You are on page 1of 28

ISO A1 594mm x 841mm

PROJECT

Approved: _____

VALVE & GATE SYMBOLS


PRIMARY ELEMENT SYMBOLS

Checked: _____

FLOW

MISCELLANEOUS SYMBOLS

ACTUATOR SYMBOLS

ELECTROMAGNETIC

DIAPHRAGM SEAL

BUBBLE TUBE

Designer: _____

PURGE SET
ANNULAR DIAPHRAGM

ULTRASONIC

ULTRASONIC CLAMP-ON
OR DOPPLER

CYLINDER

SELF CONTAINED
AIR SUPPLY

AS

ULTRASONIC IN-LINE

Project Management Initials:

VENTURI

XP

GLOBE VALVE

MOTOR

XX

RUPTURE DISK
(PRESSURE RELIEF)

CAPACITANCE

ELECTRODES
(WITH HOLDER)

PROPELLER OR TURBINE

VORTEX

RUPTURE DISK
(VACUUM RELIEF)

FLOAT
(REGULATED SIDE)

TARGET

TRAP

EQUIPMENT
CONNECTION WITH
ELECTRICAL
INTERLOCK

PRESSURE REGULATOR

H
M

PITOT TUBE

VENT TO
ATMOSPHERE

TEMPERATURE

SIGHT GLASS
NOTE X:
F=FLOW
L=LEVEL

XG

GATE, OR
(OTHER) IN-LINE VALVE

BALL CHECK VALVE

BALL VALVE

PLUG VALVE

THREE WAY VALVE


(ARROW IF SHOWN
INDICATES FAIL OPEN
PATH)

KNIFE GATE

HYDRAMOTOR

ELECTROHYDRAULIC

MANUAL (SHOWN ONLY FOR HAND OPERATED VALVES


EQUIPPED WITH POSITION MONITORING
INSTRUMENTS)

TELESCOPING VALVE

ELECTRIC

DAMPER OR LOUVER

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT

PINCH VALVE

SLEEVE VALVE

XX

OPTICAL

FI

FLOW
STRAIGHTENER

ELECTROPNEUMATIC

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

PRESSURE OR VACUUM RELIEF


SPRING OR WEIGHT LOADED

NOTE X:
W=WATER
A=AIR

ORIFICE PLATE

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

SLUICE GATE
PREFABRICATED SLIDE GATE

SOLENOID
XX

COMBINDIATION
AIR/VACUUM VALVE

ROTAMETER
TE

XX

TEMPERATURE ELEMENT
WITH WELL

XX
TE
TEMPERATURE ELEMENT
SURFACE MOUNT

WEIR

AVERAGING
PITOT TUBE

FLOW NOZZLE

XX

DP

DEVICE INTERFACE

DRAIN POINT

RECIPROCATING
PUMP (PD)

CENTRIFUGAL COMPRESSOR
OR BLOWER

XX

FIELD MOUNTED

SAMPLE POINT

FC

FLUSHING CONNECTION

RECIPROCATING
COMPRESSOR (PD)

XX

ROTARY
PUMP (PD)

XX

XX

XX

INPUTS & OUTPUTS TO SHARED OR


PROGRAMMABLE LOGIC CONTROLLER

RESET

OR

OR LOGIC

YY

A CONTROL PANEL (CP) PACKAGED WITH MECHANICAL


EQUIPMENT OR A SYSTEM IS SHOWN WITH FACE OF PANEL
MOUNTED INSTRUMENTS & EXTERNAL INTERFACE SIGNALS
SIMILAR TO MC & VSD PANELS.

4.

CONTROL PANELS (CP) OTHER THAN THOSE PREVIOUSLY DESCRIBED ARE SHOWN WITH FACE & INTERIOR OF PANEL
MOUNTED INSTRUMENTS.

5.

SEE ELECTRICAL DRAWINGS FOR MC & VFD LOCATIONS WITHIN


THE MCC.

PULSE OUTPUT
X: BLANK = TIME DURATION
(PULSE WIDTH)
F = PULSE TRAIN
T = TRIAC

6.

PIPING, EQUIPMENT & INSTRUMENTS WHICH ARE EXISTING OR


FURNISHED BY OTHERS ARE SHOWN LIGHT-LINED (HALF-TONE)

XX
HS

YY

DIGITAL INPUT
PANEL MOUNTED SWITCH

STATIC MIXER

COMPRESSOR

3.

FIELD SWITCH
YY

EJECTOR

MOTOR CONTROL (MC) & VARIABLE SPEED DRIVE (VSD) PANELS


ARE SHOWN WITH FACE OF PANEL MOUNTED INSTRUMENTS &
EXTERNAL INTERFACE SIGNALS ONLY.

YY

XX
HS

MOTOR CONTROL CENTER


MOUNTED

2.

ANALOG OUTPUT

PULSE INPUT

MOTOR

THIS IS A GENERAL P & ID SYMBOL SHEET. SOME SYMBOLS OR


NOTATIONS MAY NOT BE USED ON THIS PROJECT.

YY

ANALOG INPUT

ROTARY
COMPRESSOR (PD)

XX

XX
HS

MCC MOUNTED SWITCH

INTERIOR OF MCC
MOUNTED

EXISTING OR FURNISHED BY OTHERS

DIGITAL OUTPUT
X: BLANK = MAINTAINED
(ELECTRICALLY
HELD)
M = MOMENTARY
L = LATCHED
(MAGNETICALLY
OR MECHANICALLY
HELD)

EXAMPLE OF
INSTRUMENTS SHARING
COMMON HOUSING

PIPE LINE DESCRIPTION KEY


250-CS-SS1

YY: MEASURED VARIABLE OR OUTPUT FUNCTION


FROM INSTRUMENT IDENTIFICATION TABLE

PIPE MATERIAL

YN ON DIGITAL INPUT INDICATES COMPUTER/HAND


SWITCH STATUS

XX

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

FLOW STREAM IDENTIFICATION

CONNECTION
TO/FROM RPU/PLC

SHARED DISPLAY/ CONTROL


ACCESSIBLE TO OPERATOR
ON MAIN CONTROL CONSOLE

PIPE MATERIAL IDENTIFICATION

NOTE:

ROTARY
LOBE PUMP

NOMINAL PIPE SIZE

HEAT
EXCHANGER

PROGRESSIVE
CAVITY PUMP

ISSUE/REVISION

NEW

NOTE:

MCC PILOT LIGHT

SUMP PUMP

MUD VALVE

1.

AND LOGIC

MIXER

TURBINE

BACKFLOW PREVENTOR

GENERAL NOTES

PANEL PILOT LIGHT

SCREW PUMP

AUTO AIR RELEASE


VALVE

FLAP GATE

XX: FO = FAIL OPEN


FC = FAIL CLOSED
FI = FAIL TO INTERMEDIATE POSITION
BLANK = FAIL TO LAST POSITION

INTERLOCK LOGIC

INTERIOR OF PANEL
MOUNTED
CENTRIFUGAL
PUMP
(WET PIT)

ON LOSS OF PRIMARY POWER (PNEUMATIC OR ELECTRICAL)

YY

FACE OF PANEL
MOUNTED
XX

SP

NOTE:

INSTRUMENT & FUNCTION SYMBOLS

PILOT LIGHT
XX

F=FLUSHING WATER
L=LUBE OIL
S=SEAL WATER

DIAPHRAGM (PRESSURE BALANCED)

PRESSURE RELIEF VALVE

REGISTRATION

EQUIPMENT SYMBOLS
CENTRIFUGAL
PUMP
(DRY PIT)

NOTE X:
DD
NNN

DIAPHRAGM (SPRING OPPOSED)

PRESSURE GAUGE

AIR GAP

FLUME

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

CHECK VALVE

XX

Printed on ___% Post-Consumer


Recycled Content Paper

PRESSURE REDUCING

LEVEL

XX

BUTTERFLY VALVE,
DAMPER OR LOUVER

RESIDUALS
MANAGEMENT
FACILITY

NOTE XX : CS = CONSTANT SPEED


2S = TWO SPEED
VS = VARIABLE SPEED
PD : POSITIVE DISPLACEMENT

XX: SEE PAGE 2 OF THE P&ID LEGEND


SS1

- 316L STAINLESS STEEL,

SCH 10s

SS2

- 316L STAINLESS STEEL,

SCH 40s

PVC

- SCH 40 PVC

PVC80

- SCH 80 PVC

CPVC

- SCH 80 CPVC

REFER TO SPECIFICATIONS FOR COMPLETE PIPE MATERIAL


DESIGNATION

PROJECT NUMBER

60246477
SHEET TITLE

P&ID
LEGEND AND
GENERAL NOTES 1
SHEET NUMBER

DI601

ISO A1 594mm x 841mm


Approved: _____

PROJECT

INSTRUMENT IDENTIFICATION TABLE

INSTRUMENT & FUNCTION TAGGING

EXPLANATORY NOTATIONS

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

Checked: _____

ISA-S5.1-1984

FIRST LETTER
LETTER

Project Management Initials:

Designer: _____

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z

SUCCEEDING LETTERS

MEASURED OR
INITIATING VARIABLE

MODIFIER

ANALYSIS (2)
BURNER, COMBUSTION
DENSITY
VOLTAGE
FLOW RATE

READOUT OR
PASSIVE FUNCTION

OUTPUT FUNCTION

S-PPP
EEE ##

CLOSE, STOP, DECREASE (1)


CONTROL
OPEN, START, INCREASE (1)

III

FAIL (1)

PRESSURE, VACUUM
QUANTITY (2)
RADIATION
SPEED, FREQUENCY
TEMPERATURE
MULTIVARIABLE (2)
VIBRATION, MECHANICAL ANALYSIS
WEIGHT, FORCE
UNCLASSIFIED (2)
EVENT, STATE, PRESENCE
POSITION, DIMENSION

A
B
D
E
F
H
I

2/3:

FLOW STREAM & INSTRUMENT LINE SYMBOLS

INDICATE

LIGHT
MOTOR (1)
ORIFICE, RESTRICTION
POINT (TEST) CONNECTION

XX

LOW (CLOSED)
MIDDLE OR INTERMEDIATE
ON OR OPERATE (1)
OVERLOAD (1)

MAIN FLOW STREAM

XX

SECONDARY FLOW STREAM

XX

OTHER FLOW STREAM

PUMP (1)

INTEGRATE, TOTALIZE

CLOSED CONDUITS
(DASHED LINE
INDICATES
ALTERNATE
FLOW STREAM)

RECORD
SAFETY
MULTIFUNCTION (2)
WELL
UNCLASSIFIED (2)

SWITCH
TRANSMIT
MULTIFUNCTION (2)
VALVE, DAMPER, LOUVER
UNCLASSIFIED (2)
RELAY, COMPUTE, CONVERT
DRIVER, ACTUATOR,
UNCLASSIFIED FINAL
CONTROL ELEMENT

XX

OPEN CHANNEL OR TANK FLOW STREAM

MULTIFUNCTION (2)

UNCLASSIFIED (2)

NOTE XX:

AM
CM
CAM
CL
FR
FOR
FS
FOS
HO
HOA
LR
LOR
LOS
LP
MFS
MOC
OC
OO
OOC
OSC
SS
ST
SP
ES

SELECTOR
SWITCH
(MAINTAINED
CONTACTS)

NOTE XX: FLOW STREAM IDENTIFICATION


ELECTRIC SIGNAL
SOFTWARE LINE

(1) USER'S CHOICE

ELECTROMAGNETIC OR SONIC SIGNAL

(2) WHEN USED, SYMBOL OR SIGNAL LINE IS ANNOTATED.

