Professional Documents
Culture Documents
TRAINING GUIDE
70-2776A
MFG/PRO eB
Database: Train
January 2001
This document contains proprietary information that is protected by copyright. No part of this
document may be photocopied, reproduced, or translated without the prior written consent of
QAD Inc. The information contained in this document is subject to change without notice.
QAD Inc. provides this material as is and makes no warranty of any kind, expressed or
implied, including, but not limited to, the implied warranties of merchantability and fitness for a
particular purpose. QAD Inc. shall not be liable for errors contained herein or for incidental or
consequential damages (including lost profits) in connection with the furnishing, performance,
or use of this material whether based on warranty, contract, or other legal theory.
Some states do not allow the exclusion of implied warranties or the limitation or exclusion of
liability for incidental or consequential damages, so the above limitations and exclusion may
not be applicable.
PROGRESS is a registered trademark of Progress Software Corporation. Windows is a
trademark of Microsoft Corporation.
MFG/PRO is a registered trademark of QAD Inc. QAD, QAD eQ, and the QAD logo are
trademarks of QAD Inc.
All other products and company names are used for identification purposes only, and may be
trademarks of their respective owners.
Copyright 2001 by QAD Inc. All Rights Reserved.
70-2776A
QAD Inc.
6450 Via Real
Carpinteria, California 93013
Phone (805) 684-6614
Fax (805) 684-1890
LearningServices@qad.com
http://www.qad.com/services/learn/
Contents
ABOUT THIS COURSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Course Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Who Should Attend This Course . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Approximate Length of Course . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Topics Covered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Related Courses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Certification Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Using This Training Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Cross-Reference Icons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Notes to Instructors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
PowerPoint Slides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Class Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Configuration and Setup for This Course . . . . . . . . . . . . . . . . . . . . . . . 11
General Training Facilities Information . . . . . . . . . . . . . . . . . . . . . . . . 12
CHAPTER 1
Course Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Kanban Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Key Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
One Card Kanban Loop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Two Card Kanban Loop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MFG/PRO Kanban Sizing Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Kanban Users . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Course Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14
15
16
17
18
19
20
21
IV
Related Courses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
CHAPTER 2
BUSINESS ISSUES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Business Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Pre-requisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Supplier Relationships . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Shop Floor, Sites, and Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Items for Kanban Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Maximum Demand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Kanban and Material Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
CHAPTER 3
CONTENTS
CHAPTER 4
70
71
72
73
74
75
78
79
80
81
82
83
84
85
86
87
91
91
94
94
96
97
GLOSSARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
INDEX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
VI
Course Description
QAD designed this course to cover the basics of preparing to implement Kanban Sizing in
MFG/PRO eB. The course includes:
An introduction to Kanban Sizing
An overview of key business considerations
Setting up Kanban Sizing
Processing Kanban Sizing
Activities and exercises
Prerequisites
Initial MFG/PRO Setup training course
Basic knowledge of how MFG/PRO is used in the business
Working knowledge of the manufacturing industry in general
Topics Covered
Set Up
Generalized Codes
Planning Periods
Related Courses
Shop Floor Control
Work Orders
Inventory Control
Purchase Order Management
Certification Preparation
This course is one of several courses designed to assist students in preparing for QAD certification
examinations. However, QAD does not guarantee anyone a passing grade as a result of having
taken this course.
Students preparing for certification examinations should study all available materials (user guides,
training guides, on-line help, for example) and acquire industry and field experience.
10
Cross-Reference Icons
Additional Information
Directs students to another section of the current training guide
Cross-references another MFG/PRO training guide
Training Exercises
The following icon indicates appropriate places for students to work on training exercises:
Notes to Instructors
PowerPoint Slides
QAD created the slides using Microsoft PowerPoint 97. Instructors may want to animate text,
graphics, and other objects on the slides to
Focus on important points
Control the flow of information
Add interest and variety to the presentation
Clicking on Animation Preview on the Slide Show menu previews animation of text and objects.
To customize slides, click on Custom Animation on the Slide Show menu.
PowerPoint Slide Icons
Class Kit
Kit for Students
Kanban Sizing Training Guide, 70-2776A
MFG/PRO eB US GUI demo CD, 10-0631
Install the Database: Train for the exercises in this training course
The instructor kit is the same as the student kit with the addition of the PowerPoint slides.
11
12
Facilities
Telephone/Fax
Class Hours
Emergency
EXIT
Messages
Breaks
Restrooms
Parking
Smoking
KB-IN-035
CHAPTER 1
Introduction to
Kanban Sizing
14
&RXUVH2YHUYLHZ
s
s
s
s
KB-IN-030
Course Overview
This course is designed to present Kanban Sizing in four sections:
An overview introduction, to provide an initial acquaintance with the issues and topics of
Kanban Sizing
The business issues and considerations that need to be in place before using Kanban Sizing
How to set up and prepare to use Kanban Sizing
How to process Kanban Sizing in your manufacturing environment
15
KB-IN-040
Kanban Overview
The Japanese word kanban, loosely translated, means card, billboard, or sign
The term is often used synonymously for the specific scheduling system developed and
push
Production waits for orders from customers and reacts quickly to these orders
16
Key Elements
s Standard Lot sizes
Kan
ban
ba
Kan
ban
an
b
Kan
an
KB-IN-050
Key Elements
Some typical elements of most Kanban-controlled systems include:
Standard lot sizes or standard containers
A single card per container
Containers returning empty, usually as a signal that further material has been authorized for
movement
Work
WorkCenter
CenterAA
Storage
Storage
Work
WorkCenter
CenterBB
Material Flow
Kanban Flow
KB-IN-060
17
18
Work
WorkCenter
CenterAA
Production Kanban
Storage
Storage
Work
WorkCenter
CenterBB
Move Kanban
Material Flow
Kanban Flow
KB-IN-070
Kanban Sizing
What can it do?
