INSTANSI
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
NO
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
MACAM PEKERJAAN
JUMLAH HARGA
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN BETON
PEKERJAAN KUSEN ALUMUNIUM DAN BESI
PEKERJAAN LANTAI
PEKERJAAN PLAFOND
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
PEKERJAAN CAT-CATAN
PEKERJAAN SANITASI, SANITER DAN AIR BERSIH
PEKERJAAN INSTALASI PENERANGAN,STOP KONTAK DINDING
PEKERJAAN TATA SUARA
Jumlah nominal
PPN 10%
JUMLAH
Dibulatkan
Terbilang :
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,298,635.75
19,188,068.72
136,690,381.89
176,258,700.93
86,234,903.00
117,426,051.14
18,537,486.87
89,227,140.29
17,127,504.17
10,246,638.57
7,349,555.00
7,600,000.00
688,185,066.32
68,818,506.63
757,003,572.95
757,003,000.00
4.17
789,959,000.00
INSTANSI
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
NO
I
MACAM PEKERJAAN
VOLUME
HARGA SAT
JUMLAH HARGA
PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pengukuran dan bowplank
3 Papan nama proyek
II
1.00 ls
1.00 ls
1.00 unit
Rp.
1,000,000.00
Rp.
1,000,000.00
Rp.
298,635.75
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
1,000,000.00
1,000,000.00
298,635.75
2,298,635.75
III
1
2
3
4
5
6
7
8
9
10
11
IV
PEKERJAAN BETON
87.57
47.52
15.10
16.22
30.52
52.70
59.12
m3
m3
m3
m3
m3
m3
m3
Rp.
47,906.25
Rp.
58,590.00
Rp.
173,591.25
Rp.
173,591.25
Rp.
173,591.25
Rp.
13,190.10
Rp.
13,190.10
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,195,150.31
2,784,196.80
2,620,880.69
2,815,580.64
5,297,364.40
695,097.17
779,798.71
19,188,068.72
58.65
52.83
283.17
105.66
566.34
227.57
43.50
792.97
184.50
46.70
81.17
m3
m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
Rp.
555,581.25
Rp.
96,527.55
Rp.
90,913.20
Rp.
44,240.49
Rp.
40,284.09
Rp.
44,240.49
Rp.
166,635.00
Rp.
24,438.75
Rp.
9,633.00
Rp.
27,568.01
Rp.
74,061.23
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32,585,951.48
5,099,550.47
25,743,890.84
4,674,450.17
22,814,491.53
10,067,830.43
7,248,722.48
19,379,193.14
1,777,288.50
1,287,426.18
6,011,586.66
136,690,381.89
Rp.
680,410.50 Rp.
1,508,878.32
2.22 m3
5.54
1,147.89
73.92
73.92
m3
kg
m2
m2
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
161,941.50
6,142.00
Rp.
Rp.
Rp.
Rp.
4,635,043.18
12,803,782.65
11,970,715.68
454,016.64
1.41
291.96
28.16
28.16
1.41
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
152,685.75
6,142.00
118,085.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,177,153.82
3,256,593.24
4,299,630.72
172,958.72
166,263.68
NO
MACAM PEKERJAAN
VOLUME
HARGA SAT
1.73
358.32
34.56
34.56
1.73
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
152,685.75
6,142.00
118,085.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,444,688.78
3,996,728.07
5,276,819.52
212,267.52
204,050.88
0.55
114.41
11.04
11.04
0.55
47.60
m3
kg
m2
m2
m3
m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
152,685.75
6,142.00
118,085.00
58,327.50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
461,297.15
1,276,177.48
1,684,917.79
67,778.20
65,154.58
2,776,389.00
2.55
647.41
34.00
34.00
m3
kg
m2
m2
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
152,685.75
6,142.00
Rp.
Rp.
Rp.
Rp.
2,131,919.21
7,221,263.47
5,191,315.50
208,828.00
0.20
52.73
3.69
3.69
m3
kg
m2
m2
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
113,536.50
6,142.00
Rp.
Rp.
Rp.
Rp.
169,675.69
588,153.14
418,949.69
22,663.98
2.27
575.81
41.58
41.58
2.27
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
156,623.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,896,154.03
6,422,676.68
6,512,394.74
255,384.36
535,635.83
1.26
319.89
23.10
23.10
1.26
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
156,623.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,053,418.91
3,568,153.71
3,617,997.08
141,880.20
297,575.46
0.49
124.91
9.02
9.02
0.49
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
156,623.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
411,335.00
1,393,279.07
1,412,741.72
55,400.84
116,196.13
0.84
213.26
15.40
15.40
0.84
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
156,623.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
702,279.27
2,378,769.14
2,411,998.05
94,586.80
198,383.64
0.92
234.48
23.04
23.04
0.92
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
156,623.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
770,500.68
2,615,480.32
3,608,599.68
141,511.68
217,655.19
NO
MACAM PEKERJAAN
VOLUME
HARGA SAT
4.92
872.96
40.99
40.99
4.92
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
239,363.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
4,112,371.84
9,737,110.42
9,811,559.46
251,762.12
1,161,685.00
4.04
717.71
33.70
33.70
4.04
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
239,363.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
3,380,998.14
8,005,392.88
8,066,601.37
206,986.94
955,082.61
0.52
35.78
6.48
6.48
0.52
m3
kg
m2
m2
m3
Rp.
Rp.
Rp.
Rp.
Rp.
836,046.75
11,154.15
239,363.25
6,142.00
236,171.00
Rp.
Rp.
Rp.
Rp.
Rp.
433,406.64
399,078.94
1,551,073.86
39,800.16
122,431.05
9.84 m3
439.86 kg
Rp.
Rp.
836,046.75 Rp.
11,154.15 Rp.
8,226,700.02
4,906,311.24
0.05
2.77
0.50
0.50
m3
kg
m2
m2
Rp.
836,046.75
Rp.
11,154.15
Rp.
239,363.25
Rp.
6,142.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
42,002.99
30,940.94
120,256.10
3,085.74
176,258,700.93
3.00
2.00
8.00
2.00
12.00
304.00
1.00
1.00
unit
unit
unit
unit
unit
bh
bh
unit
Rp.
6,396,241.00
Rp.
2,793,129.00
Rp.
3,429,579.00
Rp.
568,805.00
Rp.
1,482,140.00
Rp.
25,000.00
Rp.
5,000,000.00
Rp.
2,500,000.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
19,188,723.00
5,586,258.00
27,436,632.00
1,137,610.00
17,785,680.00
7,600,000.00
5,000,000.00
2,500,000.00
86,234,903.00
8.11
10.18
135.92
16.00
51.90
41.80
34.60
17.20
305.16
140.50
1.00
2.00
m3
m2
m2
m2
m2
m'
m'
m2
m2
m2
ls
unit
Rp.
680,410.50
Rp.
163,143.23
Rp.
163,143.23
Rp.
161,474.25
Rp.
176,394.75
Rp.
25,369.64
Rp.
24,500.00
Rp.
205,994.25
Rp.
109,068.75
Rp.
200,000.00
Rp.
2,500,000.00
Rp.
3,500,000.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,517,993.07
1,660,684.16
22,173,888.44
2,583,588.00
9,154,887.53
1,060,450.98
847,700.00
3,543,101.10
33,283,757.86
28,100,000.00
2,500,000.00
7,000,000.00
117,426,051.14
VI
PEKERJAAN LANTAI
1
2
3
4
5
6
7
8
9
10
11
12
NO
VII
1
2
3
MACAM PEKERJAAN
PEKERJAAN PLAFOND
Plafond gypsum rangka hollow
Plafond kalsiboard rangka hollow
Lis plafond gypsum 6-10 cm
VOLUME
HARGA SAT
JUMLAH HARGA
105.11 m2
54.24 m2
70.00 m'
Rp.
105,048.30
Rp.
114,498.30
Rp.
