Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

Projects 1.General
& Supplies Co.Data

SUD1-03-001
Page 1 of 7

and Information:

Panel designation
Manufacture
2. Mechanical Check And Visual Inspection: As per TCS P105 Item no 4.1
Item
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

13.
14.
15.
16.

Description
Check tightness of all connections
Inspect for physical damage / defects
Panel condition, cleanliness, organization, labeling, readiness for service, panel
doors, handles...etc
CT shorting checked
Indications checked
Check the ferrules as per specification
Panel Earthing checked
Confirm that each panel has been properly secured to the floor in its final service
location.
Confirm that panels are constructed and wired as per SEC relevant
specification.
Check case cover and gasket for proper seal against dust.
Check all installed equipment nameplate information for compliance to
approved drawings and equipment /material lists.
For all internal and external panel wiring, confirm that all screw terminations are
tight and that crimp connectors are firmly secured to the wire and to the
termination point. Ensure that no part of the wire is bent
at the termination point. Check Ferrules.
Check that panel equipment is mounted securely and protected against
mal operation due to vibration, shock, etc
Use of ring type terminals for wire termination for current circuit wires.

Checked
Yes
N/A
Yes
N/A
Yes
N/A

Disconnectors Manual operation by handle and related interlocking


conditions to be checked
Mechanical interlocking between DS & ES to be checked

Yes
Yes
Yes
Yes
Yes

N/A
N/A
N/A
N/A
N/A

Yes

N/A

Yes
Yes

N/A
N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

3. Electrical Tests
Item
1
2
3
4.
5

Description
Insulation Resistance Test report of all wires to be submitted by the
contractor prior witnessing and made available
Dc power/ control supply checked.
AC Power/ Control supply checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close status
checked
All CBS, DSWs and ESWs should be tested before starting function
check

Test Performed by:


Name:

ENG/

Checked
Yes
N/A
Yes
Yes
Yes

N/A
N/A
N/A

Yes

N/A

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

Projects 4.
& Supplies
Co.breaker
Circuit

Sl no.

6.

Setting
values

st

CB blocked status
Closing
Tripping

Remarks

SF6 Gas pressure 1 Stage


nd
SF6 Gas pressure 2 Stage
CB spring charged condition
Anti-Pumping condition

Checking of Operation and Indications

Equip
Ref

Command

Operation
ECC
LCC CR
(FMK)

Test Performed by:


Name:

Page 2 of 7

closing / tripping blocking conditions:


Description

1
2
3
4

SUD1-03-001

ENG/

Indication
LCC

CR

ECC
(FMK)

Condition

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Remarks

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

----04
Open/
Close
----06
Close

----01Y
----01X
----01Z
---- 01

Open
/close

----------------Service
Test

--- 03
7.

Page 3 of 7

Service/
bus transfer
Test
Service/
Bus transfer
Test
Service
Test

Projects & Supplies Co.

----05

SUD1-03-001

Functional and Interlocking Test for Circuit Breaker ----05:


Operation

Condition

Equipments

Close*

Test
Service1
Service2

Status

Ds ---03,----04&----06
DS-----03 & ------06
DS------03 & -------04

Remarks

Fo
FC
FC

All checked under normal sf6 gas pressure operating conditions


* Protection relays should be Reset & Synchro condition OK
** Protection relays operated
Note:
FO: fully open
FC:
fully close

8.

Functional and Interlocking Test for Bus Disconnector ----04:


Operation

Condition
Test

Test Performed by:


Name:

ENG/

Equipments
ES ----01Z&141B

Status
FC

Remarks

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

SUD1-03-001
Page 4 of 7

CB----05
O
Service
DS----06, ES---01X,-FO
01Y,---01Z & 141B
DS----06,236&234
FC
CB-230
C
Bus
transfer-1 ES---01X,----01Y,--01Z
Close/open
FO
& 141B
DS--06,226A,226B,
FC
124A,124B,136 & 134
Bus
CB-120&130
C
transfer-2
ES---01X,---01Y, --01Z
FO
& 141B
Functional and Interlocking Test for Bus Disconnector ----06:

Projects & Supplies Co.

9.

Operation

Condition
Test

Equipments
ES ---01Y & 261B
CB---05
Service
DS-- 04, ES-- 01X,----01Y,--- 01Z
& 261B
DS------04,236 &234
Close/open Bus transfer-1 CB-230
ES----01X,----01Y,---- 01Z & 261B
DS-----04,226A,226B,
124A,124B,136 & 134
Bus transfer-2
CB-130 & 120
ES---01X,-----01Y,----01Z & 261B

Status
FC
O

Remarks

FO
FC
C
FO
FC
C
FO

10. Functional and interlocking test for Line Disconnector ------03:


Operation

Condition
Test-1

Close /
open

Test-2
Service

Equipments
ES----01Y
----01
ES-----01Z
----01
CB----05,------01

Status
FC
C
FC
C
O

Remarks

11. Functional and interlocking test for Earth Switch ----01x:


Operation
Condition
Equipments
Status
Close/open
-----------DS----03,----04 &--06
FO
12. Functional and interlocking test for Earth Switch ----01y:
Test Performed by:
Name:

ENG/

Remarks

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

SUD1-03-001
Page 5 of 7

Projects & Supplies Co.

Operation
Condition
Equipments
Status
Close/open
-----------DS --03,---04 &---06
FO
13. Functional and interlocking test for Earth Switch ----01z:

Remarks

Operation
Condition
Equipments
Close/open
-----------DS --03,----04 & ----06
14. Functional and interlocking test for Earth Switch ----01:

Remarks

Operation
Close/open

Condition
------------

Equipments
HES --03

Status
FO

Status
FO

Remarks

15. Checking of operations from FMK panel:


Equipment

Operation

FMK ---- TB No.

FR

Remarks

Note:
FO: fully open

FC: fully close

O: open

C: close

16. Checking of indications


As per the schematic drawings
LCC
Test Performed by:
Name:

ENG/

CR

ECC (FMK)

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

FEEDER D0
FUNCTION TEST

Sheet No.

Projects & Supplies


Sl. Co.
Events

Command

TB No.

Status

TB No. Status

SUD1-03-001
Page 6 of 7

TB No.

Status

17. Checking of LCC Annun.Indication & Alarms :( annunciator-1):


Channel No.

Events

TB No

LCC
Status

TB No

CR
Status

Status
[
[
[
[
[
[
[
[
[
[

]
]
]
]
]
]
]
]
]
]

Note:
All interlock points were checked according to interlocking conditions table which is
Approved by system operation department

Test Performed by:


Name:

ENG/

Test Witnessed by:

Date of Test

ENG/MMOHAMED HAIDER

08/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084