Calculate either:
Quantity per Kanban
Number of Kanban
4114
bkm2
4114
bkm2
Test Component
Test Component
10000
Supplying Location: 100
bkm10000 Consuming
Location:
bkmloc
Supplying
Location:
100
bkm
Consuming Location: bkmloc
0
1 0
basket
1
100basket
100
09/29/99
09/29/99
09/29/99
6 09/29/99
1 6
1
Ka
nb
an
KB-IN-080
Kanban ID:
Item Kanban
Number:ID:
Rev:
Item Number:
Rev:
Supplying Site:
Consuming
Site:
Supplying
Site:
Consuming Site:
Batch Size:
Quantity perBatch
Kanban:
Size:
Container
Quantity
per Type:
Kanban:
Container
Capacity:
Container
Type:
Container Capacity:
Print Date:
Calculate
Date:
Print
Date:
Number
of Cards:
Calculate
Date:
Card Number:
Number
of Cards:
Card Number:
4114
bkm2
4114
bkm2
Test Component
Test Component
10000
Supplying Location: 100
bkm10000 Consuming
Location:
bkmloc
Supplying
Location:
100
bkm
Consuming Location: bkmloc
0
1 0
basket
1
100basket
100
09/29/99
09/29/99
09/29/99
6 09/29/99
1 6
1
19
20
Kanban Users
Add/Modify
Add/ModifyKanban
KanbanData
Data
Add/Modify
Add/ModifyPlanning
PlanningPeriods
Periods
Inventory Control
Supervisors and Clerks
Set
SetCurrent
CurrentDemand
DemandPattern
Pattern
Review/Modify
Review/Modify
Kanban
KanbanData
DataMaintenance
Maintenance
Plan/Validate
Plan/Validateand
andCalculate
Calculate
Maximum
MaximumDemand
Demand
Review
ReviewDemand
Demandfor
for
Kanban
KanbanControlled
ControlledItems
Items
Print
PrintKanban
KanbanCards
Cards
Materials Manager
Review
ReviewCard
CardData
Data
Simulate
SimulateMaximum
MaximumDemand
Demand
Reprint
ReprintCards
Cards
Assembly
Connected
Kanban Suppliers
Receive
Receiveand
andFill
FillOrders
Orders
Review
ReviewDemand
Demand
Run
RunSimulations
Simulations
Production Control
and Mfg Supervisor
KB-IN-090
Kanban Users
Some typical users of Kanban include:
Inventory Control Supervisors and Clerks
Materials Managers
Assembly
Production Control and Manufacturing Supervisors
Connected Kanban Suppliers
Typical tasks for each user are illustrated above
&RXUVH2EMHFWLYHV
In this class you learn how to:
s Identify some key business
considerations before setting up Kanban
Sizing in MFG/PRO
s Set up Kanban Sizing in MFG/PRO
s Process Kanban Sizing in MFG/PRO
KB-IN-100
Course Objectives
21
22
Related Courses
Inventory
Inventory
Control
Control
Work
WorkOrders
Orders
Kanban
KanbanSizing
Sizing
Shop
ShopFloor
Floor
Control
Control
= Prerequisite
Courses
Purchase
PurchaseOrder
Order
Management
Management
Initial
Initial
MFG/PRO
MFG/PRO
Setup
Setup
KB-IN-110
Related Courses
&RXUVH2YHUYLHZ
KB-IN-120
23
24
CHAPTER 2
Business Issues
26
%XVLQHVV&RQVLGHUDWLRQV
In this section you learn how to:
Identify some
keykey
business
Identify
some
business
considerations before
settingsetting
up Kanban
considerations
before
up
Sizing in MFG/PRO
Kanban
Sizing
s Set up Kanban Sizing in MFG/PRO
s Process Kanban Sizing in MFG/PRO
KB-BU-010
Business Issues
BUSINESS ISSUES
27
Business Considerations
Before you set up and use Kanban
Sizing, it is assumed you have
already considered the following:
s Supplier Relationships
s Shop Floor, Sites, and
Locations
s Which Items to be KanbanControlled
s Maximum Demand for
Independent-Demand Items
KB-BU-020
Pre-requisites
There are several pre-requisites to using Kanban Sizing, which are only highlighted in this
28
Supplier Relationships
Components
Supplier
Manufactured
Finished
Goods
KB-BU-030
Supplier Relationships
Kanban items need consuming and supplying relationships. Any Kanban-connected suppliers
must be already entered into your database.
Setup Implications
Supplier Data Maintenance 2.3.1
BUSINESS ISSUES
29
Work
WorkCenter
CenterAA
Work
WorkCenter
CenterBB
KB-BU-040
30
ban
Kan
KB-BU-050
BUSINESS ISSUES
Maximum Demand
s
KB-BU-060
Maximum Demand
Kanban items need a maximum demand figure for sizing calculations. This data should be
determined before completing Kanban setup.