18,353.53
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
11,041,836.91
6,210,903.03
1,284,746.93
18,537,486.87
234.89
234.89
23.92
90.71
m2
m2
m'
m'
Rp.
178,000.00
Rp.
174,956.25
Rp.
138,794.46
Rp.
33,075.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
41,810,636.18
41,095,686.05
3,320,518.66
3,000,299.40
89,227,140.29
522.83
270.14
6.72
159.36
74.69
43.50
m2
m2
m2
m2
m2
m2
Rp.
14,421.23
Rp.
19,776.23
Rp.
36,886.50
Rp.
12,433.05
Rp.
12,433.05
Rp.
25,000.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,539,856.28
5,342,337.56
247,877.28
1,981,287.33
928,630.72
1,087,515.00
17,127,504.17
2.00
4.00
8.00
15.00
15.00
20.00
20.00
1.00
1.00
1.00
unit
unit
unit
m'
m'
m'
m'
unit
unit
unit
Rp.
437,325.00
Rp.
60,464.25
Rp.
44,779.88
Rp.
22,401.23
Rp.
19,553.10
Rp.
50,101.28
Rp.
70,269.15
Rp.
2,750,000.00
Rp.
985,169.19
Rp.
2,000,000.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
874,650.00
241,857.00
358,239.00
336,018.38
293,296.50
1,002,025.50
1,405,383.00
2,750,000.00
985,169.19
2,000,000.00
10,246,638.57
13.00
3.00
4.00
7.00
6.00
3.00
4.00
1.00
5.00
1.00
4.00
titik
titik
titik
unit
unit
unit
unit
unit
unit
unit
unit
Rp.
200,000.00
Rp.
225,000.00
Rp.
225,000.00
Rp.
110,000.00
Rp.
85,000.00
Rp.
25,000.00
Rp.
25,000.00
Rp.
30,686.25
Rp.
37,773.75
Rp.
500,000.00
Rp.
250,000.00
J U M L A H ..
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,600,000.00
675,000.00
900,000.00
770,000.00
510,000.00
75,000.00
100,000.00
30,686.25
188,868.75
500,000.00
1,000,000.00
7,349,555.00
1
2
3
4
5
6
7
8
9
10
Closed jongkok
Floor drain stainless steell
Kran air bersih diameter 1/2"
Pipa PVC 1"+ sambungan
Pipa PVC 3/4"+sambungan
Pipa PVC 3"+sambungan
Pipa PVC 4"+sambungan
Tandon air 1000 liter sekualitas Pinguin
Sumur resapan
Septictank
1
2
3
4
5
6
7
8
9
10
11
NO
MACAM PEKERJAAN
VOLUME
HARGA SAT
JUMLAH HARGA
1
2
3
4
5
6
1.00
1.00
1.00
1.00
2.00
2.00
unit
unit
unit
unit
titik
titik
2.00 unit
2.00 unit
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,000,000.00
2,000,000.00
500,000.00
600,000.00
200,000.00
250,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,000,000.00
2,000,000.00
500,000.00
600,000.00
400,000.00
500,000.00
Rp.
150,000.00 Rp.
Rp.
650,000.00 Rp.
J U M L A H .. Rp.
300,000.00
1,300,000.00
7,600,000.00
ANALISA PEKERJAAN
INSTANSI
KEGIATAN
PEKERJAAN
LOKASI
TAHUN
Uraian
Kode
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
L.01
L.02
L.02
L.04
oh
oh
oh
oh
1.0000
0.0175
1.0000
0.1000
58,500
60,000
60,000
70,000
Jumlah Harga Tenaga Kerja
58,500.00
1,050.00
60,000.00
7,000.00
126,550.00
m3
m2
kg
kg
m3
m3
0.0350
1.0000
0.6000
16.8000
0.0270
0.0405
2,500,000
30,000
14,000
1,300
150,000
150,000
Jumlah Harga Bahan
87,500.00
30,000.00
8,400.00
21,840.00
4,050.00
6,075.00
157,865.00
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Tukang kayu
Mandor
B
1
2
3
4
5
6
Bahan
Kayu meranti
Print outdoor flexi
Paku
Portland Cement
Pasir beton
Kerikil beton
Peralatan
D
E
F
284,415.00
14,220.75
298,635.75
5.00%
Uraian
2
Tenaga
Pekerja
Mandor
Kode
Satuan
Koefisien
L.01
L.04
oh
oh
0.7500
0.0250
B
1
Bahan
Peralatan
D
E
F
Harga Satuan
(Rp)
6
58,500
70,000
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
43,875.00
1,750.00
45,625.00
45,625.00
2,281.25
47,906.25
Uraian
Kode
Satuan
Koefisien
L.01
L.04
oh
oh
0.9000
0.0450
2
Tenaga
Pekerja
Mandor
B
1
Bahan
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
58,500
70,000
Jumlah Harga Tenaga Kerja
52,650.00
3,150.00
55,800.00
55,800.00
2,790.00
58,590.00
5.00%
Uraian
Kode
Satuan
Koefisien
L.01
L.04
oh
oh
0.1920
0.0190
2
Tenaga
Pekerja
Mandor
B
1
Bahan
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
58,500
70,000
Jumlah Harga Tenaga Kerja
11,232.00
1,330.00
12,562.00
12,562.00
628.10
13,190.10
5.00%
Uraian
2
Kode
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
L.01
L.02
oh
oh
0.2500
0.0100
58,500
70,000
Jumlah Harga Tenaga Kerja
14,625.00
700.00
15,325.00
kg
1.2000
125,000
Jumlah Harga Bahan
150,000.00
150,000.00
1
A
1
2
Tenaga
Pekerja
Mandor
B
1
Bahan
Pasir urug
Peralatan
D
E
F
165,325.00
8,266.25
173,591.25
Mengurug tanah m3
No
Uraian
Kode
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
L.01
L.02
oh
oh
0.3000
0.0100
58,500
70,000
Jumlah Harga Tenaga Kerja
17,550.00
700.00
18,250.00
kg
1.2000
40,000
Jumlah Harga Bahan
48,000.00
48,000.00
1
A
1
2
Tenaga
Pekerja
Mandor
B
1
Bahan
Tanah urug
Peralatan
D
E
F
66,250.00
3,312.50
69,562.50
5.00%
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
1.5000
0.7500
0.0750
0.0750
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
87,750.00
45,000.00
4,875.00
5,250.00
142,875.00
B
1
2
3
Bahan
Batu belah 15 cm/20 cm
Portland Cement
Pasir Pasang
m3
kg
m3
1.2000
117.0000
0.5610
125,000
1,300
150,000
Jumlah Harga Bahan
150,000.00
152,100.00
84,150.00
386,250.00
Peralatan
D
E
F
529,125.00
26,456.25
555,581.25
5.00%
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
No
Uraian
1
2
A
Tenaga
1
Pekerja
2
Tukang batu
3
Kepala tukang batu
4
Mandor
Jumlah Harga Tenaga Kerja
B
Bahan
1
Bata merah
2
Portland Cement
3
Pasir Pasang
Kode
Satuan
3
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.3000
0.1000
0.0100
0.0150
58,500
60,000
65,000
70,000
17,550.00
6,000.00
650.00
1,050.00
25,250.00
bh
kg
m3
70.0000
14.3700
0.0400
600
1,300
150,000
Jumlah Harga Bahan
42,000.00
18,681.00
6,000.00
66,681.00
91,931.00
4,596.55
96,527.55
Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
No
Uraian
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
B
1
2
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
L.01
L.04
oh
oh
oh
oh
0.3000
0.1000
0.0100
0.0150
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
17,550.00
6,000.00
650.00
1,050.00
25,250.00
Bahan
Bata merah
Portland Cement
bh
kg
Pasir Pasang
m3
70.0000
9.6800
0.0450
600
1,300
150,000
Jumlah Harga Bahan
42,000.00
12,584.00
6,750.00
61,334.00
Peralatan
D
E
F
10
