ENGINEERING GUIDELINES
Sip Out clstetons (orton)
Estimating Downward
Vertical Projection
\extons invert oroecton of»
Feet bt ceed abn si)
{be etsy uty (igure
So) Ti carton he gt and
eat tne doanm seve a ered
Frozen nonin ompertre
(Sterns rg heat. 3.
‘epee itera f° ag
‘leg ner rt
tear ectmatealet rectors
it eet trp eet
ERRHET OSE 5
ation ea ke
Dituser Applications
on Exposed Ducts
‘A ord tert err ater when,
(ete elo cling lr eet ud overt
theca Thuan cused by at rene eon
ig eed shee der lng te he
brosur mre room path ear. alo psite
{orth das to ht De apt th con
‘Gen goon on teat vere roto, her
‘home ta veteal postin be snd fom he ell
ation
ow patents ae otal of ang
‘heat og tomar whens frre ater
bream tea jreare brome hes eal Uae
I thereon ante, oo presser
‘nether han ros flow pen sro
oust beter srt er! pen an
(aces ate ates pects om te
‘os ow patra ah he ces canbe spend
‘ae eer mite ceria he oasis igs.
these
‘goa dsr Napa he TOCA, wth 3
‘oy paton,
ey
$$ suisnsic: anv sa ro BS
ye 2 TOG, #5 ae 250 Moun nose Dut
Ce