SPRING RETURN SWITCH


OR PUSHBUTTONS
(MOMENTARY
CONTACTS)

PNEUMATIC SIGNAL

FLOW STREAM IDENTIFICATION

HYDRAULIC SIGNAL

CAPILLARY TUBE

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG
Printed on ___% Post-Consumer
Recycled Content Paper

BACKWASH WASTE THICKENED SLUDGE

BTS
BWW

BACKWASH WASTE THICKENER


SUPERNATANT
BACKWASH WASTE

CCS

CLARIFIER THICKENED SLUDGE

CEN

CENTRATE

CS

CLARIFIED SLUDGE

CTS
DS

CLARIFIER SLUDGE THICKENER


SUPERNATANT
DEWATERED SLUDGE

POL

POLYMER SOLUTION

SLU

BLENDED SLUDGE

STS

SODIUM THIOSULPHATE

XX

XX

XX

VT

VENT

* IDENTIFICATION MAY BE FOLLOWED BY A NUMBER


TO DIFFERENTIATE AMONG SIMILAR FLOW STREAMS.
FOR EXAMPLE, CH1 & CH2 WOULD REPRESENT
TWO DIFFERENT CHEMICAL FLOW STREAMS.

SIGNAL CONTINUATION
ON SAME DRAWING. X = 1,2,3,ETC.

FLOW STREAM TO OR FROM EQUIPMENT


NOT SHOWN ON OTHER DRAWINGS

GENERAL NOTES
1. THIS IS A GENERAL P & ID LEGEND SHEET. SOME SYMBOLS OR
NOTATIONS MAY NOT BE USED ON THIS PROJECT.

ABBREVIATIONS
AS

INSTRUMENT AIR SUPPLY

L/S

ECV

ELECTRIC CHECK VALVE

NC

NORMALLY CLOSED

ES
(F)

ELECTRICAL SUPPLY

NFC

NOT FULLY CLOSED

FURNISHED

NFO

NOT FULLY OPEN

FC

FAIL CLOSE

NO

NORMALLY OPEN

FI

FAIL INDETERMINATE

O/P

OUTPUT

FL

FAIL LOCKED

ORB

ORBIT VALVE

FO

FAIL OPEN

PV

PROCESS VARIABLE

FP

FULL PORT

REV

REVERSE

FWD

FORWARD

RV

RECIRCULATION VALVE

I/P

INPUT

SP

SET POINT

LITRES/SECOND

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

ANALYSIS INSTRUMENTS

TAPPED OR SAMPLED

SIGNAL NO. NN
FROM SHEET NO. XX

CLIENT

REGISTRATION

NON-CONNECTING LINES
FLOW STREAM NO. NN
TO SHEET NO. XX

AUTO/MANUAL
COMPUTER/MANUAL
COMPUTER/AUTO/MANUAL
COMPUTER/LOCAL
FORWARD/REVERSE
FORWARD/OFF/REVERSE
FAST/SLOW
FAST/OFF/SLOW
HAND/OFF
HAND/OFF/AUTO
LOCAL/REMOTE
LOCAL/OFF/REMOTE
LOCKOUT STOP
LOCAL/PLC
MODULATE FASTER/SLOWER
MODULATE OPEN/CLOSE
OPEN/CLOSE
ON/OFF
OPEN/OFF/CLOSE
OPEN/STOP/CLOSE
START/STOP
START
STOP
EMERGENCY STOP

"R", WHEN ADDED TO NOTATION, INDICATES REMOTE.


EXAMPLE: HOR = HAND/OFF/REMOTE

EXPOSED PROBE
OR GAS DETECTOR

NN/XX

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

2.

NOTE XX:

NN/XX

UTILITY WATER

MOTOR
ELECTROMAGNETIC, SONIC
PNEUMATIC
PULSE FREQUENCY
PULSE DURATION
RESISTANCE

"A", WHEN ADDED TO NOTATION, INDICATES AUTO.


EXAMPLE: HOA = HAND/OFF/AUTO

XX = ES-ELECTRICAL SUPPLY HS-HYDRAULIC SUPPLY


GS-GAS SUPPLY
NS-NITROGEN SUPPLY
REFER TO FLOW STREAM IDENTIFICATION FOR OTHER TYPES
OF SUPPLY

CONNECTING LINES

UW

=
=
=
=
=
=

1.

INSTRUMENT SUPPLY OR CONNECTION TO PROCESS


BCS

M
O
P
PF
PD
R

ANALOG
BINARY
DIGITAL
VOLTAGE
FREQUENCY
HYDRAULIC
CURRENT

HAND SWITCHES

CONTROL STATION

MOMENTARY

=
=
=
=
=
=
=

SMALL CIRCLE SIGNIFIES


LOGICAL INVERSION OF SIGNAL

HIGH (OPENED)
SCAN
TIME RATE OF CHANGE

PROCESS OR INITIATING VARIABLE

I I =I FUCTIONAL INSTRUMENT IDENTIFICATION


LETTERS FROM INSTRUMENT IDENTIFICATION
TABLE

GLASS, VIEWING DEVICE


HAND
CURRENT (ELECTRICAL)
POWER
TIME, TIME SCHEDULE
LEVEL
MOTOR, MOTION (1)

1:

EEE = LOOP NUMBER

SENSOR (PRIMARY ELEMENT)


RATIO (FRACTION)

NOTE

PPP = IF USED, ONE TO THREE ALPHANUMERIC


CHARACTERS TO IDENTIFY BUILDING OR
PROCESS

MODIFIER

ALARM

DIFFERENTIAL

SIGNAL CONVERTERS

S = IF USED, ONE NUMERIC OR CHARACTER TO


IDENTIFY A FACILITY SECTION

RESIDUALS
MANAGEMENT
FACILITY

IN-LINE

COL
CDG
CG
CH4
CLG
CLR
COG
DO
HC
HUM
H2S
MHO
NOG
NH4
N2G
OG
ORP
OUR
OZG
PH
SD
SO2
SS
TOC
TRB

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

COLOUR
CARBON DIOXIDE GAS
COMBUSTIBLE GAS
METHANE
CHLORINE GAS
CHLORINE RESIDUAL
CARBON MONOXIDE GAS
DISSOLVED OXYGEN
HYDROCARBONS
HUMIDITY
HYDROGEN SULFIDE
CONDUCTIVITY
NITRIC OXIDE GAS
AMMONIA
NITROGEN GAS
OXYGEN GAS
OXIDATION REDUCTION POT.
OXYGEN UPTAKE RATE
OZONE GAS
pH
SOLIDS DENSITY
SULPHUR DIOXIDE GAS
SUSPENDED SOLIDS
TOTAL ORGANIC CARBON
TURBIDITY

ISSUE/REVISION

EQUIPMENT DESCRIPTORS
PMP
SMP
VLV
FLM
PRM
TPM
PRS
LVS
BCH
BLD
GEN
ATS
UPS
PFR
UPM
ICP
GCP

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

PUMP
SUMP PUMP
VALVE
FLOW METER
PRESSURE METER
TEMPERATURE METER
PRESSURE SWITCH
LEVEL SWITCH
BATTERY CHARGER
BUILDING SERVICES
GENERATOR
AUTOMATIC TRANSFER SWITCH
UNINTERRUPTIBLE POWER SUPPLY
POWER FAIL RELAY
UNIVERSAL POWER METER
INSTRUMENT CONTROL PANEL
GENERATOR CONTROL PANEL

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

P&ID
LEGEND AND
GENERAL NOTES 2
SHEET NUMBER

DI602

ISO A1 594mm x 841mm

PROJECT
READY STATUS

READY STATUS

DEVICENET

BWP03_VFD_START
LOCAL/REMOTE STATUS

BWP03_VFD_REMOT

Designer: _____

ORP INDICATION

LOCAL/REMOTE STATUS

BWP02_VFD_REMOT

BWP01_VFD_START

CLIENT

LOCAL/REMOTE STATUS

BWP01_VFD_REMOT

ELGIN AREA WATER


SUPPLY SYSTEM

RUNNING STATUS

BWP01_VFD_RUNNG
FAULT STATUS

FAULT STATUS

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

BWP01_VFD_FAULT

BWP02_VFD_FAULT

BWT01_AT1_FAULT

BWT01_LT1

10-STS-CPVC

MOTOR CURRENT

MOTOR CURRENT

MOTOR CURRENT

BWP01_VFD_STAAI

BWP02_VFD_STAAI

BWP03_VFD_STAAI

HIGH PRESSURE

HIGH PRESSURE

HIGH PRESSURE

CONSULTANT

BWP01_PSH_ALMDI

BWP02_PSH_ALMDI

BWP03_PSH_ALMDI

80-PD-PVC

START/STOP COMMAND

BWP02_VFD_RUNNG

BWP03_VFD_FAULT

FROM SODIUM THIOSULPHATE


DOSING PUMPS

DI609

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

BWT01_AT1_STAAI
TRANSMITTER FAULT

Project Management Initials:

BWP02_VFD_START

BWP03_VFD_RUNNG
FAULT STATUS

DI615

START/STOP COMMAND

RUNNING STATUS

RUNNING STATUS

BWT01_V01_CLOSD

BWP01_VFD_FEDBK

DEVICENET

Checked: _____

START/STOP COMMAND

CLOSED STATUS

SPEED FEEDBACK

BWP02_VFD_FEDBK

BWP03_VFD_FEDBK

BWT02_LT1_FAULT

BWT01_LT1_FAULT

BWP01_VFD_SETPT

SPEED FEEDBACK

SPEED FEEDBACK
TRANSMITTER FAULT

TRANSMITTER FAULT

SPEED SETPOINT

BWP02_VFD_SETPT

BWP03_VFD_SETPT

BWT02_LT1_STAAI

BWT01_LT1_STAAI

RESIDUALS
MANAGEMENT
FACILITY

BWP01_VFD_READY

SPEED SETPOINT

SPEED SETPOINT
LEVEL INDICATION

LEVEL INDICATION

READY STATUS

BWP02_VFD_READY

DEVICENET

Approved: _____

BWP03_VFD_READY

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

NOTE 2

FROM CONVEYORS / TRUCK


LOADING STATIONS

LCP20
BWP01_PSH
BWT01_AT1

900-BWW-CPP
FROM FILTERS

DI608

CONNECTION TO
FUTURE PUMP

CONNECTION TO
FUTURE PUMP

250-CEN-SS1

100x200
400x200

200x150

400-BWW-SS1

200-BWW-SS1

300-CTS-SS1

BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP01

DP

DI605

TO BACKWASH
WASTE
CLARIFIER
CLF01

DP

LCP21
BWP02_PSH

BACKWASH WASTE
ZSL
EQUALIZATION
BASIN
BWT02

200-CS-SS1

FROM SEDIMENTATION
SLUDGE EQ TANKS

PI

PSH

M
DI607

REGISTRATION

100x200

150-SLU-SS1

400x200

200x150

200-BWW-SS1

FROM THICKENED
SLUDGE HOLDING TANK

VS

NOTE 2

BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP02

DP

DP

LCP22
CLOSED STATUS

DI615

10-STS-CPVC

BWP03_PSH

BWT02_V01_CLOSD

FROM SODIUM THIOSULPHATE


DOSING PUMPS

PI

BWT02_AT1

ORP INDICATION

PSH

AIT

BWT02_AT1_STAAI

ORP
TRANSMITTER FAULT

10-STS-CPVC

BWT02_AT1_FAULT

100x200
200x150

200-BWW-SS1

300-BWW-SS2

400-BWW-SS1

100-PD-PVC
FROM MAIN & 2nd FLOOR
PROCESS DRAINS

M
400x200

300-BWW-SS2

100-PD-PVC

FROM SODIUM THIOSULPHATE


DOSING PUMPS

AE

OVERFLOW

DI615

200-BWW-SS1

BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP03

ISSUE/REVISION
CONNECTION TO
FUTURE PUMP

900-BWW

LCP

NOTE 3

DEVICENET
LSL LSH1 LSH2 LSHH

TEMPERATURE INDICATION

BWT00_MX1_READY

PI

PSH

BWT00_TT1

TE

75-PD-PVC

TIT

200-BWW-SS1

BWT00_PSH
40

200x350

400x200

400-BWW-SS1

PROCESS DRAINS
SUMP PIT
SMT01

SMP01
SMP02
SUBMERSIBLE SUMP
PUMPS

DESCRIPTION

VS
BACKWASH WASTE
MIXING PUMP
BWT00_MX1

KEY PLAN

BWT00_MX1_FEDBK
START/STOP COMMAND

BWT00_MX1_START
LOCAL/REMOTE STATUS

DP

RUNNING STATUS

PROJECT NUMBER

60246477

BWT00_MX1_RUNNG

SHEET TITLE
FAULT STATUS

350x300

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s.
NOTE 3: FLAP GATE TO BE INSTALLED AT THE OVERFLOW PIPE
ENTRANCE TO DISCHARGE MH.

