You are on page 1of 17

NEBOSH International General Certificate

in Occupational Health and Safety

UNIT IGC3: HEALTH AND SAFETY PRACTICAL


APPLICATION

Student Name:

Student Number:

Date of Submission:

IGC3 The Health and Safety Practical Application


Candidate and course provider declarations:
For completion by the candidate:
I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name
Signature

_______________________________

Date
For completion by a course provider representative (e.g. internal practical assessor):
I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print)

_______________________________

Signature

_______________________________

Date

_______________________________

For completion by the course providers internal practical assessor:


I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out
in the NEBOSH Malpractice policy.

Name (Print)

_______________________________

Signature

_______________________________

Date

_______________________________

NB: This declaration must be completed in full submitted and retained with the
candidates script. If this declaration is not submitted the candidates result may be
declared void.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Assessors marking sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Date of practical application:

Name of assessor:

Course provider
number

Course provider
name

Student number

Student name

Maximum
marks
available

Criteria
1

Completion of observation sheets

1.1

Range and outline of hazards and consequences

15

1.2

Identification of suitable control measures and


timescales

15

Report - Introduction and Executive Summary

2.1

Introduction providing an overview of the chosen


area

2.2

Executive summary

Report - Main findings of the inspection

3.1

Quality of interpretation of findings

3.2

Identification of possible breaches of international


standards

3.3

Persuasiveness / conciseness / technical content

Report - Conclusions and Recommendations

4.1

Clear and concise conclusions which are clearly


related to report findings and are effective in
convincing management to take action

15

4.2

Recommendations which present realistic actions to


improve health and safety in the chosen area

15

TOTAL MARKS
Grades:

15
5
10

100

Assessors
marks awarded

NEBOSH
moderated
marks
(if different)

Outcome: PASS (60% or more)

REFER (less than 60%)

Date assessed ____ / ____ / ____


Assessors signature ______________________
Date received by course provider ____ / ____ / ____
Date received by NEBOSH
(if applicable) _____ / _____ / _____

Assessors additional comments on the practical application:

ASSESSED BY (name in block letters) ________________________________________________


The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY


NEBOSH Moderators comments:

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidates observation
sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number of
Student name ______________

Student number:

Place inspected Shoba Terrain, Devanahalli, Bangalore Date of inspection :30/March/2014


Observations
Hazards and consequences

Control measures

Timescale

Immediate and longer term actions

1. Excavation(Physical
Hazard):Workers are seen in a ditch
working on drainage facility in the
construction area about eight feet in
depth and observed that no shoring or
other means of protection which may
lead to cave- ins and lead death to
employees and/ or serious injury but
not limited to limbs fracture, head
injuries and no signage of authorized
personnel only which may lead to slip
and fall and injuries from cuts, bruises
or bone fractures for workers.
2. Physical and Chemical Hazard: A
painter is seen working on the 7thfloor
level at 40 feet height painting outside
of the building in the construction area
of Phase-I using boatswains chair and
brush, subject to risk of falling from
height potentially as he had neither
safety belt and nor safety harness tied
to its body to protect from fall could
cause loss of his life or serious injury
such as fractureof upper/lower limbs
and/or head injury, Back pain,
Chemical hazard and ergonomic
hazard.

Short Term Measure:

3.Fall from Height Hazard: Workers


using scaffold at 45feet high for
construction had not been mounted
well on the even surface and had no
guard rail, outerriggers broken and not
replaced, not enough braces and toe
boards have large gaps on the work
platform which all could lead to falling

Short Term Measure:


Stop the work activity using scaffold for
construction work at height

Provision of signage Authorized


personnel only.

1 day

Long term Measure:


Construct hydraulic shore on the ditch
sides to prevent cave-ins and slip and trip
hazard for workers.

Short Term Measure: Stop the work


activity of painting.
Long term measures:
. Use cherry picker and electric spray
paint where painter can prevent from
falling and exposure to the paint
chemicals would be less with face piece
respirator.
.Training and Instruction:
Sufficient training and instruction should
be given to painters on the risks involved
by videos of painters working in
boatswains chair and importance of
personnel protective equipment , safety
harness and prolonged exposure of
chemical hazards.

