DEPARTAMENTO DE CORDOBA
MUNICIPIO DE MOITOS
CONSTRUCCION DE LA ESTRUCTURA DE PAVIMENTO EN PLACA HUELLA QUE DE LA VIA SAN BERNARDO
DEL VIENTO - MOITOS CONDUCE AL CORREGIMIENTO DEL PUEBLITO MUNICIPIO DE MOITOS, CORDOBA,
CARIBE.
AIU
COSTO DIRECTO
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
DESCRIPCION
VALOR UNITARIO
3.14%
0.92%
1.31%
$
$
$
8,780,419.38
2,574,208.67
3,654,382.17
0.59%
1,641,915.53
0.41%
0.10%
0.12%
0.08%
0.06%
0.63%
0.05%
0.80%
2.00%
0.80%
2.00%
2.00%
5.00%
20.00%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1,151,590.07
281,149.92
337,379.90
224,919.88
168,689.95
1,754,375.50
151,820.96
2,240,092.02
5,600,230.32
2,240,092.13
5,600,230.32
5,600,230.32
14,000,575.75
56,002,302.81
5.0%
2.00%
0.81%
0.79%
1.40%
5.0%
$
$
$
$
$
$
$
14,000,575.70
5,600,230.28
2,268,093.26
2,212,090.96
3,920,161.20
14,000,575.70
84,003,454.22
ADMINISTRACIN
SUBTOTAL ADMINISTRACIN
2
2.1
2.2
2.3
2.4
3
280,011,514.05
IMPREVISTOS (%)
REPARACION DE CERCAS
REPARACION DE PISOS
REMOCION DE ARBOLES
REPARACIONES DESPUES DE ENTREGADA LA OBRA
UTILIDAD (%)
TOTAL A.I.U (%)
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE MOITOS
CONSTRUCCION DE PLACA HUELLA QUE DE LA VIA SAN BERNARDO DEL VIENTO - MOITOS CONDUCE AL CORREGIMIENTO DEL PUEBLITO MUNICIPIO
DE MOITOS, CORDOBA, CARIBE.
ITEM
DESCRIPCIN
I
1
2
3
4
CONDICIONES CONTRACTUALES
UND
CANT
M2
M2
M3
M3
M3
0.00 $
166,545.00 $
M2
4,587.75 $
645.00 $
7
8
9
10
11
SUBBASE GRANULAR
CONCRETO ESTRUCTURAL CLASE D (3000 PSI)
CONCRETO ESTRUCTURAL CLASE G (CICLOPEO)
ACERO DE REFUERZO DE FY = 4.200 KG / CM 2 (60.000 PSI)
SELLO ASFALTICO PARA JUNTAS
CUNETA DE CONCRETO CLASE F VACIADA IN SITU; INCLUYE LA CONFORMACIN
DE LA SUPERFICIE DE APOYO.
M3
M3
M3
KG
ML
788.17
90.00
67.00
5,400.00
0.00
12
M3
$
$
$
$
$
44.00 $
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
$
$
$
$
1,927.00
509.00
19,672.00
23,175.00
MODIFICACION
VALOR TOTAL
TRAZADO Y REPLANTEO
ROCERIA
EXCAVACIN MANUAL EN MATERIAL COMN
EXCAVACIONES VARIAS SIN CLASIFICAR
MEJORAMIENTO DE LA SUBRASANTE EMPLEANDO PIEDRA RAJON. INCLUYE
TRANSPORTE DEL MATERIAL AL SITIO DE LA OBRA
4,970.06
4,587.75
1,376.33
0.00
VALOR PARCIAL
$
$
$
$
(+/-)
9,577,313.74
2,335,165.56
27,075,242.45
-
CANTIDAD
V. PARCIAL
0.00
-4,587.75
-1,376.33
0.00
4,970.06 $
0.00 $
$
$
9,577,313.74
-
24.85
15.29
6.88
0.00
1.00
2.00
1.00
1.00
24.85
7.65
6.88
0.00
0.00
0.00
1.00
0.00
2,959,099.77
-4,587.75
6.55
1.00
6.55
103,758,244.72
55,175,220.00
31,514,053.00
24,118,182.81
-
-788.17
-90.00
-67.00
-5,400.00
0.00
$
$
$
$
$
9.85
18.00
11.17
21.60
0.00
1.00
3.00
3.00
3.00
1.00
9.85
6.00
3.72
7.20
0.00
534,068.00 $
23,498,992.00
-44.00
4.40
1.00
4.40
$
$
$
$
$
$
$
$
280,011,514.05
56,002,302.81
14,000,575.70
14,000,575.70
84,003,454.22
364,014,968.27
182,007,484.13
182,007,484.13
131,645.00
613,058.00
470,359.00
4,466.33
3,183.00
20%
5%
5%
30%
$
$
$
$
$
CONDICIONES ACTUALIZADAS
CANTIDAD
945.00
315.00
1575.00
2945.00
1.87
LONG
ANCH
ES-1
ES-2
1.6
1200
0.15
288
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
ESPECIFICACIN: 900-07
ITEM: 900.P
UNIDAD: M3-Km
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
#REF!