DATE

SPEED FEEDBACK

BWT00_MX1_REMOT

DP

I/R

ISSUE FOR TENDER

BWT00_MX1_SETPT

350x200

2013-10-09

SPEED SETPOINT

FROM LOWER FLOOR


PROCESS DRAINS

READY STATUS

LCP23

BWT00_TT1_STAAI

Printed on ___% Post-Consumer


Recycled Content Paper

TO BACKWASH
WASTE
CLARIFIER
CLF02

DP

CONNECTION TO
FUTURE PUMP

SMT01_LCP_ALMDI

40

DI605

VS

DP

GENERAL ALARM

50-PD-PVC

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

200-BWW-SS1
VS

FROM SEDIMENTATION
SLUDGE THICKENERS

DI604

PSH

ORP

AE

FROM
CENTRIFUGES

DI606

PI

AIT

BACKWASH WASTE
EQUALIZATION
BASIN
BWT01
ZSL
BWT02_LT1

BWT00_MX1_FAULT

350x300

MOTOR CURRENT

350-BWW-SS2

BWT00_MX1_STAAI
HIGH PRESSURE

BWT00_PSH_ALMDI

P&ID
BACKWASH WASTE EQUALIZATION
BASIN & TRANSFER PUMPS
SHEET NUMBER

DI603

ISO A1 594mm x 841mm

SPEED SETPOINT

SPEED SETPOINT

RSP03_VFD_SETPT

SPEED SETPOINT

RSP02_VFD_SETPT

SPEED FEEDBACK

RSP01_VFD_SETPT

SPEED FEEDBACK

RSP03_VFD_FEDBK

SPEED FEEDBACK

RSP02_VFD_FEDBK

RSP01_VFD_FEDBK

PROJECT
START/STOP COMMAND

RSP03_VFD_REMOT
RUNNING STATUS

RSP03_VFD_RUNNG

Checked: _____

FAULT STATUS

Designer: _____

RUNNING STATUS

RSP02_VFD_RUNNG

RSP01_VFD_REMOT
RUNNING STATUS

RSP01_VFD_RUNNG

RSP01_VFD_FAULT

READY STATUS

RSP03_VFD_READY

READY STATUS

RSP02_VFD_READY

MOTOR CURRENT

RSP01_VFD_STAAI

HIGH PRESSURE

RSP03_PSH_ALMDI

ELGIN AREA WATER


SUPPLY SYSTEM

MOTOR CURRENT

RSP02_VFD_STAAI

HIGH PRESSURE

CLIENT

RSP01_VFD_READY

MOTOR CURRENT

RSP03_VFD_STAAI

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

FAULT STATUS

RSP02_VFD_FAULT

READY STATUS

SED01_LT1_FAULT

RSP02_VFD_REMOT

RESIDUALS
MANAGEMENT
FACILITY

LOCAL/REMOTE STATUS

FAULT STATUS

RSP03_VFD_FAULT

TRANSMITTER FAULT

LOCAL/REMOTE STATUS

DEVICENET

DEVICENET

LOCAL/REMOTE STATUS

SED01_LT1_STAAI

RSP01_VFD_START

RSP02_VFD_START

DEVICENET

Approved: _____

RSP03_VFD_START

LEVEL INDICATION

START/STOP COMMAND

START/STOP COMMAND

HIGH PRESSURE

RSP02_PSH_ALMDI

RSP01_PSH_ALMDI

LEVEL INDICATION

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

SED02_LT1_STAAI
TRANSMITTER FAULT

LCP24

Project Management Initials:

SED02_LT1_FAULT

RSP01_PSH

CLOSED STATUS

SED01_V01_CLOSD

PI

CONSULTANT

PSH

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

SED01_LT1

CLOSED STATUS

SED02_V01_CLOSD

FLOOD ALARM

SED00_LSH_ALMDI

100x200
300x200

TO
SEDIMENTATION
SLUDGE
THICKENER
CLF03

NOTE 2
SEDIMENTATION SLUDGE

FROM
SEDIMENTATION
BASINS

300-CS-SS2

SED02_LT1
ZSL

LCP25

RSP02_PSH

250-CS-SS

PI

300-CS-SS2

ZSL

PSH

M
100x200
300x200

SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED02

LSH

200x150

VS

200-CS-SS2
300-CS-SS2

SEDIMENTATION SLUDGE

REGISTRATION

DP

DP
VALVE CHAMBER

LCP26
NOTE 2

RSP03_PSH
PI

300-CS-SS2

PSH

M
100x200

300x200

250-CS-SS2

250-CS-SS2

200-CS-SS1

80 DRAIN

200-CS-SS2

200x150

DP

SEDIMENTATION SLUDGE
THICKENER FEED PUMP
RSP03

TO
SEDIMENTATION
SLUDGE
THICKENER
CLF04

DP

DEVICENET

CONNECTION TO
FUTURE PUMP

SPEED SETPOINT

SPEED FEEDBACK

SED00_PSH
CONNECTION TO
FUTURE PUMP

TIT

PI

SED00_TT1

ISSUE/REVISION

SED00_MX1_SETPT

LCP27

TE

DI606

VS

200-CS-SS2

250-CS

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

DP

DP
SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED01

DI606

VS

200-CS-SS2

250-CS

DI618

200-CS-SS2

200x150

SED00_MX1_FEDBK

PSH
START/STOP COMMAND

SED00_MX1_START
TEMPERATURE INDICATION

SED00_TT1_STAAI

LOCAL/REMOTE STATUS

SED00_MX1_REMOT
100x250

300x250

250x200

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

RUNNING STATUS

200x150

SED00_MX1_RUNNG

VS

250-CS-SS2

KEY PLAN

FAULT STATUS

DP
250x200

SEDIMENTATION SLUDGE
MIXING PUMP
SED00_MX1

DP

SED00_MX1_FAULT
READY STATUS

SED00_MX1_READY

250x200

MOTOR CURRENT

250-CS-SS2

SED00_MX1_STAAI
HIGH PRESSURE

SED00_PSH_ALMDI

200-CS-SS1

PROJECT NUMBER
DI603

TO BACKWASH WASTE
EQUALIZATION BASIN

TO PLANT DRAIN

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s

Printed on ___% Post-Consumer


Recycled Content Paper

TO PLANT DRAIN

60246477
SHEET TITLE

P&ID
SEDIMENTATION SLUDGE EQ
BASIN & TRANSFER PUMPS
SHEET NUMBER

DI604

ISO A1 594mm x 841mm

OPEN COMMAND

CLF01_IC1_OPENN

PROJECT
CLOSE COMMAND

RESIDUALS
MANAGEMENT
FACILITY

Approved: _____

CLF01_IC1_CLOSE
LOCAL/REMOTE STATUS

CLF01_IC1_REMOT
OPENED STATUS

CLF01_IC1_OPEND

Checked: _____

FLOW INDICATION

CLF01_FT1_STAAI

CLF01_IC1_CLOSD

TRANSMITTER FAULT

FAULT STATUS

CLF01_FT1_FAULT

CLF01_IC1_FAULT

CLIENT

VENDOR
CONTROL PANEL
SCP23

20-POL-PVC80

DI612

Designer: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

THICKENER
VENDOR PACKAGE

CLOSED STATUS

ELGIN AREA WATER


SUPPLY SYSTEM

FROM POLYMER
SYSTEM

CLF01_AT2

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

TSS INDICATION

CLF01_AT1_STAAI
CLF01_MX1

Project Management Initials:

TRANSMITTER FAULT

CLF01_AT1_FAULT

CS

CLF01_MX2
CLF01_SLC
M
M
CS
CS

SS

CONSULTANT

CLF01_FT1

400x300

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

CLF01_IC1

M
CLF01_AT1

200x250
M

200-BWW-SS1

SS

BACKWASH WASTE
THICKENER/CLARIFIER
CLF01

FROM BACKWASH
WASTE TRANSFER
PUMP BWP01

OPEN COMMAND

CLF02_IC1_OPENN

CLF01_AT3

CLOSE COMMAND

CLF01_FT2

CLF02_IC1_CLOSE

SS

LOCAL/REMOTE STATUS

CLF01_0C1

300-BTS-SS1

DI603

CLF02_IC1_REMOT
200x100
OPENED STATUS

100-BCS-SS2

CLF02_IC1_OPEND

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

CLOSED STATUS

THICKENER
VENDOR PACKAGE

CLF02_IC1_CLOSD

REGISTRATION
FAULT STATUS

CLF02_IC1_FAULT

FLOW INDICATION

CLF02_FT1_STAAI
TRANSMITTER FAULT

VENDOR
CONTROL PANEL
SCP24

CLF02_FT1_FAULT

NOTE 2

CLF02_AT2

N/C
TO BWW
EQUALIZATION
BASIN

20-POL-PVC80

DI612

CLF02_MX1

FROM POLYMER
SYSTEM

TSS INDICATION

CS

CLF02_AT1_STAAI
TRANSMITTER FAULT

SS

CLF02_MX2
CLF02_SLC
M
M
CS
CS

CLF02_FT1

CLF02_AT1_FAULT

400x300

350-BTS-SS1
300-BTS-SS1
300x350

CLF02_AT1

CLF02_IC1

TO RMF
DISCHARGE

200x250

200-BWW-SS1

SS

ISSUE/REVISION
BACKWASH WASTE
THICKENER/CLARIFIER
CLF02
DI603

FROM BACKWASH
WASTE TRANSFER
PUMP BWP03

NOTE 2
TO BWW
EQUALIZATION
BASIN

CLF02_AT3
CLF02_FT2
SS

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

CLF02_0C1

M
200x100

100-BCS-SS2

DI607

TO THICKENED
SLUDGE HOLDING
TANKS

PROJECT NUMBER
DI606

FROM SEDIMENTATION
SLUDGE THICKENERS
DISCHARGE

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3:
DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL

Printed on ___% Post-Consumer


Recycled Content Paper

300-CTS-SS1

60246477
SHEET TITLE

P&ID
BACKWASH WASTE
THICKENING
SHEET NUMBER

DI605

ISO A1 594mm x 841mm

OPEN COMMAND

CLF03_IC1_OPENN
CLOSE COMMAND

CLF03_IC1_CLOSE

PROJECT
LOCAL/REMOTE STATUS

RESIDUALS
MANAGEMENT
FACILITY

Approved: _____

CLF03_IC1_REMOT
OPENED STATUS

CLF03_IC1_OPEND
FLOW INDICATION

CLOSED STATUS

CLF03_FT1_STAAI

CLF03_IC1_CLOSD

TRANSMITTER FAULT

Checked: _____

THICKENER
VENDOR PACKAGE

CLF03_FT1_FAULT

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

VENDOR
CONTROL PANEL
SCP25

FAULT STATUS

CLF03_IC1_FAULT

CLIENT

Designer: _____

CLF03_MX1

FROM POLYMER
SYSTEM

M
CS

TSS INDICATION

CLF03_AT1_STAAI

CLF03_AT2

CLF03_MX2
CLF03_SLC
M
M
CS
CS

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

SS

CLF03_AT1
CLF03_FT1

TRANSMITTER FAULT

Project Management Initials:

ELGIN AREA WATER


SUPPLY SYSTEM

20-POL-PVC80

DI613

SS

CLF03_AT1_FAULT

250x200

CLF03_IC1

CONSULTANT

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

200x250
M

DI604

200-CS-SS2

FROM SEDIMENTATION
SLUDGE PUMP RSP01
SEDIMENTATION
SLUDGE THICKENER
CLF03
OPEN COMMAND

CLF04_IC1_OPENN
CLOSE COMMAND

CLF04_IC1_CLOSE

CLF03_AT3

LOCAL/REMOTE STATUS

SS

CLF03_OC1

OPENED STATUS

CLF04_IC1_OPEND

200-CCS-SS2

CLOSED STATUS

CLF04_IC1_CLOSD

200-CTS-SS1

CLF03_FT2

CLF04_IC1_REMOT

FAULT STATUS

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

CLF04_IC1_FAULT
THICKENER
VENDOR PACKAGE

REGISTRATION

VENDOR
CONTROL PANEL
SCP26

FLOW INDICATION

CLF04_FT1_STAAI
TRANSMITTER FAULT

CLF04_FT1_FAULT
CLF04_AT2

20-POL-PVC80

DI613

CLF04_MX1

FROM POLYMER
SYSTEM

M
CS

TSS INDICATION

CLF04_AT1_STAAI

SS

CLF04_MX2
CLF04_SLC
M
M
CS
CS

200x300

CLF04_AT1
CLF04_FT1

TRANSMITTER FAULT

CLF04_AT1_FAULT

250x200

CL04_IC1

SS

200x300
200-CTS-SS1

300-CTS-SS1

TO BACKWASH
WASTE EQUALIZATION
BASINS

200x250
DI604

200-CS-SS2

DI603

FROM SEDIMENTATION
SLUDGE PUMP RSP03

ISSUE/REVISION
NOTE 2
300-CTS-SS1

SEDIMENTATION
SLUDGE THICKENER
CLF04

DI605

N/C
TO
SEDIMENTATION
SLUDGE TANKS

CLF04_AT3
CLF04_FT2

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

SS

CLF04_OC1

M
200-CCS-SS2

200-CCS-SS2

DI607

TO THICKENED
SLUDGE HOLDING
TANKS

PROJECT NUMBER

NOTE 2

60246477

200-CCS-SS2
TO
SEDIMENTATION
SLUDGE TANKS

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3:
DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL

Printed on ___% Post-Consumer


Recycled Content Paper

SHEET TITLE

P&ID
SEDIMENTATION SLUDGE
THICKENING
SHEET NUMBER

DI606

LOCAL/REMOTE STATUS

SFP03_VFD_REMOT

SLT00_MX1_REMOT

Approved: _____

SPEED SETPOINT

Checked: _____

SLT00_MX1_SETPT
SPEED FEEDBACK

LEVEL INDICATION

SFP03_VFD_SETPT
SPEED FEEDBACK

SPEED SETPOINT

SFP02_VFD_SETPT
SPEED FEEDBACK

MOTOR CURRENT

SFP02_OC1_CLOSE

SPEED FEEDBACK

SFP02_OC1_REMOT

READY STATUS

OPENED STATUS

SFP01_VFD_READY

SFP02_OC1_OPEND

MOTOR CURRENT

CLOSED STATUS

SFP01_VFD_STAAI

SFP02_VFD_STAAI

SFP02_OC1_CLOSD

LEVEL INDICATION
HIGH PRESSURE ALARM

SLT02_LT1_STAAI

HIGH PRESSURE ALARM

SLT01_PSH_ALMDI

HIGH PRESSURE ALARM

HIGH PRESSURE ALARM

SFP03_PSH_ALMDI

FAULT STATUS

SFP01_PSH_ALMDI

SFP02_PSH_ALMDI

SFP02_OC1_FAULT

TRANSMITTER FAULT

Project Management Initials:

SLT02_LT1_FAULT
LCP28

SLT01_LT1

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

I
SFP01_PSH

CLOSED STATUS

PI

SLT01_V02_CLSD

RESIDUALS
MANAGEMENT
FACILITY

LOCAL/REMOTE STATUS

SFP01_VFD_FEDBK

MOTOR CURRENT

SFP03_VFD_STAAI

CLOSE COMMAND

SFP01_VFD_SETPT

SFP02_VFD_READY

MOTOR CURRENT

SLT00_MX1_STAAI

SFP02_OC1_OPENN

SPEED SETPOINT

READY STATUS

SFP03_VFD_READY

OPEN COMMAND

SFP01_VFD_FAULT

SFP02_VFD_FEDBK

READY STATUS

SLT00_MX1_READY

SLT01_LT1_FAULT

Designer: _____

SPEED SETPOINT

SFP02_VFD_FAULT

SFP03_VFD_FEDBK

READY STATUS

TRANSMITTER FAULT

FAULT STATUS

FAULT STATUS

SFP03_VFD_FAULT

SLT00_MX1_FEDBK

SLT01_LT1_STAAI

SFP01_VFD_RUNNG

SFP02_VFD_RUNNG

FAULT STATUS

SLT00_MX1_FAULT

DEVICENET

FAULT STATUS

RUNNING STATUS

RUNNING STATUS

SFP03_VFD_RUNNG

SLT00_MX1_RUNNG

SFP01_VFD_REMOT

SFP02_VFD_REMOT

RUNNING STATUS

RUNNING STATUS

PROJECT

LOCAL/REMOTE STATUS

LOCAL/REMOTE STATUS

DEVICENET

LOCAL/REMOTE STATUS

SFP01_VFD_START

SFP02_VFD_START

DEVICENET

SLT00_MX1_START

START/STOP COMMAND

START/STOP COMMAND

SFP03_VFD_START

DEVICENET

ISO A1 594mm x 841mm

START/STOP COMMAND

START/STOP COMMAND

PSH

VS
CLOSED STATUS

SLT01_V01_CLSD

250x150

NOTE 2

150-SLU-SS2

DI608

ZSL

CENTRIFUGE
FEED PUMP
SFP01

LCP29
SLT02_LT1

ZSL

SFP02_OC1

300-SLU-SS2
SFP02_PSH

PI

100-BCS-SS2

PSH

VS

THICKENED SLUDGE
HOLDING TANK
SLT02

FROM BACKWASH
WASTE CLARIFIERS

250x150
150-SLU-SS2

150-SLU-SS2

ZSL

300-SLU-SS2
DI606

200-CCS-SS2

LCP30

SFP02_OC2

CLOSED STATUS

NOTE 2

SLT02_V01_CLSD

250-SLU-SS2

FROM
SEDIMENTATION
SLUDGE
THICKENERS

REGISTRATION

80-SLU-SS2

CENTRIFUGE
FEED PUMP
SFP02

ZSL

CLOSED STATUS

SLT02_V02_CLSD

M
SFP03_PSH

PI

PSH

VS

250x150

200-SLU-SS2

200-SLU-SS2

150-SLU-SS2
150-SLU-SS1

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

THICKENED SLUDGE
HOLDING TANK
SLT01
DI605

TO CENTRIFUGE
CEN01

CONNECTION TO
FUTURE PUMP

80-SLU-SS2

CENTRIFUGE
FEED PUMP
SFP03
LCP31

CONNECTION TO
FUTURE PUMP

DI608

TO CENTRIFUGE
CEN02

TEMPERATURE INDICATION

SLT00_TT1_STAAI

ISSUE/REVISION

SLT00_TT1

TE

SLT00_PSH

TIT

PI

PSH

VS
250x150

OPEN COMMAND

SFP02_OC2_OPENN

250-SLU-SS2

CLOSE COMMAND

SFP02_OC2_CLOSE

250x200

250x200

THICKENED SLUDGE
HOLDING TANK
MIXING PUMP
SLT00_MX1

100-SLU-SS2

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

LOCAL/REMOTE STATUS

SFP02_OC2_REMOT

KEY PLAN

OPENED STATUS

SFP02_OC2_OPEND

250-SLU-SS2

CLOSED STATUS

SFP02_OC2_CLOSD
FAULT STATUS

SFP02_OC2_FAULT

PROJECT NUMBER
TO PLANT DRAIN

100-SLU-SS2
80-SLU-SS2

DI616

SHEET TITLE

80-UW-PVC80
DI603

UTILITY WATER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s

Printed on ___% Post-Consumer


Recycled Content Paper

60246477

TO BWW EQ BASIN

P&ID
THICKENED SLUDGE HOLDING
TANK & CENTRIFUGE FEED PUMPS
SHEET NUMBER

DI607

ISO A1 594mm x 841mm

PROJECT
TSS INDICATION

CEN01_AT1_STAAI

Approved: _____

FEED PUMP START


PERMISSIVE

FLOW INDICATION

CEN01_FT1_STAAI

TRANSMITTER FAULT

SLUDGE CONVEYANCE PATH


READY

TRANSMITTER FAULT

CEN01_AT1_FAULT

RESIDUALS
MANAGEMENT
FACILITY

CEN01_LCP_LKOUT

CEN01_FT1_FAULT

CEN01_LCP_DISBL

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

CEN01
VENDOR
CONTROL PANEL
SCP21

CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com
100x65

65-UW-PVC80
65x50

65x50

65x25

65x25

100x65

FLUSHING

CEN01_CO3

CIP

CEN01_CO1

UTILITY WATER

FC

CEN01_CO2

65-POL-PVC80

DI614

CEN01_BDV

NOTE 2

FI
CEN01_AT1

FROM POLYMER
FEED SYSTEM

SE

TE

VT

150-SLU-SS2

DI607

CEN01_VT1

CEN01_MDV

SE

VE

TE

M
VS

65x50

SS

PI

M
VS

CEN01_FT1

FI

FROM CENTRIFUGE
FEED PUMP SFP01

REGISTRATION
CENTRIFUGE
CEN01

65-UW-PVC80
65x50

65x50

65x25

65x25

TSS INDICATION

CEN02_AT1_STAAI

FLUSHING

DI614

CEN02_CO3

CEN02_AT1_FAULT

FC

CIP

65-POL-PVC80

NOTE 2

65-POL-PVC

FI

CEN02_AT1

FROM POLYMER
FEED SYSTEM

SE

TE

M
CEN02_VT1

VS

VT

CEN02_FT1

SS

PI

GATE
FLUSH

CEN02_MDV

SE

VE

150-SLU-SS2

TE

M
VS

250-CEN-SS1

FI

DI607

200-DS-SS

CEN02_BDN

CEN01_OC1

TRANSMITTER FAULT

CEN02_CO2

CEN02_CO1

65x50

FROM CENTRIFUGE
FEED PUMP SFP03

ISSUE/REVISION

CENTRIFUGE
CEN02

CHUTE
CONNECTION
200-DS-SS

FLOW INDICATION

CEN02_FT1_STAAI
TRANSMITTER FAULT

CEN02_FT1_FAULT

DI609

TO SLUDGE
CAKE
CONVEYOR
SCC01

CEN02_OC1

250-CEN-SS1

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

GATE
FLUSH

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

250-CEN-SS1

FEED PUMP START


PERMISSIVE

CEN02_LCP_LKOUT
SLUDGE CONVEYANCE PATH
READY

CEN02_LCP_DISBL

NOTES:
1.

ALL TAGS TO BE PREFIXED BY "EAW_".

2.

THREE (3) POLYMER INJECTION LOCATIONS TO BE POSITIONED:


- AT CENTRIFUGE INLET
- 2m UPSTREAM OF INLET
- 10m UPSTREAM OF INLET
DENOTES DEVICE SUPPLIED BY CENTRIFUGE VENDOR. OTHER
DEVICES SUPPLIED BY CONTRACTOR

3.

