maintenance
program for each tree to be transplanted.
2. A copy of the root stimulant manufacturer's product sheet and instructions for the application of the
root stimulant.
20-2.02 MATERIALS
20-2.02A Packet Fertilizer for Transplant Tree and Transplant Palm Tree
Comply with the specifications for packet fertilizer under section 20-7.02D(1)(c).
20-2.02B Root Stimulant for Transplant Tree and Transplant Palm Tree
Reserved
20-2.02C Backfill Material for Transplant Palm Tree
Backfill material for the transplant palm tree planting holes must be 100 percent washed plaster sand.
20-2.03 CONSTRUCTION
20-2.03A Transplant Tree and Transplant Palm Tree
20-2.03A(1) General
Remove and transplant or store the trees to be transplanted before performing work within the areas

where the existing trees to be transplanted are located.

Transplant trees on the same day the trees are removed. If the transplant locations are not ready to

receive the trees, store and maintain the trees to be transplanted until the transplant locations are

authorized. Store the trees upright.

Saturate the area around each tree with water before transplanting.

Backfill holes resulting from the removal of the transplanted trees the same day the trees are removed.

You may use soil from the surrounding area to backfill. Mound the backfill in the plant basin slightly above

the surrounding ground level. Grade the backfill to conform with the adjacent existing grade.

Cover exposed root balls with wet burlap or canvas and crown with 90 percent shade cloth until planted.

Do not drag trees. The use of chains is not allowed.

Do not lay trees on the ground. Trees are to remain upright.

285

SECTION 20

LANDSCAPE

Protect tree trunks from injury.

Apply root stimulant according to the manufacturer's instructions.

Saturate the planting holes before transplanting trees.

Place packet fertilizer at the time of planting at the rate shown.

After the planting holes have been backfilled, apply water to the full depth of the backfill soil.

If the backfill material settles below the required level after planting and watering, add additional backfill to

bring the backfill to the required level after planting.

Construct a watering basin around each transplanted tree as shown.

20-2.03A(2) Transplant Tree


Prune trees to be transplanted immediately before removing.
20-2.03A(3) Transplant Palm Tree
Transplant palm trees between March 15 and October 15.
Before transplanting a palm tree, remove dead fronds and frond stubs from the trunk. Remove green
fronds up to 2 rows of fronds away from the center of growth. Tie the remaining 2 rows of fronds in an
upright position with light hemp or manila rope. Remove fronds and frond stubs at the trunk in a manner
that will not injure the trunk. Remove fronds and frond stubs for Phoenix dactylifera (Date Palm)
approximately 4 inches from the trunk.
20-2.03B Replacement
20-2.03B(1) General
Comply with section 20-7.03I(16) for the replacement of damaged transplanted trees.
Dispose of damaged transplanted trees.
20-2.03B(2) Transplant Tree
The replacement trees must be planted in individual plant holes at the locations determined by the
Engineer within the area of the tree being replaced.
Comply with section 20-7 for the planting of the replacement trees.
20-2.03B(3) Transplant Palm Tree
Palm tree replacement planting must comply with the work plan and be planted in the same planting hole.
20-2.03C Maintain Transplant Tree and Transplant Palm Tree
Kill weeds within the basin, including the basin walls. If pesticides are used to kill weeds, weeds must be
killed before the weeds reach the seed stage of growth or exceed 4 inches in length, whichever occurs
first. If weeds are to be killed by hand pulling, weeds must be hand pulled before the weeds reach the
seed stage of growth or exceed 4 inches in length, whichever occurs first. Dispose of hand pulled weeds
the same day they are pulled. Comply with section 20-1.02B.
20-2.03D Maintain Existing Planted Areas
Maintain existing planted areas as shown.

Maintain existing planted areas must be maintained from the 1st working day through Contract

acceptance.

Existing plants to be maintained must comply with section 20-1.03C.

Inspect for deficiencies with the Engineer present. Complete the inspection within 15 days after the start

of work.

Deficiencies requiring corrective action include:

1. Weeds
286

SECTION 20
2.
3.
4.
5.
6.

LANDSCAPE

Dead, diseased, or unhealthy plants


Missing plant stakes and tree ties
Inadequate plant basins and basin mulch
Other deficiencies needing corrective action to promote healthy plant life
Rodents and pests

Correct deficiencies as ordered within 15 days of the order. Correction of deficiencies is change order
work.
20-2.04 PAYMENT
Not Used
20-3 IRRIGATION
20-3.01 GENERAL
20-3.01A Summary
Section 20-3 includes specifications for (1) maintaining existing irrigation facilities, (2) installing or
modifying manual and automatic irrigation systems, and (3) disposing of removed material.
20-3.01B Definitions
irrigation crossover: Irrigation crossover includes conduit, sprinkler control crossover, water line
crossover and appurtenances.
sprinkler control crossover: Sprinkler control crossover is electrical conduit for control and neutral
conductors installed in a larger conduit that is used as an irrigation crossover under a roadway or
other facility.
water line crossover: Water line crossover is plastic pipe supply line installed in conduit.
20-3.01C Submittals
20-3.01C(1) General
Reserved
20-3.01C(2) Product Data
Submit the manufacturer's descriptive and technical literature for all materials.
20-3.01C(3) Control and Neutral Conductors Schedule of Values
Reserved
20-3.01C(4) Wiring Plans and Diagrams
Submit shop drawings for the electrical components of the irrigation system except electrical service. The
drawings must:
1. Show wire and conduit sizes and the wire routes between electrical components
2. Bear the written approval of the controller manufacturer or the manufacturer's authorized agent
Before Contract acceptance, submit 3 copies of the as-built schematic wiring diagram, including any
wiring modifications, for each type of controller installed.
For each controller, laminate and place in an envelope 1 copy of:
1. As-built schematic wiring diagram including wiring modifications.
2. 11 by 17 inches reduced irrigation plan showing the equipment controlled by the controller including
the installed locations and station numbers for each remote control valve.
The laminate must be clear, mat-finished plastic that is at least 10 mils thick. The envelope must be
heavy-duty plastic.
Attach the envelope to the inside of the controller enclosure or cabinet door. If the door is not large
enough to secure the envelope, submit the envelope and its contents.
Submit wire samples with colors to be used and a splice sample.
287

SECTION 20

LANDSCAPE

20-3.01C(5) Manufacturer's Instructions


Five business days before starting installation, submit the manufacturer's written instructions for the
following items:
1.
2.
3.
4.
5.

Couplings for conduits used for irrigation crossovers


Plastic pipe and fittings
Solvent cement for plastic pipe and flexible hose
Sprinklers Type D
F
low sensors

20-3.01C(6) Certificate of Compliance


Submit a certificate of compliance for (1) polyethylene pipe and (2) plastic pipe supply line for pipe with
wall thickness of the bell less than the specified minimum wall thickness of the pipe.
20-3.01C(7) Notifications
Notify the Engineer:
1. At least 4 business days before shutting off the water supply to any portion of the existing irrigation
system. Notify the Engineer immediately after restoring the water supply to any portion of the existing
irrigation system.
2. At least 5 business days before testing backflow preventers.
3. At least 24 hours before performing any pressure tests.
4. At least 5 business days before performing any functional tests.
20-3.01C(8) Maintenance and Operations Manuals
Submit as an informational submittal a complete manufacturers maintenance and operations manual for
each type of controller installed. Submit the manual at the time the wiring plans and diagrams are placed
inside the controller enclosure or cabinet door.
20-3.01D Quality Control and Quality Assurance
20-3.01D(1) Certify Backflow Preventers
All backflow preventers must be certified by a backflow preventer tester with a valid certification from the
local governing authority.
The local governing authority must be the county, city, or water purveyor having the governing authority
over testing of backflow preventers involved. If the local governing authority does not have a certification
program, the tester must be certified by AWWA or a county that has a certification program.
All backflow preventers must be recertified every year until Contract acceptance. An additional
certification must be done 10 days before Contract acceptance.
20-3.01D(2) Plastic Pipe Irrigation Lines
Reserved
20-3.02 MATERIALS
20-3.02A General
Electrical material and equipment must comply with section 86-1.02.
20-3.02B Backflow Prevention Devices and Appurtenances
20-3.02B(1) Atmospheric Vacuum Breaker
Atmospheric vacuum breakers must have a brass or bronze body, silicone float disc, and a plastic float.
20-3.02B(2) Backflow Preventer Assemblies
Backflow preventer assemblies include backflow preventer, wye strainer, fittings, supports, concrete
thrust blocks, and pad as described.
Backflow preventer must be a reduced-pressure principle type and comply with the requirements of the
water utility company or water district that has jurisdiction over the job site.

288

SECTION 20

LANDSCAPE

Backflow preventers must be factory assembled and have 2 check valves, 1 pressure differential relief
valve, 2 shut-off valves, and 4 test cocks. Backflow preventers and valves must be the same size as the
pipeline where they are installed.
Shut-off valves must be manufactured from iron or bronze and be either (1) resilient wedge gate valves,
(2) resilient seated and fully ported ball valves, or (3) resilient seated butterfly valves. Provide unions as
shown. Unions must be brass or malleable iron.
Backflow preventer assembly components must be capable of withstanding a cold-water working
pressure of 150 psi.
Gate valves attached to the outlets of the wye strainer must be:
1.
2.
3.
4.
5.

T
hreaded
Brass or bronze body
Stem and wedge type
Same size as the outlet
Modified so that attachments cannot be made to the outlet valves

The seating rings on the discharge side of the gate valves must be Teflon. Valve wedges must be driven
obliquely by cam action into the seating rings.
20-3.02B(3) Backflow Preventer Assembly Blanket
Backflow preventer assembly blanket must:
1.
2.
3.
4.

Be polyester fabric that is coated with vinyl or polymeric resin


Be resistant to UV, water, mildew, and flames
Have an R-value from R-30 to R-38
Be green as authorized

Blankets must have a securing mechanism that includes either zippers, velcro, grommets, snaps, buttons
or any combination of these. Wherever the backflow preventer is not in an enclosure, the securing
mechanism must be capable of accepting a padlock. The padlock is furnished by the Engineer.
20-3.02B(4) Backflow Preventer Assembly Enclosures
Fabricate enclosures using structural steel angles and flattened expanded metal. The enclosure must
comply with the following:
1. Expanded metal sides, ends, and top panels must be fabricated from 9-gauge minimum thickness
sheet steel. The flattened expanded metal openings must be approximately 3/4 by 1-3/4 inches.
2. Expanded metal panels must be attached to the 3/16-inch thick steel frames by a series of welds that
are not less than 1/4 inch in length, spaced not more than 4 inches on center along the edges of the
enclosure.
3. Lock guards must be cold rolled steel with a minimum thickness of 3/16 inch.
4. Galvanize the enclosure after fabrication under section 75-1.05.
5. Hold-down bolt assemblies must be galvanized. Nuts must be hexagonal and washers must be lock
type.
6. Enclosure must be painted by the manufacturer with 1 application of pretreatment, vinyl wash primer
and a minimum of 1 application of exterior enamel for metal. The color must match no. 20450 of FED
STD-595.
The padlock is furnished by the Engineer.
20-3.02C Booster Pump
Booster pump must comply with section 74-4.
20-3.02D Concrete
Concrete must comply with the specifications for minor concrete, except the concrete must not contain
less than 463 pounds of cementitious material per cubic yard. Hand mixing of the concrete is allowed.

289

SECTION 20

LANDSCAPE

20-3.02E Conductors, Electrical Conduit, and Pull Boxes


20-3.02E(1) Control and Neutral Conductors
Conductors must comply with section 86-2.08 and the following:
1. No. 12 AWG or larger.
2. For installations less than 50 V, rated for direct burial, underground feeder type identified as "UF" with
a minimum PVC insulation thickness of 56 mils for conductors no. 10 and smaller and 70 mils for
conductors no. 8 and larger, you may use UL listed polyethylene insulation conforming to UL 44 test
standards with a minimum thickness of 41 mils for wire sizes 10 AWG and smaller.
3. The color of low voltage neutral and control conductor insulation, except for the striped portions, must
be homogeneous throughout the entire thickness of the insulation.
New control and neutral conductors that are to replace existing control and neutral conductors must be
the same size and color as the existing control and neutral conductors being replaced.
20-3.02E(2) Armor-Clad Conductors
Armor-clad conductors must comply with the following:
1. Conductors must be solid, uncoated copper.
2. Conductor size must be not less than 90 percent of the AWG diameter required and the proper size
for the application.
3. Conductor insulation covering must be either of the following:
3.1. PVC, UL style type UF 60 degrees C, 600 V. The average thickness of insulation must not be
less than 60 mils with a minimum thickness of 54 mils.
3.2. Polyethylene, UL listed, complying with UL 44 test standards with a minimum insulation
thickness of 41 mils for wire sized 10 AWG and smaller.
4. Armor must be stainless steel tape, Type 304 helically wrapped over each conductor with a 33
percent minimum overlap. Tape size must be 0.5 inch wide and at least 0.005 inch thick.
5. Outer conductor jacket must be UV resistant PVC and comply with the ICEA S-61-402, NEMA
standard WC5 and UL listing 1263. Jacket nominal thickness must be 30 mils with a minimum
thickness of 24 mils.
20-3.02E(3) Electrical Conduit
Electrical conduit must comply with section 86-2.05A and section 86-2.05B.
20-3.02E(4) Pull Boxes
Pull boxes must comply with section 86-2.06A and be no. 5 or larger unless otherwise shown. Pull boxes
for low voltage conductors must not have side openings.
Pull box covers used solely for electrical service must be marked to comply with 86-2.06B. All other
irrigation system pull box covers must be marked "Sprinkler Control" under section 86-2.06B.
20-3.02F Filter Assembly Units
Filter assembly units include the filter housing, reusable filter cartridge, ball valve, fittings, pipe and valve
box with woven wire cloth and gravel as shown.
Filter housing must (1) withstand a cold-water working pressure of 150 psi and (2) be manufactured of
reinforced polypropylene plastic.
Comply with section 20-3.02R(1) for ball valves.
20-3.02G Flexible Hose
Flexible hose must be nonrigid PVC and comply with ASTM D 2287, cell Type 6564500. The hose wall
thickness must comply with ASTM D 2122 and the dimensions shown in the following table:

290

SECTION 20

LANDSCAPE

Hose size, nominal


Minimum wall thickness
(inch)
(inch)
1/2
0.147
3/4
0.154
1
0.179
a
As measured at any point on the cross-section

The hose must provide leak-free, nonseparating connections suitable for the purpose intended when
connected to the fittings specified.
Fittings for flexible hose must be injected molded PVC, Schedule 40 and comply with ASTM D 2466.
Fittings must be solvent cemented type.
Solvent cement for flexible hose and fittings must be specifically manufactured for the use with nonrigid
PVC hose. Primer for hose fittings must be the same as specified for plastic pipe supply line fittings.
20-3.02H Irrigation Controller System
20-3.02H(1) Irrigation Controllers
Irrigation controllers must be single, solid state independent controllers and comply with the following:
1. Fully automatic and operate a complete 14 day or longer irrigation program.
2. A switch or button on the face of the irrigation control panel must be so that the irrigation controller
can be turned on or off and provide for automatic or manual operation. Manual operation must allow
cycle start at the desired station and allow activation of a single station.
3. Watering time of each station must be displayed on the face of the control panel.
4. Irrigation controller mechanism, panel and circuit board must be connected to the low voltage control
and neutral conductors by means of a plug and receptacle connectors. The connection must be
located within the cabinet enclosure.
5. Each station must have a variable or incremental timing adjustment ranging from a maximum of at
least 90 minutes to a minimum of 1 minute.
6. Controllers must be capable of a minimum of 2 program schedules.
7. Controllers must have an output that can energize a pump start circuit or a remote control valve
master.
8. Controllers and low voltage output source must be protected by fuses or circuit breakers.
Rain sensor unit must be a solid state, automatic shut-off type, compatible with the irrigation controller.
Rain sensor unit must automatically interrupt the master remote control valves when approximately 1/8
inch of rain has fallen. The irrigation system must automatically be enabled again when the accumulated
rainfall evaporates from the rain sensor unit collection cup. Rain sensor units must be rated 24 V(ac) to
30 V(ac).
Irrigation controllers must operate on 120 V, 60 Hz(ac) and supply 24 to 30 V, 60 Hz(ac) for operating
electrical remote control valves.
House irrigation controllers in pedestal or wall mounted enclosures as described.
Irrigation controllers not installed in enclosure cabinets must be weatherproof, constructed of fiberglass or
metal and have a door lock with 2 keys provided.
20-3.02H(2) Irrigation Controller Battery
Reserved
20-3.02H(3) Irrigation Controller Solar
Reserved
20-3.02I Irrigation Controller Enclosure Cabinets
Fabricate irrigation controller enclosure cabinet under section 86-3.04A.
Irrigation controller enclosure cabinets fabricated of cold rolled steel or aluminum must be cleaned and
painted by the manufacturer and comply with section 86-3.04A.
291

SECTION 20

LANDSCAPE

Provide cross ventilation, roof ventilation, or a combination of both. Ventilation must not compromise the
weather resistance properties of the cabinet and must be fabricated by the cabinet manufacturer.
Include protection against lightning damage.
The inside of the cabinet doors must have provisions for storage of the as-built schematic wiring diagram
and irrigation plans.
If a remote irrigation control system is specified, the equipment must be shop installed in the cabinet
before field installation, except for field wiring.
20-3.02J Irrigation Crossovers
20-3.02J(1) Conduit
20-3.02J(1)(a) Corrugated Steel Pipe Conduit
Corrugated steel pipe conduit must comply with section 66. The nominal thickness of metal sheets for
pipe must be 0.064 inch for corrugated steel pipe and 0.060 inch for corrugated aluminum pipe. Coupling
bands and hardware must comply with section 66.
20-3.02J(1)(b) Welded Steel Pipe Conduit
Welded steel pipe must comply with ASTM A 53. Pipe must be either black or galvanized and have
welded or threaded joints.
The minimum wall thickness for the various sizes of welded steel pipe must comply with the dimensions
shown in the following table:
Pipe size, nominal
Minimum wall thicknessa
(inch)
(inch)
3
0.216
4
0.237
6
0.280
8
0.277
10
0.279
12
0.330
a
As measured at any point on the cross-section
Pipe must be sized to withstand jacking or drilling operations.
20-3.02J(1)(c) ABS Composite Pipe
ABS composite pipe and couplings must comply with ASTM D 2680. Couplings must be solvent cement
type.
20-3.02J(1)(d) Bituminous Coated Corrugated Steel Pipe Conduit
Bituminous coated corrugated steel pipe conduit must comply with section 66. The nominal thickness of
metal sheets for pipe must be 0.064 inch for corrugated steel pipe and 0.060 inch for corrugated
aluminum pipe. Coupling bands and hardware must comply with section 66.
20-3.02J(1)(e) Corrugated High Density Polyethylene Pipe Conduit
Corrugated high density polyethylene pipe must comply with ASTM F 405 and F 667 or be Type S and
comply with AASHTO M252 and M294. Couplings and fittings must be as recommended by the pipe
manufacturer.
20-3.02J(2) Crossovers
20-3.02J(2)(a) Sprinkler Control Crossovers
Electrical conduit for sprinkler control crossovers must be rigid, nonmetallic type. Comply with section 862.05A, Type 3. The size of conduit is as described.
20-3.02J(2)(b) Water Line Crossovers
Water line crossover must comply with section 20-3.02M(3)(a).
292

SECTION 20

LANDSCAPE

Fittings must be Schedule 80.


20-3.02K Irrigation Sleeves
Irrigation sleeves must comply with section 20-3.02M(3)(a).
Fittings must be Schedule 80.
20-3.02L Location Markers
Location markers must be Schedule 40 white PVC plastic pipe.
20-3.02M Pipe
20-3.02M(1) Copper Pipe
Copper pipe must be Type K rigid pipe and comply with ASTM B 88. Fittings must be wrought copper or
cast bronze either soldered or threaded.
Solder must be 95 percent tin and 5 percent antimony.
20-3.02M(2) Galvanized Steel Pipe Supply Lines
Galvanized steel pipe supply lines and couplings must be standard weight and comply with ASTM A 53,
except that the zinc coating must not be less than 90 percent of the specified amount. Except for
couplings, fittings must be galvanized malleable iron, banded and threaded, and comply with ANSI B16.3,
Class 150.
20-3.02M(3) Plastic Pipe
Plastic pipe for irrigation systems includes plastic pipe supply line and plastic pipe irrigation line.
20-3.02M(3)(a) Plastic Pipe Supply Lines
Plastic pipe supply lines must be PVC 1120 or PVC 1220 pressure rated pipe.

Plastic pipe supply lines must be Schedule 40 PVC and comply with ASTM D 1785.

Plastic pipe supply lines must have solvent-cemented type joints. Primer must be used in the solvent
cemented type joints.

Bell end pipe must comply with ASTM D 2672 and be marked with either ASTM D 2672 or D 2241.

Threaded fittings and fittings to be solvent cemented to plastic pipe supply line must be injection molded

PVC, Schedule 40, and comply with ASTM D 2466, except fittings for water line crossovers and irrigation

sleeves must be Schedule 80.

Risers and threaded nipples for irrigation facilities must be Schedule 80, PVC 1120 or PVC 1220 pipe and

comply with ASTM D 1785.

Solvent cement and primer for PVC plastic pipe and fittings for supply line must be specifically

manufactured for use with rigid PVC plastic pipe and fittings and must be applied separately. Solvent

cement must comply with the local Air Quality Management District requirements.

The solvent cement and primer must be made by the same manufacturer and the primer color must

contrast with the color of the pipe and fittings.

Plastic pipe supply line must be NSF approved and comply with either ASTM D 2241 or D 2672.

20-3.02M(3)(b) Plastic Pipe Irrigation Lines


Reserved
20-3.02M(4) Recycled Water Supply Lines
Recycled water supply lines must be purple PVC and must:
1. Be Schedule 40, PVC 1120.
2. Comply with one of the following standards:
2.1. ASTM D 1785
2.2. ASTM D 3139
293

SECTION 20
2.3.
2.4.

LANDSCAPE

ASTM D 2241
ASTM D 2672

Pipe must have permanent wording "CAUTION RECYCLED WATER" in 2 rows on the pipe. The rows
must be spaced approximately 180 degrees apart in the longitudinal direction of the pipe. Repeat the
wording every 24 inches along pipe.
20-3.02M(5) Ultraviolet Resistant Plastic Pipe
UV-resistant plastic pipe supply line must be Schedule 40, Type I, Grade 1, UV-resistant PVC pipe (UVCPVC) and must comply with ASTM D 1785.
Fittings must be Schedule 40, UV-resistant PVC, Type I, Grade 1, and comply with ASTM D 2466.
The pipe must be homogeneous, uniform color and be manufactured of:
1. At least 80 percent vinyl chloride resin with UV stabilizers
2. Non-PVC resin modifiers and coloring ingredients
3. Coloring ingredients that resist the damaging effects of UV wave lengths of solar radiation.
Solvent cement for UV-resistant plastic pipe and fittings must comply with the local Air Quality
Management District and be recommended by the pipe manufacturer.
20-3.02N Recycled Water Warning Signs
Warning sign decals must show the phrase, "Recycled Water, Do Not Drink" and the "Do Not Drink"
drinking glass graphic symbol.
Warning sign decals must be UV fade resistant, all weather, and manufactured from a flexible vinyl based
or flexible vinyl based with mylar product. Decals must have a purple background, black text, and backing
that has a peel-off cover that is self-adhesive.
Aluminum sign plates must be 1/16-inch aluminum.
Warning tags must show the phrase "Recycled Water" and the "Do Not Drink" drinking glass graphic
symbol. Warning tags must be purple, double-sided, and manufactured from polyurethane, incorporating
an integral neck attachment and attachment hole. The attachment hole must be capable of withstanding
178 pounds of pull out resistance. Tag lettering must be hot-stamped in black and capable of
withstanding outdoor usage.
20-3.02O Remote Control Valve Actuator Systems
A remote control valve actuator system includes a portable handheld receiver, transmitter, field carrying
case, (ac) power charging unit, and a receiver connector. The remote control valve actuator equipment
must be fully compatible with the irrigation controller. The receiver and transmitter must comply with FCC,
Rules and Regulations, part 15, as of the date of manufacture.
The receiver connector must be attached directly to the terminal strip or an existing plug of each irrigation
controller. It must continue out to the socket head mounted to the outside of the irrigation controller
enclosure cabinet as shown. The connector housing must be weather resistant thermoplastic with a
hinged socket head cap and screw to be used as a locking mechanism.
The receiver must:
1.
2.
3.
4.

Operate the stations of the irrigation controller on radio signals from the transmitter
Receive radio signals at a minimum distance of 1 mile
Be protected from overload by a field replaceable fuse
Operate on 24 V(ac)

The transmitter must:


1. Provide a 2-way FM radio signal for a minimum range of 1 mile to the receiver located at the irrigation
controller enclosure cabinet.

294

SECTION 20

LANDSCAPE

2. Have a digital keypad and instant actuation of the stations, master valves, or pumps. Actuation must
be able to be random, numerical or reverse numerical sequences and by pressing a single key for
each function.
3. Allow for remote data retrieval, manual control, and programming.
4. Operate a master valve or pump independently of the controller stations.
The power source for the portable units must include an internal charged battery pack, that is recharged
by the charging unit. The charging unit must have an input of 110 V(ac) and an output of 24 V(ac) at 1.5
Amp.
20-3.02P Sprinklers
20-3.02P(1) General
Sprinklers include risers, riser supports, swing joints, flow shut-off devices, pressure compensation
devices, check valves and fittings as shown.
Flexible risers must be UV resistant and brown.
Flow shut-off devices on risers must automatically and instantly stop the flow of water from a riser when
the riser is broken on the downstream side of the device. Install the flow shut-off according to the
manufacturer's instructions.
20-3.02P(2) Sprinkler Type C-2 Mod
Sprinkler Type C-2 Mod includes a sprinkler Type 2 inserted in a drainpipe with gravel and capped with a
drain grate.
Drainpipe must be commercial type, rigid, perforated, PVC pipe with holes spaced not more than 6 inches
on center on 1 side of the pipe.
Drain grate must be commercially available, 1 piece, injection molded drain grate manufactured from
structural foam polyolefins with UV light inhibitors. Drain grate must be black.
Gravel for filling the drainpipe must be graded such that 100 percent passes the 3/4-inch sieve and 100
percent is retained on the 1/2-inch sieve. Gravel must be clean, washed, dry, and free from clay or
organic material.
20-3.02P(3) Sprinkler Type D
Sprinkler Type D must be plastic, nonadjustable, pressure compensating emitters with automatic flushing
action. Sprinkler must be regulated by dual silicone diaphragms with a flow rate and operating pressure
range shown.
Flexible tubing for the emitters must be virgin polyethylene plastic containing 2 to 3 percent carbon black.
The size of the tubing must be as recommended by the emitter manufacturer.
20-3.02Q Unions
Unions must be brass or malleable iron. Unions must withstand the working pressure range of the pipes
for which the unions are used.
20-3.02R Valves
20-3.02R(1) Ball Valves
PVC or chlorinated PVC ball valves must comply with the requirements shown in the following table:

295

SECTION 20

LANDSCAPE

Property
Requirements
Nonshock cold-water
235 psi
working pressure for 3/4 to
4 inch valves, min
Nonshock cold-water
150 psi
working pressure for 6 inch
valves, min
Seats
PTFE
O-ring seals
EPDMa or Viton
a
EPDM (ethylene-propylene-diene-monomer)

Two-piece brass or bronze body, full port opening ball valves must comply with the requirements shown
in the following table:
Property
Nonshock cold-water working pressure,
min
Seats
O-ring seals

Requirements
400 psi
Teflon
Teflon

20-3.02R(2) Check Valves


Check valve springs must be factory set at 10 psi.
20-3.02R(3) Control Valves
Control valves must be manual or remote control as shown. Control valves must be capable of
withstanding a cold-water pressure of 150 psi.
20-3.02R(3)(a) Manual Control Valves
Manual control valves must be made of brass or bronze. Valve handles must be brass or bronze.
20-3.02R(3)(b) Remote Control Valves
Remote control valves must be as specified.
Remote control valves must:
1. Be normally closed type.
2. Be completely serviceable from the top without removing the valve body from the system.
3. Be equipped with a device that regulates and adjusts the flow of water and be provided with a manual
shut-off. The manual shut-off for valves larger than 3/4 inch must be operated by a cross handle.
4. Be the same model series and compatible with the model series of the irrigation controller.
5. Have solenoids operate on the low voltage (ac) current supplied from the irrigation controller.
6. Have a manual bleed device.
7. Equipped with internal diaphragms installed in the valve body casting.
Compression discs or diaphragms in valves must be replaceable.
Valve inlets and outlets must have threaded fittings.
Valve must be of the same size as the pipeline that the valve serves, unless otherwise shown.
Valve solenoids for solar or battery controllers must be DC latching and operate on 3.5 V.
20-3.02R(3)(c) Remote Control Valve with Pressure Regulators
Remote control valve must be fitted with an adjustable pressure regulator. Pressure regulator must be
compatible for use with the remote control valve and be made by the same manufacturer as the remote
control valve.

296

SECTION 20

LANDSCAPE

Pressure regulators must regulate and maintain the outlet pressure regardless of the incoming pressure.
Pressure regulators must withstand a cold-water working pressure of 200 psi. Adjust the pressure
regulator to provide proper operation of the irrigation system downstream of the remote control valve.
20-3.02R(4) Flush Valves
Flush valves include a garden valve, riser, and location marker. Furnish 3 loose keys for the flush valves
before Contract acceptance.
20-3.02R(5) Gate Valves
Gate valves must be:
1. Either flanged or threaded type
2. Iron or bronze body
3. Bronze trimmed valves with either of the following:
3.1. Internally threading rising stem
3.2. Nonrising stem
4. Able to withstand a cold-water working pressure of 150 psi
5. Same size as the pipeline that the valves serves unless otherwise shown
Gate valves smaller than 3 inches must have a cross handle.
Gate valves 3 inches or larger must be flanged type with a square nut. Furnish 3 long shank keys to
operate the valve before Contract acceptance. Pipe flanges used to connect plastic or metal pipe to gate
valves must be plastic or metal. Gate valves must have a solid bronze or brass wedge.
20-3.02R(6) Pressure Regulating Valves
Pressure regulating valves must be:
1.
2.
3.
4.
5.

Either flanged or threaded type connections


Brass, bronze or cast iron body
Spring diaphragm
Hydraulically operated
Pilot controlled

Pressure regulating valves must not have internal filter screens.


Pressure gauges must be hermetically sealed with neoprene. The gauges must have watertight
polycarbonate cases and covers with molded clear polycarbonate windows. Gauges must be 2 inches in
diameter calibrated from 0 to 160 psi, and have brass stems and black aluminum pointers that contrast
with gauge faces. Internal gauge parts must be brass or bronze.
20-3.02R(7) Pressure Relief Valves
Pressure relief valves must have brass or bronze bodies, stainless steel springs, bronze nickel chrome
seats, composition seat discs, female bottom inlets and female side outlets.
20-3.02R(8) Quick Coupling Valves
Quick coupling valves must be 3/4 inch double slotted with a self-closing cap, 3/4-inch brass key and 3/4
inch brass hose swivel unless otherwise shown. Except for the cap, quick coupling valves must be brass
or bronze construction. Furnish 3 loose quick coupling brass keys and brass hose swivels before Contract
acceptance.
20-3.02R(9) Garden Valves
Garden valves must be the inverted nose type of brass or bronze construction with female thread inlet,
replaceable seat washer, rising valve stem within a protective collar, and male thread hose outlet. Garden
valves must have a loose key handle.
20-3.02S Cam Coupler Assemblies
Fabricate cam coupler assemblies as shown.
Cam coupler assemblies consist of a cam coupler, dust cap, check valve, pipes, fittings, concrete thrust
block, and valve box with woven wire cloth and gravel.
297

SECTION 20

LANDSCAPE

Cam couplers and keys must be manufactured of brass or bronze and be able to withstand a cold-water
working pressure of 150 psi.
Furnish 3 loose cam coupler brass keys before Contract acceptance.
20-3.02T Valve Assembly Units
A valve assembly unit includes a remote control valve, wye strainer, garden valve, and 5/8-inch diameter
garden hose. The hose must be 3 feet long and attached with a 3/4-inch internal pipe size female fitting.
Pipe and fittings for valve assembly units must be Schedule 80 PVC.
20-3.02U Valve Boxes and Covers
Valve boxes must be precast concrete.
Valve boxes must not have side openings.
Covers must be concrete or steel. Steel covers must be hinged with brass hinge pins for valve boxes
containing valves smaller than 2 inches.
Covers must be marked with "WATER" in cast-in letters not less than 1 inch high.
Covers must be 1 piece, except when the weight of the valve box cover exceeds 35 pounds, then the
cover must be 2 pieces.
Identify valve boxes on the top surface of the covers with labels containing the appropriate abbreviation
for the irrigation facility contained in the valve box as shown. Valve boxes that contain remote control
valves must be identified with the appropriate controller letter and station number as shown. Label
material must be polyurethane.
Paint the valve box covers for recycled water supply lines with exterior latex paint. The color must closely
match the light purple of the recycled water supply lines.
Label remote control valves for recycled water supply lines as specified above and as specified under
section 20-3.02N.
20-3.02V Water Meters
Reserved
20-3.02W Wye Strainers
Wye strainers must have a cast iron or all bronze body with a removable stainless steel or monel strainer.
Wye strainers must be capable of withstanding a cold-water working pressure of 150 psi. Wye strainers at
backflow preventer assemblies must be equipped with a gate valve at the outlet. All other wye strainers
must be equipped with a garden valve at the outlet.
The strainer screen for the wye strainer in a backflow preventer assembly must have an open area equal
to at least 3 times the cross-sectional area of the pipe based on an iron pipe size. Screen must be 20
mesh woven wire mesh or perforated sheet with 0.045-inch diameter holes.
Wye strainer for the valve assembly unit must be stainless steel with 80 size mesh. All other wye strainers
must be equipped with 40-mesh strainer screens.
20-3.03 CONSTRUCTION
20-3.03A General
Check for deficiencies of existing plants that are to remain in place before starting irrigation work under
section 20-2.03D.
Except for sprinkler locations, the irrigation systems shown are diagrammatic.
Supply lines, control and neutral conductors and electrical conduits installed in common trenches must
not be installed above each other.
Install hold-down assemblies for the backflow preventer assembly enclosures when concrete is still
plastic.
298

SECTION 20

LANDSCAPE

Install control valves and sprinklers:


1. 6-1/2 to 8 feet from curbs, dikes, and sidewalks
2. 10 feet from paved shoulders
3. 3 feet from fences, walls, or both
If control valves and sprinklers cannot be installed within these limits, the locations will be determined by
the Engineer.
If the supply line location interferes with the excavation of plant holes, relocate the plant hole to clear the
supply line. Do not install supply lines through plant holes unless shown.
Connect underground metallic pipes, valves, or fittings made of dissimilar metals through a dielectric
coupling or bushing. Pipe installed in this manner must be physically separated from the other metal
objects. Dielectric couplings must physically separate the pipes a minimum of 1/8 inch in all directions.
Nonconducting spacers that ensure the physical separation of pipe from foreign objects may be required
by the Engineer.
Prevent foreign material from entering the irrigation system during installation. Immediately before
assembling, clean all pipes, valves, and fittings. Plug or cap all unattached ends of pipe, fittings, and
valves pending attachment of additional pipe or fittings. Flush out all lines before attachment of sprinklers,
emitters, and other terminal fittings.
Set risers for sprinklers on slopes perpendicular to the plane of the slope.
Repair irrigation systems within 7 days after a malfunction or damage has occurred.
Finish exposed top surfaces of concrete foundations and pads with a medium broom finish applied
parallel to the long dimension of foundations and pads.
Use minor concrete for replacing removed concrete facilities.
HMA for replacing removed asphalt concrete surfacing and facilities must comply with section 39. You
may use minor HMA if authorized.
20-3.03B Existing Facilities
20-3.03B(1) General
Reserved
20-3.03B(2) Existing Irrigation Facilities
Existing irrigation facilities must comply with section 15.
20-3.03B(3) Maintain Existing Water Supply
Maintain the existing water supply. A temporary water supply may be used if authorized.
If existing plants are to be maintained by the Department and Contractor from the same water supply,
sufficient water must be supplied to the Department for watering plantings on and off the highway as
necessary to maintain a healthy condition through Contract acceptance.
If the existing water supply is interrupted for more than 3 consecutive days, provide an alternative water
supply. Water all existing plants in the area irrigated from that water supply, including those maintained by
the Department, as often as necessary to maintain healthy plant growth.
Keep existing irrigation facilities in place that are described to be removed, relocated, or salvaged until
the Engineer determines their use is no longer required.
Repair or replace existing irrigation facilities damaged by your operations within 10 working days of the
damage. The repaired or replaced irrigation facilities must be compatible with the irrigation systems to
remain. After repair or replacement of the facilities is complete, demonstrate to the Engineer that the
repaired or replaced facilities operate properly. If remote control valves are repaired or replaced, the
valves must be tested with the irrigation controller in the automatic mode.

299

SECTION 20

LANDSCAPE

20-3.03B(4) Check and Test Existing Irrigation Facilities


Before performing irrigation system work, check existing irrigation facilities to remain in place or to be

relocated for deficiencies including missing parts, damaged components, and improper operation.

Provide a list of irrigation system deficiencies within 7 days after checking the existing facilities.

The Engineer determines watering cycle lengths for checking and testing existing irrigation facilities.

Correction of deficiencies is change order work.

Except for work specified under section 15 and section 20-3.03B(5), perform additional repairs required to

the existing irrigation system as ordered. This work is change order work.

20-3.03B(5) Maintain Existing Irrigation Facilities


Existing irrigation facilities shown to be maintained must be maintained through Contract acceptance.
Maintain existing irrigation facilities begins after completion of repairs found during check and test existing
irrigation facilities.
Maintain all existing irrigation facilities except for water meters, underground pipe supply lines, control
and neutral conductors, and electrical conduits.
Maintaining existing irrigation facilities includes checking for proper operation and adjusting, repairing or
replacing valves, valve boxes, sprinklers, risers, swing joints, wye strainers, valve assembly units, and
filter assembly units. Check irrigation systems and facilities for proper operation at least once every 30
days. Complete adjustments and repairing or replacing irrigation facilities within 7 days after checking the
irrigation system.
Operate automatic irrigation systems automatically until Contract acceptance. Manual operation is
allowed for work during plant replacement, fertilization, weed germination and repair of irrigation facilities.
Program the irrigation controllers for seasonal requirements. During the winter season irrigation systems
must be operated automatically a minimum of 2 minutes every 2 weeks.
Perform a final cleaning of wye strainers and filters within 15 working days of Contract acceptance.
20-3.03B(6) Locate Existing Crossovers
Before performing work on irrigation systems, locate existing crossovers and conduits shown to be
incorporated into the new work.
Before removing or disturbing existing Type A pavement markers that show the location of the existing
crossover conduit, mark the location of the existing crossover conduit on the pavement.
Locate existing conduits by excavating exploratory holes at the locations indicated by existing markers or
as directed. Excavate exploratory holes to a maximum size of 2-1/2 feet wide by 5 feet deep parallel with
the roadway 5 feet on each side of the marker or directed location.
Backfill exploratory holes and replace pavement markers.
If the size of the exploratory hole must be increased as authorized by the Engineer, the additional
excavation and backfill is paid as change order work.
Remove debris found in the conduit before performing other work in the conduits. Debris found more than
3 feet from the ends of the conduits is removed as change order work.
20-3.03B(7) Relocate Existing Irrigation Facilities
Relocate existing irrigation facilities must comply with section 15-2.09D.
20-3.03B(8) Remove Existing Irrigation Facilities
Remove existing irrigation facilities must comply with section 15-2.02L.
20-3.03B(9) Replace Existing Valve Box Covers
Existing valve box covers shown to be replaced must remain until the new covers are ready to be
installed.
300

SECTION 20

LANDSCAPE

Valve box covers must be (1) concrete or steel for concrete boxes and (2) glass fiber reinforced plastic for
reinforced plastic and plastic boxes. Valve box covers must be the same size as the covers they replace.
Identification, labeling and color must comply with section 20-3.02U.
Dispose of removed valve box covers.
20-3.03C Irrigation Crossover
20-3.03C(1) Conduit Installation Methods for Irrigation Crossovers
20-3.03C(1)(a) Jack and Drill
Do not disturb pavement without authorization, and only when obstructions are encountered.
If authorized, small holes may be cut in the pavement to locate or remove obstructions. Jacking or drilling
pits must be at least 2 feet from pavement edge whenever possible. Do not use excessive water that will
soften subgrade or undermine pavement.
Install conduits not less than 18 inches below the top of curb grade in sidewalk areas and not less than 40
inches below finished grade in all other areas measured to the top of conduit. If possible install conduits
within 1 foot below the minimum depth.
20-3.03C(1)(b) Open Trench
Install conduits in a trench under areas to be paved or under existing pavement in a trench approximately
12 inches wider than the outside diameter of the conduit to be installed. The top of the installed conduit
must be a minimum of 24 inches below finished grade.
Do not cut or remove concrete curbs, concrete drainage gutters, and asphalt concrete dikes for the
installation of conduits unless shown.
If no joint exists in a concrete sidewalk, cut the sidewalk on a straight line at the location determined by
the Engineer.
Existing concrete must be cut to a straight line where new concrete is to join the existing concrete.
If no joint exists between the existing asphalt concrete or concrete surfacing to be removed and the
asphalt concrete or concrete surfacing to remain in place, outline the areas to be removed as determined
by the Engineer. Cut the outline of the surfacing to be removed using a power driven saw, on a straight
line with no shatter outside of the removal area, to a minimum depth of 2 inches before removing the
surfacing material.
Replaced concrete must be performed by methods that produce a surface of uniform smoothness, color
and texture at least equal to the adjacent concrete surface.
Dispose of removed asphalt concrete, concrete, and surplus excavated material.
Grade and prepare the bottom of the trench to provide a firm and uniform bearing throughout the entire
length of the conduit. During backfill operation, the conduit must be rigidly supported so that no
movement or damage to the conduit or joints occurs.
Backfill for trenches must comply with section 19-3.02B.
Backfill under surfaced areas must comply with section 19-3. The compacted thickness of the
replacement underlying material, HMA, or concrete must not be less than the thickness of the material
removed. The finished surface of the replaced material must be flush with the adjacent surface.
20-3.03C(1)(c) Directional Boring
Reserved
20-3.03C(2) Irrigation Crossover Installation
20-3.03C(2)(a) General
Install conduits for water line crossovers and sprinkler control crossovers before installing other pipe
supply lines.

301

SECTION 20

LANDSCAPE

Irrigation crossovers include conduit, water line crossovers, sprinkler control crossovers, concrete thrust
blocks, and appurtenances as shown, as well as pressure testing of new water line crossovers. The size
of conduit, water line crossovers and sprinkler control crossovers must be as shown.
Extend conduits 2 feet beyond all paving unless otherwise shown.
After installation of conduits for water line crossovers and sprinkler control crossovers, and placement of
base and surfacing is complete, demonstrate the conduits are free of obstructions and restrictions.
If there are no conductors installed in electrical conduits, install pull boxes for irrigation crossovers on a
foundation of compacted soil.
Cap the ends of conduits with a piece of no. 30 asphalt-felt building paper secured with galvanized wire.
Designate the location of each conduit by cementing a Type A pavement marker as shown to the paved
shoulder near each end and over the centerline of the conduit using a standard set type adhesive. Type A
pavement markers and adhesive must comply with section 85.
Replace ground cover plants that have been removed or damaged. Comply with section 20-7.03I(16).
20-3.03C(2)(b) Sprinkler Control Crossovers
Sprinkler control crossovers includes installing electrical conduit, pull boxes and appurtenances as
described.
At each end of a sprinkler control crossover, install a no. 5 pull box that complies with section 20
3.03H(2)(c).
20-3.03C(2)(c) Water Line Crossovers
Installation of water line crossovers for irrigation crossovers includes:
1. Installing supply line pipes in conduits and appurtenances
2. Pressure testing under section 20-3.03N
After completing conduit backfill above irrigation crossover conduit, demonstrate that the water line
crossover can be moved longitudinally within the conduit.
Repair leaks and retest until a satisfactory pressure test is achieved.
Where water line crossovers are not to be connected to other supply lines, cap the ends of the crossovers
immediately after testing.
20-3.03C(2)(d) Extend Irrigation Crossovers
Extending irrigation crossovers includes conduit, water line crossovers and sprinkler control crossover
extensions, concrete thrust blocks, and appurtenances as shown, locating existing crossovers, and
pressure testing existing and new water line crossovers.
Before starting work in an area where an existing irrigation crossover conduit is to be extended, locate the
existing conduit. If exploratory holes are used to located the existing conduit, excavate the exploratory
holes under section 20-3.03B(6).
Before installation of water line crossover extension, pressure test the existing water line under section
20-3.03N.
After installation of water line crossover extensions, existing and extended water line crossovers must be
retested for leakage under section 20-3.03P. Leaks that develop must be repaired and the water line
crossovers must be retested until a satisfactory pressure test is achieved.
Existing conductors must be removed from existing sprinkler control crossovers to be extended.
After installation of the sprinkler control crossover extension, install conductors without splices in the
existing extended sprinkler crossover. New conductors must match the removed conductors in color and
size and be spliced to the existing conductors in adjacent pull boxes.
After the new conductors are installed, the conductors must be tested under section 86-2.14B.
302

SECTION 20

LANDSCAPE

20-3.03D Irrigation Sleeves


Install irrigation sleeves so that the top of a sleeve is at least 18 inches below finished grade. Extend
sleeves 6 inches beyond paving, Class 2 AB, gravel access roads, and decomposed granite. Cap ends of
sleeves until used.
20-3.03E Trenching and Backfilling
20-3.03E(1) General
Trench and backfill under sections 86-2.01 and 86-2.02.
Open trenches and excavation pits from a single water service point can be open 1 at a time. After
pressure testing is complete, backfill trenches and pits before excavating for conduit or supply lines from
another water service point.
Trenches for solvent-cemented plastic pipe supply lines must be a sufficient width to permit snaking of the
pipe. Do not excavate other trenches wider than necessary for the proper installation of pipe supply lines.
Trenching must be smooth and free of jagged rubble or sharp objects that could cause bending stresses
or uneven load distribution to pipes, conduits and conductors during backfill operations.
Rocks or debris encountered during trenching operations must be brought to the surface of the ground.
Remove rocks or debris larger than 2 inches in maximum dimension unless otherwise authorized.
Dispose of any pavement removed during trenching.
Backfill pipe trenches so that the pipe is protected from damage by sharp objects. Do not place rocks
directly on the pipe.
Except as specified, use material excavated from the trenches as backfill material. Compact by ponding
or jetting with water until the backfill material is level with the surrounding soil after settlement.
The Engineer may determine that the excavated material is not suitable for backfilling against the pipe. If
ordered, backfill against the pipe with sand or topsoil before backfilling the remainder of the trench.
Backfilling with sand or topsoil is change order work.
If a backfill area has settled, refill the area with additional material and compact.
20-3.03E(2) Remove Existing Plants for Trenching
Removing existing plants for trenching includes removing and replacing ground cover, pruning trees and
shrubs within the trench location, and disposing of removed plant material, including pruned material.
When trenching for irrigation facilities in areas where existing trees or shrubs are present, adjust the
trench alignment to avoid damage to the trees or shrubs.
When trenching for irrigation facilities where ground cover is present, remove sufficient ground cover to
permit the proper installation of the facilities, but do not remove more than a 6 foot width.
Existing Carpobrotus and Delosperma ground cover may be rototilled if the backfill for the trenches will
not contain plants longer than 6 inches in length.
Replace ground cover removed or rototilled with the same variety as the existing ground cover. For
Carpobrotus or Delosperma replacement plants, use cuttings that comply with section 20-7.02C(1). Plant
cuttings 12 inches on center. Other replacement ground cover plants must be from flats and planted 12
inches on center.
Perform ground cover replacement planting before the start of the plant establishment period. If no plant
establishment period is specified, plant at least 15 days before Contract acceptance.
Planting of ground cover plants must comply with section 20-7.03I(9).
Water replacement ground cover.
Replacement planting is not required in areas within 6 feet of fences, curbs, dikes or shoulders.

303

SECTION 20

LANDSCAPE

Trees and shrubs adjacent to dikes, walks, fences, guard railing and pavement edges may be pruned
back 10 feet from these facilities for trenching work. Where trenching is adjacent to other trees and
shrubs that can not be avoided, they may be pruned if authorized. If the Engineer determines these trees
and shrubs must be removed after pruning, the removal and disposal is change order work.
Dispose of removed ground cover and pruned materials.
20-3.03E(3) Remove Existing Turf Sod for Trenching
Remove existing turf sod in trenching areas and replace under section 20-7.
If crossing existing turf sod areas, the trench width must not exceed 12 inches.
20-3.03E(4) Open Trenching in Existing Surfacing
Pipe supply lines and control and neutral conductors in electrical conduits must be installed in common
open trench where trenching is (1) to be installed under concrete sidewalks or (2) below existing asphalt
concrete surfacing not subject to traffic loads or (3) not being installed in an irrigation crossover.
Do not excavate open trenches across traffic lanes.
For pipe supply lines or electrical conduits 3 inches or less in diameter:
1. Trench width in asphalt concrete surfacing must not exceed 12 inches.
2. Trench width in concrete sidewalks must not exceed 18 inches.
The tops of the installed pipe supply lines and electrical conduits must be a minimum of 12 inches below
finished grade.
Install pipes and conduits at the bottom of trenches and backfill with sand to a depth of 2 inches over the
top of the pipes and conduits. Excluding the part of the trench backfilled with surfacing or pavement, the
remainder of the trench must be backfilled with material that is excavated from the trench. Rock, broken
concrete, asphalt concrete and other particles larger than 2 inches in greatest dimension must not be
used.
For pipe supply lines between 3 to 12 inches in diameter and electrical conduits more than 3 inches in
diameter, the trench width in asphalt concrete surfacing and concrete sidewalks must be a minimum of 6
inches outside the proposed pipe diameter and electrical conduit.
Trenches must be deep enough so that the tops of the pipe or conduit are a minimum of 4 diameters
below the finished grade.
20-3.03F Pipe
20-3.03F(1) General
Supply line trenches located adjacent to curbs, dikes and paved shoulders must be at least 4 feet from
the curbs, dikes and paved shoulders.
Pipe supply lines installed between water meters and backflow preventer assemblies must be installed
not less than 18 inches below finished grade measured to the top of the pipe.
Where a connection is made to existing supply lines, compression type fittings may be used.
Cut pipe straight and true. After cutting, ream out the ends to the full inside diameter of the pipe.
You may install plastic pipe supply line with solvent-cemented fittings or plastic pipe irrigation line by
methods other than trenching, provided that pipes are installed at the depths specified.
20-3.03F(2) Galvanized Steel Pipe Supply Lines
Coat male pipe threads on galvanized steel pipe with a joint compound that is nonhardening and
noncorrosive. Apply joint compounds according to the manufacturer's instructions. Pipe thread sealant
tape will not be allowed.
Supply lines that cross paved ditches more than 3 feet deep at their flow line must be galvanized steel
pipe and span the ditches.
304

SECTION 20

LANDSCAPE

Comply with section 20-4 for supply lines that are surfaced mounted on concrete structures.
20-3.03F(3) Plastic Pipe Supply Lines
Plastic pipe supply lines with solvent-cemented type joints must be installed not less than 1 foot below
finished grade measured to the top of the pipe.
Supply lines must be installed under paved ditches that are 3 feet deep or less at their flow line.
Install plastic pipe and fittings according to the manufacturer's instructions and as specified.
For PVC pipe 1-1/2 inches in diameter or smaller, cut the pipe with PVC cutters.
Solvent-cement welding must comply with the manufacturer's instructions for the solvent cement.
Wrap the male portion of each threaded plastic pipe fitting with at least 2 layers of pipe thread sealant
tape.
Snake plastic pipe installed by trenching and backfilling methods.
20-3.03F(4) Plastic Pipe Irrigation Lines
Reserved
20-3.03F(5) Ultraviolet Resistant Plastic Pipe
UV resistant plastic pipe must be secured on grade as shown.
20-3.03F(6) Recycled Water Supply Line
Reserved
20-3.03G Thrust Blocks
Install thrust blocks on the main supply line at all changes in direction and terminus run and as shown.
20-3.03H Electrical Installation for Electrical Automatic Irrigation Systems
20-3.03H(1) General
Electrical systems for electrical automatic irrigation systems must comply with section 86-1.02.
Electrical components for electrical automatic irrigation systems include:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Controllers with enclosures


Controller enclosure cabinets
Base stations
Field units
Remote control valves
Valve boxes and pull boxes
Electrical conduits
Conductors between irrigation system components
Moisture sensors
Flow sensors
Remote control valve actuators
All appurtenances, incidentals and accessories required for the proper installation and operation of
the electrical portion for the electrical automatic irrigation systems

The electrical service is not included in the electrical components.


Modifications to electrical components required to meet specifications must be done by the manufacturer
before shipment to the job site.
20-3.03H(2) Conductors, Electrical Conduit, and Pull Boxes
20-3.03H(2)(a) Conductors
Conductors must be color coded where (1) 2 or more controllers are located within 1 irrigation controller
enclosure cabinet or (2) conductors from more than 1 controller are installed in a common trench. The
color of the conductors must be uniform from any one controller to its valves. Neutral conductors must be
305

SECTION 20

LANDSCAPE

white. Do not use white for control conductors. Conductors with green insulation must not be used except
as permitted by the NEC.
Low voltage conductors must be 36 V or less.
Each irrigation controller must have a common neutral conductor to its respective remote control valves.
Each remote control valve must have a separate control conductor from the irrigation controller with no
other valves connected.
If conductors are installed in a common trench and not in a conduit, they must be wrapped together with
electrical tape at 5 foot intervals.
Leave at least 2 feet of slack for each conductor at each pull box.
At each valve box, at least 2 feet of slack must be left for each conductor that is (1) connected to other
facilities within the box or (2) spliced within the box.
Splices for low voltage control and neutral conductors must comply with sections 86-2.09C, 86-2.09D,
and 86-2.09E except method B splice insulation must not be used. Tape used for splice insulation must
be PVC tape.
Splices must be made only in pull boxes or valve boxes.
Do not splice conductors in irrigation controller cabinets.
Do not use temporary splices used for testing valve circuits as permanent splices.
Permanent splice connections must be made with freshly cut and skinned conductors.
Where conductors are installed in the same trench or opening as supply line pipe, the conductors must be
installed at the same depth as the pipe. At other locations the conductors must be installed not less than
12 inches below finished grade.
Where conductors are located adjacent to curbs, dikes and paved shoulders, and not in a supply line pipe
trench, they must be at least 4 feet from the curbs, dikes and paved shoulders.
You may install conductors for an irrigation system by methods other than trenching provided that
conductors are installed at the depths specified and the conductor insulation is not damaged.
Conductors must be installed in electrical conduit if conductors are to be:
1.
2.
3.
4.
5.

Surface mounted
Installed in or on structures
Installed under paved areas
Installed in irrigation crossovers
Placed in concrete

Mark low voltage control and neutral conductors in pull boxes, valve boxes, at irrigation control terminals,
and at splices.
Mark conductor terminations and splices with adhesive cloth wrap-around markers. Seal markers with
clear, heat-shrinkable sleeves.
Mark nonspliced conductors with clip-on C-shaped white extruded PVC sleeves. Sleeves must have black
indented legends of uniform depth with transparent overlays over the legends and chevron cuts for the
alignment of 2 or more sleeves.
Markers for the control conductors must be identified with the appropriate number or letter designations or
irrigation controllers and station numbers. Markers for neutral conductors must be identified with the
appropriate number or letter designations of the irrigation controllers.
20-3.03H(2)(b) Electrical Conduit
Surface mounted conduits, conduits installed in or on a structure; conduits installed in concrete; and
conduits installed by jacking and drilling must be the rigid steel type. All other electrical conduits, including
306

SECTION 20

LANDSCAPE

electrical conduit installed in irrigation crossover conduits for water line crossovers and sprinkler control
crossovers and conduits under paved areas must be nonmetallic.
20-3.03H(2)(c) Pull Boxes
Install pull boxes as shown for the valve box.
Install pull boxes at the following locations:
1.
2.
3.
4.

At all conductor splices except splices made in valve boxes


Within 5 feet of irrigation controllers
At ends of electrical conduits
At other locations shown

If no conductors are installed in electrical conduits, pull boxes for irrigation crossovers must be installed
on a foundation of compacted soil.
Installation intervals of pull boxes must not exceed 500 feet along any low voltage control and neutral
conductor run.
Valve boxes installed along a conductor run must not be considered as pull boxes in determining the
spacing. If authorized you may install additional pull boxes to facilitate the work.
20-3.03H(3) Conductor Testing
Perform field tests on all conductors. Field tests must comply with the specifications for lighting circuits in
section 86-2.14B.
Where the conductors are installed by trenching and backfilling, field tests must be performed after at
least 6 inches of backfill material has been placed over the conductors and the material has been
compacted. Compact backfill material under section 20-3.03E.
20-3.03H(4) Controllers
20-3.03H(4)(a) Irrigation Controller
Install irrigation controllers per the manufacturer's instructions and as described.
The installation date and expiration date of the manufacturers guarantee for the controllers must be
permanently marked on the inside face of the controller.
If 2 or more irrigation controllers operate the same remote control valve master, an isolation relay must be
provided and installed per the controller manufacturer's instructions.
Irrigation controllers must be the same make.
Where direct burial conductors are to be connected to the terminal strip, the conductors must be
connected with the proper size open-end-crimp-on wire terminals. Exposed wire must not extend beyond
the crimp of the terminal and the wires must be parallel on the terminal strip.
20-3.03H(4)(b) Irrigation Controller Battery
Reserved
20-3.03H(4)(c) Irrigation Controller Solar
Reserved
20-3.03H(5) Remote Control Valve Actuator System
The receiver connector must be attached directly to the terminal strip or an existing plug on each irrigation
controller and continue out to the socket head mounted to the outside of the irrigation controller enclosure
cabinet as shown.
The receiver must be plugged into the receiver connector.
20-3.03H(6) Rain Sensor
Install rain sensor units for irrigation controllers on the irrigation controller enclosure cabinets. Provide
protection against lightning damage.
307

SECTION 20

LANDSCAPE

20-3.03I Service
Installation of electrical service must comply with section 86-2.11A and as described.
20-3.03J Recycled Water Warning Signs
Fasten recycled water warning signs to above ground irrigation facilities that are associated with recycled
water.
Place signs on the above ground irrigation facilities in visible locations.
Place sign decals directly to clean, smooth surfaces. Clean the surface with alcohol, or an equivalent
cleaner before applying the decal.
Apply warning sign decals directly to irrigation facilities with smooth surfaces or affixed to aluminum sign
plates, that are attached to the various above-ground irrigation facilities.
Permanently attach warning sign decals or warning sign decals on aluminum sign plates to:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Backflow preventers
Valve boxes
Nozzle lines
Concrete sprinkler protectors
Sprinkler risers
Irrigation controller enclosure cabinets
Flow sensors
Irrigation controller enclosures not in cabinets
Gates
Fences
Other irrigation facilities as shown

Permanently attach sign decals approximately 2-1/2 by 3 inches to sprinkler risers.


Permanently attach a 4 by 4 inch warning sign decal to:
1. Irrigation controller enclosure cabinet doors.
1.1. Attach decals for cabinets to aluminum sign plates and the plates attached with cadmium
plated, nonremovable, self-tapping screws or cadmium plated bolts, nuts and washers.
2. Irrigation controller enclosures not in cabinets.
3. Backflow preventer assemblies.
4. Backflow preventer assembly enclosures.
5. Valve box covers.
Place a 12 by 12 inch warning sign decal on an aluminum sign plate and attach to gates, fences, and
walls 5 feet above finished grade. Sign plates for gates and fences must be attached with S hooks and C
clips or 14-gauge galvanized steel wire as shown. Sign plates for concrete walls or other rough surfaces
must be affixed with a silicon-based adhesive.
Attach warning tags to the remote control valves and remote control valves (master). Tags must be 2 by 2
inches. Attach them inside the valve box according to the manufacturers instructions.
Post and fastening hardware for post mounted recycled water warning signs must comply with section 56
4.
Mark underground pipe for recycled water under section 20-3.02M(4).
20-3.03K Sprinklers Type D
Install Sprinklers Type D as shown and according to the manufacturers instructions.
Sprinklers must be equipped with a single barb inserted into a shrub nut. The shrub nut must be installed
on a threaded PVC riser.

308

SECTION 20

LANDSCAPE

Discharge ends of tubing must be held in place by plastic or metal stakes within the basin and
approximately 2 inches above grade. Comply with the sprinkler manufacturers instructions for stake
installation.
20-3.03L Valves and Valve Boxes
20-3.03L(1) General
Install and identify valve boxes as shown.
Install valves, flow sensor, wye strainers, filter assembly units, and cam coupler assemblies in valve
boxes as shown.
Where installed in walkways and paved areas, install the tops of valve boxes flush with the surrounding
finished grade. In other areas, the top of valve boxes must be installed 2 inches above the surrounding
finished grade.
20-3.03L(2) Ball Valves
Ball valves must be the same size as the supply line that the valve serves unless otherwise shown.
20-3.03L(3) Check Valves
Install spring-action check valves used as anti-drain valves at locations shown. The size of the check
valve must be the same size as the supply line it serves. If locations are not shown the Engineer will
determine the location.
20-3.03L(4) Garden Valves
Where a garden valve is open on (1) a valve assembly unit or (2) a wye strainer in a valve box, the
discharge must be up and out of the valve box.
20-3.03L(5) Pressure Regulating Valves
Install pressure regulating valves with threaded connections and a union on the inlet side of the valves.
20-3.03L(6) Flush Valves
Install location marker 8 to 10 inches from the back of the garden valve.
20-3.03M Wye Strainers
Install wye strainers other than within the backflow preventer assemblies on the upstream side of the
remote control valves as shown.
20-3.03N Pressure Testing
Perform pressure testing before backfilling supply line trenches. Pressure testing must be performed in
the presence of the Engineer.
Perform pressure tests between 8 a.m. and 5 p.m.. Do not test on Saturdays or holidays.
Perform pressure testing for leakage on all pipe supply lines installed, except for nonrigid pipelines and
pipelines with spray nozzles or emitters installed into the pipe.
Test pipelines after installation with all open ends of the pipeline and fittings plugged or capped.
Choose either Method A or B to test (1) pipes installed by trenching and backfilling and (2) pipelines that
are completely visible after installation. All other pipelines, including those installed in the ground by
methods other than trenching and backfilling must be tested by Method A.
Test water line crossovers and extended water line crossovers by Method A with the testing period
modified to 0.5 hour and allowable pressure drop is modified to no drop in pressure.
20-3.03N(1) Method A
Method A pressure testing procedures for leakage must comply with the following:
1. The pressure gauge must be calibrated from 0 to 200 psi in 5 psi increments and be accurate to
within a tolerance of 2 psi.

309

SECTION 20

LANDSCAPE

2. Fill the pipeline to be tested with water and connect a pressure gauge to the pipeline. Place the
pipeline under a pressure of 125 psi by air or water pressure. Remove the source of pressure and
leave the line under the required pressure.
3. Test the pipeline under the required pressure for a period of 1 hour. The pressure gauge must remain
in place until each test period is completed.
4. Leaks that develop in the tested portion of the system must be located and repaired after each test
period if a drop of more than 5 psi is indicated by the pressure gauge. After the leaks have been
repaired, repeat the 1 hour pressure test until the drop in pressure is 5 psi or less.
If a system consists of new pipelines connected to existing pipelines, the new pipelines must be isolated
from the existing pipelines and the new pipelines must be tested.
20-3.03N(2) Method B
Method B pressure testing procedures for leakage must comply with the following:
1. Before any portion of the pipeline on the supply side of a control valve is backfilled, water must be
turned on for that portion of the line and maintained at full pressure from the water source for a period
not less than 8 consecutive hours after all air has been expelled from the line. Before any portion of
the pipeline on the discharge side of the control valve is backfilled, perform the same test for a period
not less than 1 hour.
2. Repair leaks that develop in the tested portion of the system. After the leaks have been repaired,
repeat the pressure test until no leaks occur as determined by the Engineer.
20-3.03O Repairs and Sprinkler Coverage
Leaks that develop and defective material in any portion of the irrigation system installed under this
Contract must be repaired or replaced.
After installation of the sprinklers, check and adjust the entire sprinkler system for uniform and complete
coverage. Check emitters for proper orientation and clean or replace.
Any ordered changes to the new irrigation system necessary to achieve complete and accurate coverage
of an area to be watered is change order work.
20-3.03P Irrigation System Functional Test
Functional tests must be satisfactorily completed before:
1. Planting the plants. Upon completion of a satisfactory functional test, the plants to be planted in the
areas watered by the irrigation system may be planted, if the planting areas have been prepared as
specified.
2. The 2nd test must be performed after the planting of plants and before the start of the plant
establishment period.
The functional tests for each irrigation controller and associated automatic irrigation system served by a
single electric service point or a group of irrigation controllers and associated automatic irrigation systems
served by a single electric service point must consist of not less than 1 complete cycle of operation.
The Engineer determines the length of the cycle.
20-3.03Q Final Irrigation System Check
A final check of the existing and new irrigation facilities must be performed not more than 30 working days
and not less than 20 working days before Contract acceptance.
The Engineer determines the length of the cycle.
Remote control valves connected to existing and new irrigation controllers must be checked for automatic
performance when the controllers are in automatic mode.
Unsatisfactory performance of irrigation facilities installed or modified must be repaired and rechecked
until satisfactory performance is obtained.

310

SECTION 20

LANDSCAPE

20-3.04 PAYMENT
Work described in this section is paid under bid items specified in section 20-3.02 except for check and
test existing irrigation facilities, maintain existing irrigation facilities, replace existing valve box covers, and
extend irrigation crossover.
Pipes and conduits are measured along the slope.

Payment for maintain existing water supply is included in payment for the various items of work.

Payment for irrigation crossovers is included in payment for the various types and sizes of conduit.

Payment for extend irrigation crossover is included in payment for the various sizes of conduit extensions.

Payment for water line crossover, appurtenances, and for pressure testing the water line crossover is

included in payment for the various types and sizes of plastic pipe supply line.

Payment for sprinkler control crossovers, water line crossovers, pavement markers, pull wires, pull boxes,

and appurtenances, and for pressure testing the water line crossover is included in payment for various

types and sizes of conduit.

Payment for pipe supply line from water meter through the backflow preventer to plastic pipe supply line

is included in payment for the various sizes of backflow preventers.

Payment for remove existing turf sod for trenching or remove existing plants for trenching is included in

payment for the various types and sizes of pipe supply line.

Payment for flush valves and atmospheric vacuum breakers is included in payment for the various types

and sizes of plastic pipe supply line.

Payment for remote control valve (master) and remote control valve with pressure regulator is paid for as

remote control valve.

Payment for remote control valve actuator system is included in payment for the various types of irrigation

controllers.

Payment for rain sensor is included in payment for the irrigation controller enclosure cabinet.

Payment for checking and cleaning emitters and for checking and adjusting the various types of sprinklers

for proper flow and coverage after installation is included in the payment for the various types of

sprinklers.

Electrical conduit and pull boxes are measured and paid for as control and neutral conductors.

Armor-clad conductors are measured and paid for as control and neutral conductors.

Payment for recycled water supply lines and UV-resistant plastic pipe will be measured and paid for as

plastic pipe supply line.

Payment for functional tests and final irrigation system check are included in payment for the various
items of work.
20-4 SUPPLY LINE ON STRUCTURES
20-4.01 GENERAL
20-4.01A General
20-4.01A(1) Summary
Section 20-4 includes specifications for installing water supply lines through bridges and on the exterior of
concrete structures.
20-4.01A(2) Definitions
Reserved
20-4.01A(3) Submittals
Submit a work plan for temporary casing support at the abutments as an informational submittal.
311

SECTION 20

LANDSCAPE

20-4.01A(4) Quality Control and Assurance


20-4.01A(4)(a) General
Before installing seismic expansion assemblies or expansion assemblies, the Engineer must authorize
the extension setting.
20-4.01A(4)(b) Regulatory Requirements
Piping materials must bear the label, stamp, or other markings of the specified standards.
20-4.01A(4)(c) Site Tests
Test water supply lines before:
1. Backfilling
2. Beginning work on box girder cell decks
3. Otherwise covering the water supply lines
Furnish pipe anchorages to resist thrust forces occurring during testing.
Test the water supply lines as 1 unit. The limits of the unit must be 5 feet beyond the casing at each end
of the bridge.
Cap each end of the water supply lines before testing. Caps must be rated for the test pressure.
Test water supply lines under section 20-3.03N(1), except that the testing period must be 4 hours with no
pressure drop.
For water supply lines 4 inches and larger testing must meet the following additional requirements:
1. Testing pressure must be at least 120 psi
2. Air relief valve must not be subjected to water pressure due to testing
If water supply lines fail testing, retest the lines after repair.
20-4.01B Materials
20-4.01B(1) General
Protect stored piping from moisture and dirt. Elevate piping above grade. Support piping to prevent
sagging and bending.
Protect flanges, fittings, and assemblies from moisture and dirt.
20-4.01B(2) Air Release Valve Assemblies
Air release valve assemblies include an air release valve, ball valve, tank vent, nipples, and pipe saddle.
Assemblies must comply with the following:
1. Air release valves must have a cast iron body with stainless steel trim and float, 1-inch NPT inlet, 1/2
inch NPT outlet, and 3/16-inch orifice.
2. Ball valves must have a 2-piece bronze body with chrome plated or brass ball, 1-inch full-size port,
and be rated for at least 400 psi.
3. Tank vents must have a 1/2-inch NPT inlet and downward-facing double openings with screened
covers.
4. Nipples must be schedule 40 galvanized steel pipe.
5. Pipe saddle must be rated for at least 150 psi and compatible with water supply line. Pipe saddle
must be (1) single strap pipe saddle for water supply lines smaller than 4 inches or (2) double strap
pipe saddle for water supply lines 4 inches and larger. You may use a tee fitting for galvanized steel
water supply lines.
20-4.01B(3) Casings
Casings must be welded steel pipe casing complying with section 70-7.
20-4.01B(4) Pipe Wrap Tape
Pipe wrap tape must be pressure sensitive tape made from PVC or polyethylene. Pipe wrap tape must be
at least 50 mils thick and not wider than 2 inches.
312

SECTION 20

LANDSCAPE

20-4.01B(5) Pipe Hangers


Pipe hangers must comply with section 70-7.02C.

The pipe hanger must be rated for the water supply line. If casings are shown, include the casings weight.

20-4.01B(6) Epoxy Adhesives


Epoxy used for anchoring concrete pipe supports must comply with section 70-7.02D.
20-4.01B(7) Concrete Pipe Supports
Concrete pipe supports must comply with section 70-7.02D.
20-4.01B(8) Pipe Clamps and Anchors
Metal clamps must be commercial quality steel complying with section 75-1.02. Anchors must comply with
the specifications for concrete anchorage devices in section 75-1.03C.
20-4.01B(9) Pull Boxes
Pull boxes and covers must comply with section 20-3.03H(2)(c).
20.4.01C Construction
20-4.01C(1) General
Support water supply lines as described.
Where water supply lines penetrate bridge superstructure concrete, either form or install pipe sleeves at
least 2 pipe sizes larger than the pipe.
20-4.01C(2) Preparation
Clean the interior of the pipe before installation. Cap or plug openings as pipe is installed to prevent the
entrance of foreign material. Leave caps or plugs in place until the next pipe section is installed.
20-4.01C(3) Installation
20-4.01C(3)(a) General
Reserved
20-4.01C(3)(b) Casings
Install casings under section 70-7.03.

Seal casing end with 8 inches of polyurethane foam at dirt stop or pipe end seal.

20-4.01C(3)(c) Wrapping Water Supply Line


Wrap damaged supply line coatings with pipe wrap tape. Wrap field joints and fittings that are in contact
with the earth.
Wrapping must comply with the following:
1. Clean and prime area as recommended by the tape manufacturer.
2. Tightly wrap tape with 1/2 uniform overlap, free from wrinkles and voids, to provide not less than a
100 mil thickness.
3. The tape must conform to joint or fitting contours.
4. Extend tape at least 6 inches over adjacent pipe.
20-4.01C(3)(d) Pipe Clamps and Anchors
Install water supply lines on the exterior surfaces of bridges or other concrete structures with metal
clamps and anchors.
Drilling of holes for anchors must comply with the following:
1. Drill holes to manufacturers recommended depth.
2. Drilling tools must be authorized.
3. Do not drill holes closer than 6 inches to the edge of a concrete structure.

313

SECTION 20

LANDSCAPE

4. Relocate holes if reinforcing steel is encountered. Fill abandoned holes with mortar. Mortar must
comply with section 51-1.02F.
Where water supply lines are mounted vertically for more than 2 feet, install clamps and anchors within 6
inches of the elbows.
Where water supply lines are mounted vertically for more than 10 feet, install additional clamps and
anchors at 10 foot centers unless otherwise shown.
20-4.01C(4) Sequences of Operation
If the bridge superstructure is to be prestressed do not place mortar around casings in abutments and
hinges until bridge superstructure prestressing has been completed.
20-4.01D Payment
Supply line on structures is measured from end to end, along the centerline.
The Department does not pay for failed tests.
20-4.02 SUPPLY LINE ON STRUCTURES, LESS THAN 4 INCHES
20-4.02A General
20-4.02A(1) Summary
Section 20-4.02 includes specifications for installing water supply lines smaller than 4 inches.
20-4.02A(2) Definitions
Reserved
20-4.02A(3) Submittals
Product data for materials includes catalog cuts, performance data, and installation instructions.
Submit product data for:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Water supply line


Expansion assemblies
Casing insulators
Pipe end seals
P
ipe anchorages
Air release valve assemblies
C
asings
Pipe hangers
E
poxy adhesives
Concrete pipe supports

20-4.02A(4) Quality Control and Assurance


Reserved
20-4.02B Materials
20-4.02B(1) General
Reserved
20-4.02B(2) Water Supply Line
Water supply lines must comply with section 20-3.02M(2).
20-4.02B(3) Expansion Assemblies
Expansion assemblies must consist of a hose with ends, insulated flange connections, and elbows.
Expansion assemblies must have the same nominal inside diameter as the water supply line. Working
pressure must be at least 150 psi.
Hose must be medium or heavy weight, crush and kink resistant, rated for at least 150 psi. Cover must be
flexible, oil resistant rubber or synthetic, reinforced with at least 2-ply synthetic yarn or steel wire. The
inner tube must meet FDA and USDA Standards for potable water. Hose ends must be stainless steel
314

SECTION 20

LANDSCAPE

flanged connections with stainless steel crimped bands or swaged end connectors. Do not use barbed
ends with band clamps.
Elbows must be 45 degree, standard weight galvanized steel fittings.
20-4.02B(4) Casing Insulators
Casing insulators must be:
1. 2-piece, high-density, injection-molded polyethylene, nonconductive inner liner, with cadmium-plated
nuts and bolts.
2. Factory constructed to ensure the water supply line is centered in the casing. Insulators must not
allow any contact between pipe and casing and have at least 2 runners seated on the bottom of the
casing.
3. Sized for the casing and water supply line shown.
20-4.02B(5) Pipe Anchorages
Pipe anchorages must consist of an I-beam, U-bolts, anchors, and double nuts.
Use concrete anchorage devices for anchors on existing bridges. Use L-anchor bolts for anchors on new
bridges.
Fabricate the I-beam from 1/2-inch steel plate. Steel plate, U-bolts, L-anchors, and nuts must comply with
section 75-1.02. Concrete anchorage devices must comply with section 75-1.03C.
20-4.02B(6) Pipe End Seals
Pipe end seals must consist of a pipe end seal, stainless steel bands, and polyurethane foam.
Pipe end seal must be factory constructed from seamless neoprene and sized for the casing and water
supply line shown. Neoprene must be at least 1/8 inch thick. Stainless steel bands must be crimped.
Polyurethane foam must be expanding foam spray that is water resistant and moisture cured.
20-4.02C Construction
Locate pipe anchorage halfway between expansion assemblies.
Pipe end seal must be pulled onto the casing during pipe installation. Do not use wrap-around type end
seals.
20-4.02D Payment
Supply line on structures is paid for as galvanized steel pipe (supply line on bridge).
20-4.03 SUPPLY LINE ON STRUCTURES, 4 INCHES AND LARGER
20-4.03A General
20-4.03A(1) Summary
Section 20-4.03 includes specifications for installing water supply lines 4 inches and larger.
20-4.03A(2) Definitions
Reserved
20-4.03A(3) Submittals
Product data for materials includes catalog cuts, performance data, and installation instructions.
Submit product data for:
1.
2.
3.
4.
5.
6.
7.

Water supply line


Expansion assemblies
Flange insulating gaskets
Casing insulators
Seismic expansion assemblies
Lateral restraint assemblies
Air release valve assemblies
315

SECTION 20
8.
9.
10.
11.

LANDSCAPE

C
asings
ipe hangers
P
Epoxy adhesives
Concrete pipe supports

Submit the maximum range and preset dimension for each expansion assembly or seismic expansion
assembly as an informational submittal.
Submit at least 5 sets of product data to OSD, Documents Unit. Each set must be bound together and
include an index stating equipment names, manufacturers, and model numbers. Two sets will be
returned. Notify the Engineer of the submittal. Include in the notification the date and contents of the
submittal.
20-4.03A(4) Quality Control and Assurance
Reserved
20-4.03B Materials
20-4.03B(1) General
Reserved
20-4.03B(2) Water Supply Line
Water supply lines must consist of ductile iron pipe and fittings. Pipe must comply with ANSI/AWWA
C151/A21.51, Class 350. Fittings must comply with ANSI/AWWA C110/A21.10, rated for a working
pressure of 350 psi.
Ductile iron pipe connections to expansion assemblies must be a flanged joint complying with
ANSI/AWWA C115/A21.15. Flange gaskets must be rated for a working pressure of 350 psi. Fasteners
must comply with section 75-1.02, except that stainless steel fasteners must not be used.
All other ductile iron pipe and fitting joints must be push-on, restrained type complying with ANSI/AWWA
C111/A21.11. Push-on, restrained type joints may use proprietary dimensions and proprietary restrained
joint locking systems.
Ductile iron pipe and fittings must have an asphaltic coating complying with ANSI/AWWA C151/A21.51,
and a cement mortar lining complying with ANSI/AWWA C104/A21.4.
20-4.03B(3) Expansion Assemblies
Expansion assemblies must be a sleeve type expansion joint. The expansion assembly must have:
1.
2.
3.
4.
5.

Ductile iron body complying with ANSI/AWWA C153/A21.53


Flanged ends complying with ANSI/AWWA C110/A21.10
Fusion bonded epoxy internal lining complying with ANSI/AWWA C213 at least 15 mils thick
Internal expansion sleeve limiting stop collars and be pressure balanced
Working pressure of at least 350 psi for sizes 24 inches and smaller and 250 psi for sizes larger than
24 inches
6. NSF 61 certification
The expansion assembly must be factory set at 1/2 the extension capacity.
20-4.03B(4) Flange Insulating Gaskets
Flange insulating gaskets must consist of a dielectric flange gasket, insulating washers and sleeves, and
commercial quality steel bolts and nuts. Dielectric flange gasket must have a dielectric strength of at least
500 vpm.
20-4.03B(5) Casing Insulators
Casing insulators must be:

1. 2-piece, 8-inch, 14-gauge epoxy-coated or galvanized steel band, four 2-inch-wide glass-reinforced
polyester or polyethylene runners, with cadmium-plated nuts and bolts.
2. Coated with at least 15-mils heat-fused PVC to provide a nonconductive inner liner.
316

SECTION 20

LANDSCAPE

3. Factory constructed to ensure the water supply line is centered in the casing. Insulators must not
allow any pipe to casing contact and have at least 2 runners seated on the bottom of the casing.
4. Sized for the casing and water supply line shown.
20-4.03B(6) Dirt Stops
Dirt stops must consist of a redwood cover with polyurethane foam.
Use construction heart grade redwood complying with 57-2.01B(2). Construct cover to fit snugly around
the water supply line. The cover must be 2 inches taller and 2 inches wider than the casing.
Polyurethane foam must be expanding foam spray that is water resistant and moisture cured.
20-4.03B(7) Seismic Expansion Assemblies
Seismic expansion assemblies must be a sleeve type expansion joint with integral ball joints at each end.
Seismic expansion assemblies must have:
1. Ability to withstand at least 15 degree angular deflection at each end and maximum movement in all 3
planes at the same time
2. Ductile iron body complying with ANSI/AWWA C153/A21.53
3. Flanged ends complying with ANSI/AWWA C110/A21.10
4. Fusion bonded epoxy internal lining complying with ANSI/AWWA C213 at least 15 mils thick
5. Internal expansion sleeve limiting stop collars and pressure balanced
6. Ball joints contained in flanged retainers with seal gaskets
7. Working pressure of at least 350 psi for sizes 24 inches and smaller and 250 psi for sizes larger than
24 inches
8. NSF 61 certification
The seismic expansion assembly must be factory set at 1/2 the extension capacity.
20-4.03B(8) Lateral Restraint Assemblies
Lateral restraint assemblies must be (1) constructed from commercial quality steel components complying
with section 75-1.02, (2) adjustable, and (3) able to resist a horizontal force of 10 percent of the
contributory dead load.
20-4.03C Construction
Each ductile iron pipe must be connected and fully extended (pulled out) after joint assembly before the
next pipe section is added.
Install flange insulating gaskets on the outside flange of seismic expansion assemblies and expansion
assemblies.
20-4.03D Payment
Supply line on structures is paid for as supply line (bridge).
20-5 REMOTE IRRIGATION CONTROL SYSTEM
Reserved
20-6 REMOTE IRRIGATION CONTROL SYSTEM FUNCTIONAL TEST
Reserved
20-7 HIGHWAY PLANTING
20-7.01 GENERAL
20-7.01A Summary
Section 20-7 includes specifications for planting including clearing planting areas, preparing planting
areas, and planting plants.
Some plants required for this Contract may not be readily available and must be grown specifically for this
project.

317

SECTION 20

LANDSCAPE

20-7.01B Submittals
20-7.01B(1) Vendor Statement
Within 30 days after Contract approval, submit a statement from the vendor that the order for the plants to
be grown for this Contract, including inspection plants and replacement plants, has been received and
accepted by the vendor. The statement from the vendor must include the names, sizes, and quantities of
plants ordered and the anticipated delivery date. Notify the Engineer when the vendor has started to grow
the plants.
At least 60 days before planting the plants, submit a statement from the vendor that the order for the
plants required for this Contract, including inspection plants, has been received and accepted by the
vendor. The statement from the vendor must include the names, sizes, and quantities of plants ordered
and the anticipated delivery date.
20-7.01B(2) Certificate of Compliance
Submit a certificate of compliance for:
1. Turf sod
2. Soil amendment
3. Mulch
Submit a 2 cu ft mulch sample with the mulch source listed on the bag and obtain approval before
delivery of mulch to the job site.
20-7.01B(3) Product Data
Submit a copy of the root stimulant manufacturer's product sheet and the instructions for the application
of the root stimulant.
20-7.01B(4) Nursery Invoice
Submit nursery invoices for plants furnished showing species or variety.
20-7.01C Quality Control and Assurance
Plants must comply with federal and state laws requiring inspection for plant diseases and infestations.
Inspection certificates required by law must accompany each shipment of plants and must be furnished to
the Engineer.
Obtain clearance from the county agricultural commissioner as required by law before planting plants
delivered from a source outside the county where the plants are to be planted. Furnish evidence that
clearance is obtained.
20-7.02 MATERIALS
20-7.02A General
Plant groups described but not specified under section 20-7.02 must comply with section 20-7.
Plants must be the variety and size shown and true to the type or name shown. Plants must be
individually tagged or tagged in groups identifying the plants by species or variety. Tagging is not required
for Carpobrotus and Delosperma cuttings.
Furnish healthy, shapely and well-rooted plants with roots that show no evidence of being restricted or
deformed. Plants must be well-grown, free from insect pests and disease, and grown in nurseries
inspected by the Department of Food and Agriculture.
Root condition of plants furnished in containers are determined by removal of earth from the roots of not
less than 2 plants nor more than 2 percent of the total number of plants of each species or variety.
If container-grown plants are provided from several sources, the roots of not less than 2 plants of each
species or variety from each source must be inspected to determine the root condition.
If the sample plants inspected are found to be defective, including plants that are root bound or have an
underdeveloped root ball, the entire lot or lots of plants represented by the defective samples may be
rejected. Sample plants rendered unsuitable for planting because of this inspection are considered as
samples at your expense.
318

SECTION 20

LANDSCAPE

20-7.02B Delivery, Storage, and Handling


Trucks used for transporting plants must be equipped with covers to protect plants from windburn.

Deliver fertilizer in labeled containers showing weight, chemical analysis, and name of the manufacturer.

Roots of plants not in containers must be kept moist and covered until the plants are planted.

Before transporting the plants to the planting area, thoroughly wet the root ball.

Handle and pack plants in an authorized way for the species or variety.

Protect turf sod with tarps or other protective covers during delivery. Do not allow turf sod to dry out

during delivery or before placement.

Any plant, determined to be damaged or is dry or in a wilted condition when delivered to the planting area

must be replaced.

20-7.02C Plants
20-7.02C(1) Carpobrotus and Delosperma Cuttings for Plant Group H
Carpobrotus cuttings must be 10 inches or more in length and not rooted. Delosperma cuttings must be 6
inches or more in length and not rooted. Cuttings must be tip cuttings from healthy, vigorous, and strong
growing plants free from insects and disease.
Carpobrotus cuttings must not be taken from any plants that show the presence of ice plant scale
(Pulvinaria species).
Mature or brown stem growths or cuttings that have been trimmed are not accepted.
Carpobrotus and Delosperma cuttings may be taken from existing plantings to the extent available within
the highway under permit. Cuttings available from existing plants on the highway may not be enough to
complete the work. Contact the Department's encroachment permit office in the district where the work is
to be performed for information concerning areas where the removal of cuttings will be permitted.
Plant cuttings no more than 2 days after being cut. Do not allow cuttings to dry or wither.
20-7.02C(2) Liner Plants for Plant Group M
Do not use containers made of biodegradable material.
20-7.02C(3) Plug Plants for Plant Group P
Plug plants must be grown in individual container cells.
Do not use containers made of biodegradable material.
20-7.02C(4) Seedling Plants for Plant Group S
Seedling plants must be bare root.
20-7.02C(5) Turf Sod
Turf sod must be grown to comply with the Food & Agri Code. Turf sod must be free from disease, weeds,
insects, and undesirable types of grasses and clovers. Soil upon which the turf sod is grown must contain
less than 50 percent silt and clay.
Turf sod must be machine-cut to a uniform soil thickness of 5/8 1/4 inch, not including top growth and
thatch.
20-7.02D Miscellaneous
20-7.02D(1) Fertilizer
20-7.02D(1)(a) General
Fertilizer must comply with the requirements of the Food & Agri Code.

319

SECTION 20

LANDSCAPE

20-7.02D(1)(b) Slow-Release or Controlled-Release Fertilizer


Slow-release or controlled-release fertilizer must be a pelleted or granular form, must be slow-release or
controlled-release with a nutrient release over an 8 to 12 month period, and must fall within the following
guaranteed chemical analysis range:
Ingredient
Nitrogen
Phosphoric acid
Water soluble potash

Content
(percent)
1621
6-8
4-10

20-7.02D(1)(c) Packet Fertilizer


Packet fertilizer must be slow release or controlled release in a biodegradable packet. The packet must
gradually release nutrients over a 12 month period. Each packet must have a weight of 10 1g and have
the following guaranteed chemical analysis:
Ingredient
Nitrogen
Phosphoric acid
Water soluble potash

Content
(percent)
20
10
5

20-7.02D(1)(d) Organic Fertilizer


Reserved
20-7.02D(2) Root Stimulant
Reserved
20-7.02D(3) Foliage Protector
Foliage protector must be:
1. Fabricated from 1-inch, hexagonal pattern, 20-gauge mesh wire
2. Approximately 4 feet high and 2 feet in diameter
Wire edges at the top of the cylinder must be the uncut manufactured finished edge free of sharp points.
Other wire edges that are cut must be free of sharp points.
Support stakes must be one of the following:
1. 3/4-inch reinforcing steel bar a minimum of 5 feet long with an orange or red plastic safety cap that
fits snugly onto the top of the reinforcing steel bar
2. 2 inch nominal diameter or 2 by 2 inch nominal size wood stakes a minimum of 5 feet long. Wood
stakes must be straight
Comply with the specifications for jute mesh under section 21-1.02O(2).

Twine required to hold the jute mesh cover in place must be 1/8-inch diameter manila hemp twine.

20-7.02D(4) Iron Sulfate


Iron sulfate must be ferrous sulfate in pelleted or granular form containing not less than 18.5 percent iron
expressed as metallic iron. Iron sulfate must comply with the Food & Agri Code.
20-7.02D(5) Edging
20-7.02D(5)(a) Header Board Edging
Anchor edging with stakes. Stakes must be the size and shape shown.
Lumber must be one of the following types:
1. Construction grade cedar
320

SECTION 20

LANDSCAPE

2. Pressure-treated Douglas fir


3. Construction heart grade redwood complying with 57-2.01B(2).
Lumber must be:
1. Rough cut from sound timber.
2. Straight. Sweep must not exceed 1 inch in 6 feet.
3. Free from loose or unsound knots. Knots must be sound, tight, well spaced, and not to exceed 2
inches in size on any face.
4. Free of shakes in excess of 1/3 the thickness of the lumber.
5. Free of splits longer than the thickness of the lumber.
6. Free of other defects that would render the lumber unfit structurally for the purpose intended.
20-7.02D(5)(b) Metal Edging
Metal edging must be commercial quality, made of aluminum or steel, and have an L-shaped design.
Edging must be a minimum of 4 inches in height. Thickness must be as recommended by the
manufacturer for commercial installation for the use intended. Anchor edging with steel spikes or stakes,
whichever is provided by the manufacturer. Spike or stake size must comply with the manufacturer's
recommendations for use and site conditions.
20-7.02D(5)(c) High Density Polyethylene Edging
Edging must be commercial quality HDPE edging. Edging must be a minimum of 4 inches in height.
Thickness must be as recommended by the manufacturer for commercial installation for the use intended.
Anchor edging with spikes or stakes, whichever is provided by the manufacturer. Spike or stake size must
comply with the manufacturer's recommendations for use and site conditions.
20-7.02D(5)(d) Concrete Edging
Concrete for edging must be minor concrete.
20-7.02D(6) Mulch
20-7.02D(6)(a) General
Mulch must not contain more than 0.1 percent of deleterious materials such as rocks, glass, plastics,
metals, clods, weeds, weed seeds, coarse objects, sticks larger than the specified particle size, salts,
paint, petroleum products, pesticides or other chemical residues harmful to plant or animal life.
20-7.02D(6)(b) Tree Bark Mulch
Tree bark mulch must be derived from cedar, Douglas fir, or redwood species.
Tree bark mulch must be ground so that a minimum of 95 percent of the material by volume is less than 2
inches and no more than 30 percent by volume is less than 1 inch.
20-7.02D(6)(c) Wood Chip Mulch
Wood chip mulch must be derived from clean wood and not contain leaves or small twigs.
Wood chip mulch must have an average thickness of 1/16 inch, length between 1/2 inch and 3 inches,
and a width 3/8 inch or greater. At least 95 percent of wood chips, by volume, must conform to these
dimensions.
20-7.02D(6)(d) Shredded Bark Mulch
Shredded bark mulch must be a blend of loose, long, thin wood or bark pieces derived from trees with a
high length-to-width ratio. A minimum of 95 percent of the wood strands must have lengths from 2 to 8
inches, with a width and thickness from 1/8 to 1-1/2 inches.
20-7.02D(6)(e) Tree Trimming Mulch
Tree trimming mulch must be derived from chipped trees and may contain leaves and small twigs.
Tree trimming mulch must have a particle size such that a minimum of 95 percent of the material by
volume is less than 3 inches and no more than 30 percent by volume is less than 1 inch.

321

SECTION 20

LANDSCAPE

20-7.02D(7) Root Barrier


Reserved
20-7.02D(8) Root Protector
Root protector must be:
1. Fabricated from 1-inch, hexagonal pattern, 20-gauge mesh wire
2. Closed bottom design with a height and diameter that provides a minimum of 6 inches of clearance
between the root ball and the sides and bottom of the wire cylinder
Wire edges at the top of the cylinder must be the uncut manufactured finished edge free of sharp points.
Galvanized wire mesh must be treated with a chemical solution that will remove the galvanized material
prior to installation.
20-7.02D(9) Soil Amendment
Soil amendment must comply with the requirements in the Food & Agri Code.
20-7.02D(10) Wood Plant Stakes
Plant stakes installed at trees and shrubs must be of sufficient lengths to support each plant in an upright
position. Plant stakes must be either 2 inch nominal diameter or 2 by 2 inch nominal size stakes.
Plant stakes for vines must be 1 by 1 inch nominal size stakes, 18 inches long.
20-7.02D(11) Plant Ties
Plant ties must be extruded vinyl-based tape, 1 inch wide and a minimum of 10 mils thick.
20-7.03 CONSTRUCTION
20-7.03A General
Planting includes delivery, storage, and handling.
Planting includes plant stakes and plant ties.
20-7.03B Roadside Clearing
20-7.03B(1) General
Roadside clearing includes:
1.
2.
3.
4.

Removing of trash and debris


Removing of existing plants
Killing, controlling, and mowing weeds
Controlling rodents and pests

Perform roadside clearing where described.


Remove existing plants where described. Removal of existing plants includes removing their stumps and
roots 2 inches or larger in diameter to a minimum depth of 12 inches below finished grade. Backfill holes
resulting from stump removal to finished grade with material obtained from adjacent areas.
Weeds within the wildflower seeding areas must be controlled by mowing until the start of the wildflower
seeding operation.
Where pesticides are used to kill weeds, weeds must be killed before they reach the seed stage of growth
or exceed 4 inches in length, whichever occurs first.
Areas to be mowed must be mowed before the weeds reach the seed stage of growth or exceed 6 inches
in length, whichever occurs first. Weeds must be mowed to a height of 3 inches. Remove trash and debris
before mowing.
A growth regulator may be applied to weed growth in mowed areas. Growth regulator must be applied
before the weeds reach the seed stage of growth or exceed 6 inches in length, whichever occurs first.

322

SECTION 20

LANDSCAPE

Weeds to be hand pulled must be pulled before they reach the seed stage of growth or exceed 4 inches
in length, whichever occurs first, except for tumbleweeds.
Tumbleweeds must be killed by hand pulling before they reach the seed stage of growth or exceed 6
inches in length, whichever occurs first.
20-7.03B(2) Initial Roadside Clearing
Disposal of weeds killed during the initial roadside clearing is not required except for:
1. Weeds killed from within areas where asphalt concrete surfacing, concrete surfacing, rock blankets,
graveled or decomposed granite areas are to be placed, and unpaved gore areas between the edge
of pavement and planting areas as shown.
2. Weeds killed by hand pulling. Dispose of them the same day they are pulled.
3. Tumbleweeds. Dispose of them the same day they are pulled.
Dispose of weeds controlled by mowing that are outside of mulched areas, plant basins, ground cover
and within wildflower seeding areas.
Dispose of existing ground cover.
20-7.03B(3) After Initial Roadside Clearing
After the initial roadside clearing work is complete, additional roadside clearing work must be performed
as often as required to maintain the areas in a neat and presentable condition. Continue the work as
specified under initial roadside clearing until Contract acceptance or the start of the plant establishment
period. This work includes killing weeds in plant basins, including basin walls by hand pulling after the
plants have been planted.
Disposal of mowed material and weeds killed during the after initial roadside clearing is not required
except for:
1. Weeds killed from within areas where asphalt concrete surfacing, concrete surfacing, rock blankets,
graveled or decomposed granite areas are to be placed, and unpaved gore areas between the edge
of pavement and planting areas as shown.
2. Weeds killed by hand pulling. Dispose of them the same day they are pulled.
3. Tumbleweeds. Dispose of them the same day they are pulled.
Dispose of existing ground cover.
20-7.03C Prepare Planting Area
Prepare planting area includes:
1.
2.
3.
4.
5.

Preparing holes including constructing plant basins


Preparing trenches including constructing plant basins
Cultivating
W
eed germination
C
onstructing edging

20-7.03D Prepare Hole


The Engineer designates the ground location of all plants by directing the placing of the plants or placing
of stakes or other suitable markers.
Conduct work so the existing flow line in drainage ditches is maintained. Material displaced by your
operations that interferes with drainage must be removed.
Unless larger planting holes are specified, plants must be planted in holes large enough to receive the
root ball or the total length and width of roots, backfill, amendments and fertilizer. Where rock or other
hard material prohibits holes from being excavated, new holes must be excavated and the abandoned
holes backfilled.
Excavate planting holes by hand digging or by drilling. Do not use water for the excavation of planting
holes.
323

SECTION 20

LANDSCAPE

At locations shown, longitudinal basins must be formed by constructing a continuous dike on each side of
the planting line. Form cross checks to pond irrigation water around each plant.
Remove existing pavement shown where planting holes are to be excavated.
20-7.03E Prepare Trench
Center planting trenches on the planting line.
Unless otherwise described, the trench width and depth must be large enough to receive the plant roots

or root ball, soil amendments, and fertilizer.

Soil amendments, if specified to be added to the plants, must be added to the plant location of each plant

at the rate shown and thoroughly mixed with the trench soil.

Remove existing pavement shown where planting trenches are to be excavated.

20-7.03F Cultivate
Cultivation must be by mechanical methods and performed until the soil is in a loose condition to a
minimum depth of 6 inches. Soil clods must not be larger than 2 inches in maximum dimension after
cultivation.
The use of rubber-tired equipment will be permitted for cultivating operations provided the equipment
used completely eradicates any compaction caused by the tires. Rubber-tired equipment of any kind will
not be allowed on cultivated areas after cultivation.
The outer limits of the areas to be cultivated must extend 12 inches beyond the outer rows of plants

requiring cultivation, unless otherwise described.

Cultivate areas to be cultivated before adding soil amendment and fertilizer.

Add soil amendment and fertilizer at the rates shown.

Recultivate to thoroughly mix soil amendment and fertilizer with the soil.

Planting areas that have been cultivated and become compacted must be recultivated.

Rocks or debris encountered during soil preparation in planting areas must be brought to the surface of

the ground. Remove rocks or debris larger than 2 inches in maximum dimension unless otherwise

authorized.

Remove existing pavement shown where cultivation is to be done.

20-7.03G Weed Germination


Reserved
20-7.03H Edging
Construct edging as shown, including excavation and backfill.
Spike or stake spacing must comply with the manufacturer's instructions for use and site conditions.
Saw cut surfaces where (1) asphalt concrete or concrete surfacing must be removed to permit the
installation of edging and (2) no joint exists between the surfacing to be removed and the surfacing to
remain in place. The surfacing must be cut in a straight line to a minimum depth of 2 inches with a power
driven saw before the surfacing is removed.
20-7.03I Planting
20-7.03I(1) General
Planting work includes:
1. P
lanting plants
2. Applying or placing fertilizer, applying iron sulfate, adding soil amendment, and placing or spreading
mulch
3. S
taking plants
4. I nstalling turf sod
324

SECTION 20

LANDSCAPE

5. Watering
6. Installing foliage protector, root barrier, and root protector
7. Plant replacement
Do not begin planting until authorized.
Do not perform planting in an area until the functional test has been completed for the irrigation system
serving that area.
Adjust plant locations for trees and shrubs so no plant is closer than 8 feet to an impact, rotary gear
driven or pop-up type sprinkler.
Trees, shrubs, and vines planted within ground cover or cutting planting areas or both must be planted
before ground cover plants or cuttings are planted.
Where shrubs and ground covers are shown to be planted in groups, the outer rows directly adjacent to
the nearest roadway or highway fence must be parallel to the nearest roadway or highway fence. Stagger
shrubs and ground covers in adjacent rows. Adjustment in the number or alignment of plants must be
made between the outer rows.
Where vines are to be planted against walls or fences, plant as close as possible to the wall or fence.

Vines planted next to walls and fences must be staked and tied thereto as shown, at the time of planting.

Vines planted next to fences must be tied to the fence with plant tie material at the time of planting.

Core holes in concrete masonry block wall as shown.

Do not distribute more plants than can be planted and watered on that day.

Remove containers from plants when planting.

Remove containers from plants in such a manner that the ball of earth surrounding the roots is not

broken. Plant containers must not be cut before delivery of the plants to the planting area. Plant and

water plants immediately after removal from their containers.

Before planting, apply water to the backfill with a pipe or tube inserted into the bottom of the hole or

trench until the backfill material is saturated for the full depth.

Set plants in the backfill material in flat bottom holes to a depth so that after settlement of the backfill, the
backfill is 1 inch below the top of the root ball as shown. If the backfill material settles below this level
after planting and watering, add additional backfill to bring the backfill to the required level after planting.
Plants must be planted in such a manner that the roots are not restricted or distorted.

Any plant that has settled deeper than shown must be raised back to the required level after planting.

The Department rejects or suspends planting work if (1) planting is done in soil that is too wet, too dry or

not properly conditioned as specified or (2) planting is in a condition not generally accepted as

satisfactory for planting from a horticultural standpoint.

Backfill material for plant holes must be a mixture of native soil and soil amendment. Soil amendment

must be added at the rate shown. Thoroughly mix backfill material and uniformly distribute throughout the

entire depth of the plant hole without clods or lumps.

Remove nursery stakes after planting.

20-7.03I(2) Carpobrotus or Delosperma Cuttings for Plant Group H


Plant Carpobrotus cuttings to a depth where not less than 2 nodes are covered with soil. The basal end of
Delosperma cuttings must not be less than 2 inches below the surface of the soil and the basal end of
Carpobrotus cuttings must be not less than 4 inches below the surface of the soil.
Apply root stimulant to Delosperma cuttings before planting and apply root stimulant according to the
manufacturer's instructions.
325

SECTION 20

LANDSCAPE

Do not plant Carpobrotus or Delosperma cuttings in soil that does not contain sufficient moisture at an
average depth of 2 inches below the surface.
20-7.03I(3) Liner Plants for Plant Group M
Reserved
20-7.03I(4) Plug Plants for Plant Group P
Reserved
20-7.03I(5) Seedling Plants for Plant Group S
Reserved
20-7.03I(6) Fertilizer
Apply or place fertilizer at the time of planting, at the rate shown.
Slow-release, controlled-release or organic fertilizer required during planting as described, must be mixed
into the plant hole backfill a minimum depth of 2 inches near the root ball.
Packet fertilizer required during planting as described, must be placed in the backfill of each plant. Place
to within 6 to 8 inches of the ground surface and approximately 1 inch from the root ball. If more than 1
packet is required per plant, distribute the packets evenly around the root ball.
Fertilizer required during planting as described, must be applied to ground cover plants planted from
cuttings, plugs, or flats immediately after planting and watered into the soil.
20-7.03I(7) Foliage Protector
Install foliage protectors over the plants within 2 days after planting.
Install foliage protectors vertically and centered over the plant as shown. If foliage protectors are not
installed in plant basins, cut the bottom of the wire cylinder to match the slope of the ground. Do not leave
sharp points of wire after cutting. Sharp points must be bent over or blunted.
Install 2 support stakes for foliage protectors vertically and embed in the soil on opposite sides of the
plant as shown and in a transverse direction to the prevailing wind.
Either weave the support stakes through the wire cylinder mesh at 6 inch maximum centers or fasten the
wire cylinder to the support stakes at 6 inch maximum centers.
The wire cylinder must be snug against the support stakes but loose enough to be raised for pesticide
application or to perform weeding within the plant basin.
Install jute mesh cover over the foliage protector and secure with twine as shown.
20-7.03I(8) Iron Sulfate
Apply iron sulfate at the time of planting, at the rate shown.

Comply with the manufacturer's instructions.

Iron sulfate required during planting as described, must be evenly distributed within the plant basin and

mixed into the plant hole backfill a minimum depth of 2 inches.

20-7.03I(9) Ground Cover


Ground cover plants in areas with an irrigation system must be planted in blocks that comply with the
design of the irrigation system.
Each ground cover planting area covered by a single control valve must be completely planted and
watered before planting other ground cover planting areas.
Plant ground cover plants in moist soil, and in neat, straight rows, spaced as shown. Do not plant ground
cover plants closer than 5 feet to trees or shrubs, nor closer than 6'-6" to curbs, dikes, paved areas, walls,
and fences, unless shown.

326

SECTION 20

LANDSCAPE

20-7.03I(10) Mulch
Spread mulch placed in areas outside of plant basins to a uniform thickness as shown.
Mulch must be placed at the rate described and placed in the plant basins or spread in areas as shown
after the plants have been planted. Mulch placed in plant basins must not come in contact with the plant
crown and stem.
Spread mulch from the outside edge of the proposed plant basin or plant without basin to the adjacent
edges of shoulders, paving, retaining walls, dikes, curbs, sidewalks, walls, fences, and existing plantings.
If the proposed plant or plant without basin is 12 feet or more from the adjacent edges of shoulders,
paving, retaining walls, dikes, curbs, sidewalks, walls, fences, and existing plantings, spread the mulch 6
feet beyond the outside edge of the proposed plant basin or plant without basin.
Do not place mulch within 4 feet of the (1) flow line of earthen drainage ditches, (2) edge of paved
ditches, or (3) drainage flow lines.
20-7.03I(11) Watering
Plants must be watered immediately after planting. Water must be applied until the backfill soil around
and below the roots or ball of earth around the roots of each plant is thoroughly saturated. When watering
with a hose, an accepted nozzle, water disbursement device or pressure reducing device must be used.
Do not allow the full force of the water from the open end of the hose to fall within the basin around any
plant. Ground cover plants in areas provided with an irrigation system must be watered by sprinklers.
Several consecutive waterings may be necessary to thoroughly saturate the soil around each plant.
20-7.03I(12) Root Barrier
Reserved
20-7.03I(13) Root Protector
Install root protectors at the time the plant holes are being prepared as shown. Place root protectors in
the plant holes as shown.
20-7.03I(14) Turf Sod
Areas to be planted with sod must be cultivated.
Fine grade and roll areas to be planted with sod after completing cultivation, installation of irrigation
systems, and excavation and backfilling of plant holes. Grade to drain. Grade to a smooth and uniform
surface before placing sod.
Areas planted with sod adjacent to sidewalks, edging and other paved borders and surfaced areas must
be 1 inch below the finished surface elevation of the facilities, after fine grading, rolling, and settlement of
the soil.
Place sod such that the ends of adjacent strips of sod are staggered a minimum of 2 feet. Place edges
and ends of sod firmly against adjacent sod and against sidewalks, edging, and other paved borders and
surfaced areas.
Lightly roll the entire sodded area to eliminate air pockets and ensure close contact with the soil after
placement of sod. Water the sodded areas so that the soil is moistened to a minimum depth of 4 inches
after rolling. Do not allow the sod to dry out.
If irregular or uneven areas appear in the sodded areas, restore to a smooth and even appearance.
Turf sod edges, including edges adjacent to sidewalks, edging, and other paved borders and surfaced
areas, must be trimmed to a uniform edge not extending beyond the edge of turf or the facilities. Mowed
and trimmed growth must be removed.
20-7.03I(15) Plant Stakes and Ties
Plants to be staked must be staked at the time of planting as shown.
Install 2 plant stakes for each plant to be staked as shown, against but not through the root ball.

327

SECTION 20

LANDSCAPE

Tie the plant to the stakes with plant ties, 1 tie to each stake. Install ties at the lowest position that will
support the plant in an upright position. Ties must provide trunk flexibility but not allow the trunk to rub
against the stakes. Each tie must form a figure 8 by crossing the tie between the plant and the stake as
shown. The figure 8 must be formed twice. Wrap each end of the tie 1-1/2 turns around the stake and
securely tie.
The top of the stakes must have a minimum 4 inch clearance from the bottom of the tree crown where
applicable after installation of tree stakes.
20-7.03I(16) Replacement Plants
Plants that show signs of failure to grow at any time or are so injured or damaged as to render them
unsuitable for the purpose intended, must be removed, replaced, and replanted. Replace unsuitable
plants within 2 weeks after the Engineer marks or indicates that the plants must be replaced.
Replacement planting must comply with the original planting requirements, spacing, and size provisions
described for the plants being replaced.
Replacement ground cover plants must be the same species specified for the ground cover being
replaced. Other replacement plants must be the same species as the plants being replaced.
Place orders for replacement plants with the vendor at the appropriate time so that the replacement
plants are not in a root-bound condition.
The Department does not pay for replacement plants or the planting of replacement plants.
20-7.04 PAYMENT
Measure root barriers by the total length of the installed panels, measured parallel to the ground surface.
Items paid by the sq yd are calculated by actual or computed slope measurements.
Measurement for slow-release or controlled-release fertilizer, organic fertilizer, or iron sulfate is
determined from marked weight or sack count.
Mulch and soil amendment are measured in the vehicle at the point of delivery.
Cultivation area is measured from areas shown to be planted with plants requiring cultivation, plus the
area 12 inches beyond the outer row of plants in each area. Planting areas for plants within the cultivation
areas that do not require cultivation will not be deducted from the cultivation payment area.
Various sizes and types of plants are measured by either the product of the average plant density and the
total area planted or by actual count of the living plants in place, determined by the Engineer. The
average plant density is the number of living plants per sq yd determined from actual count of test areas
chosen representing the total planted area. The size and location of the test areas is determined by you
and the Engineer, except that the total area tested must be equal to not less than 3 percent nor more than
5 percent of the planted area being determined. The Engineer will make the final determination of the
areas to be tested.
Work described in this section is paid under bid items specified under section 20-7.02, except for
Roadside Clearing, Prepare Hole, Prepare Trench, Cultivate, and Weed Germination.
20-8 WILDFLOWER SEEDING
20-8.01 GENERAL
20-8.01A Summary
Section 20-8 includes specifications for planting wildflower seeds including mowing weeds, scarifying the
soil, incorporating fertilizer, and dry applying native wildflower seed to wildflower seeding areas shown.
Pesticides must not be used on wildflower seeding areas after the seed has been applied.
Comply with section 20-9.03F.
20-8.01B Submittals
Submittals must comply with section 21-1.01B.
328

SECTION 20

LANDSCAPE

20-8.01C Quality Control and Assurance


Quality control and assurance must comply with section 21-1.01C.
20-8.01D Site Conditions
The Engineer designates the extent of wildflower seeding areas by directing the placement of stakes or
other suitable markers in increments of 1 acre or less. Furnish tools, labor, materials, and transportation
required to mark areas receiving wildflower seeding.
20-8.02 MATERIALS
20-8.02A General
Reserved
20-8.02B Delivery, Storage, and Handling
Delivery, storage, and handling must comply with section 21-1.02B.
20-8.02C Seed
Seed must comply with section 21-1.02G.
20-8.02D Fertilizer
20-8.02D(1) Organic Fertilizer
Reserved
20-8.03 CONSTRUCTION
20-8.03A General
Reserved
20-8.03B Site Preparation
Immediately before applying wildflower seed to wildflower seeding areas, trash and debris must be
removed and weeds must be mowed as close to the ground as possible. Disposal of mowed material is
not required.
After mowing and just before seed application, wildflower seeding areas must be scarified to a minimum
depth of 1 inch.
20-8.03C Application
Apply seed and fertilizer at the rates shown and incorporate into the soil to a maximum depth of 1/4 inch
by raking, dragging, or drilling.
Watering of wildflower seeding areas is not required unless ordered. If ordered, watering is change order
work.
20-8.03D Maintenance
Reserved
20-8.04 PAYMENT
Wildflower seeding is measured by the area parallel to the ground surface.
20-9 PLANT ESTABLISHMENT WORK
20-9.01 GENERAL
20-9.01A Summary
Section 20-9 includes specifications for performing plant establishment work that consists of caring for the
highway planting, including watering plants, pruning plants, replacing damaged plants, weed, rodent and
pest control, and the operation and repair of all existing irrigation facilities used and irrigation facilities
installed as part of the new irrigation system.
20-9.01B Definitions
Type 1 plant establishment: Plant establishment period with the number of working days specified for
plant establishment beginning after all work has been completed except for plant establishment work
and other bid items specified to be performed until Contract acceptance.
329

SECTION 20

LANDSCAPE

Type 2 plant establishment: Plant establishment period with the number of working days specified for
plant establishment beginning after all planting work has been completed except for plant
establishment work and other bid items specified to be performed until Contract acceptance, provided
that the Contract must not be accepted unless the plant establishment work has been satisfactorily
performed for at least the number of working days specified for plant establishment.
If maintenance and protection relief is granted for a completed portion of the work under section 5
1.38, Type 2 plant establishment period for the completed portion of the work is the time between
completion of all planting work except for plant establishment work, and the granting of maintenance
and protection relief, provided that the relief must not be granted unless the plant establishment work
in the completed portion of the work has been satisfactorily performed for at least the number of
working days specified for the plant establishment period.
20-9.01C Submittals
20-9.01C(1) General
Submit seasonal watering schedules for use during the plant establishment period within 10 days after
the start of the plant establishment period. Remote irrigation control system watering schedule must
utilize the remote irrigation control system software program.
Submit updated watering schedules within 5 business days after any changes have been made to the
authorized schedules.
Submit a revised watering schedule for each irrigation controller not less than 30 days before completion
of the plant establishment period.
20-9.01C2) Notification
The Engineer will notify you in writing when the plant establishment period begins and will furnish
statements regarding the number of working days credited to the plant establishment period after the
notification.
Notify the Engineer at least 5 business days before applying each application of fertilizer.
20-9.02 MATERIALS
20-9.02A General
Reserved
20-9.02B Fertilizer
Fertilizer must comply with section 20-7.02D(1)(b) and 20-7.02D(1)(d).
20-9.03 CONSTRUCTION
20-9.03A General
Working days on which no work is required, as determined by the Engineer, will be credited as a plant
establishment working day, regardless of whether or not you perform plant establishment work.
Working days whenever you fail to adequately perform plant establishment work will not be credited
toward the plant establishment working days.
Remove trash and debris.
Surplus earth accumulated in roadside clearing and planting areas must be removed.
20-9.03B Plant Growth Control
Prune plants planted as part of the Contract as authorized.
Remove plant growth that extends within 2 feet of sidewalks, curbs, dikes, shoulders, walls or fences.
Remove proposed and existing ground cover from within the plant basins, including basin walls, turf
areas, and planting areas within edging.
Vines next to walls and fences must be kept staked and tied. Train vines on fences and walls or through
cored holes in walls.
330

SECTION 20

LANDSCAPE

20-9.03C Fertilizer
Apply fertilizer to the plants as specified and water into the soil after each application.

Apply fertilizer at the rates shown and spread with a mechanical spreader, whenever possible.

20-9.03D Weed Control


Weeds in roadside clearing and planting areas as described must be controlled as specified in section 207.03B.
A growth regulator may be applied to weed growth in mowed areas. Growth regulator must be applied
before the weeds reach the seed stage of growth or exceed 6 inches in length, whichever occurs first.
Where pesticides are used to kill weeds, weeds must be killed before they reach the seed stage of growth
or exceed 4 inches in length, whichever occurs first.
Where weeds are to be mowed, mow weeds before they reach the seed stage of growth or exceed 6
inches in length, whichever occurs first. Mow weeds to a height of 3 inches. Disposal of mowed weeds is
not required. Remove trash and debris before mowing.
Where weeds are to be killed by hand pulling, weeds must be hand pulled before they reach the seed
stage of growth or exceed 4 inches in length, whichever occurs first, except for tumbleweeds. Dispose of
weeds the same day they are pulled.
Tumbleweeds are to be killed by hand pulling before the tumbleweeds reach the seed stage of growth or
exceed 6 inches in length, whichever occurs first. Dispose of tumbleweeds the same day they are pulled.
Remove dead weed growth if the Engineer determines it will interfere with subsequent plant
establishment or become unsightly.
Perform weed control to maintain the highway in a neat and presentable condition.
20-9.03E Rodent and Pest Control
Control rodents and pests.
20-9.03F Wildflower Seeding Restrictions
The Engineer notifies you of the start of the plant establishment period if (1) wildflower seeding cannot be
performed within the time limits specified and (2) the Engineer determines that the work except for
wildflower seeding and plant establishment work has been completed.
Wildflower seeding that is not performed before the start of the plant establishment period must be
performed during the plant establishment period at a time determined by the Engineer.
Plant establishment work, except for mowing, is not required for wildflower seeding areas after sowing
wildflower seed. Mow after wildflower seeds have set and the wildflowers have started to die back. Mow
wildflowers to a height of 3 inches. Remove trash and debris before mowing.
20-9.03G Plant Staking
Replace the plant stakes that are inadequate to support plants with larger stakes at your expense if
authorized.
Remove plant stakes when the Engineer determines they are no longer needed.
20-9.03H Replacement Plants
Replacement plants must comply with section 20-7.03I(16).
Replacement of plants up to and including the 125th plant establishment working day must be with a plant
of the same size as originally specified. Plants of a larger container size than those originally specified for
replacement plants may be used during the first 125 working days of the plant establishment period.
Replacement of plants after the 125th plant establishment working day must comply with the following
size requirements:

331

SECTION 20

LANDSCAPE

Plant size
(Original)
Pot/liner/plug/
seedling
No. 1 container
No. 5 container

Plant size
(Replacement)
No. 1 container
No. 5 container
No. 15 container

Other replacement plants must be the same size as originally specified.

Replacement ground cover plants must comply with the following spacing requirements:

Original
spacing
(inches)

9
12
18
24
36

On center spacing of replacement ground cover


plants
(inches)
Number of completed plant establishment
working days
1125
126190
191End of
plant
establishment
period
9
6
6
12
9
6
18
12
9
24
18
12
36
24
18

20-9.03I Watering
Operate the electric automatic irrigation systems in the automatic mode unless authorized.
If any component of the electric automatic irrigation system is operated manually, the day will not be

credited as a plant establishment working day unless the manual operation is authorized.

Water plants utilizing the remote irrigation control system software program unless authorized.

Implement the watering schedule program not less than 10 working days before completion of the plant

establishment period.

20-9.03J Miscellaneous Plant Establishment Work


Mow and trim turf areas. Dispose of mowed and trimmed material.
If irregular or uneven areas appear within turf areas, restore to a smooth and even appearance. Re-seed
turf seed areas.
Remove the tops of foliage protectors if plants become restricted.
Remove foliage protectors, including support stakes, within 20 working days before the completion of the
plant establishment period.
Keep plant basin walls well formed.
Clean new wye strainers and existing wye strainers that are a part of the new irrigation system annually
until the completion of the plant establishment period. The last cleaning must be done within 15 working
days before the completion of the plant establishment period.
Remove, clean, and reinstall new filters and existing filters that are a part of the new irrigation system
annually until the completion of the plant establishment period. The last cleaning must be done within 15
working days before the completion of the plant establishment period.

332

SECTION 20

LANDSCAPE

20-9.03K Training
Provide training by a qualified person on the use and adjustment of the irrigation controllers installed, 30
working days before completion of the plant establishment period.
20-9.03L Final Inspection
Complete the final inspection not more than 30 working days and not less than 20 working days before
the completion of the plant establishment period.
20-9.04 PAYMENT
Not Used
20-10 DECOMPOSED GRANITE
20-10.01 GENERAL
20-10.01A Summary
Section 20-10 includes specifications for placing and stabilizing decomposed granite as shown.
20-10.01B Submittals
Submit the following:
1. Product data including the manufacturer's product sheet together with the instructions for installing
the filter fabric and solidifying emulsion.
2. Certificates of compliance for the following items at least 5 business days before delivery of the
materials to the job site:
2.1. Filter fabric.
2.2. Solidifying emulsion.
3. Five pound sample of the decomposed granite.
20-10.01C Quality Control and Assurance
20-10.01C(1) Test Plot
Construct a test plot at least 3 by 12 feet at a location designated by the Engineer. Notify the Engineer not
less than 7 days before constructing the test plot. Construct the test plot with the same materials, tools,
equipment, and methods to be used in the final placement of the decomposed granite.
The test plot must be constructed so that the decomposed granite is (1) mixed with the solidifying
emulsion and water under the manufacturers rates and instructions and (2) compacted to a relative
compaction of not less than 90 percent. If ordered, construct additional test plots. Additional test plots are
change order work.
Obtain authorization of the test plot before placing the decomposed granite. Use the authorized test plot
as the standard for comparison in determining acceptability of the decomposed granite. If the test plot is
not incorporated into the work and the Engineer determines it is no longer needed, remove of it.
20-10.02 MATERIALS
20-10.02A General
Reserved
20-10.02B Soil Sterilant
Soil sterilant must be oxadiazon granular preemergent and must comply with section 20-1.02B.
20-10.02C Edging
Edging and stakes must comply with section 20-7.02D(5).
20-10.02D Aggregate Base
Aggregate base must comply with the 3/4-inch maximum, aggregate grading under section 26-1.02B.
20-10.02E Filter Fabric
Filter fabric must be Class A.

333

SECTION 20

LANDSCAPE

20-10.02F Fasteners
Staples for filter fabric must comply with section 21-1.02R.
20-10.02G Decomposed Granite
Reserved
20-10.02H Solidifying Emulsion
Solidifying emulsion must be either a water-based polymer or nontoxic organic powdered binder
specifically manufactured to harden decomposed granite. The solidifying emulsion must not alter the
decomposed granite color.
20-10.03 CONSTRUCTION
20-10.03A General
Reserved
20-10.03B Earthwork
Earthwork must comply with section 19.
Excavate areas to receive decomposed granite to the depth shown after clearing. Where decomposed
granite is to be placed adjacent to existing curbs, dikes, pavement, sidewalks or sound walls, excavate so
that the finished decomposed granite elevation adjacent to those items will maintain the planned flow
lines, slope gradients, and contours of the job site. After excavation, grade subgrade to receive
decomposed granite to a smooth, uniform surface, and compact to not less than 90 percent relative
compaction.
20-10.03C Treatment of Soil
Sterilize areas with oxadiazon after compaction. Apply soil sterilant at the maximum label rate. Do not
apply soil sterilant more than 12 inches beyond the decomposed granite limits. The soil sterilant
application and decomposed granite placement must be completed in these areas within the same work
day.
20-10.03D Edging
Install edging to delineate the limits of the decomposed granite areas. Edging will not be required
between decomposed granite areas and the adjacent face of sound walls, pavement edges, curbs, dikes
or rock blanket areas.
20-10.03E Aggregate Base
Spread and compact aggregate base as specified under section 26-1.03C and section 26-1.03D.
20-10.03F Filter Fabric
Immediately before placing filter fabric, surfaces to receive filter fabric must be free of loose or extraneous
material and sharp objects that may damage the filter fabric during installation.
Align fabric and place in a wrinkle-free manner.
Overlap adjacent rolls of the fabric from 12 to 18 inches. Spread each overlapping roll in the same
direction. Fasten fabric with staples flush with the fabric to prevent movement of fabric by placement of
decomposed granite.
Repair or replace fabric damaged during placement of decomposed granite with sufficient fabric to
comply with overlap requirements.
20-10.03G Decomposed Granite
Do not place decomposed granite during rainy conditions.
Mix solidifying emulsion thoroughly and uniformly throughout the decomposed granite and under the
manufacturer's instructions. Mix the material in the field using portable mixing equipment, or delivered in
mixer trucks from a local ready-mixed plant.

334

SECTION 20

LANDSCAPE

Place decomposed granite uniformly in layers no more than 1-1/2 inch thick. Compact each layer of
decomposed granite to a relative compaction of not less than 90 percent. Compaction must not begin less
than 6 hours or more than 48 hours after placement.
Apply a final application of solidifying emulsion as recommended by the manufacturer. Prevent runoff or
overspray of solidifying emulsion onto adjacent paved or planting areas.
The finished decomposed granite surface must be smooth and uniform, compacted to a relative
compaction of not less than 90 percent, maintaining original flow lines, slope gradients, and contours of
the job site.
20-10.04 PAYMENT
Decomposed granite is measured parallel to the decomposed granite surface.
20-11 GRAVEL MULCH
20-11.01 GENERAL
20-11.01A Summary
Section 20-11 includes specifications for placing gravel mulch as shown.
20-11.01B Submittals
Submit the following:
1. Product data including the manufacturer's product sheet and the instructions for installing the filter
fabric
2. Certificate of compliance for filter fabric at least 5 business days before delivery of the material to the
job site
3. Five pound sample of the gravel mulch
20-11.02 MATERIALS
20-11.02A General
Reserved
20-11.02B Soil Sterilant
Soil sterilant must be oxadiazon granular preemergent and must comply with section 20-1.02B.
20-11.02C Edging
Edging and stakes must comply with section 20-7.02D(5).
20-11.02D Aggregate Base
Aggregate base must comply with 3/4 inch maximum, aggregate grading under section 26-1.02B.
20-11.02E Filter Fabric
Filter fabric must be Class A.
20-11.02F Fasteners
Staples for filter fabric must comply with section 21-1.02R.
20-11.02G Gravel Mulch
Reserved
20-11.03 CONSTRUCTION
20-11.03A General
Reserved
20-11.03B Earthwork
Earthwork must comply with section 19.
Excavate areas to receive gravel mulch to the depth shown after clearing. Where gravel mulch is to be
placed adjacent to existing curbs, dikes, pavement, sidewalks or sound walls, excavate so that the
335

SECTION 20

LANDSCAPE

finished gravel mulch elevation adjacent to those items will maintain the planned flow lines, slope
gradients, and contours of the job site. After excavation, grade subgrade to receive gravel mulch to a
smooth, uniform surface, and compact to not less than 90 percent relative compaction.
20-11.03C Treatment of Soil
Sterilize areas with oxadiazon after compaction. Apply soil sterilant at the maximum label rate. Do not
apply soil sterilant more than 12 inches beyond the gravel mulch limits. The soil sterilant application and
gravel mulch placement must be completed in these areas within the same work day.
20-11.03D Edging
Install edging to delineate the limits of the gravel mulch areas. Edging is not required between gravel
mulch areas and the adjacent face of sound walls, pavement edges, curbs, dikes or rock blanket areas.
20-11.03E Aggregate Base
Spread and compact aggregate base as specified under section 26-1.03C and section 26-1.03D.
20-11.03F Filter Fabric
Immediately before placing filter fabric, surfaces to receive filter fabric must be free of loose or extraneous
material and sharp objects that may damage the filter fabric during installation.
Align fabric and place in a wrinkle-free manner.
Overlap adjacent rolls of the fabric from 12 to 18 inches. Spread each overlapping roll in the same
direction. Fasten fabric with staples flush with the fabric to prevent movement of fabric by placement of
gravel mulch.
Repair or replace fabric damaged during placement of gravel mulch with sufficient fabric to comply with
overlap requirements.
20-11.03G Gravel Mulch
Do not place gravel mulch during rainy conditions.

Place gravel and compact by rolling.

The finished gravel mulch surface must be smooth and uniform, maintaining original flow lines, slope

gradients, and contours of the job site.

20-11.04 PAYMENT
Gravel mulch is measured parallel to the gravel mulch surface.
20-12 ROCK BLANKET
20-12.01 GENERAL
20-12.01A Summary
Section 20-12 includes specifications for placing rock blanket as shown.
20-12.01B Submittals
Submit a 1 sq yd sample of the various rock sizes.
20-12.02 MATERIALS
20-12.02A General
Reserved
20-12.02B Soil Sterilant
Soil sterilant must be oxadiazon granular preemergent and must comply with section 20-1.02B.
20-12.02C Concrete
Concrete must comply with the specifications for minor concrete and have a maximum aggregate size of
3/4 inch.

336

SECTION 20

LANDSCAPE

20-12.02D Rock
Reserved
20-12.02E Mortar
Mortar must comply with section 51-1.02F.
20-12.03 CONSTRUCTION
20-12.03A General
Reserved
20-12.03B Earthwork
Earthwork must comply with section 19.
Excavate areas to receive rock blanket to the depth shown after clearing. Where rock blanket is to be
placed adjacent to existing curbs, dikes, pavement, sidewalks or sound walls, excavate so that the
finished rock blanket elevation adjacent to those items will maintain the planned flow lines, slope
gradients, and contours of the job site. After excavation, grade subgrade to receive rock blanket to a
smooth, uniform surface, and compact to not less than 90 percent relative compaction.
20-12.03C Treatment of Soil
Sterilize areas with oxadiazon after compaction. Apply soil sterilant at the maximum label rate. Do not
apply soil sterilant more than 12 inches beyond the rock blanket limits. The soil sterilant application and
rock blanket placement must be completed in these areas within the same work day.
20-12.03D Placement
Place concrete as shown.

Rock must be placed while concrete is still plastic.

Space rocks a maximum of 1/2 inch apart.

Rocks must have a 1 inch maximum separation between the top of adjacent rock surfaces.

Remove concrete adhering to the exposed surfaces of the rock.

Loose rocks, or rocks with a gap greater than 3/8 inch, must be reset by methods accepted by the

Engineer. The rock gap is measured from the edge of the rock to the surrounding concrete bedding.

Place mortar as shown.

20-12.04 PAYMENT
Rock blanket is measured parallel to the rock blanket surface.
20-13 ROCK STAINING
20-13.01 GENERAL
20-13.01A Summary
Section 20-13 includes specifications for applying stain to the exterior surface of landscape boulders,
native rock that has been damaged or scarred, rock energy dissipaters, rock slope protection and gabion
surfaces.
20-13.01B Submittals
Submit the following:
1. Work plan showing methods to control overspray and spillage, and to protect adjacent surfaces
2. Product data including the manufacturer's product sheet and the instructions for the application of the
stain

337

SECTION 20

LANDSCAPE

20-13.01C Quality Control and Assurance


20-13.01C(1) Test Plot
Apply stain to a test plot rock area not less than 3 by 3 feet at a location designated by the Engineer.
Notify the Engineer not less than 7 days before staining the test plot. Prepare and stain the test plot with
the same materials, tools, equipment, and methods to be used in staining final surfaces. Separate test
plots are required for staining rock slope protection and native rock. If ordered, prepare additional test
plots. Additional test plots are change order work.
Obtain authorization of the test plot before staining surfaces. Use the authorized test plot as the standard
for comparison in determining acceptability of staining. If the test plot is not incorporated into the work and
the Engineer determines it is no longer needed, remove of it.
20-13.02 MATERIALS
20-13.02A General
Reserved
20-13.02B Stain
Reserved
20-13.03 CONSTRUCTION
20-13.03A General
Reserved
20-13.03B Application
Before applying stain, the areas to be stained must be identified and authorized.
Remove oils, dirt, and other contaminants and then dry surfaces before staining.
After areas to be stained have been identified, prepared, and test plot authorized, stain exposed surfaces
under the manufacturer's instructions to achieve a color consistent with, or as close as possible to, the
authorized test area color.
Control overspray and protect adjacent surfaces.
Stained surfaces must be kept dry for a minimum of 20 days following the application of stain.
20-13.04 PAYMENT
Rock stain areas are measured along the slope face.
20-14 WILLOW CUTTINGS FOR PLANT GROUP W
20-14.01 GENERAL
20-14.01A Summary
Section 20-14 includes specifications for obtaining, transporting, preparing planting holes, and planting
willow cuttings.
20-14.01B Submittals
Submit the following:
1. Work plan for maintaining willow cuttings
2. Product data including a copy of the root stimulant manufacturer's product sheet and the instructions
for the application of the root stimulant
20-14.02 MATERIALS
20-14.02A General
Reserved

338

SECTION 20

LANDSCAPE

20-14.02B Willow Cuttings for Plant Group W


Take cuttings from areas shown or designated by the Engineer. Take cuttings at random from healthy,
vigorous plants. Do not cut more than 50 percent of the plants in an area. Do not cut more than 25
percent of an individual plant. Make cuts with sharp, clean tools.
A cutting must be:
1. Reasonably straight
2. 20 to 24 inches in length
3. 3/4 to 1-1/2 inch in diameter at the base of the cutting
The top of each cutting must be cut square above a leaf bud. The base must be cut below a leaf bud at

approximately a 45 degree angle.

Trim off leaves and branches flush with the stem of the cutting.

Keep cuttings wet until planted.

20-14.02C Packet Fertilizer


Comply with the specifications for packet fertilizer under section 20-7.02D(1)(c).
20-14.02D Root Stimulant
Reserved
20-14.03 CONSTRUCTION
20-14.03A General
Reserved
20-14.03B Planting
Before planting, remove trash, debris, and weeds within an area 2 feet in diameter centered at each
proposed planting location as shown. Pesticides must not be used for weed control within the 2 foot
diameter.
Plant cuttings within 48 hours after cutting. Cuttings not planted within 48 hours after cutting or allowed to
dry out must not be used.
Planting holes must be made perpendicular to the ground line and must be formed with a steel bar or
excavated by the use of an auger, post hole digger, or similar tools. Plant holes must be large enough to
receive the cuttings and planted to the specified depths without damaging the bark.
Where rock or other hard material prohibits the excavation of the planting holes, excavate new holes and
backfill the unused holes.
If the soil in and around the plant hole is not wet before planting, the soil must be watered and kept wet
until the cuttings are planted.
Apply root stimulant according to the manufacturer's instructions.
Plant the base of the cutting from 10 to 12 inches deep and have from 3 to 5 bud scars exposed above
the ground. If more than 5 bud scars are exposed, remove the excess scars by pruning.
Place 1 fertilizer packet in the backfill of each cutting. Place to within 6 to 8 inches of the ground surface
and approximately 1 inch from the cutting.
After planting, the plant holes must be backfilled with excavated material. The excavated material must be
distributed evenly within the hole without clods, lumps, or air pockets. Compact the backfill without
damaging the cutting's bark. Compaction must be enough so that the cutting is prevented from being
easily removed from the soil.
Dispose of trimmings, prunings, and unused cuttings.
Replace dead cuttings under section 20-7.03I(16).
339

SECTION 20

LANDSCAPE

20-14.03C Maintain Planted Willow Cuttings


Reserved
20-14.04 PAYMENT
Willow cuttings are measured from actual count in place. No payment is made for unused cuttings and
replacement cuttings.
20-15 SITE FURNISHINGS
Reserved

340

21 EROSION CONTROL

21-1.01 GENERAL
21-1.01A Summary
Section 21 includes specifications for applying permanent erosion control measures to the soil surface.
The Engineer designates the extent of erosion control areas by directing the placement of stakes or other
suitable markers in increments of 1 acre or less. Furnish tools, labor, materials, and transportation
required to mark areas receiving erosion control treatments.
Move-in/move-out for erosion control includes (1) moving onto the project when the Engineer determines
an area is ready to receive erosion control materials, (2) setting up all required personnel and equipment,
and (3) moving out all personnel and equipment when work in that area is complete.
21-1.01B Submittals
Submit a certificate of compliance for tackifier, bonded fiber matrix, and polymer-stabilized fiber matrix at
least 5 business days before application. Certificates of compliance must include:
1. Material Safety Data Sheet
2. P
roduct label
3. List of applicable nonvisible pollutant indicators for soil amendment and stabilization products as
shown in the table titled "Pollutant Testing Guidance Table" in the Caltrans Construction Site
Monitoring Program Guidance Manual
4. Report of acute and chronic toxicity tests on aquatic organisms conforming to EPA methods
5. List of ingredients, including chemical formulation
6. Properties of polyacrylamide in tackifier including (1) percent purity by weight, (2) percent active
content, (3) average molecular weight, and (4) charge density
Submit a certificate of compliance for straw, fiber, RECP, and fasteners before application.
At least 60 days before seed application, submit proof that the order for seed required for the Contract
has been placed and accepted by the seed vendor. Include the seed's botanical names, quantity ordered,
and the anticipated date of delivery.
Submit the compost producer's Compost Technical Data Sheet including test results and Seal of Testing
Assurance certificate before application.
Submit a copy of the Analysis Report for each seed species before application.
Submit quality control records for hydraulically applied erosion control materials that indicate (1)
compliance with the specified application rates, (2) areas treated and quantity of materials applied, and
(3) application date and time.
21-1.01C Quality Control and Assurance
Obtain seed from lots that have been tested for purity and germination by a seed laboratory certified by
the Association of Official Seed Analysts or by a seed technologist certified by the Society of Commercial
Seed Technologists. Tests must be performed not more than 12 months before application.
Seed must not contain prohibited noxious weed seed or more than 1.0 percent total weed seed by weight.
Provide seed labels from the seed supplier that indicate:
1.
2.
3.
4.
5.
6.

Seed variety including botanical name and common name


Lot number or other lot identification
Origin
Net weight
Percent pure live seed
Percent total viability, which is equal to the sum of the percent germination, percent hard seed, and
the percent dormant seed
7. Percent by weight inert matter
8. Percent by weight other crop seed
9. Percent by weight weed seed
341

SECTION 21

EROSION CONTROL

10. Name of restricted noxious weed seed by number per pound of seed
11. Name and address of the supplier or grower responsible for the analysis
Compost producers must be permitted by the California Department of Resources Recycling and
Recovery, Local Enforcement Agencies, and any other State and local agencies that regulate solid waste
facilities. If exempt from State permitting requirements, the composting facility must certify it complies with
the guidelines and procedures for production of compost under the environmental health standards of CA
Code of Regs 17868.117868.4.
Compost producers must be participants in the United States Composting Council's Seal of Testing
Assurance program.
21-1.02 MATERIALS
21-1.02A General
Reserved
21-1.02B Delivery, Storage, and Handling
Deliver seed to the job site in unopened, separate containers with the seed tag attached.
The Engineer takes a sample of approximately 1 ounce or 1/4 cup of seed for each seed lot greater than
2 pounds. At the time of seed sampling, provide the Engineer with a glassine-lined bag and custody seal
tag for each seed lot sample.
Deliver fertilizer in labeled containers showing weight, chemical analysis, and name of the manufacturer.
Furnish RECP in suitable wrapping to protect against moisture and extended ultraviolet exposure
occurring before placement. Label RECP to provide identification sufficient for inventory and quality
control purposes.
21-1.02C Duff
Duff must consist of vegetation removed and collected from clearing and grubbing activities. Vegetation
may include trees, shrubs, ground cover, grasses, bark, leaves, and roots with attached soil.
Process vegetation into duff by tub grinding or chipping it into pieces not exceeding 6 inches in any
dimension.
Stockpile duff until work area to receive duff is complete. Duff stockpiles must not exceed 5 feet in height.
21-1.02D Topsoil
Obtain topsoil from sources within or outside the job site as shown.
Topsoil must comply with the following requirements:
1. Local topsoil must conform to the requirements for selected material in section 19 and consists of (1)
excavating topsoil, including organic material and leaf litter, in designated areas to the depth
indicated, (2) stockpiling the soil on site, and (3) maintaining the stockpile until the material is reused
in the work.
2. Imported topsoil must consist of fertile, friable soil of loamy character that contains organic matter in
amounts natural to the region and be capable of sustaining healthy plant life. Imported topsoil must
be free from deleterious substances such as litter, refuse, toxic waste, stones larger than 1 inch in
size, coarse sand, heavy or stiff clay, brush, sticks, grasses, roots, noxious weed seed, weeds, and
other substances detrimental to plant, animal, and human health.
21-1.02E Fiber
Fiber must be wood fiber, cellulose fiber, alternate fiber, or a combination of these fibers.
Wood fiber must be a long strand, whole wood fiber thermomechanically processed from clean whole
wood chips.
Celullose fiber must be made from natural or recycled pulp fiber, such as wood chips, sawdust, newsprint,
chipboard, corrugated cardboard, or a combination of these materials.
342

SECTION 21

EROSION CONTROL

Alternate fiber must be a long strand, whole natural fiber made from clean straw, cotton, corn, or other
natural feed stock.
Fiber must:
1.
2.
3.
4.
5.

6.
7.
8.
9.
10.

Disperse into a uniform slurry when mixed with water.


Contain 3/4-inch fiber strands for at least 25 percent by total volume.
Have at least 40 percent retained when passed through a no. 25 sieve.
Have an initial moisture content of no more than 15 percent of its dry weight when tested under CA
Test 226. The moisture content must be marked on the packaging.
Have a water holding capacity, by weight, of at least 1,200 percent when tested under the procedure
designated in the Department's Final Report, CA-DOT-TL-2176-1-76-36, "Water Holding Capacity for
Hydromulch," available from METS.
Be nontoxic to plants and animal life.
Be free of synthetic or plastic materials, lead paint, printing ink, varnish, petroleum products, seed
germination inhibitors, and chlorine bleach.
Contain less than 250 ppm of boron.
Contain less than 7 percent ash when tested under Technical Association of the Pulp and Paper
Industry, TAPPI Standard T 413.
Be colored to contrast with the area on which the fiber is to be applied. The coloring agent must be
biodegradable, nontoxic, and free from copper, mercury and arsenic and must not stain concrete or
painted surfaces.

Fiber for temporary hydraulic mulch must be at least 50 percent wood fiber. The remaining percentage
must be cellulose fiber, alternate fiber, or a combination.
Fiber for temporary bonded fiber matrix and bonded fiber matrix must be 100 percent wood fiber and
comply with the requirements for fiber except the sieve requirement must be at least 50 percent retained
on a no. 25 sieve.
Fiber for polymer stabilized fiber matrix must be at least 50 percent wood fiber. The remaining percentage
must be cellulose fiber, alternate fiber, or a combination.
21-1.02F Tackifier
21-1.02F(1) General
Tackifier must be (1) free from growth or germination inhibiting factors, (2) nonflammable, (3) nontoxic to
aquatic organisms, and (4) functional for a minimum of 180 days.
General purpose tackifier may be either a plant based product or a polymeric emulsion blend as follows:
1. Plant based tackifier must be a natural high molecular weight polysaccharide, a high viscosity
hydrocolloid that is miscible in water, and labeled as either guar, psyllium, or starch, as follows:
1.1. Guar gum based product must be derived from the ground endosperm of the guar plant,
Cyanmopsis tetragonolobus. It must be treated with dispersing agents for easy mixing. It must
be able to be diluted at the rate of 1 to 5 pounds per 100 gallons of water.
1.2. Psyllium based product must be manufactured from the finely ground, mucilloid coating of
Plantago ovata or Plantago ispaghula seeds and able to dry and form a firm but rewettable
membrane.
1.3. Starch based product must be a nonionic, water-soluble, granular material derived from corn,
potato, or other plant-based source.
2. Polymeric emulsion blend tackifier must be a prepackaged liquid or dry powder, anionic formulation
with a residual monomer content not exceeding 0.05 percent by weight. The tackifier must contain
and be labeled with one of the following as the primary active ingredients:
2.1. Acrylic copolymers and polymers.
2.2. Polymers of methacrylates and acrylates.
2.3. Copolymers of sodium acrylates and acrylamides.
2.4. Polyacrylamide and copolymer of acrylamide.
2.5. Hydrocolloid polymers.

343

SECTION 21

EROSION CONTROL

21-1.02F(2) Polymer Stabilized Fiber Matrix Tackifier


Tackifier for polymer stabilized fiber matrix must be:
1. A liquid formulation with polyacrylamide as the primary active ingredient with the following
requirements:
1.1. Linear, anionic copolymer of acrylamide and sodium acrylate.
1.2. Anionic with a residual monomer content that is at most 0.05 percent by weight.
2. Formulated and labeled as one of the following:
2.1. Water-in-oil emulsion containing at least 2.6 pounds of pure polyacrylamide per gallon. Pure
polyacrylamide must be at least 30 percent active.
2.2. Liquid dispersed polyacrylamide containing at least 4.4 pounds pure polyacrylamide per gallon.
Pure polyacrylamide must be at least 35 percent active.
21-1.02F(3) Bonded Fiber Matrix Tackifier
Tackifier for bonded fiber matrix must:
1. Be bonded to the fiber or prepackaged with the fiber by the manufacturer
2. Contain a minimum of 10 percent of the combined weight of the dry fiber, activating agents, and
additives
3. Be an organic, high viscosity colloidal polysaccharide with activating agents or a blended
hydrocolloid-based binder
21-1.02G Seed
Seed with a germination rate lower than the minimum rate shown may be used if authorized.
Measure and mix individual seed species in the presence of the Engineer before applying seed.
21-1.02H Fertilizer
Fertilizer must comply with the material specifications for fertilizer in section 20-7.02D(1).
21-1.02I Straw
Straw must be stalks from wheat, rice, or barley furnished in air-dry condition with a consistency
compatible for application with commercial straw-blowing equipment. Wheat and barley straw must be
derived from irrigated crops.
Straw must be free of plastic, glass, metal, rocks, and refuse or other deleterious material.
Straw must have not have been used for stable bedding.
21-1.02J Polymer Stabilized Fiber Matrix
Polymer stabilized fiber matrix must be a hydraulically applied material composed of fiber and tackifier
and may also include seed and fertilizer as shown.
21-1.02K Bonded Fiber Matrix
Bonded fiber matrix must be a hydraulically-applied material composed of fiber and tackifier and may also
include seed and fertilizer as shown.
21-1.02L Hydraulically Applied Erosion Control Products
Reserved
21-1.02M Compost
Compost must be derived from one or a combination of the following types of materials:
1. Green material consisting of chipped, shredded, or ground vegetation or clean, processed, recycled
wood products
2. Biosolids
3. M
anure
4. Mixed food waste

344

SECTION 21

EROSION CONTROL

Compost must not be derived from mixed, municipal solid waste and must not contain paint, petroleum
products, pesticides or other chemical residues harmful to plant or animal life. Materials must be
composted to reduce weed seeds, pathogens, and deleterious materials under 14 CA Code of Regs
17868.3.
Metal concentrations in compost must not exceed the maximum listed under 14 CA Code of Regs
17868.2.
Compost must comply with the requirements shown in the following table:
Property
pH

Soluble salts

Moisture content

Organic matter
content
Maturity

Stability

Particle size:
fine compost

Particle size:
medium compost

Particle size:
coarse compost

Pathogen

Pathogen

Physical
contaminants

Physical
contaminants

Compost
Test method a
TMECC 04.11-A
Elastomeric pH 1:5 slurry method
pH
TMECC 04.10-A
Electrical conductivity 1:5 slurry method
dS/m (mmhos/cm)
TMECC 03.09-A
Total solids & moisture at 70 5 C
% wet weight basis
TMECC 05.07-A
Loss-on-ignition organic matter method (LOI)
% dry weight basis
TMECC 05.05-A
Germination and vigor
Seed emergence
Seedling vigor
% relative to positive control
TMECC 05.08-B
Carbon dioxide evolution rate
mg CO2-C/g OM per day
TMECC 02.02-B Sample sieving for aggregate
Size classification % dry weight basis
Pass 5/8-inch sieve
Pass 3/8-inch sieve
Maximum particle length: 6 inches
TMECC 02.02-B sample sieving for aggregate
Size classification % dry weight basis
Pass 2-inch sieve
Pass 1-inch sieve (minimum 70% retained)
Maximum particle length: 6 inches
TMECC 02.02-B sample sieving for aggregate
Size classification % dry weight basis
Pass 2-1/2-inch sieve
Pass 3/8-inch sieve (minimum 60% retained)
Maximum particle length: 6 inches
TMECC 07.01-B
Salmonella
< 3 MPN per 4 grams, dry weight basis
TMECC 07.01-B
Fecal coliform bacteria
< 1,000 MPN per gram, dry weight basis
TMECC 02.02-C Man-made inert removal and
classification:
Plastic, glass, and metal
% > 4 mm fraction
TMECC 02.02-C
Man-made inert removal and classification:
345

Requirement
68.5

010

3060

40100

-80 or above
80 or above

8 or below
min
max
95%
70%

---

min

max

95%
--

30%

min

max

99%
--

40%

--

--

pass

pass

combined total:
< 1.0

none detected

SECTION 21

EROSION CONTROL

Sharps (sewing needles, straight pins and


hypodermic needles)
% > 4mm fraction
a
TMECC refers to "Test Methods for the Examination of Composting and Compost," published
by the United States Department of Agriculture and the United States Compost Council (USCC).

21-1.02N Reserved
21-1.02O Rolled Erosion Control Products
21-1.02O(1) General
RECP must be a long-term, degradable, open-weave textile manufactured or fabricated into rolls
designed to reduce soil erosion and assist in the growth, establishment, and protection of vegetation.
RECP must conform to the classification system established by the Erosion Control Technology Council.
21-1.02O(2) Jute Mesh
Jute mesh must be made of processed natural jute yarns woven into a matrix. Jute mesh must comply
with the requirements shown in the following table:
Property
Classification
Minimum strands per foot in each
direction
Minimum roll width
Matrix
Universal soil loss equation
(USLE) C-Factor for a 1.5:1 (H:V)
unvegetated slope.
Maximum shear stress
Minimum tensile strength
Functional longevity
Average open area
Minimum weight of fabric

Jute Mesh
Requirements
ECTC Type 3B

Test method
--

1420

--

48 inches
Unbleached and undyed woven jute

---

0.25

--

2.0 psf
100 psf
12 months
65 5%
14.419.2 oz/sq yd

ASTM D 6460
ASTM D 5035
--ASTM D 3776

21-1.02O(3) Netting
Netting must be made of coconut fiber woven into a matrix. Netting must comply with the requirements
shown in the following table:
Property

Netting
Requirements

Type

Classification

--

Test method

ECTC Type 4

--

Minimum thickness

A, B, C

0.30 inch

--

Roll width

A, B, C

72158 inches

--

Matrix

A, B, C

100% woven coir (coconut


fiber)

--

Universal Soil Loss Equation


(USLE) C-Factor for a 1:1 (H:V)
unvegetated slope

A, B, C

0.25

--

Maximum shear stress

A
B
C

2.25 psf
4.4 psf
4.6 psf

346

ASTM D 6460

SECTION 21

EROSION CONTROL

Minimum tensile strength

A, B, C

125 psf

Functional longevity

A, B, C

36 months

A
B
C
A
B
C

63 5%
48 5%
38 5%
11.8 oz/sq yd
20 oz/sq yd
26 oz/sq yd

Average open area

Minimum weight of fabric

ASTM D 5035
---

ASTM D 3776

21-1.02O(4) Erosion Control Blankets


Erosion control blanket must be made of processed natural fibers that are mechanically, structurally, or
chemically bound together to form a continuous matrix that is surrounded by 2 natural nets. The erosion
control blanket must comply with the requirements shown in the following table:
Erosion Control Blanket
Property

Type

Classification

Requirements
--

Test Method

ECTC Type 2D

--

Net type

A, B, C

Natural

--

Number of nets

A, B, C

Double

--

Minimum roll width

A, B, C

72 inches

--

A
B
C

70/30% (straw/coconut fiber)


100% woven coir (coconut fiber)
Wood excelsior (80 percent of the
fiber 6 inches or longer)

--

0.20

--

Matrix

Universal soil loss equation


(USLE) C-Factor for a 2:1 A, B, C
(H:V) unvegetated slope.
A, B, C
Maximum shear stress
Minimum tensile strength
Functional longevity

1.75 psf

A, B, C

75 psf

A, B, C

12 months

ASTM D 6460
ASTM D 5035
-

21-1.02O(5) Turf Reinforcement Mats


Turf reinforcement mat must be a nondegradable, open-weave textile made of synthetic fibers, filaments,
nets, wire mesh or other elements, processed into a permanent, three-dimensional matrix. Turf
reinforcement mat must comply with requirements shown in the following table:
Property
Classification

Turf Reinforcement Mat


Type
Requirements
--

Test Method

ECTC Type 5

--

Net type

A, B, C

Synthetic

--

Number of nets

A, B, C

Per manufacturer's
specifications

--

Minimum thickness

A, B, C

0.25 inch
347

ASTM D 6525

SECTION 21

EROSION CONTROL

Minimum roll width

A, B, C

72 inches

--

Matrix

A, B, C

Per manufacturer's
specifications

--

0.25

--

Universal soil loss equation


(USLE) C-Factor for a 1.5:1 (H:V) A, B, C
unvegetated slope.
A
Maximum shear stress
B
C
A
Minimum tensile strength
B
C

6 psf
8.4 psf
10 psf
125 psf
150 psf
175 psf

Functional longevity

A, B, C

36 months

UV stability

A, B, C

80% at 500 hours

ASTM D 6460

ASTM D 5035
-ASTM D 4355

21-1.02P Fiber Rolls


Fiber roll must have a minimum functional longevity of 1 year and comply with the following requirements:
1. Type A fiber roll must be fabricated from an erosion control blanket rolled along its width. Secure with
natural fiber twine at 6-foot intervals, and 6 inches from each end. Fiber roll size must comply with
either one of the following:
1.1. 8 to 10 inches in diameter, 10 to 20 feet long, and at least 0.5 lb/ft
1.2. 10 to 12 inches in diameter, at least 10 feet long, and at least 2 lb/ft
2. Type B fiber roll must be a premanufactured roll filled with rice or wheat straw, wood excelsior, or
coconut fiber. Rolls must be covered with biodegradable jute, sisal, or coir fiber netting secured tightly
at each end. Fiber roll size must comply with either one of the following:
2.1. 8 to 10 inches in diameter, 10 to 20 feet long, and at least 1.1 lb/ft
2.2. 10 to 12 inches in diameter, at least 10 feet long, and at least 3 lb/ft
21-1.02Q Compost Socks
Compost sock must be a mesh tube 12 inches in diameter filled with compost and must have a functional
longevity of 1 year.
The mesh tube must be composed of a natural biodegradable product such as cotton, jute, sisal, burlap,
or coir. The mesh tube must be clean, evenly woven, and free of encrusted concrete or other
contaminating materials, cuts, tears, broken or missing yarns, and thin, open, or weak places.
Compost particle size for compost sock must comply with the material specification for coarse compost in
the table titled "Compost Properties" specified in section 21-1.02M.
21-1.02R Fasteners
Wood stakes must be untreated fir, redwood, cedar, or pine and cut from sound timber. The ends must be
pointed for driving into the ground. Notched stakes must be at least 1 by 2 by 24 inches in size. Stakes
without notches must be at least 1 by 1 by 24 inches.
Metal stakes must be at least 1/2 inch in diameter and have tops bent at 90-degree angles or capped with
an orange or red plastic safety cap that fits snugly onto the metal stake.
Steel staples must be a minimum of 11-gauge, 6-inch, U-shaped staples with a 1-inch crown. Provide
heavier gauge and greater length if required by the site conditions. You may use an alternative
attachment device such as a 100 percent biodegradable fastener to install RECP instead of staples.
Rope to fasten fiber rolls and compost socks must be 1/4 inch in diameter and biodegradable, such as
sisal or manila.
348

SECTION 21

EROSION CONTROL

21-1.02S Water
Water must be of a quality that promotes germination of seeds and growth of plants.
21-1.03 CONSTRUCTION
21-1.03A General
Before applying erosion control measures, verify that finished grades meet the requirements for grade,
compaction and finish as specified in section 19.
Apply erosion control materials within 24 hours after the final preparation of the erosion control areas. Do
not apply hydraulically applied materials under the following conditions:
1.
2.
3.
4.

Precipitation
Water is standing on or moving across the soil surface
Soil is frozen
Air temperature is below 40 degrees F during the tackifier curing period unless allowed by the
tackifier manufacturer and authorized

21-1.03B Site Preparation


Remove and dispose of trash, debris, and weeds in areas to receive erosion control materials.
Remove and dispose of loose rocks larger than 2-1/2 inches in maximum dimension unless otherwise
authorized.
Protect the traveled way, sidewalks, lined drainage channels, and existing vegetation from overspray of
hydraulically-applied material.
21-1.03C Duff
Upon completion of the earthwork in an area, spread duff to a uniform thickness. Do not apply duff within
10 feet of the pavement edge. Roadway and adjacent areas must be left in a neat and finished
appearance.
Trackwalk duff with tracked equipment run perpendicular to slope contours. Water may be used to assist
this process but must not cause erosion.
21-1.03D Topsoil
Place topsoil after all other earthwork in an area is complete.
Spread topsoil to a uniform thickness.
Trackwalk topsoil with tracked equipment run perpendicular to slope contours. Water may be used to
assist the process but must not cause erosion.
21-1.03E Hydromulch and Hydroseed
Apply hydromuch with hydraulic spray equipment that mixes fiber, tackifier, fertilizer, and other erosion
control materials specified. If applying hydroseed, add seed to hydromulch. Seed may be dry applied to
small areas not accessible by hydroseeding equipment if authorized.
Add water to hydromulch and hydroseed materials as recommended by the manufacturer and mix
sufficiently to ensure an even application. A dispersing agent may be added to the mixture if authorized.
Equipment must utilize a built-in continuous agitation and discharge system capable of producing a
homogeneous mixture and a uniform application rate. The tank must have a minimum capacity of 1,000
gallons. You may use a smaller tank if authorized.
Apply materials in locations, rates, and number of applications shown and as follows:
1. Begin application within 60 minutes after adding seed to the tank.
2. Apply in successive passes as necessary to achieve the required application rate.
3. Apply all hydromulch or hydroseed materials indicated for a single area within 72 hours.
When hydromulch or hydroseed materials are applied to areas covered by RECP, apply hydromulch and
hydroseed materials to the rolled product as follows:
349

SECTION 21

EROSION CONTROL

1. Verify the RECP is in uniform contact with the slope surface.


2. Spray materials into the RECP perpendicular to the slope and integrate well.
3. Do not displace or damage the RECP.
After the final application, do not allow pedestrians or equipment onto the treated areas.
21-1.03F Dry Seed
Apply dry seed and fertilizer at the rates shown after site preparation. Scarify areas to a minimum depth
of 1 inch. Apply and incorporate materials into the soil to a maximum depth of 1/4 inch by dragging or
raking.
21-1.03G Drill Seed
Drill-seeding equipment must be a rangeland drill seeder with a ring roller attached. The seeder must be
equipped with a fluffy seed box with agitators to prevent bridging and clogging. The seed box must have
metal row dividers and individual box adjustments to meter the seed flow.
Apply drill seed as follows:
1. Drill seed in rows no greater than 8 inches apart and to a depth of 1/4 inch.
2. Make a minimum of 3 passes in different directions with seeding equipment to reduce any uniform
row appearance.
3. Do not apply seed within 8 feet of the pavement edge.
21-1.03H Straw
Apply straw by spreading it uniformly without clumping or piling at the rates shown, based upon slope
measurements. Once straw work is started in an area, apply all materials for that area in the same
working day.
21-1.03I Polymer Stabilized Fiber Matrix
Apply polymer stabilized fiber matrix materials from multiple directions and angles to ensure complete
coverage in the locations, application rate, and number of applications shown.
21-1.03J Bonded Fiber Matrix
Apply bonded fiber matrix materials in the locations, rates, and number of applications shown and as
follows:
1. Apply in successive passes as necessary to achieve the required application rate.
2. Form a continuous uniform mat with no gaps between the mat and the soil surface as follows:
2.1. Apply in 2 or more directions if necessary.
2.2. Apply in layers as necessary to avoid slumping and aid drying.
21-1.03K Hydraulic Erosion Control Products
Reserved
21-1.03L Compost
Apply compost to a uniform thickness in the locations shown. If compost and seed are applied
simultaneously, mix and apply together with equipment suitable for the application such as a pneumatic
blower truck.
21-1.03M Reserved
21-1.03N Incorporate Materials
Incorporate topsoil, duff, compost, and mulch to the depth shown until well mixed. Materials may be
mixed together before incorporation if authorized.
Do not incorporate materials within 2 feet of the pavement edge.
Incorporate straw with a roller made of approximately 7/8-inch steel plate equipped with straight studs
placed approximately 8 inches apart and staggered. Studs must not be less than 6 inches long nor more
than 6 inches wide and must be rounded to prevent the straw withdrawing from the soil. The roller weight

350

SECTION 21

EROSION CONTROL

must be sufficient to incorporate the straw into the soil to a depth that will not support combustion and
result in a uniform surface.
Compact the area to a relative compaction between 82 percent and 90 percent except as otherwise
specified in section 19-5.
21-1.03O Rolled Erosion Control Products
Before placing RECP, ensure the subgrade has been graded smooth and has no depressed voids. The
subgrade must be free from obstructions, such as tree roots, projecting stones, or foreign matter greater
than 1 inch in diameter.
Fasten RECP to the surface with staples and anchor as shown.
Do not drive vehicles upon RECP following placement.
21-1.03P Fiber Rolls
Before installing fiber roll remove obstructions from the ground, including rocks, clods, and debris greater
than 1 inch in diameter.
Install fiber roll approximately parallel to the slope contour. For any 20-foot section of fiber roll, prevent
the fiber roll from varying more than 5 percent from level. Install fiber roll on slopes at the following
spacing unless shown otherwise:
1.
2.
3.
4.

10 feet apart for slopes steeper than 2:1 (horizontal:vertical)


15 feet apart for slopes from 2:1 to 4:1 (horizontal:vertical)
20 feet apart for slopes from 4:1 to 10:1 (horizontal:vertical)
50 feet apart for slopes flatter than 10:1 (horizontal:vertical)

Type 1 fiber roll installation consists of placing and fastening as follows:


1.
2.
3.
4.

Place in a furrow that is from 2 to 4 inches deep.


Fasten with wood stakes every 4 feet along the length of the fiber roll.
Fasten the ends of the fiber roll by placing a stake 6 inches from the end of the roll.
Drive the stakes into the soil so that the top of the stake is less then 2 inches above the top of the
fiber roll.

Type 2 fiber roll installation consists of placing and fastening as follows:


1.
2.
3.
4.

Fasten with notched wood stakes and rope.


Drive stakes into the soil until the notch is even with the top of the fiber roll.
Lace the rope between stakes and over the fiber roll. Knot the rope at each stake.
Tighten the fiber roll to the surface of the slope by driving the stakes further into the soil.

Maintain fiber roll in a manner that provides sediment holding capacity and reduces runoff velocities as
follows:
1. Remove sediment from behind the fiber roll when sediment is 1/3 of fiber roll height above ground.
2. Repair or adjust the fiber roll when rills or other evidence of concentrated runoff occur beneath the
fiber roll.
3. Repair or replace the fiber roll when they become split, torn, or unraveled.
4. Add stakes when the fiber roll slumps or sags.
5. Replace broken or split wood stakes.
6. Remove sediment deposits, trash, and debris from fiber roll as needed or when ordered. If removed
sediment is deposited within project limits, it must be stabilized and not exposed to erosion by wind or
water.
21-1.03Q Compost Socks
Before installing compost sock remove obstructions from the ground including rocks, clods, and debris
greater than 1 inch in diameter.
Install and maintain compost sock following the procedures for fiber rolls and the following:
351

SECTION 21

EROSION CONTROL

1. Place mesh tube, secure the end, and fill uniformly with compost. Secure the remaining end.
2 Fasten compost sock to soil surface following the procedures for Type 1 and Type 2 installation of
fiber roll.
3. Remove sock when ordered. Cut sock and empty contents in place. Dispose of sock.
21-1.04 PAYMENT
Items paid for by area or length are measured parallel to the ground surface excluding overlaps.
A move-in followed by a move-out counts as 1 unit. The Department does not adjust the unit price for an
increase or decrease in the move-in/move-out quantity.
Collecting, processing, and stockpiling of duff is paid for as clearing and grubbing as specified in section
16. Spreading duff is paid for as duff. Local topsoil is paid for as roadway excavation as specified in
section 19-2.
Imported topsoil is measured in the vehicle at the point of delivery.

352

22 FINISHING ROADWAY

22-1.01 GENERAL
Section 22 includes specifications for finishing the roadway.

Perform finishing activities after completing all other construction activities.

22-1.02 MATERIALS
Not Used
22-1.03 CONSTRUCTION
Trim and shape graded areas without surfacing to smooth and uniform cross sections and slopes:
1. Between edge of shoulder and hinge point of slopes
2. At medians
For a graded roadbed without surfacing or pavement, trim and shape the entire roadbed to uniform cross

sections and slopes.

Trim slopes of gutters without lining or surfacing to the required grade and cross section.

Do not stockpile material on finished pavement or allow material to drift across pavement. Clean finished

pavement of dirt and foreign material.

Clear debris and obstructions from ditches and channels constructed under the Contract.

Clean out sewers, culverts, and other drainage facilities and appurtenant structures constructed under the

Contract.

Remove debris and excess material next to culverts, headwalls and endwalls, bridge ends, poles, posts,

trees, or other objects and leave in a neat and orderly condition.

Remove from slopes any exposed material that might become loose such as rocks and roots.

Remove loose rock larger than 2-1/2 inches in maximum dimension from:

1. Between edge of shoulder and hinge point of slopes


2. At medians
3. Finished roadbed
Dispose of material resulting from finishing activities. If authorized, soil and rock resulting from finishing
activities may be used along the roadway.
22-1.04 PAYMENT
Not Used

23 RESERVED

353

DIVISION IV SUBBASES AND BASES

24 STABILIZED SOILS

24-1 GENERAL

Reserved
24-2 LIME STABILIZED SOIL
24-2.01 GENERAL
24-2.01A Summary
Section 24 includes specifications for stabilizing soil by mixing lime and water with soil and compacting
the mixture.
24-2.01B Definitions
mellowing period: Time between the initial and final mixing to promote initial chemical reactions between
lime, water, and soil.
24-2.01C Submittals
From 30 to 180 days before use, submit one 10 lb sample of each lime product proposed and from each
source.
Submit lime samples in airtight containers under ASTM C 50. Mark the sample date on the container.
Include the MSDS and chemical and physical analysis with the submittal.
Submit a certificate of compliance with the lime samples that includes a statement certifying the lime
furnished is the same as on the Authorized Material Source List.
At least 15 days before starting soil stabilization activities, submit the name of the authorized laboratory
you will use for QC tests. The laboratory must be qualified under the Department's Independent
Assurance Program.
At least 25 days before applying lime in slurry form, submit the slurry's lime content for authorization.
Before performing QC sampling and testing, submit the time and location the sampling and testing will
occur. Submit QC testing results within 24 hours of receiving the results.
24-2.01D Quality Control and Assurance
24-2.01D(1) General
Perform QC testing in the presence of the Engineer.
Place unique, sequentially numbered lock seals on each load and affix them to trailer blow down valves
that are locked open. The bill of lading for each lime delivery must have that specific lock seal number
legibly and visibly imprinted.
24-2.01D(2) Preparing Soil
After preparing an area for lime soil stabilization verify the surface grades. For every 500 cu yd of soil
prepared for lime soil stabilization:
1. Test the relative compaction under California Test 231
2. Test the moisture content under California Test 226
24-2.01D(3) Applying Lime
The Engineer determines the final application rate for each lime product proposed from the samples
submitted. Wherever the soil to be stabilized changes, the Engineer changes the application rate. Based
on California Test 373, the Engineer reports the application rate as the percent of lime by dry weight of
soil. The Engineer provides the optimum moisture content determined under California Test 373 for each
application rate.
Whenever lime is used in dry form, the Engineer verifies the application rate using the drop pan method
once per 40,000 square feet stabilized, or twice per day, whichever is greater.

355

SECTION 24

STABILIZED SOILS

Whenever lime in slurry form is used, report the quantity of slurry placed by measuring the volume of
slurry in the holding tank once per 40,000 square feet stabilized, or twice per day, whichever is greater.
24-2.01D(4) Mixing
For each day of initial mixing, test the moisture content under California Test 231 and verify moisture
content under California Test 226. Sample the material immediately after initial mixing.
Randomly test the adequacy of the final mixing with a phenolphthalein indicator solution.
During mixing operations, measure and record the ground temperature at full mixing depth.
Take a composite sample from 5 random locations after initial mixing. The moisture content of the
composite sample tested under California Test 226 must be a minimum of 3 percent greater than
optimum. Determine the moisture versus density relationship of the composite sample material under
California Test 216, except part 2, section E, paragraph 6 is modified as follows:
After adjustment of the moisture content, compact each of the remaining test specimens in the mold,
then record the water adjustment, tamper reading, and the corresponding adjusted wet density from
the chart on Table 1 using the column corresponding to the actual wet weight of the test specimen
compacted. Note each of these wet weights on Line I.
After mixing and before compacting, determine maximum density under California Test 216 from
composite samples of mixed material samples from 5 random locations and at each distinct change in
material. Test the gradation for compliance with section 24-2.03D. Test the moisture content of the mixed
material under California Test 226.
24-2.01D(5) Compaction
Test relative compaction on a wet weight basis.
After initial compaction determine in-place density under California Test 231 and moisture content under
California Test 226, at the same locations. Perform one test per 250 cu yd of lime stabilized soil. Test in
0.50-foot depth intervals.
Construct test pads for compaction tests by scraping away material to the depth ordered. If a compaction
test fails, corrective action must include the layers of material already placed above the test pad
elevation.
24-2.01D(6) Test Strip
Construct test strips with materials, tools, equipment, and methods you will use in the work.
24-2.01D(7) Test Result Disputes
Work with the Engineer to avoid potential conflicts and resolve disputes regarding test result
discrepancies. If you dispute the test result notify the Engineer within 5 days of receiving the test result.
If you or the Engineer dispute each other's test results, submit written quality control test results and
copies of paperwork including worksheets used to determine the disputed test results. An Independent
Third Party (ITP) must perform referee testing. Before the ITP participates in a dispute resolution, the ITP
must be accredited under the Department's Independent Assurance Program. The ITP must be
independent of the project. By mutual agreement, the ITP is chosen from:
1.
2.
3.
4.

A Department laboratory
A Department laboratory in a district or region not in the district or region the project is located
The Transportation Laboratory
A laboratory not currently employed by you or your lime producer

If split quality control or acceptance samples are not available, the ITP uses any available material
representing the disputed material for evaluation.
24-2.02 MATERIALS
24-2.02A General
Reserved
356

SECTION 24

STABILIZED SOILS

24-2.02B Lime
Lime sources must be on the Authorized Material Source List.

Lime must comply with ASTM C 977 and the requirements shown in the following table:

Property
Available calcium and magnesium
oxide (min, %)

Lime Quality
ASTM
C 25
or
C 1301 and C 1271

Loss on ignition (max, %)

C 25

Slaking rate

C 110

Requirements
High calcium quicklime:
CaO > 90
Dolomitic quicklime:
CaO > 55 and CaO + MgO > 90
7 (total loss)
5 (carbon dioxide)
2 (free moisture)
30 C rise in 8 minutes

A 0.50 lb sample of lime dry-sieved in a mechanical sieve shaker for 10 minutes 30 seconds must
comply with the grading shown in the following table:
Lime Grading
Sieve sizes Percentage passing
3/8 inch
98100
Slurry must:
1. Be free of contaminants
2. Contain at least the minimum dry solids
3. Have uniform consistency
Prepare lime slurry at the job site.
24-2.02C Water
Whenever available, use potable water for mixing soil and lime. Notify the Engineer if water other than
potable water is used. Water, other than potable water must:
1. Contain no more than 650 parts per million of chlorides as Cl, and no more than 1,300 parts per
million of sulfates as SO4
2. Not contain an amount of impurities that will cause a reduction in the strength of the stabilized soil
24-2.02D Curing Seal
Curing seal must comply with section 94, Grade SS1, SS1h, CSS1, or CSS1h.
24-2.03 CONSTRUCTION
24-2.03A General
Do not mix different types of lime or lime from more than one source. The Engineer determines separate
application rates.
Deliver lime in full loads unless it is the last load needed for a work shift.
Before applying lime, measure the ground surface temperature. Apply lime at ground temperatures above
35 degrees F. Do not apply lime if you expect the ground temperature to drop below 35 degrees F before
you complete mixing and compacting.
During mixing, maintain the in-place moisture of the soil to be stabilized a minimum 3 percent above the
optimum moisture determined under California Test 216 as modified in section 24-2.03D. During
compaction and finish grading, add water to the surface to prevent drying until the next layer of mixed
material is placed, or until you apply curing treatment.

357

SECTION 24

STABILIZED SOILS

Scarify the surface of lime stabilized soil at least 2 inches between each layer. Do not scarify the finished
surface of the lime stabilized soil.
From the application of lime to 3 days after the application of curing treatment, only equipment and
vehicles essential to the lime stabilization work are allowed on the soil.
24-2.03B Preparing Soil
For native soil and embankment other than imported borrow, remove rocks or solids larger than 1/3 of the
layer thickness. Regardless of the layer thickness, remove rocks and solids greater than 4 inches.
Removing soil clods is not required. Notify the Engineer if you encounter rocks or solids greater than 1/3
of the layer thickness. Removing and disposing of rocks and solids is change order work.
Before adding lime, place the soil to be stabilized to within 0.08 foot of the specified lines and grades and
compact to not less than 90 percent relative compaction.
24-2.03C Applying Lime
Apply lime in dry form. You may apply lime in slurry form, if authorized.

Apply lime uniformly over the area to be stabilized using a vane spreader.

Do not vary from the Engineer's determined application rate by more than 5 percent.

Lime slurry must be in suspension during application. Apply lime slurry uniformly making successive

passes over a measured section or roadway until the specified lime content is reached. Apply the residue
from lime slurry over the length of the roadway being processed.
24-2.03D Mixing
Lime and soil to be stabilized must be uniformly mixed at least twice to within 0.10 foot of the depth
shown at any point. If the mixing depth exceeds the depth shown by more than 10 percent, add lime in
proportion to the exceeded depth. The Department does not pay for this added lime.
Mix lime on the same day it is applied. After the initial mixing, allow a mellowing period for at least 36
hours before final mixing. Moisture content during the mellowing period determined under California Test
226 must be at least 3 percent higher than the optimum moisture content. You may add water and mix
during the mellowing period.
Remix until the mixture is uniform with no streaks or pockets of lime.
Except for clods larger than 1 inch, mixed material must have a color reaction with sprayed
phenolphthalein alcohol indicator solution.
Complete all the mixing work within 7 days of the initial application of lime.
Before compaction, the mixed material excluding rock must have the grading shown in the following table:
Mixed Material Grading
Sieve sizes
Percentage
passing
1"
98100
No. 4
60100
24-2.03E Compaction
Begin compacting immediately after final mixing.
Compact using a sheepsfoot or segmented wheel rollers immediately followed by steel drum or
pneumatic-tired rollers. Do not use vibratory rollers.
Wherever the thickness shown is 0.50 foot or less, compact in 1 layer. Wherever the thickness shown is
more than 0.50 foot, compact in 2 or more layers of approximately equal thickness. The maximum
compacted thickness of any 1 layer must not exceed 0.50 foot unless you first construct a test strip to
demonstrate your equipment and methods provide uniform distribution of lime and achieve the specified
compaction. The test strip must contain no more material than 1 day's production.
358

SECTION 24

STABILIZED SOILS

Use other compaction methods in areas inaccessible to rollers.


Compact the lime stabilized soil to at least 95 percent relative compaction determined under California
Test 216 as modified in section 24-2.03D The relative compaction is determined on a wet weight basis.
24-2.03F Finish Grading
Maintain the moisture content of the lime stabilized soil at a minimum of 3 percent above optimum
moisture content through the entire finish grading operation.
The finished surface of the lime stabilized soil must not vary more than 0.08 foot above or below the
grade established by the Engineer unless the lime stabilized soil is to be covered by material paid for by
the cubic yard, in which case the finished surface may not vary above the grade established by the
Engineer.
Wherever lime stabilized soil is above the allowable tolerance, trim, remove, and dispose of the excess
material. Do not leave loose material on the finished surface. If finish rolling cannot be completed within 2
hours of trimming, defer trimming.
Wherever lime stabilized soil is below the allowable tolerance, you may use trimmed material to fill low
areas only if final grading and final compaction occurs within 48 hours of beginning initial compaction.
Before placing trimmed material, scarify the surface of the area to be filled at least 2 inches deep.
Finish rolling of trimmed surfaces must be performed with at least 1 complete coverage with steel drum or
pneumatic-tired rollers.
Do not proceed with construction activities for subsequent layers of material until the Engineer verifies the
final grades of the lime stabilized soil.
24-2.03G Curing
24-2.03G(1) General
Cure by any one of the following methods:
1. Water cure
2. Curing seal
3. Moist material blanket
Choose the method of curing and apply the chosen cure method within 48 hours of completing the
sheepsfoot or segmented wheel compaction and within the same day of any trimming and finish grading.
24-2.03G(2) Water Cure
Water may be used to cure the finished surface before you place a moist material blanket or apply curing
seal. Keep the surface above the optimum moisture content of the lime stabilized soil. Use this method for
no more than 3 days, after which you must apply a curing seal or place a moist material blanket.
24-2.03G(3) Curing Seal
Curing seal equipment must have a gauge indicating the volume of curing seal in the storage tank.
Apply curing seal:
1.
2.
3.
4.

To the finished surface of lime stabilized soil under section 94-1.06


At a rate from 0.10 to 0.20 gallon per square yard. The exact rate is ordered
When the lime stabilized soil is at optimum moisture
When the ambient temperature is above 40 degrees F and rising

Repair damaged curing seal the same day the damage occurs.
24-2.03G(4) Moist Material Blanket
Moist material blanket must be moist structural material. Moist material blanket may be either a temporary
or permanent layer of material of sufficient thickness to prevent drying of the lime stabilized soil. You may
use moist material blanket if the lime stabilized soil can bear the weight of construction equipment.

359

SECTION 24

STABILIZED SOILS

Maintain the moist material blanket above the optimum moisture content, as appropriate, until the next
structural layer is placed.
24-2.04 PAYMENT
Lime stabilized soil is measured from horizontal measurements of the planned surface of the lime
stabilized soil.
Curing seal quantity is determined under section 94. The amount of curing seal used is determined from
the gauge on the curing equipment.
The Department does not adjust the unit price for an increase or decrease in lime quantity.
Quantities of lime wasted or disposed of in a manner not specified, or remaining on hand after completion
of the work, will not be paid for. If you use a partial load of lime, weigh the truck and the remaining lime on
a scale and submit a weighmaster certificate.
If the dispute resolution ITP determines the Engineer's test results are correct, the Engineer deducts the
ITP's testing costs from payments and pays the ITP. If the ITP determines your test results are correct,
the Department pays the ITP testing costs without deduction.
24-324-6 RESERVED

360

25 AGGREGATE SUBBASES
25-1.01 GENERAL
Section 25 includes specifications for spreading and compacting AS.
25-1.02 MATERIALS
25-1.02A General
Aggregate for Class 1, 2, 3, and 4 AS must be clean and consist of any combination of the following:
1.
2.
3.
4.
5.

Broken stone
Crushed gravel
Natural rough surfaced gravel
Sand
Reclaimed processed asphalt concrete, PCC, LCB, or CTB

Class 5 AS is specified in the special provisions.


25-1.02B Class 1, Class 2, and Class 3 Aggregate Subbases
When tested under California Test 202, aggregate must comply with the grading requirements for the
sieve sizes shown in the following table:

Sieve size

3"
2 1/2"
No. 4
No. 200

Aggregate Grading
Percentage passing
Class 1
Class 2
Operating
Contract
Operating
Contract
range
compliance
range
compliance
100
100
100
100
90100
87100
90100
87100
3570
3075
4090
3595
020
023
025
029

Class 3
Operating
Contract
range
compliance
100
100
90100
87100
50100
45100
030
034

Aggregate must comply with the quality requirements for the classes shown in the following table:

Property
Sand
equivalent
(min)
Resistance
(R-value)
(min)

Aggregate Quality
Class 1
Class 2
Class 3
California
Operating Contract
Operating Contract
Operating Contract
Test
range
compliance
range
compliance
range
compliance
217

21

18

21

18

21

18

301

--

60

--

50

--

40

If the aggregate grading test results, the sand equivalent test results, or both comply with contract
compliance requirements but not operating range requirements, you may continue placing AS for the
remainder of the work day. Do not place additional AS until you demonstrate to the Engineer the AS to be
placed complies with the operating range requirements.
If the aggregate grading test results, sand equivalent test results, or both do not comply with contract
compliance requirements, remove the AS or request a payment deduction. If your request is authorized,
$2.00/cu yd is deducted for each noncompliant test result. An aggregate grading and a sand equivalent
test represents up to (1) 500 cu yd or (2) 1 day's production if less than 500 cu yd.
25-1.02C Class 4 Aggregate Subbase
Reserved

361

SECTION 25

AGGREGATE SUBBASES

25-1.02D Class 5 Aggregate Subbase


Reserved
25-1.03 CONSTRUCTION
25-1.03A General
Water AS under section 17-3.
25-1.03B Subgrade
Immediately before spreading the AS, the subgrade must comply with the specified compaction and
elevation tolerance for the material involved and be free from loose or extraneous material.
Areas of the subgrade lower than the grade established by the Engineer may be filled with AS. AS used
to fill low areas of the subgrade is not included in the quantity for payment.
25-1.03C Spreading
Deliver uniform mixtures of AS to the roadbed. Deposit AS in layers or windrows. Spread and shape the
AS to such thickness that after watering and compacting, the completed AS is within the tolerances
specified in section 25-1.03D. When AS is spread and compacted the moisture content must be uniform
and sufficient to obtain the required compaction. Avoid material segregation. AS must be free from
pockets of coarse or fine material.
Where the subgrade is cohesionless sand and if authorized, you may dump AS in piles and spread it
ahead in sufficient quantities to stabilize the subgrade.
Where the shown subbase thickness is 0.50 foot or less you may spread and compact the AS in one
layer. Where the shown thickness is more than 0.50 foot, spread and compact in 2 or more layers
approximately equal in thickness. The compacted thickness of any one layer must not exceed 0.50 foot.
At locations inaccessible to spreading equipment, spread and compact AS by any means that will
produce the specified results.
25-1.03D Compacting
Compact each AS layer to at least 95 percent relative compaction under California Test 231.
The finished surface of AS not covered, or covered by material paid for by weight, must not vary more
than 0.08 foot above or below the grade established by the Engineer.
The finished surface of AS covered by material paid for by volume must not project above the grade
established by the Engineer at any point.
Correct areas of AS that do not comply with the thickness shown if an equivalent thickness of overlying
base will not compensate or request a payment deduction. If your request is authorized, the Engineer
calculates the deduction by multiplying:
1.
2.
3.
4.

Deficient thickness less allowable tolerance


Planned width
Longitudinal distance of the deficient thickness
$11.00/cu yd

25-1.04 PAYMENT
The payment quantity of AS is based on the dimensions shown.

362

26 AGGREGATE BASES

26-1.01 GENERAL
Section 26 includes specifications for spreading and compacting AB.
26-1.02 MATERIALS
26-1.02A General
Aggregate for Class 2 and Class 3 AB must be clean and consist of any combination of the following:
1.
2.
3.
4.
5.

Broken stone
Crushed gravel
Natural rough surfaced gravel
Sand
Processed reclaimed asphalt concrete, PCC, LCB, or CTB

Use either 1-1/2 inch or 3/4 inch aggregate grading. Do not change your selected aggregate grading
without authorization.
If the aggregate grading test results, sand equivalent test results, or both comply with contract compliance
requirements but not operating range requirements, you may continue placing AB for the remainder of the
work day. Do not place additional AB until you demonstrate to the Engineer the AB to be placed complies
with the operating range requirements.
If the aggregate grading test results, sand equivalent test results, or both do not comply with contract
compliance requirements, remove the AB or request a payment deduction. If your request is authorized,
$2.00/cu yd is deducted. If AB is paid by weight, the Engineer converts tons to cubic yards for the
purpose of reducing payment for noncompliant AB left in place. An aggregate grading and a sand
equivalent test represents up to (1) 500 cu yd or (2) 1 day's production if less than 500 cu yd.
26-1.02B Class 2 Aggregate Base
When tested under California Test 202, aggregate must comply with the grading requirements for the
sieve sizes shown in the following table:

Sieve sizes
2"
1-1/2"
1"
3/4"
No. 4
No. 30
No. 200

Aggregate Grading
Percentage passing
1-1/2 inch maximum
3/4 inch maximum
Operating
Contract
Operating
Contract
range
compliance
range
compliance
100
100
--90100
87100
----100
100
5085
4590
90100
87100
2545
2050
3560
3065
1025
629
1030
535
29
012
29
012

Aggregate must comply with the quality requirements shown in the following table:

Property
Resistance (R-value) (min)
Sand equivalent (min)
Durability index (min)

Aggregate Quality
California
Operating range
Test
301
-217
25
229
--

363

Contract compliance
78
22
35

SECTION 26

AGGREGATE BASES

Aggregate samples must not be treated with lime, cement, or chemicals before testing for durability index.
Aggregate from untreated reclaimed processed asphalt concrete, PCC, LCB, or CTB is not considered
treated.
26-1.02C Class 3 Aggregate Base
When tested under California Test 202, aggregate must comply with the grading requirements for the
sieve sizes shown in the following table:

Sieve
sizes
2"
1-1/2"
1"
3/4"
No. 4
No. 30
No. 200

Aggregate Grading
Percentage passing
1-1/2 inch maximum
3/4 inch maximum
Operating
Contract
Contract compliance Operating range
range
compliance
100
100
--90100
87100
----100
100
5090
4595
90100
87100
2560
2065
4070
3575
1035
639
1240
745
315
019
315
019

Aggregate must comply with the quality requirements shown in the following table:

Property
Resistance (R-value) (min)
Sand equivalent (min)

Aggregate Quality
California
Operating range
Test
301
-217
21

Contract compliance
50
18

26-1.03 CONSTRUCTION
26-1.03A General
Water AB under section 17-3.
26-1.03B Subgrade
Immediately before spreading AB, the subgrade must comply with the specified compaction and elevation
tolerance for the material involved and be free from loose or extraneous material.
If AB is paid by volume, fill areas of finished AS that are lower than the grade established by the Engineer
with AB. AB used to fill low areas is not included in the quantity for payment.
If the subgrade is not AS and AB is paid by volume, areas that are lower than the grade established by
the Engineer may be filled with AB. AB used to fill low areas where AS is not specified is not included in
the quantity for payment. If the basement material is imported borrow, AB placed to fill low areas is not
measured or paid for as imported borrow.
26-1.03C Spreading
Deliver uniform mixtures of AB to the roadbed. Deposit AB in layers or windrows. Spread and shape the
AB to such thickness that after watering and compacting, the completed AB is within the tolerances
specified in section 26-1.03D. When AB is spread and compacted the moisture content must be uniform
and sufficient to obtain the required compaction. Avoid material segregation. AB must be free from
pockets of coarse or fine material.
Where the subgrade is cohesionless sand you may dump AB in piles and spread it ahead in sufficient
quantities to stabilize the subgrade, if authorized.
Where the shown AB thickness is 0.50 foot or less you may spread and compact the AB in one layer.
Where the shown thickness is more than 0.50 foot, spread and compact in 2 or more layers
364

SECTION 26

AGGREGATE BASES

approximately equal in thickness. The compacted thickness of any one layer must not exceed 0.50 foot.
At locations inaccessible to spreading equipment, spread and compact AB by any means that will obtain
the specified results.
26-1.03D Compacting
Compact each AB layer to at least 95 percent relative compaction under California Test 231.
The finished AB surface must not vary more than 0.05 foot from the grade established by the Engineer.
Correct areas of AB that do not comply with the described thickness or request a payment deduction if AB
is paid for by volume. If your request is authorized, the Engineer calculates the deduction by multiplying:
1.
2.
3.
4.

Deficient thickness less allowable tolerance


Planned width
Longitudinal distance of the deficient thickness
$17.00 per cubic yard or the item bid price adjusted for cubic yards, whichever is higher

26-1.04 PAYMENT
If AB is paid for by volume, the quantity is determined from the dimensions shown.
If AB is paid for by weight, the Engineer adjusts the weight in the weighmaster certificate of the delivered
AB by deducting the water weight over one percent plus the optimum moisture content. The Engineer
determines the AB water content under California Test 226 and AB optimum moisture content under
California Test 216. The Engineer does not pay for the deducted water weight.

365

27 CEMENT TREATED BASES

27-1 GENERAL

27-1.01 GENERAL
Section 27-1 includes general specifications for mixing and placing cement treated bases.
27-1.02 MATERIALS
Cement must comply with section 90-1.02B(2), Type ll.
Water must comply with section 90-1.02D.
27-1.03 CONSTRUCTION
Reserved
27-1.04 PAYMENT
If an increase or decrease in the specified cement content is ordered, payment will be adjusted based on
the cost of cement per ton, f.o.b. the cement mill including sales tax plus the freight cost per ton for
delivery from the mill to the plant. In determining payment, any cash or trade discount offered or available
regardless of whether it was taken by the purchaser will be credited to the Department.
Submit evidence of the cost of cement used for an ordered increase or decrease. Maintain records that
allow a clear determination of the cement costs associated with the increase or decrease.
If your records show an excessive price for the increase or decrease of cement or you furnish inadequate
evidence for the cost, the Engineer determines the price to be the lowest wholesale cost that the cement
was available in the quantities delivered to the point of production, less any available discounts.
The quantity of cement subject to increased or decreased compensation will be the difference between
the specified theoretical quantity of cement and the theoretical quantity of cement ordered by the
Engineer. No additional adjustment of compensation will be made for variations in the cost of work
resulting from the change in the quantity of portland cement.
27-2 CEMENT TREATED BASE
27-2.01 GENERAL
27-2.01A Summary
Section 27-2 includes specifications for mixing aggregate, cement and water, and spreading and
compacting the mixture.
27-2.01B Definitions
coarse aggregate: Aggregate retained on a no. 4 sieve.
fine aggregate: Aggregate passing a no. 4 sieve.
27-2.02 MATERIALS
When tested under California Test 202, the percentage composition by weight of the aggregate must
comply with the grading requirements for the sieve sizes shown in the following table:
Aggregate Gradinga
Percentage passing
Sieve sizes
3"
2-1/2"

Operating range
--

Class A
Contract compliance
--

Operating range
100

Class B
Contract compliance
100

--

--

90100

87100

100

100

--

--

3/4"

90100

87100

--

--

No. 4

4070

3575

3570

2877

1"

367

SECTION 27

CEMENT TREATED BASES

No. 30

1240

745

--

--

No. 200

315

019

320

024

California Test 202 is modified by California Test 105 whenever the difference in sp gr between the
coarse and fine portions of the aggregate or between the blends of different aggregates is 0.2 or more.

Aggregate must comply with the quality requirements shown in the following table:
Aggregate Quality
California Test Operating range

Property
Sand equivalent (min)
Compressive strength (psi) (min)

Contract compliance

217

21

18

312

--

750

For Class A CTB only

When tested under California Test 301, aggregate for Class B CTB must have (1) a resistance (R-value)
of at least 60 before mixing with cement and (2) an R-value of at least 80 when aggregate is mixed with
an amount of cement that does not exceed 2.5 percent by weight of the dry aggregate.
Aggregate must be clean and free from deleterious substances. Aggregate samples must not be treated
with lime, cement, or chemicals before testing for sand equivalent.
If the aggregate grading test results, the sand equivalent test results, or both comply with contract
compliance requirements but not operating range requirements, you may continue placing CTB for the
remainder of the work day. Do not place additional CTB until you demonstrate to the Engineer the CTB to
be placed complies with the operating range requirements.
If the aggregate grading test results, sand equivalent test results, or both do not comply with contract
compliance requirements, remove the CTB or request a payment deduction. If your request is authorized,
$2.50/cu yd is deducted. If CTB is paid by weight, the Engineer converts tons to cu yd for the purpose of
reducing payment for noncompliant CTB left in place. An aggregate grading and a sand equivalent test
represents up to (1) 500 cu yd or (2) 1 day's production if less than 500 cu yd.
27-2.03 CONSTRUCTION
27-2.03A General
After the CTB has been spread on the subgrade before initial compaction, the cement content of the
completed mixture of CTB must not vary from the specified cement content by more than 0.6 percent of
the weight of the dry aggregate when tested under California Test 338.
27-2.03B Subgrade
Immediately before spreading CTB, the subgrade, must comply with the specified compaction and
elevation tolerance for the material involved and be free from loose or extraneous material.
27-2.03C Depositing Aggregate and Mixing Road-Mixed Cement Treated Base
27-2.03C(1) Depositing Aggregate
For road-mixed CTB, deposit sufficient untreated aggregate on the roadbed to comply with the width and
depth specifications in section 27-2.03E and grade tolerance specifications in section 27-2.03F. Do not
mix the aggregate to be treated with roadbed material that is not to be treated.
Whenever 2 or more nominal sizes of coarse and fine aggregate are deposited on the grade, accurately
and uniformly meter each nominal size as it is deposited. Before adding cement, mix the deposited
aggregate as many times as necessary to produce a uniform mixture that complies with the specified
grading.
For mixing done from windrows, shape the windrow to a uniform cross section with a sizing device. Do
not use a motor grader unless equipped with a sizing device.
368

SECTION 27

CEMENT TREATED BASES

Aggregate mixed with cement and water before delivery on the roadbed must be deposited and spread
on the prepared subgrade under section 27-2.03E.
27-2.03C(2) Mixing
Mix road-mixed CTB by any of the following methods:
1. Road-mixed method:
1.1. On the roadbed
1.2. At a location off the roadbed
2. Plant-mixed method under section 27-2.03D except a Class 2 batch plant may be used
Use mechanical equipment that uniformly distributes cement and water. Whenever cement is added to
windrowed aggregates, flatten or slightly trench the top of the windrow to receive cement. Whenever
cross-shaft mixers are used, spread cement uniformly over the entire surface of the deposited aggregate.
Do not spread cement on aggregate more than 4 hours before the road-mixing operation.
The road-mixing machine must introduce water at the time of mixing with a metering device or other
authorized methods. Supply the correct quantity of water by means of controls that will produce a
completed mixture with a uniform moisture content. Correct water leaks from equipment or excessive
amounts of water during application before proceeding.
Just before initial compaction the moisture content of the completed mixture, when tested under California
Test 226, must be at least the optimum moisture content less 1 percent. The optimum moisture content is
determined under California Test 312.
For CTB spread and compacted in 2 or more layers, mix material for each layer separately.
Whenever more than 1 pass of the road-mixing machine is required to obtain a uniform mixture, at least 1
pass must be made before adding water to the material.
Regulate the length of road-mixed sections to comply with section 27-2.03G.
27-2.03D Proportioning and Mixing Plant-Mixed Cement Treated Base
27-2.03D(1) General
Mix plant-mixed CTB at a central mixing plant by either of the following:
1. Batch type mixing using either of the following:
1.1. Revolving blade
1.2. Rotary drum mixers
2. Continuous type mixing.
In all mixing plants, proportion aggregate, cement, and water by weight or volume. The Engineer must be
able to readily verify the amount of water per batch or the flow rate for continuous mixing. The time of the
addition of water or the points where it is introduced into the mixer must be authorized.
In all mixing plants, add cement in such a manner that it will be uniformly distributed throughout the
aggregates during the mixing operation.
Provide safe, convenient facilities in the supply line to the weigh hopper or pugmill for sampling cement.
At the point of delivery to the work, the moisture content of the completed mixture must be at least the
optimum moisture content less 1 percent. Determine moisture content under California Test 226 and
optimum moisture content under California Test 312.
27-2.03D(2) Batch Mixing
Whenever different aggregate sizes are used, the aggregates must be blended as they enter the mixer.
Weigh cement for each batch on scales that are separate and distinct from the aggregate batching
scales. Each cement scale graduation must be approximately 1/1000 of the total scale capacity. The total
capacity of the scale must not exceed the capacity of the smallest commercially available scale that is
capable of weighing twice the amount of cement when the plant is operated at full capacity. No scale is
required to have a total capacity less than 1000 lb or graduations less than 1 lb.
369

SECTION 27

CEMENT TREATED BASES

Mixing plants must be Class 1 unless Class 2 is specified.


Class 1 batch mixing plants must be equipped with:
1. Sufficient number of paddles arranged to produce a uniform mixture
2. Mixer platform large enough to provide safe and convenient access to the mixer and other equipment
3. Timing device accurate to within 2 seconds that indicates the end of the mixing period by audible or
visual signal
For Class 1 mixing plants, the mixing period begins after all the ingredients are in the mixer and ends
when the mixer is half empty. Mix until a homogeneous mixture with uniformly distributed and properly
coated aggregates, that do not change appearance, is produced and testing indicates the cement content
consistently complies with section 27-2.03A. The mixing period must not be less than 30 seconds.
Class 1 mixing plants must be equipped with automatic sampling devices actuated by operation of a push
button or similar device. When a sampling device is actuated it must simultaneously deliver a
representative sample of each size of aggregate or the combined aggregates to adequately sized
receptacles. Each sample must weigh from 55 to 65 lb. Locate receptacles safely clear of plant
operations with convenient access.
Class 2 mixing plants must comply with the specifications for a Class 1 mixing plant except (1) a timing
device to signal the end of mixing is not required and (2) automatic sampling devices are not required.
Class 2 mixing plants must provide safe and convenient access to sampling facilities for obtaining
representative samples of aggregate and the mixture.
27-2.03D(3) Continuous Mixing
Draw aggregate from storage facilities by a feeder or feeders that continuously supply the correct amount
of aggregate in proportion to cement. Whenever different aggregate sizes are used, arrange feeders so
the proportion of each aggregate size can be separately adjusted.
Storage facilities for fine aggregate must be equipped with a device that effectively vibrates the side walls
of the feeder preventing hang-up of material while the plant is operating.
The plant must be equipped with a control system that automatically closes down the plant when the
material in any storage facility approaches the strike-off capacity of the feed gate. The plant must not be
operated unless the automatic control system is in good working condition.
The aggregate feeder must be mechanically or electrically driven.
Mechanically driven feeders must be directly connected to the cement feeder drive. The drive shaft on the
feeder must be equipped with a revolution counter that reads to 1/10 revolution with sufficient capacity to
register the total number of revolutions in a day's run.
Electrically driven feeders must be actuated by the same circuit that provides power to the cement feeder
motor. For electric power obtained from a noncommercial source, a frequency meter must be connected
to the cement feeder motor circuit. The meter must have a minimum range from 57 to 63 Hz and must be
graduated in 1 Hz increments or less.
A voltage regulating transformer must be installed in the circuit of vibratory aggregate feeders. The
transformer must maintain the voltage to the feeder motors to within 1 percent of their nameplate voltage.
A voltmeter must be connected to the secondary of the voltage regulating transformer. The meter must
have a range from -10 to +10 percent of the motor nameplate voltage and must be graduated in
increments of 1 percent of the nameplate voltage, or less.
For plants equipped with electrically actuated aggregate feeders, the power must have a frequency of 60
1 Hz.
Continuous mixing plants must be equipped with an automatic sampling device specified for Class 1
plants in section 27-2.03D(2) that allows sampling when the plant is in full operation.
The cement feeder and aggregate feeders must be equipped with devices that allow the feed rate to be
determined when the plant is in full operation.
370

SECTION 27

CEMENT TREATED BASES

27-2.03E Spreading Treated Mixture


Transport materials mixed at a location off the roadbed as a uniform mixture. Cover the mixture during
transport to avoid moisture loss, if ordered. Deposit the mixture on the roadbed at a quantity that provides
the specified compacted thickness without spotting, picking up, or shifting the mixture.
Just before depositing plant-mixed or spreading road-mixed CTB, moisten the area to be covered. The
area must be kept moist, but not excessively wet.
Avoid material segregation. CTB must be free from pockets of coarse or fine material.
Spread the mixed materials in widths not less than 2 lanes, insofar as the width of the CTB to be spread
permits. Sections with 3-lane width may be spread as a 2-lane width and a 1-lane width. Spread materials
with 1 spreader or with several spreaders operating in a staggered position across the subgrade, unless
traffic conditions limit spreading to less than a 2-lane width. Whenever traffic conditions limit spreading to
less than a 2-lane width, spread the remainder of the 2-lane section within 2 hours. For traffic conditions
that prevent placement of CTB in adjacent lanes within 2 hours, a longer time may be authorized.
Longitudinal construction joints must be within 1 foot of lane line delineation.
For areas inaccessible to mechanical spreading equipment, spread CTB in 1 layer using an authorized
method. After spreading, thoroughly compact the mixture with pneumatic tampers or other compacting
equipment that obtains the degree of compaction specified in section 27-2.03F to the required lines,
grades, and cross section.
Do not mix or place CTB while the atmospheric temperature is below 35 degrees F. Do not place CTB on
frozen ground. Apply curing seal to completed CTB before the atmospheric temperature falls below 35
degrees F.
Comply with one of the following types of spreading operations:
1. For Type 1 spreading operation, spread CTB with a self-propelled mechanical spreader in one
operation. The CTB must be ready for compaction without further shaping. Equipment not propelled
by the unloading equipment is considered self-propelled. The spreader must be equipped with a
screed that strikes off and distributes the material to the full width being spread and within the
specified surface tolerance. The screed must be adjustable to produce the required cross section.
Screed action includes any cutting, crowding or other practical motion that produces a finished
surface texture of uniform appearance. The mechanical spreader must be equipped with fully
automatic screed and grade sensing controls that control the longitudinal grade and cross slopes of
the screed. Screed controls must be able to automatically compensate for differences from the slope
and grade established by the Engineer.
2. For Type 2 spreading operation, comply with Type 1 except automatic screed controls and grade
sensing controls are not required.
3. For Type 3 spreading operation, spread the treated mixture with any equipment that will consistently
finish the base within the tolerance specified in section 27-2.03F without material segregation.
Whenever a spreading type is not specified, use Type 3 on ramps and Type 1 at all other locations.
Except as otherwise specified, do not used motor graders for spreading and compacting operations. In
order to finish the base within the specified tolerance, motor graders may be used to trim the edges and
surface of CTB after initial compaction. A motor grader is considered a self-propelled mechanical
spreader if:
1. Equipped with end wings on the blade
2. Blade is locked in a position perpendicular to the direction of travel
3. Equipped with cross slope and automatic grade controls that comply with the requirements for the
specified type of spreading operation
27-2.03F Compacting
Compacting equipment must produce the required compaction within the operation time limit specified in
27-2.03G.
Immediately following the spreading operation, compact the CTB with at least 1 complete coverage.
371

SECTION 27

CEMENT TREATED BASES

After initial compaction, wherever the finished surface is higher than the specified tolerance, trim off high
spots to within tolerance. Do not fill low areas by drifting or hauling trimmed material.. Following trimming,
the trimmed areas must be compacted with 1 complete coverage so that the entire layer of CTB complies
with the specified compaction requirements. Perform final compaction in such a manner that no loose
material remains on the surface and tear marks are eliminated.
Whenever CTB is spread and compacted in more than 1 layer, compact each lower layer to the required
degree of compaction before placing the next layer. Trim only to comply with the specified layer
thickness.
The compacted thickness of any 1 layer must not exceed 0.50 foot or be less than 0.25 foot. When
placed in more than 1 layer, keep the compacted material moist until covering with the next layer or
curing seal. Apply curing seal to the surface of a lower layer that will not be covered with the next layer on
the same day.
The relative compaction of CTB must not be less than 95 percent. For Class A CTB, compaction is tested
under California Test 312 or 231. Each layer of CTB may be tested for compaction, or all layers may be
tested together, at the option of the Engineer. Whenever all layers are tested together, you are not
relieved of the responsibility to achieve the required compaction in each layer placed.
The finished CTB surface must be uniform and must not deviate at any point more than 0.03 foot from the
bottom of a 12-foot straight edge laid in any direction.
The finished CTB surface must not vary 0.05 foot above or below the grade established by the Engineer,
except whenever concrete pavement will be placed on CTB, the finished CTB surface must not extend
above the grade established by the Engineer.
Wherever the surface of hardened CTB is lower than 0.05 foot from the grade established by the
Engineer, remove the base and replace it with CTB or, if authorized fill low areas according to the
pavement material as follows:
1. For HMA pavement, fill low areas with HMA that complies with the specifications for the lowest layer
of HMA pavement. Do not fill low areas concurrently with the paving operation.
2. For concrete pavement, fill low areas with pavement concrete concurrent with the paving operation.
The surface must be kept moist at all times until the curing seal is applied.
Excess material may be placed as aggregate for shoulder construction if:
1. Shoulder subgrade is prepared as specified.
2. Hardened chunks of trimmed material are removed or reduced to the maximum size specified for
shoulder aggregate.
3. Trimmed material incorporated into the shoulder does not exceed 25 percent of the planned volume
of shoulder aggregate per linear foot of shoulder. Whenever trimmed material exceeds this limit, it
must be removed and placed in other areas to comply with the 25 percent limit.
4. Excess material is uniformly distributed in the shoulder area prior to spreading additional shoulder
aggregate.
Excess material may be used in other work provided the material complies with the applicable
specifications.
27-2.03G Operation Time Requirement
Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to
completion of initial compaction before trimming. Do not allow more than 2-1/2 hours to elapse from the
time water is added to the aggregate and cement to completion of final compaction after trimming.
27-2.03H Contact Joints
Construct a contact joint at the end of each work day and whenever CTB operations are delayed or
stopped for more than 2 hours. Contact joints must be constructed in thoroughly compacted material,
normal to the roadbed centerline, with a vertical face. Do not place additional CTB until the contact joint is
accepted.
372

SECTION 27

CEMENT TREATED BASES

Where CTB has been finally compacted for more than 1 hour, construct longitudinal joints by cutting
vertically into the existing edge approximately 3 inches deep. Moisten the face of the cut joint in advance
of placing adjacent base. Material from cutting may be used as excess material as specified in section 272.03F.
27-2.03I Curing
Cover the completed CTB with asphaltic emulsion curing seal. Asphaltic emulsion curing seal must
comply with section 94, Grade SS1 or CSS1.
Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic
emulsion. The water must not cause premature separation of the emulsion. Uniformly apply the diluted
curing seal at a rate between 0.20 to 0.30 gal/sq yd of CTB surface. The exact rate will be ordered.
Apply curing seal on the same day as completion of final compaction and as soon after final compaction
is practicable. Keep the surface moist until curing seal is applied.
Do not allow traffic or equipment on the CTB for 72 hours after application of the curing seal. After 72
hours, limit traffic and equipment on the CTB to that used in paving operations or placing additional layers
of CTB.
27-2.04 PAYMENT
Whenever excess material is placed in an area in which the item is measured by the ton, payment as the
item where placed will not be allowed unless applicable measurement specifications for the item where
placed are complied with.
Whenever CTB is paid for by the ton, the quantity of excess material will be deducted from the measured
quantity of CTB except, the quantity of CTB used in shoulders.
For CTB paid for by the cu yd, a deduction will be made when areas that are deficient in thickness and for
which the deficient thickness has not been compensated for by filling of low areas with CTB. The
deduction will be computed as the product of:
1.
2.
3.
4.

Deficient thickness less allowable tolerance


Spread width
Longitudinal distance of the deficient thickness
$28.00 per cubic yard or the item bid price, whichever is higher

For determining areas of deficient thickness, the longitudinal distance between thickness measurements
will not exceed 1,000 linear feet for each direction of travel. Whenever requested, the Engineer will make
additional measurements at the Engineer's discretion to define the area of deficient thickness at your
cost.
Whenever CTB is measured by the cu yd:
1. The volume will be calculated on the basis of the dimension shown
2. CTB placed below the grade established by the Engineer will not be measure or paid for.
3. If an increase or decrease in the specified quantity of portland cement is ordered, the quantity of
cement subject to increased or decreased compensation will be the difference between the specified
theoretical quantity of cement and the theoretical quantity of cement ordered. The theoretical quantity
of cement will be determined by use of the following formula:
Wc =

1686C x V(D - M)

100 + C

Where:
Wc = Theoretical quantity of cement in lb
V = Pay volume of CTB in cu yd
C = Percentage of cement in the mix
D = Average in-place wet density in g/cc
M = Average in-place moisture in g/cc
373

SECTION 27

CEMENT TREATED BASES

Whenever CTB is measured by the ton:


1. Quantity of CTB to be paid for will be the sum of the weight of the aggregate used in the mix and the
weight of cement to be added to the mix.
2. Quantity of aggregate for road-mixed CTB that is mixed on the roadbed will be measured before
delivery to the roadbed under section 9-1.02 except, the weight to be paid for will be determined by
deducting from the weight of the aggregate, and the weight of the water in the aggregate at the time
of weighing in excess of 3 percent of the dry weight of the aggregate.
3. Quantity of portland cement for road-mixed CTB that is mixed on the roadbed to be included in the
quantity of the combined item of road-mixed CTB for payment will be the weight, in tons, calculated
by multiplying the specified percentage of cement to be added to the mix by the weight of dry
aggregate.
4. Quantity of plant-mixed CTB or road-mixed CTB that is mixed by the plant-mixed method will be
measured, after mixing, under section 9-1.02 except that moisture in excess of 3 percent of the dry
weight of the mixture will be deducted from the weight of the combined aggregate, cement and water.
When the specified quantity of portland cement is increased in plant-mixed CTB or road-mixed CTB
mixed by the plant-mixed method, the weight of cement subject to increased compensation, as
provided in section 27-1.04 is deducted from the combined weight of aggregate and cement.
27-3 RESERVED

374

28 CONCRETE BASES

28-1 GENERAL

Reserved
28-2 LEAN CONCRETE BASE
28-2.01 GENERAL
28-2.01A Summary
Section 28 includes specifications for mixing aggregate, portland cement, water, and chemical admixtures
and spreading, shaping, and compacting the mixture.
28-2.01B Submittals
Submit the grading of the aggregate to be used as an information submittal. The material must be
available for sampling and testing at least 45 days before placing LCB. If you change the aggregate
source, submit the new source and grading and have the aggregate available for sampling and testing at
least 45 days before use.
28-2.01C Definitions
coarse aggregate: Aggregate retained on a no. 4 sieve.
fine aggregate: Aggregate passing a no. 4 sieve.
28-2.02 MATERIALS
Cement must comply with section 90-1.02B(2), Type II.
Water must comply with section 90-1.02D.
The air content in LCB must not exceed 4 percent. If the aggregate used for LCB is produced from
processed reclaimed asphalt concrete or other material that may cause the air content to exceed 4
percent, reduce the air content with an admixture.
The portland cement content of LCB must be at least 270 lb/cu yd except, after testing samples from the
proposed aggregate supply an increase in the cement content may be ordered. Compensation for an
ordered increase is specified in section 28-2.04.
A water-reducing chemical admixture may be used. Water-reducing chemical admixture must comply with
ASTM C 494, Type A or Type F.
Air-entraining admixtures must comply with section 90-1.02E.
Aggregate must be clean and free from decomposed material, organic material, and other deleterious
substances. Aggregate samples must not be treated with lime, cement, or chemicals before testing for
sand equivalent.
Use either 1-1/2 inch or 1 inch grading. Do not change your selected aggregate grading without
authorization.
When tested under California Test 202, the percentage composition by weight of the aggregate must
comply with the grading requirements for the sieve sizes shown in the following table:

375

SECTION 28

CONCRETE BASES

Aggregate Grading
Percentage passing
Sieve sizes
1-1/2" maximum
1" maximum
Operating range
Contract compliance
Operating range
Contract compliance
2"
100
100
--1-1/2"
90100
87100
100
100
1"
--90100
87100
3/4"
5085
4590
50100
45100
3/8"
4075
3580
4075
3580
No. 4
2560
2065
3560
3065
No. 30
1030
634
1030
634
No. 200
012
015
012
015
a
Modify California Test 202 under California Test 105 whenever the difference in the specific gravities of
the coarse and fine portions of the aggregate or the blends of different aggregates is 0.2 or more.
Aggregate must comply with the quality requirements shown in the following table:

Property
Sand equivalent (min)
Compressive strength (psi) (min)

Aggregate Quality
California Test Operating range
217
21
548
-

Contract compliance
18
700

If the aggregate grading or the sand equivalent test results, or both comply with contract compliance
requirements but not operating range requirements, you may continue placing LCB for the remainder of
the work day. Do not place additional LCB until you demonstrate to the Engineer the LCB to be placed
complies with the operating range requirements.
If the aggregate grading or sand equivalent test results, or both do not comply with contract compliance
requirements, remove the LCB or request a payment deduction. If your request is authorized, $2.50/cu yd
is deducted. An aggregate grading and a sand equivalent test represents up to (1) 500 cu yd or (2) 1
day's production if less than 500 cu yd.
28-2.03 CONSTRUCTION
28-2.03A General
Reserved
28-2.03B Subgrade
Immediately before spreading LCB, the subgrade must:
1. Comply with the specified compaction and elevation tolerance for the material involved
2. Be free from loose or extraneous material
3. Be uniformly moist
Areas of subgrade lower than the grade established by the Engineer must be filled with LCB. LCB used to
fill low areas of subgrade is not included in the quantity of LCB for payment.
28-2.03C Proportioning, Mixing, and Transporting
Proportion LCB under section 90-1.02F except, aggregate does not have to be separated into sizes.
Mix and transport LCB under section 90-1.02G except, the 5th and 7th paragraphs in section 90-1.02G(6)
do not apply.
Nominal penetration range for LCB must be from 0 to 1-1/2 inches. Maximum penetration must not
exceed 2 inches.
28-2.03D Placing
Place LCB under section 40-1.03H(1) except the 3rd paragraph does not apply.
376

SECTION 28

CONCRETE BASES

Unless shown or specified, construct LCB in minimum widths of 12 feet separated by construction joints.
For LCB constructed monolithically in widths greater than 26 feet, construct a longitudinal contraction joint
offset no more than 3 feet from the centerline of the width being constructed.
Longitudinal contraction joints must comply with section 40-1.03E(5).
For LCB to be paved with concrete pavement, construct longitudinal construction and contraction joints in
LCB to provide at least 1 foot horizontal clearance from planned longitudinal construction and contraction
joints in the concrete pavement.
Do not mix or place LCB when the atmospheric temperature is below 35 degrees F. Do not place LCB on
frozen ground.
28-2.03E Spreading, Compacting, and Shaping
Spread, compact, and shape LCB under section 40-1.03H(4) or under section 40-1.03H(5).
For LCB to be paved with HMA, before curing operation texture the LCB finished surface by dragging a
broom, burlap, or a spring steel tine device. If using a spring steel tine device, the device must produce a
scored surface with scores parallel or transverse to the pavement centerline. Texture at a time and in a
manner that produces the coarsest texture for the method used.
Do not texture LCB to be paved with concrete pavement. Before applying curing compound, finish LCB to
a smooth surface free from mortar ridges and other projections.
The finished surface must be free from porous areas.
For LCB to be paved with HMA, the finished surface must not vary more than 0.05 foot from the grade
established by the Engineer.
For LCB to be paved with concrete pavement, the finished surface must not be above the grade, or more
than 0.05 foot below the grade established by the Engineer.
28-2.03F Curing
Cure LCB with pigmented curing compound under section 90-1.03B(3) and 40-2.03J except, for LCB to
be paved with concrete pavement use curing compound no. 3 that contains a minimum of 22 percent
nonvolatile vehicles consisting of at least 50 percent paraffin wax. Apply curing compound to the area to
be paved with concrete pavement:
1.
2.
3.
4.

In 2 separate applications
At a rate of 1 gal/150 sq ft for each application
Before the atmospheric temperature falls below 40 degrees F
Within 4 days after the last application, clean the surface and apply curing compound at a rate of 1
gal/200 sq ft

Do not allow traffic or equipment on the LCB for 72 hours after application of the curing compound. After
72 hours, limit traffic and equipment on the LCB to that used in paving operations or placing additional
layers of LCB.
Immediately repair damage to the curing compound or LCB.
28-2.03G Surfaces Not Within Tolerance
Where LCB will be paved with concrete pavement, remove the base wherever the surface is higher than
the grade established by the Engineer and replace it with LCB. Where LCB will not be paved with
concrete pavement, remove the base wherever the surface is higher than 0.05 foot above the grade
established by the Engineer and replace it with LCB. If authorized, grind the surface with either a diamond
or carborundum blade to within tolerance. After grinding LCB to be paved with concrete pavement and
after all free water has left the surface, clean foreign material and grinding residue from the surface. Apply
curing compound to the ground area at a rate of approximately 1 gal/150 sq ft.
Where the surface of LCB is lower than 0.05 foot from the grade established by the Engineer, remove the
base and replace it with LCB or, if authorized, fill low areas according to the pavement material as
follows:
377

SECTION 28

CONCRETE BASES

1. For HMA pavement, fill low areas with HMA that complies with the specifications for the lowest layer
of pavement. Do not fill low areas concurrently with the paving operation.
2. For concrete pavement, fill low areas with pavement concrete concurrent with the paving operation.
28-2.04 PAYMENT
LCB is measured from the dimensions shown.
If an increase in the specified cement content is ordered, payment for the increase in cement will be the
cost of cement per ton, f.o.b. the cement mill including sales tax plus the freight cost per ton for delivery
from the mill to the plant. In determining payment, any cash or trade discount offered or available
regardless of whether it was taken by the purchaser will be credited to the Department.
Submit evidence of the cost of cement used for an ordered increase. Maintain records that allow a clear
determination of the cement costs associated with the increase.
If your records show an excessive price for the increase of cement or you furnish inadequate evidence for
the cost, the Engineer determines the price to be the lowest wholesale cost that the cement was available
in the quantities delivered to the point of production, less any available discounts.
The quantity of cement subject to increased compensation will be the difference between the specified
theoretical quantity of cement and the theoretical quantity of cement ordered by the Engineer. No
additional adjustment of compensation will be made for variations in the cost of work resulting from the
change in the quantity of portland cement.
28-328-6 RESERVED

378

29 TREATED PERMEABLE BASES


29-1.01 GENERAL
Section 29 includes specifications for mixing aggregate with asphalt binder or mixing aggregate with
portland cement and water, spreading, compacting, and shaping the mixture.
29-1.02 MATERIALS
29-1.02A General
Reserved
29-1.02B Asphalt Treated Permeable Base
Aggregates must be clean and free from decomposed material, organic material, and other deleterious
substances.
When tested under California Test 202, aggregate must comply with the grading requirements for the
sieve sizes shown in the following table:
Aggregate Grading
Sieve sizes Percentage passing
1"
100
3/4"
90100
1/2"
3565
3/8"
2045
No. 4
010
No. 8
05
No. 200
02
Aggregate must comply with the quality requirements shown in the following table:
Aggregate Quality
Property
Percentage of crushed particles (min)
Los Angeles rattler loss at 500 rev (max)
Cleanness value (min)
Film stripping (max)

California
Test
205
211
227
302

Value
90%
45%
57
25%

29-1.02C Cement Treated Permeable Base


Aggregate must comply with section 90-1.02C. Aggregate grading must comply with the specifications for
the 1" x no. 4 primary aggregate nominal size coarse grading in section 90-1.02C(4)(b).
Cement must comply with section 90-1.02B(2),Type II.
Water must comply with section 90-1.02D.
29-1.03 CONSTRUCTION
29-1.03A General
Immediately before spreading treated permeable base, the subgrade must:
1. Comply with the specified compaction and elevation tolerance for the material involved
2. Be free from loose or extraneous material
3. Be uniformly moist
Areas of subgrade lower than the grade established by the Engineer must be filled with treated
permeable base. Treated permeable base used to fill low areas of subgrade is not included in the quantity
of treated permeable base for payment.

379

SECTION 29

TREATED PERMEABLE BASES

Spread treated permeable base when the atmospheric temperature is above 40 degrees F.
Finish treated permeable base to a uniform surface within 0.05 foot of the grade established by the
Engineer.
Place filter fabric on the edge and on the top of the high side (the side opposite the edge drain side) of the
treated permeable base and at intermediate cross drain interceptors. Place filter fabric under section 68
1.03.
Place and compact treated permeable base for edge drains under section 68-4.02C.
29-1.03B Asphalt Treated Permeable Base
Produce ATPB under section 39-1.08 except:
1.
2.
3.
4.

Aggregate does not need to be separated into sizes.


Temperature of the aggregate before adding the asphalt binder must be from 275 to 325 degrees F.
Do not store ATPB longer than 2 hours.
Combine aggregate with 2.5 percent asphalt binder by weight of dry aggregate. An increase or
decrease in the asphalt content may be ordered after your proposed aggregate supply has been
tested. If an ordered increase or decrease exceeds the specified amount of asphalt content by more
than 0.1 percent by weight of dry aggregate, compensation for ATPB is determined by the total
increase or decrease in asphalt.
5. The Engineer has the option of determining the asphalt content of the asphalt mixture under
California Test 310, 362, or 379. The bitumen ratio (pounds of asphalt per 100 lb of dry aggregate)
must not vary more than 0.5 lb of asphalt above or below the amount designated by the Engineer.
Samples used to determine the bitumen ratio are obtained from trucks at the plant or from the mat
behind the paver before rolling. If the sample is taken from the mat behind the paver, the bitumen
ratio must not be less than the amount designated by the Engineer, less 0.7 lb of asphalt per 100 lb of
dry aggregate.
Spreading and compacting ATPB must comply with the specifications for spreading and compacting HMA
in section 39-3 except, spread and compact base in 1 layer using one of the following methods:
1. One complete coverage with a steel-tired, 2-axle tandem roller that has an operating weight below
110 lb per linear inch of steel-tire width. Compact when the base mixture is from 250 to 200 degrees
F.
2. One complete coverage with a steel-tired, 2-axle tandem roller weighing from 8 to 12 tons. Compact
when the base mixture is from 150 to 100 degrees F.
Do not use water to cool the ATPB.
Vibratory rollers complying with the above requirements may be used if the vibratory unit is turned off.
29-1.03C Cement Treated Permeable Base
Store, proportion, mix, and transport aggregates, cement and water, under sections 90-1.02F and 901.02G except, aggregate does not have to be separated into sizes and the water amount and penetration
requirements do not apply.
The cement content of CTPB must be at least 287 lb/cu yd.
The water to cement ratio must be approximately 0.37. The Engineer determines the exact water to
cement ratio.
Place CTPB under section 40-1.03H(1) except the 3rd paragraph does not apply.
Spread, compact, and shape CTPB under section 40-1.03H(4) or under section 40-1.03H(5). Vibrators
must not be used.
Compact with a 2-axle steel-tired roller weighing from 6 to 10 tons. Compact within 30 minutes after
spreading the base. Compaction must consist of 2 complete passes of the CTPB.
Cure CTPB by sprinkling the completed surface with a fine spray of water every 2 hours for a period of 8
hours. Start curing the morning after base has been placed.
380

SECTION 29

TREATED PERMEABLE BASES

29-1.03D Surfaces Out of Tolerance


Where the surface of treated permeable base is higher than 0.05 foot from the grade established by the
Engineer, remove the base and replace it with the specified treated permeable base. If authorized,
remove high spots to comply with the specified tolerance by any method that does not produce
contaminating fines or damage the base remaining in place. Grinding is not allowed.
Where the surface of treated permeable base is lower than 0.05 foot from the grade established by the
Engineer, remove the base and replace it with the specified treated permeable base. If authorized, fill low
areas with pavement material as follows:
1. For HMA pavement, fill low areas with HMA that complies with the specifications for the lowest layer
of HMA pavement. Do not fill low areas concurrently with the HMA paving operation.
2. For concrete pavement, fill low areas with paving concrete concurrent with the concrete pavement
paving operation.
29-1.04 PAYMENT
ATPB and CTPB is measured from the dimensions shown. Unless ordered, base placed outside of the
shown dimensions will not be measured or paid for.
Treated permeable base for edge drains installed adjacent to treated permeable base is not measured or
paid for as treated permeable base.