86,584.00
4,329.20
90,913.20
5.00%
Uraian
1
2
A
Tenaga
1
Pekerja
2
Tukang kayu
3
Kepala tukang kayu
4
Mandor
Jumlah Harga Tenaga Kerja
B
Bahan
1
List profil cornees gypsum
2
Tepung gypsum
3
Alkasit
Kode
Satuan
3
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.1125
0.0375
0.0037
0.0065
58,500
60,000
65,000
70,000
6,581.25
2,250.00
240.50
455.00
9,526.75
m1
kg
kg
1.1000
0.8750
0.0044
4,000
4,000
12,000
Jumlah Harga Bahan
4,400.00
3,500.00
52.80
7,952.80
17,479.55
873.98
18,353.53
10
11
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
B
1
2
3
4
5
6
7
8
Bahan
Rangka hollow 2x4 cm
Rangka hollow 4x4 cm
Gypsum board 9 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku skrup
Kawat penggantung
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.2400
0.3700
0.0370
0.0120
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
14,040.00
22,200.00
2,405.00
840.00
39,485.00
m1
m1
lbr
roll
kg
kg
kg
m1
3.5000
1.2000
0.3600
0.0500
0.4500
0.0030
0.1500
5.0000
6,000
8,000
55,000
12,500
4,000
12,000
18,000
1,000
Jumlah Harga Bahan
21,000.00
9,600.00
19,800.00
625.00
1,800.00
36.00
2,700.00
5,000.00
60,561.00
12
100,046.00
5,002.30
105,048.30
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
B
1
2
3
4
5
6
7
8
Bahan
Rangka hollow 2x4 cm
Rangka hollow 4x4 cm
Kalsiboard 6 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku skrup
Kawat penggantung
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.2400
0.3700
0.0370
0.0120
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
14,040.00
22,200.00
2,405.00
840.00
39,485.00
m1
m1
lbr
roll
kg
kg
kg
m1
3.5000
1.2000
0.3600
0.0500
0.4500
0.0030
0.1500
5.0000
6,000
8,000
80,000
12,500
4,000
12,000
18,000
1,000
Jumlah Harga Bahan
21,000.00
9,600.00
28,800.00
625.00
1,800.00
36.00
2,700.00
5,000.00
69,561.00
109,046.00
5,452.30
114,498.30
11
13
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.7000
0.3500
0.0350
0.0350
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
40,950.00
21,000.00
2,275.00
2,450.00
66,675.00
B
1
2
3
4
Bahan
Ubin keramik
Portland Cement
Pasir Pasang
Semen warna
m2
kg
m3
kg
1.0890
8.1900
0.0450
1.6200
62,500
1,300
150,000
2,000
Jumlah Harga Bahan
68,062.50
10,647.00
6,750.00
3,240.00
88,699.50
Peralatan
D
E
F
14
155,374.50
7,768.73
163,143.23
5%
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.7000
0.3500
0.0350
0.0350
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
40,950.00
21,000.00
2,275.00
2,450.00
66,675.00
B
1
2
3
4
Bahan
Ubin keramik
Portland Cement
Pasir Pasang
Semen warna
m2
kg
m3
kg
1.0600
10.4000
0.0450
1.6200
60,000
1,300
150,000
2,000
Jumlah Harga Bahan
63,600.00
13,520.00
6,750.00
3,240.00
87,110.00
Peralatan
D
E
F
153,785.00
7,689.25
161,474.25
12
15
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
3
4
Bahan
Plint ubin keramik 10 x 40 cm
Portland Cement
Pasir pasang
Semen warna
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0900
0.0900
0.0090
0.0050
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
5,265.00
5,400.00
585.00
350.00
11,600.00
bh
kg
m3
kg
2.6500
1.2000
0.0030
0.1000
3,906
1,300
150,000
2,000
Jumlah Harga Bahan
10,351.56
1,560.00
450.00
200.00
12,561.56
5%
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.7000
0.3500
0.0350
0.0350
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
40,950.00
21,000.00
2,275.00
2,450.00
66,675.00
B
1
2
3
4
Bahan
Ubin keramik
Portland Cement
Pasir Pasang
Semen warna
m2
kg
m3
kg
1.0600
10.4000
0.0450
1.6200
100,000
1,300
150,000
2,000
Jumlah Harga Bahan
106,000.00
13,520.00
6,750.00
3,240.00
129,510.00
Peralatan
D
E
F
196,185.00
9,809.25
205,994.25
13
17
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.9000
0.4500
0.0450
0.0450
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
52,650.00
27,000.00
2,925.00
3,150.00
85,725.00
B
1
2
3
4
Bahan
Keramik
Portland Cement
Pasir Pasang
Semen warna
m2
kg
m3
kg
1.0600
9.3000
0.0180
1.9400
60,000
1,300
150,000
2,000
Jumlah Harga Bahan
63,600.00
12,090.00
2,700.00
3,880.00
82,270.00
Peralatan
D
E
F
18
167,995.00
8,399.75
176,394.75
5%
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.7000
0.3500
0.0350
0.0350
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
40,950.00
21,000.00
2,275.00
2,450.00
66,675.00
B
1
2
3
Bahan
Batu tempel hitam
Portland Cement
Pasir Pasang
m2
kg
m3
1.1000
11.7500
0.0350
65,000
1,300
150,000
Jumlah Harga Bahan
71,500.00
15,275.00
5,250.00
92,025.00
Peralatan
D
E
F
19
158,700.00
7,935.00
166,635.00
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
3
4
Bahan
List keramik dinding motif
Portland Cement
Pasir Pasang
Semen putih
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.1000
0.0100
0.0500
0.0025
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
5,850.00
600.00
3,250.00
175.00
9,875.00
bh
kg
m3
kg
5.0000
0.4080
0.0009
0.0600
3,500
1,300
150,000
1,750
Jumlah Harga Bahan
17,500.00
530.40
135.00
105.00
18,270.40
28,145.40
1,407.27
29,552.67
14
Uraian
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah Harga Tenaga Kerja
Bahan
Portland Cement
Pasir Pasang
Jumlah Harga Bahan
Peralatan
D
E
F
B
1
2
21
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.3000
0.1500
0.0150
0.0150
58,500
60,000
65,000
70,000
17,550.00
9,000.00
975.00
1,050.00
28,575.00
kg
m3
7.7760
0.0230
1,300
150,000
10,108.80
3,450.00
13,558.80
42,133.80
2,106.69
44,240.49
5%
Uraian
2
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.3000
0.1500
0.0150
0.0150
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
17,550.00
9,000.00
975.00
1,050.00
28,575.00
B
1
2
Bahan
Portland Cement
Pasir Pasang
kg
m3
4.4160
0.0270
1,300
150,000
Jumlah Harga Bahan
5,740.80
4,050.00
9,790.80
Peralatan
D
E
F
22
1.00
0.5000
m1
kg
0.0020
0.0570
0.0380
0.0380
0.0020
m3
oh
oh
oh
oh
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
JUMLAH ( BELUM PPN )
JASA 5%
JUMLAH
DIBULATKAN
38,365.80
1,918.29
40,284.09
5%
@ Rp.