1 Month.

Immediately

1 month.

1 Month.

Immediately

Long Term Measure:


Purchase of new scaffold equipments
and properly utilising all the safety
practices for Scaffold erection

1 month.

objects and workers falling from height


and majorly collapse of scaffold due to
poor design and structure.
4. Collision Hazard (Physical):
Forklift trucks at the warehouse in the
construction site are observed that
rounding a blind corner into a loading
area without stopping can lead to
collision with workers, collision with
stationary objects and collision with
other vehicles which can cause from
death to serious personal injury by
falling objects and also lead to
property damage by topple and/or
collision.
5.Hot Work (Fire Hazard): Welding
rods work at construction site are
happening near the LPG gas storage
area which could lead to massive fire
or explosion wherein other flammable
objects such as timber woods could
lead to massive casualties,
environmental pollution and property
damage.

Short Term Measure:


. Provision of side mirrors on all blind
corners where driver can foresee the
visibility of vehicles and workers
movements.
Long Term Measures:
.Provision of banks men at the blind
corners.
.Adequate training to all forklift drivers on
the safety practices of driving forklifts on
the blind corners and spots or speed
bumps at the blind corners.

Short Term Measure:


Stop the welding work immediately

1 week.

1month(Hiring
competent
person)
1 month.

1 day.

Long Term Measure:


Separate closed ventilated area to weld
the rods and other welding works for the
construction site.

6. Electrical Hazard: Excavation


area at Phase-III of construction
sitehad high voltage (10000v)power
supply of electricity for the whole
construction area had no barriers or
danger signage and workers exposed
may lead to electrocution ,electric
burns and secondary effects such as
thrown off to the excavated area lead
to serious injury from head injury to
death.

Short Term Measure: Danger voltage


signage needs to be placed.

7. Physical Hazard: Excavation area


at the construction site of 8ft depth
has not been protected by barriers
which may lead to falling people by
slip, topple of excavator and falling of
object can lead from death to serious
injury but not limited to bone
fractures, or limbs disabilities and
head injuries.

Short Term Measure:


Stop the excavation work in progress.

8.Physical Hazard: Drilling machine


used at the construction site for
concrete coring produces high level of
noise and vibration which can lead
the users from temporary ringing to
permanent ringing of ears(Tinnitus),

Short term Measure:. Use of


appropriate PPE such as gloves to
protect moderately from vibration and
ear muff to protect from noise.

1 month.

1 day.

Long term measure:


Barricade the area from the excavation
by isolating lock out tag out system.

Long term measure: Barrier the


excavation area and provide adequate
training on safety practices of excavation
procedures.

1 Month.

Immediately

3 weeks

1 week.

Long term measure: Purchase of latest


version of drilling machine available in
the market which is of making less noise
and vibration.

1 month

.Maintenance or servicing the existing


drilling machine.

3 weeks

9. Chemical Hazard: Workers at


concrete mixer without loading hopper
been exposed to inhalation of cement
dust which can lead to respiratory
issues and/or asphyxiation.

Frequent breaks and job rotation can be


done by instructions.

1 week.

Providing respiratory PPE (Filtering


face- piece respirator) enable the worker
not to inhale cement dust.

4 weeks.

10. Ergonomic Hazard: Manual


handling of carrying cement and
bricks construction materials by one
of the workers using wheel barrow
weigh approximately 150kgwhich can
lead to back pain, rupture of
intervertebral discs, overloaded
muscle can tear.

Short Term Measure: Instruct to carry


only safe working load limit which is
40Kgs.

2 days

11. Physical Hazard: Concrete mixer


workers have been exposed to hot
weather condition of approximately
over 43c could lead to dehydration,
heat stress /strokes.

Short term Measure: Frequent breaks


and job rotation methods by instructions
by properly preparing working schedule
for staffs.

and also vibration can cause from


vibration White finger to nerve
damage and also observed that the
user not wearing any personnel
protective equipment.

