You are on page 1of 9
TATA TATA PROJECTS LIMITED Quality Management for SURFACE PREPARATION AND | Standard Procedure PAINTING | Doc No: TPL/QMD/ MECH/SPROC/004 4. eS a SB fy ‘ny i “aloo 0 | 19.02.2014 First Issue SRK GSVM a fon GVA z Services 7 Rev| Date | Purporeofisue | Prepared by | Reviewed By | Reviewed By | _ Approved By Co —__ | TATA STANDARD PROCEDURE FOR SURFACE PREPARATION AND PAINTING Proc No.: TPL /AMD/MECHISPROC / 004 Rev No, & Date: 0 & 19.02.2014 1.0 SCOPE This Procedure covers the application and testing requirements of Surface Preparation and Painting on Storage Tanks, Piping and Structural Stee! Works. 2.0 STANDARD AND SPECIFICATIONS All works covered by this Procedure shall be carried out in accordance with the relevant sections of the following documents. -1S0 8501-1 -1S0 129445 - Paint Product Data Sheets - Approved FOP & Drawings - Customer Specifications e 2.0 ENVIRONMENTAL CONDITIONS Unless otherwise specified by the Customer / Painting Manufacturer, no surface preparation or application of top coating shall take place under the following conditions. > Air temperature is below 102C Surface temperature is below 52C Surface temperature is 3°C or less than the Dew Point Relative humidity is 85% or above Wet or Damp atmosphere Wet Surfaces Rain, mist or fog is present Wind speed above 25 kmph ‘Atmosphere contaminated by dirt, dust, oil, product or any pollutant vv VV VVVY 3.0 PROCEDURE 3.1 SURFACE CLEANING e 3.1.1 Mill scale, rust, rust scale and foreign matter shall be removed fully to ensure that a clean and dry surface is obtained. Unless otherwise specified, surface preparation shall be done as per Customer Specification / Approved Drawing. 3.1.2 The minimum acceptable standard in case of manual or hand tool cleaning shall be St. 2 or equivalent, in case of mechanical or power tool cleaning it shall be St. 3 or equivalent and in case of blast cleaning it shall be Sa 2-1/2 as per Swedish Standard ISO 8501-01. 3.1.3 All other contaminates, oil, grease ete. shall be removed by use of an aromatic solvent, prior to surface cleaning. 3.1.4 Blast cleaning shall not be performed where dust can contaminate surface undergoing such cleaning or during humid weather conditions having humidity exceed 85%.In case of internal coating or storage tanks. De-humidifiers shall be used to control the humidity = 4 age 10 yay 14) Pet At. Bae oo TATA STANDARD PROCEDURE FOR SURFACE PREPARATION AND PAINTING Proc No.: TPL /QMD/MECHISPROC / 004 Rev No. & Date: 0 & 19.02.2014 levels during rainy season. If painting is to be carried out during the rainy days in case of exigency of projects schedule, it shall be carried out with prior permission of Customer. 3.1.5 Irrespective of the method of surface preparation, the first coat of primer must be applied by airless spray / as recommended by the paint manufacturer on dry surface. This should be done immediately and in any case within 4 hours of cleaning of surface. However, at times of unfavourable weather conditions, the Customer shall have the liberty to control the time period, at his sole discretion and/or to insist on re-cleaning, as may be required, before primer application is taken up. In general, during unfavourable weather conditions, blasting and painting shall be avoided as far as practicable. 3.1.6 Surface preparation by Air Blast Cleaning with abrasives. 