You are on page 1of 10
2016 MnDOT Greater Minnesota Construction Projects District 1- Duluth/Virginia Contact: Beth Petrowske 298-725-2708 beth petrowske@stte.mn.us Huy 1,168, Location: Wee of Si Me Lake Reto ene of Brasach Rd Eagos Nest Lake area Description: Reconstruct Huy 1, staighten alignment and atin hls Total Cost: $20.7 nilion 2018 Cost: $3 ition Date: Fall 2016-Fal 2017 Impact: Lane closures and Nagging Benefit: Saher, straighter, eter road enon mndot.aov/diprofectaiy162eagles! Hy 168 Location: Wes of Sik Mo Lake Reo east of Bracach Ra, Eases Nest Lake area Description: Clear irees Total Gost: $218,225 2016 Cost: $219,085 Dato: Feo-Ap 2018, Impact: None Benefit: Cia’ cori for new road algrenent Hwy 2 ‘Location: Hwy 2 at Saginaw Welgh Staton Description: neal variable mestage sgn, pbc sess system, scoreboards and overheight selectors Total Cost: $117,170 2016 Cost $117,170 Date: May 2016 Impact Temporary, ntrmiten lane closures Benefit: Improves Wate safely Hy 23 Location: One mie east ef-35 over the Ketle River Description: Resuraco bridge Total Cost: $500,000 2016 Cost: $600,000 Date: Juy-Aug 2016 Impact: Detour Benefit: Smoother, ster ioge sntrmndet.gov/dtiprolectsnuv23-carton-pine-st. louis:county, Huy 23 Location: 17 miles NE of he south Carton County Description: Construct new ge and apeoaches Total Cost: $316 mition 2018 Cost: $26 millon Date: June 2015-Nov 2016, Impact: Temporary lave dosues, taggers Benefit: Smoathe. ster tnige wa mndot novi Jouls-couns ne Hy 23 Location: the St cus River Description: Resuooe bese , Total Cost $5.05 mason 2016 Cost: $305 ion Date: May-Ox:2016 Impact Sealer tafe conrledby signals or fosoes Benefit Sector, lor igo vr amndot. gov pole ine Iouiscounty Hwy 23 Location: Becks Rt -35in Duluh Description: Reconstuct Hwy 2 rom Bath Ave Wo Blocks Re Total Cost: $8.83 milion 2016 Cost: $888 milon Date: Jre-Oet 2016, Impact: Singlelane tafe in each drecton, temporary fone closures, foggers Benefit: New bidge, acess, salty and drainage improveronts tur mndot govld/prjectsMwy23arand ty 23 Location: 135 bth ve Win Bu Deseitin Resse iy 23 om 3 fh roth Tot Gost: $103 rion ott Cort sain Datta 201-206 pet Slee te tc mech recon rary \aecare hope oot: No re xs, ely and dre impor Hy 23 Location: St. Lous River /Raload Stto not of Stak Rin Cloquet Description Resurac safety inprovenents Total Cost: $15 ion 2016 Cost: $1.5 milion Date: iy-Aug 2016 Impact: Lane restictions Benefit: Smocther pavement, improved accesiity svement make ADA an 195, Hwy 61,198 Location: Lake Ave to Hay London Rel, Huy NB from Homestead Rta north of te Knie Rive fang on Hy 194 between E Skyine Pky and W Sed Stn Duluth Description Rega and resurface pavement, improve dtrinage “otal Cost: $3.03 millon 2016 Gost: $3.08 milion Date: May-July 2018 Impact: Lane reatrefons, ramp cose, detours Beneft: Smoother paveens, improved darage nwmndot.sovldVarojectsl-Hmy-61-Huy-196. ‘Resurfacing. es Lato: One le seth of R11 a1 8 me mort vs 23 Dascripton: Resist pavent lcs ite nd brige ppoach paln lnad Total Cont $270 on zois cos 370 ion Bate: Ag-02018 Imac Hota tte nett Sater oo i, =a numndot govt jectsi-35-Pine-County! ny 48 Location: Thee miles south of CR 13 a the Popple River Description: Resriace pavement isa new box uve Total Cost: $757,197 2016 Gost: $757,197 Date: July-Aug 2016 Impact: Lane cosures and faggers Benefit: Smoober pavement improved danage Hy 5 Location: Hsnos Rl to Wioway Rt in Oulth Description: Resuisce pavement, mprowe accussiity and safety Total Cost $4.18 miion 2018 Gost: $200,000 Date: 2015-0ct 2016 Impact: Temporary lane closures, fapges Benefit: Smoother, safer road, improved salty and sccsssiy i rondo. gov orolectsiwyS3.6916.108/ Hwy 53 Location: uy 37 oust south of Veion Orin Evelet and Vigna Description Resrtace pavement, repair coinage, improve accessisty and say Total Cost: $1.38 millon 2016 Cost $1. 38:mibon Date: May-June 2016 Impact: Temporary lane cosues,faggers Benefit: Smoother pavement, proved crinage, satel and acessibty ‘ww mndot gov/sroietswyS3-Resurfacing- Evele-Viainia Hwy 58 Location: Hay 58 at CR 91 (Hanes Ra} in Out Description: Improve atc signals, morove ancessibity 2016 MnDOT Greater Minnesota Construction Projects Total Cost: $524,008 2016 Cost: $624,008 Date: Sept-Oct 2016 Impact: Taf estcsed to singe ane Benefit: Safety, accessibity merovaments warn mndot govt projects Mwy53.6916.104/ Hy 5 Location: $8 lanes ust south ofthe White Face River to Augusta Late Re Description: Resurace pavement Total Gost: $2.18 milion 2018 Cost: $218 mon Date: May-vune 2016, Impact: Lane dosures Benefit: Smoother