You are on page 1of 8

E 1,578,250

CHIEF SURVEY SECTION

08/04/2015

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,602,750

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

0
N 2,602,750

STATE

CALIFORNIA

Date:

E 1,577,500

E 1,577,250

E 1,577,000

US Army Corps
of Engineers

DESCRIPTION

BY

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

APPVD REVISION

N 2,602,500
0

N 2,602,500

DATE

NOTES

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
0

5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

N 2,602,250

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.
N 2,602,250

SURVEY CONTROL DATA

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

N 2,602,000

CURVE DATA
CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

C5

278.000'

295.969'

DELTA ANGLE

072850_VH01.DWG

1,579,007.85

FILE NAME:

2,603,279.85

ANSI E

TMP-1 1982

SIZE:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

2914

20.57

8/4/2015

1,577,411.00

1" = 50'

2,603,536.20

JOB NO.:

NO 21 1966

PLOT DATE:

3 1/2 INCH USACE DBC

SCALE:

17.75

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

1,578,004.17

W911KB-14-D-0013 / 0014

2,602,778.67

Thomas A. Sloan, Chief Geomatics Section

BREAK 1965

CONTRACT NO.:

NGS NAVD 88 BENCH MARK

APPROVED BY:

16.98

072850

1,584,077.40

GWG/ENHJ/TAS

2,608,238.50

GWG/ENHJ

BM 98 1964

UPC:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK
4 August 2015

34.30

CHECKED BY:

1,577,794.00

DRAWN BY:

2,603,915.90

DATE:

4240 L 1978

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

N 2,602,000

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

NAVIGATION AIDS
NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

VOLUME COMPUTATIONS

PROJECT LIMITS

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

659

CORNER# NORTHING

AREA B: BASIN

50

25

50

100

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AREA C: USCG APPROACH CHANNEL

200

GRAPHIC SCALE IN FEET

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

15,655

N 2,601,500

JUNE 15-22, 2015

N 2,601,750

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,601,750

USCG
NO.

N 2,601,500

E 1,578,250

E 1,578,000

E 1,577,750

E 1,577,500

E 1,577,250

E 1,577,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,578,250

08/04/2015
CHIEF SURVEY SECTION

Date:

DESCRIPTION

BY

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,604,250

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

N 2,604,250

STATE

CALIFORNIA

E 1,578,000

E 1,577,750

E 1,577,500

E 1,577,250

E 1,577,000

US Army Corps
of Engineers

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

N 2,604,000

APPVD REVISION

N 2,604,000

DATE

NOTES

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

N 2,603,750

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

N 2,603,750

SURVEY CONTROL DATA

3 1/2 INCH USACE DBC

NO 21 1966

2,603,536.20

1,577,411.00

20.57

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

TMP-1 1982

2,603,279.85

1,579,007.85

23.16

3 1/2 INCH USACE DBC

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AREA C: USCG APPROACH CHANNEL


AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

15,655

N 2,603,500

CURVE DATA
CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

C5

278.000'

295.969'

DELTA ANGLE
USCG APPROACH CHANNEL
PROJECT DEPTH: -12 MLLW

NAVIGATION AIDS

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

N 2,603,250

072850_VH01.DWG

17.75

FILE NAME:

1,578,004.17

ANSI E

2,602,778.67

SIZE:

BREAK 1965

AREA B: BASIN

2914

659

8/4/2015

-13.0

1" = 150'

AVAILABLE TO MAX PAY DEPTH (MP)

JOB NO.:

NGS NAVD 88 BENCH MARK

PLOT DATE:

16.98

SCALE:

1,584,077.40

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

2,608,238.50

W911KB-14-D-0013 / 0014

BM 98 1964

Thomas A. Sloan, Chief Geomatics Section

263

CONTRACT NO.:

-12.0

APPROVED BY:

AVAILABLE TO PROJECT DEPTH (PD)

072850

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

GWG/ENHJ/TAS

34.30

GWG/ENHJ

1,577,794.00

UPC:

2,603,915.90

4 August 2015

4240 L 1978

CHECKED BY:

CU. YD.