1,300.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
150,000.00
58,500
60,000
65,000
70,000
650.00
300.00
3,334.50
2,280.00
2,470.00
140.00
9,174.50
458.73
9,633.23
9,633.00
15
23 Memasang acian
No
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.2000
0.1000
0.0100
0.0100
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
11,700.00
6,000.00
650.00
700.00
19,050.00
B
1
Bahan
Portland Cement
kg
3.2500
1,300
4,225.00
4,225.00
Peralatan
D
E
F
24
23,275.00
1,163.75
24,438.75
5%
Membuat beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
No
Uraian
Kode
Satuan
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
3
4
Bahan
Portland Cement
Pasir beton
Kerikil beton (maksimum 30 mm)
Air
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
1.6500
0.2750
0.0280
0.0830
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
96,525.00
16,500.00
1,820.00
5,810.00
120,655.00
247.0000
0.6207
0.7400
215.0000
1,300
150,000
150,000
10
Jumlah Harga Bahan
321,100.00
93,105.00
111,000.00
2,150.00
527,355.00
kg
m3
m3
Liter
648,010.00
32,400.50
680,410.50
16
25
Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
No
Uraian
1
2
A
Tenaga
1
Pekerja
2
Tukang batu
3
Kepala tukang
4
Mandor
Jumlah Harga Tenaga Kerja
B
Bahan
1
Portland Cement
2
Pasir beton
3
Kerikil beton (maksimum 30 mm)
4
Air
Kode
Satuan
3
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
1.6500
0.2750
0.0280
0.0830
58,500
60,000
65,000
70,000
96,525.00
16,500.00
1,820.00
5,810.00
120,655.00
371.0000
0.4986
0.7756
215.0000
1,300
150,000
150,000
10
Jumlah Harga Bahan
482,300.00
74,790.00
116,340.00
2,150.00
675,580.00
kg
m3
m3
Liter
796,235.00
39,811.75
836,046.75
17
26
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
0.0700
0.0700
0.0070
0.0040
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
4,095.00
4,200.00
455.00
280.00
9,030.00
B
1
2
Bahan
Besi beton ulir
Kawat beton
kg
kg
10.5000
0.1500
9,000
18,000
Jumlah Harga Bahan
94,500.00
2,700.00
97,200.00
Peralatan
D
E
F
27
106,230.00
5,311.50
111,541.50
11,154.15
5%
Uraian
2
Kode
Satuan
3
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
B
Bahan
1
Kayu kelas III
2
Paku 5 cm - 10 cm
3
Minyak bekisting
Jumlah Harga Bahan
C
Peralatan
Jumlah Harga Peralatan
D
Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )
E
Overhead + Profit
F
Harga Satuan Pekerjaan ( D + E )
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.5200
0.2600
0.0260
0.0260
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
30,420.00
15,600.00
1,690.00
1,820.00
49,530.00
m3
m3
ltr
0.0400
0.3000
0.1000
2,500,000
14,000
5,000
100,000.00
4,200.00
500.00
104,700.00
5%
154,230.00
7,711.50
161,941.50
18
28
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
oh
oh
oh
oh
0.5200
0.2600
0.0260
0.0260
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
30,420.00
15,600.00
1,690.00
1,820.00
49,530.00
B
1
2
3
Bahan
Kayu kelas III
Paku 5 cm - 10 cm
Minyak bekisting
m3
m3
ltr
0.0225
0.1500
0.0500
2,500,000
14,000
5,000
Jumlah Harga Bahan
56,250.00
2,100.00
250.00
58,600.00
Peralatan
D
E
F
29
108,130.00
5,406.50
113,536.50
5%
Uraian
2
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
oh
oh
oh
oh
0.6600
0.3300
0.0330
0.0330
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
38,610.00
19,800.00
2,145.00
2,310.00
62,865.00
B
1
2
3
4
5
Bahan
Kayu kelas III
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
m3
m3
ltr
m3
lbr
0.0200
0.2000
0.1000
0.0075
0.1750
2,500,000
14,000
5,000
2,500,000
60,000
50,000.00
2,800.00
500.00
18,750.00
10,500.00
btg
Peralatan
D
E
F
82,550.00
145,415.00
7,270.75
152,685.75
19
30
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
oh
oh
oh
oh
0.6600
0.3300
0.0330
0.0330
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
38,610.00
19,800.00
2,145.00
2,310.00
62,865.00
B
1
2
3
4
5
Bahan
Kayu kelas III
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
m3
m3
ltr
m3
lbr
0.0200
0.2000
0.1000
0.0090
0.1750
2,500,000
14,000
5,000
2,500,000
60,000
50,000.00
2,800.00
500.00
22,500.00
10,500.00
btg
1.0000
Peralatan
D
E
F
86,300.00
31
149,165.00
7,458.25
156,623.25
5%
Uraian
2
Kode
Satuan
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
B
1
2
3
4
5
Bahan
Kayu kelas III
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.6600
0.3300
0.0330
0.0330
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
38,610.00
19,800.00
2,145.00
2,310.00
62,865.00
m3
m3
ltr
m3
lbr
0.0400
0.4000
0.2000
0.0150
0.3500
2,500,000
14,000
5,000
2,500,000
60,000
100,000.00
5,600.00
1,000.00
37,500.00
21,000.00
btg
6.0000
165,100.00
227,965.00
11,398.25
239,363.25
20
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
5
6
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
oh
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
58,500
60,000
60,000
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
10,530.00
1,200.00
1,200.00
1,200.00
390.00
630.00
15,150.00
B
1
2
3
4
5
6
7
Bahan
Kayu kelas III
Paku 5 cm - 12 cm
Besi beton polos
Kawat beton
Portland Cement
Pasir beton
Kerikil beton
m3
m3
kg
kg
kg
m3
m3
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
2,500,000
14,000
9,000
18,000
1,300
150,000
150,000
Jumlah Harga Bahan
5,000.00
140.00
27,000.00
810.00
5,200.00
900.00
1,350.00
40,400.00
Peralatan
D
E
F
33
55,550.00
2,777.50
58,327.50
5%
Uraian
2
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
5
6
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
oh
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
58,500
60,000
60,000
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
17,374.50
1,980.00
1,980.00
1,980.00
650.00
1,050.00
25,014.50
B
1
2
3
4
5
6
7
Bahan
Kayu kelas III
Paku 5 cm - 12 cm
Besi beton polos
Kawat beton
Portland Cement
Pasir beton
Kerikil beton
m3
m3
kg
kg
kg
m3
m3
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
2,500,000
14,000
9,000
18,000
1,300
150,000
150,000
Jumlah Harga Bahan
7,500.00
280.00
32,400.00
900.00
7,150.00
1,350.00
2,250.00
51,830.00
Peralatan
D
E
F
76,844.50
3,842.23
80,686.73
21
Uraian
Kode
Satuan
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
Bahan
Scafolding
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
2.2000
3.5000
0.3500
0.1200
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
128,700.00
210,000.00
22,750.00
8,400.00
369,850.00
unit
32.0000
2,500
Jumlah Harga Bahan
80,000.00
80,000.00
35
36
449,850.00
22,492.50
472,342.50
5%
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
2,500
58,500
60,000
65,000
70,000
20,000.00
32,175.00
52,500.00
5,687.50
2,100.00
112,462.50
5,623.13
118,085.63
118,085.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
2,500
58,500.00
60,000.00
65,000.00
70,000.00
40,000.00
64,350.00
105,000.00
11,375.00
4,200.00
224,925.00
11,246.25
236,171.25
236,171.00
@ Rp.