Long term Measure: Organising


training for all manual handling workers
about manual handling techniques and
maximum weight that one can carry and
consequences if they exceed the weight
limit.

4 weeks.

1 Week

Long Term Measure: Construct heat


insulated ventilated area where workers
can get some rest with drinking water
facility.

1 month.

12.Slip (Physical )Hazard: Spillage


of oil from one of the forklifts on the
workers pathway can cause slip and
fall and may lead from serious injury
like bone fracture to lower injury such
cuts and bruises.

Short Term Measure: Clean the oil spill


by placing wet floor sign.

4hrs.

13. Psychological Hazard: Observed


that one of the workers at the
construction site were shouting and
yelling at the other co-worker to do
something which can lead to stress
and demotivation in front of other
workers.( Behavioral issue)

Short term measure: Consultation with


both employees about the situation and
reason for yelling at the work place.

14.Physical Hazard: Poor lighting at


the warehouse where workers needs
to get construction materials to the
site might lead to slip, trip and fall
cause serious injury like head cuts,
bone fracture, Limbs disorders etc.

Short Term Measure: Adequate lighting


need to be provided where workers have
more access to materials on daily basis

2 days.

Long term measure Providing lux level


lighting at all areas of warehouse.

3 weeks

Long term measure could be


systematic inspection, maintenance and
service for all forklifts.

Long term measure :Reiterating zero


tolerance policy and imparting education
on the workplace attitude.
Training on behavioural issue and
workplace culture.

1 month.

1 day

1 month

15. Chemical Hazard: Poor


ventilation at the cement storage area
where workers need access to get
cement to the construction site and
prolonged exposure can lead to
respiratory problems, headache,
irritation to eyes.

Short Term Measure: Instruct the


worker not to enter cement storage area.

16. Physical Hazard: Emergency fire


exit door has been obstructed with
wooden boxes which can lead to trip
and fall hazard may cause death of
many casualties due to major fire and
lead to serious injury from head to
fracture of bones

Short Term Measure: Remove the


obstruction from the emergency fire exit
door.

17. Trip Hazard: Trailing of cables at


the back office work area where
marketing employees were doing the
booking of apartments can lead to trip
and fall to both employees and guests
could lead to bone fracture, head
injury.

Short Term Measure: Immediately


remove all cables from the walking
areas and floor and mount it through
ceiling.
Long term measure :Showing training
videos for workers at risk and hidden
hazards present in accident of trailing
cables,

4 weeks.

18. Ergonomic Hazard: Sales


&Marketing department employees
have a poor working posture looking
at the computer due to nonadjustable chairs and computer
monitors can lead to musculoskeletal
disorder, eye strain, fatigue and back
pain.

Short Term Measure: frequent breaks


and job rotation by having tailor made
good working schedule.

1 week.

19.Biological Hazard: Been


observed that there is a pond located
near right side of the construction
area where all drainage water of the
village are stagnated can cause
biological effect of inhaling and/or
absorption of harmful bacteria and
viruses may lead to contagious
diseases or Dermatitis,Legionellosis.

Short Term Measure: Water treatment


with chlorine (eg.chlorination) to kill the
bacteria.

Long term measure : changing the


cement storage area to adequate
ventilated area by installing Dilution
Ventilation system.

Long term measure: Reiterate


employees about the importance of fire
evacuation emergency procedures in
place by training and to maintain good
housekeeping.

Long term measure :Purchasing


adjustable chairs and monitors where
workers can adjust to adequate level

Long term measure: Constructing a


barricade on the whole construction
areas where workers can be exposed
less than normal.

1 day

1 month

1 day

4 Weeks.

3 days.

1 month

2 days.

1 month

20. Mechanical Hazard:Electric disc


cutter machine (110V) for stone
cutting had no guards and could lead
to potentially high risk for
entanglement as he is wearing loose
clothing, and cutting and/or abrasion
as he is not using any PPE.

Short Term Measure: Instruct worker to


use PPE Gloves and not to wear loose
clothing to prevent entanglement.