VOLQUETA 6M3
Rendimiento
65.00
Valor-Unit.
#REF!
Sub-Total
#REF!
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
Prestaciones
Jornal Total
Rendimiento
Valor-Unit.
Sub-Total
Total Costo Directo
0.00
#REF!
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
Valor Total
#REF!
#REF!
5%
#REF!
Sub-Total
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
CARRETERA :
ITEM: PILOTE DE CONCRETO FUNDIDO EN SITIO, D=1.0 m, INCLUYE ANILLO
I. EQUIPO
Descripcin
HERRAMIENTA MENOR (10%MO)
MOTOBOMBA DE 3"
VIBRADOR DE CONCRETO
TRIPODE CON MALACATE
Tipo
Tarifa/Hora
Rendimiento
#REF!
2.550
0.220
0.80
12,000
Unidad
KG
M3
M2
U
M3
Precio-Unit.
#REF!
#REF!
7,150
380,000
#REF!
Cantidad
170.00
0.385
0.750
1.000
0.800
III. TRANSPORTES
Material
TRANSPORTE MATERIALES DE
EXCAVACION
EQUIPOS
Vol-peso Cant.
Distancia
M3-Km
Tarifa
1.47
20.0
29.4
1,000.00
Jornal
#REF!
#REF!
Prestaciones
185%
185%
Jornal Total
#REF!
Rendimiento
0.85
0.85
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
ESPECIFICACIN: 621.1
ITEM: 621.1
UNIDAD : ML
Valor-Unit.
#REF!
#REF!
15,000.00
Sub-Total
#REF!
Valor-Unit.
#REF!
#REF!
5,363.00
380,000.00
#REF!
Sub-Total
#REF!
Valor-Unit.
29,400.00
40,000.00
Sub-Total
69,400.00
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
#REF!
#REF!
Valor Total
#REF!
#REF!
#REF!
Sub-Total
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
#REF!
ESPECIFICACIN: 630P
ITEM: 630.1_2
UNIDAD : M3
I. EQUIPO
Descripcin
MEZCLADORA DE CONCRETO (1 BULTO)
VIBRADOR
HERRAMIENTA MENOR (10%MO)
Tipo
Tarifa/Hora
#REF!
Rendimiento
1.00
1.00
Valor-Unit.
#REF!
0.00
Sub-Total
#REF!
Unidad
M3
LT
M3
KG
Precio-Unit.
#REF!
Cantidad
0.840
185
0.630
260
Valor-Unit.
#REF!
#REF!
Sub-Total
#REF!
III. TRANSPORTES
Material
AGREGADO PETREO
ARENA
Distancia
#REF!
M3-Km
#REF!
#VALUE!
Tarifa
1,000.00
1,000.00
Valor-Unit.
#REF!
Sub-Total
#REF!
Jornal
#REF!
#REF!
Prestaciones
185%
185%
Jornal Total
#REF!
Rendimiento
8.00
8.00
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
#REF!
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
Valor Total
#REF!
#REF!
5%
#REF!
Sub-Total
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
#REF!
