You are on page 1of 5

22535

4445

4595

4470

4590

4435

6548

sliding window

STUDENTS CONFERENCE

CR(W)

CR(W)

sliding window

CLERK /
SECRETARY

DEANS
OFFICE

HALL

FIRE EXIT
DN

READING ROOM

FACULTY ROOM

sliding window

sliding window

SECOND FLOOR
SCALE 1: 150 MTS

NAME OF BUILDING

PREPARED BY:

NURSING BUILDING 1

NOTED:

REYNALDO B. MABELIN
ARCHITECT/HEAD PPDO

PERFECTO B. BOJO, Ph.D.


DIRECTOR UPDO

22540
9120
4004

13420

DR

OR

4966

2310

2235

4435

2077

2400

2500

SCRUB

RECOVERY
ROOM

NICU

CR(W) CR(M)
FEMALE
WARD

OB WARD

NURSES
STATION

ER

4590

MALE WARD

PEDIATRIC
WWARD

CSR

4450

4595

4470

4590

4435

GROUND FLOOR
SCALE 1: 150 MTS
NAME OF BUILDING1

PREPARED BY:

NURSING BUILDING 1

NOTED:
REYNALDO B. MABELIN

PERFECTO B. BOJO, Ph.D.

ARCHITECT/HEAD PPDO

DIRECTOR UPDO

45250

OPEN HALL

STAIR

5732

LOBBY

ANATOMY
LAB

STO

ROOF

T
PREP

OFFICE

CORRDOR

STAIR

LECTURE
RM

LECTURE
RM
LOBBY

5000

5000 4750

5000

5000

5000

14750

5000

5000

5000

4850

34850

SECOND FLOOR PLAN


NAME OF BUILDING

PREPARED BY:

NURSING BUILDING 2

NOTED:

REYNALDO B. MABELIN

PERFECTO B. BPJO, Ph.D.

ARCHITECT/HEAD PPDO

DIRECTOR UPDO

9045

4470

4590

4435

2876

3672

Sliding window sliding window

CR(W)

CR(W)

STUDENTS CONFERENCE

CLERK/

DEANS
SECRETARY

FIRE EXIT

HALL

OFFICE

FIRE EXIT
DN

READING ROOM

9040

FACULTY ROOM

4470

9025

SECOND FLOOR PLAN


SCALE 1: 150 MTS.

CENTRAL MINDANAO UNIVERSITY

PROJECT TITLE

PREPARED BY:

RECCOMENDING APPROVAL APPROVED

UNIVERSITY TOWN, MUSUAN, BUKIDNON


REVISED PLAN (SCHEME 4)
ENGINEERING TECHNICAL PLANNING
CONVERSION OF WHITE HOUSE TO
REYNALDO B. MABELINROY V. AGBAYANI
DR. MARDONIO M. LAOSEPT. 21, 2006
AND SERVICES
COLLEGE OF NURSING BUILDINGARCHITECT II
DIRECTOR, GEN. SERVICES CMU PRESIDENT

You might also like