3036 RESERVED

381

DIVISION V SURFACING AND PAVEMENTS

37 BITUMINOUS SEALS

37-1 GENERAL

37-1.01 GENERAL
Section 37-1 includes general specifications for applying bituminous seals.
37-2 SEAL COATS
37-2.01 GENERAL
37-2.01A Summary
Section 37-2 includes specifications for applying seal coats and screenings.
Seal coat includes applying asphaltic emulsion followed by screenings.
Fog seal coat includes applying slow-setting asphaltic emulsion.
Flush coat includes applying a fog seal coat to the surface of a seal coat, followed by sand.
Modified emulsion seal coat includes applying polymer modified asphaltic emulsion, followed by
screenings, and then a flush coat.
37-2.01B Definitions
Reserved
37-2.01C Submittals
37-2.01C(1) General
Reserved
37-2.01C(2) Asphaltic Emulsion Seal Coat
Submit a 1/2 gallon sample of asphaltic emulsion in a plastic container. Take the sample from the
distributor truck spray bar at mid load.
37-2.01C(3) Fog Seal Coat
Submit a 1/2 gallon sample of asphaltic emulsion for fog seal coats in a plastic container. Take the
sample from the distributor truck spray bar at mid-load.
37-2.01C(4) Polymer Modified Asphaltic Emulsion Seal Coat
At least 10 days before starting modified emulsion seal coat application, submit the name of an
authorized laboratory for polymer modified asphaltic emulsion quality control testing.
Submit a sample of polymer modified asphaltic emulsion to the authorized laboratory and the Engineer.
Each sample must be submitted in an insulated shipping container within 24 hours of sampling.
Within 7 days after taking samples, submit the authorized laboratory's test results for polymer modified
asphaltic emulsion.
At least 10 days before starting modified-emulsion seal coat application, submit a signed copy of the test
result report of the Vialit test method for aggregate retention in chip seals (french chip) to the Engineer
and to:
DEPARTMENT OF TRANSPORTATION
Division of Maintenance, Roadway Maintenance Office
1120 N Street, MS 31
Sacramento, CA 95814
37-2.01C(5) Reserved
37-2.01C(6) Unsuitable Day Notice
Submit the name of a representative and provide a means for the Engineer to communicate an unsuitable
day notice.
383

SECTION 37

BITUMINOUS SEALS

37-2.01D Quality Control and Assurance


37-2.01D(1) General
Reserved
37-2.01D(2) Asphaltic Emulsion Seal Coat
Samples for the screenings grading and cleanness value must be taken from the spreader conveyor belt.
37-2.01D(3) Polymer Modified Asphaltic Emulsion Seal Coat
Samples for the screenings grading and cleanness value must be taken from the spreader conveyor belt.
Within 3 business days of sampling, the authorized laboratory must test polymer modified asphaltic
emulsion for the following properties:
1.
2.
3.
4.

Viscosity (AASHTO T 59)


Sieve test(AASHTO T 59)
Demulsibility (AASHTO T 59)
Torsional recovery (California Test 332)

The authorized laboratory must test screenings for retention under the Vialit test method for aggregate in
chip seals (french chip). The Vialit test results are not used for acceptance. The Vialit test is available at
the METS Web site.
Circulate polymer modified asphaltic emulsion in the distributor truck before sampling. Take samples from
the distributor truck at mid load or from a sampling tap or thief. Before taking samples, draw and dispose
of 1 gallon. Take two 1/2-gallon samples in the presence of the Engineer.
If the test results for polymer modified asphaltic emulsion do not comply with the specifications, the
Engineer assesses a pay factor value for the following properties and increments:
Polymer Modified Asphaltic Emulsion Pay Factor Table
Test method and property
Increment
Test on asphaltic emulsion (polymer modified)
Each 10 seconds above max or
AASHTO T 59
(Viscosity, sec Saybolt Furol, at 50 below min
C)
AASHTO T 59
Each 1.5 percent above max
(settlement, 5 days, percent)
AASHTO T 59
Each 0.2 percent above max
(sieve test, percent max)
AASHTO T 59
Each 2 percent below min
(demulsibility percent)
Test on residue from evaporation test
AASHTO T 49
Each 2 dm above max or below min
(penetration, 15 C)
ASTM D 36
2 C below min
(field softening point C)
California Test 332
For each 1 increment below the min
(torsional recovery a)
value of 18
For each 2 increments below the min
value of 18
For each 3 or more increments
below the min value of 18
a
The highest pay factor applies

Pay factor

The Engineer assesses a pay factor of 1 for sampling not performed in compliance with the
specifications, including shipping and sampling containers.

384

1
1
1

1
1
1
3
10

SECTION 37

BITUMINOUS SEALS

If test results for polymer modified asphaltic emulsion are not in compliance with the specifications, you
may request that the seal coat represented by the tests remain in place with a payment deduction based
on the pay factors.
If a test result for the screenings cleanness value is from 75 to 86, you may request that the seal coat
represented by the test remain in place. A payment deduction is made as specified in section 37-2.04 If
the screenings cleanness value is less than 75, remove the seal coat.
37-2.01D(4) Reserved
37-2.02 MATERIALS
37-2.02A General
Reserved
37-2.02B Asphaltic Emulsion
Reserved
37-2.02C Asphaltic Emulsion for Fog Seal Coat
Asphaltic emulsion for fog seal coat must be any of the slow-setting grades of asphaltic emulsion.
If additional water is added to the asphaltic emulsion, the resultant mixture must not be more than 1 part
asphaltic emulsion to 1 part water. The Engineer determines the exact amount of additional water.
37-2.02D Asphaltic Emulsion for Flush Coat
The Engineer selects the type of asphaltic emulsion from Grade CSS1, Grade CSS1h, or Grade CQS1h.
37-2.02E Prime Coat
Liquid asphalt for prime coat must comply with section 93.
37-2.02F Polymer Modified Asphaltic Emulsion
Polymer modified asphaltic emulsion must include elastomeric polymer.
Modified emulsion must comply with section 94, Table 3, under the test on residue from evaporation test
for Grades PMRS2, PMRS2h, PMCRS2, and PMCRS2h and the following:
1. The penetration at 59 degrees F (7 oz for 60 seconds) determined under AASHTO T 49 must be at
least 6.
2. Test elastic recovery under AASHTO T 301.
3. Polymer content in percent by weight does not apply.
4. The minimum ring and ball softening point temperature determined under AASHTO T 53 for Test on
Residue from Evaporation Test must comply with the following:
4.1. 126 degrees F for a geographical ambient temperature from 32 to 104 degrees F
4.2. 129 degrees F for a geographical ambient temperature from 18 to 104 degrees F
4.3. 135 degrees F for a geographical ambient temperature from 18 to greater than 104 degrees F
37-2.02G Reserved
37-2.02H Screenings
37-2.02H(1) General
Screenings must be broken stone, crushed gravel, or both. At least 90 percent of screenings by weight
must be crushed particles as determined under California Test 205.
Screenings for seal coats must have the properties specified in the following table:
Seal Coat Screenings
Properties
Test method
Los Angeles Rattler, %, max
California Test
Loss at 100 revolutions.
211
Loss at 500 revolutions.
Film stripping, %, max
California Test
302
385

Specification
10
40
25

SECTION 37

BITUMINOUS SEALS

37-2.02H(2) Asphaltic Emulsion Seal Coat


Screenings for asphaltic emulsion seal coat must have the gradation as determined under California Test
202 in the following table.
Asphaltic Emulsion Seal Coat Screenings Gradation
Percentage passing
Sieve
Coarse
Medium
Medium fine
Fine
sizes
1/2" max
3/8" max
5/16" max
1/4" max
3/4"
100
---1/2"
95100
100
--3/8"
5080
90100
100
100
No. 4
015
530
3060
6085
No. 8
05
010
015
025
No. 16
-05
05
05
No. 30
--03
03
No. 200
02
02
02
02
The cleanness value determined under California Test 227 must be 80.
37-2.02H(3) Polymer Modified Asphaltic Emulsion Seal Coat
Screenings for polymer modified asphaltic emulsion seal coat must have the gradation as determined
under California Test 202 in the following table:
Polymer Modified Asphaltic Emulsion Seal Coat Screenings
Gradation
Percentage passing
Sieve
Coarse
Medium
Medium fine
Fine
sizes
1/2" max
3/8" max
5/16" max
1/4" max
3/4"
100
---1/2"
85100
100
--3/8"
030
85100
100
100
No. 4
05
015
050
6085
No. 8
-05
015
025
No. 16
--05
05
No. 30
--03
03
No. 200
02
02
02
02
The cleanness value determined under California Test 227 must be 86.
37-2.02H(4) Reserved
37-2.02I Polymer Modified Asphaltic Emulsion and Screenings Test
Polymer modified asphaltic emulsion and screenings must have 90 percent retention when tested under
the Vialit test method for aggregate in chip seals (french chip).
37-2.02J Sand
Sand for flush coat must comply with the material specifications for fine aggregate grading in section 90
1.02C(3). Sand must not include organic material or clay.
37-2.03 CONSTRUCTION
37-2.03A General
Wherever final sweeping or brooming of the seal coat surface is complete, place permanent traffic stripes
and pavement markings within 10 days.
37-2.03B Equipment
37-2.03B(1) General
Equipment for seal coats must include and comply with the following:
386

SECTION 37

BITUMINOUS SEALS

1. Screenings haul trucks. Haul trucks must have:


1.1. Tailgates that discharge screenings
1.2. Devices to lock onto the rear screenings spreader hitch
1.3. Dump beds that will not push down on the spreader when fully raised
1.4. Dump beds that will not spill screenings on the roadway when transferred to the spreader
hopper
2. S
elf-propelled screenings spreader. The spreader must have:
2.1. Screenings hopper in the rear
2.2. B
elt conveyors that carry the screenings to the front
2.3. Spreading hopper capable of providing a uniform screening spread rate over the entire width of
the traffic lane in 1 application.
3. Self-propelled power brooms. Do not use gutter brooms or steel-tined brooms. Brooms must be
capable of removing loose screenings adjacent to barriers that prevent screenings from being swept
off the roadway, including curbs, gutters, dikes, berms, and railings.
4. Pneumatic-tired rollers. Pneumatic-tired rollers must be an oscillating type at least 4 feet wide. Each
roller must be self-propelled and reversible. Pneumatic tires must be of equal size, diameter, type,
and ply. The roller must carry at least 3,000 lb of load on each wheel and each tire must have an air
pressure of 100 5 psi.
37-2.03B(2) Reserved
37-2.03C Unsuitable Day
The Engineer may notify you of unsuitable conditions before 4:00 p.m. on the day before your 1st
intended working day to place seal coat. After you have started seal coat placement activities, the
Engineer has until 4:00 p.m. on the day before the next working day to give you an unsuitable day notice.
If the Engineer gives you an unsuitable day notice (1) do not place seal coat on the next working day and
(2) the Department does not pay for the return, storage or disposal of materials delivered to the job site or
the time of workers. If maintenance of previously applied seal coat can be performed, continue to perform
maintenance.
In the absence of an unsuitable day notice or if the Engineer gives notice after 4:00 p.m. of the previous
day:
1. Comply with specifications restricting seal coat application.
2. Return, store, or dispose of any seal coat materials you deliver to the job site when conditions are
unsuitable.
3. The Department adjusts payment for the return, storage or disposal of materials delivered to the job
site.
4. The Department adjusts payment for the show-up time of workers who would have applied seal coat.
5. Payment of materials and labor will be determined under section 9-1.04, except markups are not
added.
It is a nonworking day if the seal coat work is the controlling operation and (1) the Engineer provides you
timely notice of an anticipated unsuitable day or (2) there is untimely or no notice and conditions are
unsuitable for placing seal coat.
If you fail to submit the name of a person authorized to communicate with the Engineer about unsuitable
day notices, the specifications for payment do not apply.
37-2.03D Surface Preparation
Before applying seal coat, cover manholes, valve and monument covers, grates, or other exposed
facilities located within the area of application, using a plastic or oil resistant construction paper secured
by tape of adhesive to the facility being covered. Reference the covered facilities with a sufficient number
of control points to relocate the facilities after the application of the seal coat.
After completion of the seal coat operation, remove covers from the facilities.

387

SECTION 37

BITUMINOUS SEALS

Immediately before applying seal coat, clean the surface to receive seal coat by removing extraneous
material and drying. Cleaning the existing pavement includes the use of brooms.
If seal coat is applied to untreated material, apply a prime coat of liquid asphalt. The prime coat
application rate must be from 0.20 to 0.33 gal/sq yd. The Engineer determines the exact rate.
37-2.03E Reserved
37-2.03F Applying Emulsion
37-2.03F(1) General
For areas not accessible to a truck distributor bar, apply the emulsion with a squeegee, rake or other
means authorized by the Engineer.
Prevent spray on existing pavement not intended for seal coat or on previously applied seal coat using a
material such as building paper. Remove the material after use. At longitudinal joints, you may overlap
the emulsion applications before the application of screenings if the overlap is dispersed with squeegees
or rakes.
Align longitudinal joints between seal coat applications with designated traffic lanes. Overlap longitudinal
joints by not more than 4 inches. You may overlap longitudinal joints up to 8 inches if authorized.
Do not apply the emulsion unless there are sufficient screenings at the job site to cover the emulsion or
binder.
Discontinue application of emulsion early enough to comply with lane closure specifications and
darkness. Apply to 1 lane at a time and cover the lane entirely in 1 operation.
37-2.03F(2) Asphaltic Emulsion for Fog Seal Coat
Apply asphaltic emulsion for fog seal coat at a residual asphalt rate from 0.02 to 0.06 gal/sq yd. The
Engineer determines the exact rate.
Apply fog seal coat when the ambient air temperature is above 40 degrees F.
Sprinkle water on fog seal coat that becomes tacky in an amount determined by the Engineer,.
If fog seal coat and seal coat with screenings are specified on the same project, apply fog seal coat at
least 4 days before applying the adjoining seal coat with screenings. The joint between the seal coats
must be neat and uniform.
37-2.03F(3) Asphaltic Emulsion for Seal Coat
Asphaltic emulsion must be applied within the application rate ranges shown in the following table:
Asphaltic Emulsion Application Rates
Screenings
Application rate range(gallons
per square yard)
Fine
0.150.30
Medium fine
0.250.35
Medium
0.250.40
Coarse
0.300.40
The Engineer determines the exact application rate.

At the time of application, the temperature of the asphaltic emulsion must be from 130 to 180 degrees F.

Apply asphaltic emulsion when the ambient air temperature is from 65 to 110 degrees F and the

pavement surface temperature is at least 80 degrees F.

Do not apply asphaltic emulsion when weather forecasts predict the ambient air temperature will fall

below 39 degrees F within 24 hours after application.

When tested under California Test 339, the application rate for asphaltic emulsion must not vary from the

average by more than:

388

SECTION 37

BITUMINOUS SEALS

1. 15 percent in the transverse direction


2. 10 percent in the longitudinal direction
37-2.03F(4) Polymer Modified Asphaltic Emulsion for Modified Emulsion Seal Coat
Polymer modified asphaltic emulsion must be applied within the application rate ranges shown in the
following table:
Polymer Modified Asphaltic Emulsion Application Rates
Screenings
Application rate range(gallons
per square yard)
Fine
0.150.30
Medium fine
0.250.35
Medium
0.250.40
Coarse
0.300.40
The Engineer determines the exact application rate.
At the time of application, the temperature of polymer modified asphaltic emulsion must be from 130 to
180 degrees F.
Apply polymer modified asphaltic emulsion when the ambient air temperature is from 60 to 105 degrees F
and the pavement surface temperature is at least 55 degrees F.
Do not apply polymer modified asphaltic emulsion when weather forecasts predict the ambient air
temperature will fall below 39 degrees F within 24 hours after application.
When tested under California Test 339, the application rate for polymer modified asphaltic emulsion must
not vary from the average by more than:
1. 15 percent in the transverse direction
2. 10 percent in the longitudinal direction
37-2.03F(5) Asphaltic Emulsion for Flush Coat
Apply asphaltic emulsion for flush coat at a residual asphalt rate from 0.02 to 0.06 gal/sq yd. The
Engineer determines the exact rate.
During flush coat activities, close adjacent lanes to traffic. Do not track asphaltic emulsion on existing
pavement surfaces.
Apply sand immediately after the asphaltic emulsion application.
Spread sand with a self-propelled screenings spreader equipped with a mechanical device that spreads
sand at a uniform rate over the full width of a traffic lane in a single application. Spread sand at a rate
from 2 to 6 lb/sq yd. The Engineer determines the exact rate.
37-2.03F(6) Reserved
37-2.03G Spreading Screenings
37-2.03G(1) General
Prevent vehicles from driving on asphaltic emulsion before spreading screenings.

Spread screenings at a uniform rate over the full lane width in 1 application.

Broom excess screenings at joints before spreading adjacent screenings.

Operate the spreader at speeds slow enough to prevent screenings from rolling over after dropping.

If the spreader is not moving, screenings must not drop. If you stop spreading and screenings drop,

remove the excess screenings before resuming activities.

389

SECTION 37

BITUMINOUS SEALS

37-2.03G(2) Asphaltic Emulsion Seal Coat Screenings


You may stockpile screenings for asphaltic emulsion seal coat if you prevent contamination. Screenings
must have damp surfaces at spreading. If water visibly separates from the screenings, do not spread.
You may redampen them in the delivery vehicle.
Spread screenings before the asphaltic emulsion sets or breaks.
Spread screenings within 10 percent of the rate determined by the Engineer. Screenings must have a
spread rate within the ranges shown in the following table:
Screening Spread Rates
Seal coat type
Range (lb/sq yd)
Fine
1220
Medium fine
1625
Medium
2030
Coarse
2330
Do not spread screenings more than 2,500 feet ahead of the completed initial rolling.
37-2.03G(3) Polymer Modified Asphaltic Emulsion Seal Coat Screenings
You may stockpile screenings for polymer modified emulsion seal coat if you prevent contamination.
Screenings must have damp surfaces at spreading. If water visibly separates from the screenings, do not
spread. You may redampen them in the delivery vehicle.
Spread screenings before the modified emulsion sets or breaks.
Spread screenings within 10 percent of the rate determined by the Engineer. Screenings must have a
spread rate within the ranges shown in the following table:
Screening Spread Rates
Seal coat type
Range (lb/sq yd)
Fine
1220
Medium fine
1625
Medium
2030
Coarse
2330
Do not spread screenings more than 2,500 feet ahead of the completed initial rolling.
37-2.03G(4) Reserved
37-2.03H Finishing
37-2.03H(1) General
Remove piles, ridges, or unevenly distributed screenings. Repair permanent ridges, bumps, or
depressions in the finished surface. Spread additional screenings and roll if screenings are picked up by
rollers or vehicles.
Seal coat joints between adjacent applications of seal coat must be smooth, straight, uniform, and
completely covered. Longitudinal joints must be at lane lines and not overlap by more than 4 inches.
Blend the adjacent applications by brooming.
A coverage is the number of passes a roller needs to cover the width. A pass is 1 roller movement
parallel to the seal coat application in either direction. Overlapping passes are part of the coverage being
made and are not part of a subsequent coverage. Do not start a coverage until completing the previous
coverage.
Before opening to traffic, finish seal coat in the following sequence:
1. Perform initial rolling consisting of 1 coverage with a pneumatic roller
2. Perform final rolling consisting of 3 coverage's with pneumatic-tired rollers
3. Broom excess screenings from the roadway and adjacent abutting areas
390

SECTION 37

BITUMINOUS SEALS

4. Apply flush coat if specified


The Engineer may order salvaging of excess screenings.
Dispose of excess screenings the Engineer determines are not salvageable. Dispose of screenings in any
of the following ways or locations:
1. Under section 14-10
2. On embankment slopes
3. In authorized areas
Salvaging and stockpiling excess screenings is change order work.
37-2.03H(2) Reserved
37-2.03I Seal Coat Maintenance
Seals coat surfaces must be maintained for 4 consecutive days from the day screenings are applied.
Maintenance must include brooming to maintain a surface free of loose screenings, to distribute
screenings over the surface so as to absorb any free asphaltic material, to cover any areas deficient in
cover coat material, and to prevent formation of corrugations
After 4 consecutive days, excess screenings must be removed from the paved areas. Brooming must not
displace screenings set in asphaltic material.
The exact time of brooming will be determined by the Engineer. As a minimum, brooming will be required
at the following times:
1. On 2-lane 2-way roadways, from 2 to 4 hours after traffic, controlled with pilot cars, has been routed
on the seal coat
2. On multilane roadways, from 2 to 4 hours after screenings have been placed
3. In addition to previous brooming, immediately before opening any lane to public traffic, not controlled
with pilot cars
4. As the 1st order of work on the morning following the application of screenings on any lane that has
been open to public traffic not controlled with pilot cars.
For 2-lane 2-way roadways under 1-way traffic control, upon completion of secondary rolling, public traffic
must be controlled with pilot cars and routed over the new seal coat for a period of 2 to 4 hours. The
Engineer will determine the exact period of time.
Schedule the operations so that seal coat is placed on both lanes of the traveled way each work shift and
so that 1-way traffic control is discontinued 1 hour before darkness. At the end of the work shift, the end
of the seal coat on both lanes must generally match.
On multilane roadways, initial brooming must begin after the screenings have been in place for a period
of 2 to 4 hours. When the initial brooming is not completed during the work shift in which the screenings
were placed, the initial brooming must be completed as the 1st order of work at the beginning of the next
work shift.
Public traffic must be controlled with pilot cars and be routed on the new seal coat surface of the lane for
a minimum of 2 hours after completion of the initial brooming and before opening the lane to traffic not
controlled with pilot cars. When traffic is controlled with pilot cars, a maximum of 1 lane in the direction of
travel must be open to public traffic. Once traffic controlled with pilot cars is routed over the seal coat at a
particular location, continuous control must be maintained at that location until the seal coat placement
and brooming on adjacent lanes to receive seal coat is completed.
37-2.04 PAYMENT
If there is no bid item for a traffic control system, furnishing and using a pilot car is included in the various
items of the work involved in applying the seal coat.
If test results for the screenings grading do not comply with specifications, you may remove the seal coat
represented by these tests or request that it remain in place with a payment deduction. The deduction is
$1.75 per ton for the screenings represented by the test results.
391

SECTION 37

BITUMINOUS SEALS

If asphaltic emulsion seal coat with screenings does not comply with the cleanness value specifications,
you may request that the seal coat remain in place with a pay deduction corresponding to the cleanness
value shown in the following table:

Asphaltic Emulsion Seal Coat Cleanness Value Deductions


Cleanness value
Deduction
80 or over
None
79
$2.00 /ton
7778
$4.00 /ton
7576
$6.00 /ton
If polymer modified asphaltic emulsion seal coat with screenings does not comply with the specifications
for cleanness value you may request that the seal coat remain in place with a pay deduction
corresponding by the cleanness value shown in the following table:
Polymer Modified Asphaltic Emulsion Seal Coat Cleanness

Value Deductions

Cleanness value
Deduction
86 or over
None
8185
$2.20/ton
7780
$4.40/ton
7576
$6.60/ton
If test results for polymer modified asphaltic emulsion aggregate grading and cleanness value test results
do not comply with the specifications, all deductions are made. A test for asphaltic emulsion (polymer
modified) represents the smaller of 55 tons or 1 day's production. A test for the screenings grading or
cleanness value represents the smaller of 300 tons or 1 day's production.
The Department does not adjust the unit price for an increase or decrease in the sand cover for the flush
coat quantity.
The Department does not adjust the unit price for an increase or decrease in the asphaltic emulsion (fog
seal coat) quantity.
The payment deduction for noncompliant modified emulsion is based on the total pay factor value
determined from the table titled, "Polymer Modified Asphaltic Emulsion Pay Factor Deduction." You must
remove modified emulsion seal coat with a pay factor value greater than 20. You may request seal coat
with noncompliant modified emulsion to remain in place with a pay deduction for the total pay factor value
shown in the following table:
Polymer Modified Asphaltic Emulsion

Pay Factor Deductions

Total pay factor


Deduction
value
0
none
12
$5.00/ton
35
$10.00/ton
69
$15.00/ton
1014
$25.00/ton
1520
$50.00/ton
37-3 SLURRY SEAL AND MICRO-SURFACING
37-3.01 GENERAL
37-3.01A Summary
Section 37-3 includes specifications for applying slurry seal and micro-surfacing .
392

SECTION 37

BITUMINOUS SEALS

Slurry seal includes applying a mixture of asphaltic emulsion or polymer modified asphaltic emulsion,
aggregate, set-control additives, and water spread on a surface or pavement.
Micro-surfacing includes applying a mixture of micro-surfacing emulsion, water, additives, mineral filler,
and aggregate spread on pavement.
37-3.01B Definitions
Reserved
37-3.01C Submittals
37-3.01C(1) General
The testing laboratory must sign the original laboratory report and mix design.
If the mix design consists of the same materials covered by a previous laboratory report, you may submit
the previous laboratory report, which must include material testing data performed within the previous 12
months for authorization.
If requesting substitute materials, submit a new laboratory report and mix design at least 7 days before
starting placement.
37-3.01C(2) Slurry Seal
Submit a laboratory report of test results and a proposed mix design 7 days before starting placement of
slurry seal. The report and mix design must include the specific materials to be used.
The laboratory report must include:
1. Test results used in the mix design
2. Proportion of the following material based on the aggregate's dry weight:
2.1. Aggregate
2.2. Filler determined from tests, minimum and maximum
2.3. Water, minimum and maximum
2.4. Asphalt solids content
2.5. Set control agent
3. Comparison of slurry seal test results to the specified values
Each day, submit moisture data for the aggregate collected every 2 hours when you are unable to
maintain the moisture content to within a maximum daily variation of 0.5 percent.
37-3.01C(3) Micro-surfacing
Submit a laboratory report of test results and a proposed mix design 10 days before starting placement of
micro-surfacing. The report and mix design must include the specific materials to be used and show a
comparison of test results and specifications.
Submit a certificate of compliance with each shipment of micro-surfacing emulsion as specified for
asphaltic emulsion in section 94-1.01B.
Before micro-surfacing activities start, submit the name of a person authorized to communicate with the
Engineer about days when unsuitable weather conditions prevent micro-surfacing.
The mix design report must include:
1. Test results used in the mix design
2. Proportions of the following material based on the aggregate's dry weight:
2.1. Aggregate
2.2. Water, minimum and maximum
2.3. Additives
2.4. Mineral filler, minimum and maximum
2.5. Micro-surfacing emulsion residual asphalt content, minimum and maximum
3. Recommended changes to the following proportions based on heating the mixture to 100 degrees F
and mixing for 60 seconds:
3.1. Water
3.2. Additives
393

SECTION 37
3.3.

BITUMINOUS SEALS

Mineral filler

Do not recommend these changes when nighttime applications are specified or when atmospheric
temperatures below 90 degrees F are forecast for daytime applications.
4. Comparison of each individual material's test results to its specified values.
5. Quantitative moisture effects on the aggregate's unit weight determined under ASTM C 29M.
37-3.01D Quality Control and Assurance
37-3.01D(1) General
Your laboratory must be able to perform International Slurry Surfacing Association tests and mix designs.
37-3.01D(2) Slurry Seal
Calibrate each truck mounted mixer-spreader used in the presence of the Engineer. Calibration must
comply with California Test 109.
Calibrate the adjustable cut-off gate settings of each mixer-spreader truck on the project to achieve the
correct delivery rate of aggregate and emulsion per revolution of the aggregate feeder in compliance with
California Test 109.
Checks must be performed for each aggregate source using an approved California Test 109 vehicle
scale.
Individual checks of the aggregate belt feeder's delivery rate to the pugmill mixer must not vary more than
2 percent from the average of 3 runs of at least 3 tons each.
Individual checks of the emulsion pump's delivery rate to the pugmill mixer must not vary more than 2
percent from the average of 3 runs of at least 500 gal each.
Measure aggregate moisture every 2 hours during slurry seal placement or maintain the moisture content
within a maximum daily variation of 0.5 percent.
37-3.01D(3) Micro-surfacing
Calibrate each truck-mounted mixer-spreader used in the presence of the Engineer. Notify the Engineer
at least 5 business days before calibrating. Calibration must comply with the Department's Material Plant
Quality Program.
If the Department authorizes a truck-mounted mixer-spreader, its calibration is valid for 6 months provided
you:
1. Use the same truck verified with a unique identifying number
2. Use the same materials in compliance with the authorized mix design
3. Do not perform any repair or alteration to the proportioning systems
Before using a variable-rate emulsion pump, the pump must be calibrated and sealed in the calibrated
condition under the Department's Material Plant Quality Program.
For the aggregate belt feeder, the delivery rate for any individual check run must not deviate more than 2
percent from the average of the rates of 3 runs of at least 3 tons each.
For the emulsion pump, the delivery rate for any individual check run must not deviate more than 2
percent from the average of the rates of 3 runs of at least 300 gallons each.
37-3.01D(4) Mix Design
37-3.01D(4)(a) General
Reserved
37-3.01D(4)(b) Slurry Seal
The slurry seal mix design must comply with the requirements shown in the following table:

394

SECTION 37

BITUMINOUS SEALS
Slurry Seal Mix Design Requirements
Properties
International
Specification
Slurry
Surfacing
Association
test
method
Consistency, mm, max
Technical
30
Bulletin 106
Wet stripping
Technical
Pass
Bulletin 114
Compatibility
Technical
Pass a
Bulletin 115
Cohesion test b, kg-mm within
Technical
200
1 hour, min
Bulletin 139
Wet track abrasion, g/m2,,
Technical
800
max
Bulletin 100
a
Mixing test must pass at the maximum expected air temperature

at the job site during placement.

b
Using project source aggregate, asphaltic emulsion, and set
control agents, if any.

The mix design must have the percent of asphaltic emulsion, based on percentage by weight of the dry
aggregate, within the ranges shown in the following table:
Asphaltic Emulsion Percentage
Aggregate type
Range
I
1520
II
1218
III
1015
The Engineer determines the exact percentage based on the design asphalt binder content and the
asphalt solids content of the asphaltic emulsion furnished
Aggregate type is described in section 37-3.02A.
37-3.01D(4)(c) Micro-surfacing
Micro-surfacing mix design must have the material proportion limits shown in the following table:
Micro-surfacing Mix Design Proportion Limits
Material
Proportion limits
Micro-surfacing
5.59.5% of aggregate dry weight
emulsion residual
asphalt
Water and
No limit
additives
Mineral filler
03% of aggregate dry weight
The micro-surfacing mix design must have the properties as specified in the following table:

395

SECTION 37

BITUMINOUS SEALS
Micro-surfacing Mix Design Tests
Property
International
Specification
Slurry
Surfacing
Association
test method
Wet cohesion
Technical
@ 30 minute (set), min,
Bulletin 139
12
kg-cm
@ 60 minute (traffic),
20
min, kg-cm
Excess asphalt, max, g/m2
Technical
540
Bulletin 109
Wet stripping, min, %
Technical
90
Bulletin 114
Wet track abrasion loss
Technical
6-day soak, max, g/m2
Bulletin 100
810
Displacement
Technical
Lateral, max, %
Bulletin
5
Specific gravity after
147A
1000 cycles of 57 kg,
2.10
max
Classification compatibility,
Technical
min, grade points
Bulletin 144
(AAA, BAA) 11
Mix time @ 25 C, min
Technical
Controllable to 120
Bulletin 113 seconds

37-3.02 MATERIALS
37-3.02A General
Aggregate must have the following gradation as determined under California Test 202:

Sieve sizes
3/8"
No. 4
No. 8
No. 16
No. 30
No. 200

Aggregate Grading
Percentage passing by aggregate type
I
II
III
-100
100
100
94100
7090
90100
6590
4570
6090
4070
2850
4065
2550
1934
1020
515
515

Aggregate must be rock dust or sand such as plaster sand. Aggregate larger than the no. 50 sieve must
be 100 percent crushed rock. Aggregate must be free from vegetable matter, deleterious substances,
caked or clay lumps, and oversized particles.
37-3.02B Slurry Seal
37-3.02B(1) General
Reserved
37-3.02B(2) Aggregate
If the specific gravities differ by 0.2 or more, California Test 202 is replaced with California Test 105 for
blends of different aggregates.
Aggregate for slurry seal must have the quality characteristics as specified in the following table:

396

SECTION 37

BITUMINOUS SEALS

Aggregate Quality

Quality characteristic
Sand equivalent, min
Durability index, min

Test
method
California
Test 217
California
Test 229

Specification by
aggregate type
I
II
III
45

55

60

55

55

55

Each day's aggregate moisture content measurements must not vary more than 0.5 percent.
37-3.02B(3) Asphaltic Emulsion
37-3.02B(3)(a) General
Asphaltic emulsion must be either Grade QS1h anionic or Grade CQS1h cationic.
Water must not allow separation of the asphaltic emulsion from the emulsion before you place the slurry
seal. You may use a set-control agent that does not adversely affect the slurry seal.
37-3.02B(3)(b) Polymer Modified Asphaltic Emulsion
Polymer modified asphaltic emulsion must:
1. Consist of a polymer mixed with a bituminous material uniformly emulsified with water and an
emulsifying or stabilization agent
2. Use either neoprene polymer or butadiene and styrene copolymer. The polymer must be
homogeneous and milled into the asphaltic emulsion at the colloid mill.
3. Polymer modified asphaltic emulsion must be Grade PMCQS1h cationic and have the values of the
properties shown in the following table:
Polymer Modified Asphaltic Emulsion
Property

Test method

Tests on emulsion:
Saybolt Furol Viscosity @ 25
AASHTO T 59
C, SFSa
Sieve test, %
AASHTO T 59
Storage stability, 1 day, %
AASHTO T 59
Residue by evaporation, %
California Test 331
Particle charge
AASHTO T 59
Tests on residue by evaporation
test
Penetration, 25 C
AASHTO T 49
Ductility, 25 C, mm
AASHTO T 51
Torsional recovery, %
California Test 332
or
Polymer content, %
California Test 401
Note:
a
SFS means Saybolt Furol seconds
Sampling must comply with section 94-1.03.
37-3.02C Micro-surfacing
37-3.02C(1) General
Reserved

397

Value
Min

Max

15

90

--57

0.30
1
-Positive

40
400
18

90
---

2.5

--

SECTION 37

BITUMINOUS SEALS

37-3.02C(2) Aggregate
If you blend aggregate from different sources, each source's aggregate must comply with the aggregate
specifications except grading.
Aggregate for micro-surfacing excluding mineral filler must have the quality characteristics as specified in
the following table:
Micro-surfacing Aggregate
Test
Quality characteristic
Specification
method
California Test
Sand equivalent, min
65
217
California Test
Durability index, min
65
229
Percentage of crushed
California Test
95%
particles, mina
205
Los Angeles Rattler
California Test
35%
Loss at 500 revolutions,
211
b
max
a
Crushed particles must have at least 1 fractured face.
b
California Test 211 must be performed on the aggregate
before crushing.
37-3.02C(3) Micro-surfacing Emulsion
Micro-surfacing emulsion must be a homogeneous mixture of asphalt, polymer, and emulsifier solution.
Add polymer modifier to asphalt or emulsifier solution before emulsification. Polymer solids must be a

minimum 3 percent by weight of the micro-surfacing emulsion's residual asphalt.

Micro-surfacing emulsion must have the values of the properties as specified in the following table:

Micro-surfacing Emulsion
Property
Test method
Saybolt Furol Viscosity @ 25 AASHTO T 59
C, SFSa
Sieve test, max
AASHTO T 59
Settlement, 5 days, max b
ASTM D 244
Storage stability, 1 day, max AASHTO T 59
Residue by evaporation, min California Test
331
a
SFS means Saybolt Furol seconds
b
Waived if used within 48 hours of shipment.

Value
1590 seconds
0.30%
5%
1%
62%

The micro-surfacing emulsion's residue by evaporation must have the values of the properties shown in
the following table:

398

SECTION 37

BITUMINOUS SEALS
Micro-surfacing Emulsion Residue By Evaporation
Property
Test method
Value
G* @ 20 C, 10 rad/sec,
AASHTO T 315
Report only
MPa
Penetration @ 25 C
AASHTO T 49
4090
AASHTO T 315
Report only
Phase angle @ 50 C, 10
rad/sec,
PA (maximum) - PA base
Softening point, min, C
AASHTO T 53
57
AASHTO T 313
Report only
Stiffness @ -12 C, MPa,
and M-value

37-3.02C(4) Mineral Filler


If portland cement is used as mineral filler, it must be any combination of Type I, Type II, or Type III
cement.
37-3.03 CONSTRUCTION
37-3.03A General
Before applying slurry seal or micro-surfacing, cover manholes, valve and monument covers, grates, or
other exposed facilities located within the area of application, using a plastic or oil resistant construction
paper secured by tape of adhesive to the facility being covered. Reference the covered facilities with a
sufficient number of control points to relocate the facilities after the application of the seal coat.
In areas inaccessible to spreading equipment, spread the slurry seal or micro-surfacing mixture with hand
tools or other authorized methods. If placing with hand tools, first lightly dampen the area. Do not handle
or shift the material.
37-3.03B Proportioning
37-3.03B(1) General
The Engineer determines the asphalt distribution under California Test 310. The bitumen ratio, in
kilograms of asphalt per 100 kg of dry aggregate, must not vary more than 0.5 kg of asphalt from the
determined amount.
37-3.03B(2) Slurry Seal
Proportion slurry seal ingredients in compliance with the authorized mix design. Proportion and blend
different aggregate types before adding other ingredients.
After proportioning, the slurry seal mixture must be workable and permit traffic within 1 hour after
placement without occurrences of bleeding, raveling, separation or other distresses. None of the same
occurrences must be present 15 days after placing the slurry seal.
37-3.03B(3) Micro-surfacing
Proportion the micro-surfacing materials using the authorized mix design.
Field conditions may require adjustments during construction. Obtain authorization before adjusting
proportions.
37-3.03C Mixing and Spreading Equipment
37-3.03C(1) General
Mixing and spreading equipment for slurry seal and micro-surfacing must proportion asphaltic emulsion,
water, aggregate, and any set-control additives by volume and mix them in continuous pugmill mixers.
Continuous pugmill mixers must be of adequate size and power for the type of materials to be mixed.
37-3.03C(2) Truck Mounted Mixer Spreaders
Truck mounted mixer spreaders must comply with the following:
1. Rotating and reciprocating equipment must be covered with metal guards.

399

SECTION 37
2
3.

4.

5.

6.

7.
8.
9.

BITUMINOUS SEALS

Proportion aggregate using a belt feeder with an adjustable cutoff gate. The height of the gate
opening must be determinable.
The belt feeder must have a depth monitor device. The depth monitor device must automatically shut
down power to the belt feeder whenever the aggregate depth is less than 70 percent of the target
depth.
A separate monitor device must detect the revolutions of the belt feeder. This device must
automatically shut down power to the belt feeder if it detects no revolutions. If the belt feeder is an
integral part of the equipment's drive chain, the monitor device is not required.
The aggregate belt feeder must be connected directly to the drive on the emulsion pump. The
aggregate feeder drive shaft must have a revolution counter reading the nearest 0.10 revolution for
micro-surfacing, and nearest 1 revolution for slurry seal.
Emulsion storage must be equipped with a device that automatically shuts down power to the
emulsion pump and aggregate belt feeder when the level of stored emulsion is lowered. To allow for
normal fluctuations, there may be a delay of 3 seconds between detection of low emulsion storage
levels or low aggregate depths and automatic power shut down.
Emulsion storage must be located immediately before the emulsion pump.
The emulsion storage tank must have a temperature indicator at the pump suction level. The indicator
must be accurate to 5 degrees F.
No-flow and revolution warning devices must be in working condition and comply with California Test
109. Low-flow indicators must be visible while walking alongside the equipment.

37-3.03C(3) Continuous Self-Loading Mixing Machine


Continuous self-loading mixing machines must be automatically sequenced and self-propelled. The
mixing machine must deliver the materials to a double shafted mixer and discharge the mixed product on
a continuous flow basis. The mixing machine must have sufficient storage capacity to maintain a
continuous supply of materials to the proportioning controls. The mixing machine must be self-loading
without interrupting placement. The mixing machine operator must have full control of forward and
reverse speeds during placement.
37-3.03C(4) Slurry Seal Equipment
37-3.03C(4)(a) General
Introduce emulsion into the mixer with a positive displacement pump. If you use a variable-rate pump, the
adjusting unit must be sealed in its calibrated position.
Introduce water into the mixer with a meter that measures gallons.
Identifying numbers for equipment must be at least 2 inches high and located on the front and rear of the
vehicle.
37-3.03C(4)(b) Spreader Box
Spread the slurry mixture with a spreader box that complies with the following:
1. Capable of spreading a lane width
2. Equipped with material such as flexible rubber belting on each side and in contact with the pavement
to prevent loss of slurry from the box
3. If wider than 7.5 feet, a spreader box equipped with a means, such as baffles or reversible motor
driven augers, to uniformly apply slurry seal on superelevated sections and shoulder slopes
4. Equipped with rear flexible strike-off blades making close contact with the pavement and adjustable to
various crown shapes in order to apply a uniform slurry seal
5. Equipped with flexible drags attached to the rear and cleaned daily and changed if longitudinal
scouring occurs
6. Clean and free of slurry seal or emulsion at the start of each work shift
37-3.03C(5) Micro-surfacing Equipment
37-3.03C(5)(a) General
Choose a continuous self-loading mixing machine or truck mounted mixer-spreader.
Proportion micro-surfacing emulsion using a positive displacement pump.

400

SECTION 37

BITUMINOUS SEALS

Identifying numbers for equipment must be at least 3 inches high and located on the front and rear of the
vehicle
37-3.03C(5)(b) Spreader Box
The spreader box must be capable of spreading the micro-surfacing a minimum of 12 feet wide and
preventing the loss of micro-surfacing. Spreader boxes over 8 feet in application width must have a
device, such as baffles or reversible motor driven augers, to ensure uniform application on superelevated
sections and shoulder slopes. Clean micro-surfacing and micro-surfacing emulsion from the spreader box
before each work shift.
The spreader box must have a series of strike-off devices at its rear.
The leading strike-off device must be:
1.
2.
3.
4.

Fabricated of a suitable material such as steel or stiff rubber


Designed to maintain close contact with the pavement during spreading
Capable of obtaining the specified thickness
Capable of being adjusted to the various pavement cross sections

The final strike-off device must be:


1. Fabricated of flexible material that produces a uniform texture in the finished surface
2. Cleaned daily and changed if longitudinal scouring occurs in the micro-surfacing
Do not use flexible drags attached to the rear of the spreader box.
37-3.03C(5)(c) Shoulder Equipment
Spread micro-surfacing on shoulders with a device such as an edge box that forms clean and straight
joints and edges.
37-3.03C(5)(d) Scratch Course Box
Spread scratch course with the same type of spreader box used to spread micro-surfacing except use an
adjustable steel strike-off device instead of a final strike-off device.
37-3.03C(5)(e) Wheel Path Depression (Rut) Box
Wheel path depression (rut) boxes must have adjustable strike-off devices between 5 and 6 feet wide that
regulate depth. The rut box must also have devices such as hydraulic augers capable of:
1. Moving the mixed material from the rear to the front of the filling chamber
2. Guiding larger aggregate into the deeper section of the wheel path depression
3. Forcing the finer material towards the outer edges of the spreader box
37-3.03D Placing
37-3.03D(1) General
If truck-mounted mixer-spreaders are used, keep at least 2 operational spreaders at the job site during
placement.
In areas inaccessible to spreading equipment, spread the slurry seal or micro-surfacing mixture with hand
tools. If placing with hand tools, first lightly dampen the area. Do not handle or shift the mixture.
37-3.03D(2) Surface Preparation
37-3.03D(2)(a) General
Before you place slurry seal or micro-surfacing, clean the pavement surface.
Remove loose particles of extraneous materials, including paving and dirt. Use any nondestructive
method, such as flushing or sweeping.
37-3.03D(2)(b) Slurry Seal
If slurry seal operations affect access to public parking, residential property, or commercial property, notify
residents, businesses, and local agencies at least 24 hours before starting activities. The notice must:
401

SECTION 37
1.
2.
3.
4.

BITUMINOUS SEALS

Describe the work to be performed


Detail streets and limits of activities
Indicate work hours
Be authorized

Before starting slurry seal activities, post signs at 100-foot intervals on the affected streets. Signs must
display "No Parking Tow Away." Signs must state the day of the week and hours parking or access will
be restricted.
Within 1 hour after placement, slurry seal must be set enough to allow traffic without pilot cars. Slurry seal
must not exhibit distress from traffic such as bleeding, raveling, separation or other distresses.
37-3.03D(2)(c) Micro-surfacing
37-3.03D(2)(c)(i) General
You may fog the roadway surface with water ahead of the spreader box. The fog spray must be adjusted
for pavement:
1. Temperature
2. Surface texture
3. Dryness
37-3.03D(2)(c)(ii) Repair Wheel Path Depression
If repair wheel path depression is specified, fill wheel path depressions and irregularities with micro
surfacing material before spreading micro-surfacing. If the depressions are less than 0.04 foot deep, fill
with a scratch course. If the depressions are 0.04 foot deep or more, fill the depressions using with a
wheel path depression (rut) box.
Spread scratch course by adjusting the steel strike-off of a scratch course box until it is directly in contact
with the pavement surface.
Spread micro-surfacing with a rut box leaving a slight crown at the surface. Use multiple applications to fill
depressions more than 0.12 foot deep. Do not apply more than 0.12 foot in a single application.
Allow traffic to compact each filled wheel path depression for a minimum of 12 hours before placing
additional micro-surfacing.
37-3.03D(3) Test Strip
37-3.03D(3)(a) General
Reserved
37-3.03D(3)(b) Slurry Seal
Test strip does not apply to slurry seal.
37-3.03D(3)(c) Micro-surfacing
Reserved
37-3.03D(4) Placement
37-3.03D(4)(a) General
Reserved
37-3.03D(4)(a)(i) General
Longitudinal and transverse joints must be:
1.
2.
3.
4.
5.
6.

Uniform
Straight
Neat in appearance
Butt-type joints
Without material buildup
Without uncovered areas

402

SECTION 37

BITUMINOUS SEALS

Place longitudinal joints:


1. On centerlines, lane lines, edge lines, or shoulder lines
2. With overlaps not more than 3 inches
Set the leading edge of roofing felt on transverse joints to create a straight butt joint with the next
application when the roofing felt is removed.
37-3.03D(4)(a)(ii) Weather Conditions
Only place slurry seal or micro-surfacing if both the pavement and air temperatures are at least 50
degrees F and rising. Do not place slurry seal or micro-surfacing if either the pavement or air temperature
is below 50 degrees F and falling. The expected high temperature must be at least 65 degrees F within
24 hours after placement.
Do not place slurry seal or micro-surfacing if rain is imminent or the air temperature is expected to be
below 36 degrees F within 24 hours after placement.
37-3.03D(4)(a)(iii) Unsuitable Day
The Engineer may notify you of unsuitable conditions before 4:00 p.m. on the day before your 1st
intended working day to place slurry seal or micro-surfacing. After you have started slurry seal or micro
surfacing placement activities, the Engineer has until 4:00 p.m. on the day before the next working day to
give you an unsuitable day notice. If the Engineer gives you an unsuitable day notice (1) do not place
slurry seal or micro-surfacing on the next working day and (2) the Department does not pay for return,
storage or disposal of materials delivered to the job site and the time of workers. If maintenance of
previously applied slurry seal or micro-surfacing can be performed, continue to perform maintenance.
In the absence of an unsuitable day notice or if the Engineer gives notice after 4:00 p.m. of the previous
day:
1. Comply with specifications restricting slurry seal or micro-surfacing application.
2. Return, store, or dispose of any slurry seal or micro-surfacing materials you deliver to the job site
when conditions are unsuitable.
3. The Department adjusts payment for the return, storage or disposal of materials delivered to the job
site.
4. The Department adjusts payment for the show-up time of workers who would have applied slurry seal
or micro-surfacing.
5. Payment of materials and labor will be determined under section 9-1.04, except markups are not
added.
It is a nonworking day if the slurry seal or micro-surfacing work is the controlling operation and (1) the
Engineer provides you timely notice of an anticipated unsuitable day or (2) there is untimely or no notice
and conditions are unsuitable for placing slurry seal or micro-surfacing.
If you fail to submit the name of a person authorized to communicate with the Engineer about unsuitable
day notices, the specifications for payment do not apply.
37-3.03D(4)(b) Slurry Seal
Spread slurry seal uniformly within the specified rate. Do not spot, rehandle, or shift the mixture.
If there is a bid item for tack coat, coat the pavement surface with an SS or CSS grade asphaltic emulsion
mixed with additional water. The ration of water to asphaltic emulsion must be 3 to 1. Apply the tack coat
at a rate from 0.08 to 0.15 gal/sq yd. The exact rate must be authorized.
The Engineer determines the exact spread rate for slurry seal. The completed rate must be within 10
percent of the Engineer's determined spread rate. The slurry seal spread rates must be within the ranges
shown in the following table:

403

SECTION 37

BITUMINOUS SEALS
Slurry Seal Spread Rates
Type of
Range
aggregate
(lb of dry
aggregate/sq yd)
I
812
II
1015
III
2025

Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if

they do not adversely affect the slurry seal.

Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3

inches.

Use a material, such as building paper at transverse joints and over previously placed slurry seal to

prevent double placement. Remove the material after use. Use hand tools to remove spillage.

The finished surface must be smooth.

The mixture must be uniform and homogeneous after spreading and there must not be separation of the

emulsion and aggregate after setting.

Protect the slurry seal from damage until it has cured and will not adhere or be picked up by vehicle tires.

37-3.03D(4)(c) Micro-surfacing
37-3.03D(4)(c)(i) General
The Engineer determines the exact spread rate for micro-surfacing, The completed spread rate must be
within 10 percent of the Engineer's determined spread rate. The micro-surfacing spread rates must be
within the ranges shown in the following table:
Micro-surfacing Spread Rates
Micro-surfacing type
Location
Range (lb of dry
aggregate/sq yd)
Type II
Full lane width
1020
Full lane width
2032
Type IIIa
Type IIIb
Full lane width
3032
a
Over asphalt concrete pavement
b
Over concrete pavement and concrete bridge decks
Spread micro-surfacing either in the direction of traffic or in the opposite direction.
Keep hand tools available to remove spillage.
37-3.03D(4)(c)(ii) Joints
The maximum difference between the pavement surface and the bottom edge of a 12-foot straightedge
placed perpendicular to the joint must be:
1. 0.04 foot for longitudinal joints
2. 0.03 foot for transverse joints
37-3.03D(4)(c)(iii) Finished Surface
Finished micro-surfacing must be free of irregularities such as scratch or tear marks. You may leave up to
4 marks that are 1/2 inch or more wide and 6 inches or more long per 75 linear feet of micro-surfacing
placed. Do not leave any marks that are over 1 inch wide or 6 inches long.
Sweep the micro-surfacing 24 hours after placement without damaging the micro-surfacing. For 5 days
afterward, sweep the micro-surfacing daily.

404

SECTION 37

BITUMINOUS SEALS

37-3.03D(4)(c)(iv) Repair of Early Distress


If bleeding, raveling, delaminating, rutting, or washboarding occurs after placing the micro-surfacing,
make repairs using an authorized method.
37-3.04 PAYMENT
37-3.04A General
If tack coat is specified, it will be measured under section 94-1.04.
37-3.04B Slurry Seal
Slurry seal is measured by combining the weight of the aggregate and asphaltic emulsion. The weight of
added water and set-control additive are not measured.
If test results for aggregate grading or sand equivalent do not comply with the specifications, you may
remove the installed slurry seal represented by the test results or request it remain in place with a
payment deduction. The deduction is $1.75 per ton.
If test results for both aggregate grading and sand equivalent do not comply with the specifications, both
deductions are made. An aggregate grading or cleanness value test represents 300 tons or 1 day's
production, whichever is less.
37-3.04C Micro-surfacing
Micro-surfacing is measured by combining the weight of the aggregate and micro-surfacing emulsion,
including test strips. The weight of added water and set-control additives are not measured for payment.
If test results for aggregate grading or sand equivalent do not comply with the specifications, you may
remove the installed micro-surfacing represented by the test results or request it remain in place with a
payment deduction. The deduction is $2.00 per ton.
If test results for both aggregate grading and sand equivalent do not comply with the specifications, both
deductions are made.
37-4 PARKING AREA SEALS
37-4.01 GENERAL
37-4.01A Summary
Section 37-4 includes specifications for applying a mixture of asphaltic emulsion, aggregate, polymer, and
water spread on a surface or pavement.
37-4.01B Definitions
Reserved
37-4.01C Submittals
At least 15 days before starting placement, submit samples of the aggregate to be used. The samples
must be processed the same way as the aggregate to be used in the work.
At least 10 days before starting placement, submit the name of a laboratory to perform testing and mix
design.
At least 7 days before starting placement, submit a laboratory report of test results and a proposed mix
design. The report and mix design must include the specific materials to be used and show a comparison
of test results and specifications. The mix design report must include the amount of water allowed to be
added at the job site. The laboratory performing the tests must sign the original laboratory report and mix
design.
If the mix design consists of the same materials covered by a previous laboratory report, you may submit
the previous laboratory report which must include material testing data performed within the previous 12
months for authorization.
If you request substitute materials, submit a new laboratory report and mix design at least 10 days before
starting placement.
At least 10 days before use, submit the manufacturer's product data for oil seal primer and polymer.
405

SECTION 37

BITUMINOUS SEALS

Submit a certificate of compliance for the parking area seal material.


37-4.01D Quality Control and Assurance
Sample the undiluted parking area seal material.
37-4.02 MATERIALS
37-4.02A General
Aggregate must be clean, hard, durable, uncoated, and free from organic and deleterious substances.
One hundred percent of the aggregate must pass the no. 16 sieve.
Asphaltic emulsion must be either Grade SS1h or CSS1h. Asphaltic emulsion must comply with section
94, except in Tables 1 and 2, the values for penetration at 25 degrees C for tests on residue from
distillation must be from 20 to 60. You may use clay-stabilized emulsion with a solids content not less
than 45 percent by weight.
Polymer must be either neoprene, ethylene vinyl acetate, or a blend of butadiene and styrene.
Oil seal primer must be a quick-drying emulsion with admixtures. Oil seal primer must be manufactured to
isolate the parking area slurry seal from pavement with residual oils, petroleum grease, and spilled
gasoline.
Crack sealant must comply with section 37-5.
Water must be potable and not separate from the emulsion before the material is placed.
37-4.02B Mix Design
The proposed mix design for parking area seals must have the values of the properties shown in the
following table:
Parking Area Seal Mix Design Requirements
Requirement
Property
Test method
Min
Max
Mass per liter
ASTM D 244
1.1 kg
Cone penetration,
California Test 413
340
700
mm
ASTM D 2042a
% Nonvolatile
50
% Nonvolatile
10
35
soluble in tri
clorethylene
ASTM D 3910
380
Wet track abrasion,
g/m2
Dried film color
Black
75 KUb
Viscosity
ASTM D 562
a
Weigh 10 g of homogenous product into a previously tared, small
ointment can. Place in a constant temperature oven at 165 5 C
for 90 3 minutes. Cool, reweigh, and calculate nonvolatile
components as a percent of the original weight.
b
Krebs units
Parking area seals must contain a minimum of 2 percent polymer by volume of undiluted asphaltic
emulsion.
37-4.03 CONSTRUCTION
37-4.03A General
Reserved

406

SECTION 37

BITUMINOUS SEALS

37-4.03B Proportioning
Mix parking area seal ingredients in a central plant. The plant must include mechanical or electronic
controls that consistently proportion the ingredients. Mix asphaltic emulsion with the other ingredients
mechanically.
Store the parking area seal in a tank equipped with mixing or agitation devices. Keep stored materials
thoroughly mixed. Protect stored materials from freezing conditions.
37-4.03C Surface Preparation
If cracks in the existing pavement are from 1/4 to 1 inch wide, treat the cracks under section 37-5. Do not
place the parking area seal until the Engineer determines that the crack treatment is cured.
If cracks in the existing pavement are greater than 1 inch wide, the Engineer orders the repair.
After any crack treatment and before placing parking area seal, clean the pavement surface, including
removal of oil and grease spots. Do not use solvents.
If cleaning the pavement with detergents, thoroughly rinse with water. Allow standing water to dry before
placing parking area seal.
You must seal oil and grease spots that remain after cleaning. Use an oil seal primer and follow the
manufacturer's instructions.
If the existing pavement has oil and grease spots that do not come clean and sealing is insufficient, the
Engineer orders the repair of the pavement. This work is change order work.
37-4.03D Placement
Do not place parking area seal when the ambient temperature is less than 55 degrees F or the surface
temperature is less than 60 degrees F. Do not place seal within 24 hours of rain or within 24 hours of
forecast rain or freezing temperatures. Request that the Engineer shut off the irrigation control system at
least 5 days before placing the seal. Do not water plants adjacent to the seal at least 24 hours before and
after the seal coat placement.
Add polymer at the job site in the Engineer's presence.
If adding water at the job site based on the manufacturer's recommendations for consistency and
spreadabilty, do not exceed 15 percent by volume of undiluted asphaltic emulsion.
Before placing the parking area seal, dampen the pavement surface using a distributor truck. Place the
seal on the damp pavement but do not place it with standing water on the pavement.
Place the parking area seal in 1 or more application. The seal must be uniform and smooth, free of ridges
or uncoated areas.
If placing in multiple applications, allow the last application to thoroughly dry before the subsequent
application.
Do not allow traffic on the parking area seal for at least 24 hours after placement.
Do not stripe the parking area seal until it is dry.
37-4.04 PAYMENT
Parking area seal is measured by combining the weight of the aggregate and asphaltic emulsion. Added
water and set-control additive are not measured.
37-5 CRACK TREATMENT
37-5.01 GENERAL
37-5.01A Summary
Section 37-5 includes specifications for treating cracks in asphalt concrete pavement, including
shoulders.

407

SECTION 37

BITUMINOUS SEALS

37-5.01B Definitions
Reserved
37-5.01C Submittals
Submit a certificate of compliance if your selected crack treatment material is on the Authorized Material
List. The submittal must include:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Manufacturer's name
Production location
Product brand or trade name
Product designation
Batch or lot number
Crack treatment material type
Contractor or subcontractor name
Contract number
Lot size
Shipment date
Manufacturer's signature

If your selected crack treatment material is not on the Authorized Material List submit a sample and test
results from each batch or lot 20 days before use. Testing must be done by an authorized laboratory and
test results must show compliance with the specifications. Test reports must include the information
specified for the certificate of compliance submittal. Hot-applied crack treatment material samples must
be 3 pounds minimum in a silicone release container. Cold-applied crack treatment material samples
must be submitted in a minimum 2-quart plastic container.
Submit the following with each delivery of crack treatment material to the job site:
1. Manufacturer's heating and application instructions
2. Manufacturer's MSDS
3. Name of the manufacturer's recommended detackifier
37-5.01D Quality Control and Assurance
Hot-applied crack treatment material must be sampled at least once per project in the Engineer's
presence. Collect two 3-pound minimum samples of crack treatment material from the dispensing wand
into silicone release boxes. Submit 1 sample.
Cold-applied crack treatment material must be sampled at least once per project in the Engineer's
presence. Collect 2 samples of crack treatment material from the dispensing wand into 1-quart containers
and submit 1 sample.
37-5.02 MATERIALS
Crack treatment material must have the values of the properties shown in the following table:

408

SECTION 37
Property a

BITUMINOUS SEALS
ASTM test
method b

Crack Treatment Material


Type 1
Type 2
Type 3
material
material
material

Type 4
material

Type 5
material

Softening point
(min)
D 36
102 C
96 C
90 C
84 C
84 C
Cone
penetration at
77 F (max)
D 5329
35
40
50
70
90
Resilience at
77 F, unaged,
%
D 5329
2060
2565
3070
3575
4080
Flexibility c
D 3111
0 C
0 C
0 C
-11 C
-28 C
Tensile
adhesion, %,
(min)
D 5329
300
400
400
500
500
Specific gravity
(max)
D 70
1.25
1.25
1.25
1.25
1.25
Asphalt
compatibility
D 5329
Pass
Pass
Pass
Pass
Pass
Sieve test
(percent
passing)
See note d
100
100
100
100
100
a
Cold-applied crack treatment material residue collected under ASTM D 6943, Method B and
sampled under ASTM D 140 must comply with the grade specifications.
b
Except for viscosity, cure each specimen at a temperature of 23 2 C and a relative humidity
of 50 10 percent for 24 2 hours before testing.
c
For the flexibility test, the specimen size must be 6.4 0.2 mm thick by 25 0.2 mm wide by
150 0.5 mm long. The test mandrel diameter must be 6.4 0.2 mm. The bend arc must be
180 degrees. The bend rate must be 2 1 seconds. At least 4 of 5 test specimens must pass
at the specified test temperature without fracture, crazing, or cracking.
d
For hot-applied crack treatment, dilute with toluene and sieve through a no. 8 sieve. For cold
applied crack treatment, sieve the product as-received through a no. 8 sieve. If the
manufacturer provides a statement that added components passed the no. 16 sieve before
blending, this requirement is void.
Crack treatment material must be delivered to the job site with the information listed below. If crack
treatment material is delivered to the job site in containers, each container must be marked with the
following information.
1.
2.
3.
4.
5.
6.
7.
8.

Manufacturer's name
Production location
Product brand or trade name
Product designation
Crack treatment trade name
Batch or lot number
Maximum heating temperature
Expiration date for cold application only

Hot-applied crack treatment must be delivered to the job site premixed in cardboard containers with
meltable inclusion liners or in a fully meltable package.
Cold-applied crack treatment must have a minimum shelf life of 3 months from the date of manufacture.
Sand applied to tacky crack treatment material must be clean, free of clay, and have the following
gradation:

409

SECTION 37

BITUMINOUS SEALS
Sieve size
No. 4
No. 50
No. 200

Sand Gradation
Percent passing
100
030
05

37-5.03 CONSTRUCTION
Treat cracks from 1/4 to 1 inch in width for the entire length of the crack. Fill or repair cracks wider than 1
inch as ordered. Filling cracks wider than 1 inch is change order work.
For hot-applied crack treatment material rout cracks or saw cut to form a reservoir.
Cracks must be clean and dry before treating. Before treating, blast cracks with oil-free compressed air at
a pressure of at least 90 psi.
If the pavement temperature is below 40 degrees F or if there is evidence of moisture in the crack, use a
hot air lance immediately before applying crack treatment. The hot air lance must not apply flame directly
on the pavement.
Heat hot-applied crack treatment material in compliance with the manufacturer's instructions. Comply with
the manufacturer's application instructions.
Apply cold-applied crack treatment material with a distributor kettle, a piston, or a diaphragm barrel pump
that can deliver from 50 to 75 psi. The application line must have a pressure gauge and a filter. The
pressure in the application line must not exceed 20 psi. The pressure gauge must have a regulator. Use a
high-pressure hose with a 1/2-inch National Pipe Tapered Thread (NPT) swivel connection and a
dispensing wand.
Apply crack treatment with a nozzle inserted into the crack. Fill the crack flush. If after 2 days the crack
treatment is more than 1/4 inch below the specified level, the sealant fails or the crack re-opens, re-treat
the crack.
Immediately remove crack treatment material that is spilled or deposited on the pavement surface.
Before opening to traffic, apply sand or the manufacturer's recommended detackifying agent to tacky
crack treatment material on the traveled way. Sweep up excess sand before opening to traffic.
37-5.04 PAYMENT
Crack treatment is measured by the lane-mile. A lane-mile consists of a paved lane and any adjacent
shoulders. The Engineer determines the quantity paid from actual measurements along the edge of each
paved lane parallel with the pavement centerline.

38 RESERVED

410

39 HOT MIX ASPHALT

39-1 GENERAL

39-1.01 GENERAL
39-1.01A Summary
Section 39-1 includes general specifications for producing and placing HMA by mixing aggregate and
asphalt binder at a mixing plant and spreading and compacting the HMA mixture.
HMA includes one or more of the following types:
1.
2.
3.
4.

Type A
Type B
OGFC, including HMA-O, RHMA-O, and RHMA-O-HB
RHMA-G

The HMA construction process includes one or more of the following:


1. Standard
2. Method
3. QC/QA
39-1.01B Definitions
coarse aggregate: Aggregate retained on a no. 4 sieve.
fine aggregate: Aggregate passing the no. 4 sieve.
supplemental fine aggregate: Aggregate passing the no. 30 sieve, including hydrated lime, portland
cement, and fines from dust collectors.
39-1.02 MATERIALS
39-1.02A Geosynthetic Pavement Interlayer
Geosynthetic pavement interlayer must comply with the specifications for pavement fabric, paving mat,
paving grid, paving geocomposite grid, or geocomposite strip membrane.
39-1.02B Tack Coat
Tack coat must comply with the specifications for asphaltic emulsion or asphalts. Choose the type and
grade.
Notify the Engineer if you dilute asphaltic emulsion with water. The weight ratio of added water to
asphaltic emulsion must not exceed 1 to 1.
Measure added water either by weight or volume in compliance with section 9-1.02 or you may use water
meters from water districts, cities, or counties. If you measure water by volume, apply a conversion factor
to determine the correct weight.
With each dilution, submit:
1.
2.
3.
4.

Weight ratio of water to bituminous material in the original asphaltic emulsion


Weight of asphaltic emulsion before diluting
Weight of added water
Final dilution weight ratio of water to asphaltic emulsion

39-1.02C Asphalt Binder


Asphalt binder in HMA must comply with the specifications for asphalts or section 39-1.02D.
Asphalt binder for geosynthetic pavement interlayer must comply with the specifications for asphalts.
Choose from Grades PG 64-10, PG 64-16, or PG 70-10.

411

SECTION 39

HOT MIX ASPHALT

39-1.02D Asphalt Rubber Binder


39-1.02D(1) General
Use asphalt rubber binder in RHMA-G, RHMA-O, and RHMA-O-HB. Asphalt rubber binder must be a
combination of:
1. Asphalt binder
2. Asphalt modifier
3. CRM
The combined asphalt binder and asphalt modifier must be 80.0 2.0 percent by weight of asphalt rubber
binder.
39-1.02D(2) Asphalt Modifier
Asphalt modifier must be a resinous, high flash point and aromatic hydrocarbon and must have the values
for the quality characteristics shown in the following table:
Asphalt Modifier for Asphalt Rubber Binder
Quality characteristic
Test method
Value
Viscosity, m2/s (x 10-6) at 100 C
ASTM D 445
X 3a
Flash point, Cleveland Open Cup,
ASTM D 92
207 min
C
Molecular analysis
Asphaltenes, percent by mass
ASTM D 2007
0.1 max
Aromatics, percent by mass
ASTM D 2007
55 min
a
The symbol "X" is the proposed asphalt modifier viscosity. "X" must be from 19 to 36. A change in
"X" requires a new asphalt rubber binder design.
Asphalt modifier must be from 2.0 to 6.0 percent by weight of the asphalt binder in the asphalt rubber
binder.
39-1.02D(3) Crumb Rubber Modifier
CRM consists of a ground or granulated combination of scrap tire crumb rubber and high natural rubber.
CRM must be 75.0 2.0 percent scrap tire rubber and 25.0 2.0 percent high natural rubber by total
weight of CRM. Scrap tire crumb rubber must be from any combination of automobile tires, truck tires, or
tire buffings.
Sample and test the scrap tire crumb rubber and high natural rubber separately. CRM must have the
values for the quality characteristics shown in the following table:
Crumb Rubber Modifier for Asphalt Rubber Binder
Quality characteristic
Test method
Scrap tire crumb rubber gradation
LP-10
(% passing no. 8 sieve)
High natural rubber gradation
LP-10
(% passing no. 10 sieve)
Wire in CRM (% max.)
LP-10
Fabric in CRM (% max.)
LP-10
CRM particle length (inch max.) a
-California
CRM specific gravity a
Test 208
Natural rubber content in high natural rubber (%) a
ASTM D 297
a
Test at mix design and for certificate of compliance.

Value
100
100
0.01
0.05
3/16
1.11.2
40.048.0

CRM must be ground and granulated at ambient temperature. If steel and fiber are cryogenically
separated, it must occur before grinding and granulating. If cryogenically produced, CRM particles must
be large enough to be ground or granulated and not pass through the grinder or granulator.

412

SECTION 39

HOT MIX ASPHALT

CRM must be dry, free-flowing particles that do not stick together. CRM must not cause foaming when
combined with the asphalt binder and asphalt modifier. You may add calcium carbonate or talc up to 3
percent by weight of CRM.
39-1.02D(4) Asphalt Rubber Binder Design and Profile
Submit a proposal for asphalt rubber binder design and profile. In the design, include the asphalt, asphalt
modifier, and CRM and their proportions. The profile is not a performance specification and only serves to
indicate expected trends in asphalt rubber binder properties during binder production. The profile must
include the same component sources for the asphalt rubber binder used.
Design the asphalt rubber binder from testing you perform for each quality characteristic and for the
reaction temperatures expected during production. The 24-hour (1,440-minute) interaction period
determines the design profile. At a minimum, mix asphalt rubber binder components, take samples, and
perform and record the tests shown in the following table:
Test

Asphalt Rubber Binder Reaction Design Profile


Minutes of reaction a
45
60
90
120
240
360

Limits
1440

Xb
X
X
2570
Cone penetration @ 77 F, 0.10-mm
(ASTM D 217)
Resilience @ 77 F, percent rebound
X
X
X
18 min.
(ASTM D 5329)
Field softening point, F
X
X
X
125165
(ASTM D 36)
Viscosity, centipoises (LP-11)
X
X
X
X
X
X
X
1,5004,000
a
Six hours (360 minutes) after CRM addition, reduce the oven temperature to 275 F for 16 hours. After
the 16-hour (1,320-minutes) cooldown after CRM addition, reheat the binder to the reaction temperature
expected during production for sampling and testing at 24 hours (1,440 minutes).
b
"X" denotes required testing
39-1.02D(5) Asphalt Rubber Binder
After interacting for at least 45 minutes, asphalt rubber binder must have the values for the quality
characteristics shown in the following table:
Asphalt Rubber Binder
Test for quality
Test method
control or
acceptance
Cone penetration @ 77 F, 0.10 mm
Acceptance
ASTM D 217
Resilience @ 77 F, percent rebound
Acceptance
ASTM D 5329
Field softening point, F
Acceptance
ASTM D 36
Viscosity @ 375 F, centipoises
Quality control
LP-11
Quality characteristic

Value
Minimum
Maximum
25
18
125
1,500

70
-165
4,000

39-1.02E Aggregate
Aggregate must be clean and free from deleterious substances.
The specified aggregate gradation must be determined before the addition of asphalt binder and includes
supplemental fine aggregate. The Department tests for aggregate grading under California Test 202,
modified by California Test 105 if there is a difference in specific gravity of 0.2 or more between the
coarse and fine parts of different aggregate blends.
Choose sieve size TV within each TV limit presented in the aggregate gradation tables.
The proposed aggregate gradation must be within the TV limits for the specified sieve sizes shown in the
following tables:

413

SECTION 39

HOT MIX ASPHALT


Aggregate Gradation
(Percentage Passing)
HMA Types A and B

Sieve sizes
1"
3/4"
1/2"
No. 4
No. 8
No. 30
No. 200

3/4-inch HMA Types A and B


TV limits
100
90100
7090
4555
3240
1221
2.07.0

Allowable tolerance
-TV 5
TV 6
TV 7
TV 5
TV 4
TV 2

Sieve sizes
3/4"
1/2"
3/8"
No. 4
No. 8
No. 30
No. 200

1/2-inch HMA Types A and B


TV limits
100
9599
7595
5566
3849
1527
2.08.0

Allowable tolerance

TV 6
TV 6
TV 7
TV 5
TV 4
TV 2

Sieve sizes
1/2"
3/8"
No. 4
No. 8
No. 30
No. 200

3/8-inch HMA Types A and B


TV limits
100
95100
5872
3448
1832
2.09.0

Allowable tolerance
-TV 6
TV 7
TV 6
TV 5
TV 2

Sieve sizes
3/8"
No. 4
No. 8
No. 30
No. 200

No. 4 HMA Types A and B


TV limits
100
95100
7277
3743
2.012.0

Allowable tolerance
-TV 7
TV 7
TV 7
TV 4

414

SECTION 39

HOT MIX ASPHALT

RHMA-G

Sieve sizes
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 200

3/4-inch RHMA-G
TV limits
100
95100
8387
6570
2842
1422
06.0

Allowable tolerance

TV 5
TV 6
TV 6
TV 7
TV 5
TV 2

Sieve sizes
3/4"
1/2"
3/8"
No. 4
No. 8
No. 200

1/2-inch RHMA-G
TV limits
100
90100
8387
2842
1422
06.0

Allowable tolerance
-TV 6
TV 6
TV 7
TV 5
TV 2

OGFC

Sieve sizes
1 1/2"
1"
3/4"
1/2"
No. 4
No. 8
No. 200

1-inch OGFC
TV limits
100
99100
8596
5571
1025
616
1.06.0

Allowable tolerance

TV 5
TV 5
TV 6
TV 7
TV 5
TV 2

Sieve sizes
3/4"
1/2"
3/8"
No. 4
No. 8
No. 30
No. 200

1/2-inch OGFC
TV limits
100
95100
7889
2837
718
010
03.0

Allowable tolerance
-TV 6
TV 6
TV 7
TV 5
TV 4
TV 2

Sieve sizes
1/2"
3/8"
No. 4
No. 8
No. 30
No. 200

3/8-inch OGFC
TV limits
100
90100
2936
718
010
03.0

Allowable tolerance
-TV 6
TV 7
TV 6
TV 5
TV 2

Before the addition of asphalt binder and lime treatment, aggregate must have the values for the quality
characteristics shown in the following table:
415

SECTION 39
Quality characteristic
Percent of crushed particles
Coarse aggregate (% min.)
One fractured face
Two fractured faces
Fine aggregate (% min)
(Passing no. 4 sieve
and retained on no. 8 sieve.)
One fractured face
Los Angeles Rattler (% max.)
Loss at 100 rev.
Loss at 500 rev.
Sand equivalent (min.) a

HOT MIX ASPHALT

Aggregate Quality

Test method
A
California
Test 205
90
75

California
Test 211

HMA type
RHMA-G

OGFC

25
-

-
90

90
75

70

20

70

90

12
45
47

-
50
42

12
40
47

12
40
--

California
Test 217
Fine aggregate angularity
California
45
45
45
-(% min.) b
Test 234
Flat and elongated particles
California
10
10
10
10
(% max. by weight @ 5:1)
Test 235
a
Reported value must be the average of 3 tests from a single sample.

b
The Engineer waives this specification if HMA contains less than 10 percent of nonmanufactured sand

by weight of total aggregate. Manufactured sand is fine aggregate produced by crushing rock or gravel.

39-1.02F Reclaimed Asphalt Pavement


You may produce HMA Type A or B, using RAP. HMA produced using RAP must comply with the
specifications for HMA, except aggregate quality specifications do not apply to RAP. You may substitute
RAP aggregate for a part of the virgin aggregate in HMA in a quantity not exceeding 15.0 percent of the
aggregate blend. Do not use RAP in OGFC and RHMA-G.
Assign the substitution rate of RAP aggregate for virgin aggregate with the JMF submittal. The JMF must
include the percent of RAP used. If you change your assigned RAP aggregate substitution rate by more
than 5 percent (within the 15.0 percent limit), submit a new JMF.
Process RAP from asphalt concrete. You may process and stockpile RAP during the entire project.
Prevent material contamination and segregation. Store RAP in stockpiles on smooth surfaces free of
debris and organic material. Processed RAP stockpiles must be only homogeneous RAP.
39-1.03 HOT MIX ASPHALT MIX DESIGN REQUIREMENTS
39-1.03A General
The mix design process consists of performing California Test 367 and laboratory procedures on
combinations of aggregate gradations and asphalt binder contents to determine the OBC and HMA
mixture qualities. The results become the proposed JMF.
Use the Contractor Hot Mix Asphalt Design Data form to record aggregate quality and mix design data.
Use the Contractor Job Mix Formula Proposal form to present the JMF.
Laboratories testing aggregate qualities and preparing the mix design and JMF must be qualified under
the Department's Independent Assurance Program. Take samples under California Test 125.
The Engineer reviews the aggregate qualities, mix design, and JMF and verifies and authorizes the JMF.
You may change the JMF during production. Do not use the changed JMF until it is authorized. Except if
adjusting the JMF as specified in section 39-1.03E, perform a new mix design and submit a new JMF
submittal if you change any of the following:
1.
2.
3.
4.

Target asphalt binder percentage


Asphalt binder supplier
Asphalt rubber binder supplier
Component materials used in asphalt rubber binder or percentage of any component materials
416

SECTION 39
5.
6.
7.
8.

HOT MIX ASPHALT

Combined aggregate gradation


ggregate sources
A
Substitution rate for RAP aggregate of more than 5 percent
Any material in the JMF

For OGFC, submit a complete JMF submittal, except for asphalt binder content. The Department
determines the asphalt binder content under California Test 368 within 20 days of your complete JMF
submittal and provides you a Caltrans Hot Mix Asphalt Verification form.
39-1.03B Hot Mix Asphalt Mix Design
Perform a mix design that produces HMA with the values for the quality characteristics shown in the
following table:
HMA Mix Design Requirements
Test
HMA type
method
A
B
RHMA-G
Air void content (%)
California
4.0
4.0
Section 39-1.03B
Test 367
Voids in mineral aggregate (% min.)
California
No. 4 grading
Test 367
17.0
17.0
-
3/8" grading
15.0
15.0
-
a
1/2" grading
14.0
14.0
18.023.0
18.023.0a
3/4" grading
13.0
13.0
Voids filled with asphalt (%)
California
Note c
No. 4 grading
Test 367
76.080.0
76.080.0
3/8" grading
73.076.0
73.076.0
1/2" grading
65.075.0
65.075.0
3/4" grading
65.075.0
65.075.0
Dust proportion
California
Note c
No. 4 and 3/8" gradings
Test 367
0.92.0
0.92.0
1/2" and 3/4" gradings
0.61.3
0.61.3
Stabilometer value (min.) b
California
No. 4 and 3/8" gradings
Test 366
30
30
-
1/2" and 3/4" gradings
37
35
23
a
Voids in mineral aggregate for RHMA-G must be within this range.

b
California Test 304, Part 2.13.

c
Report this value in the JMF submittal.

Quality characteristic

Report the average of 3 tests. If the range of stability for the 3 briquettes is more than 8 points, prepare

new briquettes and test again. The average air void content may vary from the specified air void content

by 0.5 percent.

39-1.03C Job Mix Formula Submittal


Each JMF submittal must consist of:
1. Proposed JMF on a Contractor Job Mix Formula Proposal form
2. Mix design records on a Contractor Hot Mix Asphalt Design Data form dated within 12 months of
submittal
3. JMF verification on a Caltrans Hot Mix Asphalt Verification form, if applicable
4. JMF renewal on a Caltrans Production Start-Up Evaluation form, if applicable
5. MSDS for the following:
5.1. Asphalt binder
5.2. Base asphalt binder used in asphalt rubber binder
5.3. CRM and asphalt modifier used in asphalt rubber binder
5.4. Blended asphalt rubber binder mixture
5.5. Supplemental fine aggregate except fines from dust collectors
5.6. Antistrip additives

417

SECTION 39

HOT MIX ASPHALT

If the Engineer requests, sample the following materials in the presence of the Engineer and place in
labeled containers weighing no more than 50 lb each:
1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples
must be at least 120 lb for each coarse aggregate, 80 lb for each fine aggregate, and 10 lb for each
type of supplemental fines. The Department combines these aggregate samples to comply with the
JMF TVs submitted on a Contractor Job Mix Formula Proposal form.
2. RAP from stockpiles or RAP system. Samples must be at least 60 lb.
3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical-shaped cans with
open top and friction lids.
4. Asphalt rubber binder with the components blended in the proportions to be used. Samples must be
in four 1-quart cylindrical-shaped cans with open top and friction lids.
Notify the Engineer at least 2 business days before sampling materials. For aggregate and RAP, split the
samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing.
For HMA Type A or B produced under the QC/QA construction process, submit with the JMF submittal:
1. California Test 204 plasticity index results
2. California Test 371 tensile strength ratio results for untreated HMA
3. California Test 371 tensile strength ratio results for treated HMA if untreated HMA tensile strength
ratio is below 70
For RHMA-G produced under the QC/QA construction process, submit with the JMF submittal:
1. California Test 371 tensile strength ratio results for untreated RHMA-G
2. California Test 204 plasticity index results on the aggregate blend if untreated RHMA-G tensile
strength ratio is below 70
3. California Test 371 tensile strength ratio results for treated RHMA-G if untreated RHMA-G tensile
strength ratio is below 70
For any HMA produced under the QC/QA construction process, submit the California Test 371 test results
to the Engineer and to:
Moisture_Tests@dot.ca.gov
39-1.03D Job Mix Formula Review
The Engineer reviews each mix design and proposed JMF within 5 business days from the complete JMF
submittal. The review consists of reviewing the mix design procedures and comparing the proposed JMF
with the specifications.
The Engineer may verify aggregate quality characteristics during this review period.
39-1.03E Job Mix Formula Verification
If you cannot submit a Department-verified JMF on a Caltrans Hot Mix Asphalt Verification form dated
within 12 months before HMA production, the Engineer verifies the JMF.
Based on your testing and production experience, you may submit an adjusted JMF on a Contractor Job
Mix Formula Proposal form before verification testing. JMF adjustments may include a change in the:
1. Asphalt binder content TV up to 0.6 percent from the OBC value submitted on a Contractor Hot Mix
Asphalt Design Data form, except for RHMA-G, do not adjust the TV for asphalt rubber binder below
7.0 percent
2. Aggregate gradation TVs within the TV limits specified in the aggregate gradation tables
For HMA Type A, Type B, and RHMA-G, the Engineer verifies the JMF from samples taken from HMA
produced by the plant to be used. Notify the Engineer at least 2 business days before sampling materials.
In the Engineer's presence and from the same production run, take samples of:
1. Aggregate
2. A
sphalt binder
418

SECTION 39

HOT MIX ASPHALT

3. R
AP
4. H
MA
Sample aggregate from cold feed belts or hot bins. Sample RAP from the RAP system. Sample HMA
under California Test 125, except if you request and if authorized, you may sample from any of the
following locations:
1.
2.
3.
4.
5.

Plant
T
ruck
Windrow
Paver hopper
Mat behind the paver

You may sample from a different project, including a non-Department project, if you make arrangements
for the Engineer to be present during sampling.
For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3
split parts and keep 1 part for your testing.
The Engineer verifies each proposed JMF within 20 days of receiving all verification samples and the JMF
submittal has been accepted. If you request, the Engineer verifies RHMA-G quality requirements within 3
business days of sampling. Verification is testing for compliance with the specifications for:
1.
2.
3.
4.

A
ggregate quality
Aggregate gradation TVs within the TV limits
Asphalt binder content TV within the TV limit
HMA quality specified in the table HMA Mix Design Requirements except:
4.1. Air void content, design value 2.0 percent
4.2. Voids filled with asphalt, report only if an adjustment for asphalt binder content TV is less than
0.3 percent from OBC
4.3. Dust proportion, report only if an adjustment for asphalt binder content TV is less than 0.3
percent from OBC

The Engineer prepares 3 briquettes from a single split sample. To verify the JMF for stability and air void
content, the Engineer tests the 3 briquettes and reports the average of 3 tests. The Engineer prepares
new briquettes if the range of stability for the 3 briquettes is more than 8 points.
The Engineer may use the briquettes used for stability testing to determine bulk specific gravity under
California Test 308. If the same briquettes are used and the tests using bulk specific gravity fail, the
Engineer prepares 3 new briquettes and determines a new bulk specific gravity.
If the JMF is verified, the Engineer provides you a Caltrans Hot Mix Asphalt Verification form.
If tests on plant-produced samples do not verify the JMF, the Engineer notifies you and you must submit
a new JMF submittal or submit an adjusted JMF based on your testing. JMF adjustments may include a
change in:
1. Asphalt binder content TV up to 0.6 percent from the OBC value submitted on a Contractor Hot Mix
Asphalt Design Data form except do not adjust the TV for asphalt rubber binder for RHMA-G below
7.0 percent
2. Aggregate gradation TVs within the TV limits specified in the aggregate gradation tables
You may adjust the JMF only once due to a failed verification test. An adjusted JMF requires a new
Contractor Job Mix Formula Proposal form and verification of a plant-produced sample.
The Engineer reverifies the JMF if HMA production has stopped for longer than 30 days and the verified
JMF is older than 12 months.
For each HMA type and aggregate size specified, the Engineer verifies at the Department's expense up
to 2 proposed JMF, including a JMF adjusted after verification failure. The Engineer deducts $3,000 from
payments for each verification exceeding this limit. This deduction does not apply to verifications initiated
by the Engineer or if a JMF expires while HMA production is stopped longer than 30 days.
419

SECTION 39

HOT MIX ASPHALT

For any HMA produced under the QC/QA construction process, the Department does not use California
Test 371 test results for JMF verification.
39-1.03F Job Mix Formula Renewal
You may request a JMF renewal by submitting:
1. Proposed JMF on a Contractor Job Mix Formula Proposal form
2. Previously verified JMF documented on a Caltrans Hot Mix Asphalt Verification form dated within 12
months
3. Mix design documentation on a Contractor Hot Mix Asphalt Design Data form used for the previously
verified JMF
If the Engineer requests, sample the following materials in the presence of the Engineer and place in
labeled containers weighing no more than 50 lb each:
1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples
must include at least 120 lb for each coarse aggregate, 80 lb for each fine aggregate, and 10 lb for
each type of supplemental fines. The Department combines these aggregate samples to comply with
the JMF TVs submitted on a Contractor Job Mix Formula Proposal form.
2. RAP from stockpiles or RAP system. Samples must be at least 60 lb.
3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical-shaped cans with
open top and friction lids.
4. Asphalt rubber binder with the components blended in the proportions to be used. Samples must be
in four 1-quart cylindrical-shaped cans with open top and friction lids.
Notify the Engineer at least 2 business days before sampling materials. For aggregate, RAP, and HMA,
split samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing.
The Engineer reviews each complete JMF renewal submittal within 5 business days.
The Engineer may verify aggregate qualities during this review period.
The Engineer verifies the JMF under section 39-1.03E except:
1. Engineer retains samples until you provide test results for your part on a Contractor Job Mix Formula
Renewal form.
2. Department tests samples of materials obtained from the HMA production unit after you submit test
results that comply with the specifications for the quality characteristics in section 39-1.03E.
3. Engineer verifies each proposed JMF within 30 days of receiving verification samples.
4. You may not adjust the JMF due to a failed verification.
5. For each HMA type and aggregate gradation specified, the Engineer verifies at the Department's
expense 1 proposed JMF.
If the Engineer verifies the JMF renewal, the Engineer provides you a Caltrans Hot Mix Asphalt
Verification form.
39-1.03G Job Mix Formula Acceptance
You may start HMA production if:
1. Engineer's review of the JMF shows compliance with the specifications
2. Department has verified the JMF within 12 months before HMA production
3. Engineer authorizes the verified JMF
39-1.04 CONTRACTOR QUALITY CONTROL
39-1.04A General
Establish, maintain, and change a quality control system to ensure materials and work comply with the
specifications. Submit quality control test results within 3 days of a request, except if the QC/QA
construction process is specified.

420

SECTION 39

HOT MIX ASPHALT

You must identify the HMA sampling location in your QC plan. During production, take samples under
California Test 125, except if you request and if authorized, sample HMA from any of the following
locations:
1.
2.
3.
4.
5.

Plant
Truck
Windrow
Paver hopper
Mat behind the paver

39-1.04B Prepaving Conference


Hold a prepaving conference with the Engineer at a mutually agreed time and place. Discuss methods of
performing the production and paving work.
39-1.04C Asphalt Rubber Binder
Take asphalt rubber binder samples from the feed line connecting the asphalt rubber binder tank to the
HMA plant. Sample and test asphalt rubber binder under Laboratory Procedure LP-11.
Test asphalt rubber binder for compliance with the viscosity specifications in section 39-1.02. During the
asphalt rubber binder production and HMA production using asphalt rubber binder, measure the viscosity
every hour with not less than 1 reading for each asphalt rubber binder batch. Log the measurements with
the corresponding time and asphalt rubber binder temperature. Submit the log daily.
Submit a certificate of compliance and test results for CRM and asphalt modifier with each truckload
delivered to the HMA plant. A certificate of compliance for asphalt modifier must not represent more than
5,000 lb. Use an AASHTO-certified laboratory for testing.
Sample and test gradation and wire and fabric content of CRM once per 10,000 lb of scrap tire crumb
rubber and once per 3,400 lb of high natural rubber. Sample and test scrap tire crumb rubber and high
natural rubber separately.
Submit certified weight slips for the furnished CRM and asphalt modifier.
39-1.04D Aggregate
Determine the aggregate moisture content and RAP moisture content in continuous mixing plants at least
twice a day during production and adjust the plant controller. Determine the RAP moisture content in
batch mixing plants at least twice a day during production and adjust the plant controller.
39-1.04E Reclaimed Asphalt Pavement
Perform RAP quality control testing each day.
Sample RAP once daily and determine the RAP aggregate gradation under California Test 367, appendix
B, and submit the results with the combined aggregate gradation.
39-1.04F Density Cores
To determine density for Standard and QC/QA construction process projects, take 4- or 6-inch diameter
density cores at least once every 5 business days. Take 1 density core for every 250 tons of HMA from
random locations the Engineer designates. Take density cores in the Engineer's presence and backfill
and compact holes with authorized material. Before submitting a density core, mark it with the density
core's location and place it in a protective container.
If a density core is damaged, replace it with a density core taken within 1 foot longitudinally from the
original density core. Relocate any density core located within 1 foot of a rumble strip to 1 foot
transversely away from the rumble strip.
39-1.04G Briquettes
Prepare 3 briquettes for each stability and air void content determination. Report the average of 3 tests.
Prepare new briquettes and test again when the range of stability for the 3 briquettes is more than 8
points.

421

SECTION 39

HOT MIX ASPHALT

You may use the same briquettes used for stability testing to determine bulk specific gravity under
California Test 308. If you use these briquettes and tests using bulk specific gravity fail, you may prepare
3 new briquettes and determine a new bulk specific gravity.
39-1.05 ACCEPTANCE CRITERIA
HMA acceptance is specified in the sections for each HMA construction process.
The Department samples materials for testing under California Test 125 and the applicable test method,
except samples may be taken:
1. At the plant from a truck or an automatic sampling device
2. From the mat behind the paver
Sampling must be independent of Contractor quality control, statistically based, and random.
If you request, the Department splits samples and provides you with a part.
HMA acceptance is based on:
1.
2.
3.
4.
5.

Authorized JMF
Accepted QC plan for Standard and QC/QA construction process projects
Compliance with the HMA acceptance tables
Lot acceptance for QC/QA construction process projects
Visual inspection

The Department prepares 3 briquettes for each stability and air void content determination. The average
of 3 tests is reported. If the range of stability for the 3 briquettes is more than 8 points, new briquettes are
prepared and tested.
The Department may use the briquettes used for stability testing to determine bulk specific gravity under
California Test 308. If the Engineer uses the same briquettes and the tests using that bulk specific gravity
fail, the Engineer prepares 3 new briquettes and determines a new bulk specific gravity.
39-1.06 DISPUTE RESOLUTION
Work with the Engineer to avoid potential conflicts and to resolve disputes regarding test result
discrepancies. Notify the Engineer within 5 days of receiving a test result if you dispute the test result.
If you or the Engineer dispute each other's test results, submit quality control test results and copies of
paperwork including worksheets used to determine the disputed test results. An independent third party
performs referee testing. Before the independent third party participates in a dispute resolution, the party
must be accredited under the Department's Independent Assurance Program. The independent third
party must be independent of the project. By mutual agreement, the independent third party is chosen
from:
1.
2.
3.
4.

Department laboratory
Department laboratory in a district or region not in the district or region the project is located
Transportation Laboratory
Laboratory not currently employed by you or your HMA producer

If split quality control or acceptance samples are not available, the independent third party uses any
available material representing the disputed HMA for evaluation.
39-1.07 PRODUCTION START-UP EVALUATION
The Engineer evaluates HMA production and placement at production start-up.
Within the first 750 tons produced on the 1st day of HMA production, in the Engineer's presence and from
the same production run, take samples of:
1.
2.
3.
4.

Aggregate
Asphalt binder
RAP
HMA
422

SECTION 39

HOT MIX ASPHALT

Sample aggregate from cold feed belts or hot bins. Take RAP samples from the RAP system. Sample
HMA under California Test 125, except if you request and if authorized, you may sample HMA from any of
the following locations:
1.
2.
3.
4.
5.

Plant
Truck
Windrow
Paver hopper
Mat behind the paver

For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3
split parts and keep 1 part.
For Standard and QC/QA construction process projects, you and the Department must test the split
samples and report test results within 3 business days of sampling. If you proceed before receipt of the
test results, the Engineer may consider the HMA placed to be represented by these test results.
For Standard and QC/QA construction process projects, take 4- or 6-inch diameter density cores within
the first 750 tons on the 1st day of HMA production. For each density core, the Department reports the
bulk specific gravity determined under California Test 308, Method A, in addition to the percent of
maximum theoretical density. You may test for in-place density at the density core locations and include
them in your production tests for percent of maximum theoretical density.
39-1.08 PRODUCTION
39-1.08A General
Produce HMA in a batch mixing plant or a continuous mixing plant. Proportion aggregate by hot or cold
feed control.
HMA plants must be Department qualified. Before production, the HMA plant must have current
qualification under the Department's Materials Plant Quality Program.
During production, you may adjust:
1. Hot or cold feed proportion controls for virgin aggregate and RAP
2. Set point for asphalt binder content
39-1.08B Mixing
Mix HMA ingredients into a homogeneous mixture of coated aggregates.
Asphalt binder must be from 275 to 375 degrees F when mixed with aggregate.
Asphalt rubber binder must be from 350 to 425 degrees F when mixed with aggregate.
When mixed with asphalt binder, aggregate must not be more than 325 degrees F, except aggregate for
OGFC must be not more than 275 degrees F. These aggregate temperature specifications do not apply if
you use RAP.
HMA with or without RAP must not be more than 325 degrees F.
39-1.08C Asphalt Rubber Binder
Deliver scrap tire crumb rubber and high natural rubber in separate bags.
Either proportion and mix asphalt binder, asphalt modifier, and CRM simultaneously or premix the asphalt
binder and asphalt modifier before adding CRM. If you premix the asphalt binder and asphalt modifier, the
asphalt binder must be from 375 to 425 degrees F when you add the asphalt modifier. Mix for at least 20
minutes. When you add CRM, the asphalt binder and asphalt modifier must be from 375 to 425 degrees
F.
Do not use asphalt rubber binder during the first 45 minutes of the reaction period. During this period, the
asphalt rubber binder mixture must be from 375 to the lower of 425 degrees F or 25 degrees F below the
asphalt binder's flash point described in the MSDS.
423

SECTION 39

HOT MIX ASPHALT

If any asphalt rubber binder is not used within 4 hours after the reaction period, discontinue heating. If the
asphalt rubber binder drops below 375 degrees F, reheat before use. If you add more scrap tire crumb
rubber to the reheated asphalt rubber binder, the binder must react for 45 minutes. The added scrap tire
crumb rubber must not exceed 10 percent of the total asphalt rubber binder weight. Reheated and
reacted asphalt rubber binder must comply with the viscosity specifications for asphalt rubber binder in
section 39-1.02D. Do not reheat asphalt rubber binder more than twice.
39-1.09 SUBGRADE, TACK COAT, AND GEOSYNTHETIC PAVEMENT INTERLAYER
39-1.09A General
Prepare subgrade or apply tack coat to surfaces receiving HMA. If specified, place geosynthetic
pavement interlayer over a coat of asphalt binder.
39-1.09B Subgrade
Subgrade to receive HMA must comply with the compaction and elevation tolerance specifications in the
sections for the material involved. Subgrade must be free of loose and extraneous material. If HMA is
paved on existing base or pavement, remove loose paving particles, dirt, and other extraneous material
by any means including flushing and sweeping.
39-1.09C Tack Coat
Apply tack coat:
1. To existing pavement, including planed surfaces
2. Between HMA layers
3. To vertical surfaces of:
3.1. Curbs
3.2. Gutters
3.3. Construction joints
Before placing HMA, apply tack coat in 1 application. The application rate must be the minimum residual
rate specified for the underlying surface conditions shown in the following tables:
Tack Coat Application Rates for HMA Type A, Type B, and RHMA-G
Minimum residual rates (gal/sq yd)
CSS1/CSS1h,
CRS1/CRS2,
Asphalt binder and
SS1/SS1h and
RS1/RS2 and
PMRS2/PMCRS2
HMA overlay over:
QS1h/CQS1h
QS1/CQS1
and
asphaltic
asphaltic
PMRS2h/PMCRS2h
emulsion
emulsion
asphaltic emulsion
New HMA (between layers)
0.02
0.03
0.02
PCC and existing HMA (AC)
0.03
0.04
0.03
surfaces
Planed PCC and HMA (AC)
0.05
0.06
0.04
surfaces
Tack Coat Application Rates for OGFC
Minimum residual rates (gal/sq yd)
CSS1/CSS1h,
CRS1/CRS2,
Asphalt binder and
SS1/SS1h and
RS1/RS2 and
PMRS2/PMCRS2
OGFC over:
QS1h/CQS1h
QS1/CQS1
and
asphaltic
asphaltic
PMRS2h/PMCRS2h
emulsion
emulsion
asphaltic emulsion
New HMA
0.03
0.04
0.03
PCC and existing HMA (AC)
0.05
0.06
0.04
surfaces
Planed PCC and HMA (AC)
0.06
0.07
0.05
surfaces

424

SECTION 39

HOT MIX ASPHALT

If you dilute asphaltic emulsion, mix until homogeneous before application.


For vertical surfaces, apply a residual tack coat rate that will thoroughly coat the vertical face without
running off.
If you request and if authorized, you may:
1. Change tack coat rates
2. Omit tack coat between layers of new HMA during the same work shift if:
2.1. No dust, dirt, or extraneous material is present
2.2. Surface is at least 140 degrees F
Immediately in advance of placing HMA, apply additional tack coat to damaged areas or where loose or
extraneous material is removed.
Close areas receiving tack coat to traffic. Do not track tack coat onto pavement surfaces beyond the job
site.
Asphalt binder tack coat must be from 285 to 350 degrees F when applied.
39-1.09D Geosynthetic Pavement Interlayer
Place geosynthetic pavement interlayer under the manufacturer's instruction.
Before placing the geosynthetic pavement interlayer and asphalt binder:
1. Repair cracks 1/4 inch and wider, spalls, and holes in the pavement. These repairs are change order
work.
2. Clean the pavement of loose and extraneous material.
Immediately before placing the interlayer, apply 0.25 0.03 gal of asphalt binder per square yard of
interlayer or until the fabric is saturated. Apply asphalt binder the width of the geosynthetic pavement
interlayer plus 3 inches on each side. At interlayer overlaps, apply asphalt binder on the lower interlayer
the same overlap distance as the upper interlayer.
Asphalt binder must be from 285 to 350 degrees F and below the minimum melting point of the
geosynthetic pavement interlayer when applied.
Align and place the interlayer with no folds that result in a triple thickness, except that triple thickness
layers less than 1 inch in width may remain if less than 1/2 inch in height. Folds that result in a triple layer
greater than a 1 inch width must be slit and overlapped in a double thickness at least 2 inches in width.
The minimum HMA thickness over the interlayer must be 0.12 foot thick, including conform tapers. Do not
place the interlayer on a wet or frozen surface.
Overlap the interlayer borders from 2 to 4 inches. In the direction of paving, overlap the following roll with
the preceding roll at any break.
You may use rolling equipment to correct distortions or wrinkles in the interlayer.
If asphalt binder tracked onto the interlayer or brought to the surface by construction equipment causes
interlayer displacement, cover it with a small quantity of HMA.
Before placing HMA on the interlayer, do not expose the interlayer to:
1. Traffic, except for crossings under traffic control, and only after you place a small HMA quantity
2. Sharp turns from construction equipment
3. Damaging elements
Pave HMA on the interlayer during the same work shift.
39-1.10 SPREADING AND COMPACTING EQUIPMENT
Paving equipment for spreading must be:
1. S
elf-propelled
425

SECTION 39
2.
3.
4.
5.

HOT MIX ASPHALT

Mechanical
Equipped with a screed or strike-off assembly that can distribute HMA the full width of a traffic lane
Equipped with a full-width compacting device
Equipped with automatic screed controls and sensing devices that control the thickness, longitudinal
grade, and transverse screed slope

Install and maintain grade and slope references.


The screed must produce a uniform HMA surface texture without tearing, shoving, or gouging.
The paver must not leave marks such as ridges and indentations, unless you can eliminate them by
rolling.
Rollers must be equipped with a system that prevents HMA from sticking to the wheels. You may use a
parting agent that does not damage the HMA or impede the bonding of layers.
In areas inaccessible to spreading and compacting equipment:
1. Spread the HMA by any means to obtain the specified lines, grades, and cross sections.
2. Use a pneumatic tamper, plate compactor, or equivalent to achieve thorough compaction.
39-1.11 TRANSPORTING, SPREADING, AND COMPACTING
Do not pave HMA on wet pavement or a frozen surface.
You may deposit HMA in a windrow and load it in the paver if:
1. Paver is equipped with a hopper that automatically feeds the screed
2. Loading equipment can pick up the windrowed material and deposit it in the paver hopper without
damaging base material
3. Activities for deposit, pickup, loading, and paving are continuous
4. HMA temperature in the windrow does not fall below 260 degrees F
You may pave HMA in 1 or more layers on areas less than 5 feet wide and outside the traveled way,
including shoulders. You may use mechanical equipment other than a paver for these areas. The
equipment must produce uniform smoothness and texture.
HMA handled, spread, or windrowed must not stain the finished surface of any improvement, including
pavement.
Do not use petroleum products such as kerosene or diesel fuel to release HMA from trucks, spreaders, or
compactors.
HMA must be free of:
1. Segregation
2. Coarse or fine aggregate pockets
3. Hardened lumps
Longitudinal joints in the top layer must match specified lane edges. Alternate the longitudinal joint offsets
in the lower layers at least 0.5 foot from each side of the specified lane edges. You may request other
longitudinal joint placement patterns.
Until the adjoining through lane's top layer has been paved, do not pave the top layer of:
1.
2.
3.
4.
5.
6.
7.
8.
9.

Shoulders
Tapers
Transitions
R
oad connections
D
riveways
Curve widenings
Chain control lanes
Turnouts
Turn pockets
426

SECTION 39

HOT MIX ASPHALT

If the number of lanes changes, pave each through lane's top layer before paving a tapering lane's top
layer. Simultaneous to paving a through lane's top layer, you may pave an adjoining area's top layer,
including shoulders. Do not operate spreading equipment on any area's top layer until completing final
compaction.
If leveling with HMA is specified, fill and level irregularities and ruts with HMA before spreading HMA over
the base, existing surfaces, or bridge decks. You may use mechanical equipment other than a paver for
these areas. The equipment must produce uniform smoothness and texture. HMA used to change an
existing surface's cross slope or profile is not paid for as HMA (leveling).
If placing HMA against the edge of existing pavement, sawcut or grind the pavement straight and vertical
along the joint and remove extraneous material.
Rolling must leave the completed surface compacted and smooth without tearing, cracking, or shoving.
Complete finish rolling activities before the pavement surface temperature is:
1. Below 150 degrees F for HMA with unmodified binder
2. Below 140 degrees F for HMA with modified binder
3. Below 200 degrees F for RHMA-G
If a vibratory roller is used as a finish roller, turn the vibrator off.
Do not use a pneumatic-tired roller to compact RHMA-G.
For Standard and QC/QA construction processes, if 3/4-inch aggregate grading is specified, you may use
1/2-inch aggregate grading if the total layer thickness is from 0.125 to 0.20 foot thick.
Spread and compact HMA under sections 39-3.03 and 39-3.04 if any of the following applies:
1. Specified paved thickness is less than 0.15 foot.
2. Specified paved thickness is less than 0.20 foot and 3/4-inch aggregate grading is specified and
used.
3. You spread and compact at:
3.1. Asphalt concrete surfacing replacement areas
3.2. Leveling courses
3.3. Areas for which the Engineer determines conventional compaction and compaction

measurement methods are impeded

Do not allow traffic on new HMA pavement until its mid-depth temperature is below 160 degrees F.
If you request and if authorized, you may cool HMA Type A and Type B with water when rolling activities
are complete. Apply water under section 17-3.
Spread sand at a rate from 1 to 2 lb/sq yd on new RHMA-G, RHMA-O, and RHMA-O-HB pavement when
finish rolling is complete. Sand must be free of clay or organic matter. Sand must comply with section 90
1.02C(4)(c). Keep traffic off the pavement until spreading sand is complete.
39-1.12 SMOOTHNESS
39-1.12A General
Determine HMA smoothness with a profilograph and a straightedge.
Smoothness specifications do not apply to OGFC placed on existing pavement not constructed under the
same project.
If concrete pavement is placed on HMA:
1. Cold plane the HMA finished surface to within specified tolerances if it is higher than the grade
ordered.
2. Remove and replace HMA if the finished surface is lower than 0.05 foot below the grade ordered.

427

SECTION 39

HOT MIX ASPHALT

39-1.12B Straightedge
The top layer of HMA pavement must not vary from the lower edge of a 12-foot straightedge:
1. More than 0.01 foot when the straightedge is laid parallel with the centerline
2. More than 0.02 foot when the straightedge is laid perpendicular to the centerline and extends from
edge to edge of a traffic lane
3. More than 0.02 foot when the straightedge is laid within 24 feet of a pavement conform
39-1.12C Profilograph
For the top layer of HMA Type A, Type B, and RHMA-G pavement, determine the PI0 and must-grinds
under California Test 526. Take 2 profiles within each traffic lane, 3 feet from and parallel with the edge of
each lane.
A must-grind is a deviation of 0.3 inch or more in a length of 25 feet. You must correct must-grinds.
For OGFC, only determine must-grinds if placed over HMA constructed under the same project. The top
layer of the underlying HMA must comply with the smoothness specifications before placing OGFC.
Profile the pavement in the Engineer's presence.
On tangents and horizontal curves with a centerline radius of curvature of 2,000 feet, the PI0 must be at
most 3 inches per 0.1-mile section.
On horizontal curves with a centerline radius of curvature from 1,000 to 2,000 feet, including pavement
within the superelevation transitions, the PI0 must be at most 6 inches per 0.1-mile section.
Before the Engineer accepts HMA pavement for smoothness, submit final profilograms.
Submit 1 copy of profile information in Microsoft Excel and 1 copy of longitudinal pavement profiles in
".erd" format or other ProVAL compatible format to the Engineer and to:
Smoothness@dot.ca.gov
The following HMA pavement areas do not require a PI0. You must measure these areas with a 12-foot
straightedge and determine must-grinds with a profilograph:
1. New HMA with a total thickness less than 0.25 foot
2. HMA sections of city or county streets and roads, turn lanes, and collector lanes less than 1,500 feet
in length
The following HMA pavement areas do not require a PI0 and you must measure them with a 12-foot
straightedge:
1. Horizontal curves with a centerline radius of curvature less than 1,000 feet, including pavement within
the superelevation transitions of those curves
2. Within 12 feet of a transverse joint separating the pavement from:
2.1. Existing pavement not constructed under the same project
2.2. A bridge deck or approach slab
3. Exit ramp termini, truck weigh stations, and weigh-in-motion areas
4. If steep grades and superelevation rates greater than 6 percent are present:
4.1. Ramps
4.2. Connectors
5. T
urn lanes
6. Areas within 15 feet of manholes or drainage transitions
7. Acceleration and deceleration lanes for at-grade intersections
8. Shoulders and miscellaneous areas
9. HMA pavement within 3 feet from and parallel to the construction joints formed between curbs,
gutters, or existing pavement

428

SECTION 39

HOT MIX ASPHALT

39-1.12D Smoothness Correction


If the top layer of HMA Type A, Type B, or RHMA-G pavement does not comply with the smoothness
specifications, grind the pavement to within specified tolerances, remove and replace it, or place an
overlay of HMA. Do not start corrective work until your choice of methods is authorized.
Remove and replace areas of OGFC not in compliance with the must-grind and straightedge
specifications, except you may grind OGFC for correcting smoothness:
1. At transverse joints separating the OGFC from pavement not constructed under the same project
2. Within 12 feet of a transverse joint separating the OGFC from a bridge deck or approach slab
Corrected HMA pavement areas must be uniform rectangles with edges:
1. Parallel to the nearest HMA pavement edge or lane line
2. Perpendicular to the pavement centerline
Measure the corrected HMA pavement surface with a profilograph and a 12-foot straightedge and correct
the pavement to within specified tolerances. If a must-grind area or straightedged pavement cannot be
corrected to within specified tolerances, remove and replace the pavement.
On areas ground but not overlaid with OGFC, apply fog seal coat under section 37-2.
39-1.13 HOT MIX ASPHALT ON BRIDGE DECKS
Produce and place HMA on bridge decks under the Method construction process.
Aggregate must comply with the 1/2-inch HMA Types A and B gradation.
If authorized, aggregate may comply with the no. 4 HMA Types A and B gradation for a section or taper at
a bridge end that is less than 1 inch in total depth.
If a concrete expansion dam is to be placed at a bridge deck expansion joint, tape oil-resistant
construction paper to the deck over the area to be covered by the dam before placing the tack coat and
HMA across the joint.
Do not leave a vertical joint more than 0.15 foot high between adjacent lanes open to traffic.
The tack coat application rate must be the minimum residual rate specified in section 39-1.09C. For HMA
placed on a deck seal, use the minimum residual rate specified for a PCC underlying surface.
HMA placed on a deck seal must be placed in at least 2 approximately equal layers. The 1st layer must
be at least 1 inch thick after compaction. Protect the deck seal throughout all operations.
For placement of the 1st HMA layer on a deck seal:
1. Comply with the HMA application temperature recommended by the deck seal manufacturer.
2. Deliver and place HMA using equipment with pneumatic tires or rubber-faced wheels. Do not operate
other vehicles or equipment on the bare deck seal.
3. Deposit HMA on the deck seal in such a way that the deck seal is not damaged. Do not windrow the
HMA material on the bridge deck seal.
4. Place HMA in a downhill direction on bridge decks with grades over 2 percent.
5. Spreading equipment need not be self-propelled.
39-1.14 MISCELLANEOUS AREAS AND DIKES
The following specifications in section 39 do not apply to miscellaneous areas and dikes:
1.
2.
3.
4.

HMA construction process


HMA mix design requirements
Contractor quality control
P
roduction start-up evaluation

Miscellaneous areas are outside the traveled way and include:


1. Median areas not including inside shoulders
429

SECTION 39
2.
3.
4.
5.
6.
7.
8.

HOT MIX ASPHALT

Island areas
Sidewalks
Gutters
G
utter flares
Ditches
Overside drains
Aprons at the ends of drainage structures

Spread miscellaneous areas in 1 layer and compact to the specified lines and grades.
For miscellaneous areas and dikes:
1. Do not submit a JMF.
2. Choose the 3/8-inch or 1/2-inch HMA Type A and Type B aggregate gradations.
3. Minimum asphalt binder content must be 6.8 percent for 3/8-inch aggregate and 6.0 percent for 1/2
inch aggregate. If you request and if authorized, you may reduce the minimum asphalt binder content.
4. Choose asphalt binder Grade PG 70-10 or the same grade specified for HMA.
39-1.15 MINOR HOT MIX ASPHALT
39-1.15A GENERAL
39-1.15A(1) Summary
The following specifications in section 39 do not apply to minor HMA:
1.
2.
3.
4.

HMA construction process


HMA mix design requirements
Contractor quality control
P
roduction start-up evaluation

39-1.15A(2) Definitions
Reserved
39-1.15A(3) Submittals
Reserved
39-1.15A(4) Quality Control and Assurance
Reserved
39-1.15B MATERIALS
The minimum asphalt binder content must be 6.8 percent for 3/8-inch aggregate gradation and 6.0
percent for 1/2-inch aggregate gradation.
Choose asphalt binder Grade PG 64-10, PG 64-16, or PG 70-10.
If you request and if authorized, you may reduce the minimum asphalt binder content.
Choose the 3/8-inch or 1/2-inch HMA Type A or Type B aggregate gradation.
39-1.15C CONSTRUCTION
Produce HMA at a central mixing plant.
Choose any method and equipment to spread and compact.
The surface must be:
1. Textured uniformly
2. Compacted firmly
3. Without depressions, humps, and irregularities
Smoothness specifications do not apply.

430

SECTION 39

HOT MIX ASPHALT

39-1.16 RUMBLE STRIPS


Reserved
39-1.17 DATA CORES
Reserved
39-1.18 HOT MIX ASPHALT AGGREGATE LIME TREATMENTDRY LIME METHOD
Reserved
39-1.19 HOT MIX ASPHALT AGGREGATE LIME TREATMENTSLURRY METHOD
Reserved
39-1.20 LIQUID ANTISTRIP TREATMENT
Reserved
39-1.21 REPLACE ASPHALT CONCRETE SURFACING
Reserved
39-1.22 LIQUID ASPHALT PRIME COAT
Reserved
39-1.23 HOT MIX ASPHALT TYPE C
Reserved
39-1.24 BONDED WEARING COURSEGAP GRADED
Reserved
39-1.25 RUBBERIZED BONDED WEARING COURSEGAP GRADED
Reserved
39-1.26 RUBBERIZED BONDED WEARING COURSEOPEN GRADED
Reserved
39-1.27 BONDED WEARING COURSEOPEN GRADED
Reserved
39-1.28 ROADSIDE PAVING
Reserved
39-1.29 SOIL TREATMENT
Reserved
39-1.3039-1.40 RESERVED
39-2 STANDARD CONSTRUCTION PROCESS
39-2.01 GENERAL
Section 39-2 includes specifications for HMA produced and constructed under the Standard construction
process.
39-2.02 CONTRACTOR QUALITY CONTROL
39-2.02A Quality Control Plan
Establish, implement, and maintain a QC plan for HMA. The QC plan must describe the organization and
procedures you will use to:
1. Control the quality characteristics
2. Determine when corrective actions are needed (action limits)
3. Implement corrective actions
When you submit the proposed JMF, submit the proposed QC plan. You and the Engineer must discuss
the QC plan during the prepaving conference.
431

SECTION 39

HOT MIX ASPHALT

The QC plan must address the elements affecting HMA quality including:
1.
2.
3.
4.
5.

Aggregate
Asphalt binder
Additives
Production
Paving

The Engineer reviews each QC plan within 5 business days from the submittal. Do not produce HMA until
the Engineer authorizes the QC plan.
39-2.02B Quality Control Testing
Perform sampling and testing at the specified frequency for the quality characteristics shown in the
following table:

432

SECTION 39

HOT MIX ASPHALT

Minimum Quality ControlStandard Construction Process

Test
Minimum
HMA type
method
sampling
and testing
A
B
RHMA-G
frequency
California
Aggregate
JMF
JMF
JMF
Test 202
gradationa
Toleranceb Toleranceb Toleranceb
1 per 750
tons and
California
47
42
47
Sand equivalent
any
Test 217
(min)c
remaining
Asphalt binder
California
JMF 0.45 JMF 0.45 JMF 0.50
part
content (%)
Test 379
or 382
HMA moisture
California 1 per 2,500
1.0
1.0
1.0
content (%, max)
Test 226
tons but
or 370
not less
than 1 per
paving day
Percent of
QC plan
2 per
9197
9197
9197
maximum
business
theoretical density
day (min.)
(%)d, e
Stabilometer value California
One per
(min)c, f
Test 366
4,000 tons
No. 4 and 3/8"
or 2 per 5
30
30
-
gradings
business
1/2" and 3/4"
days,
37
35
23
gradings
whichever
is greater
Air void content
California
42
42
TV 2
(%)c, g
Test 367
Aggregate
California
moisture content
Test 226
at continuous
or 370
mixing plants and
2 per day
RAP moisture
during
-
-
-
content at
production
continuous mixing
plants and batch
mixing plantsh
Percent of crushed California
particles coarse
Test 205
aggregate (%,
min)
One fractured
90
25
-
face
Two fractured
75
-
90
faces
As
Fine aggregate
designated
(%, min)
in the QC
(Passing no. 4
plan. At
sieve and
least once
retained on
per project
no. 8 sieve.)
One fractured
70
20
70
face
Los Angeles
California
Rattler (%, max)
Test 211
Loss at 100
12
-
12
rev.
Quality
characteristic

433

OGFC
JMF
Toleranceb
-JMF 0.50
1.0

--

-
---

--

90
75

90

12

SECTION 39
Loss at 500
rev.
Flat and elongated
particles (%, max
by weight @ 5:1)
Fine aggregate
angularity (%, min)
Voids filled with
asphalt (%)i
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
Voids in mineral
aggregate (% min)i
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
Dust proportion i
No. 4 and 3/8"
gradings
1/2" and 3/4"
gradings
Smoothness

HOT MIX ASPHALT

45

50

40

40

California
Test 235

Report only

Report only

Report only

Report only

California
Test 234
California
Test 367

45

45

45

--

76.080.0
73.076.0
65.075.0
65.075.0

76.080.0
73.076.0
65.075.0
65.075.0

Report only

17.0
15.0
14.0
13.0

17.0
15.0
14.0
13.0

-
-
j
18.023.0
18.023.0 j

0.92.0

0.92.0

Report only

0.61.3

0.61.3

12-foot
straight
edge, must
grind, and
PI0

12-foot
straight
edge, must
grind, and
PI0

12-foot
straight
edge, must
grind, and
PI0

12-foot
straight
edge, must
grind, and
PI0

1,500
4,000

1,500
4,000

California
Test 367

California
Test 367

Section
39-1.12
-

Asphalt rubber
binder viscosity @
350 F,
centipoises
Asphalt modifier

Section
39-1.02D

Section
39-1.04C

Section
Section
Section
Section
-
-39-1.02D
39-1.04C
39-1.02D
39-1.02D
CRM
Section
Section
-
-Section
Section
39-1.02D
39-1.04C
39-1.02D
39-1.02D
a
Determine combined aggregate gradation containing RAP under California Test 367.

b
The tolerances must comply with the allowable tolerances in section 39-1.02E.

c
Report the average of 3 tests from a single split sample.

d
Required for HMA Type A, Type B, and RHMA-G if the specified paved thickness is at least 0.15

foot.

e
Determine maximum theoretical density (California Test 309) at the frequency specified for Test

Maximum Density under California Test 375, Part 5.D.

f
California Test 304, Part 2.13.

g
Determine the bulk specific gravity of each lab-compacted briquette under California Test 308,

Method A, and theoretical maximum specific gravity under California Test 309.

h
For adjusting the plant controller at the HMA plant.

i
Report only if the adjustment for the asphalt binder content TV is less than or equal to 0.3 percent

from OBC value submitted on a Contractor Hot Mix Asphalt Design Data form.

j
Voids in mineral aggregate for RHMA-G must be within this range.

For any single quality characteristic except smoothness, if 2 consecutive quality control test results do not

comply with the action limits or specifications:

1. Stop production.
2. Notify the Engineer.
3. Take corrective action.
434

SECTION 39

HOT MIX ASPHALT

4. Demonstrate compliance with the specifications before resuming production and placement.
39-2.03 ACCEPTANCE CRITERIA
39-2.03A Testing
The Department samples for acceptance testing and tests for the quality characteristics shown in the
following table:

435

SECTION 39

HOT MIX ASPHALT

HMA AcceptanceStandard Construction Process


Quality characteristic
Test
HMA type
method
A
B
RHMA-G
a
Aggregate gradation
California
JMF
JMF
JMF
Test 202
Sieve
3/4" 1/2"
3/8"
tolerance c
tolerance c
tolerance c
Xb
1/2"
3/8"
X
No. 4
X
No. 8
X
X
X
No. 200
X
X
X
Sand equivalent (min) d
California
47
42
47
Test 217
Asphalt binder content (%)
California JMF 0.45 JMF 0.45 JMF 0.50
Test 379
or 382
HMA moisture content
California
1.0
1.0
1.0
(%, max)
Test 226
or 370
California
9197
9197
9197
Percent of maximum
Test 375
theoretical density (%) e, f
Stabilometer value (min)d,g
California
-
No. 4 and 3/8" gradings
Test 366
30
30
35
23
1/2" and 3/4" gradings
37
Air void content (%) d, h
California
42
TV 2
42
Test 367
Percent of crushed particles
California
Coarse aggregate (%, min)
Test 205
One fractured face
90
25
-
Two fractured faces
75
-
90
Fine aggregate (%, min)
(Passing no. 4 sieve and
retained on no. 8 sieve.)
One fractured face
70
20
70
Los Angeles Rattler (%, max)
California
Loss at 100 rev.
Test 211
12
-
12
Loss at 500 rev.
45
50
40
Fine aggregate angularity (%,
California
min)
Test 234
45
45
45
Flat and elongated particles
California
Report only Report only Report only
(%, max by weight @ 5:1)
Test 235
i
Voids filled with asphalt (%)
California
No. 4 grading
Test 367
76.080.0
76.080.0
3/8" grading
73.076.0
73.076.0
Report only
1/2" grading
65.075.0
65.075.0
3/4" grading
65.075.0
65.075.0
Voids in mineral aggregate
California
(% min) i
Test 367
No. 4 grading
17.0
17.0
-
3/8" grading
15.0
15.0
-
j
1/2" grading
14.0
14.0
18.023.0
18.023.0 j
3/4" grading
13.0
13.0
i
Dust proportion
California
No. 4 and 3/8" gradings
Test 367
0.92.0
0.92.0
Report only
1/2" and 3/4" gradings
0.61.3
0.61.3
Smoothness
Section
12-foot
12-foot
12-foot
39-1.12
straight
straight
straight
edge, must edge, must edge, must
grind, and
grind, and
grind, and
436

OGFC
JMF
tolerance c

-JMF 0.50
1.0

--

-
---

90
75

90
12
40
-Report only

--

--

-12-foot
straight
edge and
must grind

SECTION 39

HOT MIX ASPHALT

PI0
Section 92
Section 92
Section
Section
92
92-1.01D(2)
1.01D(2)
and section
and section
39-1.02D
39-1.02D
Asphalt modifier
Various
--Section
Section
39-1.02D
39-1.02D
CRM
Various
-
-Section
Section
39-1.02D
39-1.02D
a
The Engineer determines combined aggregate gradations containing RAP under California Test
367.

b
"X" denotes the sieves the Engineer tests for the specified aggregate gradation.

c
The tolerances must comply with the allowable tolerances in section 39-1.02E.

d
The Engineer reports the average of 3 tests from a single split sample.

e
The Engineer determines percent of maximum theoretical density if the specified paved thickness is

at least 0.15 foot under California Test 375, except the Engineer uses:

1. California Test 308, Method A, to determine in-place density of each density core instead of
using the nuclear gauge in Part 4, "Determining In-Place Density By The Nuclear Density
Device."
2. California Test 309 to determine maximum theoretical density instead of calculating test
maximum density in Part 5, "Determining Test Maximum Density."
f
The Engineer determines maximum theoretical density (California Test 309) at the frequency
specified for Test Maximum Density under California Test 375, Part 5.D.
g
California Test 304, Part 2.13.
h
The Engineer determines the bulk specific gravity of each lab-compacted briquette under California
Test 308, Method A, and theoretical maximum specific gravity under California Test 309.
i
Report only if the adjustment for the asphalt binder content TV is less than or equal to 0.3 percent
from the OBC value submitted on a Contractor Hot Mix Asphalt Design Data form.
j
Voids in mineral aggregate for RHMA-G must be within this range.
Asphalt binder
Asphalt rubber binder

Various
Various

PI0
Section 92
--

PI0
Section 92
--

No single test result may represent more than 750 tons or 1 day's production, whichever is less.
For any single quality characteristic except smoothness, if 2 consecutive acceptance test results do not
comply with the specifications:
1. Stop production.
2. T
ake corrective action.
3. Take samples and split each sample into 4 parts in the Engineer's presence. Test 1 part for
compliance with the specifications and submit 3 parts to the Engineer. The Department tests 1 part
for compliance with the specifications and reserves and stores 2 parts.
4. Demonstrate compliance with the specifications before resuming production and placement.
The Department tests the density core you take from each 250 tons of HMA production. The Department
determines the percent of maximum theoretical density for each density core by determining the density
core's density and dividing by the maximum theoretical density.
If the specified total paved thickness is at least 0.15 foot and any layer is less than 0.15 foot, the
Department determines the percent of maximum theoretical density from density cores taken from the
final layer measured the full depth of the total paved HMA thickness.
For percent of maximum theoretical density, the Engineer determines a deduction for each test result
outside the specifications using the reduced payment factors shown in the following table:

437

SECTION 39

HOT MIX ASPHALT

Reduced Payment Factors for Percent of Maximum Theoretical Density

HMA Type A and B Reduced payment HMA Type A and B Reduced payment
and RHMA-G
factor
and RHMA-G
factor
percent of
percent of
maximum
maximum
theoretical density
theoretical density
91.0
0.0000
97.0
0.0000
90.9
0.0125
97.1
0.0125
90.8
0.0250
97.2
0.0250
90.7
0.0375
97.3
0.0375
90.6
0.0500
97.4
0.0500
90.5
0.0625
97.5
0.0625
90.4
0.0750
97.6
0.0750
90.3
0.0875
97.7
0.0875
90.2
0.1000
97.8
0.1000
90.1
0.1125
97.9
0.1125
90.0
0.1250
98.0
0.1250
89.9
0.1375
98.1
0.1375
89.8
0.1500
98.2
0.1500
89.7
0.1625
98.3
0.1625
89.6
0.1750
98.4
0.1750
89.5
0.1875
98.5
0.1875
89.4
0.2000
98.6
0.2000
89.3
0.2125
98.7
0.2125
89.2
0.2250
98.8
0.2250
89.1
0.2375
98.9
0.2375
89.0
0.2500
99.0
0.2500
Remove and
Remove and
> 99.0
< 89.0
replace
replace
39-2.04 TRANSPORTING, SPREADING, AND COMPACTING
Determine the number of rollers needed to obtain the specified density and surface finish.
39-3 METHOD CONSTRUCTION PROCESS
39-3.01 GENERAL
Section 39-3 includes specifications for HMA produced and constructed under the Method construction
process.
39-3.02 ACCEPTANCE CRITERIA
39-3.02A Testing
The Department samples for acceptance testing and tests for the quality characteristics shown in the
following table:

438

SECTION 39

HOT MIX ASPHALT

HMA AcceptanceMethod Construction Process


Quality characteristic
Test
HMA type
method
A
B
RHMA-G
a
Aggregate gradation
California
JMF
JMF
JMF
Test 202
tolerance b
tolerance b
tolerance b
Sand equivalent (min) c
California
47
42
47
Test 217
Asphalt binder content (%)
California JMF 0.45 JMF 0.45 JMF 0.50
Test 379
or 382
HMA moisture content (%, max) California
1.0
1.0
1.0
Test 226
or 370
Stabilometer value (min) c, d
California
No. 4 and 3/8" gradings
Test 366
30
30
-
1/2" and 3/4" gradings
37
35
23
Percent of crushed particles
California
Coarse aggregate (% min)
Test 205
One fractured face
90
25
-
Two fractured faces
75
-
90
Fine aggregate (% min)
(Passing no. 4 sieve and
retained on no. 8 sieve.)
One fractured face
70
20
70
Los Angeles Rattler (% max)
California
Loss at 100 rev.
Test 211
12
-
12
Loss at 500 rev.
45
50
40
California
Air void content (%) c, e
42
42
TV 2
Test 367
Fine aggregate angularity
California
45
45
45
(% min)
Test 234
Flat and elongated particles
California
Report only Report only Report only
(% max by weight @ 5:1)
Test 235
Voids filled with asphalt
California
(%) f
Test 367
No. 4 grading
76.080.0
76.080.0
Report only
3/8" grading
73.076.0
73.076.0
1/2" grading
65.075.0
65.075.0
3/4" grading
65.075.0
65.075.0
Voids in mineral aggregate
California
(% min) f
Test 367
No. 4 grading
17.0
17.0
-
3/8" grading
15.0
15.0
-
g
1/2" grading
14.0
14.0
18.023.0
18.023.0 g
3/4" grading
13.0
13.0
f
Dust proportion
California
No. 4 and 3/8" gradings
Test 367
0.92.0
0.92.0
Report only
1/2" and 3/4" gradings
0.61.3
0.61.3
Smoothness
Section
12-foot
12-foot
12-foot
39-1.12
straight
straight
straight
edge and
edge and
edge and
must-grind
must-grind
must-grind
Asphalt binder
Various
Section 92
Section 92
Section 92
Asphalt rubber binder
Various
--Section
92
1.01D(2)
and section
39-1.02D
439

OGFC
JMF
tolerance b
-JMF 0.50
1.0

-
--

90
75

90
12
40
--Report only

--

--

-12-foot
straight
edge and
must-grind
Section 92
Section
92
1.01D(2)
and section
39-1.02D

SECTION 39
Asphalt modifier

HOT MIX ASPHALT

Various

--

--

Section
Section
39-1.02D
39-1.02D
CRM
Various
-
-Section
Section
39-1.02D
39-1.02D
a
The Engineer determines combined aggregate gradations containing RAP under California Test
367.

b
The tolerances must comply with the allowable tolerances in section 39-1.02E.

c
The Engineer reports the average of 3 tests from a single split sample.

d
California Test 304, Part 2.13.

e
The Engineer determines the bulk specific gravity of each lab-compacted briquette under California

Test 308, Method A, and theoretical maximum specific gravity under California Test 309.

f
Report only if the adjustment for the asphalt binder content TV is less than or equal to 0.3 percent

from the OBC value submitted on a Contractor Hot Mix Asphalt Design Data form.

g
Voids in mineral aggregate for RHMA-G must be within this range.

No single test result may represent more than 750 tons or 1 day's production, whichever is less.
For any single quality characteristic except smoothness, if 2 consecutive acceptance test results do not
comply with the specifications:
1. S
top production.
2. Take corrective action.
3. Take samples and split each sample into 4 parts in the Engineer's presence. Test 1 part for
compliance with the specifications and submit 3 parts to the Engineer. The Department tests 1 part
for compliance with the specifications and reserves and stores 2 parts.
4. Demonstrate compliance with the specifications before resuming production and placement.
39-3.03 SPREADING AND COMPACTING EQUIPMENT
Each paver spreading HMA Type A and Type B must be followed by 3 rollers as follows:
1. One vibratory roller specifically designed to compact HMA. The roller must be capable of at least
2,500 vibrations per minute and must be equipped with amplitude and frequency controls. The roller's
gross static weight must be at least 7.5 tons.
2. One oscillating type pneumatic-tired roller at least 4 feet wide. Pneumatic tires must be of equal size,
diameter, type, and ply. The tires must be inflated to 60 psi minimum and maintained so that the air
pressure does not vary more than 5 psi.
3. One steel-tired, 2-axle tandem roller. The roller's gross static weight must be at least 7.5 tons.
Each roller must have a separate operator. Rollers must be self-propelled and reversible.
Compact RHMA-G as specified for HMA Type A and Type B except do not use pneumatic-tired rollers.
Compact OGFC with steel-tired, 2-axle tandem rollers. If placing 300 tons or more of OGFC per hour, use
at least 3 rollers for each paver. If placing less than 300 tons of OGFC per hour, use at least 2 rollers for
each paver. Each roller must weigh from 126 to 172 lb per linear inch of drum width. Turn the vibrator off.
39-3.04 TRANSPORTING, SPREADING, AND COMPACTING
Pave HMA in maximum 0.25-foot thick compacted layers.
If the surface to be paved is both in sunlight and shade, pavement surface temperatures must be taken in
the shade.
Spread HMA Type A and Type B at the atmospheric and surface temperatures shown in the following
table:

440

SECTION 39

HOT MIX ASPHALT

Minimum Atmospheric and Surface Temperatures

Compacted layer
thickness, feet

Atmospheric, F
Unmodified
Modified asphalt
asphalt binder
bindera
55
50
0.15
0.150.25
45
45
a
Except asphalt rubber binder.

Surface, F
Unmodified
Modified asphalt
asphalt binder
binder a
60
55
50
50

If the asphalt binder for HMA Type A and Type B is unmodified asphalt binder, complete:
1. First coverage of breakdown compaction before the surface temperature drops below 250 degrees F
2. Breakdown and intermediate compaction before the surface temperature drops below 200 degrees F
3. Finish compaction before the surface temperature drops below 150 degrees F
If the asphalt binder for HMA Type A and Type B is modified asphalt binder, complete:
1. First coverage of breakdown compaction before the surface temperature drops below 240 degrees F
2. Breakdown and intermediate compaction before the surface temperature drops below 180 degrees F
3. Finish compaction before the surface temperature drops below 140 degrees F
For RHMA-G:
1. Only spread and compact if the atmospheric temperature is at least 55 degrees F and the surface
temperature is at least 60 degrees F.
2. Complete the 1st coverage of breakdown compaction before the surface temperature drops below
280 degrees F.
3. Complete breakdown and intermediate compaction before the surface temperature drops below 250
degrees F.
4. Complete finish compaction before the surface temperature drops below 200 degrees F.
5. Cover loads in trucks with tarpaulins, if the atmospheric temperature is below 70 degrees F. The
tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper
or to the pavement surface.
For HMA-O with unmodified asphalt binder:
1. Only spread and compact if the atmospheric temperature is at least 55 degrees F and the surface
temperature is at least 60 degrees F.
2. Complete the 1st coverage using 2 rollers before the surface temperature drops below 240 degrees
F.
3. Complete all compaction before the surface temperature drops below 200 degrees F.
4. Cover loads in trucks with tarpaulins, if the atmospheric temperature is below 70 degrees F. The
tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper
or to the pavement surface.
For HMA-O with modified asphalt binder, except asphalt rubber binder:
1. Only spread and compact if the atmospheric temperature is at least 50 degrees F and the surface
temperature is at least 50 degrees F.
2. Complete the 1st coverage using 2 rollers before the surface temperature drops below 240 degrees
F.
3. Complete all compaction before the surface temperature drops below 180 degrees F.
4. Cover loads in trucks with tarpaulins, if the atmospheric temperature is below 70 degrees F. The
tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper
or to the pavement surface.
For RHMA-O and RHMA-O-HB:
1. Only spread and compact if the atmospheric temperature is at least 55 degrees F and surface
temperature is at least 60 degrees F.
441

SECTION 39

HOT MIX ASPHALT

Complete the 1st coverage using 2 rollers before the surface temperature drops below 280 degrees
F.
3. Complete compaction before the surface temperature drops below 250 degrees F.
4. Cover loads in trucks with tarpaulins, if the atmospheric temperature is below 70 degrees F. The
tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper
or to the pavement surface.
For RHMA-G and OGFC, tarpaulins are not required if the time from discharging to the truck until transfer
to the paver's hopper or the pavement surface is less than 30 minutes.
HMA compaction coverage is the number of passes needed to cover the paving width. A pass is 1 roller's
movement parallel to the paving in either direction. Overlapping passes are part of the coverage being
made and are not a subsequent coverage. Do not start a coverage until completing the prior coverage.
Start rolling at the lower edge and progress toward the highest part.
Perform breakdown compaction of each layer of HMA Type A, Type B, and RHMA-G with 3 coverages
using a vibratory roller. The speed of the vibratory roller in miles per hour must not exceed the vibrations
per minute divided by 1,000. If the thickness of the HMA layer is less than 0.08 foot, turn the vibrator off.
The Engineer may order fewer coverages if the thickness of the HMA layer is less than 0.15 foot.
Perform intermediate compaction of each layer of HMA Type A and Type B with 3 coverages using a
pneumatic-tired roller at a speed not exceeding 5 mph.
Perform finish compaction of HMA Type A, Type B, and RHMA-G with 1 coverage using a steel-tired
roller.
Compact OGFC with 2 coverages using steel-tired rollers.
39-4 QUALITY CONTROL/QUALITY ASSURANCE CONSTRUCTION PROCESS
39-4.01 GENERAL
Section 39-4 includes specifications for HMA produced and constructed under the Quality Control /
Quality Assurance construction process.
The QC/QA construction process consists of:
1. Establishing, maintaining, and changing if needed a quality control system providing assurance the
HMA complies with the specifications
2. Sampling and testing at specified intervals, or sublots, to demonstrate compliance and to control the
process
3. Department sampling and testing at specified intervals to verify the testing process and HMA quality
4. Engineer using test results, statistical evaluation of verified quality control tests, and inspection to
accept HMA for payment
A lot is a quantity of HMA. The Engineer designates a new lot when:
1. 20 sublots are complete
2. J MF changes
3. Production stops for more than 30 days
Each lot consists of no more than 20 sublots. A sublot is 750 tons, except a quantity of HMA paved at
day's end greater than 250 tons is a sublot. If a quantity of HMA paved at day's end is less than 250 tons,
you may either make this quantity a sublot or include it in the previous sublot's test results for statistical
evaluation.
39-4.02 CONTRACTOR QUALITY CONTROL
39-4.02A General
Use a composite quality factor, QFC, and individual quality factors, QFQCi, to control your process and
evaluate the quality control program. For quality characteristics without quality factors, use your QC plan's
action limits to control your process.
Control HMA quality including:
442

SECTION 39
1.
2.
3.
4.

HOT MIX ASPHALT

Materials
Proportioning
Spreading and compacting
Finished roadway surface

Develop, implement, and maintain a quality control program that includes:


1. Inspection
2. Sampling
3. Testing
39-4.02B Quality Control Plan
With the JMF submittal, submit a QC plan. The QC plan must comply with the Department's Quality
Control Manual for Hot Mix Asphalt Production and Placement. Discuss the QC plan with the Engineer
during the prepaving conference.
The Engineer reviews each QC plan within 5 business days from the submittal. Do not produce HMA until
the Engineer authorizes the QC plan.
The QC plan must include the name and qualifications of a QC manager. The QC manager administers
the QC plan and during paving must be at the job site within 3 hours of receiving notice. The QC manager
must not be any of the following on the project:
1.
2.
3.
4.

Foreman
Production or paving crewmember
Inspector
Tester

The QC plan must include action limits and details of corrective action you will take if a test result for any
quality characteristic falls outside an action limit.
As work progresses, you must submit a QC plan supplement to change quality control procedures,
personnel, tester qualification status, or laboratory accreditation status.
39-4.02C Quality Control Inspection, Sampling, and Testing
Sample, test, inspect, and manage HMA quality control.
Provide a roadway inspector while HMA paving activities are in progress. Provide a plant inspector during
HMA production.
Inspectors must comply with the Department's Quality Control Manual for Hot Mix Asphalt Production and
Placement.
Provide a testing laboratory and personnel for quality control testing. Provide the Engineer unrestricted
access to the quality control activities. Before providing services for the project, the Engineer reviews,
accredits, and qualifies the testing laboratory and personnel under the Department's Independent
Assurance Program.
For HMA at production start-up and every 5,000 tons, sample and test under California Test 371. Submit
the test results to the Engineer and to:
Moisture_Tests@dot.ca.gov
For HMA at production start-up and once during production, submit samples split from your HMA
production sample for California Test 371 to the Engineer and the Transportation Laboratory, Attention:
Moisture Test.
The Department does not use results from California Test 371 to determine specification compliance.
Comply with the values for the HMA quality characteristics and minimum random sampling and testing for
quality control shown in the following table:

443

SECTION 39
Quality
characteristic

HOT MIX ASPHALT

Minimum Quality ControlQC/QA Construction Process

Test
Minimum
HMA Type
Location
method
sampling
of
and
sampling
testing
A
B
RHMA-G
frequency

Aggregate
gradationa

California
Test 202

Asphalt binder
content (%)

California
Test 379
or 382

Percent of
maximum
theoretical
density (%)c,d
Aggregate
moisture
content at
continuous
mixing plants
and RAP
moisture
content at
continuous
mixing plants
and batch
e
mixing plants
Sand
equivalent
(min) f

HMA moisture
content
(%,max)

QC plan

JMF
tolerance b

JMF
tolerance b

JMF
tolerance b

JMF 0.45

JMF 0.45

JMF 0.50

9296

9296

9196

QC plan

--

24
hours

California
Test 226
or 370

2 per day
during
production

--

Stock
piles or
cold feed
belts

California
Test 217

1 per 750
tons

47

42

47

California
Test 125

California
Test 226
or 370

1 per
2,500 tons
but
not less
than 1 per
paving
day

1.0

1.0

1.0

Stabilometer
value (min)f,g
No. 4 and 3/8"
gradings
1/2" and 3/4"
gradings
Air void
content (%)f,h

1 per 750
tons

California
Test 125
Loose
mix
behind
paver
See
California
Test 125

California
Test 366

California
Test 367

1 per
4,000 tons
or 2 per 5
business
days,
whichever
is greater

Maxi
mum
report
-ing
time
allow
ance

30

30

37

35

23

42

42

TV 2

444

24
hours

24
hours
Loose
Mix
Behind
Paver
See
California
Test 125

48
hours

SECTION 39
Percent of
crushed
particles
coarse
aggregate
(% min.):
One fractured
face
Two fractured
faces
Fine
aggregate
(% min)
(Passing no. 4
sieve and
retained on
no. 8 sieve.):
One fractured
face
Los Angeles
Rattler (%
max):
Loss at 100
rev.
Loss at 500
rev.
Fine
aggregate
angularity
(% min)
Flat and
elongated
particle
(% max by
weight @ 5:1)
Voids filled
with asphalt
(%) i:
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
Voids in
mineral
aggregate
(% min.) i:
No. 4 grading
3/8" grading
1/2" grading
3/4" grading

HOT MIX ASPHALT

90

25

75

90

California
Test 205

California
Test 211

California
Test 234

California
Test 235

California
Test 367

California
Test 367

California
Test 125

As design
ated in
QC plan.
At least
once per
project.

70

20

70

12

12

45

50

40

45

45

45

California
Test 125

Report
only

Report
only

Report
only

California
Test 125

76.080.0
73.076.0
65.075.0
65.075.0

76.080.0
73.076.0
65.075.0
65.075.0

Report
only

California
Test 367

17.0
15.0
14.0
13.0

445

17.0
15.0
14.0
13.0

--
j
18.023.0
18.023.0j

California
Test 125
48
hours

California
Test 367

SECTION 39

HOT MIX ASPHALT

Dust
proportion i:
No. 4 and 3/8"
gradings
1/2" and 3/4"
gradings
Smoothness

Asphalt
rubber binder
viscosity @
350 F,
centipoises
CRM

California
Test 367

Report
only

California
Test 367

12-foot
straight
edge,
must
grind, and
PI0

12-foot
straight
edge,
must
grind, and
PI0

--

1,500
4,000

Section
39-1.02D

0.92.0

0.92.0

0.61.3

0.61.3

Section
39-1.12

12-foot
straight
edge,
must
grind, and
PI0

Section
39-1.02D

24
hours

Section
-
-
-Section
Section
48
39-1.02D
39-1.02D
39-1.02D hours
a
Determine combined aggregate gradation containing RAP under California Test 367.

b
The tolerances must comply with the allowable tolerances in section 39-1.02E.

c
Required for HMA Type A, Type B, and RHMA-G if the specified paved thickness is at least 0.15

foot.

d
Determine maximum theoretical density (California Test 309) at the frequency specified for test

maximum density under California Test 375, Part 5 D.

e
For adjusting the plant controller at the HMA plant.

f
Report the average of 3 tests from a single split sample.

g
California Test 304, Part 2.13.

h
Determine the bulk specific gravity of each lab-compacted briquette under California Test 308,

Method A, and theoretical maximum specific gravity under California Test 309.

i
Report only if the adjustment for the asphalt binder content TV is less than or equal to 0.3 percent

from the OBC value submitted on a Contractor Hot Mix Asphalt Design Data form.

j
Voids in mineral aggregate for RHMA-G must be within this range.

Within the specified reporting time, submit test results including:


1. Sampling location, quantity, and time
2. T
esting results
3. Supporting data and calculations
If test results for any quality characteristic are beyond the action limits in the QC plan, take corrective
actions. Document the corrective actions taken in the inspection records under section 39-4.02E.
Stop production, notify the Engineer, take corrective action, and demonstrate compliance with the
specifications before resuming production and placement if:
1. A lot's composite quality factor, QFC, or an individual quality factor, QFQCi for i = 3, 4, or 5, is below
0.90 determined under section 39-4.02F using quality control data
2. An individual quality factor, QFQCi for i = 1 or 2, is below 0.75 using quality control data
3. Quality characteristics for which a quality factor, QFQCi, is not determined has 2 consecutive quality
control tests not in compliance with the specifications
39-4.02D Charts and Records
Record sampling and testing results for quality control on forms provided in the Quality Control Manual for
Hot Mix Asphalt Production and Placement, or on forms you submit with the QC plan. The QC plan must
also include posting locations and submittal times for forms.

446

SECTION 39

HOT MIX ASPHALT

Submit quality control test results using the Department's statistical evaluation program, HMAPay. For
HMAPay, go to the Department's Construction Web site.
39-4.02E Records of Inspection and Testing
During HMA production, submit a daily:
1. HMA Construction Daily Record of Inspection. Also make this record available at the HMA plant and
job site each day.
2. HMA Inspection and Testing Summary. Include in the summary:
2.1. QC worksheet with updated test results from the HMAPay program
2.2. Test forms with the testers' signatures and QC manager's initials
2.3. Inspection forms with the inspectors' signatures and QC manager's initials
2.4. List and explanation of deviations from the specifications or regular practices
2.5. Signed statement by the QC manager that says:
"It is hereby certified that the information contained in this record is accurate, and that
information, tests, or calculations documented herein comply with the specifications of the
Contract and the standards set forth in the testing procedures. Exceptions to this certification
are documented as part of this record."
Retain for inspection the records generated as part of quality control, including inspection, sampling, and
testing for at least 3 years after final acceptance.
39-4.02F Statistical Evaluation
39-4.02F(1) General
Determine a lot's composite quality factor, QFC, and the individual quality factors, QFQCi. Perform
statistical evaluation calculations to determine these quality factors based on quality control test results
for:
1. Aggregate gradation
2. Asphalt binder content
3. Percent of maximum theoretical density
The Engineer grants a waiver and you must use 1.0 as the individual quality factor for percent of
maximum theoretical density, QFQC5, for HMA paved in:
1. Areas where the total paved thickness is less than 0.15 foot
2. Areas where the total paved thickness is less than 0.20 foot and 3/4-inch grading is specified and
used
3. Dig outs
4. L
eveling courses
5. Areas where compaction or compaction measurement by conventional methods is impeded
39-4.02F(2) Statistical Evaluation Calculations
Use the Variability-Unknown / Standard Deviation Method to determine the percentage of a lot not in
compliance with the specifications.
Determine the percentage of work not in compliance with the specification limits for each quality
characteristic as follows:
1. Calculate the arithmetic mean ( X ) of the test values

X =
n
where:
x=
n=

individual test values


number of test values

447

SECTION 39

HOT MIX ASPHALT

2. Calculate the standard deviation

n (x2 )-(x) 2
n(n-1)

s=
where:

(x2) =
(x)2 =
n=

sum of the squares of individual test values


sum of the individual test values squared
number of test values

3. Calculate the upper quality index (Qu)

Qu =

USL - X
s

where:
USL =
s=
X =

TV plus the production tolerance or upper specification limit


standard deviation
arithmetic mean

4. Calculate the lower quality index (QL);

QL =

X - LSL
s

where:
LSL =
s=
X =

TV minus production tolerance or lower specification limit


standard deviation
arithmetic mean

5. From the table, Upper Quality Index QU or Lower Quality Index QL, determine PU ;
where:
PU =

estimated percentage of work outside the USL


PU = 0, if USL is not specified

6. From the table, Upper Quality Index QU or Lower Quality Index QL, determine PL;
where:
PL =

estimated percentage of work outside the LSL


PL = 0, if LSL is not specified

7. Calculate the total estimated percentage of work outside the USL and LSL, percent defective
Percent defective = PU + PL
The PU and PL are determined from the following:

448

SECTION 39
PU
or
PL

HOT MIX ASPHALT

Upper Quality Index QU or Lower Quality Index QL


Sample Size (n)
7
8
9
10
12
15
18
23
30
11
14
17
22
29
42
1.99 2.07 2.13 2.20 2.28 2.34 2.39 2.44 2.48
1.82 1.88 1.91 1.96 2.01 2.04 2.07 2.09 2.12
1.72 1.75 1.78 1.81 1.84 1.87 1.89 1.91 1.93
1.63 1.66 1.68 1.71 1.73 1.75 1.76 1.78 1.79
1.56 1.58 1.60 1.62 1.64 1.65 1.66 1.67 1.68
1.49 1.51 1.52 1.54 1.55 1.56 1.57 1.58 1.59
1.43 1.45 1.46 1.47 1.48 1.49 1.50 1.50 1.51
1.38 1.39 1.40 1.41 1.41 1.42 1.43 1.43 1.44
1.33 1.33 1.34 1.35 1.35 1.36 1.36 1.37 1.37
1.28 1.28 1.29 1.29 1.30 1.30 1.30 1.31 1.31
1.23 1.24 1.24 1.24 1.25 1.25 1.25 1.25 1.25
1.19 1.19 1.19 1.19 1.20 1.20 1.20 1.20 1.20
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
1.10 1.10 1.10 1.10 1.11 1.11 1.11 1.11 1.11
1.07 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06
1.03 1.03 1.02 1.02 1.02 1.02 1.02 1.02 1.02
0.99 0.99 0.99 0.98 0.98 0.98 0.98 0.98 0.98
0.95 0.95 0.95 0.95 0.94 0.94 0.94 0.94 0.94
0.92 0.92 0.91 0.91 0.91 0.91 0.90 0.90 0.90
0.88 0.88 0.88 0.87 0.87 0.87 0.87 0.87 0.87
0.85 0.85 0.84 0.84 0.84 0.83 0.83 0.83 0.83
0.82 0.81 0.81 0.81 0.80 0.80 0.80 0.80 0.80
0.79 0.78 0.78 0.77 0.77 0.77 0.76 0.76 0.76
0.75 0.75 0.74 0.74 0.74 0.73 0.73 0.73 0.73
0.72 0.72 0.71 0.71 0.70 0.70 0.70 0.70 0.70
0.69 0.69 0.68 0.68 0.67 0.67 0.67 0.67 0.67
0.67 0.65 0.65 0.65 0.64 0.64 0.64 0.64 0.64
0.63 0.62 0.62 0.62 0.61 0.61 0.61 0.61 0.61
0.60 0.59 0.59 0.59 0.58 0.58 0.58 0.58 0.58
0.57 0.57 0.56 0.56 0.55 0.55 0.55 0.55 0.55
0.54 0.54 0.53 0.53 0.52 0.52 0.52 0.52 0.52
0.51 0.51 0.50 0.50 0.50 0.49 0.49 0.49 0.49
0.48 0.48 0.48 0.47 0.47 0.47 0.46 0.46 0.46
0.45 0.45 0.45 0.44 0.44 0.44 0.44 0.43 0.43
0.43 0.42 0.42 0.42 0.41 0.41 0.41 0.41 0.41
0.40 0.39 0.39 0.39 0.38 0.38 0.38 0.38 0.38
0.37 0.37 0.36 0.36 0.36 0.36 0.36 0.36 0.36
0.34 0.34 0.34 0.33 0.33 0.33 0.33 0.33 0.33
0.32 0.31 0.31 0.31 0.30 0.30 0.30 0.30 0.30
0.29 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

43
66
2.51
2.14
1.94
1.80
1.69
1.59
1.51
1.44
1.37
1.31
1.26
1.20
1.15
1.11
1.06
1.02
0.98
0.94
0.90
0.87
0.83
0.80
0.76
0.73
0.70
0.67
0.64
0.61
0.58
0.55
0.52
0.49
0.46
0.43
0.41
0.38
0.36
0.33
0.30
0.28
0.25
0.23
0.20
0.18
0.15
0.13
0.10
0.08
0.05
0.03
0.00

0
1.72 1.88
1
1.64 1.75
2
1.58 1.66
3
1.52 1.59
4
1.47 1.52
5
1.42 1.47
6
1.38 1.41
7
1.33 1.36
8
1.29 1.31
9
1.25 1.27
10
1.21 1.23
11
1.18 1.18
12
1.14 1.14
13
1.10 1.10
14
1.07 1.07
15
1.03 1.03
16
1.00 0.99
17
0.97 0.96
18
0.93 0.92
19
0.90 0.89
20
0.87 0.86
21
0.84 0.82
22
0.81 0.79
23
0.77 0.76
24
0.74 0.73
25
0.71 0.70
26
0.68 0.67
27
0.65 0.64
28
0.62 0.61
29
0.59 0.58
30
0.56 0.55
31
0.53 0.52
32
0.50 0.49
33
0.47 0.48
34
0.45 0.43
35
0.42 0.40
36
0.39 0.38
37
0.36 0.35
38
0.33 0.32
39
0.30 0.30
40
0.28 0.25
41
0.25 0.23
42
0.23 0.20
43
0.18 0.18
44
0.16 0.15
45
0.13 0.13
46
0.10 0.10
47
0.08 0.08
48
0.05 0.05
49
0.03 0.03
50
0.00 0.00
NOTES:
1. If the value of QU or QL does not correspond to a value in the table, use the next lower value.
2. If QU or QL are negative values, PU or PL is equal to 100 minus the table value for PU or PL.
449

>66
2.56
2.16
1.95
1.81
1.70
1.60
1.52
1.44
1.38
1.31
1.26
1.20
1.15
1.11
1.06
1.02
0.98
0.94
0.90
0.87
0.83
0.79
0.76
0.73
0.70
0.66
0.63
0.60
0.57
0.54
0.52
0.49
0.46
0.43
0.40
0.38
0.36
0.32
0.30
0.28
0.25
0.23
0.20
0.18
0.15
0.13
0.10
0.08
0.05
0.03
0.00

SECTION 39

HOT MIX ASPHALT

39-4.02F(3) Quality Factor Determination


Determine individual quality factors, QFQCi, using percent defective = PU + PL and the following:
Quality Factors
Maximum allowable percent defective (PU + PL)
Quality
Sample size (n)
factor
5
6
7
8
9
10
12
15
18
23
30
43
>66
11
14
17
22
29
42
66
1.05
0
0
0
0
0
0
0
0
0
0
1.04
0
1
3
5
4
4
4
3
3
3
3
1.03
0
2
4
6
8
7
7
6
5
5
4
4
1.02
1
3
6
9
11
10
9
8
7
7
6
6
1.01
0
2
5
8
11
13
12
11
10
9
8
8
7
1.00
22
20
18
17
16
15
14
13
12
11
10
9
8
0.99
24
22
20
19
18
17
16
15
14
13
11
10
9
0.98
26
24
22
21
20
19
18
16
15
14
13
12
10
0.97
28
26
24
23
22
21
19
18
17
16
14
13
12
30
28
26
25
24
22
21
19
18
17
16
14
13
0.96
0.95
32
29
28
26
25
24
22
21
20
18
17
16
14
0.94
33
31
29
28
27
25
24
22
21
20
18
17
15
0.93
35
33
31
29
28
27
25
24
22
21
20
18
16
0.92
37
34
32
31
30
28
27
25
24
22
21
19
18
0.91
38
36
34
32
31
30
28
26
25
24
22
21
19
0.90
39
37
35
34
33
31
29
28
26
25
23
22
20
0.89
41
38
37
35
34
32
31
29
28
26
25
23
21
0.88
42
40
38
36
35
34
32
30
29
27
26
24
22
30
29
27
25
23
0.87
43
41
39
38
37
35
33
32
0.86
45
42
41
39
38
36
34
33
31
30
28
26
24
0.85
46
44
42
40
39
38
36
34
33
31
29
28
25
0.84
47
45
43
42
40
39
37
35
34
32
30
29
27
0.83
49
46
44
43
42
40
38
36
35
33
31
30
28
0.82
50
47
46
44
43
41
39
38
36
34
33
31
29
0.81
51
49
47
45
44
42
41
39
37
36
34
32
30
0.80
52
50
48
46
45
44
42
40
38
37
35
33
31
0.79
54
51
49
48
46
45
43
41
39
38
36
34
32
0.78
55
52
50
49
48
46
44
42
41
39
37
35
33
52
50
49
47
45
43
42
40
38
36
34
0.77
56
54
0.76
57
55
53
51
50
48
46
44
43
41
39
37
35
0.75
58
56
54
52
51
49
47
46
44
42
40
38
36
60
57
55
53
52
51
48
47
45
43
41
40
37
61
58
56
55
53
52
50
48
46
44
43
41
38
Reject
62
59
57
56
54
53
51
49
47
45
44
42
39
63
61
58
57
55
54
52
50
48
47
45
43
40
64
62
60
58
57
55
53
51
49
48
46
44
41
Reject values greater than those shown above
NOTE: To obtain a quality factor if the estimated percent outside specification limits from table titled,
"Upper Quality Index QU or Lower Quality Index QL," does not correspond to a value in the table, use
the next larger value.
Compute the composite of single quality factors, QFC, for a lot using:
5

QFC = w i QF QCi
i=1

where:
QFC =
QFQCi =

the composite quality factor for the lot rounded to 2 decimal places
the quality factor for the individual quality characteristic
450

SECTION 39

HOT MIX ASPHALT

w=

the weighting factor listed in the table titled "HMA Acceptance QC/QA
Construction Process"
the quality characteristic index number in the table titled "HMA Acceptance
QC/QA Construction Process"

i=

39-4.03 QUALITY ASSURANCE


39-4.03A General
The Department assures quality by:
1.
2.
3.
4.

Reviewing mix designs and proposed JMF


Inspecting procedures
Conducting oversight of quality control inspection and records
Verification sampling and testing during production and paving

39-4.03B Verification Sampling and Testing


39-4.03B(1) General
The Department samples:
1. Aggregate to verify gradation
2. HMA to verify asphalt binder content
39-4.03B(2) Verification
For aggregate gradation and asphalt binder content, the ratio of verification testing frequency to the
minimum quality control testing frequency is 1:5. The Department performs at least 3 verification tests per
lot.
Using the t-test, the Engineer compares quality control tests results for aggregate gradation and asphalt
binder content with corresponding verification test results. The Engineer uses the average and standard
deviation of up to 20 sequential sublots for the comparison. The Engineer uses production start-up
evaluation tests to represent the 1st sublot. If there are less than 20 sequential sublots, the Engineer uses
the maximum number of sequential sublots available. The 21st sublot becomes the 1st sublot (n = 1) in
the next lot.
The t-value for a group of test data is computed as follows:

Xc Xv
1 1
Sp
nc nv

and

Sp2 =

Sc2 (nc - 1)+Sv2 (nv -1)


nc + nv - 2

where:
nc =
nv =

Number of quality control tests (2 min, 20 max).


Number of verification tests (min of 1 required).
Mean of quality control tests.

Xc =

X v = Mean of verification tests.

Sp =
Sc =
Sv =

Pooled standard deviation (when nv = 1, Sp = Sc).

Standard deviation of quality control tests.

Standard deviation of verification tests (when nv > 1).

The comparison of quality control test results and the verification test results is at a level of significance of
= 0.025. The Engineer computes t and compares it to the following critical t-values, tcrit:

451

SECTION 39
Degrees of freedom
(nc+nv-2)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

HOT MIX ASPHALT

Critical T-Value

Degrees of freedom
tcrit
(nc+nv-2)
(for = 0.025)
24.452
18
6.205
19
4.177
20
3.495
21
3.163
22
2.969
23
2.841
24
2.752
25
2.685
26
2.634
27
2.593
28
2.560
29
2.533
30
2.510
40
2.490
60
2.473
120

2.458

tcrit
(for = 0.025)
2.445
2.433
2.423
2.414
2.405
2.398
2.391
2.385
2.379
2.373
2.368
2.364
2.360
2.329
2.299
2.270
2.241

If the t-value computed is less than or equal to tcrit, quality control test results are verified.
If the t-value computed is greater than tcrit and both X v and X c comply with acceptance specifications,
the quality control tests are verified. You may continue to produce and place HMA with the following
allowable differences:
1.

X v X c 1.0 percent for any grading

2.

X v X c 0.1 percent for asphalt binder content

If the t-value computed is greater than tcrit and the X v X c for grading and asphalt binder content are
greater than the allowable differences, quality control test results are not verified and:
1. Engineer notifies you.
2. You and the Engineer must investigate why the difference exists.
3. If the reason for the difference cannot be found and corrected, the Department's test results are used
for acceptance and pay.
39-4.04 ACCEPTANCE CRITERIA
39-4.04A Testing
The Engineer samples for acceptance testing and tests for the following quality characteristics:

452

SECTION 39
Index
(i)

1
1
1
2
3
4

HOT MIX ASPHALT

HMA AcceptanceQC/QA Construction Process

Quality characteristic
Weight
Test
HMA type
-ing
method
factor
(w)
A
B
Aggregate
gradation a

Sieve 3/4" 1/2" 3/8"


Xb
-
-
1/2"
3/8"
-X
-No. 4
--X
No. 8
X
X
X
No.
X
X
X
200
Asphalt binder content (%)

Percent of maximum
theoretical density (%) d, e
Sand equivalent (min) f
Stabilometer value (min) f,g
No. 4 and 3/8"
gradings
1/2" and 3/4" gradings
Air void content (%)f, h
Percent of crushed
particles coarse aggregate
(% min)
One fractured face
Two fractured faces
Fine aggregate (% min)
(Passing No. 4 sieve
and retained on No. 8
sieve.)
One fractured face
HMA moisture content
(%, max)
Los Angeles Rattler (%
max)
Loss at 100 rev.
Loss at 500 rev.
Fine aggregate angularity
(% min)
Flat and elongated particle
(% max by weight @ 5:1)
Voids in mineral aggregate
(% min) i
No. 4 grading
3/8" grading
1/2" grading
3/4" grading

RHMA-G

0.05
0.05
0.05
0.10
0.15

California
Test 202

0.30

California
Test 379
or 382
California
Test 375
California
Test 217
California
Test 366

JMF 0.45

JMF 0.45

JMF 0.5

9296

9296

9196

47

42

47

30
37

30
35

-
23

California
Test 367
California
Test 205

42

42

TV 2

90
75

25
-

-
90

70
1.0

20
1.0

70
1.0

12
45
45

-
50
45

12
40
45

Report only

Report only

Report only

0.40

California
Test 226
or 370
California
Test 211

California
Test 234
California
Test 235
California
Test 367

JMF Tolerance c

(Note j)
17.0
15.0
14.0
13.0

453

17.0
15.0
14.0
13.0

-
-
18.023.0
18.023.0

SECTION 39
Voids filled with asphalt
(%) i
No. 4 grading
3/8" grading
1/2" grading
3/4" grading
Dust proportion i
No. 4 and 3/8"
gradings
1/2" and 3/4" gradings
Smoothness

HOT MIX ASPHALT

California
Test 367

California
Test 367

76.080.0
73.076.0
65.075.0
65.075.0

76.080.0
73.076.0
65.075.0
65.075.0

Report only

0.92.0

0.92.0

Report only

0.61.3
12-foot
straight
edge, must
grind, and
PI0
Section 92

0.61.3
12-foot
straight
edge, must
grind, and
PI0
Section 92

12-foot
straight
edge, must
grind, and
PI0
Asphalt binder
Various
Section 92
Section
92-1.01D(2)
Asphalt rubber binder
Various
--and section
39-1.02D
Section
Asphalt modifier
Various
--39-1.02D
Section
CRM
Various
-
-39-1.02D
a
The Engineer determines combined aggregate gradations containing RAP under California Test 367.

b
"X" denotes the sieves the Engineer tests for the specified aggregate gradation.

c
The tolerances must comply with the allowable tolerances in section 39-1.02E.

d
The Engineer determines percent of maximum theoretical density if the specified total paved

thickness is at least 0.15 foot under California Test 375 except the Engineer uses:

1. California Test 308, Method A, to determine in-place density of each density core instead of
using the nuclear gauge in Part 4, "Determining In-Place Density By The Nuclear Density Device."
2. California Test 309 to determine maximum theoretical density instead of calculating test
maximum density in Part 5, "Determining Test Maximum Density."
e
The Engineer determines maximum theoretical density (California Test 309) at the frequency
specified for Test Maximum Density under California Test 375, Part 5.D.
f
The Engineer reports the average of 3 tests from a single split sample.
g
California Test 304, Part 2.13.
h
The Engineer determines the bulk specific gravity of each lab-compacted briquette under California
Test 308, Method A, and theoretical maximum specific gravity under California Test 309.
i
Report only if the adjustment for the asphalt binder content TV is less than or equal to 0.3 percent
from the OBC value submitted on a Contractor Hot Mix Asphalt Design Data form.
j
Voids in mineral aggregate for RHMA-G must be within this range.
Section
39-1.12

The Department determines the percent of maximum theoretical density from the average density of 3
density cores you take from every 750 tons of production or part thereof divided by the maximum
theoretical density.
If the specified total paved thickness is at least 0.15 foot and any layer is less than 0.15 foot, the
Department determines the percent of maximum theoretical density from density cores taken from the
final layer measured the full depth of the total paved HMA thickness.
The Engineer calculates QFQCi for i = 1, 2, 3, and 4 using quality control data and QFQCi for i = 5 using
quality assurance data,
The Engineer stops production and terminates a lot if:
1. A lot's composite quality factor, QFC, or an individual quality factor, QFQCi for i = 3, 4, or 5, is below
0.90 determined under section 39-4.02F
2. An individual quality factor, QFQCi for i = 1 or 2, is below 0.75
454

SECTION 39

HOT MIX ASPHALT

3. Quality characteristics for which a quality factor, QFQCi, is not determined has 2 consecutive
acceptance or quality control test results not in compliance with the specifications
For any single quality characteristic for which a quality factor, QFQCi, is not determined, except
smoothness, if 2 consecutive acceptance test results do not comply with specifications:
1. S
top production.
2. Take corrective action.
3. Take samples and split each sample into 4 parts in the Engineer's presence. Test 1 part for
compliance with the specifications and submit 3 parts to the Engineer. The Department tests 1 part
for compliance with the specifications and reserves and stores 2 parts.
4. Demonstrate compliance with the specifications before resuming production and placement.
39-4.04B Statistical Evaluation, Determination of Quality Factors, and Acceptance
39-4.04B(1) Statistical Evaluation and Determination of Quality Factors
To determine the individual quality factor, QFQCi, for any quality factor i = 1 through 5 or a lot's composite
quality factor, QFC, for acceptance and payment adjustment, the Engineer uses the evaluation
specifications under section 39-4.02F and the following:
1. Verified quality control test results for aggregate gradation
2. Verified quality control test results for asphalt binder content
3. Department's test results for percent of maximum theoretical density
39-4.04B(2) Lot Acceptance Based on Quality Factors
The Engineer accepts a lot based on the quality factors determined for aggregate gradation and asphalt
binder content, QFQCi for i = 1 through 4, using the total number of verified quality control test result
values and the total percent defective (PU + PL).
The Engineer accepts a lot based on the quality factor determined for maximum theoretical density,
QFQC5, using the total number of test result values from cores and the total percent defective (PU + PL).
The Engineer calculates the quality factor for the lot, QFC, which is a composite of weighted individual
quality factors, QFQCi, determined for each quality characteristic in the HMA Acceptance QC/QA table in
section 39-4.04A.
The Engineer accepts a lot based on quality factors if:
1. Current composite quality factor, QFC, is 0.90 or greater
2. Each individual quality factor, QFQCi for i = 3, 4, and 5, is 0.90 or greater
3. Each individual quality factor, QFQCi for i = 1 and 2, is 0.75 or greater
No single quality characteristic test may represent more than 750 tons or 1 day's production, whichever is
less.
39-4.04B(3) Payment Adjustment
If a lot is accepted, the Engineer adjusts payment with the following formula:

PA

HMACP* wi * QFQCi * (HMATT WHMATTi) WHMATTi HMACP* HMATT


i1

where:

455

SECTION 39

HOT MIX ASPHALT

PA =
HMACP =
HMATT =
WHMATTi =
QFQCi =

payment adjustment rounded to 2 decimal places


HMA Contract price
HMA total tons represented in the lot
total tons of waived quality characteristic HMA
running quality factor for the individual quality characteristic

w=
i=

QFQCi for i = 1 through 4 must be from verified Contractor's QC results.


QFQC5 must be determined from the Engineer's results on density cores
taken for percent of maximum theoretical density determination.
weighting factor listed in the HMA acceptance table
quality characteristic index number in the HMA acceptance table

If the payment adjustment is a negative value, the Engineer deducts this amount from payment. If the
payment adjustment is a positive value, the Engineer adds this amount to payment.
The 21st sublot becomes the 1st sublot (n = 1) in the next lot. If the 21st sequential sublot becomes the
1st sublot, the previous 20 sequential sublots become a lot for which the Engineer determines a quality
factor. The Engineer uses this quality factor to pay for the HMA in the lot. If the next lot consists of less
than 8 sublots, these sublots must be added to the previous lot for quality factor determination using 21 to
27 sublots.
39-4.04C Dispute Resolution
For a lot, if you or the Engineer dispute any quality factor, QFQCi, or verification test result, every sublot in
that lot must be retested.
Referee tests must be performed under the specifications for acceptance testing.
Any quality factor, QFQCi, must be determined using the referee tests.
For any quality factor, QFQCi, for i = 1 through 5, dispute resolution:
1. If the difference between the quality factors for QFQCi using the referee test result and the disputed
test result is less than or equal to 0.01, the original test result is correct
2. If the difference between the quality factor for QFQCi using the referee test result and the disputed test
result is more than 0.01, the quality factor determined from the referee tests supersedes the
previously determined quality factor
39-5 RESERVED
39-6 PAYMENT
Section 39-6 includes specifications for HMA payment. The weight of each HMA mixture designated in
the Bid Item List must be the combined mixture weight.
If the QC/QA construction process is specified, the Engineer adjusts payment under section 39-4.
If recorded batch weights are printed automatically, the bid item for HMA is measured by using the printed
batch weights, provided:
1. Total aggregate and supplemental fine aggregate weight per batch is printed. If supplemental fine
aggregate is weighed cumulatively with the aggregate, the total aggregate batch weight must include
the supplemental fine aggregate weight.
2. Total asphalt binder weight per batch is printed.
3. Each truckload's zero tolerance weight is printed before weighing the 1st batch and after weighing the
last batch.
4. Time, date, mix number, load number, and truck identification is correlated with a load slip.
5. Copy of the recorded batch weights is certified by a licensed weighmaster and submitted to the
Engineer.
If tack coat, asphalt binder, and asphaltic emulsion are paid with separate contract items, their contract
items are measured under section 92 or section 94.

456

SECTION 39

HOT MIX ASPHALT

The Department does not adjust the unit price for an increase or decrease in the tack coat quantity.

Section 9-1.06 does not apply to tack coat.

Place hot mix asphalt dike of the type specified is measured along the completed length.

Place hot mix asphalt (miscellaneous areas) is measured as the in-place compacted area.

HMA dike is paid for as place hot mix asphalt dike of the type specified in the Bid Item List and by weight

for hot mix asphalt.

HMA specified to be placed in miscellaneous areas is paid for as place hot mix asphalt (miscellaneous

area) and by weight for hot mix asphalt.

If the QC/QA construction process is specified, HMA placed in dikes and miscellaneous areas is paid for

as hot mix asphalt as specified in section 39-4 except section 39-4.04B does not apply.

If minor hot mix asphalt is paid by area, it is measured from the dimensions shown.

Payment for tack coat for minor HMA is included in payment for minor hot mix asphalt or the bid item that

requires minor HMA.

Geosynthetic pavement interlayer is measured for the actual pavement area covered.

If the dispute resolution independent third party determines the Department's test results are correct, the

Engineer deducts the independent third party's testing costs from payments. If the independent third party

determines your test results are correct, the Department pays the independent third party's testing costs.

457

40 CONCRETE PAVEMENT

40-1 GENERAL

40-1.01 GENERAL
40-1.01A Summary
Section 40-1 includes general specifications for constructing concrete pavement and applying crack
treatment.
40-1.01B Definitions
Reserved
40-1.01C Submittals
40-1.01C(1) General
Reserved
40-1.01C(2) Certificates of Compliance
Submit a certificate of compliance for the following materials:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Tie bars
Threaded tie bar splice couplers
Dowel bars
Tie bar baskets
Dowel bar baskets
Chemical adhesive for drilling and bonding tie bars and dowel bars
Silicone joint sealant
Asphalt rubber joint sealant
Preformed compression seal
Backer rods, including the manufacturer's statement of compatibility with the sealant to be used.
Joint filler material
Epoxy powder coating

40-1.01C(3) Drilled Corings


Submit each core taken in a plastic bag for acceptance. Mark each core with a location description.
40-1.01C(4) Independent Third Party Air Content Testing Laboratory
Submit for authorization, the name of a laboratory that will test drilled core specimens for air content in
case of dispute.
40-1.01C(5) Frequency Measuring Device (Tachometer)
Submit as an information submittal, calibration documentation and operational guidelines for frequency
measuring devices for concrete consolidation vibrators.
40-1.01C(6) Manufacturer's Recommendations and Instructions
At least 15 days before delivery to the job site, submit manufacturer's recommendations and instructions
for storage and installation of:
1.
2.
3.
4.
5.
6.

Threaded tie bar splice couplers


Chemical adhesive for drilling and bonding tie bars and dowel bars
Silicone liquid sealant
Asphalt rubber liquid sealant
Preformed compression seals
Joint filler material

40-1.01C(7) Preformed Compression Seal


Submit the manufacturer's data sheet used to develop the recommended preformed compression seal
based on the joint dimensions.

459

SECTION 40

CONCRETE PAVEMENT

40-1.01C(8) Protecting Concrete Pavement During Cold Weather


Submit a plan for protecting concrete pavement during the initial 72 hours after paving when the average
ambient daily temperature is below 40 degrees F and daytime ambient temperature is less than 50
degrees F.
40-1.01C(9) Mix Design
At least 15 days before testing for mix proportions, submit a copy of the AASHTO accreditation for your
laboratory determining the mix proportions. At least 30 days before starting field qualification, submit the
proposed concrete mix proportions determined under California Test 559, the corresponding mix
identifications, and laboratory test reports including the modulus of rupture for each trial mixture at 10, 21,
28, and 42 days.
40-1.01C(10) Quality Control Plan
Submit a concrete pavement QC plan. The QC plan must detail the methods used to ensure the quality of
the work. You or the Engineer may request a meeting. The meeting must include you and the Engineer to
discuss the QC plan. Allow 30 days for the Department's review.
40-1.01C(11) Concrete Field Qualification
Submit field qualification data and test reports including:
1.
2.
3.
4.
5.
6.
7.

Mixing date
Mixing equipment and procedures used
Batch volume in cubic yards
Type and source of ingredients used
Penetration of the concrete
Air content of the plastic concrete
Age and strength at time of concrete beam testing

Field qualification test reports must be certified with a signature by an official in responsible charge of the
laboratory performing the tests.
40-1.01C(12) Quality Control Charts
Submit updated quality control charts each paving day.
40-1.01C(13) Profilograms
Submit profilograms within 5 business days of initial profiling and within 2 business days of profiling
corrected sections.
Submit 1 electronic copy of profile information to the Engineer and to:
Smoothness@dot.ca.gov
The Contract will not be accepted until the original final profilograms are submitted and accepted.
Submitted profilograms become the Department's property.
40-1.01C(14) Reserved
40-1.01D Quality Control and Assurance
40-1.01D(1) General
Reserved
40-1.01D(2) Just-In-Time-Training
Reserved
40-1.01D(3) Prepaving Conference
Schedule a prepaving conference at a mutually agreed upon time and place to meet with the Engineer.
Make the arrangements for the conference facility. Discuss methods of performing each item of the work.
Prepaving conference attendees must sign an attendance sheet provided by the Engineer. The prepaving
conference must be attended by your:
460

SECTION 40
1.
2.
3.
4.

CONCRETE PAVEMENT

P
roject superintendent
Q
C manager
Paving construction foreman
Workers and your subcontractor's workers, including:
4.1. Foremen
4.2. Concrete plant manager
4.3. Concrete plant operator
4.4. Personnel performing saw cutting and joint sealing

Do not start paving activities including test strips until the listed personnel have attended a prepaving
conference.
40-1.01D(4) Quality Control Plan
Establish, implement, and maintain a QC plan for JPCP and CRCP. The QC plan must describe the
organization and procedures used to:
1. Control the production process
2. Determine if a change to the production process is needed
3. I mplement a change
The QC plan must include details of corrective action to be taken if any process is out of control. As a
minimum, a process is out of control if any of the following occurs:
1. For fine and coarse aggregate gradation, 2 consecutive running averages of 4 tests are outside the
specification limits
2. For fine and coarse aggregates, the moisture content of either aggregate changes by more than 0.5
percentage point from any reading
3. For individual penetration or air content measurements:
3.1. One point falls outside the suspension limit line
3.2. Two points in a row fall outside the action limit line
Stop production and take corrective action for out of control processes or the Engineer rejects
subsequent material. You may continue production when fine and coarse aggregate moisture content is
out of control, but take corrective action.
The QC plan must address the elements affecting concrete pavement quality including:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

M
ix proportions
Aggregate gradation
M
aterials quality
Stockpile management
Line and grade control
P
roportioning
Mixing and transportation
Placing and consolidation
Contraction and construction joints
Bar reinforcement placement and alignment
Dowel bar placement, alignment, and anchorage
Tie bar placement
Modulus of rupture
Finishing and curing
Surface smoothness
Joint sealant and compression seal installation

40-1.01D(5) Mix Design for Portland Cement Concrete


Your laboratory must determine the minimum cementitious materials content or the maximum water to
cementitious materials ratio under California Test 559.
Make trial mixtures no more than 24 months before field qualification.

461

SECTION 40

CONCRETE PAVEMENT

Modulus of rupture used to determine the minimum cementitious materials content or maximum water to
cementitious materials ratio must be at least 570 psi at 28 days age and at least 650 psi at 42 days age.
Your laboratory must determine an increase in the cementitious materials content or a decrease in the
water to cementitious materials ratio from the trial mixtures to ensure compliance with the specifications.
If changing an aggregate supply source or the mix proportions, produce a trial batch and field-qualify the
new concrete. The Engineer does not adjust contract time for performing sampling, testing, and qualifying
new mix proportions or changing an aggregate supply source.
40-1.01D(6) Field Qualification
Before placing concrete pavement, proposed mix proportions must be field qualified. Use an ACI certified
"Concrete Laboratory Technician, Grade I" to perform field qualification tests and calculations.
40-1.01D(7) Quality Control Testing
Select random locations and perform sampling and testing for the tests shown in the following table:
Test
Cleanness value
Sand equivalent
Aggregate
gradation
Air content (freeze
thaw) a
Air content (non
freeze thaw) a
Density
Penetration
Calibration of
moisture meter b, c

Quality Control Testing


Frequency
Test method
2 per day
California Test 227
2 per day
California Test 217
2 per day
California Test 202
1 per hour

California Test 504

1 per 4 hours

California Test 504

1 per 4 hours
1 per 4 hours
1 per day

California Test 518


California Test 533
California Test 223
or California Test
226
a
If air entrainment is specified, make at least 1 air content

measurement per hour. If air entrainment is not specified, make

at least 1 air content measurement per 4 hours.

b
Make at least 1 measurement of moisture content per week to

check the calibration of an electronically actuated moisture meter.

c
Random location sampling and testing does not apply.

If air entrainment is specified, the testing laboratory and tester must be qualified under the Department's
Independent Assurance Manual. The manual is available at the METS web site.
40-1.01D(7)a40-1.01D(7)h Reserved
40-1.01D(8) Control Charts
Maintain control charts to identify potential problems and assignable causes. Post a copy of each control
chart at a location determined by the Engineer.
Individual measurement control charts must use the target values in the mix proportions as indicators of
central tendency.
Develop linear control charts for:
1.
2.
3.
4.
5.

Cleanness value
Sand equivalent
Fine and coarse aggregate gradation
Air content
Penetration

Control charts must include:


462

SECTION 40
1.
2.
3.
4.
5.
6.
7.

CONCRETE PAVEMENT

C
ontract number
M
ix proportions
Test number
Each test parameter
Action and suspension limits
Specification limits
Quality control test results

For fine and coarse aggregate gradation control charts, record the running average of the previous 4
consecutive gradation tests for each sieve and superimpose the specification limits.
For penetration and air content control charts, record the individual measurements and superimpose the
action and suspension limits shown in the following table:
Penetration and Air Content Action and Suspension Limits
Individual measurements
Control parameter
Action limit
Suspension limit
Penetration,
1 inch
1-1/2 inch
California Test 533
Air content,
1.0 %
1.5 %
California Test 504
The action limit is the limiting value at which corrective actions must be made while production may
continue. The suspension limit is the limiting value at which production must be suspended while
corrections are made.
40-1.01D(9) Concrete Pavement Smoothness
For the following concrete pavement areas, a profilograph is not required. Test and correct high points
determined by a 12-foot straightedge placed parallel with and perpendicular to the centerline:
1. Horizontal curves with a centerline radius of curvature less than 1,000 feet including concrete
pavement within the superelevation transitions of those curves.
2. Exit ramp termini, truck weigh stations, and weigh-in-motion areas
3. Where steep grades and superelevation rates greater than 6 percent are present on:
3.1. Ramps
3.2. Connectors
4. Turn lanes and areas around manholes or drainage transitions
5. Acceleration and deceleration lanes for at-grade intersections
6. Miscellaneous gore areas
7 Shoulders
Measure the PI0 of new concrete pavement surface using a zero (null) blanking band under California
Test 526 within 10 days after paving.
Use a California profilograph or equivalent to determine the concrete pavement profile. If the profilograph
uses a mechanical recorder, use an electronic scanner to reduce the profilogram.
The profilograph operator must be qualified under the Department's Independent Assurance Manual. The
manual is available at the METS web site.
Notify at least 2 business days before performing profilograph testing. Each day before performing
profilograph testing, notify the Engineer of the start location. Perform profilograph testing in the Engineer's
presence.
Before starting profilograph testing, remove foreign objects from the concrete pavement surface.
Before starting profilograph testing, calibrate the profilograph in the Engineer's presence. If the Engineer
chooses not to be present during profilograph testing, you may perform the testing with authorization.
Note the Engineer's absence on the profilogram.

463

SECTION 40

CONCRETE PAVEMENT

Determine PI0 values for the final concrete pavement surface of each 0.1-mile section of a traffic lane.
Take 2 profiles within each traffic lane, 3 feet from and parallel with the edge of each lane. Each section's
PI0 is the average of the PI0 values for the measurements within that traffic lane. A section that is less
than 0.01 mile and is the result of an interruption to continuous concrete pavement surface must comply
with the PI0 specifications for a full section. Adjust the PI0 for a partial section to reflect a full section.
Use stationing to locate vertical deviations greater than 0.3 inch. The profilogram stationing must be the
same as the project stationing. Note 0.1-mile segments on the profilogram.
Label the profilogram with:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Contract number
County and route number
Stationing
Operator's name
Test date
Test number
Traffic direction
Traffic lane (numbered from left to right in direction of travel)
Test wheel path (left or right in direction of travel)
Test direction
Paving direction

40-1.01D(10) Laboratory Requirements


Use a laboratory that complies with ASTM C 1077 to determine the mix proportions for concrete
pavement. The laboratory must have a current AASHTO accreditation for:
1. AASHTO T 97 or ASTM C 78
2. ASTM C 192/C 192M
40-1.01D(11) Joint Sealant and Compression Seal Installation Training
Before installing joint sealant or compression seals, arrange for a representative from the joint sealant or
compression seal manufacturer to provide training on the cleaning and preparation of the joint and
installing the sealant or seal. Until your personnel and the Department's personnel have been trained, do
not install joint sealant or compression seals.
40-1.01D(12) Frequency Measuring Device (Tachometer)
Before each day's concrete pavement placement and at intervals not to exceed 4 hours of production,
test and record vibration frequency for concrete consolidation vibrators.
40-1.01D(13) Acceptance Criteria
40-1.01D(13)(a) General
Concrete pavement is accepted based on the Department's testing for the concrete pavement quality
characteristics shown in the following table:

464

SECTION 40

CONCRETE PAVEMENT

Concrete Pavement Acceptance Criteria

Test method
Quality
Quantity b
characteristic
1,000 CY
California Test
28-day modulus of
rupture, for PCC
523
Thickness
1,200 sq yd for primary area
California Test
measurements
531
Dowel bar
700 sq yd
measurement
placement
Tie bar placement
4,000 sq yd
measurement
Coefficient of
One day's paving
California Test
friction
342
Air content (freeze
One day's paving
California Test
thaw) a
504
a
If air entrainment is specified, air content tests must be performed.
b
A single test represents no more than the quantity specified.

Concrete pavement may be accepted based on the Department's testing for smoothness. A single test
represents no more than 0.1 mile.
Other concrete pavement quality characteristics are considered in determining final acceptance.
Acceptance of modulus of rupture, thickness, dowel bar and tie bar placement, coefficient of friction,
smoothness, and air content, does not constitute final concrete pavement acceptance.
40-1.01D(13)(b) Field Qualification
Field qualification is accepted under the following criteria:
1. California Test 523 must be performed at 10, 21, and 28 days of age
2. At an age not later than 28 days, when 5 beams are tested under California Test 523, no single
beam's modulus of rupture is less than 550 psi and the average modulus of rupture is at least 570 psi
40-1.01D(13)(c) Modulus of Rupture
40-1.01D(13)(c)(1) General
Reserved
40-1.01D(13)(c)(2) Portland Cement Concrete
Concrete pavement is accepted for modulus of rupture on a lot basis. The minimum modulus of rupture
for each lot is 570 psi at 28 days.
For modulus of rupture, a lot of concrete for concrete pavement must comply with the following:
1. Quantity must not exceed 1,000 cubic yards.
2. Department determines the modulus of rupture of test beams aged 10 days and 28 days.
3. Department calculates the modulus of rupture by averaging the individual test results of 2 beams
aged for 28 days.
4. Difference in the individual test results of beams aged 28 days must not exceed 12 percent when
tested by Method 1, or 16 percent when tested by Method 2. The Engineer calculates the difference
relative to the average of the 2 test results.
The Department provides molds and machines for modulus of rupture acceptance testing. Provide the
material and labor the Engineer may require.
40-1.01D(13)(d) Concrete Pavement Smoothness
If the Department tests for smoothness, testing complies with section 40-1.01D(9).
The Engineer accepts concrete pavement for smoothness in compliance with the following:
1. For tangents and horizontal curves having a centerline radius of curvature 2,000 feet or more, the PI0
must be at most 3 inches per 0.1-mile section.
465

SECTION 40

CONCRETE PAVEMENT

2. For horizontal curves having a centerline radius of curvature from 1,000 to 2,000 feet including
concrete pavement within the superelevation transitions of those curves, the PI0 must be at most 6
inches per 0.1-mile section.
3. If using a profilograph to measure smoothness, the surface must not have individual high points
greater than 0.3 inch.
4. If using a straightedge to measure smoothness, the surface must be within 0.02 foot of the
straightedge's lower edge.
Profile index specifications apply to existing pavement within 50 feet of the transverse joint separating
new concrete pavement and the existing pavement.
If the Department's profilograph test results do not match yours, the Engineer may order you to
recalibrate your profilograph equipment and perform a retest. If your test results are inaccurate due to
operator error, the Engineer may disqualify your profilograph operator. If the Engineer determines your
test results are inaccurate, the Department does not make adjustments to payment or contract time for
recalibrating, retesting, and delays.
40-1.01D(13)(e) Concrete Pavement Thickness
Concrete pavement is accepted for thickness based on coring in the primary area, which is the area
placed in 1 day for each thickness. Concrete pavement thickness must not be deficient by more than 0.05
foot.
After corrective grinding has been completed, core concrete pavement in the primary area under section
40-1.03F at locations determined by the Engineer and in the Engineer's presence. The core specimen
diameter must be 4 inches. To identify the limits of concrete pavement deficient in thickness by more than
0.05 foot, you may divide primary areas into secondary areas. Specifications that may affect concrete
pavement thickness such as allowable tolerances for subgrade construction do not change the thickness
specified for concrete pavement.
In each primary area, the Engineer measures concrete pavement thickness every 1,200 square yards
and any remaining area. The Engineer measures cores under California Test 531 to the nearest 0.01
foot. Core at least 1 foot from existing, contiguous, and parallel concrete pavement not constructed as
part of this Contract.
You may request the Engineer make additional thickness measurements and use them to determine the
average thickness variation. The Engineer determines the locations with random sampling methods.
If each thickness measurement in a primary area is less than 0.05 foot deficient, the Engineer calculates
the average thickness deficiency in that primary area. The Engineer uses 0.02 foot for a thickness
difference more than 0.02 foot over the specified thickness.
For each thickness measurement in a primary area deficient by more than 0.05 foot, the Engineer
determines a secondary area where the thickness deficiency is more than 0.05 foot. The Engineer
determines this secondary area by measuring the thickness of each concrete pavement slab adjacent to
the measurement found to be more than 0.05 foot deficient. The Engineer continues to measure the
thickness until an area that is bound by slabs with thickness deficient by 0.05 foot or less is determined.
Slabs without bar reinforcement are defined as the areas bound by longitudinal and transverse joints and
concrete pavement edges. Slabs with bar reinforcement are defined as the areas bound by longitudinal
joints and concrete pavement edges and 15-foot lengths. Secondary area thickness measurements in a
slab determine that entire slab's thickness.
The Engineer measures the remaining primary area thickness after removing the secondary areas from
consideration for determining the average thickness deficiency.
The Engineer determines the slabs to remove and replace.
40-1.01D(13)(f) Required Use of Air-Entraining Admixtures
If air-entraining admixtures are specified, the Engineer may choose to accept concrete pavement for air
content based on your air content quality control tests. The Engineer decides to use your air content
quality control tests based on a t-test that determines the difference in the means of your test and the
Engineer's verification tests. The Engineer calculates the t-value of the test data as follows:
466

SECTION 40

CONCRETE PAVEMENT

Xc Xv
1 1
Sp
nc nv

and

Sp2 =

Sc2 (nc - 1)+Sv2 (nv -1)


nc + nv - 2

where:
nc
nv

Xc
Xv
Sp
Sc
Sv

= Number of your quality control tests (minimum of 2 required)


= Number of verification tests (minimum of 1 required)
= Mean of your quality control tests
= Mean of the verification tests
= Pooled standard deviation
(When nv = 1, Sp = Sc)
= Standard deviation of your quality control tests
= Standard deviation of the verification tests (when nv > 1)

The Engineer compares your quality control test results with the Department's verification test results at a
level of significance of = 0.01. The Engineer compares the t-value to tcrit, determined from:
tcrit
degrees of freedom
(nc+nv-2)
1
2
3
4
5
6
7
8
9
10

tcrit
(for = 0.01)
63.657
9.925
5.841
4.604
4.032
3.707
3.499
3.355
3.250
3.169

If the t-value calculated is less than or equal to tcrit, your quality control test results are verified. If the t
value calculated is greater than tcrit, quality control test results are not verified.
If your quality control test results are not verified, core at least 3 specimens from concrete pavement
under section 40-1.03F. The Engineer selects the core locations. Your approved third party independent
testing laboratory must test these specimens for air content under ASTM C 457. The Engineer compares
these test results with your quality control test results using the t-test method. If your quality control test
results are verified based on this comparison, the Engineer uses the quality control test results for
acceptance of concrete pavement for air content. If your quality control test results are not verified based
on this comparison, the Engineer uses the air content of core specimens determined under ASTM C 457
for acceptance.
40-1.01D(13)(g) Dowel Bar and Tie Bar Placement
Core specimens are used to evaluate and accept concrete pavement. Except for CRCP, core specimens
for:
1. Dowel bar placement
2. Tie bar placement
3. Concrete consolidation around dowel and tie bars

467

SECTION 40

CONCRETE PAVEMENT

Obtain cores under section 40-1.03F. The Engineer determines the core locations. Each core must have
a nominal diameter of 4 inches. Core each day's paving within 2 business days in compliance with:
1. One test for every 700 square yards of doweled concrete pavement or remaining fraction of that area.
Each dowel bar test consists of 2 cores, 1 on each dowel bar end to expose both ends and allow
measurement.
2. One test for every 4,000 square yards of concrete pavement with tie bars or remaining fraction of that
area
If the tests indicate dowel or tie bars are not placed within the specified tolerances or if there are air voids
around the dowel or tie bars, core additional specimens to determine the limits of unacceptable work.
The Engineer determines the slabs to remove and replace.
If authorized, slabs may remain in place with an adjustment in payment for:
1. Dowel bars with centers from 2 to 3 inches from the saw cut of a transverse contraction joint or with
deficient concrete consolidation around the dowel bars
2. Tie bars placed outside their specified placement and position or with deficient concrete consolidation
around the tie bars
40-1.01D(13)(h) Bar Reinforcing Steel
Bar reinforcing steel is accepted based on inspection before concrete placement.
40-1.02 MATERIALS
40-1.02A General
Reserved
40-1.02B Concrete
40-1.02B(1) General
Reserved
40-1.02B(2) Portland Cement Concrete
PCC for concrete pavement must comply with section 90-1.
40-1.02B(2)(a) Cementitious Material
PCC for concrete pavement must contain from 505 pounds to 675 pounds cementitious material per cubic
yard. The specifications for reducing cementitious material content in section 90-1.02E(2) do not apply to
concrete pavement.
40-1.02B(2)(b) Admixture
For a project shown in the low and south mountain climate regions, add air-entraining admixture specified
in section 90-1.02E to attain an air content of 4 1.5 percent in the freshly mixed concrete.
For a project shown in the high desert and high mountain climate regions, add air-entraining admixture
specified in section 90-1.02E to attain an air content of 6 1.5 percent in the freshly mixed concrete.
40-1.02B(2)(c) Aggregate
Aggregate must comply with section 90-1.02C except the specifications for reduction in operating range
and contract compliance for cleanness value and sand equivalent specified in section 90-1.02C(2) and
section 90-1.02C(3) do not apply to concrete pavement.
For combined aggregate gradings, the difference between the percent passing the 3/8-inch sieve and the
percent passing the no. 8 sieve must not be less than 16 percent of the total aggregate.
40-1.02C Curing Compound
Curing compound must be curing compound no. 1 or 2.
40-1.02D Bar Reinforcement
Bar reinforcement must comply with section 52.
468

SECTION 40

CONCRETE PAVEMENT

If the job site is shown to be in high desert or any mountain climate regions, bar reinforcement must be
one of the following:
1. Epoxy-coated steel reinforcing bar:
1.1. Bar must comply with ASTM A 615/A 615M, Grade 40 or 60; ASTM A 996/A 996M; or ASTM A
706/A 706M.
1.2. Epoxy coating must comply with section 52-2.03B for prefabricated bar reinforcement. Handle
under ASTM D 3963/D 3963M and section 52-2.02C.
2. Low carbon, chromium steel bar:
2.1. Low carbon, chromium steel bar must comply with ASTM A 1035/A 1035 M.
40-1.02E Tie Bars
Tie bars must be one of the following:
1. Epoxy-coated steel reinforcing bar:
1.1. Bar reinforcing must comply with ASTM A 615/A 615M, Grade 40 or 60; ASTM A 996/A 996M;
or ASTM A 706/A 706M
1.2. Epoxy coating must comply with section 52-2.02B for epoxy coated bar reinforcement or
section 52-2.03B for prefabricated bar reinforcement.
2. Stainless-steel bar:
2.1. Stainless-steel bar must be descaled, pickled, and polished solid stainless-steel bars UNS
Designation S31603 or S31803, Grade 60 under ASTM A 955/A 955M.
3. Low carbon, chromium-steel bar:
3.1. Low carbon, chromium-steel bar must comply with ASTM A 1035/A 1035M.
For a project shown to be in high desert or any mountain climate region, tie bars must be one of the
following:
1. Epoxy-coated steel reinforcing bar:
1.1. Bar must comply with ASTM A 615/A 615M, Grade 40 or 60; ASTM A 996/A 996M; or ASTM A
706/A 706M.
1.2. Epoxy coating must comply with section 52-2.03B for prefabricated bar reinforcement.
2. Stainless-steel bar:
2.1. Stainless-steel bar must be descaled, pickled, and polished solid stainless-steel bars UNS
Designation S31603 or S31803, Grade 60 under ASTM A 955/A 955M
Fabricate, sample, and handle epoxy-coated tie bars under ASTM D 3963/D 3963M, section 52-2.02B or
section 52-2.03C.
Do not bend epoxy-coated tie bars.
40-1.02F Dowel Bars
Dowel bars must be plain steel bars and one of the following:
1. Epoxy-coated bar
1.1 Bar must comply with ASTM A 615/A 615M, Grade 40 or 60
1.2 Epoxy coating must comply with section 52-2.02B for epoxy-coated wire reinforcement and
section 52-2.03B for epoxy-coated prefabricated wire reinforcement.
2. Stainless-steel bar:
2.1. Stainless-steel bar must be descaled, pickled, and polished solid stainless-steel bars, UNS
Designation S31603 or S31803, Grade 60 under ASTM A 276/A 276M, and ASTM A 955/A
955M.
3. Low carbon, chromium-steel bar:
3.1. Low carbon, chromium-steel bar must comply with ASTM A 1035/A 1035M.
For a project shown to be in high desert or any mountain climate region, dowel bars must be one of the
following:
1. Epoxy-coated bar
1.1 Bar must comply with ASTM A 615/A 615M, Grade 40 or 60
469

SECTION 40

CONCRETE PAVEMENT

1.2 Epoxy coating must comply with 52-2.03B for epoxy-coated prefabricated wire reinforcement.
2. Stainless-steel bar:
2.1. Stainless-steel bar must be descaled, pickled, and polished solid stainless-steel bars, UNS
Designation S31603 or S31803, Grade 60 under ASTM A 276/A 276M, and ASTM A 955/A
955M.
Fabricate, sample, and handle epoxy-coated dowel bar and dowel bar baskets at the job site under ASTM
D 3963/D 3963M and section 52-2.03C except each sample must be 18 inches long.
40-1.02F(1) Dowel Bar Lubricant
Dowel bar lubricant must be petroleum paraffin based or a curing compound. Paraffin-based lubricant
must be Dayton Superior DSC BB-Coat or Valvoline Tectyl 506 or an approved equal and must be
factory-applied. Curing compound must be curing compound no. 3.
40-1.02F(2) Reserved
40-1.02G Dowel and Tie Bar Baskets
Dowel and tie bar baskets must be:
1. Minimum W10 wire size number in compliance with ASTM A 82/A 82M
2. Either U-frame or A-frame shape
3. Welded under ASTM A 185/A 185M, section 7.4
Dowel and tie bar baskets may be epoxy-coated.
Epoxy coating must comply with section 52-2.02B for epoxy-coated wire reinforcement and section 522.03B for epoxy-coated prefabricated wire reinforcement.
For a project shown to be in high desert or any mountain climate region, dowel bar and tie bar baskets
must be one of the following:
1. Epoxy-coated
1.1 Epoxy coating must comply with section 52-2.03B for epoxy-coated prefabricated wire

reinforcement.

2. Stainless-steel
2.2. Stainless-steel baskets must comply with ASTM A 1022 / A 1022M, UNS S31600 or S31603
and be descaled, pickled, and polished solid stainless steel wire, Grade 60 under ASTM A 276
/A 276 M.
If tie bars or dowel bars are stainless steel, tie bar and dowel bar baskets must be stainless steel.
If tie bars or dowel bars comply with ASTM A 1035/A 1035M, tie bar or dowel bar baskets must comply
with ASTM A 1035/A 1035M.
Handle epoxy-coated tie bar and dowel bar baskets under ASTM D 3963/D 3963M, section 52-2.02B or
52-2.03B.
Fasteners must be driven fasteners in compliance with ASTM F 1667. Fasteners on lean concrete base
or HMA must have a minimum shank diameter of 3/16 inch and a minimum shank length of 2-1/2 inches.
For asphalt treated permeable base or cement treated permeable base, the shank diameter must be at
least 3/16 inch and the shank length must be at least 5 inches.
Fasteners, clips, and washers must have a minimum 0.2-mil thick zinc coating applied either by
electroplating or galvanizing.
40-1.02H Chemical Adhesive for Drill and Bond
Chemical adhesive for drilling and bonding dowels and tie bars must be prequalified. A list of prequalified
chemical adhesives is available on the Department's METS Web site. The prequalified list indicates the
appropriate chemical adhesive system for the concrete temperature and installation conditions.
Each chemical adhesive system must clearly and permanently show the following:
1. Manufacturer's name
470

SECTION 40
2.
3.
4.
5.
6.
7.
8.

CONCRETE PAVEMENT

Model number of the system


Manufacture date
Batch number
Expiration date
Current International Conference of Building Officials Evaluation Report number
Directions for use
Warnings or precautions required by state and federal laws and regulations

40-1.02I Joint Sealant


40-1.02I(1) General
Reserved
40-1.02I(2) Silicone Joint Sealant
Silicone joint sealant must be low modulus furnished in a 1-part silicone formulation. Do not use acid cure
sealant. Silicone joint sealant must be compatible with the surface it is applied to and have properties
shown in the following table:

471

SECTION 40

CONCRETE PAVEMENT

Silicone Joint Sealant

Property
Test
Specification
method
Tensile stress, 150% elongation, 7
ASTM D
45 psi max.
day cure at 77 2 F and from 45%
412
to 55% R.H. a
(Die C)
must not flow
Flow at 77 2 F
ASTM C
from channel
639 b
3 to 9 oz/min.
Extrusion rate at 77 2 F
ASTM C
603 c
Specific gravity
ASTM D
1.01 to 1.51
792
Method
A
Durometer hardness, at 0 F, Shore
ASTM C
10 to 25
A, cured 7 days at 77 2 F
661
Ozone and UV resistance, after
ASTM C
no chalking,
5,000 hours
793
cracking or bond
loss
ASTM C
less than 75
Tack-free at 77 2 F and 45% to
679
minutes
55% R.H. a
ASTM D 500 percent min.
Elongation, 7 day cure at 77 2 F
412
and 45% to 55% R.H. a
(Die C)
ASTM D
Less than 75
Set to Touch, at 77 2 F and 45%
1640
minutes
to 55% R.H. a
Shelf Life, from date of shipment
-6 months min.
Bond, to concrete mortar-concrete
AASHT
50 psi min.
briquettes, air cured 7 days at 77 2
O
F
T 132 d
Movement capability and adhesion,
ASTM C no adhesive or
cohesive failure
100% extension at 0 F after, air
719 e
after 5 cycles
cured 7 days at 77 2 F, and
followed by 7 days in water at 77 2
F
a
R.H. equals relative humidity.

b
ASTM C 639 Modified (15 percent slope channel A).

c
ASTM C 603, through 0.12-inch opening at 50 psi.

d
Mold briquettes under AASHTO T 132, saw in half and bond with

a 0.60-inch maximum thickness of sealant and test under

AASHTO T 132. Briquettes must be dried to constant mass at 212

10 F.

e
Prepare 12 by 1 by 3 inch concrete blocks under ASTM C 719.

Use a sawed face for bond surface. Seal 2 inches of block leaving

0.50 inch on each end of specimen unsealed. The depth of


sealant must be 0.40 inch and the width 0.50 inch.

After application, silicone joint sealant must not flow on grades up to 15 percent.
40-1.02I(3) Asphalt Rubber Joint Sealant
Asphalt rubber joint sealant must be paving asphalt mixed with ground rubber containing not less than 22
percent ground rubber by weight. One hundred percent of ground rubber must pass a no. 8 sieve. Ground
rubber must be vulcanized or a combination of vulcanized and devulcanized materials.
Asphalt rubber joint sealant must comply with the following:
1. ASTM D 6690, Type II except:
472

SECTION 40

CONCRETE PAVEMENT

2.1.

Cone penetration requirement must not exceed 120 at 77 degrees F, 5 ounces, 5


seconds.
2.2.
Resilience requirement must be a minimum 50 percent recovery when tested at 77
degrees F
2. Ring and Ball softening point must be 135 degrees F minimum when tested under AASHTO T 53
3. Capable of being melted and applied to cracks and joints at temperatures below 400 degrees F
Do not apply asphalt rubber joint sealant when the concrete pavement surface temperature is below 50
degrees F.
40-1.02I(4) Preformed Compression Joint Seals
Preformed compression joint seals must comply with ASTM D 2628. Lubricant adhesive used with the
seals must comply with ASTM D 2835. Preformed compression joint seals must have 5 or 6 cells, except
seals for Type A2 and Type B joints may have 4 cells. Install preformed compression joint seals in
compliance with the manufacturer's instructions. Show evidence that the seals are compressed from 40 to
50 percent for the joint width and depth.
40-1.02I(5) Backer Rods
Backer rods must comply with ASTM D 5249, Type 1. Backer rod diameter must be at least 25 percent
greater than the saw cut joint width. Backer rod material must be expanded, crosslinked, closed-cell
polyethylene foam. Do not allow bonding or an adverse reaction to occur between the backer rod and
sealant. Do not use hot-pour sealant that will melt the backer rod.
40-1.02I(6) Joint Filler Material
Joint filler for isolation joints must be preformed expansion joint filler for concrete (bituminous type) in
compliance with ASTM D 994.
40-1.02J Nonshrink Hydraulic Cement Grout
Nonshrink hydraulic cement grout must comply with ASTM C 1107/C 1107M. Clean, uniform, rounded
aggregate filler may be used to extend the grout. Aggregate filler must not exceed 60 percent of the grout
mass or the maximum recommended by the manufacturer, whichever is less. Aggregate filler moisture
content must not exceed 0.5 percent. Aggregate filler must comply the grading shown in the following
table:
Aggregate Filler Grading
Sieve size
Percentage passing
1/2-inch
100
3/8-inch
85100
No. 4
1030
No. 8
010
No. 16
05
40-1.02K Tack Coat
Tack coat must comply with section 39.
40-1.02L Water For Core Drilling
Water for core drilling must be from a local domestic water supply. Water must not contain:
1. More than 1,000 parts per million of chlorides as CL
2. More than 1,300 parts per million of sulfates as S04
3. Impurities that cause concrete discoloration or surface etching
40-1.03 CONSTRUCTION
40-1.03A General
Aggregate and bulk cementitious material must be proportioned by weight by means of automatic
proportioning devices of approved types.

473

SECTION 40

CONCRETE PAVEMENT

40-1.03B Water Supply


Before placing concrete pavement, develop enough water supply for the work.
40-1.03C Subgrade Preparation
Immediately before placing concrete, the subgrade to receive concrete must be:
1.
2.
3.
4.

In compliance with the specified compaction and elevation tolerances


Free of loose and extraneous material
Uniformly moist, but free of standing or flowing water
Excavated for thickened parts of concrete pavement end anchors with no disturbed compaction
outside the end anchor dimensions

For cement treated permeable base, cover the base surface with asphaltic emulsion before placing
concrete pavement. Apply the asphaltic emulsion uniformly at a rate of 0.1 gal/sq yd. Asphaltic emulsion
must comply with anionic slow-setting type, SS1h grade in section 94. Repair damaged asphaltic
emulsion before placing concrete pavement.
40-1.03D Shoulder Rumble Strip
40-1.03D(1) General
Construct shoulder rumble strips by rolling or grinding indentations in new concrete pavement.
Do not construct shoulder rumble strips on structures or approach slabs.
Construct rumble strips within 2 inches of the specified alignment. Rumble strip equipment must be
equipped with a sighting device enabling the operator to maintain the rumble strip alignment.
Indentations must not vary from the specified dimensions by more than 1/16 inch in depth or more than
10 percent in length and width.
Grind or remove and replace noncompliant rumble strip indentations as determined by the Engineer to
bring them to within specified tolerances. Ground surface areas must be neat and uniform in appearance.
Pick up residue from grinding with a vacuum attachment on the grinding machine.
40-1.03D(2) Ground-In Indentations
Concrete pavement must be hardened before grinding rumble strips indentations. Do not construct
indentations until the following occurs:
1. 10 days elapse after concrete placement
2. Concrete has developed a modulus of rupture of 550 psi determined under California Test 523,
40-1.03D(3) Rolled-In Indentations
Construct rolled-in indentations before final concrete set. Indentation construction must not displace
adjacent concrete.
40-1.03E Joints
40-1.03E(1) General
Concrete pavement joints consist of:
1. Longitudinal and transverse construction joints
2. Longitudinal and transverse contraction joints
3. I solation joints
Construction joints must be perpendicular to the concrete pavement surface.
Keep joints free from foreign material including soil, gravel, concrete, or asphalt mix until Contract
acceptance.
For concrete pavement damaged during joint construction, repair the pavement under section 40
1.03Q(2).

474

SECTION 40

CONCRETE PAVEMENT

Do not bend tie bars or reinforcement in existing concrete pavement joints.


40-1.03E(2) Construction Joints
Construction joints form where fresh concrete is placed against hardened concrete, existing pavements,
or structures.
Before placing concrete at construction joints, apply curing compound no. 1 or 2 to the vertical surface of
existing or hardened concrete and allow it to dry.
Use a metal or wooden bulkhead to form transverse construction joints. If dowel bars are specified, the
bulkhead must allow dowel bar installation.
If a transition joint between concrete pavement and HMA is specified, apply tack coat between the
concrete pavement and HMA.
40-1.03E(3) Contraction Joints
In monolithic concrete pavement, construct longitudinal contraction joints as shown with the sawing
method. Construct transverse contraction joints with the sawing method.
Construct transverse contraction joints within 1 foot of their specified spacing. If a slab length of less than
5 feet would be formed, adjust the transverse contraction joint spacing.
Construct transverse contraction joints across the full concrete pavement width regardless of the number
or types of longitudinal joints crossed. In areas of converging and diverging pavements, space transverse
contraction joints so their alignment is continuous across the full width where converging and diverging
pavements are contiguous. Longitudinal contraction joints must be parallel with the concrete pavement
centerline. Transverse and longitudinal contraction joints must not deviate by more than 0.1 foot from
either side of a 12-foot straight line, except for longitudinal joints parallel to a curving centerline.
If widening existing concrete pavement, do not construct transverse contraction joints to match the
existing pavement's joint spacing or skew unless specified.
40-1.03E(4) Isolation Joints
Construct isolation joints by saw cutting a minimum 1/8-inch width to full concrete pavement depth at the
existing concrete pavement's edge. Remove the concrete to expose a flat vertical surface. Before placing
concrete, secure joint filler material that prevents new concrete from adhering to the existing concrete
face.
40-1.03E(5) Sawing Method
Sawing method consists of cutting a groove in the concrete pavement with a power driven concrete saw.
Grooves for longitudinal and transverse contraction joints must be the minimum width possible for the
type of saw used. If necessary, the top of the joint must be sawn wider to provide space for joint sealant.
Immediately wash slurry from the joint with water at 100 psi maximum pressure.
Saw longitudinal and transverse contraction joints before cracking occurs and after the concrete is hard
enough to saw without spalling, raveling, or tearing.
To keep foreign material out of grooves before joint sealant or compression seal installation, you may use
a filler in sawed contraction joints. Joint filler material must not react adversely with the concrete or cause
concrete pavement damage. After sawing and washing a joint, install joint filler material that keeps
moisture in the adjacent concrete during the 72 hours after paving. If you install joint filler material, the
specifications for spraying the sawed joint with additional curing compound in section 40-1.03N do not
apply. If using absorptive filler material, moisten the filler immediately before or after installation.
40-1.03E(6) Joint Sealant and Compression Seal Installation
40-1.03E(6)(a) General
Do not seal construction joints.
At least 7 days after concrete pavement placement and not more than 4 hours before installing joint
sealant or compression seal materials, use dry sandblasting and other methods to clean the joint walls of
objectionable material such as soil, asphalt, curing compound, paint, and rust. The maximum
sandblasting nozzle diameter must be 1/4 inch. The minimum pressure must be 90 psi. Sandblast each
475

SECTION 40

CONCRETE PAVEMENT

side of the joint at least once, in at least 2 separate passes. Hold the nozzle at an angle to the joint from 1
to 2 inches from the concrete pavement. Using a vacuum, collect sand, dust, and loose material at least 2
inches on each side of the joint. Remove surface moisture and dampness at the joints with compressed
air that may be moderately hot.
Before you install joint sealant or compression seal, the joint wall must be free of moisture, residue, or
film.
If grinding or grooving over or adjacent to sealed joints, remove and dispose of joint sealant or
compression seal materials. After grinding or grooving, replace the joint sealant or compression seal
materials.
40-1.03E(6)(b) Liquid Sealant
Install backer rods when the concrete pavement temperature is above the air dew point and when the air
temperature is at least 40 degrees F.
Install liquid sealant immediately after installing the backer rod. Install sealant using a mechanical device
with a nozzle shaped to introduce the sealant from inside the joint. Extrude sealant evenly and with
continuous contact with the joint walls. Recess the sealant surface after placement. Remove excess
sealant from the concrete pavement surface.
Do not allow traffic over sealed joints until the sealant is set.
40-1.03E(6)(c) Preformed Compression Seal
Install preformed compressions seals in isolation joints when specified.
Install longitudinal seals before transverse seals. Longitudinal seals must be continuous except at
intersections with transverse seals. Install transverse seals in 1 continuous piece for the entire transverse
length of concrete pavement. With a sharp instrument, cut across the longitudinal seal at the intersection
with transverse construction joints. If the longitudinal seal does not relax enough to properly install the
transverse seal, trim the longitudinal seal to form a tight seal between the 2 joints.
Use a machine specifically designed for preformed compression seal installation. The machine must
install the seal:
1.
2.
3.
4.

To the specified depth


To make continuous contact with the joint walls
Without cutting, nicking, or twisting the seal
With less than 4 percent stretch

Lay a length of preformed compression seal material cut to the exact length of the pavement joint to be
sealed. The Engineer measures this length. After you install the length of preformed compression joint
sealant, the Engineer measures the excess amount of material at the joint end. The Engineer divides the
excess amount length by the original measured length to determine the percentage of stretch.
40-1.03F Drilled Cores
Drill concrete pavement cores under ASTM C 42/C 42M. Core drilling equipment must use diamond
impregnated bits.
Clean, dry, and fill core holes with hydraulic cement grout (nonshrink) or pavement concrete. Coat the
core hole walls with epoxy adhesive for bonding new concrete to old concrete under section 95. The
backfill must match the adjacent concrete pavement surface elevation and texture.
40-1.03G Test Strips
Section 40-1.03G applies to projects with more than 2,000 cubic yards of JPCP or CRCP.
The first paving activity must be to construct a test strip:
1. 700 to 1,000 feet long
2. Same width as the planned paving
3. With the same equipment used for the planned paving

476

SECTION 40

CONCRETE PAVEMENT

The Engineer evaluates the test strip for compliance with the specifications for acceptance criteria.
The Engineer selects from 6 to 12 core locations for dowel bars and up to 6 locations for tie bars per test
strip.
If you use mechanical dowel bar inserters, the test strip must demonstrate they do not leave voids,
segregations, or surface irregularities such as depressions, dips, or high areas.
Allow the Engineer 3 business days to evaluate the test strip for:
1.
2.
3.
4.

Smoothness
Dowel bar and tie bar alignment
Thickness
Final finishing except coefficient of friction

During the 3 business day evaluation, the Engineer rejects a test strip if any of the following occurs:
1.
2.
3.
4.
5.

Surface varies more than 0.02 foot from a 12-foot straightedge's lower edge
Wheel path's individual high points are greater than 0.025 foot in 25 feet
Dowel bars do not comply with specified placement tolerances
Concrete pavement thickness deficiency is greater than 0.05 foot
Final finishing does not comply with the specifications except coefficient of friction

Remove the test strip if the Engineer rejects it for noncompliance with the specifications for dowel bar
alignment, or thickness. Dispose of rejected test strip material.
If the Engineer rejects the test strip for noncompliance with the smoothness or final finishing
specifications except coefficient of friction, you may grind the test strip into compliance if you intend to
leave it as part of the paving.
If the Engineer does not reject the test strip during the 3-business-day evaluation, you may begin
production paving while the Engineer continues to evaluate the test strip for compliance with the other
specifications. If the Engineer rejects the test strip for noncompliance with the other specifications, stop
production paving until you construct a test strip the Engineer accepts.
For rejected test strips, submit a plan for changed materials, methods, or equipment before constructing
additional test strips. Construct additional test strips until the Engineer accepts one.
Construct additional test strips if you:
1. Propose different paving equipment including:
1.1. Batch plant
1.2. Paver
1.3. Dowel bar inserter
1.4. Tie bar inserter
1.5. Tining
1.6. Curing equipment
2. Change concrete mix proportions
The Engineer may authorize paving to start without a test strip if you use a batch plant mixer, paving
equipment, and personnel that completed a Department project of the same type within the preceding 12
months. Submit supporting documents and previous project information.
40-1.03H Placing Concrete
40-1.03H(1) General
Place concrete pavement with stationary side forms or slip-form paving equipment.
Place consecutive concrete loads within 30 minutes of each other. Construct a transverse construction
joint when concrete placement is interrupted by more than 30 minutes. The transverse construction joint
must coincide with the next contraction joint location, or you must remove fresh concrete pavement to the
preceding transverse joint location.

477

SECTION 40

CONCRETE PAVEMENT

Place concrete pavement in full slab widths separated by construction joints or monolithically in multiples
of full lane widths with a longitudinal contraction joint at each traffic lane line.
Do not retemper concrete.
If the concrete pavement surface width is constructed as specified, you may construct concrete pavement
sides on a batter not flatter than 6:1 (vertical:horizontal).
40-1.03H(2) Concrete Pavement Widening
If concrete pavement is placed adjacent to existing pavement not constructed as part of the contract,
grind the existing concrete pavement lane or shoulder adjacent to the new concrete pavement. Perform
the grinding before new concrete pavement is placed. The new concrete pavement must match the
elevation of the existing concrete pavement after grinding. Grind existing concrete pavement under
section 42-3 except profile index must comply with the pavement smoothness specifications in section
40-1.01D.
Use paving equipment with padded crawler tracks or rubber-tired wheels on the existing concrete
pavement with enough offset to avoid breaking or cracking the existing concrete pavement's edge.
40-1.03H(3) Concrete Pavement Transition Panel
For concrete pavement placed in a transition panel, texture the surface with a drag strip of burlap, a
broom, or a spring steel tine device that produces scoring in the finished surface. The scoring must be
either parallel with or transverse to the centerline. For the method you choose, texture at the time that
produces the coarsest texture.
40-1.03H(4) Stationary Side Form Construction
Stationary side forms must be straight and without defects including warps, bends, and indentations. Side
forms must be metal except at end closures and transverse construction joints where other materials may
be used.
You may build up side forms by attaching a section to the top or bottom. If attached to the top of metal
forms, the attached section must be metal.
The side form's base width must be at least 80 percent of the specified concrete pavement thickness.
Side forms including interlocking connections with adjoining forms must be rigid enough to prevent
springing from subgrading and paving equipment and concrete pressure.
Construct subgrade to final grade before placing side forms. Side forms must bear fully on the foundation
throughout their length and base width. Place side forms to the specified grade and alignment of the
finished concrete pavement's edge. Support side forms during concrete placing, compacting, and
finishing.
After subgrade work is complete and immediately before placing concrete, true side forms and set to line
and grade for a distance that avoids delays due to form adjustment.
Clean and oil side forms before each use.
Side forms must remain in place for at least 1 day after placing concrete and until the concrete pavement
edge no longer requires protection from the forms.
Spread, screed, shape, and consolidate concrete with 1 or more machines. The machines must uniformly
distribute and consolidate the concrete. The machines must operate to place the concrete pavement to
the specified cross section with minimal hand work.
Consolidate the concrete without segregation. If vibrators are used:
1. The vibration rate must be at least 3,500 cycles per minute for surface vibrators and 5,000 cycles per
minute for internal vibrators
2. Amplitude of vibration must cause perceptible concrete surface movement at least 1 foot from the
vibrating element
3. Use a calibrated tachometer for measuring frequency of vibration
4. Vibrators must not rest on side forms or new concrete pavement
478

SECTION 40

CONCRETE PAVEMENT

5. Power to vibrators must automatically cease when forward or backward motion of the paving machine
is stopped
Use high-frequency internal vibrators within 15 minutes of depositing concrete on the subgrade to
uniformly consolidate the concrete across the paving width including adjacent to forms. Do not use
vibrators to shift the mass of concrete.
40-1.03H(5) Slip-Form Construction
If slip-form construction is used, spread, screed, shape, and consolidate concrete to the specified cross
section with slip-form machines and minimal hand work. Slip-form paving machines must be equipped
with traveling side forms and must not segregate the concrete.
Do not deviate from the specified concrete pavement alignment by more than 0.1 foot.
Slip-form paving machines must use high frequency internal vibrators to consolidate concrete. You may
mount vibrators with their axes parallel or normal to the concrete pavement alignment. If mounted with
axes parallel to the concrete pavement alignment, space vibrators no more than 2.5 feet measured center
to center. If mounted with axes normal to the concrete pavement alignment, space the vibrators with a
maximum 0.5-foot lateral clearance between individual vibrators.
Each vibrator must have a vibration rate from 5,000 to 8,000 cycles per minute. The amplitude of vibration
must cause perceptible concrete surface movement at least 1 foot from the vibrating element. Use a
calibrated tachometer to measure frequency of vibration.
40-1.03I Tie Bar Placement
Place tie bars perpendicular to the longitudinal concrete pavement joint and parallel with the concrete
pavement surface at mid-slab depth within the following tolerances:
1. Not less than 1/2 inch below the saw cut depth of joints
2. With not less than 2 inches clearance from the concrete pavement's surface and bottom
3. With embedment length tolerance of 2 inches
Install tie bars at longitudinal joints by one of the following methods:
1. Drill concrete and bond tie bars with chemical adhesive in compliance with the manufacturer's
instructions. Clean and dry drilled holes before placing chemical adhesive and tie bars. After inserting
tie bars into chemical adhesive, support the bars to prevent movement during curing. If the Engineer
rejects a tie bar installation, cut the tie bar flush with the joint face and coat the exposed end of the tie
bar with chemical adhesive under section 40-1.02H. Offset new holes 3 inches horizontally from the
rejected hole's center.
2. Insert tie bars into plastic slip-formed concrete before finishing. Inserted tie bars must have full
contact between the bar and the concrete. If tie bars are inserted through the plastic concrete
surface, eliminate evidence of the insertion by reworking the concrete over the tie bars.
3. Use threaded tie bar splice couplers fabricated from deformed bar reinforcement free of external
welding or machining.
4. Use tie bar baskets. Anchor baskets at least 200 feet in advance of the concrete placement activity. If
you request a waiver, describe the construction limitations or restricted access preventing the
advanced anchoring. After the baskets are anchored and before the concrete is placed, cut and
remove temporary spacer wires and demonstrate the tie bars do not move from their specified depth
and alignment during concrete placement. Use fasteners to anchor tie bar baskets.
If tie bars are not placed correctly, stop paving activities until you demonstrate to the Engineer correction
of the cause.
40-1.03J Dowel Bar Placement
Center dowel bars within 2 inches in the longitudinal direction on transverse contraction joints or
construction joints.
If using curing compound as lubricant, apply the curing compound to dowels in 2 separate applications.
Lubricate each dowel bar entirely before placement. The last application must be applied not more than 8

479

SECTION 40

CONCRETE PAVEMENT

hours before placing the dowel bars. Apply each curing compound application at a rate of 1 gallon per
150 square feet.
If dowel bars are placed by mechanical insertion, eliminate evidence of the insertion by reworking the
concrete over the dowel bars.
If drilling and bonding dowel bars at construction joints, use a grout retention ring.
If using dowel bar baskets, anchor them with fasteners.
Use at least 10 fasteners for basket sections greater than 12 feet and less than or equal to 16 feet.
Baskets must be anchored at least 200 feet in advance of the concrete placement activity unless your
waiver request is authorized. If requesting a waiver, describe the construction limitations or restricted
access preventing the advanced anchoring. After the baskets are anchored and before the concrete is
placed, cut and remove temporary spacer wires and demonstrate the dowel bars do not move from their
specified depth and alignment during concrete placement.
Place dowel bars to the tolerances shown in the following table:
Dowel Bar Tolerances
Dimension
Tolerance
Horizontal offset
1 inch
Longitudinal translation
2 inches
Horizontal skew
3/8 inch, max
Vertical skew
3/8 inch, max
Vertical depth
The minimum distance below the
concrete pavement surface must
be:
DB = d/3 + 1/2 inch
where:
DB = vertical distance in
inches, measured from
concrete pavement surface
to any point along the top of
dowel bar
d = concrete pavement
thickness in inches
The maximum distance below
the depth shown must be 0.05
foot.
If dowel bars are not placed correctly, stop paving activities until you demonstrate to the Engineer
correction of the cause.
Remove and replace the concrete pavement 3 feet on either side of a joint with a rejected dowel bar.
40-1.03K Bar Reinforcement
Place bar reinforcement under section 52. Bar reinforcement must be more than 1/2 inch below the saw
cut depth at concrete pavement joints.
40-1.03L Preliminary Finishing
40-1.03L(1) General
Preliminary finishing must produce a smooth and true-to-grade finish. After preliminary finishing, mark
each day's concrete pavement with a stamp. The stamp must be authorized before paving starts. The
stamp must be approximately 1 by 2 feet in size. The stamp must form a uniform mark from 1/8 to 1/4
inch deep. Locate the mark 20 5 feet from the transverse construction joint formed at each day's start of
paving and 1 0.25 foot from the concrete pavement's outside edge. The stamp mark must show the
480

SECTION 40

CONCRETE PAVEMENT

month, day, and year of placement and the station of the transverse construction joint. Orient the stamp
mark so it can be read from the concrete pavement's outside edge.
Do not apply more water to the concrete pavement surface than can evaporate before float finishing and
texturing are completed.
Allow enough time to complete finishing activities during daylight. Work may continue after daylight if the
Engineer accepts the lighting you provide.
40-1.03L(2) Stationary Side Form Finishing
If stationary side form construction is used, give the concrete a preliminary finish by the machine float
method or the hand method.
If using the machine float method:
1. Use self-propelled machine floats.
2. Determine the number of machine floats required to perform the work at a rate equal to the concrete
delivery rate. If the time from concrete placement to machine float finishing exceeds 30 minutes, stop
concrete delivery . When machine floats are in proper position, you may resume concrete delivery
and paving.
3. Run machine floats on side forms or adjacent concrete pavement lanes. If running on adjacent
concrete pavement, protect the adjacent concrete pavement surface under section 40-1.03P. Floats
must be hardwood, steel, or steel-shod wood. Floats must be equipped with devices that adjust the
underside to a true flat surface.
If using the hand method, finish concrete smooth and true to grade with manually operated floats or
powered finishing machines.
40-1.03L(3) Slip-Form Finishing
If slip-form construction is used, the slip-form paver must give the concrete pavement a preliminary finish.
You may supplement the slip-form paver with machine floats.
Before the concrete hardens, correct concrete pavement edge slump in excess of 0.02 foot exclusive of
edge rounding.
40-1.03M Final Finishing
After completing preliminary finishing, round the edges of the initial paving widths to a 0.04-foot radius.
Round transverse and longitudinal construction joints to a 0.02-foot radius.
Before curing, texture the pavement. Perform initial texturing with a burlap drag or broom device that
produces striations parallel to the centerline. Perform final texturing with a steel-tined device that
produces grooves parallel with the centerline.
Construct longitudinal grooves with a self-propelled machine designed specifically for grooving and
texturing concrete pavement. The machine must have tracks to maintain constant speed, provide traction,
and maintain accurate tracking along the pavement surface. The machine must have a single row of
rectangular spring steel tines. The tines must be from 3/32 to 1/8 inch wide, on 3/4-inch centers, and must
have enough length, thickness, and resilience to form grooves approximately 3/16 inch deep. The
machine must have horizontal and vertical controls. The machine must apply constant down pressure on
the pavement surface during texturing. The machines must not cause ravels.
Construct grooves over the entire pavement width in a single pass except do not construct grooves 3
inches from the concrete pavement edges and longitudinal joints. Final texture must be uniform and
smooth. Use a guide to properly align the grooves. Grooves must be parallel and aligned to the pavement
edge across the pavement width. Grooves must be from 1/8 to 3/16 inch deep after the concrete has
hardened.
For irregular areas and areas inaccessible to the grooving machine, you may hand-construct grooves
under section 40-1.03L(2) using the hand method. Hand-constructed grooves must comply with the
specifications for machine-constructed grooves.