21. Cafeteria for construction workers


and management has been found in
tidy and hygienic condition with
healthy menu which demonstrates the
commitment of the management.

Appreciate the management and


cafeteria staff for designing healthy
menu and housekeeping of entire
cafeteria.

Long Term Measure:Provide training,


instruction and demonstrating videos to
the workers on procedures of operating
electric stone cutters and its importance.

22. Locker facility allocated for each


and every construction section
employees separately according to
their needs and nearest to the place
of work for easy access.

Demonstrates the management


commitment towards health and safety
of their employees.

23. First aid provision at each


construction sections and first aid
training for all employees given during
orientation mandatorily.

It demonstrates the importance of first


aid provision and how it can be utilized
well when unplanned event occurs at
work site.

24. Drinking water facility at each floor


level for employees with hot and cold
options according to the worker
needs.

Promotes good working atmosphere for


employees and ability to work with
morale.

25. Toilets have been maintained


clean and tidy with all provision to the
workers such as hand wash liquid
soaps, toilet rolls (big and small), air
freshener and air-conditioned.

Good commitment from the


management towards the hygienic
facility of toilets with provisions.

2 days

4 weeks.

Continue

Continue

Continue

Continue

Continue.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student number
Location:Shoba Terrain Devanahalli, Bangalore

Date of review:28/September/2014

Introduction including overview of area inspected and activities taking place:

I am Paul prepared this report follows the health and safety inspection of one of the biggest
construction projects of Shoba Developers a leading real estate company in India and abroad has the
upcoming project as Shoba Terrain at Devanahalli Bangalore which comprises of three phases,
warehouse and administrative building which had both indoor and outdoor activities and its spread
over 20 acres located at Devanahalli, Bangalore north which is close to our Bangalore International
airport. The inspection took place on 28 march 2014 between 1000 and 1300hrs.
Phase-I and II each comprises of 12 floors and have 460 apartments where the indoor activities such
as painting ,drilling , plumbing, and electrical connection are happening and it is almost in the
handover stage.
Phase-III is at the initial stage of construction where the main outdoor activities such as excavation,
building concrete, concrete mixing and welding works are happening which comprises of 230
apartments&12floor levels and expected to complete by March-2014.
Warehouse where indoor activities such as safe stacking and storing of construction materials such
as cement ( separate storage area) in the warehouse and welding rods, bricks, woods .
Workers in administrative building are carrying out registration activities of apartments & other
administrative indoor activities such as printing, copying and emails.
Management and administrators of about 20 employees and 400 construction workers were present
while this inspection was conducted.
The aim and reason for this inspection report to highlight the areas of concern about existing health
and safety hazard and to reduce the accidental statistics of previous year, also to measure the
standard of health and safety management system maintained and to check whether it meets the
legal standards.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Student number
Location: Shoba Terrain, Devanahalli, BangaloreDate of review28 /September /2014

Executive Summary

In 2013, there have been 12 accidents recorded on this construction site, out of which 7 minor from
cuts and bruises and 5major injury of bone fracture, head injury due to worker fell from height .This
inspection observed some major areas of health and safety concern on both outdoor and indoor
activities carrying out by workers which can put them under risk but not limited to death, serious injury
and property damage.
Major findings and its recommendations:
Workers are at high risk of cave-in at the ditch where drainage pipeline work is happening and
construction of hydraulic shoring could prevent from death to serious injury.
th
Painter is working at height of 40feet( 7 floor) on boatswains chair with neither safety belt
and nor harness which might lead to fall from height cause serious injury to death and cherry
picker with electric foam painter has been recommended.
Scaffold not erected on the flat surface, no guard rails braces are not well fitted and some
missing, toe boards have huge gaps can lead to scaffold collapse , people and object fall from
height and purchasing new scaffold is highly recommended.
Forklifts are not stopping at the blind corners and can lead to collision with other vehicle &
workers and topple forklift if the load is heavy may cause from death to serious injury and
property damage , using banks men and side mirror at the blind spots are highly
recommended.
Rods have been welded close to the LPG storage area which can lead to explosion and fire
and cause from several personnel death to serious injury and property damage, a separate
covered welding place is highly recommended to prevent from this risk.
High power electric supply near excavation area needs to be covered by lock out-tag out
isolation system.

