You are on page 1of 41
« COOL CENGEEULLEEEDEELELEUUILDELEE ZTE UUs TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED SA APTRANSTO STANDARD SCHEDULE OF RATES FOR EHT TRANSMISSION LINES AND SUBSTATIONS OF 220kV & 132kV FOR THE YEAR 2013 -14 (With effect from the date of issue of T.0.0. Ms.No.162, dated. 26.08.2013.) TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED APTRANSCO ~ Standard Schedule of Rates for 220kV & 132kV Transmission fines and Substations works for the year 2013-14 ~ Communicated ~ Regarding. T.0.0. No. CE (Construction-2)/ Ms.No.162 dt. 26.08.2013 Read the following:- Ref 1). T.0.0.CE (Civil). Ms.No.148, dt.21.10.2009 2).T.0.0.Ms(CE-Construction-2) MS. No. 150, dated.09.08.2012 3).7.0.0.Ms(CE-Construction-2) MS. No.31 1, dated.16.01.2013 ORDER The Standard Schedule of Rates for 220kV & 132kV Transmission lines and Substations for the year 2013-14 approved by Transmission Corporation of Andhra Pradesh Limited in respect of item of works and materials pertaining to EHV Transmission lines and Substations are communicated herewith for adoption in preparation of estimates. For all Civil item of works of EHV Transmission lines & substations, the rates that are approved in the common SSR 2013-14 for all engineering departments of Govt of A.P and the provisions made in the T.0.0.No.148, dated.21.10.2009 of APTRANSCO shall be adopted as already approved and communicated vide ref’ 1" cited, ‘The Standard Scheduled of Rates for 2013-14 will come into force from date issue of 7.0.0, Enel: As above. (BY ORDER AND IN THE NAME OF TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED) Sd/- 8. SUBRAHMANYAM DIRECTOR (PROJECTS) To The Chief Engineer/ Construetion -2/VS/Hyderabad. The Chief Engineer! Construction -1/VS/Hyderabad ‘The Chief Engineer/ LIS/VS/Hyderabad. The Chief Engineer/ Construction/400kV /VS/Hyderabad. ‘The Chief Engineer/ Transmission /VS/Hyderabad. ‘The Chief Engineer /Civil/VS/Hyderabad The Chief Engineer/Telecom/Vidyut Soudha/Hyderabad The Chief Engineer /Zone/Metro/Hyderabad The Chief Engineer/Zone/Rural/Hyderabad The Chief Engineer/Zone/Kadapa ‘The Chief Engine vy The Chief Engineer/Zone/Vishakapainam. ‘The Chief Engineer/Zone/Warangal ‘The Superintending Engineer/TI.C/Metro/Hyderabad The Superintending Engineer/TLC/Rural/Hyderabad. The Superintending Engineer! TLC/Warangal The Superintending Engineet/TLC/Vijayawada. The Superintending Engineer/TLC/Visakhapatnam, The Superintending Engineer/TLC/Karimnagar™ The Superintending Engineer!TLC/Kadapa, The Superintending Engineer/TLC/LIS/Kumool. The Superintending Engincer/TL&SS/ Metro Circle / Hyderabad The Superintending Engineer/TL&SS/ Hyderabad Circle / Hyderabad. The Superintending Engineer/TL&SS/ Mahaboob Nagar. The Superintending Engineer/TL&SS/ Nalgonda The Superintending Engineer/O&M/400 KV L&SS/ Mamidipally The Superintending Engineer/O&M/400 KV L&SS/ Vemagiri. The Superintending Engineer/O&M/400 KV L&SS/ Kalpaka. The Superintending Engineer/TL&SS/ Warangal The Superintending Engineer/TL&SS/ Karimnagar The Superintending Engineer/TL&SS/ Nizamabad The Superintending Engineer/TL&SS/ Vijayawada The Superintending Engincer/TL&SS/ Nellore The Superintending Engineer/TL&SS/ Rajahmundry The Superintending Engineer/TL&SS/ Vizag ‘The Superintending Engineer/TL&SS/ Kadapa The Superintending Engineer/TL&SS/ Kurnool The Superintending Engincer/Telecom/Vidyut Soudha/Hyderabad. The Superintending Engineer/Telecom/Metro/Hyderabad. The Superintending Engincer/Telecom/Rural/Hyderabad, The Superintending Engineer/Telecom/ Warangal. The Superintending Engineer/Telecom/Kadapa. The Superintending Engineer/Telecom/ Vijayawada The Superintending Engineer/Telecom/Vishakapatnam, (Contd....3) ‘The Superintending Engineer/Civil /TLC/Hyderabad The Superintending Engineer/Civil/TLC/Warangal The Superintending Engineer/Civil/TLC/V ijayawada. The Superintending Engineer /Civil/TLC/Kadapa. The Superintending Engineer /Civil/TLC/Visakhapatnam The Executive Engineer/TLC/RMS/Hyderabad. The Executive Engineer/T1.C/Mahaboob Nagar. The Executive Engineer/TLC/Nalgonda, The Executive Engineer/TLC/Erragadda, The Executive Engineer/TLC/Sanga Reddy. The Divisional Engineer/ MRT / EHT / TLC / Hyderabad The Executive Engineer/TLC/ Warangal. The Executive Engineer/TLC/Karimnagar. The Executive Engineer’ TLC/Nizamabad. The Executive Engineer/TLC/ Vijayawada The Executive Engineer/TLC/Gunadala. The Executive + TLC/Guntur. The Executive Engineer/TLC/Nellore The Executive Engineer /TLC/Ongole. ‘The Executive Engineer/TLC/Thirupathi. The Executive Engineer/TLC/Rajahmundry ‘The Executive Engineer/TLC/Vizag. The Executive Engineer/TLC/Kurnool The Executive Engineer/TLC/LIS/Division-VKurnool. The Executive Engineer/TLC/LIS/Division-2/Kurnool The Executive Engineer/TLC/Kadapa The Executive Engineer/Div-1/400kV L&SS/Mint Compound/Hyderabad. the Executive Engineet/Div-2/400kV L&SS/Mint Compound/Hyderabad, The Executive Engineer/Div-3/400kV L&SS/Mint Compound/Hyderabad. ‘The Executive Engineer/Div-4/400kV L&SS/Warangal The Executive Engineer/Div-1/400kV L&SS/Vijayawada, The Executive Engineer/Div-1/400kV L&SS/Guntur. The Executive Engineer/Div-1/400kV L&SS/Krishnapatnam. The Executive Engineer/Div-/400kV L&SS/Rajahmundry. The Divisional Engineer/O&M 400kV TL&SS / Dichpally. The Divisional Engineer/O&M 400kV TLA&SS / Nizamabad, The Divisional Engineer/O&M 400kV TL&SS / Gajwel, The Divisional Engincer/O&M 400kV TL&SS / Vemagiri The Divisional Engineer/O&M 400kV TL&SS / Rajahmundry. The Divisional Engineer/O&M 400kV TL&SS / Chittoor, The Divisional Engineer{O&M 400kV TL&SS /Manubolu (Nellore district). The Divisional Engineer/O&M 400kV TL&SS /Veltur (Mahaboobnagar district). The Divisional Engineer/O&M 400kV TL&SS /Kalpaka (Visakhapatnam district). (Contd....4) lalate ala eLelelel ata) al etapa) a) ala eLelers ala er et etal The Divisional The Divisional Engineer/IL& ngineer /TLC/TRE/Kadapa / Chandrayangutta The Divisional Engineer/TL&SS / Moulali The Divisional Engineer/TL&SS / Erragadda The Divisional Engineer! MRT / Metro Circle / Hyderabad The Divisional Engineer! MRT / Hyderabad Circle / Hyderabad The Divisional Engineer/TL&SS / Mahaboobnagar The Divisional Engineer/TL&SS / Yeddumaitaram ‘The Divisional Engineer/TL&SS / Miryalaguda The Divisional Engineer/TL&SS / Nagarjunasagar The Divisional Engineer! O&M / 400 KV / Mamidipally The Divisional Engineer! TL&SS / Warangal The Divisional Engineer’ TL&SS / MRT / Warangal The Divisional Engineer/ TL&SS / Budidampadu The Divisional Engineer TL&SS / Karimnagar The Divisional Engineer! TL&SS / Ramagundam, The Divisional Engineet/ MRT / Nizamabad ‘The Divisional Engineer’ TL&SS / Nirmal The Divisional Engineer’ TL&SS / Dichpally The Divisional Engineer/ MRT / TLC / Warangal The Divisional Engineer’ MRT / EHT / TLC / Vijayawada The Divisional Engineer! MRT / EHT / TLC / Nellore The Divisional Engineer! TL&SS / Vijayawada The Divisional Engineer! TL&SS / Guntur The Divisional Engineer! MRT / TL&SS / Vijayawada The Divisional Engineer! MRT / TL&SS / Nellore The Divisional Engineer/ TL&SS / Nellore The Divisional Engineet/ TL&SS / Ongole The Divisional Engineer/ TL&SS / Bommur The Divisional Engincer/ TL&SS / Nidadavole The Divisional Engineer/ HVDC / TL&SS Circle / Rajahmundry The Divisional Engineer/ MRT / EHT / Rajahmundry The Divisional Engineer’ TL&SS / Gazuwaka The Divisional Engineer’ TL&SS / Garividi The Divisional Engineer/ MRT / TL&SS / Vizag The Divisional Engineer! TL&SS / Kadapa The Divisional Engineer! TL&SS / Yerraguntla The Divisional Engineer/ TL&SS / Tirupathi ‘The Divisional Engineer/ BHT / MRT / Kadapa ‘The Divisional Engineer/ MRT / TL&SS / Kurnool ‘The Divisional Engineer/ MRT / TL&SS / Ananthapur The Divisional Engineer’ Windfarms / Ananthapur ‘The Divisional Engineer/ TL&SS / Kurnool The Divisional Engineer TL&SS / Ananthapur ‘The Divisional Engineer/ O&M / 400 KV / Kumool The Divisional Engineer! O&M / 400 KV Lines / Srisailam. (Contd...5) EEULTEGECTEULUOLL LUE Cb cite eee eu ‘The Executive Engineer/Civil/TLC/Mint Compound/Hyderabad. The Executive Engineer/Civil/TLC/Rajahmundry. The Executive Engineer/Civil/TLC/Kadapa The Divisional Engineer/Quality Control/ Vidyut Soudha / Hyderabad Superintending Engineer/Construction /PM-I /VS/Hyd. Superintending Engineer/Construction /PM-I/VS/Hyd, Superintending Engineer/PM-1/400 KV /VS/Hyderabad. Superintending Engineer/PM-1/400 KV /VS/Hyderabad. Superintending Engineer/LIS /VS/Hyderabad. Superintending Engineer/O&M/Lines/VS/Hyderabad. Superintending Engineer/O&M/Substations/VS/Hyderabad. Divisional Engineer-1/Construction-1/VS/Hyderabad Divisional Engineer-2/Construction-1/VS/Hyderabad. Divisional Engineer-3/Construction-1/VS/Hyderabad. Divisional Engineer-4/Construction-1/VS/Hyderabad. Divisional Engineer-1/Construction-2/VS/Hyderabad. Divisional Engineer-2/Construction-2/VS/Hyderabad. eet-3/Construction-2/VS/Hyderabad Divisional Engineer-1/LIS/VS/Hyderabad. Divisional Engineer-2/LIS/VS/Hyderabad. Divisional Engineer/Design/Construction-1/VS/Hyderabad. Divisional Engineer-1/PM-1/400kV Construction/VS/Hyderabad. Divisional Engineei-2/PM-1/400kV Construction/VS/Hyderabad. Divisional Engineer-1/PM-2/400kV Construction/VS/Hyderabad. Divisional Engineer-2/PM-2/400kV Construction/VS/Hyderabad. Eme-1/Transmission/VS/Hyderabad. Eme-2/Transmission/VS/Hyderabad, Eme-3/Transmission/VS/Hyderabad. DE/O&M Lines/Transmission/VS/Hyderabad. PS to Chairperson Managing Director/APTransco/VS/Hyd, PS to Joint Managing Director/ HRD, Commi. IPC, & IT/APTransco/VS/Hyderabad. PS to Joint Managing Director’ V&S/ APTransco/VS/Hyderabad. PS to Director /Projects/ APTransco/VS/Hyderabad, ADE/Tech to Director /Grid, Transmission& Management/ APTransco/VS/Hyderabad. PS to Director /Finance & Revenue/ APTransco/VS/Hyderabad, The FA & CCA (A,E &R)/APTransco/VS/Hyderabad. ADE/Tech to Chief Engineer/Construction-2/APTransco/VS/Hyderabad FORWARDED BY ORDER // Pate DIVISIONAL ENGINEER ~ 37PM-I (Ofo.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad. LULL ETGLETELELG ELLE LL ETL ea eect INDEX eamble Sl | Description ANNEXURE-I 220KV & 132kV Transmission Lines 3 [ANNEXURET 220KV & 132kV Substations ANNEXURE-I: Handling charges of Equipments & Line Materials 4 and Line Materials. = of Protection and Control of Equipment | 2 ANNEXURE- O&M works of EHT Lines [@ TANNEXUREVIEs—s—“—SCS ERECTION OF TELECOM EQUIPMENT APTRANSCO SSR 2013-14 * | PREAMBLE 1. 