ESPECIFICACIN: 630-07
ITEM: 630.7
UNIDAD : M3
I. EQUIPO
Descripcin
HERRAMIENTA MENOR (5%)
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
#REF!
Sub-Total
#REF!
Unidad
M3
M3
FORMALETA
DESPERDICIO
M2
Precio-Unit.
#REF!
Cantidad
0.600
#REF!
0.400
Valor-Unit.
#REF!
1.820
#VALUE!
Sub-Total
#REF!
III. TRANSPORTES
Material
PIEDRA
Vol-peso Cant.
0.4
Distancia
#REF!
M3-Km
#REF!
Tarifa
1,000.00
Valor-Unit.
#REF!
Sub-Total
#REF!
6
1
Jornal
Prestaciones
#REF!
185%
185%
Jornal Total
#REF!
Rendimiento
4.40
4.40
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
#REF!
#REF!
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
Valor Total
#REF!
#REF!
5%
#REF!
Sub-Total
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
CARRETERA :
ITEM: MATERIAL GRANULAR FILTRANTE
ESPECIFICACIN: 673-07
ITEM DE PAGO: 673.1
UNIDAD : M3
I. EQUIPO
Descripcin
Descripcin
HERRAMIENTA MENOR (5%MO)
Tipo
Tipo
Tarifa/Hora
Tarifa/Hora
Rendimiento
Rendimiento
Valor-Unit.
Valor-Unit.
#REF!
Sub-Total
Unidad
Precio-Unit.
M3
Cantidad
#REF!
Valor-Unit.
1.100
#REF!
Sub-Total
III. TRANSPORTES
Material
Material filtrante (tamao mximo
Vol-peso Cant.
1.1
Distancia
#REF!
M3-Km
#REF!
Tarifa
803
Valor-Unit.
#REF!
Sub-Total
Jornal
3
#REF!
Prestaciones
185%
Jornal Total
#REF!
Rendimiento
15.00
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
Valor Total
#REF!
#REF!
5%
#REF!
Sub-Total
PECIFICACIN: 673-07
M DE PAGO: 673.1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE ANTIOQUIA
CARRETERA :
ACTIVIDAD : GEOTEXTIL NT 2500
ESPECIFICACIN: 673-07
ITEM : 673.2
UNIDAD : M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
Sub-Total
Unidad
M
Precio-Unit.
#REF!
Cantidad
1.100
Valor-Unit.
#REF!
Sub-Total
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
2
#REF!
Prestaciones
185%
Jornal Total
#REF!
Rendimiento
300.00
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
#REF!
#REF!
#REF!
Sub-Total
PECIFICACIN: 673-07
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
CARRETERA :
#REF!
ITEM:
SELLO ASFALTICO PARA JUNTAS
ESPECIFICACIN: 433.1
UNIDAD : ML
I. EQUIPO
Descripcin
COMPRESOR (Barrido y/o Soplado de la Superficie P
HERRAMIENTA MENOR (5%MO)
Tipo
Tarifa/Hora
70,000.00
Rendimiento
1,250.00
Valor-Unit.
56.00
26.18
Sub-Total
Unidad
KG
LT
Precio-Unit.
2,000.00
1,600
Cantidad
0.600
1.180
Valor-Unit.
1,200.00
1,888.00
SEAL PREVENTIVA
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
$ 37,732.00
$ 37,732.00
Prestaciones
185%
185%
Jornal Total
69,804.20
69,804.20
Rendimiento
1,250.00
1,250.00
Valor-Unit.
55.84
55.84
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
656.40
164.10
164.10
Sub-Total
ESPECIFICACIN: 433.1
82.18
3,088.00
0.00
111.69
3,282.00
984.60
4,267.00
MINISTERIO DE TRANSPORTE
#REF!
ITEM
651P2.1
DESCRIPCIN
I. EQUIPO
DESCRIPCIN
II. MATERIALES
DESCRIPCIN
III. TRANSPORTES
MATERIAL
TRABAJADOR
OFICIAL
OBREROS (2)
SOLDADOR
1
2
1
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
ENTO A PROYECTOS
PUBLICA
CDIGO
MSE--FR-14
VERSIN
PGINA
DE
OS
TOS ESPECFICOS
#REF!