Setup Implications
Maximum Demand Maintenance 17.22.10
See in this training guide: Maximum Demand Maintenance on page 65
31
32
Supplier
Receiving
Ka
nb
an
Stores
Push
Production
Intermediate
products
Components and
raw materials
Pull (Flow)
Production
Finished
Goods
Finished
Goods
Customer
KB-BU-070
BUSINESS ISSUES
Review
s
s
s
s
KB-BU-080
Review
33
34
&RXUVH2YHUYLHZ
KB-BU-090
CHAPTER 3
36
6HWXS.DQEDQ6L]LQJ
In this section you learn how to:
Setup
upKanban
Kanban Sizing
in MFG/PRO
Set
Sizing
in MFG/PRO
s Process Kanban Sizing in MFG/PRO
KB-SU-010
37
Set up
Generalized
Codes
Set up Planning
Periods
Set up Kanban
Data for
Controlled Items
Define Kanban
Control File
Set up Maximum
Demand
KB-SU-020
38
Set up Planning
Periods
Define Kanban
Control File
36.2.13
36.2.13
Set up Kanban
Data for
Controlled Items
Set up Maximum
Demand
KB-SU-030
39
Demand
Demand Patterns
Patterns (kbmd_pattern)
(kbmd_pattern)
ss Used
to
reflect
trends
Used to reflect trendsor
orcycles
cycles
ss Only
one
demand
pattern
Only one demand pattern will
will be
be active
activeat
ataa time
time
Other
OtherCodes:
Codes:
Kanban
KanbanTypes
Types(knb_type)
(knb_type)
ss Used
Usedfor
forreporting
reportingpurposes
purposes
Container
ContainerTypes
Types(knb_cont_type)
(knb_cont_type)
ss Information
only
Information only
KB-SU-040
36.2.13
You can create as many Demand Patterns as you like, but only one demand pattern is active at
a time
See in this training guide: Summary of Generalized Codes on page 97
40
Setup Exercises
KB-SU-180
Important The data used in these exercises may not be the same as the data shown in the screen
Data
Field Name
Value
Description
knb_type
test
test kanban type
Copyright 2001 by QAD Inc. All Rights Reserved.
Data
knb_cont_type
basket
basket container type
Data
kbmd_pattern
summer
summer demand pattern
Field
Field Name
Value
Description
Data
kbmd_pattern
winter
winter demand pattern
41
42
Set up
Generalized
Codes
Set
up
Set
up Planning
Planning
Set up Planning
Periods
Periods
Periods
Define Kanban
Control File
17.22.7
17.22.7
Set up Kanban
Data for
Controlled Items
Set up Maximum
Demand
KB-SU-050
43
KB-SU-060
17.22.7
44
Setup Exercises
KB-SU-180
Data
daily8
daily 8 hours
8.00
Planning Period
Description
Hours Per Period
daily12
daily 12 hours
12.00
Set up
Generalized
Codes
Set up Planning
Periods
Set up Kanban
Data for
Controlled Items
Define
Kanban
Define
Kanban
Define Kanban
Control
ControlFile
File
Control
File
17.22.24
17.22.24
Set up Maximum
Demand
KB-SU-070
45
46
KB-SU-080
17.22.24
Setup Exercises
KB-SU-180
47
48
Set up
Generalized
Codes
Set up Planning
Periods
Set
up
Kanban
Set
Kanban
Setup
up Kanban
Data
for
Data for
Data
for
Controlled
Controlled
Items
ControlledItems
Items
Define Kanban
Control File
Set up Maximum
Demand
17.22.1
17.22.1
KB-SU-090
Unique
UniqueKey
Key55Fields:
Fields:
Item
ItemNumber
Numberand
and
Defining
Definingthe
the
Supplying
Supplyingand
and
Consuming
Consuming
Relationships
Relationships
Hours
Hours
Optional
Optional
Two
Two==Prints
Printsboth
bothProduction
Productionand
andMove
MoveCards
Cards
One
One==Prints
PrintsaaSingle
SingleCard
Card
KB-SU-100
17.22.1
Item Number
Cannot have the Pur/Mfg Code of F (family) in Item Master Maintenance 1.4.1
Cannot be a global phantom for either the item site or item master (ptp_phantom or
pt_phantom cannot be Yes)
Replenishment Time
Includes all relevant components of lead time and required slack time
Slack time is used for any producing cell that produces more than one item
This field is a contract between supplying and consuming sites, reflecting maximum
turnaround time
Copyright 2001 by QAD Inc. All Rights Reserved.
49
50
Safety Stock
Safety stock is optional, and defaults to zero
Variability Factor
If you use two supply sites, you can split usage between sites by setting a fractional variability
If more than one loop exists for the item and consuming site, this field can be used to show the
percentage belonging to each loop (allowing better control of the number of cards per loop)
One / Two Card
A detailed description of the one-card loop and two-card loop follows
51
Work
WorkCenter
CenterAA
Storage
Storage
Work
WorkCenter
CenterBB
Need
Needfor
forItems
Items
Material
Pulls
Pulls Material
from
fromAAto
toBB
Material Flow
Kanban Flow
KB-SU-110
Important Storage is in quotes because this material does not remain here long. Do not confuse
kanban storage with inventory storagematerial moves only on demand.
2
Work center B pulls the containers from storage when it needs the material (and may return an
empty container to the storage area).
When B pulls the container, the moved kanban is removed from the container and placed in
the card rack at A.
The moved kanban in A indicates an authorization for A to produce another container of parts.
52
Kanban
KanbanAuthorizes
Authorizes
Movement
Movementof
ofMaterials
Materials
Need
NeedPulls
PullsMaterial
Material
from
fromAAtotoBB
Work
WorkCenter
CenterAA
Production Kanban
Storage
Storage
Work
WorkCenter
CenterBB
Move Kanban
Material Flow
Kanban Flow
KB-SU-120
The move kanban pulled from the container goes to the storage area.
A full container is found, the production kanban is removed, and the move kanban is placed in
the container.
This authorizes movement of the container from storage to work center B.
The production kanban is then placed near work center A as an authorization to produce
another container of parts.