Printed on ___% Post-Consumer


Recycled Content Paper

CEN02
VENDOR
CONTROL PANEL
SCP22

DI603

TO BACKWASH
WASTE
EQUALIZATION
BASINS

PROJECT NUMBER
CHUTE
CONNECTION

DI609

TO SLUDGE
CAKE
CONVEYOR
SCC02

60246477
SHEET TITLE

P&ID
CENTRIFUGES
SHEET NUMBER

DI608

ISO A1 594mm x 841mm

MOTION STATUS

SCC03_MSI_STADI

MOTION STATUS

SCC01_MS1_STADI

FORWARD COMMAND

SCC03_000_STARF

START / STOP COMMAND

SCC01_000_START

START / STOP COMMAND

SCC03_000_START

PROJECT

LOCAL / REMOTE STATUS


LOCAL / REMOTE STATUS

DEVICENET

RUNNING STATUS

DEVICENET

SCC01_000_RUNNG

OPENED STATUS

FAULT STATUS

SCC01_000_FAULT

Checked: _____

SCC03_000_RUNNG

SCC02_000_START

FAULT STATUS

SCC01_000_STAAI

SCC02_000_REMOT

SCC02_SV1_OPEND

RUNNING STATUS

CLOSED STATUS

SCC02_SV1_CLOSD

SCC03_000_STAAI
EMERGENCY STOP

SCC01_000_ESTOP

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

LOCAL / REMOTE STATUS

OPENED STATUS

MOTOR CURRENT

EMERGENCY STOP

Designer: _____

START / STOP COMMAND

SCC03_000_READY

MOTOR CURRENT

SCC01_SV1_CLOSD

SCC02_MS1_STADI

RUNNING STATUS

READY STATUS

SCC01_000_READY

CLOSED STATUS

RESIDUALS
MANAGEMENT
FACILITY

MOTION STATUS

SCC03_000_FAULT

READY STATUS

SCC01_SV1_OPEND

SCC03_000_REMOT

SCC02_000_RUNNG

DEVICENET

Approved: _____

SCC01_000_REMOT

SCC03_000_ESTOP

CLIENT

FAULT STATUS

ELGIN AREA WATER


SUPPLY SYSTEM

SCC02_000_FAULT
READY STATUS

DI608

SCC02_000_READY
FROM CENTRIFUGE
CEN02

SCC01
LOCAL CONTROL
PANEL
LCP35

DI608

SCC02_000_STAAI
EMERGENCY STOP

SCC02_000_ESTOP

SCC02_SV1

50-UW-PVC80

DI616

OPEN COMMAND

SCC02
LOCAL CONTROL
PANEL
LCP36

SCC01_SV1

UTLITY WATER

OPEN COMMAND

SCC03_OC1_OPENN

SCC03_OC2_OPENN
CLOSE COMMAND

SCC03_OC2_CLOSE

CLOSE COMMAND

SCC03_OC2_REMOT

LOCAL / REMOTE STATUS

OPENED STATUS

SCC03_OC1_REMOT
START / STOP COMMAND

SCC04_000_START

MS

CLOSED STATUS

CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE

SCC03_OC1_OPEND

SCC01_MS1

LOCAL / REMOTE STATUS

MS

SCC03_OC2_CLOSD

SCC02_MS1

CLOSED STATUS

SCC04_000_REMOT

FAULT STATUS

SCC03_OC1_CLOSD

RUNNING STATUS

SCC04_000_RUNNG

DEVICENET

SCC03_OC2_OPEND

OPENED STATUS

CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE

SCC03_OC2_FAULT

M
FAULT STATUS

CS

SCREW CONVEYOR
SCC01

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

LOCAL / REMOTE STATUS

SCC03_OC1_CLOSE

CS

SCC03_OC1_FAULT

SCREW CONVEYOR
SCC02

FAULT STATUS

SCC04_000_FAULT
READY STATUS

SCC04_000_READY
MOTOR CURRENT

UP
SLOW

UP
SLOW

UP
FAST

UP
FAST

SCC03
LOCAL CONTROL
PANEL
LCP37

SCC04_000_STAAI
Last saved: (2013-10-04) Last Plotted: 2013-10-04
Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

CONSULTANT

DOWN
SLOW

EMERGENCY STOP

SCC04_000_ESTOP
DOWN
FAST

MOTION STATUS

SCC04_MSI_STADI

SCC03
LOCAL CONTROL
PANEL
LCP37

MS
SCC03_MS1

NOTE 2

NOTE 2

CS

CRN01
LOCAL CONTROL
PENDANT

SCREW CONVEYOR
SCC03

DOWN
SLOW

CRN02
LOCAL CONTROL
PENDANT

SCC03_OC1

SCC03_OC2

DOWN
FAST

80-PD-PVC

FLOOR

FLOOR

SCC04
LOCAL CONTROL
PANEL
LCP38

FLOOR

DI603

FLOOR

HOIST WINCH
CRN01

HOIST WINCH
CRN02
TELESCOPIC CHUTE

REGISTRATION

DRAIN TO BW
EQ BASIN

TELESCOPIC CHUTE

SCC05_MS1

MS

SCC04_MS1

MS

OPEN BOTTOM
SCREW CONVEYOR
SCC04

OPEN BOTTOM
SCREW CONVEYOR
SCC05

ISSUE/REVISION
M

M
CS

SLUDGE TRAILER #1

SCC05
LOCAL CONTROL
PANEL
LCP39

CS
E

SLUDGE TRAILER #2

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

MOTION STATUS

SCC05_MS1_STADI
START / STOP COMMAND
E

SCC05_000_START
LOCAL / REMOTE STATUS

SCC05_000_REMOT
RUNNING STATUS

PHOTOELECTRIC SENSOR LEGEND

R RECEIVER

EMITTER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: GATES SCC03_OC1 & SCC03_OC2 RELAY
TO SCC03 LCP

Printed on ___% Post-Consumer


Recycled Content Paper

FORWARD

FORWARD

VENDOR
CONTROL PANEL
SCP29

BACKWARD

BACKWARD
Y

STOP

STOP

TRAFFIC
LIGHT

PROJECT NUMBER

60246477

FAULT STATUS

SCC05_000_FAULT

TRAFFIC
LIGHT

SCC05_000_RUNNG

DEVICENET

Project Management Initials:

FROM CENTRIFUGE
CEN01

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

MOTOR CURRENT

SCC03
LOCAL CONTROL
PANEL
LCP37

READY STATUS

SCC05_000_READY
MOTOR CURRENT

SCC05_000_STAAI
EMERGENCY STOP

SCC05_000_ESTOP

SHEET TITLE

P&ID
DEWATERED SLUDGE
CONVEYOR SYSTEM
SHEET NUMBER

DI609

ISO A1 594mm x 841mm


Approved: _____

PROJECT

RESIDUALS
MANAGEMENT
FACILITY

HIGH LEVEL ALARM

PDT11_LSH_ALMDI

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

Designer: _____

VENDOR
CONTROL PANEL
SCP27

CLIENT

ELGIN AREA WATER


SUPPLY SYSTEM

RECIRCULATION

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

PDT11_WT1
PDT11_LSH

PPP11_SV1

Project Management Initials:

LSH

LIQUID POLYMER
TOTE

FC

CONSULTANT
PPP11_PI1

PDT11

PI

RUN
ASL DRY

TOTE SCALE

PPP11_PSH

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

PSH

PPP11_SV2
S

NOTE 2

PDT12_LT1

VS

PDT12_MX1

M
PPP11

PDT12_LSH

PDT12_LSL

M
CS

VAP11

M
VACUUM
LOADER
S

PDT13_LSH

PDT12_SV1
PDT13_LT1

PDT13_LSL

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

POLYMER FEEDER

DI613

PFR11_LSL

LSL

FROM FEED PUMP


PRESSURE RELIEF

AGING TANK
PDT12

PFR11

REGISTRATION

M
PPP12

VS

25-POL-PVC
PPS10_SV1

WETTING
CHAMBER

FEED TANK
PDT13

DI612

TO THICKENER
POLYMER
FEED SYSTEM

PPS10_SV2

25-POL-PVC

PPS10_SV3
S

ISSUE/REVISION

POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE

DI616

40-UW-SS

HIGH LEVEL ALARM

POP10_LSH_ALMDI

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

TEMPERED WATER

KEY PLAN

POP10_LSH

LSH

PROJECT NUMBER
TO BWW EQ
BASIN

60246477
SHEET TITLE

TO BWW EQ
BASIN

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR

Printed on ___% Post-Consumer


Recycled Content Paper

P&ID
THICKENER POLYMER
PREPARATION SYSTEM
SHEET NUMBER

DI610

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

Designer: _____

VENDOR
CONTROL PANEL
SCP28

CLIENT

ELGIN AREA WATER


SUPPLY SYSTEM

RECIRCULATION

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

PDT21_WT1
PPP21_SV1

FC

CONSULTANT
PPP21_PI1

PDT21

PI

25-POL-PVC
RUN
ASL DRY

TOTE SCALE

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

PSH

PPP21_SV2
S

15-POL-PVC

PDT22_LSL

LSL
S

PDT23_LT1

PDT23_SV1

PDT22_SV2

PDT23_SV2

PDT23_MX1

PDT22_LSH

LSH

NOTE 2

PDT22_SV1

PDT22_LT1

VS

PDT22_MX1

PPP21

PPP21_PSH

NOTE 2

Project Management Initials:

LIQUID POLYMER
TOTE

PDT23_LSH

PDT23_LSL

CS

CS

DI614

FROM FEED PUMP


PRESSURE RELIEF

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

POLYMER FEEDER
PFR21_LSL

LSL

PFR21

REGISTRATION

PDT22_SV3

M
PPP22

VS

PPS20_SV1
S

PDT23_SV3

WETTING
CHAMBER
BATCH TANK #2
PDT23

BATCH TANK #1
PDT22

65-POL-PVC

DI614

TO CENTRIFUGES
POLYMER FEED
SYSTEM

PPS20_SV2
S

50-POL-PVC

ISSUE/REVISION

POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE

TEMPERED WATER
DI616

HIGH LEVEL ALARM

50-UW-SS

FROM UTILITY WATER


BOOSTER PUMP /
HEATERS

POP20_LSH_ALMDI

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

POP20_LSH

LSH

PROJECT NUMBER
TO BWW EQ
BASIN

60246477
SHEET TITLE

P&ID
DEWATERING POLYMER
PREPARATION SYSTEM
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR

Printed on ___% Post-Consumer


Recycled Content Paper

SHEET NUMBER

DI611

ISO A1 594mm x 841mm

DI610

TO STORAGE TANK

OPEN COMMAND

PROJECT

POP11_SV1_OPENN

Approved: _____

OPEN COMMAND

FLOW INDICATION

POP10_SV1_OPENN

POP10_FT1_STAAI

HIGH PRESSURE ALARM

Checked: _____

TRANSMITTER FAULT

POP10_FT1_FAULT

POP10_FT2_FAULT

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

LOCAL
CONTROL
PANEL
LCP32

START/STOP COMMAND

POP11_000_START
LOCAL/REMOTE STATUS

POP11_000_REMOT

FIT

NOTE 2

PI

POP11_000_RUNNG

POP10_IC1_SETPT
POSITION FEEDBACK

LOCAL/REMOTE STATUS

FAULT STATUS

POP10_IC1_REMOT

RUN
ASL DRY

SPEED SETPOINT

POP10_IC1

FE

POP11_SV1

POP10_IC1_FAULT

NOTE 3

15-POL-PVC

15-POL-PVC

VS

POP11_000_FEDBK

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

FAULT STATUS

POP11_000_SETPT
SPEED FEEDBACK

ELGIN AREA WATER


SUPPLY SYSTEM

POP10_IC1_FEDBK

FIT

POP11_000_FAULT

CLIENT

POP10_FT1

PSH

25-POL-PVC

Project Management Initials:

POSITION SETPOINT

POP10_FT2

FE

POP11_PSH

POP11_PI1

RUNNING STATUS

Designer: _____

POP10_FT2_STAAI

TRANSMITTER FAULT

POP11_PSH_ALMDI

RESIDUALS
MANAGEMENT
FACILITY

FLOW INDICATION

DI605

CONSULTANT

POP10_SV1

POLYMER DOSING
PUMP POP11

TO BACKWASH
WASTE THICKENER
CLF01

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

HIGH PRESSURE ALARM

POP12_PSH_ALMDI

LOCAL
CONTROL
PANEL
LCP32

START/STOP COMMAND

POP12_000_START
LOCAL/REMOTE STATUS

POP12_000_REMOT

POP12_PSH

POP12_PI1

NOTE 2

PI

RUNNING STATUS

PSH

25-POL-PVC

POP12_000_RUNNG
FAULT STATUS

15-UW-PVC

RUN
ASL DRY

POP12_000_FAULT
SPEED SETPOINT

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

POP12_000_SETPT

15-POL-PVC
VS

SPEED FEEDBACK

POP12_000_FEDBK

POLYMER DOSING
PUMP POP12

REGISTRATION

OPEN COMMAND

POP10_SV2_OPENN
OPEN COMMAND

FLOW INDICATION

POP13_SV1_OPENN

POP10_FT3_STAAI

HIGH PRESSURE ALARM

FLOW INDICATION

POP10_FT4_STAAI

TRANSMITTER FAULT

POP13_PSH_ALMDI

POP10_FT3_FAULT

TRANSMITTER FAULT

POP10_FT4_FAULT

LOCAL
CONTROL
PANEL
LCP32

START/STOP COMMAND

POP13_000_START
LOCAL/REMOTE STATUS

POP13_000_REMOT

POP10_FT4

POP10_IC2_SETPT

PI

RUNNING STATUS

POSITION FEEDBACK

FE

POP13_PSH

POP13_PI1

NOTE 2
POP13_000_RUNNG

POSITION SETPOINT

FIT

POP10_IC2_FEDBK

POP10_FT3

PSH

LOCAL/REMOTE STATUS

FIT

25-POL-PVC

POP10_IC2_REMOT

M
FAULT STATUS

RUN
ASL DRY

POP13_000_FAULT

POP10_IC2

FE

POP13_SV1

FAULT STATUS

POP10_IC2_FAULT

ISSUE/REVISION

NOTE 3

SPEED SETPOINT

POP13_000_SETPT

VS
SPEED FEEDBACK

POP13_000_FEDBK

15-POL-PVC

15-POL-PVC
POLYMER DOSING
PUMP POP13

POP10_SV2

DI605

TO BACKWASH
WASTE THICKENER
CLF02

CONNECTION FOR
FUTURE PUMPS

POLYMER FEED SYSTEM


VENDOR PACKAGE

DI610

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

DI613

HIGH LEVEL ALARM

CONNECTION TO
FUTURE POLYMER
DOSING PUMPS

POP11_LSH_ALMDI

TO SLUDGE
THICKENERS
POLYMER FEED
PUMPS

POP11_LSH

50x15

LSH
DI616

UTILITY WATER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES

Printed on ___% Post-Consumer


Recycled Content Paper

2013-10-09

KEY PLAN

25-POL-PVC

FROM POLYMER
PREPARATION SYSTEM
FEED TANK

50-UW-PVC

PROJECT NUMBER
DI613

UTILITY WATER

60246477
SHEET TITLE

P&ID
BACKWASH WASTE THICKENING
POLYMER FEED SYSTEM
TO BWW EQ
BASIN

SHEET NUMBER

DI612

ISO A1 594mm x 841mm

15-POL-PVC

DI610

TO FEED TANK

OPEN COMMAND

POP10_SV3_OPENN
OPEN COMMAND

FLOW INDICATION

Approved: _____

POP14_SV1_OPENN
HIGH PRESSURE ALARM

Checked: _____

TRANSMITTER FAULT

POP10_FT5_FAULT

POP10_FT6_FAULT

LOCAL
CONTROL
PANEL
LCP33

START/STOP COMMAND

POP14_000_START
LOCAL/REMOTE STATUS

POP14_000_REMOT

POP10_FT6

PI

POSITION FEEDBACK

FE

POP14_PSH

POP14_PI1

POP14_000_RUNNG

PSH
FIT

25-POL-PVC

POP10_IC3_FEDBK

POP10_FT5

POP10_IC3_REMOT

RUN
ASL DRY

SPEED SETPOINT

POP10_IC3

FE

POP14_SV1

POP10_IC3_FAULT

NOTE 3

15-POL-PVC

20-POL-PVC

VS POLYMER DOSING
PUMP POP14

POP14_000_FEDBK

FAULT STATUS

POP14_000_SETPT
SPEED FEEDBACK

ELGIN AREA WATER


SUPPLY SYSTEM

LOCAL/REMOTE STATUS

FAULT STATUS

Project Management Initials:

POP10_IC3_SETPT

CLIENT

NOTE 2

POP14_000_FAULT

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

POSITION SETPOINT

FIT

RUNNING STATUS

Designer: _____

POP10_FT6_STAAI

TRANSMITTER FAULT

POP14_PSH_ALMDI

RESIDUALS
MANAGEMENT
FACILITY

FLOW INDICATION

POP10_FT5_STAAI

PROJECT

DI606

15x20

POP10_SV3

TO SEDIMENTATION
SLUDGE THICKENER
CLF03

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

HIGH PRESSURE ALARM

POP15_PSH_ALMDI

LOCAL
CONTROL
PANEL
LCP33

START/STOP COMMAND

POP15_000_START
LOCAL/REMOTE STATUS

POP15_000_REMOT

POP15_PSH

POP15_PI1

NOTE 2

PI

RUNNING STATUS

PSH

25-POL-PVC

POP15_000_RUNNG
FAULT STATUS

15-UW-PVC

RUN
ASL DRY

POP15_000_FAULT
SPEED SETPOINT

POP15_000_SETPT

15-POL-PVC

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

VS
SPEED FEEDBACK

POP15_000_FEDBK

POLYMER DOSING
PUMP POP15

REGISTRATION

OPEN COMMAND

POP10_SV4_OPENN
OPEN COMMAND

FLOW INDICATION

POP16_SV1_OPENN
HIGH PRESSURE ALARM

POP10_FT8_STAAI

TRANSMITTER FAULT

POP16_PSH_ALMDI

TRANSMITTER FAULT

POP10_FT7_FAULT

POP10_FT8_FAULT

LOCAL
CONTROL
PANEL
LCP33

START/STOP COMMAND

POP16_000_START
LOCAL/REMOTE STATUS

POP16_000_REMOT

POP10_FT8

POSITION SETPOINT

FIT

PI

POP10_IC4_SETPT
POSITION FEEDBACK

FE

POP16_PSH

POP16_PI1

NOTE 2

RUNNING STATUS

POP16_000_RUNNG

FLOW INDICATION

POP10_FT7_STAAI

POP10_IC4_FEDBK

POP10_FT7

PSH

LOCAL/REMOTE STATUS

FIT

25-POL-PVC

POP10_IC4_REMOT
M

FAULT STATUS

RUN
ASL DRY

POP16_000_FAULT

POP10_IC4

FE

POP16_SV1

FAULT STATUS

POP10_IC4_FAULT

ISSUE/REVISION

NOTE 3

SPEED SETPOINT

POP16_000_SETPT

VS
SPEED FEEDBACK

POP16_000_FEDBK

20-POL-PVC

15-POL-PVC
POLYMER DOSING
PUMP POP16

POP10_SV4

15x20

DI606

TO SEDIMENTATION
SLUDGE THICKENER
CLF04

POLYMER FEED SYSTEM


VENDOR PACKAGE

DI612

FROM POLYMER
PREPARATION SYSTEM

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

25-POL-PVC

CONNECTION TO
FUTURE POLYMER
DOSING PUMPS

PROJECT NUMBER
DI616

UTILITY WATER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES

Printed on ___% Post-Consumer


Recycled Content Paper

50-UW-PVC

DI614

UTILITY WATER

60246477
SHEET TITLE

P&ID
SED. SLUDGE THICKENING
POLYMER FEED SYSTEM
SHEET NUMBER

DI613

ISO A1 594mm x 841mm

32-POL-PVC

DI611

TO BATCH TANK

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0

START/STOP COMMAND

Checked: _____

POP21_000_START
LOCAL/REMOTE STATUS

OPEN COMMAND

POP21_000_REMOT
RUNNING STATUS

OPEN COMMAND

POP21_000_RUNNG

Designer: _____

CLIENT

POP21_SV1_OPENN
FLOW INDICATION

POP20_SV1_OPENN

FAULT STATUS

HIGH PRESSURE ALARM

POP21_000_FAULT

POP20_FT2_STAAI

TRANSMITTER FAULT

POP21_PSH_ALMDI

ELGIN AREA WATER


SUPPLY SYSTEM

FLOW INDICATION

POP20_FT1_STAAI

TRANSMITTER FAULT

POP20_FT1_FAULT

POP20_FT2_FAULT

POSITION SETPOINT

POP20_IC1_SETPT

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

SPEED SETPOINT
POSITION FEEDBACK

POP21_000_SETPT

POP20_IC1_FEDBK

LOCAL
CONTROL
PANEL
LCP34

Project Management Initials:

SPEED FEEDBACK

POP21_000_FEDBK

POP20_FT2

NOTE 2

CLOSED STATUS

65x40

FE

POP21_SV1

POP20_IC1

RUNNING STATUS

NOTE 3

65-UW-PVC

SPEED SETPOINT

POP22_000_SETPT

65-POL-PVC

VS POLYMER DOSING
PUMP POP21

POP22_000_RUNNG

FAULT STATUS

POP20_IC1_FAULT

POP22_000_REMOT

POP22_000_FAULT

POP20_IC1_CLOSD

LOCAL/REMOTE STATUS

FAULT STATUS

POP20_IC1_OPEND

FIT
RUN
ASL DRY

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

OPENED STATUS

POP20_FT1

PSH

40-POL-PVC

POP22_000_START

CONSULTANT

POP20_IC1_REMOT

FE

POP21_PSH

POP21_PI1

PI
START/STOP COMMAND

LOCAL/REMOTE STATUS

FIT

32-POL-PVC

32x65

POP20_SV1

DI608

TO CENTRIFUGE CEN01

HIGH PRESSURE ALARM

POP22_PSH_ALMDI

LOCAL
CONTROL
PANEL
LCP34

SPEED FEEDBACK

POP22_000_FEDBK

NOTE 2

POP22_PSH

POP22_PI1

PI

PSH

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

40-POL-PVC
65x40
RUN
ASL DRY

START/STOP COMMAND

REGISTRATION

POP23_000_START

FLOW INDICATION

M
LOCAL/REMOTE STATUS

POP23_000_REMOT

POP20_FT3_STAAI

VS POLYMER DOSING
PUMP POP22

OPEN COMMAND

TRANSMITTER FAULT

POP20_SV2_OPENN

RUNNING STATUS

POP23_000_RUNNG

POP20_FT3_FAULT

OPEN COMMAND

FLOW INDICATION

POP23_SV1_OPENN

FAULT STATUS

POP20_FT4_STAAI
POSITION SETPOINT

POP23_000_FAULT

HIGH PRESSURE ALARM

TRANSMITTER FAULT

POP23_PSH_ALMDI

SPEED SETPOINT

POSITION FEEDBACK

POP23_000_SETPT

POP20_IC2_FEDBK

LOCAL
CONTROL
PANEL
LCP34

SPEED FEEDBACK

POP23_000_FEDBK

POP20_FT4

LOCAL/REMOTE STATUS

FIT

NOTE 2

POP23_PI1

POP20_IC2_REMOT
OPENED STATUS

FE

POP23_PSH

PI

POP20_IC2_OPEND

POP20_FT3

PSH

FIT

40-POL-PVC
65x40

CLOSED STATUS

POP20_IC2_CLOSD

ISSUE/REVISION

FE

RUN
ASL DRY

POP20_IC2

POP23_SV1

FAULT STATUS

POP20_IC2_FAULT

NOTE 3

65-POL-PVC

VS POLYMER DOSING
PUMP POP23

32-POL-PVC
POP20_SV2

32x65

DI608

TO CENTRIFUGE CEN02

POLYMER FEED SYSTEM


VENDOR PACKAGE

DI611

POP20_IC2_SETPT

POP20_FT4_FAULT

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

65-POL-PVC

PREPARATION SYSTEM

CONNECTION TO
FUTURE POLYMER
DOSING PUMPS

PROJECT NUMBER
DI616

UTILITY WATER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES

Printed on ___% Post-Consumer


Recycled Content Paper

50-UW-PVC

60246477
SHEET TITLE

P&ID
DEWATERING
POLYMER FEED SYSTEM
SHEET NUMBER

DI614

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0

Checked: _____

START/STOP COMMAND

TSP01_000_START
LOCAL/REMOVE STATUS

CLIENT

TSP01_000_REMOT

ELGIN AREA WATER


SUPPLY SYSTEM

RUNNING STATUS
HIGH PRESSURE ALARM

Designer: _____

TSP01_000_RUNNG

TSP01_PSH_ALMDI
FAULT STATUS

TSP01_000_FAULT

LOCAL
CONTROL
PANEL
LCP40

SPEED SETPOINT

TSP01_000_SETPT

Project Management Initials:

SPEED FEEDBACK

TSP01_000_FEDBK

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

DECHLORINATION
SYSTEM VENDOR
PACKAGE

NOTE 2
TSP01_PSH

CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

PSH
PI

TSP01_PI1

VS
15x10
START/STOP COMMAND

TSP02_000_START

10-STS-CPVC

DOSING PUMP
TSP01

LOCAL/REMOVE STATUS

DI603

TO BACKWASH
WASTE EQ BASIN
BWT01

HIGH PRESSURE ALARM

TSP02_000_REMOT

TSP02_PSH_ALMDI

WEIGHT INDICATION
RUNNING STATUS

TST01_WT1_STAAI

TSP02_000_RUNNG

TRANSMITTER FAULT

LOCAL
CONTROL
PANEL
LCP40

FAULT STATUS

TST01_WT1_FAULT

TSP02_000_FAULT
SPEED SETPOINT

TSP02_000_SETPT

NOTE 2

TSP02_PSH

PSH

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

SPEED FEEDBACK

PI

TSP02_000_FEDBK

TSP02_PI1

REGISTRATION

TST01_WT1

VS

15-STS-CPVC
15x10

DI603

DOSING PUMP
TSP02

SODIUM
THIOSULPHATE
SOLUTION
TST01

TO BACKWASH
WASTE EQ BASIN
OVERFLOW

HIGH PRESSURE ALARM

TSP03_PSH_ALMDI

START/STOP COMMAND

LOCAL
CONTROL
PANEL
LCP40

TSP03_000_START
LOCAL/REMOVE STATUS

TSP03_000_REMOT

NOTE 2

RUNNING STATUS

TSP03_000_RUNNG

TSP03_PSH

PSH
PI

TSP03_PI1

FAULT STATUS

ISSUE/REVISION

TSP03_000_FAULT

M
SPEED SETPOINT

TSP03_000_SETPT

VS

SPEED FEEDBACK

TSP03_000_FEDBK

15x10

DOSING PUMP
TSP03

10-STS-CPVC

DI603

TO BACKWASH
WASTE EQ BASIN
BWT02

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

CONTAINMENT

TO
SEDIMENTATION
SLUDGE TANK

PROJECT NUMBER

60246477
SHEET TITLE

P&ID
RMF DISCHARGE
DECHLORINIZATION SYSTEM.
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP

Printed on ___% Post-Consumer


Recycled Content Paper

SHEET NUMBER

DI615

ISO A1 594mm x 841mm

RTU1 SAC GENERAL ALARM

BLD06_CP1_ALMDI
LOCAL/REMOTE STATUS

PROJECT

BSP01_VFD_REMOT

RTU2 SAC GENERAL ALARM

BLD06_CP2_ALMDI

RESIDUALS
MANAGEMENT
FACILITY

Approved: _____

RUNNING STATUS

BSP01_VFD_RUNNG

RTU3 SAC GENERAL ALARM

BLD06_CP3_ALMDI
GENERAL ALARM

BSP01_VFD_ALMDI

PUMP GALLERY SAC


GENERAL ALARM

BLD06_CP4_ALMDI

PRESSURE SETPOINT

Checked: _____

ON DEMAND WATER
HEATERS

BSP01_VFD_SETPT

SLUDGE THICKENER SAC


GENERAL ALARM

PRESSURE INDICATION

BLD06_CP5_ALMDI

BSP01_VFD_STAAI
PWH01

TRUCK BAY SAC GENERAL


ALARM

PWH02

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

NOTE:
FOR ON DEMAND TANKLESS
WATER HEATERS REFER TO
DRAWING M610 FOR GAS AND
CONNECTION DETAILS

PWH03

CLIENT

PUMP ENABLE/DISABLE

BLD06_CP6_ALMDI

BSP01_VFD_DISBL

ELGIN AREA WATER


SUPPLY SYSTEM

Designer: _____

DECHLORINATION ROOM
SAC GENERAL ALARM

BLD06_CP7_ALMDI
CENTRIFUGE ROOM SAC
GENERAL ALARM
PIT

BLD06_CP8_ALMDI

PE

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

BSP01_PT1

PI

CONSULTANT

LCP41

BUILDING HVAC ALARMS

80x32

TI
TI
M
80x32

80-UW-SS

40-UW-SS

VS
150x80

SECURITY SYSTEM ARMED

ALP06_000_STADI

ALP06_604_ALMDI

NC

NC

SECURITY SYSTEM
ELECTRICAL ROOM ALARM

TEMPERATURE
CONTROLLER

150-UW-SS

ALP06_607_ALMDI
SECURITY SYSTEM
CHEMICAL ROOM ALARM

ALP06_605_ALMDI
SECURITY SYSTEM
CENTRIFUGE ROOM ALARM

TO THICKENING
POLYMER
PREPARATION

TE

BOOSTER PUMP
BSP01

150x80

SECURITY SYSTEM
PROCESS ROOM ALARM

BSP01_TE1

BSP01_CNV

DI610

80x40

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

50-UW-SS

DI611

80x50
TO DEWATERING
POLYMER
PREPARATION

BOOSTER PUMP
VENDOR PACKAGE

ALP06_617_ALMDI
SECURITY SYSTEM
CONTROL ROOM ALARM

50-UW-SS1

ALP06_608_ALMDI

DI612

80x50

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

TO POLYMER
FEED

SECURITY SYSTEM

REGISTRATION
32-UW-PVC80
80x32
TO MAIN FLOOR
HOSE STATIONS
AND SAMPLE SINKS

100-UW-SS1

100-UW-SS1

DI608

150x100
100x32

100x80

TO
CENTRIFUGES

100x50

FLOW INDICATION

UWH01_FT1_STAAI

50-UW-SS1

TRANSMITTER FAULT

UWH01_FT1_FAULT

DI609

TO CONVEYORS

ISSUE/REVISION
80-UW-SS1

YARD PIPE

150-WP-PVC

150-WP-SS

TO CENTRIFUGE
FEED PUMPS

UWH01_FT1

IN-PLANT PIPE

150-WP-SS

32-UW-PCV80
TO HOSE STATIONS
(LOWER LEVEL)

FROM POTABLE
WATER SERVICE

Printed on ___% Post-Consumer


Recycled Content Paper

DI607

150x32

SEE MECHANICAL DRAWINGS


FOR CONTINUATION

2013-10-09

I/R

DATE

ISSUE FOR TENDER


DESCRIPTION

KEY PLAN

32-WP-CU
TO BUILDING
SERVICES
SEE MECH
DRAWINGS

PROJECT NUMBER

60246477
SHEET TITLE

P&ID
RMF PLANT UTILITY WATER
AND MISCELLANEOUS
SHEET NUMBER

DI616

ISO A1 594mm x 841mm

DI618
DI618

HYDRAULIC POWER
UNIT No 4 HPU40

Approved: _____

RSP11_SV1

RSP11_PSH
RSP11_IC1

Checked: _____

200-CS-SS2

50-CS-SS2

Designer: _____

PSH

VS

250x150

HYDRAULIC POWER
UNIT No. 3
HPU30

PI

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

250x50

RSP10_AT1

150x250

CLIENT

RSP10_FT1

SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP11

RSP10_IC1

CONTAINMENT

M
M

DI618

RSP12_PSH
RSP12_IC1

ELGIN AREA WATER


SUPPLY SYSTEM

RSP10_OC1

SS

M
RSP12_SV1

Project Management Initials:

HPU30_LSL

SS
LOR
HS
HS

RESIDUALS
MANAGEMENT
FACILITY

RSP10_OC2

HPU30_TSH

PI

TO SEDIMENTATION
SLUDGE TANKS

PSH

VS

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

UTILITY WATER
250x150

PROJECT

150x250

SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP12
SLC11_SV1
(NOTE 2)

200-CS-SS

SED11_LT1

NOTE:
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP30
SED11_SV1

CROSS COLLECTOR #1

MAIN COLLECTOR No 1

(NOTE 2)

REGISTRATION

SED12_SV1
S

EX SEDIMENTATION BASIN No 1
SECTION 2
SED12
MAIN COLLECTOR No 2

(NOTE 2)

HPU10_TSH
HPU10_LSL

SS
LOR
HS
HS

FROM EX
FLOCCULATION
TANK No 1

ISSUE/REVISION

SED13_SV1

HYDRAULIC POWER
UNIT No. 1
HPU10

CROSS COLLECTOR #2

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

EX SEDIMENTATION BASIN No 1
SECTION 1
SED11

CONTAINMENT

EX SEDIMENTATION BASIN No 1
SECTION 3
SED13
MAIN COLLECTOR No 3

(NOTE 2)

2013-10-09

DI618

I/R

DATE

DI618

KEY PLAN

ISSUE FOR TENDER


DESCRIPTION

HYDRAULIC POWER
UNIT No 2 HPU20

PROJECT NUMBER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.

Printed on ___% Post-Consumer


Recycled Content Paper

60246477

(NOTE 2)
S

SHEET TITLE

SLC13_SV1

TO EX FILTERS

300-SD-DI
TO PLANT DRAIN

P&ID
SEDIMENTATION BASIN No1
SLUDGE SCRAPER SYSTEM
SHEET NUMBER

DI617

ISO A1 594mm x 841mm

DI617
DI617

HYDRAULIC POWER
UNIT No 3 HPU30

Approved: _____

RSP21_SV1

RSP21_PSH
RSP21_IC1

Checked: _____

200-CS-SS2

50-CS-SS2

Designer: _____

PSH

VS

250x150

HYDRAULIC POWER
UNIT No. 4
HPU40

PI

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

250x50

RSP20_AT1

150x250

CLIENT

RSP20_FT1

SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP21

RSP20_IC1

CONTAINMENT

ELGIN AREA WATER


SUPPLY SYSTEM

RSP20_OC1

SS

RSP22_SV1

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

250-CS-SS2

RSP22_PSH
RSP22_IC1

Project Management Initials:

HPU40_LSL

SS
LOR
HS
HS

RESIDUALS
MANAGEMENT
FACILITY

RSP20_OC2

HPU40_TSH

PI

PSH

VS

CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

UTILITY WATER
250x150

150x250

SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP22

DI617

SLUDGE TRANSFER
LINE

PROJECT

250-CS-SS2

DI604

SLC21_SV1

TO SEDIMENTATION
SLUDGE TANKS

(NOTE 2)

200-CS-SS

SED21_SV1

SED21_LT1

NOTE:
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP31
SED21_SV1

CROSS COLLECTOR #3

MAIN COLLECTOR No 4

(NOTE 2)

REGISTRATION

SED22_SV1
S

EX SEDIMENTATION BASIN
No 2 SECTION 2
SED22
MAIN COLLECTOR No 5

HPU20_TSH

(NOTE 2)

HPU20_LSL

SS
LOR
HS
HS

FROM EX
FLOCCULATION
TANK No 1

ISSUE/REVISION

SED23_SV1

HYDRAULIC POWER
UNIT No. 2
HPU20

CROSS COLLECTOR #4

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-601_619_PID - REV0-ISSUE FOR TENDER.DWG

EX SEDIMENTATION BASIN No 2
SECTION 1
SED21

CONTAINMENT

EX SEDIMENTATION BASIN No 2
SECTION 3
SED23
MAIN COLLECTOR No 6

(NOTE 2)

2013-10-09

DI617

I/R

DATE

DI617

KEY PLAN

ISSUE FOR TENDER


DESCRIPTION

HYDRAULIC POWER
UNIT No 1 HPU10

PROJECT NUMBER

NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.

