You are on page 1of 2

ARAR INFRASTRUCTURE

CONSULTANT: DAR AL RIYADH

Dia
250
200
160
110
90
75
63
50
40
32
25
20
PERCENTAGE

HDPE Pipe
length( mts)
0
245
7902
6908

pipe
installed

1960
1050

DATE: 30/07/2015

SUB:Portable water&Fire Work progress Report


CONTRACTOR:MASCO
valve
FH
GV(nos) installed FH(nos) INSTALLED
2
43
57

CLIENT: MOH

WATER
METER(nos)

141
9

638
19.92

DATE: 30/07/2015
CLIENT: MOH
INSTALLA
INSTALLA
TION
D.I PIPE TION
1210
0
855