9.3.2 Backfiling and heavy equipment shall not be allowed to be kept at the edge of
‘excavation pit.
9.3.3 Dally site inspections before work commences should be carried out to look for
indications of any situation that could result in cave-ins and indications of failure of
protective systemis.
9.3.4 Provide sufficient lighting within and around the edges of excavation pit during the
hours of darkness to allow safe working conditions.
10.0 Quality Assurance
10.1. All Site activities shall be in compliance with the Contractor's Project Quality Plan which
was submitted to the Engineer on 2012.02.10 with TRANSMITTAL NO.NRY-YM-2012-009.
10.2 In order to monitor, coordinate and verify the site works, ‘Inspection and Test Plan’ and
=< ‘Inspection checklist’ shall be followed (see Appandices 3 and 4).
Vets S _
- 10.3 All required tests will bo carried out either by approved independent Testing Laboratory or
(s— ~~), Site Laboratory in accordance with the specifications,
9 Seo
we} ore 10.4 Inspoctions and test results will be recorded and forwarded to the Engineer for review and
g Kes approval
Appendices:
Appendix 1 Typical Excavation Details
Appendix 2. Construction Sequence
Appendix 3 Inspection Test Plan
Appendix 4 Inspection Checklist