2 Circuit Stringing with 1® Circuit lives. | |] Works under shutdown [50% extra | APTRANSCO SSR 2013-14 The Rates for the item of works (Line & Substations) involved under special conditions in the existing SSR 2013-14 are as follows: () | TRANSMISSION LINE WORKS: Description of work River Crossing with JC type towers This is applicable under the following conditions only. i. Pre-programmed for interruption of line. ii.Pre-arranged replacement / rectification of line materials. Dismantling works Emergency Works such as break down works. This will not be applicable for pre- | arranged shutdown works. | Stringing of railway crossings National and State High way crossin. Tree cutting & Jungle Clearance Line works as the works are in shutdown SUBSTATIONS AND OTHER WORKS: Description of work Works under shutdown: | This is applicable under the following conditions only. equipment. ii, Pre-Programmed replacement of bus in Substation iii. Pre-arranged replacement / i. Pre-frogrammed for interruption of | 75% of Normal Rate. | rectification of equipment. % Over the basic labour rates 100% extra, 75% extra 100% extra 100% extra 25% extra 100% extra 100% extra % Over the Basic labour rates 50% extra 2 APTRANSCO SSR 2013-14 Si. | Description of work | % Over the Basic labour rates No. 2. | Dismantling works 75% of Normal Rate. 3. | Emergency Works such as break down | 100% extra works. This _will_not_be applicable_for_pre- arfanged shutdown works, | oe 4. [idle trip (No load) rate of the low- | 50% of basic labour rate of loaded bedded trailer for movement of Power | trip. Shortest distance from / to the Transformers. place of availability of low bedded trailer shall be considered. Note:- However if more than one special condition such as emergency, shutdown, 2 circuit stringing with First circuit live and breakdown ete are applicable for a particular work item / situation, only one condition with maximum extra rate out of applicable special conditions can be allowed. Applying more than one special condition for any item is to be dispensed. 2 For EHT Transmission line works, Keeping scattered in nature, some extra provisions are provide and are as follows a. 5% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in general areas Or b. 10% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in difficult areas. The concerned SE/TLC has to certify that entire line passes through difficult terrain / areas duly furnishing the justification. Note:- If 10% extra toward mobilization efforts in difficult areas is applicable for a work, then the 5% extra towards mobilization effort in general areas is not applicable. c Transmission line erection works, Uniform area allowance minimum of 25% on basic labour charges for the entire state as recommended by Board of Chief Engineers will be allowed against weighted average of area allowance mentioned in Schedule of rates except in Greater Municipal corporation limits. if the entire line is with in the Greater Municipal Corporation limits, area allowance shall be considered as mentioned in Common SSR 2013-14, This uniform area allowance is applicable only for the Transmission line erection works. However area allowance shall be considered as adopted from Common SSR 2013-14, for the works other than transmission line works. COPPPTRPPIPPRPPRPLPEPPEPPPLPOLL PRYOR 3) APTRANSCO SSR 2013-14 3a) 10% extra to the rate of earth flat (material) is allowed towards wastage, cleats 3(b) 3(c) 3d) A) and overlap etc., while preparing the estimate as the billing for this item is on Running Meters basis and after laying of earth mat. For stringing of conductor for small modification works, if the length of the line is less than 0.5 KM, 0.5KM is considered and if the length of the line is greater than 0.5 KM and less than 1 KM, 1KM is considered, in the preparation of estimate. For survey of small length of lines, if the length of line is less than 1KM, then 1KM is considered for survey of small length of lines in the preparation of estimate. The rates for tree cutting and jungle clearance may be followed as per Common ‘SSR of Govt of Andhra Pradesh. AREA ALLOWANCES: CORPORATIONS & MUNICIPALITIES: a) b) °) a) e- (i) 25% extra over the rates on labour component of works is allowed in all, Municipal Corporation Limits of Andhra Pradesh except Greater Hyderabad, Greater Visakhapatnam and Vijayawada municipal Corporations ( up to a belt of 12 Kms. from Municipal Corporation limits ) and other corporations as notified by the Government from time to time. (ii) 40% extra over the rates on labour component of works for Greater Hyderabad, Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12 Kms. from Municipal Corporation limits) Allow 20% extra over basic rates on labour component of works in all District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms. from Municipal limits) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of labour component is allowed. For works at Horsely hills in Chittoor District, 30% extra over the basic ates of labour component is allowed. 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed. B) c D) E) 4 APTRANSCO SSR 2013-14 JAIL COMPOUNDS: 15% extra is allowed over basic labour rates for the work in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are allowed inside. ° INDUSTRIAL AREA: 20% over basic rates on labour component works allowed for works situated within 10 Kms belt of Industrial area of, Jeedimetla, Lingampally, Ibrahimpatnam,Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District, Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda District, Ramagundam and Godavarikhani in Karimnagar District, Renigunta in Chittoor District and Yerraguntla. & Mangampet in Kadapa District, Manchiryal, Mandamarti, Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha, Manguguru, Singareni Collieries in Khammam District, Kamalapur, Bhoopalpally of Warangal District, Wadepally of Nalgonda District, Nagapally (Centenary Colon Begumpet “X” roads),Takkelapally of Karimnagar District, Hindupur, Tadipati Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur & Bethamcherla of Kurnool District Anakapally of Vishakhapatnam District. AGENCY / TRIBAL AREAS: a) 25% extra is allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located with in & upto16 KMs from any all weather route inside Agency / Tribal. b) 40% extra is allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located beyond 16 KMs from any all weather routes inside Agency / Tribal. The extra percentage under Agency / Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials. GHAT ROADS: For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned. Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 % times of actual length Note: if more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the allowable percentages is to be allowed. qgpPpPPFPIhPPrprppPLhPsLbpPpPpPPrphpLrLhrPprPriirprpepPpLhrprrprprgrg yl EULL€enb erro btutrys Cunboeucevretygyete 6. ee 5 APTRANSCO SSR 2013-14 14% on basic labour rates towards for contractor's overheads and profit including labour importation is applicable only for Turnkey projects (New substations, Lines, 33kV features & Bay extension works) of more than 1 Crore and not applicable to O&M works and other than turnkey works. Contractor's over heads and profit including Labour importation 14% is allowed on basic labour rates. ‘The overhead charges include the following: + Site accommodation, setting up plant, access road, water supply, electricity and general site arrangements. Office furniture, equipment and communications. Expenditure on: Corporate office of contractor. Site supervision. Documentation and “as built’ drawings. Mobilization / de-mobilization of resources Labour camps with minimum amenities and transportation to work sites. Light vehicles for site supervision including administrative and managerial requirements. + Laboratory equipment and quality control including field and laboratory testing * Minor T&P and survey instruments and setting outworks, including verification of line, dimensions, trial pits and bore holes, where require. Watch and ward. Traffic management during construction Expenditure on safe guarding environment. Sundries Financing Expenditure. Sales / Turn over tax. Work Insurance / compensation. AutoCAD Tower /Structure drawings of required sets. AutoCAD shop drawings of Towers /Structures of required sets AutoCAD Substation layout. Testing and commissioning of the equipment. {i) The area allowances, COP’s and Mobilization charges are not applicable on Fabrication charges and Galvanization Charges. {ii) The area allowance shall be applicable for O&M and RMI works also on par “with construction works. (iii) The mobilization charges shall be applicable for O&M & RMI works of lines also on par with construction works. —§ 6 APTRANSCO SSR 2013-14 2 The area allowances are applicable for electrical works (labour), where the value : of work is more than Rs.20.00 lakhs (electrical & civil). But this (APTRANSCO : SSR) is not applicable for only Civil works. < . . 7.(a) TREE CUTTING AND CLEARING OF JUNGLE : Please refer Common SSR of Board of Chief Engineers for the year 2013-14. ‘ 7(b) THE (LEAD) CONVEYANCE CHARGES FOR TRANSPORTATION OF : EQUIPMENT / MATERIALS. 5 Please refer Common SSR of Board of Chief Engineers for the year 2013-14. ‘ . 8. “Erection of Power Transformers and Oil filteration Works ‘ The rates communicated by CE/Transmission vide letter No.CTO-121/F.PTRs 5 erection works/D.No.104/08, Dt.05.07.2008 and subsequent Amendment No.l, z dt. 15.07.2009 and Amendment No.ll, dt. 21-04-11 on rate contract basis for = erection, dismantling, transportation and oi filteration of power transformers > through private agency are valid up to 03.07.2014. = Area Allowances, Special provisions and any other allowances are not . applicable on the rates of rate contract, < The rates mentioned under the rate contract include all taxes & duties, = allowances and all extra provisions including Transport ete. excluding service tax. 5 In the case of the works of Handling, Erection and Fiteration of power e Transformers will be carried out by the department, in such cases, area > allowances, special provisions other than shutdown charges, taxes and duties . are not applicable. x Note: < () Shutdown charges are applicable only for the works carried out during - shutdown period. The same has to be certified by the concemed . ‘Superintending Engineer. 4 (ii) Whenever double boom crane is utilized for PTR works of 80 MVA & : above capacity, 50% extra over the existing crane charges are applicable. : However, the same has to be certified by concerned Superintending Engineer. Daan a » EUULL CIEL ETIULUL LU LLU elie lu yee lu! 10. "1 12. 