Table1.4
COSTESTIMATESFORWORKITEMOFPROJECTS(PESOS)
asofMarch2015
Table1.4
A.PreventiveMaintenance
SURFACETYPE
SCOPEOFWORK
ASPHALT/CONCRETE
Overlay50mm
Overlay80mm
Overlay100mm
Overlay50mmwithminor
corrections
ASPHALT
(Assumption:Halfofthe
existing pavement w/
corrections)
NCR
REGIONI
REGIONII
REGIONIII
REGIONIVA
8,311,581.78
19,703,301.40
13,363,387.10
19,148,771.43
22,870,842.96
17,328,391.83
11,777,347.80
16,859,362.03
20,055,553.80
18,485,917.52
12,679,715.20
17,888,496.79
21,533,802.15
12,945,696.21
9,520,817.31
13,295,924.10
15,598,982.85
15,800,219.05
11,043,006.50
15,665,721.37
18,534,051.63
UNITCOST/KM.(PESOS)
SCOPEOFWORK
ASPHALT/CONCRETE
Overlay50mm
Overlay80mm
Overlay100mm
Overlay50mmwithminor
corrections
ASPHALT
(Assumption:Halfofthe
existing pavement w/
corrections)
REGIONIVB
REGIONV
REGIONVI
REGIONVII
REGIONVIII
REGIONIX
9,943,035.90 11,926,793.33
Overlay80mmwithminor
corrections
10,519,755.92 12,596,864.12
Overlay100mmwithminor
corrections
Reblockingwithoverlay50mm
CONCRETE
(Assumption : 30% for
reblocking)
UNITCOST/KM.(PESOS)
SURFACETYPE
SCOPEOFWORK
ASPHALT/CONCRETE
Overlay50mm
Overlay80mm
Overlay100mm
Overlay50mmwithminor
corrections
SURFACETYPE
CAR
13,206,961.67
9,638,085.76
13,472,318.30
15,822,124.75
Overlay100mmwithminor
corrections
Overlay80mmwithminor
corrections
UNITCOST/KM.(PESOS)
Reblockingwithoverlay50mm
CONCRETE
(Assumption : 30% for Reblockingwithoverlay80mm
reblocking)
Reblockingwithoverlay100mm
ASPHALT
(Assumption:Halfofthe
existing pavement w/
corrections)
Overlay80mmwithminor
corrections
Overlay100mmwithminor
corrections
REGIONX
REGIONXI
REGIONXII
REGIONXIII
Reblockingwithoverlay50mm
CONCRETE
(Assumption : 30% for
reblocking)
Reblockingwithoverlay80mm
Reblockingwithoverlay100mm
B.Rehabilitation/Reconstruction
ASPHALT
(Assumption:withbase
failure)
CONCRETE
(Assumption:withbase
failure)
ASPHALT
CONCRETE
(Assumption
reblocking)
50%
SURFACETYPE
SCOPEOFWORK
UNITCOST/KM.(PESOS)
ReconAC50mm
ReconAC80mm
ReconAC100mm
NCR
CAR
REGIONI
REGIONII
REGIONIII
REGIONIVA
10,714,595.91 15,442,300.80 12,435,929.19 13,718,813.46 10,668,804.48 11,834,905.38
14,458,521.65 21,061,306.98 17,432,261.03 19,027,104.89 14,340,086.97 16,358,782.28
16,746,415.13 24,669,368.75 20,569,710.40 22,371,654.03 16,571,977.12 19,159,359.19
ReconstructionPCC230mm
ReconstructionPCC280mm
ReconstructionPCC300mm
UpgradetoConcrete230mm
UpgradetoConcrete280mm
UpgradetoConcrete300mm
Reblocking230mm
Reblocking280mm
Reblocking300mm
12,818,027.62
14,638,954.40
15,373,755.70
12,294,102.28
13,319,329.75
14,041,844.18
5,536,097.62
6,431,165.28
6,792,412.48
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/new_page_139.htm
14,676,426.66
16,811,231.04
17,673,735.28
13,468,262.79
16,459,037.05
17,309,380.11
6,240,557.13
7,292,720.69
7,717,882.21
12,985,758.14
14,861,448.54
15,618,683.11
12,080,045.26
13,382,210.58
14,248,775.11
5,631,816.93
6,554,392.44
6,926,906.70
14,441,888.14
16,552,460.40
17,404,134.94
12,713,113.14
15,362,397.08
16,200,559.54
6,175,755.14
7,214,114.02
7,633,185.24
13,125,774.24
14,936,908.37
15,668,009.15
12,479,814.99
13,435,710.27
14,152,675.76
5,527,666.04
6,415,526.84
6,773,999.58
13,475,405.17
15,385,337.50
16,155,578.61
12,399,586.44
13,791,627.94
14,547,571.35
5,697,728.87
6,634,785.76
7,012,747.45
1/4
4/15/2016
Table1.4
SURFACETYPE
ASPHALT
(Assumption : with base
failure)
CONCRETE
(Assumption : with base
failure)
ASPHALT
CONCRETE
(Assumption
reblocking)