3.1.7 The surfaces shall be blast cleaned using one of the abrasives like copper slag, Al20 particles at pressure of 7Kg/cm2 at a appropriate distance and angle depending of nozzles size maintaining constant velocity and pressure. The Quality of abrasives shall be free from contaminants and impurities and shall meet the requirements of SSPC AB1 (Abrasive Specification No.1 "Mineral and Slag Abrasives”). Compressed air shall be free from moisture and oil. Nozzles orifice may vary from 3/16” to %". On completion of blasting operation, the blasted surface shall be clean and free from any scale or rust and must show a grey white metallic luster. Primer / first coat of paint shall be applied within 4 hours of surface preparation. Blast cleaning shall not be done outdoors in bad weather without adequate protection or when there is dew on the metal, which is to be cleaned. Surface profile shall be uniform to provide good key to the paint adhesion. 3.1.8 Surface Preparation by Mechanical or Power Tool Cleaning 3.1.9 Power tool cleaning shall be done by mechanical striking tools, chipping hammers, rinding wheels or rotating steel wire brushes. On completion of cleaning, the detached rust mill scale etc. Shall be removed by clean rags and thoroughly dried with compressed air jet before application of paint. 3.2 Coating Procedure and Application 3.2.1 The Paint Containers will be rolled to and fro on a level ground for a couple of times prior to opening. if on opening any sedimentation is observed, the contents will be rejected of further investigation to establish the quality. All paints will be stirred up thoroughly using agitator prior to and during the application. 3.2.2 Primer or first coat of paint will be applied within 4 hours of surface preparation and as per Manufacturer's recommendation. 3.2.3 Irrespective of the method of surface preparation, the first coat of primer / paint will be applied by using the method as specified in Customer specification on dry surface. 3.2.4 Application of paint using air gun will not be carried out under the following conditions. eo" fb naeaeta Oe Zezibe a Beaty oon TATA STANDARD PROCEDURE FOR SURFACE PREPARATION AND PAINTING Proc No.: TPL /QMD/MECHISPROC / 004 Rev No. & Date: 0 & 19.02.2014 a) When the ambient temperature is below 5° C. b) When the ambient temperature is above 40°C. c) During adverse weather condition of rain, fog, dust, storm and when humidity exceeds 85% 3.2.5 Primer / paint will be applied in uniform thickness. 3.2.6 Painting works will be done on daytime only. 3.2.7 The remaining paint in the open container will not be used if signs of polarization are noticed 3.2.8 DFT will be checked using calibrated Elcometer after each coat of primer / paint as per Customer Spec. 3.2.9 Each Coat must be dried for the time recommended by the Paint Manufacturer for application succeeding Coat. 3.3. Drying of coated surfaces 3.3.1 No coat shall be applied until the preceding coat has dried. The material shall be considered dry for re-coating when another coat can be applied without the development of any film irregularities such as lifting or loss of adhesion of undercoats. Drying time of the applied coat should not exceed maximum specified for it as a first coat; if it exceeds the paint material has po: ly deteriorated or mixing is faulty. 3.3.2 No paint shall be force dried under conditions which will cause checking, wrinkling, blistering formation of pores, or detrimentally affect the conditions of the paint. 3.3.3 Paint shall be protected from rain, condensation, contamination, snow and freezing until dry to the fullest extent practicable. 3.4 Repair of damaged paint surface 3.4.1 Where paint has been damaged in handling and in transportation, the repair of damaged coating of pre-erection / fabrication and shop primer shall be done as given in Customer Specification 4.0 Inspection, Tes \g and Acceptance 4.1 _ FQE shall check the surface preparation as per Customer Specification / approved Drawing / FOP by using Testex Tape (or) Roughness Comparator (or) Surface Profile Gauge before applying the Primer. 4.2 _Allthe prepared surfaces shall be inspected and cleared by FQE as per approved FOP before applying the Primer. 