7 APTRANSCO SSR 2013-14 Civil Engineering Works in Transmission lines & Substations : For Civil items works of Transmission Lines and Substations the common SSR 2013-14 for engineering departments shall be followed in Toto. Some provisions made in T.0.0.CE (Civil) Ms No.148, dated.21.10.2009 are also applicable for civil works. But the APTRANSCO SSR 2013-14 is not applicable for Civil Works. In respect of Cement and Steel rods the procedure indicated in Common SSR for all Engineering Departments shall be adopted for updating of estimates at the time of finalization of tenders. Alll statutory levies such as VAT (Works Contract Tax), Service Tax., Cess for labour welfare if any, are based on the prevailing notified rate, shall have to be added in the estimate The S.S.R will come into force with immediate effect until further orders. SdI- S. SUBRAHMANYAM. DIRECTOR (PROJECTS) FORWARDED BY ORDER i DIVISIONAL ENGINEER ~ 3 /PM-IL O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad. APTRANSCO SSR 2013-14 8 APTRANSCO SSR 2013-14 ANNEXURE ERECTION OF 220kV & 132 kV TRANSMISSION LINES a 35 Rate for Se Description of Item Unit 2013-14 No. | No. aa GUi [7 1 |Gheck Survey, peg marking the tower positions on) KM 3555.00] lground, conforming to the approved Profile and tower| lschedules using GPS, Total stations, Digital theodolites| etc lz |~2 |Conducting reconnotery and preliminary survey along] RRM 3228 00| bee tine with three alternative routes and furnishing report for selecting the best proposal for approval, including cost |&. conveyance of all materials, hire charges of equipment, tools and plant, preparation of drawings and reports, labour charges, complete for finished item of work as per| the directions. of Engineer.in-charge at site, [Theodolite / With GPS equipment ( As per Clause 4.9, lof survey) ith total station equipment 3 [Conducting detailed survey by taking the levels along the] route to a corridor of 15 mtrs. width on either side off laignment, at every 20 mirs. interval and wherever there| lis @ steep increasefdecrease in ground profile duly indicating the chainage between angle points, rive crossings, railway crossing and major highway crossings| land plotting the profiles and preparation of vicinity maps| to the standard scales. The survey inches clearing off loushes, branches of tree, crops and shrubs wherever| lencountered for detailed survey for viewing, for fixing lanchor towers and also taking levels ete. required fo lconducting detailed surveys. [This work can be done with Theodolte or wih GPS lequioment (As per clause no.4.9 of survey) of with total station equipment. This work involves the following items, cele Hower schedules as per tower spoling requirements T1087 0 pittes on reprocucie tracing of prote ginal wth one lexra copy shall be gven . Towers Schedules should be submited with GPS Co-ordinates. identification of win] Leones, collection of Hydraulic data of rivers / drains from [competent authorty | RKM. Loc 307 09] cla ip| Taking earth resistivity at an interval of 1 Km resistivity method (4 point method) or by ERM method. PPPLTITSPITIT PPP eererecpecPrpyeeLlerepr ers ‘y Jy TEU dined cen enb iu htonotcusyeww gee bb APTRANSCO SSR 2013-14 si. | item No. | No. Description of tem Unit SS Raio for | 2013-14 (Rs) ia) Preparing of PTCC questionnaire, topo sheets @xradts with marking of the proposed line. Soil resistivity report lower sketch, station single line diagram ete. (30 opiesisets) CLs _3i a| lap to 25KM Te. 4305.00) [cre] 3 ii) [Above 25N, Job 7892.00] cu} 3) [Enumeration and numbering of trees, & marking on tree| lwitn white letters on yellow paint measuring girth and height of the trees and plotting in the profile. The trees| lenumerated shall be shown in profile on either side of centre line clearly, up to required corridor for 132kV| Line -35 Meters) indicating| lname of tree, gith & height. Separate tree schedule| [should be submitted along with the profile for arriving tee| lcompensation amount Each 76.30 cial av lcrossing and EHV power line crossing separately lwherever required reparation of ground profes for Ralway crossing, River] Esch cossng 2408.00 IThe above rates shal include cost and conveyance of all materials hire charges of equipment tools & plant preparation of profile drawing, painting of trees, labour charges, preparation of report elc., complete for fnished| tem of work as per instructions of Engineer-in-charge. aay 4 |Excavation of tral pits of standard dimensions of 7 mir X| Ht mtr. width upto 3 mtrs. depth at 1 KM interval of lwherever there is abnormal change in topography and| taking observation of soil strata for classification off foundation and position of existing ground water] tablefdepth of water in the existing open wells if any andl lback fling the trial pits after vetting by Departmental officials Each 7330.00 [Setting of slubs with Sub-seting template | Erection off [stubs, stub template, fixing of jacks for supporting| ltemplate, allign ment and leveling for exact location aff stubs of stubselting template, dismanting of template| after completion of intial curing of C.C., movement off Itemplate from one location to other location (A, minimum] lead of 1 KM is adopted), Cid | fa) TS2 KVP, R& S-Type Towers Toe 3346.00) cuit |) 1220 KV A, B, C & D-Type Towers, Loe. 9247.00] cut2 | (c) F132. KV Mult circuit Towers Loe 7932.00 CLs) 1220 KV Multi circuit Towers Loe 71558.00 cca} te) T32kV Narrow based Niufi Creu Towers “Single oi 7284.00] PTRANSCO SSR 2019-14 . 10 3CO SSR 2013-14 =~ tem 7 ‘SS Rate for ] 2 Me Description of Item Unit 2013-14 ee eee (Rs) « TLis| i) [2200V Narrow based Nai Creu Towers Singie BE 1064200 ~ GLI6 | ig)__[Poieistructure fr termination of 220132kV cables Loe 7138.09 Liz [th] 200 1132 KV Narrow based fower Loe 402.50 LIB] Gla) erection of tower structures, mchdng al types off — MIT 4201.00 : Jextensions except JC type towers (stub template erection] > fand dismantling are nol to be included) (neluding 3 mtr e |6 mtr. , 9 mtr., & 12 mtr. extensions) a ZLIB] Be) [Erection of al ypes of narrow based towers I mali eeu MT 3585 00 . [ower structures 7 narrow based mull crcult towers i |structures, including all types of extensions except JC| : ype towers (stub template erection and dismanting are 7 Jnot to be included) (including 3 mtr., 6 mtr. 9 mtr,, & 12} - mtr extensions) S CL20] 6(c) [Erection of all types of JC’ Type tower structures, wT + 7565.00 =~ including all types of extensions (st template erection - land dismanting are not to be included) (including “| ~ based, Extended and Truncates) 7 Gla2| “Gia [erection of povelsructure for 2207132 KV eabie|] MT 30430 > ltermination 2 7 [STRINGING OF POWER CONDUCTOR: Hoisting of| = — tension insulators and Suspension insulators, paving out - Ine conductor, rough sagging Jointing, tensioning, tipping ~~ and fixing of preformed Armour rods and vibration : dampers, measuring ground clearances _wherever| — necessary Which excludes the works involved in the - lcrossing of LT, 14kV & 33kV power lines ~ dismantling and restringing of conductor « ~ E123] _ |S Nos. Zebra conductors ~ RRM 35826 00| nN CL24| (ii) [6 Nos. Zebra conductors ~ RKM 53736 .00| * [Las | ~w)_[2 Nos. Panther conductors RM 7970300 ~ CLz6] | Nos. Panther conductors RK 73657 00 24 CLa7| iv) [6 Nos. Panther conductors — RKM 4537.00] - GL2B] wi) |2.Nos. Moose conductors RK 30267.00 C129} (vil) [3 Nos. Moose conductors RKM '45377.00) - cL IS Nos Woose conductors RW 71646.00 > CL3t [3 Nos. Bear conductors ~RKM "38826 .00} = CL32| (x) [6 Nos. Bear conductors ~RKM '53736.00| ~ GL33] (x) [3 Nos. Dog conductors RK 21492,00 ‘CL34]" (xii) [6 Nos. Dog conductors a RKM '34032.00] ~ LIF] pain Twin Moose Conductor for Single creut stinging (area) RK | Please refer : phases) with TSE Machine 400k” SSR A GLE] Hiv) Twin Moose Conductor for Double Greut stinging (inves REM | Please refer . phases) with TSE Machine _ a0okv ssR_| + ~ = - > " APTRANSCO SSR 2013-14 = Se haieor > & [tee as ee | ora ~ C139] |Siinging of Earhwire: fining hardware, paving sal —RRMT 5754.00 i rt—seSC—SCSC 7. t3ram high terete gatatoed ate wae 140] 9 [Earthing of towers including cost of Excavation, Back] Nos 3646.00 filing, including cost of 25 mm dia 2.5 mm thick, class ‘C} |G. pipe of 3.00 Mirs length with 50X6 mm Gl Flat 4.05 Mrs long, BH Coke, Salt etc., and measuring tower| footing resistance. CL4i| 10 |Slant Earthing of towers weluding cost of Excavation] ~~ Nos 3586.00 Backing, including cost of 25 mm cia 2.5 mm thick ass °C’ G1. pipe of 3.00 Mrs length, wth 50x6mm G | Flat of 4.05 Meters, BH Coke, Salt etc., and ‘measuring| tower toting resistance CL42|"" 17 [Earthing of towers including cost of Excavation, Back] Nos 7968.00 iting. including cost of 25 mm dia 2.5 mm thick, class 'C} |G.l. pipe of 3.00 Mtrs length,BH Coke, Salt etc., and Imeasunng tower footing resistance. (Without Gi Flat ) for {counter poise earthing CL43 |" 12 [Counterpoise earthing including clamping devices and) Amis 32:30] terminal lugs, but excluding cost of steel wire. Gi44] 13 [Half round welding of G.ibolis and nuts of towers in the] Each 7520} [section between ground level & upto bottom X.arm level including ail bolts connecting the bracings at the bottom X{ [arm level and painting the welded portion with one coat of zinc rich paint. C145 |" 14 Half round welding of G.ibolts and nuts of towers in the] Each 22.0} JSection between ground level & upto bottom X-arm level including all bolts connecting the bracings at the bottom X; larm level and painting the welded portion with one coat of linc rch paint- For JC type towers C146 | 75 [Laying of 33 KV 400 sqimmm XLPE cable Finis 244.0) cL47 | “16 [Termination of 400 sq mm XLPE cable — Each 4432.0] CL4B| 17 [Dismantling & re stringing of 33 KV conductor (all types off Per conductor 2316.0] |conductors) for crossing of 33 kV line during stringing of EHT lines, CLAS] 18 |Dismanting & re stringing of 17 KV conductor (alliypas off Pav Conductor 7367.9 Iconductors) for crossing of 11 kV line during stringing of EHT tines C50] 19. |Dismanting & re stringing of LT conductor/cables Tor] Per conducior 7980] crossing of LT tine (all types) during stringing of EHT lines ‘Sd/- 5. SUBRAHMANYAM DIRECTOR (PROJECTS) 2 1 FORWARDED BY ORDER / Vewccathhss: 7 Roan it fo Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad ee ee 2 APTRANSCO SSR 2013-14 ANNEXURE - Il ERECTION OF 220kV, 132 KV & 33kV SUBSTATIONS, oa SS Rate for Description of tem unit [2013-14 No. | No. (Rs.) CS1| 1 [Hoisting of insulators and hardware, stretching the| Bus 19100 .09 Jconductor and stringing of 220 kV bus comprising of three] Section phases with Quadraple Moose conductor to a tension of 900kgs for single moose conductor( The maximum’ length or up to a length of bus section of 40m) CS2| 2 |Aowsiing of Insulators and hardware, stretching the| Bus 4776.09] conductor and stringing of 220 kV bus comprising of three] Section phases with single Zebra/Moose conductor to a tension of . 