pavement worm mot qovidiprojectswyS3-Resurtacing Hy 8 Location: Vigiria Description: Gonstuct new agnor, bide, ‘appccaches and inerchange at Huy 135 Total Cost: $156 mion 2016 Cost: $110,000, Date: Fall 2015-Fal 2017 Impact: None Benefit Manan acess to on Range cies en mndotgovidprojectamhwySirelocation! Hy 61 Lacation: Four mies NE of the Gunn Teal Description: Replace bridge, improve approaches, resurface pavement Total Cost: $25 mon 2018 Cost: $25 milion Date: May-Oct 2016, Impact: Lane estctons contvotes by temporary signal system Benefit: Smoother pavement, improved safety ntowmndot;aovlsprojectstny-61-Devi-Track- iver Hy 64,135, 37, 73, 169,53 Location: Grand Maras to Grand Portage dstictide Description: Maintain, prove crainage systems Total Cost: $414 milion 2016 Gost: $414 maton Date: May-iay 2016 Impact: Lane costes cones by signals foggess Benefit: Improved drainage mm.mndot gov iprject/wy6' ‘randoortagedndex hte andmarss: Hwy 169 Location: SWof CR 15 to eas of Sonic CRT Description: Expand rad tom 210 4-anes, ist ew box caver Total Cost: $8.5 miton 2016 Gost: $425 millon Date: Sumer 2016~ 2017 Impact: Most werk willbe ofa, some tagging Benet smndot.govidiprojectsy Hwy 198 Location: 8 Sto th Stin Duluth Description: Remove etaning wal and buleing Total Cost: $72,464 2016 Cost: $72,484 Date: May 2016. Impact: Sidewak closures Benefit: Improve sty, wall no longer needed Hy 210 Location: CR 151 (ay Cooke Re) to Hwy 230 Jay Cooke State Park Description: Resurtace pavement and imoxove rsinage Total Cost: $21.3 milion 2016 Cost: $15 milion Date: May 2018-Oct 2017 Impact: Secon i cose in Jay Cooke Site Park ‘Boneft: Reopen damaged eecton ww imndot gov project/Hwy2tOfuturefindex ht a Hwy 247 Location: Font tin Liter to Hay 53 Description: Resuface pavement improve lighing and epairoege Total Cost: $481 milion 2018 Cost: $481 millon Date: June-Sept 2016, Impact: Long detour Benet: Smoother pavement, improved safety mura mndot gould iprjoctsHmy-217 Resurfacing Various highways Location: Attn, Cook, tasca, St Lous counties Description: nal rural ight Total Cost: $170 625 2016 Cost: $170,825 Date: June-Aug 2016 Impact: Sheuder cues, sho tem lane closures, Fogoing Benefit: Improveighing, safety Various highways Location: Distitwide Description Install sinusoidal centerine eamblestips Total Gost: $657,248 2016 Cost: $557,248 Date: June 2016 Impact: Intermitent ane osures Boneft: Improved seety Various highways Location: Pine, Kanabec counties Descriptio: sal sgnng on Hs 48,70 and 123 Total Cost: $200,000, 2016 Cost: $100,000 Date: Get 2016-Ney 2017 Impact: Intemitertlane cosures Benefit: Improved saety Hwy 1538 Location: Blank Sige o 135 in Duluth Description: Repair pavement, enorce structure improve csinage Total Gost: $2.8 ition 2016 Cost: $28 ion Date: Aug-Oat 2016 Impact: Three lanes onthe Batik ridge wil as, ‘ne detonate wl detour the Huy 2 Beng Bdge, rap cocues Benefit: Sale, creased Hespan of ge 0 wid proectsblatiindex htm District 2— Bemidji/Crookston Contact: Td Melcher 218-785-6652 tjmelcher@etatesmn.us Hy 2 Location: Eskne Weigh Staton Description: Replace signage and pub ederess system Total Cost: $132,711 2016 Cost: 8132711 Date: Sunmer 20% Impact: Nove Benefit; Safer and more effcien weigh ston Hwy 9 Location: Brie over Wild Rice River, 2s south of Ada Description: Repace bridge over Wi Rice River and raise elevation Total Cost: $26 ion 2016 Cost: $26 milion Date: June-Oct 2018 Impact: Detour Benefit: Higher clearanoe over vero reduce tooding potental Hwy 11 Location: Baucete to Pit Description Resurfae 10 mis of pavement, repaiesurace bilge over Bout iver, consbuct tun lanes, and teplae cvs, cxelgter, storm sewer, santry Sener, water utes, pedestrian amps and signs Total Cost $5 8 ion 2016 Cost: $5.8 mon =) 2016 MnDOT Greater Minnesota Construction Projects Date: une-Oet 2016 Impact: Detous Yong tem and shorten), ane osu ‘Benefit: Smocther and sar cri, improved anage, updated ly ules wm mndot govi2iprojeetsn Abaudette Hwy 32 ‘Lovaion: Fete to not Jt of Hy 200 Description: Aoply 151miesealoat Total Cost: $352,423 2016 Cost: $352,473, Date: Summer 2016 Impact: Temporary lone osures ‘Benefit: Longer ating road sutace Hay 48 ‘Location: Bridge over the Pope iver, 3 miles south of Abwood Description: Replace bridge over Poople River wth boxculvert Total Cost: $852,000 2016 Cost: $852,000 Date: Juy-Aug 2016 Impact: Detour Bonaft: Safer brig, smosthr read surtce, Improved crinage Hy 88 Location: Ganatan Border to Huy 175 Description: Resurace 17 miles of pavement, lace bridge, cuverts, som sewer Total Cost: $3.67 milo 2016 Cost $367 