GRUPO DE
AJUSTE
TIPO
TARIFA/HORA
UNIDAD
CANTIDAD
ML
RENDIMIENTO
Vr. UNITARIO
#REF!
1.00
1.00
3.00
3.00
SUBTOTAL $
UNIDAD
CANTIDAD
ML
ML
KG
GALON
GALON
1.45
3.00
0.60
0.30
0.10
GALON
0.32
PRECIO UNIT.
DISTANCIA
M3 o Ton/Km
#REF!
TARIFA
PRESTACIONE
S
#REF!
185%
#REF!
185%
#REF!
JORNAL
TOTAL
#REF!
0%
Porcentaje
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
Vr. UNITARIO
SUBTOTAL $
JORNAL
#REF!
Vr. UNITARIO
SUBTOTAL $
VOL. o PESO
#REF!
#REF!
RENDIMIENTO
0.00
Vr. UNITARIO
2.90
2.90
#REF!
2.90
SUBTOTAL $
#REF!
#REF!
Valor Total
20%
5%
5%
#REF!
#REF!
#REF!
SUBTOTAL $
#REF!
#REF!
REPUBLICA DE COLOMBIA
INSTITUTO NACIONAL DE VAS
#REF!
ESPECIFICACIN: 801-07
ITEM: 801.1
UNIDAD : HA
ITEM: ROCERIA
I. EQUIPO
Descripcin
GUADAADORA
HERRAMIENTA MENOR (10%MO)
Tipo
Tarifa/Hora
#REF!
Rendimiento
0.0900
Valor-Unit.
#REF!
#REF!
Sub-Total
#REF!
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
MATERIAL DESMONTADO
Distancia
10.0
M3-Km
50.0
Tarifa
1,000.00
Valor-Unit.
50,000.00
Sub-Total
50,000.00
Jornal
4
#REF!
Prestaciones
185%
Jornal Total
#REF!
Rendimiento
0.72
Valor-Unit.
#REF!
Sub-Total
Total Costo Directo
#REF!
#REF!
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
Valor Total
#REF!
#REF!
5%
#REF!
Sub-Total
#REF!
#REF!
MINISTERIO DE TRANSPORTE
ITEM
465.1
DESCRIPCIN
I. EQUIPO
DESCRIPCIN
TIPO
II. MATERIALES
DESCRIPCIN
UNIDAD
III. TRANSPORTES
MATERIAL
MATERIAL DE EXCAVACION
VOL. o PESO
DISTANCIA
1.3
10.0
JORNAL
PRESTACIONES
OFICIAL (1)
OBREROS (4)
$ 36,378.00
$ 84,600.00
185%
185%
T
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Precio Unitario To
Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :
OBSERVACIONES INTERVENTORA
Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :
Original: Archivo de Gestin Contractual ( Subdireccin Administrativa)
Copias : Unidad Ejecutora, Contratista, Interventor y Direccin Territorial.
CDIGO
MSE--FR-14
VERSIN
PGINA
DE
#REF!
DATOS ESPECFICOS
GRUPO DE
AJUSTE
TARIFA/HORA
98,000
20,000
85,000
6,000
UNIDAD
CANTIDAD
M3
RENDIMIENTO
Vr. UNITARIO
6.00
12.00
30.00
6.00
SUBTOTAL $
CANTIDAD
PRECIO UNIT.
SUBTOTAL $
M3 o Ton/Km
TARIFA
13.0
JORNAL TOTAL
67,299
156,510.00
16,333.33
1,666.67
2,833.33
1,000.00
233.1346875
22,066.47
Vr. UNITARIO
0.00
Vr. UNITARIO
757.58
9,848.48
SUBTOTAL $
9,848.48
RENDIMIENTO
48.00
48.00
Vr. UNITARIO
1,402.07
3,260.63
SUBTOTAL $
4,662.69
36,578.00
Porcentaje
20%
5%
5%
Valor Total
7,315.60
1,828.90
1,828.90
SUBTOTAL $
10,973.40
47,551.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
TRAZADO Y REPLANTEO
M2
I. EQUIPO
Descripcin
TEODOLITO
NIVEL
HERRAMIENTAS MENORES(10%)
Tipo
Tarifa/Hora
4,410.00
4,410.00
Rend/Hora
20.00
20.00
Valor-Unit.