900kgs( The maximum length or up to 2 length of bus| section of 40m) CSS] 3 [Hoisting of Insulators and hardware, stretching the) Bus 9554 00} [conductor and stringing of 220 KY bus comprising of three] Section phases with Twin Zebra/Moose conductor to a tension off /1B00kgs, including fixing of spacer clamps( The maximum| length or up to a length of bus section of 40m), CS4] 4 |Ffoisting of Insulators and hardware, stretching the] Bus 4776.00) [conductor and stringing of 132 kV bus comprising of three] Section phases with Single Zebra/Moose conductor to a tension of le00kgs.( The maximum length or up to a length of bus lsection of 45m). [ess] 5 |Hoisting of insulators and hardware, stretching the| Bus 9554.00] Jconductor and stringing of 132 kV bus comprising of three| Section phases with Twin Zebra/Moose conductor to a tension of 4800kgs including fixing of spacer clamps ( The maximum| length or up to a length of bus section of 45m) C86} 6 [Hoisting of Insulators and hardware, stretching the] Bus 3583 00| | lconductor and stringing of 33 KV bus comprising of three| Section phases with Single Zebra/Moose conductor to a tension off |450kgs.( The maximum length or up to a length of bus section of 20m). CST] F|ewing of Tnsulatow and hardware, steiching the) Bus 357500 conductor and stinging of 33 AV bus comprising of thee| Section lpnases wih Twin Zebra/Moose conductor to a tension of [S00Kgs including fixing of spacer clamps ( The maximum length or up toa length of bus section af 20m). CS8| 6 [Hoisting of Insulators and hardware, stretching the| Bus 3183.00} Iconductor and stringing of 132 KV bus comprising of two| Section lahases with Single Zebra/Moose conductor to a tension of| 900kgs.( The maximum length or up to a length of bus| section of 45m). i rrppe,prPpP PPL rE peppPpppeppepppepppepppeepPpprpeese | ETUDE EITC L ELL GL Tabb cute ge bv! 13 APTRANSCO SSR 2013-14 st | tom 85 Rate for Description of item | unit | “2ot3-14 No. | No ' (Rs.) TSE] 9 [Fang of spacers for Twn Moose conductor Each TSH CS10]} 10 _|Fixing of spacers for Quadruple Moose Conductor Each 130.50} CS11|* 17 [Fixing of Hardware,stretching the ground wire and stringing] Each 713.80] ot earth wire to a tension of 45095 from pinace to piace TSIa) 17 |Fnng of Nardware avelchng the ground wre and angina) RM 7300) Jaf earth wre to 2 tension of 460k9s ftom pinaceto ground CS13| 13 |Connection of equipment to bus and or another equipment! Each 7 250.00} fwin "single zebraMMoose/Panther conductor sncuding Imeasuning, cutingclamping. and hoisting of ‘suspension Ineuator assembly. to suppon the ‘conductor wherever _recessary - TSia] Ta” Connection Of equipment bus and or another equemeni| adh TEED wih Twin zebra/Moose/Panther conductor including fmeascring, cuttng.camping and hoisting of ‘suspension Insulator assembly. to suppor! the conductor wherever __|necessan, i S15} 15 [Connection of equipment to bus and or another equipment Each 776.00| lwth Quad zebra/Moose/Panther conductor _including| measuring, cutting,clamping and hoisting of suspension] insulator assembly to support the conductor wherever| lnecessary 76 [laying Of earih mat including excavation of trenches, lwelging, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, driling and| Iconnecting earth rods including connecting cast iron pipes| fas per Drg. No. SET(P)/149/82 with the following sizes of MS| Flats (GI Flats (for 220KV & 132kV) including fabrication. CSiS| Ta | 10xt6mm MS Fiat [GI Flat Ri 73.80] C517| 166 [50x 8mm MS Fiat /GI Fiat a RM 58.20) [Gsta[ te [75x emmMS Fiat GI Fist : Fi 66.00 ESi9] 160 For laying of earth fat i hard rook wy substation 7 bays) RM 50.09 Jextension, an additonat amount to the basic labour rate of ISSR wil be allowed as there is no provision in the rate of | laying of earth fat for temvoal of hard rocks. Sia} 7 JExcavation of earth pit, puting cast iron pipe wilh Tange on] Each lone end (as per ISS7181/86) of nominal dia 125mm and [275 moters long in side the pit including supply and thing RCC ‘colars 075 meter dia (OD), 50mm thick ang 0.60meters long in side the pit, backill the pit in the 25mm size granules of BHcoke for full depth of the pit with) llerate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, sal, clamps, C.LPipes and RCC colas, labour charges for all operational GSR] AT [Laying of contro: cables of al sizes (from 2 core 25 /) RW Jaosqmm 10.12 core, 25/4 0sqmm , both copper and faluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This inciudes| running of cables in contol room where cables are run on| cable racks in cable duct | 0646.00 309] 14 APTRANSCO SSR 2013-14 all | ss Rate for lees |hna Description of item unit | 2013-14 (Rs.) [7S |tayina of power cables A S23] 79 a [upto 50 samm 7 _ RM 70.39] C825] 18 [above 50 sqmr — RM 819) 20 [Cable terminations to the swi Marshaliing boxes /| a Panel terminal biocks/conttol & relay panels, LTAC panel including providng suitable ferrules and lugs as per [specification (including cost of ferrules and lugs) (for 220kV| la 132kv) C524] 20i]2.5 samm Copper wih copper gs each core atboth ends | Nos | 2540] C25 20 ii[40 sqmm Aluminium with Aluminium lugs each core at both! Nos. | 27.00} lends, C526] 20 ii Up to 50 samm Power Cable with lugs each core at both] Nos. 58.50] lends, C527] 20 w[Above 50 sqmm Power Cable with lugs each core at lends, instalation of lighting fixtures on switch yard structures| Each 956,00] including cabling and connections, labour charges etc including 40mm dia G.I bent pipe of 0.75m length with suitable clamps for fixing to structures in complete shape| (excluding cost of lighting fixtures) 22|Erection of the following equipment with Crane / Derrick al| site including handling the material / equipment caretuly al site including labour charges for all incidental andl Joperational’ items of work. {excluding cost of transpor! Icharges from Dept. stores to the site) sath] Nos. 107 65] cay 2 2211220 KV Ci preakers with Support structure & marshaling] Each 16718.00] boxes including grouting of foundation bolts and wi lcables from Pioe. CS30|~ 222/732 KV Circuit breakers with support structure & marshalling] Each 71944 00| boxes including Pioe to Pole cable wiring and terminations 3 AV Crit breakers incuang Proe to Powe cable wiingl Each wai3 00 and terminations cst TSH] PZAz-pole 220 KV Circuit Breaker wilh suppor siwclure 6} Each | 1427009 |imarsnaling boxes inc. grouting of foundation bolts & wing lof cables & terminations. 2 TSH] BBS]z-pole 132 KV Circuit Breaker wilh Suppor siucture é} Each | 1016209 |imarshaling boxes incl. grouting of foundation bots & wiring lot cables & terminations CSG] 256|200 KV Current Tranformers tach 0620] 227/132 kV Current Tranformers — “Each | 2627 10] 22.8[33 AV Curent Tranformers Ses facecns 31740 22 9|220 KV Potential Transforers Each [4062 00] 22.10] 132 KV Potential ransformers Each 2627-10 22 11]39 KV Potential transformers Each 81.40 22.12|220 KV Lightning Arrestors Each 2627.10 S41] 22-73] 132 kV Lightning Arrestors = each 240-09 C542] 22.14/35 KV Lightning Arrestors Each| 485.00 [esas] 22 15[220 kV Capacive Voltage Transformers Each 3622.00 S44] 22. 16/132 kV Capacitve Voltage Transformers, Each 2627.10] 15 APTRANSCO SSR 2013-14 ‘SS Rate for Description of Item unit | 2013-14 (Rs.) 1220 KV Isolators with earth swtich including sold core) Each 6449.00] insulators erection, alignment in full shape for smooth) «operation by Electrical and manually S46] 22,18[132 KV Isolators with earth swtich including sold core] Each 4776.00} insulators erection, alignment in full shape for smooth loperation by manually | GS47] 22.19/20 KV Isolators without earth swtich including solid core} Each 5973.00] insulators erection, alignment in full shape for smooth] loperation by Electrical and manually. eee ‘CS48| 22.20] 132 KV Isolators without earth swtich inchiding solid core] insulators erection, alignment in full shape for smooth| loperation by manually. (CS49] 22.21]2-pole, 220 KV Isolators without earth swlich including solid) Each | ~ 5077-00] core insulators erection, alignment in full shape for smooth loperation by Electrical and manually ‘CS50| 22.22|2-pole, 132 kV Isolators without earth swiich including solid Each 3652.00] core insulators erection, alignment in full shape for smooth] loperation by Electrical and manually. 4297.00] CS5i] 22.23/33 kV Isolators including sold core insulators erection,| Each 1552.00 alignment in full shape for smooth operation. ‘CSE2|_23:24|220 kV Bus Post Type Insulators, Each 338.40} (C883) 22.25]132 kV Bus Post Type Insulators. Each 254.70] C854] 22.26/33 KV Solid Core Insulators _ Each 174.00] 855] 23 [83 KV 1400 V Station Transformer including all necessary] Each 395.00] lconnectioris on HV & LV side including cost of lugs (Bu lexcluding cost of transformer and HG fuse set) 856| 24 [Erection of Control 7 Relay panels, LTAC panels, Jannounciation, PTDB panels etc. in the control room duly lmounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation] oo 2122.00 ots for 220kV & 132KV ) including man power suppor lo Met wing for commissioning, GBBT] ]Etection of 220 V, 200 Ahi 60 Ah Lead Acid battery inf Set wai5 00 complete shape ft for charging Jerecton of 220 V, 200 Ahi 80 Ah mainlenance tree battery] Set 768809 in complete shape fit for charging 555] 27 [Erection of 220 V. 200 Ah TBOAN baltery charger a F76500 6860/28 Erection of Capacitor Bank including series reactor of 75] Each 4283 09 _lwvar Cepaciy - GSET|20 Erection of Marshaling Wosk Each 773.80] S52] 30 [Erection of Marsnaling boxes Each 346 60 GEES|_S1 [Erection of Lighting pilar box in switchyard on Toundation) Each 55] laid (Excluding pillar box), (for 220kV & 132KV ) Bore earthing in estimations as per field conditions will be considered on case to case basis as supplemental items. ii, 25% excess over CS64 is allowed for JC tower fabrication charges ‘Sd/- S. SUBRAHMANYAM. DIRECTOR (PROJECTS) (1 FORWARDED BY ORDER 1 34 iby ALJ DIVISIONAL ENGINEER -3 Olo.