You are on page 1of 1
EMPLOYER dno of aut Arai, ny ofan, Pu vente Fund PF) provecr | Nr south Raheny Proje conet Anipeh Wekthop Werks froween LB rn er Cara Conn BA an EE OD 8 A 0) CONTRACTOR Yorke Sa co. 9.3.2 Backfiling and heavy equipment shall not be allowed to be kept at the edge of ‘excavation pit. 9.3.3 Dally site inspections before work commences should be carried out to look for indications of any situation that could result in cave-ins and indications of failure of protective systemis. 9.3.4 Provide sufficient lighting within and around the edges of excavation pit during the hours of darkness to allow safe working conditions. 10.0 Quality Assurance 10.1. All Site activities shall be in compliance with the Contractor's Project Quality Plan which was submitted to the Engineer on 2012.02.10 with TRANSMITTAL NO.NRY-YM-2012-009. 10.2 In order to monitor, coordinate and verify the site works, ‘Inspection and Test Plan’ and =< ‘Inspection checklist’ shall be followed (see Appandices 3 and 4). Vets S _ - 10.3 All required tests will bo carried out either by approved independent Testing Laboratory or (s— ~~), Site Laboratory in accordance with the specifications, 9 Seo we} ore 10.4 Inspoctions and test results will be recorded and forwarded to the Engineer for review and g Kes approval Appendices: Appendix 1 Typical Excavation Details Appendix 2. Construction Sequence Appendix 3 Inspection Test Plan Appendix 4 Inspection Checklist | a yap. | ‘Method Statement for Excavation Works 10 Mar, 2012 merkezi NRW/YMISLA/SWVEAW/MS/001-00 travels

You might also like