DRAWN BY:

MLLW=0

DATE:

AREA A: ENTRANCE CHANNEL

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

VOLUME COMPUTATIONS

USCG
NO.

NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

PROJECT LIMITS

CORNER# NORTHING
00

50

25

50

100

200

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

GRAPHIC SCALE IN FEET

JUNE 15-22, 2015

PROJECT LIMITS
0

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,000

N 2,603,000

E 1,578,250

E 1,577,500

E 1,577,250

E 1,577,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,579,750

08/04/2015
CHIEF SURVEY SECTION

Date:

DESCRIPTION

BY

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,604,250

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

N 2,604,250

STATE

CALIFORNIA

E 1,579,500

E 1,579,250

E 1,579,000

E 1,578,500

US Army Corps
of Engineers

DATE

NOTES

N 2,604,000

APPVD REVISION

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

00

4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.

SH

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.

5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

WALL
E
L
I
P
EET

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

SURVEY CONTROL DATA

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

BASIN
PROJECT DEPTH: -12 MLLW

ILE W
P
T
E
E

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

ALL

NAVIGATION AIDS

SH

USCG
NO.

NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

VOLUME COMPUTATIONS

CURVE DATA

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

-13.0

659

AVAILABLE TO MAX PAY DEPTH (MP)

AREA B: BASIN

CORNER# NORTHING

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

98.481'

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

100.000'

183.261'

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

C4

100.000'

157.076'

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

C5

278.000'

295.969'

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

C3

DELTA ANGLE

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

AREA C: USCG APPROACH CHANNEL

50

25

50

100

200

GRAPHIC SCALE IN FEET

15,655

N 2,603,000

N 2,603,000

E 1,579,750

E 1,579,500

E 1,579,250

E 1,579,000

E 1,578,750

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

JUNE 15-22, 2015

PROJECT LIMITS

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,250

E 1,578,500

072850_VH01.DWG

1,579,007.85

FILE NAME:

2,603,279.85

ANSI E

TMP-1 1982

SIZE:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

2914

20.57

8/4/2015

1,577,411.00

1" = 50'

2,603,536.20

JOB NO.:

NO 21 1966

PLOT DATE:

3 1/2 INCH USACE DBC

SCALE:

17.75

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

1,578,004.17

W911KB-14-D-0013 / 0014

2,602,778.67

Thomas A. Sloan, Chief Geomatics Section

BREAK 1965

CONTRACT NO.:

NGS NAVD 88 BENCH MARK

APPROVED BY:

16.98

072850

1,584,077.40

GWG/ENHJ/TAS

2,608,238.50

GWG/ENHJ

BM 98 1964

UPC:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK
4 August 2015

34.30

CHECKED BY:

1,577,794.00

DRAWN BY:

2,603,915.90

DATE:

4240 L 1978

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

BASIN
PROJECT DEPTH: -12 MLLW

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,581,250

08/04/2015
CHIEF SURVEY SECTION

Date:

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,604,250

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

N 2,604,250

STATE

CALIFORNIA

E 1,581,000

E 1,580,750

E 1,580,500

E 1,580,250

E 1,580,000

US Army Corps
of Engineers

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

659

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

DESCRIPTION

BY

VOLUME COMPUTATIONS

AREA B: BASIN

AREA C: USCG APPROACH CHANNEL

NOTES

15,655

N 2,604,000

DATE

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

APPVD REVISION

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

N 2,603,750

SURVEY CONTROL DATA

1,579,007.85

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

N 2,603,500

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

CURVE DATA

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

C5

278.000'

295.969'

DELTA ANGLE

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

N 2,603,500

072850_VH01.DWG

2,603,279.85

FILE NAME:

TMP-1 1982

ANSI E

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

SIZE:

20.57

2914

1,577,411.00

8/4/2015

2,603,536.20

1" = 50'

NO 21 1966

JOB NO.:

3 1/2 INCH USACE DBC

PLOT DATE:

17.75

SCALE:

1,578,004.17

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

2,602,778.67

W911KB-14-D-0013 / 0014

BREAK 1965

Thomas A. Sloan, Chief Geomatics Section

NGS NAVD 88 BENCH MARK

CONTRACT NO.:

16.98

APPROVED BY:

1,584,077.40

072850

2,608,238.50

GWG/ENHJ/TAS

BM 98 1964

GWG/ENHJ

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

UPC:

34.30

4 August 2015

1,577,794.00

CHECKED BY:

2,603,915.90

DRAWN BY:

4240 L 1978

DATE:

DESCRIPTION

Gregory W. Gibson

NORTHING EASTING MLLW

SURVEYED BY:

STATION

NAVIGATION AIDS
NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

PROJECT LIMITS
CORNER# NORTHING

50

25

50

100

200

GRAPHIC SCALE IN FEET

N 2,603,000

N 2,603,000

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

E 1,581,250

E 1,581,000

E 1,580,750

E 1,580,500

E 1,580,250

E 1,580,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

JUNE 15-22, 2015

N 2,603,250

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,250

USCG
NO.

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,578,250

CHIEF SURVEY SECTION

08/04/2015

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,602,750

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

0
N 2,602,750

STATE

CALIFORNIA

Date:

E 1,577,500

E 1,577,250

E 1,577,000

US Army Corps
of Engineers

DESCRIPTION

BY

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

APPVD REVISION

N 2,602,500
0

N 2,602,500

DATE

NOTES

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
0

5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

N 2,602,250

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.
N 2,602,250

SURVEY CONTROL DATA

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

N 2,602,000

CURVE DATA
CURVE

RADIUS

ARC LENGTH

DELTA ANGLE

C1

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

MIN. ELEV.

MAX. ELEV.

C5

278.000'

295.969'

-160.0

-32.0

-32.0

-28.0

-28.0

-24.0

-24.0

-20.0

-20.0

-16.0

-16.0

-14.0

-14.0

-12.0

-12.0

-10.0

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

-10.0

-8.0

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

659

ELEVATION COLOR LEGEND

11

50

25

50

100

200

GRAPHIC SCALE IN FEET

-8.0

NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

N 2,601,750

VOLUME COMPUTATIONS

-6.0

-6.0

USCG
NO.

PROJECT LIMITS
CORNER# NORTHING

AREA B: BASIN

-4.0

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

-13.0

9,966

12

-4.0

-2.0

AVAILABLE TO MAX PAY DEPTH (MP)

13

-2.0

0.0

AREA C: USCG APPROACH CHANNEL

14

0.0

2.0

15

2.0

4.0

16

4.0

6.0

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

15,655

N 2,601,500

JUNE 15-22, 2015

10

NAVIGATION AIDS

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,601,750

COLOR

072850_VH01.DWG

1,579,007.85

FILE NAME:

2,603,279.85

ANSI E

TMP-1 1982

SIZE:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

2914

20.57

8/4/2015

1,577,411.00

1" = 50'

2,603,536.20

JOB NO.:

NO 21 1966

PLOT DATE:

3 1/2 INCH USACE DBC

SCALE:

17.75

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

1,578,004.17

W911KB-14-D-0013 / 0014

2,602,778.67

Thomas A. Sloan, Chief Geomatics Section

BREAK 1965

CONTRACT NO.:

NGS NAVD 88 BENCH MARK

APPROVED BY:

16.98

072850

1,584,077.40

GWG/ENHJ/TAS

2,608,238.50

GWG/ENHJ

BM 98 1964

UPC:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK
4 August 2015

34.30

CHECKED BY:

1,577,794.00

DRAWN BY:

2,603,915.90

DATE:

4240 L 1978

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

N 2,602,000

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

N 2,601,500

E 1,578,250

E 1,578,000

E 1,577,750

E 1,577,500

E 1,577,250

E 1,577,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,578,250

08/04/2015
CHIEF SURVEY SECTION

Date:

DESCRIPTION

BY

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,604,250

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

N 2,604,250

STATE

CALIFORNIA

E 1,578,000

E 1,577,750

E 1,577,500

E 1,577,250

E 1,577,000

US Army Corps
of Engineers

ELEVATION COLOR LEGEND


-160.0

-32.0

-32.0

-28.0

-28.0

-24.0

-24.0

-20.0

-20.0

-16.0

-16.0

-14.0

-14.0

-12.0

-12.0

-10.0

-10.0

-8.0

10

-8.0

-6.0

11

-6.0

-4.0

12

-4.0

-2.0

13

-2.0

0.0

14

0.0

2.0

15

2.0

4.0

16

4.0

6.0

NOTES

N 2,604,000

DATE

COLOR

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

N 2,604,000

APPVD REVISION

MAX. ELEV.

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.

BY

MIN. ELEV.

2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.
3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.

DESCRIPTION

4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.


5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

N 2,603,750

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

N 2,603,750

SURVEY CONTROL DATA

3 1/2 INCH USACE DBC

NO 21 1966

2,603,536.20

1,577,411.00

20.57

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

TMP-1 1982

2,603,279.85

1,579,007.85

23.16

3 1/2 INCH USACE DBC

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AREA C: USCG APPROACH CHANNEL


AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

15,655

N 2,603,500

CURVE DATA
CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

C5

278.000'

295.969'

DELTA ANGLE
USCG APPROACH CHANNEL
PROJECT DEPTH: -12 MLLW

NAVIGATION AIDS

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

N 2,603,250

072850_VH01.DWG

17.75

FILE NAME:

1,578,004.17

ANSI E

2,602,778.67

SIZE:

BREAK 1965

AREA B: BASIN

2914

659

8/4/2015

-13.0

1" = 150'

AVAILABLE TO MAX PAY DEPTH (MP)

JOB NO.:

NGS NAVD 88 BENCH MARK

PLOT DATE:

16.98

SCALE:

1,584,077.40

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

2,608,238.50

W911KB-14-D-0013 / 0014

BM 98 1964

Thomas A. Sloan, Chief Geomatics Section

263

CONTRACT NO.:

-12.0

APPROVED BY:

AVAILABLE TO PROJECT DEPTH (PD)

072850

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

GWG/ENHJ/TAS

34.30

GWG/ENHJ

1,577,794.00

UPC:

2,603,915.90

4 August 2015

4240 L 1978

CHECKED BY:

CU. YD.

DRAWN BY:

MLLW=0

DATE:

AREA A: ENTRANCE CHANNEL

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

VOLUME COMPUTATIONS

USCG
NO.

NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

PROJECT LIMITS

CORNER# NORTHING

50

25

50

100

200

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

GRAPHIC SCALE IN FEET

JUNE 15-22, 2015

PROJECT LIMITS
0

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,000

N 2,603,000

E 1,578,250

E 1,577,500

E 1,577,250

E 1,577,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,579,750

-28.0

-24.0

-24.0

-20.0

-20.0

-16.0

-16.0

-14.0

-14.0

-12.0

-12.0

-10.0

-10.0

-8.0

10

-8.0

-6.0

11

-6.0

-4.0

12

-4.0

-2.0

13

-2.0

0.0

14

0.0

2.0

15

2.0

4.0

16

4.0

6.0

08/04/2015

Date:

DESCRIPTION

BY

APPVD

N 2,604,250

CHIEF SURVEY SECTION

-28.0

PRIME CONTRACTOR

-32.0

MICHAEL E. MUELLER

Approved:

-32.0

Recommended:

-160.0

CITY SAN RAFAEL

COLOR

ETRAC INC.

