ANALISA HARGA SATUAN PEKERJAAN PONDASI


No.
C-01

C-02

C-03

C-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu Belah
M3
1.1
205,500.00
- Semen Portland
Kg
202
1,406.00
- Pasir Pasang
M3
0.485
233,400.00
- Pekerja
Oh
1.5
42,000.00
- Tukang Batu
Oh
0.6
65,000.00
- Kepala Tukang
Oh
0.06
75,000.00
- Mandor
Oh
0.075
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu Belah
M3
1.1
205,500.00
- Semen Portland
Kg
163
1,406.00
- Pasir Pasang
M3
0.52
233,400.00
- Pekerja
Oh
1.5
42,000.00
- Tukang Batu
Oh
0.6
65,000.00
- Kepala Tukang
Oh
0.06
75,000.00
- Mandor
Oh
0.075
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu Belah
M3
1.1
205,500.00
- Semen Portland
Kg
136
1,406.00
- Pasir Pasang
M3
0.544
233,400.00
- Pekerja
Oh
1.5
42,000.00
- Tukang Batu
Oh
0.6
65,000.00
- Kepala Tukang
Oh
0.06
75,000.00
- Mandor
Oh
0.075
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah
M3
1.2
205,500.00
- Pasir Urug
M3
0.3
175,300.00
- Pekerja
Oh
0.78
42,000.00
- Tukang Batu
Oh
0.39
65,000.00
- Kepala Tukang
Oh
0.039
75,000.00
- Mandor
Oh
0.039
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
226,050.00
284,012.00
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,761.00
226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,096.00
226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,736.00
246,600.00
52,590.00
32,760.00
25,350.00
2,925.00
3,120.00
363,345.00
363,345.00