UNITCOST/KM.(PESOS)
ReconAC50mm
ReconAC80mm
ReconAC100mm
REGIONIVB
REGIONV
REGIONVI
REGIONVII
REGIONVIII
REGIONIX
16,754,021.17 17,803,461.42 15,189,722.00 12,394,752.29 14,961,338.06 17,616,773.19
23,718,297.78 25,198,537.11 21,064,311.35 16,855,541.63 20,782,987.49 24,631,386.89
28,193,096.71 29,952,998.98 24,814,315.42 19,644,576.62 24,499,565.08 29,115,016.90
ReconstructionPCC230mm
ReconstructionPCC280mm
ReconstructionPCC300mm
UpgradetoConcrete230mm
UpgradetoConcrete280mm
UpgradetoConcrete300mm
Reblocking230mm
Reblocking280mm
Reblocking300mm
50%
SCOPEOFWORK
15,886,354.89
18,179,527.47
19,104,215.07
12,957,336.79
16,593,648.32
17,501,646.22
6,655,525.80
7,781,212.82
8,235,201.76
SURFACETYPE
SCOPEOFWORK
ASPHALT
(Assumption:withbase
failure)
ReconAC50mm
ReconAC80mm
ReconAC100mm
CONCRETE
(Assumption:withbase
failure)
ASPHALT
CONCRETE
(Assumption
reblocking)
14,323,765.96
16,384,860.44
17,218,124.33
12,884,546.61
15,351,964.54
16,171,856.10
6,095,305.09
7,109,099.76
7,519,035.53
ReconstructionPCC230mm
ReconstructionPCC280mm
ReconstructionPCC300mm
UpgradetoConcrete230mm
UpgradetoConcrete280mm
UpgradetoConcrete300mm
Reblocking230mm
Reblocking280mm
Reblocking300mm
50%
15,573,742.84 14,816,527.61
17,737,609.57 16,952,853.36
18,613,349.30 17,815,844.34
12,970,552.24 12,591,279.89
15,940,653.54 15,550,812.14
16,798,643.31 16,399,734.13
6,430,703.47 6,356,689.65
7,490,412.24 7,407,229.13
7,919,397.11 7,831,680.11
16,627,915.18
19,058,339.49
20,041,013.53
12,951,118.76
17,462,935.41
18,428,994.17
7,032,465.91
8,226,871.81
8,709,891.18
16,285,210.80
18,530,940.35
19,437,219.16
13,218,391.99
16,592,002.60
17,478,752.12
6,627,740.02
7,726,156.02
8,169,520.77
UNITCOST/KM.(PESOS)
REGIONX
REGIONXI
REGIONXII
REGIONXIII
16,775,586.64 15,340,265.64 15,409,538.41 18,062,744.96
23,136,212.33 21,371,101.08 21,512,756.34 25,146,089.86
27,192,591.33 25,254,488.82 25,392,770.11 29,695,565.16
15,958,935.26
18,086,351.49
18,946,347.10
13,362,478.15
16,191,249.22
17,031,374.11
6,418,760.51
7,457,593.08
7,877,645.52
14,069,904.00
16,088,616.97
16,905,144.80
12,904,810.49
15,182,772.84
15,986,558.94
6,007,550.80
7,000,942.97
7,402,826.01
15,134,597.29
17,275,321.59
18,141,249.45
12,704,793.66
15,631,801.38
16,481,873.76
6,378,443.50
7,428,949.15
7,853,975.33
15,856,209.45
18,036,625.64
18,917,970.10
13,406,943.05
16,660,130.75
17,524,143.15
6,516,641.85
7,585,147.71
8,017,143.90
C.RoadUpgrading
LEVELOF
IMPROVEMENT
UNITCOST/KM.(PESOS)
SCOPEOF
WORK
GRAVELTOASPHALT
AC50mm
AC80mm
AC100mm
GRAVELTOCONCRETE
PCC280mm
PCC300mm
13,663,656.35
15,873,792.61 13,930,302.70 15,792,247.23 14,119,937.36 14,555,003.88
15,160,983.91
17,497,820.21 15,452,238.81 17,553,078.09 15,782,992.06 16,272,073.54
UNITCOST/KM.(PESOS)
SCOPEOF
WORK
11,661,789.87
LEVELOF
IMPROVEMENT
CAR
REGIONI
REGIONII
REGIONIII
REGIONIVA
13,293,122.62 10,771,153.32 11,853,252.82 8,884,694.93 10,082,507.21
18,583,945.25 15,591,481.77 16,921,969.40 12,345,593.20 14,405,431.30
21,973,218.00 18,611,595.53 20,106,801.96 14,437,227.19 17,072,039.67
PCC230mm
FLATTERRAIN
NCR
8,989,108.54
12,547,775.08
14,712,162.43
FLATTERRAIN
REGIONIVB
REGIONV
REGIONVI
REGIONVII
REGIONVIII
REGIONIX
GRAVELTOASPHALT
AC50mm
14,795,840.91
AC80mm
21,492,290.57
AC100mm
25,788,538.21
GRAVELTOCONCRETE
PCC280mm
17,485,002.20
PCC300mm
19,540,192.24
UNITCOST/KM.(PESOS)
SCOPEOF
WORK
FLATTERRAIN
REGIONX
REGIONXI
REGIONXII
REGIONXIII
GRAVELTOASPHALT
AC50mm
14,664,223.57
AC80mm
20,709,650.42