millon Date: Juy-Sept 2016, Impact: Detour Benefit: Sefer bridge, smoother road sue, improved crinage Huy 72 Location: Waskish north to milepost 48 Description: Apply 12: seaicoat Total Cost: $352,423 2018 Cost: $352,423, Date: Summer 2016 Impact: Temporary lane cosures ‘Benefit: Longer astng road sulace Hy 75 Location: Bridge ver Sat Coulee, north of Huot Description: Replace bridge over Salt Coulee wth box ouvert and raise elevation Total Cost: $484 591 2016 Cost: $464,591 Date: Aug 2016 Impact: Shr: tem detour Benefit: Soothe cad sutace and imeroved ctainage Hwy 75 LLcation: Donaldson to Halock Description: Repa shoulder Total Gost: $15,000 2018 Cost: $115,000, Date: Summer 2 Impact Temporay tae closures ‘Boneft: Safer highway Huy 75 Location: cid to Waren Description: Resurface 20 miles of paveront, replace ‘5 cues, constnct edgeine rumble stips Total Cost: $458 mison 2016 Cost: $458 milion Date: June Sept 2016 Impact: Detour Bene: Smoother and safer rea, irproved drainage Hy 75 Location: Rairoad cessing | mile east of St. Vincent Description: Intl gates and ashing ahs Total Cost: $254,000 2016 Cost: $254,000, Date: Summer 2016 Impact: Ternprat ane closures Benefit: Safer ralroad crossing Hy 92 Location: Gori to Trai Description: Apply 8s sesicost Total Cost: $352.23 2016 Cost: $352,425, Date: Summer 2016 Impact: Temporary ane cosures Benefit: Longer ast road suriace Hwy 102 Location: Festa o Crookston Description: Apply 19:ilesealcoat Total Cost: $352,428 2016 Cost $352,423 Date: Surmer 2016 Impact: Tergoray lane closures Boneft Longer lasting road surface Hy 175; Location: Noh Dakota border fo Hallock Description: Repair shoulder Total Cost: $115,000, 2016 Coat: $115 000 Date: Summer 2018 Impact: Temporary lane closures Benefit Safer ngway wy 197 Location: 18h Sto 81h Stin Bem Description: Replace sidewalk, sta crossualk wih ‘fasting beacon Total Cost: $230,253, 2016 Cost: $220,253 Date: June 20%6| Impact: Temporary lane dosures Benefit: Safer peestian cossing Huy 200 Location: Matomen to Roy Lake Description: Resriace 20 miles of pavernent,eptace calvens Total Cost: $5.5 milion 2018 Gost: 5.58 mon Date: June Aug 2016 Impact: Detcur Benefit: Soother and safer road surtace, improved drainage Various highways Location: Notwestom Minesola Deseription: rsa ramble sos Total Cost: $150,525 2016 Cost $150,825 Date: May 2018 Impact: Temporary lane closures Benefit: Safer highway Various highways Location: Northwesiem Minnesota Description. Repaiepiace som Sawer Total Cost: $515,708 2016 Cost: $515,708 Date: Sumer 2016 Impact Lane dosures Benoit: Improved drainage District 3- Baxter/St. Cloud Contact: JP Gilach 218-828-5708 James gllach@state.mn.us Hwy 6 Location: Nenh ef Crosby Description: Resurtace em Misi’ River ridge toMori Re Total Cost: 1.6 millon 2016 Cost: $1 Sion Date: July Oot 2016 Impact: Lane cosures, taggers lot cars Benefit: Smoothar re, exten fe ofroad Hwy 10 Location: East of Becker at 18TH St Description: Reign htrseton, ad tun lanes at uy 10 aed 137th Stntrsacton Total Cost $250,000 2016 Cost: $250,000 Date: Sumer 2018 Impact: Lane closures Benefit; improve safety Hwy 10 Location: Moti, raikoad crossing noth of Main St Description. Upsade raoad crosig (gates, gral) 2016 MnDOT Greater Minnesota Construction Projects Total Cost: $275,000 2016 Cost: $275,000 Date: Fal 2016 Impact: Lane closures, posse detour ‘Boneft: Improve safety Hwy 15 Location: Hay 23/Dslon Stin St Cows to Sarl Description: Resutface, tum anes, improve sccessbily Total Cost: $3.17 milion 2016 Cost: $3.17 milion Date: Apa Aug 2016 Impact: Lane are ramp dosues, detours Benefit: Smother ise, extend 08d fe, merove ‘ately swsawmndotgoviaiiste Hwy 24 Location: Annan Description: New idewak along ay 24 near schoo! Total Cost: $30,000, 2016 Cost: $30,000 Date: Summer 2016, Impact: Occationa shodder closes Benefit: Improve pedestian safety Hwy 24 Location: Cleanater Description: Constuct new Huy 24 bridge spanning ss. River Total Cost: $1742 mln 2016 Cost: $6 mien Date: Aug 2015-June 2018 Impact: Mirimal- erg lanes remain open ud new lanesbége opens Benefit: New bridge sur. smndot gov. 24 Hy 25 Location: Butao Description: Reconsuct sogments of Hay 25 south of Hy 88 Total Cost $6.12 mon 2016 Cost $3.5 millon Date: Jy 2015-Aug 2018 Impact: Segments of iy 25 dosed and detoured Bono: improve motored and pedestian moby safely hough business dtc, smoother Ne, extend road li, imerove drainage, upgrade ues ‘winx mndot 7ovisbulalo Hwy 25 Location: Bualo Description: Recon Hay 25 fom Hay $5 orhward te Catin St, improve Hay 25a 55 Intrsecon, upgrade lighting o LED, improve