When work center A is done producing a full container of parts, the production kanban is then
placed in this container and moved to storage.
Copyright 2001 by QAD Inc. All Rights Reserved.
sDefine
sDefineififdifferent
differentfrom
fromthe
thecontainer
containercapacity
capacity
sIf
system
calculated,
leave
as
default
sIf system calculated, leave as default
Maximum
MaximumCapacity
Capacity
Used
Usedto
topad
pador
orlimit
limitthe
theamount
amountof
of
inventory
inventoryin
inWIP,
WIP,similar
similarto
tosafety
safetystock
stock
KB-SU-130
following:
Maximum quantity held by a carton or container
Standard supplier package size
Production constraint such as size of an oven tray
For unwieldy or heavy items, maximum amount that can be handled
Container Capacity must be greater than zero (0)
53
54
55
Displays
DisplaysCurrent
Current
Calculated
CalculatedValues
Values
Select
Selectwhich
whichshould
shouldbe
becalculated
calculatedby
by
Kanban
Card
Size/Print
IfIfsystem
systemcalculated,
calculated,rather
rather
than
quantity
than quantityper
perkanban,
kanban,
leave
leaveas
asdefault
default
KB-SU-140
56
Setup Exercises
KB-SU-180
Data
kanban1
kanban site 1
Site
Description
kanban2
kanban site 2
Data
kanban1
kbloc1
kanban location 1
Site
Location
Description
kanban2
kbloc2
kanban location 2
Data
kbparent
kanban parent item
1000
PG1
AC
kanban1
kbloc1
Pur/Mfg
Yield
M
100%
Field
Item
Description
Product Line
Promo Group
Status
Site
Location
Data
kbassy1
kanban assembly item 1
1000
PG1
AC
kanban1
kbloc1
Pur/Mfg
Yield
M
98%
57
58
Field
Item
Description
Product Line
Promo Group
Status
Site
Location
Data
kbcomp1
kanban component item 1
1000
PG1
AC
kanban1
kbloc1
Pur/Mfg
Yield
Curent Cost Data:
Material Cost
Labor Cost
P
100%
2.25
1.10
Field
Item
Description
Product Line
Promo Group
Status
Site
Location
Data
kbcomp2
kanban component item 2
1000
PG1
AC
kanban1
kbloc1
Pur/Mfg
Yield
Curent Cost Data:
Material Cost
Labor Cost
P
95%
1.05
0.55
Field
Item
Description
Product Line
Promo Group
Status
Site
Location
Data
kbcomp3
kanban component item 3
1000
PG1
AC
kanban2
kbloc2
Pur/Mfg
Yield
P
100%
5.25
1.25
Data
kbparent
kbassy1
1
0%
Parent
Component
Quantity Per
Scrap
kbparent
kbcomp3
3
2%
Parent
Component
Quantity Per
Scrap
kbassy1
kbcomp1
1
0%
Parent
Component
Quantity Per
Scrap
kbassy1
kbcomp2
2
0%
Parent
Component
Quantity Per
Scrap
kbassy1
kbcomp3
3
2%
59
60
Data
kbassy1
kanban2
kbloc2
kanban1
kbloc1
test
basket
1.4
<leave blank>
One
0
1.00
1
0
0
2
Qty
Field
Item
Supplying Site
Supplying Location
Consuming Site
Consuming Location
Kanban Type
Container Type
Replenishment Time
Supplier
One/Two Card
Safety Stock
Variability Factor
Container Capacity
Quantity Per Kanban
Data
kbcomp1
kanban2
kbloc2
kanban1
kbloc1
test
basket
2.5
002
One
10
1.00
80
0
Copyright 2001 by QAD Inc. All Rights Reserved.
Batch Size
Number of Cards
Calculate Cards/Qty
0
6
Qty
Field
Item
Supplying Site
Supplying Location
Consuming Site
Consuming Location
Kanban Type
Container Type
Replenishment Time
Supplier
One/Two Card
Safety Stock
Variability Factor
Container Capacity
Quantity per Kanban
Batch Size
Number of Cards
Calculate Cards/Qty
Data
kbcomp2
kanban2
kbloc2
kanban1
kbloc1
test
basket
3.5
<leave blank>
Two
0
1.20
100
50
0
0
Cards
Field
Item
Supplying Site
Supplying Location
Consuming Site
Consuming Location
Kanban Type
Container Type
Replenishment Time
Supplier
One/Two Card
Safety Stock
Variability Factor
Container Capacity
Quantity Per Kanban
Batch Size
Number of Cards
Calculate Cards/Qty
Data
kbcomp3
kanban2
kbloc2
kanban1
kbloc1
test
basket
6.5
002
One
0
.75
50
50
0
0
Cards
61
62
Field
Item
Supplying Site
Supplying Location
Consuming Site
Consuming Location
Kanban Type
Container Type
Replenishment Time
Supplier
One/Two Card
Safety Stock
Variability Factor
Container Capacity
Quantity Per Kanban
Batch Size
Number of Cards
Calculate Cards/Qty
Data
kbcomp3
kanban1
kbloc1
kanban1
kbloc1
test
basket
10.5
002
One
0
.25
150
50
0
1
Qty
KB-SU-150
63
64
Set up
Generalized
Codes
Set up Planning
Periods
Set up Kanban
Data for
Controlled Items
Define Kanban
Control File
Set
up
SetSet
up
Maximum
upMaximum
Maximum
Demand
Demand
Demand
17.22.10
17.22.10
KB-SU-160
Used
Usedfor
forSizing
SizingCalculation,
Calculation,
NOT
to
Forecast
NOT to ForecastDemand
Demand
Could
Couldbe
beFinished
FinishedGoods
Goods
or
Service
or ServiceParts
Parts
Define
Definethe
themaximum
maximumdemand
demandper
perconsuming
consuming
site,
demand
pattern,
and
planning
site, demand pattern, and planningperiod
periodfor
for
items
with
independent
demand
items with independent demand
KB-SU-170
17.22.10
independent demand
65
66
Setup Exercises
KB-SU-180
Data
kanban1
summer
daily8
kbparent
1045
Copyright 2001 by QAD Inc. All Rights Reserved.