AC100mm
24,555,896.86
GRAVELTOCONCRETE
14,920,141.87
PCC230mm
LEVELOF
IMPROVEMENT
PCC230mm
15,186,988.94
PCC280mm
17,662,590.24
PCC300mm
19,958,956.60
D.FloodedSections(RaisingofGradeandDrainage)
UNITCOST/KM.(PESOS)
SURFACETYPE
SCOPEOFWORK
ASPHALT
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
AC50mm
AC80mm
AC100mm
NCR
CAR
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/new_page_139.htm
REGIONI
REGIONII
REGIONIII
REGIONIVA
2/4
4/15/2016
Table1.4
CONCRETE
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
PCC230mm
PCC280mm
PCC300mm
AC50mm
AC80mm
AC100mm
PCC230mm
PCC280mm
PCC300mm
ASPHALT
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
CONCRETE
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
UNITCOST/KM.(PESOS)
SURFACETYPE
SCOPEOFWORK
ASPHALT
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
AC50mm
AC80mm
AC100mm
PCC230mm
PCC280mm
PCC300mm
AC50mm
AC80mm
AC100mm
PCC230mm
PCC280mm
PCC300mm
CONCRETE
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
ASPHALT
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
CONCRETE
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
REGIONIVB
REGIONV
REGIONVI
REGIONVII
REGIONVIII
REGIONIX
UNITCOST/KM.(PESOS)
SURFACETYPE
SCOPEOFWORK
ASPHALT
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
AC50mm
AC80mm
AC100mm
PCC230mm
PCC280mm
PCC300mm
AC50mm
AC80mm
AC100mm
PCC230mm
PCC280mm
PCC300mm
CONCRETE
(Assumption : raising of
grade by 1.00 meter &
removal/replacement of
RCPCatbothsides)
ASPHALT
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
CONCRETE
(Assumption : raising of
grade by 1.00 meter
without replacement of
RCPCatbothsides)
REGIONX
REGIONXI
REGIONXII
REGIONXIII
E.DrainageandSlopeProtection
UNITCOST/L.M.(PESOS)
SURFACETYPE
SCOPEOFWORK
NCR
CAR
REGIONI
REGIONII
REGIONIII
REGIONIVA
SLOPEPROTECTION
GroutedRiprap(H=3.00)
6,008.70 4,579.52 4,289.58 8,369.84 4,668.62 5,076.05
(PerLinearMeter)
StoneMasonry(H=3.00)
13,779.67 11,549.18 10,748.57 18,896.69 11,289.72 12,199.36
UNITCOST/L.M.(PESOS)
SURFACETYPE
SCOPEOFWORK
REGIONIVB
REGIONV
REGIONVI
REGIONVII
REGIONVIII
REGIONIX
SLOPEPROTECTION
GroutedRiprap(H=3.00)
5,124.98 4,792.70 5,529.25 5,831.49 5,427.83 6,454.72
(PerLinearMeter)
StoneMasonry(H=3.00)
12,790.20 11,930.79 13,302.01 13,768.85 13,247.14 15,292.87
UNITCOST/L.M.(PESOS)
SURFACETYPE
SCOPEOFWORK
REGIONX
REGIONXI
REGIONXII
REGIONXIII
SLOPEPROTECTION
GroutedRiprap(H=3.00)
5,411.45 4,946.60 6,182.49 4,812.05
(PerLinearMeter)
StoneMasonry(H=3.00)
13,078.18 12,165.26 14,739.91 11,985.87
(PerLinearMeter)
ConcreteLinedCanal(H=1.00x0.60) 8,109.56 7,462.61 8,276.55 8,407.98
RCPC(910mm.Dia.)/Manhole
8,975.68 7,631.66 9,124.76 9,640.01
Note:
1.Thepriceofconstructionmaterialsarebasedontheregionalaveragepricesplus15%markupforthehaulingcost(4thQuarterofCY2014),equipmentratesarebasedfromthe
latestACELRates(24thEdition)andlaborratesarebasedonregionallaboraverage(February2015).
2.ItemAtoC,theEstimatedCostexcludescostforDrainageandSlopeProtectionWorks.
3.TheEstimatedCostwasassumedforaflatterraincondition.Acostfactorof10%forrollingmountainousterrainconditionmaybeapplied.
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/new_page_139.htm
3/4
4/15/2016
Table1.4
BackHomeUpNext
ForquestionsregardingthisWebsitecontactdpwh_feedback@yahoo.comortheDPWHCFMC.
Lastupdated:10/09/15.
bestviewedusingInternetExplorer10orFirefoxver.28
Disclaimer
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/new_page_139.htm
4/4