481

SECTION 40

CONCRETE PAVEMENT

Initial and final texturing must produce a coefficient of friction of at least 0.30 when tested under California
Test 342. Notify the Engineer when the concrete pavement is scheduled to be opened to traffic. Allow at
least 25 days for the Department to test for coefficient of friction from the later of:
1. Seven days after concrete placement
2. When the concrete pavement has attained a modulus of rupture of 550 psi
Do not open the concrete pavement to traffic unless the coefficient of friction is at least 0.30.
40-1.03N Curing
Cure the concrete pavement's exposed area under section 90-1.03B using the waterproof membrane
method or curing compound method. If using the curing compound method use curing compound no. 1 or
2. When side forms are removed within 72 hours of the start of curing, also cure the concrete pavement
edges.
Apply curing compound with mechanical sprayers. Reapply curing compound to saw cuts and disturbed
areas.
40-1.03O Early Use of Concrete Pavement
If requesting early use of concrete pavement:
1.
2.
3.
4.

Furnish molds and machines for modulus of rupture testing


S
ample concrete
Fabricate beam specimens
Test for modulus of rupture under California Test 523

If you request early use, concrete pavement must have a modulus of rupture of at least 350 psi. Protect
concrete pavement under section 40-1.03P.
40-1.03P Protecting Concrete Pavement
Protect concrete pavement under section 90-1.03C.
Maintain the concrete pavement temperature at not less than 40 degrees F for the initial 72 hours.
Protect the concrete pavement surface from activities that cause damage and reduce texture and
coefficient of friction. Do not allow soil, gravel, petroleum products, concrete, or asphalt mixes on the
concrete pavement surface.
Construct crossings for traffic convenience. If authorized, you may use Type III portland cement in the
concrete for crossings. Do not open crossings until the Department determines by California Test 523 the
concrete pavement's modulus of rupture is at least 550 psi.
Do not open concrete pavement to traffic or use equipment on the concrete pavement for 10 days after
paving nor before the concrete has attained a modulus of rupture of 550 psi except:
1. If the equipment is for sawing contraction joints
2. If authorized, one side of paving equipment's tracks may be on the concrete pavement after a
modulus of rupture of 350 psi has been attained, provided:
2.1. Unit pressure exerted on the concrete pavement by the paver does not exceed 20 psi
2.2. You change the paving equipment tracks to prevent damage or the paving equipment tracks
travel on protective material such as planks
2.3. No part of the track is closer than 1 foot from the concrete pavement's edge
If concrete pavement damage including visible cracking occurs, stop operating paving equipment on the
concrete pavement and repair the damage.
40-1.03Q Repair and Replacement of New Concrete Pavement
40-1.03Q(1) General
Reserved

482

SECTION 40

CONCRETE PAVEMENT

40-1.03Q(2) Repair of Spalls, Raveling, and Tearing


Before concrete pavement is open to traffic, repair spalls, raveling, and tearing in sawed joints. Make
repairs in compliance with the following:
1. Saw a rectangular area with a diamond-impregnated blade at least 2 inches deep.
2. Remove unsound and damaged concrete between the saw cut and the joint and to the saw cut's
depth. Do not use a pneumatic hammer heavier than 15 pounds. Do not damage concrete pavement
to remain in place.
3. Dispose of removed concrete pavement.
4. Clean the repair area's exposed surfaces with high pressure abrasive water blasting. Further clean
and dry the exposed surfaces with compressed air free of moisture and oil.
5. Apply epoxy under section 95 for epoxy resin adhesive for bonding new concrete to old concrete.
Apply the epoxy with a stiff bristle brush.
6. Apply a portland cement concrete or mortar patch immediately following the epoxy application. Install
joint form board to prevent bonding of the sides of planned joints.
Repair spalls:
1. Deeper than 0.05 foot
2. Wider than 0.04 foot
3. Longer than 0.3 foot
40-1.03Q(3) Repair of Cracks
If cracks form that do not extend to the full depth of a slab, treat the cracks with a high molecular weight
methacrylate resin under section 40-6.
Working cracks are full-depth cracks essentially parallel to a planned contraction joint beneath which a
contraction crack has not formed. If ordered take 4-inch nominal diameter cores on designated cracks
under section 40-1.03F.
Treat working cracks within 0.5 foot of either side of a planned contraction joint in compliance with the
following:
1. Route and seal the crack with epoxy resin in compliance with the following:
1.1. Use a powered rotary router mounted on wheels, with a vertical shaft and a routing spindle that
casters as it moves along the crack
1.2. Form a reservoir 3/4 inch deep by 3/8 inch wide in the crack
1.3. Use equipment that does not cause raveling or spalling
1.4. Place liquid sealant
2. Treat the contraction joint adjacent to the working crack in compliance with the following:
2.1. Use epoxy resin specified in ASTM C 881/C 881M, Type IV, Grade 2 for Type B joints and
secondary saw cuts for Type A1 and Type A2 joints
2.2. Pressure inject epoxy resin specified in ASTM C 881/C881M, Type IV, Grade 1 for narrow saw
cuts including initial saw cuts for Type A1 and Type A2 joints
If a working crack intersects a contraction joint, route and seal the working crack and seal the contraction
joint as specified for installing liquid sealant in section 40-1.03E(6).
40-1.03Q(4) Removal and Replacement
As specified, remove and replace slabs or partial slabs for:
1. I nsufficient thickness
2. Dowel bar misalignment
3. Working cracks more than 0.5 foot from a planned contraction joint
40-1.03Q(5) Smoothness and Friction Corrective Action
Correct concrete pavement not complying with the acceptance criteria specified for smoothness by
grinding under section 42-3 and for coefficient of friction by grooving or grinding under section 42.
Do not grind before:
483

SECTION 40

CONCRETE PAVEMENT

1. Ten days after concrete pavement placement


2. The concrete has developed a modulus of rupture of at least 550 psi
Grind the entire lane width. When completed, the lane width must be uniform in texture and appearance.
Square the corrected area's start and end normal to the paved surface's centerline.
Before opening to traffic, retest sections where corrections were made. Allow at least 25 days for the
Department to retest sections for coefficient of friction.
40-1.04 PAYMENT
Sealing joints are measured from field measurements for each type of sealed joint.

Transition panels to HMA pavement are measured from dimensions shown.

The Engineer calculates the volume for the payment of concrete pavement based on the plan

dimensions.

The Engineer adjusts payment for each primary area for the average thickness deficiency shown in the

following table:

Pay Adjustments for Deficient Thickness


Average thickness
Deficiency
deficiency (foot)
adjustment ($/sq yd)
0.01
0.90
0.02
2.30
0.03
4.10
0.04
6.40
0.05
9.11
If the average thickness deficiency is less than 0.01 foot, the Engineer does not adjust payment for
thickness deficiency. If the average thickness deficiency is more than 0.01 foot, the Engineer rounds to
the nearest 0.01 foot and uses the adjustment table.
The Department does not pay for the portion of concrete that penetrates treated permeable base.
The material and work necessary for the construction of crossings for public convenience, and their
subsequent removal and disposal, will be paid for at the contract prices for the items of work involved and
if there are no contract items for the work involved, payment for concrete pavement crossings will be
change order work.
Shoulder rumble strips will be measured by the station along each shoulder on which the rumble strips
are constructed without deductions for gaps between indentations.
The Department reduces payments by $56.12 per square yard for JPCP slabs allowed to remain in place
represented by cores indicating dowel bars placed with their centers from 2 to 3 inches from the saw
cut of a transverse contraction joint.
The Engineer will calculate the reduced payment using the slab dimensions adjacent to and inclusive of
the joints with misplaced dowel bars. This reduced payment is in addition to other specified payment
reductions.
The Department reduces payments to the Contractor by $59.56 per square yard for JPCP allowed to
remain in place represented by cores indicating either of the following:
1. Tie bars placed outside their specified placement and position tolerances
2. Bar reinforcement placed outside their specified placement and position tolerances
The Engineer calculates the reduced payment using the slab dimensions adjacent to and inclusive of the
joints with misplaced tie bars. This reduced payment is in addition to other specified payment reductions.
If the initial cores show that dowel bars or tie bars are within alignment tolerances and the Engineer
orders more dowel or tie bar coring, the additional cores will be paid for as change order work.
484

SECTION 40

CONCRETE PAVEMENT

The Department will not pay for additional coring to check dowel or tie bar alignment you request.
If the Engineer accepts a test strip and it remains as part of the paving surface, the test strip is measured
as specified for JPCP or CRCP, seal pavement joint, and seal isolation joint.
If the curvature of a slab affects tie bar spacing and additional tie bars are required, they are included in
the payment for jointed plain concrete pavement.
40-2 JOINTED PLAIN CONCRETE PAVEMENT
Reserved
40-3 CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
Reserved
40-440-5 RESERVED
40-6 CONCRETE PAVEMENT CRACK TREATMENT
40-6.01 GENERAL
40-6.01A Summary
Section 40-6 includes specifications for applying a high molecular weight methacrylate resin system to
concrete pavement surface cracks that do not extend the full slab depth. High molecular weight
methacrylate is not to be applied to any cracks in CRCP.
High molecular weight methacrylate resin system consists of:
1. High molecular weight methacrylate resin
2. Promoter
3. Initiator
40-6.01B Definitions
Reserved
40-6.01C Submittals
40-6.01C(1) General
Submit high molecular weight methacrylate samples 20 days before use.
If sealant is to be removed, submit the proposed removal method at least 7 days before sealant removal.
Do not remove sealant until the proposed sealant removal method is authorized.
40-6.01C(2) Public Safety Plans
Before starting crack treatment, submit the following plans as shop drawings:
1. Public safety plan for high molecular weight methacrylate resin system
2. Placement plan for the construction activity
3. MSDS for each component of the high molecular weight methacrylate resin system
The public safety plan and the placement plan must identify materials, equipment, and methods to be
used.
The public safety plan must include details for:
1.
2.
3.
4.

Shipping
Storage
Handling
Disposal of residual high molecular weight methacrylate and the containers

If the project is in an urban area adjacent to a school or residence, the public safety plan must also
include an airborne emissions monitoring plan prepared by a industrial hygienist with current certification
in Comprehensive Practice by the American Board of Industrial Hygiene. Submit a copy of the hygienist's
certification. The hygienist must monitor the emissions at a minimum of 4 points including the mixing

485

SECTION 40

CONCRETE PAVEMENT

point, the application point, and the point of nearest public contact. At work completion, submit a report by
the industrial hygienist with results of the airborne emissions monitoring plan.
The placement plan must include:
1. Crack treatment schedule including coefficient of friction testing
2. Methods and materials including:
2.1. Equipment description for high molecular weight methacrylate resin system application
2.2. Equipment description for sand application
2.3. Gel time range and final cure time for resin
Revise rejected plans and resubmit. With each plan rejection, the Engineer gives revision directions
including detailed comments in writing. The Engineer notifies you of a plan's acceptance or rejection
within 2 weeks of receiving that plan.
40-6.01D Quality Control and Assurance
40-6.01D(1) General
Reserved
40-6.01D(2) Test Area
Before starting crack treatment, treat a 500-square foot test area within the project limits and at a location
accepted by the Engineer. Use test areas outside the traveled way if available. Weather and pavement
conditions during the test crack treatment must be similar to those expected during production crack
treatment. Use equipment during testing similar to those to be used during crack treatment.
For the test area and during crack treatment, use test tiles for evaluating the high molecular weight
methacrylate resin system cure time. Coat at least one 4 by 4 inch smooth glazed tile for each batch of
high molecular weight methacrylate resin system. Place the coated tile adjacent to the area being treated.
Do not apply sand to the test tiles.
Do not start crack treatment until the Engineer accepts the test area.
The Engineer accepts a treated area if:
1.
2.
3.
4.
5.

Corresponding test tiles are dry to the touch


Treated surface is tack-free and nonoily
Sand cover adheres enough to resist hand brushing
Excess sand is removed
Coefficient of friction is at least 0.30 determined under California Test 342

40-6.02 MATERIALS
40-6.02A General
Reserved
40-6.02B High Molecular Weight Methacrylate Resin
Promoter and initiator in the high molecular weight methacrylate resin system must be compatible. The
high molecular weight methacrylate resin may be a prepromoted resin consisting of promoter and resin
mixed together before filling containers. Identify prepromoted resin on the container label.
The resin gel time must be from 40 to 90 minutes at the application temperature. Adjust the gel time to
compensate for temperature changes throughout the application.
High molecular weight methacrylate resin must comply with the following requirements:

486

SECTION 40

CONCRETE PAVEMENT

High Molecular Weight Methacrylate Resin

Property
Requirement
Test method
a
Viscosity
25 cP, maximum,
ASTM D 2196
(Brookfield RVT with
UL adapter, 50 RPM
at 77 F
0.90 minimum,
ASTM D 1475
Specific gravity a
at 77 F
Flash point a
180 F, minimum
ASTM D 3278
1.0 mm Hg,
ASTM D 323
Vapor pressure a
maximum, at 77 F
Tack-free time
400 minutes,
Specimen prepared
maximum, at 77 F
under California Test
551
Volatile content a
30 percent,
ASTM D 2369
maximum
PCC saturated
500 psi, minimum, at California Test 551
surface-dry bond
24 hours and 77 2
strength
F
a
Test must be performed before adding initiator.

Sand must be commercial quality dry blast sand. At least 95 percent of the sand must pass the no. 8
sieve and at least 95 percent must be retained on the no. 20 sieve.
40-6.03 CONSTRUCTION
40-6.03A General
Apply high molecular weight methacrylate resin system after any grinding.
Prevent deleterious material such as oil from being deposited on the pavement by equipment with
devices such as traps, filters, and drip pans.
Before applying high molecular weight methacrylate resin system, clean the pavement surface by
abrasive blasting and blow loose material from visible cracks with high-pressure air. Remove concrete
curing seals from the pavement to be treated. The pavement must be dry when blast cleaning is
performed. If the pavement surface becomes contaminated before applying the high molecular weight
methacrylate resin system, clean the pavement surface by abrasive blasting.
If performing abrasive blasting within 10 feet of a lane occupied by traffic, operate abrasive blasting
equipment with a concurrently operating vacuum attachment.
During pavement treatment, protect pavement joints, working cracks, and surfaces not to be treated.
Block drains and openings that convey water to water ways.
The machine applying high molecular weight methacrylate resin system must combine the components
by either static in-line mixers or by external intersecting spray fans. The pump pressure at the spray bars
must not cause atomization. Do not use compressed air to produce the spray. Use a shroud to enclose
the spray bar apparatus.
You may apply high molecular weight methacrylate resin system manually to prevent overspray onto
adjacent traffic. If applying resin manually, limit the batch quantity of high molecular weight methacrylate
resin system to 5 gallons.
Do not apply high molecular weight methacrylate resin system in more than 90 percent relative humidity.
The prepared area must be dry and the surface temperature must be from 50 to 100 degrees F when the
high molecular weight methacrylate resin system is applied. Apply high molecular weight methacrylate
resin system at a rate of 90 square feet per gallon.
Protect existing facilities from the high molecular weight methacrylate resin system application. Repair or
replace existing facilities contaminated with high molecular weight methacrylate resin system at your
expense.
487

SECTION 40

CONCRETE PAVEMENT

Flood the treatment area with high molecular weight methacrylate resin system, penetrating the pavement
and cracks. Apply high molecular weight methacrylate resin system within 5 minutes after complete
mixing. Mixed high molecular weight methacrylate resin system viscosity must not increase. Redistribute
excess material with squeegees or brooms within 10 minutes of application. Remove excess material
from tined grooves.
Wait at least 20 minutes after applying high molecular weight methacrylate resin system before applying
sand. Apply sand at a rate of approximately 2 pounds per square yard or until refusal. Remove excess
sand by vacuuming or sweeping.
Do not allow traffic on the treated surface until:
1.
2.
3.
4.

Treated surface is tack-free and nonoily


Sand cover adheres enough to resist hand brushing
Excess sand is removed
Coefficient of friction is at least 0.35 determined under California Test 342

40-6.04 PAYMENT
Payment for high molecular weight methacrylate crack treatment is included in payment for concrete
pavement.

488

41 CONCRETE PAVEMENT REPAIR

41-1 GENERAL

41-1.01 General
Section 41 includes specifications for pavement subsealing, pavement jacking, repair spalled joints,
sealing concrete pavement joints, crack existing concrete pavement, pavement transition taper, dowel bar
retrofit and individual slab replacement with rapid strength concrete.
41-2 PAVEMENT SUBSEALING
41-2.01 GENERAL
41-2.01A Summary
Section 41-2 includes specifications for filling voids under existing concrete pavement by drilling holes
through the pavement and underlying base, cleaning the holes, injecting grout, and filling the holes with
mortar or concrete.
41-2.01B Definitions
Reserved
41-2.01C Submittals
Submit shipping invoices with packaged or bulk fly ash, cement and blended cement.

Before grouting activities begin, submit a proposal for the materials to be used. Include authorized

laboratory test data for the grout indicating:


1. Initial set time
2. Compressive strength results at 1, 3, and 7 days for 10, 12, and 14-second efflux times. Use
specimen molds and curing conditions specified in ASTM C 109
If requesting a substitution of grout materials, submit a proposal that includes test data.
41-2.01D Quality Control and Assurance
Reserved
41-2.02 MATERIALS
41-2.02A General
Reserved
41-2.02B Grout
Grout must consist of portland cement, fly ash, and water. Proportion portland cement and fly ash by
weight. Use from 2.4 to 2.7 parts fly ash to 1 part portland cement. Add enough water to produce a grout
efflux time from 10 to 16 seconds determined under California Test 541, part D.
Cement for grout must comply with material specifications for portland cement, Type II.
Your test result for the 7-day compressive strength must be at least 750 psi at 12-second efflux time.
You may use chemical admixtures and calcium chloride in grout.
41-2.02C Chemical Admixtures and Calcium Chloride
Chemical admixtures must comply with the material specifications for concrete admixtures. Calcium
chloride must comply with ASTM D 98.
41-2.02D Fly Ash
Fly ash must comply with AASHTO M 295, Class C or Class F. Fly ash sources must be on the
Authorized Material List.
41-2.02E Mortar
If mortar is used to fill injection holes, it must be 1 part portland cement to 3 parts fine aggregate by
volume. Fine aggregate and aggregate gradings must comply with the material specifications for their use
in concrete. Add only enough water to the mortar to produce a consistency that allows for placing and
packing into the holes. You may use a commercial-quality premixed fast-setting mortar or concrete.
489

SECTION 41

CONCRETE PAVEMENT REPAIR

41-2.03 CONSTRUCTION
Do not inject grout if the atmospheric or subgrade temperature is below 40 degrees F. Do not inject grout
in inclement weather. If rainwater is present in the holes, obtain the Engineer's authorization before
injecting grout.
Do not inject grout until at least 2 consecutive slabs that require subsealing are drilled ahead of the
grouting activities.
Drill holes through the pavement and underlying base to a depth from 15 to 18 inches below the
pavement surface. The hole diameter must match the fitting for the grout injecting equipment.
Do not leave drilled holes ungrouted for more than 2 business days.
Immediately before grout injection, clean the injection holes with water at a minimum pressure of 40 psi.
The cleaning device must have at least 4 jets that direct water horizontally at the slab-base interface.
The grout plant must consist of a positive displacement cement injection pump and a high-speed colloidal
mixer. The colloidal mixer must operate from 800 to 2,000 rpm. The injection pump must sustain 150 psi if
pumping grout mixed to a 12-second flow time. A pressure gauge must be located immediately adjacent
to the supply valve of the grout hose supply valve and positioned for easy monitoring.
Before mixing, weigh dry cement and fly ash if delivered in bulk. If the materials are packaged, each
container must weigh the same.
Introduce water to the mixer through a meter or scale.
Dispose of grout not used within 1 hour of mixing.
Inject grout under pressure until the voids under the pavement slab are filled. If a slab raises more than
0.050 inch due to grout injection, stop injecting grout in that hole.
The injection nozzle must not leak. Do not inject grout with the nozzle below bottom of the slab. Inject
grout 1 hole at a time. Stop injecting grout in a hole if injected grout rises to the surface at any joint, or
crack, or flows into an adjacent hole.
If grout does not flow under a sustained pump gauge pressure of 150 psi after 7 seconds and there is no
indication the slab is raising, stop injecting grout at that hole.
Immediately after removing the nozzle, plug the hole with a round and tapered wooden plug. Do not
remove plugs until injecting grout in adjacent holes progresses enough so that grout does not surface
through previously grouted holes.
After grouting, remove grout from drilled holes at least 4 inches below the pavement surface. Clean holes
and fill with mortar or concrete. Finish filled holes flush with the pavement surface.
41-2.04 PAYMENT
Drill hole (subsealing) is measured by actual count of drilled holes. Drilled holes not shown are not
counted.
Grout (subsealing) is measured as the dry weight of cement and fly ash. The Engineer measures the fly
ash and cement mixed into grout and used in the work. Wasted grout due to leaking is not measured.
41-3 PAVEMENT JACKING
41-3.01 GENERAL
41-3.01A Summary
Section 41-3 includes specifications for filling the voids beneath pavement and raising the pavement to
grade by drilling holes through existing pavement, cleaning the holes, injecting grout through the holes,
grinding or replacing concrete pavement raised too high, and filling the holes with mortar or concrete.
41-3.01B Definitions
Reserved

490

SECTION 41

CONCRETE PAVEMENT REPAIR

41-3.01C Submittals
Submit shipping invoices with packaged or bulk fly ash, cement and blended cement.
Before grouting activities begin, submit a proposal for the materials to be used.
Include authorized laboratory test data for the grout indicating:
1. Initial set time
2. Compressive strength results for 1, 3, and 7 days at 10, 12, and 14-second efflux times Use
specimen molds and curing conditions specified in ASTM C 109
If requesting a substitution of grout materials, submit a proposal that includes test data.
41-3.01D Quality Control and Assurance
Reserved
41-3.02 MATERIALS
Materials must comply with the specifications for pavement subsealing in section 41-1.02 with the
following exceptions for grout:
1. Add enough water to produce a grout efflux time from 16 to 26 seconds determined under California
Test 541, part D.
2. To initiate the pressure injection of grout, you may add additional water to reduce the grout efflux time
to not less than 10 seconds.
41-3.03 CONSTRUCTION
Pavement jacking must comply with the specifications for pavement subsealing in section 41-2.03 with
the following exceptions:
1. Positive displacement pump for grout injection must provide a sustained gauge pressure of 200 psi.
Gauge pressures may be from 200 to 600 psi for brief periods to start slab movement.
2. Raise the slabs uniformly. Use string lines to monitor the pavements movement.
3. Raised pavement final elevation must be within 0.01 foot of the established grade. If the raised
pavement final elevation is 0.01 foot higher than the established grade, grind the pavement to within
0.01 foot of the established grade, except remove and replace pavement higher than 0.10 foot. For
replacement, use concrete pavement specified in section 40. Grind under section 42-3.
4. Do not move adjacent slabs not specified for grade adjustment. If you move adjacent slabs not
specified for grade adjustment, correct the grade of adjacent slabs. If grade correction is greater than
0.1 foot, remove slab and replace with JPCP specified in section 40. If grade correction is less than
0.1 foot, grind under section 42-3.
41-3.04 PAYMENT
Drill hole (jacking) is measured by actual count of drilled holes. Drilled holes not shown are not counted.
Grout (jacking) is the measured weight of dry cement and fly ash. The Engineer measures the fly ash and
cement mixed into grout and used in the work. Wasted grout due to leaking is not measured.
The Engineer does not pay for grinding or removing and replacing of concrete pavement due to pavement
jacking higher than the tolerances for the established grade.
41-4 REPAIR SPALLED JOINTS
41-4.01 GENERAL
41-4.01A Summary
Section 41-4 includes specifications for repairing spalled joints by removing unsound or damaged
concrete and filling the area with a fast-setting grout or polyester grout.
41-4.01B Definitions
Reserved
41-4.01C Submittals
If polyester grout is used, submit a MSDS for each shipment of polyester resin binder before using.
491

SECTION 41

CONCRETE PAVEMENT REPAIR

41-4.01D Quality Control and Assurance


If polyester grout is used, allow 14 days for sampling and testing of the polyester resin binder before the
proposed use.
If polyester resin binder is stored in containers larger than 55 gallons, notify the Engineer 10 days before
the delivery of the resin to the jobsite.
41-4.02 MATERIALS
41-4.02A General
Reserved
41-4.02B Fast-Setting Grout
Fast-setting grout must be one of the following types:
1. One of the following magnesium phosphate grouts:
1.1. Single component water activated
1.2. Dual component with a prepackaged liquid activator
2. Modified high alumina based grout
3. Portland cement based grout
Addition of retarders to the fast-setting grout must comply with the grout manufacturer's
recommendations.
You may use any accelerating admixtures complying with ASTM C 494/C 494 M, Type C and complying
with the material specifications for concrete admixtures. Fast-setting grout must comply with the values
for the properties shown in the following table:
Property

Fast-Setting Grout
Test method

Requirement
s
-
3,000 min
5,000 min
-500 min
-300 min

Compressive strength
-at 3 hours, psi
California Test 551
at 24 hours, psi
California Test 551
Flexural strength
-at 24 hours, psi
California Test 551
Bond strength at 24 hours
-Saturated surface dry
California Test 551
concrete, psi
Dry concrete, psi
California Test 551
400 min
Water absorption, %
California Test 551
10 max
Abrasion resistance at 24
California Test 550
25 max
hours, grams
Drying shrinkage at 4 days,
ASTM C 596
0.13 max
%
Soluble chlorides by weight,
California Test 422
0.05 max
%
a
California Test 417
0.25 max
Water soluble sulfates by
weight, %
a
Test must be performed on a cube specimen, fabricated under CT
551, cured at least 14 days, and then pulverized to 100% passing
the no. 50 sieve.

Aggregate filler may be used to extend prepackaged grout. Aggregate filler must be clean, uniformly
rounded, and have a moisture content that does not exceed 0.5-percent by weight.
When tested under California Test 202, aggregate filler must comply with the grading requirements for the
sieve sizes shown in the following table:

492

SECTION 41

CONCRETE PAVEMENT REPAIR

Aggregate Filler Grading

Sieve size
Percentage passing
1/4"
100
No. 16
05

Aggregate filler must not exceed 50 percent of the grout volume or the maximum recommended by the
manufacturer, whichever is less.
Fast-setting grout must be formulated for a minimum initial set time of 15 minutes and a minimum final set
time of 25 minutes at 70 degrees F. Fast-setting grout materials must be stored in a cool and dry
environment.
Mix water used with water activated material must be free from oil and not contain more than 2,000 parts
per million of chlorides as Cl, or more than 1,500 parts per million of sulfates as SO4.
Water for curing must not contain enough impurities to cause discoloration of the concrete surface or
surface etching.
For magnesium phosphate grout, the quantity of water or liquid activator blended with the dry component
must comply with the limits recommended by the manufacturer.
41-4.02C Polyester Grout
Polyester grout consists of polyester resin binder and dry aggregate. The polyester resin binder must be
an unsaturated isophthalic polyester-styrene copolymer.
Polyester resin binder must have the required values for the properties shown in the following table:

493

SECTION 41

CONCRETE PAVEMENT REPAIR

Property
Viscositya, Pas
(RVT, no. 1
Spindle,
20 RPM at 77
F)
Specific
gravity a, at 77
F
Elongation, %,
Type I at 0.45
inch/min
Thickness =
0.25 0.05
inch

Tensile
strength, psi,
Type I at 0.45
inch/min
Thickness =
0.25 0.05
inch

Polyester Resin Binder

Test method
Requirement
ASTM D 2196
0.075 to 0.200

ASTM D 1475

1.051.10

ASTM D 638

35 min

ASTM D 618

Sample conditioning:
18/25/50 + 5/70
2,500 min

ASTM D 638

ASTM D 618
Styrene
content a, %
(by weight)
Silane coupler,
%
(by weight of
polyester
styrene resin)
PCC saturated
surface
dry bond
strength, psi,
at 24 hours
and 70 2 F
Static volatile
emission a, oz /
sq yd, loss,

ASTM D 2369

Sample conditioning:
18/25/50 + 5/70
4050

1.0 min

California Test 551

500 min

2 max
South Coast Air
Quality
Management
District,
Standard Method b
a
Test must be performed before adding initiator.
b
SCAQMD Method 309-91, Determination of Static Volatile
Emissions.

Silane coupler must be an organosilane ester, gamma-methacryloxypropyltrimethoxysilane. Promoter


must be compatible with suitable methyl ethyl ketone peroxide (MEKP) and cumene hydroperoxide (CHP)
initiators.
Aggregate for polyester grout must comply with the specifications for concrete aggregate. Use either the
3/8 inch maximum grading or the no. 4 maximum grading. When tested under California Test 202,
aggregate must comply with the combined aggregate grading requirements for the sieve sizes shown in
the following table:
494

SECTION 41

CONCRETE PAVEMENT REPAIR

Sieve size
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200

Combined Aggregate Grading

Percentage passing
3/8 inch maximum
No. 4 maximum
100
100
83100
100
6582
6285
4564
4567
2748
2950
1230
1636
617
520
07
07
03
03

Aggregate retained on the no. 8 sieve must have a maximum of 45 percent crushed particles when tested
under California Test 205. Fine aggregate must be natural sand.
Polyester resin binder in grout must be approximately 12 percent by weight of the dry aggregate. The
Engineer determines the exact percentage.
The average of coarse and fine aggregate absorption must not exceed 1 percent when tested under
California Tests 206 and 207.
At the time of mixing with the resin, the moisture content of the combined aggregate must not exceed 1/2
of the average aggregate absorption when tested under California Test 226.
41-4.02D Joint Form Board
Joint form board must be corrugated cardboard with a 6-mil polyethylene covering or expanded
polystyrene material. Do not use polystyrene when polyester grout is used.
41-4.02E Bonding Agent
Bonding agent must be a type recommended by the grout manufacturer.
41-4.03 CONSTRUCTION
41-4.03A General
Reserved
41-4.03B Concrete Removal
Cut along the outlines of rectangular areas marked by the Engineer with a diamond bladed saw. If fast
setting grout is specified, cut to a minimum depth of 2 inches. If polyester grout is used, cut to a minimum
depth of 1-1/2 inches but not greater than 1/3 of the depth of pavement
Remove unsound and damaged concrete between the saw cut and the joint to the depth of the saw cut
by methods that will not damage the concrete pavement to remain in place. If you damage concrete
pavement outside the limits of the designated repair, enlarge the spall repair to encompass the damaged
concrete. The Department does not pay for the repair of the added area. Do not use pneumatic hammers
that weigh more than 15 lb for concrete removal.
41-4.03C Cleaning
After unsound concrete has been removed from the repair area, clean the exposed faces of the concrete.
Clean by sand blasting or high pressure water blasting. Water blasting equipment must be capable of
producing a blast pressure from 3,000 to 6,000 psi.
After blasting, clean the exposed concrete area with moisture-free and oil-free compressed air to remove
debris. Air compressors must deliver air at a minimum of 120 cu ft/min and develop 90 psi of nozzle
pressure.

495

SECTION 41

CONCRETE PAVEMENT REPAIR

41-4.03D Joint Form Board Installation


After cleaning, form the joint within the repair area to match the existing joint width and alignment. Place
the joint form board full depth along the joint, and extend 1 inch into the joint beyond the edges of the
patch.
41-4.03E Bonding Agent Application
Mix bonding agent at the job site in small quantities under the manufacturer's instructions. Before placing
grout, apply a thin even coat of bonding agent with a stiff bristle brush scrubbing the entire area, including
the patched walls.
41-4.03F Mixing
41-4.03F(1) General
Reserved
41-4.03F(2) Fast-Setting Grout
Mix fast-setting grout in a small mobile drum or paddle mixer under the manufacturer's instructions.
The dual components of prepackaged magnesium phosphate grout with a prepackaged liquid activator
must be as supplied by the manufacturer. Use the full amount of each component. Do not add water to
dual component magnesium phosphate grout.
Magnesium phosphate grout must not be mixed in containers or worked with tools containing zinc,
cadmium, aluminum, or copper. High alumina based grout must not be mixed in containers or worked with
tools containing aluminum.
41-4.03F(3) Polyester Grout
Mix polyester grout under the manufacturer's instructions.
41-4.03G Placement
41-4.03G(1) General
Place grout on a dry surface except if a bonding agent is used.
41-4.03G(2) Fast-Setting Grout
Grout other than magnesium phosphate may be placed on a surface that has been dampened and
allowed to dry or on a bonding agent recommended by the manufacturer.
41-4.03G(3) Polyester Grout
Place grout on a surface with a bonding agent.
41-4.03H Curing
Cure according to the manufacturer's instructions. If curing compound is recommended by the
manufacturer, it must comply with the specifications for the curing compound method, curing compound
no. 1 or 2.
41-4.03I Protecting Spall Repairs
Protect fast setting grout from traffic for at least 2 hours after the grout sets. Protect polyester grout from
traffic for at least 1 hour after the grout sets.
41-4.04 PAYMENT
Repair spalled joint is measured as the actual area of pavement surface repaired.
41-5 SEALING CONCRETE PAVEMENT JOINT
41-5.01 GENERAL
41-5.01A Summary
Section 41-5 includes specifications for constructing or replacing sealed joints in concrete pavement at
existing transverse and longitudinal contraction joints with silicone or asphalt rubber liquid sealant.
Seal concrete pavement joints consists of cutting and cleaning new reservoirs and placing new joint
sealant.
496

SECTION 41

CONCRETE PAVEMENT REPAIR

Replace concrete pavement joints consists of removing existing joint sealant and backer rod, cleaning
existing joint reservoirs, and placing new joint sealant and backer rod.
41-5.01B Definitions
Reserved
41-5.01C Submittals
Before use, submit a certificate of compliance for the joint sealant. With each certificate of compliance,
submit a certified test report of the results for the required tests performed within 12 months before the
proposed use. Submit the certificate of compliance and accompanying test report for each lot of joint
sealant shipped to the job site.
Submit a manufacturer's data sheet verifying that the backer rod is compatible with the silicone joint
sealant to be used.
Submit the manufacturer's application instructions and MSDS at least 10 days before beginning sealant
placement activities.
Submit one of the following for the facility that you have arranged to receive the concrete saw cutting
residue:
1. Copy of the facility's RWQCB or other applicable agency permit
2. RWQCB or other applicable agency's written approval
3. Applicable local, state, or federal agency permits if located outside the State
At least 10 days before beginning removal work, submit the proposed removal method of existing sealant,
including backer rods. Do not remove existing sealant until the Engineer authorizes a sealant removal
method.
41-5.01D Quality Control and Assurance
Reserved
41-5.02 MATERIALS
41-5.02A General
Reserved
41-5.02B Silicone Joint Sealant
Silicone joint sealant must comply with section 40-1.02I(2).
41-5.02C Asphalt Rubber Joint Sealant
Asphalt rubber joint sealant must comply with section 40-1.02I(3).
41-5.02D Backer Rod
Backer rods must comply with section 40-1.02I(5).
41-5.03 CONSTRUCTION
41-5.03A General
Reserved
41-5.03B Remove Existing Sealant
Remove existing joint sealant materials and backer rods by sawing, plowing, or cutting. Do not damage
the existing sealant reservoir or pavement. If the plowing method is used, use rectangular plows.
41-5.03C Construct Joint Sealant Reservoir
Construct a joint sealant reservoir in concrete pavement by the sawing method. The sawing machine
must have a vacuum attachment to pick up residue from sawing. Prevent residue from flowing across the
pavement or remaining on the pavement surface.
Dispose of removed concrete pavement and residue from sawing at an appropriate disposal facility.

497

SECTION 41

CONCRETE PAVEMENT REPAIR

41-5.03D Joint Cleaning


41-5.03D(1) General
Reserved
41-5.03D(2) Debris Removal
Clean dust, dirt, or visible traces of old sealant from the joint. Do not use chemical solvents to wash the
joint. Immediately remove slurry or remaining debris after sawing, plowing, cutting, or manual removal.
Clean in 1 direction to minimize contamination of surrounding areas.
41-5.03D(3) Reservoir Drying
After debris removal, dry the sealant reservoir with compressed air or moderately hot compressed air, or
you may request another means. Drying activities must not leave a residue or film on the reservoir wall.
41-5.03D(4) Sandblasting
After reservoir drying, sandblast the reservoir to remove remaining residue. Do not sandblast straight into
the reservoir. Point the sandblasting nozzle close to the surface at an angle to clean each reservoir face.
Make at least 1 pass along each reservoir face.
41-5.03D(5) Air Blasting
After sandblasting, air blast the reservoir to remove sand, dirt, and dust. Air blast within 1 hour before
placement of sealant. Compressed air used to air blast the reservoir must not introduce oil into the
reservoir. If oil is accidentally introduced into the reservoir, redo the joint cleaning sequence until the
Engineer determines the reservoir is clean before you continue work on the joint. Compressed air must
be delivered at a minimum rate of 120 cubic feet per minute and develop at least 90 psi nozzle pressure.
41-5.03D(6) Vacuuming
After air blasting, use a vacuum sweeper to remove debris or contaminants from the surrounding
pavement surfaces.
41-5.03E Backer Rod Installation
Install the backer rod after cleaning the pavement surface and the joints to be sealed have been patched,
cleaned, and dried. Install if the temperature of the pavement is above the dew point of the air and if the
air temperature is at least 40 degrees F. Backer rod installation must not leave a residue or film on the
reservoir walls.
41-5.03F Sealant Installation
Before installing sealant, demonstrate that fresh liquid sealant is ejected from the nozzle free of cooled or
cured material.
If asphalt rubber sealant is specified, heat and place asphalt rubber joint sealant under the manufacturer's
instructions. Do not place asphalt rubber joint sealant if the pavement surface temperature is below 50
degrees F.
Pump sealant through a nozzle sized for the width of the sealant reservoir so that sealant is placed
directly onto the backer rod. The installer must draw the nozzle toward his body.
After pumping the sealant into the joint, tool it to the recessed depth shown. Tool the sealant within 10
minutes of installation or before the sealant begins to form a skin.
After each joint is sealed, remove surplus joint sealer on the pavement surface. Do not allow traffic over
the sealed joints until the sealant is tack free and firm enough to prevent embedment of roadway debris
into the sealant.
41-5.04 PAYMENT
Seal concrete pavement joint is measured as the actual length of joints installed.
Replace concrete pavement joint is measured as the actual length of joints installed.

498

SECTION 41

CONCRETE PAVEMENT REPAIR

41-6 CRACK EXISTING CONCRETE PAVEMENT

41-6.01 GENERAL
41-6.01A Summary
Section 41-6 includes specifications for cracking and seating existing concrete pavement to form discrete
segments of pavement, including cleaning loose debris and filling joints, cracks, and spalls.
41-6.01B Definitions
Reserved
41-6.01C Submittals
Submit cores taken to verify cracking equipment and procedure.
41-6.01D Quality Control and Assurance
Before starting cracking operations, the Engineer selects and marks a test section from 3 to 5 existing
slabs within the limits of pavement to be cracked.
Demonstrate the ability of the selected equipment and procedure to produce cracks in the concrete
pavement as specified.
Immediately before cracking the test section slabs, apply water to the surface of the slabs in sufficient
quantity so that cracking can readily be determined. After the application of water, crack the test section
pavement using varying impact energy and striking patterns until a proper procedure is established.
To verify that the procedure is producing cracked pavement that complies with the specifications, take at
least 2 drilled pavement cores at least 6 inches in diameter. The Engineer orders the exact location where
cores are to be taken. Take cores under ASTM C 42. Fill core holes with a fast-setting grout that complies
with section 41-3.02B.
41-6.02 MATERIALS
41-6.02A General
Reserved
41-6.02B Hot Mixed Asphalt
Hot mix asphalt (HMA) for filling spalls must comply with section 39, Type B. Aggregate for HMA must
comply with section 39-1.02E, no. 4 gradation. Choose asphalt binder Grade PG 64-10, PG 64-16, or PG
70-10. The minimum asphalt binder content must be 6.8 percent.
41-6.03 CONSTRUCTION
Do not allow flying debris during cracking operations.
Crack existing concrete pavement into segments that nominally measure 6 feet transversely by 4 feet
longitudinally. If existing panels are already cracked into segments, crack them further into equal-sized
square or rectangular pieces that nominally measure not more than 6 feet transversely and from 3 to 5
feet longitudinally. The pavement cracking equipment must not impact the pavement within 1 foot of
another break line, pavement joint, or edge of pavement.
Crack concrete pavement so that vertical cracks are formed completely through the pavement. The
vertical cracks must not deviate from vertical by more than 6 inches between the pavement surface and
bottom. The cracks must be continuous without surface spalling over 0.10-foot in depth along the crack
and without excessive shattering of the pavement or base.
Equipment for cracking concrete pavement must impact the pavement with a variable force and a point of
impact that can be controlled. Do not use equipment and procedures that utilize unguided free-falling
weights such as "headache balls."
After the equipment and the procedure for cracking pavement have been authorized by the Engineer, use
that equipment and procedure to crack the concrete pavement. Take cores of the cracked concrete
pavement in the same manner specified for coring test sections. Take cores at intervals of not less than 1
core per lane mile for each machine used. If cores indicate the cracking does not comply with the
requirements or if the equipment or procedures are changed, the Engineer orders and marks an
499

SECTION 41

CONCRETE PAVEMENT REPAIR

additional test section. Crack the additional test sections and core sample until the cracked pavement
complies with the requirements.
Areas of concrete pavement that are covered with 0.10-foot or less of asphalt concrete may be cracked
without removal of the asphalt concrete if, after cracking the pavement, a strip of the asphalt concrete
surfacing at least 50 feet long is removed for inspection where ordered by the Engineer. If the inspection
strip does not comply with the specifications, modify the equipment and procedures, crack another area,
and remove another 50-foot strip of asphalt concrete for inspection. If the inspection strip complies with
the specifications, use the equipment and procedure to crack the remainder of the concrete pavement
covered with 0.10-foot or less of asphalt concrete. Dispose of asphalt concrete surfacing removed from
the concrete pavement.
Before opening cracked concrete pavement to traffic, sweep the pavement of loose debris.
Allow public traffic on newly cracked pavement or the first layer of HMA placed for no more than 15 days.
Seat cracked concrete by making not less than 5 passes over the cracked concrete with an oscillating
pneumatic-tired roller as specified in section 39-3.03 and weighing not less than 15 tons, or a vibratory
sheepsfoot roller exerting a dynamic centrifugal force of at least 10 tons. A pass must be 1 movement of
a roller in either direction. The roller speed must not exceed 5 miles per hour.
After all segments have been seated, clean loose debris from joints and cracks using compressed-air.
Fill joints, cracks, and spalls greater than 3/4 inch in width and greater than 1 inch in depth by applying
tack coat, filling with HMA, and compacting the HMA, before opening to traffic or before applying tack
coat for the 1st layer of HMA.
Within 24 hours of seating any segment of cracked pavement, place the 1st layer of HMA on it.
41-6.04 PAYMENT
Crack existing concrete pavement is measured from the full width and length of the pavement cracked.
No deduction is made for existing cracked segments.
41-7 PAVEMENT TRANSITION TAPER
41-7.01 GENERAL
41-7.01A Summary
Section 41-7 includes specifications for constructing pavement transition tapers in existing pavement.
41-7.01B Definitions
Reserved
41-7.01C Submittals
Reserved
41-7.01D Quality Control and Assurance
Reserved
41-7.02 MATERIALS
Reserved
41-7.03 CONSTRUCTION
Use equipment that can construct a pavement transition taper without damaging the concrete pavement
to remain in place.
Do not allow flying debris during the construction of tapers.
Existing concrete pavement shown to be tapered may be removed and replaced. If you remove the
existing concrete, the replacement concrete must comply with individual slab replacement under section
41-8:
1. Existing base need not be removed
500

SECTION 41

CONCRETE PAVEMENT REPAIR

2. Finished surface of the replacement concrete pavement must approximate the planned pavement
transition taper surface
3. Replacement concrete pavement surface must be a coarse broom finish
If the final layer of HMA is not placed before opening the lane to public traffic, place temporary HMA in the
taper. Temporary HMA must comply with section 39-1.15. Remove temporary HMA before placing the
final layer of HMA.
41-7.04 PAYMENT
The Department does not pay for temporary HMA.
Pavement transition tapers are measured from the dimensions shown.
If you choose to remove and replace concrete pavement, the Department does not make additional
payment for this work.
41-8 DOWEL BAR RETROFIT
Reserved
41-9 INDIVIDUAL SLAB REPLACEMENT WITH RAPID STRENGTH CONCRETE
41-9.01 GENERAL
41-9.01A Summary
Section 41-9 includes specifications for removing existing pavement and possibly the underlying base
and constructing concrete pavement and possibly the underlying base, using RSC.
41-9.01B Definitions
early age: The age less than 10 times the concrete final set time.
final set time: Time a specific penetration resistance of 4,000 psi is achieved, determined under ASTM C
403.
individual slab replacement: Replacement of short segments of single or multiple sequential slabs and
possibly the underlying base in the same lane to match the existing concrete thickness.
opening age: Age at which the concrete achieves the specified strength for opening to traffic, including
construction traffic.

41-9.01C Submittals
41-9.01C(1) Certificates of Compliance
Submit a certificate of compliance for the following materials:
1.
2.
3.
4.
5.
6.
7.
8.

D
owel bars
Chemical adhesive for drilling and bonding dowel bars
Silicone joint sealant
Asphalt rubber joint sealant
Preformed compression seal
Backer rods, including the manufacturer's statement of compatibility with the sealant to be used.
Joint filler material
Epoxy powder coating

41-9.01C(2) Manufacturer's Recommendations and Instructions


At least 15 days before delivery to the job site, submit manufacturer's recommendations and instructions
for storage and installation of:
1.
2
3.
4.
5.

Chemical adhesive for drilling and bonding dowel bars


Silicone liquid sealant
Asphalt rubber liquid sealant
P
reformed compression seals
Joint filler material
501

SECTION 41

CONCRETE PAVEMENT REPAIR

41-9.01C(3) Protecting Pavement During Cold Weather


Submit a plan for protecting pavement during the initial 72 hours after paving if the average ambient daily
temperature is below 40 degrees F and daytime ambient temperature is less than 50 degrees F.
41-9.01C(4) Quality Control Plan
Reserved
41-9.01C(5) Rapid Strength Concrete
At least 45 days before the intended use, submit a sample of cement from each proposed lot and
samples of proposed admixtures in the quantities ordered by the Engineer.
During RSC pavement operations, submit uniformity reports for hydraulic cement at least once every 30
days to METS, Attention: Cement Laboratory. Uniformity reports must comply with ASTM C 917, except
testing age and water content may be modified to suit the particular material.
At least 10 days before use in a trial slab, submit a mix design that includes:
1.
2.
3.
4.
5.
6.
7.
8.

Opening age
Proposed aggregate gradation
Proportions of hydraulic cement and aggregate
Types and amounts of chemical admixtures
Maximum time allowed between batching and placing
Range of ambient temperatures over which the mix design is effective
Final set time
Any special instructions or conditions such as water temperature requirements

Submit more than 1 mix design to plan for ambient temperature variations anticipated during RSC
placement. Each mix design must have a maximum ambient temperature range of 18 degrees F.
Submit modulus of rupture development data for each mix design. You may use modulus of rupture
development data from laboratory-prepared samples. The modulus of rupture development data must
include tests at 1 hour before opening age, opening age, 1 hour after opening age, 24 hours, 7 days, and
28 days.
41-9.01D Quality Control and Assurance
41-9.01D(1) Just-In-Time-Training
Reserved
41-9.01D(2) Prepaving Conference
Schedule a prepaving conference at a mutually agreed time and place to meet with the Engineer. Make
the arrangements for the conference facility. Discuss methods of performing each item of the work.
Prepaving conference attendees must sign an attendance sheet provided by the Engineer. The prepaving
conference must be attended by your:
1.
2.
3.
4.

Project superintendent
Project manager
QC manager
Workers and your subcontractor's workers, including:
4.1. Foremen
4.2. Concrete plant manager
4.3. Concrete plant operator
4.4. Concrete plant inspectors
4.5. Personnel performing saw cutting and joint sealing
4.6. Paving machine operators
4.7. Inspectors
4.8. Samplers
4.9. Testers
502

SECTION 41

CONCRETE PAVEMENT REPAIR

Do not start paving activities, including test strips, until the listed personnel have attended a
preconstruction conference.
The purpose of the prepaving conference is to familiarize personnel with the project's specifications.
Items to be discussed include the processes for:
1.
2.
3.
4.
5.
6.
7.

Production
Transportation
Placement
Replacing pavement
Contingency plan
Sampling
Testing

41-9.01D(3) Quality Control Plan


Reserved
41-9.01D(4) Trial Slabs
Before starting individual slab replacement work, complete 1 trial slab for each mix design. Demonstrate
that you are capable of constructing individual slab replacement in compliance with the specifications
within the specified time periods including delivery, placement, finishing, and curing times, and under
similar atmospheric and temperature conditions expected during replacement operations.
During trial slab construction, sample and split the aggregate for grading, cleanness value, and sand
equivalent testing.
Within 20 minutes after rapid strength concrete delivery for trial slabs, fabricate test beams under
California Test 524. Use test beams to determine early age and 7-day modulus of rupture values.
Cure beams fabricated for early age testing such that the monitored temperatures in the beams and the
slab are always within 5 degrees F. Monitor and record the internal temperatures of trial slabs and early
age beams at intervals of at least 5 minutes. Install thermocouples or thermistors connected to strip-chart
recorders or digital data loggers to monitor the temperatures. Temperature recording devices must be
accurate to within 2 degrees F. Measure internal temperatures at 1 inch from the top, 1 inch from the
bottom, and no closer than 3 inches from any edge until early age testing is completed.
Cure beams fabricated for 7-day testing under California Test 524 except place them into sand at a time
that is from 5 to 10 times the final set time, or 24 hours, whichever is earlier.
Trial slabs must have an early age modulus of rupture of not less than 400 psi and a 7-day modulus of
rupture of not less than 600 psi.
41-9.01D(5) Quality Control Testing
Reserved
41-9.01D(6) Acceptance Criteria
41-9.01D(6)(a) General
Reserved
41-9.01D(6)(b) Concrete Pavement Smoothness
The Department tests for smoothness using a 12-foot straightedge placed parallel with and perpendicular
to the centerline. Straightedge smoothness specifications do not apply to the pavement surface placed
within 12 inches of existing concrete pavement except you must place a straightedge longitudinally with
the midpoint coincident with the transverse construction joint. The concrete pavement surface must be
within 0.02 foot of the straightedges lower edge.
41-9.01D(6)(c) Modulus of Rupture
RSC pavement must develop a minimum modulus of rupture of 400 psi at opening age. RSC pavement
must develop a minimum modulus of rupture of 600 psi at 7 days after placement. The Engineer may
accept RSC pavement that does not attain the specified modulus of rupture under section 41-9.04B. The
Department determines the modulus of rupture by testing 3 beam specimens under California Test 524
503

SECTION 41

CONCRETE PAVEMENT REPAIR

except beam specimens may be fabricated using an internal vibrator under ASTM C 31 and averaging
the results. No single test represents more than that day's production or 130 cubic yards, whichever is
less.
The Engineer determines the modulus of rupture at other ages using beams cured and tested under
California Test 524 except the Engineer places them in sand from 5 to 10 times the final set time or 24
hours, whichever is earlier.
41-9.02 MATERIALS
41-9.02A Rapid Strength Concrete
RSC for concrete pavement must comply with section 90-3.
Choose the combined aggregate grading for RSC from either the 1-1/2 inch maximum or the 1-inch
maximum combined grading in section 90-1.02C(4)(d).
RSC must develop the specified strength at opening age and 7-day modulus of rupture strengths.
41-9.02B Temporary Roadway Pavement Structure
41-9.02B(1) General
Reserved
41-9.02B(2) Aggregate Base
Aggregate base for temporary roadway pavement structure must be produced from any combination of
broken stone, crushed gravel, natural rough-surfaced gravel, reclaimed concrete and sand. Grading of AB
must comply with the 3/4-inch maximum grading specified in section 26-1.02B.
41-9.02B(3) Hot Mix Asphalt
For HMA:
1. Choose the 3/8 inch or 1/2 inch HMA Type A or Type B aggregate gradation in section 39-1.02E.
2. Minimum asphalt binder content must be 6.8 percent for 3/8-inch aggregate gradation and 6.0
percent for 1/2 inch aggregate gradation.
3. Choose asphalt binder Grade PG 64-10, PG 64-16, or PG 70-10 in section 92.
41-9.02B(4) Concrete
RSC not conforming to the specifications may serve as temporary roadway and must be replaced during
the next paving shift.
41-9.02C Bond Breaker
Bond breaker must be one of the following:
1. White curing paper specified in ASTM C 171
2. White opaque polyethylene film specified in ASTM C 171, except the minimum thickness must be 6
mils
3. Paving asphalt, Grade PG 64-10, under section 92.
4. Curing compound no. 5
41-9.02D Chemical Adhesive for Drill and Bond
Chemical adhesive for drilling and bonding dowels must be on the Authorized Material List available on
the Department's METS website. The Authorized Material List indicates the appropriate chemical
adhesive system for the concrete temperature and installation conditions.
Each chemical adhesive system must clearly and permanently show the following:
1.
2.
3.
4.
5.
6.

Manufacturer's name
Model number of the system
Manufacture date
Batch number
Expiration date
Current International Conference of Building Officials (ICBO) Evaluation Report number
504

SECTION 41

CONCRETE PAVEMENT REPAIR

7. Directions for use


8. Warnings or precautions required by State and Federal laws and regulations
41-9.03 CONSTRUCTION
41-9.03A General
Contingency plan equipment, materials and personnel for temporary roadway pavement structure must
be present at the job site.
41-9.03B Trial Slabs
Trial slabs must be 10 by 20 feet. The trial slab thickness must be at least 10 inches. Place trial slabs
near the job site at a mutually-agreed location that is neither on the roadway nor within the project limits.
Dispose of trial slabs and test specimens for trial slabs.
41-9.03C Removing Existing Pavement and Base Materials
The exact limits of individual slab replacement is shown or directed by the Engineer.
Remove existing pavement, and underlying base material if shown, and replace it with base material and
concrete pavement. If you are unable to construct, finish, and cure concrete pavement before the
specified traffic opening time, construct a temporary roadway pavement structure.
Saw cut the outline of concrete pavement to be removed except where adjacent to an asphalt concrete
shoulder with a power-driven saw. Do not saw cut within concrete pavement slabs more than 2 business
days before concrete pavement slab removal. If you saw cut in work shifts that are before the actual
removal work shift, do not make saw cuts parallel or diagonal to the traveled way. Saw cut such that
traffic will not dislodge any pieces or segments.
Saw through any tie bars and dowel bars before concrete pavement slab removal.
Inside the sawed outline, do not impact the surface within 18 inches of pavement to remain in place.
Remove the pavement and base without damage to the pavement or base remaining in place.
Dispose of removed materials.
After removing pavement and base to the required depth shown, grade to a uniform plane. Water and
compact the material remaining in place to a firm and stable base. The finished surface of the remaining
material must not extend above the grade established by the Engineer. At your expense, fill areas that
were over-excavated during base removal with replacement material in the same operation as the base
replacement.
41-9.03D Base Replacement Layer
Replace removed base materials with the specified base material in a separate and distinct operation
from replacing concrete pavement.
Finish the replacement base layer to the grade of the original base layer. Do not texture the surface.
Finish to a smooth surface, free of voids, porous areas and projections such as mortar ridges.
41-9.03E Bond Breaker
Before application, remove foreign and loose materials.
Place bond breaker between replacement pavement and existing lean-concrete base, cement-treated
base, or new base replacement layer.
If you use curing paper or polyethylene film, place it in a wrinkle free manner. Overlap adjacent sheets a
minimum of 6 inches in the same direction as the concrete pour.
If you use paving asphalt, do not add water before applying asphalt to the base surface. Apply the paving
asphalt in 1 even application at a rate from 0.02 to 0.10 gallon per square yard over the entire base
surface area. Do not place concrete pavement until the paving asphalt has cured.
If you use curing compound, apply it in 2 separate applications. Apply each application evenly at a rate
from 0.07 to 0.11 gallon per square yard over the entire base surface area.
505

SECTION 41

CONCRETE PAVEMENT REPAIR

41-9.03F Spreading, Compacting, and Shaping


Use metal or wood side forms. Wood side forms must not be less than 1-1/2 inches thick. Side forms
must be of sufficient rigidity, both in the form and in the connection with adjoining forms, that movement
will not occur under forces from subgrading and paving equipment or from the pressure of concrete.
Side forms must remain in place until the pavement edge no longer requires the protection of forms.
Clean and oil side forms before each use.
After you deposit the RSC, consolidate RSC with high-frequency internal vibrators. Consolidate adjacent
to forms and across the full paving width. Place RSC as nearly as possible to its final position. Do not use
vibrators for extensive shifting of concrete pavement.
Spread and shape RSC with powered finishing machines supplemented by hand finishing. After you mix
and place RSC, do not add water to the surface to facilitate finishing. Use surface finishing additives as
recommended by the manufacturer of the cement after their use is authorized.
41-9.03G Joints
Before placing RSC against existing concrete, place 1/4-inch thick commercial quality polyethylene
flexible foam expansion joint filler across the original transverse and longitudinal joint faces and extend
the excavation's full depth. Place the top of the joint filler flush with the top of the pavement. Secure joint
filler to the joint face of the existing pavement to prevent the joint filler from moving during the placement
of RSC.
Where the existing transverse joint spacing in an adjacent lane exceeds 15 feet, construct an additional
transverse contraction joint midway between the existing joints. Complete sawing of contraction joints
within 2 hours of completion of final finishing.
Cut contraction joints a minimum of 1/3 the depth of the slab.
41-9.03H Dowel Bar
Drill existing concrete and bond dowel bars with chemical adhesive at transverse construction joints as
shown. Do not place dowel bars in transverse contraction joints.
Clean drilled holes in compliance with the chemical adhesive manufacturer's instructions. Holes must be
dry at the time of placing the chemical adhesive and dowel bars. Immediately after inserting the dowel
bars into the chemical adhesive, support the dowel bars to prevent movement during curing. Leave the
supported dowel bars undisturbed until the chemical adhesive has cured a minimum time instructed by
the manufacturer. If the Engineer rejects dowel bars, drill new holes adjacent to the rejected holes, place
new dowel bars, and securely bond to the concrete.
41-9.03I Final Finishing
After completing preliminary finishing, round the edges of the initial paving widths to a 0.04-foot radius.
Round transverse and longitudinal construction joints to a 0.02-foot radius.
Before curing, texture the pavement. Perform initial texturing with a burlap drag or broom device that
produces striations parallel to the centerline. Perform final texturing with a steel-tined device that
produces grooves parallel with the centerline.
The tines must be from 3/32 to 1/8 inch wide, on 3/4-inch centers, and must have enough length,
thickness, and resilience to form grooves approximately 3/16 inch deep.
Construct grooves over the entire pavement width except do not construct grooves 3 inches from the
concrete pavement edges and longitudinal joints. Final texture must be uniform and smooth. Grooves
must be parallel and aligned to the pavement edge across the pavement width. Grooves must be from 1/8
to 3/16 inch deep after concrete has hardened.
If the Engineer determines by visual inspection that the final texturing may not comply with the
specifications for coefficient of friction, the Engineer tests to determine the coefficient of friction. Open the
pavement to traffic and allow 25 days after concrete placement for the Department to test for the
coefficient of friction. If pavement does not comply with the specifications for coefficient of friction, groove
or grind the pavement under section 42. Perform grooving or grinding before the installation of any
required joint seal or edge drains adjacent to the areas to be grooved or ground.
506

SECTION 41

CONCRETE PAVEMENT REPAIR

Protect concrete pavement under section 90-1.03C.


Maintain the concrete pavement temperature at not less than 40 degrees F for the initial 72 hours.
Correct pavement at construction joints not in compliance with straightedge smoothness specifications
within 48 hours by grinding.
41-9.03J Temporary Roadway Pavement Structure
Place HMA and aggregate base where existing pavement is replaced for construction of a temporary
roadway pavement structure. The quantity must be equal to the quantity of pavement removed during the
work shift. If you place temporary roadway pavement structure, it must be maintained and later removed
as the 1st order of work if replace concrete pavement activities resume. The temporary roadway
pavement structure must consist of 3-1/2 inch thick HMA over aggregate base. Concrete not conforming
to the specifications may be used for temporary roadway pavement structure with authorization.
Spread and compact aggregate base and HMA by methods that produce a well-compacted, uniform
base, with a surface of uniform smoothness, texture and density. Surfaces must be free from pockets of
coarse or fine material. You may spread aggregate base and HMA each in 1 layer. The finished surface
of HMA must not vary more than 0.05 foot from the lower edge of a 12-foot long straightedge placed
parallel with the centerline and must match the elevation of existing concrete pavement along the joints
between the existing pavement and temporary surfacing.
After removing temporary roadway pavement structure, you may stockpile removed aggregate base at
the job site and reuse it for temporary roadway pavement structures. If no longer required, dispose of
standby material or stockpiled material for temporary roadway pavement structures.
41-9.03K Reserved
41-9.04 PAYMENT
41-9.04A General
Individual slab replacement is measured based on field measurements.
Drill and bond dowel bars are not included in payment for individual slab replacement.
If calibration of volumetric batch-trucks is performed more than 100 miles from the project limits, total
payment for RSC is reduced by $1,000 per calibration session.
41-9.04B Pay Factor Adjustment for Low Modulus of Rupture of RSC
The Engineer adjusts payment for RSC for modulus of rupture as follows:
1. Payment for RSC with a modulus of rupture of 400 psi or greater before opening to traffic and 7-day
modulus of rupture of 600 psi or greater is not adjusted.
2. Payment for RSC with a 7-day modulus of rupture less than 500 psi is not adjusted and no payment
is made. Remove this RSC and replace it at your expense with RSC that complies with the
specifications.
3. Payment for RSC with a modulus of rupture less than 300 psi before opening to traffic is not adjusted
and no payment is made. Remove this RSC and replace it at your expense with RSC that complies
with the specifications.
4. Payment for RSC with a modulus of rupture of 300 psi or greater before opening to traffic and a 7-day
modulus of rupture greater than or equal to 500 psi is reduced by the percentage in the following pay
table for the quantity represented by the tests.

507

SECTION 41

CONCRETE PAVEMENT REPAIR

Modulus of rupture
(psi) at opening to
traffic

Percentage Pay Table

7-Day modulus of rupture (psi)


Greater Less than 600 Less than 550
than or
and greater
and greater
equal to
than or equal
than or equal
600
to 550
to 500
100%
95%
90%

Greater than or
equal to 400
Less than 400 and
95%
95%
90%
greater than
or equal to 350
Less than 350 and
80%a
80%a
80%a
greater than or
equal to 300
a
The Engineer rejects any RSC area that develops 1 or more
transverse cracks within 21 days after placement. Remove this
RSC at your expense and replace it with RSC that complies with
the specifications. A transverse crack is a crack running from one
longitudinal edge of the panel to the other.

508

42 GROOVE AND GRIND CONCRETE


42-1 GENERAL
42-1.01 GENERAL
42-1.01A Summary
Section 42-1 includes general specifications for:
1. Grooving and grinding the surface of pavement and bridge decks
2. Disposing of pavement grooving and grinding residue
42-1.01B Definitions
Reserved
42-1.01C Submittals
Submit one of the following for the facility that you have arranged to receive the concrete residue:
1. Copy of the facility's RWQCB or other applicable agency permit
2. RWQCB's or other agency's written approval
3. Applicable local, state, or federal agency permits if located outside the State
Within 5 business days after completing concrete grooving or grinding activities, submit disposal facility
receipts and weight tickets for concrete grooving or grinding residue.
42-1.01D Quality Control and Assurance
Reserved
42-1.02 MATERIALS
Reserved
42-1.03 CONSTRUCTION
42-1.03A General
Reserved
42-1.03B Pavement Grooving and Grinding Residue
Remove grooving and grinding residue with a vacuum attached to the grooving or grinding machine.
Prevent residue from flowing across the pavement or remaining on the pavement surface. Dispose of
grooving and grinding residue at an appropriate disposal facility.
Do not store concrete pavement grooving or grinding residue within the highway.
If authorized, you may transport liquid grooving or grinding residue to an offsite location for drying. The
offsite drying location must be identified and protected under the SWPPP or Water Pollution Control
Program.
42-1.04 PAYMENT
Reserved
42-2 GROOVING
42-2.01 GENERAL
42-2.01A Summary
Section 42-2 includes specifications for grooving the surface of pavement and bridge decks.
42-2.01B Definitions
Reserved
42-2.01C Submittals
Reserved

509

SECTION 42

GROOVE AND GRIND CONCRETE

42-2.01D Quality Control and Assurance


The Engineer selects and measures grooved areas for acceptance. Grooved areas are accepted if at
least 95 percent of any 2 by 100 foot longitudinal pavement area is grooved except where prevented by
irregularities in the pavement surface. Omitted grooves resulting from a single failed blade are allowed to
remain and are measured as grooved. Omitted grooves resulting from more than a single failed blade that
is not more than 50 feet in length are allowed to remain and are measured as grooved. Other omitted
grooves required to be recut must be grooved before the area is measured for payment.
42-2.02 MATERIALS
Reserved
42-2.03 CONSTRUCTION
42-2.03A General
Reserved
42-2.03B Grooving Equipment
Grooving blades must be 0.095 0.005 inch wide and spaced on 3/4-inch centers.
At the start of each new work shift, grooving machines must be equipped with a full complement of
functioning grooving blades.
42-2.03C Grooving
Begin and end grooving at lines normal to the roadway centerline. Center grooving within the lane width.
For new pavement or bridge decks, groove the full lane width.
Groove pavement from 1/8 to 1/4 inch deep. Groove bridge decks from 1/8 to 3/16 inch deep. If grooving
over inductive loop detectors, groove from 1/16 to 1/8 inch deep.
If a single grooving blade on any grooving machine fails to cut a groove in compliance with the
specifications, you may continue to groove for the remainder of the workshift. Do not re-groove because
of a single failed blade. If more than a single blade fails, perform either of the following:
1. Discontinue work with that grooving machine within 50 feet of the failure. Do not cut omitted grooves.
2. Continue grooving with that grooving machine until the end of the work shift and cut all the omitted
grooves by other means within the same work shift. The Engineer does not accept any grooves in
that work shift until you cut all omitted grooves.
42-2.04 PAYMENT
Groove existing concrete pavement and groove existing bridge deck are measured by multiplying the
width by the length of the grooved area.
42-3 GRINDING
42-3.01 GENERAL
42-3.01A Summary
Section 42-3 includes specifications for grinding the surface of pavement and bridge decks, and profiling
the ground surface to determine smoothness.
You may replace concrete pavement instead of grinding. Smoothness specifications apply to replaced
concrete pavement.
42-3.01B Definitions
Reserved
42-3.01C Submittals
Reserved
42-3.01D Quality Control and Assurance
Pavement grinding must result in a finish surface that complies with the quality control and assurance
specifications for surface smoothness in section 40-1.01D.
510

SECTION 42

GROOVE AND GRIND CONCRETE

42-3.02 MATERIALS
Reserved
42-3.03 CONSTRUCTION
42-3.03A General
Reserved
42-3.03B Equipment
Grind with abrasive grinding equipment using diamond cutting blades mounted on a self-propelled
machine designed for grinding and texturing concrete pavements.
42-3.03C Grinding
Grind bridge decks only when specified. Begin and end grinding at lines perpendicular to the roadway
centerline.
Grind in the longitudinal direction of the traveled way and grind the full lane width.
Grinding concrete must result in a parallel corduroy texture with grooves from 0.08 to 0.12 inch wide and
from 55 to 60 grooves per foot of width. Grooves must be from 0.06 to 0.08 inch from the top of the ridge
to the bottom of the groove.
Grinding concrete pavement not constructed as part of the project must comply with the following:
1. Both sides of transverse joints and cracks must have the same depth of texture. The surface must be
within 0.01 foot of the lower edge of a 12-foot long straightedge when laid parallel with the centerline
with its midpoint at the joint or crack.
2. If necessary, perform additional grinding to achieve the required surface smoothness. Straightedge
and profilograph requirements do not apply to areas abnormally depressed from subsidence or other
localized causes. End profilograph testing 25 feet before and resume 25 feet after these areas.
3. Cross-slope must be uniform and have positive drainage across the traveled way and shoulder. The
surface must be within 0.02 foot of the lower edge of a 12-foot long straightedge when laid
perpendicular to the centerline.
4. For weigh-in-motion scales, the profile index specifications do not apply. The surface must be within
0.01 foot of the lower edge of a 12-foot long straightedge laid parallel or perpendicular to the

centerline.

The following ground areas must comply with the specifications for smoothness and concrete cover over
reinforcing steel in section 51-1.01D(4):
1. Structures
2. Approach slabs
3. Adjacent 50 feet of approach pavement
The coefficient of friction for ground pavements must be at least 0.30 determined under California Test
342.
The coefficient of friction for bridge decks and approach slabs must comply with section 51-1.01D(4).
42-3.03D Pavement Replacement
Instead of grinding, you may replace existing concrete pavement. The new concrete pavement must be
the same thickness as the removed pavement. Replace between longitudinal joints or pavement edges
and between transverse joints. Do not remove portions of slabs.
Replacement of concrete pavement must comply with individual slab replacement under section 41-9.
For replacement concrete pavement, you may stir pigmented curing compound manually during
application. You may apply curing compound with hand-held spraying equipment and the nozzle may be
unshielded.
Do not disturb adjacent concrete pavement and subgrade during concrete pavement removal and
replacement. Recompact disturbed subgrade to 95 percent relative compaction at your expense.
511

SECTION 42

GROOVE AND GRIND CONCRETE

42-3.04 PAYMENT
Grind existing concrete pavement and grind existing bridge deck are measured by multiplying the width
by the length of the actual area ground.
If you begin grinding and change to replacing concrete pavement, the grinding is not paid for.
Replacement concrete pavement constructed instead of grinding is measured by multiplying the width by
the length of the area of replaced pavement and is paid for as grind existing concrete pavement.
The Department does not pay for grinding replacement concrete pavement or for additional grinding to
comply with smoothness requirements.

4345 RESERVED

512

DIVISION VI STRUCTURES

46 GROUND ANCHORS AND SOIL NAILS

46-1 GENERAL

46-1.01 GENERAL
46-1.01A Summary
Section 46-1 includes general specifications for constructing ground anchors and soil nails.
46-1.01B Definitions
Reserved
46-1.01C Submittals
46-1.01C(1) General
Submit a certified calibration chart for each jack and its gage as an informational submittal.
46-1.01C(2) Shop Drawings
Submit shop drawings to OSD, Documents Unit. Notify the Engineer of the submittal. Include in the
notification the date and contents of the submittal. Submit 5 sets of shop drawings for initial review. After
review, submit from 6 to 12 sets, as requested, for authorization and use during construction.
Shop drawings for ground anchors and soil nails must include:
1.
2.
3.
4.
5.

6.
7.
8.
9.

Your name, address, and telephone and fax numbers.


Construction schedule and sequence of installing and grouting.
E
ncapsulation details.
Repair procedure for damaged sheathing.
Drilling methods and equipment, including:
5.1. Drilled hole diameter
5.2. Equipment space requirements
Grout mix design and testing procedures.
Grout placement equipment and procedures, including minimum required cure time.
Details for providing the bonded and unbonded length. If packers or other similar devices are to be
used, include the type.
Testing equipment, including:
9.1. Jacking frame and appurtenant bracing
9.2. Method and equipment for measuring movement during testing

Ground anchor shop drawings must include:


1. Details and specifications for the anchorage system and ground anchors
2. Details for the transition between the corrugated plastic sheathing and the anchorage assembly
3. If shims are used during lock-off, shim thickness and supporting calculations
Soil nail shop drawings must include:
1. Details and specifications for:
1.1. Anchorage system
1.2. Production soil nails
1.3. Test soil nails
2. Drilling methods and equipment, including:
2.1. Supporting calculations
2.2. Assumed bond strength
3. Details for isolating installed proof test soil nails during shotcrete application
4. Procedure for extracting grouted soil nails
Soil nail shop drawings must be sealed and signed by an engineer who is registered as a civil engineer in
the State.
Allow 30 days for the Department's review of soil nail shop drawings.
513

SECTION 46

GROUND ANCHORS AND SOIL NAILS

46-1.01C(3) Test Data


Submit the following data for each ground anchor or soil nail test:
1.
2.
3.
4.

5.
6.
7.
8.
9.
10.
11.

Key personnel
Test loading equipment
Anchor or nail location
Time and date of:
4.1. Drilling
4.2. Installation
4.3. Grouting
4.4. Testing
Hole diameter and depth
Drilling method
Soil or rock classification and description
Bonded and unbonded length
Quantity of ground water encountered within the bonded length
Grout quantity and pressure used within the bonded length
Anchor end or nail head movement at each load increment or at each time increment during the load
hold period

Submit the test data when ground anchor or soil nail testing is complete or when requested.
46-1.01D Quality Control and Assurance
46-1.01D(1) General
Stability testing and wall zones must comply with section 19-3.
46-1.01D(2) Load Testing
46-1.01D(2)(a) General
The jacking equipment and the movement measuring system must be stable during all phases of loading.
Do not unload or reposition the test equipment during load testing.
46-1.01D(2)(b) Jacking Equipment and Calibration
Apply the test loads using a hydraulic jack supported by a reaction frame that can support the test
equipment without excessive deformation.
Use a calibrated pressure gage or a load cell to determine the magnitude of applied test loads.
The pressure gage must have an accurately reading, clearly visible dial or display. Dial gages must be
graduated in 100 psi increments or less.
Calibrate each jack and its gage as a unit, with the cylinder extension in the approximate position it will
have at the final jacking force. Calibrate the jack and gage assembly under the specifications for jacks
used to stress tendons permanently anchored at 25 percent or more of the specified ultimate tensile
strength in section 50-1.01D(3).
The load cell must be calibrated and have an indicator capable of measuring the maximum test load. The
load cell range must be such that the lower 10 percent of the manufacturer's rated capacity is not used in
determining the jacking force.
46-1.01D(2)(c) Measuring Movements
The equipment for measuring the movement at the anchor end or nail head must be accurate to 0.001
inch and have enough capacity to complete the test without being reset.
46-1.01D(2)(d) Procedure
At each load increment, including the ending alignment load, measure the movement at the anchor end or
nail head relative to an independent, fixed reference point. Record the movements to the nearest 0.001
inch.
Maintain each test load within 5 percent of the specified load throughout each hold period.
514

SECTION 46

GROUND ANCHORS AND SOIL NAILS

The Department may verify the test loads under California Test 677 using Department-furnished testing
equipment. If requested, install and support the equipment during testing and remove the equipment after
testing is complete.
46-1.01E Research Investigation
Reserved
46-1.02 MATERIALS
46-1.02A General
Reserved
46-1.02B Sheathing
PVC sheathing must comply with ASTM D 1784, Class 13464-B.
HDPE sheathing must have a density of from 940 to 960 kg/m3 when measured under ASTM D 792.
Smooth and corrugated sheathing, including joints, must be:
1.
2.
3.
4.

Strong enough to prevent damage during construction


Watertight
Chemically stable without embrittlement or softening
Nonreactive with:
4.1. Concrete
4.2. Steel
4.3. Corrosion-inhibiting grease, if used

The corrugation width, the distance between corrugations, and the corrugation height of corrugated
plastic sheathing must be approximately equal.
46-1.03 CONSTRUCTION
46-1.03A General
Water or grout from ground anchor or soil nail construction must not:
1. Fall on traffic
2. Flow across shoulders or lanes occupied by traffic
3. Flow into landscaping, gutters, or other drainage facilities
Do not use an excessive quantity of water when drilling and installing ground anchors.
46-1.03B Drilling
Drilled holes must not extend beyond the right-of-way or easement limits.
Drilling equipment must produce straight, clean holes.
Use the rotary or rotary percussion drilling method to drill ground anchor or soil nail holes in the
foundation material.
At locations where caving is anticipated, keep enough casing and auger lengths on the job site to
maintain uninterrupted anchor or nail installation.
At locations where hard drilling conditions, such as rock, cobbles, boulders, or obstructions, are
anticipated, keep a down-hole pneumatic hammer drill rig and drill bit available on the job site for drilling
holes.
Clean the holes to remove material from drilling activities. Do not use water to clean soil nail holes unless
authorized.
46-1.03C Installation
Before you insert each ground anchor or soil nail into a drilled hole, clean the anchor or nail of oil, grease,
dirt, and other extraneous substances and repair or replace any damaged sheathing.

515

SECTION 46

GROUND ANCHORS AND SOIL NAILS

There must be no evidence of distress in the plastic sheathing or crushing of the grout within the
pregrouted sheathing.
Do not insert an anchor or nail into a hole until the hole has been inspected by the Engineer.
Install the anchor or nail in the drilled hole promptly so that caving or deterioration of the hole does not
occur.
If you cannot insert an anchor or nail into a drilled hole to the required depth without difficulty, remove the
anchor or nail and clean or redrill the hole. Do not force or drive a partially inserted anchor or nail into a
drilled hole. Partially inserted anchors or nails are rejected.
For open-hole drilling methods, keep hole-cleaning tools on the job site. The tools must be suitable for
cleaning drilled holes along their full length just before inserting the anchor or nail.
46-1.04 PAYMENT
Not Used
46-2 GROUND ANCHORS
46-2.01 GENERAL
46-2.01A Summary
Section 46-2 includes specifications for constructing ground anchors.
A ground anchor consists of a steel bar or strand tendon with an anchorage assembly placed in a cored,
formed, or drilled hole, and then grouted and stressed.
Fabrication, installation, and testing of ground anchors must comply with section 50. Interpret "member" in
section 50 as "ground anchor."
46-2.01B Definitions
lock-off load: Load maintained on the jacks while the anchor head or anchor nuts on the ground anchor
are permanently set.
46-2.01C Submittals
At least 40 days before using the corrosion-inhibiting grease, submit a test sample from the lot to be used
and test data showing compliance with the specifications for strand coating and encapsulation.
46-2.01D Quality Control and Assurance
46-2.01D(1) General
Reserved
46-2.01D(2) Load Testing
46-2.01D(2)(a) General
The Contract describes which ground anchors are to be performance tested. Proof test all ground
anchors that are not performance tested.
Perform load testing against the completed structural element shown. Do not test directly against the soil.
Do not stress against the concrete until it has attained a compressive strength of at least 2,880 psi or has
cured for at least 7 days.
Bearing pads must be a minimum of 1 foot away from the edges of the drilled hole.
46-2.01D(2)(b) Procedure
Conduct the performance and proof tests as follows:
1. Incrementally load and unload the anchor as shown in the following table:

516

SECTION 46

GROUND ANCHORS AND SOIL NAILS


Loading Schedules
Performance test
Proof test
Load
Hold time
Load
Hold time
increment
(minutes)
increment
(minutes)
AL
Until stable
AL
Until stable
0.20FTL
12
0.20FTL
12
AL
Until stable
0.40FTL
12
0.20FTL
12
0.60FTL
12
0.40FTL
12
0.80FTL
12
10 or 60
AL
Until stable
1.00FTLa
0.20FTL
12
AL
Until stable
0.40FTL
12
--0.60FTL
12
--AL
Until stable
-
-0.20FTL
12
--0.40FTL
12
--0.60FTL
12
--0.80FTL
12
--AL
Until stable
-
-0.20FTL
12
--0.40FTL
12
--0.60FTL
12
0.80FTL
12
--a
10 or 60
--1.00FTL
AL
Until stable
-
-NOTE: FTL = factored test load shown. AL = alignment load, 0.10FTL.
a
Maximum test load

2. Apply each load increment in less than 1 minute and hold it for the length of time shown in the table
titled "Loading Schedules."
3. Measure and record the applied test load and the anchor end movement at each load increment.
4. When applying the maximum test load:
4.1. Hold the load constant for 10 minutes
4.2. Start the observation period for the load hold when the pump starts to apply the last load
increment
4.3. Measure and record the anchor end movement at 1, 2, 3, 4, 5, 6, and 10 minutes
5. If the movement measured from 1 to 10 minutes is greater than 0.04 inch:
5.1. Hold the load constant for an additional 50 minutes
5.2. Measure and record the anchor end movement at 15, 20, 25, 30, 45, and 60 minutes
5.3. Plot a creep curve as a function of the logarithm of time, showing the anchor end movement
from 6 to 60 minutes
6. Reduce the load to the ending alignment load and record the residual movement.
46-2.01D(2)(c) Acceptance Criteria
A performance- or proof-tested ground anchor is acceptable if:
1. Total measured movement at the maximum test load minus the measured residual movement at the
ending alignment load exceeds 80 percent of the theoretical elastic elongation of the sum of the
unbonded length and the jacking length.
2. Creep movement complies with one of the following:
2.1. For a 10-minute load hold, the creep movement measured from 1 to 10 minutes is less than
0.04 inch.
2.2. For a 60-minute load hold, the creep movement measured from 6 to 60 minutes is less than
0.08 inch and the creep rate is linear or decreasing in time logarithmic scale from the 6- to the
60-minute reading.

517

SECTION 46

GROUND ANCHORS AND SOIL NAILS

If a ground anchor fails to comply with the acceptance criteria, redesign or replace the ground anchor. Do
not retest a ground anchor unless you post-grout the anchor bond length after the unacceptable test.
46-2.02 MATERIALS
46-2.02A General
If a bond breaker is shown near the bearing plate, use a 1/4-inch premolded joint filler that complies with
section 51-2.01.
46-2.02B Steel
The anchorage enclosure and the steel tube and bearing plate of the anchorage assembly must be
galvanized steel complying with section 55. Section 11-3.02 does not apply to the anchorage enclosure
welds or to the weld between the steel tube and the bearing plate.
The permanent bearing plate must effectively distribute the factored test load uniformly to the concrete
such that:
1. Concrete bearing stress does not exceed 2,400 psi
2. Bending stress of the plate does not exceed:
2.1. 0.90 of the yield strength for steel
2.2. 0.55 of the yield strength for cast steel or cast iron
46-2.02C Sheathing
46-2.02C(1) General
Polypropylene sheathing must have a density of from 900 to 910 kg/m3 when measured under ASTM D
792.
46-2.02C(2) Smooth Plastic Sheathing
Smooth sheathing for bar tendons must be PVC or HDPE.
Smooth sheathing for encapsulating individual strands of strand tendons must be HDPE or polypropylene
and must have a minimum wall thickness of 40 mils.
46-2.02C(3) Corrugated Plastic Sheathing
Corrugated plastic sheathing must be PVC or HDPE.
PVC corrugated sheathing must have a nominal wall thickness of 40 mils.
HDPE corrugated sheathing with an outside diameter of 3 inches or greater must have a nominal wall
thickness of 60 mils. HDPE corrugated sheathing with an outside diameter of less than 3 inches must
have a nominal wall thickness of 40 mils.
46-2.02D Strand Coating and Encapsulation
Within the unbonded length of strand tendons, fully coat each individual strand with corrosion-inhibiting
grease and encapsulate it with a smooth HDPE or polypropylene sheath.
Hot melt extrude or shop apply the sheath onto the strand using a method that ensures all spaces
between the sheath, strand, and strand wires are filled with corrosion-inhibiting grease.
The corrosion-inhibiting grease must:
1. Fill all space between the strand wires
2. Encapsulate the strand, giving an encasement diameter at least 5 mils greater than the diameter of
the bare strand
3. Provide a continuous, nonbrittle film of corrosion protection to the prestressing steel
4. Provide lubrication between the strand and the sheathing
5. Resist flow from the sheathing
6. Be chemically stable and nonreactive with the prestressing steel, sheathing material, and concrete
7. Be organic
8. Have appropriate polar, moisture-displacing, and corrosion-inhibiting additives
9. Have the physical properties shown in Table 1 of Specification for Unbonded Single Strand Tendons
published by the Post-Tensioning Institute
518

SECTION 46

GROUND ANCHORS AND SOIL NAILS

46-2.02E Grout
The grout must comply with section 50, except the grout is not required to pass through a screen with
0.07-inch maximum clear openings before being introduced into the grout pump.
For drilled holes 8 inches or larger in diameter, you may add fine aggregate to the grout used outside of
the corrugated sheathing. The fine aggregate must comply with section 90-1.02C. Grout with fine
aggregate must contain at least 845 pounds of cement per cubic yard.
46-2.03 CONSTRUCTION
46-2.03A General
Ground anchor installation must comply with the manufacturer's instructions unless otherwise specified.
Determine the bonded length necessary to comply with the specified acceptance criteria.
Sheath the tendons in the unbonded length with smooth plastic sheathing that extends into the steel tube
of the permanent anchorage assembly. Sheath the tendons full length with corrugated plastic sheathing.
The transition between the corrugated plastic sheathing and the anchorage assembly must allow
stressing to the maximum test load without evidence of distress in the corrugated plastic sheathing.
Select a ground anchor installation method that achieves the loadings specified.
Do not drill for ground anchors in a wall zone until any required stability testing is complete and the test
results are authorized.
Drill the holes for ground anchors in the foundation material deep enough to provide the necessary bond
length beyond the minimum unbonded length shown.
If coring through concrete structures, core the holes using methods that do not shatter or damage the
concrete adjacent to the hole.
The diameter of the drilled hole must be large enough to provide a minimum grout cover of 1 inch over
the corrugated sheathing for the full length of the tendon.
Before installing a ground anchor, repair or replace any damaged portions of the sheathing.
Place centralizers at 10-foot maximum intervals for the full length of the tendon, with the uppermost
centralizer located 2 feet from the end of the steel tube and the deepest centralizer located 2 feet from the
end of the anchor.
Pregrout each tendon at least 48 hours before you place the tendon in the drilled hole.
At each grouting stage, inject the grout at the low end of the void to be filled. Place the grout using grout
tubes. Do not place grout in the unbonded length under pressure. Record the quantity of grout and the
grout pressures.
After initial grouting, the anchor must remain undisturbed until the grout is strong enough to provide
anchorage during load testing.
Protect the anchorage assembly against rust, corrosion, and physical damage until the enclosure is
grouted or the assembly is encased in concrete.
For ground anchors installed inside driven structural elements, such as pipe, casing, shells, and pipe
piles, construct the drilled hole in the foundation material as follows:
1. Use construction methods that do not reduce the compression or tension capacity of the driven
element.
2. After the driven element is installed, advance the anchor hole with a drill casing using rotary methods
to at least 10 feet beyond the tip of the driven element. Do not use percussion drilling until the casing
is in place.
3. Do not extract the casing until the tendon is installed and the portion of the initial grout outside the
corrugated sheathing and within the bonded length has been placed.
519

SECTION 46

GROUND ANCHORS AND SOIL NAILS

46-2.03B Bar Tendons


For bar tendons, provide a seal between the smooth sheathing and the corrugated sheathing at the top
and bottom of the length of smooth sheathing.
Center the bar in the corrugated sheathing and pregrout the annular space between the bar and the
sheathing before placing the tendon in the drilled hole.
You may place the initial grout in the drilled hole before or after inserting the bar tendon.
Stress the bars for multiple-bar tendons simultaneously.
46-2.03C Strand Tendons
Separate the individual strands of strand tendons within the bonded length using spacers such that the
entire surface of each strand is bonded in the grout. The spacers must be:
1. Spaced at 5 feet maximum
2. Made of plastic
3. Strong enough to support the individual strands during construction activities
Pregrout the corrugated sheathing a minimum length of 2 feet before inserting the strand tendon in the
hole.
After inserting the strand tendon and before placing the initial grout in the hole, inject grout into the
corrugated sheathing to the limits shown.
46-2.03D Lock-off
After a successful ground anchor test, tension the anchor and lock it off at the lock-off load shown.
Lock off strand tendons as follows:
1. Stress the tendon to the maximum test load.
2. Fully set the permanent wedges in the anchor head.
3. Remove the shims or use other appropriate means to achieve the lock-off load shown.
Immediately after lock-off, perform a lift-off test to verify that the lock-off load has been attained. If
necessary, adjust the shim thickness to achieve the lock-off load.
After lock-off, place grout to the secondary grout level shown. At least 24 hours after the secondary grout
has set, fill the remaining void in the steel tube and bearing plate with grout. Maintain a minimum grout
head of 2 feet until the grout has set.
If a grouted anchorage enclosure is shown, install the enclosure as follows:
1.
2.
3.
4.
5.
6.

Grout the steel tube.


Clean the bearing plate surface.
Place the sealant.
Bolt the anchorage enclosure in place.
Fill the void in the anchorage enclosure with grout.
Clean and seal any holes in the top of the anchorage enclosure used for grout placement. Use a
nonsag polysulfide or polyurethane sealing compound that complies with ASTM C 920.

46-2.04 PAYMENT
Not Used
46-3 SOIL NAILS
46-3.01 GENERAL
46-3.01A Summary
Section 46-3 includes specifications for constructing soil nails.
A soil nail consists of steel bar reinforcement with an anchorage assembly placed in a drilled hole and
grouted.
520

SECTION 46

GROUND ANCHORS AND SOIL NAILS

46-3.01B Definitions
pullout failure: Occurrence in which attempts to increase the test load result in nail head movement
relative to a fixed reference point without an increase in load.
46-3.01C Submittals
If a pullout failure occurs, submit the pullout failure load as part of the test data.
If production soil nails are rejected under section 46-3.01D(2)(c), submit revised shop drawings.
If additional verification soil nails are required under section 46-3.01D(2)(c), submit revised shop drawings
and a test boring report.
The test boring report must include:
1. Summary of drilling methods, drilling equipment, drill platforms, and drilling difficulties encountered
2. Location map of the surveyed position of the new test borings relative to existing and proposed
facilities in the California Coordinate System and bridge stationing
3. Bore hole surveying notes
4. Depth increments of borings
5. Soil and rock classifications and descriptions
6. Photographs of cuttings
7. Copies of original daily drilling notes, including dates and weather conditions
Classify soil and rock under the Soil and Rock Logging, Classification, and Presentation Manual. For the
manual, go to the Geotechnical Services Web site.
The test boring report must be sealed and signed by a geologist or engineer registered as a geologist or
civil engineer in the State.
46-3.01D Quality Control and Assurance
46-3.01D(1) General
Reserved
46-3.01D(2) Load Testing
46-3.01D(2)(a) General
Perform load testing of verification and proof test soil nails to verify the installation methods and pullout
resistance.
Load testing must include incrementally loading the soil nail until the maximum test load is held for the
specified duration or a pullout failure occurs. If a pullout failure occurs, record the pullout failure load.
46-3.01D(2)(b) Procedure
46-3.01D(2)(b)(i) General
Determine the test load using the following equation:
T = Lb x Qd
where:
T = test load, lb
Lb = soil nail bonded length, feet, 10 feet minimum
Qd = design pullout resistance shown, lb/ft
46-3.01D(2)(b)(ii) Verification Test
Perform verification testing in the Engineer's presence.
Install and test 2 verification test soil nails for each wall zone. You may install and test the nails during
stability testing.
Conduct the verification test as follows:
1. Incrementally load the test soil nail as shown in the following table:
521

SECTION 46

GROUND ANCHORS AND SOIL NAILS


Verification Test Loading Schedule
Hold time
Load increment
(minutes)
AL
Until stable
0.20T
12
0.40T
12
0.60T
12
0.80T
12
60
1.00Ta
1.25T
12
1.50Tb
10
AL
Until stable
NOTE: T = test load. AL = alignment load, 0.10T.
a
Creep test
b
Maximum test load

2. Apply each load increment in less than 1 minute and hold it for the length of time shown in the table
titled "Verification Test Loading Schedule."
3. Measure and record the applied test load and the nail head movement at each load increment.
4. During the creep test:
4.1. Hold the load constant for 60 minutes
4.2. Start the observation period for the load hold when the pump starts to apply the load increment
from 0.80T to 1.00T
4.3. Measure and record the nail head movement at 1, 2, 3, 4, 5, 6, 10, 20, 30, 40, 50, and 60
minutes
4.4. Plot a creep curve as a function of the logarithm of time, showing the nail head movement from
6 to 60 minutes
5. If the movement measured from 6 to 60 minutes is less than 0.08 inch:
5.1. Increase the load incrementally to 1.50T
5.2. Hold the load constant for 10 minutes
5.3. Start the observation period for the load hold when the pump starts to apply the load increment
from 1.25T to 1.50T
5.4. Measure and record the nail head movement at 1, 2, 3, 4, 5, 6, and 10 minutes
5.5. Reduce the load to the ending alignment load and record the residual movement
6. If the movement measured from 6 to 60 minutes is 0.08 inch or greater, reduce the load to the ending
alignment load.
46-3.01D(2)(b)(iii) Proof Test
Production soil nails must be represented by proof test soil nails within a given wall zone.
Perform proof testing in the Engineer's presence at the locations shown.
Test against a temporary yoke that bears directly on the shotcrete facing. Test loads transmitted through
the temporary yoke must not fracture the shotcrete or cause displacement or sloughing of the soil
surrounding the drilled hole.
Conduct the proof test as follows:
1. Incrementally load the test soil nail as shown in the following table:

522

SECTION 46

GROUND ANCHORS AND SOIL NAILS


Proof Test Loading Schedule
Hold time
Load increment
(minutes)
AL
Until stable
0.20T
12
0.40T
12
0.60T
12
0.80T
12
1.00Ta,b
10 or 60
12
1.25Tc
12
1.50Tc
AL
Until stable
NOTE: T = test load. AL = alignment load, 0.10T.
a
Creep test
b
Maximum test load for proof test
c
Loads for supplemental testing only

2. Apply each load increment in less than 1 minute and hold it for the length of time shown in the table
titled "Proof Test Loading Schedule."
3. Measure and record the applied test load and the nail head movement at each load increment.
4. During the creep test:
4.1. Hold the load constant for 10 minutes
4.2. Start the observation period for the load hold when the pump starts to apply the load increment
from 0.80T to 1.00T
4.3. Measure and record the nail head movement at 1, 2, 3, 4, 5, 6, and 10 minutes
5. If the movement measured from 1 to 10 minutes is greater than 0.08 inch:
5.1. Hold the load constant for an additional 50 minutes
5.2. Measure and record the nail head movement at 20, 30, 40, 50, and 60 minutes
5.3. Plot a creep curve as a function of the logarithm of time, showing the nail head movement from
6 to 60 minutes
6. Reduce the load to the ending alignment load and record the residual movement.
46-3.01D(2)(b)(iv) Supplemental Test
The Engineer selects up to 1/2 of proof test soil nails for supplemental testing. Only proof test soil nails
with a creep movement less than 0.08 inch measured from 1 to 10 minutes are considered for
supplemental testing.
Perform supplemental testing immediately following creep testing. Incrementally load the soil nails as
shown in the table titled "Proof Test Loading Schedule." Record the test load and nail head movement as
part of the test data.
46-3.01D(2)(c) Acceptance Criteria
A soil nail is acceptable if:
1. For verification tests:
1.1. Creep movement measured from 6 to 60 minutes is less than 0.08 inch.
1.2. Creep rate is linear or decreasing in time logarithmic scale from the 6- to the 60-minute
reading.
2. For proof tests, the creep movement complies with one of the following:
2.1. Creep movement measured from 1 to 10 minutes is no more than 0.08 inch.
2.2. Creep movement measured from 6 to 60 minutes is less than 0.08 inch and the creep rate is
linear or decreasing in time logarithmic scale from the 6- to the 60-minute reading.
3. Total measured movement at the maximum test load minus the measured residual movement at the
ending alignment load exceeds 80 percent of the theoretical elastic elongation of the unbonded
length.
4. Pullout failure does not occur.

523

SECTION 46

GROUND ANCHORS AND SOIL NAILS

Verification test soil nails that fail to comply with the acceptance criteria are rejected. Install and test
additional verification test soil nails until they comply with the acceptance criteria. Submit revised shop
drawings for additional verification test soil nails.
The Engineer determines the cause of failure for each rejected verification test soil nail.
If the Engineer determines that the installation methods are the cause of failure, the installation methods
are rejected. Show alternative installation methods on the revised shop drawings.
If the Engineer revises soil nail lengths or design pullout resistance values, any additional verification test
soil nails are change order work.
Log horizontal borings for additional verification test soil nails and submit a test boring report under
section 46-3.01C. The logging of horizontal test borings and the submittal of the test boring report is
change order work.
Production soil nails represented by proof test soil nails that fail to comply with the acceptance criteria,
except those represented by proof test soil nails selected for supplemental testing, are rejected. Submit
revised shop drawings for replacement nails that show alternative installation methods, revised
production soil nails, or a modified soil nail plan.
46-3.01D(3) Grout
Before using grout with fine aggregate, produce a test batch to verify the consistency. Produce and
deliver the test batch under conditions and in time periods similar to those expected during the grouting of
soil nails.
Place the test batch grout in an excavated hole or a container of suitable size to allow testing under
California Test 533. The test batch must comply with the specified nominal penetration. Dispose of the
grout after testing.
46-3.02 MATERIALS
46-3.02A General
Each production soil nail must be either a reinforcing bar encapsulated full length in a grouted corrugated
plastic sheathing or an epoxy-coated prefabricated reinforcing bar partially encapsulated in a grouted
corrugated plastic sheathing. The epoxy-coated prefabricated reinforcing bar must comply with section
52-2.03 and must have a minimum epoxy thickness of 12 mils.
Bar reinforcement for test soil nails is not required to be epoxy coated or encapsulated in grouted plastic
sheathing.
If you are ordered to lengthen verification or proof test soil nails, the lengthening of test soil nails is
change order work.
If you are ordered to lengthen production soil nails or install additional production soil nails, the
lengthening or addition of production soil nails is change order work.
46-3.02B Steel
Soil nail anchorage assemblies must comply with section 75-1.02, except galvanizing is not required for
nuts, washers, wedges, and bearing plates if they are fully encased in concrete, grout, or shotcrete.
Concrete anchors on bearing plates must comply with the specifications for stud connectors in section 55
1.02.
46-3.02C Bar Reinforcement
Bar reinforcement must comply with section 52.
Splice the bar reinforcement only where shown on the authorized shop drawings or at the end of a soil
nail that is ordered to be lengthened.
For bar reinforcement for production soil nails:
1. Grade 60 bar reinforcement must comply with ASTM A 615/A 615M or A 706/A 706M.
2. Grade 75 bar reinforcement must comply with ASTM A 615/A 615M.
524

SECTION 46

GROUND ANCHORS AND SOIL NAILS

3. Reinforcement must have at least a 6-inch length of thread on the anchorage end. Threading must be
either continuous spiral deformed ribbing provided by the bar deformations or cut into the bar. For
bars with cut threads, use the next larger bar size from that shown and use coarse threads.
4. Epoxy coating at the anchorage end of epoxy-coated bars may be omitted for no more than 6 inches.
5. Metal surfaces of assembled splices of epoxy-coated bars must be epoxy coated.
Choose the bar reinforcement size and grade for test soil nails. Test soil nail bars must not be smaller
than the production soil nails they represent.
Do not splice a test soil nail within the bonded length.
46-3.02D Sheathing
Corrugated plastic sheathing must be PVC or HDPE and must have a minimum thickness of 25 mils.
46-3.02E Grout
Grout must comply with section 50, except testing under California Test 541 is not required and the grout
is not required to pass through a screen with 0.07-inch maximum clear openings before being introduced
into the grout pump.
For drilled holes 6 inches or larger in diameter, you may add fine aggregate to the grout. Grout with fine
aggregate must:
1.
2.
3.
4.
5.

Contain at least 845 pounds of cement per cubic yard of grout


Use fine aggregate that complies with section 90-1.02C
Have a nominal penetration of at least 3-1/2 inches when measured under California Test 533
Have an air content of no more than 2 percent when measured under California Test 504
Not contain air-entraining admixtures

46-3.03 CONSTRUCTION
46-3.03A General
Determine the drilled hole diameter and installation method required to achieve the soil nail pullout
resistance values shown.
Do not drill for proof test or production soil nails in a wall zone until stability testing, if required, and
verification soil nail testing are complete in the wall zone and the test results are authorized.
46-3.03B Test Soil Nails
Construct verification and proof test soil nails using the same equipment, methods, nail inclination, and
drilled hole diameter as to be used for production soil nails.
Drill, install, and grout verification test soil nails in the Engineer's presence.
You may install verification test soil nails by any of the following means:
1.
2.
3.
4.
5.

Through the existing slope face.


Through the drill platform work bench.
Through the stabilization berm.
Through the stability test exposed face.
Into slot cuts made for the lift in which verification test soil nails are located. A slot cut must be no
larger than is needed to accommodate the drill and test setup equipment.

Install the verification test soil nails within the limits of each wall zone or within the limits of the excavated
stability test face. Space the verification test soil nails at least 10 feet apart.
Grout only the bonded length of verification and proof test soil nails.
Remove each verification and proof test soil nail to 6 inches behind the front face of the shotcrete after
testing is complete. Fill the void with grout.
If requested, extract the verification and proof test soil nails and fill the voids with grout.

525

SECTION 46

GROUND ANCHORS AND SOIL NAILS

46-3.03C Installation
Install and grout the soil nails in the same work shift that the holes are drilled.
Use centralizers to support the soil nail in the center of the drilled hole. Space the centralizers at 7.5 feet
maximum along the bar length and 1.5 feet from the bar ends. You may use plastic centralizers.
Verify and record the drilled hole length before grouting.
Grout the drilled hole after installing the soil nail. Inject the grout at the low end of the drilled hole. Fill the
drilled hole with a dense grout, free of voids and foreign material. Grout the hole in 1 continuous
operation. Do not use cold joints in the grout placement.
Fill any void remaining at the open end of the drilled hole of a production soil nail with shotcrete. Secure
the soil nail at the face of the shotcrete. The bearing plate must have full bearing on the shotcrete
surface.
Hand tighten the nut on the end of the production soil nail bar before the initial set of the shotcrete. Make
the nut wrench tight after the shotcrete has set for 24 hours, unless a shorter time is authorized.
After placing the grout, the soil nails must remain undisturbed for the minimum cure time shown on the
authorized shop drawings.
46-3.04 PAYMENT
Soil nails are measured along the bar centerline from the back face of shotcrete to the tip end shown or
ordered.
Verification and proof test soil nails are paid for as soil nails.
For proof test soil nails that fail supplemental testing, the Department deducts $1.00 per linear foot of
proof test soil nail.

526

47 EARTH RETAINING SYSTEMS

47-1 GENERAL

47-1.01 GENERAL
Section 47 includes specifications for constructing earth retaining systems.
47-2 MECHANICALLY STABILIZED EMBANKMENT
47-2.01 General
47-2.01A Summary
Section 47-2 includes specifications for constructing mechanically stabilized embankments.
Concrete panels must comply with section 51.
Reinforcement must comply with section 52.
Geogrid reinforcement must comply with section 88.
Earthwork must comply with section 19.
47-2.01B Definitions
Reserved
47-2.01C Submittals
Submit results from proposed button-head wire coupler test.
Submit results from each production button-head wire coupler test.
47-2.01D Quality Control and Assurance
Perform tension and slip tests on the proposed button-head wire soil reinforcement and coupler
connection. Testing must be performed by an authorized laboratory. Test 6 connection test samples. Test
samples must consist of 2 button-head wires each 24 inches long connected by a swaged coupler.
Coupler test samples must comply with minimum tensile specifications for W11 and W20 steel wire in
ASTM A 82/A 82M. Total wire slip must be at most 3/16 inch when tested under the specifications for
tension testing of round wire test samples in ASTM A 370. Test samples using D-11 and D-20 deformed
steel wire must comply with minimum tensile specifications in ASTM A 496/A 496M.
If any test samples fail, revise the connection and retest. Do not start face panel installation until tension
and slip test results are accepted.
Perform tension and slip testing on production button-head wire and coupler connections during wall
construction. Test 4 connection test samples for each lot of 500 mat wire connections used in the work. If
2 or more test samples fail, the entire represented lot is rejected. If 1 test sample fails to comply with
specified criteria, test an additional 4 test samples. If any of these additional samples fail, the entire
represented lot is rejected.
47-2.02 Materials
47-2.02A General
Concrete leveling pads must be minor concrete.
Galvanize soil reinforcement, connecting elements, and other steel components in contact with the earth
under section 75-1.05.
Threaded ends of inspection wires for metallic soil reinforcement may be formed before or after
galvanizing. Coat the final 4 inches of the wire with 2 applications of organic zinc-rich primer. Encase the
threaded end with a waterproof vinyl enclosure secured with a nylon tie. If the threaded end is galvanized
after threading, clean the threads before painting.
Corrugated steel pipe must comply with section 66.
Perforated steel pipe underdrains and underdrain outlets and risers must comply with section 68-2.

527

SECTION 47

EARTH RETAINING SYSTEMS

Rock for rock slope protection at drain pipe outlets must be no. 3 backing and must comply with section
72-2.
Filter fabric must be Class A. Adhesive for bonding filter fabric to concrete panels must be commercial
grade.
Resin bonded cork for horizontal joints must comply with ASTM D 1752, Type II, with a compressive load
of at least 100 psi.
Pipe pins must comply with ASTM A 53/A 53M except the zinc coating of actual surface must average at
least 2.0 oz/sq ft and no individual specimen may be less than 1.8 oz/sq ft.
47-2.02B Face Panels
Concrete panels in freeze-thaw areas must comply with section 90-1.02I and contain at least 675 pounds
of cementitious material per cubic yard.
If architectural treatment is not required, finish exposed surfaces of concrete members under the
specifications for Class 1 surface finish in section 51-1.03F(3).
47-2.02C Structure Backfill
Structure backfill must:
1. Be free of organic material and substantially free of shale and other soft material of poor durability
2. Not contain slag aggregate or recycled materials such as:
2.1. Glass
2.2. Shredded tires
2.3. Portland cement concrete rubble
2.4. Asphaltic concrete rubble including asphaltic dust, sand, rock, grindings, slabs, and boulders
2.5. Other unsuitable material as determined by the Engineer
For metallic soil reinforcement, structure backfill must comply with the requirements shown in the
following tables:
Sieve size
6"
3"
No. 30
No. 200

Gradation Requirements
Percentage passing
100
78-80
0-60
0-15

California Test
202
202
202
202

Property Requirements
Test
Requirement
California Test
Sand equivalent
12 minimum
217
Plasticity index
6 maximum
204
Minimum resistivity
2000 ohm-cm
643
Chlorides
< 250 ppm
422
Sulfates
< 500 ppm
417
pH
5.5 to 10.0
643
NOTE : If 12 percent or less passes the no. 200 sieve and
50 percent or less passes the no. 4 sieve, the Sand
Equivalent and Plasticity Index requirements do not apply.
For geosynthetic soil reinforcement, structure backfill must comply with the requirements shown in the
following tables:

528

SECTION 47

EARTH RETAINING SYSTEMS


Sieve size
2"
No. 4
No. 40
No. 200

Test
Sand equivalent
Plasticity index
Durability Index
pH

Gradation Requirements
Percentage passing
100
50-80
0-30
0-15

California Test
202
202
202
202

Property Requirements
Requirement
California Test
30 minimum
217
6 maximum
204
35 minimum
229
4.5 to 9.0
643

47-2.02D Permeable Material


Permeable material must be Class 1, Type B, complying with section 68-2.02F.
Permeable material for structures with metallic soil reinforcement must comply with the requirements
shown in the following table:
Property Requirements
Test
Requirement
Minimum resistivity
2,000 ohm-cm
Chlorides
< 250 ppm
Sulfates
< 500 ppm
pH
5.5 to 10.0

California Test
643
422
417
643

Permeable material for structures with geosynthetic soil reinforcement must comply with the requirements
shown in the following table:
Test
pH

Property Requirements
Requirement
California Test
4.5 to 9.0
643

47-2.02E Soil Reinforcement


W11 and W20 steel wire must comply with ASTM A 82/A 82M. Welded wire reinforcement must comply
with ASTM A 185/A 185M. You may substitute D11 deformed steel wire for W11 steel wire and D20
deformed steel wire for W20 steel wire. Welded wire reinforcement using deformed steel wire must
comply with ASTM A 496/A 496M and A 497/A 497M.
For button-headed wires:
1.
2.
3.
4.

Buttons must be cold formed symmetrically about the axes of the wires
Buttons must develop the minimum guaranteed ultimate tensile strength of the wire
Do not use a cold forming process that causes indentations in the wire
Button heads must not contain wide open splits, more than 2 splits per head, or splits nonparallel with
the axis of the wire

Couplers at wire reinforcement connections must be seamless steel sleeves applied over the button-head
wires. Swage couplers with a hydraulic press. Couplers must develop the wire minimum tensile strength
with a total slip of at most 3/16 inch.
Splice welded wire reinforcement along its length with mechanical couplers that develop the minimum
tensile strength of the wire.
Identification, storage, and handling of geogrid reinforcement must comply with ASTM D 4873 and any
alternative system details. Protect the geogrid from chemicals, flames, welding sparks, and temperatures
529

SECTION 47

EARTH RETAINING SYSTEMS

less than 20 degrees F or greater than 140 degrees F. Do not allow foreign materials to come into contact
with or become affixed to the geogrid.
47-2.03 Construction
47-2.03A General
Water for earthwork or for dust control within 500 feet of structures with metallic soil reinforcement must
comply with section 90-1.02D.
Do not damage the unthreaded portion of the galvanized inspection wire.
47-2.03B Earthwork
47-2.03B(1) General
Grade foundations level for a width equal to the length of soil reinforcement elements plus 1 foot or as
shown. Compact foundation material to a relative compaction of at least 95 percent. Start wall
construction activities after the Engineer accepts the compacted foundation area.
If ordered, remove unsuitable material. This work is change order work.
Place structure backfill simultaneously with erection of facing panels. Place and compact material without
distorting soil reinforcement or displacing facing panels. Place structure backfill at the front of the wall
before backfilling more than 15 feet above the bottom of the lowermost face element.
If a mechanically stabilized embankment with soil reinforcement is to be constructed on an embankment,
the embankment must attain at least 95 percent relative compaction within the limits established by
inclined planes sloping 1.5:1 (horizontal:vertical) from lines 1 foot outside the bottom limits of the
mechanically stabilized embankment, including any permeable material.
Start placing and compacting structure backfill 1 foot from the back face of wall panels. Progress toward
the free end of the soil reinforcement. Operate compaction equipment parallel to the wall facing. Place
and compact the remaining width of backfill behind wall panels after soil reinforcement is covered to a
depth of 6 inches.
Do not use sheepsfoot or grid-type rollers within the limits of soil reinforcement. Use hand-held or hand
guided compacting equipment within 3 feet of facing panels.
Construct the structure backfill at each level of soil reinforcement to a plane 2 inches above the elevation
of the soil reinforcement connection, starting 3 feet from the back of the face panel and extending for at
least the remaining length of soil reinforcement. Complete this grading before placing the next layer of soil
reinforcement.
Place permeable material and filter fabric when placing structure backfill. Place permeable material in
layers less than 2 feet thick. Compaction of permeable material for the drainage system outside the limits
of soil reinforcement is not required. Do not operate equipment directly on the permeable material or filter
fabric. If a sloped layer of permeable material is placed to facilitate the work or to satisfy safety
considerations, the vertical limits of the permeable material must remain unchanged and the thickness of
the layer of permeable material is measured normal to the slope.
Grade backfill to drain away from the wall face at the end of each work shift. Use berms or ditches to
direct runoff away from the wall site. Do not allow surface runoff from adjacent areas to enter the
construction site.
47-2.03B(2) Soil Reinforcement
Place geogrid soil reinforcement in full-length sections.
Cover soil reinforcement with structure backfill during the same work shift that it is placed.
Tension soil reinforcement in the direction perpendicular to the wall face. Use sufficient force to remove
slack in the connection and the soil reinforcement. Secure soil reinforcement in place before and during
compaction.
Do not operate construction equipment directly on soil reinforcement. Maintain a layer of structure backfill
at least 6 inches thick between soil reinforcement and any construction equipment.
530

SECTION 47

EARTH RETAINING SYSTEMS

Place structure backfill over geogrid soil reinforcement in lifts of at most 6 inches if using hand-operated
compaction equipment and 8 inches if using heavy compaction equipment.
47-2.03B(3) Face Panels
Vertical and horizontal panel alignment offset must not exceed 3/4 inch when measured along a 10-foot
straightedge. The offset in any panel joint must not exceed 3/4 inch.
47-2.03C Filter Fabric
Immediately before placing filter fabric, the subgrade to receive filter fabric must be free of loose or
extraneous material and sharp objects that may damage the filter fabric.
Concrete panel surfaces to receive filter fabric must be dry and thoroughly cleaned.
Handle and place filter fabric under the manufacturer's instructions. Stretch, align, and place fabric
without wrinkling.
Adjacent borders of filter fabric must be stitched or overlapped. Overlap rolls 12 to 18 inches. Place the
preceding roll over the following roll in the direction the material is being spread. Stitch fabric using yarn
of a contrasting color. Yarn size and composition must be as recommended by the filter fabric
manufacturer. Use 5 to 7 stitches per inch of seam.
Repair damaged filter fabric by placing a piece of filter fabric large enough to cover the damaged area
and provide at least a 12-inch overlap.
Maintain at least 6 inches of permeable material between filter fabric and equipment during spreading of
permeable material. Where structure backfill is to be placed on filter fabric, maintain at least 18 inches of
structure backfill material between filter fabric and equipment during placement. Do not operate
equipment or vehicles directly on filter fabric.
47-2.03D Concrete
Place concrete for leveling pads at least 24 hours before erecting face panels.
After placing backfill to 2 feet above inspection elements, dry pack voids in face panels with mortar under
section 51-1.03E(2) except the proportion of cementitious material to sand must be such that the mortar
achieves a 28 day compressive strength of 1,000 to 1,500 psi.
47-2.04 Payment
The vertical height of each section is the difference in elevation on the outer face from the bottom of the
lowermost face element to the top of wall profile.
47-3 CRIB WALLS
47-3.01 General
47-3.01A General
Section 47-3 includes specifications for constructing crib walls.
47-3.01B Materials
Not Used
47-3.01C Construction
Place crib walls to the lines and grades established by the Engineer. The foundation must be accepted by
the Engineer before any crib members are placed.
47-3.01D Payment
Not Used
47-3.02 Reinforced Concrete Crib Wall
47-3.02A General
Section 47-3.02 includes specifications for constructing reinforced concrete crib walls.
Reinforced concrete crib walls must comply with section 51.
531

SECTION 47

EARTH RETAINING SYSTEMS

Concrete crib walls consist of a series of rectangular cells composed of interlocking, precast, reinforced
concrete headers, stretchers, and blocks.
47-3.02B Materials
47-3.02B(1) General
Pads shown to be placed between bearing surfaces must either be (1) neoprene complying with the
specifications for strip waterstops in section 51-2.05 or (2) commercial quality no. 30 asphalt felt. The
protective board is not required for neoprene pads.
47-3.02B(2) Crib Members
47-3.02B(2)(a) General
All members may be manufactured to dimensions 1/8 inch greater in thickness than shown. The

thickness of the lowest step must not be less than the dimension shown.

Stretchers may be manufactured 1/2 inch less in length than shown.

When an opening is shown in the face of the wall, special length stretchers and additional headers may

be necessary.

For nontangent wall alignments, special length stretchers may be required.

For nontangent wall alignments and at locations where filler blocks are required, special length front face

closure members may be required.

47-3.02B(2)(b) Reinforcement
Reinforcing steel must comply with ASTM A 706/A 706M.
Reinforcing wire must comply with ASTM A 496/A 496M.
For hoops or stirrups use either (1) reinforcing wire or (2) deformed steel welded wire reinforcement. The
size must be equivalent to the reinforcing steel shown. Deformed steel welded wire reinforcement must
comply with ASTM A 497/A 497M.
47-3.02B(2)(c) Concrete
Concrete test cylinders must comply with section 90-1.01D(5), except when the penetration of fresh
concrete is less than 1 inch, the concrete in the test mold must be consolidated by vibrating the mold
equivalent to the consolidating effort being used to consolidate the concrete in the members.
Cure crib members under section 51-4.02C.
When removed from forms, the members must present a true surface of even texture, free from
honeycombs and voids larger than 1 inch in diameter and 5/16 inch in depth. Clean and fill other pockets
with mortar under sections 51-1.02F and 51-1.03E(2).
External vibration resulting in adequate consolidation may be used.
If the Engineer determines that rock pockets are of the extent or character as to affect the strength of the
member or to endanger the life of the steel reinforcement, replace the member.
Finish concrete-to-concrete bearing surfaces to a smooth plane. Section 51-1.03F does not apply to
concrete crib members.
47-3.02C Construction
The gap between bearing surfaces must not exceed 1/8 inch.
Where a gap of 1/16 inch to 1/8 inch exists or where shown, place a 1/16-inch pad of asphalt felt or sheet
neoprene between the bearing surfaces.
47-3.02D Payment
The area of reinforced concrete crib wall is measured on the batter at the outer face for the height from
the bottom of the bottom stretcher to the top of the top stretcher and for a length measured from end to
end of each section of wall.
532

SECTION 47

EARTH RETAINING SYSTEMS

47-3.03 Steel Crib Wall


47-3.03A General
47-3.03A(1) Summary
Section 47-3.03 includes specifications for constructing steel crib walls.

Steel crib walls consist of a series of rectangular cells composed of steel members.

47-3.03A(2) Definitions
Reserved
47-3.03A(3) Submittals
Submit a certificate of compliance from the manufacturer for the steel products.
47-3.03A(4) Quality Control and Assurance
Reserved
47-3.03B Materials
47-3.03B(1) General
Fabricate crib members with galvanized flat steel sheets complying with AASHTO M 218.

The Engineer may request copies of mill test reports for each heat and thickness.

The nominal thickness of galvanized sheets for crib members must be equal to or greater than that

shown.

Fabricate crib members such that:

1.
2.
3.
4.

Members of the same nominal size are interchangeable.


Bolt holes are not more than 1/8 inch larger than the bolt diameter.
Minimum forming radius of 1 inch is maintained.
Fabrication is performed without damage to the galvanizing.

Drilling, punching, or drifting bolt holes to correct defects in fabrication is not allowed.

Replace any member that is twisted, bent, or that has improperly located holes.

Load, haul, and handle galvanized material without damaging the galvanizing. Repair abraded or

damaged galvanized surfaces under section 75-1.05.

For nontangent wall alignments, special length stringers may be required.

47-3.03B(2) Bolts and Nuts


Comply with ASTM A 307, Grade A. Use either of the following:
1. Heavy hexagon heads and nuts without washers
2. Hexagon heads and nuts with plate washers under the heads and nuts
Washers must be round 1/8-inch-minimum-thickness steel plate, including coating. Holes in washers must

not be more than 1/16 inch larger than the diameter of the bolt.

Galvanize bolts, nuts, and washers under section 75.

Torque all bolts from 25 to 75 ft-lb.

47-3.03C Payment
The area of steel crib wall will be measured on the batter at the outer face for the height from the bottom
of the base plate to the top stringer and for a length measured from end to end of each section of wall.

533

SECTION 47

EARTH RETAINING SYSTEMS

47-4 RESERVED
47-5 TYPE 6 RETAINING WALLS

47-5.01 General
Section 47-5 includes specifications for constructing Type 6 retaining walls.

Type 6 retaining walls consist of concrete footings with either reinforced concrete stems or reinforced

concrete masonry unit stems.

Reinforced concrete footings and stems must comply with section 51.

CMU stems must comply with section 58-2.

47-5.02 Materials
Hollow CMUs must comply with ASTM C 90, normal weight, and must be of uniform color and size.

Caulking for sealing expansion joints must be a nonsag polysulfide or polyurethane type complying with

ASTM C 920.

Grout must comply with section 58-2.02D and contain at least 590 lb/cu yd of cementitious material.

47-5.03 Construction
You may construct wall stems of reinforced concrete or reinforced CMUs. Use only 1 stem type for each

wall.

Mix mortar fresh as necessary.

CMU construction must be true and plumb.

Provide recesses in the units for horizontal reinforcement.

Provide cleanout openings at the bottoms of cells where the wall height is over 4 feet. Seal cleanouts

after inspection and before filling cells with grout.

Lay units with full mortar coverage of the face in both vertical and horizontal joints except at weep holes.

Shove vertical joints tight. Exposed joints must be concave and tooled smooth.

Fill cells in hollow unit masonry with grout. Consolidate grout while pouring by puddling or vibrating. Place

the top lift of grout approximately 1 inch below the top of units. Place a mortar cap above the top lift.

Do not place backfill against the back of Type 6 retaining walls until grout strength is 1,500 psi or the

grout has been in place for 28 days.

47-5.04 Payment
Type 6 retaining walls are measured by the square foot of completed wall stem including cap, measured
along the horizontal length and the vertical height from top of footing to top of wall.
47-6 ALTERNATIVE EARTH RETAINING SYSTEMS
47-6.01 General
47-6.01A Summary
Section 47-6 includes specifications for constructing alternative earth retaining systems.

You may use an alternative earth retaining system when specified.

Use only 1 type of system at any one location.

47-6.01B Definitions
Reserved
47-6.01C Submittals
Submit shop drawings for the alternative system to OSD, Documents Unit. Submit 5 sets for initial review.
Submit from 6 to 12 sets of final shop drawings as requested for final authorization. Include the following:
1. All information required for construction of the system at each location
534

SECTION 47

EARTH RETAINING SYSTEMS

2. Existing ground line at the wall face


3. Design parameters, material notes, and wall construction procedures
Verify existing ground elevations before submitting drawings.
Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil

engineer in the State.

Allow 30 days for the Department's review.

For as-built drawings common to more than 1 structure, submit the as-built drawings for each structure.

Submit certificates of compliance for the alternative system stating the supplied material complies with the

index criteria for the system at the time of prequalification.

47-6.01D Quality Control And Assurance


The alternative systems specified are taken from the Authorized Material List. Only systems having
characteristics suitable for this project are specified. Some systems may be proprietary.
Alternative systems are selected using data furnished by suppliers or manufacturers of each system.
Authorization of additional systems is contingent on the system complying with the prequalification criteria
available on the Authorized Material List web site.
A qualified representative of the alternative system manufacturer must be present during erection and
backfill of the first 10 vertical feet of the entire length of the wall. The representative must be available
during any remaining installations. The representative must not be your employee.
47-6.02 Materials
Reserved
47-6.03 Construction
Construct the structure to the lines and grades shown. The structure must comply with the authorized
system details. Check vertical and horizontal alignment at each course during erection. Include a
drainage system where shown.
Where shown, construct the alternative system to accommodate (1) wall-mounted lighting and drainpipes
and (2) panels for future drainage inlets.
The top of wall profile must conform to the profile shown. The bottom of wall elevations must be at or
below elevations shown. Use a minimum height and length of wall adequate for the specified loading and
site conditions.
The length of soil reinforcement for any system must not be less than that shown.
The coping lip or barrier slab lip must cover the top of face panels at least 7 inches.
Place the top level of soil reinforcement:
1. Parallel to the top of the concrete panel
2. At least 3 inches below the bottom of either the barrier slab lip or concrete gutter behind the coping
3. At least 5 inches below the top edge of the concrete panel
47-6.04 Payment
Reserved

535

48 TEMPORARY STRUCTURES

48-1 GENERAL

48-1.01 GENERAL
Section 48 includes specifications for constructing temporary structures.
48-2 FALSEWORK
48-2.01 GENERAL
48-2.01A Summary
Section 48-2 includes specifications for constructing falsework.
You must design, construct, and maintain falsework that:
1.
2.
3.
4.

Is safe and adequate


Provides the necessary rigidity
Supports the loads imposed
Produces a finished structure that conforms to the lines and grades shown

48-2.01B Definitions
previously welded splice: Splice made in a falsework member before the member is shipped to the job
site.
48-2.01C Submittals
48-2.01C(1) General
Submit a certificate of compliance for each delivery of structural composite lumber used in falsework.
Submit a letter of certification that certifies all components of the manufactured assemblies are used in
compliance with the manufacturer's recommendations.
If requested (1) submit manufacturer's data for manufactured assemblies to verify manufacturer's
recommendations or (2) perform tests demonstrating adequacy of the proposed assemblies.
Submit field acceptance criteria for falsework piles with a calculated nominal resistance greater than 200
tons. Base acceptance criteria on a wave equation analysis performed on dynamic monitoring of
falsework pile driving. Analyses must be signed by an engineer who is registered as a civil engineer in the
State. Submit acceptance criteria before falsework erection is complete.
Submit a letter of certification for all falsework members with field welded splices. The letter must certify
that all welding and NDT, including visual inspection, comply with the Contract and the welding standard
shown on the shop drawings. The letter must be signed by an engineer who is registered as a civil
engineer in the State. Submit the letter before placing any concrete on the falsework being certified.
Submit a welding certification for falsework members with previously welded splices. The certification
must:
1.
2.
3.
4.

Itemize the testing and inspection methods used


Include tracking and identifying documents for previously welded members
Be signed by an engineer who is registered as a civil engineer in the State
Be submitted before erecting the members

48-2.01C(2) Shop Drawings


Submit shop drawings with supporting calculations for falsework.
Shop drawings and calculations must be signed by an engineer who is registered as a civil engineer in
the State if any of the following conditions apply:
1. Height of any portion of the falsework measured from the ground line to the soffit of the
superstructure is more than 14 feet
2. Any individual falsework clear span is more than 16 feet
3. Provisions for vehicular, pedestrian, or railroad traffic through the falsework are made
537

SECTION 48

TEMPORARY STRUCTURES

Shop drawings and calculations for falsework piles with a calculated loading capacity greater than 100
tons must be designed by an engineer who is registered as a civil or geotechnical engineer in the State.
Submit 6 sets of falsework drawings and 2 sets of design calculations. Include the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Details of erection and removal activities.


Methods and sequences of erection and removal, including equipment.
Details for the stability of falsework during all stages of erection and removal activities.
Superstructure placing diagram showing concrete placing sequence and construction joint locations.
If a schedule for placing concrete is shown, no deviation is allowed.
Assumed soil bearing values for falsework footings.
Maximum horizontal distance falsework piles may be pulled for placement under caps.
Maximum deviation of falsework piles from vertical.
Anticipated total falsework and form settlements, including footing settlement and joint take-up.
Grade (E-value), species, and type of any structural composite lumber. Include manufacturer's
tabulated working stress values for the lumber.
Design calculations including stresses and deflections in load carrying members.
Provisions for complying with temporary bracing requirements.
Welding standard used for welded members.

Submit separate drawings and calculations for each single bridge or portion of bridge.
For multi-frame bridges, submit a separate submittal for each frame.
If you submit multiple submittals at the same time or additional submittals before review of a previous
submittal is complete:
1. You must designate a review sequence for submittals
2. Review time for any submittal is 20 days plus 15 days for each submittal of higher priority still under
review
You may revise authorized falsework shop drawings if there is sufficient time for the Department's review
before construction starts on the revised section. The additional time will not be more than that originally
allowed.
For falsework over railways, authorization of falsework drawings is contingent upon the drawings being
satisfactory to the railway company involved.
The licensed engineer signing the falsework drawings must certify that the falsework is constructed as
shown in the authorized shop drawings before concrete is placed. The certification must include any
necessary testing to verify the ability of the falsework members to sustain the stresses required by the
falsework design. The licensed engineer may designate a representative to perform this certification as
follows:
1. Where falsework contains openings for railroads, vehicular traffic, or pedestrians, the designated
representative must (1) have at least 3 years of combined experience in falsework design or
supervising falsework construction and (2) be registered as a civil engineer in the State
2. For other falsework, the designated representative must have at least 3 years of combined
experience in falsework design or supervising falsework construction
3. The Engineer may request you certify the experience of the designated representative and provide
supporting documentation demonstrating the required experience
48-2.01D Quality Control and Assurance
48-2.01D(1) General
Reserved
48-2.01D(2) Welding and Nondestructive Testing
Welding must comply with AWS D1.1 or other recognized welding standard except (1) for previously
welded splices and (2) if fillet welds are used where load demands are 1,000 lb or less per inch for each
1/8 inch of fillet weld.

538

SECTION 48

TEMPORARY STRUCTURES

Perform NDT on splices made by field welding at the job site. You may use UT or RT. Each field weld and
any repair made to a previously welded splice must be tested. You must select locations for testing. The
length of a splice weld where NDT is to be performed must be a cumulative weld length equal to 25
percent of the original splice weld length. The cover pass must be ground smooth at test locations.
Acceptance criteria must comply with the specifications for cyclically loaded nontubular connections
subject to tensile stress in clause 6 of AWS D1.1. If repairs are required in a portion of the weld, perform
additional NDT on the repaired sections. The NDT method chosen must be used for an entire splice
evaluation, including any repairs.
For previously welded splices, you must determine and perform all necessary testing and inspection
required to certify the ability of the falsework members to sustain the design stresses.
48-2.01D(3) Design Criteria
48-2.01D(3)(a) General
Design falsework to resist the sum of the dead and live vertical loads and an assumed horizontal load.
Anticipated falsework settlement must not exceed 1 inch.
Design footings to carry the imposed loads without exceeding estimated soil bearing values or anticipated
settlements.
Falsework spans for T-beam girders must not exceed 14 feet plus 8.5 times the T-beam girder depth.
Design falsework supporting deck slabs and overhangs on girder bridges so there is no differential
settlement between the girders and the deck forms during deck concrete placement.
For individual steel towers with maximum leg loads exceeding 30 kips, design foundations to provide
uniform settlement under all legs of each tower.
Design support systems for form panels supporting concrete deck slabs and overhangs on girder bridges
as falsework.
Temporary bracing must be designed to withstand all imposed loads during erection, construction and
removal of any falsework. Wind loads must be included in the design of the bracing or methods.
48-2.01D(3)(b) Loads
The design load for falsework must consist of dead and live vertical loads, and an assumed horizontal
load. The minimum total design load for any falsework is 100 psf, including members that support
walkways for the combined live and dead load.
Dead loads must include the weight of concrete, reinforcing steel, forms, and falsework. Loads due to
concrete, reinforcing steel, and forms must be assumed to be at least:
1. 160 pcf for normal concrete
2. 130 pcf for lightweight concrete
Live loads must include:
1. Actual weight of any equipment to be supported by the falsework applied as concentrated loads at the
points of contact
2. Uniform load of at least 20 psf applied over the area supported by the falsework
3. Load of 75 lb/ft applied at the outside edge of deck overhangs
The assumed horizontal load the falsework bracing system must resist must be the sum of the actual
horizontal loads due to equipment, construction sequence or other causes, and a wind loading. The
horizontal load in any direction must be at least 2 percent of the total dead load.
If the concrete is to be prestressed, design the falsework to support any increased or readjusted loads
caused by the prestressing forces.
Design the falsework with sufficient rigidity to resist the assumed horizontal load without considering the
concrete load.
539

SECTION 48

TEMPORARY STRUCTURES

For heavy-duty steel shoring or steel pipe column falsework with a vertical load capacity greater than 30
kips per leg or column, the minimum horizontal wind loading must equal the sum of the products of the
wind impact area, shape factor, and wind pressure value for each height zone. The wind impact area is
the total projected area of all elements in the tower face or falsework bent normal to the direction of the
applied wind. Use a shape factor of 2.2 for heavy-duty steel shoring and 1.0 for pipe column falsework.
Use wind pressure values shown in the following table:
Height zone
(feet above ground)
030
3050
50100
Over 100

Wind pressure value


Shores or columns
At other
adjacent to traffic
locations
(psf)
(psf)
20
15
25
20
30
25
35
30

For all other falsework, the minimum horizontal wind loading must equal the sum of the products of the
wind impact area and the wind pressure value for each height zone. The wind impact area is the gross
projected area of the falsework and any unrestrained portion of the permanent structure except for the
areas between falsework bents or towers where diagonal bracing is not used. Use the wind pressure
values shown in the following table:
Wind pressure value
Height zone For members over and bents
At other
(feet above
adjacent to traffic opening
locations
ground)
(psf)
(psf)
030
2.0 Q
1.5 Q
3050
2.5 Q
2.0 Q
50100
3.0 Q
2.5 Q
Over 100
3.5 Q
3.0 Q
NOTES:
Q = 1 + 0.2W, but not more than 10
W=width of the falsework system in feet, measured in
the direction of the wind force
Design falsework to support placement of the entire superstructure cross-section, except railing, at one
time. You may consider girder stems and connected bottom slabs self-supporting between falsework
posts if:
1. They are placed more than 5 days before the top slab
2. The distance between falsework posts is at most 4 times the depth of the portion of the girder stem
placed in the 1st pour
Falsework for box girder structures with internal falsework bracing systems that use flexible members
capable of withstanding only tensile forces must be designed to include (1) the vertical effects caused by
elongation of the flexible member and (2) the design horizontal load combined with the dead and live
loads imposed by concrete placement for girder stems and connected bottom slabs. This requirement
does not apply to falsework composed of individual steel towers that use flexible members capable of
withstanding only tensile forces to resist overturning.
48-2.01D(3)(c) Stresses, Loadings, and Deflections
48-2.01D(3)(c)(i) General
Maximum allowable stresses and loadings specified in section 48-2.01D(3)(c) are based on the use of
undamaged high-quality materials. Reduce stresses and loadings for materials of lesser quality.
48-2.01D(3)(c)(ii) Timber
Design timber connections under the Department's Falsework Manual.
540

SECTION 48

TEMPORARY STRUCTURES

The maximum allowable stresses, loadings, and deflections for timber are shown in the following table:
Property
Compression perpendicular
to the grain
Compression parallel to the
grain
Flexural stress

Requirement
450 psi
480,000/(L/d) psi;
1,600 psi maximum
1,800 psi; 1,500 psi maximum for
members with a nominal depth of
8 inches or less.
140 psi
1,200 psi
1/240 of span lengtha

Horizontal shear
Axial tension
Deflection due to concrete
loading only
Modulus of elasticity (E)
1.6 x 106 psi
Timber piles
45 tons
NOTES:
L = unsupported length, inches
d = least dimension of a square or rectangular column or the
width of a square of equivalent cross-sectional area for round
columns, inches
a
Do not include deflection compensated for in camber strips
48-2.01D(3)(c)(iii) Steel
Except for flexural compressive stresses, design stresses for identified grades of steel must not exceed
stresses specified in the AISC Steel Manual.
Except for flexural compressive stresses, design stresses for unidentified steel must not exceed those
specified for steel complying with ASTM A 36/A 36M in the AISC Steel Manual or the following:
Property
Requirement
Tension, axial and flexural
22,000 psi
16,000 - 0.38(L/r)2 psia
Compression, axial
Shear on gross section of web
14,500 psi
of rolled shapes
Web yielding for rolled shapes
27,000 psi
30 x 106 psi
Modulus of elasticity (E)
NOTES:
L = unsupported length, inches
r = radius of gyration of the member, inches
a
L/r must not exceed 120
Design stresses and deflections for all grades of steel must not exceed the following:

541

SECTION 48

TEMPORARY STRUCTURES

Property
Requirement
Compression, flexural
12,000,000/[(L x d)/(b x t)] psia
Deflection due to concrete
1/240 of the spanb
loading only
Modulus of elasticity (E)
30 x 106 psi
NOTES:
L = unsupported length, inches
d = least dimension of rectangular columns or the width of a
square of equivalent cross-sectional area for round columns, or
the depth of beams, inches
b = width of the compression flange, inches
t = thickness of the compression flange, inches
Fy = specified minimum yield stress in psi
a
Not to exceed (1) 22,000 psi for unidentified steel, (2) 22,000 psi
for steel complying with ASTM A 36/A 36M, or (3) 0.6Fy for other
identified steel
b
Do not include deflection compensated for in camber strips

48-2.01D(3)(c)(iv) Manufactured Assemblies


Do not exceed the manufacturer's recommendations for loadings and deflections on jacks, brackets,
columns, joists, and other manufactured devices, except the dead load deflection of joists at locations
other than under deck slabs between girders must not exceed 1/240 of their spans.
48-2.01D(3)(d) Special Locations
Design and construct falsework over or adjacent to roadways or railroads that are open to traffic such that
the falsework is stable if subjected to impact by vehicles.
Falsework posts at the following locations are considered adjacent to roadways or railroads:
1. Posts supporting members that cross over a roadway or railroad
2. Posts located in the row of falsework posts nearest to the roadway or railroad and the horizontal
distance from the traffic side of the falsework to the edge of pavement or to a point 10 feet from the
centerline of track is less than the total height of the falsework and forms
The falsework design at the above locations must comply with section 48-2.01D(3) and the following
requirements:
1. The vertical load used for the design of falsework posts and towers that support the portion of the
falsework over openings must be the greater of:
1.1 150 percent of the design load calculated under section 48-2.01D(3)(b), not including any
increased or readjusted loads caused by prestressing forces
1.2 Increased or readjusted loads caused by prestressing forces
2. Falsework posts must be steel with a minimum section modulus about each axis of 9.5 cubic inches
or sound timbers with a minimum section modulus about each axis of 250 cubic inches.
3. Each falsework post must be mechanically connected to the support footing at its base or laterally
restrained to withstand a force of at least 2,000 lb applied at the base of the post in any direction
except toward the roadway or railroad track. Posts must be mechanically connected to the falsework
cap or stringer. The mechanical connection must resist a load in any horizontal direction of at least
1,000 lb.
4. Mechanically connect (1) exterior falsework stringers, (2) stringers adjacent to the ends of
discontinuous caps, (3) stringers over points of minimum vertical clearance, and (4) every 5th
remaining stringer to the falsework cap or framing. For falsework over railroads, mechanically connect
all stringers to caps. Mechanical connections must resist at least a 500-lb load in any direction,
including uplift on the stringer. Install connections before traffic passes under the span.
5. Connect timber bracing to falsework using at least 5/8-inch-diameter bolts or coil rod with a root
diameter equal to that of the shank of a 5/8-inch-diameter bolt.
6. Falsework member clearances must be at least those shown in the following table:

542

SECTION 48

TEMPORARY STRUCTURES

Falsework
member
Footings
Piles
Other members

Clearances
To railing members, barriers,
and anchored temporary railings
0'-3"
1'-0"
2'-0"

To unanchored
temporary railings
2'-0"
2'-9"
2'-9"

7. Falsework bents within 20 feet of the centerline of a railway track must be sheathed solid from 3 to 17
feet above the track on the side facing the track. Sheathing must be plywood at least 5/8 inch thick or
lumber at least 3/4 inch thick. Brace these bents to resist the required assumed horizontal load or
5,000 lb, whichever is larger.
8. Provide clear openings through falsework as described.
48-2.02 MATERIALS
Not Used
48-2.03 CONSTRUCTION
48-2.03A General
Install temporary bracing as necessary to withstand all imposed loads during erection, construction, and
removal of any falsework.
The materials used in the falsework construction must be of the quality necessary to sustain the stresses
required by the falsework design.
Install Type K temporary railing on both sides of vehicular openings through falsework. The Engineer may
order you to install temporary railing at other falsework less than 12 feet from the edge of a traffic lane.
Temporary railings for vehicular openings must start 150 feet in advance of the falsework and extend past
the falsework in the direction of adjacent traffic flow. For 2-way traffic openings, temporary railing must
extend at least 60 feet past the falsework in the direction of adjacent traffic flow.
Install temporary crash cushion modules as shown at the approach end of temporary railings located less
than 15 feet from the edge of a traffic lane. For 2-way traffic openings install temporary crash cushion
modules at the departing end of temporary railings located less than 6 feet from the edge of a traffic lane.
The Engineer orders the location and length of railing and the type of flare to be used.
Install all temporary railing protecting falsework before erecting falsework. Do not remove temporary
railing until authorized.
48-2.03B Foundations
Construct falsework on solid footings capable of supporting falsework loads. Protect footings from
softening and undermining. The Engineer may order you to verify the design soil bearing values do not
exceed the soil capacity using load testing.
You may place falsework foundation pads and piles before shop drawings are authorized.
Falsework piles must be driven and the actual nominal pile resistance assessed under section 49.
48-2.03C Erection
Construct falsework to support the loads imposed without settlement or take-up beyond that shown on the
falsework drawings.
Install the final bracing system before placing falsework members above stringers.
If falsework is over or adjacent to roadways or railroads, all details of the falsework system that contribute
to horizontal stability and resistance to impact, except for bolts in bracing, must (1) be installed at the time
each element of the falsework is erected and (2) remain in place until the falsework is removed.
If ordered, use camber strips to compensate for falsework deflection, vertical alignment, and anticipated
structure deflection. The Engineer furnishes the amount of camber to be used in constructing falsework.
543

SECTION 48

TEMPORARY STRUCTURES

Install tell-tales that (1) are attached to the soffit forms and (2) can be read from the ground. Provide
sufficient tell-tales to allow the total settlement where concrete is being placed to be determined.
Construct deck slab forms between girders with no allowance for settlement relative to the girders.
Do not apply dead loads other than forms and reinforcing steel to falsework until authorized.
If (1) events occur that the Engineer determines will result in a structure that does not comply with the
structure as described or (2) settlements occur that are more than 3/8 inch greater than those shown on
the falsework drawings, stop concrete placement and employ corrective measures satisfactory to the
Engineer. If satisfactory measures are not provided before initial concrete set occurs, stop concrete
placement at a location ordered.
48-2.03D Removal
Remove falsework such that portions of falsework not yet removed remain stable at all times.
Except for concrete above the deck, do not release falsework supporting any span of a:
1. Simple span bridge before 10 days after the last concrete has been placed.
2. Continuous or rigid frame bridge before 10 days after the last concrete has been placed in that span
and in adjacent portions of each adjoining span for a length equal to one-half of the span where
falsework is to be released.
3. Simple span bridge or a continuous or rigid frame bridge until the supported concrete has attained a
compressive strength of 2,600 psi or 80 percent of the specified strength, whichever is greater.
Do not release falsework for prestressed portions of structures until prestressing steel has been
tensioned.
Do not remove falsework supporting any span of a continuous or rigid frame bridge until all required
prestressing is complete (1) in that span and (2) in adjacent portions of each adjoining span for a length
equal to at least one-half of the span where falsework is to be released.
Release falsework supporting spans of CIP girders, slab bridges, or culverts before constructing or
installing railings or barriers on the spans unless authorized.
Remove falsework for arch bridges uniformly and gradually. Start at the crown and work toward the
springing. Remove falsework for adjacent arch spans concurrently.
Do not release falsework that supports overhangs, deck slabs between girders, or girder stems that slope
45 degrees or more from vertical before 7 days after deck concrete has been placed.
You may release falsework supporting the sides of girder stems that slope less than 45 degrees from
vertical before placing deck concrete if you install lateral supports. Lateral supports must be:
1. Designed to resist rotational forces on the girder stem, including forces due to concrete deck
placement
2. Installed immediately after each form panel is removed
3. Installed before releasing supports for the adjacent form panel
Do not release falsework for bent caps supporting steel or PC concrete girders before 7 days after placing
bent cap concrete. Do not erect girders onto bent caps until bent cap concrete has attained a
compressive strength of 2,600 psi or 80 percent of the specified strength, whichever is greater.
Remove falsework for structural members subject to bending as specified for simple span bridges.
Do not release falsework for box culverts and other structures with decks lower than the roadway
pavement and span lengths of 14 feet or less until the last placed concrete has attained a compressive
strength of 1,600 psi. Curing of the concrete must not be interrupted. Falsework removal for other box
culverts must comply with the specifications for the release of bridge falsework.
Do not release falsework for arch culverts sooner than 40 hours after concrete has been placed.

544

SECTION 48

TEMPORARY STRUCTURES

Remove falsework piling to at least 2 feet below the original ground or streambed. Remove falsework
piling driven within ditch or channel excavation limits to at least 2 feet below the bottom and side slopes of
the excavated areas.
Dispose of falsework materials and work debris.
48-2.04 PAYMENT
Not Used
48-3 TEMPORARY SUPPORTS
Reserved
48-4 TEMPORARY DECKING
Reserved
48-5 JACKING SUPERSTRUCTURE
Reserved
48-648-10 RESERVED

545

49 PILING

49-1 GENERAL

49-1.01 GENERAL
49-1.01A Summary
Section 49-1 includes general specifications for constructing foundation piles.
49-1.01B Definitions
control zone: Zone that has the same subsurface profile and engineering properties as a corresponding
support location.
nominal driving resistance: Sum of (1) nominal resistance required to resist the factored axial loads and
(2) driving resistance from unsuitable or scourable penetrated soil layers that do not contribute to the
design resistance.
nominal resistance: Design capacity required to resist the factored axial loads.
pile structural capacity design: Design based on the nominal strength as defined in Article 8.1.3 of the
Caltrans Bridge Design Specifications or the nominal resistance as defined in Article 1.3.2.1 of the
AASHTO LRFD Bridge Design Specifications.
49-1.01C Submittals
49-1.01C(1) General
Before handling or installing piles at a location that is closer than the length of the pile being handled or
installed to the edge of any traveled way open to public use, submit a work plan of the measures that will
be used to provide for the safety of traffic and the public.
Submit a VECP for revisions to specified tip elevations shown or installation methods.
49-1.01C(2) Test Borings
If test borings are specified in the special provisions, submit the log of test borings and the test boring
report upon completion of all test borings. Submit 4 sets of the test boring report and the log of test
borings to OSD, Documents Unit. The submittal must comply with the specifications for shop drawings.
Notify the Engineer of your submittal. Include in the notification the date and contents of the submittal.
If corrections to the submittal are required, submit 1 set of the corrected test boring report and the log of
test borings to OSD, Documents Unit.
49-1.01D Quality Control and Assurance
49-1.01D(1) General
Piling must have sufficient length to attain the specified tip elevation shown and extend into the pile cap or
footing.
49-1.01D(2) Determination of Length
You may conduct additional foundation investigation, including installing and axial load testing of
additional nonproduction indicator piling and performing test borings. The Engineer must authorize
locations of additional foundation testing. Notify the Engineer at least 5 business days before starting
additional foundation testing.
Complete additional foundation investigation before requesting revised specified pile tip elevations or
revisions to the described installation methods.
The Engineer does not authorize a revision to:
1. Specified installation methods where settlement or lateral loads control the design tip elevation
2. Specified pile tip elevation above the design tip elevation shown for settlement or lateral loads
3. Specified pile tip elevation where the tip elevation is controlled by liquefaction or scour
Indicator compression pile load testing must comply with ASTM D 1143. The pile must sustain the 1st
compression test load applied that is equal to the nominal driving resistance, with no more than 1/2-inch
547

SECTION 49

PILING

total vertical movement at the top of the pile measured relative to the top of the pile before the start of
compression load testing.
Indicator tension pile load testing must comply with ASTM D 3689 except do not use the loading
apparatus described as "Load Applied to Pile by Hydraulic Jack(s) Acting at One End of Test Beam(s)
Anchored to the Pile." The pile must sustain the 1st tension test load applied that is equal to the nominal
resistance in tension shown with no more than 1/2-inch total vertical movement at the top of the pile
measured relative to the top of the pile before the start of tension load testing.
Remove indicator piling as specified for removing portions of bridges.
49-1.01D(3) Load Test Piles
Where shown, complete load testing of each load test pile before drilling holes, casting piling, cutting
piling to length, driving piling, and fabricating reinforcing steel cages for any piles represented by the load
test pile.
Notify the Engineer at least 10 days before drilling or driving piles to be load tested.
Except in cofferdams, the bottom of the footing excavation must be level and dewatered before pile load
testing. The excavation must be kept dewatered during load testing.
Install load test piles with the same type of equipment that is to be used for installation of production piles.
Load test piles must comply with the specifications for piling as described. Locate load test piles such that
they may be cut off and become a part of the completed structure.
Remove load test and anchor piles that are not incorporated in the completed structure as specified for
removing portions of bridges.
For load test anchorages in piles used as anchor piles:
1. HS threaded steel rods must comply with ASTM A 722 for uncoated, deformed, Type II, HS steel
bars, including all supplementary requirements, except the maximum weight requirement does not
apply.
2. Steel plates must comply with ASTM A 709/A 709M, Grade 36.
3. Anchor nuts must hold the HS steel rods at a load producing a stress of not less than 95 percent of
the specified ultimate tensile strength of the HS steel rod.
4. Pipe, couplings, and fittings must be commercially available materials of the types and ratings shown.
You may use additional cementitious material in load test and anchor piles.
You may use Type III cement in any load test and anchor pile not used as a part of the completed
structure.
Furnish labor, materials, tools, equipment, and incidentals as required to assist the Department in the
installation, operation, and removal of Department-furnished steel load test beams, jacks, bearing plates,
drills, and other test equipment. This is change order work.
The Department performs testing of load test piles when the concrete in the load test and anchor piles
has developed a compressive strength of at least 2,000 psi.
Allow the Department 15 days to perform pile load tests at each test location. Allow an additional 10 days
for the Department to revise the specified tip elevations.
49-1.01D(4) Dynamic Monitoring
Section 49-1.01D(4) applies if dynamic monitoring of driven piling is specified in the special provisions.
The Department determines which piles from a control zone or support location will receive dynamic
monitoring.
The Department dynamically monitors driven piles using Department-furnished dynamic pile analyzer
monitoring instruments.

548

SECTION 49

PILING

The 4th paragraph of section 49-2.01A(4)(b) does not apply to driven piles if dynamic monitoring is
required.
The Department conducts penetration and bearing analysis of dynamically monitored piles and develops
bearing acceptance criteria curves for these piles. Penetration and bearing analyses are based on a wave
equation analysis.
Except for load test and anchor piles, do not install production piles until the Engineer provides you with
the bearing acceptance criteria curves for any piles represented by the dynamically monitored piles.
Piles to be dynamically monitored must be:
1. Available to the Department at least 2 business days before driving.
2. Safely supported at least 6 inches off the ground in a horizontal position on at least 2 support blocks.
If requested, rotate the piles on the blocks.
3. Positioned such that the Department has safe access to the entire pile length and circumference for
the installation of anchorages and control marks for monitoring.
Prepare and drive piles to be dynamically monitored in the following sequence:
1. Before driving, rotate and align the pile in the driving leads as ordered by the Department.
2. Temporarily suspend driving operations for approximately 15 minutes when the pile tip is 25 feet
above the specified tip elevation shown.
3. During the 15 minute suspension, bolt the 1-pound instrument package securely to plugs or
expansion anchors previously installed in the pile by the Department. Connect electrical cables to the
instrument package as ordered by the Department.
4. Resume driving operations as ordered by the Department. Suspend driving operations approximately
1 foot above the specified tip elevation.
5. Remove the cables and instrument package from the pile and deliver them to the Engineer.
6. The following business day, install the instrument package on the pile and attach the cables and
resume driving the pile to the specified tip elevation.
7. Remove the cables and instruments from the monitored pile and deliver them to the Engineer.
Replace any damaged cables or instruments in kind that are damaged by your activities.
After the pile has been dynamically monitored:
1. Allow 15 days for the Department to revise the specified tip elevations and to provide bearing
acceptance criteria curves.
2. If pile load testing is performed in addition to dynamic monitoring, allow 25 days for the Department to
revise the specified tip elevations and to provide bearing acceptance criteria curves.
49-1.01D(5) Test Borings
Section 49-1.01D(5) applies if test borings are specified in the special provisions.
Notify the Engineer at least 15 days before drilling test borings.
Drill test borings under the site supervision of, with the log of test borings stamped by, and with the test
boring submittal signed by a geologist or civil engineer who is registered in the State and has at least 5
years of geotechnical engineering experience with deep foundations in both soil and rock.
Drill test borings at the center of each pile location shown.
Drill test borings by rotary drill methods to a depth of at least 20 feet below the specified tip elevation
shown. Test borings must be at least 3 inches in diameter.
Perform standard penetration tests in all soil types under ASTM D 1586 for each test boring at 5-foot
maximum intervals and terminate when (1) bedrock is encountered, (2) 10 blows with no discernable
sampler advancement is observed, or (3) ordered.
Core the bedrock:
1. Continuously with at least 90 percent core recovery. Rock must not be logged from drill cuttings. Rock
quality designation must be made at 5-foot maximum intervals.
549

SECTION 49

PILING

2. Using an outer and inner core barrel drilling system. The outer core barrel must be fitted with a
diamond impregnated or polycrystalline drill bit and have an outside diameter of at least 3 inches. The
split inner tube core barrel must have an inside diameter of at least 2 inches.
Photograph the rock cores:
1. Before removal from the split inner tube barrels and placement into core boxes
2. After core boxes are filled and before boxes are removed from the drilling platform
Rock core photographs must be in color, 5 by 7 inches, and labeled with the borehole number, sample
elevation, scale, and date and time of photograph.
Place the rock cores in rock core boxes that are labeled as specified in the Soil and Rock Logging,
Classification and Presentation Manual. Include the support or pile location. Store rock core boxes on or
near the job site at an authorized location. Preserve and secure the rock core samples in a weather
protected facility until notified by the Engineer. Dispose of rock cores or transport them to Geotechnical
Services, as ordered.
The log of test borings and classifying and describing soils and rock must comply with the Soil and Rock
Logging, Classification and Presentation Manual available at the Geotechnical Services website. Use the
same version of the Soil and Rock Logging, Classification, and Presentation Manual shown. If no version
is shown, use the most current version of the manual.
The test boring report must include:
1. Summary of drilling methods, drilling equipment, drill platforms, and drilling difficulties encountered
2. Location map of the surveyed position of the test borings relative to the new pile locations in the
California Coordinate System and bridge stationing
3. Bore hole surveying notes
4. Photographs of rock cores
5. Copies of original daily drilling notes
After the test boring report and the log of test borings have been authorized, allow 20 days for the
Engineer to notify you of confirmation of or revisions to the specified pile tip elevations. Do not fabricate or
manufacture to length steel pipe piling, permanent steel casing, micropiling, and filled and unfilled steel
casing until you have been notified.
49-1.02 MATERIALS
Reserved
49-1.03 CONSTRUCTION
If the Contract allows the use of more than 1 pile type, use the same type of pile for all piles within each
individual footing.
Reinforced concrete extensions must comply with section 51.
49-1.04 PAYMENT
The payment quantity of load test piles and adjacent anchor piles is the length used in the load testing.
Load test piles and adjacent anchor piles are paid for as the type or class of piling shown in the Bid Item
List.
The length of the reinforced concrete extension is measured from the plane of pile cutoff to the top of the
extension. The extension is paid for as furnish piling or CIDH concrete piling of the type of piling on which
it is constructed.
Payment for structure excavation and structure backfill involved in constructing concrete extensions is
included in the payment for drive pile or CIDH concrete piling of the type of piling on which the extension
is constructed.

550

SECTION 49

PILING

49-2 DRIVEN PILING

49-2.01 GENERAL
49-2.01A General
49-2.01A(1) Summary
Section 49-2 includes specifications for constructing driven piles.
49-2.01A(2) Definitions
Reserved
49-2.01A(3) Submittals
49-2.01A(3)(a) General
For pile driving hammers with no way of visually observing the ram stroke, submit a printed readout as an
informational submittal showing hammer energy during driving operations.
49-2.01A(3)(b) Driving System Submittal
Section 49-2.01A(3)(b) applies if a driving system submittal is specified in the special provisions.
The driving system submittal must be sealed and signed by an engineer who is registered as a civil
engineer in the State.
Allow 15 days for the Department's review. Allow an additional 15 days for the review of any resubmittals.
Submit a revised driving system submittal if the hammers change from those shown in the submittal.
For the driving system submittal, perform driveability studies as follows:
1. Model the proposed driving system including hammers, cap blocks, and pile cushions based on a
wave equation analysis.
2. Use an authorized computer program.
3. If the driveability analysis hammers indicate that open-ended pipe pile and steel shell penetration
rates are less than 1 foot per 200 blows and the driving stresses exceed 80 percent of the yield
strength of the pipe and steel shell, include assumptions for drilling through the center of the piles and
shells.
4. If a follower is used, include (1) an analysis of the driving system with the follower and (2) an analysis
of the driving system without the follower.
Include in the driving system submittal:
1. Results of the driveability analysis showing that all proposed driving systems will install piles to the
specified tip elevation and nominal driving resistance shown. Driving systems must generate
sufficient energy to drive the piles with compressive and tensile stresses not more than 90 percent of
the yield strength of the pile as driven. Results must include:
1.1 Pile compressive stress versus blows per foot.
1.2 Pile tensile stress vs. blows per foot.
1.3 Nominal driving resistance vs. blows per foot.
2. Complete description of:
2.1 Soil parameters used, including soil quake and damping coefficients, skin friction distribution,
and ratio of shaft resistance to total resistance.
2.2 Assumptions made regarding the formation of soil plugs, drilling through the center of open
ended steel shells, and the use of closure plates, shoes, and other tip treatment.
3. List of all hammer operation parameters assumed in the analysis, including fuel settings, stroke
limitations, and hammer efficiency.
4. Copies of all test results from any previous pile load tests, dynamic monitoring, and all driving records
used in the analyses.
5. C
ompleted Pile and Driving Data Form.
49-2.01A(4) Quality Control and Assurance
49-2.01A(4)(a) General
Reserved
551

SECTION 49

PILING

49-2.01A(4)(b) Pile Driving Acceptance Criteria


Except for piles to be load tested and sheet piles, drive piles to at least the nominal driving resistance and
the specified tip elevation shown.
Drive piles to be load tested and sheet piles to the specified tip elevation shown.
Where the pile nominal driving resistance is not shown, drive the pile to the nominal resistance shown.
For pile acceptance, use the following formula to determine the required number of hammer blows in the
last foot of driving:
Ru = (1.83 x (Er)1/2 x log10 (0.83 x N)) - 124
where:
Ru = nominal driving resistance, kips
Er = manufacturer's rating for foot-pounds of energy developed by the hammer at the observed field
drop height
N = number of hammer blows in the last foot, (maximum value allowed for N is 96)
49-2.01B Materials
Reserved
49-2.01C Construction
49-2.01C(1) General
If the Engineer revises the pile tip elevation for driven piles, the work involved in furnishing, splicing, and
driving the additional length of pile is change order work.
If the Engineer orders additional lugs be placed on steel piles, furnishing and placing these lugs is change
order work. The Department does not pay for the additional work involved in driving piles due to these
additional lugs.
49-2.01C(2) Driving Equipment
Install driven piles using an authorized impact hammer. The impact hammer must be:
1. Steam, hydraulic, air, or diesel
2. Able to develop sufficient energy to drive the pile at a penetration rate of not less than 1/8 inch per
blow at the nominal driving resistance shown
Do not use vibratory hammers, oscillators, or rotators to install driven piles.
Hammers with an external combustion engine that are not single action must have a transducer that
records ram velocity.
Double acting diesel hammers with internal combustion engines must have a transducer that records
bounce chamber pressure.
Steam or air hammers must have boiler or air capacity of at least that specified by the manufacturer. The
boiler or air compressor must be equipped with an accurate pressure gage.
Maintain the valve mechanism and other parts of steam, air, or diesel hammers such that the length of
stroke and number of blows per minute for which the hammer is designed is attained. Do not use
inefficient steam, air, or diesel hammers.
You may use followers or underwater hammers for driving piles where authorized. If using a follower or
underwater hammer, verify its efficiency by furnishing the 1st pile in each bent or footing sufficiently long
and drive the pile without the use of a follower or underwater hammer.
49-2.01C(3) Drilling
If necessary to attain the specified tip elevation shown and where authorized, you may drill holes with a
diameter not greater than the least dimension of the pile to the specified depth before driving the piles.

552

SECTION 49

PILING

49-2.01C(4) Predrilled Holes


For piles to be driven through embankments constructed under the Contract, drive piles through predrilled
holes where the depth of the new embankment at the pile location is in excess of 5 feet.
The hole diameter must be at least 6 inches larger than the greatest dimension of the pile cross section.
After driving the pile, fill the space around the pile to the ground surface with dry sand or pea gravel.
49-2.01C(5) Driving
Use driving heads or driving blocks that hold the pile in position directly under the hammer when driving.
Protect the heads of driven piles from direct impact of the hammer with a cushion driving block. Maintain
the cushion in good condition during the entire driving operation. Arrange the cushion driving block such
that any reinforcing bars projecting above the pile are not displaced or damaged during driving.
Provide special driving tips or heavier pile sections or take other authorized measures to prevent damage
to steel piles, steel shells, or steel casings during installation.
If you encounter obstructions to driving, provide special driving tips or heavier pile sections, or
subexcavate below the bottom of footing, or take other measures to prevent damage to the pile during
driving. This is change order work.
Drive piles to the position and line shown. The Engineer rejects piles materially out of line. Dispose of
rejected piles that interfere with the work. Rejected piles that do not interfere with the work may be
removed or cut off and abandoned in place.
49-2.01C(6) Pile Cutoff
Cut off driven piles at the elevations shown and anchor them to the structure. Do not damage the pile
below cutoff.
Dispose of all cutoff lengths of piles.
49-2.01D Payment
Driven piling is paid for as furnish piling and drive pile of the class, type, size, or alternative shown in the
Bid Item List.
Furnish piling is measured from the specified tip elevation shown to the plane of pile cutoff.
Payment for furnish piling includes:
1. Furnishing piles to the job site
2. Splicing piles
3. Furnishing and installing pile anchors and lugs
Payment for drive pile includes:
1.
2.
3.
4.

Driving and cutting the piles off at the elevations shown


Furnishing special driving tips or heavier sections of steel piles
Drilling holes or predrilling holes through embankments
Disposing of material resulting from drilling holes or predrilling holes

49-2.02 STEEL PIPE PILING


49-2.02A General
49-2.02A(1) Summary
Section 49-2.02 includes specifications for constructing steel pipe piles.

49-2.02A(2) Definitions

shop welding: Welding performed at a permanent plant.

field welding: Welding performed at the job site.

553

SECTION 49

PILING

49-2.02A(3) Submittals
49-2.02A(3)(a) General
Reserved
49-2.02A(3)(b) Certificate of Compliance
Submit a certificate of compliance for steel pipe piles. The certificate of compliance must be signed by the
plant's QC representative. The QC representative must be on record with the Department's Office of
Structural Materials. Include with the certificate of compliance:
1. Statement that all materials and workmanship incorporated in the work and all required tests and
inspections of this work have been performed as described.
2. Certified mill test reports for each heat number of steel pipe piles being furnished.
3. Test reports for tensile, chemical, and any specified NDT. Test reports must be based on test
samples taken from the base metal, steel, coil or from the manufactured or fabricated piles.
4. Calculated carbon equivalent. The carbon equivalent may be shown on the mill test report.
49-2.02A(3)(c) Inspection Request Form
Submit an inspection request form at least 10 days before performing any welding of Class N steel pipe
piles.
49-2.02A(3)(d) Shop Drawings
Submit shop drawings for attaching handling devices to steel pipe piles. Shop drawings must include the
locations, handling and fitting device details, and connection details. Allow 7 days for review of the shop
drawings.
49-2.02A(4) Quality Control and Assurance
49-2.02A(4)(a) General
Section 11-3.02 does not apply to longitudinal, skelp end, or spiral seam welds in steel pipe piles.
49-2.02A(4)(b) Plant Audit
Fabricate steel pipe piles at a plant on the Department's Authorized Facility Audit List.
49-2.02A(4)(c) Nondestructive Testing
49-2.02A(4)(c)(1) General
Section 49-2.02A(4)(c) applies to NDT of Class N steel pipe piles.
Except for welding performed under API 5L, the acceptance criteria for RT and UT must comply with
AWS D1.1 for cyclically loaded nontubular connections for welds subject to tensile stress.
Perform NDT on backing ring welds using RT or UT for a material thickness of 5/16 inch or greater or
using RT for a material thickness less than 5/16 inch.
49-2.02A(4)(c)(2) Shop Welds
Section 49-2.02A(4)(c)(2) applies to NDT of shop welds.
For welding performed under API 5L:
1. Submit a DVD or VHS videocassette recording of the actual material testing if radiological testing is
used or the actual radiographic film if film radiography is used. Submit the recording before shipping
the material from the plant.
2. If film radiography is used to inspect pipe ends or repairs, the transmitted film density must be from
2.0 to 4.0 in the area of interest, weld, base metal, and image quality indicators.
3. Reinspect repaired defects using the NDT method that originally detected the defect except you may
use film radiography for the inspection of repairs if the defect was originally detected using
radiological testing.
For welding performed under AWS D1.1:
1. Perform NDT on 25 percent of each longitudinal, circumferential, or spiral weld using RT or UT.
2. Where repairs are required in a portion of the tested weld:
554

SECTION 49

PILING

2.1. Perform NDT on the repaired portion.


2.2. Perform additional NDT on untested areas on each side of the repaired portion. The length of
additional NDT on each side of the repaired portion must equal 10 percent of the pipe's outside
circumference.
2.3. After this additional 20 percent of NDT is performed, and if additional repairs are required,
determine and record the total cumulative repair lengths from all NDT. If the cumulative weld
repair length is equal to or more than 10 percent of the pipe's outside circumference, then
perform NDT on the entire weld.
49-2.02A(4)(c)(3) Field Welds
Section 49-2.02A(4)(c)(3) applies to NDT of field welds.
Perform NDT on 25 percent of each field weld by RT or UT at locations selected by the Engineer. The
Engineer may select several locations on a given splice. The cover pass must be ground smooth at
locations to be tested.
Personnel performing UT for field welds must have their qualifications verified before performing NDT, by
both written and practical exams. For UT qualification procedures, go to the METS Web site.
Where repairs are required in a portion of the tested weld:
1. Perform NDT on the repaired portion.
2. Perform additional NDT on untested areas on each side of the repaired portion. The length of
additional NDT on each side of the repaired portion must equal 10 percent of the pipe's outside
circumference.
3. After this additional 20 percent of NDT is performed, and if additional repairs are required, determine
and record the total cumulative repair lengths from all NDT. If the cumulative weld repair length is
equal to or more than 10 percent of the pipe's outside circumference, then perform NDT on the entire
weld.
49-2.02B Materials
49-2.02B(1) General
49-2.02B(1)(a) General
Piles not specified as Class N in the special provisions must comply with the specifications for Class R.
The carbon equivalent of steel in steel pipe piles must not exceed 0.45 percent. Use the following formula
to calculate the carbon equivalent:
CE = C + (Mn + Si)/6 + (Cr +Mo +V)/5 + (Ni + Cu)/15
where:
CE = carbon equivalent, percent
Sulfur content of steel in steel pipe piles must not exceed 0.05 percent.
Seams in steel pipe piles must be CJP welds.
For welding and prequalifying base metal under Table 3.1 of AWS D1.1, treat steel pipe piles complying
with ASTM A 252 as either ASTM A 572, Grade 50, or ASTM A 709, Grade 50.
Butt welded seams subsequently formed, including skelp end welds, must be 100 percent ultrasonically
tested in the final formed and welded condition. The acceptance criteria for UT must comply with one of
the following:
1. API 5L for API-licensed facilities
2. AWS D1.1 for cyclically loaded nontubular connections for welds subject to tensile stress.
Except for tack welding, do not use gas metal arc welding for welding of steel pipe piles. If gas metal arc
welding is used for tack welding, do not deposit filler metal by short circuiting transfer.

555

SECTION 49

PILING

49-2.02B(1)(b) Circumferential Welds


Circumferential welds must be CJP welds complying with AWS D1.1.
Locate circumferential welds at least 12 inches away from a skelp end weld.
Backing rings must comply with the following:
1. The minimum thickness of the backing ring must be 1/4 inch and the backing ring must be
continuous.
2. Splices in the backing ring must be made by CJP welds. These welds must be completed and
inspected, including performing any required NDT, before final insertion into a pipe end.
3. Attach backing rings to pipe ends using the minimum size and spacing of tack welds that will securely
hold the backing ring in place. Tack weld in the root area of the weld splice. Remove and replace
cracked tack welds before subsequent weld passes.
4. The gap between the backing ring and the steel pipe wall must not be greater than 5/64 inch. One
localized portion of the backing ring fit-up may be offset by a gap equal to or less than 1/4 inch, if the
localized portion is (1) equal to or less than 20 percent of the outside circumference of the pipe, (2)
first seal welded using shielded metal arc E7016 or E7018 electrodes, and (3) marked so that it can
be referenced during any required NDT.
5. Backing rings must have enough width such that the backing ring does not interfere with the
interpretation of the NDT.
For steel pipe piles with an outside diameter greater than 42 inches and a wall thickness greater than 1
inch, you may increase the root opening tolerances to a maximum of 3/16 inch.
For welding limited to fit-up and attaching backing rings and handling devices, the preheat and interpass
temperatures must comply with clause 3.5 and table 3.2, Category C, of AWS D1.1.
If splicing steel pipe piles using a circumferential weld, the piles must comply with the fit-up requirements
of clause 5.22.3.1 of AWS D1.1.
49-2.02B(1)(c) Tolerances
Dimensional tolerances of steel pipe piles must comply with the following:
1. Outside diameter: 0.75 percent of the outside diameter shown
2. Wall thickness: -5 to +10 percent of the nominal wall thickness shown
3. Straightness: 1.0 percent over the length of the pipe
49-2.02B(1)(e) Markings
Except for steel pipe piles marked with the API monogram, mark each length of the steel pipe pile as
follows:
1.
2.
3.
4.
5.
6.
7.

Name and location of the piling manufacturer


State Contract number, for Class N only
H
eat number
W
elding process
Outer diameter, nominal wall thickness, minimum wall thickness, and length
Year piling was produced
Marked as specified for each class of steel pipe piling

Only Department authorized audited facilities are authorized to mark piling for use on a Contract.
49-2.02B(1)(f) Substitutions
Reserved
49-2.02B(2) Class N Steel Pipe Piling
Section 49-2.02B(2) applies to steel pipe piles specified as Class N in the special provisions.
Class N steel pipe piles must comply with one of the following:
1. API 5L, minimum Grade X52, PSL1, and must be:
556

SECTION 49

PILING

1.1. Manufactured, welded, tested, and inspected at a plant licensed to apply the API monogram
1.2. Marked with the API monogram on each length of steel pipe
2. ASTM A 252, Grade 3, and the following:
2.1 Welding must comply with AWS D1.1.
2.2. Groove welds using submerged arc welding from both sides without backgouging require a
procedure qualification record witnessed by the Engineer.
2.3 At the start of fabrication and for each thickness of the piling, furnish 3 macroetch cross-section
test specimens that have been prepared under clause 4.8.4 of AWS D1.1. Remove specimens
at locations selected by the Engineer and in the presence of the Engineer. Test specimens
must indicate that the weld is free of cracks and has thorough fusion between adjacent layers
of weld metal and between weld metal and base metal. Undercut must not exceed 1/32 inch.
2.4 The weighing of individual pipe is not required as specified in ASTM A 252.
2.5 Each length of pipe must be marked "Caltrans Class N - A252."
49-2.02B(3) Class R Steel Pipe Piling
Section 49-2.02B(3) applies to Class R steel pipe piles.
Class R steel pipe piles must comply with one of the following:
1. API 5L, minimum Grade X52, PSL1, and must be:
1.1. Manufactured, welded, tested, and inspected at a plant licensed to apply the API monogram,
except that hydrostatic testing, flattening tests, and the API monogram are not required
1.2. Marked "Caltrans Class R - API" on each length of steel pipe
2. ASTM A 252, Grade 3, and the following:
2.1. Arc welding processes must comply with AWS D1.1
2.2. Groove welds using submerged arc welding from both sides without backgouging will require a
procedure qualification record witnessed by the Engineer
2.3. Underfill is not allowed
2.4. For electric resistance welded pipe, remove the outer diameter flash to a maximum of 1/32 inch
2.5. The weld reinforcement must not exceed 1/8 inch
2.6. The weighing of individual pipe is not required as specified in ASTM A 252
2.7. Each length of pipe must be marked "Caltrans Class R - A 252"
49-2.02C Construction
49-2.02C(1) General
Steel pipe piles may be retapped to prevent pile set-up provided the field welded splice remains at least 3
feet above the work platform until the Engineer authorizes the splice.
When attaching handling devices to steel pipe piles, align the welds parallel to the axis of the pile. Welds
must comply with the specifications for attaching backing rings in section 49-2.02B(1)(b). Permanent
bolted connections must be corrosion resistant.
49-2.02C(2) Field Welds
Field welds must comply with section 49-2.02B(1)(b).
Field welds made in the horizontal position where the longitudinal pipe axis is vertical must be single
bevel groove welds.
The minimum preheat and interpass temperature for splice welding and for making repairs must be 150
degrees F. When field welding is disrupted, preheating to 150 degrees F must occur before welding is
resumed.
Do not water quench field welds. Allow welds to cool unassisted to ambient temperature.
Remove ends of steel pipe piles to be spliced that have been damaged during driving to a sound and
uniform section. Pipe ends must comply with the tolerances for diameter, edge alignment, and roundness
in section 49-2.02B. Pipe ends must be field cut using automated guided cutting equipment. Do not use
manual flame cutting.

557

SECTION 49

PILING

49-2.02D Payment
Not Used
49-2.03 STRUCTURAL SHAPE STEEL PILES
49-2.03A General
49-2.03A(1) Summary
Section 49-2.03 includes specifications for constructing structural shape steel piles.
49-2.03A(2) Definitions
Reserved
49-2.03A(3) Submittals
Submit a certificate of compliance that includes:
1. Test reports for tensile, chemical, and any specified NDT. Test samples must be taken from the base
metal, steel, or from the manufactured or fabricated pile.
2. A statement that all materials and workmanship incorporated in the work and all required tests and
inspections of this work have been performed as described.
49-2.03A(4) Quality Control and Assurance
Reserved
49-2.03B Materials
Structural shape steel piles must comply with ASTM A 36 or ASTM A 572.
Splices must be CJP groove welds complying with AWS D1.1.
49-2.03C Construction
Field splices must be CJP groove welds complying with AWS D1.1.
49-2.03D Payment
Not Used
49-2.04 PRECAST PRESTRESSED CONCRETE PILING
49-2.04A General
49-2.04A(1) Summary
Section 49-2.04 includes specifications for constructing PC PS concrete piles.
PC PS concrete piles must comply with sections 50, 51, and 52.
49-2.04A(2) Definitions
Reserved
49-2.04A(3) Submittals
If requested, submit 2 sets of shop drawings for PC PS concrete piles for use during construction. Include
the following details in the shop drawings:
1.
2.
3.
4.
5.

Pile dimensions
M
aterial type
Prestressing methods
Tendon arrangement and working stresses
Any addition or rearrangement of reinforcement from that shown

Section 50-1.01C(3) does not apply to prestressing systems used for PC PS concrete piles.
Authorization of the shop drawings is not required.
49-2.04A(4) Quality Control and Assurance
PC PS concrete piles must comply with section 11-2.
558

SECTION 49

PILING

The Department inspects PC PS concrete piles at the fabrication site. Notify the Department at least 10
days before fabricating any piles. Materials to be used must be available to the Department for testing.
49-2.04B Materials
49-2.04B(1) General
Threaded inserts and other fittings must comply with section 75-1.03.
49-2.04B(2) Fabrication
Place concrete for PC PS concrete piles in smooth, mortar-tight forms. Support the forms to prevent
appreciable deformation or settlement during placing or curing.
Finish unformed surfaces to a smooth surface.

Cure PC PS concrete piles under section 90-4.03 except piles to be placed in a corrosive environment

must be steam or water cured.

If piles to be placed in a corrosive environment are steam cured, steam cure the piles under section 90
4.03 except piles must be kept continuously wet for at least 3 days, including the holding and steam
curing periods.
If piles to be placed in a corrosive environment are water cured, the piles must be kept continuously wet
by the application of water as specified in section 90-1.03B(2).
When removed from the form, the pile must:
1. Have true, smooth, even surfaces, free from honeycombs and voids
2. Be straight such that a line stretched from butt to tip on any pile face is not more than 1 inch from the
face of the pile at any point
Except for PC PS concrete piles to be placed in a corrosive environment, remove lifting anchors and fill
holes under section 51-1.03F(2).
For PC PS concrete piles to be placed in a corrosive environment, remove lifting anchors to a depth of at
least 1 inch below the surface of the concrete. Fill holes with epoxy adhesive before delivering piles to the
job site. The epoxy adhesive must comply with section 95-2.01.
If using pile anchor dowels, anchor the dowels in cast or drilled holes in the concrete pile with neat
cement paste. The diameter of the holes must be the minimum consistent with placing the neat cement
paste and dowel.
Use methods for drilling holes that will not damage the concrete, reinforcement, or prestressing steel.
The drilled hole must be free of dust and other deleterious material when placing the neat cement paste.
Neat cement paste and dowel must completely fill the drilled hole. The dowels must be left undisturbed
until the paste has hardened.
49-2.04B(3) Substitutions
Reserved
49-2.04C Construction
49-2.04C(1) General
PC PS concrete piles must not be driven until at least 14 days after casting.
49-2.04C(2) Handling
When handling or transporting PC PS concrete piles, provide slings or other equipment to avoid bending
the pile or cracking the concrete. Replace piles materially damaged in handling or during driving.
49-2.04C(3) Splicing Precast Prestressed Concrete Piles
Reserved
49-2.04D Payment
Not Used
559

SECTION 49

PILING

49-2.05 STEEL SHEET PILING


49-2.05A General
Section 49-2.05 includes specifications for installing permanent steel sheet piles.
49-2.05B Materials
Steel sheet piles must be interlocking steel sheet complying with ASTM A 328/A 328M.

The minimum section modulus per linear foot of wall must be the section modulus shown.

You may install used sheet piles provided the piles are in good condition and no alterations have been

made to reduce the section modulus. Interlocks must be straight, true, and have no gouges or kinks.

Furnish piles in lengths measured from the specified tip elevation shown to the cutoff elevation. Splices in

steel sheet piles must be CJP welds complying with AWS D1.1.

49-2.05C Construction
Drive steel sheet piles to the specified tip elevation shown. Remove and redrive or replace piles that are
materially out of line.
49-2.05D Payment
Not Used
49-3 CAST-IN-PLACE CONCRETE PILING
49-3.01 GENERAL
49-3.01A General
Section 49-3 includes specifications for constructing CIP concrete piles.
CIP concrete piles include:
1. CIDH concrete piles
2. CIDH concrete pile rock sockets
3. Driven steel shells filled with concrete and reinforcement
Bar reinforcing steel must comply with section 52.
49-3.01B Materials
49-3.01B(1) General
Unless otherwise shown, concrete must have a minimum 28-day compressive strength of 3,600 psi.

Prequalify the concrete under section 90-1.01D(5)(b).

The combined aggregate grading must comply with the 1-inch maximum grading, the 1/2-inch maximum

grading, or the 3/8-inch maximum grading specified in section 90-1.02C(4).

49-3.01B(2) Mass Concrete


Section 49-3.01B(2) applies to CIP concrete piles with a diameter greater than 8 feet.

The quantity of cementitious material must comply with the values shown in the following table:

Pile diameter (D)


(feet)

Maximum quantity of
cementitious material
(lb/cu yd)
750
720

8 < D 10
10 < D 14

Cementitious material must comply with section 90-1.02B(3), except at least 25 percent of the total
cementitious material must be fly ash.
For piles with a diameter greater than 14 feet, concrete must comply with the specifications for mass
concrete in section 51-6.
560

SECTION 49

PILING

49-3.01C Construction
Construct CIP concrete piles such that the excavation methods and the concrete placement procedures
provide for placing the concrete against undisturbed material in a dry or dewatered hole.
Place and secure reinforcement symmetrically about the axis of the pile. Securely block the reinforcement
to provide the minimum clearance shown between the reinforcing steel cage and the sides of the drilled
hole or steel shell.
Steel shells and dewatered drilled holes must be clean and free of water and debris before reinforcement
and concrete are placed.
Provide a suitable light to the Engineer for inspecting the entire length of the steel shell or dewatered hole
before placing reinforcement and concrete.
The methods used to place the concrete must prevent segregation.
Concrete must not be allowed to fall from a height greater than 8 feet without the use of adjustable length
pipes or tubes unless the flow of concrete is directed into the center of the hole and the concrete is not
allowed to strike the reinforcement, reinforcement bracing, and other objects in the hole.
Vibrate concrete in the upper 15 feet of CIP concrete piles.
After placing concrete, cure the temporarily exposed surfaces of the CIP concrete piles under section 511.03H.
49-3.01D Payment
Bar reinforcing steel is not included in the payment for CIP concrete piling unless the CIP concrete piling
is less than 24 inches in diameter or for pole or overhead sign structures.
49-3.02 CAST-IN-DRILLED-HOLE CONCRETE PILING
49-3.02A General
49-3.02A(1) Summary
Section 49-3.02 includes specifications for constructing CIDH concrete piles and CIDH concrete pile rock
sockets.
49-3.02A(2) Definitions
Reserved
49-3.02A(3) Submittals
49-3.02A(3)(a) General
Reserved
49-3.02A(3)(b) Pile Installation Plan
Submit a pile installation plan. Include complete descriptions, details, and supporting calculations for the
following:
1.
2.
3.
4.
5.

Concrete mix design, certified test data, and trial batch reports.
Drilling or coring methods and equipment.
Proposed method for casing installation and removal, if necessary.
Methods for placing, positioning, and supporting bar reinforcement.
Methods and equipment for determining:
6.1 Depth of concrete
6.2 Theoretical volume of concrete to be placed, including the effects on volume if casings are
withdrawn
6.3 Actual volume of concrete placed
6. Methods and equipment for verifying the bottom of the drilled hole is clean before placing concrete.
7. Methods and equipment for preventing upward movement of reinforcement, including the means of
detecting and measuring upward movement during concrete placement activities.
For concrete placed under slurry, include complete descriptions, details, and supporting calculations in
the pile installation plan for:
561

SECTION 49

PILING

1. Concrete batching, delivery, and placing systems, including time schedules and capacities. Time
schedules must include the time required for each concrete placing activity at each pile.
2. Concrete placing rate calculations. If requested, base calculations on the initial pump pressures or
static head on the concrete and losses throughout the placing system, including anticipated head of
slurry and concrete to be displaced.
3. Suppliers test reports on the physical and chemical properties of the slurry and any proposed slurry
chemical additives, including MSDSs.
4. Slurry testing equipment and procedures.
5. Methods of removal and disposal of excavation, slurry, and contaminated concrete, including removal
rates.
6. Methods and equipment for slurry agitating, recirculating, and cleaning.
49-3.02A(3)(c) Inspection Pipe Coupler Log
Where inspection pipes are required, submit a log of the locations of inspection pipe couplers as an
informational submittal upon completion of concrete placement in the hole.
49-3.02A(3)(d) Concrete Placement Log
Submit the concrete placement log as an informational submittal within 1 business day of completion of
concrete placement in the hole.
49-3.02A(3)(e) Coring Logs and Concrete Cores
If coring is performed under section 49-3.02A(4), submit coring logs and concrete cores.
49-3.02A(3)(f) Testing Report
If you perform testing on a rejected pile, submit this additional information in a report. The report must be
sealed and signed by an engineer who is registered as a civil engineer in the State. Allow the Department
10 days for review and analysis of this report.
49-3.02A(3)(g) Mitigation Plans
For each rejected pile, submit a mitigation plan for repair, supplementation, or replacement. The
mitigation plan must:
1. Comply with the specifications for shop drawings.
2. Be sealed and signed by an engineer who is registered as a civil engineer in the State This
requirement is waived for either of the following conditions:
2.1 The proposed mitigation will be performed under the current Department authorized version of
ADSC Standard Mitigation Plan 'A' - Basic Repair without exception or modification.
2.2 The Engineer determines that the rejected pile does not require mitigation due to structural,
geotechnical, or corrosion concerns, and you elect to repair the pile using the current
Department authorized version of ADSC Standard Mitigation Plan 'B' - Grouting Repair without
exception or modification.
The most recent version of the ADSC Standard Mitigation Plan is available at the following Web site:
http://www.dot.ca.gov/hq/esc/geotech/ft/adscmitplan.htm
Pile mitigation plans must include:
1.
2.
3.
4.
5.
6.
7.
8.

Designation and location of the rejected pile.


Review of the structural, geotechnical, and corrosion design requirements of the rejected pile.
Step by step description of the mitigation work to be performed, including drawings if necessary.
Assessment of how the proposed mitigation work addresses the structural, geotechnical, and
corrosion design requirements of the rejected pile.
Methods for preservation or restoration of existing earthen materials.
List of any affected facilities. Include methods and equipment to be used for the protection of these
facilities during mitigation.
Your name and the names of any subcontractors on each sheet.
List of materials with quantity estimates for the mitigation work and a list of personnel with their
qualifications who will be performing the mitigation work.
562

SECTION 49

PILING

For rejected piles to be repaired, include the following in the pile mitigation plan:
1. Assessment of the nature and size of the anomalies in the rejected pile
2. Provisions for access for additional pile testing, if requested
For rejected piles to be replaced or supplemented, include the following in the pile mitigation plan:
1. Proposed location and size of additional piles
2. Structural details and calculations for any modification to the structure to accommodate the
replacement or supplemental piles
Replacement piles must comply with the Contract for CIDH concrete piles.
49-3.02A(3)(h) Mitigation Report
If repairs are performed, submit a mitigation report as an informational submittal within 10 days of
completion of the repair. The report must state exactly what repair work was performed and quantify the
success of the repairs relative to the submitted mitigation plan. The mitigation report must be sealed and
signed by an engineer who is registered as a civil engineer in the State. The mitigation report must
include your name and the names of any subcontractors on each sheet.
49-3.02A(4) Quality Control and Assurance
49-3.02A(4)(a) General
Reserved
49-3.02A(4)(b) Preconstruction Meeting
Reserved
49-3.02A(4)(c) Concrete Test Batch
Section 49-3.02A(4)(c) applies if concrete is placed under slurry.
Before placing concrete under slurry, produce a concrete test batch and transport it to the job site under
the same conditions and in the same time frame that is anticipated during the placement of concrete in
the piles.
At the job site, place the test batch concrete in an excavated hole or suitable container to allow for testing.
Placing concrete under slurry is not required. The test batch must demonstrate that the proposed mix
design will achieve the minimum required slump after the specified set period.
Do not vibrate or agitate the concrete during the set period.
The Engineer tests the concrete for slump under California Test 556. In addition to meeting the specified
nominal slump, the slump of the concrete must comply with the requirements shown in the following table:
Slump Requirements
Minimum set period before
Time required to place
a
testingb
concrete , T
T 2 hours
2T
T > 2 hours
T + 2 hours
a
As described in the pile installation plan

b
The set period starts at the start of concrete placement.

Slump, after set


period
7 inches
7 inches

After testing, dispose of the concrete test batch.


49-3.02A(4)(d) Acceptance Testing
49-3.02A(4)(d)(i) General
Section 49-2.03A(4)(d) applies to CIDH concrete piles except for piles (1) less than 24 inches in diameter
or (2) constructed in dry holes or holes dewatered without the use of temporary casing to control ground
water.

563

SECTION 49

PILING

The Department performs acceptance testing using gamma-gamma logging to test the concrete density
of the pile for homogeneity.
After notification by the Engineer of pile acceptance, dewater the inspection pipes and cored holes and fill
them with grout. Grout must comply section 50-1.02C. Fill inspection pipes and holes using grout tubes
that extend to the bottom of the pipe or hole or into the grout already placed.
49-3.02A(4)(d)(ii) Vertical Inspection Pipes
Install vertical inspection pipes for acceptance testing as follows:
1. Inspection pipes must be schedule 40 PVC pipe with a nominal pipe size of 2 inches. Watertight PVC
couplers are allowed to facilitate pipe lengths in excess of those commercially available. Log the
location of the inspection pipe couplers with respect to the plane of pile cutoff.
2. Cap each inspection pipe at the bottom. Extend the pipe from 3 feet above the pile cutoff to the
bottom of the reinforcing cage. Provide a temporary top cap or similar means to keep the pipes clean
before testing. If pile cutoff is below the ground surface or working platform, extend inspection pipes
to 3 feet above the ground surface or working platform.
3. If any changes are made to the pile tip, extend the inspection pipes to the bottom of the reinforcing
cage.
4. Install inspection pipes in a straight alignment, parallel to the main reinforcement, and securely
fastened in place to prevent misalignment during installation of the reinforcement and placing of
concrete in the hole. Construct CIDH concrete piles such that the relative distance of inspection pipes
to vertical steel reinforcement remains constant.
5. Fill inspection pipes with water upon completion of the concrete placement to prevent debonding of
the pipe.
6. Inspection pipes must be completely clean, dry, and unobstructed at the time of testing providing a 2
inch diameter clear opening.
7. Provide safe access to the tops of the tubes.
After placing concrete and before requesting acceptance testing, test each inspection pipe in the
presence of the Engineer by passing a 1-1/4-inch-diameter by 4.5-foot-long rigid cylinder through the
length of pipe.
If an inspection pipe fails to pass the rigid cylinder:
1. Immediately fill all inspection pipes in the pile with water
2. Core a nominal 2-inch diameter hole through the concrete for the entire length of the pile for each
inspection pipe that does not pass the rigid cylinder
3. Locate cored holes as close as possible to the inspection pipes they are replacing and no more than
5 inches clear from the reinforcement
Coring must not damage the pile reinforcement. Core holes using a double wall core barrel system with a
split tube type inner barrel. Coring with a solid type inner barrel is not allowed. Coring methods and
equipment must provide intact cores for the entire length of the pile. Preserve cores and identify them
with the exact location the core was recovered from the pile.
The coring activity must be logged by an engineering geologist or civil engineer licensed in the State and
experienced in core logging. Coring logs must comply with the Department's Soil and Rock Logging,
Classification, and Presentation Manual. Coring logs must include core recovery, rock quality designation,
locations of breaks, and complete descriptions of inclusions and voids encountered during coring.
The Department evaluates the portion of the pile represented by the cored hole based on the submitted
core logs. If the Department determines that a pile is anomalous based on the coring logs, the pile is
rejected.
49-3.02A(4)(d)(iii) Gamma-Gamma Logging
The Department performs gamma-gamma logging under California Test 233.
Separate reinforcing steel as necessary to allow the Department access to the inspection pipes.
After requesting testing and providing access to the piles, allow 15 days for the Department to perform
the testing and to prepare and provide the pile acceptance test report.
564

SECTION 49

PILING

During testing, do not perform construction activities within 25 feet of any gamma-gamma logging activity.
If the Department determines that a pile is anomalous under California Test 233, part 5C, the pile is
rejected.
49-3.02A(4)(d)(iv) Rejected Piles
If a pile is rejected:
1. Suspend concrete placement in the remaining piles
2. Revise the pile installation plan and submit it to the Engineer
3. Do not resume concrete placement until the revised pile installation plan is authorized
Allow 30 days for the Department to determine whether the rejected pile requires mitigation and to
provide this information to you. Day 1 of the 30 days is the 1st day after access has been provided to the
Department to perform acceptance testing.
The Department may perform additional tests to further evaluate a rejected pile. These tests may include
crosshole sonic logging and other means of inspection selected by the Department. The pile acceptance
test report will indicate if the Department intends to perform any additional testing and when the testing
will be performed. Allow the Department 20 additional days for a total of 50 days to perform these tests
and to provide supplemental results.
You may perform testing on the rejected pile.
The Department determines whether the rejected pile requires mitigation due to structural, geotechnical,
or corrosion concerns. The Department considers the estimated size and location of the anomaly and
potential effects on the design. The Department provides you with the conclusions of this analysis for
developing the mitigation plan.
If a rejected pile does not require mitigation, you may repair the pile under an authorized mitigation plan
or the Department will deduct the amount shown in the table for each anomaly up to the maximum total
deduction:
Anomaly location
Entirely or partially within the
upper 2/3 of the pile length
Entirely within the lower 1/3 of
the pile length
Maximum total deduction
Note:

D = Nominal pile diameter

D < 4 feet
$1,000

Anomaly deduction
4D<6
$2,000

D6
$4,000

$500

$1,000

$2,000

$2,000

$4,000

$8,000

If a rejected pile requires mitigation or you elect to repair a rejected pile that does not require mitigation,
submit a mitigation plan for the repair, supplementation, or replacement of the rejected pile.
If the Engineer determines that it is not feasible to repair the rejected pile, submit a mitigation plan for
replacement or supplementation of the rejected pile.
49-3.02B Materials
49-3.02B(1) General
Reserved
49-3.02B(2) Concrete
Concrete placed under slurry must:
1. Have a nominal slump equal to or greater than 7 inches. The nominal and maximum slump and
penetration specifications in section 90-1.02G(6) do not apply to concrete placed under slurry.
2. Contain not less than 675 pounds of cementitious material per cubic yard and be proportioned to
prevent excessive bleed water and segregation.
565

SECTION 49

PILING

In a freeze-thaw area, the formed portion of CIDH concrete piles must contain not less than 675 pounds
of cementitious material per cubic yard.
49-3.02B(3) Aggregate Gradings
For concrete placed under slurry, the combined aggregate grading must comply with the 1/2-inch
maximum grading or the 3/8-inch maximum grading specified in section 90-1.02C(4).
49-3.02B(4) Permanent Steel Casings
Permanent steel casings must comply with section 49-2.02.
49-3.02B(5) Grout
Grout used to backfill casings must comply with section 50-1.02C except:
1. Minimum cement content of the grout must not be less than 845 lb/cu yd of grout.
2. Aggregate must be used to extend the grout. The aggregate must comply with the following:
2.1 Aggregate must consist of at least 70 percent fine aggregate and approximately 30 percent
pea gravel, by weight.
2.2 Fine aggregate must comply with section 90-1.02C.
2.3 Size of pea gravel must be such that 100 percent passes the 1/2-inch sieve, a minimum 90
percent passes the 3/8-inch sieve, and not more than 5 percent passes the no. 8 sieve.
49-3.02B(6) Slurry
49-3.02B(6)(a) General
Reserved
49-3.02B(6)(b) Mineral Slurry
Mineral slurry must be mixed and thoroughly hydrated in slurry tanks. Sample and test slurry from the
slurry tanks before placement in the drilled hole.
Recirculate or continuously agitate slurry in the drilled hole.
For recirculated slurry:
1. Remove drill cuttings from the slurry before discharging the slurry back into the drilled hole.
2. Sample and test slurry at least every 2 hours after starting its use until tests show that the samples
taken from the slurry tank and from near the bottom of the hole have consistent specified properties.
Once consistent properties have been achieved, sample slurry at least twice per shift as long as the
specified properties remain consistent.
For nonrecirculated slurry:
1. Sample and test slurry from the drilled hole at least every 2 hours after starting its use. Sample the
slurry at mid-height and near the bottom of the hole.
2. Recirculate slurry if tests show samples taken from mid-height and near the bottom of the hole do not
have consistent specified properties.
Sample and test slurry before final cleaning of the bottom of the hole and again just before placing
concrete. Sample the slurry at mid-height and near the bottom of the hole. Cleaning of the bottom of the
hole and placement of the concrete must not start until tests show that the samples have consistent
specified properties.

566

SECTION 49

PILING

Mineral slurry must comply with the requirements shown in the following table:
Property

Mineral Slurry Requirementsa


Test method

Density
Before placement in the drilled hole
and during drilling
Before final cleaning and
immediately before placing concrete
Viscosity
Bentonite

Mud Weight (Density),


API 13B-1
section 1

Marsh Funnel and Cup.


API 13B-1, section 2.2

Attapulgite
pH

Glass electrode pH meter or


pH paper
Sand,
API 13B-1, section 5

Value
64.369.1 pcfb
64.375.0 pcf b

2850 sec/qt
2840 sec/qt
810.5

Sand content
Before final cleaning and
4.0 percent
immediately before placing concrete
a
Slurry temperature must be at least 40 degrees F when tested.
b
If authorized, you may use slurry in salt water. The allowable density of slurry in salt water
may be increased up to 2 pcf.
Remove any caked slurry on the sides or bottom of hole before placing reinforcement.
When concrete is not placed immediately after placing reinforcement, the reinforcement must be removed
and cleaned of slurry, the sides of the drilled hole must be cleaned of caked slurry, and the reinforcement
again placed in the hole for concrete placement.
49-3.02B(6)(c) Synthetic Slurry
Synthetic slurry material and property requirements are specified in the special provisions.
Do not use synthetic slurries in holes drilled in primarily soft or very soft cohesive soils as determined by
the Engineer.
A manufacturer's representative must:
1. Provide technical assistance for the use of their material
2. Be at the job site before introduction of the synthetic slurry into the drilled hole
3. Remain at the job site until released by the Engineer
Sample and test synthetic slurries:
1.
2.
3.
4.

When the slurry temperature is at least 40 degrees F.


At mid-height and near the bottom of the hole.
During drilling to verify the slurry properties.
When drilling is complete but before final cleaning of the bottom of the hole. When samples comply
with the requirements shown in the tables for the slurry material selected, clean the bottom of the hole
of any loose or settled material.
5. After final cleaning and before placing concrete.
49-3.02B(6)(d) Water Slurry
You may use water as slurry if a casing is used for the entire length of the drilled hole.
Water slurry properties must comply with the requirements shown in the following table:

567

SECTION 49

PILING

Water Slurry Requirements


Test
Density
Mud Weight (Density),
API 13B-1
Before final cleaning and immediately
section 1
before placing concrete
Property

Sand content
Before final cleaning and
immediately before placing concrete

Sand,
API 13B-1, section 5

Value
63.5 pcf a

0.5 percent

If authorized, you may use salt water slurry. The allowable density of the slurry may be
increased by 2 pcf.

49-3.02B(7)49-3.02B(10) Reserved
49-3.02C Construction
49-3.02C(1) General
Except for CIDH concrete piles for sound walls and retaining walls, you may propose to increase the
diameter and revise the pile tip elevation of CIDH concrete piles with a diameter less than 2 feet.
For CIDH concrete piles for sound walls and retaining walls, you may propose to increase the diameter of
CIDH concrete piles with a diameter less than 2 feet, except that pile tip elevations must not be revised.
49-3.02C(2) Drilled Holes
The axis of the drilled hole must not deviate from plumb more than 1-1/2 inches per 10 feet of length.
During excavation, do not disturb the foundation material surrounding the pile. Equipment or methods
used for excavating holes must not cause quick soil conditions or cause scouring or caving of the hole.
For rock sockets, equipment and drill methods must not result in soften materials on the borehole walls.
After excavation has started, construct the pile expeditiously to prevent deterioration of the surrounding
foundation material from air slaking or from the presence of water. Remove and dispose of deteriorated
foundation material, including material that has softened, swollen, or degraded, from the sides and the
bottom of the hole.
Just before placing reinforcement or concrete, clean the bottom of the hole to remove any loose sand,
gravel, dirt, and drill cuttings.
After placing reinforcement and before placing concrete in the hole, if caving occurs or deteriorated
foundation material accumulates on the bottom of the hole, clean the bottom of the hole. You must verify
that the bottom of the hole is clean.
Remove water that has infiltrated the hole before placing concrete. Do not allow fluvial or drainage water
to enter the hole.
Portions of the hole may be enlarged, backfilled with slurry cement backfill, concrete, or other material,
and redrilled to the diameter shown to control caving. Backfill material at enlarged piles must be
chemically compatible with concrete and steel, be drillable, and have the necessary strength required for
the conditions.
Dispose of material resulting from placing concrete.
49-3.02C(3) Temporary Steel Casings
Furnish temporary steel casings where shown and where necessary to control water or to prevent quick
soil conditions or caving of the hole. Place temporary casings tight in the hole.
Section 11-3 does not apply to temporary steel casings.
Temporary casings must be:

568

SECTION 49

PILING

1. Watertight and of sufficient strength to withstand the loads from installation, removal, lateral concrete
pressures, and earth pressures
2. Noncorrugated with smooth surfaces
3. Clean and free of hardened concrete
Remove the temporary casing during concrete placement. In a dewatered hole, maintain the concrete in
the casing at a level of at least 5 feet above the bottom of the casing or (2) at a level above the bottom of
the casing adequate to prevent displacement of the concrete by material from outside the casing,
whichever is greater.
If slurry is not used, do not withdraw the temporary casing until the concrete head in the casing is greater
than the groundwater head outside of the casing. Maintain this positive concrete head during withdrawal
of the casing.
You may vibrate or hammer the temporary casing to (1) assist in removal of the casing from the hole, (2)
prevent lifting of the reinforcement, and (3) prevent concrete contamination.
The withdrawal of casings must not leave voids or cause contamination of the concrete with soil or other
materials.
49-3.02C(4) Reinforcement
Reinforcement for CIDH concrete piles with increased diameters and revised tip elevations must comply
with the following:
1. Size and number of the reinforcing bars and hoops, the percentage of bars required to extend to the
pile tip, and the size and pitch of spiral reinforcement must be the same as shown for the original
piles.
2. Required length of the spiral reinforcement and of any reinforcing bars that do not extend to the pile
tip must be at least the length that would have been required for the original specified or ordered tip
elevation.
3. Diameter of the spiral or hoop reinforcement must remain the same as required for the original pile or
may be increased to provide not less than the concrete cover required for the original pile. Provide
positive means to ensure that the reinforcement is centered in the pile.
49-3.02C(5) Permanent Steel Casing Installation
Section 49-2.01A(4)(b) does not apply to permanent steel casings.
For permanent steel casings placed in a drilled hole:
1. The casings must be watertight and of sufficient strength to prevent damage and to withstand the
loads from installation activities, drilling and tooling equipment, lateral concrete pressures, and earth
pressures.
2. Use spacers to center the casing inside the drilled hole. You may weld spacers to the outside of the
casing.
3. Fill voids in the annular space between the casing and the soil with grout.
4. Place grout from the bottom of the casing using grout tubes. Place grout continuously until all voids
have been filled and the grout reaches the top of the casing. Free fall of the grout from the top to the
bottom of the casing is not allowed.
5. Pump grout into the annular space such that the grout head is maintained uniformly around the
casing and no visible evidence of water or air is ejected at the top of the grout.
6. Place grout tubes along the circumference of the casing with a minimum of 4 grout tubes per casing.
The spacing of the grout tubes must not exceed 4 feet.
7. Extend grout tubes to within 1 foot of the bottom of the casing.
If the Engineer lowers the permanent steel casing tip elevation:
1. CIDH concrete pile, including bar reinforcing steel and inspection pipes, must extend to that same
elevation.
2. Tip elevation of the rock socket must extend to maintain the length of the rock socket into rock as
shown.
569

SECTION 49

PILING

The additional work involved in lowering the permanent steel casing tip elevation is change order work.
49-3.02C(6) Optional Construction Joint
Section 49-3.02C(6) applies to CIDH concrete piles where an optional construction joint is shown.
If you choose to construct the optional construction joint and a permanent steel casing is not shown, you
must furnish and install a permanent casing. The permanent casing must:
1. Be watertight and of sufficient strength to prevent damage and to withstand the loads from installation
procedures, drilling and tooling equipment, lateral concrete pressures, and earth pressures.
2. Extend at least 5 feet below the construction joint. If placing casing into rock, the casing must extend
at least 2 feet below the construction joint.
3. Not extend above the top of the drilled hole or final grade whichever is lower.
4. Not increase the diameter of the CIDH concrete pile more than 2 feet.
5. Be installed by impact or vibratory hammers, oscillators, rotators, or by placing in a drilled hole.
Casings placed in a drilled hole must comply with section 49-3.02C(5).
Section 49-2.01A(4)(b) does not apply to permanent casings.
49-3.02C(7) Placing Concrete
Section 51-1.03D(3) does not apply to CIDH concrete piles.
You may construct CIDH concrete piles 24 inches in diameter or larger by excavating and depositing
concrete under slurry.
Form, finish, and cure portions of CIDH concrete piles shown to be formed under section 51.
49-3.02C(8) Placing Concrete Under Slurry
Section 49-3.02C(8) applies if placing concrete under slurry.
After placing reinforcement and before placing concrete in the drilled hole, if drill cuttings settle out of the
slurry, clean the bottom of the drilled hole. Verify that the bottom of the drilled hole is clean.
Carefully place concrete in a compact, monolithic mass, using a method that prevents washing of the
concrete. Vibrating of concrete is not required.
Placing concrete must be a continuous activity lasting no longer than the time specified for each concrete
placing activity at each pile in your pile installation plan.
The delivery tube system must consist of one of the following:
1. A tremie tube or tubes, each of which is at least 10 inches in diameter, fed by one or more concrete
pumps
2. One or more concrete pump discharge tubes, each fed by a single concrete pump
The delivery tube system must consist of watertight tubes with sufficient rigidity to keep the tube ends
always in the mass of concrete placed. If only 1 delivery tube is used to place the concrete, place the tube
near the center of the hole. Multiple tubes must be uniformly spaced in the hole.
Internal bracing for the steel reinforcing cage must accommodate the delivery tube system. Do not use
tremies for piles without space for a 10-inch-diameter tube.
During concrete placement, provide a fully operational standby concrete pump at the job site that is
adequate to complete the work in the time specified in the pile installation plan.
Do not allow concrete to fall into the slurry during concrete placing activities. Cap the delivery tube with a
watertight cap, or plug the tube above the slurry level with a good quality, tight fitting, moving plug that will
expel the slurry from the tube as the tube is charged with concrete. The cap or plug must be designed to
release as the tube is charged.
Extend the pump discharge or tremie tube to the bottom of the hole before charging the tube with
concrete. After charging the tube with concrete, induce the flow of concrete through the tube by slightly
raising the discharge end.
570

SECTION 49

PILING

During concrete placement:


1. Embed the tip of the delivery tube within 6 inches of the bottom of the hole until 10 feet of concrete
has been placed. Maintain the embedment of the tip at least 10 feet below the top surface of the
concrete
2. Do not rapidly raise or lower the delivery tube
3. Maintain the slurry level 10 feet above the piezometric head or within 12 inches of the top of the
drilled hole, whichever is higher
If the seal is lost or the delivery tube becomes plugged and must be removed:
1. Withdraw and clean the tube.
2. Cap the tip of the tube to prevent slurry from entering.
3. Restart the operation by pushing the capped tube 10 feet into the concrete and then reinitiating the
flow of concrete.
Maintain a log of concrete placement for each drilled hole. The log must:
1. Show the pile location, tip elevation, dates of excavation and concrete placement, total quantity of
concrete placed, length and tip elevation of any casing, and details of any hole stabilization method
and materials used.
2. Include an 8-1/2 by 11 inch graph of concrete placed versus depth of hole filled as follows:
2.1 Label the graph with the pile location, tip elevation, cutoff elevation, and the dates of

excavation and concrete placement.

2.2 Plot the graph continuously throughout concrete placement. Plot the depth of drilled hole filled
vertically with the pile tip at the bottom and the quantity of concrete placed horizontally.
2.3 Take readings at each 5 feet of pile depth, and indicate the time of the reading on the graph.
If a temporary casing is used, maintain concrete placed under slurry at a level at least 5 feet above the
bottom of the casing. The withdrawal of the casing must not cause contamination of the concrete with
slurry.
The equivalent hydrostatic pressure inside the casing must be greater than the hydrostatic pressure on
the outside of the casing.
Dispose of material resulting from using slurry.
49-3.02D Payment
Not Used
49-3.03 DRIVEN STEEL SHELLS FILLED WITH CONCRETE AND REINFORCEMENT
49-3.03A General
49-3.03A(1) Summary
Section 49-3.03 includes specifications for constructing CIP concrete piles consisting of driven steel
shells filled with concrete and reinforcement.
49-3.03A(2) Definitions
Reserved
49-3.03A(3) Submittals
Submit a cleanout method for open-ended steel shells as an informational submittal.
49-3.03A(4) Quality Control and Assurance
After the steel shell is driven and before placing reinforcement and concrete, the Engineer examines the
steel shell for collapse or a reduced diameter at any point. The Engineer rejects any steel shell that is
improperly driven, broken, or shows partial collapse to an extent as to materially decrease its nominal
resistance.
49-3.03B Materials
Steel shells must comply with the specifications for steel pipe piles in section 49-2.02.
571

SECTION 49

PILING

Steel shells must be sufficiently watertight to exclude water during concrete placement.
49-3.03C Construction
49-3.03C(1) General
Drive steel shells under section 49-2.
Remove and replace rejected steel shells, or drive a new shell adjacent to the rejected shell. Fill rejected
shells that cannot be removed with concrete. If a new shell is driven to replace a rejected shell, enlarge
the footing.
If the Engineer revises the pile tip elevation, the work involved in furnishing, splicing, and driving the
additional length of pile is change order work.
49-3.03C(2) Open-Ended Steel Shells
Section 49-3.03C(2) applies to open-ended steel shells.
Internal plates must not be used.
After driving, clean out the steel shell as follows:
1. Do not disturb the foundation material surrounding the pile when cleaning out the steel shell.
2. Equipment or methods used must not cause quick soil conditions or cause scouring or caving around
or below the pile.
3. Steel shells must be free of any soil, rock, or other material deleterious to the bond between concrete
and steel before placing reinforcement and concrete.
4. The bottom 8 feet of the pile must not be cleaned out.
After the steel shell has been cleaned out, construct the pile expeditiously in order to prevent deterioration
of the surrounding foundation material from the presence of water. Remove deteriorated foundation
materials from the bottom of the steel shell, including materials that have softened, swollen, or degraded.
Dispose of material resulting from cleaning out the steel shells.
Where conditions render it impossible or inadvisable in the opinion of the Engineer to dewater the steel
shells before placing reinforcement and concrete, seal the bottom of the steel shell under section 51
1.03D(3). After sealing, dewater and clean out the steel shell.
49-3.03C(3) Close-Ended Steel Shells
Reserved.
49-3.03D Payment
Driven steel shells filled with concrete and reinforcement are paid for as furnish piling and drive pile.
Payment for furnish piling includes:
1.
2.
2.
3.

Furnishing steel shells at the job site


Furnishing concrete
Furnishing reinforcement except for piles with a diameter of 24 inches or greater
Splicing steel shells

Payment for drive pile includes:


1.
2.
3.
4.
5.
6.
7.
8.

Driving and cutting off the steel shells at the elevations shown
Furnishing special driving tips or heavier sections of steel shells
Drilling holes or predrilling holes through embankments
Cleaning out and disposing of material from open-end steel shells
Placing seal course concrete in open-ended steel shells
Dewatering open-ended steel shells
Placing reinforcement and concrete
Disposing of material resulting from drilling holes, predrilling holes, or cleaning out open-ended steel
shells

572

SECTION 49

PILING

49-4 STEEL SOLDIER PILING

49-4.01 GENERAL
Section 49-4 includes specifications for drilling holes and installing steel soldier piles in the drilled holes.
49-4.02 MATERIALS
49-4.02A General
Steel soldier piles must comply with section 49-2.03.
49-4.02B Concrete Anchors
Concrete anchors must comply with the specifications for stud connectors in section 55.
Stud connectors must be Type B complying with clause 7 of AWS D1.5.
49-4.03 CONSTRUCTION
49-4.03A General
Clean and prepare piles in heat affected areas before splicing steel piles or welding concrete anchors.
49-4.03B Drilled Holes
Drill holes for steel soldier piles into natural foundation material. Drilled holes must be accurately located,

straight, and true.

Plumb and align the pile before placing concrete backfill and lean concrete backfill. The pile must be at

least 1 inch clear of the sides of the hole for the full length of the hole to be filled with concrete backfill and

lean concrete backfill. Ream or enlarge holes that do not provide the clearance around steel piles.

Furnish and place temporary casings or tremie seals where necessary to control water or to prevent

caving of the hole.

Before placing the steel soldier pile, remove loose materials existing at the bottom of the hole after drilling

activities have been completed.

Do not allow surface water to enter the hole. Remove all water in the hole before placing concrete.

If temporary casings are used, they must comply with section 49-3.02C(3).

Maintain alignment of the pile in the hole while placing backfill material.

49-4.04 PAYMENT
Not Used
49-5 MICROPILING
Reserved
49-6 ALTERNATIVE PILING
Reserved
49-749-10 RESERVED

573

50 PRESTRESSING CONCRETE

50-1.01 GENERAL
50-1.01A Summary
Section 50 includes specifications for prestressing concrete.
50-1.01B Definitions
Reserved
50-1.01C Submittals
50-1.01C(1) General
Submit certifications and test samples to METS.
50-1.01C(2) Certifications
Submit the certifications specified in the following:
1. ASTM A 416/A 416M for uncoated seven-wire steel strand
2. ASTM A 722/A 722M for uncoated HS steel bars
3. ASTM A 882/A 882M for filled epoxy-coated seven-wire prestressing steel strand
Include with each certification:
1. Representative load-elongation curve for each size and grade of strand and for each size of bar
2. Copy of the QC tests performed by the manufacturer
50-1.01C(3) Shop Drawings
Submit shop drawings for the prestressing system proposed for use to OSD, Documents Unit. Notify the
Engineer of the submittal. Include in the notification the date and list of contents of the submittal.
For initial review, submit:
1. 6 sets for railroad bridges
2. 8 sets for railroad bridges if the project includes a BNSF Railway underpass
3. 4 sets for other structures
After initial review, submit from 6 to 12 sets to OSD, Documents Unit, as requested.
The shop drawings must show complete details and substantiating calculations of the method and
materials proposed for use in the prestressing activities, including the addition or rearrangement of
reinforcing steel.
The details must outline the method and sequence of stressing and must include:
1.
2.
3.
4.
5.

Complete specifications and details of the prestressing steel and anchorage system.
Jacking stresses.
Type of ducts.
Proposed arrangement of the prestressing steel in the members.
Exact location of anchorage system components, ducts, and other related elements. Show duct
location data, including elevations at least every 1/8th point of the span for each span.
6. Elongation calculations.
7. All other data pertaining to the prestressing.
Each shop drawing submittal must consist of drawings for a single bridge or portion of a bridge. For
multiframe bridges, each frame must have a separate shop drawing submittal.
Allow the following time for review of the shop drawings:
1. 60 days for railroad bridges
2. 45 days for other structures

575

SECTION 50

PRESTRESSING CONCRETE

For railroad bridges, authorization of the shop drawings is contingent upon the drawings being
satisfactory to the railway company involved.
50-1.01C(4) Test Samples
Submit test samples for the materials to be used as shown in the following table:
Material
Uncoated stranda
Epoxy-coated strand:
Uncoated stranda

Number of test
samples
1

Test sample description


4-foot-long sample from each reel or pack

4-foot-long sample of uncoated strand removed from each


reel or pack before coating

Coated stranda

5-foot-long sample from each reel or pack of coated


strand

Epoxy powder

8-ounce sample from each batchb

Epoxy patching
material

8-ounce sample from each batchb

1
1

7-foot-long sample of each size for each heat


Coupler from each lot of couplers with two 4-foot-long
barsc
Anchorage assembly from each lot of anchorage
assemblies

Bara
Bar couplera

1
Anchorage
assembliesa
a
Randomly selected by the Engineer.

b
Packaged in an airtight container and identified with the manufacturer's name and batch number.

c
Submit coupler and bar samples assembled. The bars must be from the same bar heats to be used in

the work.

Sample under the ASTM specified for testing the sample.


With each bar or strand test sample, include a certificate from the manufacturer stating the minimum
guaranteed ultimate tensile strength of each bar or strand test sample.
Before submitting test samples to METS:
1. Identify each test sample by location and Contract number with weatherproof markings
2. Attach a completed Sample Identification Card to each test sample
Allow 45 days for the Department's testing.
Obtain the Department's authorization of the material before incorporating it into the work.
50-1.01D Quality Control and Assurance
50-1.01D(1) General
The following items must be on the Authorized Material List:
1. Post-tensioning prestressing systems
2. Organic zinc-rich primer
For accurate identification, (1) assign an individual lot number and (2) tag each lot of the following items
to be shipped to the job site or casting site:
1.
2.
3.
4.

Bars of each size from each heat


Strand from each reel or pack
Anchorage assemblies
Bar couplers

576

SECTION 50

PRESTRESSING CONCRETE

The Department rejects any unidentified prestressing steel, anchorage assemblies, or bar couplers
received at the job site or casting site.
50-1.01D(2) Quality Assurance Testing
The Department tests the test samples for compliance with section 50-1.02B.
The Department tests the efflux time of grout under California Test 541.
The Department may verify the prestressing force:
1. Using Department-furnished load cells for post-tensioning of prestressing steel
2. Under California Test 677 for pretensioning prestressing steel
The Department determines the reduction of area of each test sample bar with the deformations
removed. The deformations are removed by machining the bar no more than necessary to remove the
deformations over a length of 12 inches.
50-1.01D(3) Equipment and Calibration
Equip each hydraulic jack used to tension prestressing steel with 2 pressure gages or 1 pressure gage
and a load cell.
Each jack body must be permanently marked with the ram area.
Each pressure gage must be fully functional and have an accurately reading dial at least 6 inches in
diameter.
Each load cell must be calibrated and have an indicator that can be used to determine the force in the
prestressing steel.
The range of each load cell must be such that the lower 10 percent of the manufacturer's rated capacity is
not used in determining the jacking force.
Calibrate jacking equipment as follows:
1. Calibrate each jack and its gage as a unit with the cylinder extension in the approximate position that
it will be at the final jacking force.
2. Each jack used to tension prestressing steel permanently anchored at 25 percent or more of its
specified minimum ultimate tensile strength must be calibrated by METS within 1 year of use and
after each repair. You must:
1.1. Schedule the calibration of the jacking equipment with METS
1.2. Verify that the jack and supporting systems are complete, with proper components, and are in
good operating condition
1.3. Mechanically calibrate the gages with a dead weight tester or other authorized means before
calibration of the jacking equipment by METS
1.4. Provide enough labor, equipment, and material to (1) install and support the jacking and
calibration equipment and (2) remove the equipment after the calibration is complete
1.5. Plot the calibration results
3. Each jack used to tension prestressing steel permanently anchored at less than 25 percent of its
specified minimum ultimate tensile strength must be calibrated by an authorized laboratory within 6
months of use and after each repair.
50-1.02 MATERIALS
50-1.02A General
Reserved
50-1.02B Prestressing Steel
Uncoated strand must comply with ASTM A 416/A 416M.
Epoxy-coated strand must comply with ASTM A 882/A 882M, grit impregnated coating, including Annex
A1.

577

SECTION 50

PRESTRESSING CONCRETE

Bars must comply with ASTM A 722/A 722M, Type II, including all supplementary requirements, except
the maximum weight requirements do not apply. The reduction of area of the bars with the deformations
removed must be at least 20 percent.
If couplers are used to extend bars:
1. Assembled units must have a tensile strength of at least the manufacturer's minimum guaranteed
ultimate tensile strength of the bars. If the test sample does not meet this requirement, the heat of
bars and lot of couplers represented by the sample will be rejected.
2. Location of couplers in the member must be authorized.
Protect the prestressing steel against physical damage and rust or other results of corrosion at all times,
from manufacture to grouting or encasing in concrete.
Package prestressing steel in containers or shipping forms that protect the steel against physical damage
and corrosion during shipping and storage.
Except for epoxy-coated strand, a corrosion inhibitor that prevents rust or other results of corrosion must
be (1) placed in the container or shipping form, (2) incorporated in a corrosion-inhibitor-carrier-type
packaging material, or (3) applied directly to the steel if authorized.
Corrosion inhibitors must not have a deleterious effect on the steel, concrete, or bond strength of the steel
to concrete.
Clearly mark each shipping container or form with:
1. Statement that the package contains prestressing steel
2. Type of corrosion inhibitor used
3. D
ate packaged
Immediately replace or restore any damaged container or shipping form to its original condition.
Do not store epoxy-coated strand within 1,000 feet of ocean or tidal water for more than 2 months.
The Engineer rejects prestressing steel that has sustained physical damage.
The Engineer may reject prestressing steel that has developed visible rust or other results of corrosion.
Patching material for epoxy-coated strand must be:
1.
2.
3.
4.

Furnished by the manufacturer of the epoxy powder


Applied under the manufacturer's instructions
Compatible with the original epoxy powder material
Inert in concrete

50-1.02C Grout
Grout must consist of cement and water and may contain an admixture if authorized.
Cement must comply with section 90-1.02B(2)
Water must comply with section 90-1.02D.
Admixtures must comply with section 90, except admixtures (1) must not contain chloride ions in excess
of 0.25 percent by weight and (2) may be dispensed in solid form.
Mix the grout as follows:
1.
2.
3.
4.

Add water to the mixer followed by cement and any admixture.


Mix the grout with mechanical mixing equipment that produces a uniform and thoroughly mixed grout.
Do not exceed 5 gallons of water per 94 lb of cement. Retempering of grout is not allowed.
Agitate the grout continuously until the grout is pumped.

