You are on page 1of 4

Check Punching Shear of PILE REACTION

Pilecap Specification :
Width

bf := 1500mm

Length

df := 1500mm

Height

hf := 500mm

Vol

Vp := bf df hf
Vp = 1.13 m

Concrete strength

fc := 30MPa

GS of concrete

c := 2400

kgf
m

Yield strength of steel

fy := 400MPa

Thickness of pilecap

hf = 500 mm

Cover concrete

cc := 75mm

Pile cut off (from bottom pilecap)

pco := 75mm

Effective depth

de := hf cc

de = 425 mm
Diameter of pile

dP := 500mm

Perimeter of Shear

bo := dP + de

bo = 2905.97 mm
Maximum Punching Shear Force
Max. Support Reaction

Fymax := 495.55kN = 50.53 tonnef

Selfweight of Pilecap

Wtp := c Vp
Wtp = 2.7 tonnef

Number of Pile in 1 Pilecap

np := 1

Maximum punching shear force

Pumax :=

Ultimate punching shear force

Vn :=

Fymax + Wtp

Pumax
0.75

np

= 53.23 tonnef

= 696.04 kN

Check Nominal Shear Strength


a.

c := 1

Vc1 := 0.17 1 +

b.

s := 20

2
fc 1MPa bo de = 3449.94 kN
c

s de

Vc2 := 0.083

bo

c.

+ 2 fc 1MPa bo de = 2765.2 kN

Vc3 := 0.33 fc 1MPa bo de = 2232.31 kN

Minimum Nominal Shear Strength (provided by concrete), Vc =

Vc := min Vc1 , Vc2 , Vc3

Vc = 2232.31 kN
Status :=

"OKE" if Vc > Vn
"NOT OKE" if Vc Vn

Status = "OKE"

Check Punching Shear of COLUMN REACTION

Column Specification :
Width

bp := 300mm

Length

dp := 300mm

527.3
kN = 703.07 kN
0.75

Punching Shear

Vn 2 :=

Effective depth

de = 425 mm

Perimeter of shear

bo2 := 2 bp + de + dp + de

) (

bo2 = 2900 mm
bp
c 2 :=

=1
dp

c.2 for column

Check Nominal Shear Strength


a.

c 2=1

Vck1 := 0.17 1 +

b.

s = 20

s de

Vck2 := 0.083

c.

2
fc 1MPa bo2 de = 3442.85 kN
c 2

bo2

+ 2 fc 1MPa bo2 de = 2762.89 kN

Vck3 := 0.33 fc 1MPa bo2 de = 2227.72 kN

Vck := min Vck1 , Vck2 , Vck3 = 2227.72 kN

Status2 :=

"OKE" if Vck > Vn 2


"NOT OKE" if Vck Vn 2

Status2 = "OKE"

You might also like