4.3 During the painting works, the surface temperature, relative air humidity, air temperature shall be measured and recovered at least 3 times a day. 4.4 Each coat shall be examined for signs of runs, roughness, patches, sags, pinholes etc and if such short comings occur, the coats shalll be repaired and permitted to dry before the next coat is applied. WY Gael ae Page 3 of 4 « TATA STANDARD PROCEDURE FOR SURFACE PREPARATION AND PAINTING Proc No.: TPL /QMD/MECHISPROC / 004 Rev No. & Date: 0 & 19.02.2014 4.5 Field Quality Engineer shall inspect each coat for defects and check Dry Film Thickness (DFT) to ensure compliance to the specified requirements, before taking up application of subsequent coat. 45.1 Individual DFT measured value shall be more than 80% of the nominal dry film thickness. 4.5.2 The individual DFT measured values between 80 to 100% of the nominal DFT, are acceptable, provided the overall average (mean) is equal to or greater than the nominal DFT. 5.0 SAFETY 5.1 Proper masks will be used during grit blasting and painting to prevent inhaling of sand particles and injurious chemicals. The paint recommended for spraying by the manufacturer only will be used for spray painting. 5.2 During grit blasting all hose connections will be checked for adequacy of the clamps and for proper tightness. 5.3. Use of thinners will be avoided unless it is necessary for proper application. 5.4 Coated pipes will be handled with bett slings only. 6.0 Documentation Surface Preparation & Painting reports shalll be made by FQE and signature of Customer shall be obtained. prepare aEVIEWeD By revsh ov, approve By “ \ ah Say ? cals s.sh8inalddeina Constructo Services GVRRN Acharya Sr.Engheer-QMD Quality Assurance - QMD Head - MD Page 4 of 4 TATA PROJECTS LIMITED ‘SURFACE PI Job Code No. customer Project Rev. Note No. Report No: Ret. Doe vate Test Conta Elcometo No. ‘S.No. ‘Activity ‘As per drg/ ‘As observed Signature. : Customer Speen Te | customer tA. {Lo SURFACE PREPARATION AND COATING Tas [ates cesning of Pie | sa 151 Dae sues sta & Comp. Tine: | Anette vii | Val ec 7 | 12 | Pimer Ove cat Spec Dae sta & Comp. Tne color Aten emp | Hum oer ort : oul ck 1.3. | Final Paint: Two coats ‘Speen: A’ Gost ote cate stat comp.time: | Ableton | oer sami | ort Maal heck fof j Speen: 2° Coat | | bate | | | Color: ‘Start & Comp. Time: | | Abie ton or | Vs heck TPL-FaE customer LA Form No. FQ/032_ Rev No. 2 A. ~ Inspection Authority TATA PROJECTS LTD TATA DAILY REPORT OF SURFACE PREPARATION AND PAINTING lcustomer ‘TPL Job Code No. JProject Report No, |customer’s Job No. Date: [unit e, aint MIR No. Biast Cleaning Clearance or Paint Thickness / Visual sno} tem Desetoton Spec | Baten No Customer Brand Ft |1PL| inspection ‘agency Subcontractor Customer inspection Agency Form No. FQ/081 Rev.2 e ravarmosecrs umn TATA REPORT FOR PAINTING OF STRUCTURAL WORKS / EQUIPMENTS eestor IREPORT NO, DATE: pRosect: Tet J08 Gove No. [GONSUCTANT TRI SUBCONTRACTOR: SITE NAME: tie |AREA / LOCATION: Surtace Preparation | primer) Pant Thickness Ambient Clearance rimer | Paine Visual Inspection by /S.No.| tom Description |M2"*| time ‘Temp. Hntermediate |! spec. | Batch No. DFT Remarks No (Deg. C) TPL PIA [Finish & C084 Brand TPLFOE| eA ‘Customer No. 7 (Customer | Tike Third Party Inspection Agency SUBCONTACTOR TrL-Foe TPIA oustomer ae TATA PROJECTS LTD TATA SURFACE PREPARATION AND PAINTING INSPECTION REPORT FOR DUCT WORKS Icustomer ‘TPL Job Code No.: Project Report No. Icustomer’s Job No. Date: [Subcontractor Paint IMIR No. Blast Cleaning Clearance | Primer? | paint Painting Painting Clearance ltem Deseriation Ambient Intermediate /| ai NO] SpootNo & Sze | OF |T™*lremperatue] rp. | customer ca ord |) visuat | ort | ter | customer | "met Subcontractor TPLFOE Customer Form No.: FQ/ 417 Reva,

You might also like