The efflux time of grout immediately after mixing must be at least 11 seconds.
578

SECTION 50

PRESTRESSING CONCRETE

50-1.02D Ducts
Ducts for prestressing steel must:
1. Be galvanized rigid ferrous metal
2. Be fabricated with either welded or interlocked seams, except galvanizing of the welded seams is not
required
3. Be mortar tight
4. Have sufficient strength to maintain their correct alignment during placing of concrete
5. Have positive metallic connections at joints between sections that do not result in angle changes at
the joints
6. Have waterproof tape at the connections
7. Have bends that are not crimped or flattened
8. Have ferrous metal or polyolefin transition couplings connecting the ducts to anchorage system
components. Ferrous metal transition couplings need not be galvanized
9. Have an inside diameter of at least:
9.1. 2.5 times the net area of the prestressing steel for multistrand tendons that will be placed by
the pull-through method
9.2. 2.0 times the net area of the prestressing steel for multistrand tendons that will not be placed
by the pull-through method
10. Have an inside diameter of at least 3/8 inch larger than the diameter of the bar
11. Have an outside diameter not exceeding 50 percent of the girder web width
Furnish all ducts or anchorage assemblies with pipes or other suitable connections for the injection of
grout after prestressing.
50-1.02E Vents
Vent all ducts having a vertical duct profile change of 6 inches or more. Place vents within 6 feet of every
high point in the duct profile. Vents must:
1. Be at least 1/2-inch-diameter standard pipe or suitable plastic pipe.
2. Be connected to ducts using metallic or plastic structural fasteners. Plastic components must not
react with the concrete or enhance corrosion of the prestressing steel and must be free from water
soluble chlorides.
3. Be mortar tight and taped as necessary.
4. Provide a means for injection of grout through the vents and for sealing the vents.
50-1.02F Flushing Water
Water used for flushing ducts must contain 0.1 pound of quicklime (calcium oxide) or slaked lime (calcium
hydroxide) per gallon of water. Use only oil-free compressed air to blow out ducts.
50-1.03 CONSTRUCTION
50-1.03A General
50-1.03A(1) General
If authorized, you may:
1. Apply a portion of the total prestressing force to a PC member before the member has obtained the
concrete strength shown
2. Move the member after applying the portion of prestressing force
Except for epoxy-coated strand, prestressing steel installed in members before placing and curing of the
concrete must be continuously protected against rust or other results of corrosion until grouted. Protect
the steel by using a corrosion inhibitor placed in the ducts or applied to the steel in the duct.
After final fabrication of the strand, do not perform any electric welding on the prestressing steel. If electric
welding is performed on or near members containing prestressing steel, attach the welding ground
directly to the steel being welded.

579

SECTION 50

PRESTRESSING CONCRETE

50-1.03A(2) Epoxy-Coated Strand


Cover epoxy-coated strand with an opaque polyethylene sheeting or other suitable protective material to
protect the strand from exposure to sunlight, salt spray, and weather. For stacked coils, drape the
protective covering around the perimeter of the stack. The covering must be adequately secured and
allow for air circulation around the strand to prevent condensation under the covering.
Cut epoxy-coated strand using an abrasive saw.
Patch all visible damage to the epoxy coating caused by shipping, job site handling, installation, or cutting
of ends, under ASTM A 882/A 882M.
50-1.03A(3) Ducts
Accurately place prestressing ducts. Securely fasten the ducts in place to prevent movement of the ducts
during concrete placement.
After installation, cover the duct ends to prevent water or debris from entering.
50-1.03B Prestressing
50-1.03B(1) General
Tension the prestressing steel using hydraulic jacks. The force in the prestressing steel must be at least
the value shown.
50-1.03B(2) Post-Tensioned Members
50-1.03B(2)(a) General
Before placing forms for deck slabs of box girder bridges, demonstrate that any prestressing steel placed
in the ducts is free and unbonded. If no prestressing steel is in the ducts, demonstrate that the ducts are
unobstructed before placing the forms.
If prestressing steel is installed after the concrete is placed, demonstrate that the ducts are free of water
and debris immediately before installing the steel.
Before post-tensioning any member, demonstrate that the prestressing steel is free and unbonded in the
duct.
The Engineer must witness all demonstrations.
If requested, for verification of the force in the prestressing steel, furnish the resources necessary to
install and support the Department's testing equipment at the prestressing steel location and to remove
the equipment after the testing is complete.
Conduct the tensioning process such that the force being applied and the elongation of the prestressing
steel can be measured at all times.
The maximum temporary tensile strength in the prestressing steel of post-tensioned members must not
exceed 75 percent of the specified minimum ultimate tensile strength of the prestressing steel.
If steam curing is used for precast members, do not install prestressing steel for post-tensioning until the
steam curing is completed.
If non-epoxy-coated prestressing steel is installed in the ducts after completion of concrete curing, and
tensioning and grouting are completed within 10 days after the installation, then (1) rust that may form
during this period is not cause for rejection of the steel and (2) the use of a corrosion inhibitor in the duct
is not required following installation.
Do not tension the prestressing steel of post-tensioned members until (1) at least 10 days after the last
concrete has been placed in the member and (2) the concrete has attained the compressive strength
described.
Distribute the prestressing force of post-tensioned bridge girders with an approximately equal quantity in
each girder and place the force symmetrically about the centerline of the structure. In slabs, distribute the
prestressing force uniformly across the slab.

580

SECTION 50

PRESTRESSING CONCRETE

Sequence the stressing of post-tensioned bridge girders such that no more than 1/2 of the prestressing
force in any girder is applied before an equal force is applied in the adjacent girders. The maximum
temporary force variation between girders must not exceed the prestressing force of the largest tendon
used in all girders. Do not apply an eccentric force about the centerline of the structure that exceeds 1/6
of the total prestressing force at any time during the prestressing.
50-1.03B(2)(b) Losses
Reserved
50-1.03B(2)(c) Anchorages and Distribution
The ends of post-tensioned prestressing steel must be secured with a permanent type anchoring system.
The anchorage system for post-tensioning must:
1. Hold the prestressing steel at a force producing a stress of at least 95 percent of the specified
ultimate tensile strength of the steel
2. Permanently secure the ends of the prestressing steel
You may omit the steel distribution plates or assemblies if you use an anchorage device of a type that is
sufficiently large and that is used in conjunction with a steel grillage embedded in the concrete that
effectively distributes the compressive stresses to the concrete.
If loop tendon anchorages are used, enclose the anchorages in ducts for their entire length.
Where the end of a post-tensioned assembly is not to be covered by concrete, recess the anchorage
system such that the ends of the prestressing steel and all parts of the anchorage system are at least 2
inches inside of the end surface of the members unless a greater embedment is shown. After post
tensioning, fill the recesses with concrete and finish flush.
The concrete used to fill the recess must be the same as that used for the structure.
Distribute the anchorage load to the concrete by using a post-tensioning system.
The load from the anchorage system must be effectively distributed to the concrete such that:
1. Concrete bearing stress directly underneath the plate or assembly does not exceed 3,300 psi
2. When the prestressing steel is tensioned to 95 percent of its specified ultimate tensile strength:
2.1 Bending stress in the plate material or assembly material does not exceed the yield point of the
material
2.2 No visible distortion is evident in the anchorage plate
50-1.03B(2)(d) Bonding and Grouting
50-1.03B(2)(d)(i) General
Bond the post-tensioned prestressing steel to the concrete by completely filling the entire void space
between the duct and the prestressing steel with grout.
Ducts must be clean and free from water and deleterious materials that would impair bonding of the grout
or interfere with grouting procedures.
Grout must pass through a screen with 0.07-inch maximum clear openings before being introduced into
the grout pump.
Prevent the leakage of grout through the anchorage assembly by positive mechanical means.
Pump grout through the duct as follows:
1. Continuously waste grout at the outlet until no visible slugs or other evidence of water or air is ejected
and the efflux time of ejected grout is at least 11 seconds
2. Close the outlet valve and hold the pumping pressure momentarily
3. Close the valve at the inlet while maintaining the pressure
If hot weather conditions will contribute to quick stiffening of the grout, cool the grout by authorized
methods as necessary to prevent blockages during pumping activities.
581

SECTION 50

PRESTRESSING CONCRETE

If freezing weather conditions are anticipated during and following the placement of grout, provide
adequate means to protect the grout in the ducts from damage by freezing.
After completing duct grouting activities:
1. Abrasive blast clean and expose the aggregate of concrete surfaces where concrete is to be placed
to cover and encase the anchorage assemblies
2. Remove the ends of vents 1 inch below the roadway surface
50-1.03B(2)(d)(ii) Grouting Equipment
Grouting equipment must be:
1. Capable of grouting at a pressure of at least 100 psi
2. Equipped with a pressure gage having a full-scale reading of not more than 300 psi
Where vents are required, furnish standby flushing equipment capable of developing a pumping pressure
of 250 psi and of sufficient capacity to flush out any partially grouted ducts.
Fit grout injection pipes, ejection pipes, and vents with positive mechanical shutoff valves capable of
withstanding the pumping pressures. Do not remove or open valves until the grout has set. If authorized,
you may substitute mechanical valves with suitable alternatives after demonstrating their effectiveness.
50-1.03B(3) Pretensioned Members
If prestressing steel for pretensioning is placed in the stressing bed and is exposed to the elements for
more than 36 hours before encasement in concrete, protect the steel from contamination or corrosion
using authorized measures.
Do not cut or release prestressing steel in pretensioned members until the concrete in the member has
attained a compressive strength of at least the value shown or 4,000 psi, whichever is greater. If epoxy
coated strand is used, do not cut or release the steel until the temperature of the concrete surrounding
the strand is less than 150 degrees F and falling.
If requested, check individually-tensioned strands for loss of prestress not more than 48 hours before
placing concrete for the members, using authorized methods and equipment. Strands showing a loss of
prestress of more than 3 percent must be retensioned to the original computed jacking force.
If prestressing steel in pretensioned members is tensioned at a temperature appreciably lower than the
estimated temperature of the concrete and the prestressing steel at the time of initial set of the concrete,
the calculated elongation of the prestressing steel must be increased to compensate for the loss in stress.
The maximum temporary tensile stress in the prestressing steel of pretensioned members must not
exceed 80 percent of the specified minimum ultimate tensile strength of the prestressing steel.
Perform the cutting and releasing of prestressing steel in pretensioned members in such an order that
lateral eccentricity of prestress is a minimum.
Anchor the prestressing steel at stresses that will result in the ultimate retention of jacking forces at least
equal to those shown.
Cut off pretensioned prestressing steel flush with the end of the member. After cutting the steel, clean and
paint the exposed ends of the steel and a 1-inch strip of adjoining concrete as follows:
1. Wire brush or abrasive blast clean to remove all dirt and residue on the metal and concrete surfaces.
2. Immediately after cleaning, apply 1 application of organic zinc-rich primer to the surfaces, except
apply 2 applications to surfaces that will not be covered by concrete or mortar. Do not use aerosol
cans. Mix the paint thoroughly when applying and work into any voids in the prestressing steel.
50-1.04 PAYMENT
Not Used

582

51 CONCRETE STRUCTURES

51-1 GENERAL

51-1.01 GENERAL
51-1.01A Summary
Section 51-1 includes general specifications for constructing concrete structures, including bridges,
approach slabs, culverts, retaining walls, minor structures, and other structures.
Sliding joints, waterstops, and strip waterstops must comply with section 51-2.
Elastomeric bearing pads must comply with section 51-3.
Falsework for constructing concrete structures must comply with section 48-2.
You may use RSC only where the specifications allow the use of RSC.
51-1.01B Definitions
form panel: Continuous section of form facing material, unbroken by joint marks, against which concrete
is placed.
opening age: Minimum age at which an element constructed with RSC may be opened to traffic.
pier column: Extension of a column or pier into bedrock material.
51-1.01C Submittals
51-1.01C(1) General
If requested, submit concrete form design and materials data for each forming system.
Submit a deck placement work plan for concrete bridge decks.
For colored concrete, submit technical data, manufacturer's specifications, and a work plan for mixing,
delivery, placement, finishing, and curing of the concrete.
51-1.01C(2) Permanent Steel Deck Forms
Submit 3 sets of shop drawings for permanent steel deck forms. Include in the submittal:
1.
2.
3
4.
5.
6.

Layout plan
Grade of steel
Physical and section properties of members
Method of support and grade adjustment
Method for accommodating skew
Methods of sealing against grout leaks

51-1.01C(3) Bonding Materials


Except for a bonding material previously authorized by the Department, submit at least a 45-pound test
sample to METS. Allow 45 days for testing. Obtain the Department's authorization of the bonding material
before incorporating it into the work.
For a bonding material previously authorized by the Department, submit a certificate of compliance for
each shipment of the material.
51-1.01C(4) Rapid Strength Concrete
For RSC, submit the mix design at least 10 days before use. Include in the submittal:
1. Compressive strength test results for prequalification of RSC at age of break, at 3 days, and at 28
days
2. Opening age in hours
3. Proposed aggregate grading
4. Mix proportions of cementitious material, aggregate, and water
5. Types and quantities of chemical admixtures, if used
6. Range of ambient temperatures over which the mix design will achieve the required minimum
compressive strength
583

SECTION 51

CONCRETE STRUCTURES

7. Source of materials
51-1.01C(5) Chemical Adhesives
Submit a certificate of compliance for chemical adhesive stating compliance with ICBO AC 58 and
Caltrans Augmentation/Revisions to ICBO AC 58. Revisions to ICBO AC 58 are on the Authorized
Material List.
Submit chemical adhesive manufacturer's installation procedures and warnings or precautions as an
informational submittal at least 2 business days before starting work.
Submit 1 test sample of each chemical adhesive system to be used from each lot to METS for testing at
least 25 days before use. The test sample must consist of 1 unit of chemical adhesive, 1 mixing nozzle,
and 1 retaining nut. A lot for chemical adhesives is 100 units, or fraction thereof, of the same brand and
product name.
Each test sample must be clearly marked with the following:
1.
2.
3.
4.
5.

Manufacturer's name and system model number


Date of manufacture
Lot number
Shelf life or expiration date
Current ICBO evaluation report number

51-1.01D Quality Control and Assurance


51-1.01D(1) General
Reserved
51-1.01D(2) Rapid Strength Concrete
Prequalify RSC before use. Prequalification of a RSC mix design includes determining the opening age
and attaining the minimum specified 28-day compressive strength.
Prequalify RSC under section 90-1.01D(5)(b).
Determine the opening age of the RSC mix design as follows:
1. Fabricate at least 5 test cylinders to be used to determine the age of break.
2. Immediately after fabrication of the 5 test cylinders, store the cylinders in a temperature medium of 70
3 degrees F until the cylinders are tested.
3. Determine the age of break to attain an average strength of the 5 test cylinders.
4. Opening age is the age of break plus 1 hour.
The average strength of the 5 test cylinders must be at least 1,200 psi. Not more than 2 test cylinders
may have a strength of less than 1,150 psi.
If compressive strength tests performed in the field show that the concrete has attained the specified
average strength, you may open the lane to traffic at the age of break. Perform the compressive strength
tests under the specifications for sampling and testing cylinders in section 90-1.01D(5)(a). If you choose
to use this option, notify the Engineer before starting construction.
51-1.01D(3) Test Panels
Test panels must be:
1. Constructed at an authorized location
2. At least 4 by 4 feet by 5 inches deep
3. Constructed and finished using the personnel, materials, equipment, and methods to be used in the
work
4. Authorized before starting work
The Engineer may request that additional test panels be constructed until the specified finish, texture, and
color are attained.

584

SECTION 51

CONCRETE STRUCTURES

The Engineer uses the authorized test panel to determine acceptability of the work.
51-1.01D(4) Testing Roadway Surfaces
51-1.01D(4)(a) General
The Engineer tests roadway surfaces for smoothness, coefficient of friction, and crack intensity.
51-1.01D(4)(b) Surface Smoothness
The Engineer tests the surface smoothness of the following:
1. Completed roadway surfaces of structures and approach slabs and the adjacent 50 feet of approach
pavement
2. Surfaces of concrete decks to be covered with another material
You must schedule smoothness testing. Allow 10 days for the Engineer to perform smoothness testing.
Before the testing, clean the test area and remove obstructions.
Surface smoothness is tested using a bridge profilograph under California Test 547. Two profiles are
obtained in each lane approximately 3 feet from the lane lines and 1 profile is obtained in each shoulder
approximately 3 feet from the curb or rail face. Profiles are taken parallel to the direction of traffic.
Deck surfaces must comply with the following smoothness requirements:
1. Profile trace having no high points over 0.02 foot
2. Profile count of 5 or less in any 100-foot section for portions within the traveled way
3. Surface not varying more than 0.02 foot from the lower edge of a 12-foot-long straightedge placed
transversely to traffic
Grind surfaces not complying with the smoothness requirements under section 42-3 until the required
smoothness is attained. Grinding must not reduce the concrete cover on reinforcing steel to less than 1
1/2 inches.
Replace portions of decks that cannot be corrected by grinding.
51-1.01D(4)(c) Coefficient of Friction
After deck surfaces and approach slabs have been textured, the Engineer tests the coefficient of friction
of the concrete surfaces under California Test 342.
If portions of completed deck surfaces or approach slabs have a coefficient of friction of less than 0.35,
those portions must be ground to produce a coefficient of friction of not less than 0.35 or grooved parallel
to the center line. Grinding and grooving must comply with section 42.
51-1.01D(4)(d) Crack Intensity
The Engineer measures crack intensity of deck surfaces after curing, before prestressing, and before
falsework release. Clean the surface for the Engineer to measure surface crack intensity.
In any 500 sq ft portion of a new deck surface, if there are more than 50 feet of cracks having a width at
any point of over 0.02 inch, treat the deck with methacrylate resin under section 15-5.05. Treat the entire
deck width between barriers to 5 feet beyond where the furthest continuous crack emanating from the
500 sq ft section is 0.02 inch wide. Treat the deck surface before grinding.
51-1.01D(5) Chemical Adhesives
Chemical adhesives for bonding dowels must be on the Authorized Material List. The chemical adhesive
must be appropriate for the installation conditions.
51-1.02 MATERIALS
51-1.02A General
Reserved

585

SECTION 51

CONCRETE STRUCTURES

51-1.02B Concrete
Except for minor structures, the cementitious material content per cubic yard of concrete in structures or
portions of structures must comply with the content shown in the following table:
Use
Deck slabs and slab spans of bridges
Roof sections of exposed top box culverts
Pier columns
Seal courses
Other portions of structures
Concrete for PC members

Cementitious material content


(lb/cu yd)
675 min, 800 max
675 min, 800 max
675 min, 800 max
675 min
590 min, 800 max
590 min, 925 max

Except for minor structures, the minimum required compressive strength for concrete in structures or
portions of structures is the strength described or 3,600 psi at 28 days, whichever is greater.
51-1.02C Bonding Materials
Bonding materials must be magnesium phosphate concrete, modified high-alumina-based concrete, or

portland-cement-based concrete.

Magnesium phosphate concrete must be either single component (water activated) or dual component

(prepackaged liquid activator).

Modified high-alumina-based concrete and portland-cement-based concrete must be water activated.

Bonding materials must comply with the requirements shown in the following table:

Property
Compressive strength at:
3 hours
24 hours
Flexural strength at 24 hours
Bond strength at 24 hours:
Saturated surface dry concrete
Dry concrete
Water absorption
Abrasion resistance at 24 hours
Drying shrinkage at 4 days
Soluble chlorides by weight
Water soluble sulfates by weight

Test method
California Test 551

California Test 551


California Test 551

California Test 551


California Test 550
ASTM C 596
California Test 422
California Test 417

Requirement
21 MPa min
35 MPa min
3.5 MPa min
2.1 MPa min
2.8 MPa min
10 percent max
25 g max
0.13 percent max
0.05 percent max
0.25 percent max

Magnesium phosphate concrete must be formulated for a minimum initial set time of 15 minutes and
minimum final set time of 25 minutes at 70 degrees F. Store the materials in a cool, dry environment
before use.
The mix water used with water-activated material must comply with section 90-1.02D.
The quantity of water for single-component type or liquid activator for dual-component type to be blended
with the dry component, must be within the limits recommended by the manufacturer and must be the
least amount required to produce a pourable batter.
If authorized, you may add retarders to magnesium phosphate concrete. The addition of retarders must
comply with the manufacturer's instructions.
Magnesium phosphate concrete must not be mixed in containers or worked with tools containing zinc,
cadmium, aluminum, or copper metals. Modified high alumina based concrete must not be mixed in
containers or worked with tools containing aluminum.

586

SECTION 51

CONCRETE STRUCTURES

51-1.02D Rapid Strength Concrete


RSC placed in bridge decks must contain at least 675 pounds of cementitious material per cubic yard.
RSC must have a minimum 28-day compressive strength of 4,000 psi except RSC placed in bridge decks
must have a minimum 28-day compressive strength of 4,500 psi.
51-1.02E Colored Concrete
Color pigments for colored concrete must be of iron oxides complying with ASTM C 979. The dosage
must not exceed 10 percent by weight of cementitious material in the concrete mix design.
When test panels are specified, cementitious materials and aggregates from the same sources used in
the authorized test panel must be used for the colored concrete in the completed work.
51-1.02F Mortar
Mortar must be composed of cement, sand, and water. Materials for mortar must comply with section 90.
The proportion of sand to cement measured by volume must be 2 to 1. Mortar must contain only enough
water to allow placing and packing. Sand particles must be no larger than 1/2 the size of the recess or
space in which the mortar is to be placed.
51-1.02G Grout
Grout must consist of portland cement and water, with a water content of at most 4 gallons per 94 pounds
of cement.
51-1.02H Miscellaneous Metal
Materials for access opening covers for new structures must comply with section 75-1.03.
51-1.02I Miscellaneous Materials
Plastic pipe for deck bleeder drains must be schedule 40 PVC complying with ASTM D 1785.
Galvanized wire cloth for deck bleeder drains must be 1/4-inch mesh with 0.047-inch-diameter wire.
51-1.03 CONSTRUCTION
51-1.03A General
Reserved
51-1.03B Methods and Equipment
Vehicles weighing over 1,000 lb are not allowed on any bridge span until the concrete attains a
compressive strength of at least 2,400 psi. Vehicles weighing over 4,000 lb are not allowed on any span
until the concrete attains a compressive strength of at least 3,250 psi or attains an age of 28 days.
Vehicles exceeding the weight limitations in Veh Code Div 15 that cross bridges as allowed in section 51.37B must not make repetitive crossings of any span until the concrete attains an age of 28 days.
Vehicles with a gross weight over 10,000 lb are not allowed on any span of PS concrete structures until
the prestressing steel for that span is tensioned.
You may precast structural elements not designated as PC members if authorized. If requested, submit
shop drawings for proposed PC members. Include construction joint details, foundation bedding, and
other requested information.
You may use the slip form method for constructing pier shafts if (1) the results are equal to those obtained
by compliance with these specifications and (2) adequate arrangements are made and carried out for
curing, finishing, and protecting the concrete.
When slip forms are used for pier construction, the line and grade furnished by the Engineer is limited to
establishing control points and checks of slip form position. You must provide targets, markers, or other
devices for the Engineer to determine the pier shaft position.
Shotcrete is not allowed as an alternative construction method for reinforced concrete members.
You may construct warped portions of wingwalls at the ends of culverts using shotcrete complying with
section 53-1.
587

SECTION 51

CONCRETE STRUCTURES

51-1.03C Preparation
51-1.03C(1) General
Bottom of footing elevations shown are approximate.
The Engineer may order changes in footing dimensions or elevations. Payment for additional structure
excavation and structure backfill resulting from these changes is made under section 19-3.04.
The Department does not pay for additional costs due to fabricating or performing other related work
before the final foundation configuration is determined.
Where a roughened concrete surface is described, roughen the existing concrete surface to a full
amplitude of approximately 1/4 inch by abrasive blasting, water blasting, or using mechanical equipment.
Pump water from the interior of foundation enclosures without removing concrete materials. Do not pump
water during concrete placement or for 24 hours after placing concrete, unless the pumping is done from
a sump separated from the concrete work.
51-1.03C(2) Forms
51-1.03C(2)(a) General
Forms must be:
1. Mortar tight
2. True to the dimensions, lines, and grades of the structure
3. Strong enough to prevent deflection during concrete placement
Face exposed surfaces of concrete structures with form panels.
Form panels for exposed surfaces must be plywood complying with or exceeding the requirements of
U.S. Product Standard PS 1 for Exterior B-B (Concrete Form) Class I Plywood or any material that
produces a similarly smooth, uniform surface. For exposed surfaces, use only form panels in good
condition and free of defects such as scars, dents, or delaminations.
Design and construct forms for exposed surfaces such that surfaces do not undulate more than 3/32 inch
or 1/270 of the center-to-center distance between studs, joists, form stiffeners, form fasteners, or wales in
any direction. Stop using forms or forming systems that produce excessive undulations until modifications
satisfactory to the Engineer are made. The Engineer may reject portions of structures with excessive
undulations.
Form exposed surfaces of each element of a concrete structure with the same forming material or with
materials that produce similar surface textures, color, and appearance.
Use form panels in uniform widths of at least 3 feet and uniform lengths of at least 6 feet except at the
ends of continuously formed surfaces where the final panel length is less than 6 feet. For members less
than 3 feet wide, form panels must be the width of the entire member.
Arrange form panels in symmetrical patterns conforming to the general lines of the structure. Place
panels for vertical surfaces with the long dimension horizontal and horizontal joints level and continuous.
Form panels for curved column surfaces must be continuous for at least 1/4 of the circumference or 6
feet. For walls with sloping footings that do not abut other walls, you may place panels with the long
dimension parallel to the footing.
Align form panels on each side of panel joints with supports or fasteners common to both panels so that a
continuous, unbroken concrete plane results. Form filler panels that join prefabricated panels must (1)
have a uniform width of at least 1 foot and (2) produce a smooth, uniform surface with consistent
longitudinal joint lines between panels.
Construct forms for exposed surfaces with triangular fillets at least 3/4 by 3/4 inch. Attach fillets so as to
prevent mortar runs and to produce smooth, straight chamfers at all sharp edges of the concrete.
Clean inside form surfaces of dirt, mortar, and foreign material. Thoroughly coat forms to be removed with
form oil before placing concrete. Form oil must:
588

SECTION 51

CONCRETE STRUCTURES

1. Be commercial quality or an equivalent coating


2. Allow the ready release of forms
3. Not discolor the concrete
Do not place concrete in forms until:
1. All form construction work has been completed, including removing foreign material
2. All materials to be embedded in the concrete have been placed
3. Engineer has inspected the forms
Forms for concrete surfaces that will not be completely enclosed or hidden below the permanent ground
surface must comply with the specifications for forms for exposed surfaces. Interior surfaces of
underground drainage structures are considered completely enclosed surfaces.
Use form fasteners to prevent form spreading during concrete placement. Do not use twisted wire ties to
hold forms in position.
Form fasteners and anchors must be of those types that can be removed as specified for form bolts in
section 51-1.03F(2) without chipping, spalling, heating or otherwise damaging the concrete surface.
You may cast anchor devices into the concrete for supporting forms or lifting PC members. Do not use
driven types of anchorages for fastening forms or form supports to concrete except for interior surfaces of
girders in PS box girder bridges where:
1. Girders have more than 2 inches of cover over the reinforcement
2. Anchorages do not penetrate the girder more than 2 inches and have a minimum spacing of 6 inches
3. Anchorages are placed at least 3 inches clear from the edge of concrete
51-1.03C(2)(b) Removing Forms
Remove all forms, except soffit forms for deck slabs of CIP box girders, forms for the interior voids of PC
members, and the forms in hollow abutments or piers may remain in place for any of the following
conditions:
1. Permanent access into the cells or voids is not shown
2. Utility facilities are not to be installed in the completed cells or voids
3. Utility facilities to be installed in completed cells or voids are to be inserted into casings that are
placed before the completion of the cell or void
4. Permanent access is shown or utility facilities other than those in preplaced casings are to be
installed in cells or voids, and you:
4.1 Remove the portions of the forms that obstruct access openings or conflict with utility facilities.
4.2 Provide a longitudinal crawl space at least 3 feet high and 2 feet wide throughout the length of
these cells or voids
4.3 Use a forming system that leaves no sharp projections into the cells or voids
4.4 Remove forms between the hinge and 5 feet past the access openings in cells of CIP box
girder bridges with access openings near the hinges
Clear the inside of the cells or voids of all loose material before completing the forming for the deck of CIP
box girders or for the cells or voids of other members when the forms are to remain in place, or after the
removal of the forms or portions of forms.
You may remove forms that do not support the dead load of concrete if 24 hours have elapsed after
concrete placement and the concrete has sufficient strength to prevent damage to the surface.
You may remove forms for railings or barriers after the concrete has hardened. Protect exposed surfaces
from damage.
51-1.03C(2)(c) Permanent Steel Deck Forms
51-1.03C(2)(c)(i) General
Permanent steel deck forms and supports must comply with ASTM A 653/A 653M, Designation SS,
Grades 33 through 80, coating designation G165.

589

SECTION 51

CONCRETE STRUCTURES

51-1.03C(2)(c)(ii) Design Requirements


Design permanent steel deck forms based on the combined dead load of forms, reinforcement, and
plastic concrete with an allowance for construction loads of at least 50 psf. The combined dead load must
be assumed to be at least 160 pcf for normal concrete and 130 pcf for lightweight concrete.
Configure forms such that the weight of deck slab and forms is at most 110 percent of the weight of the
deck slab as shown.
Compute physical design properties under "Design of Cold-Formed Steel Structural Members" of the
AISC Steel Manual.
The design span for form sheets is the clear span of the form plus 2 inches, measured parallel to the form
flutes.
Maximum allowable stresses and deflections are as follows:
1. Tensile stress must not exceed the lesser of 0.725 times the specified yield strength or 36,000 psi.
2. Dead load deflection must not exceed the lesser of 0.0056 times the form span or 1/2 inch. The dead
load for deflection calculations must be at least 120 psf total.
3. You may use form camber based on the actual dead load condition. Do not use camber to
compensate for deflection exceeding the allowable limits.
51-1.03C(2)(c)(iii) Installation
Do not weld steel deck forms to flanges of steel girders.
Permanent steel deck forms must not interfere with movement at deck expansion joints.
Clearance between deck forms and bar reinforcement must be at least 1 inch.
Do not use permanent steel deck forms for sections of deck slabs with longitudinal expansion joints
unless additional supports are placed under the joint.
Do not rest form sheets directly on top of girder flanges. Fasten sheets securely to form supports. Provide
at least 1 inch of bearing at each end. Place form supports in direct contact with girder flanges. Attach
supports using bolts, clips, or other authorized means.
Locate transverse deck construction joints at the bottom of flutes. Field drill 1/4-inch weep holes at not
less than 12 inches on center along the joint line.
Repair galvanized form surfaces damaged before installation by wire brushing to remove loose and
cracked coating and applying 2 coats of zinc-rich primer. Do not use aerosol cans. You do not need to
repair minor heat discoloration in welded areas.
51-1.03D Placing Concrete
51-1.03D(1) General
Thoroughly moisten forms and subgrade with water immediately before placing concrete.
Place and consolidate concrete using methods that (1) do not cause segregation of the aggregate and (2)
produce dense, homogeneous concrete without voids or rock pockets.
Place concrete while fresh and before initial set. Do not retemper partially hardened concrete with
additional water.
Place concrete continuously in each integral part of the structure. Do not start work unless placement can
be completed uninterrupted.
Place concrete for girder spans in at least 2 operations. The last operation must consist of placing the
deck slab. Allow at least 5 days between operations.
Place concrete as close to its final position as possible. Do not use vibrators for extensive shifting of
concrete.

590

SECTION 51

CONCRETE STRUCTURES

Except for CIP piles, do not allow fresh concrete to fall more than 8 feet without using pipes, tubes, or
double belting to prevent segregation. Do not use double belting unless the member thickness is less
than 16 inches.
Consolidate concrete using high-frequency vibrators within 15 minutes of placement. Do not use vibrators
for pipe culvert headwalls and endwalls, slope paving and aprons, and concrete placed under water. Do
not attach vibrators to or hold them against forms or reinforcing steel. Do not displace reinforcement,
ducts, or prestressing steel during vibrating.
For structure footings over 2.5 feet in depth that have a top layer of reinforcement, reconsolidate the
concrete to a depth of 1 foot after placing, consolidating, and initial screeding of the concrete.
Reconsolidate the concrete as late as the concrete will respond again to vibration but not less than 15
minutes after the initial screeding.
Vibrators used for concrete with epoxy-coated reinforcement or prestressing steel must have a resilient
covering to prevent damage to the epoxy coating.
You may use external vibrators only if consolidation by other means is not possible. Forms must be
sufficiently rigid to resist displacement or damage. The use of external vibrators must be authorized.
Do not place concrete for horizontal members until the concrete in supporting vertical members has been
consolidated and settlement due to bleeding is complete.
Where shown, apply a bond breaker to joint surfaces.
Do not construct drainage structures to final grade until adjacent paving or surfacing is complete.
51-1.03D(2) Concrete Bridge Decks
For concrete decks placed on continuous steel girders or PC concrete girders, place the portion of deck
over the supports last.
For decks on PC concrete girders, place intermediate and end diaphragms at least 5 days before placing
the deck concrete.
For decks on structural steel, install cross frames the entire width of the bridge before placing the deck
concrete.
Deck closure pours must comply with the following:
1. During primary deck placement and for at least 24 hours after completing the deck placement,
reinforcing steel protruding into the closure space must be free from any connection to reinforcing
steel, concrete, forms, or other attachments of the adjacent structure.
2. Closure pour forms must be supported from the superstructure on both sides of the closure space.
51-1.03D(3) Concrete Placed Under Water
Only seal course concrete may be placed under water.
If the Engineer determines that it is impossible or inadvisable to dewater excavations before placing
concrete, place a seal course under the water using a tremie or a concrete pump. The seal course must
be at least 2 feet thick and thick enough to seal the cofferdam.
The tremie must be a watertight tube at least 10 inches in diameter with a hopper at the top. When
concrete is deposited into the hopper, flow is induced by raising the discharge end. Equip discharge and
tremie tubes with a device to prevent water from entering the tube when charging the tube with concrete.
Support the tubes so as to allow for free movement of the discharge end over the entire work surface and
rapid lowering of the tube.
Fill the tubes using a method that prevents washing of the concrete. Keep the discharge end submerged
in the concrete at all times. The tube must contain enough concrete to prevent water entry.
Place the concrete carefully in a compact mass. Concrete flow must be continuous until completion of the
seal course. The seal course must be monolithic and homogeneous. Do not disturb concrete after
placement. Maintain still water at the point of placement.
591

SECTION 51

CONCRETE STRUCTURES

Cure the seal course concrete for at least 5 days before dewatering the cofferdam. Increase the curing
time for seal course concrete placed in water that is below 45 degrees F. Periods of time when the water
temperature is continuously below 38 degrees F is not considered as curing time.
Dewater the cofferdam after the seal course has adequate strength to resist the hydrostatic load. After
dewatering, clean the top of the concrete of all scum, laitance, and sediment. Remove local high spots to
provide the specified clearance for reinforcing steel before placing fresh concrete.
51-1.03D(4) Construction Joints
Place construction joints only where described unless authorized.
At horizontal construction joints:
1. Thoroughly consolidate fresh concrete surfaces without completely removing surface irregularities
2. At joints between girder stems and decks, roughen the surfaces of fresh concrete to at least a 1/4
inch amplitude
Abrasive blast clean construction joint surfaces before placing fresh concrete against the joint surfaces.
Remove surface laitance, curing compound, and other foreign materials.
Flush construction joint surfaces with water and allow the surfaces to dry to a surface-dry condition
immediately before placing concrete.
If authorized in an emergency, you may place a construction joint at a location not described. The
Engineer determines the location of the construction joint and the quantity of additional reinforcing steel to
be placed across the joint.
Locate longitudinal construction joints in bridge decks along lane lines if a joint location is not shown.
51-1.03D(5) Colored Concrete
When placing colored concrete:
1. Monitor the water content, weight of cementitious materials, and size, weight, and color of aggregate
to maintain consistency and accuracy of the mixed colored concrete.
2. Schedule delivery of concrete to provide consistent mix times from batching until discharge. Do not
add water after a portion of the batch has been discharged.
3. Use consistent finishing practices to ensure uniformity of texture and color.
4. Protect surrounding exposed surfaces during placement, finishing, and curing activities of colored
concrete.
If more than 1 concrete pump is used to place concrete, designate the pumps to receive colored
concrete. The designated pumps must receive only colored concrete throughout the concrete placement
operation.
Cure colored concrete by the forms-in-place method or the curing compound method.
If the curing compound method is used, the curing compound must be clear or match the color of the
colored concrete and must be manufactured specifically for colored concrete. Do not use curing
compounds containing calcium chloride. The time between completing surface finishing and applying the
curing compound must be the same for each colored concrete component.
51-1.03D(6) Bearing Surfaces
For elastomeric bearing pads, wood float finish the concrete bearing surface to a level plane that varies at
most 1/16 inch from a straightedge placed in any direction and is within 1/8 inch of the specified elevation.
The bearing area must extend at least 1 inch beyond the limits of the bearing pads.
For bearing assemblies or masonry plates not embedded in concrete, construct the concrete bearing area
above grade and grind to a true level plane that (1) does not vary perceptibly from a straightedge placed
in any direction and (2) is within 1/8 inch of the elevation shown.

592

SECTION 51

CONCRETE STRUCTURES

51-1.03E Miscellaneous Construction


51-1.03E(1) General
Where shown, paint the bridge name, bridge number, and bent number in neat, 2-1/2-inch-high black
letters and figures.
Where shown and before backfilling to within 3 feet of finished grade, install temporary bumpers at the
ends of bridges and grade top culverts.
Where pipes outside the structure join the structure, cast bell recesses in the concrete to receive the pipe
or cast sections of the pipe in the concrete. If bell recesses are used, mortar the pipe end into the bell.
51-1.03E(2) Placing Mortar
Place mortar in recesses and holes, on surfaces, under structural members, and at other locations where
described.
Clean concrete areas to be in contact with mortar of loose or foreign material that would prevent bonding
between the mortar and the concrete surfaces. Flush the concrete areas with water and allow them to dry
to a surface-dry condition immediately before placing the mortar.
Tightly pack mortar to completely fill spaces. Locations where mortar can escape must be mortar-tight
before placing mortar. Cure mortar for 3 days using the water method under section 90-1.03B.
Do not load mortar until 72 hours after placement unless authorized.
51-1.03E(3) Drill and Bond Dowels
For drill and bond dowels, drill the holes without damaging the adjacent concrete. Holes for bonded
dowels must be 1/2 inch larger than the nominal dowel diameter.
If reinforcement is encountered during drilling before the specified depth is attained, notify the Engineer.
Unless coring through the reinforcement is authorized, drill a new hole adjacent to the rejected hole to the
depth shown.
Coat the surface of any dowel coated with zinc or cadmium with a colored lacquer. Allow the lacquer to
dry thoroughly before installing the dowel.
Each drilled hole must be clean and dry when placing the bonding material and dowel. The bonding
material and dowel must completely fill the drilled hole. The surface temperature must be at least 40
degrees F when magnesium phosphate concrete is placed.
Thoroughly dry finishing tools cleaned with water before working magnesium phosphate concrete.
Leave dowels undisturbed for 3 hours or until the dowels can be supported by the concrete.
Cure modified high-alumina-based concrete and portland-cement-based concrete using the curing
compound method. Do not cure magnesium phosphate concrete.
Replace dowels that fail to bond or are damaged.
51-1.03E(4) Drill and Grout Dowels
Drill the holes under section 51-1.03E(3).
For drill and grout dowels, drill the holes 1/4 inch larger than the nominal dowel diameter. Immediately
before placing dowels, holes must be cleaned, be thoroughly saturated with water, have all free water
removed, and be dried to a saturated surface dry condition.
Place grout into the holes and insert the dowels. Retempering of grout is not allowed. Cure grout at least
3 days or until the dowels are encased in concrete. Immobilize the dowels during the curing period. Cure
using curing compound method or by keeping the surface continuously damp.
Replace dowels that fail to bond or are damaged.

593

SECTION 51

CONCRETE STRUCTURES

51-1.03E(5) Drill and Bond Dowels (Chemical Adhesive)


For drill and bond dowel (chemical adhesive), the drilled hole diameter and depth must comply with the
ICBO evaluation report for the size of dowel being installed unless otherwise shown. Increase the drilled
hole depth specified in the ICBO evaluation report by 50 percent when dowels are epoxy coated.
Immediately after inserting the dowels into the chemical adhesive, support the dowels as necessary to
prevent movement until the epoxy has cured the minimum time specified in the Authorized Material List.
Replace dowels that fail to bond or are damaged. Drill new holes adjacent to rejected dowels and install
replacement dowels.
51-1.03E(6) Nonskid Abrasive Finish
Where shown, place a nonskid abrasive finish on pedestrian walkways, stair treads, and landings. The
nonskid finish must consist of commercial-quality aluminum oxide, silicon carbide, or almandite garnet grit
particles, sieve size no. 12 to 30 or no. 14 to 35. Uniformly apply grit particles at a rate of at least 0.3 lb/sq
ft onto the floated concrete surface while the concrete is plastic. Bury the particles into the concrete to a
depth of approximately 0.7 times the diameter of each particle.
51-1.03E(7) Drains in Walls
Where shown, construct drain holes and weep holes in abutment walls, wingwalls, and retaining walls.
Cover retaining wall and abutment wall drains at the back face of the wall with 1/4-inch mesh, 0.025-inch
diameter aluminum or galvanized steel wire hardware cloth. Mount hardware cloth in forms before
pouring concrete or fasten the cloth to the exterior concrete surface with masonry nails.
In addition to wall drains, install hydrostatic pressure relief holes 3 inches in diameter at the bottom of
walls immediately above footings at approximately 15-foot centers.
51-1.03E(8) Deck Bleeder Drains
The Engineer provides the exact location for each deck bleeder drain.
Drill the holes for drains in existing bridges using a diamond core drill bit. Do not spall hole edges. Holes
must be 2 inches in diameter.
Install drains such that the top of the pipe is approximately 1/4 inch below the concrete deck surface.
Replace drains out of position as determined by the Engineer.
Secure plastic pipe installed in existing bridges with an epoxy adhesive. Score the outside surfaces of the
pipe before installing the pipe. Spread epoxy on both the pipe and hole surfaces. Epoxy must completely
fill the space between the pipe and the hole.
Install drains before placing the deck seal. Center the wire cloth above the drains. Place the cloth after
placing the deck seal and before placing the HMA. Secure the cloth using an authorized method to
prevent movement during HMA placement. Do not damage the deck seal.
51-1.03E(9) Utility Facilities
Where shown, utility facilities will be carried in or on structures.
Install hangers, anchor bolt inserts, manhole frames and covers, sleeves, and other accessories required
for the utility facility that must be cast in the concrete. The utility owner will furnish these items.
The utility owner will furnish and install conductors and casings when the structure is ready for the
installation and before any work that interferes with installation is started.
Notify the Engineer at least 30 days before the date structures are ready for utility installation. The
Engineer will notify the utility owner.
51-1.03E(10) Concrete Headers and Steel Plates
Concrete for concrete headers must comply with the specifications for minor concrete.
Steel plates and attachment hardware must comply with section 75 except that galvanizing is not
required.

594

SECTION 51

CONCRETE STRUCTURES

51-1.03E(11) Pier Columns


Place concrete for pier columns against firm, undisturbed foundation material on the bottom and sides of
the pier column excavations except place concrete against forms where shown. Immediately before
placing concrete, all excavated surfaces against which the concrete is to be placed must be free from
standing water, mud, debris, and loose material.
51-1.03E(12) Diaphragm Bolsters
Reserved
51-1.03E(13) Hinge Tiedowns
Reserved
51-1.03F Finishing Concrete
51-1.03F(1) General
Strike off exposed surfaces of consolidated concrete to the lines and grades shown. Provide a uniform
surface texture having the specified finish without undulations or irregularities.
The Engineer determines the acceptability of the surface finishes.
Finish sidewalks, curbs, and stairways on structures under section 73-3 except surfaces are not marked.
51-1.03F(2) Ordinary Surface Finish
Apply ordinary surface finish to all concrete surfaces as a final finish or before applying a higher class
finish.
Ordinary surface finish includes:
1.
2.
3.
4.

Filling holes or depressions


Repairing rock pockets and unsound concrete
Removing fins and projections flush to the surface
Removing stains and discolorations visible from traveled ways

You do not need to remove fins from surfaces that are buried underground or enclosed.
Ordinary surface finish must be the final finish for the following surfaces:
1. Undersurfaces of slab spans, box girders, spandrel arch spans, and floor slabs between girders of
superstructures
2. Inside vertical surfaces of T girders of superstructures
3. Surfaces to be buried underground or covered with embankment and surfaces of culverts above
finished ground that are not visible from the traveled way
Remove form bolts and metal placed for your convenience to at least 1 inch below the concrete surface.
Clean and fill the resulting holes with mortar. You do not need to remove form bolts in box girder cells
except you must remove bolts flush if deck forms are removed from the cells.
Fill bolt holes with mortar under section 51-1.03E(2). Fill depressions and pockets with packed mortar or
shotcrete as determined by the Engineer. Cure filler under section 51-1.03H.
For exposed surfaces, add enough white cement to the patching material to match the surrounding
concrete after drying.
If the Engineer determines that rock pockets are extensive, remove and replace the affected portions of
the structure.
51-1.03F(3) Class 1 Surface Finish
Class 1 surface finish includes finishing concrete surfaces to produce smooth, even surfaces of uniform
texture and appearance without bulges, depressions, or other imperfections. Use power carborundum
stones or disks to remove bulges and other imperfections.
Do not apply Class 1 surface finish until a uniform appearance can be attained.
595

SECTION 51

CONCRETE STRUCTURES

Sand areas not complying with the Class 1 surface finish requirements using power sanders or other
authorized abrasive means until the specified surface finish is attained.
Class 1 surface finish must be the final surface finish for the following surfaces:
1. Except for those surfaces listed in ordinary surface finish, the surfaces of bridge superstructures,
including the undersurfaces of deck overhangs
2. Surfaces of bridge piers, piles, columns, and abutments, and retaining walls above finished ground
and to at least 1 foot below finished ground
3. Surfaces of open spandrel arch rings, spandrel columns, and abutment towers
4. Surfaces of pedestrian undercrossings, except floors and surfaces to be covered with earth
5. Surfaces of culvert headwalls above finished ground and endwalls visible from a traveled way
6. Interior surfaces of culvert barrels having a height of 4 feet or more for a distance equal to the culvert
height where visible from a traveled way
7. Interior surfaces of pump house motor and control rooms and engine-generator rooms
8. Surfaces of railings
51-1.03F(4) Class 2 Surface Finish
Where a Class 2 surface finish is described:
1. Apply an ordinary surface finish to the concrete surface.
2. Abrasive blast the surface to a rough texture and then thoroughly wash the surface with water.
3. Pneumatically apply a mortar coat approximately 1/4 inch thick in at least 2 passes to the damp
surface. The coating must firmly bond to the concrete surface.
The mortar coat must consist of either (1) sand, portland cement, and water, mechanically mixed before
entering the nozzle or (2) premixed sand and portland cement, with water added before leaving the
nozzle. The proportion of cement to sand must be at least 1 to 4. Use sand with a grading suitable for the
work.
You may substitute cementitious material complying with section 90 for portland cement. You may use
admixtures specified in section 90 if authorized.
Do not mortar coat areas where bridge name or other designations are to be painted.
The coating surface must be (1) uniform without unsightly bulges, depressions, or other imperfections and
(2) as left by the nozzle. Protect the coating from damage and keep it damp for 3 days after placing.
Remove and replace loose areas of coating.
Where a Class 2 surface finish is described for a pedestrian undercrossing, use silica sand and white
portland cement.
51-1.03F(5) Finishing Roadway Surfaces
51-1.03F(5)(a) General
Construct roadway surfaces of structures, approach slabs, sleeper slabs, and adjoining approach
pavement, and concrete decks to be covered with another material, to the grade and cross section
shown. Surfaces must comply with the specified smoothness, surface texture, and surface crack
requirements.
The Engineer sets deck elevation control points for your use in establishing the grade and cross section
of the deck surface. The grade established by the deck elevation control points includes all camber
allowances. Elevation control points will not be closer together than approximately 8 feet longitudinally
and 24 feet transversely to the bridge centerline.
Before starting concrete placement for any deck section:
1. Set to grade all rails and headers used to support or control the finishing equipment
2. Check rails and headers to ensure the completed deck complies with smoothness requirements
3. Move the finishing equipment over the length of the section to check steel and bulkhead clearances
Deck surfaces and approach slabs must have a uniform surface texture with a coefficient of friction of not
less than 0.35 when opened to traffic or before seal coats are placed, whichever occurs first.
596

SECTION 51

CONCRETE STRUCTURES

Complete the smoothness testing and any required grinding before applying seal coats.
Finish bridge decks to be covered with membrane seals to a smooth surface free of mortar ridges and
other projections. The coefficient of friction requirements do not apply for these bridge decks.
Where a future widening is shown, strike off deck surfaces under curbs, railings, barriers, and sidewalks
to the same plane as the roadway and leave undisturbed.
51-1.03F(5)(b) Bridge Deck Surface Texture
Reserved
51-1.03G Concrete Surface Textures
51-1.03G(1) General
Provide the concrete surface textures shown. The Engineer determines the acceptability of the surface
textures.
Fractured rib texture must consist of straight ribs of concrete with a fractured texture on the raised surface
between ribs. Grooves between ribs must be (1) continuous with no apparent curves or discontinuities
and (2) straight to within 1/4 inch in 10 feet. The texture must have random shadow patterns. Broken
concrete at adjoining ribs and groups of ribs must have a random pattern. The texture must not have
repetitive fractured surfaces or secondary shadow patterns.
Heavy blast texture must consist of an abrasive-blasted concrete surface of uniform color and sandy
texture with air and water bubbles in the concrete partially exposed.
Formed relief texture must consist of a formed relief constructed to the dimensions and shapes shown
with a Class 1 surface finish. Intersecting corners of plane surfaces must be sharp and crisp without
easing or rounding.
Construct a test panel for each type of concrete surface texture shown.
Cure concrete surface textures by the forms-in-place or water methods.
51-1.03G(2) Form Liners
Use form liners for concrete surface textures except for heavy blast and formed relief textures. Other
forming methods must be authorized.
Form liners must (1) be manufactured from an elastomeric material by a manufacturer of commercially
available concrete form liners and (2) leave a crisp, sharp definition of the concrete surface texture.
Form liners must comply with the requirements shown in the following table:
Property
Shore A hardness
Tensile strength

Test
ASTM D 2240
ASTM D 412

Requirement
5090
1,000 psi min

Comply with the form liner manufacturer's instructions for use.


Seal and repair cuts and tears in form liners under the form liner manufacturer's instructions. Do not use
form liners that are delaminated or deformed.
Extend form liners the full length of texturing, with transverse joints at 8-foot minimum spacing. Do not use
small pieces of form liners. Align grooves straight and true. Grooves must match at joints between form
liners. For grooved patterns, joints in the direction of grooves must be located in depressions. Butt
adjoining liners together without distortion, open cracks, or offsets. Clean joints between liners and
remove mortar before use.
Adhesives must be compatible with the form liner material and the concrete. Adhesives must be
recommended by the liner manufacturer and not cause swelling of the liner material.

597

SECTION 51

CONCRETE STRUCTURES

Cast form liner patterns to prevent recurring textural configurations exhibited by repeating, recognizable
shadow patterns. Remove surfaces with recurring textural configurations by reworking using authorized
methods or by replacement.
Use form release agents recommended by the form liner manufacturer. Release agents must not:
1.
2.
3.
4.

Cause swelling of the liner material


Cause delamination from the forms
Stain the concrete
React with the liner material

Coat form liners with a thin film of release agent. For textures with longitudinal patterns, apply the release
agent using a natural bristle brush in the direction of the pattern. Clean excess release agent from liners
using compressed air. Remove release agent buildup due to liner reuse at least every 5 uses.
Form liners must release without leaving pieces of liner on the concrete or removing concrete from the
surface.
Except for formed relief textures, abrasive blast concrete surface textures with fine abrasive after
removing forms to remove sheen without exposing coarse aggregate.
51-1.03H Curing Concrete Structures
Except for bridge decks, cure newly placed concrete for CIP structures using the water method or the
forms-in-place method under section 90-1.03B.
Cure the top surface of bridge decks using both the curing compound method and the water method. The
curing compound must be curing compound no. 1.
Cure the top surface of bridge decks to be sealed with butyl rubber membrane using only the water
method.
For bridge decks and flat slabs using the water method without a curing medium, keep the entire surface
damp by applying water with an atomizing nozzle that forms a mist and not a spray until the concrete has
set. After the concrete has set, continuously sprinkle the entire concrete surface with water for at least 7
days.
You may use a pigmented curing compound complying with section 90-1.03B(3) for the following:
1. Concrete surfaces of construction joints
2. Concrete surfaces that are to be buried underground
3. Concrete surfaces not visible from a public traveled way, where only a ordinary surface finish is to be
applied and a uniform color is not required
If you use the curing compound method on the bottom slab of box girder spans, the curing compound
must be curing compound no. 1.
When ordered during periods of hot weather, apply water to concrete surfaces being cured by the curing
compound method or by the forms-in-place method until the Engineer determines that a cooling effect is
no longer required. This is change order work.
For RSC using portland cement:
1. Cure the concrete using the curing compound method. Fogging of the surface with water after the
curing compound has been applied is not required.
2. Immediately repair any damage to the film of the curing compound with additional curing compound.
Do not repair damage to the curing compound after the concrete is opened to traffic.
3. Cover the surface with an insulating layer or blanket when the ambient temperature is below 65
degrees F during the curing period. The insulation layer or blanket must have the R-value rating
shown in the table below. A heating tent may be used instead of or in combination with the insulating
layer or blanket.

598

SECTION 51

CONCRETE STRUCTURES

Temperature range during


curing period (F)
5565
4555
3945

R-value rating, min


1
2
3

51-1.03I Protecting Concrete Structures


Maintain concrete at a temperature of not less than 45 degrees F for 72 hours after placing and at not
less than 40 degrees F for an additional 4 days.
51-1.04 PAYMENT
If concrete involved in bridge work is not designated by type and is not otherwise paid for under a
separate bid item, the concrete is paid for as structural concrete, bridge.
The Department does not deduct the volume of bar reinforcing steel, structural steel, prestressing
materials, or piling from the structural concrete quantity.
For seal course concrete, the maximum volume to be paid is the volume contained between vertical
planes 1 foot outside the neat lines of the seal course shown. No adjustment to unit price is made for
increases or decreases in the quantity of seal course concrete.
Payment for bar reinforcing steel, structure excavation, and structure backfill used in constructing
structural concrete for sound walls is included in the payment for structural concrete (sound wall).
Payment for structure excavation and structure backfill used in constructing structural concrete for box
culverts is included in the payment for structural concrete, box culvert.
Structural concrete for pier columns is measured as follows:
1. Horizontal limits are vertical planes at the neat lines of the pier column shown.
2. Bottom limit is the bottom of the foundation excavation in the completed work.
3. Upper limit is the top of the pier column concrete as shown.
51-2 JOINTS
51-2.01 GENERAL
51-2.01A General
51-2.01A(1) Summary
Section 51-2.01 includes general specifications for constructing, sealing, and protecting joints in concrete
structures.
51-2.01A(2) Definitions
Reserved
51-2.01A(3) Submittals
Submit a certificate of compliance for polyethylene material for snow plow deflectors.
51-2.01A(4) Quality Control and Assurance
Reserved
51-2.01B Materials
51-2.01B(1) General
Premolded expansion joint filler must comply with ASTM D 1751.
Expanded polystyrene must be commercially available polystyrene board with (1) a flexural strength of at
least 35 psi when tested under ASTM C 203 and (2) a compressive yield strength from 16 to 40 psi at 5
percent compression. Face the surfaces of expanded polystyrene that concrete is placed against with
1/8-inch-thick hardboard complying with ANSI A135.4. You may use other facing materials that provide
equivalent protection. Secure the hardboard using nails, waterproof adhesive, or other authorized means.
599

SECTION 51

CONCRETE STRUCTURES

51-2.01B(2) Expansion Joint Armor


Fabricate expansion joint armor from steel plates, angles, or other structural shapes under section 75.
Shape the armor to the section of the concrete deck and match-mark it in the shop.
51-2.01B(3) Snowplow Deflectors
Snowplow deflectors must consist of ultra-high-molecular-weight polyethylene plates with anchorage
devices.
Anchorage devices must comply with ASTM A 276, type UNS S32205 or S31803.
Ultra-high-molecular-weight polyethylene plates must be UV stabilized and comply with ASTM D 4020
and the requirements shown the following table:
Property
Test method
Requirement
Density
ASTM D 792
58 pcf, min
Tensile strength, ultimate
ASTM D 638
5,800 psi, min
Tensile strength, yield
ASTM D 638
2,750 psi, min
Elongation at break
ASTM D 638
290%
Hardness
ASTM D 2240, Shore D
60 min
Drilling and bonding anchorage devices must comply with the specifications for drilling and bonding
dowels in section 51-1.03E(3).
Where shown, apply a thread locking system to the anchorage devices under section 75-1.03.
51-2.01C Construction
Construct open joints using a suitable material that you subsequently remove. Do not chip or break
concrete corners when removing the material. Reinforcement must not extend across an open joint.
For filled joints, place premolded or expanded polystyrene joint filler in position before placing concrete.
Fill holes and joints with mastic to prevent the passage of mortar or concrete.
Finish concrete edges at joints using an edger.
Straighten warped sections of expansion joint armor before placing. Use positive methods to hold
assemblies in the correct position during concrete placement.
51-2.01D Payment
Not Used
51-2.02 SEALED JOINTS
51-2.02A General
51-2.02A(1) General
51-2.02A(1)(a) Summary
Section 51-2.02 includes specifications for fabricating and installing sealed joints.
Sealed joints must:
1. Be in planned position
2. Resist the intrusion of foreign material and water
3. Provide bump-free passage of traffic
MR is measured normal to the longitudinal joint axis.

Use the seal type shown in the following table for the MR shown:

600

SECTION 51

CONCRETE STRUCTURES

Seal type
Movement rating
Type A or B
MR 1 inch
Type B
1 inch < MR 2 inches
Strip
seal
joint
seal assembly
2 inches < MR 4 inches
Modular unit joint seal assembly or seismic joint
MR 4 inches

51-2.02A(1)(b) Definitions
Reserved.
51-2.02A(1)(c) Submittals
Submit a work plan for cleaning expansion joints. Include details for preventing material, equipment, or
debris from falling onto traffic or railroad property.
51-2.02A(1)(d) Quality Control and Assurance
Reserved
51-2.02A(2) Materials
You may clean and paint metal surfaces of joint seal assemblies instead of galvanizing. Cleaning and
painting must comply with the specifications for new structural steel in section 59-2 except SSPC-QP 1,
SSPC-QP 2, and SSPC-QP 3 certifications are not required. Finish coats are not required. Do not paint
stainless steel or anchorages embedded in concrete.
51-2.02A(3) Construction
The Engineer may order you to install a joint seal larger than required by the MR. This is change order
work.
The joint opening at the time of placement must be that shown adjusted for temperature. Do not impair
the joint clearance.
Cover or otherwise protect joints at all times before joint seals are installed. Do not allow debris or foreign
material to enter joints.
Clean expansion joints at existing bridges before installing joint seals. Remove all existing seal material,
dirt, debris, damaged waterstops, and joint filler. Use methods that do not damage existing sound
concrete.
Verify the joint size after cleaning.
Clean existing joints with undamaged waterstops to the top of the waterstop unless the waterstop is to be
removed.
Clean existing joints without waterstops and joints with damaged waterstops down to the hinge or bearing
seat.
Repair joint damage as ordered.
Cleaning joints below existing waterstops that are damaged and repairing existing joint damage is change
order work.
51-2.02A(4) Payment
Joint seals and joint seal assemblies are measured from end to end along the centerline of the completed
seal, including return sections and curb faces.
51-2.02B Type A and AL Joint Seals
51-2.02B(1) General
51-2.02B(1)(a) Summary
Section 51-2.02B includes specifications for installing Type A and AL joints seals.

Type A and AL joint seals consist of field-mixed silicone sealant placed in grooves in the concrete.

601

SECTION 51

CONCRETE STRUCTURES

51-2.02B(1)(b) Definitions
Reserved
51-2.02B(1)(c) Submittals
Submit a certificate of compliance and certified test report for each batch of sealant.
At least 30 days before use, submit 1-quart test samples of the following to METS:
1. Both components from each batch of sealant
2. Manufacturer-required primers
51-2.02B(1)(d) Quality Control and Assurance
The Department tests sealants under California Test 435.
51-2.02B(2) Materials
The sealant must be a 2-component silicone type that withstands a 50 percent movement.
The sealant must comply with the requirements shown in the following table:
Property
Modulus at 150 percent
elongation
Recovery
Notch test
Water resistance
Ultraviolet exposure
Cone penetration

Test method
California Test 435

Requirement
875 psi

California Test 435


California Test 435
California Test 435
California Test 435
California Test 435

21/32 inch max


Notched or loss of bond, 1/4 inch max
Notched or loss of bond, 1/4 inch max
No more than slight cracking or checking
4.512.0 mm

The sealant must be self-leveling and cure rapidly enough to not flow on grades up to 15 percent.
Label sealant containers or provide identification tickets for tanks of 2-component material. Include the
following:
1.
2.
3.
4.

Material designation
Lot number
Manufacturer's name and instructions for use
Dates of manufacture, packing, and expiration

Do not use material that has expired unless it is retested and authorized.
Polyethylene foam or rod stock for retaining sealant must be commercial quality with a continuous,
impervious glazed surface.
51-2.02B(3) Construction
51-2.02B(3)(a) General
Do not use sealant or adhesive that has skinned over or cannot be redispersed by hand stirring.

Abrasive blast clean joints and remove foreign material with high-pressure air immediately before

installing seals. Protect waterstops during cleaning.

Joint surfaces must be surface dry when seals are placed.

Place the sealant using equipment that mixes and extrudes the sealant into the joint. The equipment and

the sealant placement must be as recommended by the sealant manufacturer.

Do not use liquid components that have been exposed to air for more than 24 hours.

51-2.02B(3)(b) Type A Seal Preparation


For Type A joint seals, do not start cutting grooves until joint material is delivered to the job site.

602

SECTION 51

CONCRETE STRUCTURES

Cut grooves in the concrete using saws having diamond blades with at least a 3/16-inch thickness. The
1st pass depth for groove sides must be at least 2 inches. The top width must be within 1/8 inch of
specified width and the bottom width must not vary from the top by more than 1/16 inch for every 2 inches
of depth.
Cutting grooves in existing decks includes cutting conflicting reinforcing steel.
Saw cutting grooves is not required at the following locations:
1. Joints armored with metal
2. Joints in curbs, sidewalks, barriers, and railings, if grooves are formed to the required dimensions
3. Existing joints where Type A seals are to be installed
Remove all material from the deck joint to the bottom of the saw cut. Remove foreign material from joints
in curbs, sidewalks, barriers, railings, and deck slab overhangs.
The Engineer may order you to saw cut grooves at existing joints to be sealed with a Type A joint seal.
This is change order work.
Repair spalls, fractures, or voids in the grooved surface at least 64 hours before installing the joint seal.
Bevel the lips of saw cuts by grinding.
51-2.02B(3)(c) Type AL Seal Preparation
For Type AL joint seals, remove expanded polystyrene and foreign material to the depth of the joint seal.
Grind or edge the lip of the joint.
51-2.02B(4) Payment
Not Used
51-2.02C Type B Joint Seals
51-2.02C(1) General
51-2.02C(1)(a) Summary
Section 51-2.02C includes specifications for installing Type B joint seals.
Type B joint seals consist of preformed elastomeric joint seals placed in grooves in the concrete.
51-2.02C(1)(b) Definitions
Reserved
51-2.02C(1)(c) Submittals
Submit a certificate of compliance with certified test report for each lot of elastomeric joint seal and
lubricant-adhesive. Test reports must include the seal MR, the manufacturer's minimum uncompressed
width, and test results.
Submit joint seal test samples selected by the Engineer for testing with certificates of compliance at least
30 days before use.
51-2.02C(1)(d) Quality Control and Assurance
The Engineer selects test samples of joint seal material and lubricant-adhesive at random from each lot of
material. Test samples are selected from stock at the job site or at a location acceptable to the Engineer
and the manufacturer. Joint seal test samples must be at least 3 feet long.
Demonstrate the adequacy of installation procedures for Type B seals before starting installation
activities.
51-2.02C(2) Materials
Preformed elastomeric joint seals must:
1. Comply with ASTM D 2628
2. Consist of a multi-channel, nonporous, homogeneous material furnished in a finished, extruded form
3. Have a minimum seal depth at the contact surface of at least 95 percent of the minimum
uncompressed seal width designated by the manufacturer
603

SECTION 51

CONCRETE STRUCTURES

4. Provide a MR of at least that shown when tested under California Test 673
5. Have the top and bottom edges in continuous contact with the sides of the groove throughout the
entire range of joint movement
6. Be furnished full length for each joint with at most 1 shop splice in any 60-foot length
For seals that would admit water or debris, fill each cell to a depth of 3 inches at the open ends with open
cell polyurethane foam or close the cells by other authorized means.
You may make 1 field splice per joint if authorized. Splice locations and methods must be authorized.
Seals must be manufactured full length and then cut at the splice location and rematched before splicing.
Shop and field splices must have no visible offset of exterior surfaces and no evidence of bond failure.
Combination lubricant-adhesive must comply with ASTM D 4070.
51-2.02C(3) Construction
Prepare joints under section 51-2.02B(3)(b) except remove all material from the deck joint to the top of
the waterstop or to the depth of the seal to be installed plus 3 inches.
Thoroughly clean contact surfaces and surfaces 1/2 inch from either edge of the groove immediately
before applying the lubricant-adhesive. Liberally apply the lubricant-adhesive to vertical groove surfaces
and the sides of the joint seal under the manufacturer's instructions.
Install joint seals full length for each joint using equipment that does not distort or damage the seal or the
concrete. The top edges of the installed seal must be in a plane normal to the sides of the groove.
51-2.02C(4) Payment
Not Used
51-2.02D Joint Seal Assemblies with a Movement Rating of 4 inches or Less
51-2.02D(1) General
51-2.02D(1)(a) Summary
Section 51-2.02D includes specifications for fabricating and installing joint seal assemblies with a MR of 4
inches or less.
Joint seal assemblies with a MR of 4 inches or less must consist of metal or metal and elastomeric
assemblies placed in recesses over joints. Strip seal joint seal assemblies consist of a 1 joint cell.
If authorized, you may use an alternative joint seal assembly if:
1. Quality of the alternative assembly and its suitability for the intended application are at least equal to
that of the joint seal assembly shown. The factors to be considered include the ability of the assembly
to resist the intrusion of foreign material and water throughout the full range of movement for the
application and the ability to function without distress to any component.
2. Alternative joint seal assembly has had at least 1 year of proven satisfactory service under conditions
similar to those described.
51-2.02D(1)(b) Definitions
Reserved
51-2.02D(1)(c) Submittals
51-2.02D(1)(c)(i) General
For alternative joint seal assemblies, submit a certificate of compliance for each shipment of joint seal
materials. The certificate must state that the materials and fabrication involved comply with the
specifications and the data submitted in obtaining the authorization for the alternative joint seal assembly.
51-2.02D(1)(c)(ii) Shop Drawings
For alternative joint seal assemblies, submit 5 sets of shop drawings for each joint seal assembly to OSD,
Documents Unit. Notify the Engineer of your submittal. Include in the notification the date and contents of
the submittal.
604

SECTION 51

CONCRETE STRUCTURES

After review, submit 6 to 12 sets, as requested, for final authorization and use during construction. Include
details of the joint seal assembly and anchorage components, method of installation, blockout details, and
additions or rearrangements of reinforcing steel.
If requested, submit supplemental calculations for each proposed alternative joint seal assembly.

Include in the shop drawings the thermal equation for setting the minimum joint opening at installation.

Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil

engineer.

Allow 25 days for the Department's review.

Submit 1 corrected set to OSD, Documents Unit, for each joint seal assembly within 20 days of final

authorization.

51-2.02D(1)(d) Quality Control and Assurance


Reserved
51-2.02D(2) Materials
51-2.02D(2)(a) General
Metal parts must comply with section 75-1.03.

Bolts, nuts, and washers must comply with ASTM A 325.

Sheet neoprene must comply with the specifications for neoprene in section 51-2.04. Fabricate sheet

neoprene to fit the joint seal assembly accurately.

51-2.02D(2)(b) Alternative Joint Seal Assemblies


Alternative joint seal assemblies must have CIP anchorage components for casting into the deck.
The anchorage components must include anchor studs spaced at a maximum of 4-1/2 inches. The studs
must be at least 5/8 inch in diameter and 8 inches long, except the studs may be 6 inches long in the
overhang.
Instead of complying with section 75-1.03, metal parts may comply with ASTM A 572/A 572M.
Elastomer must be neoprene complying with the requirements shown in Table 1 of ASTM D 2628, except
recovery and compression-deflection tests are not required, and the requirements shown in the following
table:
Property
Hardness, Type A durometer
Compression set, 70 hours at
100 C

Test method
ASTM D 2240
(modified)
ASTM D 395
(modified)

Requirement
5570 points
40 percent max

The design loading must be the AASHTO LRFD Bridge Design Specifications Design Truck with 100
percent dynamic load allowance. The tire contact area must be 10 inches measured normal to the
longitudinal assembly axis by 20 inches wide. The assembly must provide a smooth-riding joint without
slapping of components or tire rumble.
The MR of the assembly must be measured normal to the longitudinal axis of the assembly. Dimensions
for positioning the assembly within the MR during installation must be measured normal to the
longitudinal axis. Do not consider skew of the deck expansion joint.
The maximum depth and width of the recess must be such that the primary reinforcement providing the
necessary strength of the structural members is outside the recess. The maximum depth at abutments
and hinges is 10 inches. The maximum width on each side of the expansion joint is 12 inches.
Horizontal angle points and vertical corners at curbs must be premolded sections or standard sections of
the assembly that have been miter cut or bent to fit.
605

SECTION 51

CONCRETE STRUCTURES

51-2.02D(3) Construction
Deck surfaces must comply with section 51-1.03F(5) before placing and anchoring joint seal assemblies.
Preassemble metal parts of assemblies before installation to verify geometry.
Except for primary reinforcement, continue reinforcement through the recess construction joint into the
recess and engage anchorage components of the assembly.
Thoroughly clean joints immediately before installing sheet neoprene. Install sheet neoprene at such time
that it will not be damaged by construction activities.
Place the assembly in the blocked-out recess in the concrete deck surface. The depth and width of the
recess must allow the installation of the assembly anchorage components or anchorage bearing surface
to the lines and grades shown.
For alternative joint seal assemblies, install elastomer under the manufacturer's instructions. Thoroughly
clean the joint and blockout immediately before elastomer installation. Do not damage the installed
elastomer during construction activities.
51-2.02D(4) Payment
Not Used
51-2.02E Joint Seal Assemblies with a Movement Rating Over 4 inches
51-2.02E(1) General
51-2.02E(1)(a) Summary
Section 51-2.02E includes specifications for fabricating and installing joint seal assemblies with a MR
over 4 inches.
Joint seal assemblies and seismic joints consist of metal or metal and elastomeric assemblies that are
anchored or cast into a recess in the concrete over the joint.
Joint seal assemblies must consist of a metal frame system, supporting rails, and support bars with
intervening neoprene glands.
Joint seal assemblies will not be authorized without evidence of 1 year of satisfactory service under
similar conditions.
A qualified representative of the assembly manufacturer must be present during the installation of the 1st
assembly and available during remaining installations.
51-2.02E(1)(b) Definitions
Reserved
51-2.02E(1)(c) Submittals
Submit shop drawings for each joint seal assembly to OSD, Documents Unit. Notify the Engineer of your

submittal. Include in the notification the date and contents of the submittal.

After review, submit 6 to 12 sets, as requested, for final authorization and use during construction. Include

details of the joint seal assembly and anchorage components, method of installation, blockout details, and

additions or rearrangements of reinforcing steel.

If requested, submit supplemental calculations for each proposed alternative joint seal assembly.

Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil

engineer.

Allow 30 days for the Department's review.

Submit 1 corrected set to OSD, Documents Unit, for each joint seal assembly within 20 days of

authorization.

Submit a certificate of compliance for each shipment of joint seal assembly materials.

606

SECTION 51

CONCRETE STRUCTURES

51-2.02E(1)(d) Quality Control and Assurance


Reserved
51-2.02E(1)(e) Design Requirements
If the assembly consists of more than 1 component, design the assembly such that the external
components can be removed and reinstalled at any position within the larger half of the MR to allow for
inspection of the internal components.
The design loading must be the AASHTO LRFD Bridge Design Specifications Design Truck with 100
percent dynamic load allowance. The tire contact area must be 10 inches measured normal to the
longitudinal assembly axis by 20 inches wide. The assembly must provide a smooth-riding joint without
slapping of components or tire rumble.
The maximum width of unsupported or yielding components or grooves in the roadway surface of the
assembly must be 3 inches measured in the direction of vehicular traffic.
The assembly must have CIP anchorage components that form a mechanical connection between the
joint components and the concrete deck.
51-2.02E(2) Materials
Neoprene glands must comply with the requirements shown in Table 1 of ASTM D 2628, except recovery
and compression-deflection tests are not required, and the requirements shown in the following table:
Property
Hardness, Type A durometer
Compression set, 70 hours at
100 C

Test method
ASTM D 2240
(modified)
ASTM D 395
(modified)

Requirement
5570 points
40 percent max

Metal parts of the joint seal assembly must comply with section 75-1.03 or ASTM A 572/A 572M. Bolts,
nuts, and washers must comply with the specifications for HS steel fastener assemblies in section 75
1.02.
Anchorage components must include anchor studs spaced at a maximum of 4-1/2 inches. Studs must be
at least 5/8 inch in diameter and 8 inches long, except the studs may be 6 inches long in the overhang.
Assemblies must be assembled at the fabrication site.
51-2.02E(3) Construction
Measure dimensions for positioning the assembly during installation normal to the longitudinal axis of the
assembly, disregarding the skew of the deck expansion joint. Assemblies must be capable of adjustment
to the "a" dimension shown.
Deck surfaces must comply with section 51-1.03F(5) before placing joint seal assemblies and
anchorages.
The assembly must be completely shop-assembled and placed in a blocked-out recess in the concrete
deck surface. The depth and width of the recess must allow the installation of the assembly anchorage
components or anchorage bearing surface to the lines and grades shown.
Except for primary reinforcement, continue reinforcement through the recess construction joint into the
recess and engage anchorage components of the assembly.
Vertical expansion joints in barriers must be accessible for inspection after recess concrete is placed.
Assemblies must make a watertight, continuous return 6 inches up into barriers at the low side of the
deck. Neoprene glands must be continuous without field splices or joints.
51-2.02E(4) Payment
Not Used

607

SECTION 51

CONCRETE STRUCTURES

51-2.02F Asphaltic Plug Joint Seals


51-2.02F(1) General
51-2.02F(1)(a) Summary
Section 51-2.02F includes specifications for constructing asphaltic plug joint seals.
Asphaltic plug joint seals consist of an asphaltic binder and aggregate joint seal system.
51-2.02F(1)(b) Definitions
Reserved
51-2.02F(1)(c) Submittals
Submit 5 sets of shop drawings for the proposed asphaltic plug joint seal system to OSD, Documents
Unit. Notify the Engineer of your submittal. Include in the notification the date and contents of the
submittal.
Allow 30 days for the Department's review. After review, submit 6 to 12 sets, as requested, for final
authorization and use during construction.
Submit evidence from the manufacturer that 5,000 linear feet of the joint seal has had at least 2 years of
satisfactory service under similar conditions.
Submit certificates of compliance for materials used in the joint seals.
Submit a copy of the certified test report for binder material.
Submit a 10-pound test sample of binder material to METS. The test sample must be removed from the
same material to be shipped to the job site. Submit the test sample at least 15 days before shipment to
the job site.
51-2.02F(1)(d) Quality Control and Assurance
Binder material must be tested and certified by an authorized laboratory.

A technical representative of the joint seal manufacturer must be present during installation.

51-2.02F(2) Materials
All joint components must be from a single manufacturer.
The binder must be a thermoplastic, polymeric-modified asphalt; thermoplastic, polymer-modified
bitumen; polymer-modified asphalt sealant; or modified elastomeric binder complying with the
requirements shown in the following table:

608

SECTION 51

CONCRETE STRUCTURES

Property
Asphalt compatibility
Bond, nonimmersed

Test method
ASTM D 5329
ASTM D 5329

Cone penetration,
nonimmersed

ASTM D 5329
(modified)

Ductility
Flexibility
Flow

ASTM D 113
ASTM D 5329a
ASTM D 5329

Requirement
Pass
Pass 3 cycles at -20 F, 50%
Pass 3 cycles at 0 F, 100%
1 mm min at 0 2 F,
200 g total weight, 60 seconds
9 mm max at 77 2 F,
150 g total weight, 5 seconds
40 cm min at 77 2 F
Pass at 10 2 F
3 mm max at 140 2 F,
5 hours
40% min at 77 2 F
180 F min
550% min
390410 F
360390 F

Resilience
ASTM D 5329
Softening point
ASTM D 36
Tensile adhesion
ASTM D 5329
Safe heating temperature
Recommended pouring
temperature
a
Do not oven age specimens. After 24 hours at standard conditions, allow
specimens to condition at -10 2 degrees F for 2 hours before testing.
Binder material delivered to the job site must be labeled with:
1.
2.
3.
4.

Manufacturer's name
Lot or batch number
Dates of manufacturing, packaging, and expiration
Manufacturer's instructions for use

Binder material must be retested and recertified for use if the expiration date passes.
Aggregates must comply with:
1. Section 90-1.02C except the results of cleanness value and sand equivalent tests must comply with
the requirements for both operating range and contract compliance
2. Asphaltic plug manufacturer's instructions
The polyethylene backer rod must be commercial quality with a continuous, impervious, glazed surface
that can withstand the hot liquid binder material and is suitable for retaining the hot liquid binder while it
hardens.
The bridging plate must be 8 inches wide and at least 1/4 inch thick and comply with ASTM A 36/A 36M.
Cut the bridging plate into 48-inch-minimum-length sections. Place holes for locating pins along the
longitudinal plate centerline 12 inches on center. The locating pins must be at least 16d common steel
nails or equal.
51-2.02F(3) Construction
Uniformly double wash and dry natural aggregates before use.
Remove existing expansion dams and asphaltic concrete to the limits shown. Do not damage the deck or
remaining asphaltic concrete. Dispose of removed materials.
Steel dowels exposed when removing concrete must be cut off flush with the existing concrete or at the
bottom of concrete removal, whichever is lower. Patching around or over dowels in sound concrete is not
required. Chip voids back to sound concrete and fill voids with magnesium phosphate concrete.
Clean expansion joints under section 51-2.02C(3). Repair spalls when ordered. Repairing spalls is
change order work.
Abrasive blast blockout surfaces to receive the asphaltic plug joint seal.
609

SECTION 51

CONCRETE STRUCTURES

Clean and dry blockout surfaces and the adjacent 6 inches of roadway immediately before placing the
joint seal. Use a hot air lance producing a minimum temperature of 2,500 degrees F and a directional
velocity of at least 2,500 feet/second. There must be no moisture present during installation.
Place the top of the backer rod to a depth of at least 1 inch and at most equal to the width of the existing
gap below the bottom of the blockout.
Center bridging plate sections over the existing gap. Place the sections flat on the bottom of the blockout.
The sections must be butt jointed. Do not overlap the sections or allow gaps between the plate and
blockout.
Install the joint seal under the manufacturer's instructions.
51-2.02F(4) Payment
Not Used
51-2.03 SLIDING JOINTS
51-2.03A General
Section 51-2.03 includes specifications for constructing sliding joints.

Sliding joints consist of neoprene strips lubricated with silicone grease and covered with sheet metal.

51-2.03B Materials
Neoprene strips must comply with the specifications for neoprene in section 51-2.04.

Silicone grease must comply with Society of Automotive Engineers AS 8660.

Sheet metal must be commercial-quality galvanized sheet steel, smooth and free of kinks, bends, or

burrs. Joints must be butt joints sealed with plastic, duct-sealing tape.

51-2.03C Construction
Apply a uniform film of silicone grease to the upper surface of the neoprene strip before placing the sheet
metal.
Float the concrete surfaces where neoprene strips are placed to a level plane and finish with a steel
trowel.
Do not allow grout or concrete seepage into the sliding joint during concrete placement.
51-2.03D Payment
Not Used
51-2.04 WATERSTOPS
51-2.04A General
51-2.04A(1) Summary
Section 51-2.04 includes specifications for installing waterstops.

Waterstops must comply with the cross section and minimum dimensions shown.

51-2.04A(2) Definitions
Reserved
51-2.04A(3) Submittals
Submit a certificate of compliance for waterstop material stating compliance with paragraph 6 of Army
Corps of Engineers CRD-C 572.
51-2.04A(4) Quality Control and Assurance
Reserved
51-2.04B Materials
Waterstops must be manufactured from neoprene or PVC.
610

SECTION 51

CONCRETE STRUCTURES

Neoprene must (1) be manufactured from a vulcanized elastomeric compound containing neoprene as
the only elastomer and (2) comply with the requirements shown in the following table:
Property
Tensile strength
Ultimate elongation
Compression set,
22 hours at 70 C
Tear strength
Hardness, Type A
Ozone resistance 20% strain,
100 hours at 100 2.2 F
Brittleness temperature at -40 C
Flame propagation
Change in volume, IRM 903,
immersed 70 hours at 100 C
Change in mass,
immersed 7 days at 70 C

Test method
ASTM D 412
ASTM D 412
ASTM D 395, Method B

Requirement
2,000 psi min
300 percent min
30 percent max

ASTM D 624, Die C


ASTM D 2240
ASTM D 1149 except 100 20
parts per 100,000,000
ASTM D 746, Procedure B
ASTM C 542
ASTM D 471

26 kN/m min
55 5
No cracks
Pass
Must not propagate flame
80 percent max

ASTM D 471

15 percent max

After accelerated aging under ASTM D 573 for 70 hours at 100 degrees C, the elastomer must not show
property changes greater than those shown in the following table:
Property
Tensile strength
Elongation at break
Hardness

Requirement
-15 percent
-40 percent
+10 points

PVC waterstops must (1) be manufactured from PVC complying with CRD-C 572 and (2) comply with the
ozone resistance requirement for neoprene.
Furnish waterstops full length for straight portions of joints. Manufacturer's shop splices must be fully
vulcanized.
51-2.04C Construction
Use spacers, wire, or other authorized methods to secure reinforcing bars supporting waterstops.

If waterstops are out of shape or position after placing concrete, remove the concrete and reset

waterstops.

Field splices for neoprene waterstops must be one of the following:

1. Vulcanized
2. Mechanical using stainless steel parts
3. Made with a splicing union of the same stock as the waterstop
Completed field splices must have a full-size tensile strength of 100 pounds per inch of width.
Field splice PVC waterstops by heat sealing under the manufacturer's instructions. Do not burn the plastic
when melting.
Cut and splice waterstops at changes in direction as necessary to avoid buckling or distortion of the
waterstop.
51-2.04D Payment
Not Used
51-2.05 STRIP WATERSTOPS
51-2.05A General
Section 51-2.05 includes specifications for installing strip waterstops.
611

SECTION 51

CONCRETE STRUCTURES

51-2.05B Materials
The neoprene sheet must comply with the specifications for neoprene in section 51-2.04B.
The neoprene adhesive must comply with Federal Specification MMM-A-121.
The protective board must be at least 1/2-inch-thick wood or fiberboard that is at least 4 ft long and the
width shown.
The neoprene sheet must be smooth and free from pin holes or surface blemishes and show no sign of
delamination. Surfaces where adhesive is to be applied must have a cloth finish or a buffed finish.
Surfaces must be clean and dry when the adhesive is applied.
51-2.05C Construction
Join neoprene sheets as follows:
1.
2.
3.
4.

Lap the sheets at least 12 inches.


Apply the adhesive to both faces at the manufacturer's recommended rate.
Let the adhesive dry to an aggressive tack.
Bring the sheets together and roll in both directions to obtain a tight bond.

Abrasive blast clean the concrete surfaces to receive a strip waterstop. Allow the cleaned surfaces to air
dry 24 hours before applying the adhesive.
Apply the adhesive to the concrete and neoprene sheet at the manufacturer's recommended rate. Let the
adhesive dry to an aggressive tack. Apply the sheet to the concrete surface and roll in both directions to
obtain a tight bond.
Completely cover the installed strip waterstops with 1 layer of protective board attached with adhesive.
The protective board must remain in place until backfilling is complete.
51-2.05D Payment
Not Used
51-3 BEARINGS
51-3.01 GENERAL
Section 51-3 includes specifications for fabricating and installing bearings.
51-3.02 ELASTOMERIC BEARING PADS
51-3.02A General
51-3.02A(1) Summary
Section 51-3.02 includes specifications for fabricating and installing elastomeric bearing pads.
51-3.02A(2) Definitions
Reserved
51-3.02A(3) Submittals
51-3.02A(3)(a) General
Reserved
51-3.02A(3)(b) Plain Elastomeric Bearing Pads
For plain elastomeric bearing pads, submit:
1. Certificate of compliance with certified test results for the elastomer
2. Elastomeric bearing pad test samples at least 30 days before use
51-3.02A(3)(c) Steel-Reinforced Elastomeric Bearing Pads
Submit a certificate of compliance with certified test results from the bearing manufacturer for steel
reinforced elastomeric bearing pads.

612

SECTION 51

CONCRETE STRUCTURES

Submit 1 test sample from each lot of steel-reinforced bearing pads at least 20 days before use. The size
of the test sample must be as shown in the following table:
Bearing pad thickness
2 inches or less
More than 2 inches

Test sample size


Smallest complete bearing shown
2.25 0.125-inch-thick test sample at least
8 by 12 inches cut by the manufacturer from
the center of the thickest complete bearinga
a
Submit the test sample and the remaining parts of the complete
bearing.

51-3.02A(4) Quality Control and Assurance


51-3.02A(4)(a) General
Reserved
51-3.02A(4)(b) Plain Elastomeric Bearing Pads
For plain elastomeric bearing pads, the Engineer selects a test sample that is at least 8 by 12 inches from
each lot of pads or batch of elastomer to be furnished, whichever results in the larger number of test
samples. You may designate that test samples be taken at the point of manufacture or at the job site. Job
site test samples are completed pads as shown. Furnish additional pads to replace the pads selected for
testing.
The Department takes specimens from the test sample pads, prepares them by cutting and grinding and
tests them for tensile strength, elongation, tear strength, and ozone resistance.
51-3.02A(4)(c) Steel-Reinforced Elastomeric Bearing Pads
The Department tests a specimen taken from the test sample steel-reinforced bearing pad under
California Test 663. Specimens must show no loss of bond between the steel and elastomer laminates.
51-3.02B Materials
51-3.02B(1) General
Elastomeric bearing pads 1/2 inch or less in thickness must comply with section 51-3.02B(2).
Elastomeric bearing pads over 1/2 inch in thickness must comply with section 51-3.02B(2) or section 51
3.02B(3).
Silicone grease must comply with Society of Automotive Engineers AS 8660.
Sheet metal must be commercial-quality galvanized sheet steel, smooth and free of kinks, bends, or
burrs. Joints must be butt joints sealed with plastic duct-sealing tape.
51-3.02B(2) Plain Elastomeric Bearing Pads
For plain elastomeric bearing pads, pads 1/2 inch or less in thickness must be either laminated or all
elastomer. Pads over 1/2 inch in thickness must be laminated. The stacking of individually laminated pads
to attain thicknesses over 1/2 inch or the cold bonding of individual laminated pads is not allowed.
Elastomeric bearing pads may be cut from large sheets. Cutting must be performed so as to avoid
heating of the material, to produce a smooth edge with no tears or other jagged areas, and to cause as
little damage to the material as possible.
Neoprene must be the only polymer in the elastomeric compound and must be not less than 60 percent
by volume of the total compound. The elastomer must comply with ASTM D 4014, Type CR, Grade 3,
with a shear modulus of 110 10 psi.
The elastomer must comply with the requirements shown in the following table:

613

SECTION 51

CONCRETE STRUCTURES

Property
Tensile strength
Ultimate elongation
Compression set, 22 hours
at 70 C
Tear strength
Hardness, Type A
Ozone resistance 20%
strain, 100 hours
at 40 2 C
Instantaneous thermal
stiffening at -40 C
Low temperature
brittleness at -40 C

Test method
ASTM D 412
ASTM D 412
ASTM D 395, Method B

Requirement
2,250 psi min
350 percent min
25 percent max

ASTM D 624, Die C


ASTM D 2240 with
2 kg mass
ASTM D 1149
except 100 20 parts
per 100,000,000
ASTM D 1043

31.5 kN/m min


55 5

ASTM D 746,
Procedure B

No cracks
Not more than 4
times the stiffness
measured at 23 C
Pass

After accelerated aging under ASTM D 573 for 70 hours at 100 degrees C, the elastomer must not show
property changes greater than those shown in the following table:
Property
Tensile strength
Ultimate elongation
Hardness

Change
15 percent loss
40 percent loss; but not less than 300
percent total elongation of the material
+10 points

51-3.02B(3) Steel-Reinforced Elastomeric Bearing Pads


Steel-reinforced elastomeric bearing pads must comply with the specifications for steel-laminated
elastomeric bearings in ASTM D 4014 and the following:
1. Bearing pads must consist of alternating steel laminates and internal elastomer laminates with top,
bottom, and side elastomer covers. Steel laminates must have a nominal thickness of 0.075 inch (14
gage). Internal elastomer laminates must have a thickness of 1/2 inch. Top and bottom elastomer
covers must each have a thickness of 1/4 inch. The combined thickness of internal elastomer
laminates and top and bottom elastomer covers must be equal to the bearing pad thickness shown.
The elastomer cover to the steel laminates at the sides of the bearing must be 1/8 inch. If guide pins
or other devices are used to control the side cover over the steel laminates, any exposed portions of
the steel laminates must be sealed by vulcanized patching.
2. Total bearing thickness must be equal to the sum of the thicknesses of the elastomeric laminates and
covers and the steel laminates.
3. Elastomer must comply with section 51-3.02B(2).
51-3.02C Construction
Notify the Engineer of the type of bearing pad to be used before constructing the bearing seats. The
bearing seat elevation must correspond to the selected bearing thickness.
Where shown, lubricate the upper surface of the elastomeric bearing pad with a uniform film of silicone
grease before placing the sheet metal cover.
Do not allow grout or concrete seepage into the sliding surface during concrete placement.
51-3.02D Payment
Not Used
51-3.03 PTFE SPHERICAL BEARINGS
Reserved

614

SECTION 51

CONCRETE STRUCTURES

51-3.0451-3.05 RESERVED
51-4 PRECAST CONCRETE MEMBERS
51-4.01 GENERAL
51-4.01A Summary
Section 51-4 includes specifications for constructing PC concrete members.
You may construct PC PS concrete bridge members using segmental construction.
51-4.01B Definitions
Reserved
51-4.01C Submittals
51-4.01C(1) General
Submit shop drawings for PC concrete members.
51-4.01C(2) Girders
For PC PS concrete girders, shop drawings must include:
1. Anticipated deflections of the girders before deck placement and the methods of accommodation.
Include the following anticipated deflections:
1.1 Upward deflection due to prestressing forces
1.2 Downward deflection due to girder dead load
1.3 Deflection due to creep and shrinkage from the time of girder stressing to the planned deck
placement
2. Deflection calculations that consider the age of the girder concrete at the time of stressing and the
planned placement of the deck. Use the concrete producer's estimated modulus of elasticity at the
applicable concrete age for calculating deflections.
Submit a girder erection work plan. Include procedures, details, and sequences for unloading, lifting, and
erecting girders and for temporary bracing installation. The work plan must be signed by an engineer who
is registered as a civil engineer in the State.
For segmental girder construction, shop drawings must include the following additional information:
1.
2.
3.
4.
5.
6.

Details showing construction joints


Concrete form and casting details
Arrangement of bar reinforcing steel, prestressing tendons, and pressure-grouting pipe
Materials and methods for making closures
Construction joint keys and surface treatment
Other requested information

51-4.01C(3) Closure Wall Panels


Submit 2 sets of shop drawings for PC concrete closure wall panels as an informational submittal. Include
in the submittal:
1.
2.
3.
4.
5.

anel dimensions
P
M
aterials
Prestressing methods
Tendon arrangement and stresses
Additions or rearrangement of reinforcing steel from that shown

51-4.01C(4) Box Culverts


Shop drawings for PC concrete box culverts must include the construction method, dimensions,
reinforcement including splice type and location, and height of earth cover.
Submit a certificate of compliance signed by the manufacturer's QC representative for each shipment.

615

SECTION 51

CONCRETE STRUCTURES

51-4.01D Quality Control and Assurance


PC materials must be available to the Department for inspection. Allow the Department free access at all
times to any portion of the fabrication site where material is stored or work is performed.
PC concrete members are inspected at the fabrication site. Notify the Department when materials are
delivered to the fabrication site. Allow 10 days after notifying the Department before starting fabrication.
The manufacturer of box culverts must sample and test the concrete for compressive strength at least
once every production shift but not less than once daily. Test result records must be available to the
Engineer during regular work shifts.
51-4.02 MATERIALS
51-4.02A General
Prestressing must comply with section 50.

Reinforcement must comply with section 52.

In a freeze-thaw area, epoxy coat the reinforcement under section 52-2.02.

Bearing plates, threaded inserts, and other metal fittings must comply with section 75-1.03

Concrete for keyways must have a cementitious material content of at least 590 lb/cu yd and a 1-inch

maximum grading. Penetration of the concrete must be near the lower limit of the specified nominal

penetration.

Grout must comply with ASTM C 1107.

Deck shear connector rods, shown as tie rods, must comply with the following:

1. Steel fastener components must comply with section 55.


2. Lock washers must be ANSI heavy duty spring washers.
3. All metal must be hot-dip galvanized after fabrication under ASTM A123/A123M.
51-4.02B Fabricating Precast Concrete Members
51-4.02B(1) General
Reserved
51-4.02B(2) Girders, Box Girders, and Double T Girders
Before curing activities, the top surface of each PC member must be given a coarse texture by brooming
with a stiff bristled broom or by other suitable devices that results in uniform transverse scoring.
Additionally, the top surface texture of the following PC members must have at least a 1/4-inch amplitude:
1. Girders
2. Box girders with a concrete deck shown
3. T girders with a concrete deck shown
Wood float portions of the top surface of box girders to be covered by expanded polystyrene.
For segmental construction, materials for construction joints at exterior girders must match the color and
texture of the adjoining concrete.
51-4.02B(3) Slabs
Forms for circular voids in concrete slabs must (1) be watertight and constructed of an authorized material
that does not break or deform during concrete placement and (2) not increase the span dead load.
Before curing, the top surface of concrete slabs must be given a coarse texture by brooming with a stiff
bristled broom or by other suitable devices that results in uniform transverse scoring. The requirements of
the 6th and 7th paragraphs of section 51-1.01D(4)(b) do not apply.
51-4.02B(4) Closure Wall Panels
Exposed surfaces of closure wall panels must match the adjacent CIP concrete.
616

SECTION 51

CONCRETE STRUCTURES

Prestressing steel must be (1) placed not more than 6 inches from panel edges and (2) spaced not more
than 18 inches on center between edge tendons.
Anchorage hardware must comply with section 75-1.03. Bolt holes must comply with section 55
1.02B(6)(b) except holes must not be punched full size.
51-4.02B(5) Box Culverts
Reinforcement for PC concrete box culverts may be welded wire reinforcement.
Manufacturing tolerances for PC sections must comply with the tolerances specified in section 11 of
AASHTO M 259.
You may use the dry cast method of construction where shown on the authorized shop drawings. Results
must be equal to those obtained under section 51. External vibrators must be used. Forms must be
sufficiently rigid to resist displacement or damage. Dry casting forms may be removed after consolidating
if no slumping of the concrete occurs.
Form the ends of members such that sections can be laid together to make a continuous line of box
sections with a smooth interior free of irregularities in the flow line.
Splices in circumferential reinforcement must be lapped. Welded splices for the outside apron of steel are
allowed only where shown. Wall reinforcement on the inside of the box may be lapped and welded at any
location or connected by welding at the corners to slab reinforcement at the inside of the box.
Handling devices or holes are allowed in members for handling and laying. Clean and fill the resulting
holes with mortar.
Exposed spacers, standoffs, or ends of longitudinals used to position reinforcement are not a cause for
rejection. Do not weld spacers or standoffs to circumferential reinforcement. You may weld spacers or
standoffs to longitudinal reinforcement.
Clearly mark each PC unit. Use indentation, waterproof paint, or other authorized means. Include contract
number, date of manufacture, manufacturer, and the design earth cover. Mark each unit by indentation on
the inner or outer surface so that the top is evident immediately after stripping forms. Paint the word
"TOP" with waterproof paint on the inside and outside surfaces of the tops of each unit.
51-4.02B(6) Lagging
Concrete for PC concrete lagging in a freeze-thaw area must contain at least 675 pounds of cementitious
material per cubic yard.
If concrete lagging is steam cured, supports for reinforcement must be stainless steel containing at least
16 percent chromium.
51-4.02B(7) Deck Panels
Reserved
51-4.02C Curing Precast Concrete Members
Cure PC concrete members under section 90-4.03.
51-4.03 CONSTRUCTION
51-4.03A General
Reserved
51-4.03B Girders, Box Girders, and Double T Girders
Carefully handle, store, transport, and erect PC concrete members to avoid twisting, racking, or other
distortion that would result in cracking or damage to the members.
Handle, store, transport, and erect PC members in an upright position such that the points of support and
directions of the reactions with respect to the member are approximately the same as when the member
is in its final position.

617

SECTION 51

CONCRETE STRUCTURES

For girders and box girders or double T girders with a concrete deck shown, clean top surfaces of laitance
and curing compound before placing deck concrete.
You may make adjustments to accommodate girder deflections before placing deck concrete, including
adjustments to bearing seat elevations. Adjustments are limited by the following:
1. Minimum permanent vertical clearance under the structure is not reduced.
2. Deck profile grade and cross slope cannot be changed.
3. Except for box girders, a minimum of 1 inch of deck slab concrete is maintained between the deck
slab reinforcement and the top of the girders.
4. For box girders, a minimum of 1 inch of deck slab concrete must be maintained between the top of
expanded polystyrene in the area between the girder webs and the deck slab reinforcement.
Adjustments to accommodate girder deflections are not considered a change in dimensions.
Grout keyways after PC members are in final position. Before grouting, abrasive blast clean the keyways
to expose clean aggregate and flush with water. Allow to dry to a surface dry condition immediately
before placing the grout.
Do not place equipment or other loads on spans that have been grouted for at least 72 hours after
grouting. Do not tension or tighten transverse post-tensioning tendons until 24 hours after grouting the
last keyway.
51-4.03C Slabs
For slab spans with a concrete overlay, clean the slab top surfaces under section 51-1.03D(4).
For slab spans with a HMA overlay, removal of laitance and curing compound from the top surfaces is not
required.
Where the ends of transverse rods will be exposed, recess exposed nuts and ends of rods at least 1 inch
below the member surface. Snug tighten nuts after the deck units are positioned and before placing
mortar in the keyways.
Fill the anchor dowel holes with mortar after the slabs are in final position.
Fill keyways with concrete. Keyways must be mortar-tight before placing concrete. Thoroughly
consolidate the concrete in keyways.
Tighten nuts 24 hours after concrete in the keyways has been placed. Burr threads at the ends of bolts or
rods to prevent loosening. Fill recesses with mortar after tightening nuts.
No equipment or other loads are allowed on spans until 72 hours after the last mortar is placed in anchor
dowel holes or the last concrete is placed in keyways.
For slab spans with a concrete overlay, at least 3 slabs adjacent to a span must be in place before the
concrete overlay is placed in that span.
51-4.03D Closure Wall Panels
Reserved
51-4.03E Box Culverts
Construct box culverts using PC members where described.
You must select the combination of concrete dimensions and reinforcement if more than 1 allowable
combination is shown.
Structure excavation and backfill must comply with section 19-3.
Laying of PC concrete box culverts must comply with the specifications for laying reinforced concrete pipe
in section 65-2.03D.
Joints must comply with the specifications for cement mortar or resilient material joints in section 652.02E. You may use an external sealing band complying with ASTM C 877 instead of joint material.
618

SECTION 51

CONCRETE STRUCTURES

51-4.03F Lagging
Place concrete lagging for soldier piles walls level. Place a concrete leveling course if required.
Each lagging member must be continuous over 2 piles and cantilever at least 6 inches beyond pile
centerlines. Continuity over 3 piles is not allowed.
51-4.03G Deck Panels
Reserved
51-4.04 PAYMENT
Except for piling, furnishing of PC concrete members includes payment for delivery to the job site ready to

incorporate into the work.

Erect PC concrete members includes payment for erection into the final position in the work.

Diaphragm dowels and bolts in PC concrete members are paid for as bar reinforcing steel (bridge).

PC concrete lagging is measured based on the gross wall area dimensions shown. No deduction is made

for spacing between lagging or openings for drainage piping.

PC concrete box culvert is measured as specified for reinforced concrete pipe in section 65-2.04.

Concrete closure walls are measured on the outside surface of completed panels.

51-5 APPROACH SLABS


51-5.01 GENERAL
51-5.01A Summary
Section 51-5 includes specifications for constructing approach slabs and paving notch extensions.
Structure approach drainage systems must comply with section 68-7.
51-5.01B Definitions
Reserved
51-5.01C Submittals
If using RSC, submit the RSC mix design at least 10 days before constructing the trial slab.
51-5.01D Quality Control and Assurance
51-5.01D(1) General
If woven tape fabric is shown, notify the Engineer of the source of woven tape fabric at least 45 days
before use.
Notify the Engineer of the type of treated permeable base to be used under approach slabs at least 30
days before starting placement. After notification, do not change the type of permeable base without
authorization.
51-5.01D(2) Rapid Strength Concrete
Before starting work on approach slabs constructed using RSC, prepare a trial slab for each concrete mix
design.
Trial slabs must be:
1. Constructed, finished, and cured within the allowed time with the materials, tools, equipment,
personnel, and methods to be used in the work
2. 10 by 20 feet by 9 inches thick
3. Constructed near the job site outside the project limits at an authorized location
Trial slabs must demonstrate that you are capable of producing approach slabs within the anticipated
time periods, including delivery, placement, finishing, and curing times, and under similar atmospheric
and temperature conditions expected during construction operations. Multiple trial slabs for each concrete
mix design may be required to encompass variable atmospheric conditions.
619

SECTION 51

CONCRETE STRUCTURES

Test the trial slab concrete for compressive strength under section 90-1.01D(5). Trial slab concrete must
develop the following minimum compressive strengths:
1. 1,200 psi at the age of break
2. 2,500 psi at 3 days
3. 4,000 psi at 28 days
51-5.02 MATERIALS
51-5.02A General
Hardboard and expanded polystyrene must comply with section 51-2.01B(1).
51-5.02B Fabric
Filter fabric must be Class A.
Woven tape fabric must:
1. Be fabric of woven strips or tapes
2. Retain at least 70 percent tensile strength when tested under ASTM D 4355 with 500 hours exposure
3. Comply with the requirements shown in the following table:
Property
Test method
Requirement
Weight
ASTM D 3776
3 oz/sq yd min
Grab breaking load
ASTM D 4632
50 lb min
Apparent elongation
ASTM D 4632
35 percent min
-1,200 lb min
Toughnessa
a
Percent apparent elongation times the grab breaking load
51-5.02C Concrete
Concrete for approach slabs and paving notch extensions must contain at least 675 pounds of
cementitious material per cubic yard and comply with one of the following:
1. Cure for at least 5 days before opening to traffic
2. Comply with the specifications for RSC
For paving notch extensions, you may use magnesium phosphate concrete, modified high-alumina-based
concrete, or portland-cement-based concrete, complying with the specifications for bonding materials in
section 51-1. The concrete may be extended by using a clean, uniform, rounded aggregate filler with a
moisture content of at most 0.5 percent. The quantity of aggregate filler must comply with the
manufacturer's instructions. Concrete strengths for the extended concrete must be at least that specified
for the bonding materials. The aggregate grading must comply with the requirements shown in the
following table:
Sieve size
1/2-inch
No. 16

Percentage passing
100
05

In freeze-thaw areas, concrete for approach slabs and paving notch extensions must comply with section
90-1.02I.
Concrete for drainage pads must comply with the specifications for minor concrete.
51-5.02D Aggregate Base
AB must be produced from commercial-quality aggregates consisting of broken stone, crushed gravel or
natural rough-surfaced gravel, and sand, in any combination. Grading must comply with the 3/4-inch
maximum grading specified in section 26-1.02B.
51-5.02E Bar Reinforcement
Bar reinforcing steel must comply with section 52.
620

SECTION 51

CONCRETE STRUCTURES

In a freeze-thaw area, epoxy coat bar reinforcement under section 52-2.02.


Galvanize unbonded portions of bar reinforcement under section 52-3.
51-5.02F Miscellaneous Joint Materials
Steel components of abutment ties must comply with section 75-1.03.

PVC conduit used to encase abutment tie rods must be commercial quality.

Steel angles, plates, and bars at concrete barrier joints must comply with section 75-1.03.

Type AL joint seals must comply with section 51-2.02B.

The pourable seal between the steel angle and concrete barrier must comply with the specifications for

Type A and AL joint seals in section 51-2.02B.

Sealants may be mixed by hand-held, power-driven agitators and placed by hand methods.

Sliding joints for the sleeper slabs must comply with 51-2.03.

Building paper must be commercial-quality, 30-pound asphalt felt.

51-5.02G Hot Mix Asphalt


HMA for a temporary roadway structural section must comply with section 39. Aggregate grading must be
3/4-inch HMA Types A or B. Asphalt binder must comply with the specifications for liquid asphalt SC-800
in section 93. The quantity of asphalt binder mixed with aggregate must be 0.3 percent less than the OBC
as determined under California Test 367.
51-5.03 CONSTRUCTION
51-5.03A General
Drill and bond bar reinforcement and abutment tie rods under section 51-1.03E(3).

Finish and treat the top surfaces of approach slabs under section 51-1.03F(5). Edger finish the slab

edges.

Cure approach slabs using curing compound no. 1.

Abrasive blast clean concrete surfaces and thoroughly clean joints immediately before placing seals. Joint

surfaces must be dry at the time seals are placed.

51-5.03B Type N Approach Slabs


51-5.03B(1) General
Reserved
51-5.03B(2) Filter Fabric
Place filter fabric immediately after grading and compacting the subgrade. Handle and place filter fabric
under the manufacturer's instructions.
Adjacent borders of filter fabric must be overlapped from 12 to 18 inches or stitched. If overlapping the
borders, the preceding roll must overlap the following roll in the direction the material is being spread. If
stitching the border, use yarn of a contrasting color. Yarn size and composition must be as recommended
by the fabric manufacturer. Use 5 to 7 stitches per inch of seam.
Do not operate equipment or vehicles on filter fabric.
51-5.03B(3) Treated Permeable Base
Construct the treated permeable base under section 29.
Place and compact ATPB at a temperature from 200 to 250 degrees F. Do not use material stored for
more than 2 hours in the work.

621

SECTION 51

CONCRETE STRUCTURES

Compact ATPB base as soon as the mixture has cooled sufficiently to support the weight of the
equipment without undue displacements. Use a vibrating-shoe-type compactor or a roller weighing from
1.5 to 5 tons.
Compact CTPB with a vibrating-shoe-type compactor or with a steel-drum roller weighing from 1.5 to 5
tons. Compaction must start within 1/2 hour of spreading and must consist of 2 complete coverages of the
CTPB.
51-5.03C Type EQ Approach Slabs
Reserved
51-5.03D Type R Approach Slabs
51-5.03D(1) General
The Type R approach slab thicknesses shown are minimums. Thicknesses may vary due to material
removed.
Structure excavation and backfill must comply with section 19-3.
At locations where the removal of existing materials and approach slab construction is not required to be
completed within the same work shift, the requirements for a temporary roadway structural section and
trial slab do not apply.
51-5.03D(2) Removal of Existing Facilities
Remove portions of existing structures, pavement and base, approach slabs, HMA surfacing, concrete
pavement, subsealing material, and cement-treated base, as necessary for the construction of the new
approach slab.
Remove portions of seat-type abutments under section 15-4.
Sawcut full depth the outline of concrete pavement to be removed using a power-driven saw. Do not use
power impact tools within 1.5 feet of pavement to remain in place.
Before removing HMA, cut the outlines of excavations in HMA on a neat line to a minimum depth of 0.25
foot using a power-driven concrete saw or wheel-type rock-cutting excavator. These excavations must be
permanently or temporarily backfilled to conform to the grade of the adjacent pavement before opening
the lane to traffic.
Dispose of materials no longer used in the work.
51-5.03D(3) Existing Base Material
Uniformly grade and compact the existing base material remaining in place after removing the existing
pavement and base materials to the required depth. The finished surface of the base material at any point
must not extend above the authorized grade.
Fill areas of base material that are low as a result of overexcavation with structure approach slab
concrete at the same time that the new concrete is placed.
Where pavement subsealing has been performed under existing approach slabs, remove the full depth of
subsealing material. Where removal of CTB is required to construct the approach slab, remove the full
depth of the CTB.
Fill voids between the new approach slab and the base material remaining in place that are caused by
removal of subsealing material or CTB with either AB or approach slab concrete. If you fill these voids
with structure approach slab concrete, fill the voids at the same time that the new concrete is placed.
51-5.03D(4) Aggregate Base
Spread and compact AB for filling voids below the structure approach slab concrete by methods that will
produce a well-compacted, uniform base, free from pockets of coarse or fine material, to the authorized
grade. Where the required thickness of AB is 8 inches or less, the base may be spread and compacted in
1 layer. Where the required thickness of AB is more than 8 inches, the base must be spread and
compacted in 2 or more layers of approximately equal thickness. The maximum compacted thickness of
any 1 layer must not exceed 8 inches.
622

SECTION 51

CONCRETE STRUCTURES

51-5.03D(5) Profile Grade


Establish a grade line for the new approach slab that will provide a smooth profile grade. The profile
grade must be authorized.
51-5.03D(6) Temporary Roadway Structural Section
If approach slabs cannot be constructed before the lane is opened to traffic, fill the excavation with a
temporary roadway structural section. Temporary structural section must consist of a 0.3-foot-thick layer
of HMA over AB.
Keep a standby quantity of HMA and AB at the job site for a temporary roadway structural section.
Spread and compact the AB and HMA. Produce a well-compacted, uniform base having a surface of
uniform smoothness, texture, and density, without pockets of coarse or fine material. You may spread
and compact AB and HMA in 1 layer each.
The finished surface (1) must not vary more than 0.05 foot from the lower edge of a 12-foot straightedge
placed parallel with the centerline and (2) must match the elevation of the existing pavement and
structure along the joints between the existing pavement and structure and the temporary surfacing.
Maintain the temporary structural section until it is replaced with the approach slab.
51-5.03E Paving Notch Extensions
The construction joint between the paving notch extension and the existing abutment must comply with
the specifications for horizontal construction joints in section 51-1.03D(4). Patch spalls in the existing
paving notch when placing the paving notch extension.
The surface temperature must be at least 40 degrees F during concrete placement. Contact surfaces to
receive concrete may be damp but not saturated.
Retempering of concrete is not allowed. Finishing tools cleaned with water must be thoroughly dried
before working concrete.
The Engineer may require you to use a flow-controlled modified material when placing concrete on slopes
over 5 percent.
Except for magnesium phosphate concrete, cure the concrete using the curing compound method.
Allow 12 hours between placing the paving notch extension and placing the approach slab.
51-5.04 PAYMENT
The quantity of aggregate base (approach slab) to be paid includes the actual volume used to fill voids
below approach slab concrete. No payment is made for AB placed to fill overexcavation.
51-6 MASS CONCRETE
51-6.01 GENERAL
51-6.01A Summary
Section 51-6 includes specifications for placing mass concrete elements.
51-6.01B Definitions
Reserved
51-6.01C Submittals
Submit a thermal control plan with design calculations for each mass concrete element. The thermal
control plan and the calculations must be sealed and signed by an engineer who is registered as a civil
engineer in the State. Submit 6 copies of the control plan and 2 copies of the design calculations. Include
the following:
1. M
ix design
2. Duration and method of curing
3. Maximum allowable temperature differentials between the hottest point of the concrete and the
exterior concrete faces
4. Procedures to control concrete temperature differentials at time of placement
623

SECTION 51
5.
6.
7.
8.

CONCRETE STRUCTURES

Methods of controlling temperature differentials


Temperature differential monitoring and recording system details
Temperature sensor types and locations
Measures to ensure compliance with maximum temperature and temperature differential
requirements

Determine the maximum allowable temperature differential assuming cracking due to heat of hydration
must not occur.
Submit temperature data daily as an informational submittal.
Submit a daily progress report as an informational submittal. A copy of the daily report must be available
at the job site.
Submit a modified thermal control plan to correct deficiencies for replacement mass concrete. Include
supporting calculations.
51-6.01D Quality Control and Assurance
51-6.01D(1) General
An engineer who is registered as a civil engineer in the State must:
1. Inspect and test the temperature monitoring and recording systems before concrete placement
2. Be present during mass concrete activities
3. Provide daily progress reports
51-6.01D(2) Temperature Monitoring
Provide a temperature monitoring and recording system for mass concrete elements. The system must
consist of temperature sensors connected to a data acquisition system. The system must be capable of
recording, printing, and downloading temperature data to a computer.
Locate temperature sensors within mass concrete elements such that the maximum temperature
difference within the element is monitored. At a minimum, monitor temperatures at the following locations:
1.
2.
3.
4.

Calculated hottest location


2 outer faces
2 corners except for CIP piling elements
T
op surfaces

Record temperature readings automatically at least every hour. Install a redundant set of sensors near
the primary set with recording capability. Make records using the redundant set if the primary set fails.
You may discontinue hourly temperature recording under the following conditions:
1. Maximum internal temperature is falling
2. Difference between the interior concrete temperature and the average daily air temperature is less
than the allowable temperature differential for 3 consecutive days
3. There are no mass concrete elements to be cast adjacent
Protect the temperature sensor wiring to prevent movement during concrete placement. Keep wire runs
as short as possible. Do not let the ends of temperature sensors come into contact with concrete
supports, forms, or reinforcement.
Do not damage the monitoring and recording system when placing and consolidating concrete.
Correct equipment failures in temperature control and monitoring and recording systems immediately.
The temperature acceptance criteria for mass concrete elements are as follows:
1. Maximum allowable temperature must not exceed 160 degrees F.
2. Maximum temperature differential must not exceed that listed in the thermal control plan.

624

SECTION 51

CONCRETE STRUCTURES

51-6.02 MATERIALS
Not Used
51-6.03 CONSTRUCTION
You may use mechanical cooling systems to control internal concrete temperatures during curing.
Mechanical cooling systems must comply with the thermal control plan.

Embed the system within mass concrete elements. Surface connections to cooling pipes must be

removable to 4 inches below the concrete surface.

Design the forms such that cooling or temperature monitoring is not disturbed during form removal.

Secure the cooling pipes to prevent movement during concrete placement. Replace damaged cooling

pipes immediately.

Pressure test the cooling system for leaks at 30 psi for 30 minutes before placing concrete. Coolant must

be circulating when concrete placement starts.

Pressure grout the cooling pipes after cooling is complete. Use a nonshrink grout mix complying with

ASTM C 1107 and ASTM C 827 for 0.0 percent shrinkage and 0.0 percent minimum and 4.0 percent

maximum expansion. Place the grout under the manufacturers instructions.

After the surface connections are removed, the holes must be reamed and filled with mortar.

Remove mass concrete elements that do not comply with the temperature acceptance criteria.

51-6.04 PAYMENT
Not Used
51-7 MINOR STRUCTURES
51-7.01 GENERAL
51-7.01A General
Section 51-7 includes specifications for constructing minor structures.

You may construct minor structures using PC units or a combination of PC and CIP structures as an

alternative to CIP construction, provided that the structure in place substantially complies with the

specified CIP construction.

You may use PC drainage inlets as an alternative to CIP drainage inlets.

Earthwork must comply with section 19-3.

51-7.01B Materials
Concrete for pipe headwalls, endwalls, drainage inlets, and structures identified as minor structures must
comply with the specifications for minor concrete.
Bar reinforcing steel must comply with section 52.
Metal frames, covers, grates, and other miscellaneous iron and steel used with minor structures must
comply with section 75-1.02.
51-7.01C Construction
PC units for drainage inlets must be round, oval, or rectangular in cross section, or any combination.
Transitions from a rectangular grate opening to a round or oval basin must be made in not less than 8
inches. Provide means for field adjustment to meet final grade, paving, or surfacing.
You may construct forms for drainage inlets using any material that produces the interior dimensions and
wall thicknesses shown. Undulations of interior wall surfaces must not exceed 1/2 inch. Extend the
outside forms at least 5 inches below the top of the inlet. You may place concrete against excavated
earth below this depth except you must use full-depth outside forms or other protection when work
activities or unstable earth may cause hazardous conditions or contamination of the concrete.

625

SECTION 51

CONCRETE STRUCTURES

Remove exterior forms to at least 5 inches below the final ground surface. Exterior forms below this depth
may remain if their total thickness is not more than 1 inch.
Cure concrete surfaces of minor structures using the water method, the forms-in-place method, or the
curing compound method.
51-7.01D Payment
The Department does not adjust the payment for minor structures designated as final pay on the Bid Item
List when the constructed height of the minor structure is within 6 inches of the vertical dimension shown.
Metal frames and covers or frames and grates are not included in the payment for minor structures.
51-7.02 PRECAST DRAINAGE INLETS
Reserved

626

52 REINFORCEMENT

52-1 GENERAL

52-1.01 GENERAL
52-1.01A Summary
Section 52-1 includes general specifications for fabricating and placing reinforcement.
52-1.01B Definitions
affected zone: Portion of the reinforcing bar where any properties of the bar, including the physical,
metallurgical, or material characteristics, have been changed by:
1. Fabrication or installation of a splice. The weld and 1 inch adjacent to the weld is part of the affected
zone.
2. Manufacturing process for headed bar reinforcement.
lot:
1. 150 count, or fraction thereof, of the same type of mechanical splice coupler model for each:
1.1. Bar size
1.2. Bar deformation pattern
1.3. Hoop diameter
2. 150 count, or fraction thereof, of CJP butt-welded splices or resistance-butt-welded splices for each:
2.1. Bar size
2.2. Hoop diameter
3. 150 count, or fraction thereof, of headed bar reinforcement for each:
3.1 Bar size
3.2 Head size
3.3 Head type
3.4 Method of manufacture
3.5 Heat number of bar material
3.6 Heat number of head material
A reinforcing bar with a head on each end is counted as 2 headed reinforcing bars for establishing
and testing production lots.
52-1.01C Submittals
52-1.01C(1) General
Reserved
52-1.01C(2) Certificate of Compliance
Submit a certificate of compliance for each shipment of reinforcement.
If requested, submit the following:
1. Copy of the certified mill test report for each heat and size of reinforcing steel showing physical and
chemical analysis
2. 2 copies of a list of all reinforcement before starting reinforcement placement
52-1.01C(3) Shop Drawings
52-1.01C(3)(a) General
Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil
engineer in the State.
52-1.01C(3)(b) Temporary Support System
If a portion of an assemblage of bar reinforcing steel exceeds 20 feet in height and is not encased in
concrete, submit shop drawings and design calculations for a temporary support system.
The temporary support system must be designed to:

627

SECTION 52

REINFORCEMENT

1. Resist all expected loads


2. Prevent collapse or overturning of the cage
If form installation or other work requires changes to or the temporary release of any part of the temporary
support system, the shop drawings must show the support system to be used during these changes or
the temporary release.
The minimum horizontal wind load to be applied to the reinforcing steel assemblage or to a combined
assemblage of reinforcing steel and forms must be the sum of the products of the wind impact area and
the applicable wind pressure value for each height zone.
The wind impact area is the total projected area of the assemblage normal to the direction of the applied
wind. Determine wind pressure values using the following table:
Wind Pressure
Height zone, H
Wind pressure
(feet above
value
ground)
(psf)
20
0 30
25
30 < H 50
30
50 < H 100
H > 100
35
52-1.01D Quality Control and Assurance
Reserved
52-1.02 MATERIALS
52-1.02A General
Reserved
52-1.02B Bar Reinforcement
Reinforcing bars must be deformed bars complying with ASTM A 706/A 706M, except you may use
deformed or plain bars complying with ASTM A 615/A 615M, Grade 40 or 60, as reinforcement in the
following:
1.
2.
3.
4.
5.

Slope and channel paving


Minor structures
Sign and signal foundations
Roadside rest facilities
Concrete barrier Type 50 and 60

You may use plain bars complying with ASTM A 706/A 706M for spiral or hoop reinforcement in
structures and concrete piles.
You may substitute welded wire reinforcement for reinforcing bars in the following:
1.
2.
3.
4.
5.
6.
7.
8.

Slope paving and lined ditches


Retaining walls
Concrete barriers
Sidewalks, curbs, and gutters on structures
Nonstructural aesthetic additions
Culvert headwalls, end walls, and wing walls
Shotcrete
Deck overlays

Substituted welded wire reinforcement must be on an equivalent area basis and placed as ordered. If the
welded wire reinforcement does not provide the required area of steel, supplement it with reinforcing bars.

628

SECTION 52

REINFORCEMENT

52-1.02C Welded Wire Reinforcement


Welded wire reinforcement must comply with ASTM A 185/A 185M or ASTM A 497/A 497M.
52-1.02D Reinforcing Wire
Reinforcing wire must comply with ASTM A 82/A 82M.
52-1.03 CONSTRUCTION
52-1.03A General
Reserved
52-1.03B Cleaning
Before concrete is placed, the reinforcement to be embedded must be free of mortar, oil, dirt, excessive
mill scale and scabby rust, and other coatings that would destroy or reduce the bond.
52-1.03C Bending
Do not bend or straighten bars in a way that damages the material. Do not use bars with kinks or
improper bends.
Hooks and bends must comply with the Building Code Requirements for Structural Concrete published by
ACI.
52-1.03D Placing
Firmly and securely hold reinforcement in position by:
1. Wiring at intersections and splices.
2. Using precast mortar blocks or ferrous metal chairs, spacers, metal hangers, supporting wires, or
other authorized devices strong enough to resist crushing under applied loads. Do not use aluminum,
plastic, or wood supports.
Do not place bars on layers of fresh concrete as the work progresses.
Metal supports must have a clear cover of at least 1 inch. Do not consider protective coatings on metal
supports when determining clear cover. Where the clear cover to reinforcement shown or ordered
exceeds the minimum specified clear cover, increase the clear cover for metal supports accordingly.
The center-to-center spacing of parallel bars must be at least 2.5 times the bar diameter.
The clear distance between bundles of bars and adjacent bundles or single bars must be at least:
1. 1.5 times the maximum size of the coarse aggregate
2. 2 times the larger bar diameter for 2-bar bundles
3. 2.5 times the larger bar diameter for 3-bar bundles
Tie bundle bars together at not more than 6-foot centers.
Unless otherwise shown, reinforcement must have a 2-inch clear cover measured from the surface of the
concrete to the outside of the reinforcement.
Adjust or relocate reinforcement in post-tensioned concrete during the installation of prestressing ducts or
tendons as required to provide described clearances to the prestressing tendons, anchorages, jacks, and
equipment. Obtain authorization for any adjustments or relocations.
Unless otherwise shown, anchor each unit of wire spiral reinforcement at both ends by a 135-degree
hook with a 6-inch tail hooked around an intersecting longitudinal bar. Discontinuities in spiral
reinforcement may be made only where shown or authorized. The spiral on each side of a discontinuity or
a lap splice is a separate unit. Where discontinuities in spiral reinforcement are not allowed, splice spiral
reinforcement under section 52-6. Lap splices in spiral reinforcement must be lapped at least 80 wire
diameters.
Roll welded wire reinforcement flat before placing concrete. Secure welded wire reinforcement in place
with devices that prevent the reinforcement's vertical and transverse movement.
629

SECTION 52

REINFORCEMENT

Do not tack weld on reinforcing bars unless shown.


For column and pile bar reinforcing cages measuring 4 feet in diameter and larger:
1. Tie all reinforcement intersections with double wire ties on at least 4 vertical bars of each cage
equally spaced around the circumference.
2. Tie at least 25 percent of remaining reinforcement intersections in each cage with single wire ties.
Stagger tied intersections from adjacent ties.
3. Provide bracing to avoid collapse of the cage during assembly, transportation, and installation.
52-1.04 PAYMENT
The payment quantity of bar reinforcing steel is the calculated weight of the reinforcing bars and wire
placed as described.
The payment quantity of bar reinforcing steel includes the lap of bars for lap splicing, including locations
where you use a continuous bar instead of the splice shown.
The payment quantities are based on the following:
Bar Reinforcing Steel Quantities
Deformed bar
Weight
Nominal diameter
designation no.
(pounds per foot)
(inches)
3
0.376
0.375
4
0.668
0.500
5
1.043
0.625
6
1.502
0.750
7
2.044
0.875
8
2.670
1.000
9
3.400
1.128
10
4.303
1.270
11
5.313
1.410
14
7.650
1.693
18
13.600
2.257
NOTE: Bar numbers approximate the number of eighths of an
inch included in the nominal diameter of the bars. The nominal
diameter of a deformed bar is equal to the diameter of a plain
round bar having the same weight per linear foot as the
deformed bar.
The Department considers (1) the cross sectional area of reinforcing wire, in hundredths of square
inches, to be equal to its W-size number and (2) the density of reinforcing wire to be 0.2833 lb/cu in.
The payment quantity of welded wire reinforcement is determined based on the measured area covered
by the reinforcement and does not include laps.
If alternative transverse deck reinforcement placement details are shown, the payment quantities are
based on the detail that shows truss bars.
Bar reinforcing steel involved in bridge work is paid for as bar reinforcing steel (bridge) or bar reinforcing
steel (epoxy coated)(bridge) unless it is included in a separate bid item.
52-2 EPOXY-COATED REINFORCEMENT AND EPOXY-COATED PREFABRICATED
REINFORCEMENT
52-2.01 GENERAL
52-2.01A General
52-2.01A(1) Summary
Section 52-2.01 includes general specifications for fabricating and placing epoxy-coated reinforcement
and epoxy-coated prefabricated reinforcement.

630

SECTION 52

REINFORCEMENT

The substitution of welded wire reinforcement for bar reinforcement specified in 52-1.02B is not allowed
for epoxy-coated bar reinforcement or epoxy-coated prefabricated bar reinforcement.
52-2.01A(2) Definitions
Reserved
52-2.01A(3) Submittals
52-2.01A(3)(a) General
Reserved
52-2.01A(3)(b) Epoxy Powder Test Samples
Submit a test sample, from each batch of epoxy powder to be used for epoxy coating reinforcement, to
METS.
Each test sample must be:
1. 4 ounces
2. Packaged in an airtight container
3. Identified with the manufacturer's name and batch number
52-2.01A(3)(c) Patching Material Test Samples
Submit a test sample, from each batch of patching material to be used to repair epoxy coating on
reinforcement, to METS.
Each test sample must be:
1. 4 ounces
2. Packaged in an airtight container
3. Identified with the manufacturer's name and batch number
52-2.01A(3)(d) Quality Assurance Test Samples
Submit test samples of epoxy-coated reinforcement and epoxy-coated prefabricated reinforcement to
METS.
52-2.01A(4) Quality Control and Assurance
The following must be on the Authorized Material List:
1. Epoxy powder
2. Corrosion protection covering for splices
52-2.01B Materials
Except for field welding of butt splices, complete welding of the reinforcement before epoxy coating.
If a part of a bar or wire is described to be epoxy coated, coat the entire bar unless the bar or wire is
spliced outside the limits of epoxy coating, in which case epoxy coating is not required on the part of the

bar or wire beyond the splice.

Do not store reinforcement within 1,000 feet of ocean or tidal water for more than 2 months.

Patching material and the patching process must be suitable for field application.

52-2.01C Construction
Except for lap splices, cover splices of reinforcement with a corrosion protection covering. Install covering
under the manufacturers instructions.
52-2.01D Payment
The weight of epoxy coating is not included in the weight of reinforcement.
Bar or wire reinforcement extending beyond the limits for epoxy-coated reinforcement shown is paid for
as bar reinforcing steel (bridge).

631

SECTION 52

REINFORCEMENT

52-2.02 EPOXY-COATED REINFORCEMENT


52-2.02A General
52-2.02A(1) Summary
Section 52-2.02 includes specifications for fabricating and placing epoxy-coated reinforcement.
In a freeze-thaw area, epoxy coat the following:
1. All longitudinal and transverse reinforcement in a bridge deck 12 inches or less in thickness
2. Longitudinal and transverse reinforcement within 6 inches of the top surface of a bridge deck greater
than 12 inches in thickness
3. Reinforcement that extends to within 6 inches of the top surface of the bridge deck
4. Reinforcement within or that extends to within 6 inches of the top surface of abutment backwalls,
when the top surface of the backwall is at deck level
5. Reinforcement in concrete barriers
6. Reinforcement at locations shown
52-2.02A(2) Definitions
Reserved
52-2.02A(3) Submittals
Submit a certificate of compliance for each shipment of epoxy-coated reinforcement. Include with the
submittal:
1. Certification that the coated reinforcement complies with ASTM A 775/A 775M for bar reinforcement
or ASTM A 884/A 884M, Class A, Type 1, for wire reinforcement
2. All certifications specified in ASTM A 775/A 775M for bar reinforcement or ASTM A 884/A 884M for
wire reinforcement
Perform qualification testing and certifications required by ASTM A 775/A 775M and ASTM A 884/A 884M
at an authorized laboratory.
Submit a certificate of compliance for the patching material that includes a certification that the patching
material is compatible with the epoxy powder to be used.
Instead of providing a certification for the patching material, you may identify on the container that the
patching material is compatible with the epoxy powder to be used.
52-2.02A(4) Quality Control and Assurance
Furnish two 30-inch test samples of each size from each shipment of epoxy-coated reinforcement to the
job site.
Before transporting test samples:
1. Securely bundle and package the 2 test samples in a way that preserves their condition during
transportation
2. Identify each test sample by shipment and Contract number using weatherproof markings
3. Attach a completed Sample Identification Card to the test samples
The Department tests the test samples.
Test samples must comply with the requirements for coating thickness and coating adhesion specified in
ASTM A 775/A 775M for bar reinforcement or ASTM A 884/A 884M Class A, Type 1 for wire
reinforcement, as follows:
1. If both test samples comply with the requirements, the Department accepts all epoxy-coated
reinforcement represented by the test.
2 If both test samples do not comply with the requirements, the Department performs 1 additional test
on the reinforcement of the same size from the same shipment. This additional test consists of testing
2 test samples, randomly selected by the Engineer, for coating thickness and adhesion. If both test
samples do not comply with the specified requirements, the Department rejects all epoxy-coated
reinforcement represented by the test.
632

SECTION 52

REINFORCEMENT

52-2.02B Materials
Epoxy-coated reinforcement must comply with:
1. ASTM A 775/A 775M for bar reinforcement
2. ASTM A 884/A 884M, Class A, Type 1, for wire reinforcement
Fabrication and job site handling of epoxy-coated bar reinforcement must comply with ASTM D 3963/D
3963M.
Coating must be light green.
52-2.02C Construction
If damage to the coating occurs during field bending, patch the area immediately.
Job site practices must comply with sections X1.3.1 through X1.3.15 of appendix X1 of ASTM A 884/A
884M for wire reinforcement, except replace the term "should" with the term "must."
52-2.02D Payment
Not Used
52-2.03 EPOXY-COATED PREFABRICATED REINFORCEMENT
52-2.03A General
52-2.03A(1) Summary
Section 52-2.03 includes specifications for fabricating and placing epoxy-coated prefabricated
reinforcement.
52-2.03A(2) Definitions
Reserved
52-2.03A(3) Submittals
Submit a certificate of compliance for each shipment of epoxy-coated reinforcement. Include with the
submittal:
1. Certification that the coated reinforcement complies with ASTM A 934/A 934M for bar reinforcement
or ASTM A 884/A 884M Class A, Type 2 for wire reinforcement
2. All certifications specified in ASTM A 934/A 934M for bar reinforcement or ASTM A 884/A 884M for
wire reinforcement
Perform qualification testing and certification required by ASTM A 934/A 934M and ASTM A 884/A 884M
at an authorized laboratory.
Submit a certificate of compliance for the patching material that includes a certification that the patching
material is compatible with the epoxy powder to be used.
Instead of providing a certification for the patching material, you may identify on the container that the
patching material is compatible with the epoxy powder to be used.
52-2.03A(4) Quality Control and Assurance
Furnish two 30-inch-long test samples of each size from each shipment to the job site of epoxy-coated
prefabricated reinforcement.
Before transporting test samples:
1. Securely bundle and package the 2 test samples in a way that preserves their condition during
transportation
2. Identify each test sample by shipment and Contract number using weatherproof markings
3. Attach a completed Sample Identification Card to the test samples
The Department tests the test samples.
633

SECTION 52

REINFORCEMENT

Test samples must comply with the requirements for coating thickness and coating adhesion specified in
ASTM A 934/A 934M for bar reinforcement or ASTM A 884/A 884M Class A, Type 2 for wire
reinforcement, as follows:
1. If both test samples comply with the requirements, the Department accepts all epoxy-coated
reinforcement represented by the test.
2 If both test samples do not comply with the requirements, the Department performs 1 additional test
on the reinforcement of the same size from the same shipment. This additional test consists of testing
2 test samples, randomly selected by the Engineer, for coating thickness and adhesion. If both test
samples do not comply with the specified requirements, the Department rejects all epoxy-coated
reinforcement represented by the test.
52-2.03B Materials
Epoxy-coated prefabricated reinforcement must comply with:
1. ASTM A 934/A 934M for bar reinforcement
2. ASTM A 884/A 884M, Class A, Type 2, for wire reinforcement
Coating must be purple or gray.
52-2.03C Construction
Do not bend epoxy-coated prefabricated bar or wire reinforcement after coating application.
Job site practices must comply with sections X2.3.1 through X2.3.15 of appendix X2 of ASTM A 934/A
934M for bar reinforcement, except replace the term "should" with the term "must."
52-2.03D Payment
Not Used
52-3 GALVANIZED BAR REINFORCEMENT
52-3.01 GENERAL
Section 52-3 includes specifications for fabricating and placing galvanized bar reinforcement.
52-3.02 MATERIALS
Galvanize bar reinforcement under ASTM A 767/A 767M, Class 1, except chromating is not required.
52-3.03 CONSTRUCTION
Job site practices must comply with sections X1.3.1 through X1.3.12 of appendix X1 of ASTM A 767/A
767M for bar reinforcement, except replace the term "should" with the term "must."
52-3.04 PAYMENT
Not Used
52-4 STAINLESS STEEL BAR REINFORCEMENT
Reserved
52-5 HEADED BAR REINFORCEMENT
52-5.01 GENERAL
52-5.01A Summary
Section 52-5 includes specifications for fabricating headed bar reinforcement.
52-5.01B Definitions

visible necking: Visible decrease in the test sample's cross sectional area at the point of fracture.

52-5.01C Submittals
52-5.01C(1) General
If any part of the head is fabricated in the field, submit a prequalification report as specified for service
splices and ultimate butt splices under section 52-6.01C(4).

634

SECTION 52

REINFORCEMENT

52-5.01C(2) Certificate of Compliance


Submit a certificate of compliance for each shipment of headed bar reinforcement. Include with the
submittal copies of:
1. Mill test reports for the:
1.1. Bar reinforcement
1.2. Head material
2. Production test reports
3. Daily production logs
52-5.01C(3) Production Test Report
Submit a production test report prepared by the laboratory performing the testing. The report must be
signed by an engineer who represents the laboratory and is registered as a civil engineer in the State.
For each test, the report must include:
1.
2.
3.
4.
5.
6.
7.
8.

Lot number
Bar size
Type of headed bar reinforcement
Physical condition of each test sample
Notable defects on any test sample
Affected zone limits of each test sample
Location of visible necking area on each test sample
Ultimate strength of each test sample

52-5.01D Quality Control and Assurance


52-5.01D(1) General
Headed bar reinforcement must have full size heads and must be on the Authorized Material List.
If any part of the head is fabricated in the field, the operator and procedure must be prequalified as
specified for service and ultimate butt splices under section 52-6.01D(2).
Section 11-3.02 does not apply to headed bar reinforcement.
Welding, welder qualifications, and inspection of welding must comply with AWS C6.1.
52-5.01D(2) Daily Production Log
Maintain a daily production log for the fabrication of headed bar reinforcement for each production lot.
The log must include:
1.
2.
3.
4.

Production lot numbers


Number of bars in each production lot
Heats of bar material and head material used in each production lot
Fabrication records, including tracking and production parameters for welds or forgings

52-5.01D(3) Production Testing


A production test must consist of tensile testing 4 headed bar reinforcement test samples selected from
each lot of completed headed bar reinforcement before shipping the lot to the job site.
After completing fabrication of a lot of headed bar reinforcement, including preparation for any required
epoxy coating, notify the Engineer that the lot is ready for testing.
After being notified, the Engineer randomly selects the 4 test samples to be removed from the lot by you
and places tamper-proof markings or seals on them.
Test samples must be 4 feet long for bar reinforcement sizes no. 9 and below, and 6 feet long for bar
reinforcement sizes no. 10 and above.
A test sample will be rejected if the tamper-proof marking or seal is disturbed before testing.
Before transporting test samples to an authorized laboratory:
635

SECTION 52

REINFORCEMENT

1. Securely bundle and package the 4 test samples for each test in a way that preserves their condition
during transportation
2. Identify each test sample by lot number and Contract number using weatherproof markings
3. Attach a completed Sample Identification Card to each bundle
Tensile test headed bar reinforcement test samples:
1. At a laboratory on the Authorized Laboratory List
2. In the condition received
3. Under ASTM A 970/A970M
Do not perform tests on test samples from bundles containing fewer than 4 test samples.
At least 5 business days before performing any testing at the authorized laboratory, notify the Engineer
of:
1. Date of the testing
2. Location of the authorized laboratory where the tests will be conducted
3. Number of lots to be tested
At rupture, headed bar reinforcement test samples must comply with the requirements specified in section
52-5.02 as follows:
1. If only 1 splice test sample complies with the requirements, the Department rejects all headed bar
reinforcement in the lot.
2. If only 2 splice test samples comply with the requirements, perform 1 additional test on the same lot
of headed bar reinforcement. This additional test must consist of tensile testing 4 splice test samples,
randomly selected by the Engineer and removed by you from the lot. If any of the 4 test samples from
this additional test do not attain the specified minimum tensile strength, the Department rejects all
headed bar reinforcement in the lot.
3. If 3 or more splice test samples comply with the requirements, the Department accepts all headed bar
reinforcement in the lot.
Tag each headed bar in a production lot to be shipped to the job site in a way that allows accurate
identification at the job site.
52-5.02 MATERIALS
Headed bar reinforcement must comply with ASTM A 970/A970M.
At rupture, headed bar reinforcement must:
1. Comply with the tensile requirements of ASTM A 970/A970M, Class A.
2. Show signs of visible necking in the reinforcing bar. The visible necking must be located at least 1 bar
diameter away from the affected zone.
Equipment used to perform friction welding must be fitted with an in-process monitoring system to record
essential production parameters that describe the process of welding the head onto the reinforcement.
The parameters to be recorded include:
1.
2.
3.
4.
5.

Friction welding force


Forge force
Rotational speed
Friction upset distance and time
Forge upset distance and time

52-5.03 CONSTRUCTION
If headed bar reinforcement is to be epoxy coated:
1. Round edges of heads
2. Remove sharp edges, burrs, and weld flash that would prevent proper coating of the headed bar

636

SECTION 52

REINFORCEMENT

Do not use threaded heads when headed bar reinforcement is to be epoxy coated.
52-5.04 PAYMENT
The payment quantity of headed bar reinforcement is the quantity of heads only.
Reinforcing bar used for headed bar reinforcement is paid for as bar reinforcing steel. The length of bar
used in calculating the weight of reinforcing bar is the entire length of the completed headed bar including
the head thickness.
52-6 SPLICING
52-6.01 GENERAL
52-6.01A Summary
Section 52-6 includes specifications for splicing bar reinforcement.
Reinforcing bar splices consist of lap splices, service splices, or ultimate butt splices.
52-6.01B Definitions
Reserved
52-6.01C Submittals
52-6.01C(1) General
Section 52-6.01C applies if service splices or ultimate butt splices are used in the work.
52-6.01C(2) Certificate of Compliance
Submit a certificate of compliance for each shipment of splice material. Include with the submittal:
1. Type or series identification of the splice material, including tracking information for traceability
2. Grade and size number of reinforcement to be spliced
3. Statement that the splice material complies with the type of mechanical splice on the Authorized
Material List
4. For resistance-butt-welded material:
4.1. Heat number
4.2. Lot number
4.3. Mill certificates
52-6.01C(3) Welder and Welding Procedures Qualifications
Submit welder and welding procedure qualifications as an informational submittal.
52-6.01C(4) Splice Prequalification Report
For each splice type to be used in the work, submit a splice prequalification report for service splices and
ultimate butt splices that includes:
1. Copy of the coupler manufacturer's product literature giving complete data on the splice material and
installation procedures
2. Names of the operators who will be performing the splicing
3. Descriptions of the positions, locations, equipment, and procedures that will be used in the work
4 Certified test results from the authorized laboratory for the prequalification splice test samples
5. Certifications from the fabricator for operator and procedure prequalification
52-6.01C(5) Weld Flash Removal Process
Submit a proposed weld flash removal process. The submittal must show that the process produces a
smooth profile that can be successfully epoxy coated under section 52-2.
Removal of the weld flash must produce a smooth profile free of any sharp edges that would prevent
proper coating of the reinforcement such that:
1. Ultimate tensile strength and elongation properties of the bar are not reduced
2. Outside radius of the flash at any point along the circumference of the bar is not:
2.1. Less than the nominal radius of the bar
2.2. Greater than 3/16 inch beyond the nominal radius of the bar
637

SECTION 52

REINFORCEMENT

52-6.01C(6) Production Test Report


Submit a production test report for each lot prepared by the laboratory performing the testing. The report
must be signed by an engineer who represents the laboratory and is registered as a civil engineer in the
State.
Allow 3 business days for the Engineer's review.
Each report must include:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Lot number and location


Bar size
Splice type
Mechanical splice length
Test specimen length
Physical condition of splice test sample
Notable defects
Total measured slip
Ultimate tensile strength of each splice
For ultimate butt splices:
10.1. Location of visible necking area
10.2. Largest measured strain

You may encase splices in concrete:


1. After submitting the production test report for review
2. Before receiving notification from the Engineer that the production test report is authorized
3. Before submitting the production test report for review for splices made vertically at the job site in or
above their final positions for bar reinforcement of columns or CIP concrete piles
52-6.01C(7) Quality Assurance Test Samples
Submit test samples for QA testing to METS.
Include copies of the certificates of compliance with the QA test samples for mechanical splices and
resistance-butt-welded splices.
52-6.01C(8) Splice Rejection Report
For a rejected lot, submit a splice rejection report.
Allow 3 business days for the Engineer's review.
52-6.01C(9) Radiographic Film Developing Process Records
If requested, submit records of radiographic film developing processes and any chemical changes to the
developing processes.
52-6.01D Quality Control and Assurance
52-6.01D(1) General
Section 52-6.01D applies if service splices or ultimate butt splices are used in the work.
Assign a splicing QC manager.
If a lot of splices is rejected, do not use the rejected lot or any subsequent lots until:
1. QC manager performs a complete review of your QC process for these splices
2. You prepare a splice rejection report describing the cause of the failure for the splices in the rejected
lot and provisions for preventing similar failures in future lots
3. Engineer has notified you that the splice rejection report is authorized
Before testing resistance-butt-welded splice test samples of reinforcement to be epoxy coated, remove
the weld flash using the authorized process for flash removal.

638

SECTION 52

REINFORCEMENT

The following must be on the Authorized Material List:


1. M
echanical couplers
2. Fabricators of resistance-butt-welded splices
You may encase splices in concrete before receiving notification of the QA test results from the Engineer.
If you encase any splices in concrete before receiving notification from the Engineer, you will not be
relieved of your responsibility for incorporating material into the work that complies with the Contract.
Section 11-3.02 does not apply to resistance-butt-welded splices.
52-6.01D(2) Operator and Procedure Prequalification
Before performing any service or ultimate butt splicing, obtain certifications from the fabricator for
prequalification of the operators and the procedures to be used in the work.
For each bar size of each splice type to be used, each operator must prepare:
1. 2 prequalification splice test samples
2. 2 additional prequalification splice test samples if using splices dependent on bar deformations
Splice test samples must have been prepared and tested no more than 2 years before the submittal of
the splice prequalification report.
Splice test samples and testing must comply with the production testing requirements specified in section
52-6.01D(4) for the type of splice to be used in the work.
52-6.01D(3) Welder and Welding Procedure Qualifications
Before performing any CJP butt welds, qualify welders and welding procedures under AWS D1.4.
Qualify welders and welding procedures on splice test samples of the type to be used in the work.
52-6.01D(4) Production Testing
52-6.01D(4)(a) General
Production testing includes total slip testing, service splice testing, and ultimate butt splice testing.

Splice test samples must comply with California Test 670.

For splicing new reinforcement to existing reinforcement, make splice test samples using only

reinforcement having the deformation pattern of the new reinforcement.

Before transporting splice test samples to an authorized laboratory or to METS:

1. Securely bundle and package the 4 test samples for each test in a way that preserves their condition
during transportation
2. Identify each splice test sample by location and Contract number using weatherproof markings
3. Attach a completed Sample Identification Card to each bundle
Test production splice test samples:
1. At a laboratory on the Authorized Laboratory List
2. In the condition received
3. Under California Test 670
Before performing service splice or ultimate butt splice testing, perform total slip testing on the service
splice or ultimate but splice test samples as specified in section 52-6.01D(4)(b).
Do not perform tests on splice test samples from bundles containing fewer than 4 test samples.
At least 5 business days before performing any testing at the authorized laboratory, notify the Engineer
of:
1. Date of the testing
639

SECTION 52

REINFORCEMENT

2. Location of the authorized laboratory where the tests will be conducted


3. Number of lots to be tested
If a production test for a lot is rejected, repair or replace reinforcing bars from which test samples were
removed before the Engineer selects additional splices from this lot for more testing.
52-6.01D(4)(b) Total Slip Testing
Except for mechanical lap, welded, or hoop splices, test 1 of the 4 splice test samples for total slip.
If the splice test sample exceeds the total slip value specified in section 52-6.02B, test the 3 remaining
test samples for total slip. If any of the 3 remaining test samples exceed the specified total slip value, the
Department rejects all splices in the lot.
52-6.01D(4)(c) Service Splice Testing
A service splice test consists of preparing and testing 4 splice test samples for each lot of completed
splices.
Prepare the test samples using the same splice material, position, operators, location, equipment, and
procedures to be used in the work.
Splice test samples must comply with the requirements specified in 52-6.02C as follows:
1. If only 1 splice test sample complies with the requirements, the Department rejects all splices in the
lot.
2. If only 2 splice test samples comply with the requirements, perform 1 additional test on the same lot
of splices. This additional test must consist of tensile testing 4 splice test samples, randomly selected
by the Engineer and removed by you from the lot of completed splices. If any of the 4 splice test
samples from this additional test do not attain the specified minimum tensile strength, the Department
rejects all splices in the lot.
3. If 3 or more splice test samples comply with the requirements, the Department accepts all splices in
the lot.
52-6.01D(4)(d) Ultimate Butt Splice Testing
52-6.01D(4)(d)(i) General
An ultimate butt splice test consists of removing and testing 4 splice test samples from each lot of
completed splices.
After completing the splices in a lot, including any required epoxy coating, notify the Engineer that the
splices are ready for testing. Except for hoops, the Engineer selects splice test samples at the job site.
The Engineer selects splice test samples for hoops at the job site or fabrication plant.
After being notified, the Engineer randomly selects the 4 splice test samples to be removed by you and
places tamper-proof markings or seals on them.
If the tamper-proof marking or seal is disturbed before testing, the Department rejects the splice test
samples.
At rupture, splice test samples must comply with the requirements specified in section 52-6.02D as
follows:
1. If only 1 splice test sample complies with the requirements, the Department rejects all splices in the
lot.
2. If only 2 splice test samples comply with the requirements, perform 1 additional ultimate butt splice
test on the same lot of splices. If any of these 4 splice test samples do not comply with the specified
requirements, the Department rejects all splices in the lot.
3. If 3 or more splice test samples comply with the requirements, the Department accepts all splices in
the lot.
The Department does not require ultimate butt splice testing on repaired splices from a lot unless an
additional ultimate butt splice test is required on the same lot of splices. If this additional test is required,
the Engineer may select any repaired splice for the additional test.
640

SECTION 52

REINFORCEMENT

If splices are made vertically at the job site in or above their final positions for bar reinforcement of
columns or CIP concrete piles, instead of removing the splice test samples from the completed lot, you
may prepare the samples as specified for service splice test samples in section 52-6.01D(4)(c). Test the
splice test samples as specified for ultimate butt splice test samples.
52-6.01D(4)(d)(ii) Radiographic Testing
Section 52-6.01D(4)(d)(ii) applies when test samples for CJP butt-welded splices are not removed from a

lot of completed splices.

Notify the Engineer 48 hours before performing any RT.

Perform RT of CJP butt-welded splices under AWS D1.4:

1. Before tensile testing the splice test samples


2. On 25 percent of CJP butt-welded splices from a production lot
The Engineer selects the splices that compose the production lot and the splices within each lot to

receive RT.

If more than 12 percent of the splices radiographically tested in a production lot are defective, perform RT

on an additional 25 percent of the splices selected by the Engineer from the same production lot. If more

than 12 percent of the cumulative total of splices tested from the same production lot are defective,

perform RT on all remaining splices in the lot.

The Department does not pay for additional RT performed due to the identification of defective splices.

Repair defects under AWS D1.4.

Radiographic procedures must comply with AWS D1.1 and D1.4.

For field-produced CJP butt welds, do not radiograph more than 1 weld during 1 exposure.

Make radiographs by either X-ray or gamma ray. Each radiograph must have a density of from 2.3 to 3.5

in the area of interest. The Department allows a density tolerance of 0.05 for densitometer variations.
Gamma rays must be from the iridium 192 isotope and the emitting specimen must not exceed 0.18 inch
in the greatest diagonal dimension.
You may add an allowable weld buildup of 0.16 inch to the total material thickness when determining the
proper penetrameter selection. The Department does not accept image quality indicator equivalency.

Sufficiently shim penetrameters using a radiographically identical material. Penetrameter image densities

must be from 2.0 to 3.6.

Regardless of the reinforcing bar size, radiographic film must be Class 1.

The Department does not allow sight development.

Record the results of radiographic interpretations on a signed certification and keep a copy with the film

packet.

Technique sheets prepared under ASME Boiler and Pressure Vessel Code, section V, article 2, section

T-291, must include the developer temperature, developing time, fixing duration, and all rinse times.

52-6.01D(5) Quality Assurance Testing


At the same time you prepare or remove splice test samples for production testing, prepare or remove 4
QA splice test samples for:
1. 1st production test performed
2. 1 of every 5 subsequent production tests, or fraction thereof, randomly selected by the Engineer
QA splice test samples must comply with California Test 670.
Secure, identify, and transport QA splice test samples as specified for splice test samples in section 52
6.01D(4).
641

SECTION 52

REINFORCEMENT

The Department tests QA service splices and QA ultimate butt splices as specified for production testing
in section 52-6.01D(4).
The Department will notify you of the QA test results for each bundle of 4 test samples of splices within 3
business days after METS receives the bundle unless more than 1 bundle is received on the same day, in
which case allow 2 additional business days for each additional bundle received.
52-6.02 MATERIALS
52-6.02A General
Reserved
52-6.02B Total Slip Requirements
The total slip must not exceed the values shown in the following table when tested under California Test
670:
Total Slip
Reinforcing bar no.
Total slip (inch)
4
0.020
5
0.020
6
0.020
7
0.028
8
0.028
9
0.028
10
0.036
11
0.036
14
0.048
18
0.060
52-6.02C Service Splice Requirements
Service splices must develop a minimum tensile strength of 80,000 psi.
52-6.02D Ultimate Butt Splice Requirements
Ultimate butt splices must do one of the following:
1. Rupture in the reinforcing bar outside of the affected zone and show visible necking as specified in
California Test 670, Necking (Option I)
2. Rupture anywhere and neck as specified in California Test 670, Necking (Option II)
52-6.03 CONSTRUCTION
52-6.03A General
Butt-welded or mechanical splices not shown as requiring a service splice or an ultimate butt splice must
comply with the specifications for service splices.
Do not place splices at a location shown as a no-splice zone.
Reinforcing bars may be continuous where splices are shown. If splice locations are not shown,
determine splice locations using commercial lengths where practicable.
Unless another option is shown, stagger splices in adjacent reinforcing steel. The minimum distance
between staggered:
1. Lap splices or mechanical lap splices must be the same as the length required for a lap splice in the
largest bar
2. Butt splices must be 2 feet measured between the splice midpoints along a line centered between the
axes of the adjacent bars
For reinforcing bars where splice test samples were removed, replace either of the following:
1. Removed portion of the bar or hoop using mechanical ultimate butt splices
642

SECTION 52

REINFORCEMENT

2. Bar or hoop in kind


52-6.03B Lap Splicing
Splices made by lapping must consist of placing reinforcing bars in contact and wiring them together
while maintaining the alignment of the bars and the minimum clearances.
Do not splice reinforcing bars by lapping where you cannot provide a minimum clear distance of 2 inches
between the splice and the nearest adjacent bar.
Do not splice nos. 14 and 18 bars by lapping.
For reinforcing bars complying with ASTM A 615/A 615M, Grade 60, or ASTM A 706/A 706M, the length
of lap splices must be at least:
1. 45 diameters of the smaller bar spliced for reinforcing bars no. 8 or smaller
2. 60 diameters of the smaller bar spliced for reinforcing bars nos. 9, 10, and 11
For reinforcing bars complying with ASTM A 615/A 615M, Grade 40, the length of lap splices must be at
least:
1. 30 diameters of the smaller bar spliced for reinforcing bars no. 8 or smaller
2. 45 diameters of the smaller bar spliced for reinforcing bars nos. 9, 10, and 11
For splices in bundled bars, the length of the lap splices must be:
1. Same as the length of a single bar lap splice for bundles of 2 bars
2. 1.2 times the length of a single bar lap splice for bundles of 3 bars
Lap welded wire reinforcement such that the overlap between the outermost cross wires is at least the
larger of the following:
1. 6
inches
2. Spacing of the cross wires plus 2 inches
3. Numerical value of the longitudinal wire size (W-size number) times 4.3 divided by the spacing of the
longitudinal wires in inches
52-6.03C Service Splices and Ultimate Butt Splices
52-6.03C(1) General
Service splices and ultimate butt splices must be one of the following:
1. M
echanical splices
2. Resistance-butt-welded splices
3. CJP butt-welded splices
52-6.03C(2) Mechanical Splices
Perform service splicing and ultimate butt splicing of mechanical splices:
1. Under the manufacturer's instructions, unless otherwise specified
2. Using the manufacturer's standard equipment, jigs, clamps, and other required accessories
Splice devices must have a clear cover of at least 1-3/4 inches measured from the surface of the concrete
to the outside of the splice device. To provide the specified clear cover to reinforcement:
1. Adjust or relocate stirrups, ties, and other reinforcement
2. Place additional reinforcement, if needed
52-6.03C(3) Resistance-Butt-Welded Splices
If resistance-butt-welded bar reinforcement is to be epoxy coated, remove the weld flash using the
authorized process for flash removal.

643

SECTION 52

REINFORCEMENT

52-6.03C(4) Complete-Joint-Penetration Butt-Welded Splices


CJP butt-welded splices must comply with AWS D1.4.
Use only the joint details and dimensions shown in Figure 3.2 of AWS D1.4. Do not use split pipe
backing.
Make butt welds with multiple weld passes without an appreciable weaving motion using a stringer bead
having a width at most 2.5 times the diameter of the electrode. Perform slagging between each weld
pass. Weld reinforcement must not exceed 0.16 inch in convexity.
Electrodes for welding must have a minimum CVN impact value of 27 J at -4 degrees F.
For welding of bars complying with ASTM A 615/A 615M, Grade 40 or 60, the requirements of Table 5.2
of AWS D1.4 are superseded by the following: The minimum preheat and interpass temperatures must be
400 degrees F for Grade 40 bars and 600 degrees F for Grade 60 bars. Immediately after completing the
welding, cover at least 6 inches of the bar on each side of the splice with insulated wrapping to control the
rate of cooling. The insulated wrapping must remain in place until the bar has cooled below 200 degrees
F.
If welding different grades of reinforcing bars:
1. Electrode must comply with the specifications for Grade 40 bar
2. Preheat must comply with the specifications for Grade 60 bar
If any of the specified preheat, interpass, and post weld cooling temperatures are not met, remove the
weld and heat-affected-zone metal and reweld the splice.
Protect welding from air currents, drafts, and precipitation to prevent loss of heat or loss of arc shielding.
Do not direct butt splice reinforcing bars by thermite welding.
52-6.04 PAYMENT
Not Used
52-7 STRAY CURRENT PROTECTION
52-7.01 GENERAL
52-7.01A Summary
Section 52-7 includes specifications for installing stray current protection.
Stray current protection consists of one or a combination of the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Prestress tendon connections


Bar reinforcing steel connections
Copper cable to bar reinforcing steel connections
Pile and concrete epoxy insulation
Concrete insulation course
Neoprene sheet insulation
Joint sealant insulation
Membrane insulation
Mortar block insulation
Epoxy-coated reinforcing steel insulation
Plastic end cover insulators
Pipe wrapping tape insulation
Epoxy for insulation of embedded metal materials

The types of stray current protection to be installed are shown.


52-7.01B Definitions
Reserved

644

SECTION 52

REINFORCEMENT

52-7.01C Submittals
Reserved
52-7.01D Quality Control and Assurance
52-7.01D(1) General
Reserved
52-7.01D(2) Prestress Tendon Connection
Before welding in the work, welding operators must be prequalified by satisfactorily completing a field
qualification test weld. The operator must make qualification test welds in the presence of the Engineer
using materials similar to those in the work in the same position and under the same conditions of welding
that will be encountered in the work.
Visual inspection of completed welds must show no evidence of cracks, lack of fusion, or undercutting.
52-7.01D(3)52-7.01D(5) Reserved
52-7.02 MATERIALS
52-7.02A General
Reserved
52-7.02B Prestress Tendon Connection
For prestress tendon connections, the no. 6 steel wire must comply with ASTM A 82/A 82M, A 510, or A
510M.
52-7.02C Bar Reinforcing Steel Connection
Reserved
52-7.02D Copper Cable to Bar Reinforcing Steel Connection
Materials for exothermic welding the copper cable to bar reinforcing steel connections must comply with
the manufacturer's instructions for the mold size and shape, and the charge size and alloy mixture for the
powder.
The copper cable must comply with section 86-2.08C.
The tape must be commercially available vinyl electrical tape with a thickness of at least 7 mils.
The test box cover and anchorage devices must comply with section 75-1.03. The gasket must be made
of commercially available neoprene.
52-7.02E Pile and Concrete Epoxy Insulation
For pile and concrete epoxy insulation, epoxy must be commercial quality, nonconductive, and suitable
for adherence to concrete and steel surfaces.
52-7.02F Concrete Insulation Course
Concrete insulation courses must comply with section 51 and contain at least 590 pounds of cementitious
material per cubic yard of concrete.
52-7.02G Neoprene Sheet Insulation
Fabricate neoprene sheet insulation from sheet neoprene complying with the specifications for neoprene
in section 51-2.04.
The sheet must be at least 1/8 inch thick.
52-7.02H Joint Sealant Insulation
The joint sealant insulation must be a single-component nonsag polyurethane sealant complying with
ASTM C 920.
The primer and backing rod must comply with the joint sealant manufacturer's instructions.

645

SECTION 52

REINFORCEMENT

52-7.02I Membrane Insulation


Membrane insulation must comply with the specifications for dampproofing or preformed membrane
waterproofing in section 54.
52-7.02J Mortar Block Insulation
Mortar block insulation must contain at least 760 pounds of cementitious material per cubic yard. The
blocks must be dense, homogeneous, and watertight.
52-7.02K Epoxy-Coated Reinforcing Steel Insulation
Epoxy-coated reinforcing steel insulation must comply with section 52-2.
If a coupling nut is used at an attachment between an approach slab and an abutment, the nut must be
epoxy coated either before or after fabrication.
52-7.02L Plastic End Cover Insulators
The plastic end cover insulators must be of the type commercially available to protect workers from
protruding reinforcing bars. Bond the covers to the reinforcing bars with commercially available epoxy that
is compatible with the plastic covers.
52-7.02M Pipe Wrapping Tape Insulation
For pipe wrapping tape insulation, the tape must be pressure-sensitive PVC or polyethylene tape with a
nominal thickness of 20 mils. Use a primer as recommended by the manufacturer of the tape.
52-7.02N Epoxy for Insulation of Embedded Metal Materials
For insulation of embedded metal materials, epoxy must be commercial quality, nonconductive, and
suitable for adhering to metal surfaces.
Instead of epoxy coating hanger rods, you may use commercial quality neoprene bushings around the
pipe at strap supports.
Instead of epoxy coating metal parts of joint seal assemblies in contact with concrete, you may apply a
heavy coat of bituminous paint.
52-7.03 CONSTRUCTION
52-7.03A General
Reserved
52-7.03B Prestress Tendon Connection
Do not perform welding on the prestress anchorage devices. Do not perform arc welding on the
prestressing strand.
Connect collector wire to the prestressed strand by gas welding. Do not gas weld until the tendons are
grouted and have cured for at least 24 hours. You may join 2 wire pigtail ends by gas welding at any
stage of the work.
Oxyacetylene welding must comply with the best standards of the industry. Use gas welding rods
complying with Class RG45 (steel rods).
52-7.03C Bar Reinforcing Steel Connection
Weld bars and splices by the manual shielded metal-arc process before installing any prestressing
strands. Use low-hydrogen electrodes complying with the specifications for E7016 electrodes in AWS
A5.1/A5.1M.
52-7.03D Copper Cable to Bar Reinforcing Steel Connection
Fusion weld the copper cable to the bar reinforcing steel by an exothermic type welding process.

Apply commercially available rubber splicing compound to the welded connection.

Apply 2 layers of tape, each half lapped.

646

SECTION 52

REINFORCEMENT

52-7.03E Pile and Concrete Epoxy Insulation


Abrasive blast clean concrete surfaces on which epoxy insulation is to be applied to the extent that clean

aggregate is exposed.

Apply the epoxy by brush or other means that will completely and uniformly cover the surfaces.

Remove lifting anchors as specified for their removal in a corrosive environment in section 49-2.04B(2).

52-7.03F Concrete Insulation Course


Excavate and backfill for concrete insulation course under section 19-3.
The joint between the concrete insulation course and the footing must comply with the specifications for
horizontal construction joints in section 51-1.03D(4), except abrasive blast cleaning is not required.
52-7.03G Neoprene Sheet Insulation
For neoprene sheet insulation, lap each successive sheet securely to the preceding sheet by at least 6
inches.
52-7.03H Joint Sealant Insulation
Abrasive blast clean and prime concrete surfaces to receive joint sealant insulation.
52-7.03I Membrane Insulation
The exposed surfaces of membrane insulation must be of uniform height above ground without unsightly
bulges, depressions, or other imperfections.
Membrane insulation must comply with the specifications for dampproofing or preformed membrane
waterproofing in section 54.
52-7.03J Mortar Block Insulation
Reserved
52-7.03K Epoxy-Coated Reinforcing Steel Insulation
For a coupling nut epoxy coated after fabrication, apply the epoxy by brush or other means that will
completely and uniformly cover the surfaces in contact with concrete.
52-7.03L Plastic End Cover Insulators
Use enough epoxy to ensure no voids exist between the plastic end cover insulators and the reinforcing
bars.
52-7.03M Pipe Wrapping Tape Insulation
For pipe wrapping tape insulation, apply 1 layer of tape half lapped.
52-7.03N Epoxy for Insulation of Embedded Metal Materials
For embedded metals insulated with epoxy:
1. Prepare galvanized surfaces under section 59-3.03.
2. Apply the epoxy by brush or other means to completely and uniformly cover the surfaces in contact
with concrete.
52-7.04 PAYMENT
Not Used

647

53 SHOTCRETE

53-1 GENERAL

53-1.01 GENERAL
53-1.01A Summary
Section 53-1 includes general specifications for placing shotcrete.
Reinforcement must comply with section 52.
53-1.01B Definitions
dry-mix process: Delivering mixed aggregate and cementitious material pneumatically or mechanically
to the nozzle body and adding water and mixing the materials in the nozzle body.
wet-mix process: Delivering mixed aggregate, cementitious material, and water pneumatically to the
nozzle and adding any admixture at the nozzle.
rebound: Shotcrete material that has ricocheted off the receiving surface, which is recovered and is clean
and free of foreign material.
53-1.02 MATERIALS
Shotcrete must consist of cementitious material, fine aggregate, and water. Cementitious material, fine
aggregate, and water must comply with section 90-1.
For the dry-mix process:
1. Thoroughly mix 1 part cementitious material to not more than 4.5 parts fine aggregate in a dry state
before charging into the machine. Measurement must be either by volume or weight.
2. Fine aggregate must contain not more than 6 percent moisture by weight.
For the wet-mix process:
1. Shotcrete must contain not less than 632 pounds of cementitious material per cubic yard.
2. You may substitute a maximum of 30 percent pea gravel for the fine aggregate. The maximum size of
pea gravel must be such that 100 percent passes the 1/2-inch screen and at least 90 percent passes
the 3/8-inch screen.
3. Admixtures may be added. They must comply with section 90-1.02E.
If colored shotcrete is described, color shotcrete by mixing a fine ground, synthetic mineral oxide into the
shotcrete. The synthetic mineral oxide must be specifically manufactured for coloring shotcrete. The
coloring agent must be uniformly and homogeneously mixed with the shotcrete.
53-1.03 CONSTRUCTION
53-1.03A General
Reserved
53-1.03B Preparing Foundations
Evenly grade foundations before applying shotcrete. No point on the graded slope may be above the
slope plane shown.
Thoroughly compact foundations. Foundations must contain enough moisture to provide a firm foundation
and to prevent absorption of water from the shotcrete. Foundations must be free of surface water.
Use ground or gaging wires where necessary to establish thickness, surface planes, and finish lines.
53-1.03C Placing Shotcrete
Apply shotcrete by either the dry-mix or wet-mix process.

Direct the nozzle in a manner to minimize rebound of the shotcrete.

Maintain a uniform velocity of the material as it leaves the nozzle and at a rate determined for the job site

conditions.

649

SECTION 53

SHOTCRETE

For dry-mix shotcrete:


1. Maintain a constant pressure of at least 45 psi in the placing machine if the hose length is 100 feet or
less. Increase the pressure at least 5 psi for each additional 50 feet of hose or fraction thereof.
2. Maintain uniform water pressure at the nozzle of at least 15 psi greater than the air pressure at the
machine.
3. Do not use aggregate and cementitious materials that have been mixed for more than 45 minutes.
For wet-mix shotcrete:
1.
2.
3.
4.

Transport shotcrete under section 90-1.02G(3)


Limit placing to 8-foot lifts measured along the slope
Place gaging wires at approximately 7-foot centers
Do not use materials that have been mixed for more than 90 minutes

You may reuse rebound as fine aggregate in quantities not to exceed 20 percent of the total fine
aggregate requirements.
53-1.03D Finishing Shotcrete
Place shotcrete to the depth shown and check surface with a straightedge. Bring to grade any low spots
or depressions by placing additional shotcrete. The finished surface must be reasonably smooth and
uniform for the type of work involved.
Remove and replace loose areas of shotcrete.
Cure shotcrete for at least 72 hours by spraying with water, by a moist earth blanket, or by any of the
methods specified in section 90-1.03B.
If you add a coloring agent to the shotcrete and you use the curing compound method for curing the
shotcrete, use curing compound no. 6.
Protect shotcrete under section 90-1.03C.
53-1.04 PAYMENT
Shotcrete is measured along the slope of areas placed and the thickness shown.
The Department does not pay for shotcrete placed outside the dimensions shown or to fill low areas of
foundations.
53-2 STRUCTURAL SHOTCRETE
53-2.01 GENERAL
53-2.01A Summary
Section 53-2 includes specifications for placing structural shotcrete.
53-2.01B Definitions
Reserved
53-2.01C Submittals
Submit the following:
1. QC plan that includes:
1.1. Number and qualifications of nozzlemen available to place shotcrete, number of nozzlemen on
the job site at any time during shotcrete placement, description of their work schedule, and
procedures for avoiding fatigue of any nozzleman
1.2. Proposed method of placing shotcrete, including application rates, details of proposed
construction joints and their locations, and methods for achieving the required thickness and
surface finish
1.3. Procedures for curing shotcrete surfaces
1.4. Description of any required debris containment system
2. Preconstruction test panels and test results
3. Production test cores and test results
650

SECTION 53

SHOTCRETE

53-2.01D Quality Control and Assurance


53-2.01D(1) General
Notify the Engineer at least 24 hours before performing any coring or testing.
Obtain and test all cores for compressive strength at 28 days under ASTM C 42/C 42M at an authorized
laboratory. The compressive strength is the average strength of the 3 cores.
Shotcrete must have a minimum compressive strength of 3,600 psi at 28 days.
53-2.01D(2) Qualifications
Each nozzleman must have at least 3,000 hours of experience as a nozzleman on projects with a similar
application.
53-2.01D(3) Preconstruction Test Panels
Obtain authorization of the QC plan before constructing test panels.
Construct 1 unreinforced test panel and 1 reinforced test panel for each proposed mix design. Use
nozzlemen, application crew, equipment, materials, mix designs, and procedures proposed for the work.
Cure the test panels under conditions similar to those in the work.
For the unreinforced test panel:
1.
2.
3.
4.

Determine the size of the test panel.


Obtain three 3-inch cores from the test panel.
I dentify each core.
Test cores for compressive strength. Discard cores that show evidence of improper coring. The
compressive strength is the average strength of the remaining cores.
5. Label and submit test panel and a copy of the test results within 5 days of testing.
6. Include the mix design and ambient temperature in the submittal.
For the reinforced test panel:
1. Construct a square test panel that has the same (1) thickness, (2) bar size and quantity of bar
reinforcement or other obstructions, and (3) positioning of bar reinforcement or obstructions as the
most heavily reinforced section of shotcrete to be placed
2. Minimum length of each side must equal 3 times the thickness of the most heavily reinforced section
of shotcrete to be placed but not less than 30 inches
3. Break the test panel in the presence of the Engineer after a minimum 7-day cure into pieces no larger
than 10 inches in the greatest dimension
4. Surfaces of the broken pieces must be dense and free of laminations and sand pockets and must
show that the bar reinforcement or other obstructions are completely encased
Instead of constructing a separate unreinforced test panel, you may obtain cores from the reinforced test
panel to determine the compressive strength. If you choose this option, do not break the test panel until it
has cured for at least 14 days.
Dispose of test panels.
53-2.01D(4) Field Quality Control
53-2.01D(4)(a) General
Obtain at least three 3-inch-diameter test cores from each 50 cu yd, or portion thereof, of shotcrete
placed each day. The Engineer determines each core location.
Cores must be both visually inspected and tested for compressive strength. The Engineer performs the
visual inspection and you must perform compressive strength testing.
Identify each core, including a description of the core location and mix design, and submit the cores
immediately after coring.

651

SECTION 53

SHOTCRETE

The Engineer will perform the visual inspection and return the cores to you for compressive strength
testing within 48 hours.
53-2.01D(4)(b) Visual Inspection
Each core must:
1. Be dense and be free of laminations and sand pockets
2. Show reinforcement or other obstructions are completely encased
Shotcrete, represented by an unacceptable core, will be rejected unless you submit evidence that the
quality of the shotcrete placed in the work is acceptable.
53-2.01D(4)(c) Compressive Strength Testing
Discard cores that contain bar reinforcement or other obstructions or show evidence of improper coring.
The compressive strength is the average strength of the remaining cores.
If the compressive strength of the shotcrete is below the specified compressive strength:
1. Make corrections to the mix design or fabrication procedures and obtain authorization before you
place additional shotcrete.
2. Shotcrete represented by the cores is subject to one of the following:
2.1 If the compressive strength is at least 95 percent of the specified strength, $10/cu yd is

deducted from the payment for structural shotcrete.

2.2 If the compressive strength is below 95 percent of the specified strength but is at least 85
percent of the specified strength, $15/cu yd is deducted from the payment for structural
shotcrete.
2.3 If the compressive strength is below 85 percent of the specified strength, the shotcrete must be
removed.
If the compressive strength is below the specified strength but is at least 85 percent of the specified
strength, the deductions specified above apply unless you obtain and submit evidence that the strength of
the concrete placed in the work is greater than or equal to the specified strength and this evidence is
accepted by the Engineer.
If the compressive strength is below 85 percent of the specified compressive strength, the noncompliant
concrete represented by the test must be removed unless you obtain and submit evidence that the
strength of the concrete placed in the work is at least 85 percent of the specified compressive strength
and this evidence is accepted by the Engineer.
If the evidence consists of tests made on cores taken from the work, obtain and test the cores under
ASTM C 42/C42M.
53-2.02 MATERIALS
Mortar must comply with section 51-1.02F.
53-2.03 CONSTRUCTION
Forms must comply with section 51-1.03C(2).
Splicing of reinforcing bars no. 7 or larger must be made using a service butt splice.
Apply shotcrete by the wet-mix process. Shotcrete must completely encase reinforcement and other
obstructions. Rebound must not be used in structural shotcrete.
Taper construction joints. Construction joints must comply with section 51-1.03D(4).
Before final set, use air blowpipes to remove rebound, overspray, and other debris from the areas to
receive shotcrete.
If a finish coat is used, remove loose material, uneven or excess material, and glaze. Scarify the
remaining surface. Remove surface deposits that take a final set by abrasive blasting. Before placing the
finish coat, wash receiving surface with an air-water blast.
You may apply finish coats by the dry-mix process if authorized.
652

SECTION 53

SHOTCRETE

Remove shotcrete that extends into the space shown for CIP concrete.

Cure shotcrete under section 51-1.03H. The surface finish of the shotcrete must comply with section 51-

1.03F.

Shotcrete must be maintained at a temperature of not less than 45 degrees F for 72 hours after placing

and at not less than 40 degrees F for an additional 4 days.

After removing field QC test cores, fill the holes with mortar under section 51-1.03E(2).

53-2.04 PAYMENT
Payment for bar reinforcing steel is not included in the payment for structural shotcrete.
53-3 SCULPTED SHOTCRETE
Reserved
53-453-9 RESERVED

653

54 WATERPROOFING

54-1 GENERAL

54-1.01 GENERAL
Reserved
54-2 ASPHALT MEMBRANE WATERPROOFING AND DAMPPROOFING
54-2.01 GENERAL
Section 54-2 includes specifications for applying asphalt membrane waterproofing and dampproofing.
Asphalt membrane waterproofing consists of a coating of primer and a firmly bonded membrane
composed of 2 layers of saturated glass fabric and 3 moppings of waterproofing asphalt.
Dampproofing consists of a coating of primer and 2 moppings of waterproofing asphalt.
54-2.02 MATERIALS
Waterproofing asphalt must comply with ASTM D 449, Type I for below ground and Type II for above
ground.
The primer must comply with ASTM D 41.
Treated glass fabric must comply with ASTM D 1668, Type I.
54-2.03 CONSTRUCTION
54-2.03A General
The surface to be waterproofed must be smooth and free from holes and projections that could puncture
or damage the membrane.
The surface to be waterproofed or dampproofed must be dry and thoroughly cleaned of dust and loose
materials.
Do not apply primer or asphalt in wet weather or at ambient temperatures below 65 degrees F.
Apply the primer to the surface and allow it to dry before applying the 1st coat of asphalt.
Apply the waterproofing asphalt at a temperature of from 300 to 350 degrees F.
For waterproofing on steel column casings, apply asphalt membrane waterproofing to the painted
undercoat of the casings.
For a backfilled surface, you may use preformed membrane waterproofing as an alternative to asphalt
membrane waterproofing.
54-2.03B Waterproofing
After priming the surface, apply the waterproofing as follows:
1. Starting at the lowest point, mop the waterproofing asphalt thoroughly onto the primed surface.
2. Roll a strip of fabric of 1/2 the width of the fabric roll onto the hot asphalt immediately and press into
place, eliminating all air bubbles and obtaining close conformity with the surface.
3. Mop hot asphalt onto this strip and an adjacent section of the surface of a width equal to slightly
greater than 1/2 the width of the fabric being used. Roll a full width of the fabric into this hot asphalt,
completely covering the first strip. Press into place in the same way as for the 1st strip.
4. Mop the 2nd strip and an adjacent section of the surface with hot asphalt. Shingle a 3rd strip of fabric
on such that it laps the 1st strip by at least 2 inches.
5. Continue this process until the entire surface is covered, with each strip of fabric lapping at least 2
inches over the second to last strip.
6. Mop the entire surface with hot asphalt. Ensure a thorough seal and firm bond at all fabric laps.
Regulate the work such that at the end of the work day the final mopping of asphalt has been applied to
all the fabric in place.

655

SECTION 54

WATERPROOFING

The exposed surfaces of the membrane waterproofing applied to steel column casings must be of uniform
height above ground, without unsightly bulges, depressions, or other imperfections.
Do not apply asphalt membrane waterproofing to a surface until you are prepared to place the backfill
within a short enough time such that the waterproofing is not damaged as a result of exposure. Remove
and replace waterproofing membrane that loses bond with the surface.
54-2.03C Dampproofing
Apply dampproofing using the following procedure:
1. Prime the surface to be dampproofed.
2. Thoroughly mop the surface with waterproofing asphalt.
3. After the 1st mopping of asphalt has set sufficiently, mop the entire surface with a 2nd coat of hot
asphalt.
4. Ensure that there are no skips in the coatings and that all surfaces are thoroughly covered.
54-2.04 PAYMENT
Not Used
54-3 PREFORMED MEMBRANE WATERPROOFING
54-3.01 GENERAL
54-3.01A Summary
Section 54-3 includes specifications for applying preformed membrane waterproofing to surfaces that are
to be backfilled.
54-3.01B Definitions
Reserved
54-3.01C Submittals
Submit a certificate of compliance for the preformed membrane sheet, including:
1. Type of preformed membrane sheet
2. Conditioner or primer application rates
54-3.01D Quality Control and Assurance
Reserved
54-3.02 MATERIALS
Preformed membrane waterproofing must consist of:
1.
2.
3.
4.
5.

Adhesive
Conditioner or primer applied to a prepared surface
Preformed membrane sheet of rubberized asphalt or polymer-modified bitumen
Mastic or tape for sealing the edges of the sheet
Protective covering over the sheet held by an adhesive

The preformed membrane sheet must be permanently applied to a polyethylene film or reinforced with
one of the following:
1. Polypropylene mesh fabric
2. Polyester/polypropylene fabric
3. Fiberglass mesh fabric
The total thickness of the membrane sheet and polyethylene film or fabric reinforcement must be at least
60 mils.
The membrane sheet must comply with the values shown in the following table:

656

SECTION 54

WATERPROOFING

Membrane Sheet Property Requirements


Property

Test

Breaking strengtha
ASTM D 882b
d
Percent elongation at break
ASTM D 882b
Pliability
ASTM D 146e
Rubberized asphalt softening point
AASHTO T 53
Polymer-modified bitumen softening point AASHTO T 53
a
Breaking factor in machine direction
b
Method A, average 5 samples
c
At 73.4 3.6 degrees F
d
Machine direction
e
180-degree bend over a 1-inch mandrel at 10 degrees F

Value (min)
Polyethylene film Fabric reinforced
20 lb/inc
20 lb/inc
c
150 percent
25 percentc
No cracks
No cracks
165 F
165 F
210 F
210 F

Adhesive, conditioner, primer, mastic, and sealing tape must be manufactured for use with the membrane
sheet material used.
The protective covering must be hardboard at least 1/8 inch thick or another material that furnishes
equivalent protection.
54-3.03 CONSTRUCTION
Apply adhesive, conditioner, primer, mastic, and sealing tape under the manufacturer's instructions.
Backfill material and equipment must not cut, scratch, depress, or cause any other damage to the
preformed membrane.
Thoroughly clean dirt, dust, loose or unsound concrete, and other extraneous material from the surface to
receive the waterproofing. The surface must be free from fins, sharp edges, and protrusions that could
puncture or damage the membrane. Round outside corners and chamfer inside corners to be covered.
The surface must be dry when applying components of the waterproofing.
Do not apply preformed membrane waterproofing to a surface until you are prepared to place the
protective covering and backfill within a short enough time such that the membrane is not damaged by
workers, equipment, exposure to weathering, or any other cause. Repair or replace damaged membrane
or protective covering.
Flash all projections, such as pipes, conduits, and sleeves, passing through the preformed membrane
waterproofing with prefabricated or field-fabricated boots, fitted coverings, or other devices as necessary
to provide watertight construction.
Thoroughly mix and continuously agitate the conditioner or primer during application. Allow the
conditioner, primer, or adhesive to dry to a tack-free condition before placing membrane sheets.
Recoat the surface if the membrane sheet is not placed over the primer, conditioner, or adhesive within
the time recommended by the manufacturer.
Do not apply preformed membrane sheets in wet or foggy weather or when the ambient temperature is
below 40 degrees F.
Place the preformed membrane material starting at the bottom and lap by a minimum of 6 inches at
splices and at repairs to holes or tears.
After placing the membrane, apply a trowelled bead of manufacturer-recommended mastic or sealing
tape to the exposed edges of the membrane sheets.
The surface of the preformed membrane must be free from dirt and other extraneous material before
placing the protective covering.
Place the protective covering on a coating of adhesive. Apply the adhesive at a rate sufficient to hold the
protective covering in position until backfilled.
657

SECTION 54

WATERPROOFING

54-3.04 PAYMENT
Not Used
54-4 WATERPROOFING AND COVER
54-4.01 GENERAL
Section 54-4 includes specifications for applying membrane waterproofing and protective cover to deck
surfaces of railroad underpasses.
Furnish and apply the waterproofing and cover under the AREMA Manual for Railway Engineering.
54-4.02 MATERIALS
54-4.02A General
Reserved
54-4.02B Membrane
The waterproofing membrane must consist of butyl rubber secured with an authorized adhesive.
You may substitute ethylene propylene diene monomer (EPDM) for the butyl rubber if it complies with the
specifications for butyl rubber.
Comply with the AREMA Manual for Railway Engineering, chapter 8, part 29, for:
1.
2.
3.
4.
5.
6.

Butyl rubber membrane


Adhesive
Splicing cement
Butyl gum splicing tape
Antibonding paper
Fibered aluminum roof coating

The butyl rubber membrane must be at least 0.060 inch thick.


54-4.02C Protective Cover
The protective cover must comply with the AREMA Manual for Railway Engineering, chapter 8, part 29,
and must consist of 2 layers of asphaltic panels applied with adhesive and sealing compound to a total
thickness of at least 3/4 inch.
Sealing compound for joints and edges must be compatible with:
1.
2.
3.
4.

Membrane
Adhesive used to fasten the membrane to the deck
Splicing cement
Protective cover panels

The individual panels must be 3/8 inch thick.


The installed panels must be at least 4 by 8 feet except as cut for closures.
Ship and store the panels on smooth, flat surfaces.
If the panels are shipped with an inert material between the sheets to prevent sticking, remove the inert
material before installation.
54-4.03 CONSTRUCTION
54-4.03A General
Do not apply the membrane waterproofing until you are prepared to place the protective cover within a
short enough time such that the membrane is not damaged by workers, equipment, exposure to
weathering, or any other cause. Repair or replace damaged membrane.
Sweep or air blow the concrete surfaces to receive the seal to clean them of dirt, dust, gravel, loose
concrete particles, and other extraneous materials, and remove projections or fill depressions that could
damage the membrane.
658

SECTION 54

WATERPROOFING

The horizontal surfaces of the finished waterproofing must be free from depressions and pockets. The
membrane must be carefully turned into drainage fittings. Take special care to make the waterproofing
effective at the following locations:
1. Along the sides and ends of girders
2. At stiffeners, gussets, expansion joints, offsets in ballast retainers, and other discontinuities
For retainer-buffers and headers, use no. 1 structural grade Douglas fir timbers pressure treated under
AWPA U1, Use Category UC4B, Commodity Specification A, except do not use chromated copper
arsenate. For the anchor bolt assemblies associated with retainer-buffers and headers, use commercial
quality, hot-dip galvanized steel bolts, plates, and sheet metal.
54-4.03B Butyl Membrane Waterproofing
The surface to be waterproofed must be dry at the time of membrane application.
Do not apply the membrane when the atmospheric temperature is below 34 degrees F.
Apply the membrane using the following procedure:
1. Position and draw the membrane sheets tight without stretching.
2. Roll 1/2 of the membrane uniformly in a direction away from the starting edge or subsequent splice.
3. Apply the adhesive to the exposed deck area with a squeegee at a rate of at least 1 gallon per 100
square feet of deck surface.
4. Allow the adhesive to dry to a tack-free condition.
5. Unroll and press the membrane firmly and uniformly in place, avoiding trapping of air.
6. Repeat the same procedure for the remaining 1/2 of the membrane sheet, avoiding wrinkles and
buckles. Position each succeeding sheet to fit the previously installed sheet and splice the sheets.
Membrane splices must be tongue-and-groove type as shown in figure 8-29-3, no. 3, of the AREMA
Manual for Railway Engineering, chapter 8, part 29.
Splice the membrane sheets using the following procedure:
1. Clean all seam, lap, and splice areas with heptane, hexane, toluene, trichloroethylene, or white
gasoline using a clean cloth, mop, or similar synthetic cleaning device.
2. Spread splicing cement continuously on the seam, lap, and splice areas at a uniform rate of at least 1
gallon per 75 square feet based on both mating surfaces.
3. After the cement has dried to a tack-free condition, apply butyl gum splicing tape to the cemented
area of the membrane, extending the tape to at least 1/8 inch beyond the edges of the splice and lap
areas.
4. Roll or press the tape firmly into place to obtain full contact, avoiding bridging and wrinkles.
5. Reinforce corner splices with 2 continuous layers of rubber membrane over 1 layer of butyl tape.
Flash all projections, such as pipes, conduits, and sleeves, passing through the membrane waterproofing
with prefabricated or field-fabricated boots, fitted coverings, or other devices as necessary to provide
watertight construction. Use butyl gum tape between layers of rubber membrane.
Patch holes in the membrane sheeting under the manufacturer's instructions with a minimum overlap of 4
inches.
Before laying the membrane across a transverse expansion joint in the bridge deck, lay and center on the
joint a 12-inch-wide, galvanized, 22-gage steel sheet covered by an 18-inch-wide strip of antibond paper.
54-4.03C Asphaltic Protective Cover
Before placing the protective cover:
1. Thoroughly clean the surface of the applied membrane of dirt, dust, loose or unsound concrete, and
other extraneous material
2. At transverse expansion joints in the bridge deck, lay and center on the joint above the membrane a
12-inch-wide, galvanized, 22-gage steel sheet covered by an 18-inch-wide strip of antibond paper

659

SECTION 54

WATERPROOFING

Lay the panels with 2 superimposed layers. Offset the joints in the 2nd layer from the joints in the 1st
layer by approximately 1/2 the width of the panel.
Lay the panels in an adhesive coating using the following procedure:
1. Apply the adhesive with a squeegee at a rate of at least 1 gallon per 100 square feet of deck surface.
2. As you lay successive panels, thoroughly coat the edges and ends of adjacent panels already laid
with a sealing compound.
3. Lay the panels tightly against those previously laid such that the sealing compound completely fills
the joints and squeezes out at the top.
4. After all of the panels have been laid, fill any voids between the panels with sealing compound.
Where an edge or protrusion of asphaltic panels is exposed to prolonged sunlight, coat the area with
fibered aluminum roof coating.
54-4.04 PAYMENT
Waterproofing and cover is measured along the slope and includes the area of timber retainers and
headers.
54-5 DECK SEAL
54-5.01 GENERAL
54-5.01A Summary
Section 54-5 includes specifications for applying a deck seal.
The deck seal must consist of a preformed membrane seal system.
For placing HMA on a deck seal, comply with section 39-1.13.
54-5.01B Definitions
Reserved
54-5.01C Submittals
Submit a certificate of compliance for the preformed membrane sheet, including the type of sheet and the
conditioner or primer application rates.
54-5.01D Quality Control and Assurance
Reserved
54-5.02 MATERIALS
The preformed membrane seal system must consist of:
1. Primer or conditioner applied to a prepared concrete surface
2. Preformed membrane sheet of rubberized asphalt or polymer-modified bitumen
3. Mastic for binding and sealing the edges of the sheet to the barrier or curb face
The preformed membrane sheet must be reinforced with one of the following:
1. P
olypropylene mesh
2. Polyester/polypropylene fabric
3. Fiberglass mesh
The total thickness of the membrane sheet and polyethylene film or fabric reinforcement must be at least
65 mils.
The membrane sheet must comply with the values shown in the following table:

660

SECTION 54

WATERPROOFING

Deck Seal Membrane Sheet Property Requirements

Property
Test
Value (min)
a
b
Breaking strength
ASTM D 882
50 lb/inc
d
b
Percent elongation at break
ASTM D 882 15 percentc
Pliability
ASTM D 146e No cracks
Rubberized asphalt softening point
AASHTO T 53
165 F
Polymer-modified bitumen softening point AASHTO T 53
210 F
a
Breaking factor in machine direction
b
Method A, average 5 samples
c
At 73.4 3.6 degrees F
d
Machine direction
e
180-degree bend over a 1-inch mandrel at 10 degrees F

Primer, conditioner, and mastic must be manufactured for use with the preformed membrane sheet
material used.
54-5.03 CONSTRUCTION
Before applying the deck seal:
1. Where a slurry leveling course is shown, apply the slurry leveling course.
2. Sweep or air blow the concrete surfaces to receive the seal to clean them of dirt, dust, gravel, loose
concrete particles, and other extraneous materials. You may leave concrete curing compound on the
surface.
3. Remove sharp protrusions from the surface that could puncture the membrane.
4. Round or chamfer sharp corners to be covered. Use portland cement concrete or mortar to make
chamfers or to fill the void beneath railing bumper rails.
Before applying the primer or conditioner, tape or adhere oil-resistant construction paper mask to deck
areas that are to be covered by expansion dams. Place the membrane seal and HMA continuously
across the paper masks, except cut the mask and the preformed sheet at or near the expansion joint if
requested.
The surfaces must be dry and the temperature of the deck and of the materials must be at least 50
degrees F when the membrane seal is applied, except the rubberized asphalt material may be applied
when the temperature is at least 25 degrees F.
Apply primer, conditioner, and mastic under the manufacturer's instructions.
Apply the primer or conditioner to the entire area to be sealed, except where a slurry leveling course has
been applied. Where a slurry leveling course has been applied, apply a prime coat consisting of an RS1
grade asphaltic emulsion spread at a rate of 1 gallon per 100 sq yd of surface covered.
Thoroughly mix and continuously agitate the primer and conditioner during application.
Allow the primer to dry to a tack-free condition before placing membrane sheets.
Recoat the surface if the membrane sheet is not placed over the primer or conditioner within the time
recommended by the manufacturer.
Apply the preformed membrane sheet to the primed or conditioned surface either by hand methods or by
mechanical applicators.
Place the membrane sheets using the following procedure to achieve a shingling effect in the direction
that water will drain:
1. Place a minimum 12-inch-wide membrane strip along the juncture of the deck and the base of the
barrier curb face at the low side of the deck with the sheet extending up the face 3 inches.
2. Starting at the gutter line, lay sheets longitudinally, side lapped with adjacent sheets by at least 3
inches and end lapped by at least 6 inches.
3. If the deck has a reversing superelevation, place a minimum 12-inch-wide strip at the juncture of the
deck and the base of the barrier or curb at the high side of the deck extending up the face 3 inches.
661

SECTION 54

WATERPROOFING

4. Roll the membrane sheets with hand rollers or other apparatus as necessary to develop a firm and
uniform bond with the primed or conditioned concrete surface, minimizing wrinkles and air bubbles.
5. Patch tears, cuts, or narrow overlaps using an adhesive as follows:
5.1. Place sections of a membrane sheet over the defective area such that the patch extends at
least 6 inches beyond the defect.
5.2. For modified bitumen sheets with a permanent polyester film, use a propane torch to melt the
polyester film on the section to be patched. Place the patch over the heated surface and roll or
press it firmly onto the surface.
At open joints and deck bleeder pipes, cut and turn the membrane sheet into the joint or bleeder while
laying the membrane sheet.
If the membrane sheet is manufactured with a release film, remove the film from the contact area of the
lap joint or splice before making the joint or splice. Do not remove the film from the remainder of the
membrane sheet until immediately before placing the HMA.
Apply a bead of mastic at the following locations:
1. Along the exposed edge of the membrane sheet that extends up the barrier or curb face
2. If the deck has a reversing superelevation, along the edge in the high side gutter after installing the
sheets
Place HMA over the preformed membrane seal within 7 days after installation of the seal and before
allowing traffic on the seal.
54-5.04 PAYMENT
Deck seal is measured as the area covered by the seal without a deduction for masked areas.
54-6 SLURRY LEVELING COURSE
54-6.01 GENERAL
Section 54-6 includes specifications for applying a slurry leveling course on rough-surfaced, deteriorated
bridge decks.
54-6.02 MATERIALS
The slurry leveling course must consist of a mixture of 2 parts of undiluted asphaltic emulsion mixed with
3 parts by volume of aggregate.
The asphaltic emulsion must be commercial-quality Grade QS1h or CQS1h.
The aggregate must be a commercial-quality sand that passes a no. 30 sieve.
54-6.03 CONSTRUCTION
Mix the slurry seal in a continuous pugmill mixer. The mixer must produce a uniform and homogeneous
mixture.
You may blend additional water into the slurry to improve mixing and spreading properties if the added
water plus the surface moisture on the aggregate does not exceed 20 percent by volume of the undiluted
emulsion.
Protect surfaces of the bridge and other improvements that are not to receive slurry leveling course from
spatter and stains.
Spread the slurry on water-dampened but puddle-free concrete surfaces with a squeegee or broom of
suitable stiffness. Apply the slurry at a rate sufficient to fill local depressions in the deck without filling over
high deck areas. Mask or cover open joints, drains, access openings, and sliding surfaces during the
application of slurry.
54-6.04 PAYMENT
Slurry leveling course is measured as the quantity of undiluted asphaltic emulsion used to produce the
slurry, not including any additional water blended into the slurry.

662

55 STEEL STRUCTURES

55-1 GENERAL

55-1.01 GENERAL
55-1.01A Summary
Section 55-1 includes general specifications for furnishing and erecting structural steel or metalwork.
Connection details for highway bridges must comply with AASHTO LRFD Bridge Design Specifications
with California Amendments.
Design details, fabrication, and workmanship for railway bridges must comply with chapter 15 of the
AREMA Manual for Railway Engineering.
55-1.01B Definitions
thread stickout: The threaded end of a bolt projecting past the outer nut face.
unidentified stock material: Material that cannot be identified with certified mill test reports.
55-1.01C Submittals
55-1.01C(1) General
Submit a calibration certificate for each bolt tension measuring device and calibrated wrench before use.
Submit details for methods of straightening material to be fabricated.
Submit a welding QC plan with the steel structures shop drawings. List methods and personnel to satisfy
the requirements of AWS D1.5.
Submit reports from testing performed on fastener components and assemblies before shipment to the
job site. Test reports must include the rotational capacity lot numbers and the reports listed in the
"Certification," "Report," "Number of Tests and Retests," and "Certification and Test Report" sections of
the referenced ASTM standards. For ASTM A 307 anchor bolts, include chemical composition and carbon
equivalence for each heat of steel.
Submit copies of mill orders when orders are placed.
Submit certified mill test reports before fabrication. Include CVN impact test results if impact testing is
specified. Include grain size if fine grain steel is specified.
Submit certificates of compliance for materials used in the work except for unidentified stock material.
55-1.01C(2) Shop Drawings
Submit shop drawings for steel structures to OSD, Documents Unit. Notify the Engineer of the submittal.
Include the submittal date and contents in the notification. Allow 45 days for the Department's review for
highway bridges and 60 days for railway bridges. Submit 6 sets for highway bridges and 10 sets for
railway bridges. Submit 6 to 12 sets, as requested by the Engineer, to OSD, Documents Unit after review
for final authorization.
Include the following in the shop drawings:
1.
2.
3.
4.
5.
6.
7.
8.
9.

Sequence of shop and field assembly and erection


Welding sequences and procedures
Layout drawing of the entire structure with locations of butt welded splices
Locations of temporary supports
Vertical alignment of girders at each stage of erection
Match-marking diagrams
Details for connections not shown or dimensioned on the plans
Details of allowed options incorporated in the work
Direction of rolling of plates where orientation is specified

Submit camber calculations with the shop drawings.

663

SECTION 55

STEEL STRUCTURES

55-1.01C(3) Check Testing


Submit test samples for check testing to METS. Submit test samples for each heat of maximum thickness
of:
1. Tension flanges and webs of fracture critical members
2. Tension flanges and webs of curved girders
3. Tension hanger plates
Furnish plates, shapes, or bars containing test samples from the mill with extra length to provide for
removal of check samples at the fabrication site. Samples may be cut from either end.
You may remove test samples at the rolling mill. Remove samples from the mill plate that will be stripped
by the fabricator to produce the designated plate. Take samples from any location within the plate. Mark
donor plates with the same identifying numbers as the test samples.
Remove material for test samples in the Engineer's presence. Test samples for plates over 24 inches
wide must be 14 by 18 inches with the long dimension transverse to the direction of rolling. Test samples
for other products must be 18 inches long taken in the direction of rolling with a width equal to the product
width.
Submit test samples before fabricating into components. Mark samples with the direction of rolling, heat
numbers, and plate numbers using paint or indelible marking material. You may steel stamp samples in
one corner of the plate instead of marking.
Results of check testing are reported to you no sooner than 20 days after delivery to METS. For multiple
samples submitted on the same day, an additional day is added for every 2 samples submitted and the
test report is made for the group of samples.
55-1.01D Quality Control and Assurance
55-1.01D(1) General
Welder qualification and inspection must comply with AWS D1.5.
The results of the Department's tensile and impact testing of test samples must not vary more than 5
percent below the specified minimum or 5 percent above the specified maximum requirements. If initial
test results vary more than 5 percent but less than 10 percent from the specified requirements, a retest
may be performed on another test sample from the same heat and thickness.
Each manual torque wrench must have a dial gage or digital read out. Any electric, pneumatic, or
hydraulic calibrated wrench used to tension fasteners must have an adjustable control unit to shut off the
wrench at the desired torque.
Bolt tension measuring devices and calibrated wrenches must be calibrated not more than 1 year before
use and at least yearly during the project. The calibration must be performed by an authorized laboratory
or authorized repair and calibration center approved by the tool manufacturer. Certification equipment and
calibration standards must be traceable to NIST.
Calibrate bolt tension measuring devices to be accurate to within 1 percent of actual tension. Calibration
must consist of at least 4 evenly spaced verification readings performed over a range of 20 to 80 percent
of full scale.
Calibrate calibrated wrenches to be accurate to within 2 percent of actual torque. Calibration must consist
of at least 4 evenly spaced verification readings performed over a range of 20 to 100 percent of full scale.
If a torque multiplier is used, calibrate the torque multiplier and calibrated wrench as a unit. Include
sockets and extensions of the same length to be used in the work during calibration. Adjust the
manufacturer's torque multiplier during calibration so that the product of the torque multiplier and the input
calibrated wrench reading is within 2 percent of actual torque value. Use this system only as calibrated.
55-1.01D(2) Certifications
Reserved

664

SECTION 55

STEEL STRUCTURES

55-1.01D(3) Source Quality Control


55-1.01D(3)(a) General
The Department inspects structural steel at the fabrication site. Notify the Engineer when materials are
delivered to the fabrication site. Allow at least 10 days between giving notice and starting fabrication.
In addition to NDT requirements in AWS D1.5, ultrasonically test 25 percent of all main member tension
groove welds in material over 1/2 inch thick. The Engineer determines the location of all NDT testing for
welding.
55-1.01D(3)(b) Rotational Capacity Testing
55-1.01D(3)(b)(i) General
Perform rotational capacity testing on HS fastener assemblies before shipment to the job site.
Test each combination of bolt production lot, nut lot, and washer lot as an assembly. Assign a rotational
capacity lot number to each combination of lots tested. Mark each shipping unit of fastener assemblies
with the rotational capacity lot number.
Test 2 fastener assemblies from each lot. Both fastener assemblies tested from a rotational capacity lot
must pass for the lot to be acceptable.
Use 1 hardened washer under the nut for testing.
Test zinc-coated assemblies after lubrication.
You do not need to test cap screws or bolts used for slip base plates.
Test procedures specified are for A 325 bolts.
55-1.01D(3)(b)(ii) Long Bolt Test
Use the following equipment for long bolt testing:
1.
2.
3.
4.

Calibrated bolt tension measuring device.


Hand wrench or suitable tool for turning bolt.
Calibrated dial or digital torque wrench with socket.
Spacer washers or bushings. Spacer washers or bushings must have the same inside diameter and
an equal or larger outside diameter as the appropriate hardened washers complying with ASTM F
436.
5. Steel beam or member to which the tension measuring device will be attached. The member must be
accessible from the ground.
Use the following procedure:
1. Measure and record the bolt length from the bolt washer face to the end of the shank.
2. Install the nut on the bolt such that the first 3 to 5 full threads closest to the bolt head are between the
nut face and bolt head.
3. Measure and record the length of bolt thread protruding beyond the outer nut face. If the nut cannot
be fully threaded onto the bolt, test the assembly under section 55-1.01D(3)(b)(iii).
4. Insert the bolt into the tension measuring device. Install the hardened washer and any required
spacers under the nut to produce the thread length recorded in step 3 above.
5. Tighten the nut using a hand wrench to the minimum snug tension shown in the following table:

665

SECTION 55

STEEL STRUCTURES

Table 1 A325 Snug-Tight Tension Values

Bolt diameter
Minimum snug tensiona
(kips)
(inches)
1/2
1
5/8
2
3/4
3
7/8
4
1
5
1-1/8
6
1-1/4
7
1-3/8
9
1-1/2
10
a
The tension may exceed the table 1 value by at
most 2 kips.

6. Match-mark the assembly as follows:


6.1. Place a mark on 1 corner of the nut.
6.2. Place a heavy reference line on the face plate of the tension measuring device that aligns with
the mark on the nut.
6.3. Place a line that aligns with the mark on the nut across the flat end of the bolt shank or on the
exposed portions of the threads of tension control bolts.
6.4. Place a mark on the outside of the turning socket. The mark must be aligned with the mark on
the nut corner and be visible when the nut is being turned.
6.5. Make an additional mark on the face plate at the required rotation shown in the following table
clockwise from the heavy reference line:
a,b

Table 2 Required Nut Rotation for Rotational Capacity Tests


Required rotation (turn)
Bolt lengthc
4 bolt diameters or less
2/3
More than 4 and at most 8 bolt diameters
1
1-1/3
More than 8 and at most 12 bolt
diametersd
a
Nut rotation is relative to bolt, regardless of the element being turned.

For bolts installed by 1/2 turn or less, the tolerance is 30 degrees; for

bolts installed by 2/3 turn or more, the tolerance is 45 degrees.

b
Applicable only to connections in which all material within the grip of

the bolt is steel.

c
As measured in step 1 above.

d
If the bolt length exceeds 12 diameters, the required rotation must be

determined by actual tests in a suitable tension device simulating site

conditions.

7. Turn the nut to attain the minimum tension for the applicable bolt diameter shown the following table:
Table 3 A325 Minimum Tension Values
Bolt diameter (inches)
Minimum tension (kips)
1/2
12
5/8
19
3/4
28
7/8
39
1
51
1-1/8
56
1-1/4
71
1-3/8
85
1-1/2
103

666

SECTION 55

STEEL STRUCTURES

8. After attaining the tension shown in table 3, record in ft-lb the moving torque required to turn the nut
and the corresponding bolt tension. Measure torque with the nut in motion. Use this corresponding
bolt tension to determine T using the following formula:
T = b x d/48
where

b = corresponding bolt tension in pounds

d = bolt diameter in inches

9. Turn the nut until the rotation shown in table 2 is attained. Measure the rotation from the heavy
reference line on the face plate. Record the bolt tension.
10. Remove the nut and examine the threads on the nut and bolt.
Acceptance criteria is as follows:
1.
2.
3.
4.
5.

Moving torque recorded in step 8 must be less than or equal to the calculated value T.
Bolt tension recorded in step 9 must be at least the turn test tension value shown in table 4.
Nut is removed from the bolt with no signs of thread stripping or galling on the bolt or nut.
Bolt must not shear or fail during the test.
Assembly must not seize before the final rotation in step 8 is attained.
Table 4 A325 Turn Test Tension Values
Bolt diameter (inches)
Turn test tension (kips)
1/2
14
5/8
22
3/4
32
7/8
45
1
59
1-1/8
64
1-1/4
82
1-3/8
98
1-1/2
118

55-1.01D(3)(b)(iii) Short Bolt Test


Use the following equipment for short bolt testing:
1. Calibrated dial or digital torque wrench with socket.
2. H
and wrench.
3. Spacer washers or bushings. Spacer washers or bushings must have the same inside diameter and
an equal or larger outside diameter as the appropriate hardened washers complying with ASTM F
436.
4. Steel plate or girder. This member must have a thickness that provides the required number of
threads within the bolt grip as specified in procedure step 2 of section 55-1.01D(3)(b)(ii).
Use the following procedure:
1. Measure and record the bolt length from the bolt washer face to the end of the shank.
2. Install the nut on the bolt. The first 3 to 5 full threads must be located between the nut washer face
and the bolt washer face. Measure and record the length of bolt thread protruding beyond the outer
nut face.
3. Install the bolt into the hole in the plate or girder. The hole must be 1/16 inch larger than the nominal
bolt diameter. Install the hardened washer and any required spacers to produce the thread length
recorded in step 2.
4. Tighten the nut snug tight using a hand wrench. Do not exceed 20 percent of the maximum allowable
torque value shown in the following table.

667

SECTION 55

STEEL STRUCTURES

Table 5 A325 Maximum Allowable Torque

Bolt diameter (inches)


Torque (ft-lb)
1/2
145
5/8
285
3/4
500
7/8
820
1
1220
1-1/8
1500
1-1/4
2130
1-3/8
2800
1-1/2
3700

5. Match-mark the assembly as follows:


5.1. Place a mark on 1 corner of the nut.
5.2. Place a heavy reference line on the steel plate or girder that aligns with the mark on the nut.
5.3. Place a line that aligns with the mark on the nut across the flat end of the bolt shank or on the
exposed portions of the threads of tension control bolts.
5.4. Place a mark on the outside of the turning socket that aligns with the mark on the nut. This
mark must be visible when the nut is being turned.
5.5. Make 2 additional small marks on the steel plate or girder, one at 1/3 of a turn and one at 2/3 of
a turn clockwise from the heavy reference line on the steel plate or girder.
6. Tighten the nut to the rotation value shown in table 6. Measure the rotation from the heavy reference
line on the steel girder or plate. Do not allow the bolt head to turn during tightening.
Table 6 Nut Rotation Required
a,b
for Turn-of-Nut Installation
c
Required rotation (turn)
Bolt length
4 bolt diameters or less
1/3
a
Nut rotation is relative to bolt regardless of the

element being turned. For bolts installed by 1/2 turn or

less the tolerance is 30 degrees.

b
Applicable only to connections in which all material

within the grip of the bolt is steel.

c
Measured in step 1.

7. Record in ft-lb the moving torque required to turn the nut when the rotation value shown in table 6 is
attained.
8. Tighten the nut further to the rotation value shown in table 7. Measure the rotation from the heavy
reference line on the steel girder or plate. The line on the end of the bolt shank or on the exposed
threads of tension control bolts must remain in alignment with the start line.
Table 7 Required Nut Rotation
for Rotational Capacity Test
a
Required rotation (turn)
Bolt length
4 bolt diameters or less
2/3
a
Measured in step 1.
9. Remove the nut and examine the threads on the nut and bolt.
Acceptance criteria is as follows:
1. Moving torque recorded from step 7 must be less than or equal to the maximum allowable torque
shown in table 5.
2. Nut is removed from the bolt with no signs of thread stripping or galling on the bolt or nut after the
rotation in step 8 has been attained.
3. Bolt must not shear or fail during the test.
4. Assembly must not seize before the final rotation in step 8 is attained.
668

SECTION 55

STEEL STRUCTURES

55-1.01D(4) Field Quality Control


55-1.01D(4)(a) General
Perform job site HS fastener testing in the Engineer's presence.
The Engineer rejects uninstalled fasteners in the same rotational capacity lot as fasteners that fail a job
site installation tension test or rotational capacity test.
Perform additional rotational capacity tests, installation tension tests, and tests to determine new
inspection torques on rotational capacity lots if any of the following occur:
1.
2.
3.
4.

Any fastener is not used within 3 months after arrival on the job site
Fasteners are improperly handled, stored, or subjected to inclement weather before final tightening
Changes are noted in original surface condition of threads, washers, or nut lubricant
Required inspections are not performed within 48 hours after all fasteners in a joint have been
tensioned

55-1.01D(4)(b) Rotational Capacity Testing


Perform rotational capacity testing on each rotational capacity lot under section 55-1.01D(3)(b) before
installation.
55-1.01D(4)(c) Installation Tension Testing
Perform installation tension testing on each rotational capacity lot before installation.
Test 3 representative HS fastener assemblies under section 8 of Specification for Structural Joints Using
ASTM A 325 or A 490 Bolts of the RCSC. For short bolts, test 3 representative HS fastener assemblies
under "Pre-Installation Verification Procedures" of Structural Bolting Handbook of the Steel Structures
Technology Center.
If using direct tension indicators, perform installation verification tests under appendix X1 of ASTM F 959
except that bolts must be initially tensioned to a value 5 percent greater than the minimum required bolt
tension.
55-1.01D(4)(d) Verification Tension Testing
Verify minimum fastener tension in HS bolted connections no later than 48 hours after all fasteners in a
connection have been tensioned.
The Engineer selects fasteners to be tested. Perform testing such that the Engineer can read the torque
wrench or access direct tension indicator gaps during testing.
Check 10 percent of each type of fastener assembly in each HS bolted connection for minimum tension
under section 10 of Specification for Structural Joints Using ASTM A 325 or A 490 Bolts of the RCSC.
Check at least 2 assemblies per connection. For short bolts determine the arbitration torque using steps 1
through 7 of "Arbitration of Disputes, Torque Method-Short Bolts" in Structural Bolting Handbook of the
Steel Structures Technology Center.
Determine and use a separate inspecting torque for each different rotational capacity lot of fasteners.
55-1.02 MATERIALS
55-1.02A General
55-1.02A(1) General
Materials must comply with the requirements shown in the following tables:

669

SECTION 55
Material
Carbon steel
HS low alloy columbium
vanadium steel
HS low alloy structural steel

STEEL STRUCTURES

Structural Steel

Specification
ASTM A 709/A 709M, Grade 36 or
ASTM A36/A36Ma
ASTM A 709/A 709M, Grade 50 or
ASTM A 572/A 572M, Grade 50a
ASTM A 709/A 709M, Grade 50W, Grade HPS
50W, or ASTM A 588/A 588Ma
ASTM A 709/A 709M, Grade HPS 70W

HS low alloy structural steel


plate
High-yield strength quenched ASTM A 709/A 709M, Grade 100 and Grade
and tempered alloy steel
100W or ASTM A 514/A 514Ma
plate suitable for welding
a
Grades you may substitute for the equivalent ASTM A 709 steel subject to the
modifications and additions specified and to the requirements of ASTM A 709.
Fasteners
Material
Steel fastener components
for general applications:
Bolts and studs
Anchor bolts
HS bolts and studs
HS threaded rods
HS nonheaded anchor
bolts
Nuts
Washers
Components of HS steel
fastener assemblies for use
in structural steel joints:
Bolts
Tension control bolts
Nuts
Hardened washers

Specification

ASTM A 307
ASTM F 1554 or ASTM A 307, Grade C
ASTM A 449, Type 1
ASTM A 449, Type 1
ASTM F 1554, Grade 105, Class 2A
ASTM A 563, including appendix X1a
ASTM F 844

ASTM A 325, Type 1


ASTM F 1852, Type 1
ASTM A 563, including appendix X1a
ASTM F 436, Type 1, Circular, including
S1 supplementary requirements
Direct tension indicators ASTM F 959, Type 325, zinc-coated
a
Zinc-coated nuts tightened beyond snug or wrench tight must be furnished with
a dry lubricant complying with supplementary requirement S2 in ASTM A 563.
Other Materials

Material
Carbon steel for forgings,
pins, and rollers
Alloy steel for forgings
Pin nuts
Carbon-steel castings
Malleable iron castings
Gray iron castings
Carbon steel structural tubing
Steel pipea

Specification
ASTM A 668/A 668M, Class D

ASTM A 668/A 668M, Class G


ASTM A 36/A 36M
ASTM A 27/A 27M, Grade 65-35, Class 1
ASTM A 47/A 47M, Grade 32510 (Grade 22010)
ASTM A 48, Class 30B
ASTM A 500, Grade B or ASTM A 501
ASTM A 53, Type E or S, Grade B;
ASTM A 106, Grade B; or ASTM A 139, Grade B
Stud connectors
AWS D1.5
a
Hydrostatic testing will not apply.

670

SECTION 55

STEEL STRUCTURES

55-1.02A(2) Charpy V-notch Requirements


Structural steel plate used for the following components must comply with longitudinal CVN impact values
shown in the following table:
1. Tension members, tension flanges, eyebars, and hanger plates
2. Splice plates of tension members, tension flanges, and eyebars
Material complying with
ASTM A 709/A 709M

CVN impact value


(ft-lb at temperature)
15 at 40 F
15 at 40 F
15 at 40 F
20 at 40 F

Grade 36
Grade 50a (Thickness up to 2 inches)
Grade 50Wa (Thickness up to 2 inches)
Grade 50a
(Thickness over 2 inches up to 4 inches )
Grade 50Wa (Thickness over 2 inches up to 4
20 at 40 F
inches)
Grade HPS 50Wa (Thickness up to 4 inches)
20 at 10 F
Grade HPS 70W (Thickness up to 4 inches)
25 at -10 F
Grade 100 (Thickness of 2-1/2 inches or less)
25 at 0 F
Grade 100W (Thickness over 2-1/2 inches up to
35 at 0 F
4 inches)
a
If the material yield point is more than 65,000 psi, reduce the temperature
for the CVN impact value 15 degrees F for each increment of 10,000 psi
above 65,000 psi.
Determine CVN values under ASTM E 23. Sampling procedures must comply with ASTM A 673. Use the
Frequency H (Heat) testing for steels complying with ASTM A 709/A 709M, Grades 36, 50, 50W, and
HPS 50W. Use the Frequency P (Piece) testing for steels complying with ASTM A 709/A 709M, Grades
HPS 70W, 100, and 100W.
For fracture critical members, minimum CVN impact values are specified in the special provisions.
55-1.02A(3) Structural Steel
Unless otherwise described, structural steel plates, shapes, and bars must comply with ASTM A 709/A
709M, Grade 50. You may increase girder flange plate thickness and length if the change does not
decrease any portion of the plates in detailed thickness. For continuous girders, increases in the length of
girder flange plates that change locations of butt welds between different thicknesses of flange plates
must be authorized before fabrication.
Stud type shear connectors longer than 8 inches may consist of multiple shorter studs connected with
complete joint penetration welds.
All structural steel that is precut before arrival at the fabrication site must be cut so that the primary
direction of rolling is parallel to the direction of the main tensile or compressive stress in the member.
Do not use coiled steel plate for the following items:
1. Flanges or eyebars
2. Hanger plates
3. Splice plates for flanges or eyebars
For members shown, you may substitute rolled shapes for welded sections and welded sections for rolled
shapes if the substituted members comply with the following:
1. Depth, width, and average thicknesses are at least equal to the replaced shape or section
2. For welded sections, the flanges are welded to the web with continuous fillet welds on each side of
the web
3. Strength classification of the material is not reduced

671

SECTION 55

STEEL STRUCTURES

55-1.02A(4) Bearing Pads


Elastomeric bearing pads must comply with section 51-3.02.
55-1.02A(5) Castings
Steel, gray iron, and malleable iron castings must have adequate continuous fillets cast in place in
reentrant angles. The radius of curvature of the exposed surface of a fillet will define the fillet size. The
size of fillets must be at least 1/2 the thickness of the thinnest adjoined member but not less than 1/2
inch.
Finished casting dimensions must be at least equal to the dimensions shown. Castings must be not more
than 7.5 percent overweight. Large castings must be suspended and hammered over their entire area.
Cracks, flaws, or other defects must not be present after hammering.
55-1.02A(6) Unidentified Stock Material
You may use unidentified stock material on nonfracture critical members if:
1. No more than 30,000 pounds is used.
2. Unidentified stock material is segregated from all other materials used in the work.
3. Material is authorized before fabrication.
The Engineer may select samples for testing from each piece of unidentified stock material proposed for
use. Testing of samples must be performed by an authorized laboratory under the applicable ASTM.
55-1.02A(7) Miscellaneous Materials
Caulking must be polysulfide or polyurethane caulking complying with ASTM C 920, Type S, Grade NS.
55-1.02B Fabrication
55-1.02B(1) General
Rolled material must be straight before being laid out or worked. Subassemblies and completed members
must be straight before being incorporated into the work. The Department rejects straightened material
showing evidence of damage.
Cut and fabricate steel plates for flanges, eyebars, hanger plates, and splice plates for flanges and
eyebars such that the primary direction of rolling is parallel to the direction of the main tensile or
compressive stress in the member.
Mechanically cut edges must be clean cut without torn or ragged edges.
Weld girder stiffeners shown as bearing stiffeners. Ends of stiffeners shown as tight-fit must bear on the
girder flange with at least point bearing. Local clearances between the end of the stiffener and the girder
flange must be at most 1/16 inch. Except where stiffeners are cut back, caulk gaps between stiffener
ends and the girder flange before painting.
Build floor beams, stringers, and girders having end connection angles to exact length back to back of
connection angles. If end connections are faced, the finished angle thickness must be at least that shown
on the shop drawings.
Finished members must be true to line and free from twists, bends, and open joints.
Match-mark connecting parts that are preassembled for setting up for welding or for drilling or reaming
holes for field connections.
Where galvanizing is described, galvanize structural steel under section 75-1.05.
Neatly finish exposed parts of the work. Slightly round edges, sharp corners, and edges marred, cut, or
roughened during handling or erection.
Clean and paint iron and steel surfaces under section 59.
55-1.02B(2) Flatness of Faying and Bearing Surfaces
Surfaces of bearing and base plates and other metal surfaces that contact each other or ground concrete
surfaces must be flat to within 1/32 inch in 12 inches and 1/16 inch overall.
672

SECTION 55

STEEL STRUCTURES

Surfaces of bearing and base plates and other metal bearing surfaces that contact mortar, preformed
fabric pads, or elastomeric bearing pads must be flat to within 1/8 inch in 12 inches and 3/16 inch overall.
You may heat straighten steel slabs not in contact with other metal bearing surfaces if the above
tolerances are met.
55-1.02B(3) Bent Plates
Cold-bent load-carrying rolled steel plates must comply with the following:
1. Direction of bending must be at right angles to the direction of rolling
2. Radius of bend measured to the concave face must comply with ASTM A6/A6M
3. Before bending, the corners of the plate must be rounded to a 1/16-inch radius throughout that
portion of the plate where bending is to occur
Plates to be bent to a shorter radius than specified in ASTM A6/A6M must be bent hot. Hot bent plates
must have the direction of bending at right angles to the direction of rolling.
55-1.02B(4) Fastener Threads
Fastener threads for general applications must comply with the following:
1. External threads must comply with the Unified Coarse Thread Series requirements in ANSI B1.1 with
Class 2A tolerances before coating with zinc
2. Internal threads must comply with ASTM A 563
Threads for pin ends and nuts 1-1/2 inches or more in diameter must comply with the following:
1. External threads must be Unified Inch Screw Threads, UN Series with 6 threads per inch, complying
with ANSI B1.1 with Class 2A tolerances
2. Internal threads must be Unified Inch Screw Threads, UN Series with 6 threads per inch, complying
with ANSI B1.1 with Class 2B tolerances
55-1.02B(5) Pin Connections
Pins must be:
1. Turned to the dimensions shown
2. Straight, smooth, and free from flaws
3. Have the final surface produced by a finishing cut
In pins more than 9 inches in diameter, bore a full length hole at least 1-7/8 inches in diameter along the
pin axis after cooling and before annealing.
Bore holes for pins:
1.
2.
3.
4.

True to the diameter specified


At right angles to the member axis
Except for pins where nonparallel holes are required, holes must be parallel with each other
Smooth and straight with the final surface produced by a finishing cut

Coat machined surfaces of pins and holes with an easily removed rust inhibitor.
The distance between holes for pins must not vary by more than 1/32 inch from that shown when
measured outside-to-outside for tension members and inside-to-inside for compression members.
The diameter of holes for pins must not exceed the pin diameter by more than 1/50 inch for pins 5 inches
or less in diameter or 1/32 inch for larger pins.
Bore holes for pins in built-up members after assembly. If authorized, you may bore holes before
assembly if the same degree of accuracy is achieved as boring after assembly.
Bore pin-connected hanger plates in pairs or in stacks bolted or clamped together such that each pair of
hanger plates is matched.

673

SECTION 55

STEEL STRUCTURES

Use pilot and driving nuts for driving pins. Drive pins such that the members will bear fully on them. For
field assembly use a positive locking device to tighten and secure pin nuts.
55-1.02B(6) Bolted Connections
55-1.02B(6)(a) General
Bolted connections in structural steel joints must be made with HS steel fastener assemblies consisting of
one of the following:
1. HS steel bolt, nut, and hardened washer. You may use a direct tension indicator with the bolt, nut,
and hardened washer.
2. Tension control bolt, nut, and hardened washer
If the bolt head is the turned element during installation, perform installation tension testing and
verification tension testing, including determining inspection torque, by turning the bolt head.
Each length and diameter of fastener assembly used in any single joint of a HS bolted connection must
be from the same rotational capacity lot. Keep a record of which lots are used in each joint.
55-1.02B(6)(b) Bolt Holes
55-1.02B(6)(b)(i) General
Bolt holes must be one of the following:
1.
2.
3.
4.

Punched full size


Drilled full size
Subpunched and reamed
Subdrilled and reamed

Finished holes for bolts must be:


1.
2.
3.
4.

Cylindrical and perpendicular to the plane of the connection


At most 1/16 inch larger than the nominal bolt diameter
Clean cut without torn or ragged edges
Without irregularities that prevent solid seating

Holes punched full size, subpunched, or subdrilled must pass a pin 1/8 inch smaller than the nominal hole
size without drifting in at least 75 percent of the holes for each connection after assembling and before
any reaming.
All holes must pass a pin 3/16 inch smaller in diameter than the nominal hole size.
Do not correct mispunched or misdrilled holes by welding unless authorized.
55-1.02B(6)(b)(ii) Punching
Do not punch or subpunch ASTM A 36/A 36M structural steel thicker than 7/8 inch. Do not punch or

subpunch HS structural steel thicker than 3/4 inch.

The diameter of the punching die must not exceed the punch diameter by more than 3/32 inch.

Subpunch holes to be reamed to a diameter 1/4 inch smaller than the finished hole.

55-1.02B(6)(b)(iii) Drilling
Drill full-sized holes with the parts assembled or to a steel template with hardened bushings. If authorized,

you may drill full-sized holes with gang drill equipment.