utes, Inprow access Total Cost: $567 mition 2016 Cost $6.67 ion Date: June-Oct 2016 Impact: Segments of y 25 closed and detoures Benefit: Improve etorized and pedestrian moby, sc tech bse sie Speer, entre Hy 25 Location: Metical Description: Improve Hay 2510R 75 intersection in untoun Mental, 2d tu anes, upgrade signal system Total Cost: $1.2iion 2016 Cost: $1.2 milion Date: Api-June 2018 Impact: Non how lane cosures Benefit: Improve mcbilty, safety and accessbily nue emndot gov/amont Hy 25 Location: Woncsto Deseription:moove Huy 25tSevent Stintersecton, 2d pow tun anes, sidewalk, upgrade signals Total Cost: $500,009 2016 Cost: $500,000 Date: Sumer 2016 Impact: Lane closures Benefit: Improve maby, safely and accessibty wunamndot govlsnent Huy 27 Location: East of Lastup, and eat of Lite Falls Description: Replace Hay 27 bridge spaning Seunk River 6 mile east of Last, replace Hy 27 bridge spanning Rice Crook east of ite Fats Total Gost: 1.11 mien 2016 Cost: $1.11 milion Date: Juy-Nov 2016 Impact: Bridges wil ose, detours Benefit: New biege Hwy 27 Location: sl Description: Reeutoce 98 ils rm ise to Hwy 189, near south shee of Mile Lacs Lake; acd new tun lane a Hwy 168Wy 47 Total Cost: $2.29 millon 2018 Cost: $2.29 millon Dato: Aug-Oxt 2016 Impact: Hy 169 reduced fo single ane, fagger, pot Benefit: Soother, extend ile of road, ingrove salty Hy 88 Lecation: Amandale ‘Description: New tur lanes a Hy SS¢night CR 3 Total Cost: $400,000 2016 Cost: $400,000 Date: Sept-Now 2016 Impact: Lane closures, taggors Benefit: Improve sity TTT Hwy 55 Location: Bufo Description: Recorsrct Hay SSICR 14 intersection, wen and ada tum anes. Total Cost: 385,898, 2018 Cost: $655,808 Date: Apeitdune 2018 Impact: Hay 95 reduced to single lane, foggers contol vat trough wrk zone Benefit: improve safety Hwy 85 Location: East of cctan Description: Resign Hwy 5/Steams CR 194 intersection, ad ne ralvoad crossing fo CR 1 construct ghttun an bypass lanes on Hay 85 Total Cost $150,000 2016 Cost: $150 000 Date: Sunmertal 2018 Impact: Lane cosures Benefit Improve safety Hwy 71 Location: Belgrade Sauk Certo Deseription: Resurtace road, extend ons tum lanes, repaircuvers Teal Cost: $5.2 millon 2018 Cost: $8.2 malion Date: May-Aug 2018 Impact: Hwy 71 eduoes to single ane, agers, plot Benefit: Smacthor io, extend road if, Improve sey, improve cainage Hy 71 Location: Noch of Barta Description: Resuitae rom Botha to Wadena Count Line Total Cost: $2 ion 2018 Gost: $2 ion Date: Juy-et 20% Impact: Lone dosutes,fagges, plot cas Benefit: Smoother ee, extend ec road Hwy 04 Location: Longyile Deseription:Reslace Boy Rive brdge “otal Cot: $955 254 2016 Cost: $958854 Date: Auger 2018 Impact: Truck detour round Woran Lake Benefit: Now bridge Hwy 94 Location: St Cloud Description: Repa and resutace 1:94 bridges soanning Hy 15 Total Gost: $1.15 milion 2016 Cost: $1. 15-ilion Date: Apci-Aug 2016, Phot 2016 MnDOT Greater Minnesota Construction Projects Impact: 94 reduood to single lene, tae a rap osues Benefit: Extend ite of bdges, sate ide wana mndot govid3i96 Hy 96 Location: St. ious to Calegoilo Description: Resurace sx mies Wf GR 75 to CR 150 Total Cost: $1256 nition 2016 Cost: $12.58 milion Date: Agi Sepe 2018 Impact: 94 reduce to one lane in each erection, ramp doses Benefit: Smocter ide, extend cade wun mmdot goviaaisa Hwy 85,10 Location: Huy 95in Cambridge, Hay 10in Ree Description Landscape at new bigs and intrehonge Total Gost $117,663 2018 Cost: $111,853, Date: Apri Aug 2018 Impact: Shoider closures ‘Benefit: Erosion cot, reduce mainenance ay 169 Location: North of Maca Description: Reconstruct NB Hy 169 fom GR 1110 Rum River rest area, extend tun anes ‘otal Gost: $8.18 millon 2016 Cost: $6.58 ion Dato: Api! 2015-Aug 2015, Impact: Hwy 169 reduced to single lane in each ‘recon Benefit: Smocther ride, extend oad ie, prove sly wv mndot govies/20167 169 Hy 168 Location: Onis to Vineand Desctiption: Resurfaco 14.8 miles south of Onamia rostward to Vinetand, extend tum lanes, replace cules, impeove guard mprove acessibity Total Gost: $33 milion 2016 Cost: §3:3 milion Date: May-July 2016 Impact: Lane closes, taggers, detours Benefit: Smoother ce, extend roadie, improve sais, mprave drainage nu md. qov/d/2016 16 wy 169 Location: Zimmerman Description: Improve Hay 1691CR 4 nlersechon Total Cost: $450,000 2016 Cost: $450,000, Date: SunmerFal 2016 Impaet: Lane cosures, taggers Benefit: prove safety ny 240 Location: Hawi fo Hassman Description: Repiace 2380 sons Total Cost: $627,727 Date: Spang Summer 2016 Impact: Spode Gosures Benoit: improve safety Hoy 371 Location: Nisa, Pequot Lakes, Jenkins