Economizer in Power plant oftentimes maintained for cleaning so its not reffer to maintenance schedule that its

recomende by vendor.However, it will increase maintenance cost and economizer performances dropped.
Perform evaluation to economizer it had proceed in industrial grade for 5 months with time interval 48 hours (2
days).
Economizer performances dropped occured its caused fouling factor incresed for long time. Whatever, fouling
factor was time function, actually it had thermal resistance with assymptot curve about 0.01689(m 2K)/, and cleaning
interval was 5 months its real time for maintenance process, reduce lose time for paper production and reduce
maintenance cost.
Economizer on Power Plants often have maintenance or cleaning of the supposed (not in accordance with the
specifications of the device) this results in decreased performance and increased maintenance costs.
Evaluation of the performance of the appliance has been done with testing on an industrial scale is carried out for 5
months with intervals of 48 hours (2 days).
There was a decline in the performance of the device as a result of the increase in factor fouling which are a function
of time, with a thermal resistance asymptotic actual result of factors fouling by 0.01689 (m 2K)/W and the cleaning
intervals for nearly five months for the maintenance operation, reducing lost time on the production of paper, and
pressing maintenance cost significantly.