Consuming Site
Demand Pattern
Planning Period
Item
Maximum Demand
kanban1
summer
daily12
kbassy1
100
Consuming Site
Demand Pattern
Planning Period
Item
Maximum Demand
kanban1
winter
daily12
kbparent
690
Consuming Site
Demand Pattern
Planning Period
Item
Maximum Demand
kanban1
winter
daily12
kbassy1
140
67
68
&RXUVH2YHUYLHZ
KB-SU-190
CHAPTER 4
70
3URFHVV.DQEDQ6L]LQJ
In this section you learn how to:
Identify some key business
considerations before setting up Kanban
Sizing in MFG/PRO
71
KB-PR-020
Kanban Processing
This illustration is a suggested processing sequence of master files for the Kanban Sizing module
which is based on information that flows from one master file to another. Reading the illustration:
Boxes with solid lines are required to process Kanban Sizing and are covered in this
course.
72
KB-PR-030
demand items
Reads component yield percentage like MRP does
Alternate product structure A, co/by-product J, and data product structure D are ignored in the
explosion
Maximum demand for local phantoms is not included in the maximum demand per hour
73
sExplodes
sExplodesBills
Billsto
todetermine
determineqty
qtyrequired
required
per
hour
for
components
per hour for components
sSimilar
sSimilarto
toMRP,
MRP,and
andincludes
includesScrap
Scrap
and
Yield
percentages
and Yield percentagesinincalculation
calculation
Used
Usedto
tofind
findcorrect
correct
Bill
of
Materials
Bill of Materialsrecords
records
Simulate
SimulateCalculation
Calculationby
by
Selecting
SelectingUpdate
Update==No
No
Defaults
Defaultsfrom
fromKanban
Kanban
Control
ControlFile
File
IfIfUpdate
Update==Yes,
Yes,
Updates
Updatesdemand
demandpattern
pattern
and
anddemand
demandper
perhour
hourin
in
Kanban
KanbanData
DataMaintenance
Maintenance
KB-PR-040
17.22.13
maximum demand
Update = Yes then the records are calculated and replace the detail Kanban data
maintenance records
Copyright 2001 by QAD Inc. All Rights Reserved.
74
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
Yield Percent:
Max demand/hr w/yield:
N1
2
750
N/A
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
K45
2
1500
187.50
98%
191.3265
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
N2
4
4500
N/A
K2
3
1125
140.625
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
Scrap Percent:
Max demand/hr w/scrap:
K3
2
2250
281.25
5%
296.0526
Parent Item: K2
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
N2
4
996
N/A
Component Item:
BOM qty per:
Dep max demand:
Max demand/hr:
Scrap Percent:
Max demand/hr w/scrap:
K3
2
498
41.5
5%
43.6842
KB-PR-050
Calculation Close-up
This illustration shows how multiple level calculations cascade.
75
Processing Exercises
KB-PR-170
Important The data used in these exercises may not be the same as the data shown in the screen
From
kanban1
kanban1
Value
<use default>
Yes
<use the printer specified by your instructor, or print to window>
As Of Date
Update
Output
To
76
Item Number
----------kbassy1
kbcomp1
kbcomp2
kbcomp3
Description
--------------Kanban Assembly
Kanban Comp 1
Kanban Comp 2
Kanban Comp 3
Supplying
Site
--------kanban2
kanban2
kanban2
kanban2
Supplying
Location
--------kbloc2
kbloc2
kbloc2
kbloc2
Consuming
Site
--------kanban1
kanban1
kanban1
kanban1
Date: 10/05/99
Time: 10:31:04
Consuming
Location
--------kbloc1
kbloc1
kbloc1
kbloc1
Curr Demand
Pattern
----------Summer
Summer
Summer
Summer
Max Demand
per Hour
---------141.7942
141.7942
298.5141
833.9364
End of Report
Explained
Explainedin
in
Next
Slide
Next Slide
KB-PR-180
Calculation Explanations
kbassy1
From kbparent demand:
From kbassy1 demand:
Total kbassy1 demand per hour:
kbcomp1
From kbparent demand:
From kbassy1 demand:
Total kbcomp1 demand per hour:
kbcomp2
From kbparent demand:
From kbassy1 demand:
Total kbcomp2 demand per hour:
1,045 * 2 (qty per) / .98 (yield on kbassy1) / .95 (yield on kbcomp2) / 8 (hours per) = 280.6122
100 * 2 (qty per) / .98 (yield on kbassy1) / .95 (yield on kbcomp2) / 12 (hours per) = 17.9019
298.5141
kbcomp3
From kbparent demand
(through kbassy1):
1,045 * 3 (qty per) / .98 (yield on kbassy1)*100/98 (scrap on kbcomp3) /8 (hours per) = 408.0331
100 * 3 (qty per) / .98 (yield on kbassy1) * 100/98 (scrap on kbcomp3) / 12 (hours per) = 26.0308
833.9363
Summer Demand
Pattern
kbparent
kbassy1(Yield 98%)
kbcomp3
kbcomp1
kbcomp3
KB-PR-190
kbparent
Site: kanban1
8 hours
Max demand 1045
kbassy1
Site: kanban1
12 hours
Max demand 100
77
78
Calculate
Calculate Number
Number of
of
Kanban
Cards
Calculate
Number
Kanban
Cardsof
Kanban
or the
or
Quantity
or the
theCards
Quantity
Quantity per Kanban
per