58,500
5,850.00
5,850.00
292.50
6,142.50
6,142.00
1 M2 PEMBONGKARAN BEGESTING
37
38
Pekerja
JUMLAH ( BELUM PPN )
JASA 5%
JUMLAH
DIBULATKAN
0.1 oh
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0100
0.5000
0.0100
0.0050
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
585.00
30,000.00
650.00
350.00
31,585.00
B
1
Bahan
espanolette tanam
bh
1.0000
150,000
Jumlah Harga Bahan
150,000.00
150,000.00
Peralatan
D
E
F
39
181,585.00
9,079.25
190,664.25
5%
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0050
0.5000
0.0050
0.0003
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
292.50
30,000.00
325.00
17.50
30,635.00
B
1
Bahan
Kunci silinder
bh
1.0000
75,000
Jumlah Harga Bahan
75,000.00
75,000.00
Peralatan
22
40
D
E
F
Lockase
No
Uraian
Kode
105,635.00
5,281.75
110,916.75
5%
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0050
0.5000
0.0050
0.0003
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
292.50
30,000.00
325.00
17.50
30,635.00
B
1
Bahan
Lockase
bh
1.0000
120,000
Jumlah Harga Bahan
120,000.00
120,000.00
Peralatan
D
E
F
41
150,635.00
7,531.75
158,166.75
5%
No
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0150
0.1500
0.0150
0.0008
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
877.50
9,000.00
975.00
52.50
10,905.00
B
1
Bahan
Engsel pintu
bh
1.0000
30,000
Jumlah Harga Bahan
30,000.00
30,000.00
Peralatan
D
E
F
40,905.00
2,045.25
42,950.25
23
42
Rambuncis
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
B
1
Bahan
Spring knip
bh
Peralatan
D
E
F
0.0150
0.1500
0.0150
0.0008
1.0000
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
877.50
9,000.00
975.00
52.50
10,905.00
25,000
Jumlah Harga Bahan
25,000.00
25,000.00
43
35,905.00
1,795.25
37,700.25
5%
Casment
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0150
0.1500
0.0150
0.0008
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
877.50
9,000.00
975.00
52.50
10,905.00
B
1
Bahan
Casment
bh
1.0000
35,000
Jumlah Harga Bahan
35,000.00
35,000.00
Peralatan
D
E
F
44
45,905.00
2,295.25
48,200.25
5%
Slot pintu
No
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0200
0.2000
0.0200
0.0010
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
1,170.00
12,000.00
1,300.00
70.00
14,540.00
B
1
Bahan
Kunci selot
bh
1.0000
150,000
Jumlah Harga Bahan
150,000.00
150,000.00
Peralatan
D
E
F
164,540.00
8,227.00
172,767.00
24
45
Handel
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0200
0.2000
0.0200
0.0010
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
1,170.00
12,000.00
1,300.00
70.00
14,540.00
B
1
Bahan
Handel pintu
bh
1.0000
350,000
Jumlah Harga Bahan
350,000.00
350,000.00
Peralatan
D
E
F
46
364,540.00
18,227.00
382,767.00
5%
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0150
0.1500
0.0150
0.0008
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
877.50
9,000.00
975.00
52.50
10,905.00
B
1
Bahan
Kaca polos
m2
1.1000
80,000
Jumlah Harga Bahan
88,000.00
88,000.00
Peralatan
D
E
F
5%
47 Kloset jongkok
No
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
3
Bahan
Kloset jongkok porselen
Portland Cement
Pasir pasang
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
1.0000
1.5000
1.5000
0.1600
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
58,500.00
90,000.00
97,500.00
11,200.00
257,200.00
bh
kg
m3
1.0000
6.0000
0.0100
150,000
1,300
150,000
Jumlah Harga Bahan
150,000.00
7,800.00
1,500.00
159,300.00
416,500.00
20,825.00
437,325.00
25
Uraian
Kode
1
2
A
Tenaga
1
Pekerja
2
Tukang batu
3
Kepala tukang batu
4
Mandor
5
Tukang Gali
Jumlah Harga Tenaga Kerja
B
Bahan
1
Batu bata
2
Portland Cement
3
Pasir pasang
4
Batu kerikil
5
Besi beton
6
Pasir beton
Peralatan
D
E
F
Satuan
Koefisien
oh
oh
oh
oh
oh
2.1600
0.7200
0.0720
0.1080
0.1000
bh
kg
m3
m3
kg
m3
222.0000
114.0000
0.1840
0.0330
4.8500
0.1200
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
58,500
60,000
65,000
70,000
58,500
126,360.00
43,200.00
4,680.00
7,560.00
5,850.00
187,650.00
600
1,300
150,000
150,000
9,000
150,000
Jumlah Harga Bahan
133,200.00
148,200.00
27,600.00
4,950.00
43,650.00
18,000.00
375,600.00
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
Bahan
Pipa PVC
Harga pipa (Perlengkapan)
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0360
0.0600
0.0060
0.0018
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
2,106.00
3,600.00
390.00
126.00
6,222.00
m1
x
1.2000
0.3500
9,750
9,750
Jumlah Harga Bahan
11,700.00
3,412.50
15,112.50
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
Bahan
Pipa PVC
Harga pipa (Perlengkapan)
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0360
0.0600
0.0060
0.0018
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
2,106.00
3,600.00
390.00
126.00
6,222.00
m1
x
1.2000
0.3500
8,000
8,000
Jumlah Harga Bahan
9,600.00
2,800.00
12,400.00
18,622.00
931.10
19,553.10
26
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
Bahan
Pipa PVC
Harga pipa (Perlengkapan)
Peralatan
D
E
F
Satuan
Koefisien
oh
oh
oh
oh
m1
x
0.0810
0.1350
0.0135
0.0041
1.2000
0.3500
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
4,738.50
8,100.00
877.50
287.00
14,003.00
21,750
21,750
Jumlah Harga Bahan
26,100.00
7,612.50
33,712.50
5%
Uraian
Kode
1
2
A
Tenaga
1
Pekerja
2
Kepala tukang batu
3
Tukang batu
4
Mandor
Jumlah Harga Tenaga Kerja
B
Bahan
1
Pipa PVC
2
Harga pipa (Perlengkapan)
Jumlah Harga Bahan
C
Peralatan
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0810
0.1350
0.0135
0.0041
58,500
65,000
60,000
70,000
4,738.50
8,775.00
810.00
287.00
14,610.50
m1
x
1.2000
0.3500
33,750
33,750
40,500.00
11,812.50
52,312.50
66,923.00
3,346.15
70,269.15
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
2
Bahan
Kran air
Seal tape
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0100
0.1000
0.0100
0.0050
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
585.00
6,000.00
650.00
350.00
7,585.00
bh
bh
1.0000
0.0250
35,000
2,500
Jumlah Harga Bahan
35,000.00
62.50
35,062.50
42,647.50
2,132.38
44,779.88
27
Uraian
Kode
1
A
1
2
3
2
Tenaga
Tukang gali sumur
Pekerja
Mandor
B
1
2
Bahan
Buis beton D. 80 cm
Ijuk
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
1.0000
0.7350
0.0735
58,500
58,500
70,000
Jumlah Harga Tenaga Kerja
58,500.00
42,997.50
5,145.00
106,642.50
bh
m3
2.0000
0.0150
90,000
180,000.00
180,000.00
5%
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
Tenaga
Pekerja
Mandor
oh
oh
0.06300
0.00210
58,500
70,000
Jumlah Harga Tenaga Kerja
3,685.50
147.00
3,832.50
B
1
2
3
Bahan
Memasang buis beton 80 dengan ijuk
Urugan batu koral tebal 15 cm
Urugan pasir tebal 20 cm
m1
m3
m3
3.0000
0.0900
0.1200
300,975
150,000
150,000
Jumlah Harga Bahan
902,923.88
13,500.00
18,000.00
934,423.88
Peralatan
D
E
F
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang batu
Mandor
B
1
Bahan
Floor drain
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.0100
0.1000
0.0100
0.0050
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
585.00
6,000.00
650.00
350.00
7,585.00
bh
1.0000
50,000
Jumlah Harga Bahan
50,000.00
50,000.00
57,585.00
2,879.25
60,464.25
28
No
Kode
Satuan
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang khusus alluminium
Kepala tukang
Mandor
B
1
2
3
Bahan
Profil alluminium
Skrup fixer
Sealant
Peralatan
D
E
F
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
oh
oh
oh
oh
0.0430
0.0430
0.0043
0.0021
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
2,515.50
2,580.00
279.50
147.00
5,522.00
m1
Buah
Tube
1.1000
2.0000
0.0600
90,000
150
35,000
Jumlah Harga Bahan
99,000.00
300.00
2,100.00
101,400.00
58
106,922.00
5,346.10
112,268.10
5%
Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang Cat
Kepala tukang
Mandor
oh
oh
oh
oh
0.0700
0.1050
0.0040
0.0025
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
4,095.00
6,300.00
260.00
175.00
10,830.00
B
1
2
3
4
Bahan
Cat meni
Plamir
Cat dasar
Cat penutup
kg
kg
kg
kg
0.2000
0.1500
0.1700
0.3500
10,000
10,000
40,000
40,000
Jumlah Harga Bahan
2,000.00
1,500.00
6,800.00
14,000.00
24,300.00
Peralatan
D
E
F
59
35,130.00
1,756.50
36,886.50
5%
Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
No
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang Cat
Kepala tukang
Mandor
oh
oh
oh
oh
0.0200
0.0630
0.0063
0.0025
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
1,170.00
3,780.00
409.50
175.00
5,534.50
B
1
2
3
Bahan
Plamir tembok
Cat dasar
Cat penutup 2 x
kg
kg
kg
0.1000
0.1000
0.2600
10,000
20,000
20,000
Jumlah Harga Bahan
1,000.00
2,000.00
5,200.00
8,200.00
Peralatan
D
E
F
13,734.50
686.73
14,421.23
29
60
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga Kerja
Tukang cat
Kepala tukang cat
Pekerja
Mandor
oh
oh
oh
oh
0.0630
0.0063
0.0200
0.0025
60,000
65,000
58,500
70,000
Jumlah Harga Tenaga Kerja
3,780.00
409.50
1,170.00
175.00
5,534.50
B
1
2
Bahan
Cat alkali resisting primer
Cat ICI Weathershield
kg
kg
0.1000
0.3600
25,000
30,000
Jumlah Harga Bahan
2,500.00
10,800.00
13,300.00
Peralatan
D
E
F
5%
B.