Printed on ___% Post-Consumer


Recycled Content Paper

60246477

(NOTE 2)
S

SHEET TITLE

SLC23_SV1

TO EX FILTERS

300-SD-DI
TO PLANT DRAIN

P&ID
SEDIMENTATION BASIN No2
SLUDGE SCRAPER SYSTEM
SHEET NUMBER

DI618

ISO A1 594mm x 841mm

ELGIN AREA WATER TREATMENT PLANT


PROJECT

CNET

CNET
CNET

RPFM

CNET
CNET

RPFM

CNET
CNET

CNET
CNET

RPFM

CNET

CNET
CNET

CNET

CNET
CNET

CNET

CNET

CNET

CNET

CNET

CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CNET
CNET

CLIENT

Existing Cisco
Catalyst 2960
Ethernet Switch

Designer: _____

RESIDUALS
MANAGEMENT
FACILITY

RPU01

CNET
CNET

CNET
CNET

RPA

CNET
CNET

CNET

CNET
CNET

Checked: _____

CNET
CNET

CNET
CNET

Approved: _____

RPU02
CNET
CNET

CNET

ELGIN AREA WATER


SUPPLY SYSTEM

RPFM

RPFM

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

F
F
F

F
F
F

F
F
F
F
F
F

F
F

F
F
F

F
F
F

F
F
F

F
F

F
F
F

F
F
F

F
F
F

F
F

F
F
F

F
F
F

F
F
F

F
F

F
F
F

F
F
F

F
F
F

F
F

F
F
F

F
F
F

F
F
F

F
F

F
F
F

F
F
F

Existing Cisco
Catalyst 2960
Ethernet Switch

F
F
F

CONSULTANT

F
F
F
F

F
F

F
F

F
F
F

F
F

To Existing Wireless
Switches

F
F

F
F
F

F
F

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

F
F

F
F
F

F
F
F

Project Management Initials:

CNET

RPA

CNET

F
F
F
F
F

CHEMICAL AREA

Existing Media
Converters

Existing Fibre Optic


Patch Panel
EAW-FPP-01

EAW_NCP30
EAW_UPS30

C/F

F
F

F
F

F
F

F
F
F

F
F

F
F

F
F

EXISTING PLC NETWORK


COMMUNICATION PANEL No. 2

F
F

F
F

F
F

EAW_SWI30

IP: XXX.XXX.XXX.XX
F

EAW_SCP31

EAW_SWI31

EAW_SWI32

EAW-FPP-20

C/F

DNET
CNET

EAW_OIT31

IP: XXX.XXX.XXX.XX
Control Room
Workstation

REGISTRATION

TO STANDALONE
CONTROLLERS

RACK1
EAW_SWI20
CNET

RMF
Comms
Panel

CNET

Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX

IP: XXX.XXX.XXX.XX
Control Room
Workstation

DeviceNet
To New MCC

Wireless AP
(Floor 1)
EAW_WAP20

CNET

Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX

CNET

Main UPS
IP: XXX.XXX.XXX.XX

BACNET

Sedimentation Basin No. 1


Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX

CNET

CNET

CNET

Wireless AP
(Floor 2)
EAW_WAP21

Wireless AP
(Floor 3)
EAW_WAP22

RACK2

CNET
CNET
CNET

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

EAW_PLC20
RMF Plant PLC
IP: XXX.XXX.XXX.XX

CNET

EAW_OIT30

Existing Fibre Optic


Patch Panel
EAW-FPP-02

EAW_CPU_21

EAW_UPS20

Sedimentation Basin No. 1


Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX

Printed on ___% Post-Consumer


Recycled Content Paper

EAW_PLC31

EAW_CPU20

EAW_NCP20

EAW_SCP20
RACK0

EAW_PLC30

RESIDUALS MANAGEMENT AREA

EAW_SCP30

ISSUE/REVISION
CNET

CNET

EAW_SCP21
EAW_SWI21

EAW_PLC21

C/F

BACNET

EAW_SCP22
EAW_SWI22

EAW_SCP23

EAW_SCP25

EAW_SCP27

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

EAW_SCP29

EAW_PLC23

EAW_PLC25

EAW_PLC27

EAW_PLC29

Backwash Waste
Thickener No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX

Sedimentation Thickener No. 1


Vendor PLC
IP: XXX.XXX.XXX.XX

Polymer (Thickener)
Vendor PLC
IP: XXX.XXX.XXX.XX

Truck Unloading System


Vendor PLC
IP: XXX.XXX.XXX.XX

EAW_SCP24
EAW_PLC24

EAW_SCP26
EAW_PLC26

EAW_SCP28
EAW_PLC28

KEY PLAN

EAW_PLC22

Centrifuge No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX

Centrifuge No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX

EAW_OIT21

EAW_OIT22

PROJECT NUMBER

CNET
RPA

RPFM

ACN15

CNET

60246477

SHEET TITLE

F
DNET
DNET

Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX

Centrifuge No. 2
Vendor OIT
IP: XXX.XXX.XXX.XX

Backwash Waste
Thickener No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX

Sedimentation Thickener No. 2


Vendor PLC
IP: XXX.XXX.XXX.XX

Polymer (Dewatering)
Vendor PLC
IP: XXX.XXX.XXX.XX

GENERAL SCADA
Network Architecture
SHEET NUMBER

DI620

ISO A1 594mm x 841mm


Approved: _____

PROJECT

RESIDUALS
MANAGEMENT
FACILITY

2997 mm

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT

2286 mm

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

150 mm

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

REGISTRATION

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

RMF
CONTROL PANEL
SHEET NUMBER

DI621

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

REGISTRATION

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

CONTROL PANEL SCP-20


POWER DISTRIBUTION
SHEET NUMBER

DI622

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

REGISTRATION

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

CONTROL PANEL SCP-20


POWER DISTRIBUTION
(CONTINUED)
SHEET NUMBER

DI623

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

REGISTRATION

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

NOTES:

CONTROL PANEL
SCP-20
RACK LAYOUT
SHEET NUMBER

DI624

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

REGISTRATION

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

NOTES:

CONTROL PANEL
SCP-20
RACK LAYOUT (CONTINUED)
SHEET NUMBER

DI625

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

Designer: _____

ELGIN AREA WATER


SUPPLY SYSTEM

Project Management Initials:

235 North Centre Road, Suite 200 London


Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

REGISTRATION

Printed on ___% Post-Consumer


Recycled Content Paper

ISSUE/REVISION

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

PROJECT NUMBER

60246477
SHEET TITLE

TYPICAL LOOP
DRAWING EXAMPLES
SHEET NUMBER

DI626

ISO A1 594mm x 841mm

PROJECT

Checked: _____

Approved: _____

ITEM #

WALL-MOUNT SWING OUT RACK

LOCKABLE FRONT TINTED WINDOW DOOR

24 PORT MANAGED SWITCH

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0

RACK SHELF

Designer: _____

RESIDUALS
MANAGEMENT
FACILITY

MEDIA CONVERTER

FIBER HOUSING PANEL

Project Management Initials:

627

DESCRIPTION

FIBER ADAPTER PLATES

CLIENT

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca

653

CONSULTANT

CABLE MANAGEMENT RACK

POWER DISTRIBUTION UNIT/BAR

10

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

PUNCHDOWN COPPER PATCH PANEL

610

TOP VIEW
REGISTRATION

653

Printed on ___% Post-Consumer


Recycled Content Paper

508

3
5
Cisco Systems

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

36

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

4
BLACK BOX
XMT

RCV

100 Mbps

10

6
7
ISSUE/REVISION
705

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

8
0

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

9
KEY PLAN
NOTES:

FRONT VIEW (DOOR REMOVED)

SIDE VIEW

PROJECT NUMBER

60246477
SHEET TITLE

GENERAL SCADA
Residual Management Area
Network Panel Layout (EAW_NCP20)
SHEET NUMBER

DI627

ISO A1 594mm x 841mm

PROJECT

ITEM #

DESCRIPTION

Approved: _____
Checked: _____

MEDIA CONVERTER

Designer: _____

24VDC POWER SUPPY

MAIN CIRCUIT BREAKER

Project Management Initials:

NEMA 4X FIBERGLASS REINFORCED PLASTIC (FRP)


WALL-MOUNT HINGED DOOR

120 VAC CIRCUIT BREAKERS

6 PORT MANAGED SWITCH

24VDC REDUNDANCY MODULE

RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
CLIENT

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT

TOP VIEW

24VDC CIRCUIT BREAKERS

SURGE PROTECTOR

10

UTILITY DUPLEX RECEPTACLE

11

UPS SIMPLEX RECEPTACLE

12

GROUNDING BAR

13

2" x 3" DEEP PANDUIT

14

PANEL LIGHT

15

TOWER UPS

16

STANDARD TERMINALS

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

825

345
329
275

Allen-Bradley
BLACK BOX

100 Mbps

17

Stratix 5700
1

2
Express
Setup

14

REGISTRATION

DC2

Pwr A

DC+
3
XMT

DC-

17

Pwr B
4
RCV

DC+

DIN RAIL

5
Com

IN2

Ref

13

IN1

Printed on ___% Post-Consumer


Recycled Content Paper

16

11

10

1084

939

1025

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

8
ISSUE/REVISION

15

12

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN
NOTES:

740

FRONT VIEW (DOOR REMOVED)

PROJECT NUMBER

SIDE VIEW

60246477
SHEET TITLE

GENERAL SCADA
Settling / Sedimentation (Chemical Area)
Network Panel Layout (EAW_NCP30)
SHEET NUMBER

DI628

ISO A1 594mm x 841mm

PROJECT

Approved: _____

RESIDUALS
MANAGEMENT
FACILITY

Checked: _____

ELGIN AREA WATER TREATMENT PLANT


43665 Dexter Line
Central Elgin, Ontario N0L 2L0
120 VAC FROM EXISTING LP

CLIENT
TO GND BUS

Designer: _____

BRK01 (15A)
DOOR
SWITCH

Project Management Initials:

BKR02 (5A)

FLUORESCENT
LIGHT

ELGIN AREA WATER


SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel
519.474.00451 fax
www.watersupply.london.ca
CONSULTANT

BKR03 (5A)

AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel
519.673.5975 fax
www.aecom.com

UTILITY
#12 AWG WHITE
#12 AWG RED

BKR04 (15A)

UPS

#12 AWG WHITE

#12 AWG RED

BKR05 (5A)
SPARE

UPS
UNIT

#12 AWG GREEN

REGISTRATION
#12 AWG BLUE

#12 AWG WHITE

BKR06 (5A)

Last saved: (2013-10-04) Last Plotted: 2013-10-04


Filename: P:\60246477\000-CADD\040 CADD-BIM WIP\02-SHEETS\DI-PROCESS INSTRUMENTATION\60246477-SHT-30-0000-DI-620-F629_PID.DWG

MEDIA CONVERTER

Printed on ___% Post-Consumer


Recycled Content Paper

24VDCPS1

BKR07 (5A)

24 VDC
POWER
SUPPLY

+
24VDCPS2

BKR08 (5A)

ISSUE/REVISION

24 VDC
POWER
SUPPLY
#14 AWG BLACK

+
+V IN 1
+V IN 2
+V OUT

#14 AWG WHITE

REDUNDANCY
MODULE

#14 AWG BLACK

2013-10-09

I/R

DATE

ISSUED FOR TENDER


DESCRIPTION

KEY PLAN

5A
CB01

NETWORK SWITCH
5A

CB02

SPARE

PROJECT NUMBER

60246477
SHEET TITLE

GENERAL SCADA
Settling/Sedimentation (Chemical Area)
NP Power Schematic (EAW_NCP30)
SHEET NUMBER

DI629

You might also like