The Engineer may request a proof assembly to check the fit of major field connections.

Subdrill holes to be reamed to a diameter 1/4 inch smaller than the finished hole.

Drill through templates after the templates have been firmly clamped or bolted.

If members are drilled while assembled, hold parts together securely during drilling.

You may stack drill plates using gang drills if:

674

SECTION 55

STEEL STRUCTURES

1. Parts are firmly clamped during drilling


2. Drill bits remain perpendicular to the work during drilling
55-1.02B(6)(b)(iv) Reaming
Perform reaming after built-up members are assembled and firmly bolted together or after templates are
securely located over the member. Remove shavings after reaming. Mark pieces reamed together so that
they may be reassembled in the same position. Do not interchange reamed parts.
Reaming templates must:
1.
2.
3.
4.

Have hardened steel bushings


Have accurately dimensioned holes
Have reference lines for locating templates on members
Be firmly clamped or bolted in position

Templates used for reaming of matching members or the opposite faces of one member must be exact
duplicates.
For reaming holes in assembled material, do not mix full-sized holes with subpunched or subdrilled holes.
55-1.02B(6)(c) Installation
Bolted connections using HS fastener assemblies must comply with Specification for Structural Joints
Using ASTM A 325 or A 490 Bolts of the RCSC.
Tension HS bolted connections as slip critical.
Use the same bolt head orientation within a single HS bolted connection.
Install the hardened washer under the element turned in tightening. Locate nuts on the side of the
member not visible from the traveled way. Locate nuts for bolts partially embedded in concrete on the
side of the member to be encased in concrete.
If surface moisture is present at a HS bolted connection:
1. Do not install HS fastener assemblies having components furnished with water soluble lubricants.
2. The Engineer may require you to perform additional fastener testing if fastener assemblies are
furnished with lubricants not soluble in water.
Seal the sheared ends of tension control bolts with caulking. Caulking must be gray and at least 50 mils
thick. Apply caulk to a clean surface the same day the splined end is sheared off.
For all bolts, thread stickout after tensioning must be at least flush with the outer nut face and at most 1/4
inch. At least 3 full threads must be located within the grip of the connection. For tension control bolts,
measure thread stickout from the outer nut face to the first full thread near the sheared end of the bolt
You may use 1 additional hardened washer under the nonturning element to correct excessive thread
stickout.
Thread stickout of studs, rods, and anchor bolts must be at least flush with the outer nut face and at most
1 inch.
You may use bolts with diameters up to 1/4 inch larger than the specified bolt diameter if:
1. Authorized
2. You comply with the spacing and edge distance requirements for the larger bolt
3. Net section is adequate
If using direct tension indicators:
1. Install 1 indicator under each bolt head. The protrusions must contact the bolt head.
2. Hold the bolt head stationary and turn the nut.
3. Follow the manufacturer's installation procedures.

675

SECTION 55

STEEL STRUCTURES

4. Tension bolts in not less than 2 stages until at least 50 percent of the gaps on each indicator are
between 0.000 and 0.005 inch. Indicators with all protrusions completely crushed are rejected.
Do not torque the splined end of tension control bolts before final tensioning.
55-1.02B(7) Welding
55-1.02B(7)(a) General
Welding must comply with AWS D1.5.

Replace Table 2.2 of AWS D1.5 with the following table:

Base metal thickness of the


Minimum effective partial joint
a
thicker part joined (inches)
penetration groove weld size (inches)
3/16
Over 1/4 to 1/2 inclusive
1/4
Over 1/2 to 3/4 inclusive
5/16
Over 3/4 to 1-1/2 inclusive
3/8
Over 1-1/2 to 2-1/4 inclusive
1/2
Over 2-1/4 to 6 inclusive
5/8
Over 6
a
Weld size need not exceed the thickness of the thinner part joined.
Except for welds to reinforce groove welds, minimum fillet weld size must comply with the sizes shown in
the following table:
Base metal thickness of the thicker
Minimum fillet weld sizea
part joined (inches)
(inches)
To 3/4 inclusive
1/4
Over 3/4
5/16
a
Weld size need not exceed the thickness of the thinner part joined.
Dimensional details and workmanship for welded joints in tubular and pipe connections must comply with
part A, "Common Requirements for Design of Welded Connections" and part D, "Specific Requirements
for Design of Tubular Connections," in section 2 of AWS D1.1.
The flat side of butt-welded joints must not deviate from flatness by more than 0.20 inch in a 2-foot length
centered over the weld.
Do not weld or tack brackets, clips, shipping devices, or other material not described to any part of the
girders unless shown on the shop drawings.
Grind weld surfaces smooth and flush when NDT is required.
Work complying with sections 56-3 or section 86-2.04 does not need to comply with AWS D1.5.
55-1.02B(7)(b) Backing for Welds
Reserved
55-1.02B(8) Curved Girders
Reserved
55-1.02B(9) Shop Assembly
Prepare and paint contact surfaces of HS bolted connections before assembly. Clean all other metal
contact surfaces thoroughly before assembly.
Preassemble completed subassemblies for structures or units of structures before erection to verify
geometry and to verify or prepare field connections.

676

SECTION 55

STEEL STRUCTURES

Bolted trusses, skew portals, skew connections, rigid frames, bents, and towers must be completely
preassembled, adjusted to line and camber, and prepared for welding or checked for bolt fit before
erection.
Preassemble long span truss work in lengths of at least 3 abutting panels and adjust members for line
and camber. Prepare joints for welding or drill or ream holes for field connections during preassembly. For
holes previously drilled full size, check holes for bolt fit.
Preassemble bolted splice joints for plate girders and adjust abutting sections for line and camber. Drill or
ream holes for field connections during preassembly.
Splice joints for welded girders must be preassembled with abutting members, adjusted for line and
camber, and prepared for welding.
Preassembly methods must be compatible with the erection methods used.
Preassemble all machinery completely. Fit bearings to the clearances and alignments specified. Gear
reductions and line gears must have gear center distances set and the gears match-marked.
Assemble parts into final positions without damage. Follow all matchmarks. Do not damage or distort
members when hammering.
Drifting done during assembly must not enlarge bolt holes or distort the metal.
55-1.02C Delivery, Storage, and Handling
Mark the weight of any member weighing over 6,000 lb on the member.
Do not bend, scrape, or overstress members during handling and shipping. The Engineer rejects bent or
damaged members.
Keep structural material clean during loading, transporting, and unloading.
Store structural material above ground on supports. Keep material clean, drained, and protected from
corrosion. Store girders upright and shored. Support long members on skids placed to prevent deflection.
55-1.03 CONSTRUCTION
55-1.03A General
Reserved
55-1.03B Falsework
Falsework must comply with section 48-2 except that dead loads consist of the weight of the structural
steel and portions of the structure supported by the falsework.
Construct falsework and concrete forms on steel structures such that loads applied to girder webs are (1)
applied within 6 inches of a flange or stiffener and (2) do not produce local distortion of the web. Provide
temporary struts and ties to (1) resist lateral loads applied to girder flanges and (2) prevent appreciable
vertical movement between the edge of deck form and the adjacent steel girder.
55-1.03C Erection
55-1.03C(1) General
You may erect structural steel girders to provide girder dead load continuity as assumed in design. If
erection procedures provide dead load girder continuity, preassemble members with field joints in a no
load condition in a horizontal or an upright position.
You may erect structural steel girders such that dead load girder continuity is not provided. If erection
procedures do not provide dead load girder continuity:
1. Submit proposed steel erection procedures with calculations that show girder capacity and geometry
will be correct
2. You may increase cross-sectional areas or change grades of steel to provide the specified capacity if
authorized
3. After erection, the erected structure must have a load carrying capacity at least equal to the structure
shown
677

SECTION 55

STEEL STRUCTURES

55-1.03C(2) Bearings and Anchorages


Set bearing assemblies level. The Engineer provides adjustments to horizontal positions of bearing
assemblies due to temperature. Obtain full bearing on the concrete under bearing assemblies.
Immediately before setting bearing assemblies or masonry plates on ground concrete surfaces,
thoroughly clean and apply caulking to all contact surfaces.
During welding, protect nonmetallic bearing pads using authorized methods.
The embedded end of each anchor bolt must terminate with a head or a nut and washer. Anchor bolts
must permit true positioning of bearing assemblies.
Mortar placed (1) under masonry plates or bearing assemblies or (2) in anchor bolt sleeves or canisters
must comply with section 51-1.02F except the cement to sand ratio must be 1 to 3. Mortaring and
constructing mortar pads under masonry plates must be done after girder erection and before placing
deck concrete.
If anchor bolts are installed in pipe sleeves or metal canisters, fill the pipes or canisters completely with
mortar.
55-1.03C(3) Heat Straightening Steel Girders
Reserved
55-1.03C(4)55-1.03C(10) Reserved
55-1.04 PAYMENT
55-1.04A Measurement
Structural steel and iron is measured by the pound computed from dimensions shown using the following:
1. Density of structural and cast steel is assumed at 0.2833 lb/cu in. The density of cast iron is assumed
at 0.26 lb/cu in.
2. Weight of rolled shapes and structural plate is computed using nominal weight and dimensions with
no deduction for copes, cuts, and holes.
3. Weight of fillet welds is assumed as shown in the following table:
Size of fillet weld (inches)
3/16
1/4
5/16
3/8
1/2
5/8
3/4
7/8
1

Weight (lb/lf)
0.08
0.14
0.22
0.30
0.55
0.80
1.10
1.50
2.00

4. Weight of galvanizing is added to the calculated base metal weight using the table of weights of zinc
coatings in ASTM A 153/A 153M.
5. Weight of bolts, nuts, and washers is added to obtain the weight of completed members. The weight
of oversize bolts and nuts is not included.
6. Weight of nuts, bolts, washers, cap screws, anchor bolts, and anchor pipe sleeves in the finished
structure is based on nominal weight and dimensions.
7. Weight of paint is not included.
55-1.04B Payment
Furnish structural steel (bridge) includes fabricating and delivering structural steel to the job site ready to
incorporate into the work.
Erect structural steel (bridge) includes erecting structural steel at the job site into final position in the work.
678

SECTION 55

STEEL STRUCTURES

Structural steel (bridge) includes furnishing and erecting structural steel.


55-2 COLUMN CASINGS
Reserved
55-3 PRESTRESSING STEEL GIRDERS
Reserved
55-455-10 RESERVED

679

56 SIGNS

56-1 GENERAL

Reserved
56-2 FURNISH SIGN PANELS
56-2.01 GENERAL
56-2.01A General
56-2.01A(1) Summary
Section 56-2 includes specifications for fabricating and furnishing sign panels.
Signs must comply with the California Sign Specifications and the federal Standard Highway Signs and
Markings Book. Those publications and related publications are available at the Department's Traffic
Operations Web site under signs and work zones.
56-2.01A(2) Definitions
background: Dominant sign color.
legend: All letters, numerals, tildes, bars, arrows, route shields, symbols, logos, borders, artwork, and
miscellaneous characters that are intended to convey specific meanings on traffic signs. The style,
font, size, and spacing of the legend must comply with the standard alphabets in the federal Standard
Highway Signs and Markings Book.
56-2.01A(3) Submittals
Submit a certificate of compliance for:
1.
2.
3.
4.
5.

Aluminum sheeting
Retroreflective sheeting
S
creened-process colors
Nonreflective, opaque, black film
Protective-overlay film

Upon request, submit test samples of sign panels and materials at various stages of production. Sign
panel samples must be at least 12 by 12 inches in size and include background material and legend.
Within 15 days before starting sign fabrication, submit at least 3 copies of your quality control plan for sign
panels. Allow 10 days for the Department's review. Do not start fabricating sign panels until the Engineer
accepts the quality control plan. The quality control plan must include:
1.
2.
3.
4.
5.

I dentification of the person responsible for sign quality control


Basis of acceptance for incoming raw materials at the fabrication plant
Type, method, and frequency of quality control testing at the fabrication plant
Types and brand names of retroreflective sheeting
List of the retroreflective sheeting manufacturer's approved process colors, protective overlay film,
and black nonreflective film, including the manufacturer's name and product name for each item
6. Retroreflective sheeting manufacturer's installation and splicing instructions
7. Recommended cleaning procedure for each product
8. Method of packaging, transporting, and storing signs
Do not submit a quality control plan for construction area signs specified in section 12-3.06.
56-2.01A(4) Quality Control and Assurance
Sign panels must be produced at a fabrication plant.
The Department may inspect signs at the fabrication plant or the job site. The Engineer will reject
damaged signs, defective signs, and signs with spelling errors before or after installation.
Whenever instrumental testing under ASTM D4956 is in dispute, the Engineer's visual test will determine
the color of the retroreflective sheeting, screened process colors, or film.

681

SECTION 56

SIGNS

Construction area signs and permanent signs must be free from blemishes that could affect serviceability
and detract from the general sign color and appearance when viewed during the daytime and nighttime
from a distance of 25 feet. The face of completed signs must be uniform, flat, smooth, and free of defects,
scratches, wrinkles, gel, hard spots, streaks, extrusion marks, and air bubbles. The front, back, and
edges of sign panels must be free of router chatter marks, burns, sharp edges, loose rivets, delaminated
skins, excessive adhesive over-spray, and aluminum marks.
Signs must not be chipped or bent.
56-2.01B Materials
56-2.01B(1) General
Reserved
56-2.01B(2) Fabrication
Retroreflective sheeting must be applied to sign panels at the fabrication plant under the retroreflective
sheeting manufacturer's instructions without appreciable stretching, tearing, and damage.
The orientation of the legend must comply with the retroreflective sheeting manufacturer's instructions.
The retroreflective sheeting on a sign panel with a minor dimension of 48 inches or less must be a single,
contiguous sheet without splices except for the splices produced during the manufacturing process of the
retroreflective sheeting. A sign panel with a minor dimension greater than 48 inches may have 1
horizontal splice in the retroreflective sheeting other than the splices produced during the manufacturing
process of the retroreflective sheeting.
Unless the retroreflective sheeting manufacturer's instructions require a different method, splices in the
retroreflective sheeting must overlap by a minimum of 1 inch. The retroreflective sheeting on either side of
a splice must not exhibit a color difference under incident and reflected light.
For signs composed of multiple panels, the legend must be placed across joints in a way that does not
affect the size, shape, spacing, and appearance of the legend on the assembled sign.
For formed panel signs, the retroreflective sheeting for the background and legend must be wrapped
around the interior vertical edges of each panel as shown to prevent delamination.
Sign information must be imprinted in 1/4-inch upper case letters and numerals. Locate this information
on the back, lower right of each sign panel so that it will not be blocked by a sign post or mounting frame.
Sign information must include:
1.
2.
3.
4.
5.

Phrase "Property of the State of California"


Sign fabricator's name
Month and year of fabrication
Type of retroreflective sheeting
Sheeting manufacturer's identification and lot number for the retroreflective sheeting

Sign information must be imprinted at the fabrication plant by die-stamping on aluminum panels or by an
equivalent method for fiberglass-reinforced plastic signs, such as affixing a die-stamped aluminum tag.
The information must not be painted, screened, inked, or engraved. The information must be imprinted in
a way that does not damage the face of the sign.
Where shown, a sign with protective-overlay film must be marked at the fabrication plant with a 3/8-inch
diameter dot. The dot must be placed on the lower border of the sign before applying the protective
overlay film. The fabricator must determine the application method and exact location of the dot except
the dot must not be placed on the legend or near bolt holes. The dot must be black if placed on a white
border and white if placed on a black border.
56-2.01B(3) Storage and Handling
Protect, transport, and store sign panels fabricated with screened-process colors under the retroreflective
sheeting manufacturer's instructions.
Transport sign panels so that the face of the panels are protected from damage and weather. Ship the
panels on pallets, in crates, or in tier racks. Ship the panels vertically on edge. Do not stack the panels
682

SECTION 56

SIGNS

horizontally. Place padding and protective materials between the panels as necessary. Keep the panels
dry during transit.
Store sign panels in a dry environment at all times. Store the panels vertically on edge whether indoors or
outdoors. Do not store the panels directly on the ground. Do not let the panels get wet during storage. In
areas of high heat and humidity, store the panels in enclosed, climate-controlled trailers or containers.
Store the panels indoors whenever the storage duration will exceed 30 days.
56-2.01B(4) Sign Panels and Fastening Hardware
Furnish mounting hardware for all types of sign panels, including:
1.
2.
3.
4.

Lag screws, nuts, bolts, and washers for roadside signs


Braces and wood block spacers for roadside signs
Type A-1 and Type A-2 mounting hardware for overhead, laminated panel signs
Type A-3 mounting hardware for overhead, formed panel signs

The exposed portion of the mounting hardware on the sign face, including rivets used to attach sheeting
to framing members, must have a factory, or field-applied finish that matches closely the color of the
background and legend where it is placed.
56-2.01B(5) Aluminum Sheeting
The alloy and temper of aluminum sheeting must comply with ASTM B209 for the designation specified.
Aluminum sheeting must be pretreated for corrosion resistance under ASTM B449. The surface of the
aluminum sheeting must be cleaned, deoxidized, and coated with a light, tightly adherent chromate
conversion coating free of powdery residue. The conversion coating must be Class 2 with a weight from
10 milligrams per square foot to 35 milligrams per square foot and an average weight of 25 milligrams per
square foot. After the cleaning and coating process, protect the aluminum sheeting from exposure to
grease, oils, dust, and contaminants.
Aluminum sheeting must be free of buckles, warps, dents, cockles, burrs, and defects resulting from
fabrication.
The base plate for standard route markers must be die cut.
56-2.01B(6) Retroreflective Sheeting
Retroreflective sheeting used for background and legend must comply with ASTM D4956 and must be on
the Authorized Material List for signing and delineation materials.
Type II, III, IV, VIII, IX, and XI retroreflective sheeting must have Class 1, 3, or 4 adhesive backing except
Type II retroreflective sheeting may have Class 2 adhesive backing. The adhesive backing must be
pressure sensitive and fungus resistant.
56-2.01B(7) Process Colors and Film
The type of material used for screened-process colors, nonreflective, opaque, black film, and protective
overlay film must be the type recommended by the retroreflective sheeting manufacturer.
The fabricator must perform all patterns, layouts, and set-ups necessary for the screening process.
The completed surface of the applied screened-process color must be flat and smooth.
Colored retroreflective sheeting must be used for the background. Reverse-screened-process color on
white retroreflective sheeting for signs with green, red, blue, and brown backgrounds may be substituted
for the background color.
The coefficient of retroreflection for reverse-screened-process colors used on white retroreflective
sheeting must be not less than 70 percent of the coefficient of retroreflection specified in ASTM D4956 for
the corresponding colored retroreflective sheeting.
The legend must be black, screened-process color or nonreflective, opaque, black film.

683

SECTION 56

SIGNS

Screened-process colors and nonreflective, opaque, black film must have equivalent outdoor
weatherability characteristics as the retroreflective sheeting specified in ASTM D4956. Nonreflective,
opaque, black film must be vinyl or acrylic material.
Cured, screened-process colors must be able to withstand removal when tested by applying the 3M
Company's Scotch brand cellophane tape no. 600 or equivalent tape over the color and removing it with a
single, quick motion at a 90 degree angle normal to the surface of the sign's face.
56-2.01C Construction
Do not chip or bend sign panels.

Do not install the legend at the job site.

Immediately replace sign panels exhibiting a significant color difference between daytime and nighttime.

Do not repair sign panels at the job site unless authorized.

56-2.01D Payment
Furnishing sign panels is measured by the dimensions shown.

The Department does not pay for furnishing sign panels until the sign panels are installed.

56-2.02 SINGLE SHEET ALUMINUM PANELS


56-2.02A General
Single sheet aluminum panels must be framed or unframed panels as determined from the sizes shown.
56-2.02B Materials
Aluminum sheeting for framed and unframed panels must be aluminum alloy 6061-T6 or 5052-H38.
Single sheet aluminum panels must not have a vertical splice in the aluminum sheeting. For a panel with
a depth greater than 48 inches, 1 horizontal splice is allowed in the aluminum sheeting.
For a framed panel, the framing members must be aluminum channel or rectangular aluminum tubing.
The framing members must be within 1/8 inch of the length shown.
Aluminum channels or rectangular aluminum tubings must be welded together as shown. Weld with the
inert gas-shielded arc welding process using E4043 aluminum-electrode filler wires. The filler width must
be equal to the wall thickness of the smallest welded channel or tubing.
Attach the aluminum sheeting to the frame with 3/16-inch-diameter rivets at the spacing shown. The rivets
must be at least 1/2 inch from the web channel edges. The rivets must be made of aluminum alloy 5052
and be anodized or treated with conversion coating to prevent corrosion.
Completed, single sheet, aluminum panels must be:
1. Within 1/8 inch of the dimensions shown
2. Flat within a tolerance of 1/32 in/lf of panel dimension in any direction as measured from a straight
line across the plane of the panel to the panel surface
56-2.02C Construction
Not Used
56-2.02D Payment
Not Used
56-2.03 FIBERGLASS-REINFORCED PLASTIC PANELS
56-2.03A General
Fiberglass-reinforced plastic panels must comply with ASTM D3841 and be on the Authorized Material
List for signing and delineation materials.
56-2.03B Materials
Fiberglass-reinforced plastic panels must be weather-resistant, Grade II, thermoset polyester laminate.
684

SECTION 56

SIGNS

The plastic must:


1. Be acrylic modified and UV stabilized for outdoor weatherability.
2. Contain additives designed to suppress fire ignition and flame propagation. When tested under ASTM
D635, the extent of burning must not exceed 1 inch.
3. Be stabilized to prevent the release of solvents and monomers. The front and back surfaces of the
laminate must be clean and free of constituents and releasing agents that could interfere with the
bonding of the retroreflective sheeting.
The color of fiberglass-reinforced plastic panels must be uniform gray under Munsell color notation N7.5
to N8.5.
Fiberglass-reinforced plastic panels must be cut from a single piece of laminate. Mounting bolt holes must
be predrilled. The predrilled bolt holes, panel edges, and the front and back surfaces of the panels must
be true and smooth. The panel surfaces must be free of visible cracks, pinholes, foreign inclusions,
warping, and wrinkles that might affect performance and serviceability.
Completed fiberglass-reinforced plastic panels must be:
1. At least 0.135 inch thick
2. Flat within a tolerance of 1/32 in/lf of panel dimension in any direction as measured from a straight
line across the plane of the panel to the panel surface
3. Within 1/8 inch of the dimensions shown
56-2.03C Construction
Not Used
56-2.03D Payment
Not Used
56-2.04 LAMINATED PANELS
56-2.04A General
Not Used
56-2.04B Materials
56-2.04B(1) General
Laminated panels must consist of a honeycomb core and extruded aluminum frame laminated between 2
sheets of aluminum sheeting to produce flat, rigid panels.
The face sheet must be a single contiguous sheet of 0.063-inch-thick aluminum sheeting, alloy 6061-T6
or 5052-H32. The back sheet must be a single, contiguous sheet of 0.040-inch-thick aluminum sheeting,
alloy 3003-H14.
The core material must be 0.26 lb/sq ft phenolic-impregnated kraft paper with the following properties:
1. Impregnated 18 percent phenolic by weight
2. 1/2-inch honeycomb cell size
3. Fungus resistant under MIL-STD-401B
The adhesive used to laminate the face and back sheets to the honeycomb core and extruded aluminum
frame must produce a bond that is strong, permanent, and resistant to oil and water. The Department will
reject a laminated panel if a 0.010 by 1/2-inch wide feeler gauge can be inserted to a depth of more than
1/2 inch between the extruded aluminum frame and the aluminum sheeting.
Laminated panels must be able to resist a wind load of 33 lb/sq ft with a bending safety factor of 1.25
when tested for the following simple span lengths:

685

SECTION 56

SIGNS

Panel type
A
B
H

Nominal panel
thickness
1 inch
1 inch
2-1/2 inches
2-1/2 inches

Simple span length


9'-0"
9'-0"
14'-6"
14'-6"

The tensile strength of laminated panels must be at least 40 lb/sq in when tested under ASTM C297 and
C481, Cycle B, after aging. Instead of spraying with hot water, the specimen must be totally immersed in
158 degree F hot water.
All laminated panels must comply with incremental gradations for the various sizes shown.
Individual laminated panels must not exceed 24'-0" in length and 5'-0" in depth. Individual laminated
panels must be fabricated as single units without horizontal and vertical joints, splices, and seams.
For signs exceeding 5'-0" in depth, use 2 laminated panels. Each laminated panel must be 5'-0" or less in
depth. You may use 3 laminated panels to avoid placing the legend over a horizontal joint if authorized.
Welds are not required on the side of the framing members where the face and back sheets will be
placed.
After laminating, 3/16-inch-diameter rivets must be placed at each corner of the perimeter frame through
the face and back sheets. The rivets must be made of aluminum alloy 5052 and be anodized or treated
with conversion coating to prevent corrosion.
Sealant must be placed at the corners of the perimeter frame to prevent water intrusion.
The face of a completed laminated panel must be flat within a tolerance of 3/32 in/lf of panel dimension
in any direction as measured from a straight line across the plane of the panel to the panel surface.
Wherever laminated panels adjoin, the gap between the adjoining edges must not deviate by more than
1/32 inch from a straight line placed from corner to corner. Nonadjoining edges must not deviate by more
than 1/8 inch from a straight line placed from corner to corner. The face and back sheets must be flush
with the perimeter frame. All panel edges must be smooth.
Laminated panels must be from -1/2 to +1/8 inch of the dimensions shown. The difference in the length
between adjoining panels of multiple-panel signs must not be greater than 1/2 inch.
56-2.04B(2) Roadside Laminated Panels
Laminated panels for roadside signs must be Type B or Type H as determined from the sizes shown.
For Type B panels:
1. Channel edges must be welded together to form the perimeter frame
2. Vertical tube spacers must be welded to the perimeter frame
For Type H panels:
1. Channel edges must be screwed to the tube channel edges with self-tapping hex head stainless steel
screws to form the perimeter frame.
2. Centerline panel tube must be welded to the perimeter frame along the horizontal centerline of the
panel. The centerline panel tube must be a single, contiguous extrusion without joints.
3. Vertical tube spacers must be welded to the perimeter frame and to the centerline panel tube.
56-2.04B(3) Overhead Laminated Panels
Laminated panels for overhead signs must be Type A.
Channel edges must be screwed to the modified H sections with self-tapping hex head stainless steel
screws to form the perimeter frame.
Aluminum mounting clamps for A-1 hardware must be cast aluminum alloy with a tensile strength of at
least 25 kips/sq in. The installed bolt torque must not exceed 100 in-lb.
686

SECTION 56

SIGNS

For signs exceeding 24'-0" in length, the Engineer determines the length of Type A panels if the panel
lengths are not shown, except individual panels must not exceed 24'-0" in length or 5'-0" in depth.
56-2.04C Construction
For multiple-panel signs, place a H-section closure extrusion in the top channel of the lower panel before
mounting the upper panel. When mounted, the bottom channel of the adjoining upper panel must fit
together as shown to enclose the H-section closure extrusion for the full length of the panel without gaps.
56-2.04D Payment
Not Used
56-2.05 FORMED PANELS
56-2.05A General
Reserved
56-2.05B Materials
Formed panels must be fabricated from a single, contiguous sheet of 0.063-inch-thick aluminum sheeting,
alloy 5052-H32.
Aluminum sheeting must be attached to struts with 3/16-inch-diameter anodized aluminum rivets. Rivet
through the sign face at the spacing shown after applying the background material and legend.
Formed edges must be square. Drilled mounting holes must be straight and perpendicular to the front and
back surfaces of the formed edges at the spacing shown. The Department rejects formed panel signs
with holes that are slanted or incorrectly spaced.
Completed formed-panel signs must be:
1. Flat within a tolerance of 1/8 in/lf of panel dimension in any direction as measured from a straight
line across the plane of the panel to the panel surface
2. Within 1/16 inch of the dimensions shown
56-2.05C Construction
Not Used
56-2.05D Payment
Not Used
56-3 OVERHEAD SIGN STRUCTURES
56-3.01 GENERAL
56-3.01A Summary
Section 56-3 includes specifications for constructing overhead sign structures.
Furnishing overhead sign structures includes furnishing anchor bolt assemblies, removable sign panel
frames, sign structure hardware, and fabricated sign structures at the job site, ready for installation,
including welding and surface finishing as required.
Installation of overhead sign structures includes installing anchor bolt assemblies, removable sign panel
frames, sign panels, and performing any welding, and painting or galvanizing required during installation.
The types of sign structures include:
1.
2.
3.
4.
5.

T
russ
Box beam-closed truss
T
ubular
Lightweight
Bridge mounted

56-3.01B Definitions
Reserved
687

SECTION 56

SIGNS

56-3.01C Submittals
56-3.01C(1) General
Reserved
56-3.01C(2) Shop Drawings
Before fabricating sign structures, submit 2 sets of shop drawings. Include the following:
1.
2.
3.
4.
5.
6.
7.
8.

Sign panel dimensions


Span lengths
P
ost heights
A
nchorage layouts
Proposed splice locations
Snugging and tensioning pattern for anchor bolts and high-strength bolted connections
Details for permanent steel anchor bolt templates
Quality control program including:
8.1. Methods
8.2. Equipment
8.3. Personnel
9. Details of clips, eyes, or removable devices for preventing damage to the finished galvanized or
painted surfaces used for:
9.1 Securing the sign during shipping
9.2 Lifting and moving during erection
Allow 30 days for the Department's review.
56-3.01D Quality Control and Assurance
56-3.01D(1) General
The Department inspects structural materials for sign structures at the fabrication site. You must:
1. Notify the Engineer when the materials are delivered to the fabrication site
2. Allow at least 10 days after delivery of the material for inspection before starting fabrication
Sign structures must be:
1. Free from kinks, twists, or bends
2. Uniform in appearance
Assemble the completed sections in the shop. Check sections for straightness, alignment, and dimension.
Correct any variation.
Select the undercoating for ungalvanized surfaces from the Authorized Material List.
56-3.01D(2) Welding
56-3.01D(2)(a) General
Perform NDT of steel members under AWS D1.1 and the requirements shown in the following table:

688

SECTION 56

SIGNS

Nondestructive Testing for Sign Structures

Weld location
Circumferential splices
around the perimeter of
tubular sections, poles,
and arms.
Longitudinal seam
Longitudinal seam
within 6 inches of a
circumferential splice.
Welds attaching base
plates, flange plates, or
pole or mast arm plates,
to poles or arm tubes

Weld type
CJP groove weld with backing ring

Minimum required NDT


100% UT or RT

CJP or PJP groove weld


CJP groove weld

Random 25% MT
100% UT or RT

CJP groove weld with backing ring


and reinforcing fillet

t 5/16 inch: 100% UT and


100% MT
t< 5/16 inch: 100% MT after
root weld pass and final weld
pass
100% MT

External (top) fillet weld for socket


type connections
NOTE: t = pole or arm thickness

56-3.01D(2)(b) Ultrasonic Testing


The acceptance criteria for UT must comply with Clause 6.13.3.1 of AWS D1.1, for welded joints of
members less than 5/16 inch thick or tubular sections less than 13 inches in diameter.
The acceptance-rejection criteria for UT must comply with Table 6.3 of AWS D1.1 for cyclically loaded
nontubular connections for other welded joints.
When performing UT, use an authorized procedure under AWS D1.1, Annex S.
56-3.01D(2)(c) Radiographic Testing
The acceptance criteria for radiographic or real time image testing must comply with AWS D1.1 for tensile
stress welds.
56-3.01D(2)(d) Longitudinal Seam Welds
The Engineer selects random locations for NDT.
Grind the cover pass smooth at the locations to be tested.
If repairs are required in a portion of a tested weld, perform NDT on the repaired portion and on 25
percent of the untested portions of the weld. If more repairs are required, perform NDT on the entire
longitudinal seam.
56-3.01D(2)(e) Circumferential Welds and Base Plate to Post Welds
Without authorization, you may make 1 repair to circumferential welds and to base plate-to-post welds.
Obtain authorization before making any additional repairs.
56-3.01D(3) Charpy V-notch Impact
Reserved
56-3.02 MATERIALS
56-3.02A General
Materials must comply with section 55.
Do not use weathering steel.
56-3.02B Bars, Plates, Shapes, and Structural Tubing
Bars and plates must be structural steel complying with one or more of the following:
1. ASTM A36/A36M
2. ASTM A709/A709M, Grade 36 or 50
689

SECTION 56

SIGNS

3. ASTM A572/A572M, Grade 50


Other open shapes must be structural steel complying with one or more of the following:
1. ASTM A36/A36M
2. ASTM A709/A709M, Grade 36 or 50
3. ASTM A992/A992M
Light fixture mounting channel must be continuous slot channel made from one of the following:
1. Steel complying with ASTM A1011/A1011M, Designation SS, Grade 33
2. Extruded aluminum of alloy 6063-T6 complying with ASTM B221 or B221M
Structural tubing and hollow structural sections must be structural steel complying with ASTM A500,
Grade B.
Surface flatness after galvanizing must comply with ASTM A 6/A 6M for the following:
1. Base plates that are to come in contact with concrete, grout, or washers and leveling nuts
2. Plates in high-strength bolted connections
56-3.02C Sheets
Sheets must be carbon-steel complying with ASTM A 1011/A 1011M, Designation SS, Grade 33.
56-3.02D Bolted Connections
Bolts, nuts, and washers must comply with section 55-1.02A(1).
Components of HS bolts must comply with section 55 for high strength steel fastener assemblies unless
the bolts are shown to be snug tight. Bolts, nuts, and washers for HS bolts shown to be snug tight must
comply only with section 55-1.02A(1).
Anchor bolts must comply with ASTM F 1554, Grade 55, weldable steel.
Use a permanent steel template to maintain the proper anchor bolt spacing.
Provide 1 top nut, 1 leveling nut, and 2 washers for the upper threaded portion of each anchor bolt.
56-3.02E Anchorages
Anchorages for bridge mounted sign structures must comply with the specifications for concrete
anchorage devices in section 75-1.03.
56-3.02F Pipe Posts
Pipe posts must be welded or seamless steel pipes. Pipe posts must comply with one of the following:
1. ASTM A 53/A 53M, Grade B
2. ASTM A 106/A 106M, Grade B
3. API Specification 5L PSL2 Grade B, Grade X42R or Grade X42M using nominal pipe sizes for
threaded end pipe
You may fabricate posts from structural steel complying with ASTM A 36/A 36M.
Spiral seam welds are not allowed.
56-3.02G Steel Walkway Gratings
Steel walkway gratings must comply with the following:
1. Gratings must be the standard product of an established grating manufacturer
2. Material for gratings must be structural steel complying with ASTM A 1011/A 1011M as specified for
Designation CS, Type B or Designation SS, Grade36, Type 1
3. For welded type gratings, each joint must be full resistance welded under pressure, to provide a
sound, completely beaded joint
4. For mechanically locked gratings:
690

SECTION 56

SIGNS

4.1. Method of fabrication and interlocking of the members must be authorized


4.2. Fabricated grating must be equal in strength to the welded type
5. Gratings must be accurately fabricated and free from warps, twists, or defects affecting their
appearance or serviceability including:
5.1. Ends of all rectangular panels must be square
5.2. Tops of the bearing bars and cross members must be in the same plane
5.3. Gratings distorted by the galvanizing process must be straightened
56-3.02H Elastomeric Bearing Pads
Elastomeric bearing pads must comply with section 51-3.02.
56-3.02I Safety Chain at Walkways
Safety chain at walkways must comply with ASTM A413, Grade 43. The nominal chain size must be 1/4
inch. Use the minimum length that allows lock-up of safety railing.
56-3.02J Safety Cable at Walkways
Safety cable at walkways must:
1. Be constructed of Type 302 or 304 stainless steel 7 by 19 wire strand core
2. Have a cable breaking strength of at least 10,000 lb
3. Not be prestretched
56-3.02K Fabrication
56-3.02K(1) General
Fabricate sign structures into the largest practical sections before galvanizing.
Affix clips, eyes, and removable brackets to all signs and all posts for securing the sign during shipping,
lifting, moving, and erection. Secure the sign as necessary to prevent damage to the finished galvanized
or painted surfaces.
Do not make any holes in members unless the holes are shown or authorized.
Form the posts for tubular sign structures to the radii shown by heat treatment or by fabrication methods
that will not:
1. Crimp or buckle the interior radius of the pipe bend
2. Change the physical characteristics of the material
56-3.02K(2) Bolted Connections
Except for HS bolts shown to be snug-tight, HS bolted connections must be HS assemblies complying
with section 55-1.02B(6) except assemblies must consist of:
1.
2.
3.
4.

HS steel bolts
Nuts
H
ardened washers
Direct tension indicators

HS fastener assemblies and any other bolts, nuts, and washers attached to sign structures must be zinc
coated by the mechanical deposition process.
Nuts for HS bolts at joints designated as snug-tight must not be lubricated.
Use an alternating snugging and tensioning pattern for anchor bolts and HS bolted splices. Once
tensioned, do not reuse HS fastener components.
For bolt diameters less than 3/8 inch, the diameter of the bolt hole must be not more than 1/32 inch larger
than the nominal bolt diameter.
For bolt diameters greater than or equal to 3/8 inch, the diameter of the bolt hole must be not more than
1/16 inch larger than the nominal bolt diameter.

691

SECTION 56

SIGNS

Fasten ribbed sheet metal panels for box beam-closed truss sign structures to the truss members with
one of the following:
1. C
ap screws.
2. Bolts.
3. 3/16-inch stainless steel blind rivets complying with Industrial Fasteners Institute, Standard IFI-114,
Grade 51. The outside diameter of the large flange rivet head must be not less than 5/8 inch in
diameter. Web splices in ribbed sheet metal panels may be made with a similar type of blind rivets of
a size suitable for the thickness of the material being connected.
56-3.02K(3) Identification Plate
Permanently attach an aluminum identification plate near the base using either stainless steel rivets or
stainless steel screws. Attach the plate adjacent to the traffic side on 1 of the vertical posts.
The information on the plate must include:
1. Name of the manufacturer
2. Date of manufacture
3. C
ontract number
56-3.02K(4) Walkway
The assembled and raised walkway safety railing must have less than 1 inch of wobble when a 50-lb
horizontal load is applied alternating each way at the top center of each railing section.
Safety cable at walkways must be continuous between lugs. Before tightening cable clips at the end
anchorage, remove the slack in the cable by the full effort of a typical construction worker.
Safety cable at walkways must not be kinked, knotted, deformed, or spliced.
Install clips at safety cables under the manufacturer's instructions.
56-3.02K(5) Handholes
The edges of handholes and other large pole openings must be ground smooth. The roughness of edges
must be less than 0.001 inch.
56-3.02L Welding
Welding of steel overhead sign structure members must comply with AWS D1.1.
PJP longitudinal seam welds for tapered tubular members must have at least the minimum penetration
shown but not less than 60 percent penetration. Within 6 inches of circumferential welds, longitudinal
seam welds must be CJP groove welds. Longitudinal seam welds on structures with telescopic splices
connecting pole segments must be CJP groove welds on the female end with a length equal to the
designated slip fit splice length plus 6 inches.
Except for welds at posts shown as PJP welds, longitudinal seam welds of fabricated pipe posts must be
CJP groove welds.
The length of telescopic slip-fit splices must be at least 1.5 times the inside diameter of the exposed end
of the female section.
56-3.02M Surface Finish
56-3.02M(1) General
Galvanize all ferrous metal parts of the following sign structure types:
1.
2.
3.
4.
5.

T
russ
Lightweight
Bridge mounted
Box-beam-closed truss, clean and paint all ferrous metal parts after galvanizing
Tubular, clean and paint all ferrous metal parts after galvanizing

Do not treat galvanized surfaces with chemicals before cleaning and painting.
692

SECTION 56

SIGNS

Galvanize and do not paint walkway gratings, walkway brackets, gutters, safety railings, steel mountings
for light fixtures and all nuts, bolts, and washers for sign structures after fabrication.
56-3.02M(2) Galvanizing
Galvanizing must comply with section 75-1.05 except surfaces may be coated with zinc by the thermal
spray coating process if authorized.
If authorized to use thermal spray coating, apply the coating under section 59-10. The thickness of the
sprayed zinc coat must be at least 5 mils.
Do not use zinc solders or zinc alloys that contain tin to repair a damaged galvanized surface.
56-3.02M(3) Cleaning and Painting
56-3.02M(3)(a) General
Clean and paint sign structures under section 59-5 and section 59-3.
Clean and paint all exterior surfaces of tubular and box beam-closed truss type sign structures, including
the areas to be covered by sign panels.
56-3.02M(3)(b) Undercoating of Ungalvanized Surfaces
Blast-cleaned surfaces must receive a single undercoat consisting of an inorganic zinc coating as
specified in AASHTO M 300, Type I or Type II, except:
1. The first 2 sentences of section 5.6 do not apply
2. Section 5.6.1 does not apply
If you propose to use a coating that is not on the Authorized Material List, submit the required
documentation specified in section 5.6 of AASHTO M 300. Allow 30 days for the Engineer's review.
56-3.02M(3)(c) Testing of Inorganic Zinc Coating
Perform adhesion and hardness testing no sooner than 72 hours after application of the single undercoat
of inorganic zinc coating.
56-3.02M(3)(d) Finish Coating
The exposed area of inorganic zinc coating must receive a minimum of 2 finish coats of exterior grade
latex paint.
The 2nd finish coat color must match no. 24491 of FED-STD-595. The total dry film thickness of the
applications of the 2nd finish coat must be not less than 2 mils.
56-3.03 CONSTRUCTION
56-3.03A General
Do not fasten bridge-mounted sign to concrete elements of bridges or railings before the concrete attains
a compressive strength of 2,500 psi.
After erection, remove the brackets used to secure tubular sign structures during shipping and lifting.
Install laminated and formed sign panels on sign structures using fastening hardware of the type and
sizes shown.
Install sign panels as shown.
56-3.03B Foundations
Complete the CIDH concrete pile foundation at least 7 days before erecting the sign structure.
56-3.03C Electrical Installation
Electrical installations must comply with section 86.
56-3.04 PAYMENT
The weight of removable sign panel frames and anchorage assemblies is included in the weight for sign
structures.
693

SECTION 56

SIGNS

The weight of sign panels is not included in the weight of sign structures.

Extruded aluminum used for steel slot channel for the light fixture mounting channel is measured and paid

for on the basis of the computed weight of the steel channel.

Electrical installations are paid under section 86.

The payment for furnishing sign panels is not included in the payment for furnish and install sign

structure.

56-4 ROADSIDE SIGNS


56-4.01 GENERAL
56-4.01A Summary
Section 56-4 includes specifications for constructing roadside signs.
Roadside signs include installation of sign panels, fastening hardware, back braces, straps and saddle
brackets, and frame assemblies for multiple sign panels.
A roadside sign includes a traffic sign with 1 or more sign panels attached to a supporting structure. A
supporting structure is typically 1 or 2 posts, a signal standard, or an electrolier.
56-4.01B Definitions
Reserved
56-4.01C Submittals
Reserved
56-4.01D Quality Control and Assurance
Signs must not be chipped or bent.
56-4.02 MATERIALS
56-4.02A General
Reserved
56-4.02B Metal Posts
Mountings for roadside signs to be installed on barriers or railings must be fabricated from (1) welded or
seamless steel pipe under ASTM A53/A53M, Grade B, and (2) structural steel complying with ASTM
A36/A36M.
Bolted connections must comply with section 56-3.02D. Concrete anchorage devices must comply with
section 75-1.03.
All metal parts for mounting roadside signs must be galvanized after fabrication. Galvanization must
comply with section 75-1.05.
56-4.02C Wood Posts
Wood posts must comply with the allowable grades and species for the sizes shown in the following table:

694

SECTION 56

SIGNS

Allowable grades and species


Select heart redwood
No. 1 heart structural redwood (1050f)
No. 2 heart structural redwood (900f)
4 x 4 inches
No. 1 structural light framing Douglas fir, free of heart center
No. 1 structural light framing Hem-Fir, free of heart center
No. 1 structural light framing Southern yellow pine, free of
heart center
Select heart grade redwood
Select heart structural grade redwood (1100f)
No. 1 heart structural redwood (950f)
4 x 6 inches
No. 2 structural joists and planks, Douglas fir, free of heart
center
No. 1 structural joists and planks Hem-Fir, free of heart center
No. 2 structural joists and planks Southern yellow pine
Select heart redwood
No. 1 heart structural redwood (950f)
No. 1 posts and timbers (also known as No. 1 structural)
Greater than 4 x 6 inches
Douglas Fir, free of heart center
Select structural posts and timbers Hem-Fir, free of heart
center; and No. 1 timbers Southern yellow pine, free of heart
center
a
Sizes shown are minimum dressed dry sizes
Nominal post size

Posts must be graded as specified in section 57-2.01B(2). The sweep must not exceed 0.08 foot in 10
feet.
Before preservative treatment, the moisture content of Douglas fir, Hem-Fir, and Southern yellow pine
posts must be not more than 25 percent at the midpoint of the post in the outer 1 inch as measured under
ASTM D4444 with an authorized moisture meter.
When delivered to the job site, treated posts must have a moisture content of not more than 25 percent
when tested as described above, and must comply with the specified grading requirements.
Douglas Fir and Hem Fir posts must be treated under sections 57-2 and under AWPA U1, Use Category
UC4A, Commodity Specification A. Posts must be incised, and the minimum retention of preservative
must be as specified in the AWPA requirements.
You may cut the ends of wood posts at the job site. Wherever cutting or boring is performed after treating
posts with preservative, manually apply preservative to the cuts and holes under section 57-2.01C(3)(b).
Treat wood block spacers inserted between the post and sign panel on single-post installations with wood
preservative under section 57-2.
Unless described otherwise, do not paint wood posts and block spacers.
56-4.02D Laminated Wood Box Posts
The Department furnishes laminated wood box posts with attached metal caps at the top of each post.
If you do not immediately use laminated wood box posts, neatly stack them on dunnage. Handle the
posts in a way that does not damage the posts.
56-4.02E Sign Panel Fastening Hardware
Frame assemblies for multiple sign installations must be fabricated from structural steel complying with
ASTM A36/A36M or aluminum alloy as shown. Frames fabricated from structural steel must be hot-dip
galvanized after fabrication.
Back braces for signs must be commercial quality, mild steel, and hot-dip galvanized after fabrication.

695

SECTION 56

SIGNS

Straps and saddle brackets for mounting sign panels on electroliers, sign structure posts, and traffic
signal standards must be stainless steel under ASTM A167, Type 302 or 304. Where shown, theft-proof
bolts must be stainless steel with a chromium content of at least 16 percent and a nickel content of at
least 8 percent.
Except for theft-proof bolts, the lag screws, bolts, metal washers, and nuts must be commercial quality
steel and hot-dip galvanized after fabrication. Fiber washers must be commercial quality.
Galvanizing must comply with section 75-l.05.
56-4.03 CONSTRUCTION
56-4.03A General
Excavate post holes to the depth shown. Place posts in the holes.
Backfill the space around wood posts to the completed ground surface with selected earth or sand that is
free of rocks or other deleterious material. Backfill the space around laminated wood box posts to the
completed ground surface with granular material. Place the backfill material in layers approximately 1/3
foot thick. Moisten and thoroughly compact each layer.
Drill 2 holes in each wood post to provide the breakaway feature shown.
Backfill material for metal posts must be minor concrete. Minor concrete must contain at least 463 pounds
of cementitious material per cubic yard.
Dispose of surplus excavated material uniformly along the adjacent roadway.
The line between the center of the top of a post and the center of the post at ground level must not
deviate from a plumb line by more than 0.02 foot in 10 feet.
Make breakaway saw cuts and holes for the saw cuts in laminated wood box posts after installation of the
posts. Do not splice the posts. You may make 1 trim cut at the bottom of the post.
Drill holes for bolts, threaded rods, or expansion anchorage devices drilled in existing concrete by a
method that will not shatter the concrete adjacent to the holes.
Repair any spalling or chipping of concrete structures at your expense.
Apply standard commercial polyvinyl chloride tape, polyethylene tape, or other authorized corrosion
resistant barrier to the areas on metal sign surfaces or hardware that will be in contact with treated wood.
Before inserting bolts, fill all bolt holes with the hardware manufacturer's recommended corrosion
protection grease that will not melt or run at a temperature of 150 degrees F. The corrosion-resistant
barrier and grease is not required if wood posts and blocks are treated with pentachlorophenol in
hydrocarbon solvent.
Salvage or remove and dispose of existing sign panels as shown.
56-4.03B Sign Panel Installation
Install sign panels as shown.
Attach sign panels to metal and wood posts, laminated wood box posts, electroliers, sign structure posts,
traffic signal standards, and mast arms with fastening hardware of the types and sizes shown.
Install lag screws by turning the lag screw into pilot holes by use of a wrench. Bore the pilot holes with a
bit diameter equal to the root diameter of the lag screw thread.
56-4.04 PAYMENT
A roadside sign consisting of 1 post with attached sign panels is paid for as 1 roadside sign - one post. An
installed roadside sign consisting of 2 posts with attached sign panels is paid for as 1 roadside sign - two
post.
A roadside sign consisting of 1 or 2 laminated wood box posts with attached sign panels is counted as 1
roadside sign and paid for as install roadside sign (laminated wood box post).

696

SECTION 56

SIGNS

A roadside sign mounted on a barrier or railing is measured by scale weighings and paid for as metal (rail
mounted sign). Scale weighings include pipe posts, base plates, anchorage assemblies, and other metal
parts except sign panels and sign-panel fastening hardware.
Type N (CA), Type P (CA), and Type R (CA) marker panels are paid for as roadside signs.
Payment for furnishing sign panels is not included in the payment for roadside sign.
56-5 INSTALL SIGN PANEL ON EXISTING FRAME
56-5.01 GENERAL
Section 56-5 includes specifications for installing sign panels on existing frames in place.
56-5.02 MATERIALS
Not Used
56-5.03 CONSTRUCTION
Salvage or remove and dispose of existing sign panels as shown.

Install sign panels on existing frames with fastening hardware specified in section 56-2.01B(4).

56-5.04 PAYMENT
Payment for furnishing sign panels is not included in the payment for install sign panel on existing frame.
56-6 INSTALL REMOVABLE SIGN PANEL FRAME
56-6.01 GENERAL
Section 56-6 includes specifications for furnishing and installing removable sign panel frames with sign
panels attached on new or existing sign structures.
56-6.02 MATERIALS
Not Used
56-6.03 CONSTRUCTION
Salvage or remove and dispose of existing sign panels and removable sign panel frames as shown.

Install removable sign panel frames as shown.

Install sign panels on removable sign panel frames with fastening hardware specified in section 56
2.01B(4).

56-6.04 PAYMENT
A removable sign panel frame consisting of a single removable sign panel frame with attached sign
panels is counted as 1 removable sign panel frame.
Payment for furnishing sign panels is not included in the payment for furnish removable sign panel frame
with sign panels attached and install removable sign panel frame.
56-7 SIGN OVERLAY
56-7.01 GENERAL
Section 56-6 includes specifications for installing sign overlays.
Sign overlay includes furnishing sign overlay.
56-7.02 MATERIALS
Sign overlay materials must comply with section 56-2.01B.
56-7.03 CONSTRUCTION
Install sign overlay as shown.
Self-plugging blind rivets for installing sign overlays must have a 3/16 by 5/8-inch shank. Drill the rivet
holes with a no. 10 drill bit. If the overlay is not pre-punched, the maximum rivet spacing must be 16
inches.
697

SECTION 56

SIGNS

If the existing sign panel is porcelain enameled steel, drill the rivet holes with a diamond bit. Cover the
exposed metal around the hole with a thin coat of silicone adhesive.
56-7.04 PAYMENT
Not Used

698

57 WOOD AND PLASTIC LUMBER STRUCTURES


57-1 GENERAL
57-1.01 GENERAL
57-1.01A Summary
Section 57-1 includes general specifications for constructing wood and plastic lumber structures.
57-1.01B Definitions
hardware: Bolts with necessary nuts and washers, timber connectors, drift pins, dowels, nails, screws,
spikes, wire rope for wrapping, lag screws, and other metal fastenings.
structural metal: Structural shapes, eyebars, castings, rods with necessary nuts and washers, metal
shoes, and plates, but not including hardware.
57-1.01C Submittals
Reserved
57-1.01D Quality Control and Assurance
Reserved
57-1.02 MATERIALS
57-1.02A General
Deliver, store, and handle timber and lumber as follows:
1.
2.
3.
4.

Store in piles at the job site unless it is to be placed in the structure immediately.
Stack neatly on dunnage above ground such that it can be readily inspected.
Store and handle such that injury and breakage are avoided.
Protect from the sun to prevent warping.

57-1.02B Structural Metal


Structural metal must comply with section 75-1.03.
Hot-dip galvanize structural metal under section 75-1.05.
57-1.02C Hardware
Hardware must comply with section 75.

Except for malleable iron washers, hot-dip galvanize hardware under section 75-1.05.

Bolts and nuts must comply with ASTM A 307.

Machine bolt heads and nuts must be regular square series and threads must be coarse thread series,

Class 2 tolerance, all complying with ANSI Standard.

Washers must be cast iron ogee, malleable iron, plate, or cut washers.

Nails must be common wire nails.

Wire rope must be commercial-quality galvanized steel wire rope. Splices and end connections of wire

rope must be made with metal clips.

57-1.03 CONSTRUCTION
Not Used
57-1.04 PAYMENT
Timber and lumber are measured from nominal widths and thicknesses and the actual lengths of the
pieces in the completed structure.

699

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

57-2 WOOD STRUCTURES

57-2.01 GENERAL
57-2.01A General
57-2.01A(1) Summary
Section 57-2 includes specifications for constructing wood structures.
57-2.01A(2) Definitions
Reserved
57-2.01A(3) Submittals
Submit a certificate of compliance for timber and lumber stating the species of the material to be shipped
and including a certified grading report. If timber is treated, include a certified treating report.
Submit a certificate of compliance for glued laminated timbers and glued laminated decking.
57-2.01A(4) Quality Control and Assurance
Treated and untreated timber and lumber must comply with the grading specifications when delivered to
the job site.
57-2.01B Materials
57-2.01B(1) General
Grease used to fill bolt holes must be recommended by the manufacturer for corrosion protection and
must not melt or run at a temperature of 150 degrees F.
57-2.01B(2) Structural Timber and Lumber
Structural timber and lumber must be one of the species shown in the following table:
Type
Douglas fir
Hem-Fir
Redwood
Southern yellow pine

Species
Pseudotsuga menziesii
Abies magnifica, Abies grandis, Abies procera, Abies
amabillis, Abies concolor, Tsuga heterophylla
Sequoia sempervirens
One of the species recognized by the Southern Pine
Inspection Bureau

Inspect and grade mark structural timber and lumber.

Grade the timber and lumber under the rules and specifications shown in the following table:

Type
Douglas fir and Hem-Fir

Redwood
Southern yellow pine

Timber and Lumber Grading


Rules/specifications and publisher
Standard No. 17 Grading Rules for West Coast Lumber
published by West Coast Lumber Inspection Bureau
or
Western Lumber Grading Rules published by Western
Wood Products Association
Standard Specifications for Grades of California Redwood
Lumber published by Redwood Inspection Service
Standard Grading Rules for Southern Pine Lumber
published by Southern Pine Inspection Bureau

Stress-graded lumber must comply with the following:


1. Wood must be sound and free from decay.
2. Green timber must be protected from uneven seasoning during transit.
3. Douglas fir must be end coated with a protective coating during manufacturing to retard checking.

700

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

For all stress-grades, the sizes described for timber and lumber are nominal sizes under American
Softwood Lumber Standard, PS 20, published by NIST.
Plywood must be 3/4-inch-thick Grade BC Douglas fir plywood manufactured with adhesives for wet use
and must be preservative treated.
Each glued laminated timber or decking unit must bear the American Institute of Timber Construction
quality mark.
Glued laminated timbers must be architectural grade with glue for wet use and saw-textured exposed
surfaces.
Glued laminated timbers must comply with Product Standard PS 56 published by NIST and Standard 117
published by the American Institute of Timber Construction.
Glued laminated decking units must be:
1.
2.
3.
4.
5.

Douglas fir, white pine, or Hem-Fir


Kiln-dried solid stock lumber
Factory laminated using adhesive for wet use
At least 3 plies thick, with tongue and groove edges
At least 5.5 inches in width and thickness

The surface of glued laminated decking units at exposed faces must be saw textured.
57-2.01B(3) Preservative Treatment
Where preservative treatment of timber and lumber is specified, treat the timber, lumber, and piling after
millwork is completed.
Preservative-treated timber must be Douglas fir or Hem-Fir.
Preservatives, treatment, and treatment results must comply with AWPA Standards U1 and T1 and the
specified AWPA Use Category. If a Use Category is not specified, the preservative treatment must
comply with AWPA U1, Use Category UC4B.
Chromated copper arsenate must not be used for preservative treatment.
The treating plant must imprint legible symbols in the ends of all treated timber and lumber. The symbols
must indicate the name of the treating company and the type and year of treatment under AWPA
Standards M1 and M6.
Where timber is specified to be kiln dried before treatment, the moisture content after drying and
immediately before treating must not exceed 25 percent. Measure the moisture content under ASTM D
4444 at the midpoint of the piece in the outer 1 inch. Use an authorized type of moisture meter.
Timber and lumber treated with waterborne preservatives must be dried after treatment and have a
moisture content of no more than 25 percent when shipped to the job site.
For treated wood that is to be painted, use a waterborne wood preservative.
Manually applied wood preservative must be creosote or copper naphthenate complying with AWPA
Standard M4.
57-2.01C Construction
57-2.01C(1) General
Reserved
57-2.01C(2) Framing
Timber and lumber must be accurately cut and framed to a close fit and must have even bearing over the
entire contact surface. Do not use shimming in making joints.
Bore fastener holes as shown in the following table:

701

SECTION 57
Fastener type
Drift pin or
dowel

Bolt
Lag screw
Boat or wire
spike

WOOD AND PLASTIC LUMBER STRUCTURES

Fastener Bore Holes

Member type
Boring requirement
Untreated timber
Hole diameter a minimum of 1/16 inch less
than the pin or dowel diameter
Treated timber
Hole diameter the same as the pin or dowel
diameter
All cases
Hole diameter a maximum of 1/16 inch
larger than the bolt diameter
All cases
Bit diameter a maximum of the root
diameter of the lag screw thread
Small member, if necessary
Bit diameter the same as the spike diameter
to prevent splitting
or the smallest dimension of the spike

Fit each bolt 5/8 inch or less in diameter with a cut washer. Fit each bolt or lag screw over 5/8 inch in
diameter with a cast or malleable iron washer.
Framed bents must comply with the following:
1. Mud sills must be firmly and evenly bedded in solid material.
2. Sills must have full, even bearing on the pedestals, mud sills, or piles.
3. Posts must be framed true and must have full bearing on pedestals, sills, and caps.
Align bents before placing bracing. Provide a minimum of 8 inches between the outside bolt and the end
of the brace.
For bridge deck stringers, place the better edge down. After placing stringers, the tops of the stringers
must not vary from a plane more than will allow bearing of the floor on all the stringers.
Wheel guards and railings must be accurately framed and aligned.
57-2.01C(3) Treated Timber
57-2.01C(3)(a) General
Section 51-2.01C(3) applies to treated timber.

Do not remove bolts and hardware using flame-type or air-arc cutting equipment.

Predrill for bridge spikes within 1 foot of the ends of existing timbers and new planking. Predrill elsewhere

if necessary to avoid splitting the timber or bending the spikes.

If authorized, you may relocate the holes for new bolts and drift pins to avoid conflicts with existing

hardware embedded in existing wood.

For lumber treated with ammoniacal copper arsenate, ammoniacal copper zinc arsenate, ammoniacal

copper quat, or copper azole:

1. Fill bolt holes with grease before inserting bolts


2. Use nylon spacers, polyethylene tape, or other authorized corrosion-resistant barrier on surfaces of
hardware that will be in contact with treated wood
57-2.01C(3)(b) Manual Treatment
Do not manually apply preservative to unprotected wood in wet or damp weather or to wood with a
moisture content exceeding 25 percent or with free surface moisture.
If manually applying preservative, use suitable brushes for exposed surfaces, use swabs for holes, or use
other means that result in adequate coverage.
If treated timber is framed, cut, or bored after treatment, thoroughly swab each cut, dap, or hole with 2
applications of the same preservative specified for the timber treatment or of copper naphthenate.
Manually treat the following items with 2 applications of wood preservative:

702

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

1. Portions of rail posts to be embedded in earth or concrete


2. Faces of timber bulkheads to be in contact with earth except those of treated Douglas fir
57-2.01C(3)(c) Handling
Handle and care for pressure-treated wood materials under AWPA Standard M4.

Handle treated timber with rope slings.

Do not use cant hooks, peaveys, or other sharp instruments to handle treated timber.

57-2.01C(4) Painting
For painted timber and lumber, comply with section 59.
Paint the following items with 1 application of latex-base wood primer and 2 applications of white exterior
latex-base paint:
1.
2.
3.
4.

Rails
Portions of rail posts not embedded in earth or concrete
Wheel guards or timber curbs except the bottom faces over an earth surface
Exposed faces of posts

57-2.01D Payment
Not Used
57-2.02 TIMBER LAGGING
57-2.02A General
57-2.02A(1) Summary
Section 57-2.02 includes specifications for installing timber lagging for soldier pile retaining walls.
57-2.02A(2) Definitions
Reserved
57-2.02A(3) Submittals
Reserved
57-2.02A(4) Quality Control and Assurance
Reserved
57-2.02B Materials
Timber members must be preservative-treated Douglas fir and must be full sawn to the dimensions
shown.
57-2.02C Construction
If no concrete facing is shown:
1. Lagging members 4 inches thick or less must be installed with a 3/8-inch gap between members
2. Lagging members greater than 4 inches thick must be installed with a 1/2-inch gap between members
If a concrete facing is shown, install the lagging members with mortar-tight joints.
57-2.02D Payment
Not Used
57-2.03 TIMBER CATWALK
57-2.03A General
57-2.03A(1) Summary
Section 57-2.03 includes specifications for constructing timber catwalks.
A timber catwalk consists of a walkway of two 3- by 12-inch planks bolted to steel supports and a cable
handrail, if shown.
703

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

57-2.03A(2) Definitions
Reserved
57-2.03A(3) Submittals
Reserved
57-2.03A(4) Quality Control and Assurance
Reserved
57-2.03B Materials
57-2.03B(1) General
Reserved
57-2.03B(2) Timber Planks
The timber planks must be untreated Douglas fir Dense no. 1, rough sawn on top, optional surfaced on
bottom.
57-2.03B(3) Cable Handrail
The cable for the cable handrail must be wire rope with a minimum diameter of 1/2 inch and a minimum
breaking strength of 7,500 lb. Galvanize the cable with a Class A coating under ASTM A 603.
The turnbuckles, U-bolts, and thimbles must be commercial quality. The turnbuckles must be steel pipe
type or drop forged steel and must have jaw or eye ends. The turnbuckles and U-bolts must have a
minimum breaking strength of 7,500 lb.
The cable clamps and other required fittings must be commercial-quality steel, malleable iron, or wrought
iron.
The hardware, turnbuckles, U-bolts, cable clamps, and other fittings must be galvanized under section
75-1.05.
57-2.03C Construction
Tension the handrail cables to provide taut railings between supports.
Steel surfaces to be covered by timber must be painted the full number of applications specified before
placing timber. Painting of timber planks is not required.
57-2.03D Payment
Timber catwalk is measured along its length.
57-2.0457-2.08 RESERVED
57-3 PLASTIC LUMBER STRUCTURES
57-3.01 GENERAL
57-3.01A Summary
Section 57-3 includes specifications for constructing plastic lumber structures.
57-3.01B Definitions
postconsumer waste: Finished material, not including manufacturing waste, that has completed its life
cycle as a consumer item and would have been disposed of as a solid waste.
production lot of plastic lumber: Quantity of 100 cu yd or less that is ready for shipment to the job site
and is of the same type, manufactured by the same method, and made of the same material.
recycled product: Material, good, or supply, of which at least 50 percent of its total mass consists of
secondary waste and at least 10 percent of its total mass consists of postconsumer waste.
secondary waste: Finished products or fragments of finished products of a manufacturing process,
including postconsumer waste but not including excess virgin resources of the manufacturing
process.

704

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

57-3.01C Submittals
Submit 5 sets of shop drawings for the plastic lumber for initial review. After review, submit from 6 to 12
sets, as requested, for authorization and use during construction.
Shop drawings must show:
1. Details for component layout and connections
2. Sequence of shop and field assembly
3. Installation procedures
Submit the following product data:
1.
2.
3.
4.

Manufacturer's material test reports


Manufacturer's performance data
MSDSs
2 copies of the printed literature for the product

Submit a certificate of compliance for each shipment of plastic lumber. The certificate must be
accompanied by a laboratory test report.
Submit test samples for void testing.
Submit stiffness test results.
57-3.01D Quality Control and Assurance
57-3.01D(1) General
Start a new production lot if any production parameter changes before the maximum production lot size is
reached.
57-3.01D(2) Stiffness Test
Before shipment to the job site, perform stiffness tests for the plastic lumber in the presence of the
Engineer at an authorized laboratory. Notify the Engineer at least 15 days before conducting the tests.
The Engineer randomly selects 2 test samples from each production lot for stiffness testing.
Determine the stiffness and the yield stress in bending under ASTM D 790, except the test samples must
have a minimum length of 13 feet and tests must be performed on a 12-foot span length at a crosshead
motion of 0.25 inch per minute. Calculate the stiffness using the secant modulus at the flexural strain of
0.010 inch per inch.
If the stiffness or the yield stress in bending of either of the 2 test samples does not comply with section
57-3.02A, perform a retest on 2 additional test samples selected by the Engineer.
If the stiffness or the yield stress in bending of either of the 2 additional test samples does not comply with
section 57-3.02A in the retest, the entire production lot of plastic lumber represented by the test samples
is rejected.
57-3.01D(3) Void Tests
57-3.01D(3)(a) General
Before use in the work, the plastic lumber must be tested for both exterior and interior voids.
Allow 15 days for void testing.
The Engineer selects 2 test samples of each size from each production lot of plastic lumber delivered to
the job site.
57-3.01D(3)(b) Exterior Void Test
The Engineer examines the test samples for exterior voids.
If the exterior voids of either of the 2 test samples do not comply with section 57-3.02A, the Engineer
selects 2 additional test samples and performs a retest.

705

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

If the exterior voids of either of the 2 additional test samples do not comply with section 57-3.02A in the
retest, the entire production lot of plastic lumber represented by the test samples is rejected.
57-3.01D(3)(c) Interior Void Test
After acceptance under the exterior void test, cut the test samples into 1-foot-long segments. The
Engineer examines the cut sections for interior voids.
If the interior voids of a cut section of either of the 2 test samples do not comply with section 57-3.02A,
the Engineer selects 2 additional test samples and performs a retest.
If the interior voids of a cut section of either of the 2 additional test samples do not comply with section
57-3.02A in the retest, the entire production lot of plastic lumber represented by the test samples is
rejected.
57-3.02 MATERIALS
57-3.02A General
Plastic lumber must:
1.
2.
3.
4.

Be produced continuously and homogeneously without joints


Be straight and true and free from twist, curvature, bulging, or other deformations
Have a smooth outer layer with no visible voids
Not vary from the dimensions shown by more than 1/2 inch for the cross-sectional dimensions or 1
inch for the length
5. Have total resistance to marine borers and dry rot and must not swell, shrink, or crack
6. Comply with the physical property requirements shown in the following table:
Property
Density
Water absorption
Brittleness
Hardness
UV deterioration

Abrasion

Chemical resistance

Test
ASTM D 792,
Test Method A
ASTM D 570
ASTM D 746
ASTM D 2240,
Type D
ASTM D 4587a
ASTM D 2240,
Type D
ASTM D 4060
Cycles: 10,000
Wheel: CS17
Load: 1 kg
ASTM D 543
Practice A,
Procedure 1
ASTM D 696

Requirement
Skin: 880 kg/m3 min
Core: 680 kg/m3 min
Max increase in weight of 1.0 percent at 2
hours and 3.0 percent at 24 hours
Skin: No break at -40 C
Skin: 4575
Skin: After 500 hours of exposure,
hardness must not have changed by more
than 10 percent
Skin:
Weight loss: < 500 mg
Wear index: 2.53.0
Sea water: < 1.5 percent weight increase
Gasoline: < 7.5 percent weight increase
No. 2 diesel: < 6.0 percent weight increase
0.00009/C max

Coefficient of thermal
expansion
Ignition temperature
ASTM D 1929
> 340 C
a
ASTM D 4329 using UVA 340 bulbs operating at a UV intensity of 0.77 W/m2/nm
measured at 340 nm. The exposure cycle must be 4 hours of UV exposure at 60
degrees C and 4 hours of condensate exposure at 40 degrees C.

Stiffness and yield stress in bending of plastic lumber must have at least the values shown in the
following table:

706

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

Cross section size


Stiffness EI
Yield stress in bending
(inches)
(kip-sq ft)
(psi)
8 x 10
932
4,650
8 x 12
883
3,775
10 x 10
1,764
3,900
10 x 12
1,830
3,625
12 x 12
2,892
3,050
NOTE: These values are for the weak axis of rectangular sections.

For the exterior voids at each exposed end of plastic lumber:


1. Maximum dimension of any void must not exceed 1 inch.
2. Total number of voids with a maximum dimension greater than 1/4 inch must not exceed 4.
For the interior voids in the cut sections of each segment of plastic lumber:
1. Maximum dimension of any void in a cut section must not exceed 1/2 inch.
2. Total area of voids in a cut section must not exceed 5 percent of the total cross-sectional area.
Permanently mark each piece of plastic lumber with the manufacturer's name.

Ship and store plastic lumber in a way that minimizes scratching or damage to the outer surfaces.

57-3.02B Reinforced Recycled Plastic Lumber


Reinforced RPL must consist of recycled plastic reinforced with fiberglass reinforcing bar elements,

fiberglass filaments, or a combination of both.

Reinforced RPL must be a recycled product.

Fabricate reinforced RPL from one or more of the following thermoplastics:

1.
2.
3.
4.

High-density polyethylene
Medium-density polyethylene
Low-density polyethylene
High-density polypropylene

Reinforced RPL must have a dense outer skin at least 3/16 inch thick surrounding a less dense core. The
plastic for the outer skin must be mixed with colorants to match color no. 37030 or 30097 of FED-STD
595 and must contain a UV inhibitor and antioxidants.
Fiberglass reinforcing bar elements must comply with the requirements shown in the following table:
Property
Flexural strength
Compression modulus
Tensile strength

Test
ASTM D 790
ASTM D 695
ASTM D 638

Requirement
70,000 psi min
40,000 psi min
70,000 psi min

Fiberglass filaments must comply with the requirements shown in the following table:
Property
Density
Mechanical, single filament tensile strength
Tensile modulus of elasticity

Test
ASTM D 792
ASTM D 3822
ASTM D 3822

All reinforced RPL must contain the same type of reinforcement.


57-3.02C Composite Plastic Lumber
CPL may be substituted for reinforced RPL.
707

Requirement
2,5602,592 kg/m3
3,4503,790 MPa
6972 MPa

SECTION 57

WOOD AND PLASTIC LUMBER STRUCTURES

Fabricate the shell for CPL from polyester or epoxy resin reinforced with E-glass and mixed with
colorants, UV inhibitors, and antioxidants. The CPL coating must match color no. 37030 or 30097 of FED
STD-595.
The core material for CPL must be lightweight aggregate polymer concrete.
CPL must comply with the physical property requirements specified for reinforced RPL and the
requirements shown in the following table:
Property
Density of concrete core
28-day compressive strength of
concrete core
Structural strength of shell
Tensile strength, tensile modulus
Flexural strength, flexural modulus
Dry film thickness of coating
Color change of coating

Test
ASTM D 792
ASTM C 579

Requirement
1,762 kg/m3 min
5,000 psi min

Less than 10 percent loss


after UV deterioration test
ASTM D 638
specified for plastic lumber
ASTM D 790
-15 mils min
ASTM D 4587,
No visible color change when
Test Cycle 2
tested for 800 hours
Initial adhesion of coating
ASTM D 4541
150 psi min
No more than 10 percent
Decrease in initial adhesion of coating ASTM D 4541
decrease following 2
ASTM D 1183, Test
exposure cycles
Condition Da
a
Use a low temperature phase at 4 5 degrees F and high temperature phase at 140 5
degrees F.

Seal the cut ends of CPL with a cap securely held in place with an adhesive recommended by the
manufacturer. The adhesive must show no more than a 10 percent decrease in strength when tested
under ASTM D 3164 following 2 cycles of exposure under ASTM D 1183, Test Condition D, with a low
temperature phase of -16 3 degrees C and a high temperature phase of 60 3 degrees C.
57-3.02D Unreinforced Recycled Plastic Lumber
Unreinforced RPL may be substituted for reinforced RPL for chocks, filler blocks, and other nonstructural
members shown. Unreinforced RPL must comply with the specifications for reinforced RPL, except
fiberglass reinforcement is not required and stiffness tests do not apply.
57-3.03 CONSTRUCTION
Install plastic lumber under the manufacturer's instructions.
Cut, bevel, drill, counterbore, and otherwise fabricate plastic lumber under the manufacturer's
instructions. Fabricate lumber in the manufacturer's plant to the greatest extent possible.
Each hole for a bolt in the plastic lumber must be bored 1/8 inch larger in diameter than the bolt to be
placed. Each hole for a lag screw must be bored to a diameter under the manufacturer's instructions.
Bolts and lag screw heads must be recessed 1/2 inch from the surface of the face of plastic lumber
fenders.
Coat holes drilled through CPL members with a concrete sealant under the manufacturer's instructions.
Plastic lumber elements that are split, broken, warped, or otherwise damaged are rejected.
57-3.04 PAYMENT
Not Used

708

58 SOUND WALLS

58-1 GENERAL

58-1.01 GENERAL
Section 58-1 includes general specifications for constructing sound walls.
Reinforcement must comply with section 52.
Structure excavation and structure backfill must comply with section 19-3.
58-1.02 MATERIALS
Not Used
58-1.03 CONSTRUCTION
Not Used
58-1.04 PAYMENT
Sound walls are measured by the area of wall projected on a vertical plane between the elevation lines
and wall length.
58-2 MASONRY BLOCK
58-2.01 GENERAL
58-2.01A Summary
Section 58-2 includes specifications for constructing masonry block sounds walls.
58-2.01B Definitions
Reserved.
58-2.01C Submittals
58-2.01C(1) General
Reserved
58-2.01C(2) Test Data
Submit test data for:
1. Prepackaged mortar materials
2. Compressive strength of masonry for preconstruction testing and field QC testing
3. Grout compressive strength
58-2.01C(3) Product Data
Submit manufacturers descriptive data for each type of CMU, accessory, and manufactured material as
an informational submittal.
58-2.01C(4) Mix Design
Submit a mix design for each grout mix proposed for use. Admixtures are not allowed unless authorized.
Submit a mix design for the mortar cap.
58-2.01C(5) Samples
Submit samples of the CMUs for each color and texture as specified in ASTM C 90.
58-2.01C(6) Qualification Data
Submit qualification data for the authorized laboratory as an informational submittal.
58-2.01C(7) Certificates of Compliance
Submit a certificate of compliance for CMUs, aggregate for grout, and grout.
58-2.01C(8) Daily Field Report and Final Report
Submit a copy of the daily field report on the business day following the preparation of the report.
709

SECTION 58

SOUND WALLS

Upon completion of the work requiring special inspection, submit a copy of the final report.
58-2.01D Quality Control and Assurance
58-2.01D(1) General
Reserved
58-2.01D(2) Concrete Masonry Units
Obtain CMUs of a uniform color and texture from a single source and from a single manufacturer.
58-2.01D(3) Mortar
Obtain mortar ingredients of a uniform quality, including color, from a single manufacturer for cement and
lime and from a single source or producer for each aggregate.
If prepackaged mortar materials are used, perform the following preconstruction tests at an authorized
laboratory:
1. California Test 551. Test data must be from samples having a moist cure except that the samples
must not be immersed in lime water. The average 28-day compressive strength of mortar must be not
less than 1,800 psi.
2. California Test 422 or 417. Mortar must not contain more than 0.05 percent soluble chlorides when
tested under California Test 422 or more than 0.25 percent soluble sulfates as SO4 when tested
under California Test 417.
58-2.01D(4) Masonry Preconstruction Testing
Perform masonry preconstruction testing at an authorized laboratory. The authorized laboratory must
comply with ASTM E 329.
Determine the compressive strength of masonry for each grout mix to be used under one of the following
2007 CBC test methods:
1. Unit strength method in section 2105.2.2.1 except grout must comply with item 3.3.2 in the 1st
paragraph of section 2105.2.2.1.2
2. Prism test method section 2105.2.2.2
If the prism test method is used to determine the compressive strength, you must also test the grout
compressive strength under ASTM C 1019.
58-2.01D(5) Field Quality Control
58-2.01D(5)(a) General
You must employ a special inspector and an authorized laboratory to perform inspections and structural
tests of masonry to verify the masonry construction complies with section 1704, "Special Inspections,"
and section 2105, "Quality Assurance," of the 2007 CBC.
Masonry special inspection personnel used in the work must not be employed or compensated by any
subcontractor, or by other persons or entities hired by subcontractors, who will provide other services or
materials for the project.
58-2.01D(5)(b) Special Inspector
The special inspector must be an ICC certified Structural Masonry Special Inspector. The special
inspector must perform the inspections required in section 1704.5, "Masonry Construction," of the 2007
CBC.
The special inspector must prepare a daily field report providing information regarding the specific
activities witnessed, including placing of CMUs and bar reinforcing, grouting, fabrication of test
specimens, and other observations of importance to the work.
A daily field report is required for each day that the special inspector is on the job site. The special
inspector must prepare a signed final report stating whether the work requiring special inspection was, to
the best of the inspector's knowledge, in compliance with the plans, specifications, and the applicable
workmanship requirements of these specifications and the 2007 CBC.
710

SECTION 58

SOUND WALLS

58-2.01D(5)(c) Masonry Compressive Strength Testing


Test the compressive strength of masonry for each 10,000 sq ft of sound wall area, or portion thereof.
Determine the compressive strength as specified for masonry preconstruction testing in section 58
2.01D(4).
58-2.02 MATERIALS
58-2.02A General
Reserved
58-2.02B Concrete Masonry Units
CMUs must comply with ASTM C 90 for hollow, load bearing, lightweight or medium weight class units.
You may use standard or open-end units. If you use open-ended units, do not reduce the spacing of the
bar reinforcement shown.
The weight of a CMU for a sound wall on a bridge must not exceed 38 lb.
Identify each HS CMU with a groove in an interior corner. The groove must extend from a mortar surface
for a length of about 2 inches and must have a depth of about 3/16 inch.
58-2.02C Mortar
Mortar must comply with ASTM C 270 except the cement must comply with section 90-1.02B(2).

Aggregate must comply with ASTM C 144.

Hydrated lime must comply with ASTM C 207, Type S.

Mortar for laying CMUs must consist by volume of 1 part cement, 0.25 to 0.5 part hydrated lime, and 2.25

to 3 parts mortar sand. Add enough water to make a workable mortar. Accurately measure and

thoroughly mix each batch of mortar. Do not retemper mortar more than 1 hour after mixing.

Mortar color must match the CMU. Color pigments must be iron oxides complying with ASTM C 979. The

dosage must not exceed 10 percent by weight of cement in the mortar.

If authorized, you may use prepackaged mortar materials and mortar containing admixtures complying

with ASTM C 270.

Packages of mortar materials must bear the manufacturer's name, brand, contents, weight, and color

identification.

58-2.02D Grout
The minimum compressive strength of the grout at 28 days must be 85 percent of the greater of (1) the

masonry compressive strength shown or (2) 2,000 psi.

Cementitious material must comply with section 90-1.02B.

Grout must contain at least 550 pounds of cementitious material per cubic yard. Grout for HS CMUs must

contain at least 675 pounds of cementitious material per cubic yard.

Aggregate must comply with section 90-1.02C except section 90-1.02C(4) does not apply.

Aggregate for grout must be a mixture of fine and coarse aggregate. At least 20 percent of the aggregate

must be coarse aggregate. One hundred percent of the combined grading must pass the 1/2-inch sieve.

Mix grout with sufficient water to produce a mix consistency suitable for pumping without segregation.

Provide grout with a slump from 8 to 11 inches.

58-2.02E Lightweight Aggregate


Reserved
58-2.02F Reinforcement
Bar reinforcing steel must comply with ASTM A 615/A 615 M, Grade 60 or ASTM A 706/A 706 M.
Ladder type joint reinforcement must comply with ASTM A 951, hot-dip galvanized.
711

SECTION 58

SOUND WALLS

58-2.02G Expansion Joint Filler


Expansion joint filler must comply with ASTM D 1751 or ASTM D 2000 M2AA 805.
58-2.02H Access Gates
Timber members must be tongue and groove Douglas fir subflooring free of knotholes.
Timber members, steel frames, channels, anchorage devices, mounting hardware, gate rollers,

corrugated steel pipe, nylon washers, and neoprene tubing must be commercial quality.

The ladder rungs must be no. 8 deformed bar reinforcing steel with a nonskid surface.

Gate rollers must be rigid casters with self-lubricating bearings and hard rubber wheels.

Metal parts and hardware must be hot-dip galvanized under section 75-1.05.

Primer and stain must be top grade primer and stain from a manufacturer who has manufactured

industrial paints and stains complying with custom specifications for at least 10 years.

If the back side of the masonry wall is constructed of split-faced or rough-surface blocks, the bond beam

above the gate opening where the upper gate guide is to be mounted must have smooth-sided blocks.

Aggregate filling the inside of corrugate steel pipe landings must be a coarse concrete aggregate of

commercial quality. Compaction of the aggregate is not required.

58-2.03 CONSTRUCTION
58-2.03A General
Construct sound wall with hand laid CMUs.

Vertical lines and surfaces must not vary from plumb by more than 1/4 inch in 10 feet.

Provide bond beam units or recesses for horizontal reinforcement.

Construct walls in 4-foot-maximum-height lifts. Complete grouting of each lift before starting construction

of the next lift. The top course of each lift must be a bond beam.

Bond beams must be continuous. Cover the top of unfilled cells under horizontal bond beams with metal

or plastic lath.

Roughen, clean, and lightly wet contact surfaces where fresh masonry joins masonry that is partially or

totally set. The roughened surface must be at least as rough as a wood troweled surface. Remove

laitance, curing compounds, debris, dirt, and any substance that decreases bond to the fresh masonry.

Roughen and clean concrete surfaces on which masonry walls are to be constructed, exposing the

aggregate. Immediately before laying the CMUs, flush the surface with water and allow to dry to a surface

dry condition.

Use a masonry saw to cut CMUs to neat and true lines.

Protect masonry as specified for protecting concrete in section 51-1.03I.

During erection in inclement weather, keep cells dry by covering partially completed walls. The covering

must be waterproof fabric, plastic or paper sheeting, or other authorized material. Do not use wooden
boards or planks as covering materials. Extend the covering down each side of masonry walls
approximately 2 feet.
Remove splashes, stains, and spots from exposed faces of the wall.
58-2.03B Mortar Bedding and Jointing
Mortar joints must be approximately 3/8 inch thick.
Walls and cross webs forming cells to be filled with grout must be full bedded in mortar to prevent leakage
of grout. All head and bed joints must be solidly filled with mortar for a distance in from the face of the wall
or unit not less than the thickness of the longitudinal face shells. Shove head joints tight.

712

SECTION 58

SOUND WALLS

58-2.03C Reinforcement
Before placing grout, securely hold the reinforcement in position at the top and bottom and at intervals not
exceeding 192 bar diameters with wire ties or spacing devices. Wire must be 16 gage or heavier.
Wooden, aluminum, or plastic spacing devices must not be used.
Splice vertical reinforcement only at the locations shown.
58-2.03D Grouting
Preserve the unobstructed vertical continuity of the grout during mortar placement in joints. Any
overhanging mortar projecting more than 1/2 inch, or other obstruction or debris, must be removed from
the inside of cells.
Only fill cells containing reinforcement with grout.
Consolidate grout in the cells by vibrating and reconsolidating after excess moisture has been absorbed
and before plasticity is lost. Do not slice grout with a trowel.
If placing of grout in grout filled cells is stopped for more than 1 hour, a construction joint must be made.
The construction joint must be approximately 1-1/2 inches below the top of the last course filled with
grout.
58-2.03E Access Gates
Construct access gates with the tongue in the up position. Remove the tongue of the top board and the

groove of the bottom board. Stagger knot locations of adjoining boards.

Prime and stain timber surfaces of access gates with 2 coats of stain to match the adjacent sound wall.

For backfill outside of pipe landings, you may use material from excavation.

58-2.04 PAYMENT
Not Used
58-3 PRECAST CONCRETE PANELS
Reserved
58-4 ALTERNATIVE SOUND WALL SYSTEMS
58-4.01 GENERAL
58-4.01A Summary
Section 58-4 includes specifications for constructing alternative sound wall systems.
You may only use an alternative sound wall system where specified in the special provisions.
58-4.01B Definitions
Reserved
58-4.01C Submittals
Submit project specific shop drawings to the OSD, Documents Unit. Notify the Engineer of your submittal.
For initial review, submit 4 sets of shop drawings. Allow 25 days for the Department's review. After review
and correction, submit from 6 to 12 sets, as requested, to the OSD, Documents Unit, for authorization and
use during construction.
The shop drawings must include:
1.
2.
3.
4.

Design firm's name, address, and telephone and fax numbers


Information required for the proper construction of the system at each location
Design parameters, material notes, and wall construction procedures
Calculations for each installation of the system

Submit as-built drawings at the completion of each sound wall.

713

SECTION 58

SOUND WALLS

58-4.01D Quality Control and Assurance


Reserved
58-4.02 MATERIALS
Not Used
58-4.03 CONSTRUCTION
Construct the alternative sound wall system to the lines and grades shown except that the alternative
sound wall system may have a height greater than that shown. The construction must comply with the
details shown on the authorized shop drawings and proprietary system details.
58-4.04 PAYMENT
Not Used
58-558-6 RESERVED

714

59 PAINTING

59-1 GENERAL

59-1.01 GENERAL
59-1.01A Summary
Section 59-1 includes general specifications for painting new installations and repainting existing
installations.
59-1.01B Definitions
Reserved
59-1.01C Submittals
Submit a certificate of compliance and MSDS for each shipment of blast cleaning material.
59-1.01D Quality Control and Assurance
Measure coating dry film thickness with a calibrated Type 2 magnetic film thickness gage under SSPC-PA
2 except there is no limit to the number or location of spot measurements that may be requested by the
Engineer to verify coating thickness.
Measure coating adhesion strength with a self-aligning adhesion tester under ASTM D 4541.
Measure levels of soluble salts on surfaces using a retrieval method specified in SSPC-Guide 15.
59-1.02 MATERIALS
59-1.02A General
Water for rinsing and pressure washing must be fresh potable water with a chloride content of not more
than 75 ppm and a sulfate content of not more than 200 ppm. Continuous recycling of rinse water is not
allowed. You may collect rinse water in a tank for reuse if test samples meet specified requirements and
no water is added to the tank after sampling.
Sealing compound must be a polysulfide or polyurethane type complying with ASTM C 920, Type S,
Grade NS, Class 25, Use M.
59-1.02B Abrasives
Abrasives for blast cleaning must be of a grading suitable to produce satisfactory results. Use only the
following abrasives unless authorized:
1.
2.
3.
4.

Clean dry sand. Do not use unwashed beach sand containing salt or excessive silt.
Mineral grit.
Steel shot.
Steel grit.

Mineral and slag abrasives must comply with the requirements for Class A, Grade 2 to 3 abrasives in
SSPC-AB 1 and must not contain hazardous material.
Steel abrasive must comply with SSPC-AB 3. Recycled steel abrasive must comply with SSPC-AB 2.
59-1.02C Coatings
Coatings must comply with section 91.
Coatings selected for use must comply with the volatile organic compound limits specified for the air
quality district where the project is located.
59-1.03 CONSTRUCTION
59-1.03A General
Notify the Engineer 5 business days before starting work.

Provide protective devices to prevent damage to the work, property, or persons.

59-1.03B Weather Conditions


Apply paint only to thoroughly dry surfaces during periods of favorable weather.
715

SECTION 59

PAINTING

Do not perform blast cleaning or apply solvent-borne paint when the atmospheric or surface temperature
is below 36 degrees F or above 100 degrees F or when the relative humidity is more than 85 percent.
Do not apply water-borne paint when the atmospheric or surface temperature is below 51 degrees F or
above 100 degrees F or when the relative humidity exceeds 75 percent.
Except for work within enclosures, do not apply paint if:
1. Freshly painted surfaces may become damaged by rain, fog, or condensation
2. Atmospheric temperature or relative humidity will not remain within the specified application
conditions during the drying period
3. Steel surface temperature is less than 5 degrees F above the dew point
Repair or replace uncured paint damaged by weather.
If authorized, you may use enclosures to allow painting during inclement weather. Enclosures must
provide atmospheric conditions within specified limits.
59-1.03C Cleaning
59-1.03C(1) General
Prepare and clean surfaces before painting.
59-1.03C(2) Pressure Rinsing
Pressure rinsing includes cleaning surfaces using a pressure wash system with a minimum nozzle
pressure of 1,160 psi. Keep the nozzle tip from 12 to 18 inches from the surface. The nozzle must have a
maximum fan tip angle of 45 degrees.
59-1.03C(3) Pressure Washing
Pressure washing includes cleaning surfaces using a pressure wash system with a nozzle pressure from
2,500 to 5,000 psi and a maximum fan tip angle of 45 degrees.
59-1.03C(4) Steam Cleaning
Steam cleaning includes cleaning dirt, grease, loose chalky paint, and other foreign material from
surfaces using steam. Steam temperature at the nozzle must be from 265 to 375 degrees F.
Use a biodegradable detergent during steam cleaning. After steam cleaning, rinse cleaned surfaces with
fresh water.
Do not perform steam cleaning more than 2 weeks before painting or other phases of cleaning.
Do not paint steam-cleaned surfaces until they are thoroughly dry and 24 hours have elapsed.
59-1.03C(5) Blast Cleaning
Blast cleaning includes abrasive blasting surfaces to be painted.

Surfaces to be blast cleaned must be dry.

Prime or treat blast-cleaned surfaces the same day blast cleaning is performed unless otherwise

authorized.

59-1.03D Painting
Each spray pot must have an authorized water trap installed.

Thinning of paint is not allowed unless authorized.

Before applying, mix paint using mechanical mixers to thoroughly blend pigment and vehicle together.

Apply paint to clean dry surfaces in a neat and workmanlike manner. Apply by brush, spray, or roller in

any combination. Gun extensions are not allowed. Aerosol cans are not allowed.

Brushes must have sufficient bristle body and length to spread paint in a uniform film. Paint must be

evenly spread and thoroughly brushed out.

716

SECTION 59

PAINTING

Rollers must not leave a stippled texture in the paint film.


Apply paint to areas not accessible to regular means using daubers, bottle brushes, or other authorized
methods.
Thoroughly cure each application of paint and correct skips, holidays, thin areas, or other deficiencies
before the next application. Painted surfaces being covered must be free from moisture and deleterious
material that would prevent bonding of succeeding coats. In spot painting, remove old paint that lifts after
the first paint application by scraping and repaint the area before the next application.
Pressure rinse painted surfaces before applying additional paint if 7 days or more elapse between paint
applications.
The Engineer may require you to blast clean and reapply paint to areas with runs, sags, thin and
excessively thick areas in the paint film, skips, holidays, or areas of nonuniform appearance.
Repair painted surfaces damaged during work activities with materials and to a condition equal to that of
the specified coating.
Remove paint or paint stains on surfaces not designated to be painted.
Thoroughly clean painted surfaces after completing painting activities and other work that would deposit
foreign material on the painted surfaces.
Stencil the month and year of painting on structures at 2 locations selected by the Engineer. Use block
letters 2-1/2 inches high. The paint used must contrast with the background.
59-1.04 PAYMENT
Not Used
59-2 PAINTING STRUCTURAL STEEL
59-2.01 GENERAL
59-2.01A Summary
Section 59-2 includes specifications for preparing and painting structural steel and other metal, except
galvanized or thermal spray coated surfaces.
59-2.01B Definitions
Reserved
59-2.01C Submittals
59-2.01C(1) General
Submit certification showing the maximum allowable dry film thickness for inorganic zinc-rich coatings to
be used on faying surfaces of HS bolted connections as determined under appendix A of Specification for
Structural Joints Using ASTM A325 or A490 Bolts of the RCSC.
59-2.01C(2) Mandatory SSPC-QP Certifications
Reserved
59-2.01C(3) Painting Quality Work Plan
Submit 3 copies of a painting quality work plan for each work item requiring structural steel painting or
paint removal. Allow 20 days for the Department's review. Submit the work plan after attending the
prepainting meeting. Include the following:
1. Names of the painting contractor and any subcontractors to be used.
2. 1 copy of each applicable ASTM and SSPC specification and qualification procedure.
3. Coating manufacturer's guidelines and instructions for surface preparation, painting, drying, curing,
handling, shipping, and storage of painted structural steel. Include testing methods and maximum
allowable levels for soluble salts.
4. Materials, methods, and equipment to be used.
5. Proof of required SSPC-QP certifications or qualification statements showing compliance with SSPCQP certification.
717

SECTION 59
6.
7.
8.
9.
10.
11.

PAINTING

Methods to control environmental conditions.


Methods to protect the coating during curing, shipping, handling, and storage.
Rinse water collection plan.
Detailed paint repair plan for damaged areas.
Procedures for containing blast media and water.
Examples of proposed daily reports for testing to be performed, including type of testing, location, lot
size, time, weather conditions, test personnel, and results.

59-2.01D Quality Control and Assurance


59-2.01D(1) General
You must hold following the SSPC certifications in good standing throughout the Contract to perform the
following painting activities:
1. For cleaning and painting structural steel in the field, SSPC-QP 1
2. For removing hazardous coatings from structural steel, SSPC-QP 2
3. For cleaning and painting structural steel in a permanent painting facility, SSPC-QP 3 or AISC SPE,
Certification P-1 Enclosed
59-2.01D(2) Meetings
Before starting painting activities, conduct a meeting to discuss painting quality work plan requirements.
Meeting attendees must include the Engineer and all painting subcontractors.
59-2.01D(3) Field Quality Control
You must determine the sequence of testing. The Engineer selects test locations.
If repairs are required, retest rejected areas after completing repairs.
Test blast-cleaned steel for soluble salts using a Class A or B retrieval method before applying the
undercoat. Levels of soluble salts must not exceed the lesser of the coating manufacturer's
recommendations or 10 g/sq cm. Perform 3 tests for the first 1,000 sq ft prepared per shift and 1 test for
each additional 1,000 sq ft or portion thereof. Perform at least 2 tests when less than 1,000 sq ft is
prepared in a shift. Clean and retest areas represented by soluble salt tests exceeding specified limits.
Test the inorganic zinc undercoat before applying final or finish coats. Perform adhesion and hardness
testing no sooner than 72 hours after application.
Test the inorganic zinc undercoat as follows:
1. Perform 3 adhesion tests per girder or 1,000 sq ft of painted surface, whichever is less. If less than
1,000 sq ft is painted in a work shift, perform 3 tests. The coating must have an adhesion to steel of at
least 600 psi. If 2 or more locations fail adhesion requirements, the area represented by the tests is
rejected. If 1 of the locations fails adhesion requirements, test 3 additional locations. If any of the
additional locations fail, the area represented by the tests is rejected. Repair rejected areas by blast
cleaning and repainting. Repair test locations meeting adhesion requirements by applying organic
zinc-rich primer to the specified dry film thickness.
2. Test surfaces where finish coats are to be applied for soluble salts. Soluble salt levels must not
exceed the lesser of the coating manufacturer's recommendations or 10 g/sq cm. Perform 3 tests for
the first 1,000 sq ft prepared per day and 1 test for each additional 1,000 sq ft or portion thereof.
Perform at least 2 tests when less than 1,000 sq ft is prepared in a shift. Clean and retest areas
represented by soluble salt tests exceeding specified limits.
3. The inorganic zinc coating must exhibit a solid, hard, and polished metal surface when firmly scraped
with the knurled edge of a quarter before final or finish coats are applied. Repair areas that are
powdery, soft, or do not exhibit a polished metal surface, as determined by the Engineer, by blast
cleaning and repainting.
Perform the following additional testing for AASHTO M 300 Type II inorganic zinc primers:
1. Determine the dry-to-solvent insolubility under ASTM D 4752 except use water as the solvent. The
resistance rating must be at least 4. The test rate is 1 test per 500 sq ft or portion thereof. Repair

718

SECTION 59

PAINTING

inorganic zinc coating represented by tested areas that fail to meet solvent insolubility requirements
by blast cleaning and repainting.
2. Before applying finish coats, test the surface pH. Wet the surface with deionized water for 15 to 30
minutes. Apply pH paper with measuring increments of 0.5 pH units. Take at least 2 pH readings for
every 500 sq ft or portion thereof. If less than 500 sq ft is coated in a single shift, take at least 2 pH
readings. Do not apply finish coats until the surface pH is 7 or less.
Perform the following additional testing for AASHTO M 300 Type I inorganic zinc primers:
1. Determine the dry-to-solvent insolubility under ASTM D 4752. The resistance rating must be at least
4. The test rate is 1 test per 500 sq ft or portion thereof. Repair inorganic zinc coating represented by
tested areas that fail to meet solvent insolubility requirements by blast cleaning and repainting.
2. Determine surface hardness under ASTM D 3363. Hardness must be 2H or harder. The test rate is 1
test per 500 sq ft or portion thereof. Repair inorganic zinc coating represented by tests that fail to
meet surface hardness requirements by blast cleaning and repainting.
59-2.02 MATERIALS
Inorganic zinc-rich primer used on faying surfaces must comply with the slip coefficient specifications for
Class B coatings on blast-cleaned steel in appendix A of Specification for Structural Joints Using A325 or
A490 Bolts of the RCSC.
59-2.03 CONSTRUCTION
59-2.03A General
Clean and paint all exposed structural steel and other metal surfaces.
You must provide enclosures for cleaning and painting structural steel. Cleaning and painting of new
structural steel must be performed in a Category I Enclosure as defined in SSPC-QP 3. Maintain
atmospheric conditions inside enclosures within specified limits.
Except for blast cleaning within closed buildings, perform blast cleaning and painting during daylight
hours.
Coatings for new structural steel must comply with the requirements shown in the following table:
Description
All surfaces:
Undercoat
Finish coata

Table 1 Coatings for New Structural Steel


Coating
Dry film thickness, mils
Inorganic zinc primer,
AASHTO M 300 Type I or II
Exterior grade latex,
2 coats

48

2 minimum each coat,


48 total
Total thickness, all coats
814
a
If no finish coats are described, a final coat of inorganic zinc primer is required

Coatings for existing structural steel must comply with the requirements shown in the following table:

719

SECTION 59

PAINTING

Table 2 Coatings for Existing Structural Steel


Description
Coating
Dry film thickness,
(mils)
Connections to new
structural steel:a
Undercoat
Inorganic zinc primer,
48
AASHTO M 300 Type I or II
Finish coatb
Exterior grade latex,
2 minimum each coat,
2 coats
48 total
814
Total thickness, all coats
Other surfaces cleaned to
bare metal:
State Specification PWB 145
23
1st undercoat
State Specification PWB 146
23
2nd undercoat
State Specification PWB 171
1.53
1st finish coat
State Specification PWB 172
1.53
2nd finish coat
712
Total thickness, all coats
Existing painted surfaces
to be topcoated:
Undercoat
State Specification PWB 146
23
1st finish coat
State Specification PWB 171
1.53
2nd finish coat
State Specification PWB 172
1.53
Total thickness, new coats
59
a
Includes the following locations:
1. New and existing contact surfaces
2. Existing member surfaces under HS bolt heads, nuts, or washers
3. Bare surfaces of existing steel after trimming, cutting, drilling, or reaming
4. Areas within a 4-inch radius from the point of application of heat for welding or
flame cutting
b
If no finish coats are described, a final coat of inorganic zinc primer is required
59-2.03B Surface Preparation
59-2.03B(1) General
Corners must be chamfered and without sharp edges.
Condition thermal-cut edges before blast cleaning by shallow grinding or other authorized method to
remove the thin, hardened layer resulting from resolidification during cooling.
Remove visually evident base metal surface irregularities and defects under ASTM A 6 or AASHTO M
160 before blast cleaning.
After removing material defects exposed by blast cleaning, restore the blast profile by blast cleaning or
using mechanical tools under SSPC-SP 11.
59-2.03B(2) Cleaning
59-2.03B(2)(a) General
Clean previously painted surfaces by pressure washing or steam cleaning before performing other
cleaning or painting activities. Remove gloss from existing paint without removing sound paint. Lightly
roughen remaining areas of gloss using 100-to 200-grit sandpaper. Remove paint that becomes loose,
curled, lifted, or that loses its bond after cleaning to sound paint or metal.
After pressure washing or steam cleaning, spot blast clean painted surfaces having rust or foreign
material remaining that would hinder bonding of new paint as determined by the Engineer. When there is
no bid item for spot blast cleaning, this is change order work. Spot blast clean surfaces under SSPC-SP
6. For small areas, the Engineer may allow cleaning under SSPC-SP 11.
Remove dirt, loose rust, mill scale, or paint not firmly bonded to surfaces under SSPC-SP 2. Feather
edges of remaining paint. Do not use pneumatic chipping hammers unless authorized.
720

SECTION 59

PAINTING

59-2.03B(2)(b) Blast Cleaning


Blast clean steel surfaces to be coated with inorganic zinc under SSPC-SP 10. After blast cleaning,
surfaces must have a dense, uniform, angular anchor pattern of from 1.5 to 3.5 mils when measured
under ASTM D 4417.
Where shown, spot blast clean existing painted steel surfaces under SSPC-SP 6. After blast cleaning,
surfaces must have a dense, uniform, angular anchor pattern of at least 1.5 mils when measured under
ASTM D 4417.
Seal journals, bearings, motors, and moving parts before blast cleaning near machinery.
Reblast cleaned surfaces that rust or become contaminated before paint is applied.
Do not expose blast-cleaned steel to relative humidity exceeding 85 percent before painting.
59-2.03C Painting
59-2.03C(1) General
Paint new structural steel as follows:
1. Apply the total thickness of undercoats before erection. Apply finish coats and final coats after
erection. If a concrete deck is placed on steel members, apply finish and final coats after deck
placement.
2. After erection and deck placement, clean and spot paint areas of damaged or deteriorated coating
and exposed unpainted surfaces with undercoats to the specified thickness before applying
subsequent coatings.
3. Clean and paint surfaces exposed to the atmosphere and inaccessible for painting after erection with
the full number of coats before erection.
Paint existing structural steel as follows:
1. Precede each undercoat by a stripe coat of undercoat paint on all edges, corners, seams, crevices,
interior angles, junctions of joining members, weld lines, and similar surface irregularities. The stripe
coat must completely hide the surface being covered and be followed as soon as practical by the
undercoat.
2. Apply finish coats after the total dry film thickness of undercoat has been applied.
Caulk contact surfaces of stiffeners, railings, built up members, or open seam more than 6 mils wide with
sealing compound or other authorized material. Apply sealing compound no sooner than 72 hours after
the last application of undercoat unless authorized. Cure the sealing compound as recommended by the
manufacturer before performing subsequent painting activities. If no finish coats are applied, the sealing
compound color must be gray.
Limit the thickness of each paint application to allow uniform drying throughout the paint film.
For existing structural steel, apply all undercoats and the 1st finish coat within 30 days of initial cleaning
activities.
Paint ungalvanized anchor bolt assemblies with 2 applications of organic zinc-rich primer before
installation. You do not need to paint other metal surfaces to be embedded in concrete.
Prepare and paint (1) the bottom surfaces of masonry plates and (2) structural steel surfaces contacting
elastomeric bearing pads or preformed fabric pads with the full number of applications before erection.
Except for (1) abutting chord and column splices and (2) column and truss shoe bases, coat machine
finished surfaces with an easily removed rust inhibitor. Paint machine-finished surfaces of iron and steel
castings with 1 coat of shop paint.
Where bridge deck drains are located over steel girders, paint the top and edges of top flanges beneath
drains and for 2 inches on each side of drains before installing the drains.
Paint surfaces of machinery exposed to air with 2 coats of organic zinc-rich primer before installation.
Paint exposed surfaces after installation with 2 finish coats of commercial quality gray gloss enamel.
721

SECTION 59

PAINTING

59-2.03C(2) Zinc Coatings


59-2.03C(2)(a) General
Strain zinc coatings after mixing through a 30- to 60-mesh screen immediately before or when pouring
into the spray pot.
Use an agitating spray pot. The agitator or stirring rod must reach to within 2 inches of the bottom of the
spray pot and be moving at all times during painting. The agitator must keep the coating well mixed.
Apply zinc coatings by spray. On areas inaccessible to spray application, you may make limited
applications when authorized by brush, dauber, or roller.
Zinc coatings must be free from dust, dirt, salt, and other deleterious deposits and thoroughly cured
before applying subsequent coats.
59-2.03C(2)(b) Inorganic Zinc Undercoat
59-2.03C(2)(b)(i) General
Use inorganic zinc primer within 12 hours of initial mixing of components.
Apply the undercoat in 2 or more applications within 8 hours of starting blast cleaning.
Blast clean and repaint areas where mudcracking of the undercoat occurs.
Protect surfaces coated with Type II inorganic zinc from conditions that may cause the coating film to
dissolve. Blast clean and repaint areas of dissolved coating.
Remove dry spray by screening or other methods that minimize surface polishing before applying
additional coats or final acceptance. Dry film thickness after dry spray removal must comply with the
specified thickness.
For damaged areas of the undercoat, the following apply:
1. If the Engineer determines the damaged area is more than 2 percent of the total undercoated surface,
blast clean and repaint damaged areas with inorganic zinc.
2. If the Engineer determines the damaged area is 2 percent or less of the total undercoated surface,
you may wire brush the damaged surfaces to remove loose or cracked coating and apply 2 coats of
organic zinc-rich primer.
At faying surfaces, the total undercoat dry film thickness must be from 1 mil to the maximum allowable for
Class B coatings as determined by certified testing under appendix A of Specification for Structural Joints
Using A325 or A490 Bolts of the RCSC.
Complete field testing of the undercoat and correct deficiencies before applying subsequent coats.
59-2.03C(2)(b)(ii) Final Coat
Apply a final coat of inorganic zinc primer to undercoated surfaces that do not receive finish coats. Use
the same coating as used for the undercoat.
Lightly roughen areas to receive a final coat by abrasive blasting. Use an abrasive no larger than 30
mesh. Protect undersurfaces of girder flanges from abrasive blasting.
Apply the final coat in 1 application within 24 hours of roughening. The final coat dry film thickness must
be from 1 to 3 mils. The total thickness of undercoat and final coat must be from 5 to 9 mils.
59-2.03C(2)(b)(iii) Finish Coats
Pressure rinse undercoated surfaces to receive finish coats. Perform pressure rinsing no sooner than 72
hours after the final application of undercoat.
The 1st finish coat must be applied within 48 hours of pressure rinsing.
Apply the 1st finish coat in 2 applications. The 1st application consists of a spray-applied mist application.
Apply the 2nd application after the mist application has dried to a set-to-touch condition as determined
using the procedure in section 7 of ASTM D 1640.
722

SECTION 59

PAINTING

Apply the 2nd finish coat after the 1st finish coat has dried 12 hours unless authorized. You may apply the
2nd finish coat in a single application.
The 1st finish coat color must match color no. 34272 of FED-STD-595. The 2nd finish coat color must
match color no.14090 of FED-STD-595.
59-2.04 PAYMENT
Not Used
59-3 PAINTING GALVANIZED SURFACES
59-3.01 GENERAL
Section 59-3 includes specifications for painting galvanized metal surfaces.
59-3.02 MATERIALS
Coatings must comply with either State Specification PWB-174A or with section 91-2.02.
59-3.03 CONSTRUCTION
Clean galvanized surfaces by pressure washing or steam cleaning.
Roughen galvanized areas after cleaning by abrasive blasting. Use an abrasive no larger than 30 mesh.
Do not remove galvanizing.
Apply 2 finish coats in not less than 2 applications. Apply the 1st finish coat the same day abrasive
blasting is performed unless authorized. Apply the 2nd finish coat after the 1st finish coat has dried 12
hours unless authorized. The dry film thickness of each finish coat must be at least 2 mils. The dry film
thickness of all coats must be from 4 to 8 mils.
The 2nd finish coat color must match color no. 14090 of FED-STD-595.
59-3.04 PAYMENT
Not Used
59-4 PAINTING TIMBER
59-4.01 GENERAL
Section 59-4 includes specifications for preparing and painting timber installations.
59-4.02 MATERIALS
Not Used
59-4.03 CONSTRUCTION
Remove cracked or peeled paint, loose chalky paint, dirt, and other foreign material immediately before
painting. The moisture content of the timber must be not more than 20 percent at the time of initial paint
application.
You may apply the 1st coat before erection if authorized.

Paint new timber with 3 coats consisting of 1 coat of wood primer and 2 coats of exterior paint.

Paint previously painted timber with 2 coats of exterior paint. Prime bare wood with 1 coat of wood primer.

After timber is in place, putty cracks, checks, nail holes, and other depressions flush with the surface. Let

dry before applying the 1st coat of exterior paint.

59-4.04 PAYMENT
Not Used
59-5 PAINTING SIGN STRUCTURES
59-5.01 GENERAL
Section 59-5 includes specifications for preparing and painting sign structures.

723

SECTION 59

PAINTING

59-5.02 MATERIALS
Not Used
59-5.03 CONSTRUCTION
Prepare and paint tubular and box beam-closed truss sign structures under sections 59-2 and 59-3. Do
not paint other types of sign structures unless specified in the special provisions.
You may prepare and paint sign structures before or after erection. After erection, repair damaged paint
to the satisfaction of the Engineer.
The total dry film thickness of finish coats on contact surfaces of galvanized HS bolted connections (1)
must be from 1 to 4 mils and (2) may be applied in 1 application.
59-5.04 PAYMENT
Not Used
59-6 PAINTING CONCRETE
59-6.01 GENERAL
Section 59-6 includes specifications for painting concrete surfaces.
Submit coating manufacturer's application instructions 7 days before use.
59-6.02 MATERIALS
Coatings must comply with section 91-4.05. Unless otherwise shown, coatings must be white.
59-6.03 CONSTRUCTION
New concrete must be at least 28 days old before painting.

Prepare surfaces under SSPC-SP 13/NACE no. 6.

Pressure rinse prepared surfaces before applying coating. Surfaces must be thoroughly dry at the time of

painting. You may use artificial drying methods if authorized.

Apply at least 2 coats under the manufacturer's instructions and SSPC-PA 7.

59-6.04 PAYMENT
Reserved
59-7 ACID STAINING CONCRETE
59-7.01 GENERAL
Section 59-7 includes specifications for preparing and staining concrete surfaces using an acid stain.
Submit stain manufacturer's product data and application instructions 7 days before starting staining
activities.
59-7.02 MATERIALS
Concrete stain must:
1.
2.
3.
4.
5.

Be a water-based solution of inorganic metallic salts


Contain dilute acid that penetrates and etches the concrete surface.
Be a commercial quality product designed specifically for exterior applications
Produce abrasion resistant color deposits
Be authorized before using

59-7.03 CONSTRUCTION
Seal joints between concrete surfaces to be stained and adjacent metal before applying stain.
Test surfaces for acceptance of stain before applying stain. Clean surfaces that resist accepting stain and
retest until passing.

724

SECTION 59

PAINTING

Apply stain under the manufacturer's instructions. Apply stain uniformly to avoid excessive rundown.
Work the stain into the concrete using a nylon bristle brush in a circular motion.
After the last coat of stain has dried, rinse stained surfaces with water and wet scrub with a stiff bristle
nylon brush until the rinse water runs clear. All rinse water must be collected.
Protect adjacent surfaces during staining using an authorized method.
59-7.04 PAYMENT
Reserved
59-8 ANTI-GRAFFITI COATING
59-8.01 GENERAL
Section 59-8 includes specifications for applying a sacrificial anti-graffiti coating.
Submit manufacturer's application and removal instructions 7 days before starting work.
59-8.02 MATERIALS
Anti-graffiti coating must:
1. Be a nontoxic, sacrificial, nonflammable, water-based coating designed for protecting concrete from
graffiti
2. Be compatible with the concrete surface treatment
3. Have a clear matte finish when dry
4. Be removable with a hot pressure washer
59-8.03 CONSTRUCTION
Test surfaces for acceptance of coating before applying. Clean surfaces that resist accepting coating and
retest until passing.
Apply anti-graffiti coating under the manufacturer's instructions in at least 2 even coats.
59-8.04 PAYMENT
Not Used
59-9 PAINTING STEEL SOLDIER PILES
59-9.01 GENERAL
Section 59-9 includes specifications for preparing and painting steel soldier piles.
Where shown, prepare and paint steel soldier piles under the specifications for new structural steel in
section 59-2.
59-9.02 MATERIALS
Not Used
59-9.03 CONSTRUCTION
Repair damaged areas of the undercoat before installing piles.
Protect the exposed exterior flange and flange edges of undercoated piles from lean concrete backfill to

minimize undercoating repairs.

After removing lean concrete backfill, repair damaged or deteriorated undercoat by blast cleaning and

repainting with the same inorganic zinc coating used for the undercoat.

Apply final or finish coats after installation and excavation are complete.

Caulk open joints between concrete and steel solider piles with sealing compound or other authorized

material.

59-9.04 PAYMENT
Not Used
725

SECTION 59

PAINTING

59-10 THERMAL SPRAY COAT STRUCTURAL STEEL

59-10.01 GENERAL
59-10.01A Summary
Section 59-10 includes specifications for coating steel surfaces with a thermal spray coating.
Limits for coating are shown.
59-10.01B Definitions
Reserved
59-10.01C Submittals
59-10.01C(1) General
Submit a certificate of compliance for each shipment of wire feedstock.
59-10.01C(2) Coating Quality Work Plan
Submit 3 copies of a coating quality work plan for thermal spray coating activities. Allow 20 days for the
Department's review. Submit the work plan after attending the prejob meeting. Include the following:
1.
2.
3.
4.
5.
6.
7.
8.

Names of the coating contractor and any subcontractors to be used.


1 copy each of applicable ASTM and SSPC specifications or qualification procedures.
Materials, methods, and equipment to be used.
Proof of certification for each thermal spray coating operator.
Methods to control environmental conditions.
Methods to protect the coating during shipping, handling, and storage.
Procedures for containing blast media.
Examples of proposed daily reports for testing to be performed, including type of testing, location,
time, weather conditions, test personnel, and results.

59-10.01D Quality Control and Assurance


59-10.01D(1) General
Each thermal spray coating operator must be certified under AWS C2.16/C2.16M.
59-10.01D(2) Meetings
Before starting coating activities, conduct a meeting to discuss coating quality work plan requirements.
Meeting attendees must include the Engineer and all coating subcontractors.
59-10.01D(3) Test Coupons
Thermal spray coating operators must prepare 3 test coupons for bend testing before each work shift.
Test coupons must:
1. Be 2 by 6 inches by 1/16-inch thick
2. Be the same material as the surface to be coated
3. Pass bend test requirements before the operator starts production work
Bend test coupons under section 6.5 of SSPC-CS 23.00. Coupons must exhibit no cracking with lifting
from substrate.
59-10.01D(4) Field Quality Control
The Engineer selects test locations.
If repairs are required, retest rejected areas after completing repairs.
Test the surface profile of blast-cleaned steel under ASTM D 4417, Method C. Perform 3 tests for the first
200 sq ft of blast-cleaned steel and 1 test every 200 sq ft thereafter.
Test blast-cleaned steel for soluble salts before coating. Levels of soluble salts must not exceed 10 g/sq
cm. Perform 3 tests for the first 200 sq ft placed during a shift and 1 test every 200 sq ft thereafter.
Inspect surfaces for visual cleanliness under SSPC-SP 10 before applying coating.
726

SECTION 59

PAINTING

Test coating thickness under section 6.3 of SSPC-CS 23.00. Perform 1 test for every 150 sq ft of coating
and 1 test for each faying surface.
Perform cut testing under SSPC-CS 23.00. Perform 3 tests of 3 cuts for every 1,000 sq ft of coating.
Surfaces must exhibit no peeling or delamination.
Test coating adhesion to steel before applying seal coating. Thermal spray coating must have an
adhesion to substrate of at least 850 psi. Perform 3 tests for every 200 sq ft of coating.
Repair areas represented by tests failing adhesion or cut testing by removing and reapplying coating.
59-10.02 MATERIALS
Abrasives must be (1) slag or mineral abrasive or (2) steel or recycled steel.

Wire feedstock must be 85/15 Zn/Al complying with ASTM B 833.

Seal coat paint must be authorized before use.

59-10.03 CONSTRUCTION
Do not apply coating when the steel surface temperature is less than 32 degrees F.
Prepare surfaces under section 59-2.03B(1).
Blast clean surfaces under SSPC-SP 10. Surfaces must have a sharp, angular anchor pattern of from 2.5
to 4.0 mils. Reblast surfaces that rust or become contaminated before coating is applied.
Apply coating using arc-spray equipment within 6 hours of starting blast cleaning. Coating thickness must
be 102 mils. Coating thickness on faying surfaces must be not more than 10 mils.
Apply a seal coating to thermal spray-coated surfaces under section 59-2. Apply the seal coat within 6
hours of applying the thermal spray coating. Dry film thickness must be from 1.5 to 2.0 mils. Do not apply
the seal coating to faying surfaces.
You may field weld thermal spray-coated surfaces if authorized in advance. Remove thermal spray
coating from weld locations by blast cleaning under SSPC-SP 10 or with power tools under SSPC-SP 11
immediately before welding. Recoat welded connections after fabrication.
Repair test areas of thermal spray coating that meet adhesion and cut test requirements with 2 coats of
organic zinc-rich primer.
59-10.04 PAYMENT
Not Used
59-1159-20 RESERVED

60 RESERVED

727

DIVISION VII DRAINAGE

61 CULVERT AND DRAINAGE PIPE JOINTS

61-1.01 GENERAL
61-1.01A Summary
Section 61 includes specifications for constructing joint systems or couplers for culverts and drainage
pipes, testing joints for watertightness, and field leakage testing for pipe systems.
Joint systems or couplers for culverts and drainage pipes are described by classification as "Standard,"
"Positive," or "Downdrain."
You may use either:
1. Joint systems or couplers complying with the classification shown and as specified in sections 64, 65,
66, and 69 for the type of pipe installed
2. Joint systems or couplers under section 61-1.01D(1)(b) if authorized
The Engineer may require field tests to verify compliance.
61-1.01B Definitions
shear strength: The required joint shear strength is expressed as a percentage of the calculated pipe
shear strength at a transverse section remote from the joint. All joints, including any connection, must
be capable of transferring the required shear across the joint.
moment strength: The moment strength required of the joint is expressed as a percentage of the
calculated moment capacity of the pipe on a transverse section remote from the joint.
tensile strength: The tensile strength is the resistance to the longitudinal force that tends to separate
(disjoint) adjacent pipe sections.
integral joint overlap: The integral joint overlap is the projection of 1 pipe barrel into an adjacent pipe
barrel.
sleeve joint overlap: The sleeve joint overlap is the minimum sleeve width required to engage abutted
pipe barrels.
watertightness: Watertightness is the ability of a joint to hold water under pressure without leaking.
joint: The connection point for 2 or more pipe sections.
61-1.01C Submittals
If joints are described as watertight, submit your analysis or test results performed on representative joints
proposed for installation as specified in section 61-1.01D(1)(a) for watertightness.
If using joint systems or couplers under section 61-1.01D(1)(b), submit a certificate of compliance
certifying compliance with the table titled "Joint Properties" shown in section 61-1.01D(1)(b).
Where field leakage testing is shown for pipe systems, submit:
1. Proposed field leakage test procedure for each portion of each pipe system at least 15 days before
you start testing. The submittal for each proposed field leakage test procedure must include the
following information:
1.1 Type of test: exfiltration, low-pressure air, negative air pressure, or other authorized method
1.2. Specific joints or pipe sections to be tested
1.3. Maximum and minimum pressures or hydrostatic head to be applied
1.4. Duration of tests from location to location
1.5. Date and time of each test
1.6. List of test equipment to be used
1.7. Date of last calibration if applicable
2. Leakage calculations for the exfiltration and infiltration tests
3. Repair procedure for the repair of joints or pipe sections that fail the field leakage test
729

SECTION 61

CULVERT AND DRAINAGE PIPE JOINTS

61-1.01D Quality Control and Assurance


61-1.01D(1) Source Quality Control
61-1.01D(1)(a) Watertightness
Watertightness must be attained by use of an authorized durable, high-quality, resilient joint material
designed to perform the intended function. The material must be neoprene expanded rubber or sheet
rubber gaskets, "O" ring rubber gaskets, butyl rubber base joint sealant, or other authorized resilient
material.
Assembled joints must pass the following performance tests without joint leakage:
1. Test the hydrostatic pressure on a joint by connecting 2 pipe sections under the manufacturer's
instructions. Provide suitable bulkheads within the pipe adjacent to and on either side of the joint or at
the outer ends of the joined pipe sections. Do not place mortar or concrete coating, filling, or packing
in addition to that normally required for the joint before conducting the watertightness test. After the
pipe sections are fitted together with the gasket or gaskets in place, subject the assembly to a 10-foot
water pressure head above the pipe crown for 10 minutes. Moisture or beads of water appearing on
the surface of the joint are not considered leakage. Perform the test on individual joints at the
manufacturer's plant.
2. Test joint watertightness on pipe sections in straight alignment and on pipe sections deflected from
straight alignment. When you test joints on pipe sections not in straight alignment, position the pipe
sections to create a gap on 1 side of the outside pipe perimeter that is 1/2 inch wider than the gap for
the pipe sections in straight alignment. If you use coupling bands to test the pipe sections not in
straight alignment and the maximum gap on 1 side of the outside pipe perimeter is less than 1/2 inch
wider than that for the pipe sections in straight alignment, position the coupling band and the pipe
sections to provide the maximum gap.
61-1.01D(1)(b) Performance Specifications for Culvert and Drainage Pipe Joints
If using joint systems or couplers under section 61-1.01D(1)(b), determine the values for joint properties
by mathematical analysis or a suitable, authorized test. Joint components subject to bending forces must
not be stressed beyond the minimum specified yield strength of the material as determined by using the
plastic section modulus.
Joint systems or couplers must:
1. Perform their intended function
2. Possess durability equivalent to that of the pipe
3. Comply with the joint property values for the joint classifications shown in the following table:

730

SECTION 61

CULVERT AND DRAINAGE PIPE JOINTS

Properties of Joint Classifications

Values
Property
Standard Positivea Downdrainb
Shear strength
2%
5%
5%
Moment strength
0%
15%
15%
Tensile strength
0
0
5,000 lb
6"42" diac
0
0
10,000 lb
45"84" diac
Joint overlapd
Integral
1/4 "min
1/2" min
-12" and smaller diae
1/2" min
3/4" min
-15"33" diae
3/4" min
1" min
-36" and larger diae
Sleeve min width
10-1/2"
10-1/2"
10-1/2"
Watertightness
If
If
Required
described described
Note:
a
Positive joints must comply with either (1) shear strength, moment
strength, and joint overlap-sleeve properties, or (2) shear strength
and joint overlap-integral properties.
b
Joints for downdrains must comply with specified values when
tested with joints sealed as proposed to comply with the
watertightness requirement.
c
Limits for corrugated metal pipe arch depend upon the equivalent
diameter of circular pipe under AASHTO M 36 for corrugated steel
pipe and AASHTO M 196 for corrugated aluminum pipe.
d
Joints designed to comply with required values by means other than
joint overlap as shown in the table may be used if authorized.
e
Inside diameter of circular pipes or inside horizontal dimension of
oval or arch pipes.

61-1.01D(2) Field Quality Control


61-1.01D(2)(a) Field Leakage Testing for Culvert and Drainage Pipes
61-1.01D(2)(a)(i) General
Where field leakage testing is shown for a pipe system, perform field leakage testing on culverts and
drainage structures.
Do not perform field leakage testing if the pipe system is to be fully encased in concrete backfill.
Field leakage testing includes performing field leakage tests for culverts and drainage pipes by:
1.
2.
3.
4.
5.
6.

Cleaning and presoaking pipes


Installing and removing bulkheads or plugs necessary to perform tests
Removing and disposing of waste materials
Retesting
Repairing
Changing the drainage system to comply with specifications for field leakage testing

Test all joints for leakage in pipe systems less than 1,500 feet in length.
For pipe systems 1,500 feet or greater in length, test each pipe system for leakage at locations selected
by the Engineer at a rate of:
1. 50 joints per 100 pipe joints if less than 1 mile in length
2. 30 joints per 100 pipe joints if between 1 mile and 3 miles in length
3. 20 joints per 100 pipe joints if more than 3 miles in length

731

SECTION 61

CULVERT AND DRAINAGE PIPE JOINTS

For every selected joint or section that fails leakage requirements, the Engineer may select up to 4 more
joint locations or sections between joints for testing.
Clean and test each pipe system and appurtenances by the exfiltration, low-pressure air, or negative air
pressure method after backfilling. You may use the infiltration test where the groundwater table is low as
determined by the Engineer. You may test installed pipe joints using air or water under low pressure.
Clean the pipe and remove debris and sediment before you start testing.
Do not use your test equipment until it is authorized. The Engineer may require a calibration test of
gauges or other instrumentation.
Use only 1 leak test method on a contiguous pipe system unless the pipe type or diameter changes in the
same run.
Complete the cleaning and testing of each pipe system between inlets or ends within 20 days after
backfilling the storm drain lines and structures.
Perform each test in the presence of the Engineer.
Prevent joints from drawing during a test. Repair any damage resulting from the field leakage test.
Take corrective action and retest the line if the leakage exceeds the allowable quantity. Determine the
leak source and repair or replace the defective pipe whenever an installed pipe system fails to comply
with the requirements under the test method used.
The Engineer will not accept a pipe installation if it fails to pass the field leakage test.
Stop all obvious leaks even if the leakage is below the allowable quantity.
61-1.01D(2)(a)(ii) Exfiltration and Infiltration Testing
Exfiltration and infiltration tests must comply with ASTM C 969 except:
1. You may fill the pipe with clear water to allow normal absorption into the pipe wall before performing
the exfiltration leakage test. Start the leakage test within 72 hours after filling the pipe and complete
the field leakage test within 24 hours thereafter. The test period must be at least 1 hour in duration.
For plastic and metal pipe, the absorption period is not needed.
2. Leakage must not be more than 1,000 gallons per inch of nominal pipe diameter per mile of pipe per
day with a minimum test pressure of 6 feet of water column above the pipe crown at the upper end of
the pipe or above the active groundwater table, whichever is higher. Limit the length of pipe you test
so that the pressure on the invert of the lower end of the section does not exceed 20 feet of water
column. Increase the allowable leakage by 8 percent for each increase in pressure of 1.5 feet above
the basic 6-foot water column measured above the crown or at the lower end of the section.
3. Whenever a suitable head of groundwater exists above the pipe crown and if the pipe is large enough
to work inside, the Engineer may accept the installed pipe on the basis of visible leakage repair
during the infiltration leakage test.
4. Take into account all lateral or side storm drains included in the test section when computing the
allowable leakage. Make an allowance of 0.2 gallons per hour per foot of head above the invert for
each junction structure or drainage inlet included in the test section.
Storm drains, side storm drains, and fittings must be open, clean, and free draining upon final completion
of the work.
61-1.01D(2)(a)(iii) Low-Pressure Air Test
You may use the low-pressure air test instead of the exfiltration test or the infiltration test for pipes 30
inches in nominal diameter or less. You may prewet the pipes. Test pipes from inlet to inlet or shorter
lengths. Do not use the low-pressure air test for drainage pipes over 30 inches in nominal diameter
regardless of the material type. If you use a low-pressure air test, perform the test immediately following
pipe cleaning.
Brace plugs and bulkheads to prevent release during the low-pressure air test. Locate gauges, air piping
manifolds, and valves above the ground. Do not allow anyone to enter a manhole or inlet of a plugged
732

SECTION 61

CULVERT AND DRAINAGE PIPE JOINTS

pipe when it is under pressure. Equip the air testing apparatus with a pressure release device, such as a
rupture disk or a pressure relief valve, designed to relieve pressure in the pipe at 6 psi when under test.
Start the test after the pressure is stabilized at or above an internal pressure of 3.5 psi greater than the
average back pressure of the groundwater that could submerge the pipe. Start recording the time when
the internal pressure drops to 3.5 psi. The tested portion of the pipe passes the field leakage test when
the pressure drop is less than 1 psi for the time period calculated for the size and length of the pipe to be
tested as shown in the following table:
Minimum Test Time for Pressure Drop
Nominal pipe diameter
Time for pressure drop
(inches)
(minutes/100 feet)
6
0.7
8
1.2
10
1.5
12
1.8
15
2.1
18
2.4
21
3.0
24
3.6
27
4.2
30
4.8
61-1.01D(2)(a)(iv) Other Allowable Tests
If authorized, you may test:
1. Pipes over 27 inches in nominal diameter 1 joint at a time under ASTM C 1103 instead of the
exfiltration test under section 61-1.01D(2)(a)(ii).
2. Plastic pipe 30 inches or less in nominal diameter with the low-pressure air test under ASTM F 1417.
3. Pipes 36 inches or less in nominal diameter with the negative 3.5 psi air pressure (vacuum) test
under ASTM C 1214 instead of the exfiltration test or low-pressure air test under section 61
1.01D(2)(a)(ii). The minimum test times for pressure drop for pipes:
3.1. 30 inches in nominal diameter and smaller must be the same as the low-pressure air test under
section 61-1.01D(2)(a)(ii)
3.2. 33 inches in nominal diameter must be 5.4 minutes per 100 feet
3.3. 36 inches in nominal diameter must be 6.0 minutes per 100 feet
61-1.01D(2)(a)(v) Joints or Pipe Section Not Passing Leakage Testing
Identify joints or pipe sections that exceed the maximum allowable leakage after you complete field
leakage testing. Repair and retest the failed joints or pipe sections until they comply with test
requirements.
Repair and retest the failed joints or pipe sections as described in the repair procedures submitted under
section 61-1.01C. If the same joint fails the leakage test a 2nd time, remove and replace the pipe sections
on either side of the joint with new pipes. Whenever a pipe section fails, replace it. Retest the replaced
pipe section for leaks. The Department does not pay for repair, replacement, and retesting of failed joints
or pipe sections.
61-1.01D(2)(b) Reserved
61-1.02 MATERIALS
Not Used
61-1.03 CONSTRUCTION
Not Used
61-1.04 PAYMENT
Field leakage testing is measured along the invert of the pipe. The payment quantity includes the length
through elbows, tees, and other fittings that have passed field leakage tests. Lengths of pipe that need to
733

SECTION 61

CULVERT AND DRAINAGE PIPE JOINTS

be retested are not included in the measured quantities until passing field leakage tests have been
attained. Where drainage inlets or similar structures are within the length of the pipe to be tested, the
length of pipe is measured to the inside face of the structure.

734

62 ALTERNATIVE CULVERTS

62-1 GENERAL

62-1.01 GENERAL

Section 62-1 includes general specifications for constructing alternative culverts, alternative slotted pipe,
temporary culverts, and for placing concrete backfill for pipe trenches.
Choose from the types of alternative culverts shown. If chosen for alternative culvert:
1.
2.
3.
4.
5.
6.
7.
8.

Reinforced concrete pipe and pipe arches must comply with section 65
Corrugated steel pipe and pipe arches must comply with section 66
Corrugated aluminum pipe and pipe arches must comply with section 66
High density polyethylene pipe must comply with section 64
Polyvinyl chloride pipe must comply with section 64
Structural steel plate pipe, arches, and pipe arches must comply with section 67
Structural aluminum plate pipe, arches, and pipe arches must comply with section 67
Reinforced concrete box culverts and arch culverts must comply with section 51
62-2 ALTERNATIVE SLOTTED PIPE

62-2.01 GENERAL
Section 62-2 includes specifications for constructing alternative slotted pipe.
Choose from the types of alternative slotted pipe shown. Do not mix types of slotted pipe in the same
installation.
If chosen for alternative slotted pipe:
1. Slotted plastic pipe must comply section 64-2
2. Slotted corrugated steel pipe must comply the specifications for slotted corrugated steel pipe in
section 66-2
62-2.02 MATERIALS
Not Used
62-2.03 CONSTRUCTION
Not Used
62-2.04 PAYMENT
Not Used
62-3 TEMPORARY CULVERTS
62-3.01 GENERAL
Section 62-3 includes specifications for constructing temporary culverts.
Temporary culverts include pipe bends, wyes, tees, and other branches.
Excavation, backfill, and shaped bedding must comply with section 19-3.
62-3.02 MATERIALS
You may use used pipe if the pipe complies with the specifications for new pipe. Obtain authorization for
used pipe.
62-3.03 CONSTRUCTION
Install a size and type of temporary culvert at each location capable of sustaining the intended load and
discharging a quantity of water equivalent to the type and size of culvert shown. Obtain authorization for
the strength and capacity of the culvert before installation.
You may install a removed, undamaged, temporary culvert in the permanent work if it complies with the
specifications for the permanent culvert and it is new when installed as a temporary culvert on the project.

735

SECTION 62

ALTERNATIVE CULVERTS

Excavate and backfill the trench for a temporary culvert in a way that provides a firm, nonsettling
foundation for the roadbed to be constructed over the culvert.
Remove and dispose of the culvert when the Engineer determines that the temporary culvert is no longer
required for the work.
62-3.04 PAYMENT
Temporary culvert is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity includes the length of pipe reducers, bends, wyes, tees, and other branches to the point
of intersection. The payment quantity is the length determined by the Engineer. If pipes are cut to fit a
structure or slope, the payment quantity is the length of pipe necessary to be placed before cutting,
measured in 2-foot increments.
Pipe reducers are paid for as pipe of the larger diameter connected to the reducer.
62-4 CONCRETE BACKFILL FOR PIPE TRENCHES
62-4.01 GENERAL
62-4.01A Summary
Section 62-4 includes specifications for placing concrete backfill in pipe trenches.
62-4.01B Submittals
If RSC is used for concrete backfill, submit the concrete mix design and test data from an authorized
laboratory 10 days before excavating the pipe trench. The laboratory must specify the cure time required
for the concrete mix to attain 500 psi compressive strength when tested under California Test 521.
62-4.02 MATERIALS
Concrete for concrete backfill must comply with the specifications for minor concrete, except the concrete
must contain at least 380 pounds of cementitious material per cubic yard. You may use RSC instead of
minor concrete for concrete backfill.
If RSC is used for concrete backfill, the RSC must:
1. Contain at least 505 pounds of cementitious material per cubic yard
2. Comply with section 90-3.02A except section 90-1 does not apply
3. Comply with section 90-2
62-4.03 CONSTRUCTION
For installation of plastic pipe where saturated clay, peat, or other unsuitable material is encountered
immediately adjacent to the pipe trench, the material must be removed to a distance at least equal to 1/4
of the pipe diameter, but not less than 6 inches, on each side of the pipe.
Place concrete backfill in the trench against undisturbed material at the sides and bottom of the trench in
a way that prevents (1) floating or shifting of the pipe and (2) voids or segregation of the concrete.
Immediately remove foreign material that falls into the trench before or during placement of the concrete.
Construct and compact earth plugs at the ends of the planned concrete backfill to contain the concrete
within the trench where necessary.
Wherever minor concrete is used, do not place materials on top of the concrete backfill within 8 hours of
placing the concrete backfill.
Wherever RSC is used, do not place materials on top of the concrete backfill before the required cure
time to achieve 500 psi as specified in section 62-4.01B.
Consolidate concrete backfill using high-frequency internal vibrators.
If HMA is to be placed directly thereon, broom the concrete backfill surface with a heavy broom to
produce a uniform rough surface.
62-4.04 PAYMENT
If the limits of concrete backfill for pipe trenches are shown, the volume of concrete backfill is based on
the dimensions shown and the length of pipe designated by the Engineer.
736

SECTION 62

ALTERNATIVE CULVERTS

If the limits of concrete backfill for pipe trenches are not shown, the volume of concrete backfill is based
on the following:
1. Horizontal limits are determined from vertical planes 6 inches outside of each side of the pipe for a
diameter or span of less than 42 inches and 12 inches outside of each side of the pipe for a diameter
or span of 42 inches or greater.
2. Upper limit is determined from a horizontal plane 12 inches above the top of the pipe.
3. Lower limit is determined from a horizontal plane at the bottom of the pipe.
4. Length of pipe designated by the Engineer.
5. Volume occupied by the pipe will not be included in the quantities. Concrete backfill placed outside of
these limits will not be included in the quantities paid for unless greater limits are ordered.
If alternative pipe is shown, the volume of concrete backfill is based on the required trench width for the
pipe with the smallest outside diameter.

63 RESERVED

737

64 PLASTIC PIPE

64-1 GENERAL

64-1.01 GENERAL
64-1.01A Summary
Section 64-1 includes general specifications for fabricating and constructing plastic pipe.
Plastic pipe includes all necessary elbows, wyes, tees, other branches, fittings, and coupling systems.
64-1.01B Submittals
Submit a certificate of compliance for plastic pipe, including the average pipe stiffness, resin material cell
classification and date of manufacture.
For corrugated polyethylene pipe, submit the manufacturer's copy of plant audits and test results from the
National Transportation Product Evaluation Program for the current cycle of testing for each pipe
diameter furnished.
64-1.02 MATERIALS
64-1.02A General
Plastic pipe must be Type C or Type S corrugated polyethylene pipe, or corrugated PVC pipe with
smooth interior.
The residue from the ignition of HDPE and PVC compounds must not exceed 30 percent as determined
under ASTM D2584 except the muffle furnace temperature must be 840 45 degrees F.
Pipes and fittings must be homogenous throughout and uniform in color, opacity, density, and other
properties. The inside and outside surfaces must be semi-matte or glossy in appearance and free of
chalky, sticky, or tacky material. The pipe walls must be free of cracks, holes, blisters, voids, foreign
inclusions, or other defects affecting the pipe wall integrity or visible to the naked eye. Do not use pipes or
fittings with abrasions or scratches deeper than 10 percent of the wall thickness. The joint surfaces where
the gaskets bear must be smooth and free of imperfections, ridges, fractures, or cracks that could
adversely affect the joint seal.
Store pipes in a way that protects gaskets from the weather.
Store pipes in unit packages. Protect the bell end of pipes from damage. Support unit packages with
racks or dunnage to prevent damage and bending. Take measures to ensure the weight of the upper
units does not cause deformation to pipes in the lower units whenever the unit packages are stacked. Do
not store pipes adjacent to heat sources. Do not allow pipes to overhang vehicles or storage areas
unsupported for more than 3 feet.
Cover pipes to provide temporary sun block protection. Provide adequate air circulation around the
covered pipes to reduce excessive heat accumulation. Protect gaskets from exposure to heat, ozone, oil,
grease, and sunlight for any time period exceeding 48 hours. Do not store gaskets near electrical or
exhaust heat sources.
The Department rejects pipes with cracked or split gaskets.
Protect pipes and fittings from damage when handling and installing. Do not damage placed pipes. Do not
use cracked or chipped pipes and fittings.
64-1.02B Backfill
Structure backfill material for plastic pipe must comply with section 19-3 except the gradation of structure
backfill must comply with the following table:

739

SECTION 64

PLASTIC PIPE
Structure Backfill for Plastic Pipe
Sieve size
Percentage passing
1-1/2"
100
No. 4
2570
No. 50
520
No. 200
05

Controlled low-strength material and slurry cement backfill must comply with section 19-3.
64-1.02C Corrugated Polyethylene Pipe
Corrugated polyethylene pipe must be 60 inches or less in nominal diameter.
Type C and Type S corrugated polyethylene pipe must comply with AASHTO M 294. Corrugated
polyethylene pipe must be manufactured from HDPE virgin compounds.
HDPE compounds used in the manufacture of corrugated polyethylene pipe and fittings must comply with
AASHTO M 294 except the mix must contain from 2 to 4 percent well-dispersed carbon black.
The corrugated polyethylene pipe manufacturer must:
1. Participate in National Transportation Product Evaluation Program for each plant supplying
corrugated polyethylene pipe and fittings for the project
2. Conduct and maintain a quality control program under National Transportation Product Evaluation
Program
64-1.02D Corrugated PVC Pipe with Smooth Interior
Corrugated PVC pipe must have a smooth interior.
Corrugated PVC pipe with smooth interior must be manufactured as a single extrusion. The corrugated
exterior profile must be annular and seamless. The pipe dimensions, wall thickness, socket sizes, and
fitting tolerances must comply with ASTM F949.
The minimum stiffness of corrugated PVC pipe must be 46 psi when tested under ASTM D2412.
Corrugated PVC pipe and fittings must be manufactured from PVC virgin compounds, except clean,
reworked, recycled PVC materials generated from the manufacturer's pipe or fitting fabrication may be
reused.
Corrugated PVC pipe must comply with ASTM F949 for cell classification 12454 under ASTM D1784.
Fillers that lower the tensile strength of the compound or change the minimum cell classification are not
allowed. PVC compounds must contain at least 0.5 percent by weight rutile titanium dioxide or the
quantity recommended by the pipe manufacturer.
The chemical resistance of corrugated PVC pipe and fittings must comply with ASTM D5260 for cell
classification S47552.
The manufacturer's code must include the day, month, year, shift, and plant of manufacture.
Do not expose pipes to direct sunlight for more than 30 days.
64-1.02E Joints
Plastic pipe joints must comply with section 61-1.01D(1)(b) for standard or positive joints. Where sleeve
joint connections are used, the sleeve width must be at least 7-3/4 inches and engage at least 2
corrugations of each pipe being joined.
Joints for pipes shown as watertight must be watertight under pressure and all conditions of expansion,
contraction, and settlement, and must comply with section 61-1.01D(1)(b) for watertightness.
For corrugated polyethylene pipe:

740

SECTION 64

PLASTIC PIPE

1. If watertight joints are not shown, Type S corrugated polyethylene pipe must incorporate a closed-cell
expanded rubber gasket on each side of the joint complying with ASTM D1056, Grade 2A2. Gaskets
must be factory-installed.
2. Corrugated polyethylene pipe joints manufactured to comply with section 61-1.01D(1)(b) for integral
joints must be laid to line and grade with sections closely jointed. Corrugated polyethylene pipe to be
joined by sleeve joints must be laid to line and grade with the separate sections not more than 1-1/2
inches apart and then firmly joined together with at least 2 corrugations from each pipe section
engaged in the coupler.
For corrugated PVC pipe with smooth interior:
1. Elastomeric gaskets must comply with ASTM F477 for low-head applications. Use extruded or
molded gaskets cured in a way so that any cross section will be dense, homogeneous, and free of
porosity, blisters, pitting or other imperfections. Double gaskets must be single-piece gaskets that fit
into the first 2 full corrugation valleys on the spigot end. Ship gaskets in containers that will prevent
damage from UV exposure and handling.
2. Wyes, tees, reducers, elbows, couplings, laterals, and other fittings must be molded or fabricated
under ASTM F949 for cell classification 12454 or 13343 as specified in ASTM D1784.
3. Lubricant must comply with the pipe manufacturer's instructions. The lubricant must not have a
detrimental effect on gaskets or pipes.
4. Joints must comply with section 61-1.01D(1)(b) for integral joints except the joint overlap
requirements must be as shown. Pipe joints must be bell and spigot type with gaskets ready for field
assembly. Install joints so that the elastomeric gasket will be compressed radially between the pipe
bell and spigot to form a tight seal when assembled.
64-1.02F64-1.02H Reserved
64-1.03 CONSTRUCTION
64-1.03A General
Install Type C corrugated polyethylene pipe wherever corrugated interior wall type is shown.
Install Type S corrugated polyethylene pipe or corrugated PVC pipe wherever smooth interior wall type is
shown.
You may install corrugated or smooth interior wall pipe if the type of plastic pipe is not shown.
For PVC pipe, whenever the atmospheric temperature is forecast to be 40 degrees F or less,
demonstrate to the Engineer that the bar and block method or any other mechanical assistance method
for assembling the pipes will not damage the pipes before proceeding with pipe assembly.
64-1.03B Earthwork
Excavation, backfill, and shaped bedding must comply with section 19-3 except:
1. Where saturated clay, peat, or other unsuitable material is encountered immediately adjacent to the
pipe trench, remove the material to a distance at least equal to the pipe diameter on each side of the
pipe if compacted backfill is to be placed, or a distance at least equal to 1/4 the pipe diameter, but not
less than 6 inches, on each side of the pipe if slurry cement or controlled low-strength material is to
be placed.
2. Backfill corrugated polyethylene pipe greater than 48 inches in nominal diameter with either controlled
low-strength material under section 19-3.02F or with slurry cement backfill under section 19-3.02D.
3. Place controlled low-strength material or slurry cement backfill used for structure backfill to a level at
least 12 inches above the pipe crown.
Lay plastic pipe in a trench excavated to the established lines and grades. Grade and prepare the bottom
of the trench as shown throughout the entire length of the pipe.
Removing unsuitable material and replacing it with suitable material is change order work.
64-1.03C Laying Pipe
Provide the necessary facilities for lowering and properly placing pipe sections in the trench.

741

SECTION 64

PLASTIC PIPE

Lay plastic pipe to line and grade with sections closely jointed.
Do not let the pipe trench flood before backfilling.
Connect new plastic pipe to existing or new drainage facilities as shown. Construct concrete collars or tee
connections with minor concrete whenever concrete collars or tee connections are required to connect
new plastic pipe to existing or new pipes. Reinforcement for concrete collars and tees must comply with
section 52.
For corrugated PVC pipe with smooth interior:
1. Install gaskets on pipe spigots after the pipe is placed into the trench and ready for joint connection.
Place the gasket on the spigot end under the pipe manufacturer's installation instructions. The leading
edge of the gasket must point in the direction of the spigot end whenever a double gasket is used.
Both the spigot and bell ends must be free of debris before connection. Apply the pipe manufacturer's
recommended lubricant to the inside of the bell and over the gasket. Insert the spigot end of the pipe
into the bell end until the factory provided insertion line on the spigot end lines up with the bell edge.
2. Whenever the spigot end of a pipe is shortened, cut the end square and bevel it to the same angle as
provided on the factory-finished spigot end so that burrs are not visible. Re-mark the shortened pipe
with a new insertion line on the spigot using a factory-marked spigot insertion line as a guide.
3. Cover the ends of installed corrugated PVC pipe that were not backfilled after installation at the end
of each day.
4. Pipes must not exhibit deflection in excess of 5 percent of the original inside diameter at any location
after being backfilled to at least 5 feet above the top of the pipe or to the completed grade, whichever
is less.
64-1.04 PAYMENT
Plastic pipe is measured along the centerline of the pipe and parallel with the slope line. The payment
quantity includes the length of elbows, wyes, tees, and other branches to the point of intersection. The
payment quantity is the length designated by the Engineer. If the pipe is cut to fit a structure or slope, the
payment quantity is the length of pipe necessary to be placed before cutting, measured in 2-foot
increments.
64-2 SLOTTED PLASTIC PIPE
64-2.01 GENERAL
64-2.01A Summary
Section 64-2 includes specifications for fabricating and constructing slotted plastic pipe.
Slotted plastic pipe includes structure excavation, concrete backfill, connecting new pipe to new or
existing facilities, concrete collars, reinforcement, and other connecting devices.
64-2.01B Submittals
If RSC is used for concrete backfill for slotted plastic pipe, submit the concrete mix design and test data
from an authorized laboratory 10 days before excavating the pipe trench. The laboratory must specify the
cure time required for the concrete mix to attain 2,000 psi compressive strength when tested under
California Test 521.
64-2.02 MATERIALS
64-2.02A General
The interior surface of slotted plastic pipe must be smooth except for the vertical and top wall stiffening
ridges. Slotted plastic pipe must be polyethylene.
Slotted plastic pipe must:
1. Be manufactured from polyethylene consisting of virgin polyethylene resin and carbon black
2. Comply with the resin and requirements shown in the following table:

742

SECTION 64

PLASTIC PIPE

Slotted Plastic Pipe Property Requirements


Property
ASTM test
Requirements
designation
Resin Properties:
Density (g/cm)
D1505
0.9340.935
Melt index (g/10 minutes)
D1238
510
Performance Properties:
Flexural modulus (psi)
D790
80,000 (min)
Tensile strength @ yield (psi)
D638
2,400 (min)
Environmental stress crack
D1693
Test condition B, duration 24 hr,
resistance
45% failure (max)
Hydrostatic design basis
D2837
Not pressure rated
a
Color and UV stabilizer
-C
a
Resin must not contain less than 2 0.5 percent carbon black UV stabilizer.
The wall thickness of slotted plastic pipe must be at least 0.23 inch. The vertical and top slope walls,
except the slot, must be shaped to create external ridges at least 3/8 inch deep and 1-3/8 inches wide at
intervals not greater than 10 inches on center when the pipe is manufactured. The ridges must provide
enough wall stiffness so that the pipe does not deflect more than 1/16 inch when concrete backfill is
placed against the pipe walls.
End caps must be manufactured to the same material requirements as plastic slotted pipe. The end caps
and plastic slotted pipe must be made by the same manufacturer. The end caps must prevent concrete
backfill from entering the pipe.
Slotted plastic pipe must have tongue-and-groove interlocking ends and clips molded into the sides of the
channel to accommodate vertical reinforcing bars for positioning and anchoring purposes. Slots must be
at least 1-3/4 inches wide and have hollow throat stiffeners at 5-inch maximum intervals to keep the slot
sides apart.
64-2.02B Concrete Backfill for Slotted Plastic Pipe
Concrete for concrete backfill for slotted plastic pipe must comply with the specifications for minor
concrete. You may use RSC instead of minor concrete for concrete backfill.
If RSC is used for concrete backfill, the RSC must:
1. Contain at least 590 pounds of cementitious material per cubic yard
2. Comply with section 90-3.02A, except section 90-1 does not apply
3. Comply with section 90-2
64-2.02C Heel Resistant Grates
Heel resistant grates must comply with ADA requirements. Grate slots must be 1/2 inch wide maximum
with an open area of at least 7.43 square inches per square foot area of grate. Grates must be ductile
iron.
64-2.02D Bar Reinforcement
Bar reinforcement must comply with ASTM A615/A615M, Grade 60, or ASTM A706/A706M, Grade 60.
64-2.02E Miscellaneous Metal
Ductile iron, nuts, bolts, and washers must comply with section 75.
64-2.02F Grout
Grout must be nonshrink grout complying with ASTM C1107/C1107M.
64-2.02G Reserved
64-2.03 CONSTRUCTION
Wherever minor concrete is used for concrete backfill for slotted plastic pipe, do not allow traffic on top of
the concrete backfill within 7 days of placing the concrete backfill.
743

SECTION 64

PLASTIC PIPE

Wherever RSC is used for concrete backfill for slotted plastic pipe, do not allow traffic on top of the
concrete backfill before the required cure time to achieve 2,000 psi as specified in section 64-2.01B.
Excavation must comply with section 19-3.
Pave adjacent traffic lanes before installing slotted plastic pipe.
Lay and join slotted plastic pipe under the pipe manufacturers instructions.
Lay slotted plastic pipe to line and grade with sections closely jointed and adequately secured to prevent
separation during placement of the backfill. If the plastic slotted pipe does not have a positive interlocking
mechanism like a slot and tongue connection, secure the sections together with nuts, bolts and washers
before backfilling.
The top of slotted plastic pipe must not extend above the completed surface. Position the pipe so that the
completed concrete backfill will be flush with the surrounding grade and 1/8 to 1/4 inch above the top of
the grate.
Place channels with the male and female ends facing each other.
Weld slotted plastic pipe at joints with a commercial electric welding tool under the pipe manufacturer's
instructions where shown. The constructed welds must not have visible pinholes. The Department may
reject transition pieces that have welds with pinholes. Do not reuse the rejected material. Dispose of
rejected pieces.
Place lateral support bar reinforcement on both sides of the grate slots where shown. The support bar
reinforcement must run the full length of the grate slot.
Anchor heel resistant grates to the concrete backfill with bent 18-inch, no. 3 reinforcement bars threaded
through a metal hook or eye attached to the underside edge of the grate where shown. Place the
reinforcement bars at 20-inch maximum intervals on each longitudinal edge of the grate. You may use
another method to secure the grate to the concrete backfill if authorized 30 days before installation.
Use a transition fitting to connect a slotted plastic pipe to a drainage inlet. The transition fitting must be
supplied by the pipe manufacturer.
Fill the gap around the pipe in the structure wall with nonshrink grout where the plastic slotted pipe
connects to an existing drainage structure. Install the grout under the pipe manufacturer's instructions.
Cut the pipe as shown after the grout used to seal the transition fitting has cured for at least 24 hours.
Cover slots with heavy-duty tape or other authorized covering during backfilling and paving activities to
prevent material from entering the slots.
Place concrete backfill where shown.
Consolidate the concrete backfill with high-frequency internal vibrators.
Texture the concrete surface with a broom or burlap drag to produce a durable skid-resistant surface.
Apply a nonpigmented curing compound to the exposed concrete backfill surface whenever the
atmospheric temperature will be 90 degrees F or greater after placing the concrete backfill. The
nonpigmented curing compound must comply with ASTM C309 Type 1, Class B.
64-2.04 PAYMENT
Slotted plastic pipe is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity is the length designated by the Engineer. If the pipe is cut to fit a structure or slope, the
payment quantity is the length of pipe necessary to be placed before cutting, measured in 2-foot
increments.

744

65 CONCRETE PIPE

65-1 GENERAL

65-1.01 GENERAL
Section 65-1 includes general specifications for fabricating and constructing concrete pipe.
Concrete pipe includes all necessary bends, wyes, tees, and other branches.
Excavation, backfill, and culvert beddings must comply with section 19-3.
65-2 REINFORCED CONCRETE PIPE
65-2.01 GENERAL
65-2.01A Summary
Section 65-2 includes specifications for fabricating and constructing reinforced concrete circular pipe, oval

shaped pipe, and pipe arches and nonreinforced concrete pipe for culverts, siphons, drains, and conduits.

65-2.01B Definitions

modified designs: Designs that differ from direct designs shown with respect to reinforcement only.

special designs: Designs that differ from direct designs in any respect from those shown.

oval shaped pipe: Pipes having major and minor internal axial dimensions as described. The minor axis
length must be 60 to 65 percent of the major axis length. The 1st dimension designated represents
the rise and the 2nd dimension represents the span.
65-2.01C Submittals
If you choose to use resilient joint materials, submit the resilient joint materials for testing and
authorization.
Submit the following for circular reinforced concrete pipe, direct design method:
1. Shop drawings. Modified designs and special designs must comply with the Department's bridge
design specifications. For modified designs, do not change the clear coverage between the surface of
the concrete and the outside of the reinforcement or the thickness of the pipe barrel wall shown.
Submit 3 sets of shop drawings for initial review by the Office of Culverts and Underground
Structures. Submit 6 sets of shop drawings after the initial review for use during construction and by
the Office of Culverts and Underground Structures. Shop drawings must include:
1.1. Wall thickness
1.2. Type, size, location, and configuration of the reinforcement
1.3. List of station locations for the pipes, including the size, wall type, and maximum cover height
1.4. Method of excavation, bedding, and backfill for each location
2. Proof of adequacy for modified design proposals and special design proposals. The Engineer will
determine the adequacy of modified and special designs based upon compliance with crack
requirements and structural design parameters. The Department will not be liable to you for failure to
accept any modified design or special design you submit.
3. Copy of the concrete mix design before using the concrete or revising the mix proportions
4. Certificate of compliance for each pipe shipment. The certificate must:
4.1. Be signed by the manufacturer's quality control representative
4.2. State that all materials and workmanship comply with the specifications and authorized shop
drawings
For nonreinforced concrete pipe substituted for circular reinforced concrete pipe described or chosen by
class, submit proof of adequacy for proposed modifications or special designs. Proof must consist of 3
edge bearing tests either (1) certified by an authorized laboratory or (2) be pipe manufacturer's tests
witnessed by State representatives. The tests must demonstrate the adequacy of the proposed design. A
minimum of 3 proof tests will be required for each size and class you supply.
65-2.01D Quality Control and Assurance
65-2.01D(1) General
Reserved
745

SECTION 65

CONCRETE PIPE

65-2.01D(2) Field Testing of Siphon and Pressure Pipe


Perform field leakage tests on siphons and low-head conduits with internal hydrostatic heads not
exceeding 50 feet.
Fill the pipe with water to a hydrostatic head of 10 feet above the highest point in the line after the pipe
has been laid and backfill has been placed and compacted to a minimum of 2 feet above the pipe.
Conduct a hydrostatic test for a period of not less than 24 hours. Make accurate measurements of the
water required to maintain the test pressure during that period. Any leakage developed by the test must
not exceed the allowable leakage as computed by the following formula:
E = 0.00002H1/2LD
where:
E = allowable leakage in gpm
H = difference in elevation in feet between the water surface at 10 feet above the highest point in
the line and the invert elevation of the pipe at its lowest point
L = length of the culvert or drainage pipe in feet
D = internal diameter of the pipe in inches
Furnish all water, materials, and labor for the hydrostatic test. Conduct all hydrostatic tests in the
presence of the Engineer. The Department does not pay for hydrostatic testing.
Stop any leakage in excess of the allowable leakage as authorized. Repeat the hydrostatic test until the
total leakage does not exceed the allowable leakage. Stop all obvious leaks whether or not the leakage
from the line exceeds the allowable leakage.
You may maintain the pipe line full of water for not more than 8 hours before you start hydrostatic testing.
65-2.02 MATERIALS
65-2.02A General
The cementitious material and aggregate for reinforced concrete pipe must comply with section 90-1.02,
except (1) grading requirements do not apply to the aggregate and (2) the use of SCM must comply with
AASHTO M 170.
The concrete for reinforced concrete pipe must contain at least 470 pounds of cementitious material per
cubic yard and have a water-cementitious material ratio that does not exceed 0.40 by weight. You may
use SCM. Reinforcement must have a minimum cover of 1 inch, except pipes with a nominal diameter of
18 inches or less must have a minimum cover of 3/4 inch.
Special reinforced concrete pipe having concrete cover over the steel reinforcement greater than the
cover under AASHTO M 170 must comply with section 65-2.02, except the crack width produced by the
D-load test under AASHTO M 170 must be determined by the following formula:
t - 3/8d

b=

t - 3/8d - C

x 0.01 inch

where:
b=

t=
d=
C=

Width of crack to be produced instead of


0.01-inch crack under
AASHTO M 170
Wall thickness of pipe, inches
Effective depth of section to be tested, feet
Concrete cover over steel reinforcement in
excess of cover under AASHTO M 170

Before hydrostatic testing, reinforced concrete pipe must be tested under the 3-edge bearing method to a
maximum D-load that is 10 percent greater than the 0.01-inch cracking D-load under AASHTO M 170 or
to the actual D-load required to produce a 0.01-inch-wide crack, whichever is less.

746

SECTION 65

CONCRETE PIPE

65-2.02B Circular Reinforced Concrete Pipe


65-2.02B(1) General
Circular reinforced concrete pipe described by class must comply with section 65-2.02B(2) for the class of
pipe described.
If the class of pipe is not described, and the nominal diameter is less than 24 inches, choose the class of
pipe. The pipe chosen must comply with section 65-2.02B(2).
If the class of pipe is not described, and the nominal diameter is 24 inches or greater, choose either:
1. The class of pipe. The pipe chosen must comply with section 65-2.02B(2)
2. The wall thickness and reinforcement details under section 65-2.02B(3)
65-2.02B(2) Circular Reinforced Concrete Pipe, Described or Chosen by Class
Circular reinforced concrete pipe described or chosen by class must comply with AASHTO M 170.
If the class of circular reinforced concrete pipe is not described, choose the class of pipe and
corresponding method of backfill for the type of installation shown.
If the class of circular reinforced concrete pipe is described, choose the method of backfill for the type of
installation shown.
The D-load to produce a 0.01-inch-wide crack must be not less than the specified D-load.
For pipe classes not specified under AASHTO M 170, but within the minimum and maximum size limits
under AASHTO M 170, determine the wall thickness and steel area by interpolation from data given in the
tables for pipes of the next smaller size and pipes of the next larger size.
For pipe classes, except Class I, that are less than the minimum size for a particular class under
AASHTO M 170, the minimum wall thickness must be not less than 1-3/4 inches and the steel area must
be not less than 0.06 square inch per linear foot of pipe barrel.
The Department will grant the authorization required under AASHTO M 170 to extrapolate minimum wall
thicknesses and steel areas beyond the limits for Walls A or B in table 4 and for Wall B in table 5 under
AASHTO M 170 if you submit your pipe designs in advance and the pipes comply with all of the specified
tests and performance requirements.
The basis for acceptance of reinforced concrete pipe over 24 inches in nominal diameter is determined
from results of the 3-edge bearing test for the load to produce a 0.01-inch-wide crack. Testing to the
ultimate load is not required except as necessary to obtain samples for the absorption test.
Pipes 24 inches in nominal diameter and smaller do not need to be tested to the load to produce a 0.01
inch-wide crack if the pipe is subjected to a load equivalent to the ultimate test load and complies with
section 65-2.02. Instead of broken pipe pieces obtained as specified above, you may furnish 4-inch
diameter cores from pipe sections selected by the Engineer for performing the absorption test. Pipe
sections that have been tested to the actual 0.01-inch-wide crack will not be load-tested further, and
those sections that comply with or exceed the required strength and workmanship standards may be
used in the work if authorized.
Pipes must be marked as specified in AASHTO M 170, except circular pipe sections with elliptical
reinforcing must have the location of the minor axis of the reinforcing indicated by 3-inch-wide,
waterproof, painted stripes on the inside and outside of each pipe at the top and bottom, at least 12
inches long at each pipe section end, or you may provide a lift hole or lift holes at the top of each pipe
along the minor axis of the reinforcement. If 1 lift hole is provided, the lift hole must be located at the
balance point; if 2 lift holes are provided, the lift holes must be spaced equidistant on each side of the
balance point. The lift holes must not interfere with the reinforcement. After placing the pipe, fill the open
lift holes with cement mortar or concrete plugs before backfilling.
For reinforced concrete pipe sizes 36 inches in nominal diameter and smaller, you may substitute
nonreinforced concrete pipe if the nonreinforced concrete pipe complies with the following requirements:

747

SECTION 65

CONCRETE PIPE

1. Minimum 3-edge bearing strength must be the D-load to produce the ultimate load for the class of
equivalent reinforced concrete pipe under AASHTO M 170.
2. Pipes must comply with AASHTO M 86M/M 86, Class 1, 2 or 3 as required to comply with the
specified D-load requirements. You may request authorization for modified or special designs under
AASHTO M 86M/M 86.
3. Cementitious material and aggregate for nonreinforced concrete pipe must comply with specifications
for cementitious material and aggregate under section 65-2.02.
65-2.02B(3) Circular Reinforced Concrete Pipe, Direct Design Method
Circular reinforced concrete pipe, direct design method must comply with AASHTO M 170.
The wall thickness and reinforcement you choose must comply with the details shown and section 65
2.02B(3). Use the backfill method shown for the particular pipe design chosen.
The 3-edge bearing test does not apply to direct design method pipes.
The wall thickness of Wall X circular reinforced concrete pipe must not vary by more than 1/4 inch from
the wall thickness shown.
Determine the mix proportions for the concrete to be used in direct design method pipes.
Concrete must comply with the specifications for concrete designated by compressive strength.
Sample and test the concrete compressive strength at least once every production shift, but not less than
once daily.
The circumferential reinforcement for circular reinforced concrete pipe must be smooth or deformed
reinforcement with a minimum yield strength of 65,000 psi. Longitudinal reinforcement must be welded to
it at not more than 8-inch spacing if the reinforcement is smooth or at not more than 16-inch spacing if the
reinforcement is deformed.
Splices of circumferential reinforcement must develop a strength at least equal to Awr x Fy.
Where:
Awr = required area of reinforcement shown
Fy = specified yield strength of reinforcement
Spacers or stirrups may be welded to the longitudinal reinforcement. The welding of spacers or stirrups
will be allowed on not more than 10 percent of the circumferential reinforcement at not less than 24-inch
spacing along the pipe length. The strength of the circumferential reinforcement across the completed
welds must be at least equal to 1.1 x Awr x Fy where spacers or stirrups are welded to the circumferential
reinforcement in excess of the above requirements or where longitudinals are welded to the
circumferential reinforcement.
If you determine that handling and installation stresses require additional reinforcement, furnish and place
additional reinforcement. The Department does not pay for additional reinforcement required for handling
and installation stresses.
Markings for circular reinforced concrete pipe, direct design method must comply with AASHTO M 170,
except the pipe class marking is not required. The markings under AASHTO M 170 must be
supplemented with the Contract number, maximum cover height, and method of backfill.
65-2.02C Oval Shaped Reinforced Concrete Pipe
Oval shaped reinforced concrete pipe must comply with AASHTO M 207M/M 207.
The Department will grant the authorization required under AASHTO M 270/M 270 to extrapolate the
minimum wall thicknesses and steel areas beyond the limits in table 1 and table 2 under AASHTO M
207M/M 207 if you submit your pipe designs in advance and the pipes comply with the specified tests and
performance requirements.
The basis for acceptance of oval shaped reinforced concrete pipe larger in size than an equivalent 24
inch-nominal-diameter circular pipe must be determined by the results of the 3-edge-bearing test for the
748

SECTION 65

CONCRETE PIPE

load to produce a 0.01-inch-wide crack. Testing to the ultimate load will not be required except as
necessary to obtain samples for the absorption test.
Oval shaped reinforced concrete pipe 24 inches in nominal diameter and smaller does not need to be
tested to the load to produce a 0.01-inch-wide crack if the pipe is subjected to a load equivalent to the
ultimate test load and complies with section 65-2.02. Instead of broken pipe pieces obtained as specified
above, you may furnish 4-inch-diameter cores from pipe sections selected by the Engineer for performing
the absorption test. Pipe sections that have been tested to the actual 0.01-inch-wide crack will not be
load-tested further, and those sections that comply with or exceed the required strength and workmanship
standards may be used in the work if authorized.
Special oval shaped reinforced concrete pipe having concrete cover over the steel reinforcement greater
than the cover specified under AASHTO M 207M/M 207 must comply with section 65-2.02C, except the
crack width produced by the D-load test under AASHTO M 207M/M 207 must be determined by the
following formula:
t - 3/8d

b=

t - 3/8d - C

x 0.01 inch

where:
b=

Width of crack to be produced instead of


0.01-inch crack under
AASHTO M 270
t = Wall thickness of pipe, inches
d = Effective depth of section to be tested, feet
C = Concrete cover over steel reinforcement in
excess of cover under AASHTO M 207M/M 207
Before hydrostatic testing, oval shaped reinforced concrete pipe must be strength tested by the 3-edge
bearing method to a maximum D-load that is 10 percent greater than the 0.01-inch cracking D-load under
AASHTO M 207 or to the actual D-load required to produce a 0.01-inch wide crack, whichever is less.
65-2.02D Reinforced Concrete Pipe Arches
Reinforced concrete pipe arches must comply with AASHTO M 206M/M 206.
Reinforced concrete pipe arches must be of the class described.
The basis for acceptance of reinforced concrete pipe arches must be determined from results of the 3
edge-bearing test for the load to produce a 0.01-inch-wide crack. Testing to the ultimate load will not be
required, except as necessary to obtain samples for the absorption test.
65-2.02E Joints
Joints for culvert and drainage pipes must be standard joints unless the classification is described.
At your choosing, reinforced concrete pipe joints must comply with the details shown or section 61
1.01D(1)(b).
Seal each joint to prevent leakage and infiltration. Unless described otherwise, sealing materials must be
one or more of the following:
1. Cement mortar composed of 1 part portland cement and 2 parts sand by volume and the following:
1.1. Sand must be well graded and of such size that it will pass a no. 8 sieve.
1.2. Materials must be mixed to a consistency suitable for the purpose intended. Use the mortar
within 30 minutes after you add the mixing water.
1.3. You may use admixtures of hydrated lime, fire clay, diatomaceous earth, or other authorized
inert material in the mortar to facilitate workability. Obtain authorization for the quantity of
admixture.
2. Rubber gasketed joints complying with ASTM C443. Rubber gasketed joints must be:
2.1. Flexible and able to withstand expansion, contraction, and settlement.

749

SECTION 65

CONCRETE PIPE

2.2. Stored at 70 degrees F or less. Do not expose rubber gaskets to direct sun rays for more than
72 hours.
2.3. Type of rubber gaskets requiring lubrication. Lubricate the rubber gaskets with lubricant
recommended and supplied by the pipe manufacturer.
3. Resilient joint materials consisting of polyvinyl chloride, or fiberglass impregnated with epoxy resin, or
other suitable resilient materials.
You may use other joint sealant materials that prevent leakage and infiltration if authorized.
Joints for siphons and pressure pipes and joints for pipes shown as watertight must be watertight under
pressure and all conditions of expansion, contraction, and settlement, and must comply with section 61
1.01D(1)(b) for watertightness.
65-2.03 CONSTRUCTION
65-2.03A General
Reserved
65-2.03B Earthwork
If you substitute nonreinforced concrete pipe for reinforced concrete pipe, excavation and backfill for
nonreinforced concrete pipe must comply with the details shown for reinforced concrete pipe.
Lay the pipe in a trench excavated to the lines and grades established by the Engineer. Grade and
prepare the bottom of the trench to provide a firm and uniform bearing throughout the entire pipe length.
You may partially or completely backfill culvert pipe trenches while the joint mortar is still plastic. If the
joint mortar sets before you place the backfill, do not backfill the pipe trench within 16 hours after jointing
the pipe sections.
65-2.03C Structures
Where pipes are connected to inlet and outlet structures, place the ends of the pipes flush or cut them off
flush with the structure face.
65-2.03D Laying Pipe
Reinforced concrete pipe used for siphons and low-head conduits with internal hydrostatic heads not
exceeding 50 feet must have watertight joints under pressure and all conditions of expansion, contraction,
and settlement.
Lay and joint reinforced concrete pipe used for drainage purposes and dry conduits under generally
accepted practices suitable for the purpose intended.
Connect new reinforced concrete pipe to new or existing drainage facilities as shown. If concrete collars
or tee connections are required to connect new reinforced concrete pipe to new or existing pipes, the
concrete collars or tee connections must be constructed of minor concrete. The reinforcement for the
concrete collars or tee connections must comply with section 52.
Furnish the necessary facilities for lowering and properly placing pipe sections in the trench.
Place circular pipe with elliptical reinforcement with the minor axis of the reinforcement in the vertical
position.
Lay pipes to lines and grades with the sections closely jointed. Lay pipes upgrade.
Clean and then seal joints with the type of sealing material necessary to make a tight joint.
Fill any voids occurring in the outer and inner annular sealing material with the same type of sealing
material and finish the inside of the joint smooth.
Sufficiently protect jointing materials from the air and sun to prevent drying or deterioration.
Keep liquid types of sealing materials in molds or runners. Pour or pump liquid materials into the joint
space in a continuous operation and agitate until the joint is completely filled.

750

SECTION 65

CONCRETE PIPE

Take every precaution to prevent flooding of the pipe trench before backfilling activities start. Do not allow
free water to come in contact with the pipeline until portland cement sealing materials have set at least 24
hours.
65-2.04 PAYMENT
Reinforced concrete pipe is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity includes the length of bends, wyes, tees, and other branches to the point of
intersection. The payment quantity is the length designated by the Engineer. If pipes are cut to fit a
structure or a slope, the payment quantity is the length of pipe necessary to be placed before cutting,
measured in 2-foot increments. If you choose to construct a cast-in-place connection instead of cutting off
the pipe to fit the structure, the payment quantity is the length of pipe measured along the centerline of
the pipe to the inside face of the structure.
65-3 NONREINFORCED CONCRETE PIPE
Reserved
65-4 RESERVED

751

66 CORRUGATED METAL PIPE

66-1 GENERAL

66-1.01 GENERAL
66-1.01A Summary
Section 66-1 includes general specifications for fabricating and constructing corrugated metal pipe and
pipe arches for culverts, siphons, drains, slotted pipe, and conduits.
Corrugated metal pipe and pipe arches include all necessary bends, wyes, tees, other branches, concrete
collars or tees, and reinforcement.
Corrugated metal pipe arches must comply with section 66-1.02E.
Excavation, backfill, and shaped bedding must comply with section 19-3.
66-1.01B Submittals
Submit a certificate of compliance for:
1. Corrugated steel materials
2. Corrugated aluminum materials
66-1.01C Quality Control and Assurance
66-1.01C(1) General
Reserved
66-1.01C(2) Field Testing of Corrugated Steel Pipe Siphons
Perform field leakage tests on corrugated steel pipe siphons.
Fill the pipe with water to a hydrostatic head of 10 feet above the highest point in the line after the pipe
has been laid and backfill has been placed and compacted to a minimum of 2 feet above the pipe.
Conduct a hydrostatic test for a period of not less than 24 hours. Make accurate measurements of the
water required to maintain the test pressure during the test period. Any leakage developed by the test
must not exceed the allowable leakage as computed by the following formula:
E = 0.00002H1/2LD
where:
E = allowable leakage in gpm
H = difference in elevation in feet between the water surface at 10 feet above the highest point in
the line and the invert elevation of the pipe at its lowest point
L = length of the culvert or drainage pipe in feet
D = internal diameter of the pipe in inches
Furnish all water, materials, and labor for the hydrostatic test. Conduct all hydrostatic tests in the
presence of the Engineer. The Department does not pay for hydrostatic testing.
Stop any leakage in excess of the allowable leakage as authorized. Repeat the hydrostatic test until the
total leakage does not exceed the allowable leakage. Stop all obvious leaks whether or not the leakage
from the line exceeds the allowable leakage.
66-1.02 MATERIALS
66-1.02A General
Corrugated metal pipe must be corrugated aluminum pipe or corrugated steel pipe as described. Do not
mix aluminum and steel materials in any installation, except coupling band fastening hardware.
Ship, handle, and lay corrugated metal materials in a way that prevents bruising, scaling, or breaking of
the galvanized surface, aluminized surface, or protective coating.
66-1.02B Dimensions and Thickness
Dimensions and thicknesses shown are nominal and must comply with AASHTO M 36 for corrugated
steel pipe and AASHTO M 196 for corrugated aluminum pipe.
753

SECTION 66

CORRUGATED METAL PIPE

The nominal sheet thickness for corrugated metal pipe must be equal to or greater than the nominal
thickness described.
Lapped longitudinal seams of riveted pipe arches must be placed in the top arch and must be staggered
so as to alternate on each side of the center of the top arch at least 3 inches.
66-1.02C Protective Coatings, Linings, and Pavings
Where coating, lining, or paving is shown, pipes must be protected with bituminous coating or bituminous
lining, or have the invert paved with one or more of the following materials:
1.
2.
3.
4.
5.

Bituminous coating
Polymerized asphalt invert coating
Polymeric sheet coating
B
ituminous lining
Bituminous invert paving

Remove moisture, dirt, oil, unbonded or incompatible paint, grease, alkalies, or other foreign matter from
the surface to be protected before application of the coating. lining, or paving material.
The bituminous coating for bituminous coated pipes must be applied to the inside and outside of pipes to
a minimum thickness of 0.05 inch under AASHTO M 190, Type A.
Coupling bands and connecting hardware for coated pipes must have a protective coating. Coupling
bands to be protected by coatings under AASHTO M 190 may be single-dipped with the coating thickness
requirement waived.
A bituminous lining must be applied to the inside of the pipe over the bituminous coating wherever
bituminous lining is shown.
Bituminous paving must be applied to the inside bottom portion of the pipe over the bituminous coating
under AASHTO M 190, Type C, where bituminous paving is shown.
An asphalt mastic coating may be used instead of the bituminous coating on corrugated steel pipe if
linings and pavings are not required. The asphalt mastic must be placed on the outside surface of the
pipe. The inside of the pipe does not need to be coated.
Asphalt mastic coatings must comply with AASHTO M 243, except the asbestos fibers are not required.
The asphalt mastic material must be applied uniformly to the surface with a thickness of at least 0.05 inch
at any point. The asphalt mastic coating must be applied at the fabrication plant. Pinholes, blisters,
cracks, or lack of bond are cause for rejection.
Polymeric sheet coatings must comply with AASHTO M 246. The polymeric sheet coating must be
applied to both sides of the galvanized sheet before corrugating. The thickness of the coating must be at
least 0.010 inch. Pinholes, blisters, cracks, or lack of bond are cause for rejection.
Polymerized asphalt invert coatings must be applied under ASTM A849 for "Invert Paved Type With
Polymer Material (Class P)," except apply the polymerized asphalt coatings by immersion to a thickness
of at least 0.050 inch above the crests and troughs of the corrugations of the interior and exterior inverts
including the pipe ends. The polymerized asphalt material must comply with ASTM A742/A742M
Requirements for Polymer Coating and the following:
1. Polymerized asphalt must be hot-applied thermoplastic material containing a minimum of 7.0 percent
styrene-butadiene-styrene block copolymer.
2. Undercutting or delamination from the scribe must not be more than 1/4 inch when a minimum 12-by
12-inch coupon cut from the coated pipe is exposed for 1,000 hours under ASTM B117. The cut
edges must be sealed by dipping in a sample of the polymerized asphalt coating heated to the
manufacturer's recommended application temperature. The sealed edges must not exhibit corrosion
or delamination from the sealed edges following exposure as specified.
For bituminous lined corrugated metal pipe, the rivet heads inside the pipe must be located in the valley
of the corrugation. Provisions must be made at the ends of the pipes to retain bituminous material during
the fabrication process. Both the inside and outside surfaces must be bituminous coated under AASHTO
754

SECTION 66

CORRUGATED METAL PIPE

M 190, Type A. In addition to this coating, the valleys on the inside periphery must be filled by the
centrifugal process with the same type of bituminous material to the extent that the thickness on the
crests of corrugations is at least 1/8 inch. The lining must be smooth and uniform, and its surface must be
parallel to a line projected along the crests of the corrugations.
If protective coatings are applied to pipes, clearly identify the thickness of the metal on each section of
pipe and fittings on the inner surface with paint or by other authorized means.
Repair damaged protective coatings, linings, and invert paving. Use bituminous material under AASHTO
M 190 or other authorized materials to repair damaged bituminous coatings. Use asphalt mastic material
under AASHTO M 243 to repair damaged asphalt mastic coatings. Use tar base material under AASHTO
M 243 to repair damaged polymeric sheet coatings. Repair damaged polymerized asphalt coatings under
ASTM A762/A762M, section 11, "Repair of Damaged Coatings."
66-1.02D Coupling Bands
Coupling bands for corrugated metal pipe must comply with either section 66-1.02D or section 61
1.01D(1)(b).
Choose one of the types of corrugated metal pipe coupling bands shown. The metal bands must be
corrugated, dimpled, or otherwise formed in a way that will effectively engage the corrugations of the pipe
ends.
Coupling bands for corrugated steel pipe must comply with AASHTO M 36. Coupling bands for
corrugated aluminum pipe must comply with AASHTO M 196.
If channel or wing channel coupling bands are used, the interior bend radii of the pipe flange and the
channel must be at least the thickness of the metal of which they are formed.
Joints for siphons must consist of connections made with coupling bands shown for positive joints. Do not
use universal coupling bands.
Joints for siphons and joints for pipes shown as watertight must be watertight under pressure and all
conditions of expansion, contraction, and settlement, and must comply with section 61-1.01D(1)(b) for
watertightness.
66-1.02E Corrugated Steel Pipe
66-1.02E(1) General
Corrugated steel materials must comply with AASHTO M 36 and be fabricated from either zinc-coated
steel sheet or aluminum-coated steel sheet as shown.
Zinc-coated steel sheet must comply with AASHTO M 218, except the coating weight is determined under
ASTM A123/A123M and A153/A153M.
Aluminum-coated steel sheet must comply with AASHTO M 274.
66-1.02E(2) Fabrication
66-1.02E(2)(a) General
Corrugated steel pipe must be fabricated by one of the following methods:
1. Riveting
2. Helically corrugated steel pipe with a continuous helical lock seam
3. Continuous helical welded seam paralleling the corrugation
Pipes fabricated from 0.050-inch thick sheets must be helically corrugated steel pipe with a continuous
helical lock seam or a continuous helical welded seam.
Annular corrugated steel pipe must be fabricated from sheets having either 2-2/3-by-1/2-inch or 3-by-1
inch corrugations.
66-1.02E(2)(b) Fabrication by Riveting
Pipes fabricated by riveting must comply with AASHTO M 36.

755

SECTION 66

CORRUGATED METAL PIPE

66-1.02E(2)(c) Fabrication by Continuous Helical Seam


66-1.02E(2)(c)(i) General
Helically corrugated steel pipe must comply with AASHTO M 36.
Helically corrugated pipe must be fabricated using corrugation profiles and continuous helical seam
pitches as shown in the following table:
Corrugation Profile
Max. pitcha
Nominal depth
Seam pitcha
Diameter
Nominal pitcha
(inches)
(inches)
(inches)
(inches)
(Inches)
618
1-1/2
1-7/8
1/4
12
1284
2-2/3
2-3/4
1/2
24
48120
3
3-1/4
1
21
48120
5
5-3/16
1
29-1/2
a
Pitch must be measured at right angles to the direction of corrugations. A tolerance of 1/2
inch on seam pitch is allowable.
66-1.02E(2)(c)(ii) Fabrication by Continuous Lock Seam
You may use pipes fabricated with a continuous helical lock seam extending from end to end of each
length for full circle and equivalent pipe arch sizes. Fabrication must comply with AASHTO M 36, except
the profile of the sheet on at least 1 side of the lock seam and adjacent to the 180-degree fold must have
a minimum retaining offset of 1/2 the sheet thickness as defined under California Test 662.
Sampling and testing for continuous quality control of lock seams must comply with California Test 662.
66-1.02E(2)(c)(iii) Fabrication by Continuous Welded Seam
You may use pipes fabricated with a continuous helical welded seam parallel to the corrugations for full
circle and equivalent pipe arch sizes. Control the welding process so that the combined width of the weld
and adjacent spelter or aluminum coating burned by the welding does not exceed 3 times the metal
thickness.
If the spelter is damaged by the welding outside the specified area, repair the weld and damaged spelter
adjacent to the weld under section 75-1.05.
If the metalizing is applied immediately in a continuous operation following the resistance welding, apply a
coating of aluminum to the welded area of aluminum-coated pipe using the metalizing process under
AWS C2.2, except surface cleaning will not be required.
Quality control testing of the welded seam must comply with California Test 665.
66-1.02E(3) End Finish
Helically corrugated steel pipe ends may be rerolled to form annular corrugations extending at least 2
corrugations from the pipe end or to form an upturned flange with or without reformed annular
corrugations. The diameter of the reformed ends must not exceed that of the pipe barrel by more than the
depth of the corrugation. All types of pipe ends, whether rerolled or not, must be matched in a joint so that
the maximum difference in diameter of the abutting pipe ends is 1/2 inch.
If the ends of helically corrugated steel lock seam pipes have been rerolled, the lock seam in the rerolled
end must not contain visible cracks in the base metal and the tensile strength of the lock seam must be at
least 60 percent of the tensile strength required for the remainder of the pipe. This requirement does not
apply to the lock seam located within a flange formed in rerolling. The rerolled ends of the pipe and
flanges must exhibit good workmanship and must not have open lock seams.
If corrugated steel pipe is rerolled for coupling with a wing channel coupling or a channel coupling band,
the maximum distance from any point on the end of the pipe to the plane, normal to pipe axis and passing
through the outermost portion of the pipe end, must not exceed 1/2 the width of the channel minus the
thickness of the pipe metal. The difference between the minimum and maximum flange diameter must not
exceed 1/2 inch.
Fabricate pipes so that they can be joined effectively with the described standard coupling bands.
756

SECTION 66

CORRUGATED METAL PIPE

66-1.02E(4) Damaged Galvanizing


Repair damaged galvanized surfaces under section 75-1.05.
If you burn the galvanized surfaces by welding, thoroughly clean all the surfaces of the welded
connections by wire brushing and remove all traces of the welding flux and loose or cracked galvanizing
before repair.
66-1.02E(5) Damaged Aluminum Coatings
Repair damaged aluminum coatings under section 75-1.05.
66-1.02E(6) Corrugated Steel Pipe Siphons
The thickness of siphons must be the described thickness. If coating is required, coated pipes must
comply with section 66-1.02C.
Order pipes for siphons in lengths that will keep the number of field connections to a minimum.
If soldering is required, the outside seams of pipe fabricated by riveting, or continuous helical lock seam
must be soldered, the solder being sweated into the joints. If the pipe is fabricated by riveting, rivets on
the circumferential seams must be spaced at approximately 2-1/2-inch centers with a maximum spacing
of 3 inches. If the pipe is fabricated by a continuous helical welded seam, soldering is not required.
66-1.02F Corrugated Aluminum Pipe
66-1.02F(1) General
Corrugated aluminum materials must comply with AASHTO M 196 and AASHTO M 197.
66-1.02F(2) Fabrication
66-1.02F(2)(a) General
Corrugated aluminum pipe must be fabricated by riveting or with a continuous helical lock seam
paralleling the corrugations. Annular or helically corrugated pipe must be fabricated from sheets having 2
2/3-by-1/2-inch or 3-by-1-inch corrugations.
66-1.02F(2)(b) Fabrication by Riveting
Pipes fabricated by riveting must be lap joint construction with annular corrugations. Fabrication must
comply with AASHTO M 196.
66-1.02F(2)(c) Fabrication by Continuous Helical Lock Seam
For full circle and equivalent pipe arch sizes, you may install pipes fabricated with a continuous helical
lock seam extending from end-to-end of each length. Fabrication must comply with AASHTO M 196,
except the sheet profile on at least 1 side of the lock seam and adjacent to the 180 degree fold must have
a minimum retaining offset of 1/2 the sheet thickness as defined under California Test 662.
Sampling and testing for quality control of continuous lock seams must comply with California Test 662.
66-1.02F(3) End Finish
Helically corrugated aluminum pipe ends may be rerolled to form annular corrugations extending at least
2 corrugations from the pipe end. The diameter of the reformed ends must not exceed the diameter of the
pipe barrel by more than the corrugation depth. All types of pipe ends, whether rerolled or not, must be
matched in a joint so that the maximum difference in diameter of the abutting pipe ends is 1/2 inch.
If the ends of helically corrugated aluminum lock seam pipes have been rerolled, the lock seam in the
rerolled end must not contain visible cracks in the base metal and the tensile strength of the lock seam
must be at least 60 percent of the tensile strength required for the remainder of the pipe. The rerolled pipe
ends must exhibit good workmanship and must not have open lock seams.
Pipes must be fabricated so that they can be joined effectively with the described standard coupling
bands.
66-1.03 CONSTRUCTION
Excavate a pipe trench to the lines and grades established by the Engineer. Grade and prepare the
trench bottom to provide a firm and uniform bearing throughout the entire pipe length.
757

SECTION 66

CORRUGATED METAL PIPE

Lay annular corrugated pipe in a trench with:


1. Outside laps of circumferential joints upgrade
2. Longitudinal laps positioned other than in the invert
3. Separate sections spaced not more than 1-1/2 inches apart and then firmly joined together
Lay helical corrugated pipe in a trench with separate sections spaced not more than 1-1/2 inches apart
and then firmly jointed together with corrugations in alignment.
Corrugations or projections on the coupler must properly engage the corrugations of the pipe section
before bolts are tightened.
Connect new corrugated metal pipe to new or existing drainage facilities as shown. If concrete collars or
tee connections are required, construct the collars or tee connections with minor concrete. Reinforcement
must comply with section 52.
Wherever pipes are connected to inlet and outlet structures, place the ends of the pipes flush or cut them
off flush with the structure face.
66-1.04 PAYMENT
Corrugated metal pipe is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity includes the length of pipe reducers, bends, wyes, tees, and other branches to the point
of intersection. The payment quantity is the length designated by the Engineer. If pipes are cut to fit a
structure or slope, the payment quantity is the length of pipe necessary to be placed before cutting,
measured in 2-foot increments.
Pipe reducers are paid for as pipe of the larger diameter connected to the reducer.
66-2 SLOTTED CORRUGATED STEEL PIPE
66-2.01 GENERAL
Section 66-2 includes specifications for fabricating and constructing slotted corrugated steel pipe.
66-2.02 MATERIALS
Slotted corrugated steel pipe must be grate-slot type as shown.
Grate assemblies for slotted corrugated steel pipe must comply with section 75-1.02, but may be
fabricated from any of the materials under section 75-1.02 for steel bars, plates and shapes. Any damage
to the galvanized surface of the pipe at the toe of the grate assembly fillet weld connection to the pipe
must be repaired under section 75-1.05.
Where a heel guard is shown, the heel guard must be expanded metal and must comply with ASTM
F1267, Type II, Class 2, and Grade B. Galvanizing must comply with section 75-1.05.
Coupling bands for slotted corrugated steel pipe must be galvanized or coated as shown.
Join slotted corrugated steel pipe with coupling bands as shown. Joints must be watertight.
If you use a channel coupling band, place a 3/8-inch-thick closed-cell sponge neoprene gasket or butyl
rubber joint sealant in the channel interior for its full width.
If you use a modified hugger band, place a butyl rubber joint sealant between the coupling band and the
periphery of the pipe. The butyl rubber joint sealant material must:
1. Be an extruded strip or bead compounded from a nondrying, nontoxic, synthetic resin base with butyl
rubber and inorganic extenders and be 100 percent solid material with no shrinkage
2. Be furnished in 5/8-by-1-inch strips or 1-inch-diameter beads on 1-inch-wide release paper and
wound into rolls
3. Have enough adhesion so that the strip or bead will adhere to the galvanized steel and be soft
enough to allow cold flow if compressed during connection of the pipe sections
4. Not flow or sag at temperatures up to 180 degrees F or become brittle, crack, or lose adhesion at -30
degrees F
5. Contain no migrating components that could leach out or produce a chemical reaction with the
galvanized steel
758

SECTION 66

CORRUGATED METAL PIPE

You may use an alternative joint sealant or sealing method for slotted corrugated steel pipe to provide a
watertight joint if authorized.
66-2.03 CONSTRUCTION
Do not start installation of slotted corrugated steel pipe until after paving of the traffic lanes adjacent to the
pipe have been completed at the locations where the pipe is to be placed.
Cover pipe slots with a heavy duty tape or other authorized covering during backfilling and paving
activities to prevent material from entering the slots.
Place cement treated structure backfill for slotted corrugated steel pipe under the details shown and
section 19-3.02E(3) for soil cement beddings. Cover the completed cement treated structure backfill with
a curing seal of asphaltic emulsion, Grade SS1 or CSS1.
Do not place loads on the cement treated structure backfill within 16 hours after placement.
66-2.04 PAYMENT
Not Used
66-3 SPIRAL RIB PIPE
66-3.01 GENERAL
Section 66-3 includes specifications for fabricating and constructing spiral rib pipe.
Spiral rib pipe must comply with the specifications for corrugated metal pipe in section 66 except profile
and fabrication.
66-3.02 MATERIALS
Steel spiral rib pipe must be fabricated by continuous helical lock seam under section 66-1.02E(2)(c)(ii).
Aluminum spiral rib pipe must be fabricated by continuous helical lock seam under section 66-1.02F(2)(c).
The fabricated rib configuration for spiral rib pipe must be one of the following:
1. Three rectangular ribs spaced midway between seams with ribs 3/4 inch wide by 3/4 inch high at a
maximum rib pitch of 7-1/2 inches
2. Two rectangular ribs and 1 half-circle rib equally spaced between seams with ribs 3/4 inch wide by 1
inch high at a maximum rib pitch of 11-1/2 inches with the half-circle rib diameter spaced midway
between the rectangular ribs
3. For steel spiral rib pipes, 2 rectangular ribs equally spaced between seams with ribs 3/4 inch wide by
1 inch high at a maximum rib pitch of 8-1/2 inches
The rib pitch measured at right angles to the direction of the ribs may vary by 1/2 inch.
Coupling bands for spiral rib pipes must comply with section 66-1.02D.
You may use the coupling band shown, or an authorized coupling band under section 61-1.01D(1)(b) for
use on a pipe corrugation of 2-2/3 by 1/2 inch for corrugated metal pipe on spiral rib pipe having 2-2/3-by
1/2-inch rerolled annular ends.
66-3.03 CONSTRUCTION
Not Used
66-3.04 PAYMENT
Not Used
66-4 COMPOSITE STEEL SPIRAL RIB PIPE WITH SMOOTH INTERIOR
66-4.01 GENERAL
Section 66-4 includes specifications for fabricating and constructing composite steel spiral rib pipe with
smooth interior.

759

SECTION 66

CORRUGATED METAL PIPE

Composite steel spiral rib pipe must have a smooth interior and must comply with the specifications for
corrugated metal pipe in section 66 except profile and fabrication.
66-4.02 MATERIALS
The precoated exterior of composite steel spiral rib pipe with polymeric sheet coating must comply with
section 66-1.02C. The pipe interior must be lined with polyethylene (polyolefin plastomer). The pipe
dimensions, wall thickness, and fitting tolerances must comply with ASTM A978/A978M.
Composite steel spiral rib pipe must be fabricated by continuous helical lock seam under section 66
1.02E(2)(c)(ii). Three rectangular ribs must be spaced midway between seams with ribs 3/4 inch wide by
3/4 inch high at a maximum rib pitch of 7-1/2 inches on center. The rib pitch measured at right angles to
the direction of the ribs may vary by 1/2 inch.
Pipes formed from polymer precoated sheets must comply with ASTM A742/A742M, Grade 10, except
the sheet side for the pipe interior must have additives that will enhance the bond of the sheet to the
extruded polyethylene liner. Before application of protective coatings, the galvanized sheet must be
cleaned with an alkaline cleaner followed by chrome pretreatment.
Steel sheets coated with zinc metallic coating must comply with ASTM A929/A929M.
The polyethylene for filling the ribs and the internal liner must be virgin resin. The virgin resin properties
must comply with the values in the following table:
Property
Melt index
Flow rate ratio
Density
Hardness
Ash content

ASTM test method


D1238
D1238
D792
D2240
D5630

Value
I2+ 7.5g/10 min 1.5
I10/I2=7-8
0.902 g/cc 0.002
Shore D = 45 5
< 1.0%

Joint coupling bands fabricated from the steel sheets used to manufacture pipes must comply with
section 66-1.02C and section 66-1.02D, except steel sheets with polymetric coating on both sides.
Coupling bands must be 12 inches wide for nominal pipe diameters less than 60 inches. Coupling bands
must be 24 inches wide for nominal pipe diameters 60 inches and greater.
Galvanized nuts, bolts, and washers must comply with sections 75-1.02 and 75-1.05.
Expanded rubber gaskets must comply with ASTM D1056, Type 2, Class C, and Grade 1. Protect
gaskets from excessive exposure to heat, direct sunlight, ozone, oil, or grease. Gaskets placed over
spiral ribs must have a groove routed to match the rib's depth and width before installation. Do not
substitute O-rings for gaskets.
The gasket adhesive must be 1 part urethane elastomeric joint sealant under ASTM C920, Type S, Grade
NS, Class 25, Use NT, A, and M. Use the sealant within 9 months from the date of manufacture. Store the
adhesive at an ambient temperature of 80 degrees F or below. Do not use any adhesive that has been
stored at temperatures exceeding 80 degrees F.
Manufactured pipe joints must comply with section 61-1.01D(1)(b) for sleeve joints.
Each standard and random length of pipe must be marked clearly in permanent letters not less than 1/4
inch in height at intervals of 5 feet or less with at least the following:
1. Manufacturers code and name or trademark
2. ASTM A978/A978M
3. Nominal pipe size
Each coupling band must be marked clearly with at least the following:
1. Manufacturers code and name or trademark
2. ASTM A978/A978M
3. Nominal size
760

SECTION 66

CORRUGATED METAL PIPE

The manufacturers code must include the day, month, year, shift, and manufacturing plant.
Store pipes in unit packages with the pipe ends protected from deformation and damage. Support unit
packages with racks or dunnage to prevent damage and bending. Stack unit packages to ensure that the
weight of the upper units will not cause deformation to pipes in the lower units. Do not store pipes
adjacent to electrical or exhaust heat sources.
Cover pipes with an opaque sheeting material to provide sun block protection. Do not expose pipes to
direct sunlight for periods exceeding 30 days. Arrange the opaque sheeting material so that it provides
adequate air circulation around pipes to reduce excessive heat accumulation. Ship gaskets in containers
that will prevent damage from UV exposure and handling. Do not store gaskets near electrical or exhaust
heat sources or where they will be exposed to the sunlight for more than 48 hours.
66-4.03 CONSTRUCTION
Lay composite steel spiral rib pipe in the same way specified for helical corrugated pipe in section 66
1.03, except the gap between pipe sections must not be more than 1/2 inch. Clean the pipe ends before
applying the adhesive and installing the gaskets and the coupling bands.
Cover the ends of installed composite steel spiral rib pipe that were not backfilled after installation at the
end of each day.
Repair damaged polymeric pipe coatings on pipe and pipe fittings. For polymeric coatings with damaged
areas less than 36 square inches in area, repair breaks and scuffs under the manufacturer's
recommended repair procedures. Do not install a pipe if the individual breaks or total area of the breaks
exceeds 36 square inches in area or if the total area of the breaks exceeds 0.5 percent of the total pipe
surface area.
The polymer repair material must be one of the following:
1. Denflex Coating - Dennis Chemical Company, St. Louis, MO
2. Scotch-Clad 1706 Protective Coating - 3M Company, St. Paul, MN
3. Ranbar Trispec TPC-515-7 Black Synthetic Coating - P.D. George Company, Manor, PA
Clean and dry surfaces to be coated. The repair coating must be at least 0.010 inches thick after
hardening and must bond securely and permanently to the pipe. Apply 6 coats if the thickness of the
repair coating is not measured. Allow 30 minutes drying time between the coats.
66-4.04 PAYMENT
Not Used
66-566-10 RESERVED

761

67 STRUCTURAL PLATE CULVERTS

67-1 GENERAL

67-1.01 GENERAL
Section 67-1 includes general specifications for fabricating and constructing structural plate culverts.
Excavation, backfill, and shaped bedding must comply with section 19-3.
67-2 STRUCTURAL METAL PLATE PIPE
67-2.01 GENERAL
67-2.01A Summary
Section 67-2 includes specifications for fabricating and constructing structural metal plate pipe, arches,
and pipe arches.
Structural metal plate pipe, arches, and pipe arches include bends and elbows.
67-2.01B Submittals
Submit certificates of compliance for structural metal plate pipe, arches, and pipe arches.
Submit a copy of the manufacturer's assembly instructions before assembling structural plates.
67-2.02 MATERIALS
67-2.02A General
Structural metal plate pipe, arches, and pipe arches must be fabricated from structural steel plates or
structural aluminum plates. The type of metal, steel or aluminum, is described.
Structural plates and nuts and bolts for structural steel plate pipe, arches, and pipe arches must comply
with AASHTO M 167M/M 167.
Structural plates and nuts and bolts for structural aluminum plate pipe, arches, and pipe arches must
comply with AASHTO M 219. Bolts must be zinc-coated steel and comply with ASTM A449. Nuts must be
zinc-coated steel and comply with ASTM A563, Grade C.
Do not mix aluminum and steel materials in the same installation, except steel bolts and nuts on structural
aluminum plate pipe.
The thickness of galvanized coating for structural steel plate is determined under ASTM A123/A123M and
ASTM A153/A153M.
Repair damaged galvanized surfaces under section 75-1.05.
You may construct pipes and pipe arches with fewer plates than the number designated if the number of
plates around the circumference of structural metal plate pipes and pipe arches are described.
If welding of steel is required, it must comply with AWS D1.1 "Structural Welding Code." Weld steel
plates, except fittings, before galvanizing. If welding of aluminum is required, it must comply with AWS
D1.2/D1.2M "Structural Welding Code." The Engineer may perform nondestructive testing of the welds.
Corner plates must be at least 0.138 inch thick for structural steel plate pipe arches that are 0.109 inch
thick.
67-2.02B Protective Coating
Structural steel plate pipe, arches, and pipe arches must be protected with bituminous coating where
coating is shown. Coating must comply with section 66-1.02C, except polymeric sheet coatings are not
allowed and asphalt mastic may be field applied.
If protective coating is applied to plates for structural steel plate pipe, arches, and pipe arches, each plate
must have the nominal metal thickness painted on the inner surface of each plate so that the plate
thickness can be readily identified.

763

SECTION 67

STRUCTURAL PLATE CULVERTS

After installation, coat the portion of nuts and bolts used for assembly of coated structural steel plate pipe,
arches, and pipe arches projecting outside the pipe. The portion of nuts and bolts projecting inside the
pipe need not be coated.
If asphalt mastic is used for the protective coating, the surface at pipe joints need not be coated before
assembly. Joints must be sealed thoroughly after assembly with the asphalt mastic on the outside of the
sealed joint.
Repair damaged coatings under section 66-1.02C.
67-2.02C Identification
If plates of 2 dissimilar thicknesses are involved in 1 cross section of an installation, the installation is
described by pipe size and by a symbol designating the number and thickness of plates required. For
example, the symbol (4.109-1.168) designates an installation for 1 plate length composed of four 0.109
inch-thick steel plates and one 0.168-inch-thick steel plate, the thicker plates to be centered on the invert.
This designation does not prevent you from using fewer plates if the minimum thickness requirements are
complied with.
67-2.02D Reserved
67-2.03 CONSTRUCTION
Assemble structural plates under the manufacturer's instructions.
Tighten plate section bolts within the ranges shown in the following table before backfilling:
Bolt diameter
3/4 inch
7/8 inch

Torque
100 ft-lb min to 300 ft-lb max
150 ft-lb min to 350 ft-lb max

Place struts as shown during construction of pipes, arches, and pipe arches. Maintain the struts in place
until backfill has been placed to the grading plane elevation or 5 feet over the crown, whichever is less.
Remove the struts before construction of structures at the ends of pipes, arches, and pipe arches.
Wherever pipes are connected to inlet and outlet structures, place the ends of the pipes flush or cut them
off flush with the structure face.
Each side of an arch must rest on a galvanized metal angle or channel bearing that is securely anchored
to the footing and capable of resisting the arch thrust without damage to the angle or channel.
67-2.04 PAYMENT
Structural metal plate pipe is measured along the centerline of the pipe and parallel with the slope line.
The payment quantity includes the length of bends and elbows. The payment quantity is the length
designated by the Engineer. If the pipe is cut to fit a structure or slope, the payment quantity is the length
of pipe necessary to be placed before cutting, measured in 4-foot increments.
67-3 METAL LINER PLATE PIPE
67-3.01 GENERAL
67-3.01A Summary
Section 67-3 includes specifications for constructing metal liner plate pipe.
Metal liner plate pipe must be constructed from 2-flange or 4-flange plates.
Pipes must be circular and consist of a series of galvanized corrugated metal liner plates with a minimum
width of 18 inches for 2-flange plates and 16 inches for 4-flange plates.
Furnish plates with 2-inch-diameter, or larger, grouting holes with pipe plugs. When the plates are
installed, grouting holes must be spaced so that 1 line of holes is at the pipe crown and 1 line of holes is
on each side at approximately the midpoint as shown. The holes in each line must be not more than 6
feet apart and holes in adjacent lines must be staggered.

764

SECTION 67

STRUCTURAL PLATE CULVERTS

67-3.01B Submittals
Submit a certificate of compliance for metal liner plate pipe.

Submit a copy of the manufacturers instructions before you assemble pipes.

For tension test specimens, submit mill test reports as specified for plates for each heat and thickness

upon notification.

67-3.02 MATERIALS
67-3.02A General
The base metal for liner plates must comply with ASTM A1011/A1011M. Ungalvanized flat sheets and
plates must comply with the mechanical properties in the following table:
Base metal for liner plates
Tensile strength, psi
42,000 min
Yield point, psi
28,000 min
Elongation in 2 inches, %
30 min
Prepare and test specimens for tension test under ASTM A283/A283M for plates and ASTM
A1011/A1011M for sheets.
Galvanize plates under AASHTO M 167M/M 167 after the plates are formed, punched, and curved.
Bolts and nuts for assembling 2-flange plates must be not less than 5/8 inch in nominal diameter. Bolts
and nuts for circumferential (flange) seams must comply with ASTM A307 for Grade A chemical and
mechanical requirements and Grade B dimensions. Bolts and nuts for longitudinal seams must have
square heads with a square shoulder to engage the plate. Bolts and nuts for longitudinal plate seams
from 0.075 to 0.179-inch thick must comply with ASTM A307 for Grade A chemical and mechanical
requirements. Bolts for longitudinal plate seams from 0.209 to 0.239-inch or thicker must comply with the
chemical and mechanical requirements under ASTM A449. Nuts for use on bolts specified in ASTM A449
must comply with ASTM A307 for Grade A chemical and mechanical requirements and Grade B
dimensions.
Bolts and nuts for the assembly of 4-flange plates must be not less than 1/2 inch in nominal diameter for
0.105 to 0.179 inch thick plates and not less than 5/8 inch in nominal diameter for plates of greater
thickness. Bolts and nuts must be quick-acting coarse thread complying with ASTM A307.
Galvanize bolts and nuts under ASTM A153/A153M.
4
The moment of inertia in inches per inch of plate width, based on the average of 1 ring of plates, must
not be less than the values shown in the following table:

Uncoated plate thickness


(inch)
0.075
0.105
0.135
0.164
0.179
0.209
0.239
0.250
0.313
0.375

Moment of inertia (inches4)/inch


2-flange
4-flange
0.034
-0.049
0.042
0.064
0.055
0.079
0.070
0.087
0.075
0.103
0.087
0.118
0.120
-0.101
-0.123
-0.143

Longitudinal seams must have enough bolts to develop the ultimate seam strength per foot of pipe length
shown in the following table:

765

SECTION 67

STRUCTURAL PLATE CULVERTS

Uncoated plate thickness


(inches)
0.075
0.105
0.135
0.164
0.179
0.209
0.239
0.313
0.375

Strength (lb/ft)
2-flange
4-flange
20,000
-30,000
26,000
47,000
43,000
55,000
50,000
62,000
54,000
87,000
67,000
92,000
81,000
-115,000
-119,000

Plates must be:


1. Punched for bolting on both longitudinal and circumferential seams or joints
2. Formed to produce squarely formed flanges
3. Fabricated so that complete erection is from the inside of the pipe
Bolt holes in flanges must be spaced so that plates of the same curvature are interchangeable and to
allow staggering of the longitudinal seams. Drilling, punching, or drifting to correct defects in
manufacturing are not allowed. Plates with improperly punched holes will be rejected. Circumferential bolt
spacing must be approximately 9-1/2 inches center to center for 4-flange plates and must be
approximately 12-1/2 inches center to center for 2-flange plates.
67-3.02B Pressure Grouting
Grout for force-grouting must consist of a suitable mixture of cementitious material, sand, and a chloride
free admixture designed to provide a pumpable mix. The grout must contain at least 463 pounds of
cementitious material per cubic yard and no more water than necessary to provide a pumpable grout.
Materials for grout must be commercial quality.
Grout must consist of cement and water and may contain an admixture if authorized.
Admixtures must comply with the specifications for admixtures in section 90, except admixtures must not
contain chloride ions in excess of 0.25 percent by weight and admixtures may be dispensed in solid form.
Add water to the mixer followed by cement and admixture.
Mix the grout with mechanical mixing equipment that produces a uniform and thoroughly mixed grout.
Do not exceed 5 gal of water per 94 lb of cement. Retempering of grout is not allowed.
Agitate the grout continuously until the grout is pumped.
Grouting equipment must be:
1. Capable of grouting at a pressure of at least 100 psi
2. Equipped with a pressure gage having a full-scale reading of not more than 300 psi
67-3.02C Reserved
67-3.03 CONSTRUCTION
Install pipes in existing embankments and natural ground by the tunnel method, except you may use
open trench methods with shaped bedding near the entrance if authorized.
Excavation must not precede plate installation by more than the width of a plate. Do not leave any
excavation, including the face, unsupported except during excavation activities. Voids between the liner
plate and the wall of the excavation must be force-grouted within 8 hours of excavation.
Assemble liner plates under the pipe manufacturers instructions.

766

SECTION 67

STRUCTURAL PLATE CULVERTS

Handle plates in a way that prevents bruising, scaling, or breaking of spelter coating. Replace plates
damaged during handling or placing, and plates with damaged spelter coating, except you may repair
small areas of spelter coating with minor damage under section 75-1.05 if authorized.
Tighten bolts specified in:
1. ASTM A307 to a torque from 25 to 60 ft-lb
2. ASTM A449 to a torque from 60 to 120 ft-lb
Metal liner plate pipe must not vary by more than 1 foot from the line established by the Engineer and by
more than 0.5 foot from the grade established by the Engineer.
Force the grout through grouting holes in the plates in such a sequence and with enough pressure to
completely fill the voids. Remove the plugs in grouting holes adjacent to the grouting hole being force
grouted to allow inspection of the grout filling.
You may use free-running aggregate forced pneumatically into the voids between the liner plate and the
wall of the excavation as temporary support of the excavation. Pressure grouting of aggregate must
comply with section 50-1.03B(2)(d) if the aggregate is pressure grouted within 72 hours of excavation.
67-3.04 PAYMENT
Metal liner plate pipe is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity is the length designated by the Engineer.
67-467-5 RESERVED

767

68 SUBSURFACE DRAINS

68-1 GENERAL

68-1.01 GENERAL
Section 68-1 includes general specifications for constructing subsurface drains.
Submit a certificate of compliance for each type of subsurface drain involved.
68-1.02 MATERIALS
68-1.02A General
Reserved
68-1.02B Protective Coating
If described as coated, subsurface drains must be protected with a coating under section 66-1.02C.
Repair damaged coatings under section 66-1.02C.
68-1.03 CONSTRUCTION
68-1.03A General
Reserved
68-1.03B Filter Fabric
Remove loose or extraneous material and sharp objects immediately before placing filter fabric.

The subgrade and trench to receive the filter fabric must comply with the compaction and elevation

tolerance specified for the material involved.

Handle and place filter fabric under the manufacturer's instructions.

Align and place filter fabric without wrinkles.

Overlap adjacent roll ends of filter fabric at least 18 inches. The preceding roll must overlap the following

roll in the direction that the permeable material is being spread.

Completely replace torn or punctured sections damaged during placement or repair by placing a piece of

filter fabric that is large enough to cover the damaged area and comply with the overlap specified.

Cover filter fabric with the thickness of overlying material shown within 72 hours of placing the fabric.

68-2 UNDERDRAINS
68-2.01 GENERAL
Section 68-2 includes specifications for constructing underdrains.

Underdrains include elbows, outlets and risers, wyes, tees, and other branches.

For alternative pipe underdrain, choose one the types shown. Do not mix types of pipe in the same

installation.

Excavation and backfill must comply with section 19-3.

Submit a certificate of compliance for each type of pipe, tubing, and fitting.

68-2.02 MATERIALS
68-2.02A General
Reserved
68-2.02B Perforated Steel Pipe
Perforated steel pipe and coupling bands must comply with AASHTO M 36 and AASHTO M218 with the
following modifications:
1. Pipe must comply with any one of the full circle types specified in AASHTO M 36
2. Pipe perforations must be drilled or punched
769

SECTION 68

SUBSURFACE DRAINS

3. Perforations must be located in the inside of crests or in the flat tangent portion of all corrugations but
not in both locations in a given length of pipe
The weight of galvanizing must comply with ASTM A123/A123M and ASTM A153/A153M.
You may substitute sleeve type couplings for the band couplers required under AASHTO M 36. The
couplings must be plastic or galvanized steel, suitable for holding the pipe firmly in alignment without the
use of sealing compound or gaskets. The couplings must have mechanical properties that will prevent
distortion under normal conditions of use.
Repair damaged galvanized surfaces under section 75-1.05.
68-2.02C Perforated Aluminum Pipe
Aluminum underdrain pipe and fittings must comply with AASHTO M 196 and the following modifications:
1. Pipe must comply with Type III specified in AASHTO M 196
2. Pipe perforations must be either drilled or punched
3. Minimum thickness of sheet must be 0.060 inch
You may substitute sleeve type couplings for band couplers required under AASHTO M 196.
The couplings must be plastic or aluminum, suitable for holding the pipe firmly in alignment without the
use of sealing compound or gaskets. The couplings must have mechanical properties that will prevent
distortion under normal conditions of use.
68-2.02D Perforated Plastic Pipe
Perforated plastic pipe must be smooth-wall PVC plastic pipe, corrugated PVC plastic pipe with a smooth
interior surface, or corrugated polyethylene plastic tubing.
Smooth-wall PVC plastic pipe must comply with AASHTO M 278.
Corrugated PVC plastic pipe with a smooth interior surface must comply with material and structural
requirements in AASHTO M 278. Pipe must have perforations located in the bottom half of the pipe; the
perforations must be slots complying with the size and opening area requirements in AASHTO M 252.
Inside diameter and diameter tolerances must comply with AASHTO M 252 or M 278.
Corrugated polyethylene plastic tubing must comply with AASHTO M 252 or M 294.
PVC plastic pipe must be connected with belled ends, or with sleeve-type or stop-type couplings under
AASHTO M 278. Polyethylene tubing must be connected with snap-on, screw-on, or wrap-around fittings
and couplings under AASHTO M 252 or AASHTO M 294. Solvent cementing of joints is not required.
68-2.02E Underdrain Outlets and Risers
Underdrain outlets and risers must be fabricated from the same material as the underdrain pipe or from
corrugated metal pipe. Do not mix aluminum and steel in the same installation except for covers and
coupling band fastening hardware. Outlet and riser pipe and fittings must not be perforated.
Welded steel covers must be galvanized under section 75-1.05 after fabrication.
Welding workmanship and technique must be equal to the best practice in modern commercial shops.
Covers must be fitted and bolted into the riser pipe or elbow. Covers must seat uniformly and not be
subject to rocking.
68-2.02F Permeable Material
68-2.02F(1) General
Permeable material for use in backfilling trenches under, around, and over underdrains must consist of
hard, durable, clean sand, gravel ,or crushed stone and must be free from organic material, clay balls, or
other deleterious substances.
Permeable material must have a durability index of not less than 40.

770

SECTION 68

SUBSURFACE DRAINS

Use Class 1 permeable material for underdrains unless the class or type of permeable material is
specified in the special provisions.
At bridge abutments and wingwalls, use either Class 1 or Class 2 permeable material. Place filter fabric
between Class 1 permeable material and backfill. No filter fabric is required with Class 2 permeable
material.
68-2.02F(2) Class 1 Permeable Material
Alternative gradings within Class 1 permeable material are identified by types. Place one of the types
specified for Class 1 permeable material.
The percentage composition by weight of Class 1 permeable material in place must comply with the
grading requirements shown in the following table:
Class 1 Permeable Material

Grading Requirements

Percentage
passing
Sieve sizes
Type A
Type B
2"
-100
1-1/2"
-95100
3/4"
100
50100
1/2"
95100
-3/8"
70100
1555
No. 4
055
025
No. 8
010
05
No. 200
03
03
68-2.02F(3) Class 2 Permeable Material
The percentage composition by weight of Class 2 permeable material in place must comply with the
grading requirements shown in the following table:
Class 2 Permeable Material
Grading Requirements
Sieve sizes
Percentage
passing
1"
100
3/4"
90100
3/8"
40100
No. 4
2540
No. 8
1833
No. 30
515
No. 50
07
No. 200
03
Class 2 permeable material must have a sand equivalent value of not less than 75.
68-2.02F(4) Class 3 Permeable Material
The percentage composition by weight of Class 3 permeable material in place must comply with the
grading requirements shown in the following table:

771

SECTION 68

SUBSURFACE DRAINS
Class 3 Permeable Material
Grading Requirements
Sieve sizes
1-1/2"
1"
3/4"
3/8"
No. 4
No. 8

Percentage passing
100
88100
5285
1538
016
06

At least 90 percent by weight of Class 3 permeable material must be crushed particles as determined by
California Test 205.
68-2.02G Filter Fabric
Filter fabric use with underdrains must comply with section 88-1.02B.
At bridge abutments and wingwalls, filter fabric for underdrains must be Class A.
68-2.02H68-2.02K Reserved
68-2.03 CONSTRUCTION
Excavate trenches for underdrains, place filter fabric, install pipe, and backfill trenches with permeable
material as shown. Where underdrains are installed in trenches outside the subgrade area, backfill the
top 6 inches of the trench with structure backfill complying with section 19-3.
Join lengths of perforated steel pipe and perforated aluminum pipe with couplers.
Lay perforated pipe with the perforations down.
Place perforated polyethylene tubing to line and grade in a close-fitting semicircular bedding groove
formed in the bottom of the trench.
At bridge abutments and wingwalls:
1. Install welded steel covers on underdrains terminating under ground.
2. Place permeable material in horizontal layers. Thoroughly consolidate permeable material along with
and by the same methods specified for structure backfill in section 19-3. Ponding and jetting of
permeable material or structure backfill adjacent to permeable material is not allowed.
3. You may substitute permeable material for structure backfill material where the required width of
backfill material adjacent to the neat lines of the permeable material as shown is approximately 1 foot
or less.
68-2.04 PAYMENT
Pipe underdrain is measured along the centerline of the pipe and parallel with the slope line. The
payment quantity includes the length of elbows, outlets and risers and the length of wyes, tees, and other
branches to the point of intersection.
68-3 HORIZONTAL DRAINS
68-3.01 GENERAL
Section 68-3 includes specifications for constructing horizontal drains.
Horizontal drains include furnishing all water required for drilling holes, and necessary tees, plugs, and
street ells required for connecting to the collector system.
68-3.02 MATERIALS
Horizontal drains must consist of nominal 1-1/2-inch, schedule 80 PVC plastic pipe complying with ASTM
D1785. At your option, the type, grade, and design stress designation of the pipe must be 1120, 1220,
2110, 2112, 2116, or 2120 as specified in ASTM D1785. The plastic pipe must comply with the National

772

SECTION 68

SUBSURFACE DRAINS

Sanitation Foundation Standard No. 14 if the plastic pipe is used to conduct water for human
consumption.
Slotted pipe must have 2 rows of slots. The rows must be in the longitudinal direction of the pipe and the
slots must be cut in the circumferential direction of the pipe. The rows must be centered on 2 of the 3rd
points, 120 degrees apart, of the pipe circumference. Each row of slots must comply with one of the
configurations shown in the following table. The Engineer determines the configuration to be used.
Number of slots
(1 per linear foot)
22
23
46

Width of slot
(inch)
0.050
0.020
0.010

Minimum opening
per linear foot
(square inches)
1.00
0.46
0.46

Slots must be spaced uniformly along the pipe. The minimum opening is measured on the inner surface
of the pipe.
Perforated pipe must have 3 rows of perforations with 1 row on each side of the pipe and the 3rd row in
the top. The perforations must be 3/8 inch in diameter spaced at 3-inch centers with the top perforations
staggered in relation to the holes on either side.
Fittings for the PVC plastic pipe must be schedule 80 Type II PVC solvent weld type fittings and must
comply with ASTM D2467. You may use machined male and female ends instead of couplings.
Unslotted or unperforated PVC plastic pipe, approximately 3 to 30 feet in length, must be provided at the
outlet of the drain. The Engineer determines the exact length of pipe.
68-3.03 CONSTRUCTION
The locations shown for horizontal drains are approximate. The Engineer determines the exact locations
and placement sequence. Any ordered exploratory work is change order work.
Complete the installation of horizontal drains at a bench in an excavation slope before excavating more
than 40 feet below the bench.
Furnish water required for drilling.
Drill horizontal holes to the designated lines and grades with rotary equipment capable of drilling 3 to 6
inch-diameter holes 600 feet long through soil and rock formations.
Install plastic pipe with pipe slots or perforations on top by pushing it into the hole or inserting it inside the
drill rod then retracting the drill rod so that the drilled hole is cased for the full depth. Tightly plug the
entrance end with a rounded or pointed extension that does not extend more than 0.5 foot beyond the
end of the pipe.
During casing activity, cement plastic pipe together to form a continuous tube. Prevent telescoping and
damage to plastic pipe during installation.
Identify each drain by securely attaching a permanent brass plate with a number assigned by the
Engineer to the outlet end of the nonperforated pipe drain or by other permanent marking designated by
the Engineer.
At the outlet end of the drilled hole, tightly plug the annular space between the hole and the pipe with
earth for a length of at least 2 feet.
Connect the outlet end of the drain to the collector system by installing a pipe tee, pipe plug, street ell,
and galvanized steel pipe or plastic pipe. The Engineer determines the length of the pipe.
During drilling activities, determine the drilled hole elevation at 100-foot intervals and the elevation at the
upper end of the completed drain hole. You may take measurements by inserting tubes or pipes and
measuring liquid levels or by other authorized methods.

773

SECTION 68

SUBSURFACE DRAINS

Dispose of water used for drilling and water developed during drilling activities under section 13. Comply
with the requirements of the RWQCB for nonstormwater discharges and the Department's Construction
Site Best Management Practices (BMP) Manual for dewatering.
68-3.04 PAYMENT
Horizontal drain is measured along the centerline of perforated, slotted, and nonperforated pipe and along
the length of pipe at the outlet end required to connect to the collector system. The payment quantity is
the length designated by the Engineer.
Drill hole is measured along the centerline of the pipe for the length of the hole drilled, except the
Department does not measure or pay for any hole drilled where the drain pipe cannot be installed for the
full length of the drilled hole.
Furnishing and installing a collector system is change order work.
68-4 EDGE DRAINS
68-4.01 GENERAL
Section 68-4 includes specifications for constructing plastic pipe edge drains and edge drain outlets.
Cross drain interceptors at structure approaches, at end anchors or pressure relief joints, and at
pavement terminals joining existing pavements are considered edge drains.
68-4.02 MATERIALS
68-4.02A General
Reserved
68-4.02B Pipe and Pipe Fittings
Pipe installed in trenches to be backfilled with asphalt treated permeable material must be PVC 90C
electric plastic conduit, EPC-40 or EPC-80, and must comply with NEMA TC 2.
All other edge drain pipe and edge drain outlets, vents, and cleanouts must be one of the following:
1. PVC 90C electric plastic conduit, EPC-40 or EPC-80, and must comply with NEMA TC 2.
2. PVC plastic pipe, schedule 40 or schedule 80, and must comply with ASTM D1785. At your option,
the type, grade, and design stress designation of the pipe may be 1120, 1220, 2120, 2116, 2112, or
2110 as specified in ASTM D1785.
Pipe must be straight end or bell end. Bell end sockets must comply with ASTM D2672 except for
marking.
Pipe shown as slotted must have 3 rows of slots in the pipe. The rows must be in the longitudinal
direction of the pipe and the slots must be cut in the circumferential direction of the pipe. The 3 rows must
be spaced equally around the circumference of the pipe. Each row must have 22 1 uniformly spaced
slots per linear foot of pipe. The slots must be 0.045 to 0.065 inch wide and of such length as to provide
at least 2.00 square inches of slot opening per linear foot of pipe. Other suitable configurations of slots
that provide drainage equal to or better than the above slot requirements may be used if authorized.
Fittings for PVC 90C electric plastic conduit must comply with NEMA TC 3, and fittings for PVC plastic
pipe must be socket-type fittings under ASTM D2467 for schedule 80 pipe and ASTM D2466 for schedule
40 pipe. Y-fittings must be shop fabricated from pipe as specified for the type of edge drain pipe installed.
The fitting must provide an unobstructed passageway through both legs of the Y-fitting.
68-4.02C Treated Permeable Material
At your option, permeable material for edge drains must be asphalt treated permeable material or cement
treated permeable material complying with section 29-1.02 for treated permeable bases.
Store, proportion, and mix treated permeable material under section 29-1.03C.
68-4.02D Filter Fabric
Filter fabric comply with section 88-1.02B.