Uraian
TENAGA
Pekerja
Tukang cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Cat dasar
Cat penutup
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Profit
Harga Satuan Pekerjaan (D+E)
Satuan
Koefisien
Jumlah Harga
(Rp)
OH
OH
OH
OH
0.028
0.042
0.004
0.003
58,500
60,000
65,000
70,000
JUMLAH TENAGA KERJA
1,638.00
2,520.00
273.00
210.00
4,641.00
kg
kg
0.100
0.260
20,000
20,000
JUMLAH HARGA BAHAN
2,000.00
5,200.00
7,200.00
62
11,841.00
592.05
12,433.05
5%
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang kayu
Kepala tukang Batu
Mandor
B
1
Bahan
Genteng keramik
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.3000
0.1000
0.0100
0.0150
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
17,550.00
6,000.00
650.00
1,050.00
25,250.00
bh
14.5000
9,750
Jumlah Harga Bahan
141,375.00
141,375.00
166,625.00
8,331.25
174,956.25
30
63
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang kayu
Kepala tukang Batu
Mandor
B
1
2
3
4
Bahan
Bubungan gent.krmk KIA warna
Kapur padam
Pasir pasang
Portland Cement
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.4000
0.2000
0.0200
0.0200
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
23,400.00
12,000.00
1,300.00
1,400.00
38,100.00
bh
m3
m3
kg
4.0000
0.0152
0.0152
1.5240
22,000
120,000
150,000
1,300
Jumlah Harga Bahan
88,000.00
1,824.00
2,280.00
1,981.20
94,085.20
5%
64 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
No
Uraian
2
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
oh
oh
oh
oh
6.0000
18.0000
1.8000
0.3000
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
351,000.00
1,080,000.00
117,000.00
21,000.00
1,569,000.00
B
1
2
3
Bahan
Balok kayu kamper
Paku 10 cm
Lem kayu
m3
kg
kg
1.2000
1.2500
1.0000
7,500,000
14,000
10,000
Jumlah Harga Bahan
9,000,000.00
17,500.00
10,000.00
9,027,500.00
Peralatan
D
E
F
65
10,596,500.00
529,825.00
11,126,325.00
5%
m'
m2
@ Rp.
@ Rp.
170,000.00
103,850.25
680,000.00
103,850.25
0.25
0.025
0.00125
Oh
Oh
Oh
tk alumunium
Pekerja
Mandor
@ Rp.
@ Rp.
@ Rp.
60,000.00
58,500.00
70,000.00
15,000.00
1,462.50
87.50
800,400.25
40,020.01
840,420.26
840,420.00
Jumlah
Jasa pelaksanaan 5%
Jumlah
Dibulatkan
31
m'
m2
@ Rp.
@ Rp.
170,000.00
103,850.25
680,000.00
103,850.25
0.25
0.025
0.00125
Oh
Oh
Oh
tk alumunium
Pekerja
Mandor
@ Rp.
@ Rp.
@ Rp.
60,000
58,500
70,000
15,000.00
1,462.50
87.50
800,400.25
40,020.01
840,420.26
840,420.00
Jumlah
Jasa pelaksanaan 5%
Jumlah
Dibulatkan
67 1 M2 DAUN PINTU DOUBLE SUNKAI WOOD 4MM RAM ALUMUNIUM
4
2.000
0.300
m'
lbr
kg
@ Rp.
@ Rp.
@ Rp.
170,000.00
85,000.00
10,000.00
680,000.00
170,000.00
3,000.00
2.000
0.200
0.600
0.030
Oh
Oh
Oh
Oh
Tk kayu
Kepala tk. Kayu
Pekerja
Mandor
Jumlah
Jasa pelaksanaan 5%
Jumlah
Dibulatkan
@ Rp.
@ Rp.
@ Rp.
@ Rp.
60,000.00
65,000.00
58,500.00
70,000.00
120,000.00
13,000.00
35,100.00
2,100.00
1,023,200.00
51,160.00
1,074,360.00
1,074,360.00
m'
m2
@ Rp.
@ Rp.
170,000.00
103,850.25
680,000.00
103,850.25
0.25
0.025
0.00125
Oh
Oh
Oh
tk alumunium
Pekerja
Mandor
@ Rp.
@ Rp.
@ Rp.
60,000.00
58,500.00
70,000.00
15,000.00
1,462.50
87.50
800,400.25
40,020.01
840,420.26
840,420.00
112,268.10
11,126,325.00
1,074,360.00
42,950.25
110,916.75
172,767.00
158,166.75
561,340.50
81,778.49
1,579,309.20
128,850.75
110,916.75
172,767.00
158,166.75
2793129.43875
2,793,129.00
Jumlah
Jasa pelaksanaan 5%
Jumlah
Dibulatkan
69 1 UNIT PINTU P2
5.000
0.007
1.47
3
1
1
1
m'
m3
m2
bh
bh
set
bh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Jumlah
Dibulatkan
32
70 1 UNIT PINTU P1
8.000
2.94
0.7
6
1
2
1
1
4
2
m'
m2
m2
bh
bh
set
bh
bh
bh
bh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Jumlah
Dibulatkan
112,268.10
1,074,360.00
840,420.00
42,950.25
110,916.75
382,767.00
158,166.75
190,664.25
48,200.25
37,700.25
898,144.80
3,158,618.40
588,294.00
257,701.50
110,916.75
765,534.00
158,166.75
190,664.25
192,801.00
75,400.50
6396241.95
6,396,241.00
71 1 UNIT J1
10.050
1.5
0.6
4
2
4
2
m'
m2
m2
bh
bh
bh
bh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Jumlah
Dibulatkan
112,268.10
840,420.00
840,420.00
48,200.25
37,700.25
48,200.25
37,700.25
1,128,294.41
1,260,630.00
504,252.00
192,801.00
75,400.50
192,801.00
75,400.50
3429579.405
3,429,579.00
72 1 UNIT BV 1
2.300
0.21
2
1
m'
m2
bh
bh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Jumlah
Dibulatkan
112,268.10
840,420.00
48,200.25
37,700.25
258,216.63
176,488.20
96,400.50
37,700.25
568805.58
568,805.00
73 1 UNIT BV2
2.400
0.36
m'
m2
@ Rp.
@ Rp.
Jumlah
Dibulatkan
112,268.10
103,850.25
269,443.44
37,386.09
1482140.36
1,482,140.00
m'
m'
ls
ls
Lisplank GRC
Lisplank GRC
perlengkapan
Upah pekerja
JUMLAH ( BELUM PPN )
JASA 5%
JUMLAH
DIBULATKAN
25,000.00
1,500.00
5,000.00
25,000.00
1,500.00
5,000.00
31,500.00
1,575.00
33,075.00
33,075.00
74
1.00
1.0000
1.0000
1.0000
@ Rp.