220.50
220.50
135.05
Sub-Total
576.05
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 46,000.00
$ 25,000.00
$ 25,000.00
$ 50,000.00
Prestaciones
185%
185%
185%
185%
Jornal Total
85,100.00
46,250.00
46,250.00
92,500.00
Rendimiento
200.00
200.00
200.00
200.00
Valor-Unit.
425.50
231.25
231.25
462.50
Sub-Total
Total Costo Directo
1,350.50
1,927.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
385.40
96.35
96.35
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
578.10
2,505.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
UNIDAD:
ROCERIA
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rend/Hora
HERRAMIENTAS MENORES(10%)
Valor-Unit.
46.25
Sub-Total
46.25
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
$ 75,000.00
Prestaciones
185%
Jornal Total
138,750.00
Rendimiento
300.00
Valor-Unit.
462.50
Sub-Total
Total Costo Directo
462.50
509.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
101.80
25.45
25.45
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
152.70
662.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
UNIDAD:
M3
I. EQUIPO
Descripcin
Motoniveladora para corte
Tipo
Tarifa/Hora
Rendimiento
130,000.00
22.00
Valor-Unit.
5,909.09
69.38
Sub-Total
5,978.47
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.0
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
1.3
10.0
13.0
1,000.00
TRANSPORTE
Valor-Unit.
13,000.00
Sub-Total
13,000.00
Jornal
OBREO (3)
$ 75,000.00
Prestaciones
185%
Jornal Total
Rendimiento
138,750.00
200.00
Valor-Unit.
693.75
Sub-Total
Total Costo Directo
693.75
19,672.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
20%
IMPREVISTOS
5%
UTILIDAD
5%
Valor Total
3,934.40
983.60
983.60
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
5,901.60
25,574.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Rendimiento
Valor-Unit.
925.00
Sub-Total
925.00
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
Sub-Total
0.0
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
1.3
10.0
13.0
1,000.00
TRANSPORTE
Valor-Unit.
13,000.00
Sub-Total
13,000.00
Jornal
$ 125,000.00
Prestaciones
185%
Jornal Total
Rendimiento
231,250.00
25.00
Valor-Unit.
9,250.00
Sub-Total
Total Costo Directo
9,250.00
23,175.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
20%
IMPREVISTOS
5%
UTILIDAD
5%
Valor Total
4,635.00
1,158.75
1,158.75
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
6,952.50
30,128.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
5
UNIDAD:
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
CARGADOR FRONTAL
Rendimiento
130,000.00
35.00
Valor-Unit.
3,714.29
Sub-Total
3,714
Unidad
M3
Precio-Unit.
Cantidad
50,000
Valor-Unit.
1.25
62,500.00
Sub-Total
62,500
III. TRANSPORTES
Material
Transporte
Distancia
80.0
M3-Km
100.0
Tarifa
1,000.00
Valor-Unit.
100,000.00
Sub-Total
100,000
Jornal
OBREO (2)
$ 50,000.00
Prestaciones
185%
Jornal Total
Rendimiento
92,500.00
280.00
Valor-Unit.
330.36
Sub-Total
Total Costo Directo
330
166,545.00
V. COSTOS INDIRECTOS
Descripcin
Porcentaje
ADMINISTRACION
IMPREVISTOS
20%
5%
UTILIDAD
5%
Valor Total
33,309.00
8,327.25
8,327.25
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
49,963.50
216,509.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
M2
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
MOTONIVELADORA
VIBROCOMPACTADOR 10 TON
Carrotanque de agua
Rendimiento
Valor-Unit.
130,000.00
110,000.00
700.00
185.71
700.00
157.14
60,000.00
700.00
85.71
Sub-Total
428.57
Unidad
LT
AGUA
Precio-Unit.
100
Cantidad
2.000
Valor-Unit.