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad 16 APTRANSCO SSR 2013-14 — — 34 | toe Deseiton of tom unit | “aoe (Rs.) CSS] SE Fanon OT Wan ond Rainy soars, sub sang] | 768 Sich oe MSAnges, les, “Chanel "FS Jats itSvounds, "excudng’ ont ef Mi lee ond ono Chaveste ste | S65] 33 |Gaivanization of Main and Auxiliary structures, stub setting) MT 4576.20 Tempe, tundaten bola, U bot ot ung raw sel it rounds, oxlangcost of se and anspor chrgs __[onlsctener pass 6 gs “34 [Setting of stubs with stub setting template for sub-station| ~ uppoting he lonple, signet and creing'of exae fempate ster compiston oft cum oS CSG BAT DOR Towers == Sal OBA] [Cs67|~34.2 |132kV Towers Set 2214 00] esal 4 3 Saw Tonsis EOFS Saf 55500 Gasol 4-4 poo eat sat} aar309 cero ate fraaviesaor Sat_[ 156000 Serif ste feo WV Seater - Saf 200.0 S72] 347 [132 kV Breaker - ——T set 500.00] C573] 34.8 [33 KV Breaker [set 7006.09] GSte[ 35_rote ne mais an anny sucaras oe vargBae| iT] 23800 TST5] 36 [Fixing of 901 Fall poles over the Vanstormer plinth. mm] 7520) [esrst 39 [runt ot ask tat polesovr ie taniomo® pie: ——[~ ew|—— 5561 SS/r| at _|erenon ofS Fasesel zen | srr ESrol 36 eestor of S3KV PY Dstbuton ox ——— [ea-| sa 99 €S78[~ 40 [Laying and Terminations of 17kV. XLPE 1000 Samm Cable | RM 121.00] CS80| 41 [Erection of 11kV VCB outdoor type Kisok (within built[ Each (2467 00] Bteoer Crs P's, Suge nnestrs§ Relays) Tsao po apse oa ihe Fey oT SON a [vaso : 35 43 [132 KV substation - 20000) ‘fay ays one SB Sa = rao Tete ; poy Pope PP Pgh Lge gh gh gh PPh Pe gh Le pasa LEP or Pegs gt pry r. r = Ee — r r: e ae r~ rT r vr r: r a r rT r r r- r: r rr r~ T r r T : as |ANNEXURE - it 1 Loading / Unloading of materials from departmental | Private vehicles in to the stores yard and stacking and vice-versa r_] ‘SS Rate for si. No "em Description of Item unit |___2013-4__ | | Loading | Un Loading STi) 1 [Cement = MT — 8580] 100.00] ~ [2 Jatother materials ana Siz] —0)_|Steet = aT 794.50] 194.00] [sta] “wy [Tower paris MT 194.60] 194.00 | ~STa] “Gay |RS tosis and val pales and MS Sheets p various szes. tat [7330] 9880) 3 [Gabe [Conductor dram (orlaading / un toading) —— ST5| a [Panther ACSR = Each Drama Bia ao aay STo[—b [Zebra ACSR. - Each Drum 300 00} 300.09 ST7]_¢ [moose ACS Teach Brum 300.00 300.09 Salo [Moose ACSR (Huge Drums of 1 75KM and above) Each Drum 441.00] 447.00 staf e [Ean wie [Each Brom 128.50, 128.50 [Stra] 1 [Contotcabies up to 6 Gow Each Deum "726 50) 128.50 ST1i]_@-[Contiot cables above 6 Core — Each Drum 471.40) 171.40 [Sra] 172 Core LTAC cable drum (up to 500 meter). {each rum | ___171-40] 171.40 STia] 1 [3-12 Gore LTAC eable rum (above 500 meters). Each Drum 214-30|_214:30 4 Jother materials received in cases. S114] [Case weighing not more than TOOKGS. Each case Tao) 775.09 ST 15| i) [Case weighing fromt0ikgs to 500kgs Each case | 21300] 21300 STIG] (i) [Case contang fragile items and weighing more tan] Each case 426.10] 340.20] 5019s and up to NT ‘ST17|_ (iv) [for LTAC panel a Each 284,40) 284-40] STI] via) | TORN Normar aise asulator — Each 70 779 STIA]_viey | F2ORN Normal aise nauator Each Ta 7a | si3a) vie ]Fe0RN Norma disc ineuator Each 179 174 ST2i] via) [FOKN Ant-fog disc insulator 7 Each 70] Ta0| 5122] wie) |T2ORN Ani fog disc meuaIOr == Each 779) 174 S123] wile) |FOORN Aifog dso salar Each ez) aa (vi) [Loading / Un loading and stacking charges for 70KN| 20KN SRC insulators ae _ ‘Tay (ay | ARV Each sing 220 220 ‘ST 25[ (by [220k = Each string 2.80] 280) | -S128) Wa |lsaaing 7 Un loading and slacking charges Tor 120KN} Each sting 330) 330) 160KN SRC insulators for 400kV [Cases containing Control & Relay Panels TS ~ ST] tay [sav Fah Fea ao] 7a STH] |vTaWTand BOR a Each 34.60) 55450 [Gases containing Cis, PTs, Cvs [HWY to 3h Rating = | Each case: ‘sao 85.80 ST20] i) [Above S3kv and up to T3287 | Each case 728 50| 420.50 [CStai] ay [e2onv Rating Each case 39.00] 639.00 8 APTRANSCO SSR 2013-44 7 [Cases containing LAS Sis] [SRV Each case 600[ 18.09] ‘ST33{_()_| 132k, Each case. 213.00] 213.00] ‘St34] (il) [220KV Each case. 264.40[ 284.40] 8 [Loading /Us-Loading of Stas] 7 [33K Breaker Each set 352.10] 852.10] ‘St36| 2 [132kV CB Each set 7702.60| 1702.80] ‘St37]|_3_[a20KV SFECB. Each set 2127-50] 2127-50] 'ST38| 4 _[Station Transformer (100KVA) Each set 326.90] 326.90] 'ST39| 5 [Station Transformer (250KVA) Each set 391.60] 391 60] ‘ST40| 6 |220V BOAH Battery (Conventional) (Lead Acid) ‘Set 709.20} 709.20] ‘STai] 7 |220V BOAH Battery (VRLA) (Maintenance Free) Set WTA] 407.40) ‘STa2] 8 |220V 200AH Baltery (Conventional) (Lead Acid) ‘Set 77830} 77830) ‘S¥a3] 9 |220V 400AH Battery ‘Set 7135.20] 1736.29] ‘ST44]_10_[220V Battery Charger with DC distibution Board Sat 426.10} 426.10] STa5]_11_[DCDB for battery Charger. tach T4160] 147.60] Stab] 12 _[TS2KV Haraware single ‘Set 70.09} 7000) ‘Sra7]13_[ 132 KV Hardware double Be 7049} 100] ‘Sras] 14 _|220 KW Hardware single ‘Set 1479] T4709 ‘ST43] 15” [220 KV Hardware double Set 75:09} 7500) S750] 16 [220 KV Teolalors, without insulators including machanism] Set 26.10 426-70) box ‘STSi]_17_[220KV Solid core insulators Each 37.10 s7.10) ‘SY52) 18 [732 KV Weoators (without Sold Core neutators) Each 31850} 379.50) ‘S53 19_[TSAKV Sold core Wneutators Each 35:10 36.10} ‘ST54]~20_[33 KV Isolators (without sold core insulators) Each 14160] 147.69} ‘S¥55] Zi _|SGKV Sok core insulators Each 05] 09] ‘ST56 22 Vibration dampers, mid span compression joints, repai| 100 Nos T4760] 147-60) sleeves, clamps & connectors etc 3 |Capactor Banks ‘Sis7] a [ SMVAR Set 113520] 113529] Sise] 6 [Neuter CF Each 7730) 77.90) ‘Si58[ 24 [Scrap dems ike MS Scrap, Gl Scrap, Ferrous Scrap etc, | PerMT Zao} 273.09] ‘ST60] 25 [Scrap tems ike Conductor scrap, Earth wire Scrap, etc, | Per MT 2440} 284.40 Sei] 26 [Bots & Nols weighing 60 Kgs bags induding springs} Each bag 650) 30] washers, flat washers. ‘S¥62} 27 [3 172 Core LTAC Cable bits (0056) by measuring and load] Mis 070} 060] |) unload (up to 500 Meters, limited to Rs.142 per Bit! (Maxie) S763] 28 |Cabie bits (6086) up To 6 Core by measuring and load un] Mis 080) or) load.( up to 500 Meters, imted to Rs.106 per Bil (Maxie) ‘ST6a29|Cable bits (loose) above 6 Core by measuring and load | Mis rr) 0%] lun load.(up to 500 Meters, limited to Rs.142 per Bi (Maximum) "POOF POP EEE PPP PPO PDPOP PRP POR PR PPR PCg* 19 APTRANSCO SSR 2013.4 STE] 30 [Copper Serap [Perm Woo, 170.10) 'ST66] 31 [Battery Scrap Per hit #77 90| 177.90 $767] 32 [Capacitor units Scrap Each 7.79 770) ST6a] 35 [SURV Breaker Limb — Each Vaio) 4560) ‘STRa] 34 [ARV Breaker Limb - Each 35450) 55455 SV7O| 35 |RBORV Breakerimd : Each 510.40) 51049] ST7i[ GE [Tyres scrap ofall sizes Each 77.09 360) | S172) “37 Empty ot drums Barrel 6.00) 6.00| S173, 38 |Full drums Barrel EE) 35.50 ‘S174] 39 [220V, 200AH Battery (VRLA) (Maintenance free) Set 345.70] 45.70] S175] 40 [22ORV Bushing Each 220.50) 220.50 ‘ST7G] 47 ARV Bushing ~ Each Se) a) ‘STT7] a2 [RV Bushing [ Each 2760] 22.00) Note: - ifloading / Un loading is done with Crane, 1/3 rd Charges are to be paid towards labour charges and ‘emaining amount is towards crane hire charges 7 Example: Loading charges of 100 KVA Station Transformer is RS. 326,90/- and in case is loaded by Using a crane then labour charges would be Rs.109.00 & crane hire charges would be Rs.217.00 1. Loading and Un foading and counting at Stores for check measuring and Stock Verifiaiton Purpose No] Hem Unit] SSR Rate No. Description of item for 2013-14 S178] a3_|Towar_paris counting on part wise and restocking at Stores yard (Toy stock verification purpose) Perm 71.49 GH [labour charges for wighng and restocking of GI Tower Pars oF Bole | por yay Nuts, Washers (for stock verification purpose) ie 284.40 ‘ST8O} AB |Labour enarges for loading and unloading of ACSR, AAA Conductor &| [Earth wire bits for weighiment (for stock venfication purpose). Perm 284.40 STi] 46 [Counting and Resiocking of Hardware (Won paris, Al jumper cones, Al ~ Hensiion cones, PA rods, Acing hoens, Al grippers ete) (for stock] cach set aad | \verication purpose) STB2| [Counting and Restocking of 220kV & TS2kV Line accessories ike] ~ Dampers, MSC Joints, Repair sleeves, PA rods, D- Shackles Links| lEarthing sets, Hangers, Counter Poise Earthing Clamps etc (for stock] Each set 1.49) |veriication purpose) STs] WB [Counting and restocking of Weuators of various capasies (or aioe] —c2-, | ad I "_|veriication purpose) _ STa4] aD |ioading of Assorted Tower pars From aMferent places by observing pari eso ad easing in tol at stores "| Peet 219.0 ‘STB5} GO |For Opening and Repacking of Packing of Panels for check measuring) cacy a i lpupose ee eae '1_]For Opening and Repacking of Packing of Breakers for check measuring lpurose - — S785] (a) 220 kv = Each 141.60) Stave) [ERY Each +0000] STB8| te) [SSKV z Each 42.80 S169] 62 |For Opening and Repacking of Packing of Fragile Materials, and Small] — IPackages ike wooden, Cartoon Boxes elc., for check measuring] Each 21.29 purposes. 20 APTRANSCO SSR 2013-14 m Crane Hire charges:(for departmental works at the premises) i No] Wem Description of tem Unit] SSR Rate No. for 2013-14 BE [For Ze & Tents Capacy crane S790] Foristhour Hour 2082.50] ‘STO [For every nour or part thereat after et Hour Hour 345.90] '4_fFor 8 to 20 Tonne Capacity cane: ‘ST83| [Foret hour Hour 3247.80] S133) [nFor every nour or part thereof afer aU hour Hour 1082.60] ‘55 [For above 20 Tone Capac crane ST] For sthour Four 5008.40 S795] [uF every nour Or part Mhereot afer et Hour Hour 1760 60] IV Sparing of Departmental vehicle to the contractor: SI No] Tem ‘Description of tem Unit] SSR Rate No. : for 2013-14) | S196] 36 [Sparing of Departmental vetice(Lony) to the contractor is under] lemergency only. When departmental lorry is engaged to the Contractor] lon a particular day an amount per day or part there of should be| Per day 2729.60) Itecovered for a total KM run up to 100KM on that day plus for every} additional KM rate, which ever is higher. The run to be worked out takin nial reading at starting point and closing reading after returing the| jsame starting point duly completing the transport work. Hensal 22.70| Note 11 When the departmental lorry is used for transport of fragile and costly equipment, they have to be insured by the contractor in fist place before transport and the same wil be claimed in the respective work bil 2 Ifthe crane is given on hice o other than APTRANSCO works, the rate is a minimum of Rs22702!- (s.945.90-per hr X 24Hrs) + (Fuel cost & lubricants) per day or part thereoff and the time i to be ‘teckoned from the time of leaving department premises til eaching back Sdl- $. SUBRAHMANYAM, DIRECTOR (PROJECTS) 11 FORWARDED BY ORDER {/ ‘Ofo.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad, IrSPLTIPPLPITITLPPPLLPLLLPPLRPPPPPHPYPPDL Be a APTRANSCO SSR 2013-14 ANNEXURE -IV ‘TRANSPORT OF EQUIPMENTS / MATERIALS SiNo. [item No. Description of Item Per Load ‘The following are the minimum materials / ‘equipment, for each load. One Load = 9.0 MT. 4_[CTs, PTs, & CVTs: Te Ta _|220kV 2 Nos. T2 4b [132 kV [3 Nos. 73 tc | 33kV 112 Nos. INOTE: For transport of 220kV CTs, PTs &CVTs extra provison lof Rs.180/- may be added for each load towards labour for clearing the obstructions like electrically and telephone lines as the equipment are very tall 2__ [SF6 Circuit Breakei T4 | 2a [220K 72 sets TS | 2b [132 Kv [2/3 sets TS | 2c | 33Kv [2 Nos. 3 _|lselators with or without Earth switch including post type insulators: T7 | 3a _[220Kv T set Ts 3b | 132kV 2 Sets| T9_[ 3c¢ | 33Kv Nos. 4__|Lighting Arrestors: Ti0 | 4a [220K Nos. T11_| 4b [432 kV 6 Nos. 112 | 4c [33 KV 24 Nos. Control & Relay panels: 6 Nos. 6 _ |ACSR Conductor and Earth wire drums: T13_| 6a __|ACSR moose Nos. T.14_| 6b _|ACSR Zebra “ANos, T.15_| 6c __|ACSR Panther Nos. T.16 | 6.4 _|Earth wire of 2 km per each drum Nos. T.17_| 6.e _ |Earth wire of 3 km per each drum 6 Nos. T.18_| 6 [CABLE DRUMS 10Nos. 7 ___| Disc insulators Tis | 7a | 70KN 71000 Nos. 7.20 [7b | 120KN 800 Nos. 8 _ [Silicon Rubber insulators T21 | 8a | 70KN 275 Nos. T22 | 8b | 120KN 228 Nos. 3 _| Wave Traps 723 | 9a | 220Kv Nos. 24 [9b [132kV 16 Nos. "EEE DECECHbEEECGGCEEGDLEED&ESL CULEIUITULLL ‘Sdi- S. SUBRAHMANYAM DIRECTOR (PROJECTS) HW FORWARDED BY ORDER // hi We, DIVISIONAL ENGINEER — 3 /PM-I Olo.