Description: Expand t four lanes Nisa to Jenkin, ‘constt ne inorenange in Pequot Lakes “otal Cost: $48.88 milion 2018 Cost: $30 millon Date: 2016-2017 Impact: GR 11 detour, rtomitertane closures Benefit: Improve satey ard tity war md gowrsnun ST District 4— Detroit Lakes/Morris Contact: Jerimiah Moerke 218-046-3608 jerimish moerke@state.mn.us Hy 10,68 Location: Dato Lakes Description: Conglete Hay 10 fontage oad Total Cost: $1432 millon 2016 Cost: $1.5 tion Date: May 2018-Sprng 2018 Impact: Lane dosures Benet: improved tat How wo amndot gov rontageroad Hwy 10,75 Location: Downtown Mocehead Description: Construct tu lanes, pace sdewaks, improve pedestrian aoessiity, wsrade sara resurface Total Cost: $11.24 milion ttl $5.2 milion ‘MqDOTIOMNS grant 2016 Cost: $5.2 millon (MnDOT) Date: Api-Oet 2016 Impact: Detour, lane closures, sidewalk detours Benefit; Imerved atc How, sterntersecions Hy 42 Location: Season to Kerkhoven Description: Resurie 18 mies of cad Total Cost: $48milon 2018 Cost: $43 milion Date: Juy-Oct 2016 Impact: Lane doses, sidewake detours Benefit: Smoother ad srace, more intrsectons ir mndot.aov/dAtrojects hunt? 5 Hwy 29 Location: Parters Prato Description: Reconstruct Hwy 28 Total Cost $3.77 milion (827 milon- Me007) 2016 Cost: $27 mitlon MnDOT) Dato: June-Oe: 2016 Impact: Detour, sidewalk and ane cosures Benoit: Smoother road suave, more accessible inerssctions ‘tunumndot gov: loarherspraii Hwy 34 Location: Hany 59 in DatuitLakes Io OR 28 Description: Constt conte lft-sumn anes, prove pedestian accessibility, este Total Cost: $2. milion 2016 Cost: $2. maton Date: Juy-Sept 2016 Impact: Lane dosures Benefit: Smother oad surface, mere accmssibe road ror dot gou'daproects hwy 34a Hwy 69 Location: Mest the Gant County ne Description: Resurfaco 11 mies of Hwy 59in concrete, recontuc the ay SGM) 28 inlesocton Total Gost: $5.31 millon 2016 Cost: $5.31 millon Date: Juy Sep 2018, Impact: Detour Benefit: Smoother ead sutace wonn mndot govidilprojectsnwyS8moris Hy 75 Location: Dunn to Grace an Doran to Hey 55. Description: Replace curt Total Cost: $661,802 2018 Cost: $051,802 Date: June 2016 Impact: Detcurs Benefit: Improved drainage beneab oads Huy 75 Location: Near Kont, Description: Reaign Hoy 75 Total Cost: $27! mitlon 2018 Gost: $55 millon Date: July 2016-01 2016 Impact: Detour Benoit: Sale bridges, reduced toed petal wn mndot ovid/projectshwy Sent Hwy 79 Location: Elbow Lake to 84 Description: Resurace 11 mies of oad Total Cost: $329 milion 2016 Cost: $323 millon Date: Api-June 2018 Impact: Detour Benefit: Smoother road sutace nina mndot govidsrojectshn3 RCE stake in AaB, 2016 MnDOT Greater Minnesota Construction Projects Hy 94 Location: Mahess o Osaki Description: ntl dynamic message sign and Total Cost: $437,755 2018 Cost: $437,755, Date: June-Aug 2016, Inypact: Minimal ‘Benefit: meroved communication ard safety Hy 94 Location: Neer amesile Description: Constuct snow fence at aifoad overpass Total Cost: $250,000 2016 Gost: $250,000, Date: Summer 2016, Impact: Minimal Benefit: Sater ons sutace Hwy 94,28 Location: Avandia Description: Reconstruct LO4/My 29 interchange Total Cost: $1485 milion 2018 Cost: $8 millon Dato: July 2015-001 2016 Impact: Ramp ard ane closures Benefit: Smoother, safer bridge; improved ali ow iv. dot gov/daprojcta/elen4h Hwy 94,75 Location: Soh Moothead Description: Recontuct interchange, const ‘aoa lanes on #9 between Hay 75 and 20th St Total Cost: $1338 millon 2016 Gost: $13.58 millon Date: Ape 2016 Impact: 4 - ne closures; Hwy 75- detour and ramp closures Benefit: imeroved tafe fow, safer intersection w.amdot govidalrojectsimoorhesd! Hy 200 Location: Mahnoman to Clesswater County ne Description: Resurace 1 mies of road, aise read elevation in several tood-prone areas Total Cost: $5.58 milion 2016 Cost: $555 milion Date; Juiy Ot 2016 Impact: Detour, ana closures Benefit: Smoaher road surface, resuce ood potential ‘aura mndot aovis/prolectsy200 Hwy F94 Location: Nonhuest of Fergus Fall Description: Re-deck 194 bridges over CR 88 Total Cost $228 milion 2016 Gost: $223 milon Date: May-0ct 2016 Impact: Lane cosures, crossovers Benefit: Smoobr sar bidge sutace Various highways Location: Wee! central Minnesota Description: Seal coat highways Total Cost: $35 milion 2016 Cost: $2.26 millon Date: ug 2015-Sept 2017 Impact: Lae closures Bonefit: Longor‘asing road sutace Various highways Location: West conta Monesota Descristion inal mumble sts Total Cost: $808,727 2018 Gost: $808,727 Date: June 2018 Impact: vet ane dosures Benefit: Improved safey Various highways Location: West canta Minnesota Description: Improve