200.00
Sub-Total
200.00
III. TRANSPORTES
Material
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
0.00
Jornal
OBREROS (2)
$ 50,000.00
Prestaciones
185%
Jornal Total
Rendimiento
92,500.00
5,600.00
Valor-Unit.
16.52
Sub-Total
Total Costo Directo
16.52
645.00
V. COSTOS INDIRECTOS
Descripcin
Porcentaje
Valor Total
ADMINISTRACION
IMPREVISTOS
20%
5%
129.00
32.25
UTILIDAD
5%
32.25
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
193.50
839.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
SUBBASE GRANULAR
M3
I. EQUIPO
Descripcin
Tipo
Tarifa/Hora
Carrotanque de agua
Rendimiento
Valor-Unit.
60,000.00
80.00
750.00
VIBROCOMPACTADOR 10 TON
110,000.00
80.00
1,375.00
Motoniveladora
130,000.00
80.00
1,625.00
Sub-Total
3,750
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
47,500
1.30
61,750.00
AGUA
LTS
100
10.00
1,000.00
Sub-Total
62,750
III. TRANSPORTES
Material
Transporte
Distancia
50.0
M3-Km
65.0
Tarifa
1,000.00
Valor-Unit.
65,000.00
Sub-Total
65,000
Jornal
$ 50,000.00
Prestaciones
185%
Jornal Total
92,500.00
Rendimiento
640.00
Valor-Unit.
144.53
Sub-Total
Total Costo Directo
145
131,645.00
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
Porcentaje
20%
IMPREVISTOS
5%
UTILIDAD
5%
Valor Total
26,329.00
6,582.25
6,582.25
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
39,493.50
171,139.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
I. EQUIPO
Descripcin
MEZCLADORA DE CONCRETO (1 BULTO)
VIBRADOR DE CONCRETO
FORMALETA
HERRAMIENTA MENOR (10%MO)
Tipo
Tarifa/Hora
9,000.00
7,500.00
20,000.00
Rendimiento
0.55
0.55
0.55
Valor-Unit.
16,363.64
13,636.36
36,363.64
12,395.00
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
57,500
0.860
49,450.00
LT
M3
KG
100.00
160.000
0.560
350
16,000.00
26,040.00
210,000.00
12,059.60
46,500
600
Sub-Total
III. TRANSPORTES
Material
ARENA
AGREGADO PETREO
Distancia
50.0
80.0
M3-Km
28.0
68.8
Tarifa
1,000.00
1,000.00
Valor-Unit.
28,000.00
68,800.00
Sub-Total
Jornal
$ 300,000.00
$ 35,000.00
Prestaciones
185%
185%
Jornal Total
555,000.00
64,750.00
Rendimiento
5.00
5.00
Valor-Unit.
111,000.00
12,950.00
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
122,611.60
30,652.90
30,652.90
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
78,758.64
313,549.60
96,800.00
123,950.00
613,058.00
183,917.40
796,975.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
I. EQUIPO
Descripcin
MEZCLADORA DE CONCRETO (1 BULTO)
VIBRADOR DE CONCRETO
HERRAMIENTA MENOR (10%MO)
Tipo
Tarifa/Hora
9,000.00
7,500.00
Rendimiento
0.55
0.55
Valor-Unit.
16,363.64
13,636.36
10,329.17
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
57,500
0.504
28,980.00
LT
M3
KG
M3
100.00
46,500
600
50,000
111.000
0.378
234
0.500
11,100.00
17,577.00
140,400.00
25,000.00
4,461.14
Sub-Total
III. TRANSPORTES
Material
ARENA
AGREGADO PETREO
PIEDRA PARA CONCRETO
CICLOPEO
Vol-peso Cant.
0.378
0.504
0.500
Distancia
50.0
80.0
M3-Km
18.9
40.3
Tarifa
1,000.00
1,000.00
Valor-Unit.
18,900.00
40,320.00
80.0
40.0
1,000.00
40,000.00
Sub-Total
Jornal
$ 300,000.00
$ 35,000.00
Prestaciones
185%
185%
Jornal Total
555,000.00
64,750.00
Rendimiento
6.00
6.00
Valor-Unit.