774

SECTION 68

SUBSURFACE DRAINS

68-4.02E Miscellaneous
Concrete for splash pads must be constructed of minor concrete, except the concrete must contain at
least 470 pounds of cementitious material per cubic yard.
Mortar placed where edge drain outlets and vents connect to drainage pipe and existing drainage inlets
must comply with section 51-1.
Expansion type pressure plugs for cleanouts must seat firmly against the pipe lip and be one of the
following:
1. Expandable plugs manufactured from neoprene under section 51-2.04 with commercial quality
stainless steel bolts and 2 hex nuts
2. Commercial quality expandable duct plugs consisting of reinforced polypropylene rigid threaded plug
with a commercial quality thermoplastic rubber sealing ring
Aggregate base for backfilling trenches in existing paved areas must comply with the materials
specifications for Class 2 aggregate base, 3/4-inch-maximum grading, under section 26-1.02B.
HMA for backfilling trenches must comply with section 39-1.15.
Outlet and vent covers must be commercial quality galvanized metal screens or grates approximately 1/2
inch mesh with PVC slip joint nut fittings.
68-4.02F68-4.02H Reserved
68-4.03 CONSTRUCTION
Before excavating trenches for the installation of edge drains, outlets, vents, and cleanouts in existing
paved areas, cut the outline of the paved areas to be removed to a neat line to a minimum depth of 2
inches with a power-driven saw or a wheel type rock cutting excavator. Cuts along the joint between
existing asphalt concrete and existing concrete pavement are not required.
Remove concrete deposits that could occur along the lower edge of the concrete pavement in Type 1
installations.
Join pipe and fittings with commercial quality solvent cement and primer specifically manufactured for use
with rigid PVC plastic pipe and fittings. The solvent cement and primer must be made by the same
manufacturer. The color of the primer must contrast with the color of the pipe and fittings. Apply the
solvent cement and primer under the manufacturer's instructions.
Spread treated permeable material when the atmospheric temperature is above 40 degrees F.
You may spread the treated permeable material in 1 or more layers.
Where edge drains are to be installed adjacent to asphalt treated permeable base, you may spread the
lower 6 inches of asphalt treated permeable material in a separate operation, then spread the upper
portion of the asphalt treated permeable material with the adjacent asphalt treated permeable base.
Place asphalt treated permeable material at a temperature of not less than 180 degrees F or more than
230 degrees F, except the temperature of asphalt treated permeable material spread with asphalt treated
permeable base must comply with section 29 for spreading asphalt treated permeable base.
Compact asphalt treated permeable material spread with adjacent asphalt treated permeable base with
the adjacent base and in the same way specified in section 29 for compacting the base. Compact all
other layers of treated permeable material with a vibrating shoe-type compactor connected to the
spreading device. The vibrating shoe-type compactor must be in operation when the material is being
spread in the trench and must be turned off when the material is not being spread.
Cure cement treated permeable material that is not covered with HMA within 12 hours after compaction of
the permeable material by sprinkling the material with a fine spray of water every 4 hours during daylight
hours or by covering the material with a white polyethylene sheet not less than 6 mils thick. Start the
curing requirements at 7:00 a.m. on the morning following compaction of the cement treated permeable
material and continue for the next 72 hours or until the material is covered with HMA, whichever is less.
Do not spray the cement treated permeable material with water during the first 12 hours after compacting.
775

SECTION 68

SUBSURFACE DRAINS

You may cover the cement treated permeable material with the polyethylene sheet during the first 12
hours or before the start of the curing period.
Backfill and compact trenches in existing embankment areas with native material.
Aggregate base backfill must be spread and compacted by methods that produce a uniform base, firmly
compacted and free from pockets of coarse or fine material.
Place Type A pavement markers as shown and under section 85 on paved shoulders or dikes at outlet,
vent, and cleanout locations where authorized. The waiting period for placing pavement markers on new
HMA surfacing does not apply.
Clean edge drain outlets, vents, and cleanout pipes when installed and remove obstructions after
installation. Use a high-pressure, flexible hose with a nominal 1-inch-diameter nozzle containing flushing
and propelling jets. Insert the hose into each edge drain outlet, vent, and cleanout pipe and push it
through the pipe with a minimum 1,000 psig water pressure so that the entire edge drain system is
penetrated by the flushing nozzle. At your expense, replace pipes found to be plugged, including
replacement of treated permeable material, surfacing, and backfill materials.
Install outlet and vent covers at the end of each outlet pipe and vent pipe.
Dispose of surplus excavated material.
68-4.04 PAYMENT
Edge drain is measured along the centerline of the pipe. The payment quantity is the slope length of the
pipe designated by the Engineer. The quantity for payment includes the length of Y-fittings at cleanout
pipes and intermediate outlet connections between the couplings at each end of the straight section of the
Y-fitting.
Edge drain outlet is measured along the centerline of the pipe. The quantity for payment includes the
length of outlet pipes, vent pipes, cleanouts, and Y-fittings at cleanout pipes and intermediate outlet
connections between the couplings at each end of the curved section of the Y-fitting.
The Department does not make a deduction in the length of edge drain for gaps in edge drain pipe at
locations of dual outlet, dual vent, or dual outlet and vent connections to the edge drain.
Cross drain interceptors at structure approaches, at end anchors or pressure relief joints, and at
pavement terminals joining existing pavements are measured and paid for as edge drain.
68-5 PERMEABLE MATERIAL BLANKET
Reserved
68-6 DRAINAGE WICK
Reserved
68-7 GEOCOMPOSITE DRAIN SYSTEMS
68-7.01 GENERAL
68-7.01A Summary
Section 68-7 includes specifications for constructing geocomposite drain systems.
Structure approach drainage system consists of geocomposite drain, filter fabric, plastic pipe, treated
permeable base, and drainage pads.
Geocomposite drain includes filter fabric and plastic pipe.
68-7.01B Definitions
Reserved
68-7.01C Submittals
Submit a certificate of compliance for the geocomposite drain certifying that the drain produces the
specified flow rate. The certificate must be accompanied by a flow capability graph for the geocomposite

776

SECTION 68

SUBSURFACE DRAINS

drain showing flow rates and the externally applied pressures and hydraulic gradients. Include verification
by an authorized laboratory for the flow capability graph.
68-7.02 MATERIALS
68-7.02A General
Filter fabric must be Class A.
68-7.02B Geocomposite Drain
Geocomposite drain must comply with the specifications for geocomposite wall drain.
68-7.02C Plastic Pipe
Plastic pipe must comply with the specifications for pipe for edge drains and edge drain outlets in section
68-4.
68-7.02D Drainage Pads
Drainage pads must be constructed of minor concrete.
68-7.02E Treated Permeable Base
Treated permeable base to be placed around slotted plastic pipe at the bottom of geocomposite drains
must comply with section 29.
If asphalt treated permeable base is used, place the base material at a temperature of not less than 180
degrees F or more than 230 degrees F.
68-7.03 CONSTRUCTION
Install the geocomposite drain with the drainage void and the filter fabric facing the embankment. The
fabric facing the embankment side must overlap at least 3 inches at all joints and wrap around the
exterior edges at least 3 inches beyond the exterior edge. If additional fabric is needed to provide overlap
at joints and wraparound at edges, the added fabric must overlap at least 6 inches and be attached to the
fabric on the geocomposite drain.
Place core material manufactured from impermeable plastic sheeting having nonconnecting corrugations
with the corrugations approximately perpendicular to the drainage collection system.
If the fabric on the geocomposite drain is torn or punctured, replace the damaged section completely or
repair it by placing a piece of fabric that is large enough to cover the damaged area and provide at least a
6-inch overlap.
68-7.04 PAYMENT
Not Used

777

69 OVERSIDE DRAINS

69-1.01 GENERAL
Section 69 includes specifications for constructing overside drains.

Excavation and backfill must comply with section 19-3.

Submit a certificate of compliance for each of the following:

1. Steel materials
2. Aluminum materials
3. Plastic materials
69-1.02 MATERIALS
69-1.02A General
For alternative pipe downdrain, choose one of the types shown.

Fabrication of overside drain materials must comply with the details and dimensions shown. If authorized,

minor variations may be used to allow the use of the manufacturer's standard jigs and templates during

the fabrication. The material thickness must be not less than the thickness described.

Joints for overside drains must comply with section 61-1.01D(1)(b) for watertightness.

For pipe downdrains under concrete slope paving, the end of the downdrain must consist of steel pipe or

steel conduit.

Do not mix steel pipe and aluminum pipe in the same installation. You may use the anchor assemblies

shown with an aluminum installation if the anchor assemblies are electrically insulated.

Welding workmanship and technique must be equal to the best practice in modern commercial shops.

69-1.02B Steel Pipe Overside Drains


Steel entrance tapers, pipe downdrains, reducers, coupling bands, and slip joints must be fabricated from
galvanized steel sheets and must comply with AASHTO M 36 and section 66. The pipe must be Type I
pipe under AASHTO M 36. The nominal thickness of the sheet must be at least 0.064 inch.
Steel tapered inlets and flume downdrains must be fabricated from steel sheets under section 69-1.02B.
Coupling bands for corrugated steel pipe must comply with either section 69-1.02B or section 61
1.01D(1)(b) for downdrain pipe.
The weight of galvanizing for overside drain materials must comply with ASTM A123/A123M and
A153/A153M.
Galvanized surfaces on overside drain materials that are damaged must be repaired under section 75
1.05.
69-1.02C Aluminum Pipe Overside Drains
Aluminum entrance tapers, pipe downdrains, reducers, coupling bands, and slip joints must be
constructed of aluminum sheets and must comply with AASHTO M 196 and section 66. The pipe must be
Type I pipe under AASHTO M 196. The nominal thickness of the sheet must be at least 0.060 inch.
Aluminum tapered inlets and flume downdrains must be fabricated of aluminum sheet complying with
AASHTO M 197 with a thickness of at least 0.060 inch.
Coupling bands for corrugated aluminum pipe must comply with either section 69-1.02C or section 61
1.01D(1)(b) for downdrain pipe.
69-1.02D Plastic Pipe Overside Drains
Plastic pipe for overside drains must be Type S corrugated high-density polyethylene pipe and comply
with section 64.

779

SECTION 69

OVERSIDE DRAINS

Plastic pipe joints must comply with section 61-1.01D(1)(b) for downdrain joints. If pipe joint details are
shown, the tensile strength requirements do not apply. The joint overlap requirements for integral joints
must comply with the requirements for positive joints.
69-1.02E Anchor Assemblies
A single anchor assembly includes 2 pipe stakes with necessary hardware, bars or coupling bands, and
hardware for fastening downdrain pipe or flume downdrain.
Pipe stakes, plates, bars, clip brackets, and hardware must be hot-dip galvanized after fabrication under
section 75-1.05.
69-1.02F Cable Anchorage System
Cable anchorage assemblies for pipe downdrains must comply with section 69-1.02E.

Cables, welded steel eyes, steel rods, turnbuckles, thimbles, cable clamps, and anchor plates must

comply with specifications for similar materials in section 83-1.02B.

Steel pipe must comply with specifications for similar materials in section 56-3.02F for pipe posts.

Concrete for concrete anchors must comply with the specifications for minor concrete except the concrete

must contain at least 420 pounds of cementitious material per cubic yard.

69-1.02G Protective Coatings


If described as coated, metal overside drains must be protected with coating under section 66-1.02C.
If a protective coating is applied to a metal overside drain, each section of the downdrain pipe and each
accessory must have the nominal thickness of the metal clearly identified on the inner surface with paint
or other authorized means.
Repair damaged coatings under section 66-1.02C.
69-1.03 CONSTRUCTION
Install entrance tapers and tapered inlets so that they function properly and efficiently, keep material in
the dike, and prevent water from percolating under or around them. The seal between the taper or inlet
and the surrounding material must be watertight.
Connect an entrance taper to a downdrain pipe by means of a band coupler or a slip joint.
Weld or rivet bulkheads and outlet pipes or flume pieces to the taper or inlet to form watertight
connections.
Securely anchor a downdrain to the slope of the ground with an anchor assembly wherever the
downdrain is not in a trench.
If a plastic pipe joint restrainer assembly under Alternative A is used, install it immediately below the pipe
bell.
The bell end of a plastic pipe overside drain must face uphill.
69-1.04 PAYMENT
Pipe downdrain is measured along the centerline of the pipe and parallel with the slope line. The payment
quantity includes the length of elbows, wyes, tees, and other branches to the point of intersection. If the
pipe is cut to fit a structure or slope, the payment quantity is the length of pipe necessary to be placed
before cutting, measured in 2-foot increments. The length for slip joints is not included in the payment
quantity.
For pipe downdrains under concrete slope paving, the length of the pipe downdrain is measured from the
beginning of the corrugated steel pipe to the end of the downdrain.
The payment quantity for an entrance taper includes the length of the tapered section and the tail pipe.
The payment quantity for a tapered inlet includes the length of the tapered section and the flume stub.

780

70 MISCELLANEOUS DRAINAGE FACILITIES

70-1 GENERAL

70-1.01 GENERAL

Section 70-1 includes general specifications for (1) furnishing, placing, and connecting miscellaneous
drainage facilities for water drainage and transmission and (2) constructing casings for bridges.
Miscellaneous drainage facilities include corrugated metal pipe drainage facilities, welded steel pipe
drainage facilities, precast concrete pipe drainage facilities, drain appurtenances, grated line drains, and
casings for bridges.
For a given location, if only one type of pipe riser or pipe inlet is shown, install that type. For a given
location, if more than one type of pipe riser or pipe inlet is shown, choose one of the types shown.
70-1.02 MATERIALS
Steps and ladders must be (1) steel where installed in steel or concrete drainage facilities or (2) aluminum
where installed in aluminum drainage facilities.
70-1.03 CONSTRUCTION
Excavation and backfill for drains must comply with section 19.

Attach steps and ladders to miscellaneous drainage facilities where described.

Where new drain inlets or manholes are in paved or surfaced areas, do not construct the drain to final

grade until the paving or surfacing has been completed immediately adjacent to the drain.

70-1.04 PAYMENT
No payment is made for pipe or casing placed in excess of the length shown.
Pipe drainage facilities are paid for as the type of pipe involved. Pipes are measured along the centerline

of the pipe.

If more than one type of pipe riser is shown for a given location, pipe risers are paid for as alternative pipe

risers of the types shown in the Bid Item List.

If more than one type of pipe inlet is shown for a given location, pipe inlets are paid for as alternative pipe

inlets of the types shown in the Bid Item List.

Pipes for drainage facilities includes pipe components. Payment for pipe components that are not made

of pipe is included in payment for the type of pipe involved unless a bid item for the component is shown

on the Bid Item List.

Quantities of pipe for energy dissipators, inlets, manholes, and risers are measured to the nearest 0.1

foot of pipe.

Payment for drainage pipe stubs is included in the payment for the type of pipe involved.

Payment for constructing pipe riser connections and bar reinforcement steel riser safety cages is included

in the payment for the types of pipe riser shown in the Bid Item List.

Payment for ladders is included in the payment for the type of pipe involved.

Payment for excavation and backfill is included in the payment for the type of miscellaneous drainage

facility work involved.

70-2 CORRUGATED METAL PIPE DRAINAGE FACILITIES


70-2.01 GENERAL
Section 70-2 includes specifications for constructing drainage facilities with corrugated metal pipe.
Corrugated metal pipe drainage facilities include energy dissipators, inlets, risers, reducers, manholes,
and all necessary connections.

781

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-2.02 MATERIALS
Corrugated metal pipe must be either aluminum or steel aluminum as shown and must have a protective
coating if shown. Corrugated metal pipe and coatings must comply with section 66.
70-2.03 CONSTRUCTION
Not Used
70-2.04 PAYMENT
Not Used
70-3 WELDED STEEL PIPE DRAINAGE FACILITIES
70-3.01 GENERAL
Section 70-3 included specifications for constructing drainage facilities with welded steel pipe. Welded
steel pipe drainage facilities include energy dissipators, inlets, risers, reducers, and manholes.
70-3.02 MATERIALS
70-3.02A General
Welded steel pipe must comply with one of the following:
1. A
WWA C200
2. ASTM A 53/A 53M, Grade B
3. API Specification 5L, Grade B or Grade X42
70-3.02B Coatings
70-3.02B(1) General
If a coating is described, coat all portions of the welded steel pipe drainage facility.
70-3.02B(2) Coal Tar Coating
Coat and wrap the welded steel pipe prior to shipping as follows:
1. Clean, prime, and coat interior and exterior surfaces with coal tar enamel.
2. Wrap the exterior with a bonded felt wrapper under AWWA C203 with section A1.2 of the appendix.
70-3.02B(3) Factory Applied Fusion Bonded Epoxy Coating
If described, coat the interior or exterior surfaces of welded steel pipe. The coating must be a factory
applied fusion-bonded epoxy conforming to AWWAC213.
If fusion-bonded epoxy coating is exposed to above grade sunlight, prime and paint the exterior fusion
coated wall surfaces. Primer and paint must comply with the type, standard, and coating thickness shown
in the following table:
Coatings
Primer
Finish

Type
Zinc rich
Exterior grade
latex satin or flat

Standard
AASHTO M300
Meeting State VOC requirements and as
recommended by the manufacturer of
inorganic zinc-rich primer

Coating
thickness
2.53.5 mil DFT
2.03.0 mil DFT

Submit color options for finish paint. The Engineer selects finish color.
Repair of internal and external wall coatings must comply with the following:
1. Breaks or scuffs in the epoxy coating that are less than 36 square inches must be repaired by the
application of epoxy material similar to and compatible with the durability, adhesion and appearance
of the original epoxy coating under section 4.4.4.1.2 of AWWA C213
2. Repair coating must be a minimum thickness of 0.010 inch, 10 mils, after drying
3. Department rejects a pipe section if individual breaks exceed 36 square inches or if the total area of
breaks exceeds 0.5 percent of the total surface area of the pipe section
782

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-3.02B(4) Asphalt Coating


Reserved
70-3.03 CONSTRUCTION
70-3.03A General
Field welding must be performed under AWWA C206.
After the pipe has been fabricated and welded into lengths, it must be thoroughly cleaned of dirt, oil,
grease, loose scale and other foreign material.
Install welded steel pipe so that it is not electrically connected to or in direct physical contact with other
metal pipe. If pipe is mechanically connected to public utility lines or other metal pipe, provide electrically
insulated connections. Connections to nonmetallic pipe do not require electrically insulated connections.
Electrically insulated connections must be placed in welded steel pipe within 5 feet of its ingress into or
egress from any building or structure.
If backfill material contains rock or highly expansive clay soils, install a sand shield under AWWA C203 in
section A1.3 of the appendix.
Prior to backfilling at the welded joints, pressure test the pipe. Place the pipe under the operating head for
a period of 2 hours with no leaks. Correct any leaks or defects and retest if necessary.
70-3.03B Coatings
Repair damage to coatings under section 66-1.02C.
70-3.04 PAYMENT
Not Used
70-4 PRECAST CONCRETE PIPE DRAINAGE FACILITIES
70-4.01 GENERAL
Section 70-4 includes specifications for constructing drainage facilities with precast concrete pipes.
Precast concrete drainage facilities include energy dissipators, inlets, risers, reducers, adjustment rings,
and manholes.
70-4.02 MATERIALS
Precast concrete drainage facilities must comply with AASHTO M 199M/M 199.
Concrete must comply with section 90-1 except that the grading requirements do not apply to the
aggregate.
Reinforcement must comply with section 52.
70-4.03 CONSTRUCTION
Construct mortar joints under section 65.
Inlets may be formed in place as an alternative to using precast concrete pipe and cutting the side
openings.
70-4.04 PAYMENT
Not Used
70-5 DRAINAGE APPURTENANCES
70-5.01 GENERAL
70-5.01A General
Section 70-5 includes specifications for constructing items that are appurtenances to drainage facilities.
Drain appurtenances include flared end sections, minor concrete drainage appurtenances, miscellaneous
metal appurtenances, drainage inlet depressions, drainage inlet markers, redwood covers, and drainage
gates.

783

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-5.01B Materials
Not Used
70-5.01C Construction
Construct concrete under section 51.
70-5.01D Payment
Payment for drainage appurtenances is included in the various items of work involved unless a bid item
for the work is shown on the Bid Item List.
70-5.02 FLARED END SECTIONS
70-5.02A General
Fabricate flared end sections as shown. Minor variations may be authorized to permit the use of the
manufacturer's fabrication methods.
70-5.02A(1) Precast Concrete Flared End Sections
Precast flared end sections must comply with the specifications for Class III Reinforced Concrete Pipe in
AASHTO M 170M and the following:
1. Portland cement and aggregate must comply with section 90-1 except the grading requirements do
not apply to the aggregate
2. Area of steel reinforcement per linear foot of flared end section must be at least equal to the minimum
steel requirements for circular reinforcement in circular pipe for the internal diameter of the circular
portion of the flared end section
3. Basis of acceptance of the precast concrete flared end section is determined under section 5.1.2 of
AASHTO M 170
Reinforcement must comply with section 52.
Cutoff walls for precast concrete flared end sections must be minor concrete except the cementitious
material content must not be less than 470 lb/cu yd. Construct cutoff walls under section 51.
70-5.02A(1) Metal Flared End Sections
Metal flared end sections must comply with the following:
1. Prefabricated steel flared end sections must comply with AASHTO M 36 and M 218.
2. Prefabricated aluminum flared end sections must comply with AASHTO M 196 and M 197.
3. Metal flared end sections may be used as an alternative to precast concrete flared end sections or
plastic flared end sections. Metal flared end sections used on concrete pipe 36 inches in diameter or
smaller must be equipped with toe plates.
Mortar used to connect metal flared end sections to precast concrete pipe must comply with section 51-1.
Welded wire fabric must be commercial quality.
70-5.02A(2) Plastic Flared End Sections
Plastic flared end sections must comply with ASTM D 1248.
70-5.02A(3) Alternative Flared End Sections
For a given location, if only one type of flared end section is shown, install that type. For a given location,
if more than one type of flared end section is shown, choose one of the types shown.
Alternative flared end sections must be the same material type as the drainage facility to which it is
attached. Comply with the material specifications in section 62. Metal flared end sections may be used as
an alternative to precast concrete flared end sections or plastic flared end sections. Comply with section
70-5.02A(1).
If more than one type of flared end section is shown for a given location, flared end sections are paid for
as alternative flared end section of the types shown in the Bid Item List.

784

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-5.03 MINOR CONCRETE DRAINAGE APPURTENANCES


Minor concrete drainage appurtenances must comply with section 51-7. Minor concrete drainage
appurtenances include concrete foundations, bases, basin floors, and reinforced concrete pipe risers.
70-5.04 MISCELLANEOUS METAL DRAINAGE APPURETENANCES
Miscellaneous iron and steel items used for drains must comply with section 75.
The following items are not included in the payment for miscellaneous drainage facilities:
1.
2.
3.
4.
5.
6.

S
teel cover
Frame and grate
F
rame and cover
Manhole frame and cover
Manhole frame and grate
Manhole frame and cover (pressure)

70.5.05 DRAINAGE GATES


70-5.05A General
Reserved
70-5.05B Automatic Drainage Gates
70-5.05B(1) General
Reserved
70-5.05B(2) Drainage Gates for Low Head Pressure
Reserved
70-5.05B(3) Drainage Gates for High Head Pressure
Reserved
70-5.05C Slide Headgates
Reserved
70-5.06 INLET DEPRESSIONS
70-5.06A General
Construct inlet depressions for drainage as shown.
70-5.06B Inlet Depressions, HMA
HMA concrete drainage inlet depressions must comply with section 39 and the following:
1. In shoulder areas of roadways, provide the asphalt type that matches the roadway construction.
2. In locations outside the shoulder areas, provide the asphalt type that is specified for miscellaneous
areas.
If necessary, place and finish HMA by hand so that the drainage inlet depressions match the grade of the
surrounding material.
70-5.06C Inlet Depressions, Concrete
Concrete drainage inlet depressions must comply with specifications for minor concrete except (1) the
cement content must be at least 463 lb/cu yd and (2) placement must comply with the following:
1. If concrete pavement is placed near an inlet depression, place the pavement before constructing the
inlet depression.
2. If concrete inlet depressions are constructed in shoulder areas, concrete must be placed on prepared
base material compacted to at least 95 percent relative compaction. Finish the concrete as follows:
2.1. After placement to the lines and grades shown, smooth the surface with a float and trowel. If
concrete is adjacent to isolation joints, smooth the surface with an edger.
2.2. Broom finish the smoothed concrete surface. Create a surface with a coefficient of friction of at
least 0.30 when tested under California Test 342.
785

SECTION 70
2.3.
2.4

MISCELLANEOUS DRAINAGE FACILITIES

If use of water is necessary, apply the water immediately before brooming the surface.
Cure the concrete under section 40-1.03N.

70-5.07 DRAINAGE INLET MARKERS


Provide the size and type of drainage inlet marker shown. If a specific type is not shown, choose one type
from the table titled "Drainage Inlet Markers." Markers must comply with the requirements shown in the
following table:
Type

Property
Composition
Thickness

Thermoplastic

Metal medallion

Plastic
medallion

Drainage Inlet Markers


Requirements
Thermoplastic free of lead and
chromium
0.0800.160
inch
Blue or green

Legend color
(nonreflective)
Background color
(nonreflective)
Skid resistance
Composition

Thickness of metal,
inches
Height of marker,
inches
Legend color
(nonreflective)
Background color
(nonreflective)
Skid resistance
Composition

Thickness, inches
Thickness (with
dome), inches
Legend color
(nonreflective) a
Background color
(nonreflective) a
Weathering
resistance
Composition

Stamped
concrete
a
Requirements if metal marker is colored.

White
60 BPN
Commercial-grade stainless steel,
aluminum, brass, or bronze sheet
metal or cast.
0.055-0.138
0.055-0.138
Blue or green
White or bare metal
60 BPN
Plastic that contains ultraviolet
inhibitors
0.025-0.060
0.055-0.120
Blue or green
White
1 year without yellowing, fogging, or
pitting
Authorized concrete stamp

Test method
---AASHTO M
249
ASTM E 303
-----ASTM E 303
-----ASTM D1435
-

Install prefabricated drainage inlet markers by:


1. Mechanically cleaning and preparing the surface
2. Attaching the prefabricated drainage inlet markers to the surface with adhesives, fasteners, or heat as
recommended by the manufacturer
Install stamped concrete drainage inlet markers by:
1. Imprinting uncured concrete with an authorized concrete stamp for drainage inlet markers
2. Producing stamped concrete surfaces that are free from blemishes

786

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-5.08 REDWOOD COVERS


Boards for redwood covers must be no. 1 heart structural grade, S4S redwood.
70-6 GRATED LINE DRAINS
Reserved
70-7 CASINGS FOR BRIDGES
70-7.01 GENERAL
Section 70-7 includes specifications for constructing welded steel pipe casings through bridges and under
approach slabs.
Submit shop drawings for temporary supports of casings at abutments.
70-7.02 MATERIALS
70-7.02A General
Reserved
70-7.02B Casing
Casings for bridges must be welded steel pipe complying with section 70-3.02.
Before shipping, the casing must be cleaned, primed, and coated to comply with ANSI/AWWA C213.
Wrapping tape for the casing must be a pressure sensitive PVC or polyethylene tape with a minimum
thickness of 50 mils, 2 inches wide.
Repair damaged coating on the casing with pipe wrapping. Wrap field joints and fittings with pipe
wrapping. Apply pipe wrapping as follows:
1. Pipe casing, joints, and fittings to be wrapped must be thoroughly cleaned and primed as
recommended by the tape manufacturer.
2. Tape must be tightly applied with 1/2 uniform lap, free from wrinkles and voids to provide not less
than a 100-mil thickness.
3. Wrapping at joints must extend at least 6 inches over adjacent pipe casing coverings. Adequate
tension must be applied so tape will conform closely to contours of the joint.
70-7.02C Casing Hanger Assemblies
Casing hanger assemblies include a concrete clevis plate, adjustable steel yoke, cast iron pipe roller,
steel roller rod, and hex nuts. Steel components must be galvanized. You may use embedded steel
welded linked eye rods instead of a clevis plate.
The casing hanger assembly must be rated for the water supply line and casing.
Clevis plate, yoke, roller, rod, expansion anchors, pipe clamps, nuts and bolts, and other fittings must be
for the type and size of the water supply line and casing being supported.
Clevis plate, expansion anchors, yoke, rod, pipe clamps, nuts and bolts, and other fittings must be steel
and comply with section 75-1.03.
70-7.02D Concrete Casing Supports
Concrete casing supports must consist of either a PC concrete or CIP minor concrete pipe cradle,
galvanized steel pipe clamp, and 2 anchor bolts. The protection shield must be Type 316 stainless steel
pipe protection shield. Provide commercial quality wire mesh and reinforcement. Moist cure the concrete
casing support for not less than 3 days.
Anchor concrete casing supports with epoxy. Epoxy must be one of the following types:
1. E
poxy binder
2. Rapid set epoxy adhesive for pavement markers
3. Standard set epoxy adhesive for pavement markers

787

SECTION 70

MISCELLANEOUS DRAINAGE FACILITIES

70-7.03 CONSTRUCTION
Unless otherwise shown, install casings at each abutment and extend the casing to the greater of:
1. 5 feet beyond the approach slab
2. 5 feet beyond the end of the adjacent wingwall
3. 20 feet beyond the abutment
Where the casing passes through an abutment wall, the casing must be additionally wrapped with 2
layers of 15-pound asphalt-felt building paper, securely taped or wired in place.
If a blockout is provided in the bridge abutment wall for the casing, the space between the casing and
bridge abutment wall must be filled with mortar complying with section 51-1.
Openings for casings through the bridge superstructure concrete must either be formed or consist of pipe
sleeves that are 2 pipe sizes larger than the casing.
70-7.04 PAYMENT
Welded steel pipe casing is measured along the centerline of the casing.

71 RESERVED

788

DIVISION VIII MISCELLANEOUS CONSTRUCTION

72 SLOPE PROTECTION

72-1 GENERAL

72-1.01 GENERAL
Section 72-1 includes general specifications for constructing slope protection, concrete lining, slope
paving, and gabions.
72-1.02 MATERIALS
Concrete shown for slope protection or slope paving must comply with the specifications for minor
concrete.
Unless otherwise specified, fabric must be Class 8 RSP fabric.
72-1.03 CONSTRUCTION
If placement of fabric is required, place the fabric before placing slope protection, slope paving, and
gabions.
Before placing the fabric, the surface of the slope must be free of loose or extraneous material and sharp
objects that may damage the fabric.
Handle and place fabric in compliance with the manufacturer's instructions. Place the fabric loosely on the
slope so that the fabric conforms to the surface without damage when the cover material is placed.
Join edges of the fabric with either overlapped joints or stitched seams.
If the fabric is joined with overlapped joints, adjacent borders of the fabric must be overlapped by at least
24 inches. Overlap in the same direction that the cover material is placed.
If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Use the size and composition
of yarn that is recommended by the fabric manufacturer. Use 5 to 7 stitches per inch of seam. The
strength of a stitched seam must be the same as that specified for the fabric, except if the stitched seams
are oriented up and down a slope, the strength may be reduced to a value that it is at least 80 percent of
that specified for the fabric.
Do not operate equipment or drive vehicles directly on the fabric.
If the fabric is damaged and the Engineer determines that it cannot be repaired, replace the fabric.
If the Engineer determines that the fabric can be repaired, then repair it by covering the damaged area
with new fabric. If the repair is made using overlapped joints, the overlap must be at least 3 feet.
72-1.04 PAYMENT
Payment is not made for the additional fabric used for overlaps.
72-2 ROCK SLOPE PROTECTION
72-2.01 GENERAL
Section 72-2 includes specifications for constructing RSP. RSP includes:
1. Excavating and backfilling the footing trench
2. Placing RSP fabric where shown
3. Placing revetment type rock courses on the slope
Use the class of rock and the method for placement described.
72-2.02 MATERIALS
72-2.02A Rock
For method A placement and the class of RSP described, comply with the rock grading shown in the
following table:

789

SECTION 72

SLOPE PROTECTION

Rock Grading for Method A Placement

Percentage larger thana


Class
Rock size
8T
4T
2T
1T
1/2 T
16 Ton
05
-
-
-
-
8 Ton
50100
05
---4 Ton
95100
50100
05
--2 Ton
-95100
50100
05
-1 Ton
--95100
501
05
1/2 Ton
---95100
50100
1/4 Ton
----95100
a
For any class, the percentage of rock smaller than the smallest rock size
must be determined on the basis of weight. For all other rock sizes within a
class, the percentage must be determined on the basis of the ratio of the
number of individual rocks larger than the smallest size shown for that class
compared to the total number of rocks.

For method B placement and the class of RSP described, comply with the rock grading shown in the
following table:
Rock Grading for Method B Placement
Percentage larger thana
Rock
Class
size
1T
1/2 T
1/4 T
Light
Facing
No. 1
No. 2
No. 3
2 ton
05
-
-
-
-
-
-
-
1 ton
50100
05
------1/2 ton
-50100
05
-----1/4 ton
95100
-50100
05
----200 lb
-95100
-50100
05
05
--75 lb
--95100
-50100 50100
05
-25 lb
---95100
90100 90100
2575
05
--90100 2575
5 lb
----
1 lb
----
---90100
a
For any class, the percentage of rock smaller than the smallest rock size must be determined
on the basis of weight. For all other rock sizes within a class, the percentage must be
determined on the basis of the ratio of the number of individual rocks larger than the smallest
size shown for that class compared to the total number of rocks.

Rock must have the values for the material properties shown in the following table:
Rock Material Properties
Property
California Test
Apparent specific gravity
206
Absorption
206
Durability index
229

Value
2.5 minimum
4.2% maximuma
52 minimumb

Select rock so that shapes provide a stable structure for the required section. If the slope is steeper than
2:1, do not use rounded boulders and cobbles. Angular shaped rock may be used on any planned slope.
Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33
times the length.
72-2.02B Fabric
Fabric must be RSP fabric that complies with the class shown in the following table:
790

SECTION 72

SLOPE PROTECTION

Class
8
10

Fabric Class

Largest rock grading class used in


slope protection
1 ton or smaller
Larger than 1 ton

72-2.03 CONSTRUCTION
72-2.03A General
Excavate the footing trench along the toe of the slope.
Local surface irregularities of the RSP must not vary from the planned slope by more than 1 foot as
measured at right angles to the slope.
At the completion of slope protection work, fill voids in the footing trench with excavated material.
Compaction is not required.
72-2.03B Placement Method A
Do not place rocks by dumping.

Place larger rocks in the footing trench.

Place rocks on the slope so that their longitudinal axis is normal to the face of the embankment.

Place foundation course rocks so that they are in contact with the ground surface.

For rocks above the foundation course, place them so that each rock has a 3-point bearing on underlying

rocks; do not bear them on smaller rocks which may be used for chinking voids.

72-2.03C Placement Method B


Rocks may be placed by dumping and may be spread in layers by bulldozers or other suitable equipment.
Place rocks so that:
1. There is a minimum of voids
2. Larger rocks are in the toe course and on the outside surface of the slope protection
72-2.04 PAYMENT
If RSP is paid by the ton, the quantity is determined by weighing with a scale.

If RSP is paid by the cubic yard, the quantity is based on the dimensions shown or ordered.

72-3 CONCRETED-ROCK SLOPE PROTECTION


72-3.01 GENERAL
Section 72-3 includes specifications for constructing concreted-rock slope protection. Concreted-rock
slope protection includes:
1.
2.
3.
4.

Excavating and backfilling the footing trench


Placing fabric and weep tubes where shown
Placing revetment type rock courses on the slope
Concreting the rock

Use the class of rock and the method for placement described.
72-3.02 MATERIALS
72-3.02A Concrete
If colored slope protection is described, color the concrete by mixing a fine ground, synthetic mineral
oxide into the concrete. The synthetic mineral oxide must be specifically manufactured for coloring
concrete. The color of the completed concrete after curing and when air dry must comply with color no.
30450 (tan) of FED-STD-595.
791

SECTION 72

SLOPE PROTECTION

Use 1-inch combined aggregate gradings in the concrete.


The water content of the concrete must permit gravity flow into the interstices with limited spading and
brooming.
72-3.02B Rock
Rocks for concreted-rock slope protection must comply with the grading shown in the following table:
Concreted-Rock Grading
Rock
Percentage larger thana
size
Class
1/2 ton
1/4 ton
Light
Facing
Cobble
1 ton
05
----1/2 ton
50100
05
---1/4 ton
-50100
05
--200 lb
90100
-50100
05
-75 lb
-90100
90100
50100
05
25 lb
---90100
95100
a
For any class, the percentage of rock smaller than the smallest rock size must be
determined on the basis of weight. For all other rock sizes within a class, the
percentage must be determined on the basis of the ratio of the number of individual
rocks larger than the smallest size shown for that class compared to the total
number of rocks.

Rocks for concreted-rock slope protection must have the values for the material properties shown in the
following table:
Rock Material Properties
Property
California Test
Value
Apparent specific gravity
206
2.5 minimum
Absorption
206
4.2% maximuma
Durability index
229
52 minimumb
Select rocks so that the shape provides a stable structure for the required section. If the slope is steeper
than 2:1, do not use rounded boulders and cobbles. Angular shaped rock may be used on any planned
slope. Flat or needle shaped rock must not be used unless individual rock thickness is greater than 0.33
times the length.
72-3.02C Weep Tubes
Weep tubes must:
1. Be schedule 80, perforated PVC pipe
2. Have a 2-inch nominal diameter
3. Comply with section 68-2.02D
72-3.03 CONSTRUCTION
72-3.03A General
Excavate a footing trench along the toe of the slope.
The coloring agent must be uniformly and homogeneously mixed with the concrete.
Local surface irregularities of the RSP must not vary from the planned slope by more than 1 foot as
measured at right angles to the slope.
At the completion of slope protection work, fill voids in the footing trench with excavated material.
Compaction is not required.
792

SECTION 72

SLOPE PROTECTION

72-3.03B Placement Method A


Method A must comply with section 72-2.03B.
72-3.03C Placement Method B
Method B must comply with section 72-2.03C.
72-3.03D Placing Weep Tubes
Wrap each weep tube in filter fabric.
Place weep tubes and secure them so that they contact the face of the fabric on the slope and extend at
least 2 inches beyond the outer surface of the rock. If placement of fabric on the slope is not required, the
end of the tube near the slope must be covered with a cap made of the same material as the weep tube.
Ensure that concrete will not plug the tube and perforations.
72-3.03E Placing Concrete
The surface of the rock to be concreted must be cleaned of adhering soil and then moistened. At any one
location, place the concrete in a continuous operation during a work day. Deposit concrete by use of
chutes, tubes, buckets, pneumatic equipment, or other mechanical methods. Do not allow the concrete to
flow more than 10 feet across the slope protection.
Immediately after depositing, spade and rod the concrete into place with suitable spades, trowels, or
other acceptable means. Comply with the concrete penetration shown in the following table:

Penetration
(inches)

Minimum Concrete Penetration


Rock class
1/2 ton
1/4 ton
Light
Facing
18
14
10
8

Cobble
6

After placing the concrete, thoroughly brush the rocks to expose the top surfaces. Outer rocks must
project above the concrete by a height of 0.25 to 0.32 times the rock diameter. After completion of any
10-foot strip, do not allow workmen or loads on the surface for at least 24 hours.
Cure concreted-rock slope protection by any one of the methods specified in section 90-1.03B. As an
alternative, you may cure the concreted-rock slope protection by sprinkling a fine spray of water every 2
hours during the daytime for a period of 3 days. If colored concrete is described and you use the curing
compound method, apply curing compound no. 6.
72-3.04 PAYMENT
If concreted-rock slope protection is paid by the ton, the quantity is determined by weighing with a scale.
If concreted-rock slope protection is paid by the cubic yard, the quantity is based on the dimensions
shown or ordered.
72-4 SMALL-ROCK SLOPE PROTECTION
72-4.01 GENERAL
Section 72-4 includes specifications for constructing small-rock slope protection. Small-rock slope
protection includes:
1. Excavating and backfilling the footing trench
2. Placing RSP fabric where shown
3. Placing small rocks on the slope
72-4.02 MATERIALS
Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these.
If the rock layer is shown as 7 inches thick, comply with grading shown in the following table:

793

SECTION 72

SLOPE PROTECTION

Rock Grading for 7-inch-Thick Layer

Sieve sizes
Percentage passing
5 inch
100
4 inch
90100
3 inch
2540
2 inch
010

If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table:
Rock Grading for 5-inch-Thick Layer
Sieve sizes
Percentage passing
4 inch
100
3 inch
90100
2 inch
2540
1 inch
010
If the rock layer is shown as 4-inches thick, comply with grading shown in the following table:
Rock Grading for 4-inch Thick Layer
Sieve sizes
Percentage passing
3 inch
100
2 inch
90100
1 inch
2540
3/4 inch
010
Granular material must contain at least 90 percent crushed particles when tested under California Test
205.
72-4.03 CONSTRUCTION
Local surface irregularities of the RSP must not vary from the planned slope by more than 2 inches as
measured at right angles to the slope.
Small rocks may be placed by dumping and may be spread by bulldozers or other suitable equipment.
During spreading, do not crack the rock.
72-4.04 PAYMENT
The quantity of small-rock slope protection is based on the dimensions shown or ordered.
72-5 CONCRETE SLOPE PROTECTION, GUTTER LINING, DITCH LINING, AND CHANNEL LINING
72-5.01 GENERAL
Section 72-5 includes specifications for shaping slopes, preparing the foundation, and constructing any of
the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.

Concrete slope protection


Lined gutters
Ditch linings
Channel linings
Support walls
Cut-off stubs
Cut-off walls
Footings
Aprons

Construct using minor concrete or shotcrete.

794

SECTION 72

SLOPE PROTECTION

72-5.02 MATERIALS
Pervious backfill material must comply with section 19-3.02C.

Expansion joint filler must comply with section 51-2.01B(1).

Reinforcement must comply with section 52.

Shotcrete must comply with section 53.

If colored slope protection is described, color the concrete by mixing a fine ground, synthetic mineral

oxide into the concrete. The synthetic mineral oxide must be specifically manufactured for coloring

concrete.

The color of the completed concrete after curing and when air dry must comply with color no. 30450 (tan)

of FED-STD-595.

Weep tubes must:

1. Be schedule 80, perforated PVC pipe


2. Have a 2-inch nominal diameter
3. Comply with section 68-2.02D
At each weep tube and drain hole, place a securely tied sack that contains one cubic foot of pervious
backfill. The sack material must comply with the specifications for filter fabric.
72-5.03 CONSTRUCTION
The foundation, which includes all surfaces where concrete is to be placed, must be evenly graded so
that no point on the graded surface is above the designated plane.
Earthwork must comply with section 19.
Wrap each weep tube in filter fabric.
Place weep tubes as shown or ordered.
Place reinforcement under section 52.
Concrete must comply with section 51.
The coloring agent must be uniformly and homogeneously mixed with the concrete.
Spread and tamp concrete until it is thoroughly compacted and mortar flushes to the surface. If the slope
is too steep to permit the use of concrete sufficiently wet to flush with tamping, tamp the concrete until it is
consolidated and immediately trowel on a mortar surface that is 1/4 inch thick. The mortar must consist of
1 part portland cement and 3 parts fine aggregate.
After striking-off to grade, hand float the concrete with floats that are at least 4 inches wide and 30 inches
long. Broom the entire surface with a fine texture hair push broom to produce a uniform surface.
Brooming must be done when the surface is sufficiently set to prevent deep scarring and must be
accomplished by drawing the broom down the slope, leaving marks parallel to the edge of the panel. The
Engineer may direct you to apply a fine spray of water to the surface immediately before brooming. Edges
and joints must be edged with a 1/4-inch-radius edger before the brooming.
Install transverse expansion joints at 20-foot intervals. Fill expansion joints with 1/2-inch-thick expansion
joint filler.
After placing the concrete, fill the footing trenches with excavated material. Compaction is not required.
Curing concrete slope protection, gutter lining, ditch lining, and channel lining must comply with one of the
methods specified in section 90-1.03B. If colored concrete is described and you use the curing compound
method, apply curing compound no. 6.
Construct, finish, and cure shotcrete slope paving under section 53.

795

SECTION 72

SLOPE PROTECTION

72-5.04 PAYMENT
Quantities of minor concrete or shotcrete will be calculated by multiplying the following:
1. Area measured along the slope lines of the completed concrete slope protection
2. Thickness shown for the concrete slope protection
No additional payment is made for additional concrete placed by reason of low foundation.
72-6 BROKEN-CONCRETE SLOPE PROTECTION
Reserved
72-772-10 RESERVED
72-11 SLOPE PAVING
72-11.01 GENERAL
72-11.01A General
Section 72-11.01 includes general specifications for constructing slope paving.
Construct slope paving using minor concrete or shotcrete.
72-11.01B Materials
Shotcrete must comply with section 53.
The maximum aggregate size used in minor concrete must not be larger than 1 inch or smaller than 3/4
inch.
If colored slope paving is described, color the concrete by mixing a fine ground, synthetic mineral oxide
into the concrete. The synthetic mineral oxide must be specifically manufactured for coloring concrete.
The coloring agent must be uniformly and homogeneously mixed with the concrete. The color of the
completed concrete after curing and when air dry must comply with color no. 30450 of FED-STD-595.
Reinforcement must comply with section 52.

Timber spacers must be construction heart redwood or better and graded under section 57-2.01B(2).

Nails used to fasten the timber spacers must be hot-dip galvanized.

72-11.01C Construction
72-11.01C(1) General
Construct concrete curbs before constructing sidewalks or slope paving. Concrete curbs must comply
with section 73.
Schedule the construction of the slope paving so that the work, including placing, finishing, and
application of curing compound, is completed in any section bordered by timber spacers on the same day
that the work is started in that section. There must be no construction joints between timber spacers.
Earthwork for slope paving must comply with section 19.
Before applying concrete, evenly grade foundations so that no point on the graded slope is above the
slope plane shown.
Thoroughly compact foundations. Foundations must contain enough moisture to provide a firm foundation
and to prevent absorption of water from the concrete or shotcrete. Foundations must be free of surface
water.
Place reinforcement under section 52.
Securely hold timber spacers in place with anchor bars consisting of commercial quality bar reinforcing
steel.
If there are no timber spacers or whenever the Engineer determines that the size of a panel between
spacers is too large to be constructed without an intermediate construction joint, place a joint at an

796

SECTION 72

SLOPE PROTECTION

authorized location. Complete any section of concrete bounded by permissible construction joints within
the same day.
Cure slope paving by the curing compound method using curing compound no. 6.
72-11.01C(2) Minor Concrete
Construct and finish minor concrete slope paving under section 51-7.
Spread and tamp the concrete until it is thoroughly compacted and mortar flushes to the surface. If the
slope is too steep to permit the use of concrete sufficiently wet to flush with tamping, then tamp the
concrete until it is consolidated and immediately trowel on a mortar surface that is 1/4 inch thick. The
mortar must consist of 1 part portland cement and 3 parts fine aggregate.
After striking-off to grade, hand float the concrete with floats that are at least 4 inches wide and 30 inches
long. Broom the entire surface with a fine texture hair push broom to produce a uniform surface.
Brooming must be done when the surface is sufficiently set to prevent deep scarring and must be
accomplished by drawing the broom down the slope, leaving marks parallel to the edge of the panel. The
Engineer may order you to apply a fine spray of water to the surface immediately before brooming. Edges
and joints must be edged with a 1/4-inch-radius edger before the brooming.
72-11.01C(3) Shotcrete
Construct and finish shotcrete slope paving under section 53.
After the shotcrete has been placed to the depth shown, check the surface with a straightedge. Place
additional mortar to bring any low spots or depressions up to the proper grade.
The finish of the shotcrete slope paving must be uniform without humps or hollows of more than 1/2 inch
in 10 feet.
72-11.01D Payment
Quantities of minor concrete or shotcrete will be calculated by multiplying the following:
1. Area computed from measurements along the slope of the actual areas constructed
2. Thickness shown for the concrete slope paving
No payment is made for additional concrete placed by reason of low foundation.
No deduction is made for timber spacers.
72-11.02 EXPOSED AGGREGATE SLOPE PAVING
72-11.02A General
Section 72-11.02 includes specification for constructing slope paving with an exposed aggregate finish.
72-11.02B Materials
Shotcrete must not be used to construct exposed aggregate slope paving.
Coarse aggregate must comply with the 1 inch x No. 4 primary size coarse aggregate specified in section
90-1.02C(4)(b).
Concrete set retarders must be commercial quality, manufactured specifically for use on the top surface
of concrete. The retarder must effectively slow down the setting time and depth of the cement and fine
aggregate matrix to permit exposing the aggregates.
72-11.02C Construction
The coloring agent must be uniformly and homogeneously mixed with the concrete.
Place and consolidate the concrete so that the coarse aggregate remains uniformly distributed throughout
the concrete.
You may apply a concrete set retarder to the surface of the concrete after placing, consolidating, and
finishing of the concrete is complete. Apply the set retarder under the manufacturer's instructions.

797

SECTION 72

SLOPE PROTECTION

When the mass of the concrete is sufficiently set to permit removing the matrix of cement and fine
aggregate, expose the coarse aggregate:
1. With a water spray, coarse brooming, abrasive blasting, or a combination of these procedures.
Removal methods must not dislodge or loosen the coarse aggregate from embedment in the mortar.
2. To a depth of approximately 3/16 to 3/8 inch. Exposed aggregate surfaces must be uniform in
appearance.
Immediately after the cement mortar has hardened sufficiently to resist further removal, clean all cement
film and other loose material from the exposed aggregate and all other surfaces with stiff brooms and
water.
Cure concrete under section 90-1.03B. Except when operations for exposing the aggregate are
underway, cure the concrete. You may use the water curing method. If you remove an area of curing
compound during the curing period, keep the area continuously wet until the end of the curing period or
until you reapply the curing compound.
72-11.02D Payment
Not Used
72-11.03 SLOPE PAVING WITH CONCRETE PAVERS
Reserved
72-1272-15 RESERVED
72-16 GABIONS
72-16.01 GENERAL
Section 72-16 includes specifications for constructing gabion structures. Gabions consist of wire mesh
baskets that are placed and then filled with rock. The wire baskets must be standard sized.
Gabions must be divided by diaphragm panels so that baskets are 36-inch long cells.
Empty gabion baskets must be assembled individually and joined successively. The individual mesh
panels (base, front, ends, back, diaphragms, and lid) and successive gabions must be assembled so that
the strength and flexibility along the joints is comparable to a single panel.
Submit a certificate of compliance for each shipment of gabion baskets to the job site.
72-16.02 MATERIALS
72-16.02A General
The standard sizes for gabion baskets must be either of the following:
1. Mattress style that are 12 by 18 by 36 inches
2. Cubical style that are 36 by 36 by 36 inches
The width, height, or length of a standard basket must not vary more than 5 percent from the standard
size shown.
72-16.02B Mesh
Use the same mesh for each style and size of gabion basket.
The size of wire used to manufacture mesh must comply with ASTM A641 and the requirements in the
following tables:

798

SECTION 72

SLOPE PROTECTION

Wire Size with PVC Coating

Gabion basket
USA wire gage
Mesh type
style
Cubical
12
twisted
11 min to 9 max
welded
Mattress
12
twisted
11
welded

Wire Size without PVC Coating


Gabion basket
USA wire gage
Mesh type
style
Cubical
11
twisted
11 min to 9 max
welded
Mattress
11
twisted
11
welded
Wire material properties must have the values shown in the following table:

Property
Min tensile strength
12-gage wire:
Diameter
Zinc coating
11-gage wire:
Diameter
Zinc coating
9-gage wire:
Diameter
Zinc coating

Wire Material Properties


ASTM tests
A 370
60 ksi

Value

A641
A641 Class 3 and A90

0.106 inch with 0.102 min


0.75 oz/sq ft

A641
A641 Class 3 and A90

0.120 inch with 0.116 min


0.80 oz/sq ft

A641
A641 Class 3 and A90

0.148 inch with 0.144 min


0.85 oz/sq ft

Twisted-mesh wire must be formed with a nonraveling twist and into a uniform hexagonal pattern. For
PVC-coated wire, use 10-gage size for the selvage wires. For wire without PVC coating, use 9-gage size
for the selvage wires.
Welded-mesh wires must:
1. Be formed into the grid pattern shown
2. Be welded by resistance welding
3. Comply with ASTM A185 except weld shears must be:
3.1. 600 lb minimum for 11-gage wire
3.2. 800 lb minimum for 9-gage wire
Resistance welding after coating the wire with zinc is allowed if there are no large splashes, flakes, or
flashes of zinc at the weld.
72-16.02C PVC Coating
If PVC coating is shown, coat the mesh wire, standard tie wires, standard binders, internal connecting
wires, preformed stiffeners, and selvage wire.
PVC coating must be UV resistant. A suitable UV resistance additive must be blended with the PVC.
Identify the additive on the certificate of compliance. If the gabions are exposed to natural sunlight, the
color of the PVC coating must be gray and resistant to fading.
Apply the zinc coating before applying the PVC coating. Application of the PVC coating must comply with
the manufacturer's instructions.
799

SECTION 72

SLOPE PROTECTION

Evaluate the PVC coating by infrared spectral scan. The scan must closely match those of tested and
accepted products already on file at the Transportation Laboratory.
The minimum thickness of the PVC coating must be 0.015 inch when measured radially at any cross
section transverse to the wire length.
PVC coating will be visually inspected. There must be no nicks, cuts, holidays, or abraded areas. Minor
cuts, nicks, and other minor imperfections due to manufacturing are allowed along the selvage-wrapped
edges of the twisted wire mesh.
You are not required to coat the ends of the wires where they have been trimmed along wire or panel
edges during the normal manufacturing processes.
72-16.02D Joints
Standard tie wire and standard spiral binder wire material properties must have the values shown in the
following table.
Tie Wire and Spiral Binder Wire Material Properties
Property
Test method
Min tensile strength
ASTM A 370
Tie wire
Wire size
USA wire gage
Min diameter
ASTM A641
Max diameter
ASTM A641
Zinc coating
A641 Class 3 and ASTM A90
Spiral binder wire
Wire size
USA wire gage
Min diameter
ASTM A641
Max diameter
ASTM A641
Zinc coating
ASTM A641 Class 3 and ASTM A90

Value
60 ksi
13.5
0.086 inch
0.082 inch
0.70 oz/sq ft
9
0.148 inch
0.144 inch
0.85 oz/sq ft

Spiral binders must have a 3-inch separation between continuous successive loops.

If shown, you may use alternative fasteners.

For PVC-coated wire, alternative fasteners must comply with ASTM A313, tensile Type 302, Class 1.

For wire without PVC coating, alternative fasteners must comply with ASTM A764 and:

1. Interlocking fasteners must be Class I, finish 2 with a Class 3 zinc finish coating
2. Overlapping fasteners must comply with Class II, finish 1 with a Class 3 zinc finish coating
72-16.02E Internal Connecting Wire
Internal connecting wires must be a minimum size of 13.5-gage. The wire must comply with the
specifications for tie wire in section 72-16.02D.
You may use preformed stiffeners instead of internal connecting wires. Preformed stiffeners must comply
with the specifications for tie wire in section 72-16.02D and be installed per the manufacturer's
instructions.
72-16.02F Fabric
If gabions are shown for downdrains, use woven tape fabric instead of RSP fabric. Woven tape fabric
must comply with ASTM D4491, have a mass of at least 8 oz/sq yd, and have a maximum permeability of
7.5 gal/minute/sq ft.
72-16.02G Rock
Rock for filling gabions must comply with the testing and corresponding specifications in section 722.02A.

800

SECTION 72

SLOPE PROTECTION

Rocks for gabion baskets equal to or greater than 18 inches in height must vary in size and comply with
the gradation shown in the following table:
Rock Grading for 18-Inch or Larger

Baskets

Screen size
Percentage
(inches)
passing
12
100
4
05
Rocks for gabion baskets that are 12 inches in height must vary in size and comply with the gradation
shown in the following table.
Rock Grading for 12-Inch Baskets
Screen size
Percentage
(inches)
passing
8
100
4
05
The unit weight of a rock-filled gabion must be at least 110 lb/ cu ft. Whenever requested by the Engineer,
verify the unit weight. Verification must be performed using the smallest standard gabion basket, filling
method, and rock that will be used on the project. Use certified scales for weighing. Calculate the unit
weight using the theoretical volume of the basket.
72-16.03 CONSTRUCTION
72-16.03A General
Areas where gabions are to be placed must be constructed to the lines and grades shown. Excavation
and backfill must comply with section 19.
If fabric is shown, place the fabric on the subgrade, backslope, and sides of the excavations. If earth fill is
to be placed over the gabions, place fabric on top of the gabions before placing the earth fill.
72-16.03B Assembly
Assemble the gabions as empty units. Each gabion must be manufactured with the necessary panels that
are properly spaced and secured so that the panels can be rotated into position without additional tying of
the rotation joint. Rotate panels and diaphragms into position and join them along the vertical edges.
For twisted wire mesh, construct joints using alternating double and single half hitches (locked loops)
made at 4-inch nominal spacing. Use 13.5-gage standard tie wire. Do not construct joints with simple
spiraling (looping without locking) of the tie wire.
For welded wire mesh, construct joints using either of the following:
1. Standard tie wire and alternating double and single half hitches (locked loops) in every mesh opening
along the joint
2. Spiral binders that are 9-gage and such that the spiral binder passes through every mesh opening
along the joint. Crimp both ends of the spiral binder and secure it in place.
Temporary fasteners may be used to hold panels at gabion-to-gabion joints, and they may remain in
place.
Use either interlocking fasteners or overlapping fasteners. Place a fastener at each mesh opening along
the joint. For PVC coated wire, the spacing of fasteners must be at least 10 fasteners per 36 inches. For
wire without PVC coating, the spacing of fasteners must be at least 10 fasteners per 40 inches.
Set individual gabion baskets in place. Successively join the basket to the adjacent basket with 13.5-gage
tie wire or 9-gage standard spiral binder before filling the basket with rock. In one pass, the tie wire or
spiral binder must secure all selvage or end wires of the panels along the joint.
801

SECTION 72

SLOPE PROTECTION

If forming successive gabion-to-gabion joints with alternative fasteners, use one alternative fastener at
each mesh opening. The alternative fastener must contain and secure all wires along the joint.
Join gabion baskets along the front, back, and ends, including the top and bottom of adjacent gabions.

Multi-layered gabion configurations must be stepped and staggered. Join each layer of gabion to the

underlying layer along the front, back, and ends.

Join shear key and counterfort gabions to underlying gabions along the front, back, and ends.

For transitional gabions, fold, cut, and fasten gabion baskets as shown or as accepted by the Engineer.

72-16.03C Filling
Before filling each gabion basket, straighten any kinks and folds in the wire and align the baskets.
Place rock in the basket and preserve the alignment. Avoid bulges and minimize voids. Exposed rock
surfaces must have a smooth and neat appearance. Sharp rocks must not project through the wire mesh.
Use internal connecting wires or preformed stiffeners to produce a flat, smooth external surface.
Whenever filling 36-inch-high gabions, place rock in 12-inch-deep layers. Whenever filling 18-inch-high
gabions, place rock in 9-inch-deep layers. Install internal connecting wires or preformed stiffeners before
adding additional layers.
The last layer of rock must slightly overfill the gabion basket so that the lid will rest on rock when the lid is
closed.
Lids must be tied along the front, end, and diaphragms with 13.5-gage tie wire or 9-gage standard spiral
binder. In one pass, the tie wire or spiral binder must secure all selvage or end wires of the panels along
the lid.
If securing the lid with alternative fasteners, use one alternative fastener at each mesh opening. The
alternative fastener must contain and secure all wires along the lid.
72-16.04 PAYMENT
Gabions are measured based on the dimensions shown or ordered

802

73 CONCRETE CURBS AND SIDEWALKS

73-1 GENERAL

73-1.01 GENERAL
73-1.01A Summary
Section 73-1 includes general specifications for constructing minor concrete items including, concrete
curbs, sidewalks, gutter depressions, driveways, island paving, curbs ramps, detectable warning
surfaces, and textured and colored concrete surfaces.
73-1.01B Definitions
Reserved
73-1.01C Submittals
Reserved
73-1.01D Quality Control and Assurance
The Engineer uses test panels as the standard of comparison for accepting textured and colored concrete
surfaces.
Construct and finish test panels at the job site with materials, tools, equipment, and methods you will use
in the work. If a test panel is rejected, construct an additional test panel the same size as the original.
Do not place concrete that requires a test panel until the Engineer accepts the test panel.
73-1.02 MATERIALS
73-1.02A General
The cementitious material content of concrete must be at least 463 lb/cu yd.

For extruded or slip-form curb construction the aggregate size may range from 3/8 to 1 inch. If you use

3/8 inch maximum size aggregate, cementitious material content must be at least 505 lb/cu yd.

Steel dowels, reinforcing steel, and welded wire reinforcement must comply with section 52.

Preformed expansion joint filler must comply with ASTM D 1751.

Mortar must comply with section 51-1.02F.

Form oil must be commercial quality or other equivalent coating which allows ready release of forms and

does not discolor the concrete.

Adhesive must comply with section 95-2.03.

73-1.02B Detectable Warning Surface


Detectable warning surface must be shown on the Authorized Material List for detectable warning surface
and must comply with yellow color no. 33538 of FED-STD-595.
73-1.03 CONSTRUCTION
73-1.03A General
If you repair any part of a curb, sidewalk, curb ramp, driveway, or gutter depression, remove and replace
the entire section between contraction or expansion joints. At contraction joints saw cut a true line at least
1-1/2 inch deep before concrete removal.
To add a detectable warning surface to an existing curb ramp, install a prefabricated detectable warning
surface under manufacturer's recommendations.
73-1.03B Subgrade Preparation
Prepare subgrade to required grade and cross section. Remove soft or spongy basement material 6
inches below subgrade elevation for curbs, gutter depressions, island paving, and driveways and 3 inches
below subgrade elevation for sidewalks and curb ramps. Backfill with earth, sand, or gravel to produce a
stable foundation.
Apply water to subgrade under section 17-3 and thoroughly compact before placing concrete.
803

SECTION 73

CONCRETE CURBS AND SIDEWALKS

Verify the finished surface of the subgrade does not project into concrete cross section at any point by:
1. Means of a template supported on the side forms for fixed form method
2. Measuring from the offset guide line or survey marks for extruded or slip form methods.
73-1.03C Fixed Form
Set forms to the required alignment, grade, and dimensions.
Forms must:
1. Be smooth on the side placed against concrete
2. Have a straight upper edge
3. Be rigid enough to withstand the pressure of fresh concrete without distortion. Use enough stakes,
clamps, spreaders and braces to ensure rigidity
4. Be clean of debris and old concrete
5. Coated with form oil before placing concrete
You may use either benders or thin plank forms on curves, grade changes, or curb returns.
Wet the subgrade and forms immediately in advance of placing concrete.
Place and compact concrete in the forms without segregation.
73-1.03D Extruded or Slip Form
Wet the subgrade immediately in advance of placing concrete.
Feed concrete into the extrusion machine at a uniform rate. Restrain forward travel of the extrusion
machine to produce a well compacted mass of concrete requiring no further finishing other than a light
brushing. The brush may be filled with water. Do not finish concrete surface with a brush application of
grout.
If using a slip form machine control alignment, grade, and cross slope automatically by one of the
following:
1. Sensing of preset string lines.
2. Sensing of preset string line for control of alignment and grade and cross slope control.
The slip form machine must be equipped with traveling forms rigid enough to produce the required cross
section. The slip form machine must produce a dense homogeneous concrete true to grade and cross
section requiring minimum handwork. Consolidate concrete with internal vibrators or other authorized
method.
If the extruded or slip form machine fails to produce concrete with web marks of water on the surface or
has surface pits larger than 3/16 inch in diameter, aggregate grading limits are further restricted.
73-1.03E Expansion and Contraction Joints
Construct contraction joints by scoring concrete with a grooving tool and rounding corners with an edger
tool or saw cutting hardened concrete to a depth of at least 1 inch. Apply curing compound immediately to
the exposed surfaces of sawcut joints.
Construct expansion joints at each side of a structure and at each end of a curb return using 1/4 inch
thick preformed joint filler. Finish concrete adjacent to expansion joints with an edger tool. Do not
construct expansion joints closer than 20 feet to an island nose. Shape preformed joint filler to match
surface contour of concrete.
You may construct expansion joints by saw cutting through the full depth of the concrete cross section.
The width of the sawcut must provide for a tight fit of the preformed joint filler.
If joint is cut before concrete has hardened:
1. Protect adjacent surfaces with close fitting, firmly supported shields.
2. Complete sawcut and insertion of the preformed joint filler before curing concrete.
804

SECTION 73

CONCRETE CURBS AND SIDEWALKS

If joint is cut after concrete has hardened:


1. Mortar preformed joint filler in place using heavy trowel pressure.
2. Cover exposed portions of concrete in the vicinity of sawcut with an additional application of curing
compound.
After concrete has cured, check joint filler for tight fit. If any loose joints are found, mortar joint in place
and check after mortar has cured. Repeat as necessary to achieve a tight fit.
73-1.03F Curing
Cure concrete with pigmented curing compound under section 90-1.03B(3).

Apply curing compound to provide complete coating of all exposed faces of the concrete surface.

73-1.04 PAYMENT
Items for minor concrete are measured based on the dimensions shown.
Detectable warning surface is measured based on the dimensions shown.
73-2 CURBS
73-2.01 GENERAL
73-2.01A Summary
Section 73-2 includes specifications for constructing curbs.
73-2.01B Definitions
Reserved
73-2.01C Submittals
Reserved
73-2.01D Quality Control and Assurance
Reserved
73-2.02 MATERIALS
Reserved
73-2.03 CONSTRUCTION
73-2.03A General
Provide entrances for driveways and curb ramps.
If curbs are constructed over existing pavement use steel dowels and reinforcing steel or adhesive to
anchor the curb to the existing pavement.
If steel dowels and reinforcing are used, anchor steel dowels in drilled holes with mortar made from equal
parts in volume of portland cement and sand. You may use anchor bolts instead of anchored steel dowels
if authorized.
If adhesive is used, remove all dust, loose material, or oil from the surface of the existing pavement by
either wire brushing or blast cleaning.
Construct contraction and expansion joints under section 73-1.03E at right angles to the line of curbs.
Space contraction joints at 20 foot intervals. For curbs adjacent to existing concrete, align curb joints with
existing concrete pavement joints.
The top and face of the finished curb must be true and straight. The top surface of the curb must be
uniform in width and free from humps, sags, or other irregularities. Check the top and face of curbs and
surface of gutter for flatness with a 10-foot straightedge. No gaps greater than 0.01 feet are allowed
except at grade changes or curves.
Clean any discolored concrete at your expense by abrasive blast cleaning or other authorized method.

805

SECTION 73

CONCRETE CURBS AND SIDEWALKS

73-2.03B Fixed Form


Fixed forms must comply with section 73-1.03C.

Set forms the full depth of the back and face of curbs.

Back bender forms may be constructed with 1/2-inch-thick benders.

Cleat back bender forms together as required to obtain the full depth of the curb.

Use form clamps to prevent interference with finishing operations.

Place preformed joint filler in position at expansion joints before placing concrete.

Before removing the forms, finish the surface true to grade with a straightedge float at least 10 feet in

length. Operate the straightedge float longitudinally over the concrete surface.

Remove forms from face of curb 1 to 6 hours after placing concrete. Do not remove forms if concrete is

plastic enough to slump.

Immediately after removing forms from face of curb, use a steel trowel to obtain a smooth finish. The

smooth finish must extend to within 0.17 foot of the flow line or to the flow line of a curb with integral
gutter. After smoothing curb face, apply a fine brush finish parallel to the line of the curb.
73-2.03C Extruded or Slip Form
Extruded or slip form must comply with section 73-1.03D.
If using an extrusion machine, determine the offset guide line used to set grade for top of the curb from
survey marks established by the Engineer. The extrusion machine must be equipped with a grade line
gage or pointer that allows for continual comparison between curb placement and offset guide line.
The extrusion machine must be capable of vertical adjustment during forward travel to construct curbs of
varying height as determined by the offset guide line.
You may operate the extrusion machine on rails or forms set at uniform depth below the established
grade of the top of curb.
You may place curbs that are not on a structure with an extrusion machine or slip form paver if:
1.
2.
3.
4.

Concrete complies with section 73-1.02.


Finished curb is true to line and grade.
Concrete contains maximum amount of water that maintains curb shape without support.
Required surface texture is obtained.

73-2.04 PAYMENT
Reserved
73-3 SIDEWALKS, GUTTER DEPRESSIONS, ISLAND PAVING, CURB RAMPS AND DRIVEWAYS
73-3.01 GENERAL
73-3.01A Summary
Section 73-3 includes specifications for constructing sidewalks, gutters, gutter depressions, island paving,
curb ramps, and driveways.
73-3.01B Definitions
Reserved
73-3.01C Submittals
For a prefabricated detectable warning surface, submit a 5-year manufacturer's warranty of replacement
for defects in dome shape, color fastness, sound-on-cane acoustic quality, resilience, and attachment.
The 5-year warranty period starts at Contract acceptance.
73-3.01D Quality Control and Assurance
For a prefabricated detectable warning surface provide a 24-by-24-inch test panel.
806

SECTION 73

CONCRETE CURBS AND SIDEWALKS

73-3.02 MATERIALS
Reserved
73-3.03 CONSTRUCTION
Construct expansion joints at:
1. All returns and opposite of expansion joints in adjacent curb
2. Sixty foot maximum intervals when no adjacent curb is present
Construct contraction joints to create 12-to-20-square foot rectangular patterns into the surface of
sidewalks.
Install prefabricated detectable warning surface under manufacturers recommendations.
Broom finish surface of sidewalk, gutter depression, curb ramp and driveway. For surfaces used by
pedestrians, apply broom finish perpendicular to the path of travel. You may apply water to the surface
immediately before brooming.
The finished surface must not vary more than 0.02 foot from a 10 foot straightedge except at grade
changes.
If placing pavement around or adjacent to miscellaneous structures (i.e. manholes, pipe inlets, or other
miscellaneous structures), do not finish the miscellaneous structures to final grade until the pavement is
finished beyond the miscellaneous structure.
If using fixed forms strike-off and compact fresh concrete until a layer of mortar is brought to the surface.
Finish with a float to grade and cross section and trowel smooth.
Leave forms in place for sidewalk, gutter depression, island paving, curb ramp and driveway for a
minimum of 12 hours after surface finishing.
If using extruded or slip form method, comply with section 73-1.03D.
Clean any discolored concrete at your expense by abrasive blast cleaning or other authorized method.
73-3.04 PAYMENT
Reserved
73-4 TEXTURED CONCRETE AND COLORED CONCRETE SURFACES
73-4.01 GENERAL
73-4.01A Summary
Section 73-4 includes specifications for texturing and coloring concrete surfaces. Texture concrete by
imprinting with stamps, tools, brooms, or other methods to obtain the pattern or impressions shown.
73-4.01B Submittals
For each color of a dry-shake method colored concrete surface, submit manufacturer's data for color
hardener, and curing and finishing compounds.
73-4.01C Quality Control and Assurance
For a textured or colored concrete surface, construct a 48-by-48-inch test panel for each type of texture
and color.
73-4.02 MATERIALS
For textured and colored concrete surfaces, aggregate must comply with the grading requirements for
fine aggregate in section 90-1.02C(4)(c).
Aggregate used in grout for textured and colored concrete surfaces must comply with the grading
requirements in the following table:

807

SECTION 73

CONCRETE CURBS AND SIDEWALKS

Aggregate Grading for Grout

Sieve sizes Percentage passing


No. 4
100
No. 8
90100
No. 16
60100
No. 30
3570
No. 50
1535
No. 100
215

Color pigments for dry-shake method must comply with ASTM C 979.
73-4.03 CONSTRUCTION
Protect surrounding exposed surfaces during the placement, finishing, and curing operations of colored
concrete.
If shown, place welded wire reinforcement.
Screed concrete to the grade and cross section shown. Strike-off and compact until a layer of mortar is
brought to the surface. Wood float to a uniform surface.
For dry-shake method apply surface color hardener in 2 applications while the concrete surface is in the
plastic stage. Use at least 60 lb of hardener per 100 sq ft of concrete surface. Wood float surface after
each application of hardener. Trowel only after final floating.
Texture while concrete is in the plastic stage. For textures that require concrete stamps, use stamp under
manufacturer's recommendations.
Do not texture or grout grooved area and detectable warning surface on a curb ramp.
If textured concrete surface is grouted, place grout after initial curing of textured concrete. Remove curing
seal and other deleterious substances before applying grout. Removal method must not stain or discolor
area of textured concrete to remain exposed after grouting. Spread and consolidate grout over the
textured concrete area under manufacturer recommendations. Remove excess grout from textured
concrete area with a squeegee and damp burlap rags or other authorized method. Apply curing seal.
73-4.04 PAYMENT
Textured and colored concrete surfaces are measured parallel to the concrete surface.
73-573-6 RESERVED

808

74 PUMPING EQUIPMENT AND CONTROLS


74-1 GENERAL
74-1.01 GENERAL
74-1.01A Summary
Section 74-1 includes general specifications for pumping equipment and their control systems.
The arrangement and general location of pumping equipment and control systems are shown.
74-1.01B Definitions
Reserved
74-1.01C Submittals
74-1.01C(1) General
If you use the drainage pumps to maintain total pumping capacity before Contract acceptance, submit:
1. Shop drawings for drainage inlet bulkhead and safeguards
2. Maintenance work plan
74-1.01C(2) Shop Drawings
Plans and detail drawings may be 22 by 34 inches.
Shop drawings for pumping equipment must include:
1.
2.
3.
4.
5.

System layout
Piping connections
Appurtenances
Other materials required for the equipment installation
Mounting details and anchorage details

Shop drawings for electrical equipment must include:


1.
2.
3.
4.

Electrical equipment schematics


Control diagrams
Wiring diagrams
Conductor numbers for control and power conductors

Do not use project plan reproductions or manufacturer's standard printed data for electrical layout
drawings.
Submit shop drawings for the installation of drainage pump equipment and pumping plant electrical
equipment after product data submittals are authorized.
If drainage pump and pumping plant electrical equipment require changes to pump plant metal work or
other construction details, submit revised shop drawings. The Department does not adjust payment for
these changes.
74-1.01C(3) Product Data
Submit at least 5 sets of product data to OSD, Documents Unit. Each set must be bound together and
include an index stating equipment names, manufacturers, and model numbers. Two sets will be
returned. Notify the Engineer of the submittal. Include in the notification the date and contents of the
submittal.
Product data includes catalog cuts, performance data, installation instructions, and additional
documentation.
Catalog cuts must include:
1. Manufacturer's name
2. Catalog or part number
3. Size
809

SECTION 74
4.
5.
6.
7.
8.
9.

PUMPING EQUIPMENT AND CONTROLS

Capacity
E
lectrical ratings
F
inish
Maintenance and adjustment requirements
Identification symbols described
Installation instructions

74-1.01C(4) Samples
The Engineer may request material samples of submitted equipment. If requested, send samples to OSD,
Documents Unit.
74-1.01C(5) Work Plans
74-1.01C(5)(a) Performance Testing Plan
Submit a work plan for performance testing of pumping plant equipment. The work plan must include
methods for:
1.
2.
3.
4.
5.
6.

Blocking pipes at their entrance point into the storage box


Removing all debris from the pumping plant, storage box, debris sump and pump sump before testing
Locating and installing bulkheads in the storage boxes, if used
Operational test, including pump controller operation
Supplying water
Water disposal

74-1.01C(5)(b) Maintain Pumping Capacity and Maintenance Requirements Plan


Submit a work plan for maintaining the pumping plant total pumping capacity and maintaining the
pumping plant as specified in section 74-1.03E. The work plan must include:
1. Pumping plant maintenance procedures and schedule.
2. Total pumping capacity alternative specified in section 74-1.03E.
3. Proposed pumping equipment. If using alternative 2 or 3 specified in section 74-1.03E, include
auxiliary pump curves, equipment ratings, quantity, and power supply.
4. Method for water disposal.
74-1.01C(6) Closeout Submittals
Submit closeout submittals as a Maintenance and Operations Manual before completion of the work.
Submit 1 copy of PDF files on a CD or DVD and 2 copies in print format in 3-ring binders with tabbed
dividers. The manual must include all accepted action submittals for drainage pump equipment and
pumping plant electrical equipment. Organize each binder as follows:
1.
2.
3.
4.
5.
6.

Index
Part lists
Operating instructions
M
aintenance instructions
Wiring schematics, with control and power conductor numbers identified
Certified pump curves

Incomplete or inadequate documents are returned for correction and resubmittal.


Submit all paperwork delivered with pumping plant equipment to the Engineer.
74-1.01D Quality Control and Assurance
74-1.01D(1) General
Notify the Engineer at least 10 days before testing. The pump plant must be complete before testing is
performed.
Furnish all water and electrical energy necessary for testing. If authorized, you may use the pumping
plant discharge system.

810

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-1.01D(2) Operational Tests


Perform the operational tests in the Engineer's presence. The Engineer confirms the pump nameplates
before testing.
Fill the pump sump and storage boxes with water. Fill boxes as required until operational tests and
performance tests are accepted. If authorized, you may add bulkheads in the storage boxes.
Perform operational tests of the pumping plant to demonstrate:
1. Proper rotation of each pump
2. Manual operation of the pumps separately and combined
3. Automatic operation of the pumps separately and combined
Repeat the operational tests until the requirements have been met.
74-1.01D(3) Performance Tests
After acceptance of the operational tests, the Engineer will run performance tests on the installed
pumping plant equipment. Perform testing under section 74-1.01C(5)(a). Performance tests include two
5-minute tests for each pump.
Performance tests must show that each installed drainage pump meets at least (1) 97 percent of the
factory certified performance curve and (2) the design pump rates shown. Each pump must not load its
motor more than the actual full load nameplate amperage, regardless of head. The motor service factor
will not be applied.
The Engineer repeats performance tests until the requirements have been met.
Remove bulkheads and blocking from pipes after performance testing is complete.
74-1.01D(4) Drainage Pump Final Inspection
Section 74-1.01D(4) applies if you use the drainage pumps installed under the Contract to maintain total
pumping capacity for the pumping plant drainage area before Contract acceptance.
Remove and disassemble the pumps before Contract acceptance. The Engineer performs a final
inspection of the pumps.
Worn, damaged, or otherwise unsatisfactory parts must be replaced. Assemble and reinstall the pumps.
Test drainage pumps used before Contract acceptance under section 74-1.01C(5)(a) after the Engineer's
final inspection and before Contract acceptance.
74-1.02 MATERIALS
74-1.02A General
Anchorages must comply with the specifications for concrete anchorage devices in section 75-1.03C.
74-1.02B Delivery, Storage, and Handling
Deliver products to the job site in an undamaged condition in the manufacturer's original sealed container
or other packaging system. Packaging must be complete with labels and instructions for handling, storing,
unpacking, protecting, and installing.
Store and handle products using means and methods that comply with the manufacturer's written
instructions and prevent damage, deterioration, or loss, and maintain warrantee requirements.
74-1.03 CONSTRUCTION
74-1.03A General
Reserved
74-1.03B Painting
Painting must comply with section 59-1.
Paint uncoated drainage pump equipment, including metal work, as machinery under section 59
2.03C(1).
811

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

Before installing, paint wood on all surfaces under section 59-4.


Paint the pump number on each drainage pump motor and on each discharge pipe 5 feet above every
landing. Numbers must be stenciled and at least 1-1/2 inches tall. Use 2 applications of commercial
quality white gloss enamel.
Paint an arrow showing the direction of drainage pump rotation on each discharge pipe 4-1/2 feet above
every landing. Arrows must be stenciled and at least 6 inches long. Use 2 applications of commercial
quality white gloss enamel.
Paint surfaces before they become unreachable because of assembly operations.
Painting must not impair legibility, life expectancy, or function of the following items:
1.
2.
3.
4.
5.
6.
7.

Brass surfaces
Nameplates
Push buttons
Operating handles
Electrical cover plates
Plastic parts
Locks

Repair exposed nongalvanized threads or damaged galvanizing under section 75-1.05.

Clean, prime, and touch up damaged areas of painted surfaces. Use the same type primer, paint, and

color as the damaged finish.

Do not use cold galvanizing aerosol cans for repair or touch up work.

74-1.03C Care and Cleaning


Do not install pumping plant equipment until the structural portion of the pump sump is substantially

complete. You may install anchors and embedded equipment whenever required by the structural work.

Protect installed equipment from damage.

Clean equipment, enclosures, galvanized and noncorrodible metal surfaces, and wood surfaces in the

pumping plant after installation under section 59-1.03C.

Remove debris from the pump house, pump sump, storage boxes, and premises at Contract acceptance.

74-1.03D Maintenance Instructions


Supply an 11- by 17-inch fused-laminate copy of the maintenance instructions in a galvanized sheet
metal frame. Install the frame on an interior pump house wall.
Supply an 11- by 17 inch fused-laminate copy of the control system schematic diagram. Install on the
inside of a motor control center door.
74-1.03E Total Pumping Capacity and Maintenance Requirements
The Department will not issue relief from maintenance and protection for the pumping plant.
For existing pumping plants:
1. Stage removal activities such that total pumping capacity is maintained
2. Provide pump plant maintenance
Upon completion of new pumping plants:
1. Maintain total pumping capacity
2. Provide pump plant maintenance
Furnish electrical energy necessary for maintaining total pumping capacity and maintenance
requirements.
Pumping plant maintenance must include:
812

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

1. Removing dirt and debris from storage boxes, entrance bay, pump sump and drainage inlets
2. Performing adjustments and repairs for proper operation of drainage pump equipment and pumping
plant electrical equipment
Keep a pump house logbook of pumping plant maintenance activities. Include maintenance dates, work
performed, and the name of employee doing the work.
Maintain total pumping capacity at the corresponding dynamic head shown. Use 1 of the following
alternatives to maintain total pumping capacity:
1. Stage activities such that the entire pumping plant is complete and able to maintain total pumping
capacity.
2. Furnish an auxiliary pumping system with a capacity equal to the total pumping capacity. This system
must include a power supply, controls, temporary drainage system, sump pumps, and discharge
piping.
3. Combination of the above 2 alternatives.
Dispose of water. If authorized, you may use the pumping plant discharge system.
74-1.03F Use of Pumps before Contract Acceptance
Section 74-1.03F applies if you use the drainage pumps installed under the Contract to maintain total
pumping capacity for the pumping plant drainage area before Contract acceptance.
The pumping plant must be complete. The Engineer inspects the storage box, screens, pump sump, and
pumping plant equipment before authorizing its use.
Drainage water must be settled before entering the pumping plant. Drainage water must flow through
safeguards and drainage inlet bulkheads to remove non-suspended solids. Non-suspended solids include
debris, soil, sand, and gravel.
Safeguards include stilling ponds, basins, and checks and weirs. Safeguards must:
1. Intercept drainage water and effectively stop non-suspended solids by settling
2. Deliver settled water to paved surfaces, pipes, or other nonerodible channels leading to the drainage
inlets
3. Be maintained such that the safeguards function as intended
Construct bulkheads around drainage inlets discharging to the pump sump and storage boxes. Drainage
inlet bulkheads must consist of burlap sacks filled with pervious material.
74-1.04 PAYMENT
The Department does not pay for failed tests.
74-2 DRAINAGE PUMPING EQUIPMENT
74-2.01 GENERAL
74-2.01A Summary
Section 74-2 includes specifications for installing drainage pumping equipment.
74-2.01B Definitions
Reserved
74-2.01C Submittals
74-2.01C(1) General
Reserved
74-2.01C(2) Product Data
Submit product data for the following items:
1. Drainage pumps
2. Flexible expansion couplings
3. Wall louvers
813

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

4. Flap valves
5. P
ressure gauges
6. P
ump house doors
Drainage pump data must include:
1. P
ump components
2. Representative pump curve showing the motor does not develop more than 95 percent of its
nameplate horsepower anywhere on the curve
3. Hp, kVA, kW, power factor, and voltage
4. Starting and running currents
5. Thermal and magnetic trip settings
6. Starter overloads current setting
7. Motor nameplate data, including:
7.1. Full load speed
7.2. Full load current
7.3. Voltage
7.4. Locked rotor kVA per rated horsepower or code letter
74-2.01C(3) Certificates
Submit certificates for factory certified impeller balancing and factory certified drainage pump tests.
Certification documents must be in US customary units.
Submit the factory original hard copy and 2 copies as pdf files on 2 CDs or DVDs. Send to OSD,
Documents Unit. The Department will not accept a facsimile copy. Notify the Engineer of the submittal.
Include in the notification the date and contents of the submittal.
Factory certified test documents for each drainage pump must include:
1. Generated pump curve from cutoff head to the minimum dynamic head shown. Show on the pump
curve:
1.1. Identified test points used to generate the pump curve.
1.2. Plot of the design pump rates and dynamic heads shown on the pump curve.
1.3. Identified and plotted test point horsepower and efficiencies on the pump curve.
2. Data that confirms the pump develops from 97 to 100 percent of motor nameplate power at the point
the pump requires maximum power.
3. M
otor rpm.
4. I mpeller final diameter.
74-2.01D Quality Control and Assurance
74-2.01D(1) General
Reserved
74-2.01D(2) Regulatory Requirements
Drainage pumps must be factory certified under ANSI/HI 11.6. Each pump certification must be of the
actual motor, pump, and trimmed impeller combination delivered to the job site.
Impeller balancing must be factory certified under ISO 1940-1, ISO Balance Quality Grade G6.3, at the
supplied motor rpm.
74-2.02 MATERIALS
74-2.02A General
Use the size and type of pipe and fittings shown.
74-2.02B Drainage Pumps and Pumping Apparatus
74-2.02B(1) General
Reserved

814

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-2.02B(2) Drainage Pumps


Drainage pumps must be factory assembled, tested, and must be a submersible, end-suction, single
stage, close-coupled, overhung-impeller, centrifugal wastewater pump complying with ANSI/HI 1.1-1.2
and ANSI/HI 1.3. Do not use a base elbow mounted pump. Drainage pumps must be coated with the
manufacturer's standard finish for the intended use.
Drainage pumps must be the rpm and voltage shown and meet the design pump rates and dynamic
heads shown.
Drainage pumps must have cast iron (1) casings, (2) brackets, (3) volutes with open inlet, and (4)
horizontal pump discharges.
Drainage pumps must have a base support engineered to permit design flow into the volute and support
the assembled weight of the drainage pump. Base support legs must be bolted to the floor.
Drainage pumps must have (1) replaceable bronze wear rings on the impeller and casing, and (2) non
magnetic stainless steel external nuts and bolts.
Drainage pump impellers must be:
1.
2.
3.
4.

ynamically balanced
D
Made from ductile iron or bronze
Nonclog type, open or semi-open design for sludge, and at least 3-inch solids handling
Trimmed to develop from 97 to 100 percent of motor nameplate power at point of maximum load and
still deliver at least the design pump rates and dynamic heads shown
5. Keyed and secured to the shaft. Impeller balancing must not weaken or deform the impeller
Drainage pumps must have a stainless steel shaft with factory-sealed lubricated roller bearings, tandem
double-mechanical seals of tungsten carbide or silicon carbide with an oil reservoir, and have internal
moisture sensors in the oil reservoir.
Motors must be a standard efficiency, NEMA code letter "G" or smaller, 3-phase NEMA Design B motor
with cable assembly. The cable assembly must include a 4-conductor power cable and a 5-conductor
control cable. The motor with cable assembly must be rated for Class 1, Division 1 locations.
Motors must have NEMA Class F insulation, built-in thermal protection, and a cast iron casing with lifting
eyes or lugs.
The cables must be listed for "Extra Hard Service" in Class 1, Division 2 locations. Each cable must
include an equipment grounding conductor with green or green with yellow stripe insulation. The cables
must be long enough to be installed from the motor to the enclosure shown without splicing. Install cable
connectors for termination in junction box.
Install a motor nameplate and pump identification nameplate on each drainage pump. Attach identical
nameplates to the inside of the corresponding starter compartment door on the motor control cabinet.
74-2.02B(3) Pumping Apparatus
Flap valves must have an iron body with pipe flange frame and bronze mating surfaces.
Fasteners, expansion anchors, nuts, bolts, and washers must be Type 316 stainless steel.
Pressure gauges must be a compound gauge complying with ASME B40.100, Grade A, and must have:
1.
2.
3.
4.
5.

4-inch liquid filled dial, with stainless steel case and cover
R
eset screw
1/4-inch MPT bottom inlet
Range of 30 inches Hg vacuum to 30 psi unless otherwise shown
Gauge guard and gauge cock. Gauge guard must be 1/2 by 1/4 inch, PVC or CPVC body, PTFE or
Viton diaphragm, and rated for 0 to 250 psi. Gauge cock must be 1/2-inch NPT brass ball valve

815

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-2.02C Pump House Doors, Louvers, and Fans


74-2.02C(1) General
Fabricate pump house doors and frames under ANSI/SDI A250.8 or ANSI/NAAMM-HMMA 861.
Hinges must comply with ANSI/BHMA A156.1. Locksets must comply with ANSI/BHMA A156.2. Door
gasketing must comply with ANSI/BHMA A156.22. Thresholds must comply with ANSI/BHMA A156.21.
Galvannealed steel sheet must be commercial steel, Type B, complying with ASTM A 1008/A 1008M with
at least an A60 metallic coating complying with ASTM A 653/A 653M.
74-2.02C(2) Pump House Doors
The pump house door consists of the door, frame, and door hardware. Furnish the factory applied finish
coating system for exterior locations.
The pump house doors must be at least 1-3/4 inches thick, full flush, seamless hollow metal construction.
The doors must comply with ANSI/SDI A250.4, physical endurance Level A, and the following:
1. Fabricate face sheets, vertical stiffeners, and top and bottom channels from 0.053-inch-thick
galvannealed steel sheet.
2. Fabricate the steel-stiffened core using vertical stiffeners that extend full-door height. Install stiffeners
not more than 6 inches apart and spot weld to both face sheets no more than 5 inches on center. Fill
spaces between stiffeners with glass-fiber insulation or mineral-fiber insulation.
3. Top and bottom channels must be continuous and spot welded to both face sheets. The top channel
must be flush and the bottom channel must be inverted.
4. Include moisture vents in the bottom channel.
The door frames must:
1.
2.
3.
4.
5.

Be fabricated from 0.067-inch-thick galvannealed steel sheet, 5-1/2 by 2 inch in section


Include galvannealed steel sheet grout guards at least 0.016 inches thick
Have continuously welded (1) face joints and (2) miter corners that are flush and made smooth
Include an integral stop
Include a steel channel or angle stiffener head reinforcement at least 0.093 inch thick for openings
wider than 48 inches

Floor anchors must be welded to the bottom of jambs and mullions with at least 4 spot welds for each
anchor. There must be at least 3 jamb anchors on each side.
Hinges must be Type A2111 or A5111, heavy weight, stainless steel pin, 5 knuckle, ball bearing, and non
removable pin with set screw. Hinge fasteners must be supplied by the hinge manufacturer.
Locksets must be Series 4000 bored, Operational Grade 1, Security Grade 1, with nonhanded steel lock
chassis and self aligning trim with concealed through bolts. Locksets must be Function F75 with knobs,
chromium roses, and 1/2-inch steel square corner latchbolt.
Weatherstripping must have a polyurethane seal. Overhead door drips must have a 2-1/2-inch projection
and be full width. Door shoe with rain drips must be mill finished aluminum with neoprene insert, end
covers, and formed rain drip. Thresholds must be nominal 6 inches wide, mill aluminum with factory non
slip finish, and span the full width of the opening shown.
74-2.02C(3) Wall Louvers
Wall louvers must be continuous channel frame with nonvision, inverted Y blades. Wall louvers must:
1.
2.
3.
4.

Have the frame fabricated from 18-gauge electro-galvanized steel


Have dual 12 gauge security grilles with through bolted screws on the inside
Have bronze insect and bird screen in removable frame fastened on the inside
Be factory primed and finished with enamel or powder coated epoxy

74-2.02C(4) Fans
Reserved

816

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-2.02D Pipe, Joints, and Fittings


74-2.02D(1) General
Reserved
74-2.02D(2) Steel Pipe
Galvanized steel pipe must be standard weight complying with ASTM A 53/A 53M. Threaded fittings must

be galvanized steel or galvanized malleable iron.

Welded steel pipe must comply with section 70-3, except that electrically insulated connections must not

be used. Coat pipe under section 70-3.02B(3).

Steel pipe must be flanged. Flanges may be factory threaded or welded type. Flange dimensions must

comply with ASME B16.5, Class 150.

Threaded flanges must be ductile iron complying with ANSI/AWWA C115/A21.15.

Welded flanges must be steel hub slip-on type complying with ANSI/AWWA C207, Class D. Galvanize

welded flange pipe sections under section 75-1.05.

Gaskets must be full face SBR rubber flange type complying with ASME B16.5, Class 150.

Steel flange bolts, washers, and nuts must be nonmagnetic stainless steel.

74-2.02D(3) Ductile Iron Pipe


Ductile iron pipe must comply with ANSI/AWWA C151/A21.51.

Pipe and fitting joints must be a gasketed mechanical joint type complying with ANSI/AWWA

C111/A21.11.

Pipe fittings must comply with ANSI/AWWA C110/A 21.10 and ASME B16.1, Class 125.

Pipe and fittings must have an asphaltic coating complying with ANSI/AWWA C151/A21.51, and an epoxy

lining complying with ANSI/AWWA C116/A21.16.

74-2.02D(4) Flexible Expansion Couplings


Flexible expansion couplings must be gasketed short-sleeve type having:
1.
2.
3.
4.

Mild steel middle ring with pipe stop


2 rubber-compounded wedge-section ring gaskets
2 mild steel follower rings
Mild steel bolts to compress the gaskets

Galvanize all ferrous parts after fabrication. Assemble couplings such that a permanent watertight joint is
obtained.
74-2.02E Bracing and Hardware
Brace drainage pumps and other equipment to prevent movement during operation. Bracing method must

comply with California Seismic Hazard Zone requirements in the CBC.

Slots for bolt and U-bolt holes in bracing and clips must be 2 bolt diameters wide. Slot holes parallel to the

axis of the member. Install cut washers under bolt heads and nuts for slotted hole locations.

Galvanize braces, frames, and other metal hardware under section 75-1.05.

Pumping plant metal work must comply with section 75-1.04.

74-2.02F Storage Cabinets


Storage cabinets must:
1.
2.
3.
4.

Be wall mounted, steel, and bolted or welded construction


Have double doors with single locking handle or magnet catch, and padlock staples
Have 2 adjustable shelves
Be 24 to 28 inches wide, 10 to 12 inches deep, and 30 to 33 inches tall
817

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

5. Be factory primed and finish painted


74-2.03 CONSTRUCTION
74-2.03A General
Install pressure gauges with gauge guards and gauge cocks. Mount the gauges vertically.
Furnish specialty tools required for assembly or adjustment of equipment. Mount tools in the storage
cabinet. Install tools too large for the cabinet on adjacent brackets.
74-2.03B Pump House Doors
Install pump house doors under ANSI/BHMA A156.115.

Check door frames for square, alignment, twist, and plumb before and after installation and adjust if

necessary. Tolerances are 1/16 inch.

Check the door frame as follows:

1.
2.
3.
4.

Squareness at door rabbet on a line 90 degrees from jamb perpendicular to frame head
Alignment at jambs on a horizontal line parallel to plane of wall
Twist at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall
Plumbness at jambs on a perpendicular line from head to floor

Fill space between the door frame and wall with grout. The grout slump must not exceed 4 inches. Do not
deform or damage frames during grouting. Remove grout and other bonding materials from exposed
surfaces of doors and frames immediately after grout work.
If grout contains an antifreezing agent, field apply a bituminous coating to the backside of frames.
Fit door in frame and shim as necessary. Install weatherstripping on the top and sides of frame. Install
door shoe on door. Install overhead door drip over door. Use weatherproof silicone sealant and adhesive
as the threshold bedding sealant.
Install the pump house door lock cover as shown.
Furnish a padlock for the pump house door until Contract acceptance. The Department furnishes
padlocks after Contract acceptance.
74-2.04 PAYMENT
Not Used
74-3 PUMPING PLANT ELECTRICAL EQUIPMENT
74-3.01 GENERAL
74-3.01A Summary
Section 74-3 includes specifications for installing pumping plant electrical equipment.
Drainage pump automatic operation must be controlled by the water level monitoring system and the
pump controller.
74-3.01B Definitions
DPDT: double pole, double throw.
SPDT: single pole, double throw.
74-3.01C Submittals
74-3.01C(1) General
Submit a toll free telephone service of the designated service organization for manufacturers field
services as an informational submittal.
74-3.01C(2) Product Data
Submit product data for:

818

SECTION 74
1.
2.
3.
4.
5.
6.

PUMPING EQUIPMENT AND CONTROLS

Power and metering equipment


Pump control
Conduit
Conductors and cables
Nameplates and warning plates
Miscellaneous materials

74-3.01D Quality Control and Assurance


74-3.01D(1) General
Reserved
74-3.01D(2) Regulatory Requirements
Electrical equipment must comply with section 86-1.02 and be NRTL listed.
Materials and workmanship must comply with section 86-1.02 and the following:
1. 8 CA Code of Regs 3200 et seq.
2. 19 CA Code of Regs 1.00 et seq.
3. NFPA 820, "Standard for Fire Protection in Wastewater Treatment and Collection Facilities"
74-3.01D(3) Manufacturer's Field Services
At Contract acceptance, provide 12 months of full maintenance for the pump controller by qualified
employees of the pump controller manufacturer's designated service organization. Maintenance must
include the manufacturer's routine preventive maintenance, adjustments for proper operation, and all
required parts and supplies.
74-3.01D(4) Field Quality Control
A factory-authorized service representative must inspect, test, and adjust the pump controller for proper
installation, operation, components, and connections.
74-3.02 MATERIALS
74-3.02A General
All magnetic coils of relays, starters, and other electrical equipment must be wound for an operating
range having a mean equal to the voltage applied.
74-3.02B Power and Metering Equipment
74-3.02B(1) General
Reserved
74-3.02B(2) Service Pedestal Equipment
Reserved
74-3.02B(3) Motor Control Center Equipment
Panelboards must be a factory-assembled panelboard interior with metal cover, single-phase, 3-wire,
120/240 volts, and must have:
1.
2.
3.
4.
5.

2-pole, 50-ampere main circuit breaker and molded case branch circuit breakers
Phase, neutral, and ground buses that are hard-drawn copper, 98 percent conductivity
Separate, isolated neutral bus
Ground bus bonded to the cabinet
Directory frame mounted on the inside of the door

Current switches must be self-powered, solid state, alternating current sensing switches having the
following:
1. Single-pole, normally open contact rated 1-ampere at 240 volts
2. 1/2-inch-diameter thru-hole
3. Low range current sensing level from 1 to 15 amperes
819

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

4. High-range current sensing level from 15 to 300 amperes


Time meters must be 120-volt and nonresettable from 0 to 99,999.9 hours.
Selector switches must:
1. Be single-pole, 2-position maintained, 10-ampere, 120-volt rotary types
2. Have contacts rated at 120 volts and 35 percent power factor
3. Have an inductive pilot duty rating of:
3.1. 60 amperes make
3.2. 6 amperes break
3.3. 10 amperes continuous
Pilot lights must be panel mounted, 120-volt, high-visibility LEDs with colored plastic lens and screw cap.
Control relays must be 120-volt, 3-pole, double-throw general purpose relays with clear plastic case and
11-pin plug base with 10-ampere contacts. Control relays must include a matching barrier type, 11
contact relay socket with 10-ampere contacts and screw terminals.
Time delay relays must:
1. Be 120-volt, electronic "ON-DELAY" types
2. Have DPDT, double-break 10-ampere contacts, having a range of 0.6 to 60 seconds
3. Have time delays set for:
3.1. TDR1: 5 seconds
3.2. TDR2: 20 seconds
Intrinsically safe relays must be:
1. Solid-state, completely self-contained, latching types
2. NRTL approved for use with Class I, Division 2 location sensors
3. 120-volt with SPDT, 0.3-ampere contact with:
3.1. Maximum turn-on time of 5 milliseconds
3.2. Maximum output current of 100 microamperes at 28 volts, DC
Push buttons must:
1. Be heavy duty, general purpose types
2. Have 1 normally open, momentary contact rated at 120 volts and 35 percent power factor
3. Have an inductive pilot duty rating of:
3.1. 60 amperes make
3.2. 6 amperes break
3.3. 10 amperes continuous
Terminal blocks must be comply with NEMA ICS 4 and be:
1.
2.
3.
4.

DIN rail mounted or attached to the enclosure


Rated for 30 amperes at 600 volts
Made from molded plastic
Equipped with:
4.1. High-pressure clamp connectors
4.2. Nameplates screwed to each block or a computer printed plastic label attached with adhesive
4.3. Identified conductor numbers

74-3.02C Pump Control


74-3.02C(1) General
Reserved
74-3.02C(2) Water Level Monitoring System
The water level monitoring system must be a trapped air level monitoring type that calculates the water
depth using air pressure that is converted to an electrical signal. Trapped air level monitoring system
820

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

must include an air compressor, three-way solenoid valve, pressure transducer, polyethylene air tube,
and a compression bell.
The system must:
1. Operate from 0 to 32 feet of water head
2. Be accurate to 0.1 feet for ambient conditions ranging from 0 to 200 degrees F
3. Isolate the pressure transducer during the purge cycle of the air column
The air compressor must:
1.
2.
3.
4.

Have a 120-volt, 1/20 hp shaded pole motor with integral overload protection
Include an aluminum piston with Teflon-sleeved cylinder
Have a capacity of at least 0.65 cu ft/min at 50 psi
Be capable of initializing against 250 psi head

The solenoid valve must be a 120-volt, direct acting, three-way type having a NEMA Type 1 plastic body
and compression connections.
The pressure transducer must output a 4- to 20-mA signal.
Polyethylene air tube must be 0.04-inch-thick wall type complying with ASTM D 1248, Class A.
74-3.02C(3) Pump Controller
The pump controller must (1) control the pumps based on the output signal of the water level monitoring
system, (2) interface with the monitoring system, and (3) generate alarms. The controller must be 120
volt, solid state, industrial grade with software stored in nonvolatile memory. You may use proprietary
software.
The controller must process the 4-20 mA signal from the water level monitoring system and operate the
pumps as follows:
1.
2.
3.
4.
5.
6.

Alternate pumps for each lead pump operation


Energize the lead pump at the water level shown
Energize the lag pump at the water level shown
De-energize the lead pump at the water level shown
De-energize the lag pump at the water level shown
If the pump controller energizes both pumps simultaneously, energize the lead pump first, then
energize the lag pump ten seconds later

The controller must output a 120-volt AC signal when the high or low alarms are energized. The controller
must energize the trapped air level monitoring system air compressor to purge the air system. The purge
interval must be adjustable from 1 to 8 hours. The compressor run time must be adjustable from 5 to 30
seconds.
The controller must have an LED display with 1/2-inch-high letters that computes to 1 decimal place and
use faceplate mounted, gold contact switches for programming. Do not use software for programming
control levels.
The controller must have:
1. At least 6 output relays with 120-volt, 10-ampere rated contacts
2. LED indicators mounted on plug-in bases
3. Test pushbutton and potentiometer for system testing
System testing must bypass the pressure transducer input to allow manual adjustment of the signal.
The controller must have at least 6 programmable levels each programmable from 0 to 32 feet. The
controller must be capable of programming the following levels for the elevations shown:
1. H
igh alarm
2. Low alarm
3. Lead pump on
821

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

4. Lead pump off


5. Lag pump on
6. Lag pump off
The pump controller must include an internal power supply with:
1.
2.
3.
4.
5.
6.

120-volt AC input with DC voltage and current outputs to suit equipment


Panel or channel mounting capability
Convection cooling
Wiring that is completely enclosed
Adjustment range of at least 5 percent
Operational temperature range from 32 to 120 degrees F

74-3.02D Conduit
Conduit and fittings must comply with section 86-2.05A, Type 1.
Flexible conduit and fittings must comply with section 86-2.05A, Type 4.
74-3.02E Conductors and Cable
74-3.02E(1) General
Do not rewire manufacturer's stock items specified in section 74-3.01C(2).
74-3.02E(2) Conductors
Conductors must comply with section 86-2.08, except conductors must be stranded copper and comply
with the following:
1. In enclosures, install Type MTW
2. In wet, underground, or outdoor locations, install Type XHHW-2
3. For all other locations, install Type THHN
74-3.02E(3) Conductor and Cable Identification
Identify conductors by number. Use one of the following methods:
1. Clear, heat-shrinkable tubing sealed over adhesive-backed paper or cloth wrap-around markers
2. Pre-printed, white, heat-shrinkable tubing
74-3.02F Nameplates and Warning Plates
74-3.02F(1) General
Nameplate and warning plates must be predrilled, multilayer, multicolor, plastic labels with mechanically
engraved inscriptions.
Secure labels to equipment using screws or rivets. Do not use adhesives except on the inside face of
enclosure doors.
If authorized, you may secure nameplates to an adjacent surface.
74-3.02F(2) Nameplate and Warning Plate Identification
Nameplate and warning plate inscriptions must be as shown.
Nameplate letters must be white, upper case Helvetica, and 1/4 inch in height. Leave at least a 3/8-inch
black background on all 4 sides.
Equipment control switch nameplate letters must be white, upper case Helvetica, and 1/8 inch in height.
Leave at least a 3/8-inch black background on all 4 sides. Secure the nameplate to the equipment directly
beneath the switch.
Warning plate letters must be white, upper case Helvetica, and 1/4 inch in height. Leave at least a 3/8
inch red background on all 4 sides.
74-3.02G Miscellaneous Materials
Enclosures must be minimum NEMA Type 1.
822

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

Floor coverings must comply with ASTM D 178 and be rated for at least 20,000 volts dielectric strength,
when tested under ASTM D 149. Floor covering must be at least 1/4 inch thick.
Float switches must:
1. Be 120-volt, 8-ampere, SPDT, mechanically-activated, wide-angle types
2. Have an inert synthetic leak-proof, shockproof, and corrosion-resistant casing
3. Have a 16-gauge, 2-conductor, SJOW sealed cable
Room lights must:
1.
2.
3.
4.
5.
6.

Be NRTL listed for damp locations


Be ceiling mounted, heavy duty, industrial type fixtures
Have a fiber-reinforced polymer housing with steel wireway
Have a hinged acrylic lens with closed-cell gasket and ABS or stainless steel latches
Include 2 T8 lamps with an electronic, instant-start ballast
Include the manufacturer's emergency battery pack

Sump lights must:


1.
2.
3.
4.
5.
6.

Be NRTL listed and labeled for Class 1, Division 2 locations


Be wall mounted, nonmetallic type fixtures
Have a fiber-reinforced polymer housing
Have a hinged polycarbonate or acrylic lens with nonmetallic latches
Have nonmetallic lampholders
Include 2 T8 lamps with an electronic, instant-start ballast

Entry lights must be outdoor, wall-mounted metal-halide luminaire type having a die-cast frame with
hinged door and 1-piece front and bottom prismatic-glass lens.
Indicator lights must:
1. Be UL listed for wet locations.
2. Have a vapor-tight, cast-metal base with pin socket.
3. Have a impact and heat resistant colored polycarbonate threaded globe with neoprene gasket. Globe
color must be as shown.
4. Have a threaded, die-cast-aluminum guard.
5. Include a twin tube, 18-watt, 120-volt, compact fluorescent lamp with integral ballast.
Light switches must:
1.
2.
3.
4.

Be NRTL listed, specification grade


Have 20-ampere, 120/277-volt, silver alloy contacts
Be suitable for stranded conductor wiring
Be ivory color

Duplex plug receptacles must be NEMA Type 5-20R, specification grade, ivory color, and suitable for
stranded conductor wiring.
Junction and outlet boxes must comply with NEMA FB 1. Boxes must be cast iron with threaded hubs,
have cast iron covers with gaskets, and be at least 4 by 4 by 1-7/8 inches. For weatherproof device
boxes, use covers with gasketed, hinged flaps.
Sump light switches at remote pump station must:
1. Be single-pole, 2-position maintained, 10-ampere, 120-volt rotary switches
2. Have contacts rated at 120 volts and 35 percent power factor
3. Have an inductive pilot duty rating of:
3.1. 60 amperes make
3.2. 6 amperes break
3.3. 10 amperes continuous

823

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

Remote pump stations must be deadfront NEMA Type 4X enclosures having the following:
1.
2.
3.
4.

Hinged interior door and mounting panel on the back


Push buttons, duplex plug receptacle, nameplates, and sump light switch on the hinged interior door
Terminal blocks on the mounting panel
Hasp for a padlock

Seal failure relays must be (1) compatible with the drainage pump and (2) be a factory assembled unit
having 1 normally open and 1 normally closed contact, each rated at 120 volts. Seal failure relays must
have individual pump leak-indicator lights.
Pull boxes must be concrete-type complying with section 86-2.06.
Supporting devices must be corrosion resistant. Concrete anchorage devices must be Type 316 stainless
steel.
74-3.03 CONSTRUCTION
74-3.03A General
Do not install electrical equipment on unpainted wood panels.
74-3.03B Installation
74-3.03B(1) General
Reserved
74-3.03B(2) Conduit, Conductors, and Cable
Do not install conduits behind ladders or within 15 inches of the ladder-rung vertical centerline.
Install flexible conduit with approximately 6 inches of slack between terminations.
Flexible conduits and their fittings are considered a discontinuity and must be shunted by bonding
jumpers. Install bonding jumpers inside the flexible conduit. Do not use the flexible conduit as the ground.
Install conductors and cable under section 86-2.09B and the following:
1. Pull conductors to prevent damage to sheath or insulation
2. Install conductors and cables entering equipment and boxes with drip loops to prevent water reaching
the current-carrying parts or other conduits
3. Remove insulation without damaging the conductor
4. Identify conductors by number at each termination
Feeder and branch circuit conductors that are ungrounded must have continuously color-coded
insulation. Conductors no. 6 AWG or larger may use colored tape. If used, apply tape at each connection
and where accessible. Ungrounded conductor color-coding must be as shown in the following table:
Conductor Color-Coding
System
Color code
120/240V-Single phase
Black, blue
120/240V-Three phase
Black, orange, blue
120/208V-Three phase
Black, red, blue
480/277V-Three phase
Brown, purple, yellow
74-3.03B(3) Motor Control Center
Use concrete anchorage devices to anchor the motor control center sections to the concrete slab. Shim
each section to make the motor control center level.
The motor control center sections must fit through the pump house doorway or roof access opening. Any
modifications required for installation must be pre-approved by the manufacturer and must not alter
performance.
Install current switches in the starter compartments. Loop power conductors around the sensing coil
multiple times.
824

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

The Department does not adjust payment for disassembly, assembly, or modifications to the motor
control center for installation.
74-3.03B(4) Panel LP
The panelboard directory must list the equipment controlled and the area designation. The directory must
be printed using Times New Roman font and at least 12-point font size. Place the directory in the
panelboard door frame with a transparent protective cover.
74-3.03B(5) Miscellaneous Materials
Secure hangers, brackets, supports, and electrical equipment to surfaces using:
1. Concrete anchorage devices into concrete or solid masonry surfaces
2. Machine screws or bolts into metal surfaces
3. Wood screws into wood construction surfaces
74-3.03C Conductor Splices
Do not splice the drainage pump cables between the pumps and the enclosure shown.

Conductor splices must be made only in (1) fixtures, (2) junction boxes, and (3) gutters.

Splices must be made using either pressure connectors listed by a NRTL or soldered joints made by

soldering irons. Do not use open flame soldering.

Insulate splices using the following sequence:

1. Apply 2 half-lapped layers of self-fusing, oil and flame-resistant, synthetic rubber tape covered by 2
half-lapped layers of pressure-sensitive, adhesive, PVC electrical tape at least 7 mils thick.
2. After taping the splice, apply an electrical insulating coating. The coating must be (1) fast drying, (2)
resistant to oil, acids, alkalis, and corrosive atmospheric conditions, and (3) compatible with the tape.
74-3.03D Training
Train 6 Department personnel in programming, connection, operation, troubleshooting, and maintenance

of the pump controller. Training must be for at least 4 hours and be at the job site.

The training instructor must be a factory-authorized representative of the pump controller manufacturer.

Training must:

1. Supply Department personnel with books, manuals, and other training material
2. Include equipment required for pump controller training
3. Include hands-on experience in programming techniques and operation
74-3.04 PAYMENT
Not Used
74-4 BOOSTER PUMP
74-4.01 GENERAL
74-4.01A Summary
Section 74-4 includes specifications for installing booster pumps.

The booster pump must be a factory assembled, skid-mounted system.

74-4.01B Definitions
Reserved
74-4.01C Submittals
74-4.01C(1) General
Reserved

825

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-4.01C(2) Shop Drawings


Submit shop drawings for each booster pump.
74-4.01C(3) Product Data
Submit product data for the booster pump, including the following components:
1
2
3
4
5
6

Pump, including pump curve and motor information


Valves
Pump controller
Booster pump enclosure
Pressure gauge
Appurtenances

74-4.01C(4) Closeout Submittals


Submit closeout submittals as a Maintenance and Operations Manual before completion of the work.
Submit 2 manual copies as PDF files on CDs or DVDs. Submit 1 manual copy as fused-laminate prints in
a 3 ring binder with tabbed dividers. Organize each manual as follows:
1.
2.
3.
4.
5.

Index
Parts list
Operating instructions
Maintenance instructions
Pump curve

74-4.01D Quality Control And Assurance


The requirements of section 74-1.01D do not apply to the booster pump.
Notify the Engineer 5 business days before testing the booster pump. Test the booster pump in the
Engineer's presence after connecting the booster pump to the irrigation system.
Discharge water from testing must not cause erosion, damage to equipment or plantings, or interfere with
ongoing work.
The pump must not load the motor to more than the product of the nameplate (1) amperage and (2)
service factor. The flow rate must not vary from the pump curve by more than 5 percent at 100 percent
motor speed.
Test each booster pump at the following test points:
1.
2.
3.
4.

Zero flow rate (cutoff head)


Maximum flow rate
Design heads shown
Steady-state flow for each irrigation controller station

Record the following for each test point:


1.
2.
3.
4.
5.

Motor rpm
Motor voltage
Motor amperage
Suction pressure of the pump
Discharge pressure of the pump

After testing, run the booster pump through 3 successful, complete irrigation controller cycles.
If the booster pump fails testing, adjust system components as necessary and retest.
74-4.02 MATERIALS
74-4.02A General
The concrete for the foundation and pad of the booster pump must be minor concrete.

826

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

74-4.02B Manufactured Units


74-4.02B(1) General
The booster pump must consist of a factory assembled and tested skid-mounted system with the
following components: pump, pump controller, booster pump enclosure, manifold, inlet and outlet valves,
sensors, fittings, and appurtenances.
The system working pressure must be at least 150 psi.
The booster pump must be listed and labeled by a NRTL.
74-4.02B(2) Components
74-4.02B(2)(a) Pumps
Pumps must consist of a close-coupled pump and motor. Pumps must be (1) end suction, centrifugal type
with mechanical seals, (2) coated with the manufacturer's standard finish for exterior use, and (3) single
or multiple stage. Booster pumps must have a horizontal or vertical configuration.
For horizontal pumps:
1. Casing must be close-grained cast iron with a replaceable bronze wearing ring
2. Impeller must be (1) dynamically balanced, (2) made from bronze, and (3) keyed and secured to the
shaft by a stainless steel washer and cap screw
3. Impeller shaft must be either steel with a bronze sleeve or stainless steel with no sleeve
For vertical pumps:
1. Casing must be close-grained cast iron with replaceable stainless steel wearing ring
2. Motor pedestal must be close-grained cast iron
3. Impeller must be (1) dynamically balanced, (2) made from stainless steel, and (3) keyed and secured
to the shaft by a stainless steel washer and cap screw
3. The impeller shaft must be stainless steel
Motors must be standard efficiency, NEMA code letter "G" or smaller, open drip proof, and NEMA Design
B.
74-4.02B(2)(b) Ball Valves
Ball valves must have a 2-piece bronze body with full size port, chrome-plated or brass ball, and be rated
for at least 400 psi.
74-4.02B(2)(c) Butterfly Valves
Butterfly valves must have a ductile iron body with molded seat liner made from EPDM or PTFE, bi
directional stainless steel stem, locking lever with extended neck, and be rated for at least 250 psi.
74-4.02B(2)(d) Pump Controller
The pump controller must consist of an enclosure, VFD, main disconnect, circuit breakers, motor starter,
motor protector, and a pressure transducer.
The pump controller must keep the pump running when the flow of water fluctuates between the changing
of the irrigation controller stations. The pump controller must have a potentiometer or keypad for adjusting
motor speed.
The enclosure must be a NEMA Type 12 enclosure and rated for the horsepower, voltage, and phase
shown. The ground bus must be bonded to the enclosure. The circuit breaker must be rated as shown.
The following equipment must be on the front of the enclosure:
1. 2-way switch for automatic mode or manual mode.
2. Main disconnect. You may use the main breaker as the main disconnect if it is accessible on the front
of the enclosure.
3. High-visibility pilot lights rated for 120 volts AC, with colored plastic lens and screw caps. Include pilot
lights for the following conditions:
3.1. Power on.
827

SECTION 74
3.2.
3.3.

PUMPING EQUIPMENT AND CONTROLS

Run.
No flow.

The VFD must:


1.
2.
3.
4.
5.

Be listed and labeled by a NRTL


Have 5 percent input impedance at rated motor horsepower
Be mounted in the enclosure
Have a LCD screen with operator interface
Process the analog input signal from the pressure transducer and:
5.1. Determine water pressure
5.2. Set the pump motor speed
5.3. Determine "no-flow" conditions

When the pressure transducer signal indicates a "no flow" condition in the manifold, the VFD must stop
the pump regardless of demand. The VFD must have an adjustable time delay for the "no flow" condition.
Upon resumption of flow in the manifold, it must reset and resume automatic mode.
The VFD and the 2-way switch must operate the booster pump as follows:
1. Automatic mode must start and stop the pump based on digital input signals from multiple irrigation
controllers
2. Manual mode must start the pump regardless of the input signal
Pressure transducer must be stainless steel, rated for at least 300 psi working pressure and send a 4-20
mA output signal to the VFD.
74-4.02B(2)(e) Booster Pump Enclosures
The booster pump enclosure and lid must be fabricated from stainless steel or marine grade aluminum.
The lid must have a continuous hinge, gas springs or equivalent lid supports, and a hasp for padlocking.
Gas springs must use their entire stroke without forcing the lid beyond its fully opened position. Side
louvers must have internal bronze insect screens and be mounted on each end. The enclosure must
include at least 1 thermostatically controlled exhaust fan with bronze insect screens.
74-4.02B(2)(f) Pressure Gauges
Pressure gauges must:
1. Comply with ASME B40.100, Grade B
2. Include a 2-1/2-inch glycerin filled dial, stainless steel case and cover, reset screw, and 1/4-inch NPT
bottom inlet
3. Read from 0 to 200 psi unless otherwise shown
74-4.02B(2)(g) Appurtenances
Manifolds must be steel pipe or copper pipe. Steel pipe must comply with ASTM A53, Grade B. Copper
pipe must comply with ASTM B88, Type K.
The skid must be (1) either steel or aluminum channel with risers as necessary, and (2) all welded
construction. Welding must comply with AWS D1.1 for steel construction or AWS D1.2 for aluminum
construction.
Fasteners, expansion anchors, nuts, bolts, and washers must be Type 316 stainless steel.
Nameplates must comply with section 74-3.02F.
74-4.02B(3) Fabrication
Fabricate the booster pump as follows:
1.
2.
3.
4.

Locate the inlet and outlet valves inside the booster pump enclosure.
Use threaded or flanged fittings on the pump inlet and outlet connections.
The pump must be removable without disassembling the manifolds.
Install pressure gauges in the manifolds on the suction and discharge sides of the pump.
828

SECTION 74

PUMPING EQUIPMENT AND CONTROLS

5. Install the pressure transducer in the manifold.


6. Mount the pump controller inside the enclosure.
7. Attach the enclosure to the skid.
74-4.03 CONSTRUCTION
74-4.03A General
Support the connected water piping outside the enclosure. Do not use the booster pump to support the
connected piping.
Install a padlock after installing the booster pump. The Department will supply a lock upon Contract
acceptance.
Place the Maintenance and Operations Manual binder inside the enclosure.
74-4.03B Foundation and Pad
Pour a concrete foundation and pad where the booster pump is shown. The foundation must be at least 3
inches wider than the skid on all 4 sides. Place the pad against the foundation on the door side of the
enclosure. The pad must be the same width as the foundation and at least 36 inches long.
Conduit risers must be located inside the skid footprint.
74-4.03C Skid Installation
Use concrete anchorage devices to mount the booster pump skid on the foundation. Use at least 4 sets of
tapered steel leveling wedges to level the skid. Use 2 wedges placed taper-to-taper at each point of
support. The steel wedges must remain in place in the completed work.
After suction and discharge piping has been installed and tightened in place, level the skid and tighten the
concrete anchor hex nuts against the base.
Fill the voids under the base with mortar complying with section 51-1.02F. Retighten the mounting bolts
after the voids have been filled.
74-4.03D Nameplates
Install nameplates under section 74-3.02F. Install nameplates on:
1.
2.
3.
4.
5.
6.

Pump
Pump controller
Switches
Main disconnect
Circuit breakers
Panel lights

74-4.04 PAYMENT
Not Used
74-574-10 RESERVED

829

75 MISCELLANEOUS METAL

75-1.01 GENERAL
75-1.01A Summary
Section 75 includes specifications for fabricating and installing miscellaneous metal materials.
75-1.01B Quality Control and Assurance
Miscellaneous metal materials are inspected at the fabrication site. Notify the Engineer:
1. When materials have been delivered to the fabrication site
2. At least 10 days before starting fabrication
75-1.02 MISCELLANEOUS IRON AND STEEL
75-1.02A General
Welding must comply with AWS D1.1.
Remove burrs, rough and sharp edges, and other flaws.
Straighten warped pieces after fabricating and galvanizing.
Steel fastener components for general applications, components of HS steel fastener assemblies for
structural steel joints, carbon-steel castings, and malleable iron castings must comply with section 55
1.02A(1); other miscellaneous iron and steel materials must comply with the corresponding specifications
shown in the following table:
Miscellaneous Iron and Steel Materials
Material
Specification
Steel bars, plates, and shapes
ASTM A 36/A 36M, A 575, or A 576 (AISI or M Grades
10161030)
Stainless steel fasteners, alloys 304 & 316,
for general applications:
Bolts, screws, studs, threaded rods, and ASTM F 593 or F 738M
nonheaded anchor bolts
Nuts
ASTM F 594 or F836M
Washers
ASTM A 240/A 240M and ASME B18.22M
Gray iron castings
Inside a roadbed
AASHTO M 306
Outside a roadbed
AASHTO M 306 except only AASHTO M 105 Class
35B is allowed
Ductile iron castings
ASTM A 536, Grade 80-55-06
Cast iron pipe
Commercial quality
Steel pipe
Commercial quality, welded or extruded
Other parts for general applications
Commercial quality
Raised pattern plates must be commercial quality.
Galvanize steel parts and cast iron manhole frames and covers for sidewalks under section 75-1.05.
Galvanize after fabrication and before assembling component parts. Coat other cast iron items with
commercial-quality asphalt except machined surfaces of manhole frames and covers for decks.
75-1.02B Frames, Grates, and Covers
Grates must be produced from one of the following:
1. Structural steel complying with either of the following
1.1. ASTM A 36/A 36M
1.2. A 576, Grades 1021, 1022, 1026, 1029, or 1030
2. Ductile iron castings
3. Carbon-steel castings
Manhole frames and covers must comply with AASHTO M 306.
831

SECTION 75

MISCELLANEOUS METAL

Drainage inlet frames and grates except those on bridges need not be galvanized or coated with asphalt.
Matchmark frames and grates and frames and covers in pairs before delivery to the job site; the grates
and covers must fit into their frames without rocking.
75-1.02C Metal Cattle Guard
Reserved
75-1.02D75-1.02G Reserved
75-1.03 MISCELLANEOUS BRIDGE METAL
75-1.03A General
Miscellaneous bridge metal must comply with section 75-1.02.
Miscellaneous bridge metal consists of:
1. Structural steel and cast steel portions of bearing plates, bars, rockers, assemblies, and other
expansion or fixed bearing devices in concrete structures
2. Equalizing bolts and expansion joint armor in concrete structures
3. Expansion joint armor in steel structures
4. Manhole frames and covers, frames and grates, ladder rungs, guard posts, and access door
assemblies
5. Deck drains, area drains, retaining wall drains, and drainage piping not included in bridge deck
drainage system
Produce the parts shown in the table below from the corresponding materials shown:
Part
Bearing assemblies
Access opening covers
Access doors
Springs for deck drain
grating latchesa
Pipe bends

Miscellaneous Metal Parts


Material
ASTM A 36/A36M
Commercial-quality sheet steel
Galvanized sheet steel complying with ASTM A 653/A 653M, Coating
Designation G210 [Z600]
Commercial-quality, stainless steel spring wire containing a nominal
composition of 18% chromium and 8% nickel
Commercial-quality tube bends or fabricated bends of equal
smoothness. Do not use miter-joint bends.
Steel or stainless steel

Metal parts of anchorage


devices except iron
castings for CIP inserts
Iron castings for CIP inserts Malleable iron or ductile iron
a
Test spring latches and other mechanical devices before delivery to the job site; they must operate
smoothly and properly.
Cast steel and cast iron must comply with section 55.
Transition fittings between pipes of different diameters must be:
1. Smooth and uniform, without sags, projections, or offsets
2. At least 4 inches in length for each 1-inch reduction in pipe diameter.

Sealing compound for caulking and adhesive sealing must be polysulfide or polyurethane complying with
ASTM C 920, Type S, Grade NS, Class 25, Use O.
75-1.03B Bolted and Threaded Bar Connections
HS bolted connections must comply with the specifications for HS steel fasteners and bolted connections
in section 55.
Equalizing bolts must be bolts or threaded bars. Threaded bars shown as prestressing steel must comply
with the specifications for plain bars in ASTM A 722/A 722M, including supplementary requirements. Nuts
must comply with the 1st and 2nd paragraphs of section 50-1.03B(2)(c).
832

SECTION 75

MISCELLANEOUS METAL

Where cleaning is described, clean nuts, bolts, threaded bars, and plate washers under SSPC-SP 6 or
SSPC-SP 2. Abrasives used for blast cleaning must comply with section 59-1.02B.
Surfaces blast cleaned under SSPC-SP 6 must have a dense, uniform, angular anchor pattern of at least
1.5 mils when measured under ASTM D 4417. Paint blast-cleaned surfaces the same day blast cleaning
is performed unless otherwise authorized.
Reclean surfaces that rust or become contaminated before paint is applied.
Paint surfaces except threads engaged by nuts with 2 applications of organic zinc-rich primer. Do not use
aerosol cans. Apply the 2nd application to the nuts and threads after installation. Organic zinc-rich primer
must be on the Authorized Material List
Thread locking systems must be on the Authorized Material List for anaerobic thread locking systems and
must comply with the requirements thereon.
75-1.03C Anchorage Devices
75-1.03C(1) General
Concrete anchorage devices must be mechanical expansion anchors or resin capsule anchors installed in
drilled holes or CIP concrete inserts.
Concrete anchorage devices must be on the Authorized Material List.
Submit a certificate of compliance for anchorage devices.
An anchorage device must be a complete system, including threaded studs, hex nuts, and cut washers.
Thread dimensions for externally threaded anchorage devices before zinc coating must comply with
ASME B1.1 having Class 2A tolerances or ASME B1.13M having Grade 6g tolerances. Thread
dimensions for internally threaded concrete anchorage devices must comply with ASTM A 563.
Except for mechanical expansion anchors and iron castings for CIP inserts, metal parts of anchorage
devices must be hot-dip or mechanically galvanized.
Mechanical expansion anchors must be (1) hot-dip or mechanically galvanized, (2) made from stainless
steel, or (3) coated with electrodeposited zinc complying with ASTM B 663.
Iron castings must be mechanically galvanized.
Install mechanical expansion anchors, resin capsule anchors, and CIP inserts under the manufacturer's
instructions.
If the manufacturer's instructions do not include torque requirements, tighten nuts used to attach
equipment or fixtures to anchorage devices to the installation torque values shown in the following table:
Stud
diameter
(inches)
1-1/4
1
7/8
3/4
5/8
1/2
3/8
1/4

Torque Requirements
Installation torque values (ft-lb)
Shell-type mechanical
Integral-stud-type mechanical
expansion anchors
expansion anchors
------80
175
35
90
22
50
11
25
4
7

Resin capsule anchors


and CIP inserts
400
230
175
150
75
30
18
--

Install concrete anchorage devices such that the attached equipment or fixtures bear firmly against the
concrete.

833

SECTION 75

MISCELLANEOUS METAL

75-1.03C(2) Mechanical Expansion Anchors


Mechanical expansion anchors must be the integral stud type or the shell type with internal threads and
an independent stud. Do not use self-drilling mechanical expansion anchors.
When tested under California Test 681, mechanical expansion anchors must withstand the application of
a sustained tension test load of at least the values shown in the following table for at least 48 hours with a
movement of at most 0.035 inch:
Mechanical Expansion Anchor Sustained Tension Test Load
Stud diameter
Sustained tension test load
(inches)
(pounds)
5,000
3/4a
5/8
4,100
1/2
3,200
3/8
2,100
1/4
1,000
a
Maximum stud diameter allowed for mechanical expansion
anchors
Install shell-type mechanical expansion anchors such that the top surface of the anchor body remains 1/2
to 1 inch below the concrete surface after expansion. After installation of shell-type mechanical expansion
anchors and before mounting to equipment or fixture, demonstrate to the Engineer that the expansion
anchors are firmly seated within these tolerances.
75-1.03C(3) Resin Capsule Anchors
When tested under California Test 681, resin capsule anchors must withstand the application of a
sustained tension test load of at least the values shown in the following table for at least 48 hours with a
movement of at most 0.010 inch:
Resin Capsule Anchor Sustained Tension Test Load
Stud diameter
Sustained tension test load
(inches)
(pounds)
1-1/4
31,000
1
17,900
7/8
14,400
3/4
5,000
5/8
4,100
1/2
3,200
3/8
2,100
1/4
1,000
75-1.03C(4) Cast-In-Place Concrete Inserts
CIP concrete inserts must be ferrule loop or cast iron.
When tested under California Test 682, CIP inserts must withstand the minimum ultimate test loads
shown in the following table:

834

SECTION 75

MISCELLANEOUS METAL
CIP Insert Sustained Tension Test Load
Stud diameter
Ultimate tensile load
(inches)
(pounds)
1-1/4
25,000
1-1/8
19,800
1
16,000
7/8
11,600
3/4
7,200
5/8
6,600
1/2
4,200

75-1.03D Bridge Deck Drainage System


75-1.03D(1) General
Bridge deck drainage system consists of the drainage components specified in the special provisions.
Securely cover deck drain grates and other grating openings to prevent intrusion of debris until after final
cleanup of the deck and drainage areas.
After final cleanup of the deck and drainage areas, test each drain pipe and facility except short free fall
pipes in the Engineer's presence by discharging 100 gallons of water into the drain. The test must
demonstrate the proper operation of the drain pipe and facility. If the test indicates obstructions in the
pipe, clear the pipe and repeat the test until the drain pipe and facility are unobstructed.
75-1.03D(2) Pipe Connections and Joints
Self-tapping screws for sleeve connections must:
1.
2.
3.
4.

Be stainless steel with hex-heads


Be installed in holes drilled to fit the screws
Comply with ASTM A 276, Type 304, for a project in a non-freeze-thaw area
Comply with ASTM A 276, Type 316, for a project in a freeze-thaw area

Drain pipe joints must be watertight, smooth, and free from projections or offsets over 1/16 inch on the
inside. Mechanical couplings in piping must be gasketed short sleeve type consisting of:
1.
2.
3.
4.

Mild steel middle ring with pipe stop


2 rubber compound wedge section ring gaskets
2 mild steel follower rings
Mild steel bolts to compress the gaskets

Provide a transition section where a pipe under a walkway or other improved area must be of a smaller
diameter than the downdrain pipe.
Couplings used to connect PVC or fiberglass pipe to steel must be threaded or flanged. For PVC or
fiberglass pipe, do not use the sleeve connections shown.
75-1.03D(3) Fiberglass Pipes and Fittings
You may use fiberglass pipes and fittings with the same diameters and minimum bend radii as shown
instead of welded pipe.
Submit a certificate of compliance for fiberglass pipe and fittings; include laboratory test results.
Fiberglass pipe and fittings must:
1. Comply with ASTM D 2996
2. Have a minimum short-term rupture strength of 30,000 psi
For joining pipe and fittings, use the adhesive type recommended by the manufacturer.

835

SECTION 75

MISCELLANEOUS METAL

Fiberglass pipe not enclosed in a box girder cell or encased in concrete must be made from UV-resistant
resin pigmented with concrete-gray color or be coated with a concrete-gray resin-rich exterior coating. Do
not use paint.
Fiberglass pipe with UV protection must withstand a at least 2,500 hours of accelerated weathering when
tested under ASTM G 154 with UVB-313 lamps. The resting cycle must be 4 hours of UV exposure at 140
degrees F and then 4 hours of condensate exposure at 120 degrees F. After testing, the pipe surface
must show no fiber exposure, crazing, or checking and only slight chalking or color change.
Support spacing for fiberglass pipe must be the same as shown for welded steel pipe. Each pipe support
must have a width of at least 1-1/2 inches.
75-1.03D(4) PVC Pipes and Fittings
For drainage pipe NPS 8 or smaller encased in concrete or enclosed in a box girder cell and exposed for
at most 20 feet within the cell, you may use PVC pipe and fittings with the same diameters and minimum
bend radii as shown instead of welded pipe.
The PVC pipe and fittings must be Schedule 40, complying with ASTM D 1785. Pipe support spacing
must be at most 6 feet.
75-1.03E Bridge Joint Restrainers
75-1.03E(1) General
Bridge joint restrainers include various combinations of the following: structural steel parts, bolts, bearing
plates, cable drum units, pipe sleeves, PVC pipe, elastomeric pads, expansion joint filler, expanded
neoprene, expanded polystyrene, sheet neoprene, hardboard, and incidentals.
Place new concrete adjacent to restrainers before installing restrainers.
Where removing and replacing restrainers, remove at most 50 percent of the restrainers at any joint and
replace them with an equal proportion of new restrainers before subsequent removal activities. Perform
all removal and replacement symmetrically about the centerline of the existing bridge.
75-1.03E(2) Cable Type
75-1.03E(2)(a) General
Cable-type restrainers consist of cables, swaged fittings, studs, nuts, cable yield indicators, disc springs,
and if shown, turnbuckles.
You are responsible for determining the required lengths of the cable-type restrainers.
Submit at the manufacturer's plant:
1. 1 cable-type restrainer test sample for each 200 restrainers or fraction thereof produced. The sample
restrainer must consist of a cable fitted with a swaged fitting and right hand thread stud at both ends
and must be 3 feet in total length.
2. 1 turnbuckle fitted with an 8-inch stud at each end for each 200 turnbuckles or fraction thereof.
3. Greater of 1 percent or 8 of the cable yield indicators produced from each mill heat.
4. 2 disc springs of each size produced from each mill heat.
Submit 2 certified copies of mill test reports of each manufactured length of cable.
Submit 2 certified copies of the mill test and heat treating reports of each heat of bars used for cable yield
indicators.
75-1.03E(2)(b) Materials
Each swaged fitting, turnbuckle, stud, and nut assembly must develop the specified breaking strength of
the cable.
Cables must be galvanized, 3/4-inch preformed, 6 by 19, wire strand core or independent wire rope core,
complying with Federal Specification RR-W-410, right regular lay, manufactured of improved plow steel
with a minimum breaking strength of 23 tons.
Securely wrap each free end of restrainer-unit cables to prevent separation.
836

SECTION 75

MISCELLANEOUS METAL

Each swaged fitting must:


1.
2.
3.
4.

Be machined from hot-rolled steel bars complying with AISI C-1035


Be annealed, suitable for cold swaging
Have a hole drilled through the head to accommodate the locking pin
Have the manufacturer's identifying mark stamped on the body

The locking pin must be a 1/4-inch-diameter, zinc plated steel spring pin and keep the stud in proper
position.
Each stud must comply with ASTM A 449 after galvanizing. Before galvanizing, mill a 3/8-inch slot for the
locking pin in the stud end.
Nuts must comply with ASTM A 563, including appendix X1, except lubrication is not required.
Each cable yield indicator must:
1. Be machined from hot-rolled steel bars complying with AISI C-1035
2. Be annealed, suitable for cold swaging
3. Have the heat number and manufacturer's identifying mark stamped on the end surface
Machine the wall of the reduced section of the cable yield indicator so that the indicator yields at a load
from 36,000 to 38,000 lb when tested in compression along the major axis at a test speed of at most 1/2
inch/minute.
Disc springs must be made from steel complying with ASTM A 684/A 684M, Grade 1075. Do not
galvanize disc springs; clean and paint them with a paint recommended by the manufacturer and color
shown.
Turnbuckles must be steel pipe type. Pulls for turnbuckles must consist of a swaged fitting and stud
assembly.
Steel parts must comply with ASTM A 36/ A36M or A 576, Grade 1030, (AISI 1030) and must not be
rimmed or capped steel.
You may drill holes in steel parts after galvanizing if you repair the holes as specified for repairing
damaged galvanized surfaces in section 75-1.05.
The minimum size of fillet welds must comply with AWS D1.1 except as follows:
Minimum Fillet Weld Sizes
Base metal
Minimum size of
thickness of thicker
fillet weld
part joined (T)
(inches)
(inches)
3/4 < T 1-1/2
5/16
1-1/2 < T 2-1/4
3/8
2-1/4 < T 6
1/2
6<T
5/8
Pipe sleeves must be commercial-quality welded steel pipe.

Concrete for filling cable drum units must either (1) comply with the specifications for minor concrete or

(2) be a concrete mix with a 3/8-inch maximum combined aggregate grading and at least 675 pounds of
cementitious material per cubic yard.
Elastomeric bearing pads must comply with section 51-3.02 except pads may consist of only elastomer
and laminated reinforcement is not required.
PVC must be commercial quality.
Bond breaker on PVC pipe must be a mortar-tight wrapping of plastic or rubber sheet at least 0.010 inch
thick.
837

SECTION 75

MISCELLANEOUS METAL

Expanded polystyrene and hardboard must comply with section 51-2.01B(1).


Neoprene sheets must comply with the specifications for neoprene in section 51-2.04. The sheets must
be smooth, free from pinholes and surface blemishes, and show no evidence of delamination.
Closed-cell expanded neoprene material must be commercial quality and comply with the stiffness
requirements in ASTM D 1056 for Class SC, Grade SCE43 material or firmer.
Ship cable-type restrainers as complete units.
75-1.03E(2)(c) Installation
Notify the Engineer at least 2 days before tightening and setting cable-type restrainer units.
Repair existing structural steel paint areas that you damage and holes you drill through existing steel
members as specified for repairing damaged galvanized surfaces in section 75-1.05.
If paint removal or welding at connections to existing steel is not described at restrainer locations, wash
loose dirt and dust from existing contact surfaces of HS bolted connections without disturbing the existing
paint. Clean and paint existing contact surfaces of HS bolted connections that contain rust, loose paint, or
other foreign substances except dirt and dust; this cleaning and painting is change order work.
75-1.03E(2)(d) Corrosion Protection
75-1.03E(2)(d)(i) General
Section 75-1.03E(2)(d)(i) applies if corrosion protection on cable-type restrainers is specified in the
special provisions.
Submit a test sample of grease from the lot to be used and test results at least 40 days before use.
For the locknuts, submit a certificate of compliance with a copy of each required test report.
75-1.03E(2)(d)(ii) Materials
The corrosion protection system must be on the Authorized Material List and comply with the
requirements thereon.
The grease must comply with the corrosion-inhibiting grease specifications in section 46-2.02D.
The sheathing must have:
1. Density of 940 kg/m3 to 960 kg/m3 as measured under ASTM D 792, Test Method B
2. Minimum wall thickness of 80 mils
The sheathing must be:
1.
2.
3.
4.

Sufficiently strong to prevent damage during construction


Watertight
Chemically stable without embrittlement or softening
Nonreactive with concrete, steel, or corrosion inhibiting grease

The Department rejects burned or damaged HDPE sheathing.


The nuts must be mechanically zinc-coated nylon insert locknuts complying with ASTM A 536, Grade DH,
and ASME B18.22.2 except that the thickness must be greater than that specified in ASME B18.2.2. The
nuts must maintain complete locking effectiveness at 100 percent relative humidity. Do not use thread
locking systems. The mechanical and thermal properties of the nylon resin used in the locknut insert must
have the values shown in the following table:

838

SECTION 75

MISCELLANEOUS METAL
Property

Nylon Insert Requirements


Test method

Mechanical:
Tensile strength
Tensile strength at yield
Elongation at yield
Elongation at break
Flexural modulus
Izod impact
Thermal:
Heat deflection temperature
at 66 psi
at 264 psi
Melting point

Value

ASTM D 638
ASTM D 638
ASTM D 638
ASTM D 638
ASTM D 790
ASTM D 256

12,000 psi min


12,000 psi min
5 percent max
60 percent max
410 ksi
53 J/m

ASTM D 648
ASTM D 648
ASTM D 3418

210 C
65 C
260 C

The pigment composition and physical properties of the penetrant must have the values shown in the
following table:
Penetrant Pigment Composition and Property Requirements
Pigment composition or property
Test method
Value
Total pigment content
ASTM D 2371 2428 percent
Pigment component:
ASTM D 3721 1923 percent
Synthetic red iron oxide
Zinc hydroxy phosphite
ASTM D 4462 3337 percent
Barium sulfate
ASTM D 602
4048 percent
Nonvolatile content
ASTM D 2369 60 percent min
Consistency, KU
ASTM D 562
5075
Density
ASTM D 1475 1.018 g/mL
Drying time, dry to recoat, 4 mils wet film
ASTM D 1640 24 hours
Flash point
ASTM D 3278 40 C min
Salt fog performance, 12 mils dry film on
ASTM B 117
500 hours, no rust or creepage at
abrasive blast cleaned panel under SSPC-SP 5,
scribe
white metal blast cleaning
The penetrant vehicle must consist of 75 to 79 percent overbased crystalline calcium sulphonate alkyd
resin and 21 to 25 percent driers, UV absorbers, and aliphatic hydrocarbons. The properties of the resin
solution must have the values shown in the following table:
Property
Density
Flash point
Nonvolatile content
Viscosity

Resin Solution Property Requirements


Test method
ASTM D 1475
ASTM D 3278
ASTM D 2369
ASTM D 2196, no. 6 spindle at 25 C, 10 rpm

Value
0.935 g/mL
40 C min
70 percent min
9,000 cP min

The pigment composition and physical properties of the finish coat must have the values shown in the
following table:

839

SECTION 75

MISCELLANEOUS METAL

Finish Coat Pigment Composition and Property Requirements


Pigment composition or property
Test method
Value
Total pigment content
ASTM D 2371
2228 percent
Pigment component:
Titanium dioxide
ASTM D 476,
4043 percent
Type III or IV
Carbon black
ASTM D 561
0.041.00 percent
Zinc hydroxy phosphite
ASTM D 4462
2832 percent
Barium sulfate
ASTM D 602
2630 percent
Nonvolatile content
ASTM D 2369
70 percent min
Consistency, KU
ASTM D 562
90120
Density
ASTM D 1475
1.139 g/mL
Drying time, dry to recoat, 4 mils wet film
ASTM D 1640
Dust free
14 hours
Tack free
512 hours
Dry hard
2448 hours
Flash point
ASTM D 3278
40 C
Sag resistance
ASTM D 4400
16 mils min
Salt fog performance, 100 m dry film on SSPC-SP 5
ASTM B 117
1,000 hours, no more than
blasted cold-rolled steel panel
1 percent undercutting,
blistering, or peeling
The finish coat vehicle must consist of 77 to 81 percent overbased crystalline calcium sulphonate alkyd
resin, 12 to 16 percent modified alkyd, and 7 to 9 percent driers, UV absorbers, and aliphatic
hydrocarbons. The properties of the resin solution must have the values shown in the table titled "Resin
Solution Property Requirements" above.
The finish coat must match color no. 26373 of FED-STD-595.
75-1.03E(2)(d)(iii) Applying Corrosion Protection
Fully coat the galvanized cable-type restrainer with corrosion-inhibiting grease and encapsulate it in a
smooth HDPE sheath.
The sheath must be hot melt extruded onto the strand or must be shop applied by a method that ensures
all spaces between the sheath and the strand and between the strand wires are filled with corrosion
inhibiting grease.
The ends of the sheathing must be flush with the ends of the galvanized swaged fittings.
Cover the swaged fitting and a portion of the adjacent sheathed cable and threaded stud with a corrosion
protection system.
After final installation, the corrosion protection system must extend 2 inches onto both the sheathed cable
and the threaded stud.
Clean the cable yield indicator, washers, disc spring, nut, and threaded stud under section 59-1.03C(4)
and apply a prime coat of red calcium sulphonate penetrant.
Apply the prime coat to the specified dry film thickness in 1 or more applications. The total dry thickness
of the prime coat must be at least 1 mil.
Color code the disc springs after the application of the prime coat.
Coat the cable yield indicator, washers, disc spring, nut, and the portion of threaded stud from the outer
face of the nut to and including the ends of the stud with a finish coat of gray calcium sulphate alkyd resin.
Apply the finish coat to the specified dry film thickness in 1 or more applications. The total dry thickness of
the finish coat must be at least 8 mils.
Apply the grease, sheathing, corrosion protection system, prime coat, and finish coat at the
manufacturer's plant except do not apply the finish coat to any portion of the stud within 1-1/2 inches from
840

SECTION 75

MISCELLANEOUS METAL

the exposed end of the stud. After the cable restrainer installation is completed, recoat the parts specified
in the 9th paragraph of section 75-1.03E(2)(d)(iii) that are accessible with the finish coat.
The items specified in section 75-1.03E(2)(a) to be submitted at the manufacturer's plant must be
submitted with all manufacturer's plant-applied coatings.
75-1.03E(3) Pipe Type
Pipe-type restrainers consist of double extra strong steel pipe and associated hardware.
Submit shop drawings showing the method of grouting pipe-type restrainers.
Double extra strong steel pipe must comply with ASTM A 53/A 53M, Grade B.
Bond pipe-type restrainers to existing concrete by completely filling the void between the pipe and the
cored hole with grout within the limits shown. Grout must comply with section 50-1.02C. Provide filler
material and seals along the sides of the pipe to prevent grout from entering the bridge hinge joints. The
filler material and seals must not restrict joint movement.
75-1.03E(4) Bar Type
Bar-type restrainers consist of HS bars, bearing plates, couplers, anchorage devices, and incidentals.

Bar-type restrainers must comply with the material and sampling specifications for bar prestressing steel

in section 50.

Clean and paint new metal surfaces of bar-type restrainer units after fabrication under the specifications

for new structural steel in section 59-2, except SSPC-QP 1, SSPC-QP 2, and SSPC-QP 3 certifications

are not required.

Each anchorage device and coupler must develop the specified minimum ultimate tensile strength of the

steel bar and include locking devices to prevent turning or loosening.

You must determine the required length of each bar-type restrainer.

Bearing plates must comply with ASTM A 36/A 36M.

Elastomeric bearing pads must comply with section 51-3.02 and must be bonded to bearing plates with

adhesive complying with Federal Specification MMM-A-121.

Ship each bar-type restrainer as a complete unit, including anchorage device and coupler.

75-1.03E(5)75-1.03E(6) Reserved
75-1.03F Nonskid Surface
Where a nonskid surface is shown on steel plates, apply an epoxy mixed with grit.
Submit a work plan for the nonskid surface showing:
1. Application method
2. Spread rate of epoxy and grit
3. Number of coats
Epoxy must comply with section 95-2.01, 95-2.03, or 95-2.09.
Grit must be:
1. Commercial-quality aluminum oxide, silicon carbide, or almandite garnet grit particles
2. Screen size no. 12 to 30 or no. 14 to 35
3. Applied uniformly at a rate of at least 0.3 psf of surface area.
The finish color of the nonskid surface must be light gray.

Before applying epoxy and grit to a galvanized surface, prepare the surface under section 59-3.03.

Before applying any nonskid material, prepare a 1 sq ft test sample applied on hardboard at least 1/4 inch

thick. The nonskid surface must have a total thickness from 1/8 to 3/16 inch.

841

SECTION 75

MISCELLANEOUS METAL

If authorized, you may use a commercial-quality nonskid surface made of a 2-component UV-resistant
epoxy and grit if the quality is equal to the epoxy-grit mixture specified in section 75-1.03F.
75-1.03G Bearing Devices
Bearing assemblies or masonry plates placed on mortar pads must comply with section 55-1.03C(2).
Set bearing plates level. Set rockers and expansion devices to comply with the temperature at the time of
erection or to the specified setting.
75-1.03H75-1.03J Reserved
75-1.04 PUMPING PLANT METAL WORK
Pumping plant metal work must comply with section 75-1.02.
Pumping plant metal work consists of fabricated and cast metal parts used for constructing pumping
plants:
1. Including metal parts in the pumphouse, outside stairway, storage box, and discharge box and the
roadway-type inlet frames and grates at the pumping plant site
2. Excluding bar reinforcing steel and metal parts installed under section 74
3. Excluding roadway-type inlet frames and grates paid for as miscellaneous iron and steel
Pipe handrailing must comply with section 83-1.02G(3).
Anchorage devices must comply with the specifications for concrete anchorage devices in section 742.02E.
Except in walkway areas, cast iron manhole covers and frames and cast iron grates and frames must be
dipped in commercial-quality asphaltum.
Manhole covers and frames for pumping plant discharge boxes must be watertight and certified by the
manufacturer to be rated to the pressure shown.
Provide 1 heavy-duty, galvanized steel, safety padlock hasp and staple assembly. The assembly must be
securely attached to door and frame and have:
1. Vertical staple consisting of a rod with a diameter of at least 1/8 inch
2. Slotted leaf at least 6 inches in length
75-1.05 GALVANIZING
Galvanizing must comply with the schedules and specifications shown in the following table except that
galvanizing of miscellaneous bridge metal is not required for (1) portions of plates, shapes, or other items
embedded more than 2 inches in concrete; (2) embedded steel pipe ending at or below the surface of
encasing concrete; and (3) items described to receive other finishes.

842

SECTION 75
Material
Rolled, pressed, and
forged steel shapes,
plates, bars, and strip
1/8 inch thick
Steel <1/8 inch thick

Standard pipe

MISCELLANEOUS METAL
Galvanizing Schedules and Specifications
Specification
Schedulea
Except for pregalvanized
ASTM A 123/A123M
standard pipe, galvanize
material after fabrication into
the largest practical sections.
Galvanize before or after
If galvanized before fabrication, ASTM
fabrication
A 653/A 653M, Coating Designation
G210.
If galvanized after fabrication, ASTM A
123/A123M except the weight of zinc
coating must average at least 1.2 oz/sq
ft of surface area with no individual
specimen having a coating weight of
less than 1.0 oz/sq ft.
-ASTM A 53/A 53M except the zinc
coating for fence pipes and structural
shapes except for metal line posts for
barbed and woven wire fences must
average at least 1.2 oz/sq ft of surface
area with no individual specimen
having a coating weight of less than
1.0 oz/sq ft.
Galvanize after fabrication.
ASTM A 153/A 153M

Iron and steel hardware


except threaded studs,
bolts, nuts, and washers
specified to comply with
ASTM A 307, A 325, A
449, A 563, F 436, or F
1554b
Rail elements, backup
-AASHTO M 180
plates, terminal sections,
and end and return caps of
metal beam guard railing
a
Fabrication includes shearing, cutting, punching, forming, drilling, milling, bending, welding, and
riveting.
b
For threaded studs, bolts, nuts, and washers specified to comply with ASTM A 307, A 325, A 449, A
563, F 436, or F 1554, galvanize under their ASTMs.
Galvanizing is not required for stainless steel, monel metal, and similar corrosion-resistant parts.
Clean welded areas before galvanizing to remove slag or other material that would interfere with the
adherence of the zinc.
Galvanize parts of fastener assemblies separately before assembly.

Tapping of nuts or other internally threaded parts to be used with zinc-coated bolts, anchor bars, or studs
must be performed after galvanizing and must comply with thread dimensions and overtapping
allowances in ASTM A 563.
Repair damaged galvanized surfaces as follows:
1. Clean by thoroughly wire brushing damaged areas and removing loose and cracked coating.
2. Paint cleaned areas with 2 applications of organic zinc-rich primer from the Authorized Material List.
Do not use aerosol cans.
75-1.06 PAYMENT
Except for final-pay-item miscellaneous metal materials, miscellaneous metal materials are determined
from scale weighings.
843

SECTION 75

MISCELLANEOUS METAL

A frame and cover pair is 1 unit. A frame and grate pair is 1 unit.
The weight of nonmetallic materials for restrainer units are not included in the weight of miscellaneous
metal for restrainers.
The weight of epoxy and grit for a nonskid surface is not included in the weight of miscellaneous metal
materials.

844

76 WELLS
76-1 GENERAL
Reserved
76-2 WATER WELLS
Reserved
76-3 EXPLORATION HOLES
Reserved
76-4 REHABILITATE EXISTING WATER WELLS
Reserved
76-5 MONITOR WELLS
Reserved
76-677-10 RESERVED

845

77 LOCAL INFRASTRUCTURE
Reserved

7879 RESERVED

847

80 FENCES

80-1 GENERAL

80-1.01 GENERAL

Section 80-1 includes general specifications for constructing fences except Type ESA temporary fences.
80-1.02 CLEARING
Remove earth, trees, brush, and other obstructions that interfere with fence construction.
80-1.03 CONNECTIONS
Connect new fences to existing fences.

Place a corner post with a brace for each direction of strain at each junction with an existing fence.

Fasten the wire in the new and existing fences to each post.

If ordered, at a structure, connect the new fence to the structure such that stock can pass freely through

or under the structure; otherwise, install an end post and connect the fence to it.

80-1.04 FOOTINGS AND DEADMEN


For concrete for metal post and brace footings and for deadmen, use:
1. Commercial quality aggregates and cementitious material
2. At least 470 pounds of cementitious material per cubic yard
Crown each concrete footing to shed water.
80-1.05 POST PLACEMENT
Measure post spacing parallel to the ground slope. Place each post in a vertical position except where the
Engineer orders you to set the post perpendicular to the ground surface.
80-1.06 SURPLUS EXCAVATED MATERIAL
After constructing a fence, uniformly spread the surplus excavated material along the adjacent roadway
where designated by the Engineer.
80-1.07 TEMPORARY FENCES
A temporary fence must comply with the Contract for a permanent fence of the same type except:
1. You may use used materials if the used materials are good, sound, and suitable for the purpose
intended
2. Materials may be commercial quality if the dimensions and sizes of the materials are equal to or
greater than the dimensions and sizes shown on the plans or specified in section 80.
3. Posts must be either metal or wood
4. The Department does not require:
4.1. Galvanizing or painting of steel elements
4.2. Treating wood with a wood preservative
4.3. Concrete footings for metal posts
80-1.0880-1.09 RESERVED
80-1.10 PAYMENT
The fence payment quantity does not include the width of openings.
The fence is measured:
1. Parallel to the ground slope
2. Along the fence

849

SECTION 80

FENCES

80-2 BARBED WIRE AND WIRE MESH FENCES

80-2.01 GENERAL
80-2.01A Summary
Section 80-2 includes specifications for constructing barbed wire and wire mesh fences.

80-2.01B Definitions

alignment angle: Change in a line where the angle of deflection is less than:

1. 5 degrees for a steel post barbed wire or wire mesh fence


2. 15 degrees for a wood post barbed wire or wire mesh fence
corner: Change in a line where the angle of deflection exceeds:
1. 5 degrees for a steel post barbed wire or wire mesh fence
2. 15 degrees for a wood post barbed wire or wire mesh fence
fence, Type BW: Barbed wire fence consisting of 5 lines of barbed wire.

fence, Type WM: Wire mesh fence consisting of wire mesh fabric and 3 lines of barbed wire.

80-2.01C Submittals

Reserved

80-2.01D Quality Control and Assurance


Reserved
80-2.02 MATERIALS
80-2.02A General
Reserved
80-2.02B Metal Posts and Braces
Line posts must comply with ASTM A 702 except packaging of posts is not required. Each post must be
Class B steel. You may omit the anchor plate if the post is set in a concrete footing with a minimum cross
sectional dimension of 6 inches and a depth equal to the full penetration of the post.
Each end, latch, pull, and corner post must have:
1. Minimum resisting section modulus of 0.32 cubic inch in any direction
2. Length of at least 7 feet
3. Weight of at least 3.1 lb/ft
Each brace and brace post must have:
1. Length of at least 7 feet
2. Weight of at least 1.93 lb/ft
80-2.02C Wood Posts and Braces
80-2.02C(1) General
Each wood post and brace must be treated except where untreated wood is specified.

Each wood line post to be driven must be machine pointed at the small end.

Sweep must not exceed 0.08 foot in 6 feet.

80-2.02C(2) Untreated
Each untreated wood post and brace must be:
1. Redwood, cedar, Douglas fir, or Southern yellow pine
2. Straight and free from loose or unsound knots, shakes over 1/3 the post thickness, or other defects
that would make it unfit structurally for the purpose intended
850

SECTION 80

FENCES

Post knots must be sound, tight, well spaced, and not over 2 inches on any face.
Each untreated wood line post and brace may be split material and must have:
1. Length of at least 7 feet
2. Perimeter of at least 16 inches
3. Each cross-section dimension of at least 4 inches
Each untreated wood end, corner, and brace post must be sawed or hewed and have:
1. Length of at least 8 feet
2. Nominal size of at least 6 by 6 inches
80-2.02C(3) Treated
Each treated wood post and brace must be:
1. Douglas fir, Hem-Fir, Southern yellow pine
2. Round or sawed rectangular
3. Free of heart center
Each Douglas fir, Hem-Fir, and Southern yellow pine post and brace must be graded under section 57.
Each sawed post and brace must be of the minimum grade and species shown in the following table:
Nominal size
4 by 4 inch

6 by 6 inch

Grades and Species


Minimum grade
Construction light framing
No. 1 structural light framing
No. 2 structural light framing
Select structural posts and timbers No. 1
Select structural posts and timbers
No. 1 timbers

Species
Douglas fir
Hem-Fir
Southern yellow pine
Douglas fir
Hem-Fir
Southern yellow pine

Each round post and brace must be free from:


1.
2.
3.
4.
5.
6.

D
ecay
Shakes over 1/3 the post diameter
Splits longer than the thickness or diameter of the post
Loose or unsound knots
Multiple crooks
Other defects that would weaken the post or brace or otherwise make it structurally unsuitable for the
purpose intended

Pressure treat each post and brace under section 57 and AWPA U1, Use Category UC4A, Commodity
Specification A or B.
Treat posts after pointing.
Instead of the imprint specified in section 57, the treating plant may hammer stamp either end of a treated
post and brace with the symbol or name of the company performing the treatment.
For each round post and brace:
1. Peel to remove outer bark and inner cambium bark except minimal strips of inner bark may remain if
not over 1/2 inch wide or over 3 inches long
2. Trim knots flush with sides
3. Remove spurs and splinters
4. Cut ends square

851

SECTION 80

FENCES

Each line post and brace must be 7 feet long. Any other post must be 8 feet long. Each length may be at
most 1 inch shorter and 2 inches longer.
The small end of each round line post and brace must have a cross-sectional dimension between 3-1/2
and 5 inches. The small end of any other round post must have a cross-sectional dimension between 5
1/2 and 7 inches.
The taper from end to end of each round post and brace must not exceed 1-1/2 inches.
Each sawed rectangular line post must have a nominal size of at least 4 by 4 inches. Any other sawed
rectangular post must have a nominal size of at least 6 by 6 inches.
80-2.02D Barbed Wire
Barbed wire must:
1. Comply with ASTM A 121
2. Have 2 point barbs
3. Be one of the following:
3.1. 12-1/2 gage, Class 1
3.2. 13-1/2 gage, Class 3
3.3. 15-1/2 gage, Class 3
80-2.02E Wire Mesh
Wire mesh must:
1. Comply with ASTM A 116, Class 1
2. Be 32 inches wide
3. Have 8 horizontal wires with vertical stays spaced 6 inches apart
The top and bottom wires must be 10 gage.
The intermediate wires and vertical stays must be 12-1/2 gage.
80-2.02F Tension Wires, Hardware, and Grounding Materials
Tension wire must be 8-gage galvanized wire.
Galvanized bolts and nuts for attaching braces and straps to metal posts and galvanized devices for
holding barbed wire and wire mesh in position must be commercial quality.
Each staple used to fasten barbed wire and wire mesh fabric to wood posts must be:
1. At least 1-3/4 inches long
2. Manufactured from 9-gage galvanized wire
Wire used to fasten barbed wire and wire mesh to metal posts must be galvanized and at least 11 gage.
Clips and hog rings used for metal posts must be at least 9 gage.
Wire used to tie the lower line of barbed wire to the top wire of wire mesh must be 12-gage galvanized
wire.
Each ground rod must:
1. Be galvanized or copper-coated steel
2. Be 8 feet long
3. Have a diameter of at least 1/2 inch
Conductor must be no. 6 solid copper or equal.
80-2.02G Gateways
Fence materials and end post bracing must comply with the specifications and plans for the fence type in
which the gateway is constructed.
Except for length, end bars must comply with the line post specifications and plans.
852

SECTION 80

FENCES

Vertical stays for gateways must be:


1. Pretwisted
2. 9.5-gage galvanized wire
3. Evenly spaced between end bars at 66-inch maximum intervals
Wire loops must be 6-gage galvanized wire.
The chain for the latching device must be commercial quality short link steel coil chain. The latching bar
for the latching device must be commercial quality steel pipe. Bolts and nuts for attaching the chain to the
end posts and latching bar must be commercial quality and galvanized.
80-2.03 CONSTRUCTION
Excavate high points that interfere with placing fence fabric to the clearance shown.
Brace adjacent line posts at alignment angles with diagonal tension wires unless impractical. If
impractical, brace as specified for bracing corner posts.
Set each metal diagonal brace and metal corner, end, latch, gate, and pull post in a concrete footing.
You may drive metal line posts.
Set solid each wood line post one of the following ways:
1. Drive it into place.
2. Install it firmly in a drilled hole of the same dimension as the post.
3. Install it in a drilled or dug hole larger than the dimension of the post, backfill around the post, and
compact the backfill.
Install each wood post that is not a line post in a drilled or dug hole larger than the dimension of the post,
backfill around the post, and compact the backfill.
Install each round post installed in a drilled hole butt end down.
Securely fasten tension wires to wood posts. Make an extra loop around each post at each attachment
point and staple the wire to the post.
Connect each wood brace to its adjacent post with a 3/8- by 4-inch steel dowel. Twist the tension wires
until the installation is rigid.
Stretch barbed wire and wire mesh fabric and fasten to each wood post.
Attach barbed wire and wire mesh fabric to the private property side of posts.
On wire mesh fence, tie the lower line of barbed wire to the top wire of the wire mesh with wire at 4-foot
intervals between posts. Attach the wire mesh fabric to each post by fastening the top and bottom wires
and alternate longitudinal wires with at least 5 fasteners.
At each grade depression, snub or guy the fencing by means of a double 8-gage or a double 9-gage
galvanized wire connected to:
1. Each horizontal line of barbed wire or to the top and bottom of wire mesh fabric
2. A deadman weighing about 100 lb and buried in the ground at least 2 feet
Stretch and fasten the fencing before snubbing or guying.
Fence fabric and fence wires of fences using wood line posts must be grounded. Ground by substituting a
metal fence post for a wood post at intervals at most 500 feet with at least 1 metal post in any length of
fence over 200 feet between openings. With wire, tightly fasten each line of barbed wire and alternate
longitudinal wires of the fence to the metal post.
Where an electric transmission, distribution, or secondary line crosses a wood-post fence, ground the
fence with a ground rod installed directly below the crossing point. Drive the rod vertically until the top is 6

853

SECTION 80

FENCES

inches below the ground surface. Connect the ground rod to the fence with a conductor. The connections
must be either brazed or fastened with authorized noncorrosive clamps.
Where a powerline runs parallel or nearly parallel to and within 100 feet of the wood post fence, ground
the fence with a ground rod at each end post or at intervals of at most 1,500 feet.
If you cannot reach the specified vertical ground rod penetration, install an Engineer-authorized
equivalent grounding system.
After you attach fencing to untreated wood posts, cut off any long post that makes the fence look
nonuniform.
80-2.04 PAYMENT
Not Used
80-3 CHAIN LINK FENCES
80-3.01 GENERAL
80-3.01A Summary
Section 80-3 includes specifications for constructing chain link fences.
80-3.01B Definitions

corner: Change in a line where the angle of deflection exceeds 30 degrees.

diamond count: Number of mesh openings in each height of chain link fence.

fence, Type CL: Chain link fence. "Type CL" is followed by a number representing the width in feet of the
fence fabric. The number is shown in the bid item description.
fence, Type CL, slatted: Chain link fence with wood or plastic slats inserted vertically in the chain link
fabric.
resisting moment: Product of a member's section modulus about the designated axis and its yield
strength.
80-3.01C Submittals
If you use the protective coating system specified in section 80-3.02B, submit a certificate of compliance
for the system.
80-3.01D Quality Control and Assurance
Under California Test 674, test:
1. 1 post from each lot of 1,500 or fewer chain link fence posts
2. 1 brace from each lot of 500 or fewer chain link fence braces
If the post or brace fails, test 2 additional posts or braces from the same lot. If 1 of these posts or braces
fails, the Department rejects the lot.
80-3.02 MATERIALS
80-3.02A General
Galvanize or coat ferrous materials.

Do not use materials imperfectly galvanized or coated or with serious abrasions.

For barbed wire on a chain link fence, comply with section 80-2.02D.

80-3.02B Posts and Braces


The base metal for posts and braces must be commercial quality weldable steel.
Galvanize posts and braces under section 75-1.05 except, instead of galvanizing, tubular posts and
braces may have a protective coating system complying with the following:

854

SECTION 80

FENCES

1. Exterior surfaces of tubular posts and braces must have a combination coating consisting of hot-dip
galvanized primer followed by a chromate conversion coating followed by a finish coat of clear, cross
linked organic coating. For this combination coating:
1.1. Thickness of the zinc coating must be at least 0.9 mil as determined from the average results
of at least 2 samples and at least 0.8 mil on an individual sample.
1.2. Chromate conversion coating must be at least 15 g/sq in.
1.3. Total thickness of the combination coating must be at least 1.7 mils.
1.4. Exterior clear coated surface of the pipe must have demonstrated the ability to resist 1000
hours of exposure to salt fog with a maximum of 5 percent red rust when tested under ASTM B
117.
1.5. Clear finish coat must not have any film cracking after 500 hours of exposure in an artificial
weathering device under one of the following:
1.5.1. ASTM G 152, cycles 1, or 3 Carbon Arc artificial weathering device.
1.5.2. ASTM G 155, cycles 1, or 2 Xenon Arc artificial weathering device.
1.6. Clear finish coat must not have blistering or cracking after 500 hours of exposure to 100
percent relative humidity under ASTM D 2247.
2. Interior surfaces must have a zinc coating or a cross-linked organic coating containing a corrosion
inhibitor. For these coatings:
2.1. Coating thickness must be at least 0.3 mil.
2.2. Interior coated surface must have demonstrated the ability to resist 300 hours of exposure to
salt fog with a maximum of 5 percent red rust when tested under ASTM B 117.
Obtain authorization of the protective coating system before you use it. Any change to the protective
coating system is a new system that requires authorization.
Line, end, latch, and corner posts must have the following minimum resisting moments:
Minimum Resisting Moments of Line, End, Latch, and Corner Posts
Minimum resisting moments
(ft-lb)
Line posts
End, latch, and corner posts
Fence height Perpendicular to fence line Parallel to fence line
Any direction
6
800
400
1,400
> 6 feet
1,400
700
2,400
Each brace must have a minimum resisting moment of 400 ft-lb about the center of the major axis and
300 ft-lb about the minor axis.
Each end, latch, and corner post must have a midpoint deflection about either axis of at most 0.25 inch.
Each post and brace must have a permanent set about either axis at most 0.01 inch when tested under
California Test 674.
Before galvanizing and manufacturing, the nominal thickness of the material of each:
1. Post must be at least 0.105 inch
2. Brace must be at least 0.075 inch
A line post having a resisting moment about the weaker axis:
1. Less than 75 percent of the required minimum resisting moment perpendicular to the fence line must
not be used at an angle point in the fence line where the deflection angle exceeds 10 degrees.
2. Not less than 75 percent of the required minimum resisting moment perpendicular to the fence line
may be used at an angle point in the fence line up to a deflection angle of 30 degrees.
Each post length must be at least the depth of the concrete footing plus the height of the fabric less 4
inches. The length does not include any top fixture or other top tension wire support integral with the post.
Each post must have provisions to securely hold the top tension wire in position and allow for post
removal and replacement without damaging the wire. Fit each tubular post with a rainproof top.

855

SECTION 80

FENCES

Post tops, extension arms, stretcher bars, and other fittings and hardware must be:
1. Steel or malleable or wrought iron
2. Galvanized after fabrication under section 75-1.05
80-3.02C Fabric
Chain link fabric must comply with AASHTO M 181 for Type I fabric with a Class C coating unless vinyl
clad fabric is described in the fence bid item, in which case the fabric must comply with AASHTO M181
for Type IV fabric with a medium or dark green Class A coating.
The wire for the fabric must be:
1. 11 gage for fence 84 inches or less in height
2. 9 gage for fence over 84 inches in height and for slatted chain link fence
Chain link fabric for nonslatted fence must have the diamond count corresponding to the fabric height
shown in the following table:
Fabric height (inches)
Diamond count

36
10-1/2

Diamond Counts
42
48
60
12-1/2 13-1/2 17-1/2

72
20-1/2

84
24-1/2

96
27-1/2

Chain link fabric for slatted fence must have 3-1/4-inch-vertical and 5-1/4-inch-horizontal mesh.
Knuckle finish fabric on the top and bottom edges.
80-3.02D Tension Wires, Hog Rings, Turnbuckles, Truss Tighteners, Truss Rods, and Stretcher
Bars and Bar Bands.
Tension wire must be commercial quality 7-gage coil spring steel.

Tie wires and hog rings must be at least 9-gage steel.

Post clips must be at least 6-gage steel.

Galvanize tension and tie wires, hog rings, and post clips under ASTM A 116, coating Class 3.

Turnbuckles and truss tighteners must be:

1. Commercial quality steel, malleable iron, or wrought iron


2. Galvanized under section 75-1.05
3. Equal in tensile strength to the truss rod
Truss tighteners must have a strap thickness of at least 1/4 inch.

Each truss rod must be steel and have a diameter of at least 3/8 inch.

Each stretcher bar must be at least 1/4 by 3/4 inch.

Each stretcher bar band must be at least 1/8 by 3/4 inch.

80-3.02E Slats
Slats must be wood or plastic.

Wood slats must be one of the following:

1. Clear redwood
2. Medium-weight wood produced from the species Shorea (Meranti)
Each wood slat must have:
1. Thickness of at least 1/4 inch
2. Width about 2-5/8 inch
3. Length enough to fill the vertical openings of the fabric
856

SECTION 80

FENCES

Each plastic slat must:


1. Be a high density polyethylene with ultraviolet inhibitors
2. Have a flat tubular cross section with:
2.1. Wall thickness of about 0.03 inch
2.2. Depth of about 0.325 inch
2.3. Width of about 2.38 inches
2.4. Length equal to the fence height
The plastic slat material properties must have at least the values shown in the following table:
Plastic Slat Material Property Requirements
Property
Test method
Value
Melt index
ASTM D 1238
0.24
Density
ASTM D 1505
0.951
Low temperature brittleness ASTM D 746
-76 F
Tensile strength
ASTM D 638
3,700 psi
80-3.03 CONSTRUCTION
Brace each end, latch, and corner post to the nearest line post with either of the following:
1. Diagonal brace used as a compression member.
2. Horizontal brace used as a compression member and truss rods used as tension members.
Brace each gate post to the nearest line post with a horizontal brace used as a compression member and
truss rods used as tension members.
Equip each steel truss rod with a turnbuckle or truss tightener.
Brace line posts horizontally and truss in both directions at intervals of at most 1,000 feet unless the fabric
is installed by stretching with equipment.
Fasten chain link fabric on the side of the posts designated by the Engineer.
Stretch and securely fasten the fabric to the posts.
Fasten the top and bottom edges of the fabric to the tension wires. Stretch the tension wires tight.
Install the bottom tension wire on a straight grade between posts by excavating high points of the ground.
Do not fill in low points.
Fasten the fabric to end, latch, corner, and gate posts with stretcher bars and stretcher bar bands at 1
foot intervals except fabric may be fastened to end and corner posts by threading through loops formed
on the posts.
Fasten the fabric to line posts with tie wires or post clips and to tension wires with tie wires or hog rings.
Space the fasteners at about 14 inches on line posts and about 18 inches on tension wires. Give wire ties
at least 1 complete turn. Close each hog ring with ends overlapping. Wrap tension wires around terminal
posts. The top of the fabric to the top tension wire must be at most 2 inches.
If barbed wire supporting arms are shown, extend each upwards from the top of the fence at an angle of
about 45 degrees. Fit it with clips or other means for attaching 3 lines of barbed wire. Attach the top
outside wire to the supporting arm at a point about 12 inches above the top of the chain link fabric and 12
inches out from the fence line. Attach the other wires to the arm spaced evenly between the top of the
fence and the top outside wire.
For a chain link fence with slats, install slats vertically in the mesh openings such that the slats fit snugly.
Fasten them in a way that prevents easy removal or displacement.
80-3.04 PAYMENT
Not Used
857

SECTION 80

FENCES

80-480-9 RESERVED
80-10 GATES

80-10.01 GENERAL
80-10.01A Summary
Section 80-10 includes specifications for constructing gates in fences.
Constructing a gate in an existing fence includes removal of the fence.
80-10.01B Definitions
gate unit for a barbed wire or wire mesh fence: 1 gate with fittings, hardware, and gate posts with
braces.
gate unit for a chain link fence: 1 gate with fittings, hardware, and gate and latch posts with braces.
80-10.01C Submittals
Reserved
80-10.01D Quality Control and Assurance
Reserved
80-10.02 MATERIALS
Each drive gate for a chain link fence must be the length shown in the bid item description.

Each drive gate for a barbed wire or wire mesh fence must be at least 48 inches and at most 58 inches

high.

Each walk gate must be 4 feet wide.

A gate greater than 8 feet in length must have vertical stays such that no panel exceeds 8 feet in length.

A gate frame must be made with pipe at least 1-1/2 in diameter. Interior vertical stays must be made with

pipe at least 1 inch in diameter. Pipe must comply with the specifications for posts and braces in section
80-3.02B.
Each gate frame panel must be cross trussed with adjustable truss rods at least 3/8 inch in diameter.
Fasten and reinforce each corner of a gate frame with a malleable iron or pressed steel fitting or by
welding.
Each pressed steel fitting must:
1. Have a nominal thickness before galvanizing of at least 0.135 inch
2. Be fastened to develop the strength of connected members
Welds must be smooth and develop the strength of the connected member.

Galvanize fittings, latches, rods, and other gate hardware under section 75-1.05.

Fabric for gates in a barbed wire or wire mesh fence must comply with the specifications for nonslatted

chain link fence in section 80-3.

Fabric for gates in chain link fences must comply with the specifications for the fabric for the fence in

which the gate is installed.

Attach chain link fence fabric to the gate frame using stretcher bars and tie wires as specified for fence

construction. Space tension connectors at 1-foot intervals.

For a chain link walk gate installed in an existing fence, gate mounting hardware must not contain open
end slots for the fastening bolts.

Each gate must have a combination steel or malleable iron catch and locking attachment that does not

rotate around the latch post.

858

SECTION 80

FENCES

80-10.03 CONSTRUCTION
Hang each gate with at least 2 steel or malleable iron hinges at least 3 inches in width such that the gate
is securely clamped to the gate post and permits the gate to be swung back against the fence. The
bottom hinge must have a socket to take the ball end of the gate frame.
Construct stops to hold gates open and a center rest with catch.
For a walk gate constructed in an existing fence, remove a line post and install the gate such that the gate
is centered on the hole of the removed post. When not working on the walk gate, close the opening made
in the existing fence with existing fence fabric or 6-foot chain link fabric.
80-10.04 PAYMENT
The gate payment quantity is the quantity of gate units.
80-1180-15 RESERVED

859

81 MONUMENTS

81-1.01 GENERAL
Section 81 includes specifications for constructing cast-in-place concrete survey monuments.
81-1.02 MATERIALS
Concrete must be minor concrete with 1-inch maximum aggregate.

The Department furnishes survey marker disks.

For Type B and Type D survey monuments, the frame and cover must be fabricated from cast steel or

gray cast iron. The frame, cover, and hardware must comply with the specifications in section 55-1.02.

Covers must fit into frames without rocking.

Granular material for Type B and Type D survey monuments must be gravel, crushed gravel, crushed

rock, or any combination of these. Granular material must not exceed 1-1/2 inches in the greatest
dimension.
81-1.03 CONSTRUCTION
For Type D survey monuments, you may use either Alternative 1 or Alternative 2 as shown.
Locate the survey monument so that the point referenced falls within 1/2 inch from the center of the disk

when the disk is placed in the center of the monument.

Survey monuments must be cast-in-place in neat holes without the use of forms, unless forms are shown.

Consolidate the concrete and cure it using the water method under section 90-1.03B(2).

Place the survey marker disk in the survey monument before the concrete reaches its initial set. Press

firmly to embed the disk in the concrete.

Fill the resulting space around the monument with earth free from rock or with base and surfacing

material. Earth material must be watered and tamped into place.

Place surplus excavated material uniformly along the adjacent roadway as ordered.

81-1.04 PAYMENT
Not Used

861

DIVISION IX TRAFFIC CONTROL FACILITIES

82 MARKERS AND DELINEATORS

82-1.01 GENERAL
82-1.01A Summary
Section 82-1 includes specifications for fabricating and installing markers and delineators, including
highway post markers.
Except for highway post markers, markers and delineators must comply with the California MUTCD.
82-1.01B Submittals
Submit a certificate of compliance for:
1. Metal target plates
2. E
namel coating
3. Retroreflective sheeting
82-1.01C Quality Control and Assurance
Finished metal target plates must be free of dents and defects. The maximum edge-to-edge surface
deviation from a horizontal plane must not exceed 1/8 inch.
The enamel coating on metal target plates must be the product of a commercial manufacturer. The
coating must be smooth, substantially free of flow lines, paint washout, streaks, blisters, and other defects
that might impair serviceability or detract from the general appearance.
When tested under California Test 671, the enamel coating on metal target plates must have satisfactory
resistance to weathering, humidity, salt spray, and chemicals.
The enamel coating must have:
1.
2.
3.
4.

Satisfactory adherence and impact resistance


Pencil lead hardness of HB minimum
60 degree specular gloss of 80 percent minimum
Excitation purity of 3 percent maximum as received and after 1,000 hours in an artificial weathering
device under ASTM G155, Table X3.1, Cycle 1, and a daylight luminous directional reflectance (Y
value) of 70 minimum

The Department may sample metal target plates for testing as shown in the following table:
Metal Target Plate Sampling
Lot size
Sample size
Less than 5,000
5 target plates
10 target plates
5,00010,000a
10,000 sq ft or lessb Five 12 by 24 inch specimens
Flat sheet stock
Two 12 by 12 inch specimens or one 12 by 24
Coil stock
5,000 lb or lessc
inch specimen
a
Lot size must not exceed 10,000 target plates.
b
Lot size must not exceed 10,000 sq ft. Flat sheet stock must be identifiable with parent coil
stock.
c
Coil weight must not exceed 5,000 lb.
Production stage
Finished target plates

If any sample does not comply with section 82, the Department rejects the entire lot. If the Department
chooses to resample, the sample quantity may be twice the number shown in the table titled "Metal
Target Plate Sampling."
82-1.02 MATERIALS
82-1.02A General
Markers and delineators must be on the Authorized Material List for signing and delineation materials.
863

SECTION 82

MARKERS AND DELINEATORS

82-1.02B Wood Posts


Wood posts must comply with section 56-4.02C.
82-1.02C Metal Posts
The steel for metal posts must comply with ASTM A36/A 36M.
Metal posts must be galvanized under section 75-1.05.
82-1.02D Flexible Posts
Flexible posts must be white, except where shown as yellow.
Flexible posts must be free of burns, discoloration, contamination, and other objectionable marks or
defects that affect appearance or serviceability.
82-1.02E Target Plates
Target plates for Type K-1 (CA) and Type K-2 (CA) object markers must be the same color and material
as the flexible post.
Target plates for highway post markers and Type L-1 (CA) and Type L-2 (CA) object markers installed on
metal posts must be manufactured from aluminum sheets or zinc-coated steel sheets.
Galvanize steel sheets under section 75-1.05. The zinc-coated steel sheets must comply with ASTM
A653/A 653M, Commercial Steel (CS Types A, B and C).
The nominal thickness of a zinc-coated steel sheet must be at least 0.038 inch.
Prepare zinc-coated surfaces to produce optimum adherence of the enamel coating without damaging or
removing the zinc coating. Any evidence of damage to or removal of the zinc coating is cause for
rejection of the entire lot.
Aluminum target plates must be aluminum alloy 3003-H14. You may use other alloys having equivalent
properties if authorized.
The nominal thickness of an aluminum sheet must be at least 0.050 inch.
Prepare the aluminum sheets for the enamel coating by a suitable cleaning method to remove
contaminants and by the uniform application of an acid-chromate-fluoride, acid-chromate-fluoride
phosphate, or equivalent chemical anti-corrosion conversion coating.
Cut the target plates to size and shape and punch mounting bolt holes as shown. The surfaces and
edges of the target plates must be free from fabrication defects.
Coat the pretreated metal target plates with an opaque white coating on both sides with a 1-coat or 2-coat
system. When tested under California Test 671, the dry film for the:
1. 1-coat system must be uniform and have an average thickness of at least 0.75 mil with no individual
measurement less than 0.65 mil
2. 2-coat system must consist of 0.10 to 0.20-mil thick primer and have an average thickness of at least
0.75 mil, including primer and top coat with no individual measurement less than 0.65 mil
If using a 1-coat painting system, fabricate the zinc-coated steel target plates, including shearing, cutting,
and punching, before starting the enameling process.
Apply the enamel coating by spray, dip, roller, or continuous roller coating. Use other methods if
authorized.
82-1.02F Reserved
82-1.02G Reflectors
Reflectors for markers and delineators must consist of Type III or higher grade retroreflective sheeting on
the Authorized Material List for signing and delineation materials.

864

SECTION 82

MARKERS AND DELINEATORS

82-1.02H Hardware
Attach target plates with either (1) 1/4-inch galvanized steel or aluminum nuts and bolts or (2) 3/16-inch
blind aluminum rivets and washers.
Attach marker panels to posts with 5/16-inch galvanized steel bolts, nuts, and washers.
82-1.02I Highway Post Markers
Letters and numerals on highway post markers must be made with opaque black paint or film. Paint and
film must have equivalent outdoor weatherability characteristics as the retroreflective sheeting specified in
ASTM D4956. Nonreflective opaque black film must be vinyl or acrylic material.
Use stencils to apply painted letters and numerals on highway post markers.
Film for letters and numerals must have pressure sensitive adhesive and must be computer cut.
82-1.03 CONSTRUCTION
Drive posts in place where soil conditions permit if the method of driving does not damage the posts. Drill
pilot holes if ground conditions are such that the posts cannot be driven without damaging the posts.
Install target plates and marker panels after the posts have been set in place.
After setting the posts in position, fill any space around them with rock-free earth. During placement,
thoroughly tamp and water the fill material in a way that holds the post securely in position.
After installing the posts, place surplus excavated material uniformly along the adjacent roadway unless
otherwise specified in section 14-11.
Before Contract acceptance, apply a spot application of paint to all exposed areas where the paint has
been damaged and clean all exposed areas that have become soiled.
82-1.04 PAYMENT
A delineator post with 2 target plates is counted as a single delineator.
A highway post marker is paid for as a milepost marker.

865

83 RAILINGS AND BARRIERS

83-1 RAILINGS

83-1.01 GENERAL
Section 83-1 includes specifications for constructing railing.
83-1.02 MATERIALS AND CONSTRUCTION
83-1.02A General
Materials and construction for the various types of railings must comply with section 83-1.02.
At locations where traffic is adjacent to metal beam guard railing work, all materials required to complete
the guard railing work at any 1 location must be available before work starts at that location.
At locations exposed to traffic, schedule activities so that at the end of each day no post holes are open
and no railing posts are installed without the blocks and rail elements assembled and mounted.
Welding must comply with AWS D1.1. Welds on exposed surfaces must be ground flush with the adjacent
surfaces.
Galvanize completed steel parts and hardware for railings under section 75-1.05.
After galvanizing, railing elements must (1) be free of fins, abrasions, rough or sharp edges, and other
surface defects and (2) not be kinked, twisted, or bent. If straightening is necessary, the method used
must be authorized. Railing elements with kinks, twists, or bends may be rejected.
Clean and regalvanize (1) abraded or damaged galvanized surfaces of steel railing and posts and (2)
ends of steel railing cut after galvanizing, except if allowed by the Engineer, you may make repairs to the
surfaces under section 75-1.05.
Mortar must comply with the specifications for mortar in section 51-1 and consist of 1 part by volume of
cement and 3 parts by volume of clean sand.
Cure mortar by either the water method or the curing compound method using curing compound no. 6.
Excavation and backfill must comply with section 19.
Steel bridge railing, concrete railing, and tubular metal railing must present a smooth, uniform appearance
in its final position, conforming closely to the horizontal and vertical lines shown or ordered.
After constructing the railing, dispose of surplus excavated material uniformly along the adjacent
roadway, except as specified in section 14-11.
83-1.02B Metal Beam Guard Railing
Rail elements, backup plates, terminal sections, end and return caps, bolts, nuts, and other fittings for
metal beam guard railing must comply with AASHTO M 180, except as modified in section 83-1.02B. The
rail elements, backup plates, terminal sections, and end and return caps must comply with AASHTO M
180 for Class A, Type I W-beam guard railing, except within 0.5 miles of the coast the components must
comply with AASHTO M 180 for Class A, Type II W-beam guard railing. The edges and center of the rail
elements must contact each post block. Rail element joints must be lapped not less than 12-1/2 inches
and bolted. The rail metal must withstand a cold bend, without cracking, of 180 degrees around a mandrel
of a diameter equal to 2.5 times the thickness of the plate.
Workmanship must be equivalent to good commercial practice and all edges, bolt holes, and surfaces
must be free of torn metal, burrs, sharp edges, and protrusions.
Submit 2 certified copies of mill test reports of each heat from which the rail elements are formed.
Bolts must have shoulders of a shape that will prevent the bolts from turning. Holes in the rail elements
must be of a similar shape to the bolt shoulder.
Splice rail elements at intervals not to exceed 12.5 feet and make splices at posts, unless otherwise
shown.

867

SECTION 83

RAILINGS AND BARRIERS

Rail elements at joints must have full bearing. If the radius of curvature is 150 feet or less, the rail
elements must be shaped in the shop. Stencil the radius of curvature on the back of each rail element in
numerals of 2-1/2-inch height.
Construct metal beam guard railing using:
1. Wood or steel posts
2. Wood blocks for line posts
3. 1 type of post and block for any 1 continuous length of guard railing
Fabricate steel posts from steel that complies with ASTM A 36/A 36M.
Submit 2 certified copies of mill test reports of each heat of steel from which the steel posts are formed or
fabricated.
Plastic blocks must be listed on the Authorized Material List.
The grades and species of wood posts and blocks must be no. 1 timbers, also known as no. 1 structural,
Douglas fir or no. 1 timbers Southern yellow pine. Grade wood posts and blocks under section 57
2.01B(2) except allowances for shrinkage after mill cutting must not exceed 5 percent of the American
Softwood Lumber Standard, PS 20, minimum sizes when installed.
Wood posts and blocks must be rough or S4S. The size tolerance of rough sawn blocks in the direction of
the bolt holes must not exceed 1/4 inch.
After fabricating, pressure treat wood posts and blocks under section 57-2.01 and AWPA U1, Use
Category UC4A, Commodity Specification A.
If copper naphthenate, ammoniacal copper arsenate, chromated copper arsenate, ammoniacal copper
zinc arsenate, ammoniacal copper quat, or copper azole is used to treat the wood posts and blocks, fill
bolt holes with a grease recommended by the manufacturer for corrosion protection. The grease must not
melt or run at a temperature of 149 degrees F. Fill the bolt holes with the grease before the bolts are
inserted.
Breakaway wood guard rail terminal posts may be field bored to provide the 2-3/8-inch-diameter hole
shown.
Where field cutting or boring is performed after treatment, thoroughly swab, spray, or brush cuts and
holes with 2 applications of the same type of preservative as initially used or treat with copper
naphthenate under AWPA Standard M4. Preservative application in the field must comply with the 7th
paragraph in section 57-2.01B(3).
Drive wood posts, with or without pilot holes, or place the posts in drilled holes. Backfill any space around
wood posts with selected earth, free of rock, placed in layers approximately 4 inches thick. Moisten and
thoroughly compact each layer.
Drive steel posts. If ground conditions are such that pilot holes are necessary to prevent damage to posts
during driving, fill any space around the steel posts with dry sand or pea gravel after driving.
Drive steel foundation tubes with soil plates attached, with or without pilot holes, or place the tubes in
drilled holes. Backfill any space around the tubes with selected earth, free of rock, placed in layers
approximately 4 inches thick. Moisten and thoroughly compact each layer. Insert wood terminal posts into
the tubes by hand. Before the posts are inserted, coat the inside surfaces of the tubes with a grease that
will not melt or run at a temperature of 149 degrees F or less. The edges of the posts may be slightly
rounded to facilitate insertion of the posts into the tubes.
Place posts at equal intervals. If authorized, you may space end posts closer to the adjacent posts.
The bolted connection of the rail element to the post must withstand a 5,000-pound pull at right angles to
the line of the railing.
Fabricate the metal work in the shop. No punching, cutting, or welding is allowed in the field. Lap rail
elements such that the exposed ends do not face approaching traffic.
868

SECTION 83

RAILINGS AND BARRIERS

Install terminal sections under the manufacturer's instruction.


Components built from structural steel plates welded together may be substituted for the rolled steel
components if:
1. Depth, width, and average thicknesses are at least equal to those of the rolled section
2. For the welded section, the steel plates comply with ASTM A 36/A 36M and the flanges are welded to
the web with continuous fillet welds on each side of the web
Metal beam guard railing must be connected to bridge railings, barriers, retaining walls, abutments, and
other flat concrete surfaces as follows:
1. Metal rail posts, box spacers, and plate washers must be fabricated of steel under ASTM A 36/A
36M.
2. Metal box spacer must be fabricated from separate plates and welded or press-formed and welded.
3. HS bolts must comply with ASTM A 325, A 325M, or A 449 or the bolts may be fabricated from steel
rod under ASTM A 449. The bolts or rods must comply with the mechanical requirements specified in
ASTM A 325 or A 325M after galvanizing. Nuts and washers must comply with ASTM A 325 or A
325M.
4. For the connection of guard railing to new bridge railing or barriers, anchor bolt holes must be formed
in the concrete parapet using metal sleeves.
5. For the connection of guard railing to existing bridge railing or barriers, anchor bolt holes must be
drilled in the concrete parapet. Areas around the holes that are spalled or otherwise damaged during
drilling must be repaired with a mixture of commercial quality epoxy adhesive and sand. The
proportions of epoxy adhesive to sand must be from 1:4 to 1:6. The cementing agent must consist of
a 2-component epoxy adhesive manufactured especially for the making of epoxy-sand mortar. The 2
components and the epoxy-sand mixture must be mixed under the manufacturer's instructions.
6. Footings for railing posts must be constructed of minor concrete. Reinforcement must comply with
section 52.
7. Concrete must be placed against undisturbed material of the excavated holes for footings.
End anchor assemblies and rail tensioning assemblies for metal beam guard railing must comply with the
following:
1. Type SFT end anchor assembly must consist of an anchor cable, an anchor plate, a wood post, a
steel foundation tube, a steel soil plate, and hardware.
2. Type CA end anchor assembly must consist of an anchor cable, an anchor plate, a single anchor rod
or double anchor rods, hardware, and 1 concrete anchor.
3. Rail tensioning assembly must consist of an anchor cable, an anchor plate, and hardware.
4. Anchor plate, metal plates, steel foundation tubes, and steel soil plate must be fabricated of steel
under ASTM A 36/A 36M.
5. Anchor rods must be fabricated of steel under ASTM A 36/A 36M, A 441, or A 572, or ASTM A 576,
Grade 1018, 1019, 1021, or 1026. The eyes must be hot forged or formed with full penetration welds.
After fabricating and before galvanizing, anchor rods with eyes that have been formed with any part of
the eye below 1,600 degrees F during the forming operation or with eyes that have been closed by
welding must be thermally stress relieved. The completed anchor rod after galvanizing must develop
a strength of 50,000 lb.
6. Instead of built-up fabrication, anchor plates may be press-formed from steel plate, with or without
welded seams.
7. Bolts and nuts must comply with ASTM A 307, unless otherwise described.
8. Anchor cable must be 3/4-inch preformed, 6 x 19, wire strand core or independent wire rope core,
galvanized under Federal Specification RR-W-410, right regular lay, manufactured of improved plow
steel with a minimum breaking strength of 23 tons. Submit 2 certified copies of mill test reports of
each manufactured length of cable used. The overall length of each cable anchor assembly must be
a minimum of 6.5 feet.
9. Cable clips and a cable thimble must be used to attach cable to the anchor rod where shown.
Thimbles must be commercial quality, galvanized steel. Cable clips must be commercial quality, drop
forged, galvanized steel.
10. Swaged fitting must be machined from hot-rolled bars of steel under AISI C 1035 and annealed
suitable for cold swaging. The swaged fitting must be galvanized before swaging. A lock pin hole to
869

SECTION 83

11.
12.
13.
14.
15.
16.

17.
18.
19.
20.
21.

RAILINGS AND BARRIERS

accommodate a 1/4-inch plated spring steel pin must be drilled through the head of the swaged fitting
to keep the stud in the proper position. The manufacturer's identifying mark must be stamped on the
body of the swaged fitting.
1-inch nominal diameter stud must comply with ASTM A 449 after galvanizing. Before galvanizing, a
3/8-inch slot for the locking pin must be milled in the stud end.
Swaged fittings, stud, and nut assembly must develop the specified breaking strength of the cable.
Cable assemblies must be shipped as a complete unit, including stud and nut.
Clevises must be drop-forged galvanized steel and must develop the specified breaking strength of
the cable.
Submit 1 sample of cable properly fitted with swaged fitting and right hand thread stud at both ends,
as specified above, including a clevis if shown, 39 inches in total length for testing.
Portion of the anchor rod to be buried in earth must be coated with a minimum 20-mil thickness of
one of the following:
16.1. Coal tar enamel under AWWA C 203.
16.2. Coal tar epoxy under either of the following:
16.2.1. SSPC-Paint 16, Coal Tar Epoxy-Polyamide Black Paint
16.2.2. U.S. Army Corps of Engineers Specifications, Formula C-200a, Coal Tar-Epoxy
(Black) Paint.
Metal components of the anchor assembly must be fabricated under good shop practice and hot-dip
galvanized under section 75-1.05.
Anchor cables must be tightened after the concrete anchor has cured for at least 5 days.
Concrete used to construct anchors for end anchor assemblies must be minor concrete.
Concrete must be placed against undisturbed material of the excavated holes for end anchors. the
top 12 inches of the holes must be formed if ordered.
Reinforcing steel in concrete anchors for end anchor assemblies must comply with section 52.

Place anchor bolts to be set with epoxy in holes filled with the 2-component epoxy mixture specified in
section 95-2.01.
Railing parts must be interchangeable with similar parts, regardless of source.
83-1.02B(1) Minor Concrete Vegetation Control
Reserved
83-1.02B(2) Type WB Transition Railing
Type WB transition railing is used if metal beam guard railing is used to connect to concrete barrier
railing.
Ten-gage metal elements must comply with AASHTO M 180 for Class B, Type I thrie beam element,
except within 0.5 miles of the coast the metal elements must comply with AASHTO M 180 for Class B,
Type II thrie beam element. Other metal elements and end caps must comply with AASHTO M 180 for
Class A, Type I thrie beam element, except within 0.5 miles of the coast the metal elements and end caps
must comply with AASHTO M 180 for Class A, Type II thrie beam element.
83-1.02B(3) Temporary Metal Beam Guard Railing
Temporary metal beam guard railing must comply with the Contract for a permanent metal beam guard
railing of the same type except:
1. You may use used materials if the used materials are good, sound, and suitable for the purpose
intended
2. Steel posts, plates, foundation tubes, soil plates, hardware, threaded rods, and anchor bolts, except
HS bolts, may be commercial quality
3. The Department does not require:
3.1. Galvanizing of steel elements
3.2. Treating wood with a wood preservative
Removed temporary metal beam guard railing materials not damaged may be reused in the permanent
work provided the materials comply with the specifications for the permanent work and the materials are
new when used for the temporary metal beam guard railing.

870

SECTION 83

RAILINGS AND BARRIERS

83-1.02C Terminal System


83-1.02C(1) General
Reserved
83-1.02C(2)83-1.02C(4) Reserved
83-1.02D Steel Bridge Railing
83-1.02D(1) General
Steel bridge railing consists of steel railing fabricated from structural shapes, pipe, formed sections,
tubing, plates, and bars.
Structural shapes, tubing, plates, bars, bolts, nuts, and washers must comply with section 55-1.02. Other
fittings must be commercial quality.
Pipe sections must be standard steel pipe.
Formed sections must be:
1. Formed from mild steel and true to dimensions
2. Free from kinks, twists, and bends
3. Uniform in appearance
Closed sections must be made of 1-piece tubing or of 2 bent plates welded together at the longitudinal
joints.
Seams in the posts must be in the faces of the posts normal to the plane of the railing.
Mechanical expansion anchors for attaching the railing to the supporting concrete members must comply
with the specifications for concrete anchorage devices in section 75-1.03A.
Railings must conform to the curvature by means of a series of short chords, from center to center of rail
posts, except that railing described as conforming to the curvature must be shop bent to fit the curvature.
Joints must be matchmarked.
Railings must be carefully erected true to line and grade. Posts and balusters must be vertical within a
tolerance not to exceed 0.02 foot in 10 feet. Adjacent railing panels must align with each other within 1/16
inch.
Posts must be mortared in sockets, set on mortar pads, or set on steel or concrete supporting members
as shown.
83-1.02D(2) California Bridge Railing
Reserved
83-1.02E Cable Railing
Cable railing must consist of cables supported by pipe posts set in either concrete footings or post
pockets in the tops of retaining walls or other structures.
Pipe for posts and braces must be standard steel pipe or pipe that complies with section 80-2.02.
Truss rods, post tops, cable clamps, eye bolts, thimbles, and other required fittings must be commercial
quality steel, malleable iron, or wrought iron. Post tops must be watertight. The eye of the eye bolts must
be either drop forged or formed with a complete penetration weld. The eye must develop 100 percent of
the bolt strength.
Turnbuckles must:
1.
2.
3.
4.

Be commercial quality
Have jaw or eye ends
Have a minimum breaking strength of 2,700 lb
Be steel pipe type or drop-forged steel

Crimped sleeve clamps and stop sleeve clamps must:


871

SECTION 83

RAILINGS AND BARRIERS

1. Be nonferrous metal
2. Develop the strength of the cable
3. Be the color of the cable
Cable must:
1. Be wire strand or rope
2. Have a minimum diameter of 1/4 inch
3. Have a minimum breaking strength of 1,800 lb
Galvanize cable under Federal Specification RR-W-410.
Tension cable to provide taut railings between posts.
Construct post footings of minor concrete.
83-1.02F Concrete Railing
Concrete railing consists of either an all-reinforced concrete section or the reinforced concrete portion of
composite railing sections with end and intermediate posts.
Concrete railing must comply with sections 51 and 52.
If ordered, adjust the height of the concrete railing to allow for the camber and dead load deflection of the
superstructure. The amount of adjustment will be ordered before the concrete is placed.
83-1.02G Metal Railing
83-1.02G(1) General
Metal railing consists of metal elements mounted on concrete members.
83-1.02G(2) Tubular Metal Railing
Tubular metal railing and tubular hand railing consists of tubular metal rails supported by metal posts,
anchor bolts, hardware, and fittings.
Materials for tubular rails, posts, rods, bolts, and nuts must comply with the requirements shown in the
following table:
Material
Tubular steel rails and tubular handrailing
Steel posts, rolled bars, and plate washers
Steel sleeves for tubular rails
HS bolts
HS threaded rods
Nuts and washers for HS bolts and rods

ASTM
A 500, Grade B
A 36/A 36M
A 36/A 36M
A 325, A 325M, or A 449
A 449
A 325 or A 325M

Stud bolts must comply with the specifications for stud connectors in section 55-1.02.
HS bolts or threaded rods furnished under ASTM A 449 must comply with the mechanical requirements
specified in ASTM A 449 after galvanizing.
The metal railing posts to which the chain link railing attaches must fit the mounting brackets, pipe
sleeves, and other connection fittings.
Install shims at posts and railings, where necessary, to provide uniform bearing and conformance with the
horizontal lines and vertical grade lines. Shims at steel posts must be commercial quality, galvanized
sheet steel.
For tubular hand railing mounted on Type 80 SW concrete barrier railing:
1. Resin capsule anchors and threaded rods must comply with section 75-1.03A.
2. Drilling and bonding threaded rods must comply with the specifications for drilling and bonding dowels
in section 51-1.
872

SECTION 83

RAILINGS AND BARRIERS

If the horizontal radius of the railing is 30 feet or less, that portion of the tubular railing must be either
shop bent or built up from 1/4-inch-thick structural steel plates. Structural steel plates must comply with
ASTM A 36/A 36M. Built up tubular railing must match the seamless tubing in appearance.
The difference between out-to-out rail sleeve dimensions and the clear inside dimensions of the tubular
steel rails must not exceed 3/16 inch after galvanizing.
Submit 2 sets of anchor bolt layouts before placing parapet or other structural support reinforcement.
Carefully handle materials to avoid bending, braking, abrading, or otherwise damaging the parts. Do not
use manufacturing, handling, or installation methods that damage or distort the members or damage the
galvanizing.
Before the railing parts are assembled, clean bearing surfaces and surfaces to be in permanent contact.
The bases of posts must be true and flat to provide uniform bearing on the concrete portions of the railing.
Adjust the vertical position of the metal railing to allow for camber and dead load deflection of the
superstructure. The amount of adjustment will be ordered before the metal railing is installed.
83-1.02G(3) Pipe Handrailing
Pipe handrailing consists of handrailing elements supported by metal brackets or tubular steel posts.
Handrailing elements must be either structural tubing for tubular steel posts or commercial quality
standard steel pipe. Tubular steel posts must be round, seamless or welded structural tubing complying
with ASTM A 501 and have a wall thickness not less than that of standard steel pipe of the same nominal
size.
Brackets, bolts, threaded studs, nuts, washers, and other fittings must be commercial quality structural
steel, except that standard steel pipe fittings may be used where shown.
Mechanical expansion anchors for attaching the railing to supporting concrete members must comply with
the specifications for concrete anchorage devices in section 75-1.03A.
Railing must be carefully erected true to line and grade. Posts must be vertical within a tolerance not to
exceed 0.02 foot in 10 feet and set in sockets or on mortar pads.
83-1.02G(4) Ornamental Railing
Reserved
83-1.02H Reserved
83-1.02I Chain Link Railing
Chain link railing consists of a metal frame covered with chain link fabric, including posts, horizontal
members, post anchorages, stretcher bars, truss rods, tension wires, and other required hardware and
fittings.
Posts and horizontal members must be standard steel pipe, structural steel tubing, or structural shapes,
except where metal conduit is specified. Structural tubing steel must comply with ASTM A 500 or A 501.
Structural shapes, plates, bars, and bolts must comply with section 55-1.02.
Stretcher bars, truss rods, post tops, and other required fittings and hardware must be steel, malleable
iron, or wrought iron. Post tops and other closures must be watertight. Fittings and hardware must fasten
properly to the posts and other members.
Cable used in the frame must:
1.
2.
3.
4.

Be wire rope
Be 5/16 inch in diameter
Have a minimum breaking strength of 5,000 lb
Be galvanized under Federal Specification RR-W-410

Crimped sleeve clamps and stud socket assemblies must:


873

SECTION 83

RAILINGS AND BARRIERS

1. Be metal
2. Develop the strength of the cable
3. Be the color of the cable
Frame members carrying electrical conductors must be rigid metal conduit manufactured of mild steel
complying with UL 6, Electrical Rigid Metal Conduit - Steel. Zinc coat the interior and exterior surfaces of
the rigid metallic conduit by hot-dip galvanizing.
Tension wires must be at least 7-gage coil spring steel.

Post clips must be at least 9-gage steel.

Wire ties or hog rings must be 9-gage, commercial quality, steel wire. Wire ties must be given at least 1

complete turn.

Galvanize tension wires, post clips, wire ties, and hog rings under ASTM A 116, Coating Type Z, Class 3.

Six-gage (0.192-inch minimum diameter) aluminum wire ties complying with ASTM B 211 or B 211M,

Alloy 1100-H18, or 6-gage (0.192-inch minimum diameter) aluminum hog rings complying with ASTM B

211 or B 211M, Alloy 6061-T94 or Alloy 5052-H38 may be substituted for steel wire ties or hog rings.

Bend ends of wire ties away from pedestrian traffic.

Chain link fabric must be 11 gage and must comply with one of the following:

1. AASHTO M 181, Type I, Class C


2. AASHTO M 181, Type IV, Class A
3. ASTM F 1345, Class 2
The color of vinyl-coated chain link fabric must be either medium green or dark green.

The railings pertaining to a structure must all be the same color.

Chain link fabric must be woven into approximately 1-inch mesh.

Tighten truss rods and cables with turnbuckles or other fittings.

Stretch and fasten the fabric securely to the posts, other members, and tension wires. Stretch tension

wires tightly.

Wherever necessary to conform to curvature, either horizontal or vertical, rework and fit the fabric to

present a smooth, neat, and workmanlike appearance.

Provide openings in the fabric as required by other facilities. Reinforce openings with not less than 1 turn

of 6-gage wire.

Attach pipe handrailing to chain link railing where shown. Handrailing must comply with section 83
1.02G(3).

83-1.02J Pedestrian Barricade


Install pedestrian barricade as shown.
83-1.03 PAYMENT
Metal beam guard railing is measured along the face of the rail element from end post to end post of the
completed railing. The point of measurement at the end post is the center of the bolt attaching the rail
element to the end post. If metal beam guard railing is connected to a structure, barrier, wall, or abutment,
where the railing connects is considered the end post and the point of measurement is the midpoint
between the 2 bolts attaching the rail element at the connection.
Double metal beam guard railing is measured from end post to end post along the center line of the
installed barrier.
All other railing is measured along the face of the railing, including end and intermediate posts, and with
no deductions for gaps in the railing for lighting and sign supports.
874

SECTION 83

RAILINGS AND BARRIERS

Railing is measured without allowance for overlap at rail splices.

Payment for excavation and backfill is included in the railing work that requires it.

Payment for drilling anchor plate bolt holes in rail elements and driving steel foundation tubes is included

in the payment for end anchor or rail tensioning assembly.

An end anchor assembly (Type CA) with 2 cables attached to 1 concrete anchor is measured as 1 end

anchor assembly (Type CA).

The length of metal beam guard railing includes buried post anchors.

Temporary metal beam guard railing, temporary terminal system end treatments, temporary Type SFT

and Type CA end anchor assemblies, and temporary return and end caps are measured as specified for
the corresponding items for permanent metal beam guard railing work.
83-2 BARRIERS
83-2.01 GENERAL
Section 83-2 includes specifications for constructing barrier.
Trim existing median planting to clear the work area for median barrier construction. Dispose of
trimmings.
Do not remove an existing median barrier more than 500 feet in advance of the construction of the new
barrier being constructed.
At locations exposed to traffic, schedule activities so that at the end of each day no post holes are open
and no barrier posts are installed without the blocks and rail elements assembled and mounted.
At the end of each day's activities, reset the existing median barrier without mesh or glare screen and
anchor as authorized so that no gap is left between the reset barrier and the barrier being installed. You
may place Type K temporary railing instead of resetting the existing barrier.
83-2.02 MATERIALS AND CONSTRUCTION
83-2.02A General
Reserved
83-2.02B Thrie Beam Barrier
Thrie beam barrier must comply with section 83-1.02B.

Rail elements, backup plates, terminal connectors, terminal sections, and return caps must comply with

AASHTO M 180 for Class A, Type I thrie beam guard railing, except within 0.5 miles of coast the

components must comply with AASHTO M 180 for Type II thrie beam guard railing.

Posts for thrie beam barrier on bridges must be steel. Posts for approach barrier transitions to connect to

concrete structures and posts set in steel foundation tubes at trailing end anchors must be wood. At all
other locations, posts for thrie beam barrier must be wood or steel, however, only 1 type of post must be
selected in any 1 continuous length of barrier.
Use wood or plastic blocks with wood and steel posts.

Plastic blocks must be listed on the Authorized Material List.

Toenailing wood blocks to wood posts is not required.

Unless otherwise specified, anchor bolts and threaded rods must comply with ASTM A 307.

Plates must comply with section 55.

If a barrier is to be installed on existing structures, anchor the posts to the deck as shown.

If cored or drilled holes for anchor bolts must be offset to avoid existing main reinforcing steel, the

corresponding base plate anchor bolt holes may be slotted to adjust to the new anchor bolt locations.
Slotting must not reduce the edge distance of the hole to less than 7/8 inch.
875

SECTION 83

RAILINGS AND BARRIERS

Mortar under base plates must comply with section 83-1.02.


Drilling of anchor bolt holes and bonding of bolts must comply with section 51-1.03E(3).
If the spacing between the posts must be varied from the standard spacing, you may modify the metal
railing at the job site, if authorized. Repair damaged galvanizing under section 75-1.05.
Install terminal sections and return caps under the manufacturer's instruction.
83-2.02B(1) Minor Concrete Vegetation Control
Minor concrete vegetation control must comply with section 83-1.02B(1).
83-2.02B(2) Transition Railing
Types STB transition railing is used to connect concrete barrier or railing to single thrie beam barrier.
Types DTB transition railing is used to connect concrete barrier or railing to double thrie beam barrier.
Ten-gage metal elements must comply with AASHTO M 180 for Class B, Type I thrie beam element,
except within 0.5 miles of the coast the metal elements must comply with AASHTO M 180 for Class B,
Type II thrie beam element. Other metal elements and end caps must comply with AASHTO M 180 for
Class A, Type I thrie beam element, except within 0.5 miles of the coast the metal elements and end caps
must comply with AASHTO M 180 for Class A, Type II thrie beam element.
After constructing the transition railing, dispose of surplus excavated material uniformly along the
adjacent roadway, except as specified in section 14-11.
83-2.02C Reserved
83-2.02D Concrete Barrier
83-2.02D(1) General
Concrete barrier must comply with sections 51 and 52.
If a gap is left in the concrete barrier for equipment or special drainage features during construction on
highways open to traffic, close the gap by temporary or permanent means when work is not actively in
progress at the location of the gap.
The concrete barrier must present a smooth, uniform appearance in its final position, conforming closely
to the horizontal and vertical lines shown or ordered. The barrier must be free of lumps, sags, or other
irregularities.
The top and exposed faces of the barrier must comply with the following requirements when tested with a
10-foot straightedge laid on the surfaces:
1. For Type 50 and 60 series concrete barriers, the top must not vary more than 0.02 foot from the edge
of the straightedge and the faces must not vary more than 0.04 foot from the edge of the
straightedge.
2. For concrete barriers other than Type 50 and 60 series, both the top and faces must not vary more
than 0.02 foot from the edge of the straightedge.
If a concrete barrier is to be constructed on a recently completed bridge, adjust the height of the barrier to
allow for the camber and dead load deflection of the superstructure. The amount of adjustment will be
ordered before the concrete is placed. Place the barrier after the falsework has been released and as
long after the superstructure construction as the progress of the work will allow, unless otherwise ordered.
If a concrete barrier is to be constructed on existing pavement or an existing structure, adjust the height of
the barrier to allow for irregularities in the existing grade. The amount of adjustment will be ordered before
the concrete is placed.
If a concrete barrier is to be constructed on an existing structure, bond the dowels in drilled holes in the
existing concrete. Drilling of the holes and bonding of the dowels must comply with section 51.
If a concrete barrier is to be constructed to the face of an existing concrete structure, match the existing
weep holes.
876

SECTION 83

RAILINGS AND BARRIERS

Locate expansion joints in the barrier at deck, pavement, and principal wall joints. Expansion joint filler
material must be the same size as the joint or 1/2 inch minimum.
Cement concrete barrier markers to the barrier under the manufacturer's instruction. Match the spacing of
the markers to the spacing of the raised pavement markers on the adjacent median edgeline pavement
delineation.
Excavation and backfill must comply with section 19-3.
The portion of barrier below finished grade may be placed to the neat lines of the excavation.
For Type 50E, 60F, 60GE, and 60SF concrete barriers, granular material for backfill between the 2 walls
of concrete barrier must:
1. Be earthy material suitable for the purpose intended
2. Have no rocks, lumps, or clods exceeding 1-1/2 inches in greatest dimension
3. Be placed without compaction
At connections to structures, apply a uniform film of grease to the upper surface of the neoprene strip
before placing the sheet metal.
The tubular lower railing for Type 80SW concrete barrier must comply with the specifications for tubular
handrailing in section 83-1.02G(2).
Forms for Type 80 series concrete barrier railing must remain in place for a minimum of 36 hours after the
concrete is placed.
If the project is in a freeze-thaw area, the barrier must comply with the following requirements:
1. Concrete must contain not less than 675 pounds of cementitious material per cubic yard.
2. Bar reinforcing steel must comply with section 52-2.02.
3. Concrete barriers on bridges or walls must be cured by the water method.
83-2.02D(2) Materials
Construct Type 50 and 60 series concrete barriers of minor concrete, except as follows:
1. Maximum size of aggregate used for extruded or slip formed concrete barrier must be no larger than
1-1/2 inches and no smaller than 3/8 inch.
2. If the 3/8-inch maximum size aggregate grading is used to construct extruded or slip formed concrete
barrier, the concrete must contain not less than 675 pounds of cementitious material per cubic yard.
Concrete for concrete barriers other than Type 50 and 60 series must contain not less than 590 pounds of
cementitious material per cubic yard.
For Type 50E, 60F, 60GE, and 60SF concrete barriers, the concrete paving between the tops of the 2
walls of the barrier and the optional concrete slab at the base between the 2 walls of the barrier must be
constructed of minor concrete.
Structural steel plates and hardware required to join the concrete barrier at gaps caused by foundations
of overhead signs, electroliers, drainage structures, and at other locations must comply with sections 751.03A and 75-1.05.
Polystyrene at connections to structures and transitions to bridge columns must comply with section 51
2.01B(1).
Sheet metal, neoprene strip, and grease required at connections to structures must comply with the
following:
1. Sheet metal must be commercial quality galvanized sheet steel, smooth and free of kinks, bends, or
burrs. Joints in the sheet metal must be butt joints sealed with plastic duct sealing tape.
2. Neoprene strip must comply with section 51-2.04.
3. Grease must comply with Society of Automotive Engineers AS 8660. A uniform film of grease must
be applied to the upper surface of the neoprene strip before placing the sheet metal.
877

SECTION 83

RAILINGS AND BARRIERS

83-2.02D(3) Construction Methods


Type 50 and Type 60 series concrete barriers must be constructed by one of the following:
1. Cast-in-place-with-fixed-forms method
2. Extrusion or slip form method
3. Combination of both methods
Concrete barriers other than Type 50 and Type 60 series must be constructed by the cast-in-place-with
fixed-forms method.
83-2.02D(3)(a) Cast-In-Place with Fixed Forms
Concrete barriers constructed by the cast-in-place-with-fixed-forms method must comply with section 51.
Precast mortar blocks must not be used to support the reinforcing steel on the traffic side of barriers.
83-2.02D(3)(b) Extrusion or Slip Form
Concrete barriers constructed by using an extrusion or slip form machine or other similar type of
equipment must be of well-compacted, dense concrete, and the exposed surfaces must comply with
section 51. You may be required to furnish evidence of successful operation of the extrusion or slip form
machine or other equipment.
The combined aggregate grading for the minor concrete must be of grading to produce concrete of the
shape and surface texture specified.
Concrete may be made with the materials continuously batched by volume and mixed in a continuous
mixer under the batching and mixing requirements in ASTM C 685.
Concrete must be fed to the extrusion or slip form machine at a uniform rate. Operate the machine under
enough uniform restraint to forward motion to produce a well-compacted mass of concrete free from
surface pits larger than 1 inch in diameter and requiring no further finishing other than that under section
83-2.02D(4).
Concrete must be of a consistency such that after extrusion or slip forming it will maintain the shape of
the barrier without support.
The grade for the top of the concrete barrier must be indicated by an offset guide line set from survey
marks established by the Engineer. The forming portion of the extrusion or slip form machine must be
readily adjustable vertically during the forward motion of the machine to conform to the predetermined
grade line. A grade line gage or pointer must be attached to the machine such that a continual
comparison can be made between the barrier being placed and the established grade line as indicated by
the offset guide line.
Instead of the above method for maintaining the barrier grade, the extrusion or slip form machine may be
operated on rails or forms set at uniform depth below the predetermined finished top of the barrier grade
or on existing pavement or bridge decks.
You may construct expansion joints by sawing through the barrier section to its full depth. Insertion of joint
filler is not required.
If expansion joints are not constructed by sawing, construct the expansion joints under section 51.
If sawing or forming the joints is performed before the concrete has hardened, firmly support the adjacent
portions of the barrier with close fitting shields.
If sawing or forming the joints is performed after the application of curing compound, treat the exposed
faces of the barrier in the vicinity of the joint with curing compound after sawing or forming the joints.
If extrusion or slip forming methods of placement are used, the horizontal reinforcing bars must be placed
continuously.

878

SECTION 83

RAILINGS AND BARRIERS

83-2.02D(4) Finishing
The surface finish of Type 50 and Type 60 series concrete barriers, before the application of the curing
compound, must be free from surface pits larger than 1 inch in diameter and must be given a final soft
brush finish with strokes parallel to the line of the barriers. Finishing with a brush application of grout is
not allowed.
To facilitate finishing, remove fixed forms for CIP Type 50 and Type 60 series concrete barriers as soon
as possible after the concrete has set enough to maintain the shape of the barrier without support.
Not less than 7 days after placing Type 50 and Type 60 series concrete barriers, exposed surfaces must
receive a light abrasive blast finish to achieve a uniform appearance.
The final surface finish of concrete barriers other than Type 50 and Type 60 series must be Class 1
surface finish under section 51-1.03F(3). Alternative final surface finish methods must be submitted in
writing and must not be used unless authorized.
83-2.02D(5) Curing
Cure exposed surfaces of concrete barriers with curing compound no. 6. The formed surfaces of the
concrete barriers on bridges or walls that do not support sound walls may be cured under section 90
1.03B(5) except keep the forms in place for a minimum of 12 hours after the concrete is placed. For Type
50 and Type 60 series concrete barriers, apply curing compound by a mechanical sprayer capable of
applying the curing compound to at least 1 entire side and the top of the concrete barrier in 1 application
at a uniform rate of coverage. Protect the spray against wind.
83-2.02E Crash Cushion
83-2.02E(1) General
Reserved
83-2.02E(2)83-2.02E(6) Reserved
83-2.02F Wildlife Passage Way
Reserved
83-2.02G Reserved
83-2.03 PAYMENT
The division point for computing the length for payment of double thrie beam barrier (bridge) and double
thrie beam barrier is the face of the paving notch of the bridge.
The point of measurement at end posts of single and double thrie beam barriers is the center of the bolt
or rod attaching the rail element to the end post. Where single barriers are constructed on each side of a
median obstruction and the single barriers merge into a double barrier, the post with 2 blocks attached is
regarded as an end post for measuring the length of single and double barrier. Transition sections are
paid for as single thrie beam barrier.
Single thrie beam barrier constructed on each side of piers underneath structures or other obstructions is
measured along each line of the installed barrier.
Double thrie beam barrier is measured from end post to end post along the center line of the installed
barrier.
Within the pay limits of transition railing shown, drilling holes for wood posts and driving posts is included
in the payment for transition railing.
Payment for drilling holes for wood posts, driving posts, backfilling the space around posts, excavating
and backfilling end anchor assembly holes, and connecting thrie beam barrier to concrete surfaces is
included in the payment for the barrier.
Concrete barriers, except Types 50E, 60F, 60GE, and 60SF, are measured along the top of the barrier.
Type 50E, 60F, 60GE, and 60SF concrete barriers are measured once along the centerline between the
2 walls of the barrier.

879

SECTION 83

RAILINGS AND BARRIERS

Payment for (1) bar reinforcing steel, (2) drilling and bonding dowels in structures, (3) hardware for steel
plate barrier, (4) miscellaneous metal, (5) excavation, and (6) backfill, including concrete paving and
granular material or concrete slab used as backfill in Type 50E, 60F, 60GE, and 60SF concrete barrier, is
included in the payment for the concrete barrier.
Steel plate barrier attached to concrete barrier at overhead sign foundations, electroliers, drainage
structures, and other locations shown is paid for as the type of concrete barrier to which the steel plate
barrier attaches.

880

84 TRAFFIC STRIPES AND PAVEMENT MARKINGS

84-1 GENERAL

84-1.01 GENERAL
84-1.01A Summary
Section 84-1 includes general specifications for applying traffic stripes and pavement markings.
84-1.01B Definitions
traffic stripe: A longitudinal centerline or a longitudinal lane line used for separating traffic lanes in the
same direction of travel or in the opposing direction of travel or a longitudinal edge line marking the
edge of the traveled way or the edge of a lane at a gore area separating traffic at an exit or entrance
ramp. A traffic stripe is a traffic line as shown.
pavement marking: A transverse marking such as (1) a limit line, (2) a stop line; or (3) a word, symbol,
shoulder, parking stall, or railroad grade crossing marking.
84-1.01C Quality Control and Assurance
Within 14 days of applying a traffic stripe or a pavement marking, the retroreflectivity of the traffic stripe or
the pavement marking must be a minimum of 250 millicandelas per square meter per lux for white and
150 millicandelas per square meter per lux for yellow. Test the retroreflectivity under ASTM E 1710.
84-1.02 MATERIALS
Glass beads applied to paint and molten thermoplastic material must comply with State Specification
8010-004.
84-1.03 CONSTRUCTION
84-1.03A General
Establish alignment for traffic stripes and all layout for pavement markings with a device or method that
will not damage the pavement or conflict with other traffic control devices.
84-1.03B Protection from Damage
Protect existing retroreflective pavement markers during work activities.
Remove any existing pavement marker that is coated or damaged by work activities and replace it with an
equivalent marker on the Authorized Material List for signing and delineation materials.
Protect newly placed traffic stripes and pavement markings from traffic and other deleterious activities
until the paint is thoroughly dry or the thermoplastic is hard enough to bear traffic.
84-1.03C Tolerances and Appearance
A completed traffic stripe must:
1. Have clean, well-defined edges without running or deformation
2. Be uniform
3. Be straight on a tangent alignment and on a true arc on a curved alignment
The width of a completed traffic stripe must not deviate from the width shown by more than 1/4 inch on a
tangent alignment and 1/2 inch on a curved alignment.
The length of the gaps and individual stripes that form a broken traffic stripe must:
1. Not deviate by more than 2 inches from the lengths shown
2. Be uniform throughout the entire length of each broken traffic stripe so that a normal striping machine
will be able to repeat the pattern and superimpose successive coats on the applied traffic stripe
A completed pavement marking must comply with the dimensions shown and have well-defined edges
without running or deformation.
A completed thermoplastic traffic stripe or thermoplastic pavement marking must be free of runs, bubbles,
craters, drag marks, stretch marks, and debris.
881

SECTION 84

TRAFFIC STRIPES AND PAVEMENT MARKINGS

84-1.03D Surface Preparation


Use mechanical wire brushing to remove dirt, contaminants, and loose material from the pavement
surface that is to receive the traffic stripe or pavement marking.
Use abrasive blast cleaning to remove laitance and curing compound from the surface of new concrete
pavement that is to receive the traffic stripe or pavement marking.
Where a new traffic stripe joins an existing traffic stripe, allow enough distance between the new and
existing striping patterns to ensure continuity at the beginning and end of the transition.
84-1.03E Application of Stripes and Markings
Apply thermoplastic for a pavement marking with a stencil or a preformed marking.

