Transmittal No.

Date

Description

Received
Date

HHR-P1P2-S4-TM-0008

04/06/11

Method of Statement Excavation Works Rev.0

04/06/11

HHR-P1P2-S4-TM-0008 Rev.1

28/06/11

Method of Statement Excavation Works Rev.1

29/06/11

HHR-P1P2-S4-TM-0021

25/07/11

Project Quality Plan Rev.2

26/07/11

HHR-P1P2-S4-TM-0021 Rev1

21/08/11

Project Quality Plan Rev.3

21/08/11

P1P2-S4-CON-DAR-TRM-0039

26/09/11

Project Quality Plan Rev.4

26/09/11

P1P2-S4-CON-DAR-TRM-0086

15/10/11

Method statement for rock excavation with blasting

15/10/11

P1P2-S4-CON-DAR-TRM-0088

20/10/11

Soil investigation test results

20/10/11

P1P2-S4-CON-DAR-TRM-0090

02/11/11

Method Statement for steel works erection

02/11/11

P1P2-S4-CON-DAR-TRM-0092

13/11/11

Procedure for Survey Works

15/11/11

P1P2-S4-CON-DAR-TRM-0098

21/11/11

Soil Resistivity Test Report

04/12/11

P1P2-S4-CON-DAR-TRM-0103

13/12/11

Soil Resistivity Test Report

18/12/11

P1P2-S4-CON-DAR-TRM-0104

14/12/11

Procedure for Concrete works Rev 01 (P1P2-S4-CON-GN-C-AL-PR-0004 R01)

14/12/11

P1P2-S4-CON-DAR-TRM-0105

14/12/11

ITP for concrete Works ((P1P2-S4-CON-GN-C-AL-IT-0001 R01)

14/12/11

P1P2-S4-CON-DAR-TRM-0106

17/12/11

MS for cast Insitu reinforced concrete structutrer

18/12/11

P1P2-S4-CON-DAR-TRM-0121

12/23/2011 MS for cast Insitu reinforced concrete structutre R1

P1P2-S4-CON-DAR-TRM-0122

alper

P1P2-S4-CON-DAR-TRM-0123

alper

P1P2-S4-SBC-TRM-0155

1/11/2012 MS FOR CAST INSITU REINFORCED CONCRETE STRUCTURE REVISION 01

24/12/11

Code

Code 2

Action Date

21/06/11

25/07/11

01/08/11

06/09/11

23/10/11

19/10/11

24/10/11

12/12/2011

11/23/2011

12/7/2011

1/24/2012

12/17/2011

12/17/2011

C
P

1/2/2012