92,500.00
10,791.67
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
94,071.80
23,517.95
23,517.95
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
40,329.17
227,518.14
99,220.00
103,291.67
470,359.00
141,107.70
611,467.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
10
I. EQUIPO
Descripcin
HERRAMIENTA MENOR (10%MO)
CIZALLA
Tipo
Tarifa/Hora
Rendimiento
600.00
37.35
Valor-Unit.
62.90
16.06
Sub-Total
Unidad
KG
KG
Precio-Unit.
3,389
Cantidad
1.050
Valor-Unit.
3,558.37
4,000
0.050
200.00
Sub-Total
III. TRANSPORTES
Material
Distancia
M3 o Ton/Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
$ 50,000.00
$ 35,000.00
Prestaciones
185%
185%
Jornal Total
92,500.00
64,750.00
Rendimiento
250.00
250.00
Valor-Unit.
370.00
259.00
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
893.27
223.32
223.32
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
78.96
3,758.37
0.00
629.00
4,466.33
1,339.90
5,806.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ANLISIS DE PRECIOS UNITARIOS
ITEM:
11
I. EQUIPO
Descripcin
COMPRESOR
HERRAMIENTA MENOR (5%MO)
Tipo
Tarifa/Hora
80,000.00
Rendimiento
1,251.30
Valor-Unit.
63.93
26.18
Sub-Total
Unidad
KG
Precio-Unit.
3,000.00
Cantidad
0.900
Valor-Unit.
2,700.00
0.00
Sub-Total
III. TRANSPORTES
Material
Vol-peso Cant.
Distancia
M3-Km
Tarifa
Valor-Unit.
Sub-Total
Jornal
$ 50,000.00
$ 35,000.00
Prestaciones
185%
185%
Jornal Total
92,500.00
64,750.00
Rendimiento
400.00
400.00
Valor-Unit.
231.25
161.88
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
636.60
159.15
159.15
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
90.11
2,700.00
0.00
393.13
3,183.00
954.90
4,138.00
REPUBLICA DE COLOMBIA
MUNICIPIO DE MOITOS
ITEM:
12
I. EQUIPO
Descripcin
COMPACTADOR MANUAL VIBRATORIO (RANA)
MEZCLADORA DE CONCRETO (1 BULTO)
VIBRADOR DE CONCRETO
HERRAMIENTA MENOR (10%MO)
Tipo
Tarifa/Hora
9,500.00
9,000.00
7,500.00
Rendimiento
0.55
0.55
0.55
Valor-Unit.
17,272.73
16,363.64
13,636.36
5,272.50
Sub-Total
Unidad
Precio-Unit.
Cantidad
Valor-Unit.
M3
57,500
0.840
48,300.00
LT
M3
KG
M2
M3
KG
100.00
185.000
0.630
260
0.30
0.80
0.05
18,500.00
29,295.00
156,000.00
2,400.00
38,000.00
150.00
5,852.90
46,500
600
8,000
47,500
3,000
Sub-Total
III. TRANSPORTES
Material
MATERIAL DE RELLENO
AGREGADO PETREO
ARENA
Vol-peso Cant.
0.800
0.840
0.630
Distancia
50
70
50
M3-Km
40.000
58.800
Tarifa
1,000.00
1,000.00
Valor-Unit.
40,000.00
58,800.00
31.500
1,000.00
31,500.00
Sub-Total
Jornal
$ 250,000.00
$ 35,000.00
Prestaciones
185%
185%
Jornal Total
462,500.00
64,750.00
Rendimiento
10.00
10.00
Valor-Unit.
46,250.00
6,475.00
Sub-Total
Total Costo Directo
V. COSTOS INDIRECTOS
Descripcin
ADMINISTRACION
IMPREVISTOS
UTILIDAD
Porcentaje
20%
5%
5%
Valor Total
106,813.60
26,703.40
26,703.40
Sub-Total
_______________________________
CLAUDIA ISABEL ACOSTA MEZA
Secretaria de Infraestructura
UNIDAD:
M3
52,545.23
298,497.90
130,300.00
52,725.00
534,068.00
160,220.40
694,288.00