MAX. ELEV.

CONTRACTOR

MIN. ELEV.

CONTRACT NO. W911KB-14-D-0013

DATE

NOTES

N 2,604,000

APPVD REVISION

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.

BY

N 2,604,250

STATE

ELEVATION COLOR LEGEND

THOMAS A. SLOAN

CALIFORNIA

E 1,579,500

E 1,579,250

E 1,579,000

E 1,578,500

US Army Corps
of Engineers

2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.

SH

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.

5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

WALL
E
L
I
P
EET

DATE

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

REVISION

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

SURVEY CONTROL DATA

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

BASIN
PROJECT DEPTH: -12 MLLW

ILE W
P
T
E
E

ENTRANCE CHANNEL
PROJECT DEPTH: -12 MLLW

ALL

NAVIGATION AIDS

SH

USCG
NO.

NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

VOLUME COMPUTATIONS

CURVE DATA

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

-13.0

659

AVAILABLE TO MAX PAY DEPTH (MP)

AREA B: BASIN

CORNER# NORTHING

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

98.481'

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

100.000'

183.261'

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

C4

100.000'

157.076'

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

C5

278.000'

295.969'

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

CURVE

RADIUS

ARC LENGTH

C1

398.000'

294.700'

C2

100.000'

C3

DELTA ANGLE

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

AREA C: USCG APPROACH CHANNEL

50

25

50

100

200

GRAPHIC SCALE IN FEET

15,655

N 2,603,000

N 2,603,000

E 1,579,750

E 1,579,500

E 1,579,250

E 1,579,000

E 1,578,750

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

JUNE 15-22, 2015

PROJECT LIMITS

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,250

E 1,578,500

072850_VH01.DWG

1,579,007.85

FILE NAME:

2,603,279.85

ANSI E

TMP-1 1982

SIZE:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

2914

20.57

8/4/2015

1,577,411.00

1" = 50'

2,603,536.20

JOB NO.:

NO 21 1966

PLOT DATE:

3 1/2 INCH USACE DBC

SCALE:

17.75

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

1,578,004.17

W911KB-14-D-0013 / 0014

2,602,778.67

Thomas A. Sloan, Chief Geomatics Section

BREAK 1965

CONTRACT NO.:

NGS NAVD 88 BENCH MARK

APPROVED BY:

16.98

072850

1,584,077.40

GWG/ENHJ/TAS

2,608,238.50

GWG/ENHJ

BM 98 1964

UPC:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK
4 August 2015

34.30

CHECKED BY:

1,577,794.00

DRAWN BY:

2,603,915.90

DATE:

4240 L 1978

Gregory W. Gibson

DESCRIPTION

SURVEYED BY:

BASIN
PROJECT DEPTH: -12 MLLW

NORTHING EASTING MLLW

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

STATION

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

E 1,581,250

08/04/2015
CHIEF SURVEY SECTION

Date:

APPVD

PRIME CONTRACTOR

MICHAEL E. MUELLER

THOMAS A. SLOAN

Approved:
Recommended:

CITY SAN RAFAEL

CONTRACTOR

N 2,604,250

ETRAC INC.

CONTRACT NO. W911KB-14-D-0013

N 2,604,250

STATE

CALIFORNIA

E 1,581,000

E 1,580,750

E 1,580,500

E 1,580,250

E 1,580,000

US Army Corps
of Engineers

AREA A: ENTRANCE CHANNEL

MLLW=0

CU. YD.