shoulders Total Cost: $526,007 2016 Cost: $528,007 Date: Sept 2016 Impact: Brit one cosures Benet: improved safety Various highways. Location: West cent Minnesota Description: Micron and miroeutace highways Total Cost: $35 millon 2016 Cost: $750,000 Date: Aug 2016-Sept 2017 Impact: Lane closes Benefit: Longersastng reed sutace District 6- Rochester! Owatonna/Winona Contac: Mike Dougherty 507-206.7688 ‘michael doughorty@statemn.s Hwy 3,298, 298 Location: Norte, Fariault Hay 3 tom Norhitd bridge to Rie CountiDakola County ne Huy 288 {fom Huy 60 to Minnesota State Academy forte Blin Hwy 298 tom Hwy 6010 Minesota Stat ‘Academy forthe Deaf Description: Resurtace pavement Total Cost:$* 2 milion 2018 Gost: $1.12 rilion Date: May-Aug 2016 Impact: Loog rm lane closures Benefit: Smoother cad surface, ADA improvements Hy 14 Location: Chestoro St, charles Description: Resuiace 15 miles of Hwy 14 Total Cost: $49 milion 2016 Cost 4.9 milion Date: July-Sept 2016 Impact: Lane restos, daly lane cosures with faggers Benefit: Scher rad surtace Hwy 14,38 Location: South of Owatonna Description: Replace 9 ridges on 36, Hay 14 Total Gost: $298 mtion 2016 Cost: $18mion Dato: Sept 2018 Sept 2018 Impact: Lave closes in 2016; delays, ngle-ane rossover aici 2017, 2018 Benefit: Smeesher, safer bridges Hy 18 Location: Nortel Deserition: Historie bridge ehabitation Teta Cost: $1.4millon 2016 Gost: 100,000 Date: May 2015-June 2018 Impact: Occasional ae cosues Benefit: Smooter, safer ardge itr presenaton Hy 30 Lecation: Dodge County east of Heyl Description: Replace bridge, improve approaches, resurface pavement Total Cost: $653,000 2016 Cost: $556,000 Date: June-Sept 2018 Impact: Detour Boneft: Smocther pavement, safer bridge Hwy 35 Location: Fesbom and Stace counts, south of Geneva o south of Hope Description: sal cate median barier Total Cost: $1.09 mion 2016 Cost: $1.09 ition Dato: Set 0et 2016 Impact: Lana restictons, log tem southbound lane festctons andro weekend estictons Benoit: Safer ighways Hy 95 Location: Northecund Straight River Rest Ave, south of Owatonna Description: Repaoe rest area, expand parkrg, improve sto Total Cost: $4.5 milion 2016 Cost: $43 ion Date: Avg-Nov 2016 Impact: Rest area closed unl sing 2017 Benefit: Improved accommodations fo motors racks SP 2016 MnDOT Greater Minnesota Construction Projects Hy 42 Location: Eig Description: Replace bdye “otal Cost: $180,000 2016 Cost: $180,000 Date: July Sept 2016 Impact: Detour Benefit: Safer, emocther bridge Hg 43 Location: Winona Description: Gonstuet new bridge, reat existing bridge Total Cost: §142 ion 2018 Cost: $20 miton Date: July 2014-Nov 2019 Impact: Shorter lca road closures, detours, bie trafic ems open ‘Bonet: Safer, smootor bide, bolt padestian, Dijee access Huy 52 Location: North of Rochester Description: itl vale management stom Total Cost: $350,000 2016 Cost: $350,000 Date: June-Aug 2016, Impact: None Benefit: Improved conmmuricaton, safety Hwy 52 Location: Rochester Deseristion:Replaoe striping on Hay 52 condor in Rochester Total Cost: $695,178 2016 Cost: $695,178. Date: Apiay 2016 Impact: Lane dosures in of peak hous Benefit: Safer highway Hy 52 Location: Rochester, junction of Hwy 52 ana Hay 63 Description. Replace bge decks, pant bridges, extend portiocund acceleration lane Total Cost: $4.24 mien 2016 Cost: $4 24 milion Date: Api-Now 2018 Impact: Hwy 63 Long-term ane cosues, ramp tfosures, detours; Hwy 62: single ane head head tratie Benefit; Safer bridges, bltor maging safely fr NB Hy 82 Hy 52 Location: Souhbound ian ram Pine Island to 5 miles oh of Zumbyota| Description: Resurtce southbound anes Tota Cost: $22 mion| 2018 Cost: $2 2milion Date: May-June 2018 Impact: Long term ane cosures Benefit: Safer, smootrer surface Hy 88 Location: Edge over tle Coda Crook 2 mies west cof Adams, and bigge over ceek in Adams Description: Replace wo bidges Total Cost: $1.42 milion 2016 Cost $142 miton Date: June-Sept 2016 Impact: Detour Benefit: Saferbiges Hy 87 Location: Mentoile Description Recorstuct estore retarng wall Total Cost: $143:mllon 2016 Cost: $1.43 rion Date: June Ag 2016 Impact Lane shits Boneft:Imoroved drainage Huy 61 Location: Red Wing Deseription: Reconstruct oad Total Cost: $27 ion 2018 Cost: $8.7 millon Date: Mareh-Aug 2016 Impact Truck detour, sng lene, hesdo-head wate Benefit: Smocther cad, improved padestan safety Huy 61 Location: Winona Description: Reconstruct itrsecon, upgrade signal Total Cost: $1.9 maton 2016 Cost: $1. 