Inspection also observed good welfare facilities to workers from clean toilets with liquid hand soap,
drinking water at each floor levels, first aid provisions and lockers, however requesting your earliest
attention on the hazards which outlined above to reduce the risk to acceptable level which
subsequently enable to decrease the accident records for this year.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Student number
Location: Shoba Terrain, Devanahalli, Bangalore Date of review 28/September/2014

Main findings and recommendations of the inspection:

1.Cave- In/Trenching :
Workers are in a ditch of about 8 feet in depth doing drainage pipeline work and found that there is no
protection from cave- in and slip and fall into the ditch as well as there is no protection and signage
stating authorised personnel only or prohibited area which breaches the ILO legislation of Convention
C167-Safety and Health in construction convention, 1988(No.167).
Recommendation:
Hydraulic Shoring of trench would prevent workers to fall from height by slip or soil to cave in and
would cost approximately $200 and it is easier to fix by one person and can be used for new
upcoming projects as well.
2. Painter working at height:.
th
Painter was working at the 7 floor level of about 40feet high painting outside the building Phase-I using
boatswains chair and brush, may fall from height as he had no safety belt and harness and may
exposed to inhalation of chemical substances in paint which may lead to suffocation and manual
handling at height using hands lead to muscle pain and stress and its breaching the legislation of
ILOC155 Occupational Health and safety convention 1981 and Work at height regulation-2005(WAHR).

Recommendation:
th

Use cherry picker which is available with us for the painter to access at 5 floor level for painting and
purchase of one electric paint sprayer with face piece respirator would prevent the chemical exposure
and fall from height and also avoid much manual handling. Sprayer and respirator would cost around
$120.

3.Scaffold collapse, Falling of people and objects:


Scaffold being used by the workers at construction site level of 45 feet high is not mounted on the even
surface , out riggers were broken and not being replaced, toe board have huge gaps and some braces
been missing and others are not fitted properly which may lead to collapse of scaffold, falling of people
and object from height can lead to fatal , serious injury from head injury to muscle stress and pain
breaching the international legislation of Convention C167-Safety and Health in construction
convention ,1988(No.167) and Health and safety at work 1974(HASWA).
Recommendation:
Purchase of new scaffold which would save many people lives and prevents falling of objects and
collapsing of scaffold which would cost around $350.
4. Collision with workers, vehicles and Property damage:
Forklift trucks at the warehouse in the construction area are observed that rounding a blind corner into
a loading area without stopping can lead to collision with workers, collision with stationary objects
and/or vehicles which can cause from death to serious personal injury by falling objects on victims
and also lead to property damage by topple of forklift which breachesILO C155 Occupational Health
and safety convention 1981 and Health and safety at work 1974(HASWA).
Recommendation:
Provision of side mirror on the blind corners where driver can foresee the movement of people and
vehicles which ultimately prevent collision and it would cost $40 and also provision of banksmen for the
blind spots and corners.
5. Fire hazard at the welding area:
Welders are welding the rods which is closer to the LPG gas storage area and sparks while welding
can contact with the LPG gas lead to massive fire/explosion cause property damage and mass
casualties in the workplace which breaches the international legislation of Convention C167-Safety
and Health in construction convention, 1988(No.167) and Fire protection and prevention Act 1997.
Recommendation:
Provide a separate covered welding area for the whole construction site where all welding works can
take place may cost $550 which eventually prevents mass casualties and property damage.
6. Electrical Issue:
Main electric power supply for the entire construction site located near the excavation area is
unprotected and no signage of danger being placed can lead to electrocution, burns, death and
secondary effect like fall from height due to throw off can cause serious injury of bone fractures and
head injury which breaches theILO legislation of C155 Occupational Health and safety convention 1981
and Electricity at work regulations 1989(EAWR).
Recommendation:
Barricade the high danger electricity power supply area by isolating( lock out tag out system) and
would cost $200 can prevent electrocution, burns, even death and secondary deaths such as fall from
height by being victim throw off due to electrocution and fall into excavated area cause head injury or
serious personal injury.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATIONs
Student number:
Location :Shoba Terrain, Devanahalli, Bangalore. Date of review: 28/September/2014