per Kanban
Kanban
17.22.15
17.22.15
Print Kanban Cards
KB-PR-060
79
Group
GroupBy
By
Usually
UsuallyOnly
OnlyUpdated
Updatedwhen
whenaa
New
NewSet
Setof
ofCards
CardsisisPrinted
Printed
KB-PR-070
17.22.15
80
KB-PR-080
KB-PR-090
81
82
Print
Print
Print Kanban
Cards
Kanban
Cards
Kanban
Cards
17.22.15
17.22.15
KB-PR-100
83
Possible
Possibleto
toCalculate,
Calculate,Size,
Size,
and
Print
all
from
and Print all fromthis
thisscreen
screen
May
MayPrint
PrintCards
Cards
Only
if
Update
Only if Update==Yes
Yes
Simulate
SimulateCalculation
Calculationby
by
ss Selecting
SelectingUpdate
Update==No
No
ss and
andPrint
PrintAudit
AuditTrail
Trail==Yes
Yes
Audit
AuditTrail
Trailwill
willshow
showbefore
beforeand
andafter
after
values
of
calculations
values of calculations
KB-PR-110
17.22.15
this screen
84
Kanban
Kanban ID:
ID: 4114
4114
Item
Item Number:
Number: bkm2
bkm2
Rev:
Rev:
Supplying
Supplying Site:
Site: 10000
10000
Consuming
Consuming Site:
Site: bkm
bkm
Batch
Batch Size:
Size:
Quantity
Quantity per
per Kanban:
Kanban:
Container
Container Type:
Type:
Container
Container Capacity:
Capacity:
Print
Print Date:
Date:
Calculate
Calculate Date:
Date:
Number
Number of
of Cards:
Cards:
Card
Card Number:
Number:
Test
Test Component
Component
Supplying
Supplying Location:
Location: 100
100
Consuming
Consuming Location:
Location: bkmloc
bkmloc
00
11
basket
basket
100
100
09/29/99
09/29/99
09/29/99
09/29/99
66
11
KB-PR-120
Kanban
Kanban ID:
ID:
Item
Item Number:
Number:
Rev:
Rev:
4127
4127
Assy1
Assy1
Supplying
Supplying Site:
Site:
Consuming
Consuming Site:
Site:
20000
20000
12000
12000
Production/Move
Production/Move Card:
Card:
Batch
Batch Size:
Size:
Quantity
Quantity per
per Kanban:
Kanban:
Container
Container Type:
Type:
Container
Container Capacity:
Capacity:
Print
Print Date:
Date:
Calculate
Calculate Date:
Date:
Number
of
Cards:
Number of Cards:
Card
Card Number:
Number:
Supplying
Supplying Location:
Location: 200
200
Consuming
Consuming Location:
Location: 300
300
Prod
Prod
00
10
10
tote
tote
10
10
09/29/99
09/29/99
09/29/99
09/29/99
44
11
Kanban
Kanban ID:
ID: 4128
4128
Item
Item Number:
Number: Assy1
Assy1
Rev:
Rev:
Supplying
Supplying Site:
Site: 20000
20000
Consuming
Consuming Site:
Site: 12000
12000
Production/Move
Production/Move Card:
Card:
Batch
Batch Size:
Size:
Quantity
per
Kanban:
Quantity per Kanban:
Container
Type:
Container Type:
Container
Container Capacity:
Capacity:
Print
Print Date:
Date:
Calculate
Calculate Date:
Date:
Number
Number of
of Cards:
Cards:
Card
Number:
Card Number:
KB-PR-130
Move
Move
00
10
10
tote
tote
10
10
09/29/99
09/29/99
09/29/99
09/29/99
44
22
Supplying
Supplying Location:
Location: 200
200
Consuming
Consuming Location:
Location: 300
300
85
86
17.22.15
17.22.15 Kanban
Kanban Card
Card Size/Print
Size/Print
EIDG
EIDG 9.1
9.1 Environment
Environment
Item
Item Number:
Number:
Supplying
Supplying Site:
Site:
Supplying
Location:
Supplying Location:
Consuming
Site:
Consuming Site:
Consuming
Consuming Location:
Location:
bkm2
bkm2
10000
10000
100
100
bkm
bkm
bkmloc
bkmloc
BK-M2
BK-M2 Component
Component
San
San Diego
Diego Main
Main Plant
Plant
Raw
Materials/Assemblies
Raw Materials/Assemblies
BK-M
Site
BK-M Site
BK-M
BK-M Location
Location
Supplier:
Supplier:
Group:
Group:
Buyer/Planner:
Buyer/Planner:
ABC
ABC Class:
Class:
Before
Max
Repl
Variability
Quantity
Number
Before
Max Demand
Demand
Repl
Variability Container
Container
Quantity
Number
/After
per
Time
Factor
Capacity
of
Cost
/After
per Hour
Hour
Time Safety
Safety Stk
Stk
Factor
Capacity per
per Kanban
Kanban
of Cards
Cards
Cost Exter
Exter
--------------- --------------------- ------------- ------------------- --------------------- --------------------- --------------------- --------------------- ----------------------- ------------Before
134.2342
4.00
0
1.00
100
1
6
3.45
Before
134.2342
4.00
0
1.00
100
1
6
3.45
After
137.5780
4.00
00
1.00
100
11
66
3.23
After
137.5780
4.00
1.00
100
3.23
Item
Item Number:
Number:
Supplying
Supplying Site:
Site:
Supplying
Supplying Location:
Location:
Consuming
Site:
Consuming Site:
Consuming
Consuming Location:
Location:
bkm3
bkm3
10000
10000
100
100
bkm
bkm
bkmloc
bkmloc
BK-M3
BK-M3 Component
Component
San
San Diego
Diego Main
Main Plant
Plant
Raw
Raw Materials/Assemblies
Materials/Assemblies
BK-M
Site
BK-M Site
BK-M
BK-M Location
Location
Supplier:
Supplier:
Group:
Group:
Buyer/Planner:
Buyer/Planner:
ABC
Class:
ABC Class:
Before
Max
Repl
Variability
Quantity
Number
Before
Max Demand
Demand
Repl
Variability Container
Container
Quantity
Number
/After