9millon Date: Mey-Sert2016 Impact: Long term lane doses, Glare Ave detour ‘Benefit Improved motors, pcestian safety, vac tow Hwy 63 Location: Spring Vatey Description: Concete pavement repair, stom sewer work, ADA improvements Total Cost: $400,000 2016 Cost: $400,000 Date: Ap-May 2016 Impact: Soutttourd deta northbound single ane ‘with ane shits, rersecng roads closed Benefit: Smocher rad, imsoved pedestian safety, Hwy 90 Location: Msslsipl River south of Dresbach Description: Repiace [80 bridge over Msssspn River, et entrance rams to Huy 6, rs! aca Total Cost: $187.54 mion 2016 Cost: $30 millon Date: 2013-Nov 2018 Impact: Single lanes in boh recto, ramp closures, etout Benefit: Safer road, bide Hy 105 Location: Austin Deseription:Resurlae rad south eye of Austin to west amos of90 Total Gost: $1.7 ition 2016 Cost: $1.7 ion Date; May dy 2016 Impact: Daly lane csure, short-term intersection Cosurekieout fr culver work Benefit: Smoother ead, beter eanage Hwy 250 Location: Lanesboro Desctiption:Repiace2 bridges noth of Lanesboro Total Gost: $3.81 millon 2016 Cost: $38 millon Date: May-Oct 2016 Impact: Detour, ompoar esretonscosures for secretion rver ers Bono: Safer bridges Various highways Location: Dietretide Description: Sea cracks in road in southeast Minnesota Total Cost: 456,987 2018 Cost: 5456 987 Date: Apel 2016-0ct 2017 ‘impact: Daly lane closures Benefit: Extend if of eas Various highways Location: Distewide Description. Uoocade sting, grooved in wet refective pit and tape Total Cost: 528482 2016 Cost: $526,482 Date: Apei-iay 2016 Impact: Lane dosures Bonefit: Improved safety Various highways Location: Distwide Description: Replace ADA pedestrian ramps in various souheasiem Maescta ces Total Cost $450,000, 2016 Cost: $450,000 Date: Aug 2016 | Impact: Lave resticons Benefit: Improved pedesian access, salty Various highways Location: Distretwise Description Pat bridges in souesstor Miesota Total Cost: $15 min 2016 Gost: $15 lion Date: May 2015 Impact: Longe [ane cesures Benefit: Extend bagel span 2016 MnDOT Greater Minnesota Construction Projects Various highways Location: Distctwide Description: Apply sealcoat to cad soubaastrn Mienosota Total Cost: $3.48 milion 2016 Cost: $3.48 milion Date: May 2016-Nov 2017 Impact: Dai lane sures Benefit: Extend He of oad District 7- Mankato/Windom Contact: Rebecca Arndt 507-304-6106 rebecca amat@tate.mn.us Hwy Location: St dames Description: Recent oad, a minoundsbous, backin paring Total Cost $125 mon 206 Cost: 51min $2 lon Date: 20162015, impact: Detox Benefit Secter, safer and mre accesible rood Hwy 13 Location: South of Hay 99 Description: Reconstruct sm secon of rd Total Cost: $530,000 2016 Gost: $530,000, Date: Juy-Aug 2018 Impact: Detour Benefit: Smother, sate road ny 14 Location: Eagle Lake Description: Reconstu Total Cost: $19 milion 2018 Gost: $1.9 mien Date: Mey Sept 2016, Impact: Lane resticons Benefit: Sater highway and itersecions Hwy 14 Location: Nell to Noh Mankato Description: Expand lanes wih bypass of Nest and new interchange wth Hy 1 Total Cost $31.7 milan 2016 Cost: $18 milion Data: 2015-001 2016 Impact: 2-monh detour in Jy Aug Benefit: Smoather, sate highway | wre nde gov rolectstdnewulntonmankato | Hy Ord 14 Lecation:Janesile Description: Restore ura secon fer tuback Total Cost: $4.7 miton 2016 Cost: $47 millon Date: Apsi-Nov 2016, Impact: Detour foci sets Bene: Soother road Hy 19 Location: Henderson Description: Replace bkdge over UP Ralond Total Cost: $5.2 milion 2016 Gost: $52 milion Date: May-Now 2016 Impact: Del Benefit: Soler bide ew ndol. govidVprooctsnwy henderson Huy 88 Location lowa o south ot of Hay 60 Description: Reconstct, replace cavers Total Cost $23 rion 2016 Gost: $2.43 mien Date: Mayy 2018 Impact: Detour Benet: Smoother roa, improved drainage wy 68 Location: BrowrRecwood County tne to Huy & Description: Resulaco Total Cost $1.63 milion 2016 Gost: $1.63 milion Date: Aug 2016 Impact: Lane cosurs,dotays Benefit: Soother road Hy 71 Location: Jackson Description: Replace Des Maines River Bridge, resurace road, consiuct tal Total Cost $497 milion 2016 Cost: £4.87 millon Date: May-tow 208, Impact: Detour Benefit: Sater ridge, smoother oad, more accessible nur. anndot govi/pojects my Hiackson Hy 90 Location: Fairmont Description: Constet crossover a pond for 2017 projet Total Cost S982, 994 2016 Cost: $882 034 Date: Aug 2016 Impact: Lane closures, speed eductons Benefit: Smoother highway sn mndot gowdTprojcts90oreservel Hwy 90 Location: Round Lake to Hay 85 Description: Resurtace last segment of arger 90 Total Cost $36.3 mon 2016 Cost: 58 nition Date: 2015 2016 Impact Lane Cosues, speed reductions Benefit: Smoater highway wot gov projects 490preserre Hy 90 Location: Rushmore to Round Lake Description: Resurface