Apply paint for a pavement marking with a stencil and hand spray equipment.

You may use permanent tape for a traffic stripe or a pavement marking instead of paint or thermoplastic.

The permanent tape must be on the Authorized Material List. If permanent tape is used for a traffic stripe

or a pavement marking, apply the tape under the manufacturer's instructions.

Immediately remove drips, overspray, improper markings, paint, and thermoplastic tracked by traffic using

an authorized method.

Apply a traffic stripe or a pavement marking to a dry surface during a period of favorable weather when

the pavement surface is above 50 degrees F.

The glass beads must be embedded in the coat of paint or thermoplastic to a depth of 1/2 their diameters.

Verify the rate of glass beads application by stabbing the glass bead tank with a calibrated rod.

84-1.03F84-1.03H RESERVED
84-1.04 PAYMENT
Traffic stripe is measured along the line of the traffic stripe without deductions for gaps in the broken
traffic stripe.
Pavement marking is measured by the area covered.
84-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS
84-2.01 GENERAL
84-2.01A Summary
Section 84-2 includes specifications for applying thermoplastic traffic stripes and pavement markings.
84-2.01B Submittals
For each batch of thermoplastic material, submit:
1. Certificate of compliance
2. METS notification letter stating that the material is authorized for use
3. MSDS
84-2.02 MATERIALS
Thermoplastic must comply with State Specification PTH-02SPRAY, PTH-02HYDRO, or PTH-02ALKYD.
Primer must comply with the thermoplastic manufacturer's recommendations. Do not thin the primer.
84-2.03 CONSTRUCTION
84-2.03A General
Apply the primer:
1. To asphaltic surfaces over 6 months old and to all concrete surfaces
2. Immediately before and concurrently with the application of the thermoplastic
3. At the manufacturer's instructed rate

882

SECTION 84

TRAFFIC STRIPES AND PAVEMENT MARKINGS

Use preheaters with mixers having 360 degree rotation to preheat the thermoplastic material.

Apply the thermoplastic in a single uniform layer by spray or extrusion methods.

Completely coat and fill voids in the pavement surface with the thermoplastic.

84-2.03B Extruded Thermoplastic


Apply extruded thermoplastic at a temperature from 400 to 425 degrees F, unless a different temperature

is instructed by the manufacturer.

Apply extruded thermoplastic for a traffic stripe at a rate of at least 0.20 lb/ft of 4-inch wide solid stripe.

The applied thermoplastic traffic stripe must be at least 0.060 inch thick.

An applied thermoplastic pavement marking must be from 0.100 to 0.150 inch thick.

Apply glass beads to the surface of the molten thermoplastic at a rate of at least 8 lb/100 sq ft.

84-2.03C Sprayable Thermoplastic


Apply sprayable thermoplastic under State Specification PTH-02SPRAY at a temperature from 350 to 400

degrees F.

Apply sprayable thermoplastic at a rate of at least 0.13 lb/ft of 4-inch wide solid stripe.

The applied sprayable thermoplastic material must be at least 0.040 inch thick.

84-2.04 PAYMENT
A double thermoplastic traffic stripe consisting of two 4-inch-wide yellow stripes is measured as 2 traffic
stripes.
84-3 PAINTED TRAFFIC STRIPES AND PAVEMENT MARKINGS
84-3.01 GENERAL
84-3.01A Summary
Section 84-3 includes specifications for applying painted traffic stripes and pavement markings.
84-3.01B Submittals
For each batch of paint, submit:
1. Certificate of compliance
2. METS notification letter stating that the material is authorized for use
3. MSDS
84-3.02 MATERIALS
84-3.02A General
The paint for traffic stripes and pavement markings must comply with the specifications for the paint type
and color shown in following table:

Paint type
Waterborne traffic line
Acetone-based
Waterborne traffic line for
the international symbol of
accessibility and other
curb markings

Paint Specifications
Color
Specification
White, yellow, and black
State Specification PTWB-01R2
White, yellow, and black
State Specification PT-150VOC(A)
Blue, red, and green
Federal Specification TT-P-1952E

The color of painted traffic stripes and pavement markings must comply with ASTM D 6628.
Do not thin the paint.

883

SECTION 84

TRAFFIC STRIPES AND PAVEMENT MARKINGS

84-3.02B Mixing
Mix the paint by mechanical means until it is homogeneous. Thoroughly agitate the paint during its
application.
84-3.02C Application Equipment
Use mechanical means to paint traffic stripes and pavement markings and to apply glass beads for traffic
stripes.
The striping machine must be capable of superimposing successive coats of paint on the 1st coat and
upon existing stripes at a speed of at least 5 mph.
The striping machine must:
1.
2.
3.
4.

Have rubber tires


Be maneuverable enough to produce straight lines and normal curves in true arcs
Be capable of applying traffic paint and glass beads at the specified rates
Be equipped with:
4.1 Pointer or sighting device at least 5 feet long extending from the front of the machine
4.2 Pointer or sighting device extending from the side of the machine to gage the distance from the
centerline for painting shoulder stripes
4.3 Positive acting cutoff device to prevent depositing paint in gaps of broken stripes
4.4 Shields or an adjustable air curtain for line control
4.5 If pneumatically operated, pressure regulators and gages that are in full view of the operator
4.6 Paint strainer in the paint supply line
4.7 Paint storage tank with a mechanical agitator that operates continuously during painting
activities
4.8 Glass bead dispenser located behind the paint applicator nozzle that is controlled

simultaneously with the paint applicator nozzle

4.9 Calibrated rods for measuring the volumes of paint and glass beads in the paint and glass
bead tanks

Air-atomized spray equipment must:


1. Be equipped with oil and water extractors and pressure regulators
2. Have adequate air volume and compressor recovery capacity
3. Have properly sized orifices and needle assemblies for the spray gun tip
Where the configuration or location of a traffic stripe is such that the use of a striping machine is not
practicable, you may apply the traffic paint and glass beads by other methods and equipment if
authorized. The Engineer determines if the striping machine is not practicable for a particular use.
84-3.03 CONSTRUCTION
For existing surfaces, apply traffic stripes and pavement markings in 1 coat.
For a new surface, except the black stripe between the 2 yellow stripes of a double traffic stripe, apply
traffic stripes and pavement markings in 2 coats. The 1st coat of paint must be dry before applying the
2nd coat.
Paint a 1-coat, 3-inch-wide black stripe between the two 4-inch-wide yellow stripes of a double traffic
stripe.
If the two 4-inch-wide yellow stripes are applied in 2 coats, apply the black stripe concurrently with the
2nd coat of the yellow stripes.
Apply each coat of paint for any traffic stripe in 1 pass of the striping machine, including the glass beads,
regardless of the number, width, and pattern of the individual stripes
Do not paint traffic stripes and pavement markings if:
1. Freshly painted surfaces could become damaged by rain, fog, or condensation
2. Atmospheric temperature could drop below 40 degrees F for acetone-based paint and 50 degrees F
for waterborne paint during the drying period
884

SECTION 84

TRAFFIC STRIPES AND PAVEMENT MARKINGS

On 2-lane highways:
1. When the 1st coat of the centerline stripe is applied in the same direction as post miles increase, use
the right-hand spray gun of the 3 spray guns used to apply the double yellow stripe to apply a single
yellow stripe
2. When the 1st coat of the centerline stripe is applied in the same direction as post miles decrease, use
the left-hand spray gun of the 3 spray guns used to apply the double yellow stripe to apply a single
yellow stripe
3. Apply the 2nd coat of centerline striping in the opposite direction of the 1st coat
Apply 1-coat paint at an approximate rate of 1 gallon per 107 square feet.
Apply 2-coat paint at the approximate rate shown in the following table:
Two-Coat Paint Application Rates
Square foot coverage
per gallon
Paint type
1st coat
2nd coat
Waterborne paint
215
215
Acetone-based paint
360
150
Apply glass beads at an approximate rate of 5 lb/gal of paint.
The Engineer determines the exact application rate of the paint and glass beads.
Verify the application rate of paint by stabbing the paint tank with a calibrated rod. If the striping machine
is provided with paint gages, the Engineer may measure the volume of paint using the gages instead of
stabbing the paint tank with a calibrated rod.
84-3.04 PAYMENT
A double traffic stripe consisting of two 4-inch-wide yellow stripes separated by a 3-inch-wide black stripe
is measured as a single traffic stripe.
84-4 TWO-COMPONENT PAINT TRAFFIC STRIPES AND PAVEMENT MARKINGS
Reserved
84-5 RECESSED THERMOPLASTIC TRAFFIC STRIPES
Reserved

885

85 PAVEMENT MARKERS

85-1 GENERAL

85-1.01 GENERAL
85-1.01A Summary
Section 85-1 includes general specifications for placing pavement markers.
85-1.01B Submittals
Submit a certificate of compliance for each type of pavement marker used.
85-1.01C Quality Control and Assurance
Pavement markers must be on the Authorized Material List for signing and delineation materials.
85-1.02 MATERIALS
85-1.02A General
Package pavement markers in a way that prevents damage.

Mark each package with the manufacturer's name, type, color, quantity, lot number, and date of

manufacture.

Replace damaged shipments.

Protect pavement markers from moisture during shipment to the job site and when stored at the job site.

85-1.02B Nonreflective Pavement Markers


85-1.02B(1) General
Use ceramic or plastic nonreflective pavement markers.
Nonreflective pavement markers must be free from defects that affect adhesion, appearance,
performance, or any combination thereof. The top, bottom, and sides of nonreflective pavement markers
must be free from objectionable marks or discoloration.
The top surface of nonreflective pavement markers must be convex with a gradual change in curvature.
The bottom of nonreflective pavement markers must have areas of integrally formed protrusions or
indentations. The bottom surface of the markers must not deviate more than 0.05 inch from a flat surface.
The protrusion areas must have faces parallel to the bottom of the marker and must project approximately
0.04 inch from the bottom.
85-1.02B(2) Plastic
Plastic nonreflective pavement markers Types A and AY must be polypropylene or ABS plastic type.
Plastic nonreflective pavement markers must comply with the testing requirements specified in section
85-1.02B(3) for tests d, e, f, g, and i.
Do not coat plastic nonreflective pavement markers with any substance that interferes with the adhesive
bond.
85-1.02B(3) Ceramic
When tested under California Test 669, properties of ceramic nonreflective pavement markers must
comply with the requirements shown in the following table:

887

SECTION 85
Test
a
b
c
d
e
f
g
h
i

PAVEMENT MARKERS

Properties

Bond strength
Glaze thickness
Hardness
Luminance factor, Type A, white markers only, glazed surface
Yellowness index, Type A, white markers only, glazed surface
Color-yellow, Type AY, yellow markers only. The chromaticity
coordinates must be within a color box defined in California Test 669
Compressive strength
Water absorption
Artificial weathering, 500 hours exposure, yellowness index

Requirement
700 psi, min
0.007 in., min
6 Moh, min
75, min
7, max
Pass
1,500 lb, min
2.0%, max
20, max

85-1.02C Retroreflective Pavement Markers


The exterior surface of a retroreflective pavement marker shell must be smooth and contain 1 or 2
retroreflective faces of the specified color.
The base of a retroreflective pavement marker must be flat, rough textured, and free from gloss and
substances that could reduce the adhesive bond. The deviation of the base from a flat surface must not
exceed 0.05 inch.
When tested under California Test 669, retroreflective pavement markers must comply with the
requirements shown in the following 2 tables:
Property
a
Bond strength
Compressive strengthb
Compressive strength, recessed markers
Abrasion resistance, marker must meet the respective specific
intensity minimum requirements after abrasion.
Water soak resistance

Requirement
500 psi, min
2,000 lb, min
1,200 lb, min
Pass
No delamination of the
body or lens system of
the marker nor loss of
reflectance

The Department rejects the entire lot of markers if:


a
1. Marker body or filler material fails before reaching 500 psi under the bond strength test
b
2. Deformation is more than 0.125 inch at a load of less than 2,000 lb or if delamination of
the shell and filler material is more than 0.125 inch regardless of the load required to break a
marker
Specific intensity
Clear Yellow
Red
3.0
1.5
0.75
1.2
0.60
0.30
0.30
0.15
0.08

Reflectance
0 incidence angle, min
20 incidence angle, min
After 1 year field evaluation

85-1.02D Hot Melt Bituminous Adhesive


Bituminous adhesive must comply with the values shown in the following table:

888

SECTION 85

PAVEMENT MARKERS

Property
Penetration, dmm, 100 g, 5 seconds, 77 F
Softening point, F
Flash point, COC, F
Filler content, percent by weight
(insoluble in 1,1,1 trichloroethane)
Brookfield thermosel viscosity, centipoise, no. 27 spindle,
20 rpm, 400 F

Test
ASTM D 5
ASTM D 36
ASTM D 92
ASTM D 2371

Value
1020
200 min
550 min
6575

ASTM D 4402

3,0006,000

Flexible bituminous adhesive must comply with the requirements shown in the following table:
Property
Penetration, dmm, 100 g, 5 seconds, 77 F
Softening point, F
Ductility, in, 2 in/min, 77 F
Ductility, in, 0.4 in/min, 39 F
Flexibility

Test
ASTM D 5
ASTM D 36
ASTM D 113
ASTM D 113
California Test 440

Requirement
30 max
200 min
6 min
2 min
No breaks or
cracks
2,5006,000

Brookfield thermosel viscosity, centipoise, no. 27 spindle,


20 rpm, 375 F
Bond strength to concrete, psi

ASTM D 4402
California Test 440

100 min

Bond strength to retroreflective pavement marker, psi

California Test 440

120 min

The filler material must be ASTM D 1199, Type PC, Grade III, calcium carbonate. The fineness of the filler
material must comply with the gradation requirements shown in the following table:
Sieve sizes
No. 100
No. 200
No. 325

Percentage passing
100
95
75

85-1.02E Epoxy Adhesive


Epoxy adhesive must be either rapid set or standard set.
Automatic mixing equipment for the epoxy adhesive must use positive displacement pumps and must
properly meter the 2 components in the specified ratio, 5 percent by volume of either component. At the
start of each day, check the ratio of the 2 components of the epoxy adhesive in the presence of the
Engineer. Make the check by disconnecting the mixing heads or using suitable bypass valves and filling 2
suitable containers with the unmixed components. The mixing head must properly mix the 2 components
until black or white streaks are not visible in the mixed material.
The voids in an undisturbed sample of cured, mixed epoxy adhesive obtained from the extrusion nozzle
must not exceed 4 percent.
85-1.03 CONSTRUCTION
85-1.03A General
Establish the alignment for placing pavement markers.
Do not place pavement markers over longitudinal or transverse joints in the pavement surface.
Place pavement markers when the pavement surface is dry.
Remove undesirable material from the pavement surface, including dirt, curing compound, grease, oil,
loose or unsound layers, and paint.
889

SECTION 85

PAVEMENT MARKERS

Regardless of the pavement age or type, clean the pavement surface by abrasive blast cleaning, except
where hot melt bituminous adhesive is applied on clean, new HMA and seal coat surfaces, abrasive blast
cleaning is not required.
Apply pavement markers to the pavement with bituminous adhesive, flexible bituminous adhesive,
standard set epoxy, or rapid set epoxy adhesive, except:
1. Apply pavement markers in pavement recesses with flexible bituminous adhesive
2. Do not use epoxy adhesive to apply plastic nonreflective pavement markers
Comply with the manufacturer's installation instructions for the type of adhesive used.
Completely cover the pavement surface or bottom of the pavement marker with the adhesive without
leaving any voids. Place the pavement marker into position and firmly apply pressure until contact is
made with the pavement. Apply enough adhesive so that it protrudes around the pavement marker edges
after pressing it into place.
Place retroreflective pavement markers so that each retroreflective face is perpendicular to a line parallel
to the roadway centerline.
The Engineer determines when the adhesive has set long enough for newly installed pavement markers
to bear traffic.
85-1.03B Hot Melt Bituminous Adhesive
If using hot melt bituminous adhesive, place pavement markers on new HMA or seal coat surfaces after
the surface or seal coat has been open to public traffic for at least 7 days when the pavement
temperature and air temperature are above 50 degrees F.
Indirectly heat hot melt bituminous adhesive in an applicator with continuous agitation or recirculation. Do
not heat hot melt bituminous adhesive above the manufacturer's maximum safe heating temperature.
Place pavement markers immediately after applying hot melt bituminous adhesive. Remove any adhesive
from the marker's exposed lenses using a soft rag moistened with the manufacturer's recommended
solvent.
85-1.03C Epoxy Adhesive
If using epoxy adhesive, place pavement markers on new HMA or seal coat surfaces after the surface or
seal coat has been open to public traffic for at least 14 days.
Place pavement markers at the pavement temperature and air temperature recommended by the epoxy
adhesive manufacturer.
Apply epoxy adhesive and place pavement markers before the epoxy starts to thicken. Stop using the
epoxy when it does not protrude around the pavement marker edges upon application of slight pressure.
85-1.03D Pavement Recesses
Locate pavement recesses along the line or lines of new or existing stripes.
Do not construct recesses on existing structures.
Equipment for recess construction must be power operated, mechanical, and capable of removing
pavement to the dimensions shown.
Remove residue with a vacuum before it is blown by traffic or wind. Do not allow the residue to flow
across the pavement or into gutters or drainage facilities.
Dispose of all removed material.
85-1.04 PAYMENT
Not Used

890

86 ELECTRICAL SYSTEMS

86-1 GENERAL

86-1.01 SUMMARY
Section 86 includes specifications for installing, modifying, and removing electrical systems.
Comply with part 4 of the California MUTCD. Nothing in section 86 is to be construed as to reduce the
minimum standards in this manual.
The locations of electrical system elements shown are approximate; the Engineer determines the final
location.
86-1.015 DEFINITIONS
actuation: As defined in the California MUTCD.
channel: Discrete information path.
controller assembly: Controller unit and auxiliary equipment housed in a rainproof cabinet to control a
system's operations.
controller unit: Part of the controller assembly performing the basic timing and logic functions.
detector: As defined in the California MUTCD.
electrolier: Complete assembly of lighting standard and luminaire.
flasher: Device to open and close signal circuits at a repetitive rate.
flashing beacon control assembly: Switches, circuit breakers, terminal blocks, flasher, wiring, and
necessary electrical components all housed in a single enclosure to properly operate a beacon.
inductive loop detector: Detector capable of being actuated by inductance change caused by vehicle
passing or standing over the loop.
lighting standard: Pole and mast arm supporting the luminaire.
luminaire: Assembly that houses the light source and controls the light emitted from the light source.
magnetic detector: Detector capable of being actuated by induced voltage caused by vehicle passing
through the earth's magnetic field.
powder coating: A coating applied electrostatically using UV-stable polymer exterior grade powder.
pre-timed controller assembly: Operates traffic signals under a predetermined cycle length.
signal face: As defined in the California MUTCD.
signal head: As defined in the California MUTCD.
signal indication: As defined in the California MUTCD.
signal section: As defined in the California MUTCD.
signal standard: Pole and mast arm supporting 1 or more signal faces with or without a luminaire mast
arm.
traffic-actuated controller assembly: Operates traffic signals under the varying demands of traffic as
registered by detector actuation.
traffic phase: Signal phase as defined in the California MUTCD.
vehicle: As defined in the California Vehicle Code.
86-1.02 REGULATIONS AND CODE
Electrical equipment must comply with 1 or more of the following:

891

SECTION 86
1.
2.
3.
4.
5.
6.
7.

ELECTRICAL SYSTEMS

ANSI
ASTM
8 CA Code of Regs 2299 et seq.
EIA
NEMA
NETA
UL

Materials and workmanship must comply with:


1.
2.
3.
4.
5.
6.

FCC
I TE
N
EC
N
RTL
Public Utilities Commission, General Order No. 95, "Rules for Overhead Electrical Line Construction"
Public Utilities Commission, General Order No. 128, "Rules for Construction of Underground Electric
Supply and Communication Systems"

86-1.03 SCHEDULE OF VALUES


Determine quantities required to complete work. Submit the quantities as part of the schedule of values.
Provide a schedule of values for each lump sum bid item.
Do not include costs for traffic control system in the schedule of values.
The schedule of values must include type, size, and installation method for:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

oundations
F
Standards and poles
Conduit
Pull boxes
Conductors and cables
Service equipment enclosures
Telephone demarcation cabinet
Signal heads and hardware
Pedestrian signal heads and hardware
Pedestrian push buttons
Loop detectors
Luminaires and lighting fixtures

86-1.04 EQUIPMENT LIST AND DRAWINGS


Within 15 days of Contract approval, submit for review a list of equipment and materials that you propose
to install. The list must include:
1.
2.
3.
4.

Name of manufacturer
Dimensions
Item identification number
List of components

The list must be supplemented by 2 copies of data, including:


1. Schematic wiring diagrams
2. Scale drawings of cabinets showing location and spacing of shelves, terminal blocks, and equipment,
including dimensions
3. Operation manual
Electrical equipment constructed as shown will not require detailed drawings and diagrams.
Furnish 3 sets of computer-generated cabinet schematic wiring diagrams.

892

SECTION 86

ELECTRICAL SYSTEMS

The cabinet schematic wiring diagram must be placed in a heavy duty plastic envelope and attached to
the inside of the door of each cabinet.
Prepare diagrams, plans, and drawings using graphic symbols in IEEE 315, "Graphic Symbols for
Electrical and Electronic Diagrams."
86-1.05 CERTIFICATE OF COMPLIANCE
Submit a certificate of compliance for all electrical material and equipment.
86-1.06 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS
86-1.06A General
Keep existing electrical system or authorized temporary replacement in working order during the progress
of the work. Shutdown is allowed for alteration or removal of the system. Traffic signal shutdown must be
limited to normal working hours. Lighting system shutdown must not interfere with the regular lighting
schedule. Notify the Engineer before performing work on the existing system.
Notify the local traffic enforcement agency before traffic signal shutdown.
If lane closures are specified, traffic signal system shutdowns must be limited to the hours allowed for
lane closures.
Where an existing or temporary system is being modified and the work is not described but the Engineer
considers it necessary to keep the system in working order, the work is change order work.
The Department or local agency will:
1.
2.
3.
4.

Continue the operation and maintenance of existing electrical facilities


Continue to provide electrical energy to operate existing electrical facilities
Repair or replace existing facilities damaged by traffic
Pay for electrical energy to operate existing or new facilities undergoing the functional tests specified
in section 86-2.14C.

Verify location and depth of existing detectors, conduits, pull boxes, and other electrical facilities before
using tools or equipment that may damage those facilities or interfere with an electrical system.
Notify the Engineer immediately if existing facility is damaged by your activities. Repair or replace
damaged facility promptly. If you fail to complete the repair or replacement, promptly, the Department will
repair or replace and deduct the costs.
Replace damaged detectors within 24 hours at your expense. If you fail to complete the repair within 24
hours, the Department will repair and deduct the repair costs.
If the roadway remains open to traffic while an existing lighting system is modified:
1. Keep the existing system in working order
2. Make the final connection so the modified circuit is in operation by nightfall
Keep temporary electrical installations in working order until no longer required. Remove temporary
installations under section 86-7.
During traffic signal system shutdown, place W3-1, "Stop Ahead," and R1-1, "Stop," signs in each
direction to direct traffic through the intersection. For 2-lane approaches, place 2 R1-1 signs.
Use a minimum size of 30 inches for the R1-1 sign.
Cover signal faces when the system is shut down overnight. Cover temporary W3-1 and R1-1 signs when
the system is turned on.
86-1.06B Maintaining Existing Traffic Management System Elements During Construction
Reserved

893

SECTION 86

ELECTRICAL SYSTEMS

86-1.07 SCHEDULING OF WORK


The first order of work must be to place the order for the electrical equipment. Furnish the Engineer a
statement from the vendor that the order for the electrical equipment has been received and accepted by
the vendor. Submit the statement as an informational submittal.
Except service installation and service equipment enclosure, do not work above ground until all materials
are on hand to complete the electrical work at each location. Schedule work to allow each system to be
completed and ready for operation before opening the corresponding section of the roadway to traffic.
If street lighting exists or is installed in conjunction with traffic signals, do not turn on the signals until the
street lighting is energized.
Traffic signals will not be placed in operation until the roadways to be controlled are open to traffic.
Lighting and traffic signals, including flashing operation, will not be placed in operation before starting the
functional test period specified in section 86-2.14.
Do not pull conductors into conduit until:
1. Pull boxes are set to grade
2. Metallic conduit is bonded and grounded
In vehicular undercrossings, soffit lights must be in operation as soon as practicable after falsework has
been removed from the structure. Lighting for pedestrian structures must be in operation before opening
the structure to pedestrian traffic.
If the Engineer orders soffit lights or lighting for pedestrian structures to be activated before permanent
power service is available, installing and removing the temporary power service is change order work.
The initial traffic signal turn on must be made between 9:00 a.m. and 2:00 p.m. Before the initial turn on,
all equipment, including pedestrian signals, pedestrian push buttons, vehicle detectors, lighting, signs,
and pavement delineation must be installed and in working order. Direct louvers, visors, and signal faces
to maximize visibility.
Start functional tests on any working day except Friday or the day before a holiday. Notify the Engineer
48 hours before the start of a functional test.
86-2 MATERIALS AND INSTALLATION
86-2.01 EXCAVATING AND BACKFILLING
Dispose of surplus excavated material.
Backfill under section 19-3. Backfill placed in conduit trenches outside the hinge point of slopes and not
under pavement must be compacted to a minimum relative compaction of 90 percent. Compact backfill
within hinge points and in areas where pavement is to be constructed to a minimum relative compaction
of 95 percent.
Backfill trenches and restore sidewalk, pavement, and landscaping at 1 intersection before starting
excavation at another intersection.
Unless otherwise specified in section 12, restrict closure for excavation on a street or highway to 1 lane at
a time.
86-2.02 REMOVING AND REPLACING IMPROVEMENTS
Replace or reconstruct underlying material damaged by your activities. Replacement material must be of
equal or better quality than the material replaced.
If a part of a square or slab of concrete sidewalk, curb, gutter, or driveway is broken or damaged, the
entire square or slab must be removed and reconstructed.
Cut the outline of concrete sidewalk or driveway to be removed:
1. Using a power-driven saw
2. On a neat line
894

SECTION 86

ELECTRICAL SYSTEMS

3. To a 0.17-foot minimum depth


86-2.03 FOUNDATIONS
86-2.03A General
Except for concrete for CIDH concrete pile foundations, concrete must comply with the specifications for
minor concrete.
Construct concrete foundations on firm ground.
After each post, standard, and pedestal is properly positioned, place mortar under the base plate. Finish
the exposed portion to present a neat appearance. Mortar must comply with the specifications for mortar
in section 51-1, except mortar must have:
1. 1 part by volume of cement
2. 3 parts by volume of clean sand
Form exposed portions of the foundation to present a neat appearance and true to line and grade. The
top of the foundation for posts and standards must be finished to curb or sidewalk grade. Forms must be
rigid and braced securely in place. Conduit ends and anchor bolts must be placed at the proper height
and position. Anchor bolts must be installed a maximum of 1:40 from vertical and held in place by rigid
top and bottom templates. Use a steel bottom template at least 1/2 inch thick that provides proper
spacing and alignment of anchor bolts near the embedded bottom end. Install the bottom template before
placing footing concrete.
For relocated standards, construct new foundations and furnish anchor bolts of the proper type and size.
Galvanize steel parts under section 75-1.05.
Provide 2 nuts and washers for the upper threaded part of each anchor bolt. Provide 3 nuts and washers
for each anchor bar or stud.
Do not weld HS steel used for anchor bolts, anchor bars, or studs.
Before placing concrete, moisten the forms and ground. Keep the forms in place until the concrete sets
for at least 24 hours and is strong enough to prevent damage to the surface.
Except when located on a structure, construct foundations for posts, standards, and pedestals
monolithically.
Apply ordinary surface finish under section 51-1.03F(2).
If a foundation must be extended for additional depth, the extension work is change order work.
Do not erect posts, poles, standards, pedestals, or cabinets until the concrete foundation has cured for at
least 7 days.
The Engineer will choose either the plumbing or raking technique for posts, standards, and pedestals.
Plumb or rake by adjusting the leveling nuts before tightening nuts. Do not use shims or similar devices.
After final adjustments of both top nuts and leveling nuts on anchorage assemblies have been made, and
each post, standard, and pedestal on the structure is properly positioned, tighten nuts as follows:
1. Tighten leveling nuts and top nuts, following a crisscross pattern, until bearing surfaces of all nuts,
washers, and base plates are in firm contact.
2. Use an indelible marker to mark the top nuts and base plate with lines showing relative alignment of
the nut to the base plate.
3. Tighten top nuts, following a crisscross pattern, an additional 1/6th of a turn.
In unpaved areas, construct a raised concrete pad in front of each controller cabinet.
If a foundation is shown to be abandoned, remove the top of the foundation, anchor bolts, and conduits to
a minimum depth of 0.5 foot below the sidewalk surface or original ground. Backfill the resulting hole with
material equivalent to the surrounding material.

895

SECTION 86

ELECTRICAL SYSTEMS

A foundation must be completely removed if not shown to be reused or abandoned.


Dispose of foundations removed.
86-2.03B Cast-In-Drilled-Hole Concrete Pile Foundations
Reinforced CIDH concrete pile foundation must comply with section 49-3, except:
1. Dispose of material resulting from drilling holes under section 86-2.01
2. Concrete for CIDH concrete piles will not be considered as designated by compressive strength
Concrete must contain not less than 590 pounds of cementitious material per cubic yard.
For standards and poles located in sidewalk areas, the pile foundation must be placed to final sidewalk
grade before the sidewalk is placed. The top 4 inches must be square shaped.
86-2.04 STANDARDS, POLES, STEEL PEDESTALS, AND POSTS
86-2.04A General
Except for Type 1 standards, attach rectangular corrosion-resistant metal identification tags on all
standards and poles using stainless steel rivets as follows:
1. For standards and poles, attach a tag above the handhole near the base of the standard or pole.
2. For signal standards, attach 1 tag above the handhole near the base of the pole and 1 tag on the
underside of the signal mast arm near the arm plate.
The lettering on each identification tag must be depressed or raised, 1/4 inch tall, legible, and include the
following information:
1.
2.
3.
4.
5.

Name of the manufacturer


Date of manufacture
I dentification number
C
ontract number
U
nique identification code:
5.1. Assigned by the manufacturer
5.2. Traceable to a particular Contract and the welds on that component
5.3. Readable after the support structure is coated and installed

Change in the mast arm configuration is allowed as long as the mounting height and stability are
maintained.
Configure the mast arm as a smooth curving arm.
Holes left in the shaft of an existing standard due to the removal of equipment or mast arm must be
sealed by fastening a galvanized steel disk to cover the hole. Fasten using a single central galvanized
steel fastener. Seal edges of the disk and hole with a polysulfide or polyurethane sealing compound
complying with ASTM C 920, Type S, Grade NS, Class 25, Use O.
If an existing standard is ordered to be relocated or reused, remove large dents, straighten shafts, and
replace parts that are in poor condition. Furnish anchor bolts or bars and nuts required for relocating or
reusing standard. Repair and replacement work is change order work.
If a standard or mast arm is relocated or the Department furnishes a used standard or mast arm, furnish:
1. New bolts, nuts, cap screws, and washers
2. New keeper plate, if the standard has a slip base
86-2.04B Steel Standards, Poles, Pedestals, and Posts
86-2.04B(1) General
Welding must comply with AWS D1.1.
Handhole reinforcement rings for standards, steel pedestals, poles, and posts must be continuous around
the handholes.
896

SECTION 86

ELECTRICAL SYSTEMS

Type 1 standards and steel pedestals for controller cabinets must be manufactured of one of the
following:
1. At least 0.12-inch-thick galvanized steel
2. 4-inch standard weight galvanized steel pipe complying with ASTM A 53/A 53M
3. 4-inch Type 1 conduit with the top designed for post-top slip fitter
Push button posts, pedestrian barricades, and guard posts must comply with ASTM A 53.
Standards, poles, pedestals, posts, fasteners, and other ferrous materials must be galvanized under
section 75-1.05.
86-2.04B(2) Bolted Connections
Anchor bolts must comply with ASTM F 1554, Grade 55 for weldable steel.

HS anchor bolts, nuts, and washers must comply with section 55-1.02A(1).

Bolts, nuts, and washers for general applications must comply with section 55-1.02A(1).

HS bolts shown to be snug tight must comply with section 55-1.02A(1) for general applications.

HS bolts, nuts, and flat washers used to connect slip base plates must comply with ASTM A 325.

Assemble and tighten the slip base when the pole is on the ground. Threads of heavy hex nuts for each

slip base bolt must be coated with additional lubricant that is clean and dry to the touch. Tighten HS slip
base bolts to within 10 ft-lb of torque shown in the following table:
Slip Base Bolt Tightening Requirements
Torque
Standard type
(ft-lb)
15-SB
150
30
150
31
200
36-20A
165
Zinc-coated nuts used on fastener assemblies having a specified preload obtained by specifying a
prescribed tension, torque value, or degree of turn must be provided with a colored lubricant, clean and
dry to the touch. The lubricant color must contrast the zinc coating color on the nut such that the presence
of the lubricant is visually obvious. Lubricant must be insoluble in water or the fastener components must
be shipped to the job site in a sealed container.
Plate washers must be manufactured by saw cutting and drilling steel plate. Steel plate must comply with
AISI 1018. Before galvanizing, remove burrs and sharp edges and chamfer both sides of holes to allow
the bolt head to make full contact with the washer without tension.
HS cap screws for attaching arms to standards must comply with ASTM A 325 or A 449, and the
mechanical requirements in ASTM A 325 after galvanizing. Coat threads of cap screws with a colored
lubricant, clean and dry to the touch. Lubricant color must contrast the zinc-coating color on the cap
screw such that the presence of the lubricant is visually obvious. Lubricant must be insoluble in water or
the fastener components must be shipped to the job site in a sealed container.
Bolted connections attaching signal or luminaire arm to the pole must be considered slip critical.
Galvanized faying surfaces of plates on luminaire arm, signal arm, and pole must be roughened by hand
using a wire brush before assembly and must comply with requirements for Class C surface conditions for
slip-critical connections in "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts," a
specification approved by the RCSC. Paint for faying surfaces must comply with the RCSC specification
for Class B coating.
Before manufacturing, details must be adjusted to ensure that cap screw heads can be turned using
conventional installation tools. During manufacturing, properly locate the position of the luminaire on the
arm plate to avoid interference with the cap screw heads.
897

SECTION 86

ELECTRICAL SYSTEMS

The Engineer will randomly take test samples of fastener components from each production lot and
submit to these test samples to METS with test reports specified in ASTM fastener specifications for QA
testing and evaluation. The Engineer will determine sample sizes for each fastener component.
86-2.04B(3) Standards and Poles
Standards and poles with shaft lengths of 15 feet or longer must comply with section 55-1.02 and the
following:
1. Tapered tubes must be manufactured from sheet steel of weldable grade having a minimum yield
strength of 55,000 psi after manufacturing.
2. Certified test reports verifying compliance with minimum yield strength requirements must be
submitted. Test report may be the mill test report for the as-received steel or if the as-received steel
has a lower yield strength than required, provide test data assuring that your method of cold forming
will consistently increase the tensile properties of the steel to meet the specified minimum yield
strength. Test data must include tensile properties of the steel after cold forming for specific heats
and thicknesses.
3. If a single-ply 5/16-inch-thick pole is specified, a 2-ply pole with equivalent section modulus may be
substituted.
4. Standard may be manufactured of full-length sheets or shorter sections. Each section must be
manufactured from 1 or 2 pieces of sheet steel. If 2 pieces are used, the longitudinal welded seams
must be directly opposite from one another. If the sections are butt-welded together, the longitudinal
welded seams of adjacent sections must be placed to form continuous straight seams from the base
to the top of the standard.
5. Butt-welded circumferential joints of tubular sections requiring CJP groove welds must be made using
a metal sleeve backing ring inside each joint. The sleeve must have at least a 1/8 inch nominal
thickness and be manufactured from steel having the same chemical composition as the steel in the
tubular sections to be joined. If the sections to be joined have different specified minimum yield
strengths, the steel in the sleeve must have the same chemical composition as the tubular section
having the higher minimum yield strength. The width of the metal sleeve must be consistent with the
type of NDT selected and must be a minimum width of 1 inch. At fitting time, the sleeve must be
centered at the joint and in contact with the tubular section at the point of the weld.
6. Welds must be continuous.
7. Weld metal at the transverse joints must extend to the sleeve, making the sleeve an integral part of
the joint.
8. During manufacturing, longitudinal seams on vertical tubular members of cantilevered support
structures must be centered on and along the side of the pole that the pole plate is located.
Longitudinal seams on horizontal tubular members, including signal and luminaire arms, must be
within 45 degrees of the bottom of the arm.
9. Longitudinal seam welds in steel tubular sections may be made by the electric resistance welding
process.
10. Longitudinal seam welds must have a 60 percent minimum penetration, except:
10.1. Within 6 inches of a circumferential weld, the longitudinal seam weld must be a CJP groove
weld.
10.2. Longitudinal seam welds on lighting support structures having a telescopic pole segment splice
must be CJP groove welds on the female end for a length on each end equal to the designated
slip-fit splice length plus 6 inches.
11. Exposed circumferential welds, except fillet and fatigue-resistant welds, must be ground flush with the
base metal before galvanizing or painting. Ground flush is specified as -0, +0.08-inch.
12. Circumferential welds and base plate-to-pole welds may be repaired only 1 time.
13. Exposed edges of the plates that make up the base assembly must be finished smooth and exposed
corners of the plates must be broken. Provide shafts with slip-fitter shaft caps.
14. Surface flatness requirements specified in ASTM A 6 apply to plates:
14.1. In contact with concrete, grout, or washers and leveling nuts
14.2. In HS bolted connections
14.3. In joints, where cap screws are used to secure luminaire and signal arms
14.4. Used for breakaway slip base assemblies
15. Standards and poles must be straight with a maximum variation of:
15.1. 1 inch measured at the midpoint of a 30-foot to 35-foot standard
15.2. 3/4 inch measured at the midpoint of a 17-foot to 20-foot standard
898

SECTION 86

ELECTRICAL SYSTEMS

15.3. 1 inch measured 15 feet above the base plate for Type 35 and Type 36 standards
16. Do not make additional holes in structural members.
17. Standards with an outside diameter of 12 inches or less must be round. Standards with an outside
diameter greater than 12 inches must be round or multisided. Multi-sided standards must be convex
with a minimum of 12 sides and have a minimum bend radius of 4 inches.
18. Manufacture mast arms from material specified for the standard.
19. Manufacture the cast steel option for slip bases from material of Grade 70-40 complying with ASTM A
27/A 27M. Other comparable material may be used if authorized. The casting tolerances must comply
with the Steel Founders' Society of America's recommendations for green sand molding.
20. One casting from each lot of a maximum of 50 castings must be radiographed under ASTM E 94.
Castings must comply with the acceptance criteria for severity level 3 or better for the types and
categories of discontinuities specified in ASTM E 186 and E 446. If the casting fails the inspection, 2
additional castings must be radiographed. If the 2 additional castings fail the inspection, the lot will be
rejected.
86-2.04C Fiberglass Highway Advisory Radio Poles
Reserved
86-2.04D Aluminum Lighting Standards
Reserved
86-2.05 CONDUIT
Use conduits to run the conductors except for overhead and where conductors are run inside poles.
You may use a larger size conduit than specified as long as you use it for the entire length between
outlets. Do not use reducing coupling.
New conduit must not pass through existing foundations for standards.
86-2.05A Material
Conduit and conduit fitting must be UL or NRTL listed and comply with the requirements shown in the
following table:

899

SECTION 86

ELECTRICAL SYSTEMS
Type
1

Type
2

Type
3

Type
4

Type
5

Conduit and Conduit Fitting Requirements


Hot-dip galvanized rigid steel conduit and conduit couplings
must comply with UL 6 and ANSI C80.1. Zinc coating testing
must comply with copper sulfate test requirements in UL 6.
Conduit couplings for rigid steel conduit must be
electrogalvanized.
Hot-dip galvanized rigid steel conduit must comply with
requirements for Type 1 conduit and be coated with PVC or
polyethylene. Exterior thermoplastic coating must have a
minimum thickness of 35 mils. Internal coating must have a
minimum thickness of 2 mils. Coated conduit must comply with
UL 6; NEMA RN 1; or NRTL PVC-001.
Rigid nonmetallic PVC conduit must comply with UL 651.
Type A extruded rigid PVC conduit and extruded rigid HDPE
conduit must comply with UL 651A.
Coilable, smooth-wall, continuous length HDPE conduits must
comply with UL 651B.
Install at underground locations only.
Waterproof flexible metal conduit must consist of conduit with a
waterproof nonmetallic sunlight-resistant jacket over an inner
flexible metal core. Type 4 conduit must be UL listed for use as
the grounding conductor.
Intermediate steel conduit and conduit couplings must comply
with UL 1242 and ANSI C80.6. Zinc coating testing must comply
with copper sulfate test requirements in UL 1242. Conduit
couplings for intermediate rigid steel conduit must be
electrogalvanized. Type 5 conduit must only be used if specified.

Bonding bushings to be installed on metal conduit must be insulated and either galvanized or zinc alloy
type.
Fittings for steel conduit and for watertight flexible metal conduit must be UL listed at UL 514B.
86-2.05B Use
Install Type 1 conduit on all exposed surfaces and at the following locations:
1. In concrete structures
2. Between a structure and nearest pull box
Exposed conduit installed on painted structure must be painted the same color as the structure.
Change or extend existing conduit runs using the same material. Install pull box if an underground conduit
changes from the metallic type to Type 3.
Minimum trade size of conduit must be:
1.
2.
3.
4.
5.
6.
7.

1-1/2 inches from electrolier to adjacent pull box


1 inch from pedestrian push button post to adjacent pull box
2 inches from signal standard to adjacent pull box
3 inches from controller cabinet to adjacent pull box
2 inches from overhead sign to adjacent pull box
2 inches from service equipment enclosure to adjacent pull box
1-1/2 inches if unspecified

Two conduits must be installed between a controller cabinet and the adjacent pull box.
86-2.05C Installation
Whether shop or field cut, ream ends of conduit to remove burrs and rough edges. Make cuts square and
true. Slip joints and running threads are not allowed for coupling conduit. If a standard coupling cannot be
900

SECTION 86

ELECTRICAL SYSTEMS

used for coupling metal type conduit, use a threaded union coupling that is UL or NRTL listed. Tighten
couplings for metal conduit to maintain a good electrical connection through conduit run.
Cut Type 3 conduit with tools that will not deform the conduit. Use solvent weld for connections.
Cut Type 2 conduit with pipe cutters; do not use hacksaws. Coated conduit must be threaded with
standard conduit-threading dies. Tighten conduit into couplings or fittings using strap wrenches or
approved groove joint pliers.
Protect shop-cut threads from corrosion under the standards shown in the following table:
Shop-Cut Thread Protection
Steel conduit and conduit
ANSI C80.1
couplings
Electrical intermediate metal
ANSI C80.6
conduit and conduit couplings
Paint conduits. Apply 2 coats of authorized unthinned zinc-rich primer of organic vehicle type. Do not use
aerosol cans. Paint the following parts of conduits:
1. All exposed threads
2. Field-cut threads before installing conduit couplings to steel conduit
3. Damaged surfaces on metal conduit
Do not remove shop-installed conduit couplings.
Damaged Type 2 conduit or conduit coupling must be wrapped with at least 1 layer of 2-inch-wide, 20-mil
minimum-thickness PVC tape as specified in ASTM D 1000, with a minimum tape overlap of 1/2 inch.
Before applying the tape, conduit or fitting must be cleaned and painted with 1 coat of rubber-resin based
adhesive as recommended by the tape manufacturer. You may repair damaged spots in the
thermoplastic coating by painting over with a brushing type compound supplied by the conduit
manufacturer instead of the tape wrap.
The ends of Types 1, 2, or 5 conduit must be threaded and capped with standard pipe caps until wiring is
started. The ends of Types 3 and 4 conduit must be capped until wiring is started. If caps are removed,
replace with conduit bushings. Fit insulated bonding bushings on the end of metal conduit ending in pull
box or foundation. Bell or end bushings for Type 3 conduit must be nonmetallic type.
Conduit bends, except factory bends, must have a radius of not less than 6 times the inside diameter of
the conduit. If factory bends are not used, bend the conduit without crimping or flattening using the
longest radius practicable. Bend conduits as shown in the following table:
Type 1
Type 2
Type 3
Type 5

Conduit-Bending Requirements
By equipment and methods recommended by the conduit manufacturer.
Use standard bending tool designed for use on thermoplastic coated
conduit. Conduit must be free of burrs and pits.
By equipment and methods recommended by the conduit manufacturer. Do
not expose conduit to direct flame.
By equipment and methods recommended by the conduit manufacturer.

Install pull tape in conduit that is to receive future conductors. The pull tape must be a flat woven
lubricated soft fiber polyester tape with a minimum tensile strength of 1,800 lb and have printed
sequential measurement markings every 3 feet. At least 2 feet of pull tape must be doubled back into the
conduit at each end.
Existing underground conduit to be incorporated into a new system must be cleaned with a mandrel or
cylindrical wire brush and blown out with compressed air.
Install conduit to a depth of not less than 30 inches below finished grade, except in sidewalk and curbed
paved median areas, where it must be at least 18 inches below grade. You may lay conduit on existing
pavement within new curbed median.
901

SECTION 86

ELECTRICAL SYSTEMS

Conduit coupling must be a minimum of 6 inches from the face of the foundation.
Place a minimum of 2 inches of sand bedding in the trench before installing Type 2 or Type 3 conduit.
Place a minimum of 4 inches of same material over conduit before placing additional backfill material.
Conduit runs located behind curbs may be installed in the street, within 3 feet of, and parallel with the
face of the curb by the trenching in pavement method as specified in section 86-2.05C. Pull boxes must
be located behind the curb or at the locations shown.
Obtain authorization before disturbing pavement. If an obstruction is encountered, obtain authorization to
cut small holes in the pavement to locate or remove the obstruction. If jacking or drilling method is used,
keep jacking or drilling pit 2 feet away from edge of pavement. Pavement must not be weakened or
subgrade softened from excess water use.
Conduit used for drilling or jacking must be removed; install new conduit for completed work. If a hole
larger than the conduit is pre-drilled and you install conduit by hand or by equipment and method
recommended by the conduit manufacturer, you may install Type 2 or Type 3 conduit under the
pavement.
If trenching in pavement method is specified, conduit installation under pavement that is not a freeway
lane or freeway to freeway connector ramp, must comply with the following:
1. Use Type 3 conduit. Place conduit under pavement in a trench approximately 2 inches wider than the
outside diameter of conduit, but not exceeding 6 inches in width. Trench depth must not exceed the
greater of 12 inches or conduit trade size plus 10 inches, except that at pull boxes the trench may be
hand dug to required depth. The top of the installed conduit must be a minimum of 9 inches below
finished grade.
2. Trenching installation must be completed before placing final pavement layer.
3. Cut pavement to be removed with a rock cutting excavator. Minimize shatter outside the removal
area.
4. Place conduit in the bottom of the trench and backfill with minor concrete. Minor concrete must
contain a minimum of 590 lb of cementitious material per cubic yard. If the trench is in asphalt
concrete pavement and pavement overlay is not placed, backfill the top 0.10 foot of the trench with
minor HMA.
5. Backfill trenches, except for the top 0.10 foot, by the end of each day. The top 0.10 foot must be filled
within 3 days after trenching.
Conduit installed beneath railroad tracks must be:
1. Type 1 or 2
2. 1-1/2-inch minimum diameter
3. Placed a minimum depth of 42 inches below the bottom of the rail.
If jacking or drilling method is used, construct jacking pit to a minimum of 13 feet from the centerline of
track at the near side of jacking pit. Cover jacking pit with substantial planking if left overnight.
Conduit ending in a standard or pedestal must not extend more than 3 inches vertically above the
foundation and must be sloped toward the handhole opening. Conduit entering through the side of a
nonmetallic pull box must end inside the box within 2 inches of the wall and 2 inches above the bottom
and be sloped toward the top of the box to facilitate pulling of conductors. Conduit entering through the
bottom of a pull box must end 2 inches above the bottom and be located near the end walls to leave the
major portion of the box clear. At the outlet, the conduit must enter from the direction of the run.
Underground conduit runs, including under sidewalks, that are adjacent to gasoline service stations or
other underground gasoline or diesel storage, piping, or pumps and that lead to a controller cabinet,
circuit breaker panel, service, or enclosure where an arc may occur during normal operations must be
sealed if the conduit is within the limits specified in the NEC for Class 1, division 1. Use Type 1 or Type 2
conduit for these runs.
Conduit for future use in structures must be threaded and capped. Conduit leading to soffit, wall, or other
lights or fixtures below pull box grade must be sealed and made watertight, except where conduit ends in
a No. 9 or No. 9A pull box.
902

SECTION 86

ELECTRICAL SYSTEMS

Support for conduit in or on a wall or bridge superstructure must comply with the following:
1. Steel hangers, steel brackets, and other fittings must comply with section 75-1.03.
2. Construct precast concrete conduit cradles using minor concrete and commercial quality welded wire
fabric. Minor concrete must contain a minimum of 590 lb of cementitious material per cubic yard. The
cradles must be moist cured for a minimum of 3 days. Bond precast concrete cradles to the structure
with one of the following epoxy adhesives:
2.1. Epoxy adhesive for bonding freshly-mixed concrete to hardened concrete.
2.2. Rapid set epoxy adhesive for pavement markers.
2.3. Standard set epoxy adhesive for pavement markers.
3. Use pipe sleeve or form an opening for conduit through the bridge superstructure concrete. Sleeve or
opening through either prestressed member or conventionally reinforced precast member must be:
3.1. Transverse to the member.
3.2. Through the web.
3.3. Not more than 3 inches maximum gross opening in concrete.
4. Where conduits pass through the abutment concrete, wrap conduit with 2 layers of asphalt-felt
building paper securely taped or wired in place. Fill the space around the conduit that runs through
the bridge abutment wall with mortar under section 51-1 except the proportion of cementitious
material to sand must be 1 to 3. Fill the space around the conduits that run through the abutments
after prestressing is completed.
5. Run surface-mounted conduit straight and true, horizontal or vertical on the wall, and parallel to walls
on ceilings or other similar surfaces. Support conduit at a maximum of 5-foot intervals or closer where
necessary to prevent vibration or unsightly deflection. The supports must include galvanized
malleable iron conduit clamps and clamp backs secured with expansion anchorage devices as
specified for concrete anchorage devices in section 75-1.03. Threaded studs must be galvanized and
be of the largest diameter that will pass through the mounting hole in conduit clamp.
6. Where pull boxes are placed in conduit runs, the conduit must be fitted with threaded bushings and
bonded.
7. Mark the location of conduit end in structure, curb, or wall with a "Y" that is a minimum of 3 inches tall,
directly above conduit.
86-2.05D Expansion Fittings
Install expansion fitting where the conduit crosses an expansion joint in a structure. Each expansion fitting
for metal conduit must include a copper bonding jumper having the ampacity specified in NEC.
Each expansion-deflection fitting for expansion joints of 1-1/2-inch movement rating must be watertight
and include a molded neoprene sleeve, a bonding jumper, and 2 silicon bronze or zinc-plated iron hubs.
Each fitting must allow a minimum of 3/4-inch expansion, contraction, and lateral deflection.
86-2.06 PULL BOXES
You may use a larger standard size pull box than that described.
86-2.06A Materials
Pull box, cover, and extension for installation in ground or sidewalk area must be precast reinforced
concrete or nonconcrete material. Nonconcrete material must:
1. Be fire resistant with a burn rate no greater than 0.3 inch per minute per 0.1 inch of thickness when
tested under ASTM D 635
2. Show no significant change in physical properties with exposure to weather
3. Be dense, free of voids or porosity, and gray or brown in color
Nonconcrete pull box must comply with the following:
1. Top dimensions must not exceed the bottom dimensions by more than 1 inch.
2. Extension must be of the same material as the pull box and attached to the pull box to maintain the
minimum combined depths as shown.
3. Cover must not fail and must not deflect more than 1/4 inch when a vertical force of 1,500 lb is
applied through a 1/2-by-3-by-6-inch steel plate to a nonconcrete cover on the pull box. Center the
steel plate on the cover with its longitudinal axis coinciding with the longitudinal axis of the cover.

903

SECTION 86

ELECTRICAL SYSTEMS

Nonconcrete pull boxes must be of sufficient rigidity that when a designated concentrated force is applied
perpendicularly to the midpoint of one of the long sides at the top while the opposite long side is
supported by a rigid surface, it must be possible to remove the cover without the use of tools. The
designated concentrated force must be 150 lb for a No. 3-1/2 pull box and must be 100 lb for a No. 5 or
No. 6 pull box.
If a transformer or other device must be placed in a nonmetallic pull box, include recesses for a hanger.
Secure cover, except ceiling pull box cover, with 3/8-inch hold down bolts, cap screws, or studs, washers,
and brass stainless steel or other noncorroding metal nut. Stainless steel hardware must have an 18
percent chromium content and an 8 percent nickel content.
Galvanize ferrous metal parts under section 75-1.05.
Traffic pull box must be provided with steel cover and special concrete footing. Steel cover must have an
embossed nonskid pattern.
Traffic pull box and cover must have a vertical proof-load strength of 25,000 lb. Comply with Federal
Specification RR-F-621 and distribute the 25,000 lb load through a 9-by-9-by-2-inch steel plate. You must
be able to place the load anywhere on the box and cover for 1 minute without causing cracks or
permanent deformations.
No. 3-1/2(T) and No. 5(T) traffic pull box must be reinforced with a galvanized Z bar welded frame and
cover similar to that shown for No. 6(T) pull box. Frame must be anchored to the box with 1/4 by 2-1/4
inch concrete anchors. Four concrete anchors must be included for No. 3-1/2(T) pull box; one placed in
each corner. Six concrete anchors must be included for No. 5(T) and No. 6(T) pull boxes; one placed in
each corner and one near the middle of each of the longer sides.
Hold down screws must be 3/8-inch hex flange cap screws of Type 316 stainless steel. Nut must be zinc
plated carbon steel, vibration resistant, and have a wedge ramp at the root of the thread. Nut must be
spot welded to the underside or fabricated with galvanized Z-bar pull box frame.
Steel cover must be countersunk approximately 1/4 inch to accommodate the bolt head. When tightened,
the bolt head must not exceed more than 1/8 inch above the top of the cover. A 1/4-inch tapped hole and
brass bonding screw must be included.
Concrete placed around and under traffic pull boxes must be minor concrete.
86-2.06B Cover Marking
Marking must be clearly defined, uniform in depth, and parallel to either the long or short sides of the
cover.
Marking letters must be between 1 to 3 inches high.
Before galvanizing steel or cast iron cover, apply marking by one of the following methods:
1. Use cast iron strip at least 1/4 inch thick with letters raised a minimum of 1/16 inch. Fasten strip to
cover with 1/4-inch flathead stainless steel machine bolts and nuts. Peen bolts after tightening.
2. Use sheet steel strip at least 0.027 inch thick with letters raised a minimum of 1/16 inch. Fasten strip
to cover by spot welding, tack welding, or brazing, with 1/4-inch stainless steel rivets or 1/4-inch
roundhead stainless steel machine bolts and nuts. Peen bolts after tightening.
3. Bead weld the letters on cover such that the letters are raised a minimum of 3/32 inch.
86-2.06C Installation and Use
Space pull boxes no more than 200 feet apart. You may install additional pull boxes to facilitate the work.
Pull box in ground or sidewalk area must be installed as follows:
1. Embed bottom of the pull box in crushed rock.
2. Place a layer of roofing paper on the crushed rock.
3. Place grout over the layer of roofing paper. Grout must be 0.50 to 1 inch thick and be sloped toward
the drain hole.
4. Make a 1-inch drain hole in the center of the pull box through the grout and roofing paper.
904

SECTION 86

ELECTRICAL SYSTEMS

5. Place grout between the pull box and the pull box extension, and around conduits.
Reconstruct the sump of an existing pull box if disturbed by your activities. Remove old grout and replace
with new if the sump was grouted.
After installation of traffic pull box, install the steel cover and keep it bolted down when your activities are
not in progress at the pull box. When the steel cover is placed for the final time, the cover and Z bar frame
must be cleaned of debris and tightened securely.
86-2.07 RESERVED
86-2.08 CONDUCTORS AND CABLES
86-2.08A General
Conductor must be copper wire that complies with ASTM B 3 and B 8.
Wire size must comply with the requirements shown in the following table:
Wire Size Requirements
Conductor usage
Requirement
In loop detector lead-in cable
ASTM B 286
Everywhere except in loop detector
AWGa
lead-in cable
a
Except conductor diameter must not be less than 98 percent of
specified AWG diameter.
Single conductor and cable, except detector lead-in cable, must have clear, distinctive, and permanent
markings on the outer surface throughout its length. The markings must include the manufacturer's name
or trademark, insulation type letter designation, conductor size, voltage, and temperature rating, and for
cables, it must also include number of conductors.
86-2.08B Conductor Identification
Conductor insulation must be a solid color with a permanent stripe as specified below. The solid color
must be homogeneous through the full depth of insulation. Identification stripe must be continuous
throughout the length of conductor. For conductor sizes No. 2 and larger, the insulation may be black and
the ends of the conductors must be taped for a minimum length of 20 inches with electrical insulating tape
of the required color. Conductor identification must comply with the requirements in the following table:

905

SECTION 86

Circuit

Vehicle
signalsa, b, d

Pedestrian
signalsd

Pedestrian
push buttonsd
Traffic signal
controller
cabinet
Highway
lighting pull
box to
luminaire
Multiple
highway
lighting
Lighting
control

Service

Sign lighting
Flashing
beaconsg

Grounded and
common

Railroad
preemption
Spares

ELECTRICAL SYSTEMS
Conductor Identification
Identification
Insulation colori
Signal phase or
Band symbolsf
Base
Stripea
function
2, 6
Red, Yel, Brn
Blk
2, 6
4, 8
Red, Yel, Brn
Ora
4, 8
1, 5
Red, Yel, Brn
None
1, 5
3, 7
Red, Yel, Brn
Pur
3, 7
Ramp meter 1
Red, Yel, Brn
None
NBR
Ramp meter 2
Red, Yel, Brn
Blk
NBR
2p, 6p
Red, Brn
Blk
2p, 6p
4p, 8p
Red, Brn
Ora
4p, 8p
1p, 5p
Red, Brn
None
1p, 5p
3p, 7p
Red, Brn
Pur
3p, 7p
2p, 6p
Blu
Blk
P-2, P-6
4p, 8p
Blu
Ora
P-4, P-8
1p, 5p
Blu
None
P-1, P-5
3p, 7p
Blu
Pur
P-3, P-7
Ungrounded circuit
conductor
Blk
None
CON-1
Grounded circuit
conductor
Wht
None
CON-2
Ungrounded-line 1
Blk
None
NBR
Ungrounded-line 2
Red
None
NBR

Size
14
14
14
14
14
14
14
14
14
14
14
14
14
14
6
6
14
14

Grounded
Ungrounded-line 1

Wht
Blk

None
None

NBR
ML1

14
10

Ungrounded-line 2
Ungrounded to PEU
Switching leg from
PEU unit or SM
transformer
Ungrounded-line 1
(signals)
Ungrounded-line 2
(lighting)
Ungrounded-line 1
Ungrounded-line 2
Ungrounded between
flasher and beacons
Pedestrian push
buttons
Signals and multiple
lighting
Flashing beacons and
sign lighting
Lighting control
Service

Red
Blk

None
None

ML2
C1

10
14

Red

None

C2

14

Blk

None

NBRe

Redh
Blk
Red

None
None
None

NBRe
SL-1
SL-2

8
10
10

Red or Yel

None

F-Loc.c

14

Wht

Blk

NBR

14

Wht

None

NBR

10

Wht
Wht
Wht

None
None
None

NBR
C-3
NBR

12
14
14

Blk
Blk

None
None

R
NBR

14
14

906

SECTION 86

ELECTRICAL SYSTEMS

NBR = No band required


PEU=Photoelectric unit

On overlaps, insulation is striped for 1st phase in designation. e.g., phase (2+3) conductor is

striped as for phase 2.

b
Band for overlap and special phases as required.

c
Flashing beacons having separate service do not require banding.

d
These requirements do not apply to signal cable.

e
"S" if circuit is switched on line side of service equipment by utility.

f
Band conductors in each pull box and near ends of termination points. On signal light circuits, a

single band may be placed around 2 or 3 ungrounded conductors comprising a phase.

g
Ungrounded conductors between service switch and flasher mechanism must be black and

banded.

h
Black acceptable for size No. 2 and larger. Tape ends for 20 inches with indicated color.

i
Color Code: Yel-Yellow, Brn-Brown, Blu-Blue, Blk-Black, Wht-White, Ora-Orange, Pur-Purple.

86-2.08C Circuit Conductors


Circuit conductors must be UL or NRTL listed and rated for 600 V(ac) operation. Insulation for No. 14 to
No. 4 conductors must be one of the following:
1. Type TW PVC as specified in ASTM D 2219
2. Type THW PVC
3. Type USE, RHH, or RHW cross-linked polyethylene
Minimum insulation thickness for the insulation types shown must comply with the following table:
Insulation Thickness
Conductor size
Insulation thickness
(mils)
No. 14 to No. 10
39
USE, RHH, or RHW
No. 8 to No. 2
51
No. 14 to No. 10
27
THW or TW
No. 8
40
No. 6 to No. 2
54
Insulation type

Insulation for No. 2 and larger conductor must be one of the types listed above or Type THWN.
Conductor for wiring wall and soffit luminaire must be stranded copper with insulation rated for use at
temperatures up to 125 degrees C.
86-2.08D Signal Cable
Signal cable, except for the 28-conductor type, must:
1. Not be spliced
2. Be marked in each pull box with the signal standard information it is connecting to
Signal cable must comply with the following:
1. Cable jacket must be:
1.1. Black polyethylene with an inner polyester binder sheath
1.2. Rated for 600 V(ac) and 75 degrees C
2. Filler material, if used, must be polyethylene material.
3. Conductor must be solid copper with Type THWN insulation as specified in section 86-2.08 and
ASTM B 286. The minimum thickness of Type THWN insulation must be 12 mils for conductor sizes
No. 14 to No. 12 and 16 mils for conductor size No. 10. The minimum thickness of nylon jacket must
be 4 mils.

907

SECTION 86

ELECTRICAL SYSTEMS

Cable
typea

Conductor
quantity
and type

3CSC

3 - No. 14

5CSC

5 - No. 14

9CSC

8 - No. 14
1 - No. 12

Conductor Signal Cable Requirements


Cable jacket
Maximum
thickness
nominal
(mils)
outside
Conductor color
Average Minimum diameter
(inch)
code
blue/black,
blue/orange,
44
36
0.40
white/black stripe
red, yellow, brown,
44
36
0.50
black, white
No. 12 - white
No. 14 - red, yellow,
brown, black, and
red/black,
yellow/black,
brown/black,
60
48
0.65
white/black stripe
No. 12 - white
No. 14 - see
"12CSC Color Code
and Functional
60
48
0.80
Connection" table

Remarks
Use for pedestrian
push buttons and
spare

Use for vehicle


signals, pedestrian
11 - No. 14
signals, spares,
12CSC
1 - No. 12
and signal common
Keep signal
commons in each
cable separate
except at the signal
controller. Label
each cable as "C1"
or "C2" in pull box.
No. 10 - white
Use "C1" for signal
No. 14 - see
phases 1, 2, 3, and
"28CSC Color Code 4. Use "C2" for
27 - No. 14
and Functional
phases 5, 6, 7, and
28CSC
1 - No. 10
80
64
0.90
Connection" table
8.
a
Conductor signal cable description starts with the number of conductors, followed by "CSC".
(e.g., a signal cable with 3 conductors is labeled "3CSC.")
12CSC Color Code and Functional Connection
Termination
Red
Vehicle signal red
Yellow
Vehicle signal yellow
Brown
Vehicle signal green
Red/black stripe
Vehicle signal red
Yellow/black stripe
Vehicle signal yellow
Brown/black stripe
Vehicle signal green
Black/red stripe
Spare, or use as required for red or DONT WALK
Black/white stripe
Spare, or use as required for yellow
Black
Spare, or use as required for green or WALK
Red/white stripe
Ped signal DONT WALK
Brown/white stripe
Ped signal WALK
Color code

908

Phase
2, 4, 6, or 8
2, 4, 6, or 8
2, 4, 6, or 8
1, 3, 5, or 7
1, 3, 5, or 7
1, 3, 5, or 7

SECTION 86

ELECTRICAL SYSTEMS
28CSC Color Code and Functional Connection
Color code
Termination
Phase
Red/black stripe
Vehicle signal red
2 or 6
Yellow/black stripe
Vehicle signal yellow
2 or 6
Brown/black stripe
Vehicle signal green
2 or 6
Red/orange stripe
Vehicle signal red
4 or 8
Yellow/orange stripe
Vehicle signal yellow
4 or 8
Brown/orange stripe
Vehicle signal green
4 or 8
Red/silver stripe
Vehicle signal red
1 or 5
Yellow/silver stripe
Vehicle signal yellow
1 or 5
Brown/silver stripe
Vehicle signal green
1 or 5
Red/purple stripe
Vehicle signal red
3 or 7
Yellow/purple stripe
Vehicle signal yellow
3 or 7
Brown/purple stripe
Vehicle signal green
3 or 7
Red/2 black stripes
Ped signal DONT WALK
2 or 6
Brown/2 black stripes
Ped signal WALK
2 or 6
Red/2 orange stripes
Ped signal DONT WALK
4 or 8
Brown/2 orange stripes
Ped signal WALK
4 or 8
Red/2 silver stripes
Overlap A, C red
OLA, OLC
Brown/2 silver stripes
Overlap A, C green
OLA, OLC
Red/2 purple stripes
Overlap B, D red
OLB, OLD
Brown/2 purple stripes
Overlap B, D green
OLB, OLD
Blue/black stripe
Ped push button
2 or 6
Blue/orange stripe
Ped push button
4 or 8
Blue/silver stripe
Overlap A, C yellow
OLA(y), OLC(y)
Blue/purple stripe
Overlap B, D yellow
OLB(y), OLD(y)
White/black stripe
Ped push button common
Black/red stripe
Railroad preemption
Black
Spare

86-2.08E Signal Interconnect Cable (SIC)


Signal interconnect cable must be a 3-pair or 6-pair type with stranded tinned copper No. 20 conductors.
Each conductor insulation must be 13 mils minimum nominal thickness, color-coded, polypropylene
material. Conductors must be in twisted pairs. Color coding distinguishes each pair. Each pair must be
wrapped with an aluminum polyester shield and must have a No. 22 or larger stranded tinned copper
drain wire inside the shielded pair.
Cable jacket must be black, HDPE, rated for a minimum of 300 V(ac) and 60 degrees C, and must have a
minimum nominal wall thickness of 40 mils. Cable jacket or moisture-resistant tape directly under the
outer jacket must be marked as specified in section 86-2.08.
You must have a minimum of 6 feet of slack at each controller cabinet. Splicing is allowed only if shown.
Insulate conductor splice with heat-shrink tubing and overlap at least 0.6 inch. Cover overall cable splice
with heat-shrink tubing and overlap the cable jacket at least 1-1/2 inch.
86-2.09 WIRING
Solder conductors by hot iron, pouring, or dipping method, connectors and terminal lugs for conductor
sizes No. 8 and smaller. Do not perform open-flame soldering.
86-2.09A Circuitry
Do not run traffic signal indication conductors to a terminal block on a standard unless connected to a
mounted signal head.
Use only 1 conductor to connect to each terminal of a pedestrian push button.
The common for pedestrian push button circuit must be separate from the traffic signal circuit grounded
conductor.
909

SECTION 86

ELECTRICAL SYSTEMS

86-2.09B Installation
Use a UL- or NRTL-listed inert lubricant for placing conductors in conduit.
Pull conductors into conduit by hand, using pull tape specified in section 86-2.05C. Do not use winches or
other power-actuated pulling equipment.
If adding new conductors or removing existing conductors, remove all conductors, clean the conduit
under section 86-2.05C, and pull all conductors in the conduit as 1 unit.
If traffic signal conductors are run in a lighting standard containing street lighting conductors from a
different service point, you must encase the traffic signal conductors or the lighting conductors with a
flexible or rigid metal conduit for a length until the 2 types of conductors are no longer in the same
raceway.
If less than 10 feet above grade, enclose temporary conductors in flexible or rigid metal conduit.
Leave slack for each conductor as shown in the following table:
Conductor Slack Requirements
Slack
Location
(feet)
Signal standard
1
Lighting standard
1
Signal and lighting standard
1
Pull box
3
Splice
3
Standards with slip base
0
After conductors are installed, seal ends of conduits with an authorized sealing compound.
To form a watertight seal, tape the ends of spare conductors and conductors ending in pull boxes.
Conductors and cables inside a fixture or cabinet must be neatly arranged and tied together by function
with self-clinching nylon cable ties or enclosed in a plastic tubing or raceway.
Identify conductors for signal overlap phase as specified for vehicle signals in the table titled "Conductor
Identification."
Permanently identify conductors by function. Place identification on each conductor or each group of
conductors forming a signal phase at each pull box and near the end of the conductors.
Label, tag, or band conductors by mechanical methods. Identification must not move along the
conductors.
86-2.09C Connectors and Terminals
Connectors and terminals must be UL- or NRTL-listed crimp type. Use a manufacturer-recommended tool
for connectors and terminals to join conductors. Comply with MIL-T-7928.
Terminate stranded conductors smaller than No. 14 in crimp style terminal lugs.
86-2.09D Splicing and Terminations
Splices are allowed for:
1.
2.
3.
4.
5.

Grounded conductors in a pull box.


Pedestrian push button conductors in a pull box.
Conductors in a pull box adjacent to each electrolier or luminaire.
Ungrounded traffic signal conductors in a pull box, if traffic signals are modified.
Ungrounded traffic signal conductors to a terminal compartment or a signal head on a standard with
conductors of the same phase in the pull box adjacent to the standard.
6. Ungrounded lighting circuit conductors in a pull box, if lighting circuits are modified.

910

SECTION 86

ELECTRICAL SYSTEMS

86-2.09E Splice Insulation


You may use "Heat-shrink tubing" or "Method B" to insulate splices.
Splice must function under continuous submersion in water.
Multi-conductor cable must be spliced and insulated to form a watertight joint and to prevent moisture
absorption by the cable.
Low-voltage tape must be:
1. UL or NRTL listed
2. Self fusing, oil and flame-resistant, synthetic rubber
3. PVC, pressure-sensitive adhesive of 6 mils minimum thickness
Insulating pad must be a combination of an 80-mils thick electrical grade PVC laminate and a 120-mils
thick butyl splicing compound with removable liner.
Heat-shrink tubing must comply with the following:
1. Be medium or heavy wall thickness, irradiated polyolefin tubing with an adhesive mastic inner wall.
2. Before contraction, minimum wall thickness must be 40 mils.
3. Comply with requirements for extruded insulated tubing at 600 V(ac) in UL Standard 468D and ANSI
C119.1, and the requirements shown in the following table:

Shrinkage ratio
Dielectric
strength
Resistivity
Tensile strength
Operating
temperature
Water absorption

Heat-Shrink Tubing Requirements


33 percent, maximum, of supplied diameter when
heated to 125 C and allowed to cool to 25 C
350 kV per inch, minimum
2513 per inch, minimum
2,000 psi, minimum
-40 C to 90 C (135 C in emergency)
0.5 percent, maximum

Insulate splices using "Heat-shrink tubing" by performing the following:


1. Completely cover the splice area with electrical insulating coating and allow to dry.
2. Heat as recommended by the manufacturer. Do not perform open-flame heating.
3. When heated, the inner wall must melt and fill crevices and interstices of the covered object and the
outer wall must shrink to form a waterproof insulation.
4. After contraction, each end of the heat-shrink tubing or the open end of end cap of heat-shrink tubing
must overlap the conductor insulation at least 1-1/2 inches.
5. If 3 or more conductors are to be enclosed in 1 splice, place mastic around each conductor before
placing inside tubing. Use mastic type recommended by heat-shrink tubing manufacturer.
6. Cover entire splice with electrical insulating coating and allow to dry.
Insulate splices using "Method B" by performing the following:
1. Completely cover the splice area with electrical insulating coating and allow to dry.
2. Apply 2 layers of electrical insulating pad with a minimum thickness of 1/8 inch each layer or 2 layers
of half lapped low voltage tape.
3. Apply 3 layers of half lapped polyvinyl chloride tape.
4. Cover entire splice with electrical insulating coating and allow to dry.
Use at least 2 thicknesses of electrical insulating pad. Apply pad to splice as recommended by the
manufacturer.

911

SECTION 86

ELECTRICAL SYSTEMS

86-2.09F Fused Splice Connectors


Install a fused disconnect splice connector in each ungrounded conductor, between the line and the
ballast, in the pull box adjacent to each luminaire. Connector must be accessible in the pull box.
For 240 and 480 V(ac) circuits, each connector must simultaneously disconnect both ungrounded
conductors. Connector must not have exposed metal parts except for the head of the stainless steel
assembly screw. Recess the head of the stainless steel assembly screw a minimum of 1/32 inch below
the top of the plastic boss that surrounds the head.
Splice connector must protect the fuse from water or weather damage. Contact between the fuse and
fuseholder must be spring loaded. Splice connector terminals must be:
1. Rigidly crimped, using a tool recommended by the manufacturer of the fused splice connector, onto
ungrounded conductors
2. Insulated
3. Watertight
Fuses must be standard midget ferrule type, with "Non-Time-Delay" feature, and 13/32 by 1-1/2 inches.
86-2.10 BONDING AND GROUNDING
Secure all metallic components, mechanically and electrically, to form a continuous system that is
effectively grounded.
Bonding jumper must be copper wire or copper braid of the same cross sectional area as a No. 8 or
larger to match the load. Equipment grounding conductors must be color coded as specified in NEC or be
bare.
Attach bonding jumper to the standard as shown in the following table:
Standard type
Standard with
handhole and
traffic pull box
lid cover
Standard
without
handhole
Slip base
standard

Bonding Jumper Attachment


Requirements
Use UL-listed lug and 3/16-inch diameter or larger brass
or bronze bolt. Run a jumper to the conduit or bonding
wire in adjacent pull box. Grounding jumper must be
visible after the standard is installed and mortar pad is
placed on foundation.
Use UL-listed ground clamp on each anchor bolt.

Use UL-listed ground clamp on each anchor bolt or


attach UL-listed lug to bottom slip base plate with 3/16
inch diameter or larger brass or bronze bolt.

Ground 1 side of the secondary circuit of step-down transformer.


Ground metal conduit, service equipment, and grounded conductor at the service point as specified by
NEC and service utility, except grounding electrode conductor must be No. 6 or larger.
Equipment bonding and grounding conductors are required in conduits. Run a No. 8 minimum bare
copper wire continuously in a conduit system. The bonding wire must be sized as specified in the NEC.
Ground electrode must be:
1. 1 piece
2. 10-foot minimum length of one of the following:
2.1. Galvanized steel rod or pipe not less than 3/4 inch in diameter
2.2. Copper clad steel rod not less than 5/8 inch in diameter
3. Installed as specified in NEC
4. Bonded to service equipment using one of the following:
4.1. Ground clamp
4.2. Exothermic weld
912

SECTION 86
4.3.

ELECTRICAL SYSTEMS

No. 6 or larger copper conductor

On wood pole, metallic equipment mounted less than 8 feet above ground surface must be grounded.
Bond metallic conduit in nonmetallic pull box using bonding bushing or bonding jumper.
Bond metallic conduit in metal pull box using bonding bushings and bonding jumpers connected to
bonding wire running in the conduit system.
86-2.11 SERVICE
86-2.11A General
Electrical service installation and materials must comply with service utility requirements.
If service equipment is to be installed on a utility-owned pole, you must furnish and install conduit,
conductors, and other necessary material to complete the service installation. The service utility will
decide the riser and equipment position.
Install service equipment early on to allow service utility to schedule its work before project completion.
Furnish each service with a circuit breaker that simultaneously disconnects all ungrounded service
entrance conductors.
Circuit breakers must:
1.
2.
3.
4.
5.
6.

Be quick-break on either automatic or manual operation


Have operating mechanism that is enclosed and tripfree from operating handle on overload
Be trip indicating
Have frame size plainly marked
Have trip rating clearly marked on operating handle
Have overload tripping of breakers not influenced by ambient temperature range of -18 to 50 degrees
C
7. Be internal trip type
8. Be UL or NRTL listed and comply with UL 489 or equal
9. Have minimum interrupting capacity of 10,000 A, rms, if used as service disconnect
Service equipment enclosure must be a NEMA 3R enclosure with a dead-front panel and a hasp with a
7/16-inch hole for a padlock. Enclosure must be field marked as specified in the NEC to warn qualified
persons of potential electric arc flash hazards.
Service equipment enclosure, except Types II and III, must be galvanized or have a factory-applied rust
resistant prime coat and finish coat.
Types II and III service equipment enclosures must be manufactured from one of the following:
1. G
alvanized sheet steel
2. Sheet steel plated with zinc or cadmium after manufacturing
3. Aluminum
Manufacture service equipment enclosure as specified in section 86-3.04A. Overlapping exterior seams
and doors must comply with requirements for NEMA 3R enclosures in the NEMA Enclosure Standards.
If an alternative design is proposed for Type II or III service equipment enclosure, submit plans and shop
drawings to the Engineer for authorization before manufacturing.
Except for falsework lighting and power for your activities, when you submit a written request, the
Engineer will arrange:
1. With the service utility to complete service connections for permanent installations and the
Department will pay all costs and fees required by the service utility. Submit request at least 15 days
before service connections are required.
2. For furnishing electrical energy. Energy used before Contract completion will be charged to you,
except cost of energy used for public benefit as ordered will be paid by the Department or local
authorities.
913

SECTION 86

ELECTRICAL SYSTEMS

Payment for furnishing and installing Department-owned or permanent service poles, service equipment,
conduit, conductors, and pull boxes, including equipment, conduit, and conductors placed on utility-owned
poles, is included in the payment for the of electrical work involved.
If the service point is indeterminate and is shown as "approximate location" or "service point not yet
established," the labor and materials required for making the connection between the service point, when
established, and the nearest pull box shown is change order work.
86-2.11B Electric Service for Irrigation
Reserved
86-2.11C Booster Pump Electrical System
Reserved
86-2.12 WOOD POLES
Wood poles must comply with the following:
1.
2.
3.
4.
5.
6.

Class 5 or larger as specified in ANSI O 5.1


Less than 180-degree twist in grain over the full length
4-inch or less sweep
Beveled top
Placed in ground at least 6 feet
Length must be:
6.1. 25 feet for service pole
6.2. 35 feet for others

After fabrication, pressure-treat pole under section 57-2.01B(3) and AWPA U1, Use Category UC4B,
Commodity Specification D.
Treat pole with waterborne wood preservative if specified.
After each pole is set in ground, backfill the space around the pole with selected earth or sand, free of
rocks and other deleterious material, placed in 4-inch-thick layers. Moisten each layer and thoroughly
compact.
Manufacture mast arm from standard pipe, free from burrs. Each mast arm must have an insulated wire
inlet and wood pole mounting brackets for the mast arm and tie-rod cross arm. Manufacture tie rod from
structural steel and pipe.
Mount mast arm for luminaire to provide a 34-foot mounting height for a 200 W high-pressure sodium
luminaire and a 40-foot mounting height for a 310 W high-pressure sodium luminaire. Traffic signals and
flashing beacons on the mast arm must provide a minimum vertical clearance of 17 feet from bottom of
equipment to pavement.
86-2.13 LIGHTING AND SIGN ILLUMINATION CONTROL
Enclosure for the circuit breaker for lighting and sign illumination control must:
1. Be NEMA 3R
2. Be galvanized, cadmium plated, or powder coated
3. Include dead front panel and a hasp with a 7/16-inch-diameter hole for padlock
86-2.14 TESTING
86-2.14A Materials Testing
Deliver material and equipment to be tested to either the METS or a testing location as ordered.
Allow 30 days for acceptance testing from the time material or equipment is delivered to test site. You
must pay for all shipping, handling, and related transportation costs associated with testing. If equipment
is rejected, you must allow 30 days for retesting. Retesting period starts when corrected equipment is
delivered to test site. You must pay for all retesting costs.

914

SECTION 86

ELECTRICAL SYSTEMS

If equipment submitted for testing does not comply with specifications, remove the equipment within 5
business days after notification that the equipment is rejected. If equipment is not removed within that
period, it may be shipped to you at your expense.
When testing is complete, you will be notified. You must pick up the equipment at the test site and deliver
it to the job site.
Testing and quality control procedures for all other traffic signal controller assemblies must comply with
NEMA TS Standards for Traffic Control Systems.
86-2.14B Field Testing
Before starting functional testing, perform the following tests in the presence of the Engineer:
86-2.14B(1) Continuity
Test each circuit for continuity.
86-2.14B(2) Ground
Test each circuit for grounds.
86-2.14B(3) Insulation Resistance
Perform insulation resistance test at 500 V(dc) on each circuit between the circuit and a ground.
Insulation resistance must be 10 M minimum on all circuits, except for inductive loop detector circuits
that must have an insulation resistance value at least 100 M.
86-2.14C Functional Testing
Test periods must comply with section 86-1.07.
Acceptance of new or modified traffic signal will be made only after all traffic signal circuits have been
thoroughly tested.
Perform functional test to show that each part of the system functions as specified.
Functional test for each new or modified system must include at least 5 business days of continuous,
satisfactory operation. If unsatisfactory performance of the system occurs, the condition must be
corrected and the system retested until the 5 business days of continuous, satisfactory operation is
obtained.
Except for new or modified parts of existing lighting circuit and sign illumination system, the Department
or local agency will maintain the system during test period and pay the electrical energy cost. Except for
electrical energy, you must pay the cost of necessary maintenance performed by the Department or local
agency on new circuits or on the portions of existing circuits modified under the Contract.
Shutdown of electrical system caused by traffic, a power interruption, or unsatisfactory performance of
Department-furnished materials does not constitute discontinuity of the functional test.
86-2.15 GALVANIZING
Galvanize under section 75-1.05. Cabinet material may be galvanized before fabrication as specified in
ASTM A 653/653M, Coating Designation G 90.
Steel pipe standard and mast arm must be hot-dip galvanized after manufacturing and must comply with
section 75-1.05. Remove spikes from galvanized surfaces.
A minimum of 10 inches of upper end of anchor bolts, anchor bars or studs, and nuts and washers must
be galvanized as specified in section 75-1.05.
After galvanizing, bolt threads must accept galvanized standard nuts without requiring tools or causing
removal of protective coatings.
Galvanizing existing materials in an electrical installation will not be required.
86-2.16 PAINTING
Paint electrical equipment and material and comply with the following:
915

SECTION 86

ELECTRICAL SYSTEMS

1. Use paint material specified in section 91.


2. Factory or shop cleaning methods for metals are acceptable if equal to the methods specified.
3. Instead of the temperature and seasonal restrictions for painting as specified in section 59, for
electrical installations, paint may be applied to equipment and materials at any time the Engineer
allows.
4. Ungalvanized ferrous surface to be painted must be cleaned before applying the prime coat. Blast
cleaning is not required.
5. If an authorized prime coat is applied by the manufacturer, and in good condition, the 1st primer
application is not required.
6. Existing equipment to be painted in the field, including Department-furnished equipment, must be
washed with a stiff bristle brush using a solution of water containing 2 tablespoons of heavy duty
detergent powder per gallon. After rinsing, surface must be wire brushed with a coarse, cup-shaped,
power-driven brush to remove badly bonded paint, rust, scale, corrosion, grease, or dirt. Dust or
residue remaining after wire brushing must be removed before priming.
7. Do not paint galvanized metal guard post, galvanized equipment, Department-furnished controller
cabinet, and wood pole for traffic signal or flashing beacon.
8. New galvanized metal surface to be painted in the field must be cleaned as specified for existing
equipment before applying the prime coat. Do not wire brush new galvanized surface.
9. After erection, examine exterior surface for damaged primer, clean, and spot coat with primer.
10. Paint Types II and III steel service equipment enclosures with a polymeric or an enamel coating
system matching color no. 14672, of FED-STD-595. Coating must be commercially smooth and free
of flow lines, paint washout, streaks, blisters, and other defects that would impair serviceability or
detract from general appearance. Coating must comply with the requirements shown in the following
table:
Property
Coating
hardness
Salt spray
resistance

Adherence

Requirements
Finish must have pencil lead hardness of HB,
minimum, when tested under ASTM D 3363.
Undercutting coating system's film must not
exceed 1/8 inch average, from lines scored
diagonally and deep enough to expose the base
metal, after 336 hours of exposure in a salt spray
cabinet complying with ASTM B 117.
Must not have coating loss when tested under
California Test 645. Perform testing by applying
coating to 4" x 8" x 0.024" test specimens of the
same material as the cabinet, using the same
application method.

11. Finish interior of metal signal visor, louver, and front face of backplates with 2 applications of
lusterless black exterior grade latex paint formulated for application to properly prepared metal
surface. Good condition factory finish will be acceptable.
12. Finish metal signal section, signal head mounting, brackets and fittings, outside of visor, pedestrian
push button housing, pedestrian signal section and visor, and back face of back plate with 2
applications of lusterless black or dark olive green exterior grade latex paint formulated for application
to properly prepared metal surface. Match color to color chip no. 68 filed at METS.
13. Prepare and finish conduit and conduit fitting above ground the same as adjacent standard or post.
14. Relocated, reset, or modified equipment previously finished under this section, except for previously
finished galvanized standard with traffic signal yellow enamel, must be given a spot finishing
application on newly primed areas and 1 finishing application over the entire surface. If the signal face
or mounting brackets are required to be painted under this section, all signal faces and mounting
brackets on the same mounting must be repainted.
15. Small rusted or repaired areas of relocated or reset galvanized equipment must be cleaned and
painted as specified in section 75-1.05 for repairing damaged galvanized surfaces.
16. Stencil equipment number neatly on the standard or adjacent structure. Obtain number from the
Engineer.
17. Perform painting neatly. The Engineer reserves the right to require use of brushes if the work
performed by a paint spraying machine is unsatisfactory.
916

SECTION 86

ELECTRICAL SYSTEMS

86-2.17 RESERVED
86-2.18 NUMBERING ELECTRICAL EQUIPMENT
Place numbers and edge sealers on the equipment as ordered.
Wherever new numbers are to be placed on existing or relocated equipment, remove the existing
numbers.
Apply reflective numbers to a clean surface. Only treat the edges of the numbers with an edge sealer.
Place 5-digit, self-adhesive equipment numbers on all electroliers, soffit lighting, sign lighting, and service
pedestals as shown. On service pedestals, place the numbers on the front door.
Place numbers for illuminated signs mounted on overcrossings or for soffit luminaires on the nearest
adjacent bent or abutment at approximately the same station as the sign or soffit luminaire. Where no
bent or abutment exists near the sign or soffit luminaire, place the number on the underside of the
structure adjacent to the sign or soffit luminaire. Arrangement of numbers must be the same as those
used for electroliers.
Place the numbers for overhead sign bridges on both posts.
Numbers for wood poles must be 3-inch embossed aluminum fastened to the pole with 1-1/4-inch
aluminum nails.
86-3 CONTROLLER ASSEMBLIES
86-3.01 CONTROLLER ASSEMBLIES
86-3.01A General
Model 170E and Model 2070 controller assemblies, specified as a Model 170E/2070 controller assembly,
consists of a Model 170E or 2070 controller unit, a wired cabinet, and all auxiliary equipment required to
control the system.
86-3.01B Department-Furnished Controller Assemblies
The Model 170E/ 2070 controller assembly, excluding anchor bolts, is Department furnished.
Construct controller cabinet foundation as shown for Model 332L and 334L cabinets, including furnishing
and installing anchor bolts, install the controller cabinet on the foundation, and make field wiring
connections to the terminal block in the controller cabinet.
A listing of field conductor terminations for each Department-furnished controller cabinet will be provided
to you at the job site.
The Department will maintain the controller assemblies.
86-3.02 BATTERY BACKUP SYSTEM
86-3.02A General
86-3.02A(1) Summary
This work includes assembling and installing a BBS. Comply with TEES.
The Department will furnish the BBS components listed in section 6-2.03.
86-3.02A(2) Submittals
Before shipping external cabinets to the job site, submit a material list including Contract number, cabinet
serial numbers, and contact information to METS.
Submit a certificate of compliance for each external cabinet and batteries.
86-3.02A(3) Quality Control and Assurance
The Department may test the external cabinets.
After complete installation, perform BBS functional testing. Test for 30 minutes of continuous, satisfactory
operation with utility power turned off. Perform the test in the presence of the Engineer.
917

SECTION 86

ELECTRICAL SYSTEMS

Batteries must be warranted by the manufacturer for 2 years to operate within a temperature range of -25
to +60 degrees C.
86-3.02B Materials
Batteries must:
1. Be deep cycle, sealed, prismatic, lead-calcium based, absorbed glass mat, valve-regulated lead-acid
type
2. Have a 12 V voltage rating
3. Be group size 24
4. Be commercially available and stocked locally
5. Have a carrying handle
6. Be marked with a date code, maximum recharge data, and recharge cycles
7. Have 2 top-mounted threaded-stud posts that include all washers and nuts required for attaching 3/8
inch ring lugs of a Department-furnished BBS battery harness
8. Include rubber insulating protective covers for protecting the lugs, posts, and wiring: red for positive
terminal and black for negative terminal
9. Be new and fully charged when furnished
10. Be free from damage or deformities
External cabinet must be one listed on the Authorized Material List.
Dimensions and details for the external cabinet, for attaching the external cabinet to the Model 332L
cabinet, and for wiring the Department-furnished equipment will be available in an Information Handout as
specified in section 2-1.06B or as shown.
The following details must comply with section 86-3.04 and TEES:
1.
2.
3.
4.

Door construction, including material, thickness, coating, and welds


F
rame
Door seals
Continuous stainless steel piano hinge or 4 leaves with 2 bolts on each side of each leaf used to
connect the door to the external cabinet
5. Padlock clasp or latch and lock mechanism
The external cabinet must be ventilated by using louvered vents, a filter, and a thermostatically controlled
fan. Fan must be AC operated from the same line output as the Model 332L cabinet. A 2-position terminal
block must be provided on the fan panel along with 10 feet of connected hookup wire.
The external cabinet surface must be anodized aluminum. Do not use anti-graffiti paint.
The external cabinet must include all bolts, washers, nuts, and cabinet-to-cabinet coupler fittings
necessary for mounting it to the Model 332L cabinet.
Fasteners for the external cabinet must include:
1. Four 18-8 stainless steel hex head, fully-threaded, 3/8" 16 x 1" cabinet mounting bolts
2. 2 washers per bolt designed for 18-8 stainless steel, 1-inch OD round, 3/8-inch flat-type bolt
3. K-lock nut per bolt consisting of 18-8 stainless steel K-lock washer and a hex-nut
External cabinet to Model 332L cabinet couplings must include a conduit for power connections between
the 2 cabinets. Couplings must include:
1. 2-inch nylon-insulated steel chase nipple, T & B 1947 or equivalent
2. 2-inch sealing, steel locknut, T & B 146SL or equivalent
3. 2-inch nylon-insulated steel bushing, T & B 1227 or equivalent
86-3.02C Construction
Mount external cabinet to the right side of the Model 332L cabinet. The typical side-mounting location of
the external cabinet is flush with the bottom of the Model 332L cabinet and approximately equidistant
from the front and rear door edges.
918

SECTION 86

ELECTRICAL SYSTEMS

86-3.02D Payment
Reserved
86-3.03 RESERVED
86-3.04 CONTROLLER CABINETS
Controller assembly models other than Model 170E/2070 must comply with section 86-3.04.
86-3.04A Cabinet Construction
Cabinet must be watertight and the top crowned 1/2 inch or slanted toward the back to prevent standing
water.
Cabinet and door must be manufactured from one of the following:
1. 0.073-inch-minimum-thickness cold-rolled steel with continuously-welded exterior seams
2. 0.073-inch-minimum-thickness stainless steel with overlapping exterior seams complying with Type 4
enclosures of the NEMA Enclosure Standards
3. 0.125-inch minimum thickness aluminum with continuously-welded exterior seams
Exterior welds must be ground smooth and edges filed to a radius of at least 0.03 inch.
Cabinet manufactured from cold-rolled steel must comply with section 86-2.16 and the following:
1. Cabinet must be finished with a polymeric or an enamel coating system matching color no. 14672 of
FED-STD-595.
2. Cabinet must not have a coating loss when two 4-by-8-inch test specimens of the same material and
coating as the cabinet are tested. Two 9-inch diagonal scratches exposing bare metal will be made
on the specimen. Soak the specimen in demineralized water for 192 hours. Tightly affix a 1-inch wide
strip of masking tape to the surface and remove with one quick motion. Specimen showing evidence
of blistering, softening, or peeling of paint or coating from the base metal will be rejected. Testing
must comply with California Test 645, except the 180-degree bend test is not required.
3. Metal must be prepared by the 3-step, iron-phosphate conversion coating bonderizing technique.
4. Inside walls, doors, and ceiling of the housing must be the same as the outside finish.
Cabinet manufactured from stainless steel must comply with the following:
1. Use annealed or quarter-hard stainless steel specified in ASTM A 666, Type 304, Grades A or B.
2. Use the gas tungsten arc welding process with bare stainless steel welding electrodes. Electrodes
must comply with AWS A5.9 for ER308/ER308H.
3. Procedures, welder, and welding operator must comply with requirements and practices
recommended in AWS C5.5.
4. Ground or brush exposed exterior surfaces of stainless steel cabinet to a 25 to 50-microinch finish
using iron-free abrasives or stainless steel brushes.
5. After grinding or brushing, cabinet must not show rust discoloration when:
5.1. Exposed for 48 hours in a salt spray cabinet as specified in ASTM B 117.
5.2. Exposed for 24 hours in a tap water spray cabinet with the water temperature between 38 and
45 degrees C.
6. After the test, cabinet showing rust discoloration anywhere on its surface will be rejected. Rejected
cabinets may be cleaned, passivated, and resubmitted for testing.
Cabinet manufactured from aluminum sheet must comply with ASTM B 209 or B 209M for 5052-H32
aluminum sheet and the following:
1. Use the gas metal arc welding process with bare aluminum welding electrodes. Electrodes must
comply with AWS A5.10 Class ER5356.
2. Procedures, welder, and welding operator for welding must comply with the requirements in AWS
B3.0, "Welding Procedure and Performance Qualification," and to practices recommended in AWS
C5.6.
3. Surface finish of each aluminum cabinet must comply with MIL-A-8625 for a Type II, Class I coating
except anodic coating must have a minimum thickness of 0.0007 inch and a minimum coating weight
of 0.001 ounce per square inch. The anodic coating must be sealed in a 5 percent aqueous solution
919

SECTION 86

ELECTRICAL SYSTEMS

of nickel acetate, pH 5.0 to 6.5, for 15 minutes at 97 degrees C. Before applying anodic coating, clean
and etch cabinets using the steps below:
3.1. Clean by immersing into an inhibited alkaline cleaner such as Oakite 61A, Diversey 909, or
equal, at 71 degrees C for 5 minutes. Use 6 to 8 ounces of cleaner per gallon of distilled water.
3.2. Rinse in cold water.
3.3. Etch in a solution of 1-1/2 ounce of sodium fluoride and 4 to 6 ounces of sodium hydroxide per
gallon of distilled water at 60 to 65 degrees C for 5 minutes.
3.4. Rinse in cold water.
3.5. Immerse in 50 percent by volume nitric acid solution at room temperature for 2 minutes.
3.6. Rinse in cold water.
Cabinet must have:
1. Single front door with:
1.1. 44-inch maximum door width.
1.2. Lock, when closed and latched, is locked.
1.3. Police panel mounted on the door, equipped with a keyed lock and 2 police keys. Each police
key must have a shaft at least 1-3/4 inch in length.
2. Dust-tight gasketing on all door openings, permanently bonded to the metal. Mating surface of the
gasketing must be covered with silicone lubricant to prevent sticking.
3. H
andle that:
3.1. Allows padlocking in closed position
3.2. Has a minimum length of 7 inches
3.3. Has a 5/8-inch, minimum, steel shank
3.4. Is manufactured of cast aluminum or zinc- or cadmium-plated steel
4. Cabinet door frame with:
4.1. Latching mechanism that:
4.1.1. Holds tension on and forms a firm seal between the door gasketing and frame.
4.1.2. Is a 3-point cabinet latch with nylon rollers that have a minimum diameter of 3/4 inch
and equipped with ball bearings.
4.1.3. Has a center catch and a pushrod made of zinc- or cadmium-plated steel. Pushrod
must be at least 1/4 by 3/4 inch and turned edgewise at the outer supports. Cadmium
plating must comply with MIL-QQ-416. Zinc plating must comply with MIL-QQ-325.
4.2. H
inging that:
4.2.1. Has 3-bolt butt hinges, each having a stainless steel fixed pin. Hinges must be
stainless steel or may be aluminum for an aluminum cabinet.
4.2.2. Is bolted or welded to the cabinet. Hinge pins and bolts must not be accessible when
the door is closed.
4.2.3. Has a catch to hold the door open at 90 and 180 degrees, 10 degrees, if a door is
larger than 22 inches in width or 6 square feet in area. Catch must be at least a 3/8
inch-diameter, stainless-steel-plated rod capable of holding the door open at 90
degrees in a 60 mph wind at an angle perpendicular to the plane of the door.
5. L
ock that:
5.1. Is solid brass, 6-pin tumbler, rim type
5.2. Has rectangular, spring-loaded bolts
5.3. Is left hand and rigidly mounted with stainless steel machine screws approximately 2 inches
apart
5.4. Extends 1/8 to 3/8 inch beyond the outside surface of door
6. 2 keys removable in the locked and unlocked positions.
Submit alternative design details for review and approval before manufacturing a cabinet.
Use metal shelves or brackets that will support controller unit and auxiliary equipment.
Machine screws and bolts must not protrude outside the cabinet wall.
86-3.04B Cabinet Ventilation
Each controller cabinet must have:

920

SECTION 86

ELECTRICAL SYSTEMS

1. 8 screened, 1/2 inch diameter or larger, raintight vent holes in the lower side or bottom of the cabinet.
You may use louvered vents with a permanent metal mesh or a 4-ply woven polypropylene air filter
held firmly in place, instead.
2. Electric fan with ball or roller bearings and a capacity of at least 100 cubic feet per minute. Fan must
be thermostatically controlled and manually adjustable to turn on between 32 and 65 degrees C with
a differential of not more than 6 degrees C between automatic turn on and turn off. The fan circuit
must be fused at 125 percent of the ampacity of the installed fan motor.
Fan and cabinet vent holes must be positioned to direct the bulk of the airflow over the controller unit or
through the ventilating holes of the controller unit.
86-3.04C Cabinet Wiring
Conductors used in the controller cabinet wiring must:
1. Be neatly arranged and laced or enclosed in a plastic tubing or raceway.
2. End with a properly-sized captive- or spring-spade terminal or be soldered to a through-panel solder
lug on the back side of the terminal block. Apply a crimp-style connector with the proper tool to
prevent opening of the handle until the crimp is completed.
Controller cabinet must have an equipment-grounding bus bonded to the cabinet and is connected to the
system equipment grounding conductor with a No. 8 or larger grounding conductor.
With all cabinet equipment in place and connected, the resistance between the grounded terminal bus
and the equipment grounding bus must be 50 M, minimum, when measured with an applied voltage of
150 V(dc).
If direct current is to be grounded, connect to equipment ground only.
Use 2 or more terminal blocks for field connection. Install field terminal within 22 inches from the front of
the cabinet and orient it for screwdriver operation. Terminal must be a minimum of 5 inches above the
foundation.
No more than 3 conductors per terminal are allowed. Two flat metal jumpers, straight or U shaped, may
be placed under a terminal screw. At least 2 full threads of terminal screws must be fully engaged when
screw is tightened. Live parts must not extend beyond the barrier.
86-3.04D Cabinet Accessories
86-3.04D(1) Labels
Include permanently printed, engraved, or silk-screened label for equipment and removable items of
equipment.
Labeling must match the cabinet wiring diagram. The label for a shelf-mounted equipment must be on the
shelf face below the item. The label for a wall-mounted equipment must be below the item.
86-3.04D(2) Convenience Receptacle
Mount convenience receptacle in a readily accessible location inside the cabinet.
Convenience receptacle must be a duplex, 3-prong, NEMA 5-15R grounding-type outlet that complies
with UL Standard 943.
86-3.04D(3) Surge Arrestor
Surge arrestor must reduce effects of power line voltage transients and comply with the rating
requirements shown in the following table:
Surge Arrestor Requirements
Recurrent peak voltage
184 V(ac)
Energy rating, maximum
20 J
Power dissipation, average
0.85 W
Peak current for pulses less than 7 s
1,250 A

921

SECTION 86

ELECTRICAL SYSTEMS

Standby current must be 1 mA or less for a 120 V(ac), 60 Hz sinusoidal input.


86-3.04D(4) Terminal Blocks
Terminal block must be rated 600 V(ac), minimum, and have a nickel-, silver-, or cadmium-plated brass
binder head-screw terminal.
Heavy duty terminal block must be rated at 20 A and have 12 positions with No. 10 by 5/16-inch nickel
plated brass-binder head screws and nickel-plated brass inserts. Each position must have 2 screw-type
terminals. Terminal block must be barrier type with shorting bars in each of the 12 positions and must
have integral type marking strips.
Light-duty terminal block must be rated at 5 A and have 12 positions with No. 6 by 1/8-inch binder head
screws. Each position must have 1 screw-type terminal.
86-3.04E Components
86-3.04E(1) Toggle Switches
Toggle switch must:
1. Have poles as required
2. Be rated at 200 percent of the circuit current for circuits of 10 A or less and 125 percent of the circuit
current for circuits over 10 A
86-3.04E(2) Cartridge Fuses
Install cartridge fuse in panel-mounted fuseholder. Fuse type and rating must be as recommended by the
fuse manufacturer for the type of load being protected.
86-3.04E(3) Circuit Breakers
Circuit breaker must comply with section 86-2.11 except the breaker must have a minimum interrupting
capacity of 5,000 A, rms.
86-3.04E(4) Connectors
Connectors used for interconnecting various parts of circuits together must be designed and constructed
for the application involved. Design connector to provide positive connection of all circuits and easy
insertion and removal of mating contacts. Connector must be permanently keyed to prevent improper
connection of circuit.
Connector, or device plugging into connector, must have positive connection to prevent a circuit from
breaking due to vibration, a pull on connecting cable, or similar disruptive force.
86-4 TRAFFIC SIGNAL FACES AND FITTINGS
86-4.01 VEHICLE SIGNAL FACES
Each vehicle signal face must:
1.
2.
3.
4.
5.

Be adjustable and allow for 360-degree rotation about the vertical axis
Comply with ITE publication ST-017B, "Vehicle Traffic Control Signal Heads"
Comply with California Test 604, except for arrow and "X" faces
Have 3 sections arranged vertically: red at top, yellow at center, and green at bottom
Be of the same manufacturer and material, if more than 1 is installed at an intersection, except for
programmed visibility type
6. Be sealed with neoprene gasket at top opening
86-4.01A Signal Sections
Each signal section must comply with the following:
1. Maximum height must be 10-1/4 inches for an 8-inch section and 14-3/4 inches for a 12-inch section.
2. Housing must:
2.1. Be either die-cast or permanent mold-cast aluminum, or if specified, be structural plastic.
2.2. Comply with ITE publication ST-017B if die-cast or permanent mold-cast aluminum is used.

922

SECTION 86

3.

4.

5.
6.

ELECTRICAL SYSTEMS

2.3. Have a 1-piece, hinged, square-shaped door designed to allow access for relamping without
the use of tools. Door must be secured to hold the door closed during loading tests. Module or
lens must be watertight and mounted in the door.
Hinge pins, door latching devices, and other exposed hardware must be Type 304/304L or 305
stainless steel. Interior screws and fittings must be stainless steel or steel with a corrosion resistant
plating or coating.
Opening must be placed on the top and bottom to receive 1-1/2-inch pipe. The 8- and 12-inch
sections of an individual manufacturer must be capable of joining to form a signal face in any
combination. This interchangeability is not required between metal and plastic sections.
Gaskets must be made of a material not affected if installed in a section with metal or plastic housing
that is continuously operated for 336 hours.
Use LED modules.

Description of structural failure and the requirements for signal sections are shown in the following table:
Signal section type
Metal
Plastic

Signal Section Structural Failure


Requirements
Description of structural failure
California
Fracture within housing assembly or deflection of more than half
Test 666
the lens diameter of signal section during wind load test
California
Fracture within housing assembly or deflection of more than 10
Test 605
degrees in either the vertical or horizontal plane after wind load
has been removed from front of signal face, or deflection of
more than 6 degrees in either the vertical or horizontal plane
after wind load has been removed from back of signal face

86-4.01A(1) Metal Signal Sections


Each metal signal section must have a metal visor. Metal signal faces requiring backplates must have
metal backplates.
86-4.01A(2) Plastic Signal Sections
Housing must be molded in 1 piece or fabricated from 2 or more pieces and joined into a single piece.
Plastic must have ultraviolet stability and be self extinguishing. Housing and door must be colored
throughout and be black matching color no. 17038, 27038, or 37038 of FED-STD-595.
Each face section must be joined to adjacent section by one of the following:
1. Minimum of 3 machine screws for 8-inch sections and 4 machine screws for 12-inch sections,
installed through holes near front and back of housing. Each screw must be a No. 10 and have a nut,
flat washer, and lock washer.
2. Two machine screws, each with a nut, flat washer, and lock washer, installed through holes near the
front of the housing, and a fastening through the 1-1/2-inch pipe opening. Fastening must have 2
large flat washers to distribute the load around the pipe opening and 3 carriage bolts, each with a nut
and lock washer. Minimum screw size must be No. 10. Minimum carriage bolt size must be 1/4 inch.
Supporting section of each signal face supported only at the top or bottom must have reinforcement.
Reinforcement plate must be either sheet aluminum, galvanized steel, or cast aluminum. Each plate must
be a minimum of 0.11 inch thick and have a hole concentric with a 1-1/2-inch pipe-mounting hole in the
housing. Place reinforcement plate as shown in the following table:
Reinforcement Plate Placement
Type of reinforcement plate
Placement
Sheet aluminum
Inside and outside of housing
Galvanized steel
Inside of housing
Cast aluminum
Outside of housing
Reinforcement plates placed outside of the housing must be finished to match the signal housing color
and be designed to allow a proper serrated coupling between the signal face and the mounting hardware.
923

SECTION 86

ELECTRICAL SYSTEMS

A minimum of 3 No. 10 machine screws must be installed through holes in each plate and matching holes
in the housing. Each screw must have a round or binder head, a nut, and lock washer.
If signal face is supported by a Type MAS side attachment slip fitter inserted between 2 sections, place
spacers between the 2 sections. Vertical dimension of spacers must allow proper seating of serrations
between the slip fitter and the 2 sections. In addition to the fastening through the large openings in the
housing, the 2 sections must join with at least 2 machine screws through holes near the front of the
housing and the spacers and through matching holes in a reinforcing plate installed in the housing.
Machine screws must be No. 10 minimum size. Spacers must be made of the same material as the signal
housing.
If reinforcing webs are used to connect the back of the housing to the top, bottom, and sides, reinforcing
plates are not required.
Holes for machine screws must be either cast or drilled during signal section fabrication. Surround each
hole with a 1/8-inch-minimum-width boss to allow contact between signal sections about the axis of the
hole.
Each plastic signal section must have a plastic or metal visor. Plastic signal faces requiring backplates
must have plastic backplates.
Serrated nylon washer must be inserted between each plastic signal section and metal mounting
assembly. Each washer must be between 3/16 and 1/4 inch thick. Serrations must match those on the
signal section and the mounting assembly.
86-4.01B Electrical Components
Conductors must be connected to a terminal block mounted inside, at the back of housing. Terminal block
must have enough screw type terminals or NEMA type tab connectors to end all field and module or lamp
conductors independently. Permanently identify terminal with field conductors attached or color code
conductors to facilitate field wiring.
86-4.01C Visors
Include a removable visor with each signal section. Comply with ITE publication ST-017B. Visors are
classified by lens enclosure as (1) full circle, (2) tunnel, or (3) cap type. The bottom opens for tunnel type
and both, the bottom and the lower sides open for cap type. Unless specified, visors must be tunnel type.
Visor must have a downward tilt between 3 and 7 degrees with a length of:
1. 9-1/2-inch minimum for nominal 12-inch round lenses
2. 7 inch for nominal 8-inch round lenses
Metal visor must be formed from 0.050-inch minimum thickness aluminum-alloy sheet.
Plastic visor must be either formed from sheet plastic or assembled from 1 or more injection, rotational, or
blow-molded plastic sections. Material must be of a black homogeneous color with lusterless finish.
Sections must be joined using thermal, chemical, or ultrasonic bonding, or with aluminum rivets and
washers permanently colored to match the visor.
Secure each visor to its door and prevent removal or permanent deformation when the specified wind
load in California Tests 605 for plastic visors or 666 for metal visors is applied to its side for 24 hours.
If directional louvers are used, fit louvers snuggly into full-circular signal visors. Outside cylinder must be
constructed of 0.030-inch nominal thickness, or thicker, sheet steel and vanes must be constructed of
0.016-inch nominal thickness, or thicker, sheet steel, or the cylinder and vanes must be constructed of
5052-H32 aluminum alloy of equal thickness.
86-4.01D Light Emitting Diode Signal Module
86-4.01D(1) General
86-4.01D(1)(a) Summary
This work includes installing LED signal module.
Use LED signal module as the light source for the following traffic signal sections:
924

SECTION 86
1.
2.
3.
4.
5.
6.
7.

ELECTRICAL SYSTEMS

8
-inch section
12-inch section
12-inch arrow section
12-inch U-turn section
12-inch bicycle section
12-inch PV section
12-inch lane control section

86-4.01D(1)(b) Submittals
Before shipping LED signal modules to the job site, submit the following to METS:
1. Delivery form including Contract number and contact information
2. List containing all LED signal module serial numbers anticipated for use
3. LED signal modules
86-4.01D(1)(c) Quality Control and Assurance
86-4.01D(1)(c)(i) General
Module must be one listed on the Authorized Material List for LED traffic signals.
The Department will test LED signal module shipments as specified in ANSI/ASQ Z1.4. Testing will be
completed within 30 days of delivery to METS. LED signal modules tested or submitted for testing must
be representative of typical production units. LEDs must be spread evenly across the module. LED arrow
indication must provide the minimum initial luminous intensity listed.
LED and circular LED signal modules will be tested as specified in California Test 604. Arrow, U-turn, and
bicycle LED signal modules will be tested as specified in California Test 3001. All parameters of the
specification may be tested on the modules. Measurements will be performed at the rated operating
voltage of 120 V(ac).
Delays resulting from submittal of noncompliant materials do not relieve you from executing the Contract
within the allotted time. Noncompliant materials will be rejected. Resubmit new LED for retesting and pick
up the failed units within 7 days of notification. Provide new LED signal modules and allow a minimum of
30 days for retesting.
After testing, pick up the tested LED signal modules from METS and deliver to the job site.
86-4.01D(1)(c)(ii) Reserved
86-4.01D(2) Materials
86-4.01D(2)(a) General
LED signal module must:
1. Have an operational lifecycle rating of 48 months. During the operational lifecycle, LED signal module
must comply with all parameters of this specification.
2. Be a single, self-contained device, designed to be sealed in the door frame of a standard traffic signal
housing and comply with ITE publication, Equipment and Material Standards, chapter 2, "Vehicle
Traffic Control Signal Heads."
3. Be 4 lb maximum weight.
4. Be from the same manufacturer.
5. Be the same model for each size and type.
6. Be sealed units with:
6.1. 2 color-coded conductors for power connection, except for lane control LED signal modules
use 3 color-coded conductors.
6.2. Printed circuit board and power supply contained inside and complying with chapter 1, section
6 of TEES.
6.3. Lens that is:
6.3.1. Integral to the units.
6.3.2. Convex or flat with a smooth outer surface.
6.3.3. Made of UV-stabilized plastic or glass and withstands UV exposure from direct
sunlight for 48 months without exhibiting evidence of deterioration.
6.4. 1-piece EPDM gasket.
925

SECTION 86

ELECTRICAL SYSTEMS

7.
8.
9.
10.

Include 3-foot-long conductors with quick disconnect terminals attached.


Be weather tight and connect directly to electrical wiring.
Be capable of optical unit replacement.
Have manufacturer's name, trademark, model number, serial number, lot number, month and year of
manufacture, and required operating characteristics, including rated voltage, power consumption, and
volt-ampere, permanently marked on the back of the module.
11. Have a symbol of the module type and color. The symbol must be an inch in diameter. The color must
be written out in 0.50-inch-high letters next to the symbol.
12. Be AlInGaP technology for red and yellow indications and gallium nitride technology for green
indications.
13. Be ultra bright type rated for 100,000 hours of continuous operation from -40 to +74 degrees C.
Individual LEDs must be wired so catastrophic loss or failure of 1 LED will not result in loss of more than 5
percent of the signal module light output. Failure of an individual LED in a string must not result in loss of
an entire string or other indication.
No special tools for installation are allowed.
The symbol for a 12-inch U-turn section is an inverted "U" with an arrow on the left end and is 15/16 inch
wide. Approximate shape and size for the U-turn face is as shown.
Approximate shape and size for the 12-inch bicycle section face is as shown.
Lane control section is a combination module with a red X and green arrow. Approximate shape and size
for lane control signal face is as shown. Conductor function and color code requirements are shown in the
following table:
Conductor Function and Color Code
Function
Color
Neutral
White
Red X
Red
Green arrow
Brown
Minimum power consumption for LED signal module must be 5 W.

Maximum power consumption for LED signal module must be as shown in the following table:

Power Consumption Requirements


Power consumption
(Watts)
LED signal module
type
Red
Yellow
Green
25 C
74 C
25 C
74 C
25 C
74 C
8-inch circular
8
13
13
16
12
12
12-inch circular
11
17
22
25
15
15
12-inch arrow
9
12
10
12
11
11
12-inch U-turn
9
12
10
12
11
11
Bicycle
11
17
22
25
15
15
Programmed visibility
11
17
22
25
15
15
Lane control (X)
9
12
----Lane control (Arrow)
----11
11
Lens may be tinted or may use transparent film or materials with similar characteristics to enhance
"On/Off" contrasts. Tinting or other materials to enhance "On/Off" contrast must not affect chromaticity
and must be uniform across the face of the lens.
If polymeric lens is used, surface coating or chemical surface treatment must be applied for front surface
abrasion resistance.
The power supply must be integral to the module.
926

SECTION 86

ELECTRICAL SYSTEMS

Internal components must be adequately supported to withstand mechanical shock and vibration from
high winds and other sources.
Lens and LED signal module material must comply with the ASTM specifications for that material.
Enclosures containing either the power supply or electronic components of LED signal module, except
lenses, must be made of UL94VO flame-retardant material.
If a specific mounting orientation is required, the LED signal module must have prominent and permanent
vertical markings for accurate indexing and orientation within the signal housing. Markings must include
an up arrow, or the word "Up" or "Top."
When operating at 25 degrees C, the LED signal module must meet or exceed the illumination values
shown in the following tables:
Minimum Initial Intensities for Circular Indications (cd)
8-inch
12-inch
Red
Yellow Green
Red
Yellow
Green
Angle (v,h)
2.5, 2.5
157
314
314
399
798
798
2.5, 7.5
114
228
228
295
589
589
2.5, 12.5
67
133
133
166
333
333
2.5, 17.5
29
57
57
90
181
181
7.5, 2.5
119
238
238
266
532
532
7.5, 7.5
105
209
209
238
475
475
7.5, 12.5
76
152
152
171
342
342
7.5, 17.5
48
95
95
105
209
209
7.5, 22.5
21
43
43
45
90
90
7.5, 27.5
12
24
24
19
38
38
12.5, 2.5
43
86
86
59
119
119
12.5, 7.5
38
76
76
57
114
114
12.5, 12.5
33
67
67
52
105
105
12.5, 17.5
24
48
48
40
81
81
12.5, 22.5
14
29
29
26
52
52
12.5, 27.5
10
19
19
19
38
38
17.5, 2.5
19
38
38
26
52
52
17.5, 7.5
17
33
33
26
52
52
17.5, 12.5
12
24
24
26
52
52
17.5, 17.5
10
19
19
26
52
52
17.5, 22.5
7
14
14
24
48
48
17.5, 27.5
5
10
10
19
38
38
Minimum Luminance for [Arrows, U-turn, Bicycle, Lane Control](FL), and

Programmed Visibility Indications (cd)

Red
Yellow
Green
Arrow indication
1,605
3,210
3,210
U-turn indication
1,605
3,210
3,210
Bicycle indication
1,605
1,605
1,605
Lane control indication (X)
1,605
--Lane control indication (Arrow)
--1,605
91
91
91
PV indication at angle v=2.5, h=2.5
When operating over a temperature range of -40 to +74 degrees C, the LED signal module, except
yellow, must meet or exceed the following illumination values for 48 months. When operating at 25
degrees C, the yellow LED signal module must meet or exceed the following illumination values for 48
months:
927

SECTION 86

ELECTRICAL SYSTEMS
Minimum Maintained Intensities for Circular Indications (cd)
8-inch
12-inch
Red
Yellow Green
Red
Yellow
Green
Angle (v,h)
2.5, 2.5
133
267
267
339
678
678
2.5, 7.5
97
194
194
251
501
501
2.5, 12.5
57
113
113
141
283
283
2.5, 17.5
25
48
48
77
154
154
7.5, 2.5
101
202
202
226
452
452
7.5, 7.5
89
178
178
202
404
404
7.5, 12.5
65
129
129
145
291
291
7.5, 17.5
41
81
81
89
178
178
7.5, 22.5
18
37
37
38
77
77
7.5, 27.5
10
20
20
16
32
32
12.5, 2.5
37
73
73
50
101
101
12.5, 7.5
32
65
65
48
97
97
12.5, 12.5
28
57
57
44
89
89
12.5, 17.5
20
41
41
34
69
69
12.5, 22.5
12
25
25
22
44
44
12.5, 27.5
9
16
16
16
32
32
17.5, 2.5
16
32
32
22
44
44
17.5, 7.5
14
28
28
22
44
44
17.5, 12.5
10
20
20
22
44
44
17.5, 17.5
9
16
16
22
44
44
17.5, 22.5
6
12
12
20
41
41
17.5, 27.5
4
9
9
16
32
32

Minimum Maintained Luminance for [Arrow, U-turn, Bicycle, Lane

Control](FL), and Programmed Visibility Indications (cd)

Red
Yellow
Green
Arrow indication
1,610
3,210
3,210
U-turn indication
1,610
3,210
3,210
Bicycle indication
1,610
1,610
1,610
Lane control indication (X)
1,610
--Lane control indication (Arrow)
--1,610
314
314
314
PV indication at angle v=2.5, h=2.5
LED signal module must comply with the chromaticity requirements for 48 months when operating over a
temperature range of -40 to +74 degrees C shown in the following table:
Red
Yellow
Green

Chromaticity Standards (CIE Chart)


Y: not greater than 0.308 or less than 0.998 - X
Y: not less than 0.411 nor less than 0.995 - X
nor greater than 0.452
Y: not less than 0.506 - 0.519(X) nor less than
0.150 + 1.068(X) nor more than 0.730 - X

LED signal module must operate:


1. At a frequency of 60 3 Hz, over a voltage range from 95 to 135 V(ac), without perceptible flicker to
the unaided eye. Fluctuations of line voltage must have no visible effect on luminous intensity of the
indications. Rated voltage for measurements must be 120 V(ac).

928

SECTION 86

ELECTRICAL SYSTEMS

2. Compatible with currently used controller assemblies, including solid state load switches, flashers,
and conflict monitors. Comply with TEES chapters 3 and 6. If a 20 mA alternating current or less is
applied to the unit, the voltage read across the 2 leads must be 15 V(ac) or less.
Wiring and terminal block must comply with section 13.02 of ITE publication, Equipment and Material
Standards, chapter 2, "Vehicle Traffic Control Signal Heads." Electrical connection for each Type 1 LED
signal module must be 2 secured, color-coded, 3-foot-long, 600 V(ac), 20 AWG minimum stranded
jacketed copper wires. Wires must comply with NEC, rated for service at +105 degrees C. Three wires
must be used for lane control LED signal module.
LED signal module on-board circuitry must:
1. Include voltage surge protection to withstand high-repetition noise transients. The voltage surge
protection must comply with NEMA Standard TS2, section 2.1.6.
2. Comply with FCC, title 47, subpart B, section 15 regulations for Class A emission limits for electronic
noise.
LED signal module must provide a power factor of 0.90 or greater.
Total harmonic distortion from current and voltage induced into an alternating current power line by LED
signal module must not exceed 20 percent at an operating temperature of 25 degrees C.
When power is applied to LED signal module, light emission must occur within 90 ms.
86-4.01D(2)(b) Red and Yellow Flashing Light Emitting Diode Signal Module
No external circuitry to flash the LED signal module is allowed. Use 12 V(dc) or 120 V(ac).
Flashing LED signal module circuitry must prevent perceptible light emission to the unaided eye when a
voltage, 50 V(ac) or less for alternating current or 5 V(dc) for 12 V(dc) flasher units is applied to the unit.
Electrical connection for each flashing LED signal module must be 4 secured, color-coded, 600 V(ac), 20
AWG minimum-stranded jacketed copper wires. Wire must comply with NEC, rated for service at +105
degrees C. Conductors for flashing LED signal module must be 3 feet in length with quick disconnect
terminals attached. The color code must comply with the requirements in the following table:
Color Code Requirements
Function
Neutral/DC common
Steady on
Flash on
Flash off

Color
White
Red
Brown
Orange

Flashing LED signal module must include all necessary electronics to:
1. Operate in a "steady on" mode
2. Perform, in "flash on" mode, 50 to 60 flashes per minute with a 50 5 percent duty cycle
3. Allow alternating flashing operation, wig wag, if the "steady on" input of another flashing LED signal
module is connected
When power is applied to the "flash on" control conductor, the control output must allow a 12 V(dc) or 120
V(ac) signal that is switched opposite of the flash state of the module. Output must be able to the source
a maximum of 2.5 A for 12 V(dc) or 0.3 A for 120 V(ac).
Do not use the power consumption from "flash out" output of the flashing LED signal module when
determining maximum power consumption.
The flashing LED signal module must be clearly marked on the back, as "DC Flasher" or "AC Flasher", in
0.50-inch letters.
86-4.01E Backplates
Background light must not be visible between the backplate and the signal face or between sections.
929

SECTION 86

ELECTRICAL SYSTEMS

Plastic backplates must be either formed from sheet plastic or assembled from extruded, molded, or cast
sections. Sections must be factory joined using one of the following:
1. Appropriate solvent cement
2. Aluminum rivets and washers painted or permanently colored to match backplate
3. No. 10 machine screws with washers, lock washers, and nuts, painted to match backplate
Backplate material must be of black homogeneous color with a lusterless finish. Secure each plastic
backplate to the plastic signal face in a manner that prevents its removal or permanent deformation when
the wind-load test is applied to either the front or back of the signal face. Permanent deformation of any
portion of the backplate must not exceed 5 degrees forward or backward after wind loading is applied for
24 hours.
If plastic backplate requires field assembly, join with at least 4 No. 10 machine screws at each field
assembled joint. Each machine screw must have an integral or captive flat washer, a hexagonal head
slotted for a standard screwdriver, and either a locking nut or a nut and lockwasher. Machine screws,
nuts, and washers must be stainless steel or steel with a zinc or black-oxide finish.
If a metal backplate has 2 or more sections, fasten sections with rivets or aluminum bolts peened after
assembly to avoid loosening.
Instead of the screws shown, you may use self-threading No. 10 steel screws to fasten plastic backplates
to plastic signal face. Each screw must have an integral or captive flat washer, a hexagonal head slotted
for a standard screwdriver, and is stainless steel or steel with a zinc or black-oxide finish.
86-4.01F Terminal Blocks
Reserved
86-4.02 PROGRAMMED VISIBILITY VEHICLE SIGNAL FACES
Programmed visibility signal face and its installation must comply with sections 86-4.01 and 86-4.04.
Each programmed visibility signal section must:
1.
2.
3.
4.

Have a nominal 12-inch-diameter circular or arrow indication


Comply with ITE publication ST-017B for color and arrow configuration
Have a cap visor
Have an adjustable connection that provides incremental tilting from 0 to 10 degrees above or below
the horizontal while maintaining a common vertical axis through couplers and mountings

Terminal connection must allow external adjustment about the mounting axis in 5-degree increments.
Signal must be mountable with ordinary tools and capable of servicing without tools. Preset adjustment at
4 degrees below the horizontal.
Visibility of each programmed visibility signal face must be capable of adjustment or programming, within
the face. When programmed, each signal face's indication must be visible only in those areas or lanes to
be controlled except that during dusk and darkness a faint glow to each side is allowed.
A signal technician qualified to program the programmed visibility signal heads must be present when
signal heads are placed in operation.
Program the head as recommended by the manufacturer.
86-4.03 PEDESTRIAN SIGNAL FACES
Message symbols for pedestrian signal faces must be white "Walking Person" and portland orange
"Upraised Hand." Comply with ITE Standards: "Pedestrian Traffic Control Signal Indications" and the
California MUTCD. Each symbol's height must be at least 10 inches and width must be at least 6-1/2
inches.
Luminance of the "Upraised Hand " symbol must be 1,100 foot-lamberts, minimum, and the luminance of
the " Walking Person " symbol must be 1,550 foot-lamberts, minimum, when tested under California Test
606.
930

SECTION 86

ELECTRICAL SYSTEMS

Uniformity ratio of an illuminated symbol must not exceed 4 to 1 between the highest luminance area and
the lowest luminance area.
Luminance difference between a nonilluminated symbol and the background around the symbol must be
less than 30 percent when viewed with the front screen in place and at a low sun angle.
Each housing, including front screen, must have maximum overall dimensions of 18-1/2 inches in width,
19 inches in height, and 11-1/2 inches in depth.
All new pedestrian signal faces installed at an intersection must be the same make and type.
86-4.03A Type A
Each Type A pedestrian signal face must include a housing, 1 LED pedestrian signal combo module, and
a front screen.
86-4.03B Front Screen
Front screen installation for each Type A signal must comply with one of the following:
1. Install, tilting downward at an angle of 15 2 degrees out from the top, an aluminum honeycomb
screen with 0.2-inch cells, 3/8 inch thick, or a plastic screen of 3/8-inch squares, 1/2 inch thick with a
wall thickness of 1/16 inch. Completely cover message plate. Include a clear front cover of 1/8-inch
minimum-thickness acrylic plastic sheet or 1/16-inch-minimum-thickness polycarbonate plastic. Hold
screen and cover firmly in place with stainless steel or aluminum clips or stainless steel metal screws.
2. Install a 1-1/2-inch-deep eggcrate or Z-crate type screen of 1/32-inch-nominal-thickness
polycarbonate. Mount screening in a frame constructed of 0.040-inch minimum thickness aluminum
alloy or polycarbonate. Install screen parallel to the face of the message plate and hold in place with
stainless steel screws. A visor is not required.
The Department will test screens in a horizontal position with its edges supported. When a 3-inch
diameter, 4-lb steel ball is dropped on the screen from a height of 4 feet above, the front screen must not
fracture, separate at the welds, or compress more than 1/8 inch. When pedestrian housing is used to
support the front screen during the test, remove the message plate from the pedestrian signal housing so
as to prevent back support for the screen.
Screen and frame must be one of the following:
1. Aluminum anodized flat black or finished with lusterless black exterior grade latex paint formulated for
application to properly prepared metal surfaces
2. Flat black plastic
86-4.03C Housing
Pedestrian signal housing must comply with section 86-4.01A.
86-4.03D Reserved
86-4.03E Finish
Paint exterior of each housing as specified in section 86-2.16.
86-4.03F Control
Pedestrian signals must be controllable by solid-state switching devices specified for traffic signal
controller assemblies.
86-4.03G Terminal Blocks
Include light duty terminal block as specified in section 86-4.01B with each pedestrian signal face.
86-4.03H Reserved
86-4.03I Light Emitting Diode Pedestrian Signal Modules
86-4.03I(1) General
86-4.03I(1)(a) Summary
This work includes installing LED PSF module into standard Type A pedestrian signal housing.
931

SECTION 86

ELECTRICAL SYSTEMS

86-4.03I(1)(b) Submittals
Before shipping LED PSF modules to the job site, submit the following to METS:
1.
2.
3.
4.

Delivery form including Contract number and contact information


List containing all LED PSF module serial numbers anticipated for use
LED PSF modules
Manufacturer's name, trademark, model number, lot number, and month and year of manufacture

86-4.03I(1)(c) Quality Control and Assurance


86-4.03I(1)(c)(i) General
Module must be one listed on the Authorized Material List for LED traffic signals.
The Department will test LED PSF module shipments as specified in ANSI/ASQ Z1.4. Testing will be
completed within 30 days of delivery to METS. LED PSF modules tested or submitted for testing must be
representative of typical production units.
LED PSF modules will be tested as specified in California Test 606. All parameters of the specification
may be tested on the modules.
Delays resulting from submittal of noncompliant materials do not relieve you from executing the Contract
within the allotted time. Noncompliant materials will be rejected. Resubmit new LED for retesting and pick
up the failed units within 7 days of notification. Provide new LED PSF modules and allow a minimum of
30 days for retesting. You must pay for all shipping and handling costs related to testing and retesting.
Delays resulting from resubmittal and retesting are your responsibility and no extra time will be allowed.
After testing, pick up the tested LED PSF modules from METS and deliver to the job site.
86-4.03I(1)(c)(ii) Reserved
86-4.03I(2) Materials
LED PSF module must:
1. Be installed in standard Type A pedestrian signal housing. Do not include reflectors.
2. Use LED as the light source.
3. Be designed to mount behind or replace the face plates of standard Type A housing as specified in
ITE publication, Equipment and Material Standards, chapter 3, "Pedestrian Traffic Control Signal
Indications" and the California MUTCD.
4. Have a minimum power consumption of 5 W.
5. Use required color and be ultra bright type rated for 100,000 hours of continuous operation from -40
to +74 degrees C.
6. Be able to replace signal lamp optical units and pedestrian signal faces with both LED and
incandescent light sources.
7. Fit into pedestrian signal housings without modifications to the housing.
8. Be a single, self-contained device, not requiring on-site assembly for installation into standard Type A
housing.
9. Have the following information permanently marked on the back of the module:
9.1. Manufacturer's name
9.2. Trademark
9.3. Model number
9.4. Serial number
9.5. Lot number
9.6. Month and year of manufacture
9.7. Required operating characteristics, as follows:
9.7.1. Rated voltage
9.7.2. Power consumption
9.7.3. Volt-ampere (VA)
9.7.4. Power factor
10. Have prominent and permanent vertical markings for accurate indexing and orientation within the
signal housing if a specific mounting orientation is required. Markings must include an up arrow, or
the word "Up" or "Top." Marking must be a minimum of 1-inch diameter.
932

SECTION 86

ELECTRICAL SYSTEMS

All LED PSF modules must be from the same manufacturer.

Circuit board and power supply must be contained inside the LED PSF modules. Circuit board must

comply with Chapter 1, Section 6 of TEES.

Individual LEDs must be wired so catastrophic loss or failure of 1 LED will not result in a loss of more than

5 percent of the PSF module light output. Failure of an individual LED in a string must not result in the

loss of an entire string or other indication.

LEDs must be evenly distributed in each indication. Do not use outline forms.

No special tools for installation are allowed.

The power supply for LED PSF module must be integral to the module. The power supply for each

symbol must be isolated to avoid turn-on conflict.

Assembly and manufacturing processes for LED PSF module must assure that all internal components

are adequately supported to withstand mechanical shock and vibration from high winds and other

sources.

Material used for LED PSF module must comply with ASTM D 3935.

Enclosures containing either the power supply or electronic components of LED PSF module, except

lenses, must be made of UL94VO flame-retardant material.

The color of the "Upraised Hand" symbol must be portland orange.

The color of the "Walking Person" symbol must be lunar white.

Each symbol must not be less than 10 inches high and 6.5 inches wide. Symbols must comply with ITE

publication, Equipment and Material Standards, chapter 3, "Pedestrian Traffic Control Signal Indications,"

and the California MUTCD.

LED PSF module must maintain an average luminance value over 48 months of continuous use in signal

operation for a temperature range of -40 to +74 degrees C. In addition, LED PSF modules must meet or

exceed the following luminance values upon initial testing at 25 degrees C.

The color output of LED PSF module must comply with chromaticity requirements in section 5.3 of ITE

publication, Equipment and Material Standards, chapter 3, "Pedestrian Traffic Control Signal Indications."

When operating over a temperature range of -40 to +74 degrees C, the measured chromaticity

coordinates of LED PSF module must comply with the following chromaticity requirements for 48 months:

Chromaticity Standards (CIE Chart)


Upraised hand
Not greater than 0.390 nor less than
0.331 nor less than 0.997 - X
X: not less than 0.280 nor greater than
0.320
Walking person
Y: not less than 1.055(X) - 0.0128 nor
greater than 1.055(X) + 0.0072
LED PSF module maximum power consumption must not exceed the values shown in the following table:
Power Consumption Requirements
Power consumption
Power consumption
PSF module
@ 24 C
@ 74 C
Upraised hand
10.0 W
12.0 W
Walking person
9.0 W
12.0 W
Wiring and terminal block must comply with section 13.02 of ITE publication, Equipment and Material
Standards, chapter 2, "Vehicle Traffic Control Signal Heads." The LED PSF module must be supplied with

933

SECTION 86

ELECTRICAL SYSTEMS

spade lugs and 3 secured, color-coded, 3-foot-long, 600 V(ac), 20 AWG minimum stranded jacketed
copper wires. Wires must comply with NEC, rated for service at +105 degrees C.
LED PSF module must operate:
1. At a frequency of 60 3 Hz over a voltage range from 95 to 135 V(ac) without perceptible flicker to
the unaided eye. Fluctuations of line voltage must have no visible effect on the luminous intensity of
the indications. Rated voltage for measurements must be 120 V(ac).
2. Compatible with currently-used State controller assemblies including solid-state load switches,
flashers, and conflict monitors. Comply with TEES chapters 3 and 6. If a 20 mA alternating current or
less is applied to the unit, the voltage read across the 2 leads must be 15 V(ac) or less.
LED PSF module on-board circuitry must:
1. Include voltage surge protection to withstand high-repetition noise transients. The voltage surge
protection must comply with NEMA Standard TS2, section 2.1.6.
2. Comply with FCC, title 47, subpart B, section 15 regulations for Class A emission limits for electronic
noise.
LED PSF module must provide a power factor of 0.90 or greater.
Total harmonic distortion from a current and a voltage induced into an alternating current power line by an
LED PSF module must not exceed 20 percent at an operating temperature of 25 degrees C.
The LED PSF module circuitry must prevent perceptible light emission to the unaided eye when a voltage
50 V(ac) or less is applied to the unit.
When power is applied to an LED PSF module, light emission must occur within 90 ms.
The "Upraised Hand" and "Walking Person" symbol indications must be electrically isolated from each
other. Sharing a power supply or an interconnect circuitry between the 2 indications is not allowed.
86-4.03J Ramp Metering Sign
The "Meter On" sign must be a white message sign complying with section 86-4.03.
Lenses must be 3/16-inch-minimum-thick clear acrylic or polycarbonate plastic or 1/8-inch nominal
thickness glass fiber reinforced plastic with molded 1 piece neoprene gasket. Message lettering for
"Meter" must be series C, 4-1/2 inches high, with uniform 1/2-inch stroke. Lettering for "On" must be
series C, 6 inches high, with uniform 1-inch stroke. Letters must be clear, transparent or translucent, with
black opaque background silk screened onto the 2nd surface of the lens.
86-4.04 SIGNAL MOUNTING ASSEMBLIES
Signal mounting assembly must include:
1. 1-1/2-inch standard steel pipe or galvanized conduit
2. Pipe fitting made of ductile iron, galvanized steel, aluminum alloy Type AC-84B no. 380, or bronze
3. Mast arm and post top slip fitters and terminal compartments made of cast bronze or hot-dip
galvanized ductile iron
After installation, clean and paint exposed threads of the galvanized conduit brackets and bracket areas
damaged by a wrench or vise jaws. Use a wire brush to clean and apply 2 coats of authorized unthinned
zinc-rich primer, organic vehicle type. Do not use aerosol can.
Fit each terminal compartment with a terminal block having a minimum of 12 positions, each with 2 screw
type terminals. Each terminal must accommodate at least five no. 14 conductors. Include a cover on the
compartment for ready access to the terminal block. The terminal compartment used to bracket-mount
signals must be bolted securely to a pole or standard.
The horizontal dimension of mounting assembly members between vertical centerline of the terminal
compartment or slip fitter and the vertical centerline of each signal face must not exceed 11 inches,
except where required for proper signal face alignment or to allow programming of programmed visibility
signal faces.
934

SECTION 86

ELECTRICAL SYSTEMS

Mounting assembly members must be plumb or level, symmetrically arranged, and securely assembled.
Mounting assembly must be watertight and free of sharp edges or protrusions that might damage
conductor insulation. Include positive-locking serrated fittings that, if mated with similar fittings on signal
faces, will prevent faces from rotating.
Orient each mounting assembly to allow maximum horizontal clearance to the adjacent roadway.
Use a slip fitter for post-top mounting of signals. Fit slip fitter over a 4-1/2-inch-outside-diameter pipe or
tapered standard end. Include cadmium-plated steel set screws. Include an integral terminal compartment
for each slip-fitter used to post-top mount signals with brackets.
For Type SV-1-T mountings with 5 sections and SV-2-TD mountings, bolt the mountings to the standard
through the upper pipe fitting as shown for bolting the terminal compartment.
Do not install signal faces at an intersection until all other signal equipment, including complete controller
assembly is in place and ready for operation. You may mount signal faces if covered or not directed
toward traffic.
86-4.05 FLASHING BEACONS
Flashing beacon must include:
1.
2.
3.
4.

Single section traffic signal face with yellow or red LED module indications
Backplate
Tunnel visor
Flashing beacon control assembly or flashing LED signal module circuitry

Beacon flasher unit must be independent of the intersection flasher unit.


86-4.05A Flashing Beacon Control Assembly
86-4.05A(1) Enclosure
Enclosure must be:
1. NEMA 3R with a dead front panel and a hasp with a 7/16-inch hole for a padlock
2. Powder coated, hot-dip galvanized, or factory-applied rust resistant prime coat and finish coat
86-4.05A(2) Circuit Breakers and Switches
Circuit breakers must comply with section 86-2.11.
A switch for manually operating the sign lighting circuit must be a single-hole mounting toggle type with a
single pole and throw and rated at 12 A, 120 V(ac). Furnish a switch with an indicating nameplate reading
"Auto-Test."
86-4.05A(3) Flasher
If you use solid-state flashers, comply with the following requirements:
1.
2.
3.
4.

Comply with section 8 of NEMA Standards publication No. TS 1.


The flasher must be with no contact points or moving parts.
Include 2 output circuits to allow alternate flashing of the signal faces.
The flasher must be able to carry a minimum of 10 A per circuit at 120 V(ac).

86-4.05A(4) Wiring
Conductors and wiring in the enclosure must comply with section 86-2.09.
86-4.05A(5) Terminal Blocks
Terminal blocks must be:
1. Rated 25 A, 600 V(ac)
2. Molded phenolic or nylon material
3. Barrier type with plated-brass screw terminals and integral marking strips

935

SECTION 86

ELECTRICAL SYSTEMS

86-4.05B Reserved
86-5 DETECTORS
86-5.01 VEHICLE DETECTORS
86-5.01A Inductive Loop Detectors
86-5.01A(1) General
Inductive loop detector includes a completely installed loop or group of loops, in the roadway and a lead
in cable installed and connected inside a controller cabinet.
86-5.01A(2) Sensor Unit Construction
Reserved
86-5.01A(3) Construction Materials
Conductor for each inductive loop detector must be continuous, unspliced, and one of the following:
Conductor Options for Inductive Loop Detector
Specifications
Type RHW-USE neoprene-jacketed or Type USE cross
Type 1 loop wire
linked polyethylene insulated, No. 12, stranded copper
wire with a 40 mils minimum thickness at any point.
Type THWN or Type XHHW, No. 14, stranded copper
wire in a plastic tubing. Plastic tubing must be
polyethylene or vinyl, rated for use at 105 C, and
Type 2 loop wire
resistant to oil and gasoline. Outside diameter of tubing
must be 0.27 inch maximum with a wall thickness of
0.028 inch minimum.
Option

Conductor for loop detector lead-in cable must be two no. 16, 19 by 29, stranded, tinned copper wires,
comply with the calculated cross sectional area of ASTM B 286, Table 1, and be one of the following:
Conductor Options for Loop Detector Lead-In Cable
Option
Specifications
Type B lead-in cable Insulated with 20 mils of HDPE. Conductors must be
twisted together with at least 2 turns per foot and the
twisted pair must be protected with a copper or
aluminum polyester shield. A no. 20, minimum, copper
drain wire must be connected to equipment ground
within cabinet. Cable must have a HDPE or high
density polypropylene outer jacket with a nominal
thickness of 32 mils. Include an amorphous interior
moisture penetration barrier of nonhydroscopic
polyethylene or polypropylene fillers.
Type C lead-in cable Comply with International Municipal Signal Association
(IMSA) Specification No. 50-2. A No. 20, minimum,
copper drain wire must be connected to equipment
ground within cabinet.
Sealant for filling slots must be one of the following:
1.
2.
3.
4.

Elastomeric
Asphaltic emulsion
Hot-melt rubberized asphalt
Epoxy sealant for inductive loops

86-5.01A(3)(a) Elastomeric Sealant


Polyurethane material that will within stated shelf life cure only in the presence of moisture. Sealant must
be suitable for use in both HMA and concrete pavement.
936

SECTION 86

ELECTRICAL SYSTEMS

The cured sealant must have the performance characteristics shown in the following table:
Performance Characteristics of Cured Sealant
Characteristic
ASTM
Requirement
Hardness (indentation) at 25 C and 50%
D 2240 Rex.
65-85
relative humidity. (Type A, Model 1700 only)
Tensile strength:
D 412 Die C
3.45 MPa, min
Pulled at 508 mm per minute
Elongation:
D 412 Die C
400%, min
Pulled at 508 mm per minute
Flex at -40 C:
0.6-mm free film bend (180) over 13-mm
-No cracks
mandrel
Weathering resistance:
Weatherometer 350 h, cured 7 days at 25 C
D 822
Slight chalking
@ 50% relative humidity
Salt spray resistance:
3.45 MPa, minimum tensile
28 days at 38 C with 5% NaCl, Die C & pulled
B 117
400%, minimum elongation
at 508 mm per minute
Dielectric constant over a temperature range of
D 150
Less than 25% change
-30 C to 50 C
86-5.01A(3)(b) Asphaltic Emulsion Sealant
Comply with the Department's Specification 8040-41A-15. Use for filling slots in HMA pavement of a
maximum of 5/8 inch in width. Do not use where the slope causes the material to run from the slot.
Material must not be thinned beyond the manufacturer's instructions. Place material when the air
temperature is at least 7 degrees C.
86-5.01A(3)(c) Hot-Melt Rubberized Asphalt Sealant
Hot-melt rubberized asphalt must be:
1. In solid form at room temperature and fluid at application temperature of 190 to 205 degrees C.
Fumes must be nontoxic.
2. Suitable for use in both HMA and concrete pavement.
3. Melted in a jacketed, double-boiler type melting unit. Temperature of heat transfer medium must not
exceed 245 degrees C.
4. Applied with a pressure feed applicator or a pour pot when the pavement surface temperature is
greater than 4 degrees C.
5. Packaged in containers clearly marked "Detector Loop Sealant" and specifying manufacturer's batch
and lot number.
The cured sealant must have the performance characteristics shown in the following table:
Performance Characteristics of Cured Sealant
Characteristic
ASTM
Requirement
Cone penetration, 25 C, 150 g, 5 s
D 5329, Sec. 6
3.5 mm, max
Flow, 60 C
D 5329, Sec. 8
5 mm, max
Resilience, 25 C
D 5329, Sec. 12
25%, min
Softening point
D 36
82 C, min
Ductility, 25 C, 50 mm/min
D 113
300 mm, min
Flash point, COC, C
D 92
288 C, min
Viscosity, Brookfield thermosel,
D 150
Less than 25% change
No. 27 Spindle, 20 rpm, 190 C
86-5.01A(3)(d) Epoxy Sealant for Inductive Loops
Use for repair work on existing spalls, cracks, and other deformations in and around saw cuts housing
inductor loops and leads. The maximum gel time of the combined components must be 30 minutes when
937

SECTION 86

ELECTRICAL SYSTEMS

tested under California Test 434. The rapid cure allows minimum traffic delay when tested under
California Test 434.
86-5.01A(4) Installation Details
Install loop conductors without splices and end in the nearest pull box. Seal the open end of the cable
jacket or tubing similar to splicing requirements to prevent water from entering. Do not make final splices
between loops and lead-in cable until loop operations under actual traffic conditions are authorized.
Splice all loop conductors for each direction of travel for the same phase of a traffic signal system, in the
same pull box, to a detector lead-in cable that runs from the pull box adjacent to the loop detector to a
sensor unit mounted in the controller cabinet.
End all loop conductors in a pull box or a terminal strip in the cabinet.
Identify and band conductors for inductive loop installations. Band conductors, in pairs, by lane, in the pull
box adjacent to the loops and near the end of the conductors in the cabinet. Bands must comply with
section 86-2.09.
If HMA surfacing is to be placed, install loop conductors before placing the uppermost layer of HMA.
Install conductors in a compacted layer of HMA immediately below the uppermost layer. Install
conductors as shown, except fill the slot with a sealant flush to the surface.
When cutting loops:
1. Saw cuts must be cleaned with compressed air to remove all excess moisture and debris. For
repairing damaged saw cuts, all loose spalled material must be cleaned away from the saw cut,
chipping back to sound asphalt concrete or concrete pavement, and cleaned away from the loop
wires.
2. Residue from slot cutting activities must not be allowed to flow across shoulders or lanes occupied by
traffic and must be removed from the pavement surface before residue flows off. Dispose of residue
from slot cutting activities.
3. Before setting, surplus sealant must be removed from the adjacent road surface without using
solvents.
86-5.01A(5) Preformed Inductive Loops
Preformed inductive loops must be the type shown.
The loop must be 6-foot square unless otherwise shown. The loop must consist of 4 turns of No. 16, or
larger, wire with Type THWN or TFFN insulation.
Encase the loop wires in 3/8-inch, minimum, Schedule 40 or Schedule 80 PVC or polypropylene conduit
and seal the conduit to prevent the entrance of water and the movement of wires within the conduit.
The loop wires from the preformed loop to the adjacent pull box must be twisted together into a pair, at
least 2 turns per foot, and encased in Schedule 40 or Schedule 80 PVC or polypropylene conduit
between the preformed loop and the adjacent pull box or detector handhole. The lead-in conduit must be
sealed to prevent the entrance of water at the pull box or handhole end.
In new roadways, place the preformed loops and lead-in conduits in the base course with the top of the
conduit flush with the top of the base. Cover with HMA or concrete pavement. Protect preformed loops
and lead-in conduits from damage before and during pavement placement.
In new reinforced concrete structure decks, secure the preformed loops to the top of the uppermost layer
of reinforcing steel using nylon wire ties. Hold the loop parallel to the structure deck by using PVC or
polypropylene spacers where necessary. Place conduit for lead-in conductors between the uppermost 2
layers of reinforcing steel.
Do not install preformed inductive loops in existing structure decks.
Preformed loop installation in existing pavement must comply with the following:
1. Preformed loops and lead-in conduits must be placed in 1-1/4-inch-minimum-width slots cut into the
existing pavement. The top of the conduit must be 2 inches, minimum, below the top of pavement.
938

SECTION 86

ELECTRICAL SYSTEMS

2. Slots in asphalt concrete pavement must be filled with elastomeric or hot-melt rubberized asphalt
sealant.
3. Slots in concrete pavement must be filled with epoxy sealant or hot melt rubberized asphalt sealant.
86-5.01B Magnetic Detectors
Cable from the pull box adjacent to the magnetic detector sensing element to the field terminals in the
controller cabinet must be the type specified for inductive loop detectors.
86-5.01C Microwave Vehicle Detection System (Side Fire)
Reserved
86-5.01D Emergency Vehicle Detector System
Reserved
86-5.02 PEDESTRIAN PUSH BUTTON ASSEMBLIES
Housing must be either die-cast or permanent mold-cast aluminum. Assembly must be rainproof and
shockproof in any weather condition.
The switch must be a single-pole, double-throw switching unit with screw-type terminals rated 15 A at 125
V(ac), and must have:
1.
2.
3.
4.
5.
6.

Plunger actuator and a U frame to allow recessed mounting in the push button housing
Operating force of 3.5 lb
1/64-inch maximum pre-travel
7/32-inch minimum overtravel
0.0004- to 0.002-inch differential travel
2-inch-minimum-diameter actuator

Wherever a pedestrian push button is attached to a pole, shape the housing to fit the pole curvature and
secure. Include saddles to make a neat fit if needed.
Wherever a pedestrian push button is mounted on top of a 2-1/2-inch-diameter post, fit the housing with a
slip-fitter and use screws for securing rigidly to post.
Pedestrian push button signs must be porcelain-enameled metal or structural plastic.
Install the push button and the sign on the crosswalk side of the pole.
Point arrows on the push button signs in the same direction as the corresponding crosswalk.
Attach the sign on a Type B push button assembly.
For Type C pedestrian push button assembly, mount the instruction sign on the same standard as the
push button assembly, using 2 straps and saddle brackets. Straps and saddle brackets must be
corrosion-resisting chromium nickel steel and comply with ASTM A 167, Type 302B. Theftproof bolts must
be stainless steel with a chromium content of 17 percent and a nickel content of 8 percent.
86-6 LIGHTING
86-6.01 HIGH-PRESSURE SODIUM LUMINAIRES
High-pressure sodium luminaires must be the enclosed cutoff type. Each luminaire must consist of a
housing, a reflector, a refractor or lens, a lamp socket, an integral ballast, a terminal strip, and a lamp.
Housing must be manufactured from aluminum. Painted or powder-coated housing must withstand a
1,000-hour salt spray test as specified in ASTM B 117.
Other metal parts must be corrosion resistant.
Each housing must include a slip fitter that can be mounted on a 2-inch pipe tenon and can be adjusted 5
degrees from the axis of the tenon. Clamping brackets of the slip-fitter must not bottom out on the
housing bosses when adjusted within the 5 degree range.

939

SECTION 86

ELECTRICAL SYSTEMS

Slip fitter mounting bracket must not permanently set in excess of 0.020 inch when the 3/8-inch-diameter
cap screw used for mounting is tightened to 10 ft-lb.
When tested under California Test 611, the luminaire to be mounted horizontally on the mast arm must be
capable of withstanding the following cyclic loading for a minimum of 2 million cycles without failure of any
luminaire parts:
Cyclic Loading
Internal
Minimum peak acceleration level
ballast
(G = acceleration due to gravity)
Vertical
Removed 3.0 G peak-to-peak sinusoidal loading (same as 1.5 G peak)
Vertical
Installed 1.0 G peak-to-peak sinusoidal loading (same as 0.5 G peak)
Installed 1.5 G peak-to-peak sinusoidal loading (same as 0.75 G peak)
Horizontala
a
Perpendicular to direction of mast arm
Plane

If a photoelectric unit receptacle is included, a raintight shorting cap must be installed. If the luminaire
housing has a hole for the receptacle, the hole must be permanently closed, covered, and sealed with
weatherproof material.
The optical system must be in a sealed chamber and include:
1. Reflector shaped such that a minimum of light is reflected through the arc tube of the lamp. The
reflector surface must be specular and protected by either an anodized finish or a silicate film on it's
specular surface.
2. Refractor or lens mounted in a door frame hinged to the housing and secured with a spring-loaded
latch. The refractor must be made of glass or polycarbonate plastic. The lens must be made of heatand impact-resistant glass.
3. Lamp socket that is a porcelain enclosed mogul-multiple type. The shell must include integral lamp
grips to assure electrical contact under conditions of normal vibration. Socket must be mounted in the
luminaire to allow presetting a variety of specified light distribution patterns. Socket must be rated for
1,500 W, 600 V(ac), and a 4 kV pulse.
4. L
amp.
Provide a sealing gasket between the reflector and:
1. Refractor or lens
2. L
amp socket
The chamber must allow for filtered flow of air in and out of the chamber from lamp heat. Filtering must be
accomplished by either a separate filter or a filtering gasket.
If components are mounted on a down-opening door, the door must be hinged and secured to the
luminaire housing separately from the refractor or flat lens frame. The door must be easily removable and
replaceable, and secured to the housing to prevent accidental opening when the refractor or flat lens
frame is opened.
Field wires connected to the luminaire must terminate on a barrier-type terminal block secured to the
housing. Terminal screws must be captive and equipped with wire grips for conductors up to no. 6. Each
terminal position must be clearly identified.
Minimum light distribution for each luminaire must comply with the isolux diagrams.
Maximum brightness of each cutoff luminaire, with the lamp indicated, must be the value shown in the
following table:

940

SECTION 86

ELECTRICAL SYSTEMS
Lamp
ANSI code no.
S55
S66
S50
S67
S51

Cutoff Type
Lamp
wattage
150
200
250
310
400

Maximum brightness
(foot-lamberts)
40
40
50
60
75

Brightness readings will be taken using a brightness meter with an acceptance angle of 1.5 degrees.
When measured on the 90- and 270-degree lateral angle line, maximum brightness must not exceed the
above specified brightness when the meter is located at a horizontal distance of 120 feet and a vertical
distance of 7.5 feet between the luminaire and the meter, or at an angle of 3 degrees 35 minutes from the
horizontal to the line between the luminaire and the meter. Measurements must be made from the 90and 270-degree lines, and averaged. The lamp used for each test must operate at the wattage necessary
to produce the light output shown in the following table:
Light Output
Lamp wattage
150
200
250
310
400

Lumens
16,000
22,000
27,000
37,000
50,000

86-6.01A High Pressure Sodium Lamp Ballasts


Each ballast must:
1. Operate the lamp for its rated characteristics and wattage
2. Continuously operate at ambient air temperatures from -20 to 25 degrees C without reduction in
ballast life
3. Operate for at least 180 cycles of 12 hours on and 12 hours off, with the lamp circuit in an open or
short-circuited condition and without measurable reduction in operating requirements
4. Have a design life of not less than 60,000 hours
5. Provide proper starting and operating waveforms, voltage, and current
6. Provide reliable lamp starting and operation at ambient temperature down to -20 degrees C for the
rated life of lamp
Ballast must be tested under NEMA/ANSI C82.6.
Starting aids for a ballast of a given lamp wattage must be interchangeable between ballasts of the same
wattage and manufacturer, without adjustment.
Each integral ballast must consist of separate components that can be easily replaced. An encapsulated
starting aid will be counted as a single component. Each component must include screw terminals, NEMA
tab connectors, or a single multi-circuit connector. Conductors and terminals must be identified.
Mount heat-generating component so as to use the portion of the luminaire it is mounted to as a heat
sink. Place capacitor at maximum practicable distance from the heat-generating components or thermally
shield to limit the case temperature to 75 degrees C.
Transformer and inductor must be resin impregnated for protection against moisture. Capacitors, except
those in starting aids, must be metal cased and hermetically sealed.
The Department will test the high-pressure sodium lamp ballast. High-pressure sodium lamp ballast must
have a characteristic curve that will intersect both of the lamp-voltage limit lines between the wattage limit
lines and remain between the wattage limit lines throughout the full range of the lamp voltage and
throughout the lifetime of the lamp. This requirement must be met at the rated input voltage of the ballast
and at the lowest and highest rated input voltage of the ballast.
941

SECTION 86

ELECTRICAL SYSTEMS

Ballast for luminaires must be located in the luminaire housing.


86-6.01A(1) Regulator Type Ballasts
Regulator type ballast must comply with the following:
1. For nominal input voltage and lamp voltage, the ballast design center must not vary more than 7.5
percent from the rated lamp wattage.
2. Ballast must be designed for a capacitance variance of 6 percent that will not cause more than 8
percent variation in the lamp wattage regulation during the rated lamp life.
3. Lamp current crest factor must not exceed 1.8 for an input voltage variation of 10 percent at any
lamp voltage during the lamp life.
Regulator-type ballast must comply with one of the lamp regulations shown in the following table:
Regulator-Type Ballast
Power factor
Lamp regulation
Not less than 90 percent
Lamp wattage regulation spread
throughout the life of the lamp
does not vary by more than 18
when the ballast is operated at
percent for 10 percent input
nominal line voltage with a
voltage variation from nominal
nominally-rated reference lamp
through life
Lead typeb
Not less than 90 percent
Lamp wattage regulation spread
throughout the life of the lamp
does not vary by more than 30
when the ballast is operated at
percent for 10 percent input
nominal line voltage with a
voltage variation from nominal
nominally-rated reference lamp
through life
a
Primary and secondary windings must be electrically isolated

b
Constant wattage autoregulator (CWA)

Ballast type
Lag typea

86-6.01A(2) Nonregulator Type Ballasts


Each nonregulator type ballast must comply with the following:
1. For nominal input voltage and lamp voltage, the ballast design center must not vary more than 7.5
percent from the rated lamp wattage.
2. Lamp current crest factor must not exceed 1.8 for input voltage variation of 5 percent at any lamp
voltage during lthe amp life.
Nonregulator-type ballast must comply with the lamp regulation shown in the following table:
Ballast type
Autotransformer or
high reactance

Nonregulator-Type Ballast
Power factor
Lamp regulation
Not less than 90 percent
Lamp wattage regulation spread does
throughout the life of the lamp
not vary by more than 25 percent for
when the ballast is operated at
5 percent input voltage variation from
nominal line voltage with a
the nominal through life
nominally-rated reference lamp

86-6.01B High Pressure Sodium Lamps


High-pressure sodium lamps must comply with ANSI C78.42 when tested under ANSI C78.389. High
pressure sodium lamps must have a minimum average rated life of 24,000 hours.
86-6.02 RESERVED
86-6.03 LOW PRESSURE SODIUM LUMINAIRES
Each low-pressure sodium luminaire must be completely assembled with a lamp and a ballast, and must:
1. Be the enclosed type, either semi-cutoff or cutoff type.

942

SECTION 86

ELECTRICAL SYSTEMS

2. Consist of a housing, reflector, refractor or lens, lamp socket, integral ballast, removable ballast tray,
lamp support, terminal strip, capacitor, and slip fitter. The reflector may be an integral part of the
housing.
Luminaire housing must be a 1/16-inch thick, minimum, corrosion resistant die cast aluminum sheet and
plate with concealed continuous welds or a minimum nominal wall thickness of 3/32-inch thick
acrylonitrile-butadiene-styrene sheet material, on a cast aluminum frame that provides mounting for all
electrical components and slip fitter. Housing must be divided into optical and power compartments
individually accessible for service and maintenance. Position and clamp luminaire to pipe tenon by
tightening the mounting bolts.
Painted exterior surface of the luminaire must be finished with a fused coating of electrostatically-applied
polyester powder paint or other ultraviolet-inhibiting film. The color must be aluminum gray.
High-temperature neoprene, or equal, sealing ring must be installed in the pipe tenon opening to prevent
entry of water and insects into the power and optical compartments.
Access to the power unit assembly must be through a weathertight hinged cover, secured with spring
type latches or captive screws, to the luminaire housing.
Hardware must be stainless steel or cadmium plated. Use machine screws or bolts to secure removable
components. Do not use sheet metal screws.
Semi-cutoff luminaires and molded refractor-style cutoff luminaires must include a refractor. Other cutoff
luminaires must include a flat lens.
Refractor must be a 1-piece injection molded polycarbonate of 3/32-inch minimum thickness or a 1-piece
injection molded acrylic of 1/8-inch minimum thickness. Flat lens must be a 1-piece polycarbonate of
3/32-inch minimum thickness mounted to a metal frame. Refractor assembly and flat lens assembly must
be constructed to rigidly maintain its shape and hinged and secured with spring type latches to the
luminaire housing. Alternate methods of manufacturing the refractor may be authorized provided
minimum specified thicknesses are maintained.
Lamp socket must be high-temperature flame-retardant thermoset material with self-wiping contacts or
equivalent. Socket must be rated for 660 W and 1,000 V(ac). The position of the socket and support must
maintain the lamp in correct relationship with the reflector and refractor for the designed distribution
pattern.
Isofootcandle distribution must be ANSI Type III, short or Type IV, medium distribution, for cutoff or semi
cutoff luminaires.
With a 40-foot mounting height, each type of luminaire must maintain a minimum of 0.2 footcandle at
least 60 feet each side, along the longitudinal roadway line below the luminaire, and a minimum of 0.35
footcandle at a transverse roadway distance from the luminaire location equal to 1.5 times the luminaire
mounting height.
Certified luminaire performance data must be provided. This data must include complete photometric test
data in isofootcandle charts at a scale of 1 inch equals 20 feet for the luminaire and lamp sizes shown.
Alternate data may be in the form of horizontal footcandle values recorded on a 15 by 15 foot area
extending 90 feet longitudinally on each side of the light source, and 15 feet behind and 90 feet in front of
the light source for the luminaire and lamp sizes and mounting height shown. Horizontal footcandle levels
in the data submitted must equal or exceed the levels specified. Failure to comply with the referenced
values will be justification for rejection of the luminaires.
Photometric testing must be performed and certified by an independent and recognized testing
laboratory.
Low-pressure sodium lamp must:
1. Be a 180 W, single-ended, bayonet base, tubular gas-discharge lamp.
2. Maintain a minimum of 93 percent of initial lumens during the rated life and must comply with the
minimum performance requirements shown in the following table:
943

SECTION 86

ELECTRICAL SYSTEMS
Performance Requirements
Lamp designation
ANSI L74/E
Initial lumens
33,000 lumens
Rated average life @ 10 hrs/Start
18,000 hours
Operating position
Horizontal 20 degrees

3. Reach 80 percent of the light output within 10 minutes and must restrike within 1 minute after an
outage due to power interruption or voltage drop at the lamp socket.
4. Identify the month and year of the installation.
5. Have an autotransformer or high-reactance-type ballast. The ballast must comply with the following:
5.1. Lamp current crest factor must not exceed 1.8 at nominal line voltage
5.2. Ballast loss must not exceed 24 percent for 180 W ballast at nominal line voltage
5.3. Ballast must comply with the lamp regulation shown in the following table:

Ballast type
Autotransformer or
high-reactance

Autotransformer or High-Reactance-Type Ballast


Power factor
Lamp regulation
Not less than 90 percent when Lamp wattage regulation spread does
ballast is operated at nominal
not vary by more than 6 percent for
line voltage with a nominally
10 percent input voltage variation
rated reference lamp
from nominal through life

A multi-circuit connector must be included for quick disconnection of the ballast tray.
86-6.04 HIGH MAST LIGHTING ASSEMBLY
Reserved
86-6.05 SOFFIT AND WALL LUMINAIRES
Soffit and wall luminaire must be weatherproof and corrosion resistant.
Each flush-mounted soffit luminaire must consist of:
1. Metal body with two 1-inch minimum conduit hubs and provisions for anchoring into concrete
2. Prismatic refractor made of heat-resistant polycarbonate mounted in a door frame and clearly
identified as to street side
3. Specular anodized aluminum reflector
4. Ballast located either within the housing or in a ceiling pull box as shown
5. L
amp socket
Door frame assembly must be hinged, gasketed, and secured to the body by at least 3 machine screws.
Each pendant soffit luminaire must be enclosed and gasketed, have an aluminum finish, and include:
1.
2.
3.
4.
5.

Reflector with a specular anodized aluminum finish


Refractor made of heat-resistant polycarbonate
Optical assembly hinged and latched for lamp access and a device to prevent dropping
Ballast designed for operation in a raintight enclosure
Galvanized metal box with a gasketed cover, 2 captive screws, and 2 chains to prevent dropping and
for luminaire mounting

Each wall-mounted luminaire must consist of:


1.
2.
3.
4.
5.
6.
7.

Cast metal body


Prismatic refractor, made of glass, mounted in a door frame
Aluminum reflector with a specular anodized finish
Integral ballast
L
amp socket
Gasket between the refractor and the body
At least two 5/16-inch-minimum-diameter mounting bolts
944

SECTION 86

ELECTRICAL SYSTEMS

Cast-aluminum bodies to be cast into or mounted against concrete must have a thick application of alkali
resistant bituminous paint on all surfaces to be in contact with concrete.
Each soffit luminaire and wall luminaire must include a 70 W high-pressure sodium lamp with a minimum
average rated life of 24,000 hours. Each lamp socket must be positioned to locate the light center of the
lamp within 1/2 inch of the light center location of the luminaire design.
Ballast must comply with section 86-6.01A. Wall luminaire ballast must be located in the luminaire
housing or, if shown, in a pull box adjacent to the luminaire.
86-6.06 PEDESTRIAN CROSSING
Before starting fixture manufacturing, submit fixture design for authorization. If requested, submit 1
complete prototype fixture for authorization at least 30 days before manufacturing the fixtures. The
prototype fixture will be returned to you, and if allowed, the fixture may be installed in the work.
The lens unit in the door section must be formed of 1-1/2-inch methyl methacrylate rod cut and fire glazed
for a clear finish or a cast unit with equivalent tolerances and finish.
The lens must be secured to the door section with an extruded lens retainer of 6063-T5 aluminum alloy
that fits the lens shape. The lens retainer must fit the full length of the lens on both sides. Continuous lens
retainer for the full length of 3 lenses is allowed. Z bars of 5052-H32 or 5005-H14 aluminum alloy, 1/16
inch minimum thickness, may be substituted for the extruded lens retainer.
A captive positive-keyed screw-type latching device requiring a special socket wrench must be installed at
the upper edge to secure the door in the closed position as shown. Furnish 2 special wrenches to the
Engineer.
Each fixture must include a F48T12/CW rapid-start fluorescent lamp with recessed, double contact base
installed on the back side of the door directly behind the lens.
Each lampholder must be UL listed for outdoor use without an enclosure and with 1,500 mA rapid-start
fluorescent lamp. Lampholder must be a spring-loaded type.
For each lamp, the distance from the face of the lampholder to the lamp must be designed to provide a
compression of at least 0.10 inch on the spring-type lampholder when the lamp is in place. Lamp must
have a positive mechanical and electrical contact when it is in place. Socket on the spring-type
lampholder must have enough travel to allow the lamp installation. The spring must not be a part of the
current-carrying circuit.
Ballast must be a high-power-factor type with weatherproof leads for operation of one 48-inch rapid-start
lamp. The ballast must be UL listed for outdoor operation on 110 to 125 V(ac) 60 Hz circuit and rated at
1,500 mA.
Conductors from ballast leads to the lampholder must be a minimum size of No. 16, stranded, and UL
listed copper AWM. Splicing of lampholder conductors to ballast leads must be performed by using
mechanically-secure connectors.
Conductors in the fixture except ballast leads and entrance line conductors, must be UL-listed AWM.
Provide sufficient slack in the conductors to allow the fixture door to fully open.
Circuit conductors entering the fixture must be terminated on molded phenolic barrier-type terminal blocks
rated at 15 A and 600 V(ac) and must have integral-type white waterproof-marking strips. Current
carrying parts of terminal blocks must be insulated from the fixture with integral plugs or strips to provide
protection from line-to-ground flashover voltage. Terminal blocks must be attached to the wireway cover
in the top section. If you use sectionalized terminal blocks, each section must include an integral barrier
on each side and be capable of rigid mounting and alignment.
Exposed surfaces of the fixture must be uniform in appearance and free from significant defects, including
improper fit, dents, deep scratches and abrasions, burrs, roughness, off-square ends, holes off-center or
jagged, and surface irregularities. Screws for attaching components to the fixture door, including Z bars,

945

SECTION 86

ELECTRICAL SYSTEMS

ballasts, and terminal block, must be tapped into the door from the inside only. Screwheads, nuts, or
other fasteners must not be removable from the outside.
86-6.06A Pedestrian Undercrossing Fixtures
Fixture shell must be cast aluminum alloy, industrial type, or Federal Class 18 aluminum of 1/4 inch
minimum thickness.
Door must be 1 piece of 6061-T6 aluminum alloy of 1/8 inch minimum thickness.
Continuous piano hinge must be Type 1100 aluminum alloy. Piano hinge must be welded or riveted to the
door section with 1/8-inch aluminum rivets. Matching holes must be drilled in the hinge and the lower
edge of the fixture. After the shell is in place, the door assembly must be attached by 3/8-inch, No. 8
stainless steel self-tapping screws at a minimum.
A neoprene gasket must be attached to the frame to provide a cushion between the shell and the door.
Chain or other device must be included to prevent the door, when fully opened, from coming in contact
with the undercrossing wall.
Fixture must be held in place by three 3/8 by 8 inch anchor bolts with 2 nuts each.
Fixture surfaces in contact with concrete and with anchor bolts and nuts must be painted with a thick
application of alkali-resistant bituminous paint. Paint must comply with MIL-P-6883.
Circuit conductor entering the fixture must be terminated on 2-position terminal blocks.
Both ends of the fixture must have holes for 1-inch conduit. Unused holes must be plugged with pressed
metal closures.
86-6.06B Pedestrian Overcrossing Fixtures
Fixture shell must consist of:
1. Top section and a door section of extruded 6063-T5 aluminum alloy, each with a nominal 1/8 inch
wall thickness
2. 2 cast-end sections of 319 aluminum alloy
3. Internal wireway cover of 505-H32 aluminum alloy
Top section and door section must be joined together on 1 side by a continuous hinge formed as part of
the 2 extrusions and must overlay to allow locking on the other side. Hinge must be treated with a silicone
grease that will prevent the entrance of water by capillary action.
Wireway cover with 3/16-inch hemmed ends up and terminal blocks and circuit conductors must be
inserted before welding end sections and must provide clearance at both ends for conductors. The cover
must be fastened by at least two 1/4-inch, No. 4 self-threading sheet metal screws with a binding head
and a blunt point. You may substitute blind rivets of equivalent strength.
One or more bronze sash chains or other device must be included to prevent the door from opening to an
extent that will damage the hinge.
Lampholder must include heat-resistant circular cross section neoprene sealing gasket, silver-coated
contacts, and waterproofed lead entrance for use with a 1,500 mA rapid start fluorescent lamp.
Ballast must be at most 13-1/4 inches long.
Circuit conductors entering the fixture must be terminated on 3-position terminal blocks.
Electrical system of a pedestrian overcrossing must be grounded by a No. 8 copper wire equipment
grounding conductor installed in a conduit connecting and bonding all non current carrying metal parts in
the system. The equipment grounding conductor must be connected to the system equipment grounding
conductor.
Ground wire must be secured to the inside of the telescoping sleeve end casting where conductors are
carried and to the inside of Type LB conduit fitting on end post by a connecting lug and a No. 8 self
threading pan screw.
946

SECTION 86

ELECTRICAL SYSTEMS

Lamp, lampholder, ballast, and fixture wire must be attached to the door section. Terminal blocks must be
attached to the top section or the wireway cover.
Three No. 10, solid copper circuit conductors must be installed between terminal blocks as part of each
completed fixture.
Before shipment to the job site, fixture must be completely manufactured and assembled in the shop.
86-6.06C In-Roadway Warning Lights
Reserved
86-6.07 INDUCTION SIGN LIGHTING FIXTURES
Each induction sign lighting fixture must include a housing with a door, reflector, refractor or lens, lamp,
power coupler, high-frequency generator, socket assembly, fuse block, and fuses.
Each induction sign lighting fixture must:
1. Be designed for mounting near the bottom of the sign panel on an overhead sign structure.
2. Be an enclosed design, raintight and corrosion resistant. The door and housing must be gasketed.
Thickness of the gasket must be 1/4 inch, minimum.
3. Have a minimum average rating of 60,000 hours.
4. Be for a wattage of 87 W, 120/240 V(ac).
5. Have a power factor greater than 90 percent and total harmonic distortion less than 10 percent.
6. Be UL approved for wet locations and be FCC Class A listed.
7. Not exceed 44 lb in weight.
8. Include the manufacturer's brand name, trademark, model number, serial number, and date of
manufacture on the packaged assembly. The same information must be permanently marked on the
outside and inside of the housing.
9. Comply with the minimum horizontal footcandle requirement shown.
10. Be a maximum height of 12 inches above the top of the mounting rails.
If the fixture is located so the light center of the lamp is 55 inches in front of, 1 foot below, and centered
on a 10-by-20-foot-wide sign panel, the ratio of the maximum to minimum illuminance level on the panel
must not exceed 12 to 1 in 95 percent of the points measured. The illuminance gradient must not exceed
2 to 1 and is defined as the ratio of minimum illuminance on a 1-foot square of panel to that on an
adjacent 1-foot square of panel.
Each fixture must have a mounting assembly that will allow the fixture to be mounted on continuous slot
channels. The mounting assembly must be either cast aluminum, hot-dip galvanized steel plate, or steel
plate that has been galvanized and finished with a polymeric coating system or same finish used for the
housing.
Housing must have a door designed to hold a refractor or lens and to open without the use of special
tools. Housing and door must be manufactured of sheet or cast aluminum and have a powder coat or
polyester paint finish of a gray color resembling the unfinished manufacturing. Sheet aluminum must
comply with ASTM B 209 or B 209M for 5052-H32 aluminum sheet. External bolts, screws, hinges, hinge
pins, and door closure devices must be corrosion resistant.
Housing must include weep holes.
Door must be hinged to the housing on the side of the fixture away from the sign panel and include 2
captive latch bolts or other latching device. Door must be designed to lock in the open position, 50
degrees minimum from the plane of the door opening, with an 85-mph 3-second wind-gust load striking
the door from either side.
Reflector must be 1 piece made from specularly-finished aluminum protected with an electrochemically
applied anodized finish or a chemically-applied silicate film, and designed so deposited water due to
condensation will drain away. The reflector must be secured to the housing with a minimum of 2 screws
and removable without removing any fixture parts. Do not attach reflectors to the outside of housing.
Refractor or lens must have a smooth exterior and must be manufactured from the material shown in the
following table:
947

SECTION 86

ELECTRICAL SYSTEMS
Refractor and Lens Material Requirements
Component
Manufactured from
Flat lens
Heat-resistant glass
Convex lens
Heat resistant, high-impact resistant tempered glass
Refractor
Borosilicate heat resistant glass

Refractor and convex lens must be designed or shielded so no fixture luminance is visible if the fixture is
approached directly from the rear and viewing level is the bottom of the fixture. If a shield is used, it must
be an integral part of the door casting.
Each fixture must include an 85 W induction lamp with a fluorescent phosphor-coated interior wall. Light
output must be at least 70 percent at 60,000 hours. Lamp must have a minimum color-rendering index of
80, be rated at a color temperature of 4,000K, and be removable without the use of tools.
Lamp socket must be a porcelain enclosed mogul type with a shell that contains integral lamp grips to
assure electrical contact under normal vibration conditions. The center contact must be spring loaded.
The shell and center contact must be nickel-plated brass. The socket must be rated for 1,500 W and 600
V(ac).
Power coupler must include a construction base with antenna, heat sink, and electrical connection cable,
and be designed so it can be removed with common hand tools.
High-frequency generator must:
1. Start and operate lamps at an ambient temperature of -25 degrees C or greater for the rated life of
the lamp
2. Operate continuously at ambient air temperatures from -25 to 55 degrees C without reduction in
generator life
3. Have a design life of at least 100,000 hours at 55 degrees C
4. Have an output frequency of 2.65 MHz 10 percent
5. Have radio frequency interference that complies with FCC title 47, part 18, regulations regarding
harmful interference
6. Be replaceable with common hand tools
7. Mounted so the fixture can be used as a heat sink
Conductor terminal must be identified by the component terminal the conductor connects to.
Submit a copy of the high-frequency generator test methods and results from the manufacturer with each
lot of fixtures.
Each fixture must include a barrier-type fuse block for terminating field connections. The fuse block must
be:
1. Secured to the housing and be accessible without removal of any fixture parts
2. Mounted to leave a minimum of 1/2 inch air space from the sidewalls of the housing
3. Designed for easy removal of fuses with a fuse puller, be rated at 600 V(ac), and have box terminals.
Fuses must be 13/32-inch-diameter, 1-1/2-inch-long ferrule type, and UL or NRTL listed. For 120 V(ac)
input fixture, only the ungrounded conductor must be fused and a solid link must be provided between the
neutral and the high-frequency generator.
If shown, include a wire guard to prevent damage to the refractor or lens. The guard must be constructed
of 1/4-inch-minimum-diameter galvanized steel wire and either hot-dip galvanized or electroplated zinc
coated as specified in ASTM B 633, Service Condition SC4 with a clear chromate dip treatment. Guard
elements must be spaced to prevent rocks larger than 1-1/2-inch diameter from passing through.
86-6.08 SIGN LIGHTING FIXTURES
86-6.08A General
Reserved

948

SECTION 86

ELECTRICAL SYSTEMS

86-6.08B Fixtures for Flashing Beacons


Sign lighting fixture for flashing beacon must:
1. Be UL or NRTL listed for outdoor installation
2. Include a hood with a side outlet tapped for the conduit, a symmetrical 10-inch steel reflector with a
white porcelain-enamel finish, and a medium base socket
3. Be rated at 150 W minimum
86-6.08C Reserved
86-6.08D Fluorescent Fixtures
Reserved
86-6.09 INTERNALLY ILLUMINATED STREET NAME SIGNS
Sign fixture must be:
1. Designed and constructed to prevent deformation or failure when subjected to an 85 mph, 3-second
wind-gust load as specified in AASHTO publication, "Standard Specifications for Structural Supports
of Highway Signs, Luminaires and Traffic Signals," and its interim revisions
2. Fabricated from all new material and all ferrous parts must be galvanized or cadmium plated
3. Type A or B sign
The top and bottom must be formed or extruded aluminum and must be attached to formed or cast
aluminum end fittings. Housing must be designed for continuous sealing between the top and bottom
assemblies and end fittings, and be constructed to resist torsional twist and warp. Opening or removing 1
panel must allow access to the interior of the sign for lamp, ballast, and fuse replacement.
Photoelectric unit sockets are not allowed.
For Type A sign, both sides must be hinged at the top to allow installation or removal of the sign panel,
and to allow access to the interior of the sign.
For Type B sign, the sign panel must be slide mounted into the housing.
Reflectors may be used to obtain required sign brightness. Reflectors must be formed aluminum with
acrylic baked white-enamel surface having a minimum reflectance of 0.85.
Sign panel must be slide mounted or rigid mounted in a frame, with white legend, symbols, arrows, and
border on each face. Background must be green.
Sign panel surface must be evenly illuminated. Average of brightness readings for letters must be 150
foot-lamberts minimum. The light transmission factor of the sign panel must provide a letter to background
brightness ratio between 10 to 1 and 20 to 1. The background luminance must not vary by more than 40
percent from the average background brightness reading. The luminance of letters, symbols, and arrows
must not vary by more than 20 percent from their average brightness readings.
Sign panels must be translucent, high impact, resistant plastic panels of one of the following:
1. Glass fiber reinforced acrylated resin
2. Polycarbonate resin
3. Cellulose acetate butyrate plastic
Paint on the outside of the plastic must be protected by a plastic film that seals the front surface of the
panel and filters out ultraviolet radiation. Paint must be acrylic plastic type.
Surface must be free of blemishes in the plastic or coating that may impair the serviceability or detract
from the general appearance and color matching of the sign.
The white or green color must not fade or darken when the sign is exposed to an accelerated test of
ultraviolet light equivalent to 2 years of outdoor exposure. The green color of the sign, when not
illuminated, must match color no. 14109 of FED-STD-595.

949

SECTION 86

ELECTRICAL SYSTEMS

Sign panel must not crack or shatter when a 1-inch-diameter steel ball with a weight of 2.4 ounces is
dropped from a height of 8.5 feet above the sign panel to any point of sign panel. For this test, the sign
panel must be lying in a horizontal position and supported within its frame.
For Type A sign, gasket must be installed between sign panel frame and fixture housing to prevent water
entry between frame and fixture housing. Gasket must be uniform and even textured, and be the closed
cell, sponge-neoprene type, designed for use at temperatures between -20 and +74 degrees C.
Gasket must be neatly applied to thoroughly degreased, clean surface with a suitable heat-resistant
adhesive that will not allow the gasket to slip at temperatures between -20 and +74 degrees C.
Ballast must be high-power factor type and capable of starting the lamp at -20 degrees C and above.
Ballast for Type A sign must be rated at 200 mA. Ballast for Type B sign must be rated at 430 mA. Ballast
must be UL or NRTL listed for operation on 110 to 125 V(ac), 60 Hz circuits, and comply with ANSI C82.1
and ANSI C82.2.
Lampholder must be UL or NRTL listed for outdoor use and of the spring-loaded type. Lampholder must
have silver-coated contacts and waterproofed entrance leads for use with a rapid-start fluorescent lamp.
Removal of the lamp from the socket must de-energize the primary of the ballast. Each lampholder must
include a heat-resistant, circular cross section, partially-recessed neoprene ring to seal against lamp ends
and protect electrical contacts from moisture, dirt, or other injurious elements.
Distance between the face of lampholders must be designed to provide compression of at least 0.10 inch
on the spring-type lampholder when the lamp is in place. Lamp must have positive mechanical and
electrical contact when it is in place. Socket on spring-type lampholder must have sufficient travel to allow
lamp installation. Spring must not be a part of the current carrying circuit. Lampholder must match lamp
requirements and must not increase cathode filament circuit resistance by more than 0.10 .
Lamp must comply with ANSI C78.
Wiring connections in the fixture must be terminated on molded, phenolic, barrier-type, terminal blocks
rated at 15 A, 1,000 V(ac), and must have integral-type white waterproof-marking strips. Current carrying
parts of terminal blocks must be insulated from the fixture with integral plugs or strips to provide protection
from line-to-ground flashover voltage. If you choose to use sectionalized terminal blocks, each section
must include an integral barrier on each side and be capable of rigid mounting and alignment. Terminal
screws must be No. 10, minimum.
Fuses must be Type 3AG, miniature, slow-blowing type with appropriate current and voltage ratings.
Fuseholder must be a panel-mounting type with threaded or bayonet-type knob that grips the fuse tightly
for extraction. Use a separate fuse for each ballast.
Screened weep holes must be constructed at strategic locations in members subject to moisture
collection.
Fasteners, screws, and hardware must be passive stainless steel, Type 302 or 304, or aluminum Type
6060-T6.
Top of fixture housing must have 2 free-swinging mounting brackets. Each bracket must be adjustable
vertically for leveling the sign to either a straight or curved mast arm. Bracket assembly must allow fixture
to swing perpendicular to the sign panel.
Hinge pins for the free-swinging brackets must have a minimum diameter of 1/4 inch.
The message must be displayed on both sign panels, as shown.
If not shown, the message and the size of the symbols or arrows will be provided. Letters must be 8-inch
upper case and 6-inch lower case, Series E.
Fixture conductors must be UL- or NRTL-listed AWM stranded copper wire with 28 mils, minimum,
thermoplastic insulation, rated at 1,000 V(ac) and rated for use at 90 degrees C. Conductors must be no.
16 minimum and must match color coding of ballast leads.

950

SECTION 86

ELECTRICAL SYSTEMS

Conductors within the fixture must be secured with easily removable spring cross straps, not clamped, in
the chassis or fixture. Straps must be installed 12 inches apart or less.
Stranded copper conductors connected to screw-type terminals must terminate in UL-listed crimp-type
ring connectors.
Splices are not allowed within the fixture.
Submit shop drawings showing the message for each sign, including size of letters, symbols, or arrows,
as shown. If requested, you must supply, without cost to the Department, sufficient samples of materials
to be used in the fabrication of the sign or a complete sign assembly, to allow adequate testing and
evaluation of compliance to the specified requirements.
86-6.10 ELECTRICAL INFORMATION SIGNS
86-6.10A General
Reserved
86-6.10B Reserved
86-6.10C Extinguishable Message Sign
Reserved
86-6.10D Changeable Message Sign System
Reserved
86-6.11 PHOTOELECTRIC CONTROLS
Photoelectric controls must be capable of directly switching multiple lighting systems.
86-6.11A Types
Photoelectric control must be of the types shown in the following table:
Type I

Type II

Type III

Type IV
Type V

Photoelectric Control Types


Includes:
1. Remote photoelectric unit
2. Test switch housed in an enclosure
Includes:
1. Remote photoelectric unit
2. Separator contactor and test switch located in a service
equipment enclosure
Includes:
1. Remote photoelectric unit
2. Separator contactor and a test switch housed in an enclosure
Includes a photoelectric unit that plugs into an NEMA twist-lock
receptacle integral with the luminaire.
Includes a photoelectric unit, a separator contactor, and a test switch
located in a service equipment enclosure.

A switch to allow manual operation of the lighting circuit must be included for each Type I, II, III, and V
photoelectric control. Switches must be single-hole mounting toggle type, single pole, single throw, rated
at 12 A with a voltage rating that matches the circuit. Switches must have an indicating nameplate
reading "Auto-Test" and be connected in parallel with the load contacts of the photoelectric unit. Test
switches must not have an "Off" position.
Photoelectric unit for Types I, II, and III photoelectric controls must be pole-top mounted.
86-6.11B Equipment Details
86-6.11B(1) Photoelectric Unit
Photoelectric unit must:

951

SECTION 86

ELECTRICAL SYSTEMS

1. Have an output in response to changing light levels. Response level must remain stable throughout
the life of the control unit.
2. Have a "turn-on" between 1 and 5 footcandles and a "turn-off" between 1.5 and 5 times the "turn-on."
Measurements must be made by procedures in NEMA standards for physical and electrical
interchangeability of light-sensitive control devices used in the control of roadway lighting.
3. Have a NEMA type receptacle. Mounting brackets must be used where pole-top mounting is not
possible. Photoelectric controls must be installed at locations shown and oriented.
4. Be screened to prevent artificial light from causing cycling.
5. Have a supply voltage rating of 60 Hz, 105-130 V(ac), 210-240 V(ac), or 105-240 V(ac), as specified.
6. Have a load rating of 800 W minimum, high intensity discharge or fluorescent.
7. Operate at a temperature range of -20 to 55 degrees C.
8. Have a power consumption less than 10 W.
9. Be housed in a weatherproof enclosure.
10. Have a base with a 3-prong, NEMA standard, twist-lock plug mounting.
11. Have a "fail-on" feature.
Unit components must not require periodic replacement.
Photoelectric controls, except Types IV and V, must include a 4-inch-minimum-inside-diameter pole-top
mounting adaptor containing a terminal block, and cable supports or clamps to support pole wires.
For switching 480 V(ac), 60 Hz circuits, a 100 VA, minimum, 480/120 V(ac) transformer must be installed
in the contactor enclosure to allow 120 V(ac) for the photoelectric control unit. If more than 1 photoelectric
unit is to be installed at a location, a single transformer with a volt-ampere rating capable of handling the
total controlled load may be used.
86-6.11B(2) Contactor
Contactor must:
1. Have contacts rated to switch the specified lighting load
2. Be normally open
3. Be the mechanical armature type with contacts of fine silver, silver alloy, or superior alternative
material
86-6.11B(3) Enclosure
Enclosure for Types I and III photoelectric controls must be NEMA 3R. Enclosure must be supplied with a
factory-applied rust-resistant prime coat and finish coat. Two applications of paint to match the color of
the standard must be applied as specified in section 86-2.16. Enclosure may be hot-dip galvanized
instead of painting. A minimum of 2-1/2 inches must be provided between contactor terminals and the
end of the enclosure for wiring connections. Enclosure must be mounted on the same standard as the
photoelectric unit at a height of about 6 feet above finished grade.
86-6.11B(4) Terminal Blocks
Terminal blocks must be rated at 25 A, 600 V(ac), molded from phenolic or nylon material, and of the
barrier type with plated-brass screw terminals and integral-type marking strips.
86-6.12 TRANSFORMERS
86-6.12A Electrical Requirements
Transformers must be single-phase dry type designed for operation on a 60 Hz supply. Transformers
must have a decal showing a connection diagram. Diagram must show either color coding or wire tagging
with primary (H1, H2) or secondary (X1, X2) markers and the primary and secondary voltage and volt
ampere rating. Transformers must comply with the electrical requirements shown in the following table:
Transformer Electrical Requirements
120/480 V(ac), 240/480
Rating
V(ac), or 480/120 V(ac)
Efficiency
Exceed 95 percent
Secondary voltage
3 percent from half load to
regulation and tolerance
full load
952

SECTION 86

ELECTRICAL SYSTEMS

Secondary 480 V(ac) windings must be center tapped.


86-6.12B Physical Requirements
External leads for secondary connections must be Type USE, No. 10, rated 600 V(ac).

Transformer leads must extend a minimum of 12 inches from the case.

Transformer insulation must be NEMA 185 C or better.

Transformers must withstand the application of 2,200 V(ac) from core to coils and from coil to coil for a 1
minute period.

The above tests must be made immediately after operation of the transformer at full load for 24 hours.

Nonsubmersible transformers must include metal half-shell coil protection, have moisture resistant

synthetic varnish impregnated windings, and be suitable for outdoor operation in a raintight enclosure.

Each transformer to be installed in a pull box must be the submersible type and include a handle and a

hanger.

86-6.12C Submersible Type Transformers


Submersible type transformers must be securely encased in a rugged corrosion-resistant, watertight case
and must withstand a 5-day test submerged in 2 feet of salt water, 2 percent salt by weight, with 12-hour
on and off periods. The operating periods must be at full load.
Leads of submersible transformers must be brought out through 1 or more sealed hubs and secured to
withstand a 100 lb static pull without loosening or leaking.
86-6.13 FALSEWORK LIGHTING
86-6.13A General
Falsework lighting must include lighting to illuminate the pavement, portals, and pedestrian walkways at
or under openings in the falsework required for traffic.
Lighting for pedestrian walkway illumination must be installed at all pedestrian openings through or under
the falsework.
Before starting falsework opening construction, submit a plan of the proposed lighting installations.
Design falsework lighting so that required maintenance can be performed with a minimum of
inconvenience to traffic. Closing of traffic lanes for routine maintenance will not be allowed on roadways
with posted speed limits greater than 25 mph.
Pavement under falsework with portals less than 150 feet apart and falsework portals must be illuminated
only during the hours of darkness as defined in division 1, section 280, of the California Vehicle Code.
Photoelectric switches must be used to control falsework lighting systems. Pavement under falsework
with portals 150 feet or more apart and all pedestrian openings through falsework must be illuminated 24
hours per day.
Lighting fixtures must be aimed to avoid glare to oncoming motorists.
Type NMC cable with no. 12 minimum conductors, with ground wire, must be used. Fasten cable to
supporting structure at sufficient intervals to adequately support the cable and within 12 inches from every
box or fitting. Conductors within 8 feet of ground must be enclosed in a 1/2-inch or larger Type 1 conduit.
Each illumination system must be on a minimum of 1 separate branch circuit at each bridge location.
Each branch circuit must be fused, not to exceed 20 A.
For falsework lighting, arrange with the service utility to complete service connections. You must pay for
energy, line extension, service, and service hookup costs.
At Contract acceptance or if ordered, falsework lighting equipment will become your property and you
must remove it from the job site.

953

SECTION 86

ELECTRICAL SYSTEMS

You may propose a lighting plan that fulfills light intensity requirements to the systems specified herein.
You must supply sufficient data to allow evaluation of alternative methods.
86-6.13B Pavement Illumination
Illumination of pavement at vehicular openings through falsework must comply with the following:
1. Fixture must include R/FL commercial-type floodlamp holder with protective covers.
2. Fixture must be fully adjustable with brackets and locking screws, and allow mounting directly to a
standard metal junction box.
3. Lamp must be medium-base 120 V(ac), 120 W, minimum, PAR-38 quartz-halogen floodlamp.
4. A continuous row of fixture types required must be installed at locations and spacing specified.
Fixtures must be installed beneath falsework structure with the end fixtures not further than 10 feet
inside portal faces. Fixtures must be installed and energized immediately after the members
supporting them have been erected.
5. Fixtures along the sides of the opening must be placed not more than 4 feet behind or 2 feet in front
of the roadway face of the temporary railing. Mounting heights of fixtures must be between 12 and 16
feet above the roadway surface and must present an unobstructed light pattern on the pavement.
86-6.13C Portal Illumination
Illumination of falsework portals must comply with the following:
1. On each side of each entrance portal, plywood sheet clearance guides, 4 feet wide by 8 feet high
must be fastened vertically, facing traffic, with the bottom of the panel 3 to 4 feet above the roadway.
The center of the panel must be located approximately 3 feet horizontally behind the roadway face of
the railing. Panels must be freshly painted for each installation with not less than 2 applications of flat
white paint. Paint testing will not be required.
2. If ordered, repaint the designated areas in order to improve the general appearance of the painted
surfaces. Painting is change order work.
3. Falsework portals must be illuminated on the side facing traffic with 150 W, minimum, PAR reflector
floodlamps mounted on the structure directly over each vertical support adjacent to the traveled way,
as needed to uniformly illuminate the exterior falsework beam, the clearance guides, and the
overhead clearance sign. Each lamp must be supported approximately 16 feet above the pavement
and approximately 6 feet in front of the portal face.
4. Portal lighting and clearance guides must be installed on the day the vertical members are erected.
86-6.13D Pedestrian Walkway Illumination
Illumination of pedestrian openings through or under the falsework must comply with the following:
1. Fixtures must be flush mounted in the overhead protection shield and equipped with a damage
resistant clear polycarbonate diffuser lens. Lamps must be standard incandescent 100 W, 120 V(ac).
2. Fixtures must be centered over the passageway at intervals of not more than 15 feet with the end
fixtures not more than 7 feet inside the end of the pedestrian openings.
3. Pedestrian passageway light systems must be installed immediately after the overhead protection
shield is erected.
86-7 REMOVING, REINSTALLING, OR SALVAGING ELECTRICAL EQUIPMENT
86-7.01 REMOVING ELECTRICAL EQUIPMENT
Existing electrical equipment, pull boxes, and conduits, to be removed and not reused or salvaged,
become your property and you must dispose of it. Unused underground conduit may be abandoned in
place after all conductors have been removed except that conduit terminations from the conduit to be
abandoned must be removed from the pull boxes to remain.
Exercise care in salvaging equipment so it will not be damaged or destroyed. Mast arms must be
removed from the standards. Luminaires, signal heads, and signal mounting assemblies must be
removed from the standards and mast arms.
Holes resulting from removing pull boxes must be filled with material equivalent to the surrounding
material.

954

SECTION 86

ELECTRICAL SYSTEMS

86-7.02 REINSTALLING REMOVED ELECTRICAL EQUIPMENT


If removed electrical equipment is to be reinstalled, you must supply all necessary materials and
equipment, including signal mounting assemblies, anchor bolts, nuts, washers, and concrete as required
to complete the new installation.
Luminaires to be reinstalled must be cleaned and relamped.
Existing materials required to be reused and found to be unsatisfactory by the Engineer must be replaced
with new material and the replacement cost is change order work
86-8 PAYMENT
86-8.01 PAYMENT
If the pull box type is not a bid item, payment for that type of pull box is included in the payment for the
system work involved.
If concrete foundation is not a bid item, payment for concrete foundation is included in the payment for the
system work involved.
Payment for pedestrian barricade and for installing sign panels on pedestrian barricades, flashing beacon
standards, and traffic signal mast arms is included in the payment for the system work involved.
If interconnection conduit and cable is a bid item, payment for all interconnection conductors, and conduit
and pull boxes containing interconnection cable and no other conductors is included in the payment for
interconnection conduit and cable. If interconnection conduit and cable is paid by the foot, the payment
quantity is measured by the length of the conduit. If the conduit contains interconnection cable and other
conductors, the conduit is paid for by the work that requires the other conductors.
Payment for furnishing, installing, maintaining, and removing falsework lighting equipment is included in
the payment for the items of work involved in the structure that requires the falsework lighting.

955

DIVISION X MATERIALS
87 MATERIALSGENERAL
87-1 GENERAL
Reserved
87-2 AGGREGATE
Reserved

957

88 GEOSYNTHETICS

88-1.01 GENERAL
88-1.01A Summary
Section 88 includes specifications for furnishing geosynthetics.
88-1.01B Submittals
For each type of geosynthetic submit:
1. Certificate of compliance
2. Test sample representing each lot
3. MARV
Label submittals with the manufacturer's name and product information.
88-1.01C Quality Control and Assurance
Treat geosynthetics to resist degradation from exposure to sunlight. Furnish geosynthetics in covers to
protect against damage from moisture, sunlight, and shipping and storage.
88-1.02 MATERIALS
88-1.02A General
Reserved
88-1.02B Filter Fabric
Geosynthetics used for filter fabric must be permeable and nonwoven. Filter fabric must be manufactured
from one of the following:
1. Polyester
2. Polypropylene
3. Combined polyester and polypropylene
When tested under the referenced ASTMs, properties of filter fabric must have the values shown in the
following table:
Filter Fabric
Test

Property
Grab breaking load, 1-inch grip, lb
min in each direction
Apparent elongation, percent
min in each direction
Hydraulic bursting strength, psi min
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours
Permittivity, sec-1 min
Apparent opening size, average roll value, U.S. standard
sieve size, max

ASTM
D 4632
ASTM
D 4632
ASTM
D 3786
ASTM
D 4355
ASTM
D 4491
ASTM
D 4751

Class A

Value
Class B

Class C

157
50
210
70
0.5

0.2

0.1

40

60

70

88-1.02C Geocomposite Wall Drain


Geocomposite wall drain must consist of a polymeric core with filter fabric integrally bonded to one or

both sides of the core creating a stable drainage void.

Filter fabric must comply with section 88-1.02B.

Geocomposite wall drain must be no more than 2 inches thick.

959

SECTION 88

GEOSYNTHETICS

When tested under ASTM D 4716, properties of geocomposite wall drain must have the value shown in
the following table:
Geocomposite Wall Drain
Property
Test
Transmissivity, gal/min/ft
ASTM D 4716
gradient = 1.0, Normal stress = 5,000 psf

Value
4

88-1.02D Geotechnical Subsurface Reinforcement


88-1.02D(1) General
Geosynthetic reinforcement used for geotechnical subsurface reinforcement must be either geotextile or
geogrid.
When tested under ASTM D 4491, geotextile permittivity must be at least 0.05 sec-1.
Geogrid must have a regular and defined open area. The open area must be from 50 to 90 percent of the
total grid area.
88-1.02D(2) Long Term Design Strength
Determine the LTDS of geosynthetic reinforcement from the ultimate tensile strength in the primary
strength direction divided by reduction factors. Calculate LTDS from the guidelines in Geosynthetic
Research Institute Standard Practice GG4a, GRI GG4b, or GRI GT7.
The product of the reduction factors must be at least 1.30. Determine the reduction factor for creep using
a 75 year design life for permanent applications. For temporary applications, use a 5 year design life to
determine the reduction factor. Determine the installation damage reduction factor from the
characteristics of backfill materials used.
If test data is not available, use default values of reduction factors in the Geosynthetic Research Institute
Standard Practice to determine LTDS.
Submit the LTDS and its supporting calculations at least 15 days before placing geosynthetic
reinforcement. The calculations must be signed by an engineer registered as a civil engineer in the State.
Do not install unless authorized.
88-1.02E Silt Fence Fabric
When tested under the referenced ASTMs, the properties of silt fence fabric must have the values shown
in the following table:
Silt Fence Fabric
Property

Test

Grab breaking load, 1-inch grip, lb


min, in each direction
Apparent elongation, percent
min, in each direction
Water flow rate, gal per minute/sq ft
min and max average roll value
Permittivity, sec-1
min
Apparent opening size, inches
max average roll value
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours

Woven

Value
Nonwoven

ASTM D 4632

120

120

ASTM D 4632

15

50

ASTM D 4491

10100

100150

ASTM D 4491

0.1

1.1

ASTM D 4751

0.023

0.023

ASTM D 4355

70

70

88-1.02F Gravel-Filled Bag


When tested under the referenced ASTMs, the properties of gravel-filled bag must have the values shown
in the following table:
960

SECTION 88

GEOSYNTHETICS
Gravel-Filled Bag
Property
Grab breaking load, lb, 1-inch grip
min, in each direction
Water flow rate, gal per minute/sq ft
min and max average roll value
Permittivity, sec-1
min
Apparent opening size, inches
max average roll value
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours

Test

Value

ASTM D 4632

205

ASTM D 4491

80150

ASTM D 4491

0.2

ASTM D 4751

0.016

ASTM D 4355

70

88-1.02G Sediment Filter Bag


When tested under the referenced ASTMs, the properties of sediment filter bag must have the values
shown in the following table:
Sediment Filter Bag
Property
Grab breaking load, lb, 1-inch grip
min, in each direction
Water flow rate, gal per minute/sq ft
min and max average roll value
Permittivity, sec-1
min
Apparent opening size, inches
max average roll value
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours

Test

Value

ASTM D 4632

255

ASTM D 4491

80200

ASTM D 4491

1.0

ASTM D 4751

0.023

ASTM D 4355

70

88-1.02H Temporary Cover


When tested under the referenced ASTMs, the properties of temporary cover must have the values
shown in the following table:
Temporary Cover
Property
Grab breaking load, lb, 1-inch grip
min, in each direction
Apparent elongation, percent
min, in each direction
Water flow rate, gal per minute/sq ft
min and max average roll value
Permittivity, sec-1
min
Apparent opening size, inches
max average roll value
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours

961

Test

Value

ASTM D 4632

200

ASTM D 4632

50

ASTM D 4491

75120

ASTM D 4491

1.0

ASTM D 4751

0.007

ASTM D 4355

70

SECTION 88

GEOSYNTHETICS

88-1.02I Rock Slope Protection Fabric


RSP fabric must be a permeable, nonwoven, needle-punched geotextile. The fabric must be
manufactured from one of the following:
1. Polyester
2. Polypropylene
3. Combined polyester and polypropylene
Polymers must be either virgin compounds or clean reworked material. Do not subject virgin compounds
to use or processing other than required for initial manufacture. Clean reworked material must be
previously processed material from the processor's own production that has been reground, pelletized, or
solvated. The fabric must not contain more than 20 percent of clean reworked material by weight. Do not
use recycled materials from either post-consumer or post-industrial sources.
When tested under the referenced ASTMs, the properties of Class 8 and Class 10 RSP fabric must have
the values shown in the following table:
RSP Fabric
Property

Test

Mass, oz/sq yd
min
Grab breaking load, lb, 1-inch grip
min, in each direction
Apparent elongation, percent
min, in each direction
Permittivity, sec-1,
min
Apparent opening size, U.S. Standard sieve size:
min and max
Ultraviolet resistance, percent
min retained grab breaking load, 500 hours

Value
Class 8 Class 10

ASTM D 5261

7.5

9.5

ASTM D 4632

200

250

ASTM D 4632

50

50

ASTM D 4491

1.0

0.70

ASTM D 4751

70100

70100

ASTM D 4355

70

70

88-1.02J Paving Fabric


Geosynthetics used for paving fabric must be nonwoven. When tested under the referenced ASTMs,
properties of paving fabric must have the values shown in the following table:
Paving Fabric
Property
Test
Mass per unit area, oz/sq yd
ASTM D 5261
min
Grab breaking load, lb, 1-inch grip
ASTM D 4632
min, in each direction
Apparent elongation, percent
ASTM D 4632
min, in each direction
Hydraulic bursting strength, psi
ASTM D 3786
min
Melting point, F
ASTM D 276
min
Asphalt retention, gal/sq yd
ASTM D 6140
min

Value
4.1
100
50
200
325
0.2

88-1.02K Paving Mat


Geosynthetics used for paving mat must be a nonwoven fiberglass and polyester hybrid material. When
tested under the referenced ASTMs, properties of paving mat must have the values shown in the
following table:

962

SECTION 88

GEOSYNTHETICS
Paving Mat
Property
Test
Breaking force, lb/2 inches
ASTM D 5035
min
Ultimate elongation, percent
ASTM D 5035
max
Mass per unit area, oz/sq yd
ASTM D 5261
min
Melting point, F
ASTM D 276
min
Asphalt retention, gal/sq yd
ASTM D 6140
min

Value
45
5
3.7
400
0.10

88-1.02L Paving Grid


Geosynthetics used for paving grid must be a geopolymer material formed into a grid of integrally
connected elements with openings. When tested under the referenced ASTMs, properties of paving grid
must have the values shown in the following table:
Paving Grid
Property

Test

Class I

Value
Class II

Class III
Tensile strength at ultimate, lb/ina
ASTM
560 x 1,120
560
280
min
D 6637
Aperture size, inch
Calipered
0.5
0.5
0.5
min
Elongation, percent
ASTM
12
12
12
max
D 6637
Mass per area, oz/sq yd
ASTM
16
10
5.5
min
D 5261
Melting point, F
ASTM
325
325
325
min
D 276
a
For Class I, machine direction x cross direction. For Class II and Class III, both directions.
88-1.02M Paving Geocomposite Grid
Paving geocomposite grid must consist of a paving grid specified in section 88-1.02L bonded or
integrated with a paving fabric as specified in section 88-1.02J.
Paving geocomposite grid must have a peel strength of at least 10 lb/ft determined under ASTM D 413.
88-1.02N Geocomposite Strip Membrane
Geocomposite strip membrane must be various widths of strips manufactured from asphaltic rubber and
geosynthetics. When tested under the referenced ASTMs, properties of geocomposite strip membrane
must comply with the requirements shown in the following table:

963

SECTION 88

GEOSYNTHETICS

Geocomposite Strip Membrane


Property
Test
Strip tensile strength, lb/inch
ASTM D 882
min
Elongation at break, percent
ASTM D 882
min
Resistance to puncture, lb
ASTM E 154
min
Permeance, perms
ASTM E 96 / E
max
96M
Pliability, 1/4 inch mandrel with sample conditioned at
ASTM D 146
25 F
Melting point, F
ASTM D 276

Requirements
50
50
200
0.10
No cracks in fabric or
bitumen
325

88-1.02O Subgrade Enhancement Geotextile


Subgrade enhancement geotextile must be either polyester or polypropylene. When tested under the
referenced ASTMs, properties of subgrade enhancement geotextile must have the values shown in the
following table:
Subgrade Enhancement Geotextile
Class
A1

Class
A2

Valuea
Class
B1

<50

50

<50

Property
Test
Elongation at break, percent

ASTM D
4632

Class
B2

Class
B3

<50

50

Grab breaking load, lb, 1-inch


ASTM D
grip
250
160
-320
200
4632
min, in each direction
Wide width tensile strength at 5
ASTM D
percent strain, lb/ft
-
-
2,000
-
-4595
min
Wide width tensile strength at
ASTM D
ultimate strength, lb/ft
-
-
4,800
-
-4595
min
Tear strength, lb
ASTM D
90
60
-120
80
min
4533
Puncture strength, lb
ASTM D
500
310
620
620
430
min
6241
-1
Permittivity, sec
ASTM D
0.05
0.05
0.20
0.20
0.20
4491
min
Apparent opening size, inches
ASTM D
0.012
0.012
0.024
0.012
0.012
max
4751
Ultraviolet resistance, percent
ASTM D
min retained grab breaking
70
70
70
70
70
4355
load, 500 hours
a
Values are based on MARV in the weaker principal direction except apparent opening size is
based on maximum average roll value.
88-1.02P88-1.02S Reserved
88-1.03 CONSTRUCTION
Not Used
88-1.04 PAYMENT
Not Used

964

89 RESERVED

965

90 CONCRETE

90-1 GENERAL

90-1.01 GENERAL
90-1.01A Summary
Section 90-1 includes general specifications for furnishing, curing, and protecting concrete.
Concrete must be composed of cementitious material, fine aggregate, coarse aggregate, admixtures if
used, and water.
PCC must comply with the specifications for concrete.
90-1.01B Definitions
free water: Total water in the concrete mixture minus the water absorbed by the aggregates in reaching a
saturated surface-dry condition.
reclaimed aggregate: Aggregate that has been recovered from plastic concrete by washing away the
cementitious material.
90-1.01C Submittals
90-1.01C(1) General
Reserved
90-1.01C(2) Aggregate Gradation
Before starting concrete work, submit the gradation of the primary aggregate nominal sizes. If the
aggregate source changes, submit new gradations before using the aggregate.
If a primary coarse aggregate or the fine aggregate is separated into 2 or more sizes, submit the
gradation and proposed proportions of each size combined mathematically to show 1 proposed gradation.
Show the percentage passing for each applicable sieve size.
90-1.01C(3) Cementitious Materials
Submit a certificate of compliance for cementitious materials. Include the source name and location.
If the cementitious material is delivered directly to the job site, the certificate of compliance must be
signed by the cementitious material supplier.
If the cementitious material is used in ready-mixed concrete, the certificate of compliance must be signed
by the concrete manufacturer.
If blended cement is used, the certificate of compliance must include a statement signed by the blended
cement supplier that shows the actual percentage of SCM, by weight, in the blend. Determine the weight
of SCM by weighing device as specified in section 9-1.02B or by chemical analysis.
90-1.01C(4) Admixtures
If you propose to use an admixture from the Authorized Material List, submit a certificate of compliance
from the manufacturer certifying that the admixture furnished is the same as that previously authorized.
90-1.01C(5) Curing Compound
For each batch of curing compound delivered to the job site, submit:
1. Split curing compound test samples to METS. The test samples must be from the shipping containers
at the manufacturer's source of supply.
2. Certificate of compliance to the Engineer and to METS. The certificate of compliance must include:
2.1. Test results for the tests specified in section 90-1.01D(6).
2.2. Certification that the material was tested within 12 months before use.
If the curing compound is shipped in tanks or tank trucks, submit a shipping invoice with each load. The
invoice must show the same information specified for container labels in section 90-1.03B(3)(b).

967

SECTION 90

CONCRETE

90-1.01C(6) Mix Design


Submit the concrete mix design before using the concrete in the work and before changing the mix
proportions or an aggregate source.
90-1.01C(7) Concrete Delivery
Submit a weighmaster certificate as an informational submittal with each load of concrete delivered to the
job site.
The weighmaster certificate must show:
1.
2.
3.
4.
5.

Mix identification number.


Nonrepeating load number.
Date and time the materials were batched.
Total quantity of water added to the load.
For transit-mixed concrete, the revolution counter reading at the time the truck mixer is charged with
cement.
6. Actual scale weights in pounds for the ingredients batched. Do not substitute theoretical or target
batch weights for actual scale weights.
If authorized, you may submit the weighmaster certificates electronically instead of in printed form.
You may submit a weighmaster certificate with a separate certificate that lists the actual batch weights or
measurements for a load of concrete if both certificates are delivered to the job site and are imprinted with
the same nonrepeating load number that is unique to the Contract.
90-1.01C(8) Testing
If the concrete is tested for shrinkage, submit the test data with the mix design.
If prequalification is specified, submit certified test data or trial batch test reports under section 90
1.01D(5)(b).
If 56 days are allowed for the concrete to attain the strength described, submit test results under section
90-1.01D(5)(a).
90-1.01C(9) Stationary Mixer Certification
If you weigh the SCM cumulatively with the cement for concrete completely mixed in a stationary mixer,
submit certification of the stationary mixer under section 90-1.02F(4)(c).
90-1.01C(10) Protecting Concrete
If requested, submit a plan for protecting the concrete.
90-1.01D Quality Control and Assurance
90-1.01D(1) General
The cementitious materials and the admixture type and brand must be on the Authorized Material List at
the time of the mix design submittal.
Both the coarse and fine aggregate must be on the Authorized Material List for the aggregate used in
concrete to be considered innocuous.
If requested, furnish test samples of the freshly mixed concrete and provide satisfactory facilities for
obtaining the test samples.
90-1.01D(2) Cementitious Material Content
Adjust the batch proportions as necessary to produce concrete having the specified cementitious material
content.
The Engineer verifies compliance with the specified cementitious material content by testing under
California Test 518 for cement content. For testing purposes, SCM is considered to be cement.
For all concrete except minor concrete, if the cementitious material, portland cement, or SCM content is
less than the minimum required and is not within the batching tolerances allowed under section 90
968

SECTION 90

CONCRETE

1.02F(3), you must remove the concrete. However, if the Engineer determines that the concrete is
structurally adequate, the concrete may remain in place and $0.25 is deducted for each pound of
cementitious material, portland cement, or SCM less than the minimum required. No deductions are made
based on the results of California Test 518.
90-1.01D(3) Shrinkage
If shrinkage limitations are specified, test the concrete under AASHTO T 160, modified as follows:
1. Prepare specimens that have a 4- by 4-inch cross section.
2. Remove each specimen from the mold 23 1 hours after mixing the concrete and place the
specimen in lime water at 73 3 degrees F until 7 days age.
3. Take a comparator reading at 7 days age and record it as the initial reading.
4. Store the specimens in a humidity-controlled room maintained at 73 3 degrees F and 50 4 percent
relative humidity for the remainder of the test.
5. Take subsequent readings at 7, 14, 21, and 28 days drying.
Perform AASHTO T 160 testing at a laboratory that is accredited to perform AASHTO T 160 or that
maintains a current rating of 3 or better for the Cement and Concrete Reference Laboratory concrete
proficiency sample program.
Shrinkage test data authorized by the Department no more than 3 years before the 1st day of the
Contract is authorized for the entire Contract. The test data must be for concrete with similar proportions
and using the same materials and material sources to be used on the Contract. Concrete is considered to
have similar proportions if no more than 2 mix design elements are varied and the variation is within the
tolerances shown in the following table:
Mix design element
Tolerance ()
Water to cementitious material ratio
0.03
Total water content
5 percent
Coarse aggregate content
10 percent
Fine aggregate content
10 percent
SCM content
5 percent
25 percent
Admixture as originally doseda
a
Admixtures must be the same brand.
90-1.01D(4) Concrete Uniformity
The Engineer determines the uniformity of concrete mixtures based on differences in test results between
2 test samples of mixed concrete from the same batch for the following tests:
1. California Test 533 if the mix design specifies a penetration value
2. ASTM C 143 if the mix design specifies a slump value
3. California Test 529
90-1.01D(5) Compressive Strength
90-1.01D(5)(a) General
Section 90-1.01D(5) applies for either of the following cases:
1. Concrete is designated by compressive strength.
2. Attaining a minimum concrete compressive strength is specified as a prerequisite to applying loads or
stresses to a concrete structure or member.
If the 28-day compressive strength described is 3,600 psi or greater, the concrete is designated by
compressive strength.
If the concrete is designated by compressive strength, the strength of concrete that is not steam cured is
determined from cylinders cured under Method 1 of California Test 540.
If attaining a minimum concrete compressive strength is specified as a prerequisite to applying loads or
stresses to a concrete structure or member, cylinders for concrete that is not steam cured are cured
969

SECTION 90

CONCRETE

under Method 1 of California Test 540 and the concrete compressive strength is evaluated based on
individual tests.
For concrete with a described 28-day compressive strength greater than 3,600 psi, 42 days are allowed
to attain the strength described.
Except for concrete specified to be in a freeze-thaw area, 56 days are allowed to attain the strength
described if the cementitious material satisfies the following equation:
[(41 x UF) + (19 x F) + (11 x SL)]/TC 7.0
where:
F = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, including the quantity in
blended cement, lb/cu yd. F is equivalent to the sum of FA and FB as defined in section 90
1.02B(3).
SL = GGBFS, including the quantity in blended cement, lb/cu yd
UF = silica fume, metakaolin, or UFFA, including the quantity in blended cement, lb/cu yd
TC = total quantity of cementitious material used, lb/cu yd
For concrete satisfying the equation above, test for the compressive strength at least once every 500 cu
yd at 28, 42, and 56 days. Submit the test results to the Engineer and to METS, Attention: Office of
Structural Materials, Concrete Materials Testing Branch.
The Engineer determines the concrete compressive strength from test cylinders:
1. Made from concrete sampled under California Test 539
2. Molded and initially field cured under California Test 540
3. Cured and tested under California Test 521
A compressive strength test represents no more than 300 cu yd of concrete and consists of the average
compressive strength of 2 cylinders made from material taken from a single load of concrete. If a cylinder
shows evidence of improper sampling, molding, or testing, the cylinder is discarded and the test consists
of the compressive strength of the remaining cylinder.
If a single compressive strength test result is below the strength described at the maximum age specified
or allowed, or if the compressive strength of concrete tested at 7 days indicates to the Engineer that the
concrete will not attain the strength described at the maximum age specified or allowed, correct the mix
design or concrete fabrication procedures and obtain authorization before you place additional concrete.
If a single compressive strength test result is below the strength described at the maximum age specified
or allowed, the concrete represented by the test is subject to one of the following actions:
1. If the compressive strength is at least 95 percent of the strength described, $10 per cubic yard of
concrete is deducted.
2. If the compressive strength is below 95 percent of the strength described but is at least 85 percent of
the strength described, $15 per cubic yard of concrete is deducted.
3. If the compressive strength is below 85 percent of the strength described, you must remove the
concrete.
If a strength test result at the maximum age specified or allowed is below the strength described but is at
least 85 percent of the strength described, the deductions specified above apply unless you obtain and
submit evidence that the strength of the concrete placed in the work is greater than or equal to the
strength described and this evidence is accepted by the Engineer.
If a strength test result at the maximum age specified or allowed is below 85 percent of the strength
described, you must remove the concrete represented by the test unless you obtain and submit evidence
that the strength of the concrete placed in the work is at least 85 percent of the strength described and
this evidence is accepted by the Engineer.
If the evidence consists of tests made on cores taken from the work, obtain and test the cores under
ASTM C 42.

970

SECTION 90

CONCRETE

90-1.01D(5)(b) Prequalification
If the concrete has a described 28-day compressive strength greater than 3,600 psi, or if prequalification
is specified, prequalify the materials, mix proportions, mixing equipment, and procedures proposed for
use in the work before placing the concrete.
Submit certified test data or trial batch test reports based on the same materials, mix proportions, mixing
equipment, procedures, and batch size proposed for use in the work.
Certified test data must show that:
1. Results of 90 percent or more of at least 20 consecutive tests exceed the compressive strength
described at the maximum number of days specified or allowed and none of the test results are less
than 95 percent of the strength described
2. All tests are the most recent tests made on concrete of the proposed mix design and were made
within 1 year of the proposed use of the concrete
Trial batch test reports must show that:
1. Average compressive strength for 5 consecutive concrete cylinders taken from a single batch and
tested at not more than the maximum age specified or allowed is at least 600 psi greater than the 28
day compressive strength described
2. No individual cylinder has a strength less than the strength described at the maximum age specified
or allowed
3. Data contained in the report is from trial batches produced within 1 year of the proposed use of the
concrete
If air entrainment is specified, the air content of the trial batches must be greater than or equal to the air
content specified for the concrete without reduction due to tolerances.
Perform tests under the appropriate California Test methods or comparable ASTM test methods. Use
testing equipment that is in good condition and properly calibrated. If tests are performed during the
Contract, notify the Engineer far enough in advance that the Engineer can witness the test procedures.
Certified test data and trial batch reports must include:
1.
2.
3.
4.
5.
6
7.
8.
9.

Date of mixing
Mixing equipment and procedures
Batch size in cubic yards
Weight, type, and source for each ingredient
Penetration or slump as specified in section 90-1.02G(6)
Air content if an air-entraining admixture is used
Concrete age at the time of testing
Compressive strength for each cylinder tested
Signature of an official of the testing firm

If authorized, you may use the concrete from trial batches in the work at locations where lower quality
concrete is required.
Any change to the prequalified materials, mix proportions, mixing equipment, or procedures that could
result in a concrete strength below that described requires additional prequalification by trial batch testing.
90-1.01D(6) Curing Compound
Test each batch of curing compound delivered to the job site for:
1.
2.
3.
4.
5.

Water loss at 24 hours under California Test 534


Reflectance under ASTM E 1347
Viscosity under ASTM D 2196
Nonvolatile content under ASTM D 2369
Pigment content under ASTM D 3723

A batch must be no larger than 10,000 gal.