per
Time
Factor
Capacity
of
Cost
/After
per Hour
Hour
Time Safety
Safety Stk
Stk
Factor
Capacity per
per Kanban
Kanban
of Cards
Cards
Cost Exter
Exter
--------------- --------------------- ------------- ------------------- --------------------- --------------------- --------------------- --------------------- ----------------------- ------------Before
110.8033
3.50
00
1.00
60
11
77
2.17
Before
110.8033
3.50
1.00
60
2.17
After
105.6767
3.50
00
1.00
60
11
77
2.25
After
105.6767
3.50
1.00
60
2.25
KB-PR-140
87
Processing Exercises
KB-PR-170
Important The data used in these exercises may not be the same as the data shown in the screen
Value
No
Yes
Yes
88
Print Cards
Print Audit Trail
Output
Yes
Yes
<use the printer specified by your instructor>
Print Cards
Kanban ID:
Item Number:
Rev:
Supplying Site:
Consuming Site:
Batch Size:
Quantity per Kanban:
Container Type:
Container Capacity:
Print Date:
Calculate Date:
Number of Cards:
Card Number:
1
kbassy1
kanban2
kanban1
1
1
basket
120
10/05/99
10/05/99
2
1
Kanban ID:
Item Number:
Rev:
Supplying Site:
Consuming Site:
Batch Size:
Quantity per Kanban:
Container Type:
Container Capacity:
Print Date:
Calculate Date:
Number of Cards:
Card Number:
KB-PR-200
Kanban Assembly
Supplying Location:
Consuming Location:
2
kbassy1
kanban2
kanban1
1
1
basket
120
10/05/99
10/05/99
2
2
kbloc2
kbloc1
Kanban Assembly
Supplying Location:
Consuming Location:
kbloc2
kbloc1
89
90
Kanban
Kanban
Kanban
Kanban
Kanban
Assembly
Site 2
Location 2
Site 1
Location 1
Date: 10/05/99
Time: 10:32:25
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
0.0
0.00
0
1.00
1
1
0
0.00
0.00
After
141.7942
1.40
10
1.00
120
105
2
0.00
0.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp1
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 1
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
0.0
0.00
0
1.00
1
1
0
3.35
0.00
After
141.7942
2.50
10
1.00
80
26
15
3.35
1,306.50
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp2
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 2
Site 2
Location 2
Site 1
Location 1
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
0.0
0.00
0
1.00
1
1
0
1.60
0.00
After
298.5141
3.50
0
1.20
100
50
26
1.60
2,080.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp3
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 3
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
0.0
0.00
0
1.00
1
1
0
6.50
0.00
After
833.9364
6.50
0
0.75
50
50
82
6.50
26,650.00
KB-PR-210
91
Value
Yes
Yes
Yes
Yes
Yes
<use the printer specified by your instructor>
92
226
kbassy1
kanban2
kanban1
Kanban Assembly
Supplying Location: kbloc2
Consuming Location: kbloc1
1
1
basket
120
10/05/99
10/05/99
2
1
Kanban ID:
Item Number:
Rev:
Supplying Site:
Consuming Site:
Batch Size:
Quantity per Kanban:
Container Type:
Container Capacity:
Print Date:
Calculate Date:
Number of Cards:
Card Number:
Kanban ID:
Item Number:
Rev:
Supplying Site:
Consuming Site:
Batch Size:
Quantity per Kanban:
Container Type:
Container Capacity:
Print Date:
Calculate Date:
Number of Cards:
Card Number:
228
kbcomp1
kanban2
kanban1
1
26
basket
80
227
kbassy1
Kanban Assembly
kanban2
kanban1
1
1
basket
120
10/05/99
10/05/99
2
2
Card Number: 2
Kanban Component 1
Supplying Location: kbloc2
Consuming Location: kbloc1
Card Number: 3
Card Number: 4
Card Number: 5
Card Number: 6
Card Number: 7
Card Number: 8
10/05/99
10/05/99
8
1
KB-PR-220
Kanban
Kanban
Kanban
Kanban
Kanban
Assembly
Site 2
Location 2
Site 1
Location 1
Date: 10/05/99
Time: 10:45:48
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
141.7942
1.40
10
1.00
120
105
2
0.00
0.00
After
70.5782
1.40
10
1.00
120
55
2
0.00
0.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp1
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 1
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
141.7942
2.50
10
1.00
80
26
15
3.35
1,306.50
After
70.5782
2.50
10
1.00
80
26
8
3.35
696.80
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp2
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 2
Site 2
Location 2
Site 1
Location 1
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
298.5141
3.50
0
1.20
100
50
26
1.60
2,080.00
After
148.5858
3.50
0
1.20
100
50
13
1.60
1,040.00
KB-PR-230
Date: 10/05/99
Time: 10:45:48
(continued)
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp3
kanban1
kbloc1
kanban2
kbloc2
Kanban
Kanban
Kanban
Kanban
Kanban
Component 3
Site 1
Location 1
Site 2
Location 2
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
0.0
0.00
0
1.00
1
1
0
6.50
0.00
After
400.0778
10.50
0
0.25
150
50
22
6.50