@ Rp.
@ Rp.
33
75
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang Cat
Kepala tukang Cat
Mandor
oh
oh
oh
oh
0.0200
0.0630
0.0063
0.0025
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
1,170.00
3,780.00
409.50
175.00
5,534.50
B
1
2
Bahan
Elastic Waterproof
Fiber
kg
m
1.0000
1.0000
65,000
65,000.00
65,000.00
Peralatan
D
E
F
76
70,534.50
3,526.73
74,061.23
5%
Pasang saklar
No
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
Tenaga Kerja
Tukang Listrik
Pekerja
Mandor
oh
oh
oh
0.0500
0.0500
0.0050
60,000
58,500
70,000
Jumlah Harga Tenaga Kerja
3,000.00
2,925.00
350.00
6,275.00
B
1
2
Bahan
Saklar Engkel
Asesoris (t doos, isolasi)
bh
x
1.0000
0.3500
17,000
17,000
Jumlah Harga Bahan
17,000.00
5,950.00
22,950.00
Peralatan
D
E
F
29,225.00
1,461.25
30,686.25
34
77
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
Tenaga Kerja
Tukang Listrik
Pekerja
Mandor
oh
oh
oh
0.0500
0.0500
0.0050
60,000
58,500
70,000
Jumlah Harga Tenaga Kerja
3,000.00
2,925.00
350.00
6,275.00
B
1
2
Bahan
Saklar Engkel
Asesoris (t doos, isolasi)
bh
x
1.0000
0.3500
22,000
22,000
Jumlah Harga Bahan
22,000.00
7,700.00
29,700.00
Peralatan
D
E
F
78
35,975.00
1,798.75
37,773.75
5%
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
Tenaga
Tukang Listrik
Pekerja
Mandor
oh
oh
oh
0.0500
0.0500
0.0050
60,000
58,500
70,000
Jumlah Harga Tenaga Kerja
3,000.00
2,925.00
350.00
6,275.00
B
1
2
Bahan
Stop Kontak
Asesoris (t doos, isolasi)
bh
x
1.0000
0.3500
17,000
17,000
Jumlah Harga Bahan
17,000.00
5,950.00
22,950.00
Peralatan
D
E
F
79
29,225.00
1,461.25
30,686.25
5%
Uraian
2
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
Tenaga
Tukang Listrik
Pekerja
Mandor
oh
oh
oh
0.0500
0.0500
0.0050
60,000
58,500
70,000
Jumlah Harga Tenaga Kerja
3,000.00
2,925.00
350.00
6,275.00
B
1
2
Bahan
Stop Kontak
Asesoris (t doos, isolasi)
bh
x
1.0000
0.3500
17,000
17,000
Jumlah Harga Bahan
17,000.00
5,950.00
22,950.00
Peralatan
D
E
F
29,225.00
1,461.25
30,686.25
35
80
Uraian
Kode
Satuan
3
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
1
A
1
2
3
4
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
0.0900
0.0300
0.0030
0.0045
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
5,265.00
1,800.00
195.00
315.00
7,575.00
B
1
2
3
Bahan
Bata merah
Portland Cement
Pasir Pasang
bh
kg
m3
17.0000
4.9425
0.0137
600
1,300
150,000
Jumlah Harga Bahan
10,200.00
6,425.25
2,055.00
18,680.25
Peralatan
D
E
F
81
26,255.25
1,312.76
27,568.01
5.00%
Pasang conblock tipe segi-enam besar abu-abu 6 cm, K-200, tebal pasir 5 cm
No
Uraian
Kode
1
A
1
2
3
4
2
Tenaga
Pekerja
Tukang batu
Kepala tukang Batu
Mandor
B
1
2
Bahan
Conblock
Pasir urug
Peralatan
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Satuan
Koefisien
oh
oh
oh
oh
0.5000
0.2500
0.0250
0.0250
58,500
60,000
65,000
70,000
Jumlah Harga Tenaga Kerja
29,250.00
15,000.00
1,625.00
1,750.00
47,625.00
m2
m3
1.0000
0.0500
50,000
125,000
Jumlah Harga Bahan
50,000.00
6,250.00
56,250.00
82
1.00
6.82
0.27
18.79
37.58
13.92
8.10
0.32
0.47
unit
m3
m3
m2
m2
m'
m'
m3
m3
103,875.00
5,193.75
109,068.75
5%
Pekerjaan septictank
Galian tanah
Urug pasir bawah beton
Pasangan batu bata 1:3
Plesteran tasram 1:3
Kolom praktis
Ring praktis
Plat penutup septicktank
Cor beton lantai septicktank
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
-
36
83
1.00
1.00
71.89
8.33
0.27
84
m3
m3
kg
m2
m2
1.00
1.00
43.14
5.00
0.27
Beton
Besi
Begesting
Bongkar begesting
JUMLAH ( BELUM TERMASUK PPN )
JASA 5%
JUMLAH
DIBULATKAN
m3
m3
kg
m2
m2
@ Rp.
@ Rp.
@ Rp.
@ Rp.
-
37
SATUAN
m3
m3
m3
m3
m3
m3
m3
bj
m3
kg
kg
kg
kg
dos
dos
m2
bh
bh
m2
m2
m3
m3
m3
m3
m3
m2
lbr
lbr
m'
m2
bh
bh
bh
bh
btg
btg
btg
btg
bh
bh
kg
m3
kg
Bungkus
lbr
roll
m1
lbr
m2
kg
kg
kg
kg
kg
HARGA ( Rp )
125,000
125,000
150,000
150,000
150,000
150,000
150,000
600
40,000
1,300
2,000
1,750
10,000
65,000
60,000
62,500
3,906
3,500
100,000
65,000
7,500,000
2,500,000
2,500,000
2,750,000
2,000,000
30,000
60,000
85,000
25,000
150,000
35,000
2,500
50,000
8,000
9,750
21,750
33,750
9,750
22,000
120,000
4,000
12,000
55,000
12,500
4,000
80,000
80,000
40,000
35,000
20,000
30,000
55,000
38
URAIAN BAHAN
Plamur Fuji
Plamur kayu
Cat alkali resisting primer
Coating batu alam
Besi beton polos
Minyak begesting
Scafolding
Kawat beton / bindrat
Kawat penggantung rangka hollow
Wiremash
Pipa hollow 2 x 4 cm tebal 0,3mm
Pipa hollow 4 x 4 cm tebal 0,3mm
Kusen alumunium 4"
frame alumunium
Buis beton bulat dia. 80 cm P=0,50 m
Tipe segi enam besar tebal = 6 cm K 200
Ijuk
Paku
Paku gording 100 x 4,2 mm
Paku usuk 80 x 3,8 mm
Paku 10 cm
Paku skrup
Sekrup fixer
Sealent
Espangolate tanam
Kunci silinder
Lockase
Engsel pintu
Rambuncis
Casment
Slot pintu
Handel pintu
Saklar engkel
Saklar engkel seri
Stop kontak
Stop kontak FAN
Roster beton
Mustoko
Tulisan stainles steell MASJID ALFALAH
Tandon air 1000 liter sekualitas Pinguin
LAMPU PLC-18W+FITING
LAMPU PLC-13W+FITING
MCB+BOX
MIXER AMPLIFIER 120W sekualitas TOA
POWER AMPLIFIER 120W sekualitas TOA
SELECTOR SWITCH 5 TAP