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

263

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

659

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

2,536

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

9,966

AVAILABLE TO PROJECT DEPTH (PD)

-12.0

172

AVAILABLE TO MAX PAY DEPTH (MP)

-13.0

536

AVAILABLE SS AT 3:1 (H:V) & 25' WIDE


TOTAL MAXIMUM VOLUME AVAILABLE (MP + SS)

VARIES

4,504

DESCRIPTION

BY

VOLUME COMPUTATIONS

AREA B: BASIN

AREA C: USCG APPROACH CHANNEL

NOTES

15,655

N 2,604,000

DATE

1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83 IN US SURVEY FEET
BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83(CORS) 2003.00
EPOCH VALUES OF NGS CORS STATIONS: "GLENALLEN CORS ARP" (GNAA - NGS PID AH2492) ; "POTATO POINT
5 CORS ARP" (POT5 - NGS PID DJ3043) AND "ANCHORAGE AK DOT CORS ARP" (TBON - NGS PID DK4055). .

APPVD REVISION

2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH
MARK LIST: "945 4240, VALDEZ, PRINCE WILLIAM SOUND, ALASKA, PUBLISHED 09/30/2011". THIS TIDAL DATUM
IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK
"4240 L 1978" (VM#1257) AS 34.30'.

COLOR

-160.0

-32.0

4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.

-32.0

-28.0

-28.0

-24.0

-24.0

-20.0

5. WAS COLLECTED JUNE 19-21, 2015. SOUNDINGS WERE COLLECTED USING AN R2SONIC 2022 MULTIBEAM
ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THOUGH THE WATER COLUMN WAS DETERMINED
WITH AN AML BASE X SOUND VELOCITY PROBE. POSITION AND VESSEL ORIENTATION WERE MEASURED
USING AN APPLANIX POSMV 320 V4 SYSTEM. DATA WAS COLLECTED AND PROCESSED USING QINSY 8.1
SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING STATIC AND RTK GNSS EQUIPMENT AND
TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELING TECHNIQUES.

-20.0

-16.0

6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.

-16.0

-14.0

-14.0

-12.0

7. MAP SOUNDINGS ARE BINNED AT 24 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 12 FEET
BINNED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE BINNED AT 3 FEET AND ARE MEAN VALUE
SOUNDINGS.

-12.0

-10.0

-10.0

-8.0

10

-8.0

-6.0

11

-6.0

-4.0

12

-4.0

-2.0

13

-2.0

0.0

14

0.0

2.0

15

2.0

16

4.0

N 2,603,750

SURVEY CONTROL DATA

23.16

3 1/2 INCH USACE DBC

VH-1 1997

2,603,041.94

1,577,733.46

17.77

3 1/4 INCH TERRA SURVEYS SBC

VH-2 1997

2,603,735.41

1,578,538.01

20.51

3 1/4 INCH TERRA SURVEYS SBC

VH-3 2000

2,603,371.17

1,579,485.89

21.26

3 1/4 INCH TERRA SURVEYS SBC

VH-4 2000

2,603,143.94

1,578,248.04

21.90

3 1/4 INCH TERRA SURVEYS SBC

VH-5 2003

2,604,218.42

1,580,381.26

16.79

3 1/4 INCH TERRA SURVEYS SBC

VH-6 2003

2,603,739.93

1,580,595.12

17.59

3 1/4 INCH TERRA SURVEYS SBC

VH-7 2006

2,603,960.18

1,579,020.58

21.24

3 INCH HUGHES & ASSOC. SBC

VH-8 2006

2,604,074.83

1,579,772.68

17.42

3 INCH HUGHES & ASSOC. SBC

VH-9 2009

2,603,513.62

1,578,487.96

21.24

3 1/4 INCH TERRA SURVEYS SBC

WAREHOUSE
1966

2,602,621.30

1,582,924.60

25.52

4 INCH NOAA/NOS TIDAL BENCH


MARK

ARC LENGTH

398.000'

294.700'

C2

100.000'

98.481'

C3

100.000'

183.261'

C4

100.000'

157.076'

C5

278.000'

295.969'

DELTA ANGLE

072850_VH01.DWG

1,579,007.85

FILE NAME:

2,603,279.85

ANSI E

TMP-1 1982

SIZE:

6.0

2914

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

8/4/2015

20.57

1" = 50'

1,577,411.00

JOB NO.:

2,603,536.20

PLOT DATE:

NO 21 1966

SCALE:

4.0

ETRAC INC.
637 LINDARO ST., STE 100
SAN RAFAEL, CA 94901

3 1/2 INCH USACE DBC

W911KB-14-D-0013 / 0014

17.75

Thomas A. Sloan, Chief Geomatics Section

1,578,004.17

CONTRACT NO.:

2,602,778.67

APPROVED BY:

BREAK 1965

072850

NGS NAVD 88 BENCH MARK

GWG/ENHJ/TAS

16.98

GWG/ENHJ

1,584,077.40

UPC:

2,608,238.50

4 August 2015

BM 98 1964

CHECKED BY:

3 1/2 INCH NOAA/NOS TIDAL BENCH


MARK

DRAWN BY:

34.30

DATE:

1,577,794.00

Gregory W. Gibson

2,603,915.90

CURVE DATA
C1

DESCRIPTION

4240 L 1978

N 2,603,500

RADIUS

NORTHING EASTING MLLW

SURVEYED BY:

STATION

N 2,603,500

CURVE

DATE

MAX. ELEV.

REVISION

MIN. ELEV.

DESCRIPTION

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88
ELEVATIONS HOLDING 3.25" STAMPED BRASS CAP, "VH-4 2000" (NGS PID BBDW96), AS 20.60'.

U.S. ARMY CORPS OF ENGINEERS


ALASKA DISTRICT
P.O. BOX 6898
JBER, ALASKA 99506-0898

ELEVATION COLOR LEGEND

BY

LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 3, NAD83, IN US SURVEY FEET
HOLDING "VH-4 2000" AS N 2,603,143.94', E 1,578,248.04'.

NAVIGATION AIDS
NORTHING

EASTING

DESCRIPTION

25815

2,602,429

1,577,868

VALDEZ BOAT HARBOR LIGHT 2 RED

25820

2,602,641

1,577,601

VALDEZ BOAT HARBOR LIGHT 3 GREEN

PROJECT LIMITS
CORNER# NORTHING

50

25

50

100

200

GRAPHIC SCALE IN FEET

N 2,603,000

N 2,603,000

PROJECT LIMITS

EASTING

CORNER# NORTHING

EASTING

2,602,310.63

1,577,595.91

11

2,603,536.25

1,578,610.46

2,603,103.53

1,577,876.10

12

2,603,773.16

1,578,570.66

2,603,363.42

1,578,185.40

13

2,603,983.57

1,579,822.90

2,603,321.97

1,578,063.82

14

2,603,558.47

1,579,894.36

2,603,400.25

1,578,116.20

15

2,603,513.76

1,579,804.19

2,603,532.00

1,578,128.80

16

2,603,302.72

1,578,548.30

2,603,525.77

1,578,193.93

17

2,603,265.48

1,578,326.70

2,603,491.96

1,578,190.69

18

2,603,245.08

1,578,205.29

2,603,383.83

1,578,306.81

19

2,603,063.55

1,577,989.24

10

2,603,421.06

1,578,528.41

20

2,602,270.65

1,577,709.05

E 1,581,250

E 1,581,000

E 1,580,750

E 1,580,500

E 1,580,250

E 1,580,000

THIS HYDROGRAPHIC SURVEY WAS COMPLETED


UNDER THE OVERSIGHT OF AN ACSM/THOSOA
CERTIFIED HYDROGRAPHER

(Lewis J. Epps)

08/04/2015

David R. Neff C.H. (275)

JUNE 15-22, 2015

N 2,603,250

VALDEZ, ALASKA
VALDEZ HARBOR
PROJECT CONDITION SURVEY

N 2,603,250

USCG
NO.

SHEET
IDENTIFICATION

3-VAL-92-07-10

No. 3510

Sheet

of

You might also like