7,150.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp3
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 3
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
833.9364
6.50
0
0.75
50
50
82
6.50
26,650.00
After
392.0762
6.50
0
0.75
50
50
39
6.50
12,675.00
End of Report
93
94
Data
kbcomp3
kanban1
kbloc1
<change to:> kanban2
<change to:> kbloc2
<change to:> 4.5
Data
kanban1
winter
daily12
kbparent
540
Data
Yes
Yes
No
No
Yes
<use the printer specified by your instructor>
Recalculate as Simulation (1 of 2)
kbszmt.p 99
Page: 1
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
Kanban
Kanban
Kanban
Kanban
Kanban
Assembly
Site 2
Location 2
Site 1
Location 1
Date: 10/05/99
Time: 10:50:16
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
70.5782
1.40
10
1.00
120
55
2
0.00
0.00
After
57.8231
1.40
10
1.00
120
46
2
0.00
0.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp1
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 1
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
70.5782
2.50
10
1.00
80
26
8
3.35
696.80
After
57.8231
2.50
10
1.00
80
26
6
3.35
522.60
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp2
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 2
Site 2
Location 2
Site 1
Location 1
Supplier:
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
148.5858
3.50
0
1.20
100
50
13
1.60
1,040.00
After
121.7329
3.50
0
1.20
100
50
11
1.60
880.00
KB-PR-250
Recalculate as Simulation (2 of 2)
kbszmt.p 99
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp3
kanban1
kbloc1
kanban2
kbloc2
Kanban
Kanban
Kanban
Kanban
Kanban
Component 3
Site 1
Location 1
Site 2
Location 2
Date: 10/05/99
Time: 10:50:16
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
400.0778
10.50
0
0.25
150
50
22
6.50
7,150.00
After
321.1885
4.50
0
0.25
150
50
8
6.50
2,600.00
Item Number:
Supplying Site:
Supplying Location:
Consuming Site:
Consuming Location:
kbcomp3
kanban2
kbloc2
kanban1
kbloc1
Kanban
Kanban
Kanban
Kanban
Kanban
Component 3
Site 2
Location 2
Site 1
Location 1
Supplier: 002
Group:
Buyer/Planner:
ABC Class:
Before
Max Demand
Repl
Variability
Container
Quantity
Number
/After
per Hour
Time Safety Stk
Factor
Capacity per Kanban
of Cards
Cost
Extended Cost
-------- ----------- ------- ---------- ----------- ----------- ----------- ----------- --------------- --------------Before
392.0762
6.50
0
0.75
50
50
39
6.50
12,675.00
After
314.7647
6.50
0
0.75
50
50
31
6.50
10,075.00
End of Report
95
96
KB-PR-150
Label
Demand Pattern
Where Used
Kanban Control File
Maximum Demand Maintenance
Kanban Data Maintenance
Maximum Demand Calculation
Kanban Size/Print
knb_cont_type
Container Type
knb_type
Kanban Type
KB-PR-160
97
98
&RXUVH2YHUYLHZ
KB-PR-270
Glossary
A
C
Container. A packing item used to hold goods
and subsets of other containers. For example, a
box, pallet, rack, or trailer.
K
Kanban. A Japanese method of production and
container.
100
GLOSSARY
M
Maximum Demand. Maximum number of
items projected for a planning period.
T
Two-Card System. Two kanban cards are
Q
Quantity Per Kanban. Quantity of an item per
container.
V
Variability Factor. Limits or increases amount
of inventory in WIP.
R
Replenishment Time. Maximum turnaround
time between supplying and consuming sites.
S
Safety Stock. (1) The quantity of an item to be
W
Work in Process (WIP). A product in
Index
Numerics
1.1.13 29
1.1.18 29
1.4.1 30, 49
1.4.3 30
2.3.1 28
17.22.1 48, 49
17.22.7 42, 43
17.22.10 31, 42, 64, 65, 72
17.22.13 46, 55, 73, 83
17.22.15 46, 79, 83
17.22.17 82
17.22.24 46
36.2.13 39, 46
B
benefits 19
business issues 25
C
calculate
maximum demand 72
number of kanban 78
quantity per kanban 78
certification preparation 9
container capacity 53
D
deleting 63
E
exercises
calculate maximum demand 75
change current demand pattern 91
create kanban product structures 59
define generalized codes 40
define kanban control file 47
define kanban data 60
102
kanban loop
one card 51
two card 52
kanban records
deleting 63
key elements 16
L
limitations 19
Location Maintenance 29
locations 29
M
material flow 32
maximum demand 31
Maximum Demand Calculation 46, 55, 73, 83
Maximum Demand Maintenance 31, 42, 64, 65, 72
O
one card kanban loop 51
overview 14
P
Planning Period Maintenance 42, 43
planning periods 42
pre-requisites 27
prerequisites 8
print kanban cards 82
Q
quantity per kanban 54
R
related courses 9
replenishment time 49
S
sample
one card printout 84
two card printout 85
sample audit trail output 86
Site Maintenance 29
sites 29
Supplier Data Maintenance 28
supplier relationships 28
T
two card kanban loop 52
U
users 20