Conclusion:
Firstly, I would like to take this opportunity to thank Shoba management &each and every worker at
site for their outstanding cooperation while conducting inspection without which I could have not done
this observation about health and safety practices at construction site.
Few major findings needs immediate attention towards the safety of workers from the management
such as Cave-in, Fall from height( People and objects), Electricity & Fire hazard, collision with
vehicle and pedestrians at warehouse by forklifts which can be controlled in near future by
incorporating suitable recommendations .Other safety concerns such as manual handling, vibration,
noise, stress, biological effect, chemical exposure, heat stress, poor lighting and ventilation can also
be controlled with suitable preventive control measures which also recommended on the observation
sheet.
The workforces were seemed to be very happy when I inquired about their well-being within the
facility and they echoed there is no company can compete the welfare facilities such as locker, first
aid provisions, drinking water, healthy menu at cafeteria and cleaner toilet facilities and also told what
else one would expect? Which brings enthusiastic myself when I hear them which clearly
demonstrates the brigade management commitment towards health and safety of their workers.
Lastly, I would request to please take necessary actions on the suitable recommendation outlined for
existing major hazards and I look forward for your support to further enhance our business reputation
by protecting our workers &property and meeting the obligation of national and international
legislations and for our next ISO certification due in 2 months for renewal without any hindrance.

INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)

Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICALAPPLICATION
Student number
Location :Shoba Terrain, Devanahalli, Bangalore

Date of review28 /September /2014

Recommendations:
Recommendation
.Hydraulic shoring of
trench would prevent
workers from falling by slip
and fall and also cave-in of
soil towards the workers.

th

.Painting at 7 floor using


cherry picker and electric
paint sprayer with face
piece respirator.

.Purchase of new scaffold


and erect and training to
all scaffold employees for
proper erection procedures
and its consequences of
being collapsed

Likely resource implications


Would cost $200 to install
Hydraulic shoring and without
shoring an accident which may lead
to death of workers and insurance
compensation can be more than
$1000of each worker and other
indirect costs may be applicable.
Cost of electric paint sprayer and
face piece respirator would be $120
and cherry picker which is already
available in the work place can be
used to work at height .By not
implementing this cause painter fall
from height and lead to death
and/or serious injury and
compensation of $1000 or more
and other direct and indirect cost of
approximately $2000.

Scaffold would cost $350 and


failure to purchase and use current
scaffold may collapse and cause
property damage, falling of people
and objects which may cost
approximately $5000 including both
indirect and direct costs.

Priority

Target date

High

28-April-2014
( 1 Month)

High

28-April-2014
( 1 Month)

High

28-April-2014
( 1 Month))

Recommendations

Likely Resource implications

Priority
Target date

.Provision of side mirror at


the blind corner for the
driver to foresee the
movements.

Would cost $40 and collision with


other vehicle would cost property
damage from $500 to $800
depends on consequence.

.Provision of banks men at


blind corners to guide the
driver at warehouse.

Salary $800 monthly for hiring


competent banks men.

.Separate barricade
welding area to prevent
from fire/explosion as it is
happening close to LPG
gas storage area.

Would cost approximately $550 for


separate barricaded welding area at
construction site leaving which may
lead to many casualties and
property damage from $ 5000 to
$8000 as direct( Property damage)
and other indirect costs such as
court fines etc.

.Barricade the high voltage


main power supply area by
isolating the power using
(Lock out- Tag out)
system.

Would cost approximately $200 to


barricade the area and it would
prevent worker from death to
serious injury.

High

1 Week

Medium
28-April-2014
( 1 Month)

High
28-April-2014
( 1 Month)

High

28-April-2014
( 1 Month)

You might also like