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad, 2 APTRANSCO SSR 2013-14 ANNEXURE -V RATES FOR HANDLING & ERECTION OF POWER TRANSFORMERS item ‘SS Rate for sl. No,| 2 Description of item unit | 2013-14 " : 7 (Rs.) A) HANDLING AS JOB WORK BY DEPARTMENT “]Loading/Unioading of T&P such as wooden sleepers, winch] jacks, packing pieces etc., required for handling the power| transformers. Ti | alUp to 31.5 MVA transformers, one load of wooden sleepers and] Load | 937.00 Janother load of T&P such as chain pulley block and rail poles lete (Maximum two loads) PT2 | blFor above 315 MVA and up to 100 MVA transformers, twol Load | 937.00 loads of wooden sleepers and another load of T&P such as| Ichain pulley block, winch and rail, poles etc (Maximum three loads) PTS ¢|For the above 100 MVA and up to 160 MVA trafsformers, threel Load 937.00 loads of wooden sleepers and another load of T&P such as| winch machine and rail poles etc (Maximum Four loads) 2|Loading/Unloading of fragile material such as PTa | —alJLV bushing / Neural bushing Tor 132 RV Wanstormer Each | 12500 PTS | b)|Ta2kV Bushings Box | 50400 PT6 ‘©)|220kV Bushings — Box 627.00 INOTE Ti crane used Grane charges can be claimed as per actuals and labour charges will be reduced to 40% PT7 | 3]loading/Unioading of accessories of transformer including] Load | 1560.00 raidator, pipe line, FCG & RTCC panels, conservator tank, turtets LA set frames and oil barrels 'A' frame and header etc, (For SONVA and above 50 MVA PTRs without oil barrels) 4|Dragging of power transformer main tank duly arranging| lwooden sleeper platform providing packing pieces, jacking lup the transformer, insertion of wooden sleeper, rail poles| larrangement of pullies, steel ropes positioning of winch land anchoring of winch. al ransformers upio 16 NVA capaci PTS Up to 10 Mrs ts_| 2467.00 PTS [Over and above 10 Mis — RM 246.00 D[ Transformers above T6NVA and uplo 31.5 MVA capaci PTIO | [Upto 10 Mts. = TS_| 4506.00 Prat [Over and above 10 Mrs RM] 457.00, @[Transformers above 31.5MVA and upto 50 NVA capacity = PT | [Upto 10 Ms is | 525500 BTiS | |Over and above 10 Mirs RM_| 526.00 [Transformers above SOMVA and upio 100 MVA capacity BT | [Upto 10 Mrs is_| 649800 115 | _|Over and above 10 Mirs RM] 649.00 _ [Transformers above 100MVA and upto 160 MVA capacity (Pre | Wp to 10 mrs 1s | 836100 Pp PPI PpypPPPpr Prep LPepPpPepPhPrpepeppPprpeppPpprp pags a, CEO NDEENEEEOHDEHDH HS ECUDDLEECDY EWITYU LU Ul 2 APTRANSCO SSR 2013-4 = ' SS Rate for st. Noe Description of Item unit | 2013-14 (Rs.) PITT | [Over and above 10 MIS Rut_| 837.00 3|Turning the transformer through 80 degrees including making arrangements as above. : BTiS | af Transformers upto 16 MVA capaciy Each | 220800 PTH |b Transormers above TOMVA and upto 315 MVA capaaiy Each | 277000 120 | ~e| Transformers above 31.SMVA and upto 50 MVA capacity Each | 3445.00 P12 | a Transformers above SOMVA and upto 100 MVA capacty Each | 3942.00 P12 | el Transformers above TOOMVA and upto 160 MVA capacty | Each | 4927.00 |Tuming the transformer through 180 degrees including making arrangements as above. PT25 | al Transformers upto 16 MVA capacity Each | 382,00 PT24 |p| Transformers above T6MVA and uplo 31.5 MVA capacly Each | 4604.00 P12 |e] Transformers above 31.5MVA and upto 50 MVA capacity Each | 5425.00 P126 | —afTransformers above SOMVA and upto 100 MVA capacity Each | 6028.00 PT27 | e[Transformers above 100MVA and upto 160 MVA capacity Each | 7233.00 PT28 | 7re\fAnchoring of transformer including excavation of wench of 4 x] 1 Job | $37.00 1x0. 8 mts for anchoring and burying 2 Nos. sleepers in it and removing the same after work is completed PT29 | 7(b)| Movement of 10 MT winch for anchoring. TJob | 648.00 3|LitinglLowering the transformer main tank to the required| INeight of one sleeper using jacks and wooden sleepers packing pieces for loading onto from the truck. PT30_| al Trangformers upto Té MVA capaciy Each | 268000 PT3t_| Transformers above T6MVA and upto 31/5 MVA capacly Each | 4194.00 PT32_| _¢|Transformers above 31.5MVA and upto 50 MVA capacity Each | 514300 P133 | al Transformers above SOMVA and upto 100 MVA capacity Each | 6886.00 PT34 | e[Transformers above 10OMVA and upto 160 MVA capacity | Each | 8772.00 3]Puling the transformer from platform to the tuck Tor loading! from truck tothe platform for unloading PTS |__| Transformers upto 16 MVA capacity Each | 205400 136 |p| Transformers above T6MVA and upto 31.5 MVA capaciy Each | 3942.00 PT37 |__| Transformers above 31.5MVA and upto 50 MVA capaciy Each [4384.00 P138_| of Transformers above SOMVA and upto 100 MVA capacity Each | 5476.00 139 |__| Transformers above 1OOMVA and upto 160 MVA capacity | Each | 7404.00 olFixing of transformer wheels to main tank including alignment of transformer etc, PT40| a Transformers upto 16 MVA capaciy Job | 1002.00 PTaT |p| Transformers above TEMVA and upto 31.5 MVA capatily Job | 7280.00 142 | of Transformers above 31 SMVA and upto 50 NVA capaciy Job _| 1791.00 PT43 ‘d| Transformers above SOMVA and upto 100 MVA capacity Job 2321.00 PT4a_| el Transformers above 1OOMVA and upto 160 MVA capaci Job [3438.00 24 APTRANSCO SSR 2013-14 re 'SS Rate for St. No.|no Description of item Unit | 2013-14 7 (Rs.) Tas | Ti]Arranging gas cutter equipment at site including operator and] Job | 1708.00 lhelper to remove anchoring of transformer main tank on truck| {or loading and unloading (including cost of gas) : 412|Removal of steel rope and turn buckles of transformer main| + ftank on truck. PT46 | (@)|Up to 100MVA Capacity Job | 47000 PT47 | (D)|above TOOMVA and up to TE0MVA Capacity Job | 70300 73[Tieing the transformer main tank on to the truck with steel rope land turn buckles PT48 | (@)|Up to 100MVA Capacity Job | 604.00 PT49 | (b)]above TOOMVA and up to 160MVA Capacity Job | 90400 7a] Assisting for lifting of overhead lve ines, while transporting off transformers by truck PTS0 | (a)[Up to TOOMVA Capacity ‘Job | 1323.00 PT61 | (b)|above TOOMVA and up to TGOMVA Capacity Job | 264500 B) [ERECTION OF POWER TRANSFORMERS AS JOB WORK| IBY DEPARTMENT 7[Opening of crates and Keep ready for erection of accessories of transformers PT52 | __alTransformers upto 16 MVA capacity Job_| 1473.00 PT53 | _b| Transformers above TEMVA and upto 31.5 MVA capacity Job_| 1841.00 P54 | [Transformers above 31 5MVA and upto 50 MVA capacity Job_ [2464.00 155 |__| Transformers above SOMVA and upto 100 MVA capacity vob_| 2957.00 PT56 | _e|Transformers above 100MVA and upto 160 MVA capacity Job_[ 3842.00 2|Shifting, loading dragging of accessories of transformers tke| radiator, conservator tank, pipe line, fans, headers, DM box, FCC, oil barrels etc., from place of storage to work spot and vice| versa of transformers.(For SOMVA and above 50 MVA PTRs| lwithout oil barrels) PT87 | __a[ Transformers uplo 31.5 MVA capacity Job_| 2208.00 PT58 | _b| Transformers above 31 5MVA and upto 100 MVA capacity ‘Job [2947.00 P69 | _¢|Transformers above 100MVA and upto 160 MVA capacity Job | 4048.00 PT60 | a} Transportation of oll barrels from unloading place to the fiter | Job | 2203.00 3] Erection of Radiators to the transformers including headers P61 | _a| Transformers upto 16 MVA capacity Job _| 1639.00 PT62 | _b|Transformers above 16MVA and upto 31.5 MVA capacity Job_| 2626.00 PT63 |__| Transformers above 31 SMVA and upto 50 MVA capacity Job [3264.00 PT64 | d[Transformers above SONIVA and upto 100 MVA capacity Job_| 4007.00 PT65 | _e|Transformers above 100MVA and upto 160 MVA capacity Job_| 5454.00 Erection of main conservator tank. PT66 | _a[ Transformers upto 16 MVA capacity Each | 147600 PT67 | _p[ Transformers above TMVA and upto 31.5 NVA capacity Each [164400 Eee Eee ie ie ee ie TPP ep ppp pry SEEN DEEMEEEODEHDENS LODE ECEDYL EWE UL 25 APTRANSCO SSR 2019-14 eam 3S Rate for st. No.2" Description of item ee eet PT6B | ¢|Transformers above 31 SMVA and upto 50 MVA capacity Each [2411.00 PT69 | dlTransformers above SOMVA and upio 100 MVA capacity Each | 375500 PT70 | [Transformers above TOOMVA and upto 160 MVA capacity Each | 483400 PT71 | {[Pronal bag testing and commissioning Each | 1626.00 PTT | _alfiring of compressor Each | 1139.00 PT73 | _h]Dry Nitrogen Cylinder (in case, Diy Nivogen Cylinder is used for] Each | 1785.00 lcommissioning of Air cell instead of Air compressor), excluding transportation cost. 3[Erection of transformer bushing PIT | al33 KV Neutral and tenitary bushings Each | 32200 PT75 | Bl] 132 KV bushings up to 100MVA Each | 600.00 PT76 | bli) 132 RV bushings for above 1OOMVA and up fo T6OMVA Each | 751.00 PT77 | c(t|220KV bushings up to T00MVA . Each | 901.00 PT76 | _cli)f220KV bushings for above TOOMVA and up to 160MVA Each | 1117.00 PT79 | d{)[220KV Nos. erection of turrets up To TOOMVA Job | 1280.00 | PT80 | d{in|220KV 3 Nos. erection of turrets for above TOOMVA and upto | Job | 1692.00 eoMvA, PTST | (| 132KV 3 Nos erection oF urrels up To TOOMVA Job | 605.00 PTE | e(i)[ B2KV'S Nos. erection of turrets for above TOOMVA and upto | Job | 887.00 6OMVA PTGS | GlErection of ar blowers (cooing fens) including ames and] Job | 243700 control cubical etc., (for each transformer) PTEA | 7]Erection of LA frames (HV & LV side) Each | 765.00 PTGS | B{a)]l) Erection of driving mechanism box, bevel gear of OLTG for | Each | 76500 below 100NvA P¥86 |i. Erection of driving mechanism box, bevel gear of OLTG Each | 7530.00 OOMVA and above 100MVA PTET | B(bifi) Erection of OLTC conservator Tank with stand Tor up fo Each | 96800 HooMva, PTEB li). Erection of OLTC conservator tank with stand for above Each | 1476.00 HOOMVA and upto 160MVA G]Erection of pipe line Pras | al Transformers upto 31.5 MVA capaci Each | 517.00, PT60 | _b[ Transformers above 31.5MVA and upto 60 MVA capacity Each | 773.00, PTT | ¢|Transformers above SOMVA and upto 100 MVA capacity Each | 1810.00 PTS2 | _d[Transformers above 100MVA and upto 160 MVA capacity Each [1638.00 P73 | 10|i) Erection of Thermometer, pressure Relief valve and vent pipe | Each | $17.00 etc. PTGs | |i)Erection of Thermometer, pressure Relel valve and vent pipe | Each | 77300 letc, 100MVA and above PTRs. | 77 Erection of detachable OLTC including connecting internal jumper with OLTC tank. PT95 | __ al Transformers upto 31.5 MVA capacity Each | 2541.00 26 APTRANSCO SSR 2013-14 an 35 Rate for si. No.2 Description of item unit | 2013-14 ~ (Rs.) PTs | 0] Transformers above 37 SMVA and upto TOO MVA capacity | Each | 3628.00 PT97 |_c[ Transformers above TOOMVA and upto 160 MVA capacity | Each | 4268.00 PT9B | —12])) Erection of separate, cooler bay including A frame header | Bay | 5478.00 pipes and bends of transformers up to 100 PTRs MVA capaci PIG | |i Erection of separate, cooler bay wcluding A Fame header | Bay | 602800 pipes and bends of transformers above 100 MVA and up to 160MVA PTRs capacity. a Taih|Removal of old worn oot gaskels and replacement with new] jgaskels including cutting, pasting of gasket with all accessories| including cost of adhesives. Excl. top cover « BTI00| al Transformers upto 16 MVA capacity ee _[ 27800 “I BTIOT| b[ Transformers. 