PAGING MICROPHONE
INSTALASI TITIK TATA SUARA
INSTALASI TITIK OUTLET DYNAMIC MICROPHONE (CABLE
MICROPHONE) + OUTLET MICROPHONE
CEILING SPEAKER 6W
COLUMN SPEAKER 10W
Instalasi titik lampu
Instalasi titik stop kontak
Instalasi titik stop kontak FAN
Kipas angin
Karpet tebal 0,8 cm
SATUAN
kg
kg
kg
m2
kg
m2
unit
kg
m1
kg
m1
m1
m1
m1
bh
m2
kg
kg
kg
kg
kg
kg
bh
tube
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ls
bh
bh
bh
bh
unit
unit
unit
unit
titik
HARGA ( Rp )
10,000
10,000
25,000
25,000
9,000
5,000
2,500
18,000
1,000
12,000
6,000
8,000
90,000
170,000
90,000
50,000
14,000
14,000
15,000
14,000
18,000
150
35,000
150,000
75,000
120,000
30,000
25,000
35,000
150,000
350,000
17,000
22,000
17,000
25,000
15,000.00
5,000,000.00
2,500,000.00
2,750,000.00
110,000.00
85,000.00
500,000.00
2,000,000.00
2,000,000.00
500,000.00
600,000.00
200,000.00
titik
unit
unit
250,000.00
150,000.00
650,000.00
titik
titik
titik
bh
m2
200,000.00
225,000.00
225,000.00
250,000.00
200,000.00
39
ls
liter
ls
2,500,000.00
10.00
3,500,000.00
40
Satuan
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
41
Pekerjaan
Instansi
Anggaran
: 2016
Lokasi
: KOTA YOGYAKARTA
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Rp
JUMLAH HARGA
PROSENTASE
(Rp)
(%)
2,298,635.75
0.33
Bulan 1
Bulan 2
Bulan 3
Bulan 4
Bulan 5
mggu 1
mggu 2
mggu 3
mggu 4
mggu 5
mggu 6
mggu 7
mggu 8
mggu 9
mggu 10
mggu 11
mggu 12
mggu 13
mggu 14
mggu 15
mggu 16
mggu 17
mggu 18
mggu 19
mggu 20
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
2 hari
KETERANGAN
0.33
100%
II
Rp
19,188,068.72
2.79
III
Rp
136,690,381.89
19.86
IV
PEKERJAAN BETON
Rp
176,258,700.93
25.61
Rp
86,234,903.00
12.53
VI
PEKERJAAN LANTAI
Rp
117,426,051.14
17.06
VII
PEKERJAAN PLAFOND
Rp
18,537,486.87
2.69
VIII
Rp
89,227,140.29
12.97
IX
PEKERJAAN CAT-CATAN
Rp
17,127,504.17
2.49
Rp
10,246,638.57
1.49
XI
Rp
7,349,555.00
1.07
XII
Rp
7,600,000.00
1.10
688,185,066.32
100.00
0.93
0.93
0.93
: Minggu K-20 = 2 Hari Kalender
5.12
5.12
5.12
2.84
2.84
5.12
5.12
2.84
2.84
2.84
2.84
3.13
4.32
4.32
Jumlah
2.84
3.13
3.13
3.13
4.27
4.27
4.27
4.27
0.90
0.90
0.90
0.75
0.75
0.50
0.50
0.50
0.36
0.36
0.55
0.55
4.32
0.50
0.36
50%
0.49
0%
0.33
0.93
0.93
2.84
5.12
6.05
5.12
7.96
7.96
7.16
7.16
7.16
5.97
7.40
7.40
8.79
6.27
3.05
1.90
0.49
0.33
1.26
2.19
5.03
10.15
16.20
21.33
29.29
37.25
44.41
51.57
58.72
64.70
72.09
79.49
88.28
94.55
97.61
99.51
100.00
KEMAJUAN MINGGUAN
KEMAJUAN KOMULATIF
Yogyakarta, 1 April 2016
Dibuat,
CV. PUTERA SUPARDI
Pekerjaan
Instansi
Anggaran
: 2016
Lokasi
: KOTA YOGYAKARTA
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Rp
JUMLAH HARGA
PROSENTASE
(Rp)
(%)
2,298,635.75
0.33
Bulan 1
Bulan 2
Bulan 3
Bulan 4
Bulan 5
mggu 1
mggu 2
mggu 3
mggu 4
mggu 5
mggu 6
mggu 7
mggu 8
mggu 9
mggu 10
mggu 11
mggu 12
mggu 13
mggu 14
mggu 15
mggu 16
mggu 17
mggu 18
mggu 19
mggu 20
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
2 hari
KETERANGAN
0.33
100%
II
Rp
19,188,068.72
2.79
III
Rp
136,690,381.89
19.86
IV
PEKERJAAN BETON
Rp
176,258,700.93
25.61
Rp
86,234,903.00
12.53
VI
PEKERJAAN LANTAI
Rp
117,426,051.14
17.06
VII
PEKERJAAN PLAFOND
Rp
18,537,486.87
2.69
VIII
Rp
89,227,140.29
12.97
IX
PEKERJAAN CAT-CATAN
Rp
17,127,504.17
2.49
Rp
10,246,638.57
1.49
XI
Rp
7,349,555.00
1.07
XII
Rp
7,600,000.00
1.10
0.93
0.93
0.93
: Minggu K-20 = 2 Hari Kalender
688,185,066.32
5.12
5.12
5.12
2.84
2.84
5.12
5.12
2.84
2.84
2.84
2.84
3.13
4.32
4.32
Jumlah
2.84
3.13
3.13
3.13
4.27
4.27
4.27
4.27
0.90
0.90
0.90
0.75
0.75
0.50
0.50
0.50
0.36
0.36
0.55
0.55
4.32
0.50
0.36
50%
0.49
0%
100.00
0.33
0.93
0.93
2.84
5.12
6.05
5.12
7.96
7.96
7.16
7.16
7.16
5.97
7.40
7.40
8.79
6.27
3.05
1.90
0.49
0.33
1.26
2.19
5.03
10.15
16.20
21.33
29.29
37.25
44.41
51.57
58.72
64.70
72.09
79.49
88.28
94.55
97.61
99.51
100.00
KEMAJUAN MINGGUAN
KEMAJUAN KOMULATIF
Yogyakarta, 1 April 2016
Dibuat,
CV. PUTERA SUPARDI
Pekerjaan
Instansi
Anggaran
: 2016
Lokasi
: Pantai BARU
NO.
URAIAN PEKERJAAN
PROSENTASE
(%)
PEKERJAAN PERSIAPAN
0.33
II
PEKERJAAN LANTAI 1
2.79
Bulan 1
Bulan 2
Bulan 3
Bulan 4
Bulan 5
Bulan 6
mggu 1
mggu 2
mggu 3
mggu 4
mggu 5
mggu 6
mggu 7
mggu 8
mggu 9
mggu 10
mggu 11
mggu 12
mggu 13
mggu 14
mggu 15
mggu 18
mggu 19
mggu 20
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
7 hari
0.33
0.93
0.93
0.93
19.86
2.84
2.84
2.84
5.12
5.12
2.84
2.84
2.84
2.84
- PEKERJAAN BETON
- PEKERJAAN KUSEN, PINTU DAN JENDELA
25.61
5.12
5.12
5.12
12.53
3.13
3.13
3.13
4.27
4.27
- PEKERJAAN CAT
- PEKERJAAN MEKANIKAL
17.06
- PEKERJAAN ELEKTRIKAL
III
PEKERJAAN LANTAI 2 - 10
2.69
0.90
12.97
4.32
4.32
4.32
- PEKERJAAN BETON
- PEKERJAAN KUSEN, PINTU DAN JENDELA
2.49
0.75
0.50
1.49
0.50
0.50
1.07
0.36
0.36
1.10
0.55
0.55
0.49
100.00
0.33
0.93
0.93
2.84
5.12
6.05
5.12
7.96
7.96
7.16
7.16
7.16
5.97
7.40
7.40
3.05
1.90
0.49
0.33
1.26
2.19
5.03
10.15
16.20
21.33
29.29
37.25
44.41
51.57
58.72
64.70
72.09
79.49
97.61
99.51
100.00
KEMAJUAN MINGGUAN
KEMAJUAN KOMULATIF
KETERANGAN
100%
50%
0%
SUTRISNO
Direktur