Total Cost $7.26 milion 2016 Cost: $87 milion Date: Aug-Oet 2016 Impact: Lane dosures, speed reducons Benefit: Srooter highway ora mndot govid/projects1@0preser ny 169 Location: Mankato to St Peter Description: Rage food-prone sections, resurface, ‘sd mesion barns Total Gost: $29.71 mien 2018 Cost: §2871 milion, Date: Apt Oct 2016 Impact Detox Bonet: Resuzed ood potenti, seb, slr hgrway snide sh reece Moodntiaaon! District 8— Willmar/Marshall/ Hutchinson Contact: andi LighthizerSehict 220214628 Inandhightizershnid@state mas tiny 9 Location: New London Sunburg and Nest Lae Bide Description: Resuface Hwy 9 ftom New London to Sunburg and grinding sutace of Nest Lake Bie Total Cost: $1.8 milion 2016 Gost: $1.8 ion Date: AugSeot 2016 Impact: Lane closwes wi ager ans plot ear Benet: Smooth: road ana bridge srtace wn dot state. ushiBorojectshy Hy 12 Location: VlimrtoKandychifMeeker county ine and Wma Bypass rm jt of Hwy 20Kandyoi CR 5 tooth jet of uy Zany 71 Description: Overy of Hwy 12 aed construct turing lane at itrsecion of Hy 12 a Kandiyohi CR 4 restace westbound ane of Wilasbypass Tela Cost: 828 milion QE) 2016 MnDOT Greater Minnesota Construction Projects 2016 Cost: $29 illon Date: May-July 2016 Impact: Lane Cosures wth fayger and plot ar Benefit: Smoother road sutaco and safer intersection mane mndot.govldSprojctsiwy 2uilinartoatwate e on nnd govieBiprojects uy? twilmarbyoass Hy 12,15, 19,71 Location: Redwood Falls, Dass and Cokato Description: Concrte rehabilitation Total Cost: $1 milion 2018 Cost $1 mison Date: Sept-Oct 2016 Impact: Detour Benefit: Smoother road sufsco sv nndotgoud/proects2016concreterehabs Hy 18 Location: South Dakota state ne to Lake Benton Description: Resutace and chip sea Hwy 14, undste storm sewer, ne culvert and relace gual Total Gost: $27 milion 2016 Cost: $2 7 maton Date: Sep-Oct 2016 Impact: Three-woek detour fo storm sewer, ope ratieg and quae work; resurfacing wil be cone witlane closes and a Ragger with plot car Benefit: Snooth oad surface, safer highay and Improved drainage bevesth road sn mndet.govtdiprojects wy 4saolakebenton Hwy 14,390 Location: Revere cy its to Hay 71 and al of Hy 20 Description: Resutace Hy 14 fom Revere to Broun County Ine and overlay all of Huy 380, replace guarcrat Total Cost: $23 ion 2016 Cost: $23 mon Date: Septet 2018 Impact: Lane cosures wth fagger and it car Benefit: Smoother road surface and updated quar ra mndot govaBipoject/hwy 1éznany 330 Huy 18 Location: South Dakota sae ne to Hwy 75 and Lyon CR StoLyancRT Description: Resuraco Hay 18 ftom SD state ne to wy 75 near vanhoe and resuriacs Hwy 19 fom Lyon ER St LyoncR 7 Total Gost: 2 milion 2016 Cost: §2 mien Date: Juy.Avg 2018 Impact: Lane loses with tagger and plot car Benefit: Smootne oa surtace and improves drainage beneath road ey mndot gon/dBprojectsmnytahvanhoe Hy 19 Location: Wee of Hy 67 to Redwood Fas ‘Description: Resuface road and pedestian raps. on westside of Redwood Fal Total Cost: 537 iton 206 Cost: $37 milion Date: Sept Oct 2018 Impact: Lane cosures wth fagger ad plot car nef: Srmoaher oad suriace ‘tuna mnt govieBiproject/n er Hy 19, 68, 68 Location: Huy 1 fem Morton to Fara, Hay 68 ‘fom Moy to Huy 19, are Wass to Hay 71 Description: Resurface Hwy 19 from Morton to Fax ‘and pedestian ramps in Merton ana Faia, very of Hwy 68 rom Maroy to Hay 19, ane pedestin amps inMroy; esutace Huy 68 rom Wbasso to Hay 71 Total Cost: $36 milion 2016 Cost: §3 6 lion Date: May-July 2016 Impact: Lane clases with fagger an plot car Benefit: Smocther ead surface and amore anceesie eda ‘tira mndot.govtdprojocts hwy 19hu68 ond ww omdot ovioB/profectshwy68wabasso ct Russel, Pipestone to Jesper ‘and Pipestone to Holand Description: Construct passing lanes Total Cost: $5.2miion 2016 Cost: $52 millon Date: May Sept 2018 Impact: Detou Benefit: Improved highway safety and increased predetabilty of trav! bme dot govi8iprojects hwy 23passinal Hy 23 Location: Nth and south of Rayon, noth of Clara ‘ty and Gotterwood to Hanley Fas Description: Construct passing anes Total Gost: $5.7 milion 2016 Cost: $5.7lion Date: June-Oct 2016 Impact: Detow | ‘nef: Improve highway salty and increased predltabity of travel tne ‘turm mndot.gouid8projectsihwy23passinalanes Hy 68,75 Location: South Dakota state inet Carby and south sit of Candy to Yelow Medicine CR 3 and Hwy 67 toHwy 212 Description: Oveay and esutace highway Total Cost: $25 milion 2016 Gost: $2.5 milion Date: May-June 2015 Impact: Lane closures wih lagger and lt car Benefit: Smoother cad sutace awa modo gowdBprojetsnwy68canby and ‘hw: modo. gov/dBprojectsihwy7Scanty, 9

You might also like