31.5MVA and 50 MVA capacity Job_| 3283.00 = PTIG2| ¢| Transformers 700 MVA and_upto 160 MVA capacity Job [4237.00 < T3{ih| Removal of oid worn out gaskets and replacement wilh new] = lgaskets including cutting, pasting of gasket with all accessories including cost of adhesives. for top cover. The following rates| - | are exclusive of crane fife charges which are payable a actuals = PT103 al Transformers upto 16 MVA capacity Job: 1061.00 I PT104 ‘b| Transformers 31.5MVA and 50 MVA capacity Job 1295.00 & BTI05| ¢[Transformers 100 MVA and upto 160 MVA capacity Job [152800 - | PT106| —14]Erection of supporting insulators and earth fat for HV & LV| Job | 517.00 Neutrals Tertiary - COIL FILTERATION OF TRANSFORMERS AS JOB WORK BY ~ DEPARTMENT «| PTIO7 | a]leading [Unloading oF KL Ofte oe Pa Pri08] —zILaying of LT Cable from AC Supply point to fiter connecting} Job | 67400 ~ Pipes etc, from fiter to transformer and back to fiter and Vice - versa _ ~ PTTOg | 3|Loading runioading of ful ransformer ol barrels Barel| 47.00 me PTH10) d]Loading Punioading of ol drums Barret | 800 - 3|Oil topping for transformer through ol fier nN if Transformer already iled with ol . — - PITT] a] Transformers upto 31/5 MVA capacity Each | 68500 i PTTI2] b| Transformers above 31 SMVA and upto 60 WA capaciy when| Each | 153000 the transformer is received with transformer oil ~ PITS] 5. Transformers above SOMVA upio 160 VA capacily When thel Barrel] 22,00 < transformer is received empty with Nitrozen_ ~ [Assisting labour for filtering of oll for a period of 5 days during nS iteration of oi BTH4| a] For a period of S days for Transformers upto 81.5 MVA capacity] Each | 330800 ~ . « ~ NS = - a APTRANSCO SSR 2013-14 tem SS Rate for st. No. | Description of Item unit | 2013-14 7 = (Rs.) Prit IFor a period of 5 days for Transformers above 31.5 MVA and] Each | 4625.00 upto 100 MVA capacity PT116| _¢lFor a period of 5 days for Transformers above 100 MVA and| Each | 608.00, lupto 160 MVA capacity BIT] —ajOver and above 6 days Tor Transformers uplo S15 MVAlpor day] — GB06D copac [Priva] —vJover and above’s days TorTansformers above 31.5 MVA and] per day] — 90500 lupto 100 MIVA capacity PT173] _c|Over and above 5 days fortransformers above 100 MVA and[per day] 1321.60 lupto 160 MVA capacity PT120] _7{)[Dismantiing of control cables of power transformer for arranging,| Job | 611.00 lpuling of transformer maintank out of plinth for failed ransformer or improvement of transformercapacily PTT] —]laying of contol cables for the transformers which are recélea) Job | 1625.00 hath non completion of wing on the traneformer and completa fering ofthe transformer on the lank F.C C.D M box et, (oro repalted transtormers) PTIZ2 [Shifting of filter machine in switch yard from existing place tol RM | 76.00 lnear transformer or to the convenient place manually (where| { lmovement of tractor trailer is not possible) 9|Labour charges for arrangement for vaccum filing for the power| ltransformer for prescribed time duration for SOMVA and abovel PTRs which are recewed at site with nitrogen gas filled \| P1123 _(a)[Below 100NIVA PTRs Job_|__2437-00 PT 124] _(b)[Above T0OMVA PTRS Job | 4877.00 PTi25| _10Loading7 Unioading of 5 KL Storage tanker Job | 807.00 11 [Hire charges for a private tractor for transport of 6 KL of oil fitter [pp is} 3827.00 Beyond 50 KM perk] — 74.00 [_12|Providing of oil tanker on daily hire charges #7728] — aff KL capacity Per day] 1200.00 PT129| b]20 KL capacity [Per day) 2200.00 13] Transportation of 10 KL & 20 KL oil tanker (including return ltip charges). (a) or (b) only applicable Minimum amount upio 50 KM 1s_ [e000 More than 50 KM. Kv. 30.00) [Unloading of oil tanker at site and loading the same after completion of the job _ : 10 KL capacit Job_| 475000 | 15()/Complete wiring up of the transformer indicating systems cooler| | |eontrot fans and motor driving mechanism of OLTC panel providing suitable ferrules and lugs [P1133 | a)|16S1.5 MVA Transformer 74327 00 [PT134 | b)[50 MVA Transformer $8627.00 [PTH35/ —c}[ 100 MVA Transformer ts 20689.00 2 APTRANSCO SSR 2018-14 tem 35 Rate for SI. No. Description of Item unit | 2013-14 no. [ro __ (Rs) PTHIS| dj] TO MVA Transformer TS] 20668.06 TBlin| Complete wring up of he wansformer indicating systems cooler control fans and motor driving mechanism of OLTC panell * providing sutable ferules and lugs excluding OLTC panel PT137 | al] 161 SMA Transformer 1S_| 776400 P1138] —b)[50 MVA Transformer LS [9313.00 T1329] e)] 100 MVA Transformer LS] 10329.00 P1140] — d)| 160 MVA Transformer Ls [10328.00 PTT41 | —16)Draining of ol from main tank of the Wansformer into empty oi KL | — 349.00 larums and stacking them neatly as directed by. the| i _|APTRANSCO Engineer at ste PTT42 | 77]Unioading of 20 KL olf storage taken at site and loading the] Job | 516900 ]same atter comletion ofthe job | [By insurance for fragile material during Wansportation, erection, dismantling may be paid as per actuals from department sie for department works Sdi- $. SUBRAHMANYAM. DIRECTOR (PROJECTS) 1) FORWARDED BY ORDER I Oro cnet Engineer (Construction-2) Vidyut Soudha, Hyderabad, | TrPrPPTPTIPSTTITVT PS TLL LLP LLLILS LLP TROLL ANNEXURE - VI Rates for O&M works of EHT Lines facil Description of work unit SR 2013-14 | Mi T |(@) Providing of Vibration dampers (for 220 KV & 132 KV lines) (Excluding Material & Transportation cost) Each 108 ONE (6). Providing of spacer damper for 400 KV twin Moose lines (Excluding Material & Transportation cost) Each 148 2 [Painting of towers with two Coats of aluminum paint using |Aluminum paint 1st grade containing 306 Kg of Aluminum paste for 18 iters of thinner 1st coat is to be applied before lerection of towers and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete OME {a|First coat of 1st Grade Aluminum Paint duly scratching and cleaning of towers including labour charges, cost of paint, brushes etc. MT 3401 OMe {(b|Labour charges for painting including scratching and cleaning of towers of 1st coat of Alluminum with out cost of paint & brushes. MT 953] Ons (c| Second coat of 1st Grade Aluminium Paint duly scratching and cleaning of towers including labour charges, [cost of pint, brushes, ete MT 1990] OME (GC) Labour charges for painting including scratching and cleaning of towers of 2nd coat of Aluminum with out cost of lpaint & brushes. Mr 540| \(): The requirement of 2nd coat is to be justified by the concerned Divisional Engineer/Executive Engineer |before execution of the work. 3 [Painting of towers with single coat of red oxide paint of 1st |Grade, including scratching and cleaning of towers. g (al One coat of Tst Grade Red Oxide Paint including labour ‘charges for scratching and cleaning of towers including cost of paint, brushes etc. MT 2130| One (b|Labour charges for painting of towers including scratching ‘and cleaning of towers without cost of paint & brushes. 1181 OMe 4 [Providing of Arcing Homs for 132 KV line on both tower side land line side Le. two per string (Excluding Material & Transportation cost)(with lefty & Pulies) per string 853] ond 5 [Providing of Arcing Homs for 132 KV line (Excluding [Material & Transportation cost)(without lefty & Pullies) Each 106 ‘OMT [Providing of Arcing Homs for 220 KV line on both tower side| land line side i.e. two per string (Excluding Material & [Transportation cost)(with lefty & Pullies) per string 968 [oma 7” [Providing of Arcing Horns for 220 KV line (Excluding [Material & Transportation cost)(without lefty & Pullies) Each 106| owas @ [Providing of Missing angles! Replacement of rusted angles lon the existing towers departmentally (including ltransporaton charges & Excluding cost of tower parts, bolts [& nuts) Per each 95| oma 5 [Replacement of insulators at Suspension tower of 132 KV line (Excluding Material & Transportation cost) Per sting 1074] PEC EENECEEEHEHESDGD CODE E oo ‘OMS 70 [Replacement of insulators at Tension tower of 132 KV line (Excluding Material & Transportation cost) Per string 1817] ‘OMT | 11 Replacement of nsulators at Suspension tower of 220 KV] per line (Excluding Material & Transportation cost) seeg | 184 ‘OHIT | 712 [Replacement of insulators at Tension tower of 220 KV ne | Per |(Excluding Material & Transportation cost) string mee ‘MTB | 73 [Replacement of 732 KV ne single suspension insulator string with double suspension insulator strings (Excluding | Per 1610 Material & Transportation cost) sting ‘GHTa | 74 [Replacement of 132 KV ne single tension insulator string Jwith double tension insulator strings (Excluding Material & Per 2725) Transportation cost) string ‘OHO | 75 [Replacement of 20 KV Ine single suspension insulator string with double suspension insulator strings (Excluding Per +710] |Material & Transportation cost) string ‘GHET | 16 [Replacement of 220 KV tine single tension insulator sting lwith double tension insulator strings (Excluding Material & | Per 3133] [Transportation cost) string ‘ONS | 47" |Painting the welded portion of GI bolls and nuts of owers In Ithe section ground level dnd up to X-arm level including all bolts connecting the bracings at the bottom x-arm ievel with | Each | 4.00 lone coat of zinc rich paint including cost of paing ‘OMS | 7B [Fixing of earth bonds for existing transmission inet a 2 a Each 106.00) 18 [Re-Stringing of power conductor on the exising ines (Tor correction of $29) including fixing of tension insulators / suspension insulators, Hardware and accessories, rough sagging, jointing, tensioning, clipping and fixing of performed Jarmour rods and ibration dampers, measuring ground clearances wherever necessary. Which includes the works involved in the crossing of LT, 11 KV & 33, kv powerlines vie ismanting and restringing of conductor. eee a|3. Nos. Zebra conductors RKM 26869) OM?S | _b)6. Nos. Zebra conductors Rkm | 40302 (0m?