DISCOMS GENERATOR
OVER DRAWL (OD) UNDER DRWAL (UD) OVER INJECTION UNDER INJECTION
UI RATES UI RATES UI UI
RATES RATES
Declared Schedule
TRANSMISSION
UP TO 49.5- UP TO 10% or 250
Declared Capacity
Rs 8.73/kwh MW(which ever less) of UP TO UP TO 49.5-Rs
schedule 105% (per block) & 8.73/kwh
49.5-49.2 Hz- NORMAL UI RATES 101%(per day)
Rs12.22/kwh Rs 4.03/kwh 49.5-49.2 Hz-
(8.73+40%) More then 10% or 250 Rs10.47/kwh
MW(which ever less) of Excess Generation then (8.73+20%)
49.2 & Below Schedule 105%(per block)
Rs 17.46 CAP of Rs 4.03/kwh 101%(per day) 49.2 & Below
(8.73+100%) Rs 1.55/kwh Rs 12.22/kwh
(8.73+40%)