971

SECTION 90

CONCRETE

The Engineer samples the curing compound at the manufacturer's supply source, at the job site, or at
both locations.
The curing compound sampled from shipping containers from the manufacturer's supply source or from
the job site must match the test results for viscosity, nonvolatile content, and pigment content within the
tolerances specified in the precision and bias statements for the test methods.
Additional testing of the curing compound may be required before its use if the compound has not been
used within 1 year or if the Engineer believes that the compound may no longer be acceptable.
90-1.02 MATERIALS
90-1.02A General
Concrete for pavement, approach slabs, and bridge decks must comply with the shrinkage limitations
shown in the following table when tested under section 90-1.01D(3):
Type of work
Paving and approach slab concrete
Bridge deck concrete

Maximum length change of laboratory cast


specimens at 28 days drying (average of 3)
(percent)
0.050
0.045

When tested for uniformity under section 90-1.01D(4), the differences in test results between the 2
concrete test samples must comply with the following:
1. When tested under California Test 533, the difference in penetration values must not exceed 1/2 inch.
2. When tested under ASTM C 143, the difference in slump values must not exceed the values shown in
the following table:
Average slump, S Maximum permissible difference
(inches)
(inches)
S<4
1
4S6
1-1/2
6<S9
2
3. When tested under California Test 529, the difference in the proportion of coarse aggregate must not
exceed 170 pounds of aggregate per cubic yard of concrete.
Unless a modulus of rupture is specified, the minimum required compressive strength for concrete must
be the greater of either the strength described or 2,500 psi. Proportion the concrete to attain the minimum
required compressive strength.
For concrete not designated by compressive strength, the concrete must attain at least 85 percent of the
minimum required compressive strength when tested at 28 days.
90-1.02B Cementitious Materials
90-1.02B(1) General
Unless otherwise specified, the cementitious material must be one of the following:
1. Combination of Type II or V portland cement and SCM
2. Blended cement
The cementitious materials used in CIP concrete for exposed surfaces of similar elements of a structure
must be from the same sources and of the same proportions.
Protect cementitious materials from moisture until used.
Place sacked cementitious materials in a pile to allow access for tallying, inspecting, and identifying each
shipment.
972

SECTION 90

CONCRETE

Provide facilities that ensure the cementitious materials to be used in the work are kept separate from
each other and from other cementitious materials.
A storage silo containing a cementitious material must be emptied before using the silo for a different
cementitious material. Blended cements with a percentage of SCM differing by more than 2 percent are
considered different cementitious materials.
Sample cementitious materials under California Test 125.
90-1.02B(2) Cement
Portland cement must comply with ASTM C 150, except the C3S content of Type II cement must not
exceed 65 percent.
Blended cement must comply with portland blast-furnace slag cement, Type IS (MS), or portland
pozzolan cement, Type IP (MS), specified in AASHTO M 240, except:
1. Maximum limits on pozzolan content do not apply
2. Blended cement must be composed of Type II or V cement and SCM produced by one of the
following methods:
2.1. Intergrinding of portland cement clinker and granulated blast furnace slag, GGBFS, or

pozzolan

2.2. Blending of portland cement and either GGBFS or finely divided pozzolan
2.3. Combination of intergrinding and blending
Types II, III, and V portland cement must comply with the following:
1. Alkali content must not exceed 0.60 percent by mass of alkalies as Na2O + 0.658 K2O when
determined under AASHTO T 105.
2. Autoclave expansion must not exceed 0.50 percent.
Type III portland cement may be used only if specified or authorized.
90-1.02B(3) Supplementary Cementitious Materials
Each SCM must be one of the following:
1. Fly ash complying with AASHTO M 295, Class F, and either of the following:
1.1. Available alkali as Na2O + 0.658 K2O must not exceed 1.5 percent when tested under ASTM C
311.
1.2. Total alkali as Na2O + 0.658 K2O must not exceed 5.0 percent when tested under AASHTO T
105.
2. UFFA complying with AASHTO M 295, Class F, and the chemical and physical requirements shown
in the following 2 tables:
Chemical property
Sulfur trioxide (SO3)
Loss on ignition
Available alkalies as Na2O + 0.658 K2O

973

Requirement
(percent)
1.5 max
1.2 max
1.5 max

SECTION 90

CONCRETE

Requirement
(percent)

Physical property

Particle size distribution


Less than 3.5 microns
50
Less than 9.0 microns
90
Strength activity index with portland cement
7 days
95 (min percent of control)
28 days
110 (min percent of control)
0.10 max
Expansion at 16 days when testing project
materials under ASTM C 1567a
a
In the test mix, at least 12 percent, by weight, of the Type II or V portland
cement must be replaced with UFFA.
3. Raw or calcined natural pozzolans complying with AASHTO M 295, Class N, and either of the
following:
3.1. Available alkali as Na2O + 0.658 K2O must not exceed 1.5 percent when tested under ASTM C
311.
3.2. Total alkali as Na2O + 0.658 K2O must not exceed 5.0 percent when tested under AASHTO T
105.
4. Metakaolin complying with AASHTO M 295, Class N, and the chemical and physical requirements
shown in the following 2 tables:
Requirement
(percent)
92.0 min
1.0 max
1.0 max
1.2 max
1.0 max

Chemical property
Silicon dioxide (SiO2) + aluminum oxide (Al2O3)
Calcium oxide (CaO)
Sulfur trioxide (SO3)
Loss on ignition
Available alkalies as Na2O + 0.658 K2O

Requirement
(percent)
95

Physical property
Particle size distribution less than 45 microns
Strength activity index with portland cement
7 days
28 days

100 (min percent of control)


100 (min percent of control)

5. GGBFS complying with AASHTO M 302, Grade 100 or 120.


6. Silica fume complying with AASHTO M 307, with a minimum reduction in mortar expansion of 80
percent when using the cement from the proposed mix design.
You may commingle fly ash from different sources at uncontrolled ratios if:
1. Each source produces fly ash complying with AASHTO M 295, Class F
2. At the time of commingling, each fly ash has:
2.1. Running average of relative density that does not differ from any other fly ash by more than
0.25
2.2. Running average of loss on ignition that does not differ from any other fly ash by more than 1
percent
3. Final commingled fly ash complies with AASHTO M 295, Class F
4. Fly ash supplier is responsible for testing the commingled fly ash
The quantity of portland cement and SCM in concrete must comply with the minimum cementitious
material content specified.
The SCM content in concrete must comply with one of the following:
974

SECTION 90

CONCRETE

1. Any combination of portland cement and at least 1 SCM, satisfying equations 1 and 2:
Equation 1:
[(25 x UF) + (12 x FA) + (10 x FB) + (6 x SL)]/MC X
where:
UF = silica fume, metakaolin, or UFFA, including the quantity in blended cement, lb/cu yd
FA = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
up to 10 percent, including the quantity in blended cement, lb/cu yd
FB = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
greater than 10 percent and up to 15 percent, including the quantity in blended cement, lb/cu
yd
SL = GGBFS, including the quantity in blended cement, lb/cu yd

MC = minimum quantity of cementitious material specified, lb/cu yd

X = 1.8 for innocuous aggregate, 3.0 for all other aggregate

Equation 2:
MC - MSCM - PC 0
where:

MC = minimum quantity of cementitious material specified, lb/cu yd

MSCM = minimum sum of SCMs that satisfies equation 1, lb/cu yd

PC = quantity of portland cement, including the quantity in blended cement, lb/cu yd

2. 15 percent Class F fly ash with at least 48 oz of LiNO3 solution added per 100 lb of portland cement.
The CaO content of the fly ash must not exceed 15 percent.
90-1.02C Aggregates
90-1.02C(1) General
Aggregates must be free from deleterious coatings, clay balls, roots, bark, sticks, rags, and other
extraneous material.
Provide safe and suitable facilities, including splitting devices, for obtaining aggregate test samples under
California Test 125.
Aggregates must have:
1. Characteristics that enable the production of workable concrete within the limits of water content
specified in section 90-1.02G(6).
2. No more than 10 percent loss when tested for soundness under California Test 214. The soundness
requirement does not apply to fine aggregate if the durability index of the fine aggregate is 60 or
greater when tested under California Test 229.
Each cleanness value, sand equivalent, or aggregate grading test represents no more than 300 cu yd of
concrete or 1 day's pour, whichever is smaller.
If the results of any 1 or more of the cleanness value, sand equivalent, or aggregate grading tests do not
comply with the requirements for operating range, but all comply with the requirements for contract
compliance:
1. Suspend the concrete placement at the completion of the current pour
2. Do not restart the concrete placement until test results or other information show that the next
material to be used in the work complies with the requirements for operating range
If the results of either or both of the cleanness value and coarse aggregate grading tests do not comply
with the requirements for contract compliance, you must remove the concrete represented by the tests.
However, if the Engineer determines that the concrete is structurally adequate, the concrete may remain
975

SECTION 90

CONCRETE

in place and $3.50 per cubic yard for paving concrete and $5.50 per cubic yard for other concrete is
deducted for the concrete represented by these tests and left in place.
If the results of either or both of the sand equivalent and fine aggregate grading tests do not comply with
the requirements for contract compliance, you must remove the concrete represented by the tests.
However, if the Engineer determines that the concrete is structurally adequate, the concrete may remain
in place and $3.50 per cubic yard for paving concrete and $5.50 per cubic yard for other concrete is
deducted for the concrete represented by these tests and left in place.
The 2 preceding paragraphs apply individually to the contract compliance requirements for coarse and
fine aggregate. If both coarse and fine aggregate do not comply with the contract compliance
requirements, both paragraphs apply. The deductions specified in those paragraphs are in addition to any
deductions made under section 90-1.01D(2).
90-1.02C(2) Coarse Aggregate
Coarse aggregate must consist of gravel, crushed gravel, crushed rock, reclaimed aggregate, crushed
air-cooled iron blast furnace slag, or a combination of these.
Do not use crushed air-cooled iron blast furnace slag in reinforced or PS concrete.
Reclaimed aggregate must comply with the specifications for aggregate.
Coarse aggregate must comply with the requirements shown in the following table:
Property
Loss in Los Angeles rattler after 500 revolutions
Cleanness value
Operating range
Contract compliance

California Test
211

Requirement
45 percent max

227
227

75 min
71 min

For cleanness value, an operating range limit of 71 minimum and a contract compliance limit of 68
minimum apply if you submit a certificate of compliance certifying that:
1. Coarse aggregate sampled at the completion of processing at the aggregate production plant had a
cleanness value of at least 82 when tested under California Test 227
2. Prequalification tests performed under California Test 549 showed that the aggregate would develop
a relative strength of at least 95 percent and have a relative shrinkage of no more than 105 percent
based on concrete
90-1.02C(3) Fine Aggregate
Fine aggregate must consist of natural sand, manufactured sand produced from larger aggregate, or a
combination of these. Manufactured sand must be well graded.
Fine aggregate must comply with the requirements shown in the following table:
Property
California Test
Requirement
Organic impurities
213
Satisfactorya
Sand equivalent:
Operating range
217
75 min
Contract compliance
217
71 min
a
Fine aggregate that develops a color darker than the reference
standard color may be authorized if 95 percent relative mortar
strength is achieved when tested under ASTM C 87.
For sand equivalent, an operating range limit of 71 minimum and a contract compliance limit of 68
minimum apply if you submit a certificate of compliance certifying that:
1

Fine aggregate sampled at the completion of processing at the aggregate production plant had a
sand equivalent value of at least 82 when tested under California Test 217
976

SECTION 90

CONCRETE

2. Prequalification tests performed under California Test 549 showed that the aggregate would develop
a relative strength of at least 95 percent and have a relative shrinkage of no more than 105 percent
based on concrete
90-1.02C(4) Aggregate Gradings
90-1.02C(4)(a) General
Proposed aggregate gradations must be within the percentage passing limits shown in the following table:
Primary aggregate
nominal size
1-1/2 inch x 3/4 inch
1 inch x No. 4
1 inch x No. 4
1/2 inch x No. 4
3/8 inch x No. 8
Fine aggregate
Fine aggregate
Fine aggregate

Sieve
size
1 in
3/4 in
3/8 in
3/8 in
3/8 in
No. 16
No. 30
No. 50

Limits of proposed
gradation
1941
5285
1538
4078
5085
5575
3446
1629

The Engineer may waive, in writing, the specifications for gradation if in the Engineer's opinion furnishing
the gradation is not necessary for the work.
90-1.02C(4)(b) Coarse Aggregate Grading
Coarse aggregate must be graded within the limits shown in the following table for each size of coarse
aggregate:
Sieve
size

Percentage passing primary aggregate nominal sizes


1-1/2 inch x 3/4 inch
1 inch x No. 4
1/2 inch x No. 4
3/8 inch x No. 8
Operating
range

Contract
compliance

Operating
range

Contract
compliance

Operating
range

Contract
compliance

Operating
range

Contract
compliance

2 inch
100
100
-
-
-
-
-
-
1-1/2
88100
85100
100
100
----inch
1 inch
X 18
X 25
88100
86100
----3/4 inch
017
020
X 15
X 22
100
100
--1/2 inch
----82100
80100
100
100
3/8 inch
07
09
X 15
X 22
X 15
X 22
X 15
X 20
No. 4
--016
018
015
018
025
028
No. 8
--06
07
06
07
06
07
NOTE: "X" is the gradation that you propose to furnish for the specific sieve size under section 90
1.02C(4)(a).
Furnish coarse aggregate for the 1-1/2-inch maximum combined aggregate grading under section 90
1.02C(4)(d) in 2 or more primary aggregate nominal sizes. You may separate each primary aggregate
nominal size into 2 sizes and store them separately, provided that the combined material complies with
the grading specifications for the primary aggregate nominal size.
You may separate the coarse aggregate for the 1-inch maximum combined aggregate grading under
section 90-1.02C(4)(d) into 2 sizes and store them separately, provided that the combined material
complies with the grading specifications for the 1 inch x No. 4 primary aggregate nominal size.
90-1.02C(4)(c) Fine Aggregate Grading
Fine aggregate must be graded within the limits shown in the following table:

977

SECTION 90

CONCRETE

Percentage passing
Operating range
Contract compliance
3/8 inch
100
100
No. 4
95100
93100
No. 8
6595
6199
No. 16
X 10
X 13
No. 30
X9
X 12
No. 50
X6
X9
No. 100
212
115
No. 200
08
010
NOTE: "X" is the gradation that you propose to furnish for the
specific sieve size under section 90-1.02C(4)(a).
Sieve size

Fine aggregate sizes must be distributed such that the difference between the total percentage passing
the No. 16 and No. 30 sieves is from 10 to 40, and the difference between the percentage passing the
No. 30 and No. 50 sieves is from 10 to 40.
You may separate fine aggregate into 2 or more sizes and store them separately, provided that the
combined material complies with the grading specifications.
90-1.02C(4)(d) Combined Aggregate Grading
Use combined aggregate grading limits only for the design of concrete mixes. Design concrete mixes
such that aggregates are combined in proportions that produce a mixture within the grading limits for
combined aggregate.
Use either the 1-1/2-inch maximum grading or the 1-inch maximum grading, unless otherwise specified.
Combined aggregate must be graded within the limits shown in the following table:
Percentage passing
1-1/2 inch max 1 inch max 1/2 inch max 3/8 inch max
2 inch
100
-
-
-
1-1/2 inch
90100
100
--1 inch
5086
90100
--3/4 inch
4575
55100
100
-1/2 inch
--90100
100
3/8 inch
3855
4575
5586
50100
No. 4
3045
3560
4563
4563
No. 8
2338
2745
3549
3549
No. 16
1733
2035
2537
2537
No. 30
1022
1225
1525
1525
No. 50
410
515
515
515
No. 100
16
18
18
18
No. 200
03
04
04
04
Sieve size

Do not change from one aggregate grading to another during the progress of the work.
90-1.02D Water
Water for washing aggregates, mixing concrete, and curing must not contain:
1. O
il
2. Impurities at concentrations that cause either of the following results when compared to the same test
using distilled or deionized water:
2.1. Change of more than 25 percent in the setting time of cement when tested under ASTM C 191
or ASTM C 266
2.2. Reduction by more than 5 percent in the mortar compressive strength at 14 days when tested
under ASTM C 109
3. Chlorides as Cl or sulfates as SO4 in excess of the values shown in the following table:
978

SECTION 90

CONCRETE

Maximum
Type of
Maximum
sulfate as SO4b
concrete work
chloride as Cla
Nonreinforced
2,000 ppm
1,500 ppm
Reinforced
1,000 ppm
1,300 ppm
PS
650 ppm
1,300 ppm
a
When tested under California Test 422
b
When tested under California Test 417

Water for curing concrete must not contain impurities at concentrations that cause discoloration or
surface etching.
Water reclaimed from washing out the mixer may be used in mixing concrete. The water must not contain
coloring agents or more than 300 ppm of alkalis as Na2O + 0.658 K2O as determined on the filtrate. The
specific gravity of the water must not exceed 1.03 and must not vary more than 0.010 during a day's
activities.
90-1.02E Admixtures
90-1.02E(1) General
Admixtures must comply with the following:
1. Chemical admixtures must comply with ASTM C 494.
2. Air-entraining admixtures must comply with ASTM C 260.
3. Lithium nitrate must be in an aqueous solution that complies with the following:
3.1. Lithium nitrate as LiNO3 must be 30 0.5 percent by weight.
3.2. Sulfate as SO4 must be less than 1,000 ppm.
3.3. Chloride as Cl must be less than 1,000 ppm.
3.4. Alkalis as Na2O + 0.658 K2O must be less than 1,000 ppm.
Chemical or air-entraining admixtures must not contain more than 1 percent chlorides as Cl by weight of
admixture when tested under California Test 415.
Store and dispense the admixtures in liquid form.
Admixture properties must be uniform throughout their use in the work.
If more than 1 admixture is used, the admixtures must be compatible with each other such that the
desirable effects of all the admixtures used are realized.
Use chemical admixtures in compliance with the manufacturer's written instructions. The instructions must
include a statement that the admixture is compatible with the types and quantities of SCM used.
If you are ordered to use admixtures in the concrete that are not specified, furnishing the admixtures and
adding them to the concrete is change order work.
90-1.02E(2) Chemical Admixtures
If the use of chemical admixtures is specified, use the dosage specified. If the dosage is not specified,
use the dosage recommended by the admixture manufacturer.
You may use any of the following admixture types to conserve cementitious material or to facilitate
construction:
1. Type A or F, water-reducing
2. Type B, retarding
3. Type D or G, water-reducing and retarding
If you use a water-reducing admixture or a water-reducing and retarding admixture, you may reduce the
specified cementitious material content by up to 5 percent by weight. The resulting concrete must contain
at least 505 pounds of cementitious material per cubic yard. If you reduce the cementitious material
content, use at least the admixture dosage used in authorizing the admixture as shown on the Authorized
Material List.
979

SECTION 90

CONCRETE

You may use a Type S admixture.


You may use a Type C accelerating admixture. Inclusion of the Type C admixture in the mix design is not
required if it is added to counteract changing conditions that contribute to delayed setting of the concrete
and if the use or change in dosage of the admixture is authorized.
90-1.02E(3) Air-Entraining Admixtures
If air entrainment is specified or ordered, use the quantity of air-entraining admixture that produces
concrete having the specified air content when tested under California Test 504.
If air entrainment is not specified or ordered, you may use an air-entraining admixture to facilitate the use
of a construction procedure or equipment. The average air content of 3 successive tests must not exceed
4 percent and each test value must be no more than 5.5 percent when tested under California Test 504.
90-1.02F Proportioning Concrete
90-1.02F(1) General
Reserved
90-1.02F(2) Storage of Aggregates
Store or stockpile aggregates such that the coarse and fine particles of each size do not separate and
various sizes do not intermix before proportioning.
Prevent contamination by foreign materials while storing, stockpiling, and handling aggregates.
If you store the aggregates at a batching or mixing plant that is erected after the Contract is awarded and
is used for furnishing concrete for the work:
1. Prevent intermingling of different aggregate sizes by using measures such as the physical separation
of stockpiles or the construction of bulkheads of adequate length and height
2. Prevent contamination of the aggregates by contact with the ground through measures such as
placing the aggregates on wooden platforms or on hardened surfaces made of concrete, asphalt
concrete, or cement-treated material
When placing the aggregates in storage or moving the aggregates from storage to the weigh hopper of
the batching plant, do not use methods that cause:
1. Segregation, degradation, or the combining of materials of different gradings and result in an
aggregate size failing to comply with the grading specifications at the weigh hopper
2. Excessive particle breakage
You may be required to use devices that reduce the impact of falling aggregates.
90-1.02F(3) Proportioning Devices
Automatic weighing systems must comply with section 90-1.02F(4)(c). For an automatic device, the single
operation of a switch or starter must be the only manual operation required to proportion the aggregates,
cement, and SCM for 1 batch of concrete.
Insulate the weighing equipment against the vibration or movement of other plant equipment.
The weight of each batch of material must not vary from the weight designated by the Engineer by more
than the specified tolerances.
The weighing and measuring equipment must have the following zero tolerances:
1. For cumulative weighing of aggregates, 0.5 percent of the designated total aggregate batch weight
2. For weighing each aggregate size separately, 0.5 percent of the designated batch weight for each
aggregate size
3. For cumulative weighing of cement and SCM, 0.5 percent of the designated total batch weight of the
cement and SCM
4. For weighing cement and SCM separately, 0.5 percent of their designated individual batch weights
5. For measuring water, 0.5 percent of its designated weight or volume

980

SECTION 90

CONCRETE

The weight indicated for a batch of material must not vary from the preselected scale setting by more than
the following:
1. Aggregates weighed cumulatively must be within 1.0 percent of the designated total aggregate
batch weight.
2. Aggregates weighed separately must be within 1.5 percent of the designated batch weight of each
aggregate.
3. Cement weighed separately must be within +2 to -1 percent of the designated cement batch weight.
4. SCM weighed separately must be within +2 to -1 percent of the designated SCM batch weight.
5. For cement and SCM weighed cumulatively, the cement must be within +2 to -1 percent of the
designated cement batch weight and the total for cement and SCM must be within +2 to -1 percent of
the sum of the designated cement and SCM batch weights.
6. Water must be within 1.5 percent of the designated weight or volume of water.
Each scale graduation must be no more than 0.001 of the total scale capacity. For each material being
weighed, use a scale with single graduations that indicate a weight not exceeding the maximum
permissible weight variation above, except that graduations less than 1 lb are not required.
90-1.02F(4) Proportioning
90-1.02F(4)(a) General
Proportioning consists of dividing the aggregates into the specified sizes, each stored in a separate bin,
and combining the aggregates with cementitious material, admixtures if used, and water.
Proportion the aggregates by weight.
At the time of batching:
1. Aggregates must be dried and drained to a stable moisture content such that no visible separation of
water from the aggregate occurs during transportation from the proportioning plant to the point of
mixing
2. Free moisture content of the fine aggregate must not exceed 8 percent of its saturated surface-dry
weight
If the proportioning plant has separate supplies of the same size group of aggregate with different
moisture content, specific gravity, or surface characteristics affecting workability, exhaust one supply
before using another supply.
Weigh bulk Type IP (MS) or Type IS (MS) cement in an individual hopper and keep it separate from the
aggregates until the ingredients are released for discharge into the mixer.
Bulk cement and SCM may be weighed in separate weigh hoppers or in the same weigh hopper. Keep
the cement and SCM separate from the aggregates until the ingredients are released for discharge into
the mixer.
If the cement and SCM are weighed in the same weigh hopper, weigh the cement first. If the cement and
SCM are weighed in separate weigh hoppers, the weigh systems for the proportioning of the aggregate,
the cement, and the SCM must be individual and distinct from all other weigh systems. To constitute an
individual and distinct material-weighing device, each weigh system must have a hopper, a lever system,
and an indicator.
Discharge the cement and the SCM into the mixer simultaneously with the aggregate.
The scales and weigh hoppers for bulk weighing cement, SCM, or cement plus SCM must be separate
and distinct from the aggregate weighing equipment.
For batches of 1 cu yd or more, the batching equipment must comply with one of the following
combinations:
1. Separate boxes and separate scale and indicator for weighing each aggregate size
2. Single box and scale indicator for all aggregates
3. Single box or separate boxes and automatic weighing mechanism for all aggregates

981

SECTION 90

CONCRETE

If you are requested to check the accuracy of batch weights, determine the gross weight and tare weight
of batch trucks, truck mixers, truck agitators, and nonagitating hauling equipment. Weigh the equipment
using scales designated by the Engineer.
For proportioning pavement concrete, install and maintain in good operating condition an electronically
actuated moisture meter that indicates, on a readily visible scale, changes in the moisture content of the
fine aggregate as it is batched within a sensitivity of 0.5 percent by weight of the fine aggregate.
90-1.02F(4)(b) Proportioning and Dispensing Liquid Admixtures
Liquid admixture dispensers must:
1. Have enough capacity to measure at 1 time the total quantity of admixture required for each batch of
concrete
2. Include a graduated measuring unit that is accurate to within 5 percent of the required quantity for
each batch of concrete
3. Be located and maintained such that the graduations can be read accurately from the point at which
proportioning is controlled to allow a visual check of batching accuracy before discharge
4. Have measuring units that are clearly marked for the type and quantity of admixture
Each liquid admixture dispensing system must be equipped with a sampling device that consists of a
valve located in a safe and readily accessible position such that the Engineer can slowly withdraw a test
sample.
If more than 1 liquid admixture is used in the concrete mix, each admixture must have a separate
measuring unit and must be dispensed by injecting equipment located such that the admixtures are not
mixed at high concentrations and do not interfere with the effectiveness of each other.
If an air-entraining admixture is used with other liquid admixtures, incorporate the air-entraining admixture
into the mix first, unless you demonstrate that a different sequence improves performance.
If automatic proportioning devices are used, the liquid admixture dispensers must operate automatically
with the batching control equipment. The dispensers must have an automatic warning system in good
operating condition that provides a visible or audible signal at the point at which proportioning is
controlled. The signal must activate if the quantity of admixture measured varies from the preselected
dosage by more than 5 percent or if the entire contents of the measuring unit are not emptied from the
dispenser.
Add liquid admixtures to the premeasured batch water or discharge the admixtures into the stream of
water such that they are well-dispersed throughout the batch.
You may dispense air-entraining admixtures directly into moist sand in the batching bins if you maintain
adequate control of the concrete air content.
90-1.02F(4)(c) Automatic Proportioning
Automatic proportioning devices must be authorized by the Department.
The batching of the aggregate and the cement, SCM, or cement plus SCM must be interlocked such that
a new batch cannot start until all weigh hoppers are empty, the proportioning devices are within zero
tolerance, and the discharge gates are closed.
The interlock must not allow any part of the batch to be discharged until all aggregate hoppers and the
cement and SCM hoppers or the cement plus SCM hopper are charged with weights that are within the
tolerances specified in section 90-1.02F(3).
If interlocks are required for the cement and SCM charging mechanisms and the cement and SCM are
weighed cumulatively, their charging mechanisms must be interlocked to prevent the introduction of SCM
until the weight of cement in the cement weigh hopper is within the tolerances specified in section 90
1.02F(3).
If the concrete is mixed completely in a stationary mixer, weigh the SCM in a separate weigh hopper and
introduce the SCM and cement simultaneously into the mixer proportionately with the aggregate. If you
submit certification that the stationary mixer is capable of mixing the cement, SCM, aggregates, and water
982

SECTION 90

CONCRETE

uniformly before discharge, you may weigh the SCM cumulatively with the cement. Certification must
include:
1. Test results for 2 compressive strength test cylinders taken within the first 1/3, and 2 compressive
strength test cylinders taken within the last 1/3, of a single batch of concrete discharged from the
stationary mixer. Strength tests and cylinder preparation must comply with section 90-1.01D(5).
2. Calculations demonstrating that the average of the 2 compressive strengths taken within the first 1/3
of the batch do not differ by more than 7.5 percent from the average of the 2 compressive strengths
taken within the last 1/3 of the batch.
3. Mixer rotation speed and time of mixing before discharge that are required to produce a mix that
complies with the above requirements.
The discharge gate on the cement and SCM hoppers or the cement plus SCM hopper must be designed
to allow the regulation of the flow of cement, SCM, or cement plus SCM into the aggregate.
If separate weigh boxes are used for each aggregate size, the discharge gates must allow the regulation
of the flow of each aggregate size.
Material discharged from each bin must be controlled by gates or by mechanical conveyors.
The means of withdrawl from the bins and of discharge from the weigh box must be interlocked such that
not more than 1 bin can discharge at a time and the weigh box cannot be tripped until the required
quantity from each bin has been deposited into it.
If a separate weigh box is used for each aggregate size, all the weigh boxes may be operated and
discharged simultaneously.
If the discharge from the bins is controlled by gates, each gate must be actuated automatically such that
the required weight is discharged into the weigh box, after which the gate must automatically close and
lock.
The automatic weighing system must be designed to allow all required proportions to be set on the
weighing controller at the same time.
90-1.02G Mixing and Transporting Concrete
90-1.02G(1) General
Mix the concrete in a mechanically operated mixer, except, if allowed by the Engineer, you may mix
batches not exceeding 1/3 cu yd by hand methods under section 90-1.02G(5).
Do not use equipment with components made of aluminum or magnesium alloys that could have contact
with plastic concrete during mixing, transporting, or pumping.
Concrete must be thoroughly mixed, homogeneous, and free of lumps or evidence of undispersed
cementitious material.
90-1.02G(2) Machine Mixing
Concrete mixers must be the revolving drum or revolving blade type. Operate the mixing drum or blades
uniformly at the mixing speed recommended by the manufacturer. Do not use a mixer or agitator that has
an accumulation of hard concrete or mortar.
Immediately before placing the concrete, the temperature of the mixed concrete must be from 50 to 90
degrees F. Cool or heat the aggregates and mixing water as necessary to produce concrete within these
temperature limits. Do not heat the aggregates or water above 150 degrees F. Any ice used to cool the
concrete must be melted before the concrete is discharged from the mixer.
Charge the batch into the mixer such that some water enters before the cementitious materials and
aggregates. Add all the water to the drum by the end of the first 1/4 of the specified mixing time. If the
concrete is delivered in a truck mixer, you may withhold a portion of the mixing water and, if allowed by
the Engineer, add it at the delivery point as specified in section 90-1.02G(3).
Batch and charge the cementitious materials into the mixer by means that will not cause:
1. Loss of cementitious materials due to the effect of wind
983

SECTION 90

CONCRETE

2. Accumulation of cementitious materials on the surfaces of conveyors or hoppers


3. Other conditions that reduce or vary the required quantity of cementitious material in the concrete
mixture
Operate stationary mixers with an automatic timing device. The timing device and discharge mechanism
must be interlocked such that during normal operation no part of the batch is discharged before the
specified mixing time has elapsed.
The total time from the intermingling of damp aggregates and all cementitious materials to the start of
mixing must not exceed 30 minutes.
The batch size must not exceed the manufacturer's guaranteed capacity.
For pavement or base concrete, install and maintain suitable batch counters in good operating condition
at job site batching plants and stationary mixers. The batch counters must indicate the exact number of
batches proportioned and mixed.
Mix and deliver the concrete to the job site by one of the following methods:
1. Central-mixed concrete, in which the concrete is mixed completely in a stationary mixer and
transported to the delivery point in a truck agitator or nonagitating hauling equipment.
2. Shrink-mixed concrete, in which the concrete is mixed partially in a stationary mixer and the mixing is
completed in a truck mixer.
3. Transit-mixed concrete, in which the concrete is mixed completely in a truck mixer.
Agitators must be truck mixers operating at agitation speed or truck agitators. Each mixer and agitator
must have a metal plate attached in a prominent place that clearly shows:
1. Various uses for which the equipment is designed
2. Manufacturer's guaranteed drum or container capacity in terms of the volume of mixed concrete
3. Rotation speed of the mixing drum or blades
Truck mixers must have an electrically or mechanically actuated revolution counter that readily allows
verification of the number of revolutions of the drum or blades.
For shrink-mixed concrete, transfer concrete that has been partially mixed at a central plant into a truck
mixer and comply with the specifications for transit-mixed concrete. Partial mixing in a central plant does
not count toward the number of revolutions at mixing speed.
90-1.02G(3) Transporting Mixed Concrete
You must transport mixed concrete to the delivery point in one of the following:
1. Truck agitator operating at the manufacturer's designated agitating speed if it:
1.1. Does not carry more than the manufacturer's guaranteed capacity
1.2. Maintains the mixed concrete in a thoroughly mixed and uniform mass during hauling
2. Truck mixer operating at the manufacturer's designated agitating speed
3. Nonagitating hauling equipment with a body that does not allow leakage of any part of the concrete
mix at any time
When discharged at the delivery point, the consistency and workability of the mixed concrete must be
suitable for adequate placement and consolidation in place and the mixed concrete must comply with the
specifications for uniformity in section 90-1.02A.
Protect concrete hauled in open-top vehicles from rain or from exposure to the sun for more than 20
minutes if the ambient temperature exceeds 75 degrees F.
Do not add water to the concrete in excess of that in the authorized mix design. At the delivery point, you
may add water withheld during batching if allowed by the Engineer. Add the water in 1 operation before
the discharge of more than 1/4 cu yd. The equipment for supplying the water must comply with section
90-1.02G(6). After adding the water, revolve the drum at least 30 revolutions at mixing speed before
discharging the concrete.

984

SECTION 90

CONCRETE

Control the rate of discharge of mixed concrete from a truck mixer or agitator by the speed of rotation of
the drum in the discharge direction with the discharge gate fully open.
If you use a truck mixer or agitator to transport the concrete to the delivery point, comply with the
following limits:
1. Complete the discharge within 1.5 hours or before 250 revolutions of the drum or blades, whichever
occurs first, after introducing the cementitious materials to the aggregates.
2. Under conditions contributing to quick stiffening of the concrete, or if the concrete temperature is 85
degrees F or above, the time allowed may be less than 1.5 hours.
3. If you use an admixture to retard the set time:
3.1. Concrete temperature must not exceed 85 degrees F
3.2. Time limit is 2 hours
3.3. Revolution limit is 300
If you use nonagitating hauling equipment to transport the concrete to the delivery point:
1. Complete the discharge within 1 hour after introducing the cementitious materials to the aggregates
2. Under conditions contributing to quick stiffening of the concrete, or if the concrete temperature is 85
degrees F or above, complete the discharge within 45 minutes after introducing the cementitious
materials to the aggregates
If you add a high-range water-reducing admixture to the concrete at the job site, the total number of
revolutions must not exceed 300.
90-1.02G(4) Time or Quantity of Mixing
Mixing of the concrete in a stationary mixer must continue for the required mixing time after all
ingredients, except water and admixture that is added with the water, are in the mixing compartment of
the mixer before any part of the batch is released. The transfer time in multiple drum mixers must not be
counted as part of the required mixing time.
For concrete used in concrete structures other than minor structures, the mixing time in a stationary mixer
must be at least 90 seconds and no more than 5 minutes, except that if authorized the minimum mixing
time may be reduced to 50 seconds. For all other concrete, the mixing time must be at least 50 seconds
and no more than 5 minutes.
The minimum required revolutions at the mixing speed for transit-mixed concrete must be at least that
recommended by the mixer manufacturer and must be enough to produce uniform concrete under section
90-1.02A.
90-1.02G(5) Hand Mixing
Hand-mixed concrete must be made in batches of 1/3 cu yd or less.
Use the following procedure to make hand-mixed concrete:
1. Measure the quantity of coarse aggregate in measuring boxes.
2. Spread the coarse aggregate on a watertight, level platform.
3. Spread the fine aggregate on the layer of coarse aggregate. The total depth of the 2 layers must be 1
foot or less.
4. Spread the dry cementitious materials on the aggregates.
5. Turn the whole dry mass at least 2 times.
6. Add and evenly distribute the water.
7. Turn the whole mass at least 3 more times, not including placement in the carriers or forms.
90-1.02G(6) Quantity of Water and Penetration or Slump
Regulate the quantity of water used in the concrete mix such that the penetration as tested under
California Test 533, or the slump as tested under ASTM C 143, complies with the nominal range shown in
the following table:

985

SECTION 90

CONCRETE

Type of work

Concrete pavement
Nonreinforced concrete facilities
Reinforced concrete structures with:
Sections over 12 inches thick
Sections 12 inches thick or less
Concrete placed under water
CIP concrete piles

Nominal
Maximum
Penetration Slump Penetration Slump
(inches)
(inches)
(inches)
(inches)
01
-1.5
-01.5
-2
-01.5
02
-2.53.5

--68
57

2.5
3
-4

--9
8

If the penetration or slump exceeds the nominal range, adjust the mixture for subsequent batches to
reduce the penetration or slump to a value within the nominal range.
Do not use a batch of concrete with a penetration or a slump that exceeds the maximum value shown in
the table above.
If Type F or G chemical admixtures are used, the penetration requirements do not apply and the slump
must not exceed 9 inches after adding the chemical admixtures.
The quantity of free water must not exceed 310 pounds per cubic yard of concrete plus 20 pounds of free
water for each required 100 pounds of cementitious material in excess of 550 pounds of cementitious
material per cubic yard of concrete.
When determining the total quantity of free water, consider liquid admixtures to be water if the dosage is
more than 1/2 gallon of admixture per cubic yard of concrete.
If there are adverse or difficult conditions that affect concrete placement, you may exceed the specified
penetration and free water content limitations if you:
1. Receive authorization to increase the cementitious material content per cubic yard of concrete
2. Increase the water and cementitious material at a ratio that does not exceed 30 pounds of water per
added 100 pounds of cementitious material per cubic yard of concrete
The equipment for supplying water to the mixer must accurately measure to within 1.5 percent of the
quantity of water required to be added to the mix for any position of the mixer.
The tanks used to measure the water must be designed such that water cannot enter while water is being
discharged into the mixer. The water must be discharged into the mixer rapidly in 1 operation without
dribbling.
Arrange the equipment to allow checking of the quantity of water delivered by discharging into measured
containers.
90-1.02H Concrete in Corrosive Environments
Section 90-1.02H applies to concrete specified in the special provisions to be in a corrosive environment.
The cementitious material to be used in the concrete must be a combination of Type II or V portland
cement and SCM.
The concrete must contain at least 675 pounds of cementitious material per cubic yard.
The reduction of cementitious material content as specified in section 90-1.02E(2) is not allowed.
The specifications for SCM content in section 90-1.02B(3) do not apply.
The cementitious material must be composed of one of the following, by weight:
1. 25 percent natural pozzolan or fly ash with a CaO content of up to 10 percent and 75 percent portland
cement
2. 20 percent natural pozzolan or fly ash with a CaO content of up to 10 percent, 5 percent silica fume,
and 75 percent portland cement
986

SECTION 90

CONCRETE

3. 12 percent silica fume, metakaolin, or UFFA, and 88 percent portland cement


4. 50 percent GGBFS and 50 percent portland cement
90-1.02I Concrete in Freeze-Thaw Areas
90-1.02I(1) General
Section 90-1.02I applies to concrete for projects specified in the special provisions to be in a freeze-thaw
area.
90-1.02I(2) Materials
90-1.02I(2)(a) General
The concrete must contain at least 590 pounds of cementitious material per cubic yard unless a higher
cementitious material content is specified.
Add an air-entraining admixture to the concrete at the rate required to produce an air content of 6.0 1.5
percent in the freshly mixed concrete.
For concrete placed at least 2 feet below the adjacent undisturbed grade or at least 3 feet below
compacted finished grade, an air-entraining admixture is not required unless the concrete will experience
freezing conditions during construction.
The cementitious material must satisfy the following equation:
[(41 x UF) + (19 x F) + (11 x SL)]/TC 7.0
where:
UF = silica fume, metakaolin, or UFFA, including the quantity in blended cement, lb/cu yd
F = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, including the quantity in
blended cement, lb/cu yd. F is equivalent to the sum of FA and FB as defined in section 90
1.02I(2)(b).

SL = GGBFS, including the quantity in blended cement, lb/cu yd

TC = total quantity of cementitious material used, lb/cu yd

90-1.02I(2)(b) Concrete Exposed to Deicing Chemicals


Section 90-1.02I(2)(b) applies to concrete specified in the special provisions to be exposed to deicing
chemicals.
The specifications for SCM content in section 90-1.02B(3) and the equation in section 90-1.02I(2)(a) do
not apply.
The cementitious material must be composed of any combination of portland cement and at least 1 SCM
satisfying the following equation:
Equation 1:
[(25 x UF) + (12 x FA) + (10 x FB) + (6 x SL)]/TC X
The SCM must satisfy the following equations:
Equation 2:
4 x (FA + FB)/TC 1.0
Equation 3:

(10 x UF)/TC 1.0


Equation 4:
2 x (UF + FA + FB + SL)/TC 1.0

987

SECTION 90

CONCRETE

The concrete mix design must satisfy the following equation:


Equation 5:
27 x (TC - MC)/MC 5.0
where:
UF = silica fume, metakaolin, or UFFA, including the quantity in blended cement, lb/cu yd. If UF is
used, the quantity of UF must be at least 5 percent.
FA = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
up to 10 percent, including the quantity in blended cement, lb/cu yd. If FA is used, the quantity
of FA must be at least 15 percent.
FB = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
greater than 10 percent and up to 15 percent, including the quantity in blended cement, lb/cu
yd. If FB is used, the quantity of FB must be at least 15 percent.
SL = GGBFS, including the quantity in blended cement, lb/cu yd

TC = total quantity of cementitious material, lb/cu yd

X = 1.8 for innocuous aggregate, 3.0 for all other aggregate

MC = minimum quantity of cementitious material specified, lb/cu yd

90-1.02J Curing Compound


2
Curing compound water loss must not exceed 0.15 kg/m in 24 hours when tested under California Test
534.
90-1.03 CONSTRUCTION
90-1.03A General
Reserved
90-1.03B Curing Concrete
90-1.03B(1) General
Cure newly placed concrete by the method specified for the type of work involved.
Cure mortar and grout by keeping the surface damp for 3 days.
90-1.03B(2) Water Method
The water method must consist of keeping the concrete continuously wet by applying water for a curing
period of at least 7 days after the concrete is placed.
You may use cotton mats, rugs, carpets, or earth or sand blankets as a curing medium to retain the
moisture during the curing period.
For curing structures, you may use a curing medium consisting of white opaque polyethylene sheeting
extruded onto burlap. The polyethylene sheeting must have a minimum thickness of 4 mils and must be
extruded onto 10-ounce burlap.
For curing columns, you may use a curing medium consisting of polyethylene sheeting with a minimum
thickness of 10 mils achieved in a single layer of material.
Keep the concrete surface damp by applying water with an atomizing nozzle that forms a mist and not a
spray until the surface is covered with the curing medium. Do not apply the water under pressure directly
on the concrete or allow the water to flow over or wash the concrete surface. At the end of the curing
period, remove the curing medium.
If you use polyethylene sheeting or polyethylene sheeting on burlap as a curing medium:
1.
2.
3.
4.

Secure the sheeting and the sheeting joints as necessary to retain moisture
Keep the sheeting within 3 inches of the concrete at all points along the surface being cured
Monitor the concrete temperature during curing
Discontinue the use of these curing media if the concrete temperature cannot be maintained below
140 degrees F
988

SECTION 90

CONCRETE

90-1.03B(3) Curing Compound Method


90-1.03B(3)(a) General
The curing compound method must consist of uniformly spraying the concrete surfaces exposed to the air
with a curing compound.
90-1.03B(3)(b) Materials
The curing compound must comply with the requirements shown in the following table for the curing
compound number specified:
Curing
ASTM C 309 classification
compound no.
1
Pigmented, Type 2, Class Ba
2
Pigmented, Type 2, Class B
3
Pigmented, Type 2, Class A
4
Nonpigmented, Type 1, Class B
5
Nonpigmented, Type 1, Class A
6
Nonpigmented with fugitive dye, Type 1-D, Class A
a
The resin type must be poly-alpha-methylstyrene. The infrared scan
for the dried vehicle must match the scan on file at METS.
If no curing compound number is specified, use any of the curing compounds shown in the table above.
The curing compound must be manufactured to:
1. Remain sprayable at temperatures above 40 degrees F
2. Control sagging, pigment settling, leveling, and de-emulsification
3. Maintain the specified properties for at least 1 year
Pigmented curing compounds must be manufactured such that the pigment does not settle badly, cake or
thicken in the container, or become granular or curdled.
Settlement of pigment must be a thoroughly wetted, soft, mushy mass allowing the complete and easy
vertical penetration of a paddle. Settled pigment must be easily predisposed, with minimum resistance to
the sideways manual motion of the paddle across the bottom of the container, to form a smooth, uniform
product of the proper consistency.
Do not dilute or alter the curing compound after manufacture.
The curing compound must be packaged in clean 274-gallon totes, 55-gallon barrels, or 5-gallon pails, or
must be supplied from a suitable storage tank located at the job site. The containers must comply with 49
CFR 171180. The 274-gallon totes and 55-gallon barrels must have removable lids and airtight
fasteners. The 5-gallon pails must be round and have standard full open head and bail. Do not use lids
with bungholes.
Containers must be filled in a way that prevents skinning.
Steel containers and lids must be lined with a coating that prevents destructive action by the compound or
chemical agents in the air space above the compound. The coating must not come off the container or lid
as skins.
Plastic containers and lids must not react with the curing compound.
Label each curing compound container with:
1.
2.
3.
4.
5.
6.
7.

Manufacturer's name
ASTM C 309 classification
Batch number
Volume
Date of manufacture
Volatile organic compound content
Warning that curing compound containing pigment must be well stirred before using
989

SECTION 90

CONCRETE

8. Precautions concerning the handling and application of curing compound shown in compliance with 8
CA Code of Regs 15001938 and 32006184
9. Statement that the contents fully comply with State air pollution control rules and regulations
90-1.03B(3)(c) Mixing
Before using a curing compound, completely redisperse settled or separated solids in containers, except
tanks, by mixing at low speed in compliance with these specifications and the manufacturer's instructions.
Mix manually using a paddle or mix using a mixing blade driven by a drill motor at low speed. Mixing
blades must be the type used for mixing paint.
Keep on-site storage tanks clean and free of contaminants. Each tank must have a permanent system
that completely redisperses settled material without introducing air or other foreign substances.
At the time of use, compounds containing pigments must be thoroughly mixed. Use a paddle to loosen all
settled pigment from the container bottom and use a power-driven agitator to disperse the pigment
uniformly throughout the vehicle.
Agitation must not introduce air or other foreign substances into the curing compound.
90-1.03B(3)(d) Application
Apply the curing compound at a nominal rate of 150 sq ft/gal.
At any point, the application rate must be within 50 sq ft/gal of the nominal rate. The average application
rate must be within 25 sq ft/gal of the nominal rate when tested under California Test 535. Apply the
curing compound such that there are no runs, sags, thin areas, skips, or holidays.
Apply the curing compound using power-operated spraying equipment with an operational pressure gage
and a means of controlling the pressure. The Engineer may allow hand spraying for small and irregular
areas that, in the Engineer's opinion, are not reasonably accessible to power-operated spraying
equipment.
Apply the curing compound to the concrete after finishing the surface, immediately before the moisture
sheen disappears from the concrete surface but before drying shrinkage or craze cracks start to appear.
If the concrete surface cracks or dries, immediately and continually apply water with an atomizing nozzle
as specified in section 90-1.03B(2) until application of the curing compound is resumed or started. Do not
apply the curing compound over freestanding water.
If the film of curing compound is damaged before the expiration of 7 days after the concrete is placed for
structures and 72 hours for pavement, immediately repair it with additional compound.
90-1.03B(4) Waterproof Membrane Method
The waterproof membrane method must consist of:
1. Spraying the exposed finished concrete surfaces with water, using an atomizing nozzle that forms a
mist and not a spray, until the concrete has set
2. Placing the waterproof curing membrane immediately after spraying
3. Keeping the membrane in place for at least 72 hours
The membrane must be sheeting material that complies with AASHTO M 171 for white reflective
materials.
Use sheeting material of such a width as to completely cover the entire concrete surface. Cement the
sheeting joints together securely such that the joints are waterproof. The joint seams must have at least a
4-inch lap.
Securely weigh down the sheets by placing an earth bank on the sheet edges or by other means allowed
by the Engineer.
If any portion of the sheets are damaged within 72 hours after being placed, immediately repair the
damaged portion by cementing new sheets into place.

990

SECTION 90

CONCRETE

Do not use a membrane that is no longer waterproof or has been damaged such that it is unfit for curing
concrete.
90-1.03B(5) Forms-In-Place Method
The forms-in-place method must consist of curing formed concrete surfaces by keeping the forms in
place.
Keep the forms in place for at least 7 days after the concrete is placed, except keep the forms in place for
at least 5 days for concrete members over 20 inches in least dimension.
The joints in the forms and the joints between the end of the forms and the concrete must be kept
moisture tight during the curing period. Reseal cracks in the forms and cracks between the forms and the
concrete using authorized methods.
90-1.03C Protecting Concrete
Protect the concrete from damage due to any cause, including rain, heat, cold, wind, your actions, and
the actions of others.
Do not place the concrete on frozen or ice-coated ground or subgrade or on ice-coated forms, reinforcing
steel, structural steel, conduits, precast members, or construction joints.
If it is raining, you must provide adequate protection against damage or you must stop placing the
concrete before the quantity of surface water is sufficient to damage the surface mortar or cause a flow or
wash of the concrete surface.
90-1.04 PAYMENT
Not Used
90-2 MINOR CONCRETE
90-2.01 GENERAL
90-2.01A Summary
Section 90-2 includes specifications for furnishing and protecting minor concrete.
90-2.01B Definitions
Reserved
90-2.01C Submittals
If required by the following table, submit compressive strength test results with the mix design that verify
the minimum required compressive strength:
SCM
Test submittal required
Fly ash used alone
If portland cement content < 350 lb/cu yd
GGBFS used alone
If portland cement content < 250 lb/cu yd
Natural pozzolan used alone
If portland cement content < 350 lb/cu yd
More than 1 SCM
Always
NOTE: Compressive strength tests must be performed by an ACI-certified technician.
Submit the concrete mix design before using the concrete in the work and before changing the mix
proportions.
Submit a proposed combined aggregate grading. After authorization of the grading, the aggregate
furnished for minor concrete must comply with that grading.
If requested, submit periodic test reports of the aggregate grading furnished.
The Engineer may waive the specifications for gradation if the Engineer determines that furnishing a
gradation is not necessary for the type or quantity of concrete work to be constructed.

991

SECTION 90

CONCRETE

Before placing minor concrete from a source not previously used on the Contract, submit a certificate of
compliance stating that the minor concrete to be furnished complies with the Contract requirements,
including the specified minimum cementitious material content.
Submit a weighmaster certificate as an informational submittal with each load of ready-mixed concrete at
the concrete discharge location. The weighmaster certificate must show the date and time the load left
the batching plant and, if hauled in a truck mixer or agitator, the time the mixing cycle started.
90-2.01D Quality Control and Assurance
Section 90-1.01D(5) and the specifications for uniformity in section 90-1.02A do not apply to minor
concrete.
The Engineer may perform tests and inspect the facilities, materials, and methods for producing the minor
concrete to ensure that it is of suitable quality for use in the work.
The Engineer verifies compliance with the specified cementitious material content by testing under
California Test 518 for cement content. For testing purposes, SCM is considered to be cement. Adjust the
batch proportions as necessary to produce concrete having the specified cementitious material content.
90-2.02 MATERIALS
90-2.02A General
Reserved
90-2.02B Cementitious Material
Minor concrete must contain at least 505 pounds of cementitious material per cubic yard.
90-2.02C Aggregate
Sections 90-1.01C(2) and 90-1.02C do not apply to minor concrete.

The aggregate must be clean and free from deleterious coatings, clay balls, roots, and other extraneous

material.

The maximum aggregate size must not be larger than 1-1/2 inches or smaller than 3/4 inch.

You may use crushed concrete and reclaimed aggregate if they comply with the specifications for

aggregate.

90-2.02D Water
Section 90-1.02D does not apply to minor concrete.
Water used for washing, mixing, and curing must be free from oil, salts, and other impurities that would
discolor or etch the surface or have an adverse affect on the concrete quality.
90-2.02E Production
Sections 90-1.02F, 90-1.02G(1), 90-1.02G(2), 90-1.02G(3), and 91-1.02G(4) do not apply to minor
concrete.
Store, proportion, mix, transport, and discharge the cementitious material, water, aggregate, and
admixtures in compliance with recognized standards of good practice that result in thoroughly and
uniformly mixed concrete suitable for the intended use. Recognized standards of good practice are
outlined in various industry publications, such as those issued by ACI, AASHTO, or the Department.
Use a quantity of water that produces concrete with a consistency that complies with section 90-1.02G(6).
Do not add water during hauling or after arrival at the delivery point unless allowed by the Engineer.
Discharge ready-mixed concrete from the transport vehicle while the concrete is still plastic and before
stiffening occurs. Take whatever action is necessary to eliminate quick stiffening, except do not add
water.
Conditions contributing to quick stiffening are:
1. Elapsed time of 1.5 hours in agitating hauling equipment or 1 hour in nonagitating hauling equipment
992

SECTION 90

CONCRETE

2. More than 250 revolutions of the drum or blades after introduction of the cementitious material to the
aggregates
3. Concrete temperature over 90 degrees F
The mixing time in a stationary mixer must be at least 50 seconds and no more than 5 minutes.
The minimum required revolutions at mixing speed for transit-mixed concrete must be at least that
recommended by the mixer manufacturer and must be increased as needed to produce thoroughly and
uniformly mixed concrete.
If you add a high-range water-reducing admixture to the concrete at the job site, the total revolutions must
not exceed 300.
90-2.03 CONSTRUCTION
Maintain a concrete temperature of at least 40 degrees F for 72 hours after placing.
90-2.04 PAYMENT
Not Used
90-3 RAPID STRENGTH CONCRETE
90-3.01 GENERAL
90-3.01A Summary
Section 90-3 includes specifications for furnishing and curing RSC.
Section 90-3 applies only where the specifications allow the use of RSC.
90-3.01B Definitions
Reserved
90-3.01C Submittals
90-3.01C(1) General
Reserved
90-3.01C(2) Volumetric Proportioning
For volumetric-proportioned RSC, submit:
1. Aggregate moisture test results
2. Log of production data
3. Test samples of freshly mixed concrete for uniformity testing
Sampling facilities must be safe, accessible, and clean, and must produce a test sample that is
representative of production. The sampling devices and methods must comply with California Test 125.
90-3.01C(3) Certificate of Compliance
Submit a certificate of compliance with each delivery of aggregate, cementitious material, and admixtures
used for calibration tests. Include certified copies of the weight of each delivery.
The certificate of compliance must state that the source of the materials used for the calibration tests is
the same source as to be used for the planned work. The certificate must be signed by your assigned
representative.
90-3.01C(4) Weighmaster Certificate
Submit weighmaster certificates for RSC. Regardless of the proportioning method used, the certificates
must include all the information necessary to trace the manufacturer and manufacturer's lot number for
the cement used.
The weighmaster certificate for the cement must include:
1. Date of proportioning
2. Location of proportioning
3. Actual net draft cement weight, if proportioned into fabric containers
993

SECTION 90

CONCRETE

4. Net draft cement weight used in the load, if proportioned at the pour site from a storage silo
90-3.01C(5) Production Data
For volumetric-proportioned RSC, submit the daily production data in electronic or printed media at the
end of each production shift. Report the data, including data titles, in the following order:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Weight of cement per revolution count


Weight of each aggregate size per revolution count
Gate openings for each aggregate size
Weight of water added to the concrete per revolution count
Moisture content of each aggregate size
Individual volume of admixtures per revolution count
Time of day
Day of week
Production start and stop times
Volumetric mixer identification
Name of supplier
Specific type of concrete being produced
Source of the individual aggregate sizes
Source, brand, and type of cement
Source, brand, and type of individual admixtures
Name and signature of the operator

The device controlling the proportioning of cement, aggregate, and water must produce production data
that is captured at 15-minute intervals throughout daily production. Each capture of production data must
represent the production activity at that time and must not be a summation of data. The quantity of
material represented by each production capture is the quantity produced in the period from 7.5 minutes
before to 7.5 minutes after the capture time.
Production data must be input by hand into a pre-printed form or captured and printed by the
proportioning device.
90-3.01D Quality Control and Assurance
90-3.01D(1) General
Reserved
90-3.01D(2) Penetration
The specifications for penetration in section 90-1.02G(6) do not apply to RSC.
90-3.01D(3) Aggregate Moisture
For volumetric-proportioned RSC, determine the aggregate moisture under California Test 223 at least
every 2 hours during proportioning and mixing. Record the aggregate moisture determinations and submit
them at the end of each production shift.
90-3.01D(4) Concrete Uniformity
For volumetric-proportioned RSC, the Engineer determines the uniformity of concrete mixtures based on
differences in penetration measurements when tested under California Test 533. Differences in
penetration are determined by comparing the penetration tests on 2 test samples of mixed concrete from
the same batch or volumetric mixer load.
90-3.02 MATERIALS
90-3.02A General
RSC must be one of the following:
1. Concrete complying with section 90-1. You may use Type III portland cement.
2. Concrete complying with section 90-1, except:
2.1. You may use any cement that complies with the definition of hydraulic cement or blended
hydraulic cement in ASTM C 219 and the requirements shown in the following table:

994

SECTION 90

CONCRETE

Test
Requirementb
California Test 527,
0.053 percent max
W/C ratio = 0.390 0.010
Mortar expansion in water
ASTM C 1038
0.04 percent max
California Test 422
0.05 percent max
Soluble chloridea
California Test 417
0.30 percent max
Soluble sulfatea
Thermal stability
California Test 553
90 percent min
Compressive strength at 3 days
ASTM C 109
2,500 psi
a
Perform the test on a cube specimen fabricated in compliance with ASTM C 109,

cured for at least 14 days, and then pulverized such that 100 percent passes the no.

50 sieve.

b
If you use chemical admixtures, include them when testing.

Property
Contraction in air

2.2. You may use citric acid or borax if you submit a written request from the cement manufacturer
and a test sample.
The requirement for air entrainment of concrete in freeze-thaw areas applies only when portland cement
is used.
SCM is not required in RSC.
When tested for uniformity under section 90-3.01D(4), the difference in penetration between the 2
concrete test samples must not exceed 5/8 inch.
90-3.02B Volumetric Proportioning
90-3.02B(1) General
RSC may be proportioned and placed using a volumetric mixer.
90-3.02B(2) Proportioning
Volumetric mixers must proportion cement, water, aggregate, and additives by volume.
Proportion aggregate using a belt feeder that is operated with an adjustable cutoff gate delineated to the
nearest quarter increment. The gate opening height must be readily determinable.
Proportion cement by any method that complies with the accuracy tolerance specifications in section 90
1.02F(3).
Proportion water with a meter.
Proportion liquid admixtures under section 90-1.02F(4)(b), except proportion liquid admixtures with a
meter.
90-3.02B(3) Mixer Requirements
Mix volumetric-proportioned RSC in a mechanically operated mixer. You may use an auger-type mixer.
Operate the mixer uniformly at the mixing speed recommended by the manufacturer. Do not use a mixer
that has an accumulation of hard concrete or mortar.
Volumetric mixers must comply with the following:
1. Aggregate feeders must connect directly to the drive on the cement vane feeder.
2. Cement feed rate must be tied directly to the feed rate for the aggregate and other ingredients. The
ratio of cement to aggregate must be changed only by changing the gate opening for the aggregate
feed.
3. Drive shaft of the aggregate feeder must have a revolution counter reading to the nearest full or
partial revolution of the aggregate delivery belt.
Do not use equipment with components made of aluminum or magnesium alloys that could have contact
with plastic concrete during mixing or transporting of the RSC.
Cover the rotating and reciprocating equipment on volumetric mixers with metal guards.
995

SECTION 90

CONCRETE

The identifying numbers of volumetric mixers must be at least 3 inches in height and must be located on
the front and rear of the vehicle.
Each mixer must have metal plates that state the designed usage, the manufacturer's guaranteed mixed
concrete volumetric capacity, and the rotation speed.
Locate cement storage immediately before the cement feeder. Equip the system with a device that
automatically shuts down power to the cement feeder and aggregate belt feeder if the cement storage
level is less than 20 percent of the total volume.
Equip each aggregate bin with a device that automatically shuts down the power to the cement feeder
and the aggregate belt feeder if the aggregate discharge rate is less than 95 percent of the scheduled
discharge rate.
The proportioning device indicators must be in working order before starting proportioning or mixing and
must be visible when standing near the volumetric mixer.
90-3.02B(4) Mixer Calibration
Calibrate the cutoff gate for each volumetric mixer used and for each aggregate source. Calibrate each
volumetric mixer at 3 different aggregate gate settings that correspond to production needs. Perform at
least 2 calibration runs for each aggregate gate.
Individual aggregate delivery rate check-runs must not vary by more than 1.0 percent from the
mathematical average of all runs for the same gate and aggregate type. Each test run must be at least
1,000 lb.
Individual cement delivery rate check-runs must not vary by more than 1.0 percent from the mathematical
average of 3 runs of at least 1,000 lb each.
When the water meter operates from 50 to 100 percent of production capacity, the indicated weight of
water delivered must not differ from the actual weight delivered by more than 1.5 percent for each of 2
runs of 300 gal for pavement or 75 gal for structures.
Calibrate the water meter under California Test 109. The water meter must be equipped with a resettable
totalizer and must display the operating rate.
Conduct the calibration tests for aggregate, cement, and water proportioning devices using a platform
scale located at the calibration site. Platform scales for weighing test-run calibration material must have a
maximum capacity of 2.75 tons with maximum graduations of 1 lb. Error test the platform scale within 8
hours of calibrating the volumetric mixer proportioning devices. Perform error testing with test weights
under California Test 109. Furnish a witness scale that is within 2 graduations of the test weight load. The
witness scale must be available for use at the production site throughout the production period.
Equipment needed for the calibration of proportioning systems must remain available at the production
site throughout the production period.
The volumetric mixer must be equipped such that accuracy checks can be made. After production starts,
recalibrate the proportioning devices at least every 30 days for pavement or 90 days for structures or
when you change the source or type of any ingredient.
Each time 55 tons of cement passes through the volumetric mixer, perform a 2-run spot calibration of the
cement proportioning system only. If the spot calibration shows that the cement proportioning system
does not comply with the specifications, complete a full calibration of the cement proportioning system
before you resume production.
90-3.02B(5) Mixing Concrete
At the time of batching volumetric-proportioned RSC:
1. Aggregates must be dried and drained to a stable moisture content. Do not proportion aggregates
with visible separation of water from the aggregate.
2. Free moisture content of the fine aggregate must not exceed 8 percent of its saturated surface-dry
weight.

996

SECTION 90

CONCRETE

If the proportioning plant has separate supplies of the same size group of aggregate with different
moisture content, specific gravity, or surface characteristics affecting workability, exhaust one supply
before using another supply.
Do not use ice to cool volumetric-proportioned RSC directly. If ice is used to cool the water used in the
mix, it must be melted before entering the mixer.
Proportion and charge the cement into the volumetric mixer such that there is no variance of the required
quantity due to conditions such as wind or accumulation on equipment.
Do not mix more material in the volumetric mixer than will allow complete mixing. Reduce the volume of
material in the mixer if complete mixing is not achieved. Continue mixing until a homogeneous mixture is
produced at discharge. Do not add water to the RSC after discharge.
90-3.03 CONSTRUCTION
For RSC using a cement other than portland cement, cure the concrete as recommended by the cement
manufacturer. The method of curing must be authorized before starting construction.
90-3.04 PAYMENT
If volumetric mixer calibration is performed more than 100 miles from the project limits, $1,000 per
calibration session is deducted.
90-4 PRECAST CONCRETE
90-4.01 GENERAL
90-4.01A Summary
Section 90-4 includes specifications for furnishing and curing PC concrete.
The specifications for shrinkage in section 90-1.02A do not apply.
90-4.01B Definitions
Reserved
90-4.01C Submittals
Submit a certificate of compliance for the cementitious material used in PC concrete products that you
purchase. The certificate must be signed by the PC concrete product manufacturer.
Submit expansion test data under section 90-4.02, if required.
90-4.01D Quality Control and Assurance
For PC concrete that is steam cured:
1. Determine the concrete compressive strength from test cylinders that have been handled and stored
under California Test 540, Method 3
2. Engineer evaluates the compressive strength based on individual tests representing specific portions
of production
3. Concrete designated by compressive strength is acceptable if its compressive strength reaches the
described 28-day compressive strength in no more than the maximum number of days specified or
allowed after the concrete is cast
If PC concrete is manufactured at an established PC concrete plant, a trial batch and prequalification of
the materials, mix proportions, mixing equipment, and procedures under section 90-1.01D(5)(b) are not
required.
90-4.02 MATERIALS
You may use Type III portland cement in PC concrete.
The specifications for SCM content in section 90-1.02B(3) do not apply to PC concrete.
For PC concrete, the SCM content must comply with one of the following:
1. Any combination of portland cement and SCM satisfying the following equation:
997

SECTION 90

CONCRETE

Equation 1:
[(25 x UF) + (12 x FA) + (10 x FB) + (6 x SL)]/TC X
where:
UF = silica fume, metakaolin, or UFFA, including the quantity in blended cement, lb/cu yd
FA = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
up to 10 percent, including the quantity in blended cement, lb/cu yd
FB = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of
greater than 10 percent and up to 15 percent, including the quantity in blended cement, lb/cu
yd
SL = GGBFS, including the quantity in blended cement, lb/cu yd

TC = total quantity of cementitious material, lb/cu yd

X = 0.0 for innocuous aggregate, 3.0 for all other aggregate

2. 15 percent Class F fly ash with at least 48 oz of LiNO3 solution added per 100 lb of portland cement.
The CaO content of the fly ash must not exceed 15 percent.
3. Any combination of SCM and portland cement for which the expansion of cementitious material and
aggregate does not exceed 0.10 percent when tested under ASTM C 1567. Submit test data with
each mix design. Test data authorized by the Department no more than 3 years before the 1st day of
the Contract is authorized for the entire Contract. The test data must be for the same concrete mix
and must use the same materials and material sources to be used on the Contract.
90-4.03 CONSTRUCTION
Cure PC concrete using steam curing or any of the methods specified in section 90-1.03B. Cure for the
minimum time specified for each method or until the concrete reaches its design strength, whichever is
less.
Steam curing must comply with the following:
1. After placing the concrete, hold it for a 4-hour minimum presteaming period. If the ambient air
temperature is below 50 degrees F, apply steam during the presteaming period to hold the air
surrounding the concrete at a temperature of from 50 to 90 degrees F.
2. To prevent moisture loss on the exposed surfaces during the presteaming period, cover the concrete
as soon as possible after casting or keep the exposed surfaces wet by fog spray or wet blankets.
3. Enclosures for steam curing must allow free circulation of steam around the concrete and must be
constructed to contain the live steam with a minimum moisture loss. The use of tarpaulins or similar
flexible covers is allowed if they are kept in good repair and secured in such a way that prevents the
loss of steam and moisture.
4. Steam at the jets must be at low pressure and in a saturated condition. Steam jets must not impinge
directly on the concrete, test cylinders, or forms. During application of the steam, the temperature rise
within the enclosure must not exceed 40 degrees F per hour. The curing temperature throughout the
enclosure must not exceed 150 degrees F and must be maintained at a constant level for the time
necessary to develop the required transfer strength. Cover control cylinders to prevent moisture loss
and place them in a location where the temperature is representative of the average enclosure
temperature.
5. Use a minimum of 1 temperature recording device per 200 feet of continuous bed length for checking
the temperature. Temperature recording devices must provide an accurate, continuous, permanent
record of the curing temperature.
6. Detension the concrete in pretension beds immediately after the steam curing is completed while the
concrete and forms are still warm, or maintain the temperature under the enclosure above 60 degrees
F until the stress is transferred to the concrete.
7. Curing is complete at the end of the steam curing cycle.
90-4.04 PAYMENT
Not Used

998

SECTION 90

CONCRETE

90-5 SELF-CONSOLIDATING CONCRETE

90-5.01 GENERAL
90-5.01A Summary
Section 90-5 includes specifications for furnishing SCC.
Section 90-5 applies only where the specifications allow the use of SCC.
You may use SCC for PC concrete.
90-5.01B Definitions
self-consolidating concrete (SCC): Flowing concrete that is capable of spreading to a level state
without segregation and without the use of internal or external vibrators.
90-5.01C Submittals
Submit the following before placing SCC:
1. Mix design and placement procedures
2. Trial batch test report, including test results for the tests specified in section 90-5.01D(3)
3. If a mock-up is specified:
3.1. Details and placement procedures for the mock-up
3.2. Test samples and test results from the mock-up
Submit test results for slump flow and visual stability index.
If the Engineer rejects the SCC for slump flow and visual stability index, make corrective changes and
resubmit the SCC mix design or placement procedures.
Submit the aggregate gradings as an informational submittal.
90-5.01D Quality Control and Assurance
90-5.01D(1) General
Reserved
90-5.01D(2) Compressive Strength
Prepare SCC specimens for compressive strength testing under California Test 540, except fabricate test
specimens as follows:
1.
2.
3.
4.
5.
6.

Place the test molds on a firm, flat surface to prevent distortion of the bottom surface.
If more than 1 specimen is to be made from the same batch, make all the specimens simultaneously.
Fill the mold in 1 lift, pouring the concrete from a larger container.
Pat the sides of the mold lightly by hand or jig by rocking the mold from side to side.
Strike off the surface of the concrete even with the top edge of the mold.
Wipe the sides of the mold free of excess concrete and press the lid on.

90-5.01D(3) Prequalification of Mix Design


Prequalify the SCC mix design with a trial batch using the same materials, mix proportions, mixing
equipment, procedures, and batch size to be used in SCC production.
The SCC trial batch must comply with the requirements shown in the following table:

999

SECTION 90

CONCRETE

SCC Mix Design Requirements


Test
Requirement
ASTM C 1611
At least 20 inches
ASTM C 1611
27 seconds
ASTM C 1611
1 or less
ASTM C 1621
The difference between J-Ring
flow and slump flow must not
exceed 2 inches
Column segregation
ASTM C 1610
Static segregation must not
exceed 15 percent
Bleeding
ASTM C 232
Bleeding capacity must not
exceed 2.5 percent
Compressive strength California Test 521 The average of 5 test cylinders
must be at least 600 psi greater
than the strength describeda
Minimum compressive California Test 521 The minimum for an individual
strength
test cylinder must not be less
than the strength describeda
a
At the maximum age specified or allowed

Property
Slump flow
Flow rate, T50
Visual stability index
J-Ring flow

90-5.01D(4) Mock-up
If the construction of a mock-up is specified in the special provisions, construct a mock-up before placing
the SCC.
The mock-up must demonstrate that the SCC will:
1. Flow for the distance required by the proposed construction procedure
2. Completely fill the forms
3. Encapsulate the reinforcement and embedments
Prequalify the SCC mix design before constructing the mock-up.
The mock-up forms must be similar to those used for the production elements. Include in the mock-up the
concrete, reinforcement, and concrete embedments shown and the authorized shop drawings, except the
reinforcement and embedments must stop 12 inches from both longitudinal ends of the mock-up.
The mock-up must simulate the flow of concrete for the maximum distance anticipated during production
or for a minimum of 10 feet if the anticipated flow travel is less than 10 feet.
Place the SCC in the mock-up in the Engineer's presence.
Take a test sample of at least 100 lb of concrete from within the forms at the discharge point and at the
point farthest from the discharge point. Determine the coarse aggregate content of each test sample
under California Test 529. The coarse aggregate content of the test samples must not differ from each
other by more than 8 pounds of aggregate per cubic foot of concrete.
Saw-cut the mock-up full-depth in the transverse direction approximately 2 feet from the end of the pour.
Voids or honeycombing in the SCC or between the concrete and embedded elements are not acceptable.
If the Engineer rejects the SCC placed in the mock-up, construct additional mock-ups until the SCC is
accepted by the Engineer.
Dispose of the mock-up.
90-5.01D(5) Field Quality Control
90-5.01D(5)(a) General
Reserved
90-5.01D(5)(b) Fine Aggregate Moisture Content
Determine the fine aggregate moisture content for each batch of SCC.
1000

SECTION 90

CONCRETE

90-5.01D(5)(c) Slump Flow and Visual Stability Index


At the start of SCC placement and whenever a set of concrete cylinders is prepared, determine the slump
flow and the visual stability index under ASTM C 1611.
90-5.02 MATERIALS
Section 90-1.02C(4) does not apply to SCC.

The minimum allowable slump flow is 20 inches. The slump flow must not vary by more than 3 inches

from the mix design slump flow.

The visual stability index must not exceed 1.

90-5.03 CONSTRUCTION
Not Used
90-5.04 PAYMENT
Not Used
90-690-9 RESERVED

1001

91 PAINT

91-1 GENERAL

91-1.01 GENERAL
Section 91-1 includes general specifications for furnishing paints used for highway construction.
91-1.02 SAMPLING AND TESTING
The Department tests samples of paint taken from the source. Do not use paint until authorized.
91-1.03 MANUFACTURING AND PACKAGING
Paint must be manufactured ready for application. Do not add materials such as thinner after
manufacture.
Paint containers must be:
1.
2.
3.
4.
5.
6.
7.
8.

New
Round
No more than 6 gallons in capacity
Standard full open head with bails
Nonreactive with contents
Equipped with compatible gaskets
Free of bungholes in the lids
Labeled with:
8.1. S
tate Specification number if described
8.2. Manufacturer's name, product number, and batch number
8.3. Date of manufacture
8.4. Precautions required by 8 CA Code of Regs 15011756 and 32003206 concerning the
handling and application of paint

91-1.04 MATERIALS
Paint must be homogeneous and free of contaminants. Paint must be smooth and any settled pigment
must be soft and easily dispersed before using.
Paint must retain the properties that affect its application, adhesion, and curing for at least 1 year after the
date of manufacture.
If a paint is designated by a State Specification number, you may obtain the paint specification from
METS.
Zinc-rich primer must be on the Authorized Material List.

91-2 PAINTS FOR METAL


91-2.01 GENERAL
Section 91-2 includes specifications for furnishing paint for metal.
91-2.02 EXTERIOR GRADE LATEX PAINT
Exterior grade latex paint must be approved by the manufacturer of the zinc rich primer.
Exterior grade latex paint must comply with SSPC-Paint 24 and the following:
1. When tested for 800 hours under ASTM D4587, test cycle 2, visible color change in the finish coat
must not occur
2. Vehicle must be an acrylic or modified acrylic copolymer with a minimum of necessary additives
91-3 PAINTS FOR TIMBER
91-3.01 GENERAL
Section 91-3 includes specifications for furnishing paint for timber.

1003

SECTION 91

PAINT

91-3.02 WOOD PRIMER, LATEX-BASE


Wood primer must be latex-base paint suitable for priming unpainted wood or exterior woodwork. Wood
primer must comply with the MPI detailed performance standards for exterior wood primers and be listed
on the MPI approved product list no. 6 for primer, latex for exterior wood.
91-3.03 PAINT, LATEX-BASE FOR EXTERIOR WOOD, WHITE AND TINTS
Latex base paint for exterior wood must comply with the MPI detailed performance standards for paint,
latex, exterior and must be listed on one of the MPI approved products lists shown in the following table:
MPI list no.
10
11
119

Category name
Latex, exterior flat (MPI gloss level 1)
Latex, exterior semi-gloss (MPI gloss level 5)
Latex, exterior, gloss (MPI gloss level 6)

You may use recycled paint. Recycled paint must comply with the MPI detailed performance standards
for paint, latex, exterior and must be listed on one of the following MPI approved products lists:
MPI list no.
10RR
10RC
15RR

Category name
Latex, recycled (remanufactured), exterior flat (G1)
Latex, recycled (consolidated), exterior flat (G1)
Latex, recycled (remanufactured), exterior, low sheen (G 3-4)

For unpainted wood, apply wood primer before paint.


91-4 MISCELLANEOUS PAINTS
91-4.01 GENERAL
Section 91-4 includes specifications for furnishing paint for materials other than metal or timber.
91-4.0291-4.04 RESERVED
91-4.05 PAINT, ACRYLIC EMULSION, EXTERIOR WHITE AND LIGHT AND MEDIUM TINTS
Acrylic emulsion paint for exterior masonry must comply with the MPI detailed performance standards for
saint, latex, exterior and must be listed on one of the following MPI approved products lists:
MPI list no.
10
11
119

Category name
Latex, exterior flat (MPI gloss level 1)
Latex, exterior semi-gloss (MPI gloss level 5)
Latex, exterior, gloss (MPI gloss level 6)

Acrylic emulsion paint may be tinted by using universal or all-purpose concentrates.

1004

92 ASPHALTS

92-1.01 GENERAL
92-1.01A Summary
Section 92 includes specifications for producing, mixing, and applying asphalts.
92-1.01B Definitions
Reserved
92-1.01C Submittals
Reserved
92-1.01D Quality Control and Assurance
92-1.02D(1) General
Reserved
92-1.01D(2) Certification
Certification for asphalt must comply with the Department's Certification Program for Suppliers of Asphalt.
For program requirements, procedures, and a list of authorized material sources, go to the METS Web
site.
92-1.01D(3) Sampling
A sampling device must be located in the asphalt feed line connecting the plant storage tanks to the
asphalt weighing system or spray bar. The sampling device must be accessible from 24 to 30 inches
above the platform. Provide a receptacle for flushing the sampling device.
The valve for the sampling device must be 1/2 to 3/4 inch in diameter and must allow a 1-quart sample to
be taken slowly at any time during plant activities.
In the Engineer's presence, take two 1-quart samples per day during plant activities for the project.
Sample containers must be 1-quart capacity and include round friction-top lids.
92-1.02 MATERIALS
92-1.02A General
Asphalt must consist of refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt
prepared from crude petroleum. Asphalt must not include residues caused by artificial distillation of coal,
coal tar, or paraffin. Asphalt must be homogenous and free of water.
92-1.02B Grades
PG asphalt binder must comply with the requirements shown in the following table:

1005

SECTION 92

ASPHALTS

Property

Flash point, min C


Solubility, min %b
Viscosity at 135Cc,
max, Pas
Dynamic shear,
Test temperature at 10
rad/s, C
min G*/sin(delta), kPa
RTFO teste,
mass loss, max, %
Dynamic shear,
Test temperature at 10
rad/s, C
min G*/sin(delta), kPa
Ductility at 25C
min, cm
PAVf,
Test temperature, C

PG Asphalt Binder
AASHTO
Test
PG
PG
Method
6410
5822a
Original Binder
T 48
230
230
T 44
99
99
T 316

T 315

PG
6428

PG
7010

230
99

230
99

230
99

3.0

3.0

3.0

3.0

3.0

58
1.00

64
1.00

64
1.00

64
1.00

70
1.00

1.00

1.00

1.00

T 240

1.00
1.00
RTFO Test Aged Binder

T 315

Grade
PG
6416

58
2.20

64
2.20

64
2.20

64
2.20

70
2.20

75

75

75

75

75

100
100
100
RTFO Test and PAV Aged Binder

100

110

T 51
R 28

Dynamic shear,
Test temperature at 10
T 315
31d
28d
22d
34d
rad/s, C
22d
5000
5000
5000
5000
5000
max G*sin(delta), kPa
Creep stiffness,
Test temperature, C
-12
0
-6
-18
0
T 313
max S-value, MPa
300
300
300
300
300
min M-value
0.300
0.300
0.300
0.300
0.300
a
Use as asphalt rubber base stock for high mountain and high desert area.

b
The Engineer waives this specification if the supplier is an authorized material source as

defined by the Department's Certification Program for Suppliers of Asphalt.

c
The Engineer waives this specification if the supplier provides written certification the asphalt

can be adequately pumped and mixed at temperatures meeting applicable safety standards.

d
Test the sample at 3 C higher if it fails at the specified test temperature. G*sin(delta) remains

5000 kPa maximum.

e
"RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven Test,

AASHTO Test Method T 240 or ASTM D 2872. The residue from mass change determination

may be used for other tests.

f
"PAV" means "Pressure Aging Vessel."

PG polymer modified asphalt binder must comply with the requirements shown in the following table:

1006

SECTION 92

ASPHALTS
PG Polymer Modified Asphalt Binder
Property

Flash point, min C


Solubility, min % b
Viscosity at 135Cd,
max, Pas
Dynamic shear,
Test temperature at 10
rad/s, C
min G*/sin(delta), kPa
RTFO testg,
Mass loss, max, %

PG
5834 PM

Grade
PG
6428 PM

PG
7622 PM

230
98.5

230
98.5

230
98.5

3.0

3.0

3.0

58
1.00

64
1.00

76
1.00

1.00

1.00

1.00

58
2.20

64
2.20

76
2.20

80e

80e

80e

25
75

25
75

25
65

100
RTFO Test and PAV Aged Binder

100

110

AASHTO Test Method


Original Binder
T 48
T 44c
T 316

T 315

T 240
RTFO Test Aged Binder

Dynamic shear,
Test temperature at 10
rad/s, C
min G*/sin(delta), kPa
Dynamic shear,
Test temperature at 10
rad/s, C
max (delta), %
Elastic recoveryf,
Test temperature C
min recovery, %
PAVh,
temperature, C

T 315

T 315

T 301
R 28

Dynamic shear,
Test temperature at 10
T 315
rad/s, C
16
22
31
max G*sin(delta), kPa
5000
5000
5000
Creep stiffness,
Test temperature, C
-24
-18
-12
T 313
max S-value, MPa
300
300
300
min M-value
0.300
0.300
0.300
a
Do not modify PG Polymer Modified using polyphosphoric acid modification.
b
The Engineer waives this specification if the supplier is an Approved Supplier as defined by
the Department's Certification Program for Suppliers of Asphalt.
c
The Department allows ASTM D 5546 instead of AASHTO T 44
d
The Engineer waives this specification if the supplier provides written certification the asphalt
can be adequately pumped and mixed at temperatures meeting applicable safety standards.
e
Test temperature is the temperature at which G*/sin(delta) is 2.2 kPa. A graph of log
G*/sin(delta) plotted against temperature may be used to determine the test temperature when
G*/sin(delta) is 2.2 kPa. A graph of (delta) versus temperature may be used to determine delta
at the temperature when G*/sin(delta) is 2.2 kPa. The graph must have at least two points that
envelope G*/sin(delta) of 2.2 kPa and the test temperature must not be more than 6 degree C
apart. The Engineer also accepts direct measurement of (delta) at the temperature when
G*/sin(delta) is 2.2 kPa.
f
Tests without a force ductility clamp may be performed.
g
"RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven Test,
AASHTO Test Method T 240 or ASTM D 2872. The residue from mass change determination
may be used for other tests.
h
"PAV" means "Pressure Aging Vessel."

1007

SECTION 92

ASPHALTS

92-1.03 CONSTRUCTION
Heat and apply asphalt as specified for liquid asphalts under section 93. Do not heat asphalt to the point
where carbonized particles form.
92-1.04 PAYMENT
Asphalt will be paid for under other sections specifying construction requiring asphalt.
Whenever asphalt is a bid item paid for by weight, asphalt is measured as specified for determining the
weight of liquid asphalts under section 93.
Weight is determined from volumetric measurements if:
1. Partial loads are used
2. A mixing plant is not used and scales are not available within 20 miles
3. Asphalt is delivered in:
3.1. Calibrated trucks and each tank is accompanied by its measuring stick and calibration card
3.2. Trucks equipped with a vehicle tank meter and a calibrated thermometer that determines the
asphalt temperature at delivery
Whenever hot mix asphalt is produced from a mixing plant operating for only 1 project, volume is
measured by taking tank measurements at the start and at the end of the project. The tank must be
calibrated and equipped with a measuring stick and calibration card. Pay quantities must comply with the
following:
1. Before converting the volume to weight, the volume measured must be reduced to what the asphalt
would occupy at 60 degrees F.
2. Two hundred thirty-five gal/ton and 8.51 lb/gal must be used for the average weight and volume for
both PG and PG polymer modified grades of asphalt at 60 degrees F.
3. Conversion tables in section 93 must be used.

1008

93 LIQUID ASPHALTS

93-1.01 GENERAL
93-1.01A Summary
Section 93 includes specifications for mixing and applying liquid asphalt.
93-1.01B Submittals
Submit manufacturer's materials data for any materials shipment. Data must show results from tests.
If liquid asphalt is used before sampling and testing submit a certificate of compliance for each shipment
to the job site. Certificates of compliance must include:
1.
2.
3
4.
5.

Shipment number and shipment date


Source refinery, consignee, and destination
Type and description of material with specific gravity and quantity
Contract or purchase order number
Signature by the manufacturer of the material and a statement that the material complies with the
Contract

If no certificate of compliance is submitted, do not use liquid asphalt until authorized.


93-1.01C Quality Control and Assurance
Reserved
93-1.02 MATERIALS
SC liquid asphalt must consist of natural crude oils or residual oils from crude petroleum. SC grades must
comply with the requirements shown in the following table:
SC Liquid Asphalt
Property
Flash point, Cl.O.C., C min
Kinematic viscosity
at 60 C, square meter per second (x10-6)
Water, max %
Distillation: total distillate to 360 C,
percent volume
Tests on residue from distillation:
Kinematic viscosity test at 60 C,
square meter per
second (x10-8)
Heptane Xylene equivalent,
Max %a
Asphalt residue of 100 pen, min %
Ductility of asphalt residue at 25 C,
min mm
Solubility in Trichloroethylene, min %

Grade

Test
method
AASHTO
T48
AASHTO
T201
AASHTO
T55
AASHTO
T78
AASHTO
T201

SC-70

SC-250

SC-800

SC-3000

65

80

90

105

70-140

250-500

800-1600

3000-6000

0.5

0.5

0.5

0.5

10-30

4-20

2-12

0-5

4-70
8-85
20-140
AASHTO
T102
35
35
35
ASTM D243
50
60
70
AASHTO
T51
1000
1000
1000
AASHTO
T44
99.5
99.5
99.5
aNormal spot test and glass plate test repeated at end of 24-hour period will not be required.

40-350
35
80
1000
99.5

MC liquid asphalt must comply with the specifications for paving asphalt in section 92 fluxed or blended
with kerosene. MC asphalts must comply with the requirements shown in the following table:

1009

SECTION 93

LIQUID ASPHALTS
MC Liquid Asphalt
Property

AASHTO Test
Method

Grade

MC-70
MC-250 MC-800 MC-3000
Flash point (open tag), min C
T79
40
65
65
65
3000
Kinematic viscosity at 60 C, square
T201
70-140 250-500 800-1600
6000
meter per second (x10-6)
Water, max %
T55
0.2
0.2
0.2
0.2
Distillation percent by volume of total
distillate to 360 C:
To 225 C
T78
0-20
0-10
0-3
0-2
To 260 C
T78
20-60
15-55
0-35
0-15
To 315 C
T78
65-90
60-87
45-80
15-75
Residue from distillation to 360 C.
Volume percent of sample by difference,
min %
T78
55
67
75
80
Tests on residue from
distillation:
Penetration 25 C
T49
120-250 120-250 120-250 120-250
T51
1000
1000
1000
1000
Ductility, 25 C, min mma
Solubility in Trichloroethylene, min %
T44
99.5
99.5
99.5
99.5
T102
35
35
35
35
Heptane Xylene equivalent, max %b
aIf penetration of residue is more than 200 and its ductility at 25 C is less than 1000, the material will be
acceptable if its ductility at 15 C is equal to or more than 1000.
bNormal

spot test and glass plate test repeated at end of 24 hour period will not be required.

93-1.03 CONSTRUCTION
93-1.03A General
Do not overspray liquid asphalts on existing facilities in the roadway including:
1.
2.
3.
4.

A
djacent pavements
The portion of the traveled way being used by traffic
Structures, railings and barriers, and markers
Trees and shrubbery that are not to be removed, adjacent property, and improvements

93-1.03B Mixing
Heat liquid asphalt by a retort or by steam coils in a manner that prevents steam from being introduced
directly into the liquid asphalt during heating. Furnish a thermometer for determining the temperature of
the liquid asphalt being applied. The thermometer must be available at all times.
Apply various grades of liquid asphalt at temperatures within the limits indicated in the following table and
under the following conditions:
1. If liquid asphalt is mixed with aggregate, the aggregate temperature, at the time of adding the liquid
asphalt, must not exceed the maximum shown in the column for pugmill mixing temperatures.
2. Liquid asphalt loaded into tank cars or trucks for transportation to the job site must not exceed the
maximum temperatures shown in the table column for distributor application temperature unless
authorized.

1010

SECTION 93

LIQUID ASPHALTS
Application Temperatures of Liquid Asphalts
Pug mill mixing
Distributor application
Grade of
temperature
temperature
liquid
of aggregate
asphalt
max F
min F
max F
SC-70
-105
175
SC-250
200
140
230
SC-800
225
175
255
SC-3000
260
215
290
MC-70
-105
175
MC-250
200
140
230
MC-800
225
175
255
MC-3000
260
215
290

93-1.03C Application
Distributor trucks must comply with the following requirements:
1.
2.
3.
4.
5.
6.
7.

8.

Be equipped with a pressure type system with insulated tanks.


Spray bars must have a minimum length of 9 feet and be the full circulating type.
Spray bar extensions used to cover a greater width must be the full circulating type.
The spray bar must be adjustable to permit positioning at various heights above the surface to be
treated.
The spray bar valves must be operated by levers so that one or all valves may be quickly opened or
closed in one operation.
Cab controlled valves are permitted for application of seals. The valves controlling the flow from
nozzles must act positively to provide a uniform unbroken application of liquid asphalt on the surface.
The distributor truck must be equipped with devices and charts to provide for accurate and rapid
determination and control of liquid asphalt quantities being applied. Include an auxiliary wheel type
bitumeter that registers (1) speed in feet per minute, (2) trip by count, and (3) total distance in feet.
The distributor equipment must be (1) capable of producing a uniform application of liquid asphalt in
controlled amounts ranging from 0.02 to 1 gal/sq yd of surface and a pressure range from 25 to 75
psi. (2) equipped with a hose and nozzle for application to areas inaccessible to the distributor, and
(3) equipped with pressure gages and a thermometer for determining temperatures of the liquid
asphalt.

The use of gravity distributors is not permitted.


Maintain distributor and storage tanks at all times to prevent dripping of liquid asphalt from any part of the
equipment.
Applying liquid asphalt is not permitted whenever (1) the surface to be treated is damp, (2) weather
conditions are unsuitable, or (3) atmospheric temperature is below the minimum temperature specified for
the particular type of work.
Provide a satisfactory method of accurately measuring the volume of liquid asphalt in the storage tanks
and in each distributor unit at any time.
Dispose of excess liquid asphalt.
93-1.04 PAYMENT
The Department accepts railroad car weight as the basis for computing pay quantities for shipments of
liquid bituminous products if the material is not to be loaded into trucks and the loaded car is weighed on
track scales. Unless proven to be inaccurate, the tare stenciled on the car is used to determine the net
content. If bituminous products are weighed on track scales, submit weight tags to the Engineer. Do not
release the cars until inspected by the Engineer to determine that they are completely empty.
When hot mix asphalt is produced at a commercial plant, and when the product is not devoted to 1
project, and liquid asphalt is a separate bid item, the weight of liquid asphalt will be determined by
multiplying the weight of the hot mix asphalt by the following factor:
1011

SECTION 93

LIQUID ASPHALTS

x / (100 + x)
where:
x = the specified asphalt content expressed as percent of the weight of dry aggregate
When hot mix asphalt is produced at a commercial plant producing for only 1 project, the volume in the
plant tank is measured before project start and at the end of the project. The tank must be calibrated and
equipped with a measuring stick and calibration card.
Weight is determined from volumetric measurements if:
1. Partial loads are used
2. A mixing plant is not used and scales are not available within 20 miles
3. Liquid asphalt is delivered in:
3.1. Trucks and each tank is calibrated and accompanied by its measuring stick and calibration
card
3.2. Trucks equipped with a calibrated thermometer that determines the liquid asphalt temperature
at delivery and equipped with a vehicle tank meter
When quantities of liquid asphalt are determined from volumetric measurements, the measured volume is
reduced to the volume the material would occupy at 60 degrees F before converting the volume to weight
using the Conversion Table. SC and MC liquid asphalts of the same grade are considered to have equal
weight per volume.
Use the factors shown in the following table to convert volume to weight:
Average Weight And Volumes Of Liquid Asphalt
Grade of liquid
Gallons/ton at 60 F
Pounds/gallon at 60 F
asphalt
70
253
7.90
250
249
8.03
800
244
8.16
3000
240
8.30
Convert volumes of liquid asphalt products using the conversion table legend and conversion tables for
the following materials:
1. Liquid asphalt Grades 70 to 3000
2. Paving asphalt Grades PG 58-22, PG 64-10, PG 64-16, PG 64-28, and PG 70-10.
3. Paving asphalt, polymer modified, Grades PG 58-34 PM, PG 64-28 PM, and PG 76-22 PM
The following Conversion Table Legend applies to the Conversion Table:
Conversion Table Legend
t=observed temperature in degrees Celsius.

A=multiplier for reducing volumes to the basis of 60 F, for

asphalts with density at 60 F of 60.3 pcf or higher.

B=multiplier for reducing volumes to the basis of 60 F, for

asphalts with density at 60 F of from 53.1 to 60.2 pcf.

1012

SECTION 93

LIQUID ASPHALTS
t

-13 1.0257
-12 1.0253
-11 1.0250
-10 1.0246
-9 1.0243
-8 1.0239
-7 1.0236
-6 1.0232
-5 1.0228
-4 1.0225
-3 1.0221
-2 1.0218
-1 1.0214
0 1.0211
1 1.0207
2 1.0204
3 1.0200
4 1.0197
5 1.0193
6 1.0189
7 1.0186
8 1.0182
9 1.0179
10 1.0175
11 1.0172
12 1.0168
13 1.0165
14 1.0161
15 1.0158
16 1.0154
17 1.0151
18 1.0147
19 1.0144
20 1.0140
21 1.0136

B
1.0294
1.0290
1.0286
1.0282
1.0277
1.0273
1.0269
1.0265
1.0261
1.0257
1.0253
1.0249
1.0245
1.0241
1.0237
1.0233
1.0229
1.0225
1.0221
1.0217
1.0212
1.0208
1.0204
1.0200
1.0196
1.0192
1.0188
1.0184
1.0180
1.0176
1.0172
1.0168
1.0164
1.0160
1.0156

Conversion Table
t
A
B
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

1.0133
1.0129
1.0126
1.0122
1.0119
1.0115
1.0112
1.0108
1.0105
1.0101
1.0098
1.0094
1.0091
1.0087
1.0084
1.0080
1.0077
1.0073
1.0070
1.0066
1.0063
1.0059
1.0056
1.0052
1.0049
1.0045
1.0042
1.0038
1.0035
1.0031
1.0028
1.0024
1.0021
1.0017
1.0014

1013

1.0152
1.0148
1.0144
1.0140
1.0136
1.0132
1.0128
1.0124
1.0120
1.0116
1.0112
1.0108
1.0104
1.0100
1.0096
1.0091
1.0087
1.0083
1.0079
1.0075
1.0071
1.0067
1.0063
1.0059
1.0055
1.0051
1.0047
1.0043
1.0039
1.0035
1.0031
1.0027
1.0023
1.0019
1.0016

57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

1.0010
1.0007
1.0003
1.0000
0.9996
0.9993
0.9989
0.9986
0.9982
0.9979
0.9975
0.9972
0.9968
0.9965
0.9961
0.9958
0.9954
0.9951
0.9947
0.9944
0.9940
0.9937
0.9933
0.9930
0.9926
0.9923
0.9919
0.9916
0.9913
0.9909
0.9906
0.9902
0.9899
0.9895
0.9892

1.0012
1.0008
1.0004
1.0000
0.9996
0.9992
0.9988
0.9984
0.9980
0.9976
0.9972
0.9968
0.9964
0.9960
0.9956
0.9952
0.9948
0.9944
0.9940
0.9936
0.9932
0.9928
0.9924
0.9920
0.9916
0.9912
0.9908
0.9904
0.9900
0.9897
0.9893
0.9889
0.9885
0.9881
0.9877

SECTION 93

LIQUID ASPHALTS

92

0.9888
0.9885
0.9881
0.9878
0.9874
0.9871
0.9867
0.9864
0.9861
0.9857
0.9854
0.9850
0.9847
0.9843
0.9840
0.9836
0.9833
0.9830
0.9826
0.9823
0.9819
0.9816
0.9812
0.9809
0.9805
0.9802
0.9799
0.9795
0.9792
0.9788
0.9785
0.9781
0.9778
0.9774
0.9771

93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

Conversion TableContinued
B
t
A
B
t
0.9873
0.9869
0.9865
0.9861
0.9857
0.9853
0.9849
0.9845
0.9841
0.9837
0.9834
0.9830
0.9826
0.9822
0.9818
0.9814
0.9810
0.9806
0.9802
0.9798
0.9794
0.9790
0.9787
0.9783
0.9779
0.9775
0.9771
0.9767
0.9763
0.9759
0.9755
0.9751
0.9748
0.9744
0.9740

127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161

0.9768
0.9764
0.9761
0.9757
0.9754
0.9750
0.9747
0.9744
0.9740
0.9737
0.9733
0.9730
0.9726
0.9723
0.9720
0.9716
0.9713
0.9709
0.9706
0.9703
0.9699
0.9696
0.9692
0.9689
0.9685
0.9682
0.9679
0.9675
0.9672
0.9668
0.9665
0.9662
0.9658
0.9655
0.9651

1014

0.9736
0.9732
0.9728
0.9724
0.9720
0.9716
0.9713
0.9709
0.9705
0.9701
0.9697
0.9693
0.9689
0.9685
0.9682
0.9678
0.9674
0.9670
0.9666
0.9662
0.9658
0.9654
0.9651
0.9647
0.9643
0.9639
0.9635
0.9631
0.9627
0.9624
0.9620
0.9616
0.9612
0.9608
0.9604

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196

0.9648
0.9645
0.9641
0.9638
0.9634
0.9631
0.9628
0.9624
0.9621
0.9617
0.9614
0.9611
0.9607
0.9604
0.9600
0.9597
0.9594
0.9590
0.9587
0.9583
0.9580
0.9577
0.9573
0.9570
0.9567
0.9563
0.9560
0.9556
0.9553
0.9550
0.9546
0.9543
0.9540
0.9536
0.9533

0.9601
0.9597
0.9593
0.9589
0.9585
0.9581
0.9578
0.9574
0.9570
0.9566
0.9562
0.9558
0.9555
0.9551
0.9547
0.9543
0.9539
0.9535
0.9532
0.9528
0.9524
0.9520
0.9516
0.9513
0.9509
0.9505
0.9501
0.9497
0.9493
0.9490
0.9486
0.9482
0.9478
0.9474
0.9471

SECTION 93

LIQUID ASPHALTS

197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231

0.9529
0.9526
0.9523
0.9519
0.9516
0.9513
0.9509
0.9506
0.9503
0.9499
0.9496
0.9492
0.9489
0.9486
0.9482
0.9479
0.9476
0.9472
0.9469
0.9466
0.9462
0.9459
0.9456
0.9452
0.9449
0.9445
0.9442
0.9439
0.9435
0.9432
0.9429
0.9425
0.9422
0.9419
0.9415

Conversion TableContinued
B
t
A
B
t
0.9467
0.9463
0.9459
0.9455
0.9452
0.9448
0.9444
0.9440
0.9437
0.9433
0.9429
0.9425
0.9421
0.9418
0.9414
0.9410
0.9406
0.9403
0.9399
0.9395
0.9391
0.9387
0.9384
0.9380
0.9376
0.9372
0.9369
0.9365
0.9361
0.9357
0.9354
0.9350
0.9346
0.9342
0.9339

232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266

0.9412
0.9409
0.9405
0.9402
0.9399
0.9395
0.9392
0.9389
0.9385
0.9382
0.9379
0.9375
0.9372
0.9369
0.9365
0.9362
0.9359
0.9355
0.9352
0.9349
0.9345
0.9342
0.9339
0.9335
0.9332
0.9329
0.9325
0.9322
0.9319
0.9316
0.9312
0.9309
0.9306
0.9302
0.9299

1015

0.9335
0.9331
0.9327
0.9324
0.9320
0.9316
0.9312
0.9309
0.9305
0.9301
0.9297
0.9294
0.9290
0.9286
0.9283
0.9279
0.9275
0.9271
0.9268
0.9264
0.9260
0.9256
0.9253
0.9249
0.9245
0.9242
0.9238
0.9234
0.9230
0.9227
0.9223
0.9219
0.9216
0.9212
0.9208

267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301

0.9296
0.9292
0.9289
0.9286
0.9282
0.9279
0.9276
0.9273
0.9269
0.9266
0.9263
0.9259
0.9256
0.9253
0.9249
0.9246
0.9243
0.9240
0.9236
0.9233
0.9230
0.9226
0.9223
0.9220
0.9217
0.9213
0.9210
0.9207
0.9203
0.9200
0.9197
0.9194
0.9190
0.9187
0.9184

0.9204
0.9201
0.9197
0.9193
0.9190
0.9186
0.9182
0.9179
0.9175
0.9171
0.9168
0.9164
0.9160
0.9156
0.9153
0.9149
0.9145
0.9142
0.9138
0.9134
0.9131
0.9127
0.9123
0.9120
0.9116
0.9112
0.9109
0.9105
0.9101
0.9098
0.9094
0.9090
0.9087
0.9083
0.9079

SECTION 93

LIQUID ASPHALTS

302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336

0.9180
0.9177
0.9174
0.9171
0.9167
0.9164
0.9161
0.9158
0.9154
0.9151
0.9148
0.9144
0.9141
0.9138
0.9135
0.9131
0.9128
0.9125
0.9122
0.9118
0.9115
0.9112
0.9109
0.9105
0.9102
0.9099
0.9096
0.9092
0.9089
0.9086
0.9083
0.9079
0.9076
0.9073
0.9070

Conversion TableContinued
B
t
A
B
t
0.9076
0.9072
0.9068
0.9065
0.9061
0.9058
0.9054
0.9050
0.9047
0.9043
0.9039
0.9036
0.9032
0.9028
0.9025
0.9021
0.9018
0.9014
0.9010
0.9007
0.9003
0.8999
0.8996
0.8992
0.8988
0.8985
0.8981
0.8978
0.8974
0.8970
0.8967
0.8963
0.8960
0.8956
0.8952

337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371

0.9066
0.9063
0.9060
0.9057
0.9053
0.9050
0.9047
0.9044
0.9040
0.9037
0.9034
0.9031
0.9027
0.9024
0.9021
0.9018
0.9014
0.9011
0.9008
0.9005
0.9002
0.8998
0.8995
0.8992
0.8989
0.8985
0.8982
0.8979
0.8976
0.8973
0.8969
0.8966
0.8963
0.8960
0.8956

1016

0.8949
0.8945
0.8942
0.8938
0.8934
0.8931
0.8927
0.8924
0.8920
0.8916
0.8913
0.8909
0.8906
0.8902
0.8898
0.8895
0.8891
0.8888
0.8884
0.8880
0.8877
0.8873
0.8870
0.8866
0.8863
0.8859
0.8855
0.8852
0.8848
0.8845
0.8841
0.8838
0.8834
0.8830
0.8827

372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406

0.8953
0.8950
0.8947
0.8944
0.8940
0.8937
0.8934
0.8931
0.8928
0.8924
0.8921
0.8918
0.8915
0.8911
0.8908
0.8905
0.8902
0.8899
0.8895
0.8892
0.8889
0.8886
0.8883
0.8880
0.8876
0.8873
0.8870
0.8867
0.8864
0.8860
0.8857
0.8854
0.8851
0.8848
0.8844

0.8823
0.8820
0.8816
0.8813
0.8809
0.8806
0.8802
0.8798
0.8795
0.8791
0.8788
0.8784
0.8781
0.8777
0.8774
0.8770
0.8767
0.8763
0.8760
0.8756
0.8752
0.8749
0.8745
0.8742
0.8738
0.8735
0.8731
0.8728
0.8724
0.8721
0.8717
0.8714
0.8710
0.8707
0.8703

SECTION 93

LIQUID ASPHALTS

407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441

0.8841
0.8838
0.8835
0.8832
0.8829
0.8825
0.8822
0.8819
0.8816
0.8813
0.8809
0.8806
0.8803
0.8800
0.8797
0.8794
0.8790
0.8787
0.8784
0.8781
0.8778
0.8775
0.8771
0.8768
0.8765
0.8762
0.8759
0.8756
0.8752
0.8749
0.8746
0.8743
0.8740
0.8737
0.8734

Conversion TableContinued
B
t
A
B
t
0.8700
0.8696
0.8693
0.8689
0.8686
0.8682
0.8679
0.8675
0.8672
0.8668
0.8665
0.8661
0.8658
0.8654
0.8651
0.8647
0.8644
0.8640
0.8637
0.8633
0.8630
0.8626
0.8623
0.8619
0.8616
0.8612
0.8609
0.8605
0.8602
0.8598
0.8595
0.8591
0.8588
0.8584
0.8581

442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476

0.8730
0.8727
0.8724
0.8721
0.8718
0.8715
0.8711
0.8708
0.8705
0.8702
0.8699
0.8696
0.8693
0.8689
0.8686
0.8683
0.8680
0.8677
0.8674
0.8671
0.8667
0.8664
0.8661
0.8658
0.8655
0.8652
0.8649
0.8646
0.8642
0.8639
0.8636
0.8633
0.8630
0.8627
0.8624

1017

0.8578
0.8574
0.8571
0.8567
0.8564
0.8560
0.8557
0.8553
0.8550
0.8546
0.8543
0.8540
0.8536
0.8533
0.8529
0.8526
0.8522
0.8519
0.8515
0.8512
0.8509
0.8505
0.8502
0.8498
0.8495
0.8491
0.8488
0.8485
0.8481
0.8478
0.8474
0.8471
0.8467
0.8464
0.8461

477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511

0.8621
0.8617
0.8614
0.8611
0.8608
0.8605
0.8602
0.8599
0.8596
0.8593
0.8589
0.8586
0.8583
0.8580
0.8577
0.8574
0.8571
0.8568
0.8565
0.8561
0.8558
0.8555
0.8552
0.8549
0.8546
0.8543
0.8540
0.8537
0.8534
0.8530
0.8527
0.8524
0.8521
0.8518
0.8515

0.8457
0.8454
0.8450
0.8447
0.8443
0.8440
0.8437
0.8433
0.8430
0.8426
0.8322
0.8318
0.8315
0.8311
0.8308
0.8406
0.8403
0.8399
0.8396
0.8392
0.8389
0.8386
0.8382
0.8379
0.8376
0.8372
0.8369
0.8365
0.8362
0.8359
0.8355
0.8352
0.8348
0.8345
0.8342

SECTION 93

LIQUID ASPHALTS

512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536

0.8512
0.8509
0.8506
0.8503
0.8500
0.8496
0.8493
0.8490
0.8487
0.8484
0.8481
0.8478
0.8475
0.8472
0.8469
0.8466
0.8463
0.8459
0.8456
0.8453
0.8450
0.8447
0.8444
0.8441
0.8438

Conversion TableContinued
B
t
A
B
t
0.8338
0.8335
0.8332
0.8328
0.8325
0.8322
0.8318
0.8315
0.8311
0.8308
0.8305
0.8301
0.8298
0.8295
0.8291
0.8288
0.8285
0.8281
0.8278
0.8275
0.8271
0.8268
0.8265
0.8261
0.8258

537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561

0.8435
0.8432
0.8429
0.8426
0.8423
0.8420
0.8417
0.8413
0.8410
0.8407
0.8404
0.8401
0.8398
0.8395
0.8392
0.8389
0.8386
0.8383
0.8380
0.8377
0.8374
0.8371
0.8368
0.8365
0.8362

1018

0.8255
0.8251
0.8248
0.8245
0.8241
0.8238
0.8235
0.8231
0.8228
0.8225
0.8221
0.8218
0.8215
0.8211
0.8208
0.8205
0.8201
0.8198
0.8195
0.8191
0.8188
0.8185
0.8182
0.8178
0.8175

562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586

0.8358
0.8355
0.8352
0.8349
0.8346
0.8343
0.8340
0.8337
0.8334
0.8331
0.8328
0.8325
0.8322
0.8319
0.8316
0.8313
0.8310
0.8307
0.8304
0.8301
0.8298
0.8295
0.8292
0.8289
0.8286

0.8172
0.8168
0.8165
0.8162
0.8158
0.8155
0.8152
0.8149
0.8145
0.8142
0.8139
0.8135
0.8132
0.8129
0.8126
0.8122
0.8119
0.8116
0.8112
0.8109
0.8106
0.8103
0.8099
0.8096
0.8093

94 ASPHALTIC EMULSIONS

94-1.01 GENERAL
94-1.01A Summary
Section 94 includes specifications for mixing and applying asphaltic emulsion.
94-1.01B Submittals
If the polymer content of polymer modified asphaltic emulsion is determined under California Test 401, submit a
1-quart sample each of the base asphalt and the polymer. Submit samples to METS at least 10 days before
beginning work using the asphaltic emulsion.
Submit manufacturer's materials data for any materials shipment. Data must show results from tests.
If asphaltic emulsion is used before sampling and testing submit a certificate of compliance for each shipment to
the job site. Certificates of compliance must include the following:
1.
2.
3
4.
5.

Shipment number and shipment date


Source refinery, consignee, and destination
Type and description of material with specific gravity and quantity
Contract or purchase order number
Signature by the manufacturer of the material and a statement that the material complies with the Contract

If no certificate of compliance is submitted, do not use asphaltic emulsion until authorized.


94-1.01C Quality Control and Assurance
Sample asphaltic emulsion under AASHTO T 40.
Store samples in clean and airtight sealed containers. Storage temperature must be at least 40 degrees F until
tested.
94-1.02 MATERIALS
Asphaltic emulsions must be composed of a bituminous material uniformly emulsified with water and an
emulsifying or a stabilizing agent. Polymer modified asphaltic emulsion must also contain a polymer.
Asphaltic emulsion must be homogeneous. Within 30 days after delivery and if freezing has not caused
separation, the asphaltic emulsion must be homogeneous after thorough mixing.
Polymer used to manufacture polymer modified asphaltic emulsion must be a type that results in the test values
shown
When tested under AASHTO T 59, unless otherwise noted, properties of asphaltic emulsion must comply with the
requirements for the types and grades in the following 4 tables:

1019

1020

200
---

--
-
-

-400
5
1
-

100e 200 100e


400
-400
97.5
-97.5

-
0.10
--

-75
-
-
60

-
0.10
--

--
--

100
-
5
1
-

-
-63

-
-55

20
-
-
-
60

100
-
5
1
-

100
400
97.5

200
---

good
fair
fair
fair
-
-
-0.10
55
--

20
-
-
-
-

--
5
1
-

100
400
97.5

200
---

good
fair
fair
fair
-
-
-0.10
65
--

100
-
-
-
-

--
5
1
-

40
400
97.5

90
-
--

good
fair
fair
fair
-
-
-0.10
65
-

100
-
-
-
-

100
400
97.5

-
-57

20
-
-
-
-
--
--

200
---

2.0
0.10
--

100
-
5
1
-

40
400
97.5

-
-57

20
-
-
-
-
-----

90
---

2.0
0.10
--

100
-5
1
--

Slow-Setting
SS1
SS1h
min max min max

1020

A harder base asphalt meeting current paving asphalt specifications may be specified if the test requirements on the residue from distillation
are waived.

The demulsibility test must be made within 30 days from date of shipment.

The Engineer may require settlement tests from the time the sample is received until the asphaltic emulsion is used if the elapsed time is less
than 5 days. Settlement tests may be waived when the asphaltic emulsion is used in less than 5 days.
c
The 24-hour storage stability test may be used instead of the 5-day settlement test

Properties
Tests on emulsions:
Saybolt Furol Viscosity, @ 25 C, SFSa
Saybolt Furol Viscosity, @ 50 C, SFSa
Settlement, 5 days, %b
Storage stability test, 1 day, %c
Demulsibility, 35 ml, 0.02 N CaCl2, %d
Coating ability and water resistance:
Coating, dry aggregate
Coating, after spraying
Coating, wet aggregate
Coating, after spraying
Cement mixing test, %
Sieve test, %
Residue by distillation, %
Tests on residue from distillation test:
Penetration, 25 C
Ductility, 25 C, 50 mm/minute, mm
Solubility in trichloroethylene, %
a
SFS means Saybolt Furol seconds

TABLE I: Requirements for Anionic Asphaltic Emulsion


Type
Rapid-Setting
Medium-Setting
Grade
RS1
RS2
MS1
MS2
MS2h
min max min max min max min max min max

1021

Slow-Setting
CSS1
CSS1h
min max min max

1021

Properties
Tests on emulsions:
Saybolt Furol Viscosity, @ 25 C, SFS a
-
-
-
-
-
-
-
-
-
-
20 100 20 100
Saybolt Furol Viscosity, @ 50 C, SFS a
20 100 100 400 50 450 50 450 50 450
----Settlement, 5 days, %b
-
5
-
5
-
5
-
5
-
5
-
5
-
5
Storage stability test, 1 day, %c
-
1
-
1
-
1
-
1
-
1
-
1
-
1
Demulsibility, 35 ml, 0.8% sodium dioctyl
40
-
40
-
-
-
-
-
-
-
-
-
-
-sulfosuccinate, %d
Coating ability and water resistance:
Coating, dry aggregate
--good
good
good
--Coating, after spraying
-
-
fair
fair
fair
-
-Coating, wet aggregate
--
fair
fair
fair
--Coating, after spraying
-
-
fair
fair
fair
-
-Particle charge test
positive
positive
positive
positive
positive
positivef
positivef
Sieve test, %
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
-0.10
Cement mixing test, %
-
-
-
-
-
-
-
-
-
-
-
2.0
-
2.0
Distillation:
Oil distillate by vol. of emulsion, %
-3
-3
-20
-12
-
12
----Residue, %
60
-65
-60
-
65
-65
-57
-57
-Tests on residue from distillation test:
Penetration, 25 C
100e 250 100e 250 100 250 100 250 40
90 100 250 40
90
Ductility, 25 C, 50 mm/min, mm
400
-400
-400
-400
-400
-400
-400
-Solubility in trichloroethylene, %
97.5
-97.5
-97.5
-97.5
-97.5
-97.5
-97.5
-a
Means Saybolt Furol seconds

b
The Engineer may require settlement tests from the time the sample is received until the asphaltic emulsion is used if the elapsed time is less

than 5 days. Settlement tests may be waived when the asphaltic emulsion is used in less than 5 days.

c
The 24-hour storage stability test may be used instead of the 5-day settlement test.

d
The demulsibility test must be made within 30 days from date of shipment.

e
A harder base asphalt in compliance with the paving asphalt specifications may be specified if the test requirements on the residue from

distillation are waived.

f
Must comply with a pH requirement of 6.7 maximum (ASTM E 70) if the particle charge test result is inconclusive.

TABLE 2: Requirements for Cationic Asphaltic Emulsion


Type
Rapid-Setting
Medium-Setting
Grade
CRS1
CRS2
CMS2S
CMS2
CMS2h
min max min max min max min max min max

SECTION 94

ASPHALTIC EMULSIONS

TABLE 3: Requirements for Polymer Modified Asphaltic Emulsion


Type
Anionic
Cationic
Grade PMRS2
PMRS2h PMCRS2 PMCRS2h
Properties
min max min max min max min max
Tests on emulsions:
Test Method
-
-75 300 75 300 75 300 75 300
Saybolt Furol Viscosity,
@ 50 C, SFS a
Settlement, 5 days, %
-5
-5
-5
-5
Storage Stability, 1 day,
-
1
-
1
-
1
-
1
AASHTO T 59
%
Sieve Test, %
-- 0.30 -
0.30 -- 0.30
-0.30
Demulsibility, %
60b
-
60b
-
40c
-
40 c
-Particle Charge
-
-Positive
Positive
Ash Content, %
ASTM D 3723
-0.2
-0.2
-0.2
-0.2
Residue by
California Test
65
-65
-65
-65
-Evaporation, %
331
Test on residue from
California Test
-
-evaporation test:
331
Penetration, 25C
AASHTO T 49 100 200 40
90 100 200 40
90
Ductility, 25C, mm
AASHTO T 51 400
-400
-400
-400
-and either:
-Torsional recovery, California Test
18
-18
-18
-18
-%
332
or
-California Test
2.5
-2.5
-2.5
-2.5
-Polymer content,
401
5% (by weight)d
a
Means Saybolt Furol seconds
b
Use 35 ml of 0.02 N CaCL2 solution
c
Use 35 ml of 0.8% sodium dioctyl sulfosuccinate solution
d
See sampling requirements specified in 94-1.01C and 94-1.01D.

1022

SECTION 94

ASPHALTIC EMULSIONS

TABLE 4: Requirements for Quick-Setting Asphaltic Emulsion


Type
Grade

Anionic
QS1
QS1h
min max min max
-
15
90
15
90

Cationic
CQS1
CQS1h
min max min max
-15
90
15
90

Properties
Tests on emulsions:
Test Method
Saybolt Furol
Viscosity, @ 50 C,
SFS a
Sieve test, %
-0.30
-
0.30
-0.30
-0.30
Storage stability, 1
-
1
-
1
-
1
-
1
AASHTO T 59
day, %
Residue by
57
-57
-57
-57
-distillation, %
negative
negative
positive
positive
Particle chargeb
Tests on Residue from
-
-
-Distillation Test:
Penetration, 25C
AASHTO T 49
100 200 40
90 100 200 40
90
Ductility, 25C, mm
AASHTO T 51
400
-400
-400
-400
-Solubility in
AASHTO T 44
97
-97
-97
-97
-trichloroeythylene, %
a
Means Saybolt Furol seconds
bIf the result of the particle charge test is inconclusive, the asphaltic emulsion must be tested for
pH under ASTM E 70. Grade QS1h asphaltic emulsion must have a minimum pH of 7.3. Grade
CQS1h asphaltic emulsion must have a maximum ph of 6.7.
94-1.03 CONSTRUCTION
Asphaltic emulsion may be reheated if necessary. After loading into a tank car or truck for transport to the
job site, do not heat asphaltic emulsion above 160 degrees F. During reheating agitate the asphaltic
emulsion to prevent localized overheating.
Apply asphaltic emulsion under section 93.
Except when used for fog seal coats, apply Setting Grade 1 asphaltic emulsions at a temperature from 75
to 130 degrees F and apply Setting Grade 2 asphaltic emulsions from 110 to 185 degrees F.
Asphaltic emulsion must not cool to a temperature below 40 degrees F.
94-1.04 PAYMENT
Asphaltic emulsion is measured by weight under the specifications requiring its use not including the
deducted weight of water if used.
Asphaltic emulsion quantities are determined as specified for liquid asphalts under section 93 except for
volumetric measurement to determine pay quantities.
Weight is determined from volumetric measurements if:
1. Partial loads are used
2. A mixing plant is not used and scales are not available within 20 miles
3. Asphaltic emulsion is delivered in:
3.1. Trucks with each tank calibrated accompanied by its measuring stick and calibration card
3.2. Trucks equipped with a calibrated thermometer that determines the asphaltic emulsion

temperature at delivery and equipped with a vehicle tank meter

For asphaltic emulsion determined from volumetric measurements, the measured volume is reduced to
the volume the material would occupy at 60 degrees F before converting the volume to weight using the
values in the table titled "Conversion Table."

1023

SECTION 94

ASPHALTIC EMULSIONS

Convert volume to weight using the factors shown in the following table:
Average Weight and Volume of Asphaltic Emulsion
Type of
Gallons/Ton
Pounds/Gallon
asphaltic emulsion
at 60 F
60 F
All types
240
8.33
Conversion Table
M
t
M
t
M
t
0.98850
106
0.99425
83
1.00000
60
0.98825
107
0.99400
84
0.99975
61
0.98800
108
0.99375
85
0.99950
62
0.98775
109
0.99350
86
0.99925
63
0.98750
110
0.99325
87
0.99900
64
0.98725
111
0.99300
88
0.99875
65
0.98700
112
0.99275
89
0.99850
66
0.98675
113
0.99250
90
0.99825
67
0.98650
114
0.99225
91
0.99800
68
0.98625
115
0.99200
92
0.99775
69
0.98600
116
0.99175
93
0.99750
70
0.98575
117
0.99150
94
0.99725
71
0.98550
118
0.99125
95
0.99700
72
0.98525
119
0.99100
96
0.99675
73
0.98500
120
0.99075
97
0.99650
74
0.98475
121
0.99050
98
0.99625
75
0.98450
122
0.99025
99
0.99600
76
0.98425
123
0.99000
100
0.99575
77
0.98400
124
0.98975
101
0.99550
78
0.98375
125
0.98950
102
0.99525
79
0.98350
126
0.98925
103
0.99500
80
0.98325
127
0.98900
104
0.99475
81
0.98300
128
0.98875
105
0.99450
82
t = observed temperature in degrees Fahrenheit
M = multiplier for reducing volumes to the basis of 60 F

1024

t
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151

M
0.98275
0.98250
0.98225
0.98200
0.98175
0.98150
0.98125
0.98100
0.98075
0.98050
0.98025
0.98000
0.97975
0.97950
0.97925
0.97900
0.97875
0.97850
0.97825
0.97800
0.97775
0.97750
0.97725

95 EPOXY

95-1 GENERAL

95-1.01 DESCRIPTION

Section 95-1 includes general specifications for mixing and applying epoxy for highway construction.
Furnish epoxy as 2 components and mix them together at the job site.
The 2 proportioned epoxy components define a kit when packaged together.
95-1.02 SAMPLING AND TESTING
Submit a certificate of compliance for epoxy.
95-1.03 PACKAGING, LABELING, AND STORING
Each component must be packaged in a container of a size that complies with the epoxy manufacturer's
instructions for proportions.
Component containers must be sealed and not leak. Containers must not react with components.
The container for each component must be clearly labeled by the epoxy manufacturer with the following
information:
1.
2.
3.
4.
5.
6.
7.
8.

ASTM C 881/C 881M class and type


Component designation, A or B
Manufacturer's name
Manufacture date
Batch number
Expiration date
Directions for use
Warnings or precautions required by State and federal laws and regulations

Store components at temperatures greater than 35 degrees F.


95-1.04 DIRECTION FOR USE
Mix and apply the epoxy under the manufacturer's instructions.
Do not use a component if any of the following occur:
1. Evidence of crystallization or thickening
2. Settled pigments that cannot be readily dispersed with a paddle
3. Component is older than the manufacturer's recommended expiration date
Thoroughly stir each component before mixing a kit. Do not mix partial kits. Do not add solvents.
Automatic mixing equipment must have positive displacement pumps and be capable of metering a 2
component mix in the specified ratio 5 percent by volume of either component.
Mix the 2 components until no trace of black or white streaks is present in the mixed epoxy.
Clean surfaces to receive the epoxy of rust, paint, grease, asphalt, loose, and deleterious material. Apply
the epoxy and place materials to be bonded before the epoxy starts to thicken. Do not use epoxy that has
exceeded its working life.
95-2 TYPES OF EPOXIES
95-2.01 EPOXY BINDER
Epoxy binder must be low viscosity epoxy formulated primarily for use in:
1. Making HS epoxy concrete and epoxy mortar
2. Pressure grouting cracks in concrete
For load bearing applications, the epoxy must comply with ASTM C 881/C 881M, Type IV, Grade 1, Class
B or C.
1025

SECTION 95

EPOXY

For nonload bearing applications, the epoxy must comply with ASTM C 881/C 881M, Type I, Grade 1,
Class B or C.
Use Class B whenever the surface temperature is from 40 to 60 degrees F. Use Class C whenever the
surface temperature is above 60 degrees F.
Thoroughly mix the components before adding aggregate if the epoxy is used as binder for HS epoxy
concrete or epoxy mortar. The mix proportions must be 1 part epoxy to 4 parts aggregate by volume.
Aggregate must be clean and have a moisture content of not more than 0.50 percent when tested under
California Test 226. Prime surfaces with epoxy immediately before placing epoxy concrete or mortar.
95-2.02 RESERVED
95-2.03 EPOXY ADHESIVE FOR BONDING FRESHLY MIXED CONCRETE TO HARDENED
CONCRETE
Epoxy adhesive for bonding freshly mixed concrete to hardened concrete must comply with ASTM C
881/C 881M, Type V, Grade 2, Class B or C.
Use Class B whenever the surface temperature is from 40 to 60 degrees F or if a faster cure is required.
Use Class C whenever the surface temperature is above 60 degrees F.
Coat the blast-cleaned concrete surface with epoxy using a brush or roller. Place freshly mixed concrete
while the epoxy is tacky. Apply a new coat of epoxy if the epoxy sets.
95-2.04 RAPID SET EPOXY ADHESIVE FOR PAVEMENT MARKERS
Rapid set epoxy adhesive for bonding pavement markers to concrete and HMA must comply with ASTM
C 881/C 881M, Type IV, Grade 3, Class B or C, except the gel time may be less than 30 minutes.
Use Class B whenever the surface temperature is from 40 to 60 degrees F. Use Class C whenever the
surface temperature is above 60 degrees F.
When tested under California Test 434, epoxy must comply with the requirements for the properties
shown in the following table:
Rapid Set Epoxy Adhesive For Pavement Markers
Property
Requirement
Gel time, minutes, maximum, at 77 F
30
Bond strength to concrete, minutes, maximum to reach not less
than 200 psi
at 77 2 F
35
at 50 2 F
45
Slant shear strength, minimum, psi
2 days at 77 2 F
1,000
14 days at 77 2 F, plus water soak
1,500
Tensile adhesion and cohesion, minimum, psi
Ceramic marker bottom
700
Ceramic marker bottom, including post cure
700
Retroreflective pavement marker bottom
500
Color of mixed epoxy
gray
a
86 F
Glass transition temperature , Tg, minimum
a
Before testing samples must be conditioned at 77 F for 24 hours under ASTM
D 4065
95-2.05 STANDARD SET EPOXY ADHESIVE FOR PAVEMENT MARKERS
Standard set epoxy adhesive for bonding pavement markers to concrete and HMA must comply with
ASTM C 881/C 881M, Type IV, Grade 3, Class B or C.
Use Class B whenever the surface temperature is from 40 to 60 degrees F. Use Class C whenever the
surface temperature is above 60 degrees F.

1026

SECTION 95

EPOXY

When tested under California Test 434, epoxy must comply with the requirements for the properties
shown in the following table:
Standard Set Epoxy Adhesive For Pavement Markers
Property
Requirement
Bond strength to concrete, time, maximum to reach not less
than 200 psi
at 77 2 F
3.5 hours
at 55 2 F
24 hours
Slant shear strength, minimum, psi
2 days at 77 2 F
1,000
14 days at 77 2 F, plus water soak
1,500
Tensile adhesion and cohesion, minimum, psi
Ceramic marker bottom
700
Ceramic marker bottom, including post cure
700
Reflective pavement marker bottom
500
Color of mixed components
gray
a
86 F
Glass transition temperature , Tg, minimum
a
Before testing samples must be conditioned at 77 F for 24 hours under
ASTM D 4065
95-2.0695-2.08 RESERVED
95-2.09 EPOXY SEALANT FOR INDUCTIVE LOOPS
The epoxy for sealing inductive loops and leads imbedded in HMA and concrete must comply with ASTM
C 881/C 881M, Type I, Grade 2.
When tested under California Test 434, epoxy sealant must comply with the values for the properties
shown in the following table:
Epoxy Sealant for Inductive Loops
Property
Tensile strengtha, minimum, psi
Elongationa, minimum, %
Shore D hardnessa, minimum
a
Test on a 0.125-inch cast sheet, cured 18 hours at 77 F plus 5
hours at 160 F

Value
400
90
45

95-2.10 RESERVED
95-2.11 EPOXY RESIN ADHESIVE FOR PRESSURE INJECTION GROUTING OF CONCRETE
PAVEMENT
Epoxy resin adhesive for injection grouting of concrete pavement must comply with the values for the
properties when tested as shown in the following table:

1027

SECTION 95

EPOXY

Epoxy Resin Adhesive for Injection Grouting of Concrete Pavement

Property
California Test 434
Value
Brookfield viscosity, no. 3 spindle at 20 rpm,
Part 4, "Brookfield Viscosity"
0.9
poise, maximum, at 77 F
Gel time, minutes
Part 1, "Gel Time"
215
Slant shear strength on dry concrete, minimum,
Part 5, "Slant Shear
3,000
psi, after 4 days of cure in air at 77 2 F
Strength"a
1,700
Slant shear strength on wet concrete, minimum,
Part 5, "Slant Shear
psi, after 4 days of cure in air at 77 2 F
Strength"a
Tensile strength, minimum, psi
Part 7, "Tensile Strength and
4,500
Elongation" except test after
4 days of cure at 77 2 F
Elongation, %, maximum
Part 7, "Tensile Strength and
10
Elongation" except test after
4 days of cure at 77 2 F
a
For slant shear strength on concrete, procedures B-1 and B-5 do not apply. Testing on dry
concrete must comply with item 2 listed in the following. Testing on wet concrete must comply
with both of the following:
1. Soak blocks in water for 24 hours at 77 2 F. Remove and wipe off excess water.
2. Apply a coat of epoxy 0.010 inch thick to each diagonal surface. Place 4 pieces of shim
stock on 1 block to control final film thickness. Shim stock pieces must be 0.12 by 0.125
inch and 0.012 inch thick. Before pressing the coated surfaces together, leave the blocks
such that the coated surfaces are horizontal until the epoxy reacts slightly to prevent
excessive flow.

9698 RESERVED

1028

DIVISION XI BUILDING CONSTRUCTION


99 BUILDING CONSTRUCTION
Reserved

1029

INDEX

Abandoning
foundations, electrical systems ............................................................................................................. 895

Abbreviations ................................................................................................................................................ 4

Abrasives

blast cleaning ........................................................................................................................................ 715

Access gates ............................................................................................................................................ 713

Access openings, bridge .......................................................................................................................... 228

Act of God ............................................................................................................................. 6, 8, 47, 62, 108

Activity .......................................................................................................................................................... 6

Addresses ............................................................................................................................................. 13, 14

Adjust

frames, covers, grates, and manholes .................................................................................................. 223

inlets...................................................................................................................................................... 223

Admixtures

dispensing liquid ................................................................................................................................... 982

types...................................................................................................................................................... 979

Aerially deposited lead ................................................................................................................................. 7

After initial roadside clearing, highway planting ....................................................................................... 323

Aggregate

coarse ................................................................................................................................................... 976

fine ........................................................................................................................................................ 976

grading .................................................................................................................................................. 977

minor concrete ...................................................................................................................................... 992

washing ................................................................................................................................................. 978

Aggregate bases....................................................................................................................................... 363

approach slabs ...................................................................................................................................... 620

compacting ............................................................................................................................................ 365

grade tolerance ..................................................................................................................................... 365

spreading .............................................................................................................................................. 364

subgrade ............................................................................................................................................... 364

Aggregate subbases ................................................................................................................................. 361

grade tolerance ..................................................................................................................................... 362

Agreements ................................................................................................................................................ 38

Air pollution control ................................................................................................................................... 208

Air quality .................................................................................................................................................. 208

Air release valve assembly....................................................................................................................... 312

Alternative dispute resolution ..................................................................................................................... 50

Alternative earth retaining systems .......................................................................................................... 534

Alternative pipe and pipe arch culverts .................................................................................................... 735

Alternative slotted pipe ............................................................................................................................. 735

Alternative sound wall systems ................................................................................................................ 713

American Wire Gage ................................................................................................................................ 905

Anchor assemblies, overside drains, steel ............................................................................................... 779

Anchorages

bridge mounted sign structures............................................................................................................. 690

Antitrust Claims........................................................................................................................................... 70

Applicable sections, bid items ...................................................................................................................... 1

Apprentices ................................................................................................................................................. 68

Approach slabs ......................................................................................................................................... 619

cementitious material content ............................................................................................................... 620

coefficient of friction .............................................................................................................................. 585

compressive strength ............................................................................................................................ 620

rapid strength concrete ......................................................................................................................... 619

smoothness ........................................................................................................................................... 585

Type N................................................................................................................................................... 621

1031

INDEX

Arbitration ....................................................................................................... 49, 50, 52, 113, 127, 128, 129

Archaeological monitor ............................................................................................................................. 205

Archaeological monitoring area ............................................................................................................ 7, 205

Archaeological resources ..................................................................................................................... 7, 205

Arches, structural metal plate ................................................................................................................... 763

Areas for use .............................................................................................................................................. 43

Armor-clad conductors, irrigation systems ............................................................................................... 290

Asbestos ................................................................................................................................................... 210

As-built drawings .................................................................................................................................. 17, 40

Asphalt

liquid.................................................................................................................................................... 1009

Asphalt binder................................................................................................................................... 411, 416

Asphalt modifier ........................................................................................................................................ 412

Asphalt rubber binder ....................................................................................................... 412, 413, 421, 423

Asphalt rubber binder design and profile .................................................................................................. 413

Asphalt treated

permeable base ............................................................................................................................ 379, 380

grade tolerance.................................................................................................................................. 381

spreading and compacting ................................................................................................................ 380

Asphalt treated permeable material.......................................................................................................... 774

Asphaltic emulsions ................................................................................................................................ 1019

applications ......................................................................................................................................... 1023

Asphaltic plug joint seals .......................................................................................................................... 608

Asphalts .................................................................................................................................................. 1005

Authorized Facility Audit List ...................................................................................................................... 61

Authorized laboratory...................................................................................................................... 7, 58, 120

Authorized Laboratory List .......................................................................................................................... 58

Authorized Material List .............................................................................................................................. 61

Authorized Material Source List.................................................................................................................. 61

Autotransformer and reactor type ballasts ............................................................................................... 942

B
Backfill
metal posts ............................................................................................................................................ 696

structure, cement treated, for slotted corrugated steel pipe ................................................................. 759

Backflow preventers, irrigation systems ................................................................................................... 288

Backplates, electrical systems.................................................................................................................. 929

Bald and Golden Eagle Protection Act ..................................................................................................... 206

Ball valves, irrigation system .................................................................................................................... 295

Ballasts

high pressure sodium lamps ................................................................................................................. 941

low pressure sodium lamps .................................................................................................................. 942

Bar reinforcement ..................................................................................................................................... 628

Barricades................................................................................................................................................. 143

Barriers ..................................................................................................................................................... 875

concrete ................................................................................................................................................ 876

thrie beam ............................................................................................................................................. 875

Base .............................................................................................................................................................. 7

Basement material ........................................................................................................................................ 7

Bases

aggregate ...................................................................................................................................... 363, 620

asphalt treated permeable .................................................................................................................... 379

cement treated ...................................................................................................................................... 367

cement treated permeable .................................................................................................................... 379

lean concrete......................................................................................................................................... 375

Battery backup system ............................................................................................................................. 917

Beacons, flashing ..................................................................................................................................... 935

Bending, reinforcement ............................................................................................................................ 629

1032

INDEX

Bent plates
steel structures ...................................................................................................................................... 673

Bid item......................................................................................................................................................... 7

Bid Item List ............................................................................................................................................ 7, 23

Bid items, applicable sections ...................................................................................................................... 1

Bidders

bonds ...................................................................................................................................................... 25

insurance................................................................................................................................................. 25

security .................................................................................................................................................... 27

Bidders' Exchange ...................................................................................................................................... 17

Bidders security .......................................................................................................................................... 23

Bidding........................................................................................................................................................ 17

Bids

document completion .............................................................................................................................. 23

document examination ............................................................................................................................ 22

opening ................................................................................................................................................... 24

protest ..................................................................................................................................................... 25

rejection................................................................................................................................................... 24

relief ........................................................................................................................................................ 24

rigging ..................................................................................................................................................... 24

submittal .................................................................................................................................................. 23

submittal failure history ........................................................................................................................... 24

tied .......................................................................................................................................................... 22

withdrawl ................................................................................................................................................. 24

Binder

geosynthetic pavement interlayer ......................................................................................................... 411

hot mix asphalt .............................................................................................................................. 411, 416

open graded friction course .................................................................................................................. 417

Binder, dust palliative ............................................................................................................................... 257

Biological resources ................................................................................................................................. 206

Bird protection........................................................................................................................................... 206

Bituminous seals....................................................................................................................................... 383

Blast cleaning ........................................................................................................................................... 716

painting.................................................................................................................................................. 715

Blasting, earthwork ................................................................................................................................... 262

Bolted connections

steel structures ...................................................................................................................................... 674

Bonding and grounding, electrical systems .............................................................................................. 912

Bonding materials ..................................................................................................................... 583, 586, 620

magnesium phosphate concrete ........................................................................................................... 586

modified high-alumina-based concrete ................................................................................................. 586

portland-cement-based concrete .......................................................................................................... 586

Bonds.......................................................................................................................................................... 15

Booster pump, irrigation systems ............................................................................................................. 289

Booster pumps.......................................................................................................................................... 825

Bracing, wood structures .......................................................................................................................... 702

Breakaway guard rail terminal posts ........................................................................................................ 868

Bridge ........................................................................................................................................................... 7

Bridge deck

grind ...................................................................................................................................................... 510

groove ................................................................................................................................................... 509

Bridge deck drainage system ................................................................................................................... 835

Bridge deck methacrylate resin treatment ................................................................................................ 233

Bridge joint restrainers .............................................................................................................................. 836

bar-type ................................................................................................................................................. 841

cable-type.............................................................................................................................................. 836

pipe-type ............................................................................................................................................... 841

Bridge mounted sign structures, anchorages ........................................................................................... 690

Bridge railings

1033

INDEX

cable ...................................................................................................................................................... 871

chain link railing..................................................................................................................................... 873

concrete ................................................................................................................................................ 872

metal ..................................................................................................................................................... 872

pipe handrailing ..................................................................................................................................... 873

steel ....................................................................................................................................................... 871

tubular metal ......................................................................................................................................... 872

Bridge rehabilitation .................................................................................................................................. 229

bridge deck methacrylate resin treatment ............................................................................................. 233

core and pressure grout dowels............................................................................................................ 240

core concrete ........................................................................................................................................ 239

epoxy crack injection ............................................................................................................................. 240

polyester concrete overlay .................................................................................................................... 236

polyester concrete overlay, expansion dams ........................................................................................ 239

prepare concrete deck surface ............................................................................................................. 229

rapid setting concrete patch .................................................................................................................. 230

refinish bridge deck ............................................................................................................................... 232

remove asphalt concrete surfacing ....................................................................................................... 230

remove chip seal ................................................................................................................................... 230

remove concrete deck surface .............................................................................................................. 230

remove unsound concrete .................................................................................................................... 230

repair spalled surface area ................................................................................................................... 231

Bridge removal.......................................................................................................................................... 225

access openings ................................................................................................................................... 228

protective covers ................................................................................................................................... 226

Bridges

wood...................................................................................................................................................... 700

Briquettes.................................................................................................................................................. 421

Building-construction contract ...................................................................................................................... 7

Buried man-made objects, earthwork ....................................................................................................... 260

Buy America ............................................................................................................................................... 57

C
Cable railing.............................................................................................................................................. 871

California company ..................................................................................................................................... 22

California Test......................................................................................................................................... 7, 59

Cam coupler assembly, irrigation system ................................................................................................. 297

Casings for bridges, miscellaneous drainage facilities ............................................................................. 787

Castings

carbon steel................................................................................................................................... 669, 672

gray iron ........................................................................................................................................ 669, 672

malleable iron ................................................................................................................................ 669, 672

Cast-in-place concrete piles ..................................................................................................................... 560

CIDH concrete piles .............................................................................................................................. 561

CISS concrete piles .............................................................................................................................. 571

driven steel shells filled with concrete ................................................................................................... 571

Cement ..................................................................................................................................................... 973

Cement mortar

reinforced concrete pipe joints .............................................................................................................. 749

Cement treated

permeable base .................................................................................................................................... 379

grade tolerance.................................................................................................................................. 381

spreading and compacting ................................................................................................................ 380

Cement treated bases .............................................................................................................................. 367

compacting ............................................................................................................................................ 371

construction joints ................................................................................................................................. 372

curing seal ............................................................................................................................................. 373

grade tolerance ..................................................................................................................................... 372

1034

INDEX

operation time requirement ................................................................................................................... 372

plant-mixed............................................................................................................................................ 369

road-mixed ............................................................................................................................................ 368

subgrade ............................................................................................................................................... 368

Cement treated permeable material ......................................................................................................... 774

Cement treated structure backfill for slotted corrugated steel pipe .......................................................... 759

Cementitious material content

concrete ................................................................................................................................................ 968

concrete structures ....................................................................................................... 586, 616, 617, 620

corrosive environment........................................................................................................................... 986

freeze-thaw area ................................................................................................................................... 987

minor concrete ...................................................................................................................................... 992

precast concrete ................................................................................................................................... 997

rapid strength concrete ......................................................................................................................... 587

Certificate of compliance ........................................................................................................................ 7, 61

Certifications ............................................................................................................................................... 38

Certified Industrial Hygienist ......................................................................................................................... 7

Certified payroll records .............................................................................................................................. 66

certify backflow preventers ....................................................................................................................... 288

Chain link

fence ..................................................................................................................................................... 854

Chain link railing ....................................................................................................................................... 873

Change Order ............................................................................................................................................. 29

approval .................................................................................................................................................. 29

bills .......................................................................................................................................................... 42

Change order work ....................................................................................................................................... 7

Changeable message signs, portable ...................................................................................................... 151

Changes ..................................................................................................................................................... 29

work character................................................................................................................................. 29, 124

Channelizers ............................................................................................................................................. 147

Charpy V-notch testing

structural steel ....................................................................................................................................... 671

Check testing ............................................................................................................................................ 664

Check valves, irrigation system ................................................................................................................ 296

Checks ........................................................................................................................................................ 15

Chemical adhesives ......................................................................................................................... 584, 585

CIDH concrete piles .................................................................................................................................. 561

CISS concrete piles .................................................................................................................................. 571

Class 1 surface finish ............................................................................................................................... 595

Class 2 surface finish ............................................................................................................................... 596

Class N steel pipe piles ............................................................................................................................ 556

Class R steel pipe piles ............................................................................................................................ 557

Cleanup ...................................................................................................................................................... 32

Clearing and grubbing .............................................................................................................................. 253

Closure ..................................................................................................................................................... 153

Closure schedule ...................................................................................................................................... 155

Coated welded steel pipe, miscellaneous drainage facilities ................................................................... 782

Coatings.................................................................................................................................................... 715

for structural steel ................................................................................................................................. 719

Code, regulations, and electrical systems ................................................................................................ 891

Cofferdams ............................................................................................................................................... 263

Colored concrete .............................................................................................................................. 587, 592

Commercial quality ....................................................................................................................................... 7

Commercial source....................................................................................................................................... 7

Compaction............................................................................................................................................... 273

Compaction equipment............................................................................................................................. 380

cement treated permeable bases ......................................................................................................... 380

seal coats .............................................................................................................................................. 387

Compaction equipment, earthwork ........................................................................................................... 276

1035

INDEX

Composite steel spiral rib pipe with smooth interior ................................................................................. 759

Compressive strength

concrete ........................................................................................................................................ 969, 972

concrete structures........................................................................................................................ 586, 620

minor concrete ...................................................................................................................................... 991

precast concrete.................................................................................................................................... 997

rapid strength concrete ................................................................................................................. 584, 587

self-consolidating concrete ................................................................................................................... 999

Concrete ................................................................................................................................................... 967

admixtures............................................................................................................................................. 979

aggregate .............................................................................................................................................. 975

aggregate grading ................................................................................................................................. 977

backfill, pipe trenches ........................................................................................................................... 736

backfill, slotted plastic pipe ................................................................................................................... 743

cementitious material content ............................................................................................... 968, 987, 992

cementitious materials .......................................................................................................................... 972

channel lining ........................................................................................................................................ 794

compressive strength .................................................................................... 586, 969, 972, 991, 997, 999

corrosive environment ........................................................................................................................... 986

curb ramps ............................................................................................................................................ 803

curb ramps (curb ramps)....................................................................................................................... 806

curbs and sidewalks .............................................................................................................................. 803

curing ............................................................................................................................................ 988, 998

deicing chemicals, exposed to .............................................................................................................. 987

ditch lining ............................................................................................................................................. 794

driveways .............................................................................................................................................. 806

expansion joints, curbs ......................................................................................................................... 804

freeze-thaw area ................................................................................................................................... 987

gutter depressions......................................................................................................................... 803, 806

gutter lining............................................................................................................................................ 794

island paving ................................................................................................................................. 803, 806

members, prestressing ......................................................................................................................... 575

minor ..................................................................................................................................................... 991

mixing .................................................................................................................................... 983, 992, 996

pavement, cracking existing.................................................................................................................. 499

pavement, portland cement .................................................................................................................. 459

pavement, sealed joints ........................................................................................................................ 496

precast .......................................................................................................................................... 615, 997

prequalification .............................................................................................................................. 971, 999

proportioning ......................................................................................................................... 980, 992, 995

protecting ...................................................................................................................................... 984, 991

rapid setting patch, bridge..................................................................................................................... 230

rapid strength ........................................................................................................................................ 993

removal for existing facilities ................................................................................................................. 224

self-consolidating .................................................................................................................................. 999

shrinkage....................................................................................................................................... 969, 972

slope paving .......................................................................................................................................... 796

slope protection ..................................................................................................................................... 794

supplementary cementitious materials ......................................................................................... 973, 997

textured and colored ..................................................................................................................... 803, 807

transporting ................................................................................................................................... 983, 992

uniformity............................................................................................................................... 969, 972, 995

water, mixing ................................................................................................................................. 978, 992

water, quantity of................................................................................................................... 984, 985, 992

Concrete anchorage devices .................................................................................................................... 833

Concrete backfill ....................................................................................................................................... 267

Concrete barrier ........................................................................................................................................ 876

Concrete pavement smoothness, PCC pavement ................................................................................... 465

Concrete railing......................................................................................................................................... 872

1036

INDEX

Concrete structures .................................................................................................................................. 583

cementitious material content ....................................................................................... 586, 616, 617, 620

compressive strength .................................................................................................................... 587, 620

pier columns.......................................................................................................................................... 595

precast .......................................................................................................................................... 615, 625

prequalification ...................................................................................................................................... 584

seal course ............................................................................................................................................ 591

Concreted-rock slope protection............................................................................................................... 791

Conductor table, electrical systems .......................................................................................................... 905

Conductors

electrical systems .................................................................................................................................. 905

identification, electrical systems............................................................................................................ 905

Conduit

electrical systems .................................................................................................................................. 899

expansion fittings, electrical systems .................................................................................................... 903

Conduits for irrigation crossovers, irrigation systems ............................................................................... 292

Cones, traffic............................................................................................................................................. 149

Confined space ........................................................................................................................................... 70

Construction area signs ............................................................................................................................ 145

Construction joints .................................................................................................................................... 592

Construction site monitoring program ...................................................................................................... 166

Construction surveys .................................................................................................................................. 41

Contamination........................................................................................................................................... 211

Contingency plan ...................................................................................................................................... 156

Contract ........................................................................................................................................................ 7

acceptance .................................................................................................................................... 7, 33, 56

award ...................................................................................................................................................... 25

completion date ......................................................................................................................................... 7

compliance failure ................................................................................................................................... 33

execution ................................................................................................................................................. 25

failure of enforcement ............................................................................................................................. 33

form ......................................................................................................................................................... 26

hierarchy of components ......................................................................................................................... 33

intent ....................................................................................................................................................... 29

termination .................................................................................................................................... 107, 108

time ................................................................................................................. 31, 102, 105, 107, 118, 122

Contractor ..................................................................................................................................................... 7

representative ......................................................................................................................................... 38

Contractor generated hazardous waste ................................................................................................... 212

Control

pump, booster ....................................................................................................................................... 827

pump, pumping plant electrical equipment ........................................................................................... 821

Control and neutral conductors, irrigation systems .................................................................................. 290

Control valves, irrigation system............................................................................................................... 296

Controlled low-strength material ....................................................................................................... 266, 271

Controller assemblies

traffic signal

Model 170E and Model 2070 ............................................................................................................ 917

Controller cabinets

electrical systems .................................................................................................................................. 919

Controlling activity......................................................................................................................................... 7

Conversion table

asphaltic emulsions ............................................................................................................................. 1024

Coordination, other entities ......................................................................................................................... 38

Core and pressure grout dowels .............................................................................................................. 240

Core concrete ........................................................................................................................................... 239

Corrosion protection, restrainers .............................................................................................................. 838

Corrugated aluminum pipe ....................................................................................................................... 757

Corrugated metal pipe .............................................................................................................................. 753

1037

INDEX

aluminum............................................................................................................................................... 757

steel ....................................................................................................................................................... 755

Corrugated metal pipe arch ...................................................................................................................... 753

Corrugated metal pipe, miscellaneous drainage facilities ........................................................................ 781

Corrugated steel pipe ............................................................................................................................... 755

Costs

flagging.................................................................................................................................................. 141

Coupling bands, corrugated metal pipe .................................................................................................... 755

Crack treatment ........................................................................................................................................ 407

Crash cushion module, temporary............................................................................................................ 152

Crib wall .................................................................................................................................................... 531

reinforced concrete ............................................................................................................................... 531

steel ....................................................................................................................................................... 533

Crib walls .................................................................................................................................................. 270

Critical delay ................................................................................................................................................. 7

Critical path................................................................................................................................................... 7

Critical path method ...................................................................................................................................... 8

Critical path method schedule

Level 1..................................................................................................................................................... 97

Level 2..................................................................................................................................................... 98

Level 3................................................................................................................................................... 100

Crumb rubber modifier .............................................................................................................................. 412

Cultivate, highway planting ....................................................................................................................... 324

Cultural resources..................................................................................................................................... 205

Culvert .......................................................................................................................................................... 8

Culvert beddings ............................................................................................................................... 266, 271

Culvert rehabilitation ................................................................................................................................. 241

machine spiral wound PVC pipeliners .................................................................................................. 250

Curb construction

extruded ................................................................................................................................................ 804

slip-form ................................................................................................................................................ 804

Curb ramps, concrete ....................................................................................................................... 803, 806

Curb ramps, detectable warning surface .................................................................................................. 803

Curbs and sidewalks

concrete ................................................................................................................................................ 803

existing .................................................................................................................................................. 803

Curing compound ..................................................................................................................................... 989

testing .................................................................................................................................................... 971

water loss .............................................................................................................................................. 988

Curing concrete ........................................................................................................................................ 988

curing compound method ..................................................................................................................... 989

forms-in-place method .......................................................................................................................... 991

precast, steam....................................................................................................................................... 998

water for ........................................................................................................................................ 978, 992

water method ........................................................................................................................................ 988

waterproof membrane method .............................................................................................................. 990

Curing concrete structures ....................................................................................................................... 598

Curing seal

cement treated bases ........................................................................................................................... 373

D
Damage repair and restoration ................................................................................................................... 47

Dampproofing ........................................................................................................................................... 655

Data date ...................................................................................................................................................... 8

Day................................................................................................................................................................ 8

business day ............................................................................................................................................. 8

working day ............................................................................................................................................... 8

Deck bleeder drain.................................................................................................................................... 594

1038

INDEX

Deck seal .................................................................................................................................................. 660

Decks, bridge

bleeder drains ....................................................................................................................................... 594

cementitious material content ............................................................................................................... 586

coefficient of friction .............................................................................................................................. 585

crack intensity ....................................................................................................................................... 585

curing .................................................................................................................................................... 598

placing concrete .................................................................................................................................... 591

rapid strength concrete ......................................................................................................................... 587

removing forms ..................................................................................................................................... 589

smoothness ........................................................................................................................................... 585

Decomposed granite ................................................................................................................................ 333

Deduction...................................................................................................................................................... 8

Deficiency

thickness, aggregate bases .................................................................................................................. 365

thickness, aggregate subbases ............................................................................................................ 362

thickness, cement treated bases .......................................................................................................... 373

Delay......................................................................................................................................................... 105

Delineators................................................................................................................................................ 863

markers and .......................................................................................................................................... 863

portable ................................................................................................................................................. 145

Delivery, storage, and handling


steel structures ...................................................................................................................................... 677

Density cores ............................................................................................................................................ 421

Department ................................................................................................................................................... 8

Department-furnished material ................................................................................................................... 57

Department-generated hazardous waste ................................................................................................. 212

Department-owned float ............................................................................................................................. 12

Depressions, concrete gutter.................................................................................................................... 806

Described, interpretation .............................................................................................................................. 1

Detectors

pedestrian push button assemblies ...................................................................................................... 939

vehicle

inductive loop..................................................................................................................................... 936

magnetic ............................................................................................................................................ 939

Determination of pile length ...................................................................................................................... 547

Detour ........................................................................................................................................................... 8

Devices

traffic handling ....................................................................................................................................... 141

Differing site conditions .............................................................................................................................. 29

Direct design method, reinforced concrete pipe ....................................................................................... 748

Director ......................................................................................................................................................... 8

Director days............................................................................................................................................. 107

Disabled Veteran Business Enterprise ............................................................................................. 8, 20, 37

Disadvantaged Business Enterprise............................................................................................... 18, 26, 36

Underutilized ..................................................................................................................................... 18, 37

Disconnect splice connectors, fused ........................................................................................................ 912

Disposal .................................................................................................................................................. 8, 32

material on nonhighway property............................................................................................................ 39

District ......................................................................................................................................................... 13

Divided highway............................................................................................................................................ 8

Douglas fir................................................................................................................................................. 700

Downdrains, pipe

aluminum............................................................................................................................................... 779

plastic .................................................................................................................................................... 779

steel....................................................................................................................................................... 779

Drainage

inlets ...................................................................................................................................................... 625

Drainage appurtenances, miscellaneous drainage facilities .................................................................... 783

1039

INDEX

Drainage inlet markers, miscellaneous drainage facilities........................................................................ 786

Drainage pumping equipment .................................................................................................................. 813

Drains

horizontal............................................................................................................................................... 772

overside................................................................................................................................................. 779

plastic pipe, horizontal .......................................................................................................................... 772

subsurface............................................................................................................................................. 769

Drawings
equipment lists and electrical systems.................................................................................................. 892

Drill and bond dowel (chemical adhesive) ................................................................................................ 594

Drill and bond dowels ............................................................................................................................... 593

Drilled holes .............................................................................................................................................. 568

drilling to assist pile driving ................................................................................................................... 552

predrilled holes ...................................................................................................................................... 553

Driven piles ............................................................................................................................................... 551

precast prestressed concrete piles ....................................................................................................... 558

steel pipe piles ...................................................................................................................................... 553

steel sheet piles .................................................................................................................................... 560

steel shells ............................................................................................................................................ 571

structural shape steel piles ................................................................................................................... 558

Driven steel shells..................................................................................................................................... 571

Driveways, concrete ................................................................................................................................. 806

Driving system submittal ........................................................................................................................... 551

Drums

traffic, plastic ......................................................................................................................................... 150

Dust control............................................................................................................................................... 208

Dust palliative ................................................................................................................................... 208, 257

Dynamic monitoring .................................................................................................................................. 548

E
Early completion time ................................................................................................................................... 8

Earth retaining systems ............................................................................................................................ 527

alternative.............................................................................................................................................. 534

Earthwork.................................................................................................................................................. 259

borrow material ..................................................................................................................................... 278

cofferdams .................................................................................................................................... 263, 268

compaction ............................................................................................................................................ 273

deficiency material ................................................................................................................................ 261

ditch excavation .................................................................................................................................... 260

embankment construction ..................................................................................................................... 274

ground anchor walls ...................................................................................................................... 264, 271

relative compaction ............................................................................................................................... 273

roadway excavation .............................................................................................................................. 260

selected material ................................................................................................................................... 260

settlement periods ................................................................................................................................. 276

slides and slipouts ................................................................................................................................. 262

slopes .................................................................................................................................................... 262

soil nail walls ................................................................................................................................. 264, 271

soldier pile walls .................................................................................................................................... 263

structure excavation and backfill ........................................................................................................... 263

surcharge .............................................................................................................................................. 276

surplus material ..................................................................................................................................... 261

unsuitable material ................................................................................................................................ 259

Edge drains............................................................................................................................................... 774

Edging, highway planting .......................................................................................................................... 320

Elastomeric bearing pads ......................................................................................................................... 612

Electrical materials and equipment, irrigation systems ............................................................................ 288

Electrical service, electrical systems ........................................................................................................ 913

1040

INDEX

Electrical systems

backplates ............................................................................................................................................. 929

battery backup system .......................................................................................................................... 917

bonding and grounding ......................................................................................................................... 912

cables .................................................................................................................................................... 907

conductor identification ......................................................................................................................... 905

conductor table ..................................................................................................................................... 905

conductors............................................................................................................................................. 905

conduit................................................................................................................................................... 899

controller cabinets ................................................................................................................................. 919

equipment list and drawings ................................................................................................................. 892

excavating and backfilling ..................................................................................................................... 894

expansion fittings, conduit..................................................................................................................... 903

falsework lighting .................................................................................................................................. 953

field testing ............................................................................................................................................ 915

first order of work .................................................................................................................................. 894

fixtures, induction sign lighting .............................................................................................................. 947

flashing beacons ................................................................................................................................... 935

foundations............................................................................................................................................ 895

fused splice connectors ........................................................................................................................ 912

galvanizing ............................................................................................................................................ 915

guard posts ........................................................................................................................................... 897

high pressure sodium lamp ballasts ..................................................................................................... 941

high pressure sodium lamps ................................................................................................................. 942

high pressure sodium luminaires .......................................................................................................... 939

identification bands, conductor ............................................................................................................. 905

internally illuminated street name signs ................................................................................................ 949

light emitting diode signal module ......................................................................................................... 924

low pressure sodium luminaires............................................................................................................ 942

luminaires, high pressure sodium ......................................................................................................... 939

luminaires, low pressure sodium........................................................................................................... 942

luminaires, soffit and wall...................................................................................................................... 944

maintaining existing and temporary electrical systems ........................................................................ 893

mast arms ............................................................................................................................................. 896

materials and installation ...................................................................................................................... 894

materials testing .................................................................................................................................... 914

Model 170E and Model 2070 controller assemblies ............................................................................. 917

numbering electrical equipment ............................................................................................................ 917

painting.................................................................................................................................................. 915

pavement illumination, falsework .......................................................................................................... 954

pedestrian crossing lighting fixtures ...................................................................................................... 945

pedestrian push button assemblies ...................................................................................................... 939

pedestrian walkway illumination through falsework .............................................................................. 954

photoelectric controls ............................................................................................................................ 951

programmed visibility vehicle signal faces ............................................................................................ 930

pull boxes .............................................................................................................................................. 903

ramp metering sign ............................................................................................................................... 934

regulations and code ............................................................................................................................. 891

regulator type ballasts ........................................................................................................................... 942

reinstalling removed electrical equipment ............................................................................................. 955

removing and replacing improvements ................................................................................................. 894

removing, reinstalling and salvaging electrical equipment ................................................................... 954

salvaging electrical equipment .............................................................................................................. 954

schedule of values ................................................................................................................................ 892

scheduling of work ................................................................................................................................ 894

service ................................................................................................................................................... 913

sign lighting fixtures, induction .............................................................................................................. 947

signal cable ........................................................................................................................................... 907

signal faces, light emitting diode pedestrian ......................................................................................... 931

1041

INDEX

signal faces, light emitting diode, vehicle .............................................................................................. 924

signal faces, pedestrian ........................................................................................................................ 930

signal faces, vehicle .............................................................................................................................. 922

signal mounting assemblies .................................................................................................................. 934

signal sections....................................................................................................................................... 922

signal sections (housing) ...................................................................................................................... 922

slip bases .............................................................................................................................................. 897

soffit and wall luminaires ....................................................................................................................... 944

splice insulation ..................................................................................................................................... 911

splicing conductors ............................................................................................................................... 910

standards, poles, steel pedestals, and posts ........................................................................................ 896

traffic pull boxes .................................................................................................................................... 904

traffic signal face and fittings................................................................................................................. 922

transformers .......................................................................................................................................... 952

transformers, submersible type............................................................................................................. 953

visors ..................................................................................................................................................... 924

wall luminaires, soffit and ...................................................................................................................... 944

wiring ..................................................................................................................................................... 909

wiring diagrams ..................................................................................................................................... 892

wood poles ............................................................................................................................................ 914

Embankment

mechanically stabilized ......................................................................................................................... 527

Embankment construction ........................................................................................................................ 274

Emissions reduction.................................................................................................................................... 63

Emulsions

asphaltic .............................................................................................................................................. 1019

Enclosures

painting.................................................................................................................................................. 716

Enclosures, painting ................................................................................................................................. 719

Endangered Species Act .......................................................................................................................... 206

Engineer ....................................................................................................................................................... 8

authority .................................................................................................................................................. 33

by the ........................................................................................................................................................ 1

to the ......................................................................................................................................................... 1

Entrance tapers

aluminum............................................................................................................................................... 779

steel ....................................................................................................................................................... 779

Environmentally sensitive area ............................................................................................................. 9, 211

Environmentally Sensitive Area ................................................................................................................ 203

Epoxy ...................................................................................................................................................... 1025

binder .................................................................................................................................................. 1025

bonding freshly mixed concrete to hardened concrete ....................................................................... 1026

pressure injection grouting of concrete pavement .............................................................................. 1027

rapid set for pavement markers .......................................................................................................... 1026

sealant for inductive loops .................................................................................................................. 1027

standard set for pavement markers .................................................................................................... 1026

Epoxy crack injection, bridge .................................................................................................................... 240

Epoxy-coated

prefabricated reinforcement .......................................................................................................... 630, 633

reinforcement ................................................................................................................................ 630, 632

Epoxy-coated and epoxy-coated prefabricated reinforcement ................................................................. 630

Equalizing bolts......................................................................................................................................... 832

Equipment

booster pumps ...................................................................................................................................... 825

drainage pumping ................................................................................................................................. 813

identification ............................................................................................................................................ 43

list and drawings, electrical systems ..................................................................................................... 892

pumping and controls ............................................................................................................................ 809

pumping plant electrical ........................................................................................................................ 818

1042

INDEX

Erosion control .......................................................................................................................................... 341

quality control and assurance ............................................................................................................... 341

submittals .............................................................................................................................................. 341

Erosion control, application ...................................................................................................................... 349

bonded fiber matrix ............................................................................................................................... 350

compost................................................................................................................................................. 350

compost socks ...................................................................................................................................... 351

drill seed................................................................................................................................................ 350

dry seed ................................................................................................................................................ 350

duff ........................................................................................................................................................ 349

fiber rolls................................................................................................................................................ 351

hydromulch............................................................................................................................................ 349

hydroseed ............................................................................................................................................. 349

incorporate materials ............................................................................................................................ 350

polymer stabilized fiber matrix .............................................................................................................. 350

rolled erosion control products .............................................................................................................. 351

site preparation ..................................................................................................................................... 349

straw...................................................................................................................................................... 350

topsoil .................................................................................................................................................... 349

Erosion control, materials ......................................................................................................................... 342

compost................................................................................................................................................. 344

compost socks ...................................................................................................................................... 348

duff ........................................................................................................................................................ 342

fasteners ............................................................................................................................................... 348

fertilizer.................................................................................................................................................. 344

fiber ....................................................................................................................................................... 342

fiber rolls................................................................................................................................................ 348

rolled erosion control products .............................................................................................................. 346

blankets ............................................................................................................................................. 347

jute mesh ........................................................................................................................................... 346

netting................................................................................................................................................ 346

turf reinforcement mats ..................................................................................................................... 347

seed ...................................................................................................................................................... 344

straw...................................................................................................................................................... 344

tackifier .................................................................................................................................................. 343

bonded fiber matrix ............................................................................................................................ 344

polymer stabilized fiber matrix ........................................................................................................... 344

topsoil .................................................................................................................................................... 342

Erosion control, payment .......................................................................................................................... 352

Estimated cost .............................................................................................................................................. 9

Excavating and backfilling, electrical systems.......................................................................................... 894

Excavation ................................................................................................................ 7, 29, 44, 69, 71, 73, 74

regional notification center ...................................................................................................................... 45

Excusable delay............................................................................................................................................ 9

Existing

curbs and sidewalks .............................................................................................................................. 803

Existing and temporary electrical systems, maintaining ........................................................................... 893

Existing facilities ....................................................................................................................................... 215

abandon ................................................................................................................................................ 220

adjust..................................................................................................................................................... 223

bridge rehabilitation ............................................................................................................................... 229

bridge rehabilitation, bridge deck methacrylate resin treatment ........................................................... 233

bridge rehabilitation, core and pressure grout dowels.......................................................................... 240

bridge rehabilitation, core concrete ....................................................................................................... 239

bridge rehabilitation, epoxy crack injection ........................................................................................... 240

bridge rehabilitation, polyester concrete overlay .................................................................................. 236

bridge rehabilitation, rapid setting concrete patch ................................................................................ 230

bridge rehabilitation, refinish bridge deck ............................................................................................. 232

bridge rehabilitation, repair spalled surface area .................................................................................. 231

1043

INDEX

bridge removal ...................................................................................................................................... 225

bridge removal, access opening ........................................................................................................... 228

bridge removal, protective covers ......................................................................................................... 226

concrete removal................................................................................................................................... 224

culvert rehabilitation .............................................................................................................................. 241

culvert rehabilitation, machine spiral wound PVC pipeliners ................................................................ 250

destroy .................................................................................................................................................. 221

highway irrigation facilities .................................................................................................................... 215

modify.................................................................................................................................................... 221

obliterate roads, detours, and surfacing ............................................................................................... 216

reconstruct ............................................................................................................................................ 220

relay ...................................................................................................................................................... 224

relocate ................................................................................................................................................. 222

remodel ................................................................................................................................................. 224

remove cable chain link barriers ........................................................................................................... 218

remove contrast treatment .................................................................................................................... 217

remove drainage facilities ..................................................................................................................... 218

remove irrigation facilities ..................................................................................................................... 218

remove metal beam guard railing ......................................................................................................... 218

remove pavement ................................................................................................................................. 216

remove pavement markers ................................................................................................................... 217

remove roadside signs .......................................................................................................................... 218

remove subbase, base, and bituminious surfacing............................................................................... 216

remove traffic stripes and pavement markings ..................................................................................... 217

reset ...................................................................................................................................................... 221

salvage .................................................................................................................................................. 218

Existing highway planting ......................................................................................................................... 285

Expanded polystyrene .............................................................................................................................. 599

Expansion fittings, conduit, electrical systems ......................................................................................... 903

Expansion joints

concrete curbs....................................................................................................................................... 804

concrete sidewalks................................................................................................................................ 807

Exploratory work, horizontal drains .......................................................................................................... 773

Extra work............................................................................................................................................... 9, 29

Extra work performed by specialists ......................................................................................................... 117

Extruded curb construction ....................................................................................................................... 804

F
Fabrication

sign structures ....................................................................................................................................... 691

steel structures ...................................................................................................................................... 672

Falsework ......................................................................................................................................... 537, 583

lighting................................................................................................................................................... 953

pavement illumination ........................................................................................................................... 954

pedestrian walkway illumination............................................................................................................ 954

portal illumination .................................................................................................................................. 954

steel structures ...................................................................................................................................... 677

Fastener threads....................................................................................................................................... 673

Fasteners

steel structures ...................................................................................................................................... 669

Faying and bearing surfaces

steel structures ...................................................................................................................................... 672

Federal-aid contract ...................................................................................................................................... 9

Fences ...................................................................................................................................................... 849

chain link ............................................................................................................................................... 854

connections to existing .......................................................................................................................... 849

gates ..................................................................................................................................................... 858

temporary .............................................................................................................................................. 849

1044

INDEX

Type CL................................................................................................................................................. 854

Types BW and WM ............................................................................................................................... 850

Fertilizer, highway planting ....................................................................................................................... 319

Field leakage testing for culvert and drainage pipes ................................................................................ 731

Field testing, electrical systems ................................................................................................................ 915

Field tests, irrigation systems ................................................................................................................... 310

Filter assembly units, irrigation systems ................................................................................................... 290

Filter fabric ................................................................................................................................................ 959

Final pay item ....................................................................................................................................... 9, 112

Finished grade, earthwork ........................................................................................................................ 259

Finishing roadway ..................................................................................................................................... 353

First order of work

electrical systems .................................................................................................................................. 894

Fish protection .......................................................................................................................................... 207

Fixed cost ..................................................................................................................................................... 9

Fixtures, lighting

induction sign lighting ............................................................................................................................ 947

pedestrian crossing ............................................................................................................................... 945

Flag trees, telescoping ............................................................................................................................. 149

Flaggers .................................................................................................................................................... 141

Flagging .................................................................................................................................................... 141

costs ...................................................................................................................................................... 141

Flared end sections, miscellaneous drainage facilities ............................................................................ 784

Flashing arrow signs ................................................................................................................................. 144

Flashing beacons...................................................................................................................................... 935

Flexible hose, irrigation systems .............................................................................................................. 290

Flexible posts, markers and delineators ................................................................................................... 864

Float ...................................................................................................................................................... 9, 102

Flume downdrains

aluminum............................................................................................................................................... 779

steel....................................................................................................................................................... 779

Flush valves, irrigation system ................................................................................................................. 297

Fog seal coat ............................................................................................................................................ 383

Foilage protector, highway planting .......................................................................................................... 320

Force account

equipment rental ................................................................................................................................... 115

general .................................................................................................................................................. 114

labor ...................................................................................................................................................... 114

material ................................................................................................................................................. 114

Force account work ...................................................................................................................................... 9

Form FHWA-1273....................................................................................................................................... 78

Form liners ................................................................................................................................................ 597

Form panels ...................................................................................................................................... 583, 588

Formed relief texture ................................................................................................................................ 597

Forms .................................................................................................................................................. 33, 588

Foundation preparation ............................................................................................................................ 274

Foundations

electrical systems .................................................................................................................................. 895

Fractured rib texture ................................................................................................................................. 597

Framed bents, wood structures ................................................................................................................ 702

Framing, wood structures ......................................................................................................................... 701

Freeze-thaw areas ...................................................................................................................................... 14

Furnish sign panels .................................................................................................................................. 681

Fused spliced connectors, electrical systems .......................................................................................... 912

G
Gabions .................................................................................................................................................... 798

Galvanized reinforcement......................................................................................................................... 634

1045

INDEX

Galvanizing ............................................................................................................................................... 842

electrical systems .................................................................................................................................. 915

Gamma-gamma logging ........................................................................................................................... 564

Garden valves, irrigation systems ............................................................................................................ 297

Gate valves, irrigation system .................................................................................................................. 297

Geocomposite drain systems ................................................................................................................... 776

Geocomposite strip membrane ................................................................................................................ 963

Geosynthetic pavement interlayer ............................................................................................ 411, 424, 425

Geosynthetic reinforced embankment.............................................................................................. 274, 277

Geosynthetic reinforcement...................................................................................................................... 960

Geosynthetics ........................................................................................................................................... 959

filter fabric.............................................................................................................................................. 959

geocomposite strip membrane.............................................................................................................. 963

geosynthetic reinforcement ................................................................................................................... 960

gravel-filled bag ..................................................................................................................................... 960

paving fabric .......................................................................................................................................... 962

paving geocomposite grid ..................................................................................................................... 963

paving grid............................................................................................................................................. 963

paving mat............................................................................................................................................. 962

rock slope protection fabric ................................................................................................................... 962

sediment filter bag ................................................................................................................................. 961

silt fence fabric ...................................................................................................................................... 960

subgrade enhancement geotextile ........................................................................................................ 964

temporary cover .................................................................................................................................... 961

wall drain ............................................................................................................................................... 959

Glass beads, traffic stripes and pavement markings................................................................................ 881

Grade

tolerance, aggregate bases .................................................................................................................. 365

tolerance, cement treated bases........................................................................................................... 372

tolerance, lean concrete base............................................................................................................... 377

tolerance, treated permeable bases ..................................................................................................... 381

Grade tolerance, earthwork ...................................................................................................................... 259

Grading plane ............................................................................................................................................... 9

Gratings, steel walkway, sign structures .................................................................................................. 690

Gravel mulch............................................................................................................................................. 335

Gravel-filled bag........................................................................................................................................ 960

Groove and grind pavement ..................................................................................................................... 509

Ground anchor walls, earthwork ............................................................................................................... 264

Ground anchors ................................................................................................................................ 513, 516

Grounding, bonding and, electrical systems ............................................................................................ 912

Grout ......................................................................................................................................................... 587

Guarantee ................................................................................................................................................... 61

Guard posts, electrical systems................................................................................................................ 897

Gutter depressions, concrete ........................................................................................................... 803, 806

H
Hand cleaning, painting ............................................................................................................................ 916

Handholes, signal and lighting standards ................................................................................................. 896

Handrailing, pipe ....................................................................................................................................... 873

Hardware, wood structures ....................................................................................................................... 699

Hazardous waste ...................................................................................................................................... 212

Hazardous waste and contamination ....................................................................................................... 210

Hazardous waste management ................................................................................................................ 210

Hazardous waste manifest ....................................................................................................................... 210

Hazardous waste storage ......................................................................................................................... 210

Hazardous waste transport and disposal ................................................................................................. 213

Headed bar reinforcement ........................................................................................................................ 634

Headings ....................................................................................................................................................... 1

1046

INDEX

Heavy abrasive blast texture .................................................................................................................... 597

Heel resistant grate .................................................................................................................................. 743

Hem-Fir..................................................................................................................................................... 700

High pressure sodium lamp ballasts......................................................................................................... 941

High pressure sodium lamps .................................................................................................................... 942

High strength fasteners

steel structures ...................................................................................................................................... 669

Highway ........................................................................................................................................................ 9

Highway irrigation facilities, existing facilities ........................................................................................... 215

Highway planting ...................................................................................................................................... 317

materials................................................................................................................................................ 318

plant establishment work ...................................................................................................................... 329

preparing planting area ......................................................................................................................... 323

roadside clearing ................................................................................................................................... 322

watering................................................................................................................................................. 284

Highway post markers ...................................................................................................................... 863, 865

Holiday

definition.................................................................................................................................................... 9

document submittal ................................................................................................................................. 40

Horizontal drains ....................................................................................................................................... 772

Hot mix asphalt ......................................................................................................................................... 411

Idle equipment .............................................................................................................................................. 9

Illuminated street name signs, internally .................................................................................................. 949

Imperative mood ........................................................................................................................................... 1

Indemnification............................................................................................................................................ 74

Induction sign lighting fixtures .................................................................................................................. 947

Informal-bid contract ................................................................................................................................... 10

Information Handout ............................................................................................................................. 17, 69

Initial ......................................................................................................................................................... 323

Inlet depressions, miscellaneous drainage facilities................................................................................. 785

Inspection

access ..................................................................................................................................................... 33

final.......................................................................................................................................................... 56

request .................................................................................................................................................... 60

Inspection, job site ...................................................................................................................................... 61

Installation tension testing

steel structures ...................................................................................................................................... 669

Insulation, splice, electrical systems......................................................................................................... 911

Insurance .................................................................................................................................................... 75

Interconnect cable, electrical systems ...................................................................................................... 909

Internally illuminated street name signs ................................................................................................... 949

Iron sulfate, highway planting ................................................................................................................... 320

Irrigation controllers, irrigation systems .................................................................................................... 291

Irrigation systems...................................................................................................................................... 287

backflow preventer assembly................................................................................................................ 288

booster pump ........................................................................................................................................ 289

certify backflow preventers ................................................................................................................... 288

check and test existing irrigation facilities ............................................................................................. 300

conductors, electrical conduit and pull boxes ....................................................................................... 290

conduit for irrigation crossovers ............................................................................................................ 292

electrical service installations................................................................................................................ 308

field tests ............................................................................................................................................... 310

Irrigation controllers .............................................................................................................................. 291

maintain existing water supply .............................................................................................................. 299

materials................................................................................................................................................ 288

Pipe ....................................................................................................................................................... 293

1047

INDEX

pressure tests........................................................................................................................................ 309

Remote control valve actuator system .................................................................................................. 294

sprinkler control crossover .................................................................................................................... 292

testing ............................................................................................................................................ 309, 310

trenching and backfilling ....................................................................................................................... 303

valve boxes ........................................................................................................................................... 298

water line crossovers ............................................................................................................................ 292

wiring plans and diagrams .................................................................................................................... 287

Island paving, concrete ..................................................................................................................... 803, 806

J
Jacking

pavement .............................................................................................................................................. 490

Job site ....................................................................................................................................................... 10

Job site appearance ................................................................................................................................... 43

Job site examination ................................................................................................................................... 22

Job site management ............................................................................................................................... 174

Joint seal assemblies MR > 4 inches ....................................................................................................... 606

Joint seal assemblies MR 4 inches ....................................................................................................... 604

Joints

culvert and drainage pipe...................................................................................................................... 729

culvert and drainage pipe performance specifications.......................................................................... 730

expansion, concrete curbs .................................................................................................................... 804

expansion, concrete sidewalks ............................................................................................................. 807

plastic pipe culvert................................................................................................................................. 740

repair of spalled..................................................................................................................................... 491

rubber gasketed, reinforced concrete pipe ........................................................................................... 749

siphons, corrugated metal pipe ............................................................................................................. 755

slip, overside drains

aluminum ........................................................................................................................................... 779

steel ................................................................................................................................................... 779

L
Labor Code ................................................................................................................................................. 65

Labor Surcharge and Equipment Rental Rates.......................................................................................... 10

Lagging

timber .................................................................................................................................................... 703

Laminated wood box posts, signs ............................................................................................................ 695

Landscape ................................................................................................................................................ 283

definition.................................................................................................................................................. 10

plant damage .......................................................................................................................................... 44

repair of damage ..................................................................................................................................... 48

Laws ........................................................................................................................................................... 63

federal ..................................................................................................................................................... 78

Lead compliance plan ................................................................................................................................. 70

Lean concrete backfill ............................................................................................................................... 267

Lean concrete base .................................................................................................................................. 375

curing .................................................................................................................................................... 377

grade tolerance ..................................................................................................................................... 377

placing ................................................................................................................................................... 376

proportioning, mixing and transporting.................................................................................................. 376

spreading, compacting and shaping ..................................................................................................... 377

subgrade ............................................................................................................................................... 376

Legal actions against the Department ........................................................................................................ 77

License

contractor, federal-aid contract ............................................................................................................... 25

contractor, non-federal-aid contract ........................................................................................................ 25

joint venture bidder.................................................................................................................................. 25

1048

INDEX

subcontractors......................................................................................................................................... 36

Licenses...................................................................................................................................................... 38

Light emitting diode signal module

pedestrian signals ................................................................................................................................. 931

vehicle signals ....................................................................................................................................... 924

Lighting

autotransformer and reactor type ballasts ............................................................................................ 942

electrical systems .................................................................................................................................. 939

falsework ............................................................................................................................................... 953

falsework portal illumination .................................................................................................................. 954

fixtures, pedestrian crossing ................................................................................................................. 945

fixtures, sign lighting, induction ............................................................................................................. 947

nonregulator type ballasts ..................................................................................................................... 942

pavement illumination, falsework .......................................................................................................... 954

photoelectric controls ............................................................................................................................ 951

portal illumination .................................................................................................................................. 954

sign illumination control......................................................................................................................... 914

walkway illumination through falsework ................................................................................................ 954

Lime

Stabilized Soils ...................................................................................................................................... 357

Lime Stabilized Soil .................................................................................................................................. 355

lime........................................................................................................................................................ 357

Liquid asphalt.......................................................................................................................................... 1009

Liquidated damages ................................................................................................................................. 106

Listed species ............................................................................................................................................. 10

Lists .............................................................................................................................................................. 2

Load limits................................................................................................................................................... 45

Load test piles........................................................................................................................................... 548

Location marker, irrigation systems .......................................................................................................... 293

Logs of test borings .................................................................................................................................... 17

Luminaires

high pressure sodium............................................................................................................................ 939

low pressure sodium ............................................................................................................................. 942

soffit and wall ........................................................................................................................................ 944

M
Magnesium phosphate concrete .............................................................................................................. 586

Maintain traffic

closure schedule ................................................................................................................................... 155

Maintaining existing and temporary electrical systems ............................................................................ 893

Maintaining traffic

bridge painting and cleaning operations ............................................................................................... 155

contingency plan ................................................................................................................................... 156

seal coats .............................................................................................................................................. 154

Maintaining Traffic .................................................................................................................................... 153

Maintenance and protection relief .............................................................................................................. 47

Manhole frames and covers ..................................................................................................................... 831

Manual control valves, irrigation system .................................................................................................. 296

Markers ..................................................................................................................................................... 863

and delineators ..................................................................................................................................... 863

pavement .............................................................................................................................................. 887

Mass concrete .................................................................................................................................. 560, 623

Mast arms, electrical systems .................................................................................................................. 896

Material ....................................................................................................................................................... 10

control of ................................................................................................................................................. 57

Department furnished ............................................................................................................................. 57

found on the job site ................................................................................................................................ 29

furnishing of............................................................................................................................................. 33

1049

INDEX

local ......................................................................................................................................................... 57

new.......................................................................................................................................................... 57

on hand ................................................................................................................................................. 124

procurement from nonhighway property ................................................................................................. 39

proportioning ........................................................................................................................................... 43

source ..................................................................................................................................................... 57

source inspection .................................................................................................................................... 60

source testing .......................................................................................................................................... 60

storage .................................................................................................................................................... 58

Material hauling equipment lane................................................................................................................. 47

Material shortage ........................................................................................................................................ 10

Materials

steel structures ...................................................................................................................................... 669

structural steel ............................................................................................................................... 669, 671

Materials and installation, electrical systems ........................................................................................... 894

Materials, PCC pavement ......................................................................................................................... 468

Material-source facility audit ....................................................................................................................... 10

Measurement ............................................................................................................................................ 111

aggregate .............................................................................................................................................. 112

imported top soil .................................................................................................................................... 112

mulch ..................................................................................................................................................... 112

roadway material ................................................................................................................................... 112

soil amendment ..................................................................................................................................... 112

Measuring devices ...................................................................................................................................... 43

Mechanically stabilized embankment ....................................................................................................... 527

Median ........................................................................................................................................................ 10

Members, prestressed concrete ............................................................................................................... 575

Membrane waterproofing

and protective cover .............................................................................................................................. 658

asphalt................................................................................................................................................... 655

deck seal ............................................................................................................................................... 660

preformed.............................................................................................................................................. 656

Metal beam guard railing .......................................................................................................................... 867

steel posts ............................................................................................................................................. 868

terminal anchor assemblies .................................................................................................................. 869

wood posts ............................................................................................................................................ 868

Metal posts

markers and delineators ....................................................................................................................... 864

roadside signs ....................................................................................................................................... 694

Metal railing .............................................................................................................................................. 872

Metal signal sections, vehicle signals ....................................................................................................... 923

Methacrylate resin treatment, bridge ........................................................................................................ 233

Micro-surfacing ................................................................................................................................. 392, 397

Migratory Bird Treaty Act.......................................................................................................................... 206

Milestone .................................................................................................................................................... 10

Mineral grit

blast cleaning ........................................................................................................................................ 715

Minor concrete .......................................................................................................................................... 991

Minor structures ........................................................................................................................................ 625

Miscellaneous bridge metal ...................................................................................................................... 832

Miscellaneous drainage facilities .............................................................................................................. 781

casings for bridges ................................................................................................................................ 787

corrugated metal pipe ........................................................................................................................... 781

drainage appurtenances ....................................................................................................................... 783

drainage inlet markers .......................................................................................................................... 786

flared end sections ................................................................................................................................ 784

inlet depressions ................................................................................................................................... 785

precast concrete pipe ............................................................................................................................ 783

welded steel pipe .................................................................................................................................. 782

1050

INDEX

Miscellaneous iron and steel .................................................................................................................... 831

Miscellaneous metal ................................................................................................................................. 831

Miscellaneous metal, restrainers .............................................................................................................. 836

Mobilization ......................................................................................................................................... 10, 124

Modified high-alumina-based concrete .................................................................................................... 586

Modify

inlets, manholes, and risers .................................................................................................................. 221

pipes...................................................................................................................................................... 221

Monuments ............................................................................................................................................... 861

Mortar ....................................................................................................................................................... 587

cement, reinforced concrete pipe joints ................................................................................................ 749

Mulch, highway planting ........................................................................................................................... 321

N
Narrative report ........................................................................................................................................... 10

Near critical path ......................................................................................................................................... 10

Noise control ............................................................................................................................................. 208

Nondiscrimination ....................................................................................................................................... 63

Nonhighway facilities .................................................................................................................................. 45

Nonregulator type ballasts ........................................................................................................................ 942

Nonskid abrasive finish............................................................................................................................. 594

Nonsmall business

preference ............................................................................................................................................... 21

substitution .............................................................................................................................................. 38

Numbering electrical equipment ............................................................................................................... 917

Numeric action level ................................................................................................................................. 171

Numeric effluent limit ................................................................................................................................ 172

O
Object markers ......................................................................................................................................... 864

Obliterate roads, detours, and surfacing .................................................................................................. 216

Ordinary surface finish.............................................................................................................................. 595

OSHA.......................................................................................................................................................... 69

Outlets

edge drains ........................................................................................................................................... 774

underdrains ........................................................................................................................................... 770

Overhead sign and pole structures........................................................................................................... 140

Overhead sign structures ......................................................................................................................... 687

Overside drains......................................................................................................................................... 779

P
Paint........................................................................................................................................................ 1003

Painting..................................................................................................................................................... 715

acid staining concrete ........................................................................................................................... 724

anti-grafitti coating ................................................................................................................................. 725

application ............................................................................................................................................. 716

concrete ................................................................................................................................................ 724

electrical systems .................................................................................................................................. 915

enclosures ............................................................................................................................................. 716

faying surfaces ...................................................................................................................................... 722

galvanized surfaces .............................................................................................................................. 723

machinery.............................................................................................................................................. 721

painting quality work plan...................................................................................................................... 717

preparing structural steel ...................................................................................................................... 720

sign structures ....................................................................................................................................... 723

steel soldier piles .................................................................................................................................. 725

steel structures ...................................................................................................................................... 717

1051

INDEX

structural steel ............................................................................................................................... 717, 721

thermal spray coating ............................................................................................................................ 726

timber .................................................................................................................................................... 723

traffic stripes and pavement markings .......................................................................................... 881, 883

weather conditions ................................................................................................................................ 715

wood structures ..................................................................................................................................... 703

zinc coatings ......................................................................................................................................... 722

Painting, enclosures ................................................................................................................................. 719

Paints

for structural steel.................................................................................................................................. 719

miscellaneous ....................................................................................................................................... 715

Paleontological resources .................................................................................................................. 10, 207

Parking area seals .................................................................................................................................... 405

Partnering ................................................................................................................................................... 34

Pavement.................................................................................................................................................... 10

grind ...................................................................................................................................................... 510

groove ................................................................................................................................................... 509

hot mix asphalt ...................................................................................................................................... 411

jacking ................................................................................................................................................... 490

portland cement concrete ..................................................................................................................... 459

replacement .................................................................................................................................. 501, 511

subsealing ............................................................................................................................................. 489

transition tapers..................................................................................................................................... 500

Pavement markers.................................................................................................................................... 887

nonreflective.......................................................................................................................................... 887

pavement recesses ............................................................................................................................... 890

retroreflective ........................................................................................................................................ 888

Pavement recesses .................................................................................................................................. 890

Paving fabric ............................................................................................................................................. 962

Paving geocomposite grid ........................................................................................................................ 963

Paving grid ................................................................................................................................................ 963

Paving mat................................................................................................................................................ 962

Paving notch extension .................................................................................................................... 620, 623

Paving, concrete island .................................................................................................................... 803, 806

Payment.................................................................................................................................................... 111

alternatives............................................................................................................................................ 113

eliminated items .................................................................................................................................... 118

progress ................................................................................................................................................ 124

scope ..................................................................................................................................................... 112

PC concrete members .............................................................................................................................. 615

cementitious material content ............................................................................................................... 586

PC concrete structures ............................................................................................................................. 625

PC drainage inlets .................................................................................................................................... 625

PCC pavement

side forms for ........................................................................................................................................ 478

slip-form construction ............................................................................................................................ 479

Pedestrian barricades, electrical systems ................................................................................................ 897

Pedestrian crossing lighting fixtures ......................................................................................................... 945

Pedestrian signal face (light emitting diode),

electrical systems .................................................................................................................................. 931

Pedestrian signal push buttons ................................................................................................................ 939

Pedestrian walkway, temporary................................................................................................................ 157

Perforated pipe

aluminum, underdrains ......................................................................................................................... 770

plastic, underdrains ............................................................................................................................... 770

steel, underdrains.................................................................................................................................. 769

Permanent steel casings .................................................................................................................. 566, 569

Permanent steel deck forms ............................................................................................................. 583, 589

Permeable base

1052

INDEX

asphalt treated ...................................................................................................................................... 379

cement treated ...................................................................................................................................... 379

Permeable material

asphalt treated ...................................................................................................................................... 774

cement treated ...................................................................................................................................... 774

untreated ............................................................................................................................................... 770

Permits........................................................................................................................................................ 38

Permitted biological activities ..................................................................................................................... 10

Personal liability .......................................................................................................................................... 78

Pervious backfill material .................................................................................................................. 265, 271

Pesticides ................................................................................................................................................. 283

Photoelectric controls ............................................................................................................................... 951

Pier columns ............................................................................................................................................. 595

Pile driving equipment .............................................................................................................................. 552

Pile reinforcement ............................................................................................................................. 561, 569

Pin connections

steel structures ...................................................................................................................................... 673

Pipe

alternative pipe and pipe arch culverts ................................................................................................. 735

alternative slotted .................................................................................................................................. 735

arches, structural metal plate ................................................................................................................ 763

composite steel spiral rib with smooth interior ...................................................................................... 759

corrugated metal ................................................................................................................................... 753

corrugated metal, aluminum ................................................................................................................. 757

corrugated metal, arch .......................................................................................................................... 753

corrugated metal, bituminous coated .................................................................................................... 754

corrugated metal, bituminous lined ....................................................................................................... 754

corrugated metal, coupling bands ................................................................................................. 754, 755

corrugated metal, paved inverts............................................................................................................ 754

corrugated metal, polymeric sheet coating ........................................................................................... 754

corrugated metal, polymerized asphalt invert ....................................................................................... 754

corrugated metal, protective coatings, lining and pavings .................................................................... 754

corrugated metal, steel ......................................................................................................................... 755

corrugated metal, thickness .................................................................................................................. 753

corrugated steel, damaged aluminum coating ...................................................................................... 757

corrugated steel, damaged galvanizing ................................................................................................ 757

corrugated steel, siphons ...................................................................................................................... 753

downdrains, aluminum .......................................................................................................................... 779

downdrains, plastic ............................................................................................................................... 779

downdrains, steel .................................................................................................................................. 779

end finish, corrugated aluminum........................................................................................................... 757

end finish, corrugated steel ................................................................................................................... 756

joints, culvert and drainage pipe ........................................................................................................... 729

exfiltration and infiltration testing ....................................................................................................... 732

field leakage testing ........................................................................................................................... 731

joint systems and couplers ................................................................................................................ 729

low pressure air test .......................................................................................................................... 732

other tests .......................................................................................................................................... 733

performance specifications................................................................................................................ 730

plastic pipe......................................................................................................................................... 740

rubber gasketed ................................................................................................................................ 749

watertightness ................................................................................................................................... 730

metal liner plate ..................................................................................................................................... 764

perforated aluminum, underdrains ........................................................................................................ 770

perforated plastic. underdrains ............................................................................................................. 770

perforated steel, underdrains ................................................................................................................ 769

plastic

supply line, irrigation systems ........................................................................................................... 293

plastic, culvert ....................................................................................................................................... 739

1053

INDEX

plastic, horizontal drains ....................................................................................................................... 772

plastic, slotted ....................................................................................................................................... 742

recycled water

supply line, irrigation systems ........................................................................................................... 293

reinforced concrete ............................................................................................................................... 745

reinforced concrete, arch ...................................................................................................................... 749

reinforced concrete, circular.................................................................................................................. 747

reinforced concrete, class ..................................................................................................................... 747

reinforced concrete, direct design method ............................................................................................ 748

reinforced concrete, joints

cement mortar ................................................................................................................................... 749

resilient material ................................................................................................................................ 750

rubber gasketed................................................................................................................................. 749

reinforced concrete, marking ................................................................................................................ 748

reinforced concrete, oval shaped .......................................................................................................... 748

reinforced concrete, siphons ................................................................................................................. 746

slotted corrugated steel ......................................................................................................................... 758

slotted plastic, edge drains ................................................................................................................... 774

spiral rib................................................................................................................................................. 759

structural metal plate ............................................................................................................................. 763

temporary culverts................................................................................................................................. 735

Pipe handrailing ........................................................................................................................................ 873

Pipe posts, sign structures ....................................................................................................................... 690

Pipe, irrigation systems ............................................................................................................................ 293

Placing concrete ....................................................................................................................................... 590

PLACs......................................................................................................................................................... 38

Plans........................................................................................................................................................... 10

project plans ............................................................................................................................................ 10

revised standard plans ............................................................................................................................ 10

standard plans......................................................................................................................................... 10

Plant establishment period ......................................................................................................................... 10

Plant establishment work .......................................................................................................................... 329

Plant ties, highway planting ...................................................................................................................... 322

Plant, pumping .......................................................................................................................................... 809

Plant, pumping electrical equipment......................................................................................................... 818

Planting work, highway planting ............................................................................................................... 324

Plant-mixed cement treated bases ........................................................................................................... 369

Plants........................................................................................................................................................ 328

replacement of ...................................................................................................................................... 328

staking of............................................................................................................................................... 322

watering................................................................................................................................................. 284

Plastic

pipe supply line, irrigation systems ....................................................................................................... 293

pipe, culvert ........................................................................................................................................... 739

Recycled water supply line, irrigation systems ..................................................................................... 293

slotted pipe ............................................................................................................................................ 742

underdrain couplings ............................................................................................................................. 770

Plastic lumber

composite .............................................................................................................................................. 707

reinforced recycled ................................................................................................................................ 707

structures .............................................................................................................................................. 704

unreinforced recycled ............................................................................................................................ 708

Plastic signal sections, vehicle signals ..................................................................................................... 923

Plastic traffic drums .................................................................................................................................. 150

Plugs, edge drains .................................................................................................................................... 775

Polyester concrete overlay, bridge ........................................................................................................... 236

Polyester concrete overlay, expansion dams ........................................................................................... 239

Portable

changeable message signs .................................................................................................................. 151

1054

INDEX

delineators............................................................................................................................................. 145

signs ...................................................................................................................................................... 146

Portal illumination, falsework .................................................................................................................... 954

Portland cement........................................................................................................................................ 973

Portland cement concrete pavement ........................................................................................................ 459

Portland cement concrete, PCC pavement .............................................................................................. 468

Posts

flexible, delineators ............................................................................................................................... 864

laminated wood box, signs.................................................................................................................... 695

metal, markers and delineators............................................................................................................. 864

metal, roadside signs ............................................................................................................................ 694

pipe, sign structures .............................................................................................................................. 690

wood, markers and delineators ............................................................................................................. 864

wood, roadside signs ............................................................................................................................ 694

Potential claims........................................................................................................................................... 48

Full and Final Potential Claim Record .................................................................................................... 49

Initial Potential Claim Record .................................................................................................................. 49

Supplemental Potential Claim Record .................................................................................................... 49

Precast concrete ............................................................................................................... 133, 615, 625, 997

Precast concrete pipe, miscellaneous drainage facilities ......................................................................... 783

Preconstruction conference ...................................................................................................................... 103

Preconstruction scheduling conference ................................................................................................... 101

Predrilled holes ......................................................................................................................................... 553

Premolded expansion joint filler................................................................................................................ 599

Prepare concrete deck surface, bridge rehabilitation ............................................................................... 229

Prepare hole, highway planting ................................................................................................................ 323

Prepare trench, highway planting ............................................................................................................. 324

Preparing planting area, highway planting ............................................................................................... 323

Prepaving conference ............................................................................................................................... 421

Prequalification

concrete ................................................................................................................................................ 971

rapid strength concrete ......................................................................................................................... 584

self-consolidating concrete ................................................................................................................... 999

Preservative treatment of lumber, timber, and piling ................................................................................ 701

Pressure regulating valves, irrigation system ........................................................................................... 297

Pressure relief valves, irrigation system ................................................................................................... 297

Pressure rinsing ........................................................................................................................................ 716

Pressure tests, irrigation systems............................................................................................................. 309

Pressure washing ..................................................................................................................................... 716

Prestressing concrete ............................................................................................................................... 575

anchorages and distribution .................................................................................................................. 581

bonding and grouting ............................................................................................................................ 581

ducts...................................................................................................................................................... 579

equipment and calibration ..................................................................................................................... 577

grout ...................................................................................................................................................... 578

prestressing steel .................................................................................................................................. 577

shop drawings ....................................................................................................................................... 575

test samples .......................................................................................................................................... 576

vents...................................................................................................................................................... 579

Price adjustment

changed quantities .................................................................................................................................. 29

for changed quantities........................................................................................................................... 117

quantity decreases of more than 25 percent ........................................................................................ 117

quantity increases of more than 25 percent.......................................................................................... 117

Price index fluctuations ............................................................................................................................. 118

opt out of ................................................................................................................................................. 23

Property preservation ................................................................................................................................. 44

Proportioning

automatic............................................................................................................................................... 982

1055

INDEX

concrete ................................................................................................................................................ 980

minor concrete ...................................................................................................................................... 992

volumetric.............................................................................................................................................. 995

Protecting

cementitious materials .......................................................................................................................... 972

concrete ........................................................................................................................................ 984, 991

Protecting concrete structures .................................................................................................................. 599

Protection

stray current .......................................................................................................................................... 644

Protective radius ......................................................................................................................................... 11

Protest .................................................................................................................................... 25, 34, 48, 102

Pruning ..................................................................................................................................................... 285

Public convenience ..................................................................................................................................... 71

Public safety ........................................................................................................................... 29, 63, 72, 105

Pull boxes

cover markings, electrical systems ....................................................................................................... 904

electrical systems .................................................................................................................................. 903

traffic, electrical systems ....................................................................................................................... 904

Pull boxes, irrigation systems ................................................................................................................... 290

Pumping

booster pumps ...................................................................................................................................... 825

equipment and controls ......................................................................................................................... 809

equipment, drainage ............................................................................................................................. 813

plant electrical equipment ..................................................................................................................... 818

Pumping equipment and controls ............................................................................................................. 809

Pumping plant electrical equipment.......................................................................................................... 818

Pumping plant metal work ........................................................................................................................ 842

Pumps

booster .................................................................................................................................................. 827

drainage ................................................................................................................................................ 815

use of before contract acceptance ........................................................................................................ 813

Push button posts, electrical systems ...................................................................................................... 897

Q
QC inspector

precast .................................................................................................................................................. 133

welding .................................................................................................................................................. 135

QC manager ............................................................................................................................................. 133

precast concrete.................................................................................................................................... 133

welding .................................................................................................................................................. 137

QC plans................................................................................................................................................... 133

precast concrete.................................................................................................................................... 133

welding .................................................................................................................................................. 137

QC procedure certification ........................................................................................................................ 124

Quality assurance ................................................................................................................................. 33, 58

Quality control ....................................................................................................................................... 33, 58

Quality control plan ..................................................................................................................................... 11

welding steel structures ........................................................................................................................ 663

Quick coupling valves, irrigation system................................................................................................... 297

R
Railings ..................................................................................................................................................... 867

bridge steel............................................................................................................................................ 871

cable ...................................................................................................................................................... 871

chain link ............................................................................................................................................... 873

concrete ................................................................................................................................................ 872

metal ..................................................................................................................................................... 872

metal beam guard railing ...................................................................................................................... 867

1056

INDEX

temporary metal beam guard railing ..................................................................................................... 870

tubular metal ......................................................................................................................................... 872

Type DTB transition railing.................................................................................................................... 876

Type K, temporary ................................................................................................................................ 148

Type STB transition railing .................................................................................................................... 876

Type WB transition railing ..................................................................................................................... 870

Railroads

property ................................................................................................................................................... 44

relations................................................................................................................................................... 39

Rain event action plan ...................................................................................................................... 170, 172

Ramp metering sign ................................................................................................................................. 934

Rapid setting concrete patch, bridge ........................................................................................................ 230

Rapid strength concrete ................................................................................... 583, 584, 587, 619, 620, 993

Rates of application, seal coats ................................................................................................................ 388

Reactor type ballasts, autotransformer and ............................................................................................. 942

Reclaimed asphalt pavement ........................................................................................................... 416, 421

Reconstruct

fences.................................................................................................................................................... 220

Records

auditing.................................................................................................................................................... 42

change order bills .................................................................................................................................... 42

copying .................................................................................................................................................... 42

cost accounting ....................................................................................................................................... 42

inspection ................................................................................................................................................ 42

retention .................................................................................................................................................. 41

Redwood................................................................................................................................................... 700

Reference

to a code ................................................................................................................................................... 3

to a department ......................................................................................................................................... 3

to a document ........................................................................................................................................... 2

to a law...................................................................................................................................................... 2

to a section ................................................................................................................................................ 2

Refinish bridge deck ................................................................................................................................. 232

Regulated species ...................................................................................................................................... 11

Regulations and code, electrical systems ................................................................................................ 891

Regulator type ballasts ............................................................................................................................. 942

Reinforced concrete crib wall ................................................................................................................... 531

Reinforced concrete extensions ............................................................................................................... 550

Reinforced concrete pipe.......................................................................................................................... 745

Reinforcement .................................................................................................................................. 569, 627

bar ......................................................................................................................................................... 628

epoxy-coated................................................................................................................................. 630, 632

epoxy-coated and epoxy-coated prefabricated..................................................................................... 630

galvanized ............................................................................................................................................. 634

headed bar ............................................................................................................................................ 634

prefabricated epoxy-coated .......................................................................................................... 630, 633

splicing .................................................................................................................................................. 637

stray current protection ......................................................................................................................... 644

welded wire ................................................................................................................................... 628, 629

Reinforcing bars........................................................................................................................................ 628

Reinstalling electrical equipment, electrical systems ............................................................................... 954

Relay existing facilities ............................................................................................................................. 224

Relocate

irrigation facilities .................................................................................................................................. 222

roadside signs ....................................................................................................................................... 222

Remodel existing facilities ........................................................................................................................ 224

Remote control valves, irrigation system .................................................................................................. 296

Remove

asphalt concrete surfacing, bridge ........................................................................................................ 230

1057

INDEX

bridge .................................................................................................................................................... 225

bridge, access openings ....................................................................................................................... 228

bridge, protective covers ....................................................................................................................... 226

cable chain link barriers ........................................................................................................................ 218

chip seal, bridge .................................................................................................................................... 230

concrete ................................................................................................................................................ 224

concrete deck surface ........................................................................................................................... 230

contrast treatment ................................................................................................................................. 217

drainage facilities .................................................................................................................................. 218

irrigation facilities................................................................................................................................... 218

metal beam guard railing ...................................................................................................................... 218

pavement .............................................................................................................................................. 216

pavement markers ................................................................................................................................ 217

roadside signs ....................................................................................................................................... 218

subbase, base, and bituminious surfacing ............................................................................................ 216

traffic stripes and pavement markings .................................................................................................. 217

unsound concrete, bridge ..................................................................................................................... 230

Removing

screenings ............................................................................................................................................. 391

Removing and replacing improvements, electrical systems..................................................................... 894

Removing, reinstalling or salvaging electrical equipment......................................................................... 954

Repair of spalled joints ............................................................................................................................. 491

Repair spalled surface area, bridge.......................................................................................................... 231

Replacement, pavement ........................................................................................................................... 511

Request for information ........................................................................................................................ 33, 48

Required Contract Provisions, Federal-Aid Construction Contracts .................................................. 78, 107

Reset

mailboxes .............................................................................................................................................. 222

roadside signs ....................................................................................................................................... 222

Resilient joint material, reinforced concrete pipe...................................................................................... 750

Resources, furnishing of ............................................................................................................................. 33

Retaining wall, type 6 ............................................................................................................................... 534

Retroreflective

bands, portable delineators................................................................................................................... 142

cone sleeves ......................................................................................................................................... 142

sheeting................................................................................................................................................. 142

Retroreflective sheeting, markers and delineators ................................................................................... 864

Revised standard specifications ................................................................................................................. 11

RFI ........................................................................................................................................................ 33, 48

Risers

underdrains ........................................................................................................................................... 770

Roadbed ..................................................................................................................................................... 11

Road-mixed cement treated bases........................................................................................................... 368

Road-mixing machines, cement treated bases ........................................................................................ 369

Roadside ..................................................................................................................................................... 11

Roadside clearing, highway planting ........................................................................................................ 322

Roadside signs ......................................................................................................................................... 694

Roadway..................................................................................................................................................... 11

Rock blanket ............................................................................................................................................. 336

Rock slope protection ............................................................................................................................... 789

Rock slope protection fabric ..................................................................................................................... 962

Rock staining ............................................................................................................................................ 337

Root protector, highway planting .............................................................................................................. 322

Rotational capacity testing

steel structures .............................................................................................................................. 665, 669

Routine biological activities ........................................................................................................................ 11

Rubber gasketed joints, reinforced concrete pipe .................................................................................... 749

1058

INDEX

Salvage, existing facilities......................................................................................................................... 218

Salvaging

electrical equipment .............................................................................................................................. 954

excess screenings, seal coats .............................................................................................................. 391

Sampling and analysis day

numeric action level exceedance report ............................................................................................... 169

numeric effluent limit violation report .................................................................................................... 169

Sampling and analysis plan ...................................................................................................................... 167

Sand

blast cleaning ........................................................................................................................................ 715

Schedule ............................................................................................................................................... 11, 97

baseline ............................................................................................................................... 11, 97, 99, 101

critical path method ................................................................................................................... 97, 98, 100

revised............................................................................................................................... 11, 98, 102, 106

updated ......................................................................................................... 11, 97, 98, 99, 100, 102, 103

Schedule of values ................................................................................................................................... 124

Schedule of values, electrical systems ..................................................................................................... 892

Scheduled completion date ........................................................................................................................ 11

Scheduling of work

electrical systems .................................................................................................................................. 894

Screenings

seal coats .............................................................................................................................................. 383

Seal coat claims.......................................................................................................................................... 77

Seal coats ................................................................................................................................................. 383

maintaining traffic .................................................................................................................................. 154

Sealed joints ............................................................................................................................................. 600

asphaltic plug joint seals ....................................................................................................................... 608

joint seal assemblies MR > 4 inches..................................................................................................... 606

joint seal assemblies MR 4 inches ..................................................................................................... 604

Type A and AL joint seals ..................................................................................................................... 601

Type B joint seals .................................................................................................................................. 603

Seals

bituminous............................................................................................................................................. 383

slurry ..................................................................................................................................................... 392

Sediment filter bag .................................................................................................................................... 961

Self-consolidating concrete ...................................................................................................................... 999

mock-up .............................................................................................................................................. 1000

Service, electrical systems ....................................................................................................................... 913

Service-approved biologist ......................................................................................................................... 11

Settlement periods, earthwork .................................................................................................................. 276

Sheets, sign structures ............................................................................................................................. 690

Shop drawings ...................................................................................................................................... 10, 40

falsework ............................................................................................................................................... 537

steel structures ...................................................................................................................................... 663

Shotcrete .................................................................................................................................................. 649

structural ............................................................................................................................................... 650

Shoulder ..................................................................................................................................................... 11

Shoulder backing ...................................................................................................................................... 279

Shown, interpretation .................................................................................................................................... 1

Side form, PCC pavement ........................................................................................................................ 478

Sidewalks, curbs and, concrete ................................................................................................................ 803

Sign illumination control, electrical systems ............................................................................................. 914

Sign lighting fixtures

induction ................................................................................................................................................ 947

Sign panels

furnish ................................................................................................................................................... 681

install on existing frame ........................................................................................................................ 697

1059

INDEX

install on removable sign panel frame .................................................................................................. 697

installation ..................................................................................................................................... 693, 696

overlay................................................................................................................................................... 697

roadside signs ....................................................................................................................................... 694

Sign structures .......................................................................................................................................... 687

box beam-closed truss .......................................................................................................................... 687

bridge mounted ..................................................................................................................................... 687

fabrication.............................................................................................................................................. 691

lightweight ............................................................................................................................................. 687

truss ...................................................................................................................................................... 687

tubular ................................................................................................................................................... 687

Signal cable, electrical systems................................................................................................................ 907

Signal faces

light emitting diode pedestrian .............................................................................................................. 931

light emitting diode signal module ......................................................................................................... 924

pedestrian signals ................................................................................................................................. 930

programmed visibility signals ................................................................................................................ 930

vehicle signals ....................................................................................................................................... 922

Signal interconnect cable ......................................................................................................................... 909

Signal mounting assemblies ..................................................................................................................... 934

Signal sections.......................................................................................................................................... 922

metal, vehicle signals ............................................................................................................................ 923

plastic, vehicle signals .......................................................................................................................... 923

Signs ......................................................................................................................................................... 687

bridge painting and cleaning operations ............................................................................................... 155

construction area................................................................................................................................... 145

flashing arrow ........................................................................................................................................ 144

furnish sign panels ................................................................................................................................ 681

internally illuminated street name ......................................................................................................... 949

portable ................................................................................................................................................. 146

portable changeable message .............................................................................................................. 151

roadside ................................................................................................................................................ 694

stationary mounted construction area ................................................................................................... 147

Signs, removal of warning, regulatory, or guide ......................................................................................... 32

Silt fence fabric ......................................................................................................................................... 960

Siphons

corrugated steel pipe ............................................................................................................................ 753

reinforced concrete pipe ....................................................................................................................... 746

Slab replacement ...................................................................................................................................... 501

Sliding joints.............................................................................................................................................. 610

Slip bases, electrical systems ................................................................................................................... 897

Slip-form curb construction ....................................................................................................................... 804

Slip-form, PCC pavement ......................................................................................................................... 479

Slope paving ............................................................................................................................................. 796

exposed aggregate finish ...................................................................................................................... 797

Slope protection ........................................................................................................................................ 789

concrete slope protection, gutter lining, ditch lining, and channel lining ............................................... 794

concreted-rock ...................................................................................................................................... 791

gabions.................................................................................................................................................. 798

rock ....................................................................................................................................................... 789

slope paving .......................................................................................................................................... 796

small-rock .............................................................................................................................................. 793

Slopes, earthwork ..................................................................................................................................... 262

Slotted corrugated steel pipe .................................................................................................................... 758

Slotted pipe

edge drains ........................................................................................................................................... 774

horizontal drains .................................................................................................................................... 773

Slurry

mineral slurry......................................................................................................................................... 566

1060

INDEX

synthetic slurry ...................................................................................................................................... 567

water slurry............................................................................................................................................ 567

Slurry cement backfill ....................................................................................................................... 266, 270

Slurry leveling course ............................................................................................................................... 662

Slurry seal ................................................................................................................................................. 396

Small business...................................................................................................................................... 20, 76

participation report .................................................................................................................................. 26

preference ............................................................................................................................................... 21

Small tool .................................................................................................................................................... 11

Small-rock slope protection ...................................................................................................................... 793

Smoothness .............................................................................................................................................. 585

Snowplow deflectors ................................................................................................................................. 600

Soffit and wall luminaires .......................................................................................................................... 944

Soil amendment, highway planting ........................................................................................................... 322

Soil nail walls, earthwork .......................................................................................................................... 264

Soil nails ........................................................................................................................................... 513, 520

Soil stabilization, temporary...................................................................................................................... 182

Soldier pile walls ............................................................................................................... 263, 268, 270, 271

Solid waste disposal and recycling ........................................................................................................... 209

Sound walls .............................................................................................................................................. 709

alternative sound wall systems ............................................................................................................. 713

masonry block ....................................................................................................................................... 709

Source inspection expense deductions ...................................................................................................... 60

Southern yellow pine ................................................................................................................................ 700

Special provisions ....................................................................................................................................... 11

Specifications.............................................................................................................................................. 11

Specified, interpretation ................................................................................................................................ 1

Spiral rib pipe ............................................................................................................................................ 759

Splice insulation, electrical systems ......................................................................................................... 911

Splicing conductors, electrical systems .................................................................................................... 910

Splicing reinforcing steel ........................................................................................................................... 637

Sprinkler control crossover, irrigation systems ......................................................................................... 292

Sprinklers, irrigation systems.................................................................................................................... 295

SSPC QP certification ................................................................................................................................ 23

Stabilized Soils

Lime ...................................................................................................................................................... 355

Staking plants, highway planting .............................................................................................................. 322

Standard specifications .............................................................................................................................. 11

Standards, poles, steel pedestals, and posts ........................................................................................... 896

Start of job site activities ........................................................................................................................... 104

State ........................................................................................................................................................... 11

State Specification ...................................................................................................................................... 59

Stationary mounted signs, construction area ........................................................................................... 147

Steam cleaning ......................................................................................................................................... 716

Steel

lists, reinforcement ................................................................................................................................ 627

prestressing........................................................................................................................................... 577

walkway gratings, sign structures ......................................................................................................... 690

Steel crib wall............................................................................................................................................ 533

Steel grit

blast cleaning ........................................................................................................................................ 715

Steel pipe piles ......................................................................................................................................... 553

Class N.................................................................................................................................................. 556

Class R.................................................................................................................................................. 557

Steel sheet piles ....................................................................................................................................... 560

Steel shot

blast cleaning ........................................................................................................................................ 715

Steel soldier piles...................................................................................................................................... 573

painting.................................................................................................................................................. 725

1061

INDEX

Storm water annual report ........................................................................................................ 165, 170, 173

Storm water pollution prevention plan ...................................................................................................... 165

annual certification ................................................................................................................................ 168

construction site monitoring program .................................................................................................... 166

numeric action level .............................................................................................................................. 171

numeric effluent limit ............................................................................................................................. 172

rain event action plan .................................................................................................................... 170, 172

sampling and analysis day............................................................................................................ 169, 173

sampling and analysis plan ................................................................................................................... 167

sampling and analysis plan for nonvisible pollutants ............................................................................ 167

site inspection reports ........................................................................................................................... 168

storm water annual report ............................................................................................................. 165, 170

visual monitoring reports ....................................................................................................................... 168

Stray current protection ............................................................................................................................ 644

Street name signs, internally illuminated .................................................................................................. 949

Stringers, wood structures ........................................................................................................................ 702

Strip waterstops ........................................................................................................................................ 611

Structural aluminum plate pipe ................................................................................................................. 763

Structural metal plate pipe, arches and pipe arches ................................................................................ 763

Structural metal, wood structures ............................................................................................................. 699

Structural shotcrete................................................................................................................................... 650

Structural steel .......................................................................................................................................... 663

erection ................................................................................................................................................. 677

painting.................................................................................................................................................. 717

thermal spray coating ............................................................................................................................ 726

Structural steel plate pipe ......................................................................................................................... 763

Structural timber and lumber, wood structures ......................................................................................... 700

Structure approach drainage systems ...................................................................................................... 619

Structure backfill ....................................................................................................................... 264, 267, 269

Structure Design ......................................................................................................................................... 11

Structure excavation and backfill .............................................................................................................. 263

Structures

falsework ............................................................................................................................................... 537

plastic lumber ........................................................................................................................................ 704

sign ........................................................................................................................................................ 687

wood...................................................................................................................................................... 700

Stud connectors ................................................................................................................................ 669, 671

Subbase...................................................................................................................................................... 11

Subbases, aggregate................................................................................................................................ 361

Subcontracting ............................................................................................................................................ 36

Subcontractor List....................................................................................................................................... 23

Subgrade .................................................................................................................................................... 12

aggregate bases ................................................................................................................................... 364

aggregate subbases ............................................................................................................................. 362

cement treated bases ........................................................................................................................... 368

concrete curbs and sidewalks ............................................................................................................... 803

lean concrete base ................................................................................................................................ 376

treated permeable bases ...................................................................................................................... 379

Subgrade enhancement geotextile ................................................................................................... 279, 964

Submittals ............................................................................................................................................. 12, 39

action ................................................................................................................................................. 12, 39

informational...................................................................................................................................... 12, 41

Subsealing
pavement .............................................................................................................................................. 489

Substantial defects ............................................................................................................................... 12, 61

Substructure ............................................................................................................................................... 12

Subsurface drains ..................................................................................................................................... 769

Superstructure ............................................................................................................................................ 12

Supplemental project information ......................................................................................................... 12, 17

1062

INDEX

Supplementary cementitious materials

concrete ................................................................................................................................................ 973

corrosive environment........................................................................................................................... 986

deicing chemicals, exposed to .............................................................................................................. 987

freeze-thaw area ................................................................................................................................... 987

minor concrete ...................................................................................................................................... 991

precast concrete ................................................................................................................................... 997

Supply line on structures .......................................................................................................................... 311

Surcharge, earthwork ............................................................................................................................... 276

Surface Mining and Reclamation Act ......................................................................................................... 70

Surfacing..................................................................................................................................................... 12

Surge arrestor, electrical systems ............................................................................................................ 921

T
Tack coat .................................................................................................................................. 411, 424, 429

Take ............................................................................................................................................................ 12

Tapered inlets, overside drains

aluminum............................................................................................................................................... 779

steel....................................................................................................................................................... 779

Target plates, markers .............................................................................................................................. 864

Telephone Numbers ................................................................................................................................... 14

Telescoping flag trees .............................................................................................................................. 149

Active treatment system ........................................................................................................................... 191

Temporary active treatment system ......................................................................................................... 191

Temporary concrete washout

bin ................................................................................................................................................. 196, 197

facility .................................................................................................................................................... 196

portable ......................................................................................................................................... 196, 197

Temporary cover....................................................................................................................................... 961

Temporary culverts ................................................................................................................................... 735

Temporary linear sediment barriers.......................................................................................................... 197

fiber rolls........................................................................................................................................ 198, 200

foam barrier ................................................................................................................................... 199, 202

gravel bag berm .................................................................................................................................... 200

high visibility fabric ................................................................................................................................ 198

large sediment barrier ........................................................................................................................... 200

reinforced silt fence ............................................................................................................................... 201

rigid sediment barrier ............................................................................................................................ 188

silt fence ................................................................................................................................................ 201

straw bale barrier .................................................................................................................................. 202

Temporary metal beam guard railing ....................................................................................................... 870

Temporary sediment control ..................................................................................................................... 185

check dam ............................................................................................................................................. 187

drainage inlet protection........................................................................................................................ 187

erosion control blanket.......................................................................................................................... 185

fiber rolls................................................................................................................................................ 188

gravel bag berm .................................................................................................................................... 188

large sediment barrier ........................................................................................................................... 188

reinforced silt fence ............................................................................................................................... 188

rigid plastic barrier ................................................................................................................................. 185

sediment filter bag ......................................................................................................................... 186, 188

silt fence ................................................................................................................................................ 188

straw bale barrier .................................................................................................................................. 188

Temporary soil stabilization ...................................................................................................................... 182

Temporary steel casings .......................................................................................................................... 568

Temporary structures ............................................................................................................................... 537

Temporary tracking control

construction entrance.................................................................................................................... 188, 191

1063

INDEX

construction roadway .................................................................................................................... 188, 191

street sweeping ............................................................................................................................. 188, 191

Temporary traffic control devices ............................................................................................................. 141

Termination

Contract......................................................................................................................................... 107, 108

Contractor's control ............................................................................................................................... 107

Test borings ...................................................................................................................................... 547, 549

Test panels ............................................................................................................................................... 584

Test samples ........................................................................................................................................ 41, 61

check testing ......................................................................................................................................... 664

Testing, job site........................................................................................................................................... 61

Tests

field, electrical systems ......................................................................................................................... 915

functional testing, electrical systems..................................................................................................... 915

insulation test, electrical systems.......................................................................................................... 915

material and equipment, electrical systems .......................................................................................... 914

Thermal spray coating process, sign structures ....................................................................................... 693

Thermoplastic

pavement markings ............................................................................................................................... 882

traffic stripes .......................................................................................................................................... 882

traffic stripes and pavement markings .................................................................................................. 882

Thrie beam barrier .................................................................................................................................... 875

Timber

catwalk .................................................................................................................................................. 703

lagging................................................................................................................................................... 703

painting.................................................................................................................................................. 723

Time impact analysis .............................................................................................. 12, 49, 50, 102, 103, 122

Time-related overhead ............................................................................................................................. 121

Time-scaled network diagram .................................................................................................................... 12

Topsoil, erosion control ............................................................................................................................ 349

Total bid ...................................................................................................................................................... 12

Total float .................................................................................................................................................... 12

Trade name ................................................................................................................................................ 58

Traffic.......................................................................................................................................................... 12

cones ..................................................................................................................................................... 149

signal faces and fittings ......................................................................................................................... 922

stripes and pavement markings ............................................................................................................ 881

Traffic control system


ramp closure ......................................................................................................................................... 157

Traffic handling equipment and devices ................................................................................................... 141

Traffic lane .................................................................................................................................................. 12

Transformers

electrical systems .................................................................................................................................. 952

submersible ........................................................................................................................................... 953

Transition railing

Type DTB .............................................................................................................................................. 876

Type STB .............................................................................................................................................. 876

Type WB ............................................................................................................................................... 870

Traveled way .............................................................................................................................................. 12

Treated permeable bases ......................................................................................................................... 379

asphalt........................................................................................................................................... 379, 380

cement .................................................................................................................................................. 379

grade tolerance ..................................................................................................................................... 381

subgrade ............................................................................................................................................... 379

Treatment
of lumber, timber and piling, preservative ............................................................................................. 701

Tubular metal railing ................................................................................................................................. 872

Tunnel ................................................................................................................................................... 12, 69

Type A and AL joints seals ....................................................................................................................... 601

1064

INDEX

Type B joint seals ..................................................................................................................................... 603

Type DTB transition railing ....................................................................................................................... 876

Type ESA temporary fence ...................................................................................................................... 203

Type K temporary railing .......................................................................................................................... 148

Type STB transition railing ....................................................................................................................... 876

Type WB transition railing......................................................................................................................... 870

U
Unauthorized work ...................................................................................................................................... 12

Underdrains .............................................................................................................................................. 769

outlets.................................................................................................................................................... 770

perforated aluminum pipe ..................................................................................................................... 770

perforated plastic pipe........................................................................................................................... 770

perforated steel pipe ............................................................................................................................. 769

risers ..................................................................................................................................................... 770

Unions, irrigation systems ........................................................................................................................ 295

Units ...................................................................................................................................................... 2, 111

Unsuitable material, earthwork ................................................................................................................. 259

Use of pumps before contract acceptance............................................................................................... 813

Utilities ........................................................................................................................................................ 45

Utility facilities ................................................................................................................................... 589, 594

Value analysis............................................................................................................................................. 31

Value engineering change proposal ........................................................................................................... 30

Valve assembly units, irrigation systems .................................................................................................. 298

Valve boxes, irrigation systems ................................................................................................................ 298

Vehicle Code .............................................................................................................................................. 71

Vehicle detectors

inductive loop ........................................................................................................................................ 936

magnetic................................................................................................................................................ 939

Verification tension testing

steel structures ...................................................................................................................................... 669

Visors, electrical systems ......................................................................................................................... 924

Volume conversion table

asphaltic emulsions ............................................................................................................................. 1024

liquid asphalt ....................................................................................................................................... 1012

Volumetric proportioning........................................................................................................................... 995

W
Wages......................................................................................................................................................... 65

Wall drain.................................................................................................................................................. 959

Wall drains ................................................................................................................................................ 594

Water

nonpotable ............................................................................................................................................ 255

recycled ................................................................................................................................................. 255

supply .................................................................................................................................................... 255

Water control and foundation treatment, earthwork ................................................................................. 268

Water line crossovers ............................................................................................................................... 292

Water pollution control .............................................................................................................................. 159

Water pollution control manager............................................................................................................... 161

Water pollution control program ............................................................................................................... 163

erosivity waiver...................................................................................................................................... 163

Water supply line, on structures ....................................................................................................... 314, 316

Water, erosion control .............................................................................................................................. 349

Watering ........................................................................................................................................... 255, 327

Watering, highway planting ...................................................................................................................... 284

1065

INDEX

Waterproofing ........................................................................................................................................... 655

asphalt membrane ................................................................................................................................ 655

deck seal ............................................................................................................................................... 660

membrane, and protective cover .......................................................................................................... 658

preformed membrane ........................................................................................................................... 656

Waterstops................................................................................................................................................ 610

Watertightness, culvert joints .................................................................................................................... 730

Weather conditions

painting.................................................................................................................................................. 715

Web Sites ................................................................................................................................................... 14

Weep holes............................................................................................................................................... 594

Welded steel pipe, miscellaneous drainage facilities ............................................................................... 782

Welded wire reinforcement ............................................................................................................... 628, 629

Welding..................................................................................................................................................... 135

falsework ............................................................................................................................................... 538

steel structures ...................................................................................................................................... 676

structural steel ....................................................................................................................................... 676

Welding quality control ............................................................................................................................. 137

Welding, sign structures ........................................................................................................................... 692

Wheel guards and railings, wood structures ............................................................................................ 702

Wheelchair ramps

curb ramps, concrete ............................................................................................................................ 806

Wildflower seeding.................................................................................................................................... 328

Willow cuttings .......................................................................................................................................... 338

Wiring diagrams, electrical systems ......................................................................................................... 892

Wiring, electrical systems ......................................................................................................................... 909

Withhold ...................................................................................................................................................... 12

Withholds .................................................................................................................................................. 125

Wood poles, electrical systems ................................................................................................................ 914

Wood posts

markers and delineators ....................................................................................................................... 864

roadside signs ....................................................................................................................................... 694

Wood structures........................................................................................................................................ 700

Work ........................................................................................................................................................... 12

alternatives.............................................................................................................................................. 33

assignment .............................................................................................................................................. 35

completion ............................................................................................................................................... 56

control of ................................................................................................................................................. 33

description ............................................................................................................................................... 29

first order of, electrical systems ............................................................................................................ 894

maintenance............................................................................................................................................ 45

means and methods ............................................................................................................................... 33

noncompliant ........................................................................................................................................... 43

rejection................................................................................................................................................... 34

scheduling of, electrical systems .......................................................................................................... 894

scope ....................................................................................................................................................... 29

suspension ............................................................................................................................................ 105

unauthorized ........................................................................................................................................... 43

Work plan .................................................................................................................................................... 12

painting quality ...................................................................................................................................... 717

thermal spray coating quality ................................................................................................................ 726

Work zone................................................................................................................................................... 12

Worker, character ....................................................................................................................................... 38

Working hours............................................................................................................................................. 68

Writing

from the Contractor ................................................................................................................................... 1

from the Department ................................................................................................................................. 1

Wye strainer, irrigation systems ............................................................................................................... 298

1066