=9 | cl2. Nos. Panther conductors Rem [14327 ON2T |" 4l3. Nos. Panther conductors Rem _| 21493] (0128 | e|6. Nos. Panther conductors Rem _| 34033] O28 | "te. Nos. Moose conductors Rkw | 22689] ‘OMS | g[3. Nos. Moose conductors RKM | 34033] ons hJ6. Nos. Moose conductors RKM 53734) na i]3, Nos. Bear conductors. RKM 26869] OMG ile. Nos. Bear conductors Ra | 40302 (Owes |” ila. Nos. Dog conductors Rem | 16119] OM35 RKM 25524) ifs. Nos. Dog conductors 2 |Loading / Unloading charges = (@[For above half drum and up to one drum full drum rate: Basic rate of Full Drum (b]For below half drum and for a Piece Basic rate of Half Drum ‘Sd §, SUBRAHMANYAM c DIRECTOR (PROJECTS) 1 FORWARDED BY ORDER /1 fh AL ct (leche Engineer (Construction 2) Vid Soudha, Hyderabad Tag £9 4"*s rn p ypayvagrg TrPePpppea DDD DP gr Q preg: ysgogts? LEN IEL EL! PEE NEED UMTEEEL LEE UL GLE OE a ANYENURE-VE APTRANSCO SSR 2013-14 ERRECTION OF TELECOM EQUIPMENT LY SUB STATIONS & LINES. ; Iss Rates for 2013 Sie Description Unit ay | frcton of PLCC panel in 27ORVITTORV SS Fak So 2 ection of LMU Each a8 5 ]iesin of Wave Tap = i [Fixing of waverapon pedi mooning sulator sack A0OKW Tah ae Ti ining ofthe wave ap on peastal mounting insulate sack in 200K Fach 010 Tit Fixing of he wave wap on Suspension mounting including jumpering- in ERT Fach 2907 [fection of PLCC 48V DCISOA, 35A charger 220K WAIKV Tc at 5 Jerestin of PLCC 48V DC/100A charger in 400 KV SS Each mul (6 [fection oF 48Vi300A & 25OAH batery sts in 152 & ORWSS Each S548 7 [Erection oF 4RVHA00AH battery sin 400 KV SS Each 368 Etetion oF OLTE a MON (Optical line terminal equipment) ; 8 Tequivaen i PLCC panne = co 7 Etection of FOP re Diserbiion Panel in WOK WOR VASGRV SSCE)——__|_~Eae 73s 10_[Esstion of FDP (Fbre Disirbuton Panel in 400K V/220K VIIS2KV SS (24F) Each S41 11 [Frcstion of FDP( Fibre Distbution Panel in OOK VIP20K VA S2KV SS ABE) Fach 12 [Fiction of 16/16 EPAX equipment in 400K VI0KV/ 132KV SS Each 1 [Fsction of ATU panel in 400KV220KV/ITDKV SS Fach = [Fi [erection of protection coupler equipment in 400K V 220K WISIRWSS, Each asin of optical re approach cable nich yrds of OOK. 220KV & TSERW eM incuting hardware) ve ane DE i OD ren ei THR EON HBR SS mw Daud TT [lasing of DPE Pipe nconches in WORV.DDORV_ TTORVSS mW Ta Laying of 2F24 F OPGW cable on 220KV an 400 KW lines (nealing SpiCag aa 18 |ond fixing ofhardvare accessories) Kn aad Stinging oF ADSS tpe optical ibe eae (TOFT24F capacity) on TS2RV, ZIORV Tne 19 |ssctins in plane areas! forest areas ll ress separately. inclusive of spicing and 7 [For plane aren os a Ta iT [or ageny o tal area (5% extra on Pane aa) kM ii [lor Hl aca 40% exraon Plane area) kM cai a KM 3012 Tor mans corporation aca upio 12 Kins from munieipalig 23% exten on i one * pian ars) M pau [| for munities upto 12 Kms rom manicipaig 20Po extra an Pane oa mM TORS 20 [Fixing of tension clamp set of OFC on IS2RV & 220KV towers pes 1763 [31 fixing of suspension lamp set of OF Con W2KV._220KV towers [perce — as 32 [Fixing of tension camp set of OPGW on A0UKY Ts a —perset 2133 33 ]Fning suspension clamp set of OPGW on 400K fines perset “1822 ~34 Pixing of ples box on 152K & Z20KV owers ch 2653 25 |Fiving of pie bx on 400KV towers 16 | 26 [Fixing of bration dampers on 132KV & Z2ORV wows s 325 [27 FFising of ibtion dampers on 400K ters i052 Sg PBnlicing cares fr OF ibe ago IS7KW,S5URV. A0ORV Ts a ane [areas oresy Hill Areas! Municipal its, separately foreach ease | Tfiveplane area z ach ibe spice as forages or a ara Fach ibe splice 324 For Hil eas = Fach ibe spice | 386 for interior oo ach ibe spice 386 T+ Pac municipal corporation areas (upio 12K from manele Each ibe spice 324 ‘| formuniipaties (apo 12 Kms from muricipalities) ach fibre splice 3 29. [Splicing charges for OFC ives ai in Offices at Myderabod and Rangareddy istriets] Fach fibre splice 220 30. [fection of RCC manhole For underground OFC works incuing soply& instalation KM Detecd 2 APTRANSCO SSR 2013-14 ie ss Rates for 2013 SUN, Description Unit ae 3I_| Erection of RCC Joint Chamber Te a0 5). [Blowingtlaying janarmoured UG OFC 24F/BF (DWSMin the existing HDPE duet 3? [in case of underground works ze = 33._[Fixing of ADSS ype OFC tothe tower members wih ties, clamps de [fr 22046132 bv Each Tas it [for 40046 Fach 108 34 [Laying of eral ype OFC (dF on SSRWAIRV TILT poles KM, 3522 35 _[Layingiof 6 pair elephone cable inthe trenches in 132KV, 220KV & 400KV KM ous 36 [Laying of Cat SBI Cables a Offs. 1 Bor 37. [Laying of Cat SE16 Cables with Conduit pipes along with accessories in Offices. KM 9922 38_| Fixing of 6U = 19 inch Rack in Offices for ERP works Each 26 39 Laying of single par elephone cable in the wenches in 132KV, 220KV & A0OKV. KM, 3955 '40__Laying of 255q mm Battery eable in control room in 132k, 220KV & 40OKV. KM, 14056 «_[Lne of Coral ete Fam veh ad my tov emmnton none KM 494 Laying of 6 pi 7 ar 43 [Laying of single KM) 4961 44 [Laying of RF cables in 132KV. 220KV & 400 KV SS KM, Tn ‘as, [Diaaing of 1X1 X T (Cos ducts for ayng of telephone cable a TS2KV, ZAORV, = a lsookv ss Excavation, reiling & closing of dusts OFT TXT (Cum) im 132 KV, BOR and = $6 {400 KV SS premises hos ee {7 [Etestion of ean pitas pe standards in TS2RV, 220KV 5S Tor communication = pene urpose 48_ [Erection of earth pita per standards in 400 KV SS, Each 10648 49 _[Erecion of VSAT equipment in 1S2KV, 220K. 400 KV SS. Each 5065 50, Dismantling of VSAT equipment of 32KV, 220K, 400 KV SS Each 2521 1 [PoadineTuntoading charges far PLCC equipment in TI2RV SS, 220K VIADORV int lehicle 7 for single chanel PLCC pannel Each sie ii [Tor Twin channel PLCC pannel Each Sta 2_[Loading/unloading charges for 48V/S5A, SOA, charges Each st '33__[Loading/unloading charges for 48V/IOOA chargers Each 7 '54[Loading/unloading charges for OLTE/MUX equipeint Each 77 '55_ | Loading/unloading charges for RTU panels Each 7 36 _[Loading/unloading charges for EPAXS Each 257 57 |Loading/untoading charges for battery sets 48V/150 AN, 250 AH, 400 AH 1 [fee BOAR Fach Ei Ti [or 250 AE Each Sit for 400AH Esch 7 '8_[Losding/unloading charges for LUE Each 2377 39 [Losding/unloading charges for Wavetrap 7 _[IS2KV wave wap Each 37, Ti_[220KV Wave Trap & 100 RV. Each 34 “60 Dismantling of existing P1.CC chargers GSA, SOA, 10DA) i [35/508 Fadi Ta ii_[ 1008 Each 3555) ‘st_[ Dismantling of exsing S8V/IGSAH, O0AH, 250A Paton sets Each 275 (62 [Dismantling of existing 48V/400 AH batery ses Each 368 (63_[ Dismantling of exsing RTU, OLTEMUX equipment 1 [RT Fach or i [OL TERAX Each 2647 PLTLLLATALCLLLL OP EOL ELL TOCR ED? Ree ee 2 APTRANSCO SSR 2013-14 SLNe Deseription Unit ss Rates for 2013 14 (Re) ‘GE_| Dismantling oF EPANS Ech Tosa 65 [Dismanlng of wave tape om 153 RVEIORV 99/400 KV SS separately {Js of Erection of 2000/1 m1 Wave Trap(400 ko Pa Ti [50% of Erection of 12500.5 mH Wave Trap(220 kx) 2008, Ti_|siicaf Erection of 630A/0.2mH Wave Trap (132 KY} 1195 “66 [Dismantling of 12F24F ADSS cable rom 152KV, 220KVSS fines Esch a6 G7 JDismanlng of I2F724F OPGW cable from I32KV_ 20KV S8AD0KVSS Tes Fach 27325 “64 [Disanling and bringing down of splice boxes on 152K, 220KV rowers Fach 136 (69 [bismanling and bringing down of splice Boxes on 400K towers Each 1658 ro flies SKVA Dios Crestor ry fr ening OFT BSED ach 783 1 ing sarge of 50 AC tverer ORVA wi basey backup Tor atending OFC oe De 7 Jove down works Tp Pin charges of SBN TO(C ay Closed Ton shutter for tending splicing works Tor 2 Tatending OFC break down works a ee TE_[Dismaning of VE 30-N masts wih Gay wines ee Fach Tai 7 [Dismaning oF 10 4720 rylon masts Fach 105, [Dismantling of AOI 100 R VHFTUHE ones : Fach Dele [UGOF cabling works rates luGFO Cabling Fe [Somey & documstation [Survey ofoute, providing as bul drawing, documentation for unarmoured |uderground optical fre exble Km ad T7[Fxeavation Back ling 7 Tal ypes of soil 09d, fooipath, Taloding PCC, snd, arming BrieWstone, semi |izear RCC split cover et. for underground fibre opis cable = ae 7 |Waring Tape (including supply and instalation. Ea Te '9_ [Laying of PLD HDPE pipe O.D. 40mm (including accessories) Km elted Laying oF PLB HDPE pipe 0.D. 40am Km 9280 B0_ [Inston of HDPE pipe by Trenchless digaing (ay [o- 10 mis = me om (6) 10and upro 30 mis ate 38 {6} |More than 30 mars mt 653 I [Laying of Gt pipe 100mm (Nonial Fare). eli accessories = ne 166 2 [Laying of RCC hum pipe (NPS), 100mm Diameter (nside}, Ineudng accessoris ir 29 {Bo [Caying af namo Underproond Opiieal Fibre Cable 24 Firs DWSME i 0 1 fnsallation of Joint box in underground (Including splicing & testing) ~ 24 Fibers No. 4036 BS [ROC wanhoies eupply & instalation) - z 86 |For Jit oeatons = No, Haat TB) For providing Service loops a erosngs No, elt 87 [Fretin of RCC Joint Chambers Na, 3180 |B walled Manhole(supply & stallion eI 2) orton ocaions Be: eae (5) [For providing Serie oops a erasing No. delet a9” [lstallsion of PLS HDPE pipe on wall ullding promises tong routing oT OFC a 0 iwough it “9a [Reinsiternt of excavated areaTdanages (in road. pavement feapalh Ge) Same 1 ‘91 [Main Distbution frame (100 pairs) Nos 1630 Sd)- $. SUBRAHMANYAM, DIRECTOR (PROJECTS) iI FORWARDED BY ORDER Qo. adhere {owas exheen Mee Ofo.Chief Engineer (Constrution-2) Vidyut Soudha, Hyderabad Pedi nd bbhb bd €LELEGbbhbbGbbbb btu dh L450 0% a ANNENURE: MI APTRANSCO SSR 2013-14 ERRECTION OF TELECOM EQUIPMENT IN SUB STATIONS & LINES, Sine. Description Uni Ss Rates for 2013} Tike) 7 sion of PLC pelo DORI IRVSS teh Sa 3 rscion of MU Exh 81 5 [reaignof Wane Tap {Fist wave on pS] moun aaa stock 0ORV Ta om ST Jnig th wave rap on peat mooning ulate slack in 200K Tach 010 Jee ake wane wap on Suspnsion moaning ncloingumperng eo SER Tach 250 [Faction of PLCC ABV DCISOA, 35Achrger in D0KVITSOKV Tach 2 3 [Fetion of FLCC DCITOOA carer n 40DKV SS Tach ait &[Evesion of VD00AT & 50H tate sn 132 € SORVSS Tach 355 3 [reson of 4RVADATT baten etna KV'SS fh Te ection of OLTE & MU (Opal in ermine] Sau 8 equivalent to PLCC pannel Each ome 37] sen of FP Fie isco Pann AOR VODORVILORW SSD am BE 10 [retin of FO Fibre Distribution Panel 0K V220K V/L2RVSS HF) tach i254 Tretia af FOR Fibre Disibtion Fuel in 400K 220K WISEKV'SS GRE) fact 2599 12 [tecin of [816 PAX equipment in 4O0KVI220KV/LS2KVSS Tach 2187 3 tection of TU png in 400K VAPOR VISOR 8 ach esr Tatar of pret coupler equipment fo 400K V2D0RVIORW SS eh aie ising opt ve approach cable inswch yards of AOORW, 270KV& T5ERV 15 | tnotuding hardware kM Lai ve fates Epc OD Arana ORT HOV ETRY on ee i [avin of DPE Pipe nuance ORV, PORTIS mH a aie FISE24 F OPCW cable on 220KV wd HOOK lines Gncing SCE 18 and fixing of hardware accessories) Lo bina Singing s ADSS pe optical be caNe (TST capaci on TERY, 200K Tie 19 ecto plane eres frst oes! il ares separately. nls of slicing an sing of hana acessories er plane te wi cm iT agency ota aca Cpe on Plane wa) ki 315 si Friars se exra on Plane a) rw “colo se | ao wa Cara on Plea) om aa 7 RES STORRS TROT is OER RS or aia

You might also like